KR101427812B1 - Open cut method for constructing an underground structure - Google Patents
Open cut method for constructing an underground structure Download PDFInfo
- Publication number
- KR101427812B1 KR101427812B1 KR1020130071573A KR20130071573A KR101427812B1 KR 101427812 B1 KR101427812 B1 KR 101427812B1 KR 1020130071573 A KR1020130071573 A KR 1020130071573A KR 20130071573 A KR20130071573 A KR 20130071573A KR 101427812 B1 KR101427812 B1 KR 101427812B1
- Authority
- KR
- South Korea
- Prior art keywords
- underground structure
- precast
- upper member
- ground
- precast upper
- Prior art date
Links
- 238000000034 method Methods 0.000 title claims description 22
- 239000004567 concrete Substances 0.000 claims abstract description 19
- 238000009434 installation Methods 0.000 claims description 12
- 239000002689 soil Substances 0.000 claims description 10
- 239000000945 filler Substances 0.000 claims description 5
- 239000000463 material Substances 0.000 claims description 4
- 239000004593 Epoxy Substances 0.000 claims description 3
- 239000004570 mortar (masonry) Substances 0.000 claims description 3
- 238000010276 construction Methods 0.000 abstract description 16
- 239000011178 precast concrete Substances 0.000 abstract description 3
- 238000010586 diagram Methods 0.000 description 2
- 238000009412 basement excavation Methods 0.000 description 1
- 238000004891 communication Methods 0.000 description 1
- 238000007796 conventional method Methods 0.000 description 1
- 230000003111 delayed effect Effects 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 230000005611 electricity Effects 0.000 description 1
- 230000007613 environmental effect Effects 0.000 description 1
- 238000009415 formwork Methods 0.000 description 1
- 238000011900 installation process Methods 0.000 description 1
- 239000011435 rock Substances 0.000 description 1
- 239000010865 sewage Substances 0.000 description 1
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 1
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D29/00—Independent underground or underwater structures; Retaining walls
- E02D29/045—Underground structures, e.g. tunnels or galleries, built in the open air or by methods involving disturbance of the ground surface all along the location line; Methods of making them
- E02D29/05—Underground structures, e.g. tunnels or galleries, built in the open air or by methods involving disturbance of the ground surface all along the location line; Methods of making them at least part of the cross-section being constructed in an open excavation or from the ground surface, e.g. assembled in a trench
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D17/00—Excavations; Bordering of excavations; Making embankments
- E02D17/02—Foundation pits
- E02D17/04—Bordering surfacing or stiffening the sides of foundation pits
-
- E—FIXED CONSTRUCTIONS
- E03—WATER SUPPLY; SEWERAGE
- E03F—SEWERS; CESSPOOLS
- E03F1/00—Methods, systems, or installations for draining-off sewage or storm water
- E03F1/002—Methods, systems, or installations for draining-off sewage or storm water with disposal into the ground, e.g. via dry wells
- E03F1/003—Methods, systems, or installations for draining-off sewage or storm water with disposal into the ground, e.g. via dry wells via underground elongated vaulted elements
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D11/00—Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
- E21D11/04—Lining with building materials
- E21D11/08—Lining with building materials with preformed concrete slabs
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D11/00—Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
- E21D11/04—Lining with building materials
- E21D11/10—Lining with building materials with concrete cast in situ; Shuttering also lost shutterings, e.g. made of blocks, of metal plates or other equipment adapted therefor
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D2250/00—Production methods
- E02D2250/0023—Cast, i.e. in situ or in a mold or other formwork
Landscapes
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Structural Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Civil Engineering (AREA)
- Architecture (AREA)
- Paleontology (AREA)
- General Engineering & Computer Science (AREA)
- Geochemistry & Mineralogy (AREA)
- Geology (AREA)
- Environmental & Geological Engineering (AREA)
- Health & Medical Sciences (AREA)
- Hydrology & Water Resources (AREA)
- Public Health (AREA)
- Water Supply & Treatment (AREA)
- Underground Structures, Protecting, Testing And Restoring Foundations (AREA)
Abstract
Description
본 발명의 실시예는 저심도 지하구조물의 시공방법에 관한 것으로, 지반을 굴착하여 상부가 개방된 상태에서 지하구조물을 완성한 후, 굴착부분을 되메우는 방식으로 공사가 진행되는 개착식 지하구조물 시공방법에 관한 것이다.
An embodiment of the present invention relates to a method of constructing a low-depth underground structure, comprising: constructing an underground structure in which the upper portion of the underground structure is completed by excavating the ground, .
