KR101389485B1 - The concrete pillar structure and the constructing method thereof - Google Patents

The concrete pillar structure and the constructing method thereof Download PDF

Info

Publication number
KR101389485B1
KR101389485B1 KR1020120049918A KR20120049918A KR101389485B1 KR 101389485 B1 KR101389485 B1 KR 101389485B1 KR 1020120049918 A KR1020120049918 A KR 1020120049918A KR 20120049918 A KR20120049918 A KR 20120049918A KR 101389485 B1 KR101389485 B1 KR 101389485B1
Authority
KR
South Korea
Prior art keywords
joining
joint
reinforcing bars
column member
concrete
Prior art date
Application number
KR1020120049918A
Other languages
Korean (ko)
Other versions
KR20130126101A (en
Inventor
홍종택
Original Assignee
(주) 에센스
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by (주) 에센스 filed Critical (주) 에센스
Priority to KR1020120049918A priority Critical patent/KR101389485B1/en
Publication of KR20130126101A publication Critical patent/KR20130126101A/en
Application granted granted Critical
Publication of KR101389485B1 publication Critical patent/KR101389485B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C3/00Structural elongated elements designed for load-supporting
    • E04C3/30Columns; Pillars; Struts
    • E04C3/34Columns; Pillars; Struts of concrete other stone-like material, with or without permanent form elements, with or without internal or external reinforcement, e.g. metal coverings
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/18Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
    • E04B1/20Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts consisting of concrete, e.g. reinforced concrete, or other stonelike material
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H12/00Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures
    • E04H12/02Structures made of specified materials

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Chemical & Material Sciences (AREA)
  • Materials Engineering (AREA)
  • Wood Science & Technology (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Joining Of Building Structures In Genera (AREA)

Abstract

본 발명은 상하 일정길이로 형성된 콘크리트재질의 기둥부재와, 상기 기둥부재의 하면부 가운데부분에 수직하방으로 돌출형성된 콘크리트재질의 접합돌출부와, 상기 기둥부재의 상면부 외곽둘레를 따라 구비되며 하부는 기둥부재에 매설되고 상부는 수직상방으로 돌출된 복수개의 상부철근과, 상기 기둥부재의 하면부 외곽둘레를 따라 구비되며 상부는 기둥부재에 매설되고 하부는 수직하방으로 돌출된 복수개의 하부철근으로 구성되어 있되, 상기 접합돌출부는 기둥부재보다 작은 단면을 지닌 기둥형상으로 내부에는 기둥부재의 내측 하부와 연결된 골조철근이 매설되어 있어 접합돌출부의 내구성 및 전체강도를 향상시키도록 되어 있고 하면부 가운데부분에는 상방으로 오목하게 파인 접합제주입홈이 형성되어 있으며 상기 접합돌출부의 외측면 하부에는 접합제주입홈과 연통된 하나 또는 복수개의 접합제주입공과 하나 또는 복수개의 공기배출공이 천공되어 있어 상기 기둥부재의 접합돌출부를 다른 기둥부재나 바닥콘크리트의 상면부에 올려놓은 상태에서 상기 접합제주입공을 통해 접합제주입홈의 내측에 접합제를 주입하여 기둥부재를 상하 접합시공하도록 되어 있는 것을 특징으로 하는 건축용 콘크리트 기둥구조물 및 그 시공방법에 관한 것이다. The present invention relates to a pillar structure comprising a pillar member made of a concrete material having a predetermined length and a joining protrusion made of a concrete material protruding vertically downward at a center portion of a lower surface of the pillar member, A plurality of upper reinforcing bars embedded in the pillar member and having an upper portion vertically upwardly projecting therefrom and a plurality of lower reinforcing bars disposed along the outer periphery of the lower portion of the pillar member and having an upper portion embedded in the pillar member and a lower portion projecting vertically downwardly The joining projection has a column shape having a cross section smaller than that of the column member, and a frame reinforcing bar connected to an inner lower portion of the column member is buried therein to improve durability and overall strength of the joining projection. And an outer peripheral surface of the joint protruding portion And one or a plurality of joint grooves communicating with the joint grove grooves and one or a plurality of air discharge holes are formed in the lower portion thereof so that the joint protrusions of the column members are placed on the upper surface portions of the other column members or the bottom concrete, And a joining agent is injected into the inner side of the joining groove through the joining, so that the column member is vertically joined.

Description

건축용 콘크리트 기둥구조물 및 그 시공방법{The concrete pillar structure and the constructing method thereof}BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a concrete pillar structure for construction,

본 발명은 건축용 PC(Precast Concrete)공법에 사용되는 콘크리트 기둥구조물에 관한 것으로서, 더욱 상세하게는 상하 일정길이로 형성된 콘크리트재질의 기둥부재와, 상기 기둥부재의 하면부 가운데부분에 수직하방으로 돌출형성된 콘크리트재질의 접합돌출부와, 상기 기둥부재의 상면부 외곽둘레를 따라 구비되며 하부는 기둥부재에 매설되고 상부는 수직상방으로 돌출된 복수개의 상부철근과, 상기 기둥부재의 하면부 외곽둘레를 따라 구비되며 상부는 기둥부재에 매설되고 하부는 수직하방으로 돌출된 복수개의 하부철근으로 구성되어 있되, 상기 접합돌출부는 기둥부재보다 작은 단면을 지닌 기둥형상으로 내부에는 기둥부재의 내측 하부와 연결된 골조철근이 매설되어 있어 접합돌출부의 내구성 및 전체강도를 향상시키도록 되어 있고 하면부 가운데부분에는 상방으로 오목하게 파인 접합제주입홈이 형성되어 있으며 상기 접합돌출부의 외측면 하부에는 접합제주입홈과 연통된 하나 또는 복수개의 접합제주입공과 하나 또는 복수개의 공기배출공이 천공되어 있어 상기 기둥부재의 접합돌출부를 다른 기둥부재나 바닥콘크리트의 상면부에 올려놓은 상태에서 상기 접합제주입공을 통해 접합제주입홈의 내측에 접합제를 주입하여 기둥부재를 상하 접합시공하도록 되어 있는 것을 특징으로 하는 건축용 콘크리트 기둥구조물 및 그 시공방법에 관한 것이다.
The present invention relates to a concrete pillar structure used in a construction PC (Precast Concrete) method, and more particularly, to a concrete pillar structure used for a construction PC (Precast Concrete) And a plurality of upper reinforcing bars projecting vertically upwardly from the upper portion of the reinforcing bars and a plurality of upper reinforcing bars projecting upwardly from the lower reinforcing bars of the reinforcing bars along the outer periphery of the lower portion of the pillar member. And the lower portion of the lower reinforcing bar is formed of a plurality of lower reinforcing bars projecting vertically downward. The joining projection is a columnar shape having a smaller cross section than the column member, and a frame reinforcing bar connected to the inner lower portion of the column member So as to improve the durability and overall strength of the joint projection, Wherein one or a plurality of joint grooves communicating with the joint grooved grooves and one or a plurality of air discharge holes are perforated at the lower side of the outer side surface of the joint protrusions, And the joining projections are placed on the upper surface of the other column member or the bottom concrete, and a joining agent is injected into the joining ridge grooves through the joining ridge holes to vertically join the column members. Structure and method of construction thereof.

