KR20050019409A - Arrangement and Fit-up machine for joing fing frame to unit - Google Patents
Arrangement and Fit-up machine for joing fing frame to unit Download PDFInfo
- Publication number
- KR20050019409A KR20050019409A KR1020030057162A KR20030057162A KR20050019409A KR 20050019409 A KR20050019409 A KR 20050019409A KR 1020030057162 A KR1020030057162 A KR 1020030057162A KR 20030057162 A KR20030057162 A KR 20030057162A KR 20050019409 A KR20050019409 A KR 20050019409A
- Authority
- KR
- South Korea
- Prior art keywords
- ring frame
- mounting
- cover
- ring
- short pipe
- Prior art date
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B23—MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
- B23K—SOLDERING OR UNSOLDERING; WELDING; CLADDING OR PLATING BY SOLDERING OR WELDING; CUTTING BY APPLYING HEAT LOCALLY, e.g. FLAME CUTTING; WORKING BY LASER BEAM
- B23K37/00—Auxiliary devices or processes, not specially adapted to a procedure covered by only one of the preceding main groups
- B23K37/04—Auxiliary devices or processes, not specially adapted to a procedure covered by only one of the preceding main groups for holding or positioning work
- B23K37/047—Auxiliary devices or processes, not specially adapted to a procedure covered by only one of the preceding main groups for holding or positioning work moving work to adjust its position between soldering, welding or cutting steps
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B23—MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
- B23K—SOLDERING OR UNSOLDERING; WELDING; CLADDING OR PLATING BY SOLDERING OR WELDING; CUTTING BY APPLYING HEAT LOCALLY, e.g. FLAME CUTTING; WORKING BY LASER BEAM
- B23K37/00—Auxiliary devices or processes, not specially adapted to a procedure covered by only one of the preceding main groups
- B23K37/02—Carriages for supporting the welding or cutting element
- B23K37/0294—Transport carriages or vehicles
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B23—MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
- B23K—SOLDERING OR UNSOLDERING; WELDING; CLADDING OR PLATING BY SOLDERING OR WELDING; CUTTING BY APPLYING HEAT LOCALLY, e.g. FLAME CUTTING; WORKING BY LASER BEAM
- B23K37/00—Auxiliary devices or processes, not specially adapted to a procedure covered by only one of the preceding main groups
- B23K37/04—Auxiliary devices or processes, not specially adapted to a procedure covered by only one of the preceding main groups for holding or positioning work
- B23K37/0426—Fixtures for other work
- B23K37/0435—Clamps
- B23K37/0443—Jigs
Landscapes
- Physics & Mathematics (AREA)
- Optics & Photonics (AREA)
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Automatic Assembly (AREA)
Abstract
Description
본 발명은 단관의 링 프레임 정렬 취부장치에 관한 것으로, 압력관 내부에 링 프레임을 용접시키기 위하여 단관 외판에 링 프레임을 정렬하여 취부할 수 있는 단관의 링 프레임 정렬 취부장치에 관한 것이다. The present invention relates to a ring frame alignment mounting device for a short pipe, and relates to a ring frame alignment mounting device for a short pipe that can be mounted by aligning the ring frame on a short pipe outer plate in order to weld the ring frame to the pressure pipe.
일반적으로 압력관인 경우 강도를 구비하기 위해서는 내부에 보강재가 붙으며, 그 구조는 형상의 특성상 원형의 보강재인 'T' 형상의 링 프레임 보강재가 사용되고 있다. 단관의 제작공정은 먼저 준비된 링 프레임을 정렬하고, 단관의 외판에 하나씩 순서대로 취부작업을 실시하게 되며, 다음 공정인 용접품질 때문에 갭 관리와 정확한 취부선에 링 프레임을 취부하는 것이 중요하다.In general, in the case of a pressure pipe, a reinforcement is attached to the inside to provide strength, and a structure of the ring frame reinforcement having a 'T' shape, which is a circular reinforcement, is used in its structure. In the manufacturing process of the short pipe, the prepared ring frame is arranged first, and the mounting work is performed on the outer plate of the short pipe one by one, and it is important to install the ring frame on the gap management and the correct mounting line because of the welding quality, which is the next process.
