KR102149661B1 - Method for constructing overground transfer layer of building using precast concrete - Google Patents

Method for constructing overground transfer layer of building using precast concrete Download PDF

Info

Publication number
KR102149661B1
KR102149661B1 KR1020180164457A KR20180164457A KR102149661B1 KR 102149661 B1 KR102149661 B1 KR 102149661B1 KR 1020180164457 A KR1020180164457 A KR 1020180164457A KR 20180164457 A KR20180164457 A KR 20180164457A KR 102149661 B1 KR102149661 B1 KR 102149661B1
Authority
KR
South Korea
Prior art keywords
pouring
layer
slab
pouring concrete
concrete layer
Prior art date
Application number
KR1020180164457A
Other languages
Korean (ko)
Other versions
KR20200075601A (en
Inventor
김영욱
최문호
이강철
조경래
류종우
임은지
Original Assignee
삼표피앤씨(주)
현대건설(주)
(주)에센디엔텍
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 삼표피앤씨(주), 현대건설(주), (주)에센디엔텍 filed Critical 삼표피앤씨(주)
Priority to KR1020180164457A priority Critical patent/KR102149661B1/en
Publication of KR20200075601A publication Critical patent/KR20200075601A/en
Application granted granted Critical
Publication of KR102149661B1 publication Critical patent/KR102149661B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B5/00Floors; Floor construction with regard to insulation; Connections specially adapted therefor
    • E04B5/43Floor structures of extraordinary design; Features relating to the elastic stability; Floor structures specially designed for resting on columns only, e.g. mushroom floors
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B5/00Floors; Floor construction with regard to insulation; Connections specially adapted therefor
    • E04B5/02Load-carrying floor structures formed substantially of prefabricated units
    • E04B5/04Load-carrying floor structures formed substantially of prefabricated units with beams or slabs of concrete or other stone-like material, e.g. asbestos cement

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

본 발명에 의하면, 지상에서 기둥 구조의 저층과 벽식 구조의 상층 사이에 전이층을 시공하는 방법으로서, 지상에서 복수개의 기둥들을 기초 또는 지상층 바닥 위에 설치하여 세우는 기둥 설치 단계; 상기 기둥 설치 단계를 통해 설치된 상기 복수개의 기둥들에 복수개의 거더들을 설치하는 거더 설치 단계; 상기 거더 설치 단계를 통해 설치된 상기 복수개의 거더들에 사전 제작된 복수개의 전이층용 피씨 슬래브들을 거치하여 설치하는 피씨 슬래브 설치 단계; 상기 피씨 슬래브 설치 단계를 통해 설치된 복수개의 피씨 슬래브들 위로 콘크리트를 타설하여 1차 타설 콘크리트층을 형성하는 1차 타설 단계; 상기 1차 타설 콘크리트층 위로 콘크리트를 더 타설하여 2차 타설 콘크리트층을 형성하는 2차 타설 단계; 및 상기 2차 타설 콘크리트층 위로 콘크리트를 추가로 타설하여 3차 타설 콘크리트층을 형성하는 3차 타설 단계를 포함하며, 상기 복수개의 전이층용 피씨 슬래브들 중 측면 가장 바깥에 위치하는 최외곽 피씨 슬래브는 슬래브 몸체와, 상기 슬래브 몸체의 바깥면에 벽형태로 제거 가능하게 결합되고 상기 슬리 몸체보다 높은 상단을 갖는 거푸집 부재를 구비하며, 상기 3차 타설 콘크리트층은 상기 거푸집 부재의 상단까지 형성되도록 상기 3차 타설 단계가 수행되는 건축물의 지상 전이층 시공방법이 제공된다.According to the present invention, as a method of constructing a transition layer between a lower layer of a column structure and an upper layer of a wall-type structure on the ground, a pillar installation step of installing and erecting a plurality of pillars on the ground floor or on the ground floor; A girder installation step of installing a plurality of girders on the plurality of columns installed through the column installation step; A PC slab installation step of mounting and installing a plurality of pre-fabricated PC slabs for a transition layer on the plurality of girders installed through the girder installation step; A first pouring step of forming a first poured concrete layer by pouring concrete over a plurality of PC slabs installed through the PC slab installation step; A second pouring step of further pouring concrete over the first pouring concrete layer to form a second pouring concrete layer; And a third pouring step of additionally pouring concrete over the second pouring concrete layer to form a third pouring concrete layer, wherein the outermost PC slab located at the outermost side of the plurality of PC slabs for the transfer layer is A slab body and a formwork member that is removably coupled to the outer surface of the slab body in a wall form and has an upper end higher than the sleeve body, and the third poured concrete layer is formed to the upper end of the formwork member. A method of constructing a ground transfer layer of a building in which the vehicle placement step is performed is provided.

Description

피씨 슬래브를 이용한 건축물의 지상 전이층 시공방법 {METHOD FOR CONSTRUCTING OVERGROUND TRANSFER LAYER OF BUILDING USING PRECAST CONCRETE}Construction method for the ground transfer layer of a building using PC slab {METHOD FOR CONSTRUCTING OVERGROUND TRANSFER LAYER OF BUILDING USING PRECAST CONCRETE}

본 발명은 건축물의 전이층 시공방법에 관한 것으로서, 더욱 상세하게는 지상에서 기둥 구조의 저층과 벽식 구조의 상층 사이에 전이층을 시공하는 방법에 관한 것이다.The present invention relates to a method of constructing a transition layer of a building, and more particularly, to a method of constructing a transition layer between the lower layer of the column structure and the upper layer of the wall structure on the ground.

필로티(Piloti) 건물은 저층(통상적으로, 지상 1층의 전체 또는 일부)가 기둥식 구조(라멘 구조)로 이루어지고, 기둥식 구조로 이루어진 저층보다 위의 상층(통상적으로, 지상 2층 이상)은 기둥이 없는 벽식 구조로 이루어지는데, 벽식 구조인 상부의 축력과 수평하중을 안전하게 기둥식 구조인 하부로 전달하기 위하여 기둥식 구조와 벽식 구조의 사이에는 전이층이 형성된다.In a piloti building, the lower floor (usually all or part of the first floor above the ground) has a columnar structure (ramen structure), and the upper floors above the lower floors made of a columnar structure (usually 2 floors above the ground) Silver is made of a wall structure without columns, and a transition layer is formed between the column structure and the wall structure in order to safely transfer the axial force and horizontal load from the upper part of the wall structure to the lower part of the column structure.