일반적으로 건축용 PC(Precast Concrete)공법은 미리 건축물의 기둥, 보, 슬라브, 벽체 등의 부재를 별도의 장소에서 생산한 후 건축현장에서 조립시공하는 공법으로, 콘크리트 작업이 용이하고 외부환경의 영향을 적게 받는 장소에서 생산할 수 있어 양질의 부재를 경제적으로 얻을 수 있으며 콘크리트의 기계화작업이 가능하여 전체적인 공사비용을 절감시킬 수 있고 시공성이 우수하며 공사기간을 대폭적으로 단축시키는 효과를 기대할 수 있다.
In general, the Precast Concrete (PC) method is a method of manufacturing the parts of the building such as pillars, beams, slabs and walls in a separate place and assembling them in the construction site. It is easy to work with concrete, It can be produced in a place where it is less, thus it is possible to economically obtain a good quality member, and it is possible to mechanically work concrete, thereby reducing the overall construction cost, excellent workability, and greatly shortening the construction period.

그러나, PC공법은 각 부재들을 견고하게 연결접합하기 위한 작업이 어려워 접합이음부에 대한 기술적인 처리가 요구되며, 특히 PC기둥구조물을 이용하여 건축물의 기둥을 시공하는 경우 기 시공된 구조부와 그 부재를 연결접합시키기 위한 적절한 기술이 필요한데, 종래 PC기둥구조물의 연결접합은 대체로 내부에 매립되는 철근들을 상하로 돌출시켜 PC기둥구조물을 제작하고 하부로 돌출된 철근들을 기설치된 정착철근들과 연결고정시킨 다음 그 연결부분에 콘크리트를 타설하여 접합시켰으며, 이때, 정착철근들과 철근들의 연결고정작업은 서로 겹쳐지게 위치시켜 결속끈 또는 용접을 통하여 고정시키거나 양측 철근들의 단부를 맞대어서 슬리브를 끼우고 그 슬리브의 내부에 용융된 금속재를 충전하여 연결하였다.
However, in the PC method, it is difficult to jointly connect the respective members firmly. Therefore, the technical processing of the joint part is required, and in particular, when the column of the building is constructed using the PC column structure, A PC column structure is manufactured by vertically projecting reinforcing bars embedded in the inside of the PC column structure, and the reinforcing bars protruding downward are connected and fixed to the installed reinforcing bars. Next, concrete is put in place at the connection part. At this time, the fixing works of the fixing steel bars and the reinforcing bars are placed so as to overlap with each other and fixed through a binding cord or welding, or the ends of the two side reinforcing bars are fitted together, The inside of the sleeve was filled with molten metal and connected.

이러한 PC기둥구조물을 이용한 기둥시공방법에 관한 종래기술로서, 대한민국 등록특허공보 등록번호 제 10-0245057호에서는 소정의 높이를 가지고 세워지며 그 전체높이의 대부분을 차지하는 상측 콘크리트부는 넓고 일부분을 차지하는 하측콘크리트부는 좁은 단면으로 성형되어 하측콘크리트부의 외측에 단차공간부를 가지는 콘크리트구조체와, 상기 상측콘크리트부의 가장자리 내부에 그 중간부들이 수직하게 매립되고 상단부들은 상부로 돌출되어 일정높이로 서있고 하단부들은 하부로 돌출되어 상기 단차공간부상에 위치되며 그 상,하단부들의 끝부분에 수나사부들이 가공된 수직철근들로 구성되고, 상기 수직철근들의 상,하단부에 가공된 수나사부들 중 어느 한쪽의 수나사부들에는 견고한 강도를 나타내며 내부에 암나사부를 가지는 커플러들이 나사결합된 것에 있어서, 상기 콘크리트구조체는 설계된 건축물의 하층슬라브 상부면으로부터 상층보 하부면에 달하는 높이로 성형되며, 상기 수직철근들은 수나사부들이 상기 하측콘크리트의 하면으로부터 대략 100cm정도 위에 위치되고 그 전체길이가 설계된 건축물의 층고와 같은 길이로 성형됨을 특징으로 하는 P.C기둥재가 개시되었는데, 상기 종래기술은 콘크리트구조체의 하측콘크리트부가 다른 콘크리트구조체의 상측콘크리트부에 단순히 상하로 올려지도록 되어 있어 상하로 맞닿는 면사이에 틈새가 발생되면서 상부 P.C기둥재와 하부 P.C기둥재가 서로 견고하게 연결부착되지 않아 여름철 및 겨울철 기온변화에 따른 결로현상과 틈새에 스며든 물기의 동결에 따른 수축, 팽창 등으로 각종 하자가 발생되는 문제점이 있으며, 또한 설치시공시에도 기둥자체가 상하로 불안정하게 세워진 상태로 유지되어 각종 안전사고가 발생되는 문제점이 있었다.
As a prior art related to a method of constructing a column using such a PC column structure, Korean Patent Registration No. 10-0245057 discloses an upper concrete portion which is erected at a predetermined height and occupies most of its entire height, Wherein the upper portion is protruded upward to stand at a constant height and the lower portions are protruded to the lower portion. The upper portion of the upper concrete portion is protruded to the lower portion of the lower portion of the lower concrete portion, The vertical reinforcing bars are formed of vertical reinforcing bars, which are located on the stepped space and have male threaded portions formed at the ends of the upper and lower ends thereof. The maleized portions of the vertical reinforcing bars are rigid Couplers with female threads inside Wherein the concrete structure is formed to a height ranging from the upper surface of the lower slab to the lower surface of the upper layer of the designed building and the vertical reinforcing bars are positioned approximately 100 cm above the lower surface of the lower concrete, The PC column is characterized in that the length of the PC column is formed to have the same length as the height of the designed building. In the prior art, the lower concrete section of the concrete structure is simply raised up and down on the upper concrete section of another concrete structure, The upper PC column and the lower PC column are not firmly connected to each other, resulting in various defects due to condensation due to changes in temperature during summer and winter, and shrinkage and expansion caused by freezing of moisture in the gap. There is also a problem in Is maintained in the state pillar erected itself unstable down there is a problem in that the various types of accidents.

본 발명은 상기와 같은 문제점들을 개선하기 위한 것으로 PC공법에 따른 콘크리트재질의 기둥부재를 형성하되 상기 기둥부재의 하면부 가운데부분에는 기둥형상의 접합돌출부를 수직하방으로 돌출형성하고 상기 접합돌출부의 내부에는 기둥부재의 내측 하부와 연결되는 골조철근을 매설하고 하면부 가운데부분에는 상방으로 오목하게 파인 접합제주입홈을 형성하여 상기 기둥부재의 접합돌출부를 다른 기둥부재나 바닥콘크리트의 상면부에 올려놓은 상태에서 상기 접합돌출부의 외측면 하부에 천공된 하나 또는 복수개의 접합제주입공을 통해 접합제주입홈의 내측에 접합제를 주입하고 경화시켜 기둥부재를 상하 견고하고 간단하게 접합시공하는 것에 그 목적이 있다.
SUMMARY OF THE INVENTION The present invention has been made in order to solve the above-mentioned problems, and it is an object of the present invention to provide a pillar member made of concrete according to a PC method, wherein a columnar joint projection is formed vertically downward in the center of a lower portion of the column member, A reinforcing bar connected to an inner lower portion of the column member is buried and a joint groove formed in an upper part of the lower portion of the lower portion of the lower portion is formed so that the joint protrusion of the column member is placed on the upper surface of another column member or the bottom concrete In which the joining agent is injected and cured on the inner side of the joining ridge grooves through one or a plurality of joining ridges drilled at the lower side of the outer side surface of the joining ridge, so that the joining ridge can be vertically and firmly joined.

