KR200256974Y1 - Pipe fitting member for piping - Google Patents

Pipe fitting member for piping Download PDF

Info

Publication number
KR200256974Y1
KR200256974Y1 KR2020010026607U KR20010026607U KR200256974Y1 KR 200256974 Y1 KR200256974 Y1 KR 200256974Y1 KR 2020010026607 U KR2020010026607 U KR 2020010026607U KR 20010026607 U KR20010026607 U KR 20010026607U KR 200256974 Y1 KR200256974 Y1 KR 200256974Y1
Authority
KR
South Korea
Prior art keywords
pipe
piping
flange portion
composite branch
composite
Prior art date
Application number
KR2020010026607U
Other languages
Korean (ko)
Inventor
박화자
Original Assignee
박화자
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 박화자 filed Critical 박화자
Priority to KR2020010026607U priority Critical patent/KR200256974Y1/en
Application granted granted Critical
Publication of KR200256974Y1 publication Critical patent/KR200256974Y1/en

Links

Landscapes

  • Branch Pipes, Bends, And The Like (AREA)

Abstract

본 고안은 소방배관시 파이프에 스프링쿨러헤드를 설치함에 있어 간단하고 신속한 조립공정의 도모와 공기단축, 배관안정성과 신뢰성을 도모하기 위한;The present invention is to provide a simple and rapid assembly process in the installation of the sprinkler head to the pipe during the fire piping and to shorten the air, and to ensure the stability and reliability of the pipe;

배관용 배관부재에 있어서,In the piping piping member,

일정 직경 크기로 용수가 공급되게 형성되는 파이프(22)의 일정 위치에 뚫어 형성한 분기용 분기공(28)과,A branching hole 28 for branching formed by drilling at a predetermined position of the pipe 22 formed to supply water with a predetermined diameter size;

상기 분기공(28)에 조립 용접되어 신속하고 간단하게 스프링쿨러헤드(30)가 설치되는 복합분기관(24)을 포함한 구성으로 이루어짐을 특징으로 하는 배관용 배관부재를 제공하는 뛰어난 효과가 있다.There is an excellent effect of providing a piping member for the pipe, characterized in that the assembly comprises a composite branch pipe 24, which is assembled and welded to the branch hole 28, the sprinkler head 30 is installed quickly and simply.

Description

배관용 배관부재{PIPE FITTING MEMBER FOR PIPING }Piping fitting for piping {PIPE FITTING MEMBER FOR PIPING}

본 고안은 배관용 배관부재에 관한것으로, 더욱 상세하게는 소방배관시 파이프에 스프링쿨러헤드를 간단하고 신속하게 조립을 도모하는 배관용 배관부재에 관한 것이다.The present invention relates to a piping piping member, and more particularly to a piping piping member for the simple and rapid assembly of the sprinkler head to the pipe during fire piping.

일반적으로 스프링쿨러 헤드 조립에 이용되는 배관용 연결관들은 건물의 천장 내부에 설치되고 있는 까닭에 수십년전의 낡은 기술이 그대로 적용되고 있다.In general, plumbing connectors used to sprinkler head assembly are installed inside the ceiling of the building, so the old technology of decades ago is applied.

도1은 종래기술로 배관설비에 연결관부재가 적용되는 일예를 도시한 도면이다.1 is a view showing an example in which a connecting pipe member is applied to a piping facility in the prior art.

연결관부재(2)는 스프링쿨러헤드(4)의 연결 조립과, 메인파이프(6)간의 연결조립을 위해 티관(10)과 여기에 결합되는 니플(12)과, 여기에 결합되는 콘레듀서(16)로 구성되어 이루어지고 있다.The connecting pipe member (2) is a connection assembly of the sprinkler head (4), and the connection between the main pipe (6), the tee tube (10) and nipples (12) coupled thereto, and the transducers coupled thereto ( It consists of 16).

상기한 연결관부재(2)는 메인파이프(6)에 스프링쿨러헤드(4)를 연결 설치하는 관부재이며, 메인파이프(6)를 통해 공급되는 소방용수는 티관(10), 니플(12), 이 니플(12)의 일단에 조립된 콘레듀서(16)를 거쳐 스프링쿨러헤드(4)측으로 용수의 공급이 이루어져 화재시 소방수를 분사하게 된다.The connecting pipe member (2) is a pipe member for connecting and installing the sprinkler head (4) to the main pipe (6), the fire water supplied through the main pipe (6) is a tee (10), nipple (12) , The water is supplied to the sprinkler head 4 side through the reducer 16 assembled at one end of the nipple 12 to inject fire water in case of fire.

상기한 연결관부재(2)에 의해 이루어지는 배관설비는 건물내 눈에 뛰지 않는 천장내부에 설비되므로서 기술 발전에 관심을 기울이지 못해 종전기술 그대로 시공되는 형편임에 따라 안전성이나 설비작업 효율성과, 경제성, 시공 안정성, 배관 설비에 대한 신뢰성이 떨어져 소방설비의 문제로 대두되고 있다.The piping equipment made by the connecting pipe member (2) is installed inside the ceiling that is not conspicuous in the building, so it is not possible to pay attention to the development of technology. As a result, the construction stability and the reliability of plumbing facilities are deteriorated.