일반적으로 전이층은 현장에서 철근을 배근하고, 합판이나 각목 등을 이용하여 배근된 철근을 둘러싸 거푸집을 형성한 후 거푸집 내부에 콘크리트를 타설하는 것으로 시공된다.In general, the transfer layer is constructed by reinforcing reinforcement at the site, forming a formwork surrounding the reinforced reinforcement using plywood or timber, and then pouring concrete inside the formwork.

그러나 이와 같은 일반적인 시공방법에서는 작업자가 철근을 결속선으로 묶는 배근공정, 거푸집 설치 및 제거공정, 슬래브를 지지하는 다수의 서포트를 설치하고 제거하는 공정을 시공 현장에서 수행하게 됨으로써 많은 인력과 작업시간을 필요로 한다. 또한 타설된 콘크리트가 충분한 강도로 양생될 때까지 거푸집을 유지하게 되는 만큼 작업 일정으로 인해 공사기간이 길어질 수 밖에 없는 문제점이 있다. However, in such a general construction method, a lot of manpower and working time are saved by the operator performing the process of tying the reinforcing bars with a binding line, the process of installing and removing formwork, and installing and removing a number of supports that support the slab at the construction site. in need. In addition, as the formwork is maintained until the poured concrete is cured with sufficient strength, the construction period is inevitably extended due to the work schedule.

특히, 거푸집을 설치하고 제거하는 공정에서 다수의 거푸집 패널이 파손되어 이를 수리하거나 폐기해야하기 때문에 물적 손실이 클 뿐 아니라, 배근공정, 거푸집 설치 및 해체 공정, 미장 공정 등 많은 시간이 소요되며 이에 따라 철근공, 거푸집을 설치하고 해제하는 목수, 미장공 등 다수의 숙련공을 필요로 하게 된다.In particular, in the process of installing and removing the formwork, a number of formwork panels are damaged and need to be repaired or discarded, resulting in a large loss of property, and it takes a lot of time, such as the reinforcement process, the formwork installation and dismantling process, and the plastering process. Reinforcing bars, carpenters who install and remove formwork, and plasterers are required.

대한민국 등록특허공보 등록번호 제10-1643584호 (2016.07.29.)Republic of Korea Patent Publication Registration No. 10-1643584 (2016.07.29.)

본 발명의 목적은 지상에서 기둥 구조의 저층과 벽식 구조의 상층 사이에 전이층을 간편하게 시공하고 공기를 단축시킬 수 있는 전이층 시공방법을 제공하는 것이다.An object of the present invention is to provide a transfer layer construction method capable of easily constructing a transfer layer between the lower layer of the column structure and the upper layer of the wall structure on the ground and shortening the construction period.

상기한 본 발명의 목적을 달성하기 위하여, 본 발명의 일 측면에 따르면, 지상에서 기둥 구조의 저층과 벽식 구조의 상층 사이에 전이층을 시공하는 방법으로서, 지상에서 복수개의 기둥들을 기초 또는 지상층 바닥 위에 설치하여 세우는 기둥 설치 단계; 상기 기둥 설치 단계를 통해 설치된 상기 복수개의 기둥들에 복수개의 거더들을 설치하는 거더 설치 단계; 상기 거더 설치 단계를 통해 설치된 상기 복수개의 거더들에 사전 제작된 복수개의 전이층용 피씨 슬래브들을 거치하여 설치하는 피씨 슬래브 설치 단계; 상기 피씨 슬래브 설치 단계를 통해 설치된 복수개의 피씨 슬래브들 위로 콘크리트를 타설하여 1차 타설 콘크리트층을 형성하는 1차 타설 단계; 상기 1차 타설 콘크리트층 위로 콘크리트를 더 타설하여 2차 타설 콘크리트층을 형성하는 2차 타설 단계; 및 상기 2차 타설 콘크리트층 위로 콘크리트를 추가로 타설하여 3차 타설 콘크리트층을 형성하는 3차 타설 단계를 포함하며, 상기 복수개의 전이층용 피씨 슬래브들 중 측면 가장 바깥에 위치하는 최외곽 피씨 슬래브는 슬래브 몸체와, 상기 슬래브 몸체의 바깥면에 벽형태로 제거 가능하게 결합되고 상기 슬래브 몸체보다 높은 상단을 갖는 거푸집 부재를 구비하며, 상기 3차 타설 콘크리트층은 상기 거푸집 부재의 상단까지 형성되도록 상기 3차 타설 단계가 수행되는 건축물의 지상 전이층 시공방법이 제공된다.In order to achieve the object of the present invention described above, according to an aspect of the present invention, as a method of constructing a transition layer between the lower layer of the column structure and the upper layer of the wall structure on the ground, a plurality of pillars are formed on the ground or the ground floor Post installation step to install and erect above; A girder installation step of installing a plurality of girders on the plurality of columns installed through the column installation step; A PC slab installation step of mounting and installing a plurality of pre-fabricated PC slabs for a transition layer on the plurality of girders installed through the girder installation step; A first pouring step of forming a first poured concrete layer by pouring concrete over a plurality of PC slabs installed through the PC slab installation step; A second pouring step of further pouring concrete over the first pouring concrete layer to form a second pouring concrete layer; And a third pouring step of additionally pouring concrete over the second pouring concrete layer to form a third pouring concrete layer, wherein the outermost PC slab located at the outermost side of the plurality of PC slabs for the transfer layer is A slab body and a formwork member that is removably coupled to an outer surface of the slab body in a wall shape and has an upper end higher than that of the slab body, and the third poured concrete layer is formed to the upper end of the formwork member. A method of constructing a ground transfer layer of a building in which the vehicle placement step is performed is provided.