이러한 목적을 달성하기 위하여 상하 일정길이로 형성된 콘크리트재질의 기둥부재와, 상기 기둥부재의 하면부 가운데부분에 수직하방으로 돌출형성된 콘크리트재질의 접합돌출부와, 상기 기둥부재의 상면부 외곽둘레를 따라 구비되며 하부는 기둥부재에 매설되고 상부는 수직상방으로 돌출된 복수개의 상부철근과, 상기 기둥부재의 하면부 외곽둘레를 따라 구비되며 상부는 기둥부재에 매설되고 하부는 수직하방으로 돌출된 복수개의 하부철근으로 구성되어 있되, 상기 접합돌출부는 기둥부재보다 작은 단면을 지닌 기둥형상으로 내부에는 기둥부재의 내측 하부와 연결된 골조철근이 매설되어 있어 접합돌출부의 내구성 및 전체강도를 향상시키도록 되어 있고 하면부 가운데부분에는 상방으로 오목하게 파인 접합제주입홈이 형성되어 있으며 상기 접합돌출부의 외측면 하부에는 접합제주입홈과 연통된 하나 또는 복수개의 접합제주입공과 하나 또는 복수개의 공기배출공이 천공되어 있어 상기 기둥부재의 접합돌출부를 다른 기둥부재나 바닥콘크리트의 상면부에 올려놓은 상태에서 상기 접합제주입공을 통해 접합제주입홈의 내측에 접합제를 주입하여 기둥부재를 상하 접합시공하도록 되어 있는 것에 본 발명의 특징이 있다.
In order to accomplish the above object, the present invention provides a pillar structure, comprising: a pillar member made of a concrete material having a predetermined length; a joint protrusion made of a concrete material protruding vertically downward from a center portion of a lower surface of the pillar member; A lower portion of which is embedded in the column member and an upper portion of which is vertically upwardly protruded and a plurality of upper reinforcing bars which are provided along the outer periphery of the lower portion of the column member and whose upper portion is embedded in the pillar member, The joining projection is formed in a column shape having a cross section smaller than that of the column member, and a frame reinforcing bar connected to an inner lower portion of the column member is embedded in the inside to improve durability and overall strength of the joining projection, And a joining groove is formed at an intermediate portion of the joining groove, The joint projecting portion is provided at its lower outer side surface with one or a plurality of joint grooves communicated with the joint grove grooves and one or a plurality of air discharge holes formed therein so that the joint projections of the column members are placed on the upper surface portions of the other column members or the bottom concrete The joining agent is injected into the inside of the joining ridge grooves through the joining ridge hole in the state where the joining ridge grooves are formed, and the column member is vertically joined.

상기와 같이 본 발명에 의하면 PC공법에 따른 콘크리트재질의 기둥부재를 형성하되 상기 기둥부재의 하면부 가운데부분에는 기둥형상의 접합돌출부가 수직하방으로 돌출형성되어 있고 상기 접합돌출부의 내부에는 기둥부재의 내측 하부와 연결된 골조철근이 매설되어 있어 접합돌출부의 내구성 및 전체강도를 향상시킬 수 있으며, 상기 접합돌출부의 하면부 가운데부분에는 상방으로 오목하게 파인 접합제주입홈이 형성되어 있어 상기 기둥부재의 접합돌출부를 다른 기둥부재나 바닥콘크리트의 상면부에 올려놓은 상태에서 상기 접합돌출부의 외측면 하부에 천공된 하나 또는 복수개의 접합제주입공을 통해 접합제주입홈의 내측에 고점도의 콘크리트용 접합제를 주입경화시켜 기둥부재를 상하 견고하게 접합시공함으로써 기둥구조물의 상하접합부에 틈새가 발생되거나 결로현상과 틈새에 스며든 물기의 동결에 따른 수축, 팽창 등을 방지할 수 있는 효과가 있다.
As described above, according to the present invention, a columnar member made of concrete according to a PC method is formed, and a columnar joint projection is formed vertically downward in the center of the lower portion of the column member. Inside the joint projection, The joining protrusion can be improved in durability and overall strength by being embedded in a reinforcing bar connected to the inner lower portion of the joining protrusion, Is placed on the upper surface of the other column member or the bottom concrete, and a high viscosity concrete bonding agent is injected and cured on the inner side of the joining ridge grooves through one or a plurality of joining ridges drilled at the lower side of the outer side surface of the joining ridge The column member is vertically and jointly joined and constructed so that the upper and lower joining portions There is an effect that it is possible to prevent a condensation phenomenon and a shrinkage and swelling due to freezing of the moisture that permeates into the gap.

도 1은 본 발명에 따른 기둥구조물의 사시개략도
도 2는 본 발명에 따른 기둥구조물이 상하로 복수개가 적층되는 상태의 사시개략도
도 3은 본 발명에 따른 기둥구조물이 상하로 복수개가 적층조립된 상태의 사시개략도
도 4는 본 발명에 따른 기둥구조물이 상하로 복수개가 적층조립된 상태에서 접합제주입공에 연장호스가 끼움결합된 상태의 일부 사시개략도
도 5는 본 발명에 따른 기둥구조물이 상하로 복수개가 적층조립된 상태의 종단면개략도
도 6은 본 발명에 따른 기둥구조물이 상하로 복수개가 적층조립된 상태에서 하부에 위치된 기둥부재의 상면부 외곽부분에 슬라브구조물의 일측끝단이 올려진 상태의 종단면개략도
도 7은 본 발명에 따른 기둥구조물이 상하로 복수개가 적층조립된 상태에서 슬라브구조물이 올려지고 연결공간부에 콘크리트조성물이 타설되어 경화되는 상태의 종단면개략도
도 8은 본 발명에 따른 기둥구조물이 바닥콘크리트의 상면부에 적층조립된 상태의 종단면개략도
1 is a perspective view of a column structure according to the present invention;
2 is a perspective view schematically showing a state in which a plurality of column structures according to the present invention are stacked up and down;
3 is a perspective view of a strap in a state in which a plurality of column structures according to the present invention are stacked up and down.
FIG. 4 is a partial perspective view showing a state in which the extension hose is fitted in the joint hole at a state where a plurality of column structures according to the present invention are stacked and assembled
5 is a longitudinal sectional schematic view of a column structure according to the present invention in a state where a plurality of columns are stacked and assembled
FIG. 6 is a longitudinal sectional schematic view of a column structure according to an embodiment of the present invention in which one end of a slab structure is mounted on a periphery of a top portion of a column member positioned at a lower portion in a state where a plurality of column structures are stacked up and down.
7 is a schematic view of a longitudinal section in which a slab structure is raised in a state where a plurality of pillar structures according to the present invention are stacked up and down,
8 is a schematic view of a longitudinal section of a column structure according to the present invention,

이하 본 발명에 따른 바람직한 구성을 도면에 의해 상세히 설명하면 다음과 같다.
Hereinafter, preferred embodiments of the present invention will be described in detail with reference to the drawings.

본 발명에 따른 건축용 콘크리트 기둥구조물(1)은 도 1 내지 8에 도시된 바와 같이 건축용 PC(Precast Concrete)공법에 사용되는 콘크리트 기둥구조물에 관한 것으로, 상하 일정길이로 형성된 콘크리트재질의 기둥부재(2)와, 상기 기둥부재(2)의 하면부 가운데부분에 수직하방으로 돌출형성된 콘크리트재질의 접합돌출부(3)와, 상기 기둥부재(2)의 상면부 외곽둘레를 따라 구비되며 하부는 기둥부재(2)에 매설되고 상부는 수직상방으로 돌출된 복수개의 상부철근(11)과, 상기 기둥부재(2)의 하면부 외곽둘레를 따라 구비되며 상부는 기둥부재(2)에 매설되고 하부는 수직하방으로 돌출된 복수개의 하부철근(12)으로 구성되어 있다.
1 to 8, a concrete pillar structure 1 according to the present invention relates to a concrete pillar structure used in a PC (Precast Concrete) method as shown in Figs. 1 to 8, and comprises a pillar member 2 A joining projection 3 made of a concrete material protruding vertically downward from the center of the lower surface of the column member 2 and a joining protrusion 3 formed along the circumference of the upper surface of the column member 2, 2 and the upper part is provided with a plurality of upper reinforcing bars 11 protruding vertically upwardly and along the outer periphery of the bottom part of the pillar member 2 with the upper part embedded in the pillar member 2, And a plurality of lower reinforcing bars 12 protruding from the lower reinforcing bars 12.