즉, 가배치된 메인파이프(6)를 완전 절단한 후 티관(10)을 연결하므로서 작업이 번거로우며, 티관(10)에 니플(12)과 콘레듀서(16)를 연결 조립하여 최종적으로 스프링쿨러헤드(4)를 설치한 후 천장에 배관하므로서 많은 용접부위를 발생시켜 누수의 우려 문제점이 있다.That is, the work is cumbersome by completely cutting the temporarily placed main pipe 6 and then connecting the tee tube 10, and assembling the nipple 12 and the reducer 16 to the tee tube 10 to finally assemble the sprinkler. After installing the head 4, there is a problem of water leakage by generating a large number of welds by piping to the ceiling.

또, 다수의 연결관부재(2)를 이용 볼트 체결이 이루어짐에 따라 누수 우려등 배관설비의 신뢰성이 떨어지는 문제점이 있다.In addition, there is a problem in that the reliability of the plumbing equipment, such as leakage concerns, as the bolt is fastened using a plurality of connecting pipe members (2).

그리고 메인파이프에 스프링쿨러헤드를 연결하기 위해 다수의 연결관부재를 필요로 하며, 많은 부품의 연결에 따른 공기의 장기화로 원가상승이 발생하는등 문제점이 있다.In addition, a plurality of connecting pipe members are required to connect the sprinkler head to the main pipe, and there are problems such as cost increase due to prolonged air due to the connection of many parts.

또, 생산 업체의 영세성으로 상기 배관설비에 사용되는 많은 연결관부재들의 제품성과 제품신뢰성이 낮아 낮은 단가를 유지하게 되는 악순환을 되풀이 하여 배관설비 기술의 낙후성을 극복하지 못하는 문제점이 있다.In addition, due to the small size of the manufacturing company, many connection pipe members used in the plumbing equipment have a problem of failing to overcome the backwardness of the plumbing equipment technology by repeating the vicious cycle of low product cost and low product reliability.

상기한 바와 같이 이루어지는 종래기술의 문제점을 해소하기 위하여 제안된 본 고안의 목적은 소방배관시 메인파이프에 스프링쿨러헤드를 설치함에 있어 간단하고 신속한 조립공정의 도모와 공기단축, 배관안정성과 신뢰성을 도모하는 배관용 배관부재를 제공하는데 있다.The purpose of the present invention proposed to solve the problems of the prior art made as described above is to provide a simple and rapid assembly process and shorten the air, the stability and reliability of the pipe in the installation of the sprinkler head on the main pipe during fire piping. To provide a piping member for the pipe.

이를 실현하기 위한 본 고안은The present invention to realize this

배관용 배관부재에 있어서,In the piping piping member,

일정 직경 크기로 용수가 공급되게 형성되는 파이프(22)의 일정 위치에 뚫어 형성한 분기용 분기공(28)과,A branching hole 28 for branching formed by drilling at a predetermined position of the pipe 22 formed to supply water with a predetermined diameter size;

상기 분기공(28)에 조립 용접되어 신속하고 간단하게 스프링쿨러헤드(30)가 설치되는 복합분기관(24)을 포함한 구성으로 이루어지는 배관용 배관부재를 제공하는데 있다.It is to provide a piping piping member consisting of a configuration including a composite branch pipe 24 that is assembled and welded to the branch hole 28, the sprinkler head 30 is installed quickly and simply.

상기 복합분기관은 파이프의 분기공에 가조립되게 하단에 외향으로 일정 경사각도로 형성한 세팅플렌지부와,The composite branch pipe is a setting flange portion formed at a predetermined inclination angle outward at the bottom to be assembled to the branch hole of the pipe;

상기 세팅플렌지부로부터 일정 직경과 깊이로 형성되는 확관부와, 이 확관부상에 일정각도로 경사지게 형성한 테이퍼관부와, 이 테이퍼관부에서 확관부보다 작은 직경과 일정 길이로 형성되는 축소관부를 형성하여 이루어지는 배관용 배관부재를 제공하는데 있다.An expansion pipe portion formed with a predetermined diameter and depth from the setting flange portion, a tapered pipe portion formed to be inclined at a predetermined angle on the expansion pipe portion, and a reduction pipe portion formed with a diameter and a predetermined length smaller than the expansion pipe portion from the tapered pipe portion; It is to provide a piping member for piping.

상기한 본 고안은 메인파이프에 뚫어 형성한 분기공에 복합분기관을 용접등의 방법으로 부착하고 여기에 스프링쿨러헤드를 조립하므로서 연결 부품의 삭제가 이루지고, 배관설비의 작업 공기가 단축되는 등 경제성이 도모됨은 물론 용접부위나 볼트 체결부위의 삭제로 배관설비의 누수 우려가 해소되는 등 시공의 신뢰성이 확보 된다.According to the present invention, the composite branch pipe is attached to the branch hole formed in the main pipe by welding or the like, and the sprinkler head is assembled there, thereby eliminating the connection parts and reducing the working air of the piping equipment. In addition, the reliability of the construction is secured by eliminating the risk of leakage of the piping equipment by eliminating the welded part and the bolted part.