본 발명에 의하면 앞서서 기재한 본 발명의 목적을 모두 달성할 수 있다. 구체적으로는, 지상에 라멘 구조를 위한 기둥들이 설치되고, 기둥에 거더를 설치한 후, 거더에 사전 제작된 피씨 슬래브를 거치하고 1차 타설, 2차 타설 및 3차 타설의 단계를 거쳐서 지상에 전이층이 형성됨으로써, 지상에서 기둥 구조의 저층과 벽식 구조의 상층 사이에 전이층을 간편하게 시공하고 공기를 단축시킬 수 있게 된다.According to the present invention, all the objects of the present invention described above can be achieved. Specifically, pillars for ramen structure are installed on the ground, girders are installed on the pillars, and pre-fabricated PC slabs are mounted on the girders, followed by the steps of first pouring, second pouring, and third pouring. By forming the transition layer, it is possible to easily construct a transition layer between the lower layer of the column structure and the upper layer of the wall structure on the ground and shorten the period.

본 발명에 의하면, 트랜스퍼 플레이트에 사용하는 피씨 슬래브의 두께를 최적화 시킬 수 있다. 피씨 슬래브 설치 후 현장에서 콘크리트를 1회 타설하여 일체화할 경우, 현장 콘크리트가 과도하게 피씨 슬래브 상부에 타설되어 추가적인 가설 장비를 필요로 하게 되거나, 피씨 슬래브 두께를 증가시켜서 양중 장비 용량 상승을 유발한다. 따라서, 본 발명에 의하면 현장 콘크리트 타설이 1차 및 2차로 구분되어 수행됨으로써, 피씨 슬래브의 두께를 최적화할 수 있고 구조적 성능을 확보함과 동시에 추가 가설장비가 필요없고 양중 장비 용량의 상승을 방지하여 시공성이 개선된다.According to the present invention, it is possible to optimize the thickness of the PC slab used for the transfer plate. If concrete is poured once at the site after the installation of the PC slab and integrated, the site concrete is excessively poured on the top of the PC slab, requiring additional temporary equipment, or increasing the thickness of the PC slab, causing an increase in the lifting equipment capacity. Therefore, according to the present invention, the on-site concrete pouring is performed by being divided into primary and secondary, thereby optimizing the thickness of the PC slab, securing structural performance, and eliminating the need for additional temporary equipment and preventing an increase in the capacity of the lifting equipment. The workability is improved.

도 1은 본 발명의 일 실시예에 따른 건축물의 지상 전이층 시공방법의 주요 단계를 보여주는 순서도이다.
도 2는 도 1에 도시된 건축물의 지상 전이층 시공방법에 의해 지상 전이층이 형성된 상태를 도시한 도면이다.
도 3은 도 2의 A-A' 단면 형상을 보여주는 단면도이다.
도 4는 도 2에서 최외곽 피씨 슬래브를 도시한 단면도이다.
도 5는 본 발명의 다른 실시예에 따른 거더를 도시한 사시도이다.
도 6은 도 5에 도시된 거더가 기둥에 설치된 상태를 도시한 평면도이다.
도 7은 도 5에 도시된 거더가 기둥에 설치된 상태를 보여주는 측면도이다.
1 is a flow chart showing the main steps of a method for constructing a ground transfer layer of a building according to an embodiment of the present invention.
FIG. 2 is a diagram showing a state in which a ground transition layer is formed by the above ground transition layer construction method of the building shown in FIG. 1.
3 is a cross-sectional view showing a cross-sectional shape AA′ of FIG. 2.
4 is a cross-sectional view illustrating the outermost PC slab in FIG. 2.
5 is a perspective view showing a girder according to another embodiment of the present invention.
6 is a plan view showing a state in which the girder shown in FIG. 5 is installed on a column.
7 is a side view showing a state in which the girder shown in FIG. 5 is installed on a column.

이하, 도면을 참조하여 본 발명의 실시예의 구성 및 작용을 상세하게 설명한다.Hereinafter, the configuration and operation of an embodiment of the present invention will be described in detail with reference to the drawings.

도 1에는 본 발명의 일 실시예에 따른 건축물의 지상 전이층 시공방법의 주요 단계를 보여주는 순서도가 도시되어 있다. 도 1을 참조하면, 본 발명의 일 실시예에 따른 건축물의 지상 전이층 시공방법은 기둥 설치 단계(S10)와, 거더 설치 단계(S20)와, 피씨 슬래브 설치 단계(S30)와, 1차 타설 단계(S40)와, 2차 타설 단계(S50)와, 3차 타설 단계(S60)와, 거푸집 제거(S70)를 포함한다. 이제, 도 1에 도시된 각 단계들을 도 2 및 도 3을 함께 참조하여 상세하게 설명한다.1 is a flowchart showing the main steps of a method for constructing a ground transfer layer of a building according to an embodiment of the present invention. Referring to FIG. 1, the above-ground transfer layer construction method of a building according to an embodiment of the present invention includes a column installation step (S10), a girder installation step (S20), a PC slab installation step (S30), and a first casting. It includes a step (S40), a second pouring step (S50), a third pouring step (S60), and a mold removal (S70). Now, each step shown in FIG. 1 will be described in detail with reference to FIGS. 2 and 3 together.