본 발명의 실시예는 대심도 지하구조물을 건설하기 위해 사용되는 폭파를 이용한 NATM 공법, 암반을 기계로 굴착하는 TBM 공법, 토사의 붕괴를 지지하며 굴착하는 쉴드공법 등 대규모 단면이 필요한 지하구조물 시공방법과는 달리 소형 터널, 암거, 지하차도 등 중소규모 단면을 갖는 저심도 지하구조물에 주로 사용되는 시공방법이다.An embodiment of the present invention is a method of constructing an underground structure requiring a large-scale section such as a NATM method using a blast, a TBM method of excavating a rock, a shield method of supporting a collapse of the earth, Is a construction method mainly used in low depth underground structures with small and medium size sections such as small tunnels, culverts, and underground roads.
이 부분에 기술된 내용은 단순히 본 발명의 실시예에 대한 배경 정보를 제공할 뿐 종래기술을 구성하는 것은 아니다.
The contents described in this section merely provide background information on the embodiment of the present invention and do not constitute the prior art.
최근 신도시 개발과 재개발 사업이 진행되면서 상하수도, 전기, 통신 등을 일원화하여 관리하는 공동구 또는 다목적 암거의 시공이 확대되고 있으며, 지상 도로의 포화로 인해 교통이 정체되는 구간에는 지하차도, 소형 터널 등이 대안으로 검토되고 있다.
Recently, as the development and redevelopment projects of new cities are being carried out, the construction of a common or multi-purpose culvert for managing water and sewage, electricity, and communication is being expanded. Underground traffic, small tunnels, It is being considered as an alternative.
또한 기존 지하철에 비해 공사기간과 공사비를 절감할 수 있는 저심도 지하철 건설도 추진중에 있으며, 생태계 보존을 위해 생태이동로, 환경터널 등의 건설이 증가되는 등 중소규모 지하구조물의 수요가 증가되고 있는 추세이다.
In addition, underground subway construction is underway to reduce the construction period and construction cost compared to existing subways. Demand for small and medium sized underground structures is increasing, for example, construction of ecological transport roads and environmental tunnels are increasing to preserve ecosystems Trend.
종래기술의 개착식 지하구조물 시공방법은 도 1a, 1b, 1c, 2, 3에 도시된 바와 같이, 지하구조물의 설치방향을 따라 흙막이 벽체(100)를 설치하고 지반을 굴착하며, 굴착된 지반의 흙막이 벽체(100) 사이에는 띠장(200)과 버팀보(300)를 설치하여 흙막이 벽체 외부의 토압을 지지하고, 굴착지반 저면에는 버림 콘크리트(400)를 타설한다.
As shown in FIGS. 1A, 1B, 1C, 2 and 3, a conventional method of constructing an open underground structure includes installing an earth
상기 흙막이 벽체(100)의 일측에 설치된 크레인(600)은 지하구조물의 설치방향을 따라 이동하며 지하 가시설인 버팀보(300)의 해체 및 복원을 반복하며 다수의 작업구(700)를 형성하며, 상기 버림 콘크리트(400) 상부에 현장타설 콘크리트 하부부재(500)를 설치하고, 상기 다수의 작업구(700)를 통해 현장타설 콘크리트 하부부재(500)의 상부에 프리캐스트 상부부재(800)를 설치한다.
The
상기 현장타설 콘크리트 하부부재(500)의 상부인 요철형 연결부(900)에 상기 프리캐스트 상부부재(800)를 설치함으로써 지하구조물을 완성하고, 상기 지하구조물 주위의 지반 굴착부분을 토사 등으로 되메우는 것으로 지중에 지하구조물을 설치하는 것이다.
The precast
그러나 상기 종래기술은 지하구조물의 설치방향을 따라 크레인이 이동하며 버팀보의 해체와 복원을 반복실시하여 다수의 작업구를 형성하고, 상기 이동되는 작업구를 통해 프리캐스트 상부부재를 설치하므로,
However, in the related art, the crane is moved along the installation direction of the underground structure, the disassembly and restoration of the strut are repeatedly performed to form a plurality of workplaces, and the precast upper member is installed through the moved workplaces,
프리캐스트 부재의 설치과정이 번거로워 시공성이 저하되고 공기가 길어지며, 상기 흙막이 벽체의 일측에 크레인을 설치함으로써 차량이 일방향으로 진행되어 지하구조물 주변 교통이 혼잡해져 교통통제를 해야 하는 어려움이 있다.
