KR20040074314A - Apparatus for extension work of tunnel using the existing tunnel and constructing method for extension of tunnel using the apparatus - Google Patents

Apparatus for extension work of tunnel using the existing tunnel and constructing method for extension of tunnel using the apparatus Download PDF

Info

Publication number
KR20040074314A
KR20040074314A KR1020030009860A KR20030009860A KR20040074314A KR 20040074314 A KR20040074314 A KR 20040074314A KR 1020030009860 A KR1020030009860 A KR 1020030009860A KR 20030009860 A KR20030009860 A KR 20030009860A KR 20040074314 A KR20040074314 A KR 20040074314A
Authority
KR
South Korea
Prior art keywords
tunnel
expansion
housing
excavation
existing
Prior art date
Application number
KR1020030009860A
Other languages
Korean (ko)
Other versions
KR100573014B1 (en
Inventor
최용기
박경욱
Original Assignee
대원토질 주식회사
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 대원토질 주식회사 filed Critical 대원토질 주식회사
Priority to KR1020030009860A priority Critical patent/KR100573014B1/en
Publication of KR20040074314A publication Critical patent/KR20040074314A/en
Application granted granted Critical
Publication of KR100573014B1 publication Critical patent/KR100573014B1/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
    • E21D9/01Methods or apparatus for enlarging or restoring the cross-section of tunnels, e.g. by restoring the floor to its original level
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/04Lining with building materials
    • E21D11/10Lining with building materials with concrete cast in situ; Shuttering also lost shutterings, e.g. made of blocks, of metal plates or other equipment adapted therefor
    • E21D11/105Transport or application of concrete specially adapted for the lining of tunnels or galleries ; Backfilling the space between main building element and the surrounding rock, e.g. with concrete
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
    • E21D9/02Driving inclined tunnels or galleries
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
    • E21D9/10Making by using boring or cutting machines

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Environmental & Geological Engineering (AREA)
  • Structural Engineering (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Lining And Supports For Tunnels (AREA)

Abstract

PURPOSE: A tunnel expansion method using the existing tunnel is provided to heighten economical efficiency by reducing the period and cost required for construction work by expanding using the existing tunnel and to minimize the destruction of nature at a construction work. CONSTITUTION: The tunnel expansion method using the existing tunnel comprises the steps of: installing a housing(60) on the lining by installing a housing on the lining of the existing tunnel(10) and approaching gradually using a hydraulic jack; installing excavation equipment(40) attached with an excavator on the housing(60) and excavating a unit excavation plane for an expansion tunnel(20) by stages; forming an expansion tunnel wall(30) by assembling a reinforcing bar on the unit excavation plane for the expansion tunnel, then placing concrete; excavating and removing soils between the housing(60) and the expansion tunnel wall(30); forming an expansion tunnel wall by moving the housing(60) for the next excavation, excavating a unit excavation plane for the expansion tunnel using excavation equipment(40) installed on the housing(60), then installing a reinforcing bar and placing concrete, and excavating soil between the housing(60) and the expansion tunnel wall(30) in order to complete the construction for the expansion tunnel; and leveling up a road surface and installing lighting in a tunnel to be ready for using a tunnel.

Description

기존 터널을 이용한 터널 확장 시공장치 및 이를 이용한 터널 확장 시공방법 {Apparatus for extension work of tunnel using the existing tunnel and constructing method for extension of tunnel using the apparatus}Apparatus for extension work of tunnel using the existing tunnel and constructing method for extension of tunnel using the apparatus}

본 발명은 기존 터널을 이용한 터널확장시공장치 및 이를 이용한 터널확장 시공방법에 관한 것으로서, 기존 터널의 라이닝을 따라 일정길이의 하우징을 설치하고 하우징에 굴착기가 장착된 굴착장비를 설치하여 단계적으로 일정크기의 확장터널 단위 굴착면을 굴착하여 철근을 배치한 후에 콘크리트를 타설양생하여 확장터널벽체를 형성하면서 하우징과 확장터널 벽체사이의 토사를 굴토제거하여 단계적으로 설치한 확장터널과,The present invention relates to a tunnel expansion construction apparatus using a conventional tunnel and a tunnel expansion construction method using the same, by installing a housing of a certain length along the lining of the existing tunnel and by installing a drilling equipment equipped with an excavator in the housing step by step constant size Expansion tunnels are installed in stages by excavating earth and sand between housing and expansion tunnel wall while forming expansion tunnel wall by laying concrete and placing reinforcing bar by digging excavation surface of expansion tunnel unit

이의 시공방법은 기존 터널의 라이닝상에 하우징을 설치하고 유압잭으로 서서히 진입시켜 하우징을 라이닝상에 설치하고 상기 하우징상에 굴착기가 장착된 굴착장비를 설치하고 단계적으로 확장터널 단위 굴착면을 굴착하고 상기 확장터널 단위 굴착면에 철근을 조립설치하고 콘크리트를 타설양생하여 단계적으로 확장터널벽체를 형성한 후에 상기 하우징과 확장터널벽체사이의 토사를 굴토하여 제거하고 상기 하우징을 다음굴착을 위하여 이동하여 상기 하우징에 설치된 굴착장비를 이용하여 확장터널 단위 굴착면을 굴착하여 철근을 설치하고 콘크리트를 타설양생하여 확장터널벽체를 형성하고 상기 하우징과 확장터널벽체사이의 토사를 굴토하는 것을 순차적을 하여 확장터널의 시공을 종료한 후에 시공완료된 확장터널의 교통을 소통시키기 위하여 노면을 정리 포장하고 터널내의 조명등의 시설을 설치하여 터널을 이용할 수 있게 하는 단계를 거쳐 상기의 기존 터널을 이용하여 확장터널을 시공하는 것이다.The construction method is to install the housing on the lining of the existing tunnel and slowly enter the hydraulic jack to install the housing on the lining, install the excavation equipment equipped with the excavator on the housing and excavate the expansion tunnel unit drilling surface step by step After installing reinforcing bars on the excavation surface of the expansion tunnel unit and pouring concrete to form the expansion tunnel wall step by step, excavate and remove the soil between the housing and the expansion tunnel wall and move the housing for the next excavation. Construction of expansion tunnels is carried out by excavating the expansion tunnel unit excavation surface installed in the excavation equipment installed in the tunnel, installing reinforcing bars, and casting concrete to form expansion tunnel walls, and excavating soil between the housing and the expansion tunnel walls. Communicate the traffic of the completed expansion tunnel after finishing To clean up the road pavement and to install the facilities of the light in the tunnel after the step of enabling access to a tunnel construction to the expansion tunnel using the existing tunnel.