기둥 설치 단계(S10)에서는 복수개의 기둥(20)들이 지면에 형성된 기초(10)(또는 지상층의 바닥) 위에 설치되어서 세워진다. 기둥(20)은 철근 콘크리트 구조로서, 본 실시예에서는 피씨로 사전 제작되어서 현장에서 기초(10)에 조립되어 설치되는 것으로 설명한다. 기둥 설치 단계(S10)를 통해 설치되는 복수개의 기둥(20)들은 1층의 기둥식 구조(라멘 구조)를 형성한다. 본 실시예에서는 기둥 설치 단계(S10)에 의해 설치되는 복수개의 기둥(20)들이 1층 전체를 기둥식 구조인 라멘 구조로 형성하는 것으로 설명하는데, 본 발명은 이에 제한되지 않으며, 1층의 일부를 라멘 구조(나머지는 벽식 구조)로 형성할 수 있으며, 이 또한 본 발명의 범위에 속하는 것이다. 또한, 기둥 설치 단계(S10)에 의해 형성되는 라멘 구조는 2층 이상으로 형성될 수도 있으며, 이 또한 본 발명의 범위에 속하는 것이다. 그리고, 기둥 설치 단계(S10)에 의해 형성되는 라멘 구조는 1층을 포함하지 않는 2층 이상의 중간 층에 형성될 수도 있으며, 이 또한 본 발명의 범위에 속하는 것이다. 즉, 지상의 벽식 구조 위에 기둥 설치 단계(S10)에 의해 기둥(20)들이 설치되어서 라멘 구조를 형성할 수도 있는 것이다.In the pillar installation step (S10), a plurality of pillars 20 are installed and erected on the foundation 10 (or the ground floor) formed on the ground. The pillar 20 is a reinforced concrete structure, and in this embodiment, it is described as being pre-fabricated with PC and assembled and installed on the foundation 10 at the site. The plurality of pillars 20 installed through the pillar installation step S10 form a first-layer pillar-type structure (ramen structure). In this embodiment, it is described that the plurality of pillars 20 installed by the pillar installation step (S10) form the entire first layer in a ramen structure, which is a pillar structure, but the present invention is not limited thereto, and a part of the first layer May be formed in a ramen structure (the rest of the wall structure), which is also within the scope of the present invention. In addition, the ramen structure formed by the post installation step (S10) may be formed in two or more layers, which is also within the scope of the present invention. In addition, the ramen structure formed by the post installation step (S10) may be formed on two or more intermediate layers that do not include one layer, which is also within the scope of the present invention. That is, the pillars 20 may be installed on the wall structure on the ground by the pillar installation step (S10) to form a ramen structure.

거더 설치 단계(S20)에서는 기둥 설치 단계(S10)를 통해 설치된 복수개의 기둥(20)들의 상단에 복수개의 거더(30)들이 설치된다. 상세히 도시되지는 않았으나 거더(30)는 사전 제작되어서 현장에서 기둥(20)에 조립되어서 설치된다. 거더(30)는 철근 콘크리트 구조로서 피씨로 사전 제작되는 거더 몸체(30a)와, 거더 몸체(30a)에 제거 가능하게 결합된 거더 거푸집 부재(35)를 구비한다. 거더 몸체(30a)는 편평한 판상의 거더 기초판부(31)와, 거더 기초판부(31)의 일측에 위로 수직으로 세워져 형성된 거더 벽부(32)를 구비한다. 거더(30)는 거더 설치 단계(S20)를 통해 설치 시, 거더 벽부(32)가 시공 대상 건축물의 바깥을 향하도록 배치된다. 거더 벽부(32)의 바깥면에는 거더 거푸집 부재(35)가 결합 인서트(미도시)들에 의해 제거가능하게 결합된다. 거더 거푸집 부재(35)는 대체로 판상의 부재로서 거더 벽부(32)의 바깥면에 벽형태로 세워져서 결합 인서트(미도시)에 의해 제거 가능하게 결합된다. 거더 거푸집 부재(35)의 높이는 거더 벽부(32)보다 높게 형성되며, 본 실시예에서 거더 거푸집 부재(35)로 철재 형강이 사용되는 것으로 설명하는데, 본 발명은 이에 제한되는 것은 아니다. 거더 거푸집 부재(35)의 상단은 시공하고자 하는 지상 전이층의 상단에 대응한다. 거더 설치 단계(S20)에 의해 복수개의 거더(30)들이 모두 설치된 후에는 피씨 슬래브 설치 단계(S30)가 수행된다.In the girder installation step (S20), a plurality of girders 30 are installed on top of the plurality of pillars 20 installed through the pillar installation step (S10). Although not shown in detail, the girder 30 is pre-fabricated and assembled on the pillar 20 at the site and installed. The girder 30 is a reinforced concrete structure and includes a girder body 30a that is pre-fabricated with PC, and a girder formwork member 35 that is removably coupled to the girder body 30a. The girder body (30a) includes a flat plate-shaped girder base plate portion (31) and a girder wall portion (32) vertically erected on one side of the girder base plate portion (31). When the girder 30 is installed through the girder installation step (S20), the girder wall 32 is disposed to face the outside of the construction target building. On the outer surface of the girder wall part 32, the girder formwork member 35 is removably connected by coupling inserts (not shown). The girder formwork member 35 is a generally plate-shaped member that is erected in the form of a wall on the outer surface of the girder wall portion 32 and is removably coupled by a coupling insert (not shown). The height of the girder formwork member 35 is formed higher than that of the girder wall part 32, and it is described that a steel section steel is used as the girder formwork member 35 in this embodiment, but the present invention is not limited thereto. The upper end of the girder formwork member 35 corresponds to the upper end of the above-ground transfer layer to be constructed. After the plurality of girders 30 are all installed by the girder installation step (S20), the PC slab installation step (S30) is performed.

피씨 슬래브 설치 단계(S30)에서는 거더 설치 단계(S20)에 의해 설치된 거더(30)들에 전이층 시공용 복수개의 피씨 슬래브(40, 50)들이 거치되어서 설치된다. 복수개의 피씨 슬래브(40, 50)들은 전이층을 형성하는 평면 상에 설치된다. 피씨 슬래브(40, 50)는 피씨로 사전 제작되어서 현장에서 거더(30)들에 설치된다. 복수개의 피씨 슬래브(40, 50)들 중 측면 가장 바깥에 위치하는 최외곽 피씨 슬래브(50)가 도 3에 도시되어 있다. 도 2와 도 3을 참조하면, 최외곽 피씨 슬래브(50)는 슬래브 몸체(51)와, 슬래브 몸체(51)에 제거 가능하게 결합된 슬래브 거푸집 부재(52)와, 슬래브 거푸집 부재(52)를 슬래브 몸체(51)에 탈착 가능하게 결합시키는 복수개의 결합 인서트(53)들을 구비한다.In the PC slab installation step (S30), a plurality of PC slabs (40, 50) for transfer layer construction are mounted and installed on the girders 30 installed by the girder installation step (S20). The plurality of PC slabs 40 and 50 are installed on a plane forming a transition layer. The PC slabs 40 and 50 are pre-fabricated with PC and installed on the girders 30 at the site. The outermost PC slab 50 positioned at the outermost side of the plurality of PC slabs 40 and 50 is shown in FIG. 3. 2 and 3, the outermost PC slab 50 includes a slab body 51, a slab formwork member 52 that is removably coupled to the slab body 51, and a slab formwork member 52. It includes a plurality of coupling inserts 53 detachably coupled to the slab body 51.