상기 기둥부재(2)는 도 1 내지 8에 도시된 바와 같이 PC공법으로 시공시 건축물의 기둥을 형성하는 부분으로, 콘크리트재질로 PC공법으로 시공되는 건축물의 한층 높이에 부합되는 상하길이로 형성되어 있으며 내부에는 수직방향으로 복수개의 철근이 매설되어 있어 전체적인 강도 및 내구성을 향상시키도록 되어 있으며, 수직으로 세워진 상태에서 상하로 복수개가 적층되면서 건축물을 복층으로 시공하도록 되어 있다.As shown in FIGS. 1 to 8, the column member 2 is a part forming a column of a building during construction by a PC method. The column member 2 is formed in a vertical length corresponding to a height of a building constructed by a PC method using a concrete material And a plurality of reinforcing bars are buried in a vertical direction so as to improve the overall strength and durability of the building. A plurality of buildings are vertically stacked vertically and the building is constructed in a multi-layer structure.

상기 접합돌출부(3)는 도 1 내지 8에 도시된 바와 같이 상하로 적층되는 기둥부재(2)가 일체로 접합시공되도록 하는 부분으로, 콘크리트재질로 상기 기둥부재(2)의 하면부 가운데부분에 수직하방으로 일체로 돌출형성되어 있으며 상기 기둥부재(2)보다 작은 단면을 지닌 기둥형상으로 내부에는 도 5 내지 8에 도시된 바와 같이 기둥부재(2)의 내측 하부와 연결된 직육면체형 틀형상이나 원통형 틀형상 등의 골조철근(4)이 매설되어 있어 접합돌출부(3)의 내구성 및 전체강도를 향상시키도록 되어 있고 하면부 가운데부분에는 상방으로 오목하게 파인 접합제주입홈(5)이 형성되어 있으며 상기 접합돌출부(3)의 외측면 하부에는 접합제주입홈(5)과 연통된 하나 또는 복수개의 접합제주입공(6) 및 상기 접합제주입공(6)을 통해 주입되는 접합제(8)가 접합제주입홈(5)에 골고루 균일하게 주입되도록 하기 위한 하나 또는 복수개의 공기배출공(7)이 천공되어 있어 상기 기둥부재(2)의 접합돌출부(3)를 다른 기둥부재(2)나 바닥콘크리트(15)의 상면부에 올려놓은 상태에서 상기 접합제주입공(6)을 통해 접합제주입홈(5)의 내측에 에폭시접착제나 시멘트접착제 등으로 된 통상의 콘크리트용 접합제(8)를 주입하여 기둥부재(2)를 상하 일체로 접합시공하도록 되어 있다.
As shown in Figs. 1 to 8, the joining projection 3 is a portion for vertically stacking the column members 2 to be integrally joined together. The joining projection 3 is made of a concrete material, 5 to 8 as shown in Fig. 5 to Fig. 8, and a rectangular parallelepiped frame shape or a cylindrical shape, which is connected to the lower inner side of the column member 2, A reinforcing bar 4 such as a frame shape is embedded to improve the durability and overall strength of the joint protrusion 3 and a joint groove 5 having a concave upward concave shape is formed in the center of the lower portion, One or a plurality of joining jaw holes 6 communicating with the joining jaw grooves 5 and a joining material 8 injected through the joining jaw grooves 6 are formed at the lower side of the outer side surface of the joining protrusion 3, (5) One or a plurality of air discharge holes 7 are formed in the upper surface of the other column member 2 or the bottom concrete 15 so that the joint protrusions 3 of the column member 2 are pierced A common concrete joining agent 8 made of an epoxy adhesive or a cement adhesive is injected into the joint groove insertion groove 5 through the joint groove 6 to put the column member 2 up and down As shown in FIG.

또한, 상기 접합돌출부(3)는 하면부 외곽테두리부분에 안착면(9)이 형성되어 있어 상기 안착면(9)이 다른 기둥부재(2)나 바닥콘크리트(15)의 상면부에 올려지도록 되어 있되, 상기 안착면(9)에는 도 5 및 6에 도시된 바와 같이 통상의 콘크리트용 접합제(8)가 도포된 상태에서 다른 기둥부재(2)나 바닥콘크리트(15)의 상면부에 올려지면서 더욱 견고하게 일체로 부착되도록 되어 있다.
The joining projection 3 is formed with a seating surface 9 at the outer edge of the lower portion so that the seating surface 9 is placed on the upper surface of the other column member 2 or the bottom concrete 15 As shown in FIGS. 5 and 6, the seating surface 9 is placed on the upper surface of the other column member 2 or the floor concrete 15 in a state in which the ordinary concrete bonding agent 8 is applied, So that they are more firmly and integrally attached.

상기 접합제주입공(6)에는 도 4 및 5에 도시된 바와 같이 연장호스(10)가 삽입된 상태로 상기 연장호스(10)에 연결된 인젝션펌프(도시하지 않음) 등을 통해 고점도의 콘크리트용 접합제(8)를 주입시공하도록 되어 있다.
As shown in FIGS. 4 and 5, in the joint groove 6, a high viscosity concrete joint (not shown) is inserted through an injection pump (not shown) connected to the extension hose 10 while the extension hose 10 is inserted, (8).

한편, 본 발명의 다른 실시예로서, 상기 접합돌출부(3)는 외측면 하부에 하나 또는 복수개의 접합제주입공(6) 및 공기배출공(7)을 천공하지 않은 상태로 접합제주입홈(5)만 형성하여 제작한 다음 시공과정에서 드릴 등의 장비로 원하는 위치에 하나 또는 복수개의 접합제주입공(6) 및 공기배출공(7)을 천공하여 시공할 수 있다.
The joining protrusions 3 may be formed on the outer circumferential surface of the joining ridge groove 5 in a state in which one or a plurality of joining ridges 6 and air exhaust holes 7 are not drilled, And then one or a plurality of joining pot holes 6 and an air exhaust hole 7 may be drilled through a desired location with a drill or the like in the construction process.

또한, 상기 기둥부재(2)는 상면부 외곽둘레를 따라 수직상방으로 복수개의 상부철근(11)이 돌출되게 구비되어 있되 상기 상부철근(11)의 하부는 기둥부재(2)에 일체로 매설되어 있고, 상기 기둥부재(2)의 하면부에는 외곽둘레를 따라 수직하방으로 복수개의 하부철근(12)이 돌출되게 구비되어 있되 상기 하부철근(12)의 상부는 기둥부재(2)에 일체로 매설되어 있으며, 상기 복수개의 상부철근(11)과 하부철근(12)은 상하로 돌출된 부분이 기둥부재(2)의 하면부 가운데부분에 돌출형성된 접합돌출부(3)의 상하길이보다 짧은 길이로 형성되어 있고 상기 접합돌출부(3)와 일정간격 이격된 외곽부분에 위치되도록 되어 있으며, 상기 기둥부재(2)가 상하로 적층시공시 도 3 내지 7에 도시된 바와 같이 상부철근(11)은 상부에 적층되는 다른 기둥부재(2)의 하부철근(12)과 돌출된 부분이 서로 인접되게 겹쳐지며 상기 하부철근(12)은 하부에 위치되는 다른 기둥부재(2)의 상부철근 또는 도 8에 도시된 바와 같이 바닥콘크리트(15)위에 설치되는 기초철근(16)과 돌출된 부분이 측면에 서로 인접되게 겹쳐지면서 통상의 커플러(13)를 통해 연결되도록 되어 있다.
The column member 2 is provided with a plurality of upper reinforcing bars 11 protruding vertically upward along the periphery of the upper surface portion of the column member 2 while the lower portion of the upper reinforcing bar 11 is integrally embedded in the column member 2 A plurality of lower reinforcing bars 12 protruding vertically downward along the outer circumference of the column member 2 and the upper portion of the lower reinforcing bar 12 is integrally embedded in the column member 2, And a plurality of upper reinforcing bars 11 and lower reinforcing bars 12 are formed so that the vertically protruding portions are shorter than the vertical lengths of the joining protrusions 3 protruding from the middle portion of the lower surface of the column member 2 3 to 7, when the column member 2 is vertically stacked, the upper reinforcing bars 11 are arranged at the upper portion The lower reinforcing bars 12 of the other pillar members 2 and the lower reinforcing bars 12 of the piled- And the lower reinforcing bars 12 are connected to the upper reinforcing bars 16 of the lower pillar member 2 or the foundation reinforcing bars 16 provided on the lower concrete 15 as shown in FIG. And the protruded portions are connected to each other via the normal coupler 13 while overlapping each other adjacent to the side surface.