본 발명의 목적은 교통량등의 증가로 인하여 기존의 터널이외에 터널을 증설할 때 사용하기 위하여 제안된 것으로서, 기존 터널의 라이닝을 따라 일정길이의 하우징을 설치하고 하우징에 굴착기가 장착된 굴착장비를 설치하여 단계적으로 일정크기의 확장터널 단위 굴착면을 굴착하여 철근을 배치한 후에 콘크리트를 타설양생하여 확장터널벽체를 형성하면서 하우징과 확장터널 벽체사이의 토사를 굴토제거하여 단계적으로 설치하는 확장터널의 시공에 관한 방법이다.It is an object of the present invention to propose to use a tunnel in addition to an existing tunnel due to the increase in traffic, etc., install a housing of a certain length along the lining of the existing tunnel and install an excavation equipment equipped with an excavator in the housing Construction of the expansion tunnel by excavating the excavation surface of the expansion tunnel unit of a certain size step by step, placing the reinforcing bars, and then pouring concrete to form the expansion tunnel wall while removing the soil between the housing and the expansion tunnel wall. It is about.

이렇게 설치된 확장터널의 시공방법은 기존 터널을 이용하여 설치하므로서기존 터널의 교통을 차단하지 않고 교통을 소통시키면서 터널을 확장하므로 교통소통에 대한 별도의 대책을 세울 필요가 없으며, 또한 기존 터널의 좌우측 부분을 확장터널로 이용하므로 용지매수에 대한 비용 및 매수기간이 절대적으로 감소될 수 있어, 지금까지 터널을 확장할 때 별도의 터널을 설치하는데 따른 용지매수에 따른 기간과 매수비용 및 터널을 확장하는데 소요되는 공사비용등이 과다하게 소요되는 문제점을 해소할 수 있는 시공방법을 제공하는데 있다.Since the installation method of the extended tunnel is installed using the existing tunnel, the tunnel is expanded while communicating traffic without blocking the traffic of the existing tunnel, so there is no need to take additional measures for traffic communication. As the tunnel is used as an extension tunnel, the cost and purchase period for paper can be absolutely reduced, so it is necessary to extend the time, purchase cost, and tunnel according to the number of papers for installing a separate tunnel. It is to provide a construction method that can solve the problem of excessive construction cost, etc.

종래에는 터널을 확장할 필요가 있을 경우, 기존 터널옆에 별도의 터널을 증설하는 방법으로 터널을 설치하여 왔는데 이러한 방법은 확장 터널에 소요되는 부지의 용지매입을 위한 기간과 비용이 매우 많이 소요되는 점과 또한, 이렇게 시공되는 터널의 시공시 많은 공사비용과 공사기간이 소요되는 문제점이 상존하여 왔다. 또한, 별도의 터널을 설치하여야 하므로 자연을 훼손하는 문제점이 상존하여 왔다.Conventionally, when it is necessary to extend the tunnel, the tunnel has been installed by adding a separate tunnel next to the existing tunnel. This method requires a very long period and cost for land purchase of the site required for the expansion tunnel. In addition, there has been a problem in that a large construction cost and a construction period are required for the construction of the tunnel. In addition, there has been a problem of damaging nature because a separate tunnel must be installed.

본 발명은 이상과 같은 사항을 감안하여 제안된 것으로서, 기존 터널의 라이닝을 따라 일정길이의 하우징을 설치하고 하우징에 굴착기가 장착된 굴착장비를 설치하여 단계적으로 일정크기의 확장터널 단위 굴착면을 굴착하여 철근을 배치한 후에 콘크리트를 타설양생하여 확장터널벽체를 형성하면서 하우징과 확장터널 벽체사이의 토사를 굴토제거하는 작업을 단계적으로 하여 설치하는 확장터널의 시공에 관한 방법으로서, 기존 터널을 이용하는 반면에 기존 터널의 교통소통에는 전혀 방해를 주지않음으로 터널 확장에 따른 별도의 교통소통에 대한 대책이 필요없으며, 기존 터널을 이용하므로 용지매수비용이 절감되며, 또한 공사비 및 공사기간의 대폭적이 절감을 가져올 수 있는 시공방법을 제공하는데 있다.The present invention has been proposed in view of the above matters, and by installing a housing of a predetermined length along the lining of an existing tunnel and installing an excavation equipment equipped with an excavator in the housing, excavating an expansion tunnel unit excavation surface of a predetermined size step by step. After laying the reinforcing bar, the concrete is poured to form the expansion tunnel wall, and the earth tunnel between the housing and the expansion tunnel wall is removed. As it does not interfere with the traffic communication of existing tunnels, there is no need for a separate traffic communication plan due to the expansion of the tunnel, and by using the existing tunnel, the land purchase cost is reduced, and the construction cost and construction period are greatly reduced. To provide a construction method that can be brought.

도 1은 본 발명의 터널확장 시공방법을 보여주는 도면.1 is a view showing a tunnel extension construction method of the present invention.

도 2는 도 1의 터널확장 시공방법의 단면을 보여주는 단면도.Figure 2 is a cross-sectional view showing a cross section of the tunnel extension construction method of FIG.

도 3은 본 발명의 터널 확장을 위하여 기존 터널에 하우징을 설치한 것을 보여주는 도면.Figure 3 is a view showing a housing installed in the existing tunnel for tunnel expansion of the present invention.

도 4는 본 발명의 기존터널에 하우징을 설치하고 터널확장을 위하여 단계적으로 확장터널 단위 굴착면을 시공하는 것을 보여주는 도면.Figure 4 is a view showing the installation of the expansion tunnel unit excavation surface step by step to install the housing in the existing tunnel of the present invention tunnel expansion.