슬래브 몸체(51)는 편평한 판상의 슬래브 기초판부(54)와, 슬래브 기초판부(54)의 일측에 위로 수직으로 세워져 형성된 슬래브 벽부(55)를 구비한다. 최외곽 피씨 슬래브(50)는 피씨 슬래브 설치 단계(S30)를 통해 설치 시, 시공 대상 건축물의 바깥을 향하도록 배치된다. 슬래브 벽부(55)는 건물의 바깥쪽에 배치되며 슬래브 벽부(55)의 바깥면에는 슬래브 거푸집 부재(52)가 복수개의 결합 인서트(53)들에 의해 제거가능하게 결합된다. 슬래브 벽부(55)의 상단은 거더 벽부(32)의 상단과 일치한다.The slab body 51 includes a slab base plate portion 54 in the shape of a flat plate, and a slab wall portion 55 formed vertically upward on one side of the slab base plate portion 54. When the outermost PC slab 50 is installed through the PC slab installation step (S30), it is disposed to face the outside of the construction target building. The slab wall portion 55 is disposed on the outside of the building, and the slab formwork member 52 is removably coupled to the outer surface of the slab wall portion 55 by a plurality of coupling inserts 53. The upper end of the slab wall portion 55 coincides with the upper end of the girder wall portion 32.

슬래브 거푸집 부재(52)는 대체로 판상의 부재로서 슬래브 몸체(51)의 슬래브 벽부(55)의 바깥면에 벽형태로 세워져서 결합 인서트(53)에 의해 제거 가능하게 결합된다. 슬래브 거푸집 부재(52)의 높이는 슬래브 벽부(55)보다 높게 형성되며, 본 실시예에서 슬래브 거푸집 부재(52)로 철재 형강이 사용되는 것으로 설명하는데, 본 발명은 이에 제한되는 것은 아니다. 슬래브 거푸집 부재(52)의 상단은 시공하고자 하는 지상 전이층의 상단에 대응하며, 거더 거푸집 부재(35)의 상단과 일치한다. 피씨 슬래브 설치 단계(S30)에 의해 복수개의 피씨 슬래브(40, 50)들이 모두 거더(30)에 설치된 후에는 1차 타설 단계(S40)가 수행된다.The slab formwork member 52 is a generally plate-shaped member, which is erected in a wall shape on the outer surface of the slab wall portion 55 of the slab body 51 and is removably coupled by a coupling insert 53. The height of the slab formwork member 52 is formed higher than that of the slab wall part 55, and it is described that a steel section steel is used as the slab formwork member 52 in this embodiment, but the present invention is not limited thereto. The upper end of the slab formwork member 52 corresponds to the upper end of the above-ground transfer layer to be constructed, and coincides with the upper end of the girder formwork member 35. After the plurality of PC slabs 40 and 50 are all installed on the girder 30 by the PC slab installation step S30, the first pouring step S40 is performed.

1차 타설 단계(S40)에서는 복수개의 피씨 슬래브(40, 50)들 위로 시멘트 콘크리트가 타설된 후 양생된다. 1차 타설 단계(S40)에 의해 타설되는 1차 타설 콘크리트층(60)의 두께는 1차 타설 콘크리트층(60)의 상면이 최외곽 피씨 슬래브(50)의 슬래브 벽부(53)의 상단 및 거더 벽부(32)의 상단보다 낮도록 형성된다. 1차 타설 단계(S40)에 의해 1차 타설 콘크리트층(60)가 형성된 후에는 2차 타설 단계(S50)가 수행되는데, 2차 타설 단계(S50)가 수행되기 전 1차 타설 콘크리트층(60)의 위에 제1 상부 보강 철근(71)이 최외곽 피씨 슬래브(50)의 벽부(53)보다 낮은 높이로 배근된다.In the first pouring step (S40), cement concrete is poured onto the plurality of PC slabs 40 and 50 and then cured. The thickness of the first poured concrete layer 60 that is poured by the first pouring step (S40) is the upper surface of the first poured concrete layer 60 and the top of the slab wall 53 of the outermost PC slab 50 and the girder It is formed to be lower than the upper end of the wall portion 32. After the first pouring concrete layer 60 is formed by the first pouring step (S40), the second pouring step (S50) is performed, and before the second pouring step (S50) is performed, the first pouring concrete layer 60 ) On top of the first upper reinforcing bar 71 is reinforced at a lower height than the wall 53 of the outermost PC slab 50.

2차 타설 단계(S50)에서는 1차 타설 단계(S40)에 의해 형성된 1차 타설 콘크리트층(60)의 위로 콘크리트가 타설된 후 양생된다. 2차 타설 단계(S50)에 의해 타설되는 2차 타설 콘크리트층(70)의 두께는 2차 타설 콘크리트층(70)의 상면이 최외곽 피씨 슬래브(50)의 슬래브 벽부(53)의 상단 및 거더 벽부(32)의 상단에 대응하도록 형성된다. 2차 타설 콘크리트층(70)에 제1 상부 보강 철근(71)이 매립된다. 2차 타설 단계(S50)에 의해 2차 타설 콘크리트층(70)이 형성된 후에는 3차 타설 단계(S60)가 수행되는데, 3차 타설 단계(S60)가 수행되기 전 2차 타설 콘크리트층(70)의 위에 제2 상부 보강 철근(81)이 거푸집 부재(52)보다 낮은 높이로 배근된다. 제1 상부 보강 철근(71)과 제2 상부 보강 철근(81)은 1차 타설 단계(S40)가 수행되기 전에 설치될 수 있으며, 이 또한 본 발명의 범위에 속하는 것이다. In the second pouring step (S50), after the concrete is poured on the first poured concrete layer 60 formed by the first pouring step (S40), it is cured. The thickness of the second pouring concrete layer 70 poured by the second pouring step (S50) is the upper surface of the second pouring concrete layer 70 and the upper surface of the slab wall 53 of the outermost PC slab 50 and the girder It is formed to correspond to the upper end of the wall portion 32. The first upper reinforcing reinforcing bar 71 is embedded in the second poured concrete layer 70. After the second pouring concrete layer 70 is formed by the second pouring step (S50), the third pouring step (S60) is performed, and before the third pouring step (S60) is performed, the second pouring concrete layer 70 ) On top of the second upper reinforcing bar 81 is laid to a lower height than the formwork member 52. The first upper reinforcing bar 71 and the second upper reinforcing bar 81 may be installed before the first pouring step (S40) is performed, which is also within the scope of the present invention.