도1은 종래기술에 따른 배관설비에 연결관부재가 적용됨을 도시한 도면.1 is a view showing that the connection pipe member is applied to the piping facility according to the prior art.

도2는 본 고안에 따른 배관설비에 복합분기관이 적용됨을 도시한 도면.Figure 2 is a view showing that the composite branch pipe is applied to the piping facility according to the present invention.

도3은 본 고안에 따른 복합분기관을 도시한 사시도.Figure 3 is a perspective view showing a composite branch according to the present invention.

도4는 도3의 A-A를 도시한 도면.4 shows A-A of FIG. 3;

도5는 본 고안에 따른 복합분기관의 다른 실시예를 도시한 도면.5 is a view showing another embodiment of a composite branch according to the present invention.

도6은 본 고안에 따른 복합분기관의 또 다른 실시예를 도시한 도면.6 is a view showing another embodiment of a composite branch according to the present invention.

도7은 본 고안에 따른 복합분기관의 또 다른 실시예를 도시한 도면.도8은 본 고안에 따른 복합분기관의 세팅플렌지부에 용접각을 형성함을 도시한 도면.도9는 본 고안에 따른 복합분기관의 세팅플렌지부를 삭제 도시한 도면.도10은 본 고안에 따른 복합분기관의 맞대기 용접 경우를 도시한 도면.도11은 본 고안에 따른 복합분기관에 체결플렌지부를 도시한 도면.Figure 7 is a view showing another embodiment of the composite branch according to the present invention. Figure 8 is a view showing a welding angle to the setting flange portion of the composite branch according to the present invention. Fig. 10 is a view showing a case of butt welding of a composite branch according to the present invention. Fig. 11 is a view showing a fastening flange portion at a composite branch according to the present invention. .

*도면의 주요 부분에 대한 부호의 설명** Description of the symbols for the main parts of the drawings *

20:배관부재 22:파이프20: piping member 22: pipe

24:복합분기관 26:유자관24: compound branch office 26: citron tube

28:분기공 30:스프링쿨러헤드28: branch hole 30: spring cooler head

32:확관부 34:테이퍼관부32: Expansion pipe 34: Taper pipe

36,38:내,외나사부 40:축소관부36,38: Internal / external thread 40: Reduction pipe

42:유도돌기 44:니플42: Induction protrusion 44: Nipple

46:콘레듀서46: producer

이하, 본 고안의 바람직한 일 실시예를 첨부한 도면에 의하여 도면에 의하여 더욱 상세하게 설명한다.Hereinafter, with reference to the accompanying drawings a preferred embodiment of the present invention will be described in more detail.

도2는 본 고안에 따른 배관설비에 복합분기관이 적용됨을 도시한 도면이고, 도3은 본 고안에 따른 복합분기관을 도시한 사시도이다.Figure 2 is a view showing a composite branch pipe is applied to the piping facility according to the present invention, Figure 3 is a perspective view showing a composite branch pipe according to the present invention.

그리고 도4는 도3의 A-A를 도시한 도면이며, 도5는 본 고안에 따른 복합분기관의 다른 실시예를 도시한 도면이다.And Figure 4 is a diagram showing A-A of Figure 3, Figure 5 is a view showing another embodiment of the composite branch according to the present invention.

그리고 도6은 본 고안에 따른 복합분기관의 또 다른 실시예를 도시한 도면이고, 도7은 본 고안에 따른 복합분기관의 또 다른 실시예를 도시한 도면이다.도8은 본 고안에 따른 복합분기관의 세팅플렌지부에 용접각을 형성함을 도시한 도면.도9는 본 고안에 따른 복합분기관의 세팅플렌지부를 삭제 도시한 도면.도10은 본 고안에 따른 복합분기관의 맞대기 용접 경우를 도시한 도면.도11은 본 고안에 따른 복합분기관에 체결플렌지부를 도시한 도면.6 is a view showing another embodiment of the composite branch according to the present invention, Figure 7 is a view showing another embodiment of the composite branch according to the present invention. Figure 9 is a view showing forming a welding angle to the setting flange portion of the composite branch. Figure 9 is a view showing a setting flange portion of the composite branch according to the present invention. Figure 10 is a butt welding of the composite branch according to the present invention 11 is a view showing a fastening flange part in a composite branch pipe according to the present invention.

배관부재(20)는 파이프(22)의 분기공(28)과, 복합분기관(24)으로 구성되어 이루어지고 있다.The piping member 20 is comprised from the branch hole 28 of the pipe 22, and the composite branch pipe 24. As shown in FIG.

분기공(28)은 용수가 공급되는 일정 직경 크기로 형성된 파이프(22)의 일정 위치에 분기를 위해 일정 직경으로 뚫려 형성되고 있다.The branch hole 28 is formed by drilling a predetermined diameter for branching at a predetermined position of the pipe 22 formed with a predetermined diameter size to which water is supplied.