도 5는 본 발명의 기존터널에 설치한 하우징상에 굴착장비를 설치하여 확장터널 단위 굴착면을 시공하는 것을 보여주는 도면.5 is a view showing the construction of the expansion tunnel unit excavation surface by installing the excavation equipment on the housing installed in the existing tunnel of the present invention.

도 6은 본 발명의 터널확장을 완료한 것을 보여주는 도면.Figure 6 shows the completion of the tunnel expansion of the present invention.

도 7은 본 발명의 터널확장을 위하여 확장터널 단위 굴착면을 단계적으로 굴착 시공하는 순서를 보여주는 도면.Figure 7 is a view showing a sequence of excavation construction step by step expansion tunnel unit excavation surface for tunnel expansion of the present invention.

도 8은 본 발명의 확장터널 단위 굴착면을 시공하기 위하여 사용하는 굴착장치에 장착된 굴착기를 보여주는 도면.8 is a view showing an excavator mounted on an excavation apparatus used to construct an expansion tunnel unit excavation surface of the present invention.

도 9는 본 발명의 확장터널 단위 굴착면을 시공하는 상태를 보여주는 도면.9 is a view showing a state in which the construction of the expansion tunnel unit excavation surface of the present invention.

<도면의 주요 부분에 대한 부호의 설명><Explanation of symbols for the main parts of the drawings>

10.... 기존터널 20... 확장터널10 .... Existing Tunnel 20 ... Expansion Tunnel

30... 확장터널벽체 40... 굴착장비30 ... Extended Tunnel Wall 40 ... Excavation Equipment

50... 콘크리트 펌프차 60... 하우징50 ... concrete pump car 60 ... housing

61... 지지대61 ... Support

70... 굴착기 71... 굴착날70 ... Excavator 71 ... Excavator Blade

72... 체인 73... 콘크리트72 ... chain 73 ... concrete

80.... 확장터널 단위 굴착면 81... 시공순서(1,2,3...)80 .... Expansion tunnel unit excavation surface 81 ... Construction sequence (1, 2, 3 ...)

82... 확장터널 단위 굴착면 겹침부82 ... Excavation surface overlap of extended tunnel unit

상기의 목적을 달성하기 위하여, 본 발명은 기존 터널을 이용하여 터널을 확장하는 확장터널과 이의 시공방법에 관한 것으로서, 기존 터널(10)의 라이닝을 따라 일정길이의 하우징(60)을 설치하고 하우징에 굴착기(70)가 장착된 굴착장비(40)를 설치하여 단계적으로 일정크기의 확장터널 단위 굴착면(80)을 굴착하여 철근을 배치한 후에 콘크리트(73)를 타설양생하여 확장터널벽체(30)를 형성하면서 하우징(60)과 확장터널 벽체(30)사이의 토사를 굴토제거하여 단계적으로 설치한 확장터널(20)과,In order to achieve the above object, the present invention relates to an extension tunnel for expanding the tunnel using an existing tunnel and a construction method thereof, and to install a housing (60) of a predetermined length along the lining of the existing tunnel (10) Excavation equipment 40 equipped with an excavator 70 is installed in stepwise to excavate the expansion tunnel unit excavation surface 80 of a predetermined size by placing the reinforcing bars, and then cast concrete (73) expansion tunnel wall (30) Expansion tunnel 20 installed step by step by removing the earth and sand between the housing 60 and the expansion tunnel wall 30 while forming a),

이의 시공방법은 기존 터널의 라이닝상에 하우징(60)을 설치하고, 유압잭으로 서서히 진입시켜 하우징을 라이닝상에 설치하고, 상기 하우징상에 굴착기가 장착된 굴착장비(40)를 설치하고 단계적으로 확장터널 단위 굴착면(80)을 굴착하고, 상기 확장터널 단위 굴착면(80)에 철근을 조립설치하고 콘크리트를 타설양생하여 단계적으로 확장터널벽체(30)를 형성한 후에 상기 하우징과 확장터널벽체사이의 토사를 굴토하여 제거하고, 상기 하우징을 다음굴착을 위하여 이동하여 상기 하우징에 설치된 굴착장비(40)를 이용하여 확장터널 단위 굴착면(80)을 굴착하여 철근을 설치하고 콘크리트를 타설양생하여 확장터널벽체(30)를 형성하고 상기 하우징과 확장터널벽체사이의 토사를 굴토하는 것을 순차적을 하여 확장터널의 시공을 종료한 후에 시공완료된 확장터널의 교통을 소통시키기 위하여 노면을 정리 포장하고 터널내의 조명등의 시설을 설치하여 터널을 이용할 수 있게 하는 단계를 거쳐 상기의 기존 터널을 이용하여 확장터널을 시공하는 것에 특징이 있다.The construction method is to install the housing 60 on the lining of the existing tunnel, install the housing on the lining by slowly entering into the hydraulic jack, install the drilling equipment 40 equipped with the excavator on the housing and expand in stages After excavating the tunnel unit excavation surface 80, assembling and installing reinforcing bars on the expansion tunnel unit excavation surface 80 and pouring concrete to form the expansion tunnel wall 30 step by step between the housing and the expansion tunnel wall Excavate and remove the soil, move the housing for the next excavation and excavate the expansion tunnel unit excavation surface 80 by using the excavation equipment 40 installed in the housing to install reinforcement and expansion by pouring concrete Formation of tunnel walls 30 and excavation of the soil between the housing and the expansion tunnel walls are performed in sequence to finish the construction of the expansion tunnel and then complete the construction. In order to communicate the traffic channel after the step of outlining the road pavement and to install the facilities of the light in the tunnel, able to use the tunnel is characterized in that the expansion tunnel construction by using the existing tunnel.

이하 본 발명의 구성 및 작용을 첨부된 도면에 의하여 상세히 설명하면 다음과 같다.Hereinafter, the configuration and operation of the present invention will be described in detail with reference to the accompanying drawings.