3차 타설 단계(S60)에서는 2차 타설 단계(S50)에 의해 형성된 2차 타설 콘크리트층(70) 위로 콘크리트가 타설된 후 양생된다. 3차 타설 단계(S60)에 의해 타설되는 3차 타설 콘크리트층(80)의 두께는 3차 타설 콘크리트층(80)의 상면이 최외곽 피씨 슬래브(50)의 슬래브 거푸집 부재(52)의 상단 및 거더(30)의 거더 거푸집 부재(35)의 상단에 대응하도록 형성된다. 3차 타설 콘크리트층(80)에 제2 상부 보강 철근(81)이 매립된다. 3차 타설 단계(S60)에 의해 3차 타설 콘크리트층(80)이 형성된 후에는 거푸집 제거 단계(S70)가 수행된다.In the third pouring step (S60), the concrete is poured onto the second poured concrete layer 70 formed by the second pouring step (S50) and then cured. The thickness of the third poured concrete layer 80 poured by the third pouring step (S60) is the top of the slab formwork member 52 of the outermost PC slab 50 and the upper surface of the third poured concrete layer 80 It is formed to correspond to the upper end of the girder formwork member 35 of the girder 30. The second upper reinforcing reinforcing bar 81 is embedded in the third poured concrete layer 80. After the third pouring concrete layer 80 is formed by the third pouring step S60, the formwork removing step S70 is performed.

거푸집 제거 단계(S70)에서는 최외곽 피씨 슬래브(50)의 슬래브 거푸집 부재(52) 및 거더(30)의 거더 거푸집 부재(35)가 슬래브 몸체(51) 및 거더 몸체(30a)로부터 각각 분리되어 제거된다.In the formwork removal step (S70), the slab formwork member 52 of the outermost PC slab 50 and the girder formwork member 35 of the girder 30 are separated and removed from the slab body 51 and the girder body 30a, respectively. do.

도시되지는 않았으나, 거푸집 제거 단계(S70) 후에는 3차 타설 콘크리트층(80) 위로 벽식 구조의 상층부가 시공된다. Although not shown, after the formwork removing step (S70), the upper layer of the wall-type structure is constructed over the third poured concrete layer 80.

도 5는 본 발명의 다른 실시예에 따른 거더를 도시한 사시도이다. 도 5의 거더는 앞서서 설명된 거더(30)의 보다 구체적인 구성으로 이해될 수 있다. 도 5를 참조하면, 거더(300)는 철근 콘크리트 구조로서, 대체로 막대형상인 거더 콘크리트 몸체(310)와, 거더 콘크리트 몸체(310)와 일체로 형성된 철근들을 구비한다. 거더 콘크리트 몸체(310)는 편평한 상면과 하면이 형성된 기초판부(320)와 기초판부(320)의 폭방향 일측으로부터 위로 연장된 벽부(330)를 구비한다. 거더 콘크리트몸체(310)의 길이방향 양단부에는 기둥(200)의 상단에 돌출되어 형성된 기둥 철근(210)들이 수용될 수 있는 수용 홈(340)이 형성된다. 기초판부(320)의 상면에는 복수개의 전면 노출 철근(370)들이 돌출되고 위로 연장되어서 형성된다. 복수개의 전면 노출 철근(370)들은 기초판부(320)의 길이방향을 따라서 일렬로 차례대로 배치된다. 기초판부(320)의 길이방향 양단에는 복수개의 측면 노출 철근(350)들이 돌출되어서 길이방향을 따라서 연장되고 위로 절곡되어서 형성된다. 벽부(330)의 상단에는 복수개의 상부 노출 철근(360)들이 돌출되고 위로 연장되어서 형성된다. 본 실시예에서는 거더(300)은 피씨로 사전 제작되어서 현장에서 기둥에 조립되어 설치되는 것으로 설명한다.5 is a perspective view showing a girder according to another embodiment of the present invention. The girder of FIG. 5 may be understood as a more specific configuration of the girder 30 described above. Referring to FIG. 5, the girder 300 is a reinforced concrete structure, and includes a girder concrete body 310 having a generally rod shape, and reinforcing bars formed integrally with the girder concrete body 310. The girder concrete body 310 includes a base plate part 320 having a flat upper and lower surface formed thereon, and a wall part 330 extending upward from one side in the width direction of the base plate part 320. Accommodating grooves 340 are formed at both ends of the girder concrete body 310 in the longitudinal direction in which the reinforcing pillars 210 formed by protruding from the top of the pillar 200 can be accommodated. A plurality of front exposed reinforcing bars 370 protrude and extend upward on the upper surface of the base plate part 320 to be formed. The plurality of front exposed reinforcing bars 370 are sequentially arranged in a row along the length direction of the base plate part 320. A plurality of side exposed reinforcing bars 350 protrude at both ends of the base plate part 320 in the longitudinal direction, extending along the longitudinal direction, and being bent upward. A plurality of upper exposed reinforcing bars 360 protrude from the upper end of the wall portion 330 and are formed to extend upward. In this embodiment, the girder 300 is described as being pre-fabricated with PC and assembled and installed on a pillar at the site.