복합분기관(24)은 파이프(22)의 일정 위치에 스프링쿨러헤드(30)를 신속하고 간단하게 연결 조립하기 위하여 천공된 분기공(28)에 용이하게 세팅됨과 아울러 용접되어 설치되고 있다.The composite branch pipe 24 is easily set and welded to the perforated branch hole 28 in order to quickly and simply connect and assemble the sprinkler head 30 at a predetermined position of the pipe 22.

상기 복합분기관(24)의 적용으로 배관설비에서 니플, 콘레듀서등의 부품 삭제가 가능하다.By the application of the composite branch pipe 24, it is possible to delete components such as nipples and reducers in the piping facility.

복합분기관(24)은 파이프(22)의 분기공(28)에 가조립되게 하단에 외향으로 일정 경사각도로 세팅플렌지부(30)를 형성하고 있으며, 이 세팅플렌지부(30)로부터 일정 직경과 깊이로 확관부(32)를 형성하고 있다.The composite branch pipe 24 forms a setting flange portion 30 at an inclined angle outwardly at the lower end thereof to be temporarily assembled in the branch hole 28 of the pipe 22, and has a predetermined diameter and depth from the setting flange portion 30. The expansion pipe part 32 is formed.

상기 확관부(32)상에 일정각도로 경사지게 테이퍼관부(34)를 형성하고 있으며, 이 테이퍼관부(34)에서 확관부(32)보다 작은 직경과 일정 길이로 형성되는 축소관부(40)에 형성하여 이루어지고 있다.The tapered pipe portion 34 is formed to be inclined at a predetermined angle on the expansion pipe portion 32, and the tapered pipe portion 34 is formed in the reduction pipe portion 40 formed with a diameter and a predetermined length smaller than the expansion pipe portion 32. Is done.

상기 축소관부(40)에는 일측 단부 내,외부에 내,외나사부(36)(38)을 형성하여 이루어지고 있다.(도2,3,4참조)The reduction tube portion 40 is formed by forming internal and external thread portions 36 and 38 on one side end portion and outside portion thereof (see FIGS. 2, 3 and 4).

또는 내,외나사부(36)(38)를 축소관부(40)의 단부 내,외측에 적어도 하나의 나사산만을 형성하여 다양한 배관 부품들의 특징에 따라 연결되게 하고 있다.Alternatively, at least one screw thread may be formed inside and outside the ends of the reduction pipe part 40 so that the internal and external thread parts 36 and 38 are connected according to the characteristics of various piping parts.

또, 상기한 세팅플렌지부(30)의 저부 확관부(32)의 가장자리에서 돌출된 조립 유도돌기(42)를 형성하여 분기공(28)과의 세팅을 용이하게 하고 있다.(도2참조)Moreover, the assembly guide protrusion 42 which protrudes from the edge of the bottom expansion part 32 of the said setting flange part 30 is formed, and setting with the branch hole 28 is made easy (refer FIG. 2).

그리고 다른 실시예인 복합분기관(24)은 세팅플렌지부(30)에 수직으로 일정 직경과 상기 테이퍼관부(34), 축소관부(40)를 삭제한 높이거나 일정 높이로 수직관부(50)를 형성하고 있으며, 이 수직관부(50)의 내주면에는 니플등이나 배관자재와의 결합을 위해 체결나사부(52)를 형성하여 이루어지고 있다.(도5참조)In another embodiment, the composite branch pipe 24 forms a vertical pipe part 50 at a predetermined height or a predetermined height by removing a predetermined diameter and the tapered pipe part 34 and a reduced pipe part 40 perpendicular to the setting flange part 30. On the inner circumferential surface of the vertical pipe portion 50, a fastening screw portion 52 is formed for coupling with a nipple or the like. (See Fig. 5).

그리고 또 상기 체결나사부(52)를 삭제하고 니플등이나 배관재와의 용접 조립을 위해 걸림턱(54)를 형성하여 이루어지고 있다.(도6참조)In addition, the fastening screw portion 52 is removed, and the locking jaw 54 is formed for welding assembly with a nipple or the like. (See FIG. 6).