The installation process of the precast member is troublesome and the workability is deteriorated and the air is lengthened and the crane is installed on one side of the earth retaining wall so that the vehicle progresses in one direction and the traffic around the underground structure becomes congested,
종래의 암거 등 소규모 개착식 지하구조물은 프리캐스트 상,하부부재를 사용하여 지하구조물을 형성하고 있으나, 지하구조물의 설치방향을 따라 크레인이 이동하며 버팀보의 해체와 복원을 반복실시하여 다수의 작업구를 형성하고, 상기 이동되는 작업구를 통해 프리캐스트 상,하부부재를 설치하므로 시공성이 저하되며 공기가 지연된다.
Conventional small scale underground structures such as culverts form an underground structure using precast and lower members, but the crane moves along the installation direction of the underground structure, and the disassembly and restoration of the strut are repeatedly performed, And the precast and the lower member are installed through the moving work hole, so that the workability is lowered and the air is delayed.
또한 종래의 중규모 개착식 지하구조물은 상,하부부재를 현장타설 콘크리트로 형성하고 있으나, 현장타설 콘크리트로 인해 버팀보 등의 가시설 설치 및 해체과정이 복잡하고, 상,하부부재를 설치하기 위한 거푸집 등의 설치로 인하여 시공성이 저하되고 공기가 지연된다.In addition, although the conventional medium-scale open-ended underground structure is formed of the cast-in-place concrete, the installation and disassembly process of the strut is complicated due to the on-site cast concrete and the formwork for installing the upper and lower members Installation results in reduced workability and air delay.
본 발명의 실시예는 지하구조물의 상,하부부재를 각각 프리캐스트 콘크리트와 현장타설 콘크리트로 형성하고, 지하구조물의 일측 단부 근접한 지상에는 크레인을 설치하며, 이로 인해 작업구를 한 개소로 최소화하고, 프리캐스트 상부부재를 운반 및 설치할 수 있는 자동장비를 상기 하부부재의 임시통로에 마련하여 지하구조물을 용이하게 시공할 수 있는 개착식 지하구조물 시공방법을 제공하는 것을 목적으로 한다.In the embodiment of the present invention, the upper and lower members of the underground structure are respectively formed of precast concrete and cast-in-place concrete, and a crane is installed on the ground near one end of the underground structure, It is an object of the present invention to provide an installation method of an underground structure in which an underground structure can be easily installed by providing automatic equipment capable of carrying and installing a precast upper member in a temporary passage of the lower member.
본 발명의 실시예는 소형 터널, 지하차도 등의 저심도 지하구조물을 설치하는 개착식 지하구조물 시공방법에 있어서, ⒜ 지반에 상기 지하구조물의 폭 이상으로 소정 거리 이격하여 흙막이 벽체(10)를 지하구조물의 양측에 길이방향으로 설치하는 단계;
The present invention relates to a method of constructing an open-ended underground structure for installing a low-depth underground structure such as a small tunnel or an underground roadway, the method comprising the steps of: (a) locating the earth retaining
⒝ 지반을 지상에서 지하로 굴착하면서 상기 흙막이 벽체(10)에 설치된 띠장(20) 사이에 복수의 버팀보(30)를 순차적으로 설치하는 단계; ⒞ 상기 버팀보(30) 설치가 완료된 후, 굴착된 지반 저면에 버림 콘크리트(40)를 타설하는 단계;
(B) sequentially installing a plurality of struts (30) between the wales (20) installed on the earth retaining wall (10) while excavating the ground from the ground to the ground; Placing the shredded concrete (40) on the excavated bottom of the ground after completion of installation of the strut (30);
⒟ 하부 슬래브(51)와 측벽(52) 일부로 형성된 하부부재(50)를 현장타설 콘크리트로 지하구조물의 길이방향으로 설치하는 단계; ⒠ 상기 하부부재(50)의 현장타설 콘크리트 양생 후, 상기 하부부재(50)의 측벽(52)과 상기 흙막이 벽체(10) 사이에 토사를 되메우는 단계;
Installing a lower member (50) formed as a part of the lower slab (51) and the side wall (52) in the longitudinal direction of the underground structure with the laying concrete; Filling the soil between the side wall (52) of the lower member (50) and the earth retaining wall body (10) after curing of the cast concrete in place of the lower member (50);
⒡ 상기 하부부재(50)에 장비, 자재 등을 하역, 인양할 수 있도록 지상에 설치된 크레인(60)에 의해 상기 하부부재(50) 일측 단부에 인접한 버팀보(30)를 상단에서 하단까지 해체하여 하나의 작업구(70)를 형성하는 단계;
The
⒢ 프리캐스트 상부부재(90)가 설치될 수 있도록 지하구조물의 길이방향으로 상기 버팀보(30) 일부를 해체하고, 상기 크레인(60)에 의해 상기 프리캐스트 상부부재(90)의 운반과 조립기능을 하는 자동장비(80)를 상기 작업구(70)를 통해 상기 하부 슬래브(51)에 하역하는 단계;