도 6에는 하나의 기둥(200)(도 2와 도 3에 도시된 기둥(20)에 대응)에 도 5에 도시된 거더(300) 두개가 설치된 상태가 평면도로서 도시되어 있다. 도 6을 참조하면, 두 거더(300)들의 양단부가 기둥(200)의 상단에 놓여져서 결합되며, 두 거더(300)들 각각에 형성된 수용 홈(340)을 통해 복수개의 기둥 철근(210)들이 통과한다. 또한, 두 거더(300)들 각각의 측면 노출 철근(350)들이 기둥(200)의 상단에 기둥 철근(210)들과 함께 배치되며, 기둥(200)의 상단에 놓이는 두 거더(300)들 중 하나의 거더(300)에 구비되는 복수개의 측면 노출 철근(350)들 사이로 다른 거더(300)에 구비되는 복수개의 측면 노출 철근(350)들이 위치한다. 도 7을 참조하면, 두 거더(300)들은 두 거더(300)들 각각의 벽부(330)가 바깥쪽을 향하도록 배치된다.6 is a plan view showing a state in which two girders 300 shown in FIG. 5 are installed on one pillar 200 (corresponding to the pillar 20 shown in FIGS. 2 and 3). Referring to FIG. 6, both ends of the two girders 300 are placed on the top of the column 200 to be coupled, and a plurality of column reinforcement bars 210 are formed through the receiving groove 340 formed in each of the two girders 300. Pass through. In addition, the side exposed reinforcing bars 350 of each of the two girders 300 are disposed together with the column reinforcing bars 210 on the top of the column 200, and among the two girders 300 placed on the top of the column 200 A plurality of side exposed reinforcing bars 350 provided in the other girder 300 are positioned between a plurality of side exposed reinforcing bars 350 provided in one girder 300. Referring to FIG. 7, the two girders 300 are disposed such that the wall portion 330 of each of the two girders 300 faces outward.

이상 상기 실시예를 통해 본 발명을 설명하였으나, 본 발명은 이에 제한되는 것은 아니다. 상기 실시예는 본 발명의 취지 및 범위를 벗어나지 않고 수정되거나 변경될 수 있으며, 본 기술분야의 통상의 기술자는 이러한 수정과 변경도 본 발명에 속하는 것임을 알 수 있을 것이다.Although the present invention has been described through the above embodiments, the present invention is not limited thereto. The above embodiments may be modified or changed without departing from the spirit and scope of the present invention, and those skilled in the art will recognize that such modifications and changes also belong to the present invention.

10 : 기초 20 : 기둥
30 : 거더 40 : 피씨 슬래브
50 : 최외곽 피씨 슬래브 51 : 슬래브 몸체
52 : 거푸집 부재 53 : 결합 인서트
54 : 기초판부 55 : 벽부
60 : 1차 타설 콘크리트층 70 : 2차 타설 콘크리트층
71 : 제1 상부 보강 철근 80 : 3차 타설 콘크리트층
81 : 제2 상부 보강 철근
10: foundation 20: column
30: girder 40: PC slab
50: outermost PC slab 51: slab body
52: formwork 53: coupling insert
54: base plate part 55: wall part
60: first cast concrete layer 70: second cast concrete layer
71: first upper reinforcing bar 80: 3rd cast concrete layer
81: second upper reinforcing bar

Claims (7)

지상에서 기둥 구조의 저층과 벽식 구조의 상층 사이에 전이층을 시공하는 방법으로서,
지상에서 복수개의 기둥들을 기초 또는 지상층 바닥 위에 설치하여 세우는 기둥 설치 단계;
상기 기둥 설치 단계를 통해 설치된 상기 복수개의 기둥들에 복수개의 거더들을 설치하는 거더 설치 단계;
상기 거더 설치 단계를 통해 설치된 상기 복수개의 거더들에 사전 제작된 복수개의 전이층용 피씨 슬래브들을 거치하여 설치하는 피씨 슬래브 설치 단계;
상기 피씨 슬래브 설치 단계를 통해 설치된 복수개의 전이층용 피씨 슬래브들 위로 콘크리트를 타설하여 1차 타설 콘크리트층을 형성하는 1차 타설 단계;
상기 1차 타설 콘크리트층 위로 콘크리트를 더 타설하여 2차 타설 콘크리트층을 형성하는 2차 타설 단계; 및
상기 2차 타설 콘크리트층 위로 콘크리트를 추가로 타설하여 3차 타설 콘크리트층을 형성하는 3차 타설 단계를 포함하며,
상기 복수개의 전이층용 피씨 슬래브들 중 측면 가장 바깥에 위치하는 최외곽 피씨 슬래브는 슬래브 몸체와, 상기 슬래브 몸체의 바깥면에 벽형태로 제거 가능하게 결합되고 상기 슬래브 몸체보다 높은 상단을 갖는 거푸집 부재를 구비하며,
상기 3차 타설 콘크리트층은 상기 거푸집 부재의 상단까지 형성되도록 상기 3차 타설 단계가 수행되고,
상기 2차 타설 단계를 수행하기 전에 상기 1차 타설 콘크리트층 위에 제1 상부 보강 철근을 설치하는 제1 상부 배근 단계를 더 포함하며,
상기 2차 타설 콘크리트층에 상기 제1 상부 보강 철근이 매립되도록 상기 2차 타설 단계가 수행되고,
상기 슬래브 몸체는 기초판부와, 상기 기초판부의 바깥측에서 위로 연장되는 벽부를 구비하며,
상기 1차 타설 콘크리트층은 상기 벽부의 상단보다 낮게 형성되도록 상기 1차 타설 단계가 수행되며,
상기 2차 타설 콘크리트층은 상기 벽부의 상단까지 형성되도록 상기 2차 타설 단계가 수행되는 건축물의 지상 전이층 시공방법.
As a method of constructing a transition layer between the lower layer of the column structure and the upper layer of the wall structure on the ground,
A pillar installation step of installing and erecting a plurality of pillars on the ground floor or on the ground floor;
A girder installation step of installing a plurality of girders on the plurality of columns installed through the column installation step;
A PC slab installation step of mounting and installing a plurality of pre-fabricated PC slabs for a transition layer on the plurality of girders installed through the girder installation step;
A first pouring step of forming a first pouring concrete layer by pouring concrete over a plurality of PC slabs for a transition layer installed through the PC slab installation step;
A second pouring step of further pouring concrete over the first pouring concrete layer to form a second pouring concrete layer; And
And a third pouring step of forming a third pouring concrete layer by additionally pouring concrete over the second pouring concrete layer,
The outermost PC slab, which is located at the outermost side of the side surface of the plurality of transfer layer PC slabs, is removably coupled to the slab body in the form of a wall on the outer surface of the slab body and includes a formwork member having an upper end higher than the slab body. Equipped,
The third pouring step is performed so that the third pouring concrete layer is formed to the upper end of the formwork member,
Further comprising a first upper reinforcing step of installing a first upper reinforcing bar on the first pouring concrete layer before performing the second pouring step,
The second pouring step is performed so that the first upper reinforcing bar is buried in the second poured concrete layer,
The slab body has a base plate portion, and a wall portion extending upward from the outer side of the base plate portion,
The first pouring step is performed so that the first pouring concrete layer is formed lower than the upper end of the wall portion,
A method of constructing a ground transfer layer of a building in which the second pouring step is performed so that the second pouring concrete layer is formed up to the top of the wall portion.
삭제delete 삭제delete 청구항 1에 있어서,
상기 3차 타설 단계를 수행하기 전에 상기 2차 타설 콘크리트층 위에 제2 상부 보강 철근을 설치하는 제2 상부 배근 단계를 더 포함하며,
상기 3차 타설 콘크리트층에 상기 제2 상부 보강 철근이 매립되도록 상기 3차 타설 단계가 수행되는 건축물의 지상 전이층 시공방법.
The method according to claim 1,
Before performing the third pouring step, further comprising a second upper reinforcing step of installing a second upper reinforcing bar on the second pouring concrete layer,
The above-ground transfer layer construction method of a building in which the third pouring step is performed so that the second upper reinforcing reinforcing bar is embedded in the third poured concrete layer.
청구항 1에 있어서,
상기 거푸집 부재를 상기 슬래브 몸체로부터 제거하는 단계를 더 포함하는 건축물의 지상 전이층 시공방법.
The method according to claim 1,
Ground transfer layer construction method of a building further comprising the step of removing the formwork member from the slab body.
청구항 1에 있어서,
상기 기둥 설치 단계는 사전 제작된 피씨 기둥이 현장에서 조립되어서 수행되는 건축물의 지상 전이층 시공방법.
The method according to claim 1,
The step of installing the pillar is a method of constructing a ground transfer layer of a building in which a pre-fabricated PC pillar is assembled on site.
청구항 1에 있어서,
상기 거더 설치 단계는 사전 제작된 피씨 거더가 현장에서 조립되어서 수행되는 건축물의 지상 전이층 시공방법.
The method according to claim 1,
The girder installation step is a method of constructing a ground transfer layer of a building that is performed by assembling a pre-fabricated PC girder on site.
KR1020180164457A 2018-12-18 2018-12-18 Method for constructing overground transfer layer of building using precast concrete KR102149661B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020180164457A KR102149661B1 (en) 2018-12-18 2018-12-18 Method for constructing overground transfer layer of building using precast concrete