또, 복합분기관(24)은 세팅플렌지부(30)의 저부 확관부(32) 가장자리에서 돌출되는 유도돌기(42)를 삭제하여 파이프(6)등에 다양하게 적용되게 하고 있다.(도7참조)도8은 복합분기관(24)에 형성되고 있는 세팅플렌지부(30)의 파이프(22)에 대한 용접성 증대를 위해 파이프(22)와 접촉하는 면을 모따기 한 용접부(56)를 파이프(22)의 종방향(A)에 대해 35°와 횡방향(B)에 대해 50°의 용접각을 형성하고 있다.상기한 용접부(56)를 형성은 유도돌기(42)의 형성 유무에 관계없이 적용 가능하다.도9는 복합분기관(24)의 세팅플렌지부(30)를 삭제한 경우로 원가절감이나 생산성등의 도모를 가능하게 하며, 유도돌기(42)를 이용하여 파이프(22)에 가조립된 후 용접으로 고정 설치되고 있다.또, 도10은 복합분기관(24)의 내주면에 형성된 체결나사부(52)나 걸림턱(54)을 생략하고, 니플등과 직접 맞대기 용접할 수 있게 맞대기용접부(58)를 상단 가장자리에 형성하고 있다.상기 맞대기용접부(58)는 세팅플렌지부(30)의 저부에 형성한 유도돌기(42)의 형성 유무에 관계없이 적용 가능하다.그리고 도11은 복합분기관(24)의 맞대기용접부(58)를 형성하는 대신에 체결공(60)을 형성한 체결플렌지부(62)를 형성하여 볼트(64)와 너트(66)로 체결되게 하고 있다.따라서 체결플렌지부(62)에 체결되게 연결되는 니플등에도 플렌지부를 형성함은 당연하다.상기한 바와 같은 용접부(56)나 세팅플렌지부(30)의 삭제나 맞대기용접부(58)와 체결플렌지부(62)의 형성은 본 발명에서 제시되고 있는 복합분기관(24)에 배관 설비의 설계변경등을 통해 가변적으로 적용하여 제작될 수 있다.In addition, the composite branch pipe 24 removes the guide protrusion 42 protruding from the edge of the bottom expansion pipe portion 32 of the setting flange portion 30 so as to be applied to the pipe 6 or the like in various ways. FIG. 8 shows the welded portion 56 chamfering the surface in contact with the pipe 22 in order to increase the weldability of the setting flange portion 30 formed in the composite branch pipe 24 with respect to the pipe 22. A welding angle of 35 ° with respect to the longitudinal direction (A) of () and 50 ° with respect to the transverse direction (B) is formed. The above-described welding part 56 is applied regardless of the formation of the guide protrusion 42. 9 is a case where the setting flange portion 30 of the composite branch pipe 24 is deleted, thereby enabling cost reduction and productivity, and preliminarily assembled to the pipe 22 using the guide protrusion 42. 10, the fastening screw portion 52 and the locking jaw 54 formed on the inner circumferential surface of the composite branch pipe 24 are omitted, and the nipple and the like are omitted. A butt weld portion 58 is formed at the top edge to allow direct butt welding. The butt weld portion 58 is applicable regardless of the formation of the guide protrusion 42 formed at the bottom of the setting flange portion 30. And instead of forming the butt weld portion 58 of the composite branch pipe 24 is formed with a fastening flange portion 62 having a fastening hole 60 to the bolt 64 and the nut 66. Therefore, it is natural to form a flange portion in the nipple or the like which is fastened to the fastening flange portion 62. The above-described removal or butt welding portion 58 of the welding portion 56 or the setting flange portion 30 is formed. ) And the fastening flange portion 62 can be manufactured by variably applying to the composite branch pipe (24) proposed in the present invention through a design change of piping equipment.

상기한 바와 같이 이루어지는 본 고안의 작용을 설명하면, 파이프(22)에 분기공(28)을 천공하고, 여기에 복합분기관(24)의 세팅플렌지부(30) 저부에 돌출된 유도돌기(42)를 이용 분기공(28)과 가조립을 한다.Referring to the operation of the present invention made as described above, the guide hole 42 protrudes to the bottom of the setting flange portion 30 of the composite branch pipe 24 to the perforation of the branch hole 28 in the pipe 22 Temporary assembly with the branch hole (28) using.

그리고 나서 복합분기관(24)의 세팅이 정확하게 이루어지면세팅플렌지부(30)와 파이프(22)를 용접하여 고정시킨다.Then, when the setting of the composite branch pipe 24 is made correctly, the setting flange portion 30 and the pipe 22 are welded and fixed.

상기한 복합분기관(24)의 고정이 이루어지면 축소관부(40)의 단부에 형성된 내,외나사부(36)(38)를 이용 니플이나 콘레듀서를 삭제한 상태에서 신속하고 정밀하게 스프링쿨러헤드(30)를 조립 설치하게 된다.When the composite branch pipe 24 is fixed, the sprinkler head is quickly and precisely removed by using the internal and external screw parts 36 and 38 formed at the end of the reduction pipe part 40. 30 is assembled.

즉, 복합분기관(24)에 의해 니플, 콘레듀서, 엘보우 티관등을 배제하고 직접 스프링쿨러 헤드(30)를 나사결합시키거나 용접하므로서 배관설비의 구조가 단순하게 이루어진다.In other words, by removing the nipple, the reducer, the elbow tube and the like by the composite branch pipe 24 directly by screwing or welding the sprinkler head 30, the structure of the piping facility is made simple.

상기한 복합분기관(24)은 배관설비의 특성에 따라 수직관부(50)와 체결나사부(52)를 형성한 것을 사용하거나 아니면 걸림턱(54)을 형성한 것을 사용하면 된다.The composite branch pipe 24 may be formed by using the vertical pipe part 50 and the fastening screw part 52 according to the characteristics of the plumbing facility, or by using the locking jaw 54.