A part of the
⒣ 상기 크레인(60)에 의해 상기 프리캐스트 상부부재(90)를 상기 작업구(70)를 통해 상기 자동장비(80)의 상부에 하역하는 단계, ⒤ 상기 프리캐스트 상부부재(90)는 상기 자동장비(80)에 의해 지하구조물의 길이방향으로 차례로 운반되어 상기 하부부재(50)의 측벽 상부에 설치되는 단계;
Unloading the precast upper member (90) by the crane (60) to the upper part of the automatic equipment (80) through the operation tool (70) (80) in the longitudinal direction of the underground structure and installed above the side walls of the lower member (50);
⒥ 상기 하부부재(50)와 상기 프리캐스트 상부부재(90) 사이에는 연결부(93)가 형성되고, 상기 연결부(93)에 의해 형성된 틈새에 채움재(94)를 충전하여 상기 프리캐스트 상부부재(90)와 하부부재(50)를 일체화하는 단계;
A
⒦ 상기 프리캐스트 상부부재(90)의 측벽과 상기 흙막이 벽체(10) 사이에 토사를 되메우고, 상기 버팀보(30)를 해체하는 단계; ⒧ 토사를 지면까지 되메우는 단계로 구성되는 것을 특징으로 한다.Filling the soil between the sidewall of the precast upper member (90) and the earth retaining wall (10) and disassembling the strut (30); And filling up the soil to the ground.
본 발명의 개착식 지하구조물 시공방법은 지하구조물 일측 단부에 하나의 작업구를 형성하고 하부부재에 자동장비를 설치하여 상기 작업구를 통해 프리캐스트 상부부재의 운반 및 설치를 용이하게 함으로써, 종래의 연속되는 버팀보 해체와 복원 및 크레인 이동에 따른 작업공정을 감축하여 공사기간을 단축하고, 지하구조물 상부부재의 시공성이 향상되는 효과가 있다.
The method of constructing an open underground structure according to the present invention is characterized in that one operation hole is formed at one end of an underground structure and an automatic equipment is installed in a lower member to facilitate transportation and installation of the precast upper member through the operation hole, It is possible to shorten the construction period by reducing the number of work processes due to the disassembly and restoration of consecutive strut breaks and crane movement, and to improve the workability of the upper part of the underground structure.
또한 본 발명은 지하구조물 일측 단부에 근접한 지상에 크레인을 배치하여 프리캐스트 상부부재를 하나의 작업구를 통해 자동장비로 지하구조물에 운반, 설치함으로써, 차량이 양방향으로 진행되어 지하구조물 주변 교통을 원활하게 하며, 개착식 지하구조물의 상,하부부재는 현장타설 콘크리트와 프리캐스트 콘크리트의 효율적인 구조로 형성되어 하부부재를 임시통로로 활용하여 프리캐스트 상부부재의 설치를 용이하게 함으로써, 지하구조물의 시공성이 향상되는 효과가 있다.Further, according to the present invention, a crane is disposed on the ground close to one end of an underground structure, and the precast upper member is transported and installed to an underground structure through automatic equipment through a single operation hole, And the upper and lower members of the open underground structure are formed of an efficient structure of the cast concrete and the precast concrete to facilitate the installation of the precast upper member by utilizing the lower member as a temporary passage to improve the workability of the underground structure There is an effect to be improved.
도 1(a) ~ 1(c)는 종래기술인 개착식 지하구조물 시공과정을 나타내는 평면도
도 2는 종래기술의 지중에 설치된 지하구조물을 나타내는 단면도
도 3은 도 2의 A - A' 단면도
도 4(a) ~ 4(b)는 본 발명의 일실시예인 개착식 시공방법을 나타내는 평면도
도 5(a) ~ 5(l)은 본 발명의 개착식 지하구조물 시공과정을 나타내는 단면도
도 6(a) ~ 6(e)는 본 발명의 지하구조물 연결부를 나타내는 단면도
도 7(a) ~ 7(d)는 본 발명에 사용되는 자동장비의 턴테이블 기능을 나타내는 개념도Figs. 1 (a) to 1 (c) are plan views showing a construction process of an openable underground structure
2 is a cross-sectional view showing an underground structure installed in the ground of the prior art
3 is a cross-sectional view taken along line A-A '
4 (a) to 4 (b) are plan views showing an openable type construction method which is an embodiment of the present invention
5 (a) to 5 (l) are cross-sectional views showing a construction process of an openable underground structure of the present invention
6 (a) to 6 (e) are cross-sectional views showing connection portions of an underground structure of the present invention
7 (a) to 7 (d) are conceptual diagrams showing the turntable function of the automatic equipment used in the present invention
본 발명이 속하는 기술분야에서 통상의 지식을 가진 자가 본 발명을 용이하게 실시할 수 있도록 본 발명의 바람직한 일실시예의 도면을 참조하여 설명하면 다음과 같다.