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020180164457A KR102149661B1 (en) 2018-12-18 2018-12-18 Method for constructing overground transfer layer of building using precast concrete

Publications (2)

Publication Number Publication Date
KR20200075601A KR20200075601A (en) 2020-06-26
KR102149661B1 true KR102149661B1 (en) 2020-08-31

Family

ID=71136406

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020180164457A KR102149661B1 (en) 2018-12-18 2018-12-18 Method for constructing overground transfer layer of building using precast concrete

Country Status (1)

Country Link
KR (1) KR102149661B1 (en)

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100807395B1 (en) * 2007-03-05 2008-02-28 삼성물산 주식회사 Construction for underground parking lot and constructing method thereof
KR101614722B1 (en) * 2015-10-20 2016-04-22 장정화 The flat and Ribbed slab

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3160777B2 (en) * 1992-07-21 2001-04-25 株式会社竹中工務店 End joining method and structure of precast concrete beam attached to precast concrete beam
KR100544368B1 (en) * 2004-01-16 2006-01-23 삼성물산 주식회사 Precast transfer girder and method for constructing a structure by using of it
KR101826094B1 (en) * 2015-06-26 2018-03-22 삼성물산 주식회사 Construction method for transfer mat and transfer mat using the same
KR101643584B1 (en) 2015-10-29 2016-07-29 현대산업개발 주식회사 Structure for load transfer of piloti pillar and its design method

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100807395B1 (en) * 2007-03-05 2008-02-28 삼성물산 주식회사 Construction for underground parking lot and constructing method thereof
KR101614722B1 (en) * 2015-10-20 2016-04-22 장정화 The flat and Ribbed slab

Also Published As

Publication number Publication date
KR20200075601A (en) 2020-06-26

Similar Documents

Publication Publication Date Title
KR101903628B1 (en) Precast Double Wall Structure with Enhanced Seismic Performance and Construction method thereof
KR101574253B1 (en) A method for construction using a twin wall structure using a PC panel
KR101663132B1 (en) Self-supporting type column structure
KR102149662B1 (en) Method for constructing transfer layer of building using precast concrete slab
KR101668521B1 (en) A construction method of concrete
KR101727745B1 (en) Retaining wall construction method in which the vertical precast structures utilizing this structure
KR20170102729A (en) Multi precast wall structure and its construction method
WO2020214086A1 (en) Precast building
JP2016205051A (en) Construction method for structure
JP6552863B2 (en) How to beat the outer wall
KR102149661B1 (en) Method for constructing overground transfer layer of building using precast concrete
KR101880813B1 (en) A sandwitch pc pannel structure and construction method of structure using thereof
KR101118508B1 (en) Construction method and structure of anchored slabstone on concrete
KR101324884B1 (en) Hybrid building construction method combining dry type and wet type
KR101482523B1 (en) Nodular Box Girder, and Nodular Box Girder Bridge and Constructing Method thereof
KR101641837B1 (en) Section formation method for weight reduction at section building of bridge lower structure
KR200370135Y1 (en) Forms for edge girder construction
CN210508475U (en) History building unitized wall body with waterproof function
KR102177745B1 (en) Column type PC frame for rooftop
JPH1129910A (en) Method for constructing concrete pier
CN111502038A (en) Assembly type PC building structure and construction method thereof
KR101140627B1 (en) Construction method of concrete building
KR102028828B1 (en) Post tension flat slab sturcture construction method using rib type slab and waffle type drop
KR100612662B1 (en) Steel-frame assembly body production method of ferroconcrete infrastructure
KR101576224B1 (en) Prefabricated precast concrete girder for building construction