그리고 또, 배관설비의 특성상 복합분기관(24)의 저부에 형성된 유도돌기(42)가 필요 없으면 유도돌기(42)를 생략한 복합분기관(24)을 사용하면 된다.상기한 복합분기관(24)에 용도나 설계변경에 의해 다양한 배관설비에 적용 가능하게 세팅플렌지부(30)에 용접부(56)를 파이프(22)의 종방향(A)에 대해 35°와 횡방향(B)에 대해 50°의 용접각을 형성하므로서 파이프(22)에 대한 용접성의 증대가 이루어져 누수등을 차단하여 배관설비의 신뢰성을 제공하게 된다.(도8참조)또, 복합분기관(24)의 세팅플렌지부(30)를 삭제하므로서 중량절감을 도모하게 되어 배관설비의 하중을 낮춰 처짐을 예방하게 됨은 물론 제작시 원가절감이나 생산성 향상등을 도모하게 된다.(도9참조)그리고 복합분기관(24)에 삽입 또는 체결에 의하지 않고 맞대기용접부(58)을 형성하므로서 배관설비의 시공이 복잡하거나 어려움이 있는 곳에 적용하여 작업을 손쉽게 하여 공기의 단축등을 꾀함은 물론 기존 형성된 체결나사부(52)나 걸림턱(54)을 형성하지 않아도 됨에 따라 제조단가의 절감을 가져오는 경제적인 효과도 있다.(도10참조)아울러 복합분기관(24)의 맞대기용접부(58)를 형성하는 대신에 볼트(64)와 너트(66)로 체결 가능하게 체결공(60)을 형성한 체결플렌지부(62)를 형성하므로서 다양한 배관 설비에 적용 가능하며 노후 배관의 교체나 정비등을 용이하게 한다.상기한 바와 같은 용접부(56)나 세팅플렌지부(30)의 삭제나 맞대기용접부(58)와 체결플렌지부(62)등은 본 발명에서 제시되고 있는 복합분기관(24)의 설계변경등을 통해 적용함이 가능하며, 이를 통해 다양한 배관설비에도 적절하게 적용된다.If the induction protrusion 42 formed at the bottom of the composite branch pipe 24 is not necessary due to the characteristics of the piping equipment, the composite branch pipe 24 without the guide protrusion 42 may be used. 24) the welding portion 56 to the setting flange portion 30 to the longitudinal direction (A) of the pipe 22 and 35 ° to the transverse direction (B) so that it can be applied to various piping equipment by the use or design change. The welding angle of the pipe 22 is increased by forming a welding angle of 50 °, thereby preventing leakage and the like, thereby providing reliability of the piping equipment. (See FIG. 8) In addition, the setting flange portion of the composite branch pipe 24 is provided. By eliminating (30), weight reduction can be achieved, thereby reducing the load on the piping equipment and preventing sag, as well as cost reduction and productivity improvement during manufacturing. (See FIG. 9). Piping is established by forming the butt weld 58 without inserting or tightening. It is economical to reduce the manufacturing cost as it does not need to form the existing fastening screw part 52 or the locking jaw 54 as well as to shorten the air by applying the place where the construction is complicated or difficult. (See FIG. 10) In addition, instead of forming the butt weld portion 58 of the composite branch pipe 24, the fastening hole 60 is formed to be fastened with the bolt 64 and the nut 66. By forming the flange portion 62, it is applicable to a variety of piping equipment and facilitates replacement or maintenance of old pipes. The above-described removal of the welding portion 56 or the setting flange portion 30, butt welding portion 58. And fastening flange portion 62 and the like can be applied through the design change of the composite branch pipe 24 proposed in the present invention, through which it is appropriately applied to various piping facilities.

상기한 바와 같이 복합분기관(24)과 유자관(26)에 의해 스프링쿨러헤드(30)의 설치가 이루어짐은 용접이나 볼트체결 공정이 저감되어 배관설비의 누수를 방지하게 됨은 물론 기밀한 시공을 하게 되어 시공자에게 신뢰성 있는 배관설비를 제공하게 된다.As described above, the installation of the sprinkler head 30 by the composite branch pipe 24 and the citron tube 26 reduces welding or bolting processes, thereby preventing leakage of the plumbing equipment, as well as providing a confidential construction. This provides the builder with reliable plumbing equipment.

그리고 복합분기관의 채용으로 배관시공에 따른 부품 적용 감소를 추구하게 되므로서 사업자나 시공자에게 원가절감을 제공하게 되는 경제적 효과가 있다.In addition, the adoption of a composite branch pipe leads to a reduction in the application of components due to the construction of the piping, thereby providing an economic effect of providing cost reduction to the operator or the contractor.

또, 배관설비 시공에 따른 부품감소로 번거로운 시공상 잡무가 해소되어 시공기간이 단축되며, 이로서 작업자의 인력관리가 용이하게 이루어지는 등 경제적인 효과가 있다.In addition, troublesome construction work is eliminated due to the reduction of parts due to the construction of plumbing facilities, and the construction period is shortened, thereby making it easier to manage manpower.

상기한 바와 같은 본 고안은 복합분기관의 채용으로 티관과 니플과 콘레듀서의 부품을 대체하게 되어 배관설비 시공을 간단하게 되므로서 공기단축등 원가절감이 도모되는 효과가 있다.The present invention as described above has the effect of reducing the cost, such as shortening the air by replacing the parts of the tee pipe and the nipple and the reducer by the adoption of the composite branch pipe to simplify the installation of the piping equipment.