한편, 필요에 따라서 상부에 위치되는 기둥부재(2)의 하부철근(12)과 하부에 위치되는 기둥부재(2)의 상부철근(11) 또는 바닥콘크리트(15)의 기초철근(16)은 돌출된 부분이 서로 측면에 인접되게 위치된 상태에서 용접부착될 수 있다.
On the other hand, if necessary, the lower reinforcing bars 12 of the column member 2 positioned at the upper portion and the reinforcing bars 16 of the upper reinforcing bars 11 or the bottom concrete 15 of the pillar members 2 positioned at the lower portion are projected Welded portions can be welded while being positioned adjacent to each other on the side surface.

또한, 상기 기둥부재(2)가 하부에 위치되는 다른 기둥부재(2)의 상면부 또는 바닥콘크리트(15)의 상면부에 올려진 상태에서 기둥부재(2)보다 작은 단면을 지닌 접합돌출부(3)에 의해 도 3 내지 6, 8에 도시된 바와 같이 기둥부재(2)의 하면부 외곽부분과 다른 기둥부재(2) 또는 바닥콘크리트(15)의 상면부 사이에는 연결공간부(14)가 형성되도록 되어 있어 상기 연결공간부(14)를 통해 상,하부철근(11(12)을 커플러(13)로 연결하거나 또는 용접부착하도록 되어 있다.
In the state where the column member 2 is placed on the upper surface portion of the other column member 2 or the upper surface portion of the bottom concrete 15 which is located at the lower portion, the joint projections 3 3 to 6 and 8, a connection space portion 14 is formed between the outer periphery of the lower portion of the column member 2 and the upper surface portion of the column member 2 or the bottom concrete 15, as shown in Figs. So that the upper and lower reinforcing bars 11 (12) are connected to each other by a coupler 13 or welded thereto via the connection space portion 14.

상기와 같이 복수개의 기둥부재(2)가 상하로 적층된 상태에서 하부에 위치되는 기둥부재(2)의 상면부 외곽부분에는 도 6 및 7에 도시된 바와 같이 통상적인 슬라브구조물(17)의 일측끝단이 올려지며 상기 연결공간부(14)에 콘크리트조성물(18)이 타설되면서 슬라브구조물(17)이 기둥부재(2)와 일체로 경화되어 부착되도록 되어 있다.
As shown in Figs. 6 and 7, at the outer periphery of the upper surface portion of the column member 2, which is located at the lower side in a state where the plurality of column members 2 are stacked in the vertical direction as described above, And the slab structure 17 is cured and attached integrally with the pillar member 2 while the end is raised and the concrete composition 18 is poured into the connection space portion 14. [

이하 본 발명의 시공방법을 단계별로 구체적으로 설명하면 다음과 같다.Hereinafter, the construction method of the present invention will be described in detail as follows.

1. 기둥부재의 제조단계
도 1에 도시된 바와 같이 PC공법에 따라 상하 일정길이로 형성된 콘크리트재질의 기둥부재(2)를 제조하되 기둥부재(2)의 하면부 가운데부분에 기둥부재(2)보다 작은 단면을 지닌 접합돌출부(3)를 수직하방으로 돌출 형성하고 상기 접합돌출부(3)의 하면부 가운데부분에는 상방으로 오목하게 파인 접합제주입홈(5)을 형성하며 접합돌출부(3)의 외측면 하부에는 접합제주입홈(5)과 연통된 하나 또는 복수개의 접합제주입공(6)과 하나 또는 복수개의 공기배출공(7)를 형성한다.

2. 기둥부재의 상하적층단계
도 2에 도시된 바와 같이 PC공법에 따라 상하 일정길이로 형성된 콘크리트재질의 기둥부재(2)를 상하 수직으로 복수개 적층하여 건축물이 복층으로 시공되도록 하되 하부에 위치된 기둥부재(2)의 상면부 가운데부분에 다른 기둥부재(2)의 접합돌출부(3)가 올려지도록 하여 상하적층시공한다.

2. 철근연결단계
도 3 및 4에 도시된 바와 같이 상부에 위치되는 기둥부재(2)의 하면부 외곽둘레에 하방으로 돌출된 복수개의 하부철근(12)과 하부에 위치되는 기둥부재(2)의 상면부 외곽둘레에 상방으로 돌출된 복수개의 상부철근(11)을 서로 인접되게 겹친 상태에서 통상의 커플러(13)를 통해 연결하거나 용접부착한다.
1. Manufacturing steps of column members
1, a pillar member 2 made of a concrete material having a predetermined length is formed according to the PC method, and a joint protrusion 2 having a smaller cross section than the pillar member 2 is formed at the center of the lower surface of the pillar member 2, (3) is vertically downwardly protruded. A joint groove (5) is formed in the center of the lower surface of the joint protrusion (3) so as to be concave upward. The joint groove (5) 5 and one or a plurality of joint jaw holes 6 and one or a plurality of air exhaust holes 7 are formed.

2. Vertical lamination step of column member
As shown in FIG. 2, a plurality of pillar members 2 of a concrete material formed up and down according to the PC method are vertically stacked vertically so that the building is constructed in a multi-layer structure, And the joining projection 3 of the other pillar member 2 is placed on the middle portion, so that the upper and lower lamination is carried out.

2. Reinforcement Step
As shown in Figs. 3 and 4, a plurality of lower reinforcing bars 12 protruded downward around the lower surface of the lower portion of the pillar member 2 located at the upper portion, A plurality of upper reinforcing bars 11 protruding upward are connected to or welded to each other via a normal coupler 13 in a state of being adjacent to each other.

3. 접합시공단계
상부에 위치되는 기둥부재(2)의 접합돌출부(3)에 천공된 하나 또는 복수개의 접합제주입공(6)에 연장호스(10)를 끼움결합하고 연장호스(10)와 연결된 통상의 인젝션펌프(도시하지 않음)로부터 고점도의 콘크리트용 접합제(8)를 접합제주입홈(5)으로 주입하며 접합제(8)의 주입에 따라 접합돌출부(3)의 외측면 하부에 천공된 하나 또는 복수개의 공기배출공(7)을 통해 내부의 공기가 배출되면서 도 6에 도시된 바와 같이 접합제주입홈(5) 내측에 전체적으로 균일하게 접합제(8)가 충진되고 경화되어 상하 적층된 기둥부재(2)가 일체로 접합시공되도록 한다.