압력관 내부에 링 프레임의 취부는 대부분 수작업에 의존하고 있으며, 간이 치공구와 공장내에 설치된 크레인을 이용하여 작업부재를 고정하거나 작업시 다루고 있어서 안전을 위협하고 있다. 또한 전용장치가 없어 생산성 뿐만 아니라 용접을 위한 취부갭 관리와 취부선에 대한 링 프레임의 취부 맞춤 등의 정도관리에도 어려움과 문제점을 가지고 있었다. The mounting of the ring frame inside the pressure pipe is mostly dependent on the manual work, and the working tools are fixed or handled at the time using simple tools and cranes installed in the factory, which threatens safety. In addition, there was a difficulty and problem in not only the productivity but also the control of the mounting gap for welding and the control of the fitting of the ring frame to the mounting line because there is no dedicated device.
본 발명은 상기와 같은 문제점을 고려하여 이루어진 것으로, 그 목적은 단관 내면에 링 프레임를 정확한 위치로 정렬한 후 취부하여, 생산성 및 제작에 대한 정도관리를 향상시키며, 불량률을 저하시킴과 동시에, 작업자의 용이한 조작에 의해 작업능률 및 작업속도를 향상시킬 수 있는 단관의 링 프레임 정렬 취부장치를 제공하는 것이다.The present invention has been made in consideration of the above problems, and its purpose is to align the ring frame with the correct position on the inner surface of the short pipe and then install it, thereby improving the quality control for productivity and manufacturing, and reducing the defective rate, It is to provide a single frame ring frame alignment mounting apparatus that can improve the work efficiency and work speed by easy operation.
본 발명은 컬럼부를 중심으로 등각도를 유지하며 방사형으로 설치되는 8개의 링 프레임 취부대차와, 상기 컬럼부를 중심으로 등각도를 유지하며 취부대차 외측에 위치하도록 설치되는 링 프레임 정렬대 올림장치와, 상기 링 프레임 정렬대 올림장치에 안착 및 분리되고 다수개의 링 프레임이 등간격으로 적재되는 링 프레임 정렬대와, 상기 컬럼부와 연결되고 단관외판 상부면을 가압하는 단관 취부장치 덮개를 포함하는 단관의 링 프레임 정렬 취부장치를 제공함에 있다. The present invention is an eight ring frame mounting bogie is installed radially while maintaining an isometric angle around the column portion, a ring frame alignment table raising device is installed so as to be located outside the mounting bogie while maintaining an isometric angle around the column portion, And a ring frame aligning stand seated on and separated from the ring frame aligning device lifting device and having a plurality of ring frames loaded at equal intervals, and a short pipe attaching device cover connected to the column part and pressurizing an upper surface of the short pipe plate. A ring frame alignment mounting apparatus is provided.
도 1 은 단관 제작을 위한 링 프레임의 정렬 및 취부장치의 전체구성도를 나타내고 있다. 주요장치의 구성은 단관 취부장치의 컬럼부(16)와 방사성으로 설치된 8개의 링 프레임 취부대차(5), 링 프레임 정렬대(3), 단관 외판의 곡률반경을 유지시켜 주기 위한 단관 취부장치 덮개(4) 및 링 프레임 정렬대 올림부(17) 등으로 구성되어 있다. Figure 1 shows the overall configuration of the ring frame alignment and mounting apparatus for producing a short pipe. The main device is composed of a column part 16 of the short pipe mounting device and eight ring frame mounting trolleys 5 radially installed, a ring frame alignment table 3, and a short pipe mounting device cover for maintaining the radius of curvature of the short pipe outer plate. (4) and the ring frame alignment table raising portion 17 and the like.