배관설비의 시공 단순화로 정밀한 시공을 할 수 있어 누수등의 우려를 해소하게 되므로서 신뢰성 있는 기술을 제공하게 되는 효과가 있다.By simplifying the construction of plumbing facilities, precise construction can be performed, which eliminates the risk of water leakage, thereby providing a reliable technology.

복합분기관등을 단조품으로 제작하므로서 소비자의 욕구에 효과적으로 대체할 수 있음은 물론 내구성 증대, 성능면에서 향상된 자재를 제공하게 되므로서 기배관자재를 대체 하므로서 수입대체 효과도 있다.It is possible to effectively replace the customer's desires by manufacturing composite branch pipes, etc., and to provide improved materials in terms of durability and performance.

Claims (11)

배관용 배관부재에 있어서,In the piping piping member, 일정 직경 크기로 용수가 공급되게 형성되는 파이프(22)의 일정 위치에 뚫어 형성한 분기용 분기공(28)과,A branching hole 28 for branching formed by drilling at a predetermined position of the pipe 22 formed to supply water with a predetermined diameter size; 상기 분기공(28)에 조립 용접되어 신속하고 간단하게 스프링쿨러헤드(30)가 설치되는 복합분기관(24)을 포함한 구성으로 이루어짐을 특징으로 하는 배관용 배관부재.Piping member for the pipe, characterized in that made of a configuration including a composite branch pipe 24, which is assembled and welded to the branch hole 28, the sprinkler head 30 is installed quickly and simply. 제1항에 있어서, 상기 복합분기관(24)은 파이프(22)의 분기공(28)에 가조립되게 하단에 외향으로 일정 경사각도로 형성하면서 저부에 유도돌기(42)를 형성한 세팅플렌지부(30)와,The setting flange portion 30 of claim 1, wherein the composite branch pipe 24 is formed at a predetermined inclination angle outwardly at a lower end thereof to be assembled to the branch hole 28 of the pipe 22, and to form a guide protrusion 42 at the bottom thereof. )Wow, 상기 세팅플렌지부(30)로부터 일정 직경과 깊이로 형성되는 확관부(32)와,Expansion portion 32 is formed from the setting flange portion 30 to a predetermined diameter and depth, 상기 확관부(32)상에 일정각도로 경사지게 형성한 테이퍼관부(34)와,A tapered pipe portion 34 formed to be inclined at a predetermined angle on the expansion pipe portion 32; 상기 테이퍼관부(34)에서 확관부(32)보다 작은 직경과 일정 길이로 형성되는 축소관부(40)를 형성하여 이루어짐을 특징으로 하는 배관용 배관부재.Piping pipe member, characterized in that formed in the tapered pipe portion 34 is formed by reducing tube portion 40 is formed of a smaller diameter and a predetermined length than the expansion pipe portion (32). 제2항에 있어서, 축소관부(40)는 일측 단부 내,외부에 내,외나사부(36)(38)을 형성하여 이루어짐을 특징으로 하는 배관용 배관부재.The piping member for piping according to claim 2, wherein the reduction pipe portion (40) is formed by forming internal and external screw portions (36) (38) inside and outside of one end portion. 제3항에 있어서, 내,외나사부(36)(38)는 축소관부(40)의 단부 내,외측에 적어도 하나의 나사산이 형성됨을 특징으로 하는 배관용 배관부재.The pipe member according to claim 3, wherein the internal and external screw parts (36) (38) have at least one screw thread formed on the inside and the outside of the end portion of the reduction pipe part (40). 제2항에 있어서, 복합분기관(24)은 세팅플렌지부(30)에 수직으로 일정 직경과 높이로 형성된 수직관부(50)와, 이 수직관부(50)의 내주면에 니플등의 결합을 위한 체결나사부(52)를 형성하여 이루어짐을 특징으로 하는 배관용 배관부재.According to claim 2, the composite branch pipe 24 is a vertical pipe portion 50 formed in a predetermined diameter and height perpendicular to the setting flange portion 30, and for coupling the nipples to the inner peripheral surface of the vertical pipe portion 50 Piping member for a pipe, characterized in that formed by forming a fastening screw (52). 제5항에 있어서, 수직관부(50)에 니플등 배관자재를 용접하기 위하여 결합유지용 걸림턱(54)을 형성하여 이루어짐을 특징으로 하는 배관용 배관부재.The piping piping member according to claim 5, wherein a coupling retaining jaw (54) is formed to weld a pipe material such as a nipple to the vertical pipe portion (50). 제2항 또는 제5항에 있어서, 복합분기관(24)은 세팅플렌지부(30)의 저부 확관부(32) 가장자리에서 돌출되는 유도돌기(42)를 삭제하여 이루어짐을 특징으로 하는 배관용 배관부재.The pipe for piping according to claim 2 or 5, wherein the composite branch pipe (24) is formed by removing the guide protrusion (42) protruding from the edge of the bottom expansion portion (32) of the setting flange portion (30). absence. 제2항 또는 제5항에 있어서, 세팅플렌지부(30)는 파이프(22)와 접촉하는 면을 파이프(22)의 종방향(A)에 대해 35°와 횡방향(B)에 대해 50°의 각으로 모따기 한 용접부(56)를 형성하여 이루어짐을 특징으로 하는 배관용 배관부재.6. The setting flange portion (30) according to claim 2 or 5, wherein the setting flange portion (30) has a surface in contact with the pipe (22) 35 ° with respect to the longitudinal direction (A) of the pipe (22) and 50 ° with respect to the transverse direction (B). Piping member for a pipe, characterized in that formed by forming a welded portion 56 chamfered at each angle. 제2항 또는 제5항에 있어서, 복합분기관(24)은 중량저감과 배관설비의 하중저감을 위해 세팅플렌지부(30)를 삭제하여 형성됨을 특징으로 하는 배관용 배관부재.The piping pipe member according to claim 2 or 5, wherein the composite branch pipe (24) is formed by removing the setting flange portion (30) for weight reduction and load reduction of the piping equipment. 제5항에 있어서, 복합분기관(24)은 상단 가장자리에 맞대기 용접이 이루어지게 맞대기용접부(58)를 형성하여 이루어짐을 특징으로 하는 배관용 배관부재.The piping member according to claim 5, wherein the composite branch pipe (24) is formed by forming a butt welding portion (58) to make a butt weld on the upper edge. 제5항에 있어서, 복합분기관(24)은 상단 가장자리에 볼트(64)와 너트(66)로 체결 가능하게 체결공(60)을 형성한 체결플렌지부(62)를 형성하여 이루어짐을 특징으로 하는 배관용 배관부재.The method of claim 5, wherein the composite branch pipe 24 is formed by forming a fastening flange portion 62 formed with a fastening hole 60 to be fastened with a bolt 64 and a nut 66 at the upper edge. Piping member for plumbing.
KR2020010026607U 2001-08-31 2001-08-31 Pipe fitting member for piping KR200256974Y1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR2020010026607U KR200256974Y1 (en) 2001-08-31 2001-08-31 Pipe fitting member for piping