DETAILED DESCRIPTION OF EXEMPLARY EMBODIMENTS Hereinafter, exemplary embodiments of the present invention will be described in detail with reference to the accompanying drawings.
도 4(a) ~ 4(b)는 본 발명의 일실시예인 개착식 시공방법을 나타내는 평면도로, 지반 굴착 전 지반에 지하구조물의 폭 이상으로 소정 거리 이격하여 흙막이 벽체(10)를 지하구조물의 양측에 길이방향으로 설치하며, 지반을 지상에서 지하로 굴착하면서 흙막이 벽체(10)에 소정 간격으로 띠장(20)을 설치하고, 상기 흙막이 벽체(10)에 설치된 띠장(20) 사이에 복수의 버팀보(30)를 순차적으로 설치한다.
4 (a) to 4 (b) are plan views showing an open type construction method according to an embodiment of the present invention, in which the earth retaining
상기 지하구조물의 일측 단부에 하나의 작업구(70)를 형성하기 위해, 상기 지하구조물 일측 단부에 근접한 지상에 크레인(60)을 배치하고, 상기 크레인(60)에 의해 상기 지하구조물 일측 단부에 위치한 버팀보(30)를 상단에서 하단까지 해체하여 하나의 작업구(70)를 형성하며, 상기 크레인(60)에 의해 자동장비(80)를 작업구(70)를 통해 상기 하부 슬래브(51)에 하역함으로써, 차량이 양방향으로 진행되어 지하구조물 주변 교통을 원활하게 하고, 프리캐스트 상부부재를 효율적으로 설치할 수 있는 기술적 특징이 있다.
A crane (60) is disposed on a ground close to one side end of the underground structure to form one work hole (70) at one side end of the underground structure, and a crane The
도 5(a) ~ 5(l)은 본 발명의 개착식 지하구조물 시공과정을 나타내는 단면도로, 도 5(a) ~ 5(b)에서 지반 굴착 전 지반에 지하구조물의 폭 이상으로 소정 거리 이격하여 흙막이 벽체(10)를 지하구조물의 양측에 길이방향으로 설치하며, 지반을 지상에서 지하로 굴착하면서 상기 흙막이 벽체(10)에 소정 간격으로 띠장(20)을 설치하고, 상기 양측 흙막이 벽체(10)에 설치된 띠장(20) 사이에 복수의 버팀보(30)를 순차적으로 설치한다.
5 (a) to 5 (l) are cross-sectional views showing a construction process of an underground structure according to the present invention. In FIGS. 5 (a) The
도 5(c) ~ 5(e)에서 지중 가시설인 상기 버팀보(30) 설치가 완료되면 굴착된 지반 저면에 버림 콘크리트(40)를 타설하며, 지하구조물인 하부부재(50)는 현장타설 콘크리트로 하부 슬래브(51)와 측벽(52) 일부로 형성되어 지하구조물의 길이방향으로 연속되게 설치되고, 상기 하부부재(50)의 현장타설 콘크리트 양생 후, 상기 하부부재(50)의 측벽(52)과 상기 흙막이 벽체(10) 사이에 토사를 되메운다.
5 (c) to 5 (e), when the installation of the
도 5(f) ~ 5(i)에서 상기 하부부재(50)의 상부에 프리캐스트 상부부재(90)가 설치될 수 있도록 지하구조물의 길이방향으로 상기 버팀보(30) 일부를 해체하며, 상기 하부부재(50)의 하부 슬래브(51)를 임시통로로 사용하여 상기 임시통로에 상기 프리캐스트 상부부재(90)를 운반, 조립하는 자동장비(80)를 마련한다.
5 (f) to 5 (i), a part of the
상기 자동장비(80)에 의해 상기 프리캐스트 상부부재(90)를 상기 하부부재(50)의 측벽 상부에 설치한다. 상기 프리캐스트 상부부재는 상부 슬래브(91)와 측벽(92) 일부로 형성되어 박스형상이거나 또는 아치형상으로 형성되는 것이 가능하다.