취부작업 순서는 링 프레임 정렬대를 이용하여 링 프레임이 취부되는 간격으로 먼저 링 프레임을 정렬하고, 링 프레임이 높여진 정렬대 장치를 들어올려 단관취부장치에 올려놓게 된다. 단관 취부대차에 링 프레임 전달은 단관 취부장치의 하부베이스에 설치된 링 프레임 취부대차가 전진하여 정렬대의 링 프레임(1)을 건네받는 방식으로 되어 있다. 링 프레임을 전달후 링 프레임의 링 프레임 정렬 받침대(6)는 각 힌지를 중심으로 아랫방향으로 내려지고, 공장에 상부에 설치된 크레인을 이용해 단관 취부장치로부터 들어내어진다. 이어서 취부대차에 정렬된 링 프레임의 바깥에 밴딩된 단관 외판(2)이 취부받침대 홈에 올려지면 단관 취부장치의 덮개(4)가 단관 취부장치 컬럼(16) 위에 올려져서 덮개 누름장치(10)가 가압하는 상태로 되어 취부작업을 위한 준비작업이 마무리 되게 된다. In the installation procedure, the ring frame is first aligned with the ring frame at the interval where the ring frame is mounted, and the ring frame is lifted up and the mounting frame device is lifted and placed on the short mounting device. The ring frame delivery to the short pipe mounting trolley is such that the ring frame mounting trolley provided on the lower base of the short pipe mounting trolley is advanced to pass the ring frame 1 of the alignment table. After delivery of the ring frame, the ring frame alignment pedestal 6 of the ring frame is lowered downward about each hinge, and is lifted out of the end pipe mounting device by using a crane installed at the top of the factory. Subsequently, when the short pipe shell plate 2, which is bent on the outside of the ring frame aligned with the mounting bore, is placed on the mounting support groove, the cover 4 of the short pipe mounting device is placed on the short pipe mounting column 16 so that the cover pressing device 10 It will be in a pressurized state and the preparation work for the mounting work will be finished.
제 2 도는 링 프레임의 정렬대를 나타내고 있다. (가)는 링 프레임 정렬대에서 링 프레임을 떠 바치기 전의 형상을 나태내며, (나)의 그림은 링 프레임이 받침대에 의해 지지되고 정렬이 이루어진 뒤의 형상을 나타내고 있다. 링 프레임 받침대 구조는 힌지 구조방식으로 받침대를 90°회전시켜 링 프레임을 지지한다. 링 프레임 받침대(6)는 원형의 정렬대 위에 방사상 형태로 8곳에 설치되어 있으며, 전체 7개의 링 프레임을 정렬할 수 있도록 링 프레임 받침대가 설치되어 있다. 2 shows the alignment of the ring frame. (A) shows the shape before floating the ring frame on the ring frame alignment table, and the picture of (B) shows the shape after the ring frame is supported by the support and aligned. The ring frame pedestal structure is hinged to support the ring frame by rotating the pedestal by 90 °. The ring frame pedestal 6 is provided at eight positions in a radial form on a circular alignment table, and a ring frame pedestal is installed to align all seven ring frames.
도 3 은 단관 취부장치의 컬럼부에 설치된 상부 덮개누름 장치도를 나타내고 있다. 단관 취부장치 컬럼부는 본 장치의 중심부에 위치해 있으며, 구조는 하부가 원형이다. 상부는 단관 취부장치의 덮개를 고정할 수 있는 형상으로 직사각형의 두개의 컬럼으로 되어 있으며, 상부 직사각형의 안내면으로 단관 취부장치의 덮개가 장착되게 된다. 컬럼부에 설치된 단관 취부장치 덮개를 고정하기 위하여 덮개 누름장치(10)가 있으며, 덮개 누름장치의 회전기능을 담당하는 덮개 누름장치 회전모터(7)와 덮개 누름장치를 상승 및 하강시켜 가압할 수 있는 덮개 누름장치 유압실린더(8)가 부가적으로 구성되어 있다. 또한 취부시 링 프레임과 단관 외판의 취부선 맞춤 및 조정을 위해 단관 취부장치 덮개를 상하 위치조정하는 단관 취부장치 덮개 위치조정 실린더(9)가 컬럼의 측면 4곳에 설치되어 있으며, 그외에도 컬럼부의 중간에는 높은 위치의 링 프레임 취부작업을 위해 발판으로 사용할 수 있는 중간 작업대(11)가 설치되어 있다. 3 shows an upper lid pressing device provided in the column portion of the short pipe attaching device. The short pipe attachment column part is located in the center of the device, and the structure is circular in the lower part. The upper part has a rectangular two-column shape in which a cover of the short pipe attaching device can be fixed, and the cover of the short pipe mounting device is mounted on the guide surface of the upper rectangular. There is a cover pressing device (10) to fix the cover of the short pipe mounting device installed in the column part, and the cover pressing device rotating motor (7) which is responsible for the rotation function of the cover pressing device and the cover pressing device can be pushed up and down to pressurize it. The lid presser hydraulic cylinder 8 which is present is additionally configured. In addition, a short pipe mounting device cover positioning cylinder (9) is installed on four side surfaces of the column to adjust the top and bottom of the short pipe mounting device cover for the alignment and adjustment of the ring frame and the short pipe outer plate during installation. The intermediate work platform 11 which can be used as a scaffold for the ring frame mounting work of the high position is installed.