도 1은 본 발명의 터널확장 시공방법을 보여주는 도면으로서, 기존 터널 (10)의 라이닝상에 일정길이의 하우징(60)을 설치하고, 유압잭으로 서서히 진입시켜 하우징을 라이닝상에 설치하고, 상기 하우징(60)상에 굴착기(70)가 장착된 굴착장비(40)를 설치하여 확장터널(20)의 단면을 형성하기 위하여 상기 굴착기를 이용하여 단계적으로 확장터널 단위 굴착면(80)을 굴착하고, 상기 확장터널 단위 굴착면(80)에 철근을 조립설치하고 콘크리트(73)를 타설양생하여 순차적으로 확장터널벽체(30)를 형성한 후에 상기 하우징(60)과 확장터널벽체(30)사이의 토사를 굴토하여 제거한 후에 상기 하우징(60)을 다음굴착을 위하여 이동하여 상기 하우징(60)에 설치된 굴착장비(40)를 이용하여 확장터널 단위 굴착면(80)을 굴착하여 철근을 설치하고 콘크리트를 타설양생하여 확장터널벽체(30)를 형성하고 상기 하우징(60)과 확장터널벽체(30)사이의 토사를 굴토하는 작업을 순차적을 하는 것을 일괄하여 보여주는 도면이다.1 is a view showing a tunnel extension construction method of the present invention, the housing 60 of a predetermined length on the lining of the existing tunnel 10, and gradually enters the hydraulic jack to install the housing on the lining, the housing Excavation equipment 40 equipped with an excavator 70 on the 60 to excavate the expansion tunnel unit excavation surface 80 step by step using the excavator to form a cross section of the expansion tunnel 20, After assembling and installing reinforcing bars on the expansion tunnel unit excavation surface 80 and pouring concrete 73, the earth tunnel between the housing 60 and the expansion tunnel wall 30 is sequentially formed. After excavation and removal, the housing 60 is moved for the next excavation, using the excavation equipment 40 installed in the housing 60 to excavate the expansion tunnel unit excavation surface 80 to install reinforcing bars and pour concrete. Cured to expand The tunnel wall 30 is formed and a diagram showing the sequential operation of excavating the soil between the housing 60 and the expansion tunnel wall 30 is collectively shown.

상기 굴착장비(40)에는 굴착기(70)와 콘크리트 펌핑을 위한 펌프차(50)가 연결되어 있어 길이 12m정도의 길이를 갖는 굴착기(70)에 의해 굴착되는 확장터널단위 굴착면(80)의 규격이 깊이12m와 길이 12m 정도의 크기를 갖는 확장터널 단위 굴착면(80)을 형성하는데 이용되며 이렇게 형성된 확장터널 단위 굴착면(80)에 철근을 설치하고 콘크리트(73)를 타설할 때 상기 콘크리트 펌프차(50)를 이용하여 콘크리트(73)를 타설하게 된다.The excavation equipment 40 is connected to the excavator 70 and the pump vehicle 50 for concrete pumping is the size of the expansion tunnel unit excavation surface 80 to be excavated by the excavator 70 having a length of about 12m It is used to form an expansion tunnel unit drilling surface 80 having a depth of about 12m and a length of about 12m, and when installing reinforcing bars and placing concrete 73 in the expansion tunnel unit drilling surface 80 formed in this concrete pump vehicle ( 50) is used to pour the concrete (73).

상기 굴착기(70)에 의해 확장터널벽체(30)를 설치하기 위하여 터널의 단면을 따라 굴착되는 확장터널 단위 굴착면(80)의 굴착 순서는 도 7에서 설명하는 것과 같이 한 단면을 건너뛰어 굴착하는 방법으로 대략 터널단면의 반을 구분하는 부분에서 상기의 역순으로 다시 설치하도록 하여 확장터널벽체(30)를 설치하는 과정을 반복적으로 하여 설치하는 것이다.In order to install the expansion tunnel wall 30 by the excavator 70, the excavation sequence of the expansion tunnel unit excavation surface 80 excavated along the cross section of the tunnel is excavated by skipping one cross section as illustrated in FIG. By installing the expansion tunnel wall 30 by repeating the above installation in the reverse order in the part that roughly divides half of the tunnel section by the method.

상기 확장터널벽체(30)를 설치하기 위하여 확장터널 단위 굴착면(80)을 형성하기 위하여 도 9에서 설명하는 바와 같이 깔때기 형상으로 단계적으로 확장터널 단위 굴착면(80)을 터널굴착면을 따라 굴착한 후에 다음단계로 넘어 가도록하는 작업을 반복적으로 하는 것이다.In order to form the expansion tunnel unit excavation surface 80 to install the expansion tunnel wall 30, the expansion tunnel unit excavation surface 80 is excavated along the tunnel excavation surface stepwise in a funnel shape as described in FIG. After that, it is necessary to repeatedly move on to the next step.

또한, 기존 터널(10)의 라이닝상에 설치되는 하우징(60)은 기존의 라이닝의 상부에 삽입되어 유압잭에 의해 굴진하기 위하여 철판을 라이닝 형상으로 제작하여 설치하되 중앙부에는 H빔등의 강재를 설치하여 상기 굴착장비가 장착될 수 있게 지지대(61)를 설치한 것이다. 상기 하우징의 총길이는 40m정도로서 기존 터널 (10)입구 측에는 20m정도의 하우징(60)이 돌출되도록 하여 기존의 터널을 통과하는 차량에 방해를 주지 않게 하고, 하우징의 총 길이 40m의 중앙부인 20m 지점에는 굴착장비의 장착을 위하여 H빔등과 같은 강재를 이용하여 지지대(61)를 형성하고 그위에 상기 굴착장비(40)를 장착한다.In addition, the housing 60 is installed on the lining of the existing tunnel 10 is inserted into the upper portion of the existing lining to be manufactured by installing a steel plate in the shape of a lining in order to excavate by a hydraulic jack, but in the center of the installation of steel, such as H beam The support 61 is installed so that the drilling equipment can be mounted. The total length of the housing is about 40m, so that the housing 60 of about 20m protrudes from the entrance side of the existing tunnel 10 so as not to disturb the vehicle passing through the existing tunnel, and at the 20m point of the center of the total length of the housing For mounting the excavation equipment to form a support (61) using a steel, such as H beam, and mounting the excavation equipment 40 thereon.