The precast upper member (90) is installed above the side wall of the lower member (50) by the automatic equipment (80). The precast upper member may be formed as part of the
도 5(j) ~ 5(l)에서 상기 하부부재(50)와 프리캐스트 상부부재(90)가 조립되어 지하구조물이 일체로 구성되며, 상기 지하구조물의 상부까지 상기 프리캐스트 상부부재(90)의 측벽과 상기 흙막이 벽체(10) 사이에 토사를 되메우고, 상기 버팀보(30)를 해체한 후 토사를 지면까지 되메우는 상기 시공과정을 공사구간마다 반복하여 실시함으로써 지하구조물을 완성한다.
5 (j) to 5 (1), the
도 6(a) ~ 6(e)는 본 발명의 지하구조물 연결부를 나타내는 단면도로, 상기 하부부재(50)와 프리캐스트 상부부재(90)는 요철형상 또는 Z자 형상 또는 요홈형상의 연결부(93)가 형성되어 결합되며, 도 6(d) ~ 6(e)에서 상기 프리캐스트 상부부재(90)의 하부 일부는 상기 하부부재(50) 상부에 형성된 요홈에 삽입, 결합된다.
6 (a) to 6 (e) are cross-sectional views showing a connecting portion of an underground structure according to the present invention, wherein the
상기 하부부재(50)와 프리캐스트 상부부재(90) 사이의 연결부(93)에 형성된 틈새에는 채움재(94)를 충전함으로써 상기 하부부재(50)와 프리캐스트 상부부재(90)가 일체로 결합되며, 상기 채움재(94)로는 무수축 몰탈 또는 에폭시가 사용된다.
The
도 7(a) ~ 7(d)는 본 발명에 사용되는 자동장비의 턴테이블 기능을 나타내는 개념도로, 상기 자동장비(80)의 하부구조는 이동수단(81)을 구비하여 지하구조물의 길이방향으로 이동이 가능하고, 상부구조는 프리캐스트 상부부재를 지지, 운반 및 설치하는 턴테이블(82)을 포함하여 구비하도록 구성된다.
7A to 7D are conceptual diagrams illustrating a turntable function of the automatic equipment used in the present invention. The bottom structure of the
상기 자동장비(80)의 상부에 위치한 턴테이블(82)은 상기 프리캐스트 상부부재(90)를 상,하방향으로 높이 조절이 가능하며, 좌,우방향으로 경사지게 기울일 수 있는 롤링(Rolling) 조절이 가능하고, 전,후방향으로 경사지게 기울일 수 있는 피칭(Pitching) 조절이 가능하며, 평면상에서 회전하는 것이 가능하다.The
10 : 흙막이 벽체 20 : 띠장
30 : 버팀보 40 : 버림 콘크리트
50 : 하부부재 51 : 하부 슬래브
52, 92 : 측벽 60 : 크레인
70 : 작업구 80 : 자동장비
81 : 이동수단 82 : 턴테이블
90 : 프리캐스트 상부부재 91 : 상부 슬래브
93 : 연결부 94 : 채움재
100 : 흙막이 벽체 200 : 띠장
300 : 버팀보 400 : 버림 콘크리트
500 : 하부부재 600 : 크레인
700 : 작업구 800 : 프리캐스트 상부부재
900 : 연결부10: retaining wall 20: wale
30: strut 40: abandoned concrete
50: lower member 51: lower slab
52, 92: side wall 60: crane
70: Work area 80: Automatic equipment
81: Moving means 82: Turntable
90: precast upper member 91: upper slab
93: connection 94: filler
100: earth retaining wall 200: wale
300: strut 400: abandoned concrete
500: lower member 600: crane
700: work assembly 800: precast upper member
900: Connection
Claims (7)
⒜ 지반에 상기 지하구조물의 폭 이상으로 소정 거리 이격하여 흙막이 벽체(10)를 지하구조물의 양측에 길이방향으로 설치하는 단계;
⒝ 지반을 지상에서 지하로 굴착하면서 상기 흙막이 벽체(10)에 설치된 띠장(20) 사이에 복수의 버팀보(30)를 순차적으로 설치하는 단계;
⒞ 상기 버팀보(30) 설치가 완료된 후, 굴착된 지반 저면에 버림 콘크리트(40)를 타설하는 단계;
⒟ 하부 슬래브(51)와 측벽(52) 일부로 형성된 하부부재(50)를 현장타설 콘크리트로 지하구조물의 길이방향으로 설치하는 단계;
⒠ 상기 하부부재(50)의 현장타설 콘크리트 양생 후, 상기 하부부재(50)의 측벽(52)과 상기 흙막이 벽체(10) 사이에 토사를 되메우는 단계;
⒡ 상기 하부부재(50)에 장비, 자재 등을 하역, 인양할 수 있도록 지상에 설치된 크레인(60)에 의해 상기 하부부재(50) 일측 단부에 인접한 버팀보(30)를 상단에서 하단까지 해체하여 하나의 작업구(70)를 형성하는 단계;