도 4 는 단관 취부장치의 방사상으로 설치된 링 프레임의 취부대차 장치도를 나타내고 있다. 링 프레임 취부대차는 링 프레임의 취부작업을 위해 안내레일(18)을 따라 전후진 할 수 있으며, 링 프레임 취부작업시 취부대차 고정볼트(19)에 의해 전진 고정된 상태에서 취부작업을 실시하게 된다. 단관 외판(2)에 링 프레임(1)을 정확하게 취부선에 취부하기 위하여 링 프레임을 취부대차의 취부지그(20)에 플랜지 고정장치(12)를 이용하여 조정하고, 2개의 웨브 고정쇄기(13)를 이용해 단관의 외판과 링 프레임의 갭을 없애는데 이용된다. Fig. 4 shows a mounting cart apparatus diagram of a ring frame provided radially of the single pipe mounting apparatus. The ring frame mounting bogie can be moved back and forth along the guide rails 18 for the ring frame mounting work, and the ring frame mounting bogie is carried out in the state fixed forward by the mounting bogie fixing bolt 19 during the ring frame mounting work. . In order to mount the ring frame 1 to the mounting pipe accurately on the short pipe outer plate 2, the ring frame is adjusted by using the flange fixing device 12 to the mounting jig 20 of the mounting truck, and the two web fixing presses 13 It is used to close the gap between the shell of the short pipe and the ring frame.
도 5 는 링 프레임 정렬대 올림 장치도이다. 주요 역할은 링 프레임 정렬대의 정렬된 링 프레임을 취부대차에 쉽게 넘겨주기 위해 사용되며, 정렬대가 상승된 상태에서 취부대차가 전진하여 링 프레임을 넘겨받고, 장치의 구성은 링 프레임 정렬대의 받침(14)과 링 프레임 정렬대 올림실린더(15)로 되어 있다. 5 is a ring frame alignment raising device drawing. The main role is used to easily pass the aligned ring frame of the ring frame aligner to the mounting bogie, and the mounting bogie advances to take over the ring frame while the alignment stand is raised. ) And ring frame alignment stand lift cylinder (15).
본 발명은 상술한 특정의 바람직한 실시예에 한정되지 아니하며, 청구범위에서 청구하는 본 발명의 요지를 벗어남이 없이 당해 발명이 속하는 기술분야에서 통상의 지식을 가진 자라면 누구든지 다양한 변형실시가 가능한 것은 물론이고, 그와 같은 변경은 청구범위 기록의 범위내에 있게 된다.The present invention is not limited to the above-described specific preferred embodiments, and various modifications can be made by any person having ordinary skill in the art without departing from the gist of the present invention claimed in the claims. Of course, such changes will fall within the scope of the claims record.
이와 같이 본 발명은 단관 외판 내면에 링 프레임을 일정하게 정렬/취부할 수 있도록 기계화되어 있어, 링 프레임과 단관 외판 사이의 갭 관리나 취부정도 관리를 쉽게 할 수 있으며, 간이 치공구를 이용하는 수작업에 비해 작업준비와 대기시간을 대폭 단축하고, 이를 통해 작업효율, 생산성 및 정도관리를 획기적으로 향상시켰다. As described above, the present invention is mechanicalized to uniformly align / mount the ring frame on the inner surface of the short pipe, so that it is easy to manage the gap between the ring frame and the short pipe, and to manage the mounting accuracy, compared to the manual work using a simple tool. This drastically reduced work preparation and waiting time, which drastically improved work efficiency, productivity and quality control.