상기 확장터널 벽체(30)가 완성되었을시 확장터널 단위 굴착면(80)을 깔때기 형상으로 단계적으로 형성하므로 확장터널 벽체(30)가 굴곡이 있어 미관이나 교통안전에도 악영향을 미치게되므로 외관을 미려하게 하기위하여 프리캐스트 판넬을 확장터널 벽체(30)에 부착하여 사용할 수도 있으며, 이때, 확장터널 벽체와 프리캐스트 판넬사이에는 콘크리트를 충전시켜 밀착도를 증강시킨다.When the expansion tunnel wall 30 is completed, since the expansion tunnel unit excavation surface 80 is formed in a funnel shape step by step, the expansion tunnel wall 30 is curved, which adversely affects aesthetics and traffic safety, thereby beautifully appearance. In order to be used to attach the precast panel to the expansion tunnel wall 30, in this case, the concrete is filled between the expansion tunnel wall and the precast panel to enhance the adhesion.

도 2는 도 1의 터널확장 시공방법의 단면을 보여주는 단면도로서 굴착기가 장착된 굴착장비(40)가 하우징(60)에 설치되어 터널단면을 따라 굴착하는 것을 보여주는 것이다.2 is a cross-sectional view showing a cross section of the tunnel extension construction method of Figure 1 shows that the excavation equipment 40 equipped with an excavator is installed in the housing 60 to excavate along the tunnel cross section.

도 3은 본 발명의 터널 확장을 위하여 기존 터널에 하우징을 설치한 것을 보여주는 도면으로서, 기존 터널(10)의 라이닝 상에 하우징(60)을 설치한 것이다. 이렇게 40m정도의 길이를 갖는 하우징(60)의 20m정도는 기존 터널(10)의 입구에 돌출되도록 하여 기존 터널을 이용하는 차량에 장애를 주지 않게 하고, 나머지 20m 정도에는 굴착기(70)가 장착된 굴착장비(40)를 설치하고, 기존 터널(10)입구에서 유압잭을 이용하여 하우징(60)을 기존 터널(10)의 라이닝 상부로 굴진시킨 후에 굴착기를 이용하여 확장터널벽체(30)를 형성하고 다음단계로 이동하여 다시 굴착기를 이용하여 확장터널벽체(30)를 형성하는 작업을 단계적으로 하게 하는 것이다.3 is a view showing the installation of the housing in the existing tunnel for the tunnel expansion of the present invention, the housing 60 is installed on the lining of the existing tunnel (10). 20m of the housing 60 having a length of about 40m so as to protrude to the entrance of the existing tunnel 10 so as not to disturb the vehicle using the existing tunnel, the remaining 20m about the excavator 70 is equipped with excavation After installing the equipment 40, and using the hydraulic jack at the entrance of the existing tunnel 10 to excavate the housing 60 to the upper portion of the lining of the existing tunnel 10, using the excavator to form the expansion tunnel wall 30 and then Moving to the step is to make the step of forming the expansion tunnel wall 30 again using an excavator again.

도 4와 도 5는 본 발명의 기존터널에 하우징을 설치하고 터널확장을 위하여 단계적으로 확장터널 단위 굴착면을 시공하여 확장터널면을 따라 형성된 확장터널벽체를 보여주는 도면이다.4 and 5 are views illustrating an extension tunnel wall formed along an extension tunnel surface by installing a housing in an existing tunnel of the present invention and constructing an expansion tunnel unit excavation surface step by step for tunnel extension.

상기 하우징(60)에 설치된 지지대(61)상에 장착된 굴착장비(40)의 굴착기(70)를 이용하여 확장터널 단위 굴착면(80)을 순차적으로 굴착하여 확장터널면을 따라 확장터널 벽체(30)를 형성하는 것이다.Using the excavator 70 of the drilling rig 40 mounted on the support 61 installed in the housing 60, the expansion tunnel unit excavation surface 80 is sequentially excavated along the expansion tunnel wall along the expansion tunnel surface ( 30).

도 6은 본 발명의 터널확장을 완료한 것을 보여주는 도면으로서 확장터널(20)의 단면이 완전히 형성되어 기존 터널(10)을 제거하여 터널을 완전히 확장한 것을 보여주는 것이다.6 is a view showing that the tunnel expansion of the present invention is completed, the cross section of the expansion tunnel 20 is completely formed to show that the tunnel is completely expanded by removing the existing tunnel 10.

도 7은 본 발명의 터널확장을 위하여 확장터널 단위 굴착면을 단계적으로 굴착 시공하는 순서를 보여주는 도면이다.7 is a view showing a step of excavation construction step by step expansion unit unit drilling surface for tunnel expansion of the present invention.

상기 확장터널 벽체(30)를 터널단면을 따라 형성하기 위하여 확장터널 단위 굴착면(80)은 순차적으로 굴착설치하게 되는데 그 시공순서(81)인 굴착순서는 확장터널 단면의 중앙부의 좌측 또는 우측의 단면에 맨아래쪽의 확장터널 단위 굴착면을 굴착하고, 바로 인접한 면을 건너뛰어 다음의 확장터널 단위 굴착면을 굴착하는 순서로 굴착하고 중앙부에서는 다시 아래로 와서 상기 맨 아래쪽의 위에 있는 면을 굴착하고 다음에는 기 시공되어 있는 굴착면을 건너뛰어 기공하는 순서를 번갈아 하면서 굴착할 때마다 철근을 조립배치하고 콘크리트를 타설양생하는 작업을 순차적으로 반복하게 된다. 즉, 도면에 부여되어 있는 시공순서에 의해 시공하게 된다.In order to form the expansion tunnel wall 30 along the tunnel section, the expansion tunnel unit excavation surface 80 is excavated and installed in sequence. The excavation order of the construction order 81 is the left or right side of the center of the cross section of the expansion tunnel. Excavate the bottom of the extended tunnel unit excavation surface on the cross section, excavate in the order of excavation of the next extended tunnel unit excavation surface, and from the center, come back down and excavate the top surface of the bottom. Next, assembling and reinforcing the reinforcing bars and pouring concrete every time they excavate, alternating the order of pore by skipping the existing drilling surface. In other words, the construction is performed in the order of construction given in the drawings.