⒢ 프리캐스트 상부부재(90)가 설치될 수 있도록 지하구조물의 길이방향으로 상기 버팀보(30) 일부를 해체하고, 상기 크레인(60)에 의해 상기 프리캐스트 상부부재(90)의 운반과 조립기능을 하는 자동장비(80)를 상기 작업구(70)를 통해 상기 하부 슬래브(51)에 하역하는 단계;
⒣ 상기 크레인(60)에 의해 상기 프리캐스트 상부부재(90)를 상기 작업구(70)를 통해 상기 자동장비(80)의 상부에 하역하는 단계;
⒤ 상기 프리캐스트 상부부재(90)는 상기 자동장비(80)에 의해 지하구조물의 길이방향으로 차례로 운반되어 상기 하부부재(50)의 측벽 상부에 설치되는 단계;
⒥ 상기 하부부재(50)와 상기 프리캐스트 상부부재(90) 사이에는 연결부(93)가 형성되고, 상기 연결부(93)에 의해 형성된 틈새에 채움재(94)를 충전하여 상기 프리캐스트 상부부재(90)와 하부부재(50)를 일체화하는 단계;
⒦ 상기 프리캐스트 상부부재(90)의 측벽과 상기 흙막이 벽체(10) 사이에 토사를 되메우고, 상기 버팀보(30)를 해체하는 단계;
⒧ 토사를 지면까지 되메우는 단계를 포함하는 것을 특징으로 하는 개착식 지하구조물 시공방법.In a method of constructing an open type underground structure for installing a low depth underground structure such as a small tunnel or an underground road,
(A) installing the retaining walls 10 on both sides of the underground structure in the longitudinal direction with a predetermined distance apart from the ground structure by more than the width of the underground structure;
(B) sequentially installing a plurality of struts (30) between the wales (20) installed on the earth retaining wall (10) while excavating the ground from the ground to the ground;
Placing the shredded concrete (40) on the excavated bottom of the ground after completion of installation of the strut (30);
Installing a lower member (50) formed as a part of the lower slab (51) and the side wall (52) in the longitudinal direction of the underground structure with the laying concrete;
Filling the soil between the side wall (52) of the lower member (50) and the earth retaining wall body (10) after curing of the cast concrete in place of the lower member (50);
The strut 30 adjacent to one end of the lower member 50 is disassembled from the upper end to the lower end by a crane 60 installed on the ground so that the equipment, materials and the like can be loaded and unloaded to the lower member 50 (70);
A part of the strut 30 is disassembled in the longitudinal direction of the underground structure so that the precast upper member 90 can be installed and the transportation and assembling function of the precast upper member 90 is performed by the crane 60 Unloading the automatic equipment (80) to the lower slab (51) through the operation tool (70);
Unloading the precast upper member (90) by the crane (60) to the upper part of the automatic equipment (80) through the operation tool (70);
The precast upper member (90) is sequentially transported in the longitudinal direction of the underground structure by the automatic equipment (80) and installed on the side wall of the lower member (50).