또한, 본 발명은 다수개의 링 프레임을 한번의 작업으로 정확한 위치에 일괄적으로 정렬 및 취부하고, 갭을 일정하게 유지할 수 있어, 용접품질을 향상시키고 불량률의 발생을 억제하는 등 많은 효과가 있다. In addition, the present invention has a number of effects, such as aligning and mounting a plurality of ring frames in a single position in a batch, and can keep the gap constant, thereby improving the welding quality and suppress the occurrence of defective rate.
도 1 은 본 발명에 따른 링 프레임 정렬 및 취부장치의 전체 구성을 보인 예시도1 is an exemplary view showing the overall configuration of the ring frame alignment and mounting apparatus according to the present invention
도 2 는 본 발명에 따른 링 프레임 정렬대 장치도2 is a ring frame alignment device according to the present invention
도 3 은 본 발명에 따른 단관 취부장치의 컬럼부에 설치된 상부 덮개 누름 장치도Figure 3 is a top cover pressing device installed in the column of the short pipe mounting apparatus according to the present invention
도 4 는 본 발명에 따른 단관에 대한 링 프레임 취부 대차4 is a ring frame mounting bogie for a short pipe according to the present invention.
도 5 는 본 발명에 따른 링 프레임 정렬대 올림 장치도5 is a ring frame aligning device lifting device according to the present invention
* 도면의 주요부분에 대한 부호의 설명* Explanation of symbols for main parts of the drawings
(1) : 링 프레임 (2) : 단관 외판(1): ring frame (2): single tube shell
(3) : 링 프레임 정렬부 (4) : 단관 취부장치 덮개(3): Ring frame aligning part (4): Short pipe mounting cover
(5) : 링 프레임 취부대차 (6) : 링 플레임 받침대(5): ring frame mounting cart (6): ring flame base
(7) : 덮개 누름장치 회전모터 (8) : 덮개 누름장치 유압실린더(7): Cover presser rotary motor (8): Cover presser hydraulic cylinder
(9) : 단관 취부장치 덮개 위치조정 실린더(9): Short pipe mounting device cover positioning cylinder
(10) : 덮개 누름장치(10): cover pressing device
(11) : 중간 작업대 (12) : 플랜지 고정장치(11): Intermediate workbench (12): Flange fixture
(13) : 웨브 고정쇄기 (14) : 링 프레임 정렬대 받침(13) web fixing device 14 ring frame alignment support
(15) : 링 프레임 정렬대 올림실린더 (16) : 단관 취부장치 컬럼부(15): Lifting frame of ring frame aligning table (16): Column unit for column installation
(17) : 링 프레임 정렬대 올림장치 (18) : 취부대차 안내레일(17): Ring frame aligner lifting device (18): Mounting guide rail
(19) : 취부대차 고정볼트 (20) : 취부지그(19): Mounting cart fixing bolt (20): Mounting jig
Claims (6)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020030057162A KR100787686B1 (en) | 2003-08-19 | 2003-08-19 | Arrangement and Fit-up machine for joing fing frame to unit |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020030057162A KR100787686B1 (en) | 2003-08-19 | 2003-08-19 | Arrangement and Fit-up machine for joing fing frame to unit |
Publications (2)
Publication Number | Publication Date |
---|---|
KR20050019409A true KR20050019409A (en) | 2005-03-03 |
KR100787686B1 KR100787686B1 (en) | 2007-12-21 |
Family
ID=37228660
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR1020030057162A KR100787686B1 (en) | 2003-08-19 | 2003-08-19 | Arrangement and Fit-up machine for joing fing frame to unit |
Country Status (1)
Country | Link |
---|---|
KR (1) | KR100787686B1 (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102909510A (en) * | 2012-10-17 | 2013-02-06 | 安徽肯达机械科技有限公司 | End enclosure splicing device of non-circular container |
CN103252612A (en) * | 2013-05-31 | 2013-08-21 | 句容泰博尔机械制造有限公司 | Round rail forming mould |
KR20190044853A (en) * | 2017-10-23 | 2019-05-02 | 현대중공업 주식회사 | Annular Structure Fastening Device |
KR20190044854A (en) * | 2017-10-23 | 2019-05-02 | 현대중공업 주식회사 | Size Changable Welding Device |
Family Cites Families (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS5933072B2 (en) | 1980-03-27 | 1984-08-13 | 日本鋼管株式会社 | Rail clamp device for rail pressure welding |