도 8은 본 발명의 확장터널 단위 굴착면을 시공하기 위하여 사용하는 굴착장치에 장착된 굴착기를 보여주는 도면으로서, 기존 터널(10)의 라이닝 상에 설치된 굴착장비(40)에 장착된 굴착기(70)를 보여주는 것이다. 상기 굴착기(70)는 길이가 12m정도로서 체인(72)면을 따라 다수개 설치된 굴착날(71)을 이용하여 상기 확장터널 단위 굴착면(80)을 굴착하는 것이다. 이러한 장비를 이용할 수 있는 지반은 양호한 토사로서 암반 또는 풍화암과 같은 암종류의 지반에는 적용할 수가 없다.8 is a view showing an excavator mounted on an excavation apparatus used to construct an extended tunnel unit excavation surface of the present invention, an excavator 70 mounted on an excavation equipment 40 installed on a lining of an existing tunnel 10. To show. The excavator 70 is about 12m in length to excavate the expansion tunnel unit excavation surface 80 using a plurality of excavation blades 71 provided along the chain 72 surface. The ground on which such equipment can be used is good soil and cannot be applied to rock types such as rock or weathered rock.

도 9는 본 발명의 확장터널 단위 굴착면을 시공하는 상태를 보여주는 도면으로서, 도 7에서 설명한 상기 확장터널 벽체(30)를 터널단면을 따라 형성하기 위하여 확장터널 단위 굴착면(80)은 시공순서(81)에 따라 순차적으로 굴착설치하게 되는데 이러한 확장터널 벽체(30)를 형성하기 위하여 본 도에서 보여주는 바와 같이 깔때기 형상으로 확장터널 단위 굴착면(80)을 굴착하는 과정을 거쳐 확장터널벽체(30)를 설치하게 된다. 이러한 확장터널 벽체(30)의 작업을 단계적으로 실시하여 확장터널(20)을 설치하게 된다. 이때 확장터널 단위 굴착면(80)의 길이와 깊이는 12m이며 깔때기 형상으로 상기 확장터널 단위 굴착면(80)을 굴차할 때 도 9에서 보는 바와 같이 확장터널 단위 굴착면 겹침부(82)를 3m로 하여 굴착한다. 이렇게 굴착하는 것은 굴착입구에는 굴착시 토사가 교란되어 지내력이 약해지게되는 것을 방지하기 위함이다.9 is a view showing a state in which the expansion tunnel unit excavation surface of the present invention, the expansion tunnel unit excavation surface 80 in order to form the expansion tunnel wall 30 described in FIG. Excavation is installed sequentially according to (81), but in order to form such an expansion tunnel wall 30 through the process of excavating the expansion tunnel unit excavation surface 80 in a funnel shape as shown in this figure expansion tunnel wall 30 Will be installed. The expansion tunnel 20 is installed step by step to work the expansion tunnel wall (30). At this time, the length and depth of the extended tunnel unit excavation surface 80 is 12m and when the expansion tunnel unit excavation surface 80 in the funnel shape as shown in Figure 9 the expansion tunnel unit excavation surface overlap portion 82 3m Excavation This excavation is to prevent the soil strength from being disturbed due to disturbance of earth and sand during excavation at the excavation entrance.

이상의 설명에서와 같이, 본 발명은 기존 터널을 이용하여 터널을 확장하는 시공방법에 관한 것으로서, 기존터널을 이용하여 터널을 확장하는 방법을 사용하면 별도의 터널을 확장할 시 요구되는 용지의 보상과 매입에 소요되는 노력과 비용을 절감할 수 있으며, 확장에 따른 별도의 교통소통대책을 수립할 필요가 없으며, 별도의 터널을 확장할때에 소요되는 공사비용과 공사기간에 비하여 기존의 터널을 이용하여 확장하므로서 공사비용 및 공사기간이 획기적으로 절감될 수 있는 매우 경제적인 시공방법이며, 또한, 기존 터널을 이용하여 확장할 시에는 자연의 파괴를 최소화할 수 있는 친환경적인 시공방법인 것이다.As described above, the present invention relates to a construction method for extending a tunnel by using an existing tunnel, and using a method of expanding a tunnel by using an existing tunnel, compensation of paper required when extending a separate tunnel and It can reduce the effort and cost of the purchase, and does not need to establish a separate traffic communication plan according to the expansion, and uses the existing tunnel compared to the construction cost and construction period required when expanding the separate tunnel. It is a very economical construction method that can significantly reduce the construction cost and construction period by expanding, and is an environmentally friendly construction method that can minimize the destruction of nature when expanding by using existing tunnels.

Claims (9)