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR2020010026607U KR200256974Y1 (en) 2001-08-31 2001-08-31 Pipe fitting member for piping

Publications (1)

Publication Number Publication Date
KR200256974Y1 true KR200256974Y1 (en) 2001-12-24

Family

ID=73107905

Family Applications (1)

Application Number Title Priority Date Filing Date
KR2020010026607U KR200256974Y1 (en) 2001-08-31 2001-08-31 Pipe fitting member for piping

Country Status (1)

Country Link
KR (1) KR200256974Y1 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100566508B1 (en) 2004-06-11 2006-03-31 신상훈 Branch pipe member for piping
KR101269641B1 (en) 2012-11-02 2013-05-30 주식회사 한국쿨러 Oil cooler for automatic transmission

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100566508B1 (en) 2004-06-11 2006-03-31 신상훈 Branch pipe member for piping
KR101269641B1 (en) 2012-11-02 2013-05-30 주식회사 한국쿨러 Oil cooler for automatic transmission

Similar Documents

Publication Publication Date Title
JP3990288B2 (en) Flange joint for tubular members
KR100766661B1 (en) Tube girder filled with concrete
KR100440092B1 (en) Pannel for Repair and Reinforcement Method of Pier and Utilize Pannel Repair and Reinforcement Method
KR20110000170A (en) Composit pile combined steel tubular pile and concrete pile reinforced with connecting structure
KR200256974Y1 (en) Pipe fitting member for piping
JP2002256570A (en) Position adjustable joining structure of steel pipe pile and anchor reinforcement
CN218969809U (en) Quick assembled closed box culvert structure
KR20030009832A (en) Device fixing bar and structure for connecting head of steel pile and concrete footing of the same
KR100550278B1 (en) Pipe couplings and joint construction of pipe structure using pipe couplings
JP4452060B2 (en) Steel pipe pile head joint structure and steel pipe pile head construction method
KR20110093167A (en) Vessel
KR20000006844A (en) coupling device of flange for piping
JPS5840627B2 (en) Reinforcement sleeve structure for through holes in concrete structures
KR200382029Y1 (en) Band structure for joining pipes
KR20080030427A (en) Pipe connecting pin
JP2006046007A (en) Joint member
KR200245405Y1 (en) Couplers for Steel Pipe Piles
KR200277305Y1 (en) Device for connecting pipe and flange
JP2004285816A (en) Joint structure for column, and connector member for the same
KR20030009835A (en) Device fixing bar and structure for connecting head of steel pile and concrete footing of the same
KR20010099422A (en) Reinforce with bolt for the end of steel pile
KR200434640Y1 (en) Pipe connecting pin
CN218439419U (en) Quick-connection type connecting sleeve
KR200389950Y1 (en) Valve for a pipe of a boiler
KR970002929Y1 (en) Flanged joints

Legal Events

Date Code Title Description
REGI Registration of establishment
T201 Request for technology evaluation of utility model
J210 Request for trial for objection to revocation decision
T601 Decision on revocation of utility model registration
J301 Trial decision

Free format text: TRIAL DECISION FOR APPEAL AGAINST DECISION OF CANCELLATION REQUESTED 20031021

Effective date: 20050929

LAPS Lapse due to unpaid annual fee