JPS58145393A (en) | 1982-02-20 | 1983-08-30 | Hitachi Zosen Corp | Automatic welding device |
JP2891608B2 (en) * | 1993-06-04 | 1999-05-17 | 日本鋼管株式会社 | Rail clamp device and rail flash welding device |
KR20190000870U (en) * | 2017-09-28 | 2019-04-05 | 한국전력공사 | Cable holder |
-
2003
- 2003-08-19 KR KR1020030057162A patent/KR100787686B1/en not_active IP Right Cessation
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102909510A (en) * | 2012-10-17 | 2013-02-06 | 安徽肯达机械科技有限公司 | End enclosure splicing device of non-circular container |
CN103252612A (en) * | 2013-05-31 | 2013-08-21 | 句容泰博尔机械制造有限公司 | Round rail forming mould |
KR20190044853A (en) * | 2017-10-23 | 2019-05-02 | 현대중공업 주식회사 | Annular Structure Fastening Device |
KR20190044854A (en) * | 2017-10-23 | 2019-05-02 | 현대중공업 주식회사 | Size Changable Welding Device |
Also Published As
Publication number | Publication date |
---|---|
KR100787686B1 (en) | 2007-12-21 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JP3075723B1 (en) | Equipment for welding metal flanges to metal pipe ends | |
CN113478159B (en) | Head welding equipment | |
CN104148873B (en) | A kind of adjustable steel pipe seaming device | |
CN113814646A (en) | Steel pipe stiffening ring assembling device and assembling method thereof | |
KR100787686B1 (en) | Arrangement and Fit-up machine for joing fing frame to unit | |
JPH0361541B2 (en) | ||
CN219189245U (en) | High-altitude large-size pin shaft mounting device | |
JP2003020908A (en) | Supporting device for inspecting and maintaining turbine | |
CN210499016U (en) | Anti-deformation welding tool | |
CN209021527U (en) | Tooling platform for pump case built-up welding | |
CN208019661U (en) | High accuracy positioning welding turntable | |
JPS6348699B2 (en) | ||
CN112518270B (en) | Long-distance continuous roller way quick installation device and installation method | |
CN217070617U (en) | High-efficient retooling moving platform of casting and forging integrated into one piece machine | |
CN219026507U (en) | Welding positioning tool for electric hoist | |
CN220278756U (en) | Lifting and rotating tool for repair welding of standard joint | |
CN219132228U (en) | Adjustable switching supporting structure for assembly and debugging in shield machine factory | |
CN219703889U (en) | Cantilever crane lift and automatic weld equipment | |
CN216426654U (en) | Large-scale gas chamber installation operation platform | |
CN112975187B (en) | High-precision slurry line product deslagging system manufacturing process structure and method | |
JP3258710B2 (en) | Stretch reducer housing exchange device | |
CN218472626U (en) | Cable erecting device for building electromechanical installation | |
CN115922288B (en) | High-altitude large-size pin shaft mounting device | |
CN215659055U (en) | Positioning and pressing device for drilling forklift portal support | |
CN209792989U (en) | Section joint beam welding supporting device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A201 | Request for examination | ||
E902 | Notification of reason for refusal | ||
E701 | Decision to grant or registration of patent right | ||
GRNT | Written decision to grant | ||
FPAY | Annual fee payment |
Payment date: 20101213 Year of fee payment: 5 |
|
FPAY | Annual fee payment |
Payment date: 20121206 Year of fee payment: 7 |
|
FPAY | Annual fee payment |
Payment date: 20141212 Year of fee payment: 9 |
|
FPAY | Annual fee payment |
Payment date: 20161128 Year of fee payment: 10 |
|
FPAY | Annual fee payment |
Payment date: 20171129 Year of fee payment: 11 |
|
LAPS | Lapse due to unpaid annual fee |