기존 터널의 라이닝을 따라 일정길이의 하우징을 설치하고 하우징의 지지대에 굴착기가 장착된 굴착장비를 설치하여 단계적으로 일정크기의 확장터널 단위 굴착면을 굴착하여 철근을 배치한 후에 콘크리트를 타설양생하여 확장터널 벽체를 형성하면서 하우징과 확장터널 벽체사이의 토사를 굴토제거하는 작업을 순차적으로 하여 확장터널을 설치하는 것을 특징으로 하는 기존 터널을 이용한 터널 확장 시공장치.Install the housing of a certain length along the lining of the existing tunnel, install the excavation equipment equipped with the excavator on the support of the housing, and excavate the excavation surface of the expansion tunnel unit of a certain size step by step to place the reinforcing bars, and then expand the concrete by pouring them. Tunnel expansion construction device using the existing tunnel, characterized in that to install a tunnel to sequentially remove the earth and sand between the housing and the expansion tunnel wall while forming the tunnel wall. 제 1항에 있어서,The method of claim 1, 상기 하우징은 기존 터널의 라이닝을 따라 유압잭에 의해 굴진 설치하게 되는데 하우징은 철판을 터널의 라이닝의 형상으로 하고 상기 하우징의 중간부에는 H빔과 같은 강재를 설치하여 굴착장비를 장착할 지지대를 설치하는 것을 특징으로 하는 기존 터널을 이용한 터널 확장 시공장치.The housing is installed by the hydraulic jack along the lining of the existing tunnel, the housing is a steel plate in the shape of the lining of the tunnel and the middle portion of the housing to install a support for mounting the drilling equipment by installing a steel, such as H beam Tunnel expansion construction apparatus using an existing tunnel, characterized in that. 제 1항 및 제 2항에 있어서,The method according to claim 1 and 2, 상기 하우징은 터널입구쪽에 상기 하우징의 일부가 돌출되도록 설치하고 나머지에는 굴착장비와 기존 터널의 라이닝에 굴진되도록 하는 것을 특징으로 하는기존 터널을 이용한 터널 확장 시공장치.The housing is installed so that a portion of the housing protrudes in the tunnel inlet and the other end of the tunnel expansion construction device using an existing tunnel, characterized in that the excavation equipment and excavated in the lining of the existing tunnel. 제 1항 내지 제3항에 있어서,The method according to claim 1, wherein 상기 하우징의 길이는 40m이며, 하우징의 20m는 터널입구측에 돌출되도록 설치하고, 중앙부에는 굴착기가 장착된 굴착장비를 설치할 지지대위에 굴착장비를 장착한 것을 특징으로 하는 기존 터널을 이용한 터널 확장 시공장치.The length of the housing is 40m, 20m of the housing is installed so as to protrude to the tunnel inlet side, the tunnel expansion construction device using the existing tunnel, characterized in that the excavation equipment is mounted on the support to install the excavation equipment equipped with the excavator in the center . 제 1항에 있어서,The method of claim 1, 상기 확장터널 단위 굴착면은 확장터널면을 따라 상기 굴착기에 의해 굴착설치되는 것으로서 깊이와 길이는 각각 12m인 것으로서 굴착이 완료되면 철근을 상기 확장터널 단위 굴착면내에 조립설치하고 콘크리트를 타설양생하여 확장터널면을 따라 이러한 확장터널 단위 굴착면을 시공완료하여 확장터널벽체를 설치하는 것을 특징으로 하는 기존 터널을 이용한 터널 확장 시공장치.The expansion tunnel unit excavation surface is excavated and installed by the excavator along the expansion tunnel surface, and the depth and length are 12m, respectively, and when the excavation is completed, the reinforcing bars are assembled and installed in the expansion tunnel unit excavation surface and expanded by pouring concrete Tunnel expansion construction device using the existing tunnel, characterized in that to install the expansion tunnel wall by completing the expansion tunnel unit excavation surface along the tunnel surface. 제 1항 및 제 5항에 있어서,The method according to claim 1 and 5, 상기 확장터널벽체는 확장터널면을 따라 순차적으로 굴착기를 이용하여 굴착설치하는 확장터널 단위 굴착면의 조합에 의하여 설치되는 것으로서 도 7에 기재되어 있는 시공순서에 의하여 순차적으로 굴착시공하되 그 굴착순서는 확장터널 단면의 중앙부의 좌측 또는 우측 단면의 맨아래쪽의 확장터널 단위 굴착면을 굴착하고, 바로 인접한 면을 건너뛰어 다음의 확장터널 단위 굴착면을 굴착하는 순서로 굴착하여 중앙부에서는 다시 아래로 와서 상기 맨 아래쪽의 위에 있는 확장터널 단위 굴착면을 굴착하고 다음에는 기 시공되어 있는 굴착면을 건너뛰어 시공하는 순서를 번갈아 하면서 굴착할 때마다 철근을 조립배치하고 콘크리트를 타설양생하는 작업을 반복적으로 하여 확장터널벽체를 설치하는 것을 특징으로 하는 기존 터널을 이용한 터널 확장 시공장치.The expansion tunnel wall is installed by a combination of the expansion tunnel unit excavation surface to be excavated by using an excavator sequentially along the expansion tunnel surface to be excavated in sequence according to the construction sequence described in FIG. Excavate the extended tunnel unit excavation surface at the bottom of the left or right cross section of the center of the extended tunnel section, and in the order of excavating the next expansion tunnel unit excavation surface by skipping the immediately adjacent surface. Excavate the excavation surface of the expansion tunnel unit at the bottom of the bottom, and then skip the existing excavation surface, and alternately install and install reinforcing bars and reinforce concrete for each excavation. Tunnel expansion using existing tunnels, characterized by installing tunnel walls Intestinal construction device. 제 1항 및 제 6항에 있어서,The method according to claim 1 and 6, 상기 확장터널벽체를 형성하기 위하여 확장터널면을 따라 깔때기 형상으로 단계적으로 확장터널 단위 굴착면을 형성하며 확장터널 단위 굴착면의 길이는 12m로 하되 상기 깔때기 형상으로 굴착시 전방의 확장터널 단위 굴착면과 확장터널 단위 굴착면의 겹침부를 3m로 하여 확장터널벽체를 설치하는 것을 특징으로 하는 기존 터널을 이용한 터널 확장 시공장치.In order to form the expansion tunnel wall, an expansion tunnel unit excavation surface is formed in a funnel shape along the expansion tunnel surface stepwise, and the length of the expansion tunnel unit excavation surface is 12 m, but the excavation surface of the expansion tunnel unit in front of the expansion tunnel unit is excavated. Tunnel expansion construction device using the existing tunnel, characterized in that for installing the expansion tunnel wall with the overlap portion of the expansion tunnel unit excavation surface 3m. a) 기존 터널의 라이닝상에 하우징을 설치하고 유압잭으로 서서히 진입시켜 하우징을 라이닝상에 설치하는 단계;a) installing the housing on the lining of the existing tunnel and installing the housing on the lining by slowly entering the hydraulic jack; b) 상기 하우징상에 굴착기가 장착된 굴착장비를 설치하고 단계적으로 확장터널 단위 굴착면을 굴착하는 단계;b) installing an excavation equipment equipped with an excavator on the housing and digging an expansion tunnel unit excavation surface step by step; c) 상기 확장터널 단위 굴착면에 철근을 조립설치하고 콘크리트를 타설양생하여 확장터널벽체를 형성하는 단계;c) assembling and installing reinforcing bars in the expansion tunnel unit excavation surface and forming concrete to form expansion tunnel walls; d) 상기 하우징과 확장터널벽체사이의 토사를 굴토하여 제거하는 단계;d) excavating and removing the soil between the housing and the expansion tunnel wall; e) 상기 하우징을 다음굴착을 위하여 전진이동하여 상기 하우징에 설치된 굴착장비를 이용하여 확장터널 단위 굴착면을 굴착하여 철근을 설치하고 콘크리트를 타설양생하여 확장터널벽체를 형성하고 상기 하우징과 확장터널벽체사이의 토사를 굴토하는 것을 순차적을 하여 확장터널의 시공을 종료하는 단계; 및e) Moving the housing forward for the next excavation, using the excavating equipment installed in the housing, excavating the expansion tunnel unit excavation surface to install reinforcing bars and pouring concrete to form expansion tunnel walls, and the housing and expansion tunnel walls Sequencing the excavation of soil between the steps of ending the construction of the expansion tunnel; And f) 시공완료된 확장터널의 교통을 소통시키기 위하여 노면을 정리 포장하고 터널내의 조명등의 시설을 설치하여 터널을 이용할 수 있게 하는 단계를 포함하는 것을 특징으로 하는 기존 터널을 이용하여 터널을 확장 시공하는 장치를 이용한 터널확장 시공방법.f) A device for expanding a tunnel using an existing tunnel, comprising the steps of arranging and paving a road surface to communicate traffic of a completed expansion tunnel and installing a facility such as lighting in the tunnel to use the tunnel. Tunnel extension construction method using 제 8항에 있어서,The method of claim 8, 상기 e)단계에서 확장터널벽체가 깔때기 형상으로 설치되므로서 벽체의 굴곡에 의하여 터널의 미관 또는 교통사고 발생시의 충격등을 고려하여 프리캐스트 판넬을 상기 확장터널벽체에 부착설치하고 그사이를 콘크리트로 충전하는 단계를 더 갖는 것을 특징으로 하는 기존 터널을 이용하여 터널을 확장 시공하는 장치를 이용한 터널 확장 시공방법.In the step e), the expansion tunnel wall is installed in the shape of a funnel, and the precast panel is attached to the expansion tunnel wall in consideration of the aesthetics of the tunnel or the impact of a traffic accident due to the bending of the wall, and the concrete is filled therebetween. Tunnel extension construction method using a device for extending the tunnel using an existing tunnel, characterized in that it further has a step.
KR1020030009860A 2003-02-17 2003-02-17 Apparatus for extension work of tunnel using the existing tunnel and constructing method for extension of tunnel using the apparatus KR100573014B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020030009860A KR100573014B1 (en) 2003-02-17 2003-02-17 Apparatus for extension work of tunnel using the existing tunnel and constructing method for extension of tunnel using the apparatus