한편, 본 발명에 따른 다른 실시예로서, 상기 기둥부재의 제조단계는 접합돌출부(3)의 외측면 하부에 하나 또는 복수개의 접합제주입공(6) 및 공기배출공(7)을 천공하지 않은 상태로 접합제주입홈(5)만 형성하여 제작한 다음 접합시공단계에서 드릴 등의 장비로 원하는 위치에 하나 또는 복수개의 접합제주입공(6) 및 공기배출공(7)을 천공하여 접합제(8)가 주입시공되도록 할 수도 있다.
3. Construction step of joint
The extension hose 10 is fitted to one or a plurality of jointed jeans holes 6 perforated in the joint protrusion 3 of the column member 2 located at the upper portion and is connected to a common injection pump (Not shown) is injected into the joining ridge grooves 5, and one or a plurality of holes (not shown) pierced under the outer surface of the joining ridge 3 in accordance with the injection of the joining agent 8 The inner air is discharged through the discharge hole 7, and the bonding agent 8 is uniformly and uniformly filled in the inside of the joint groove receiving grooves 5 as shown in FIG. 6 and hardened to form the vertically stacked column member 2 So that they are integrally joined together.

Meanwhile, according to another embodiment of the present invention, the step of manufacturing the column member may include a step of forming one or a plurality of joining ridges 6 and an air vent 7 in the lower side of the outer surface of the joining projection 3 The joining agent 8 is formed by forming only one joint groove 6 and an air exhaust hole 7 at a desired position with equipment such as a drill in the joining construction step, May be injected.

4. 슬라브구조물 연결단계
도 7에 도시된 바와 같이 하부에 위치된 기둥부재(2)의 상면부 외곽부분에 슬라브구조물(17)의 일측끝단을 올려놓고 하부에 위치되는 기둥부재(2)와 상부에 올려지는 기둥부재(2) 사이에 형성되는 연결공간부(14)에 콘크리트조성물(18)을 타설하여 슬라브구조물(17)이 기둥부재(2)와 일체로 경화되어 부착되도록 한다.
4. Slab structure connection step
7, one end of the slab structure 17 is placed on the outer periphery of the upper surface portion of the column member 2 located at the lower portion, and the column member 2 positioned at the lower portion and the column member The slab structure 17 is integrally cured and attached to the pillar member 2 by placing the concrete composition 18 in the connection space portion 14 formed between the pillar member 2 and the pillar member 2.

삭제delete

한편, 도 8에 도시된 바와 같이 지면에 타설되어 경화된 바닥콘크리트(15)의 상면부에 기둥구조물(1)을 설치하는 경우에도 기둥부재(2)의 접합돌출부(3)를 바닥콘크리트(15)의 상면부에 올려놓고 상기 바닥콘크리트(15)의 상면부와 기둥부재(2)의 하면부 사이에 형성되는 연결공간부(14)를 통해 바닥콘크리트(15)위에 설치되는 기초철근(16)과 기둥부재(2)의 하부철근(12)을 서로 커플러(13)로 연결하거나 용접부착한 다음 상기 연결공간부(14)에 콘크리트조성물을 타설하여 건축물의 바닥면과 기둥구조물(1)을 일체로 연결시공하게 되며, 상기 기둥부재(2)의 접합돌출부(3)를 다른 기둥부재(2)의 상면부 또는 바닥콘크리트(15)의 상면부에 적층하는 과정에서 접합돌출부(3)의 하면부 외곽테두리부분에 형성된 안착면(9)에는 도 5 및 6에 도시된 바와 같이 통상의 콘크리트용 접합제(8)가 도포된 상태에서 다른 기둥부재(2)나 바닥콘크리트(15)의 상면부에 올려지도록 하여 더욱 견고하게 부착되도록 한다.
8, even when the pillar structure 1 is provided on the upper surface of the hardened floor concrete 15, the joint protrusions 3 of the pillar member 2 can be disposed on the bottom concrete 15 And the foundation reinforcing bars 16 installed on the bottom concrete 15 through the connection space portion 14 formed between the upper surface portion of the bottom concrete 15 and the lower portion of the pillar member 2, And the lower reinforcing bars 12 of the pillar member 2 are connected to each other by a coupler 13 or welded together and then a concrete composition is placed in the connecting space portion 14 so that the bottom surface of the building and the pillar structure 1 are integrally And the joining projection 3 of the column member 2 is joined to the upper surface of the other column member 2 or the upper surface of the bottom concrete 15, As shown in Figs. 5 and 6, on the seating surface 9 formed at the rim portion, So as to put in for the bonding agent 8 applied state to the upper surface portion of the other post member (2) and a concrete floor (15) such that more securely attached.

1. 기둥구조물 2. 기둥부재
3. 접합돌출부 4. 골조철근
5. 접합제주입홈 6. 접합제주입공
7. 공기배출공 8. 접합제
9. 안착면 10. 연장호스
11. 상부철근 12. 하부철근
13. 커플러 14. 연결공간부
15. 바닥콘크리트 16. 기초철근
17. 슬라브구조물 18. 콘크리트조성물
1. Column structure 2. Column member
3. Joint protrusion 4. Frame reinforcement
5. Joint Jeju Entrance 6. Joining Jeju
7. Air vent 8. Bonding agent
9. Seat face 10. Extension hose
11. Upper Reinforcement 12. Lower Reinforcement
13. Coupler 14. Connection space
15. Floor Concrete 16. Foundation Reinforcement
17. Slab construction 18. Concrete composition

Claims (6)