A connection portion 93 is formed between the lower member 50 and the precast upper member 90 and a filler 94 is filled in a gap formed by the connection portion 93 to connect the precast upper member 90 ) And the lower member (50);
Filling the soil between the sidewall of the precast upper member (90) and the earth retaining wall (10) and disassembling the strut (30);
The method according to any one of claims 1 to 3, further comprising the step of filling up the soil to the ground.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020130071573A KR101427812B1 (en) | 2013-06-21 | 2013-06-21 | Open cut method for constructing an underground structure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020130071573A KR101427812B1 (en) | 2013-06-21 | 2013-06-21 | Open cut method for constructing an underground structure |
Publications (1)
Publication Number | Publication Date |
---|---|
KR101427812B1 true KR101427812B1 (en) | 2014-08-07 |
Family
ID=51749879
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR1020130071573A KR101427812B1 (en) | 2013-06-21 | 2013-06-21 | Open cut method for constructing an underground structure |
Country Status (1)
Country | Link |
---|---|
KR (1) | KR101427812B1 (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR101545307B1 (en) * | 2014-10-14 | 2015-08-19 | 유한회사 강남이앤씨 | Construction method of complex temporary facility with bottom grouting for weak ground |
KR102110080B1 (en) | 2019-07-18 | 2020-05-12 | (주)제이피이엔씨 | H-type steel wall And Open cut method for constructing an underground structure using H-type steel wall |
KR20210157776A (en) * | 2020-06-22 | 2021-12-29 | (주)지승씨앤아이 | Semi-Open Underpath structure using hat shape precast module for Bus Rapid Transit |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20000017967A (en) * | 1999-12-31 | 2000-04-06 | 박병무 | Cuvert And Production Method Therof |
JP2004232328A (en) | 2003-01-30 | 2004-08-19 | Taisei Corp | Structure of half precast type arch culvert and its construction method |
KR100483200B1 (en) | 2002-07-20 | 2005-04-14 | (주)스틸엔콘크리트 | Walltype pile phased tension in and manufacturing method thereof and construction method of pile wall structures using the same |
JP2005256525A (en) | 2004-03-15 | 2005-09-22 | Tsurumi Concrete Kk | Conveying device for sewer repairing body and installation device for sewer repairing body |
-
2013
- 2013-06-21 KR KR1020130071573A patent/KR101427812B1/en active IP Right Grant
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20000017967A (en) * | 1999-12-31 | 2000-04-06 | 박병무 | Cuvert And Production Method Therof |
KR100483200B1 (en) | 2002-07-20 | 2005-04-14 | (주)스틸엔콘크리트 | Walltype pile phased tension in and manufacturing method thereof and construction method of pile wall structures using the same |
JP2004232328A (en) | 2003-01-30 | 2004-08-19 | Taisei Corp | Structure of half precast type arch culvert and its construction method |
JP2005256525A (en) | 2004-03-15 | 2005-09-22 | Tsurumi Concrete Kk | Conveying device for sewer repairing body and installation device for sewer repairing body |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR101545307B1 (en) * | 2014-10-14 | 2015-08-19 | 유한회사 강남이앤씨 | Construction method of complex temporary facility with bottom grouting for weak ground |
KR102110080B1 (en) | 2019-07-18 | 2020-05-12 | (주)제이피이엔씨 | H-type steel wall And Open cut method for constructing an underground structure using H-type steel wall |
KR20210157776A (en) * | 2020-06-22 | 2021-12-29 | (주)지승씨앤아이 | Semi-Open Underpath structure using hat shape precast module for Bus Rapid Transit |
KR102529071B1 (en) * | 2020-06-22 | 2023-05-08 | (주)지승씨앤아이 | Semi-Open Underpath structure using hat shape precast module for Bus Rapid Transit |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
KR101028535B1 (en) | Construction method of double tunnel | |
KR102136951B1 (en) | Construction Method of Duplex Tunnel | |
KR20180118009A (en) | Duplex tunnel construction method | |
CN104632245A (en) | Method using multi-pilot-tunnel expanding excavation large-diameter shield tunnel for building subway station | |
CN103485791A (en) | Construction method for in-situ maintenance or extension of road tunnel | |
CN104184097B (en) | Non-migration suspension protection system and method for communication pipes and cables | |
JP2019120115A (en) | Method of constructing tunnel lining structure | |
KR101427812B1 (en) | Open cut method for constructing an underground structure | |
JP2003213708A (en) | Construction method for underground structure and elevated traffic roadway | |
CN204457789U (en) | A kind of stake arch wall supports the subway station digging large diameter shield tunnel and build | |
KR101144900B1 (en) | The bottom segment and shield tunnel process thereof | |
KR100977278B1 (en) | The bottom segment and shield tunnel process thereof | |
JP2019124019A (en) | Invert construction method to existing tunnel | |
CN111139863B (en) | Waterproof construction method for open cut half reverse construction method tunnel surrounding purlin node | |
JP2016204938A (en) | Ground lowering method for existing tunnel | |
KR101612522B1 (en) | Construction method for tunneling | |
CN205857198U (en) | Subway station construction main body building enclosure | |
KR100928566B1 (en) | Roof assembly and constructing method thereof | |
JP5155236B2 (en) | Installation method of lining board in open shield method | |
KR101234091B1 (en) | Method of underground railway crossing over direct installation of precast concrete slab | |
JP4705467B2 (en) | Construction method of underground structure | |
KR101109169B1 (en) | Method for constructing tunnel using precast concrete panel | |
KR20190101117A (en) | 2-Arch tunnel construction | |
CN204131065U (en) | The non-migrating formula suspension protection system of a kind of communication pipe and cable | |
CN112780298B (en) | Tunnel construction method using fabricated tunnel shallow buried section shed tunnel structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
E701 | Decision to grant or registration of patent right | ||
GRNT | Written decision to grant | ||
FPAY | Annual fee payment |