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020030009860A KR100573014B1 (en) 2003-02-17 2003-02-17 Apparatus for extension work of tunnel using the existing tunnel and constructing method for extension of tunnel using the apparatus

Related Child Applications (1)

Application Number Title Priority Date Filing Date
KR20-2003-0004582U Division KR200326698Y1 (en) 2003-02-17 2003-02-17 Apparatus for extension work of tunnel using the existing tunnel

Publications (2)

Publication Number Publication Date
KR20040074314A true KR20040074314A (en) 2004-08-25
KR100573014B1 KR100573014B1 (en) 2006-04-25

Family

ID=37361062

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020030009860A KR100573014B1 (en) 2003-02-17 2003-02-17 Apparatus for extension work of tunnel using the existing tunnel and constructing method for extension of tunnel using the apparatus

Country Status (1)

Country Link
KR (1) KR100573014B1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101858220A (en) * 2010-05-28 2010-10-13 深圳市建设(集团)有限公司 Tunnel double upper sidewall heading construction method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101858220A (en) * 2010-05-28 2010-10-13 深圳市建设(集团)有限公司 Tunnel double upper sidewall heading construction method

Also Published As

Publication number Publication date
KR100573014B1 (en) 2006-04-25

Similar Documents

Publication Publication Date Title
KR101051965B1 (en) Panel joint for underground continuous wall construction and underground continuous wall construction method
KR20090100867A (en) The method construction work and unit metal tubing constructing system for the road underground driveway
JP5843413B1 (en) Lowering method of existing tunnel
JP6186267B2 (en) How to build an underground tunnel
KR20190079588A (en) Construction Method of Duplex Tunnel
JP4309219B2 (en) Tunnel construction method
JP6944882B2 (en) How to build an invert in an existing tunnel
JP3893056B2 (en) Construction method of underground structure
KR100784201B1 (en) Method for construction of tunnel
JP4144702B2 (en) How to build an enlarged tunnel
KR100573014B1 (en) Apparatus for extension work of tunnel using the existing tunnel and constructing method for extension of tunnel using the apparatus
KR200326698Y1 (en) Apparatus for extension work of tunnel using the existing tunnel
KR101427812B1 (en) Open cut method for constructing an underground structure
KR100548810B1 (en) The expanding tunnel and constructing method of the existing tunnel which was constructed in rock masses
JP3917146B2 (en) Laying method and removing method of lining plate in open shield method
KR200316681Y1 (en) The expanding tunnel and constructing method of the existing tunnel
KR100432782B1 (en) Supporting structure for tunnel and underground tunnel construction method using the same
JP3996597B2 (en) Open shield machine and open shield method using it
JP4349570B2 (en) Construction method of division box and underground level crossing
KR20210002947A (en) Two-side semicircle arch type leading pipe and structure of non-excavation type tunnel using thereof and method of constructing thereof
JP2668648B2 (en) Construction method of underground structure and starting pit used for it
KR102610909B1 (en) Method and structure of steel pipe propulsion using anchor installation inside steel pipe to prevent sinking
JP2976106B1 (en) Installation method of lining plate in open shield method
JP4319122B2 (en) Branch and junction structure of branching tunnel and its construction method
KR20040023915A (en) Underaround continued wall structure using a large diameter cast-in-place pile installed by Benoto method and construction method thereof

Legal Events

Date Code Title Description
A201 Request for examination
E902 Notification of reason for refusal
E90F Notification of reason for final refusal
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20090410

Year of fee payment: 6

FPAY Annual fee payment

Payment date: 20120413

Year of fee payment: 9

FPAY Annual fee payment

Payment date: 20160405

Year of fee payment: 11

FPAY Annual fee payment

Payment date: 20170314

Year of fee payment: 12

FPAY Annual fee payment

Payment date: 20180410

Year of fee payment: 13

FPAY Annual fee payment

Payment date: 20190416

Year of fee payment: 14