상하 일정길이로 형성된 콘크리트재질의 기둥부재(2)와, 상기 기둥부재(2)의 하면부 가운데부분에 수직하방으로 돌출형성된 콘크리트재질의 접합돌출부(3)와, 상기 기둥부재(2)의 상면부 외곽둘레를 따라 구비되며 하부는 기둥부재(2)에 매설되고 상부는 수직상방으로 돌출된 복수개의 상부철근(11)과, 상기 기둥부재(2)의 하면부 외곽둘레를 따라 구비되며 상부는 기둥부재(2)에 매설되고 하부는 수직하방으로 돌출된 복수개의 하부철근(12)으로 구성되어 있되, 상기 접합돌출부(3)는 기둥부재(2)보다 작은 단면을 지닌 기둥형상으로 내부에는 기둥부재(2)의 내측 하부와 연결된 골조철근(4)이 매설되어 있고 하면부 가운데부분에는 상방으로 오목하게 파인 접합제주입홈(5)이 형성되어 있으며 상기 접합돌출부(3)의 외측면 하부에는 접합제주입홈(5)과 연통된 하나 또는 복수개의 접합제주입공(6)과 하나 또는 복수개의 공기배출공(7)이 천공되어 있어 상기 기둥부재(2)의 접합돌출부(3)를 다른 기둥부재(2)나 바닥콘크리트(15)의 상면부에 올려놓은 상태에서 접합제주입공(6)을 통해 접합제주입홈(5)의 내측에 접합제(8)를 주입하여 기둥부재(2)를 상하 접합시공하도록 되어 있는 것을 특징으로 하는 건축용 콘크리트 기둥구조물.
A joint projection 3 made of a concrete material vertically downwardly protruded in the center of a lower surface of the lower surface of the column member 2 and a lower surface of the upper surface of the column member 2, A plurality of upper reinforcing bars 11 provided along the outer periphery of the column member 2, the lower portion of which is embedded in the column member 2 and the upper portion of which is vertically upwardly projected, And a plurality of lower reinforcing bars 12 embedded in the column member 2 and projecting downwardly in the vertical direction. The joining projection 3 is formed into a column shape having a cross section smaller than that of the column member 2, A reinforcing bar 4 connected to an inner lower portion of the member 2 is embedded and a joint groove 5 having an upwardly concave shape is formed in the middle of the lower portion. (5) in communication with the groove Or one or more air discharge holes 7 are drilled so that the joint protrusions 3 of the column member 2 are inserted into the other column member 2 or the bottom concrete 15, , And the joining agent (8) is injected into the joining ridge groove (5) through the joining ridge groove (6) in the state of being placed on the upper surface of the joining ridge groove (5) Concrete column constructions.
제 1항에 있어서, 상기 접합돌출부(3)는 하면부 외곽테두리부분에 안착면(9)이 형성되어 있어 상기 안착면(9)이 다른 기둥부재(2)나 바닥콘크리트(15)의 상면부에 올려지도록 되어 있되, 상기 안착면(9)에는 콘크리트용 접합제(8)가 도포된 상태에서 다른 기둥부재(2)나 바닥콘크리트(15)의 상면부에 올려지면서 일체로 부착되도록 되어 있는 것을 특징으로 하는 건축용 콘크리트 기둥구조물.
2. The apparatus according to claim 1, wherein the joint projection (3) has a seating surface (9) formed at a rim portion of a bottom portion, and the seating surface (9) And the upper surface of the other column member 2 or the bottom concrete 15 is mounted on the seating surface 9 in a state of being coated with the bonding agent 8 for concrete, Structural concrete pillar structure characterized.
제 1항에 있어서, 상기 복수개의 상부철근(11)과 하부철근(12)은 상하로 돌출된 부분이 기둥부재(2)의 하면부 가운데부분에 돌출형성된 접합돌출부(3)의 상하길이보다 짧은 길이로 형성되어 있고 상기 접합돌출부(3)와 일정간격 이격된 외곽부분에 위치되도록 되어 있으며, 상기 기둥부재(2)가 상하로 적층시공시 상부철근(11)은 상부에 적층되는 다른 기둥부재(2)의 하부철근(12)과 돌출된 부분이 서로 인접되게 겹쳐지며 상기 하부철근(12)은 하부에 위치되는 다른 기둥부재(2)의 상부철근 또는 바닥콘크리트(15)위에 설치되는 기초철근(16)과 돌출된 부분이 서로 인접되게 겹쳐지면서 커플러(13)를 통해 연결되거나 용접부착되도록 되어 있는 것을 특징으로 하는 건축용 콘크리트 기둥구조물.
The columnar structure according to claim 1, wherein the plurality of upper reinforcing bars (11) and the lower reinforcing bars (12) are vertically protruded from each other and are shorter than the vertical length of the joining projection (3) And the upper reinforcing bars 11 are stacked on top of the other reinforcing members 11 which are stacked on top of the other reinforcing bars 11 when the pillar members 2 are vertically stacked The lower reinforcing bars 12 and the protruding portions of the lower reinforcing bars 12 and 12 are adjacent to each other and the lower reinforcing bars 12 are connected to the upper reinforcing bars of the other pillar members 2, 16 and the protruded portions are connected to each other or welded to each other via the coupler 13 while being adjacent to each other.
상하 일정길이로 형성되는 콘크리트재질의 기둥부재(2) 하면부 가운데부분에는 기둥부재(2)보다 작은 단면을 지닌 접합돌출부(3)를 수직하방으로 돌출형성하고 접합돌출부(3)의 하면부 가운데부분에는 상방으로 오목하게 파인 접합제주입홈(5)을 형성하며 접합돌출부(3)의 외측면 하부에는 접합제주입홈(5)과 연통된 하나 또는 복수개의 접합제주입공(6) 및 공기배출공(7)를 형성하는 기둥부재의 제조단계; 하부에 위치된 기둥부재(2)의 상면부 가운데부분에 다른 기둥부재(2)의 접합돌출부(3)가 올려지도록 상하적층하는 기둥부재의 상하적층단계; 상부에 위치되는 기둥부재(2)의 하면부 외곽둘레에 하방으로 돌출된 복수개의 하부철근(12)과 하부에 위치되는 기둥부재(2)의 상면부 외곽둘레에 상방으로 돌출된 복수개의 상부철근(11)을 서로 인접되게 겹친 상태에서 커플러(13)를 통해 연결하거나 용접부착하는 철근연결단계; 상부에 위치되는 기둥부재(2)의 접합돌출부(3)에 천공된 하나 또는 복수개의 접합제주입공(6)에 연장호스(10)를 끼움결합하고 연장호스(10)를 통해 콘크리트용 접합제(8)를 주입하며 접합제(8)의 주입에 따라 접합돌출부(3)의 외측면 하부에 천공된 하나 또는 복수개의 공기배출공(7)을 통해 내부의 공기가 배출되면서 접합제주입홈(5) 내측에 전체적으로 균일하게 접합제(8)가 충진 경화되어 상하적층된 기둥부재(2)가 일체로 접합되는 접합시공단계로 이루어지는 것을 특징으로 하는 건축용 콘크리트 기둥구조물의 시공방법.
A joint projection 3 having a smaller cross section than the column member 2 is vertically downwardly protruded from the center of the lower portion of the concrete column member 2 formed in an up and down constant length, And one or a plurality of joint jaw holes 6 communicating with the joining jaw grooves 5 and an air exhaust hole 6 communicating with the joining jaw grooves 5 are formed below the outer surface of the joining protrusion 3 7); A vertically stacking step of vertically stacking the columnar members so that the joining projections 3 of the other columnar members 2 are stacked on the middle part of the upper surface portion of the columnar members 2 located at the lower portion; A plurality of upper reinforcing bars 12 protruding downward around the lower surface of the lower portion of the pillar member 2 located at the upper portion and a plurality of upper reinforcing bars 12 projecting upwardly around the upper surface of the pillar member 2 located at the lower portion. (11) are connected to each other via a coupler (13) in a state in which they are adjacent to each other; The extension hose 10 is fitted to one or a plurality of joint grove holes 6 drilled in the joint projection 3 of the column member 2 located on the upper side and the concrete hose 10 is inserted through the extension hose 10 8 are injected and the air is exhausted through one or a plurality of air discharge holes 7 formed in the lower portion of the outer side surface of the joint projection 3 in accordance with the injection of the bonding agent 8, And a joining step of integrally joining the vertically stacked columnar members (2) with the joining agent (8) filled and cured on the entire inner side uniformly.
상하 일정길이로 형성되는 콘크리트재질의 기둥부재(2) 하면부 가운데부분에는 기둥부재(2)보다 작은 단면을 지닌 접합돌출부(3)를 수직하방으로 돌출형성하고 접합돌출부(3)의 하면부 가운데부분에는 상방으로 오목하게 파인 접합제주입홈(5)을 형성하는 기둥부재의 제조단계; 하부에 위치된 기둥부재(2)의 상면부 가운데부분에 다른 기둥부재(2)의 접합돌출부(3)가 올려지도록 상하적층하는 기둥부재의 상하적층단계; 상부에 위치되는 기둥부재(2)의 하면부 외곽둘레에 하방으로 돌출된 복수개의 하부철근(12)과 하부에 위치되는 기둥부재(2)의 상면부 외곽둘레에 상방으로 돌출된 복수개의 상부철근(11)을 서로 인접되게 겹친 상태에서 커플러(13)를 통해 연결하거나 용접부착하는 철근연결단계; 상부에 위치되는 기둥부재(2)의 접합돌출부(3) 외측면 하부에 접합제주입홈(5)과 연통되도록 하나 또는 복수개의 접합제주입공(6) 및 공기배출공(7)를 천공한 후접합제주입공(6)에 연장호스(10)를 끼움결합하고 연장호스(10)를 통해 콘크리트용 접합제(8)를 주입하며 접합제(8)의 주입에 따라 접합돌출부(3)의 외측면 하부에 천공된 하나 또는 복수개의 공기배출공(7)을 통해 내부의 공기가 배출되면서 접합제주입홈(5) 내측에 전체적으로 균일하게 접합제(8)가 충진 경화되어 상하적층된 기둥부재(2)가 일체로 접합되는 접합시공단계로 이루어지는 것을 특징으로 하는 건축용 콘크리트 기둥구조물의 시공방법.
A joint projection 3 having a smaller cross section than the column member 2 is vertically downwardly protruded from the center of the lower portion of the concrete column member 2 formed in an up and down constant length, A step of manufacturing a column member that forms an upwardly concave connecting groove 5; A vertically stacking step of vertically stacking the columnar members so that the joining projections 3 of the other columnar members 2 are stacked on the middle part of the upper surface portion of the columnar members 2 located at the lower portion; A plurality of upper reinforcing bars 12 protruding downward around the lower surface of the lower portion of the pillar member 2 located at the upper portion and a plurality of upper reinforcing bars 12 projecting upwardly around the upper surface of the pillar member 2 located at the lower portion. (11) are connected to each other via a coupler (13) in a state in which they are adjacent to each other; One or a plurality of joint jaw holes 6 and an air exhaust hole 7 are drilled in the lower portion of the outer side surface of the joining projection 3 of the column member 2 located on the upper side so as to communicate with the joining jaw groove 5, The extension hose 10 is inserted into the jeju inlet 6 and the concrete joining agent 8 is injected through the extension hose 10 and the outer side surface of the joining projection 3 The air is exhausted through one or a plurality of air discharge holes 7 formed in the upper and lower sides of the joint groove 8 so as to uniformly fill the joint agent 8 uniformly in the inside of the joint groove 5 to form the upper and lower stacked column members 2 And a jointing step of integrally joining the joints.
제 4항 또는 제 5항에 있어서, 상기 접합시공단계는 하부에 위치된 기둥부재(2)의 상면부 외곽부분에 슬라브구조물(17)의 일측끝단을 올려놓고 하부에 위치되는 기둥부재(2)와 상부에 올려지는 기둥부재(2) 사이에 형성되는 연결공간부(14)에 콘크리트조성물(18)을 타설하여 슬라브구조물(17)이 기둥부재(2)와 일체로 경화되어 부착되도록 하는 슬라브구조물 연결단계를 포함하여 이루어지는 것을 특징을 하는 건축용 콘크리트 기둥구조물의 시공방법.6. The method according to claim 4 or 5, wherein the joining step includes the step of placing one end of the slab structure (17) on the outer side of the upper surface of the column member (2) And a slab structure (17) for placing the concrete composition (18) in the connection space portion (14) formed between the columnar member (2) And a connecting step of connecting the concrete pillar structure to the building.
KR1020120049918A 2012-05-10 2012-05-10 The concrete pillar structure and the constructing method thereof KR101389485B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020120049918A KR101389485B1 (en) 2012-05-10 2012-05-10 The concrete pillar structure and the constructing method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020120049918A KR101389485B1 (en) 2012-05-10 2012-05-10 The concrete pillar structure and the constructing method thereof

Publications (2)

Publication Number Publication Date
KR20130126101A KR20130126101A (en) 2013-11-20
KR101389485B1 true KR101389485B1 (en) 2014-04-25

Family

ID=49854259

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020120049918A KR101389485B1 (en) 2012-05-10 2012-05-10 The concrete pillar structure and the constructing method thereof

Country Status (1)

Country Link
KR (1) KR101389485B1 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20180122152A (en) * 2017-05-02 2018-11-12 경희대학교 산학협력단 the rigid connection structure between the upper precast concrete column and the lower precast concrete column and the rigid connection structure of the precast concrete girder using the same
KR20180122151A (en) * 2017-05-02 2018-11-12 경희대학교 산학협력단 the rigid connection structure between the upper precast concrete column and the lower precast concrete column and the rigid connection structure of the precast concrete girder using the same

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101458409B1 (en) * 2013-10-15 2014-11-07 이인규 The precast concrete girder structure for a building

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR19990025556A (en) * 1997-09-12 1999-04-06 김헌출 P.C pillar materials and construction method of pillars using the same
KR20070109423A (en) * 2006-05-11 2007-11-15 이수호 Assembled precast reinforced concrete culverts with steel bar
KR20090008072A (en) * 2007-07-16 2009-01-21 아주대학교산학협력단 Segmental internally confined hollow concrete filled tube pier

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR19990025556A (en) * 1997-09-12 1999-04-06 김헌출 P.C pillar materials and construction method of pillars using the same
KR20070109423A (en) * 2006-05-11 2007-11-15 이수호 Assembled precast reinforced concrete culverts with steel bar
KR20090008072A (en) * 2007-07-16 2009-01-21 아주대학교산학협력단 Segmental internally confined hollow concrete filled tube pier

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20180122152A (en) * 2017-05-02 2018-11-12 경희대학교 산학협력단 the rigid connection structure between the upper precast concrete column and the lower precast concrete column and the rigid connection structure of the precast concrete girder using the same
KR20180122151A (en) * 2017-05-02 2018-11-12 경희대학교 산학협력단 the rigid connection structure between the upper precast concrete column and the lower precast concrete column and the rigid connection structure of the precast concrete girder using the same
KR101995497B1 (en) 2017-05-02 2019-07-02 경희대학교 산학협력단 the rigid connection structure between the upper precast concrete column and the lower precast concrete column and the rigid connection structure of the precast concrete girder using the same
KR101995496B1 (en) * 2017-05-02 2019-10-01 경희대학교 산학협력단 the rigid connection structure between the upper precast concrete column and the lower precast concrete column and the rigid connection structure of the precast concrete girder using the same

Also Published As

Publication number Publication date
KR20130126101A (en) 2013-11-20

Similar Documents

Publication Publication Date Title
KR101131679B1 (en) Splicing Method of Embedded type Baseplate with Steel Column
TWI592546B (en) Architecture structure and its construction method
KR101505579B1 (en) Prestressed precast concrete using pipe rack or beam column joint structure and construction method of the same
KR101348379B1 (en) The building wall structure and the constructing method thereof
KR101663132B1 (en) Self-supporting type column structure
JP4844918B2 (en) Construction method of steel / concrete composite deck using precast concrete board
KR101574253B1 (en) A method for construction using a twin wall structure using a PC panel
KR101036851B1 (en) Manufacturing method of pre cast concrete filled steel tube and pre cast concrete filled steel tube using the smae
JP5051598B2 (en) Construction method of steel / concrete composite deck using precast concrete board
KR101389485B1 (en) The concrete pillar structure and the constructing method thereof
JP2005097946A (en) Construction method of bridge pier
KR101460559B1 (en) Structure and Method for Connecting between Precast Column and In-situ Concrete Slab
KR101308053B1 (en) Precast Concrete Column Connecting Structure Using The Low Bending Moment Zone
JP2017110346A (en) Construction method of pillar/beam using precast concrete pillar
KR101783757B1 (en) Lining block embedded concrete and tank constructing method using thereof
KR101036177B1 (en) Method for constructing building using PRC integrating method
JPH08135087A (en) Precast concrete column member and joint method thereof
KR101324884B1 (en) Hybrid building construction method combining dry type and wet type
JP2002294858A (en) Halfprecast concrete column member and halfprecast concrete beam member and construction method of reinforced concrete column-beam frame using these members
KR102371555B1 (en) Hollow core slab joint wall construction structure and construction method thereof
KR101436969B1 (en) Prefabricated wall frame using a timber
JP4696739B2 (en) Precast concrete beam member joining structure and joining method
KR101492066B1 (en) Construction method for foundation structure of column
KR101895803B1 (en) Housing construction method
KR101308055B1 (en) Precast Concrete Column Connecting Structure Using The Low Bending Moment Zone

Legal Events

Date Code Title Description
A201 Request for examination
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20170421

Year of fee payment: 4

FPAY Annual fee payment

Payment date: 20180421

Year of fee payment: 5

FPAY Annual fee payment

Payment date: 20190422

Year of fee payment: 6