KR101212606B1 - Blast method for center hole of tunnel - Google Patents

Blast method for center hole of tunnel Download PDF

Info

Publication number
KR101212606B1
KR101212606B1 KR1020100095799A KR20100095799A KR101212606B1 KR 101212606 B1 KR101212606 B1 KR 101212606B1 KR 1020100095799 A KR1020100095799 A KR 1020100095799A KR 20100095799 A KR20100095799 A KR 20100095799A KR 101212606 B1 KR101212606 B1 KR 101212606B1
Authority
KR
South Korea
Prior art keywords
blasting
holes
hole
armed
medicine
Prior art date
Application number
KR1020100095799A
Other languages
Korean (ko)
Other versions
KR20120034328A (en
Inventor
이강수
김용범
김종용
Original Assignee
흥도이엔지 주식회사
김종용
김용범
이강수
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 흥도이엔지 주식회사, 김종용, 김용범, 이강수 filed Critical 흥도이엔지 주식회사
Priority to KR1020100095799A priority Critical patent/KR101212606B1/en
Publication of KR20120034328A publication Critical patent/KR20120034328A/en
Application granted granted Critical
Publication of KR101212606B1 publication Critical patent/KR101212606B1/en

Links

Images

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F42AMMUNITION; BLASTING
    • F42DBLASTING
    • F42D1/00Blasting methods or apparatus, e.g. loading or tamping
    • F42D1/04Arrangements for ignition
    • F42D1/06Relative timing of multiple charges
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
    • E21D9/006Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries by making use of blasting methods
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F42AMMUNITION; BLASTING
    • F42DBLASTING
    • F42D1/00Blasting methods or apparatus, e.g. loading or tamping
    • F42D1/02Arranging blasting cartridges to form an assembly
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F42AMMUNITION; BLASTING
    • F42DBLASTING
    • F42D3/00Particular applications of blasting techniques
    • F42D3/04Particular applications of blasting techniques for rock blasting
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F42AMMUNITION; BLASTING
    • F42DBLASTING
    • F42D5/00Safety arrangements
    • F42D5/04Rendering explosive charges harmless, e.g. destroying ammunition; Rendering detonation of explosive charges harmless
    • F42D5/045Detonation-wave absorbing or damping means

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Environmental & Geological Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Drilling And Exploitation, And Mining Machines And Methods (AREA)

Abstract

본 발명은 심발공의 형성이 용이하고 발파에 따른 진동과 소음을 더욱 저감시킬 수 있도록 하는 터널 심발공의 발파방법에 관한 것이다. 개시한 터널 심발공의 발파방법은 터널 자유면 중심부에 제1무장약공을 형성하고; 제1무장약공으로부터 상측, 하측, 좌측, 우측으로 일정 간격 이격된 위치에 제1무장약공과 평행한 4개의 제2무장약공을 형성하고; 제1무장약공 주위에 정사각형의 형태로 배치하여 4개의 1차 발파공을 형성하되, 이들이 피라미드 형태를 이루도록 각각 제2무장약공들 사이의 중심 위치로부터 제1무장약공의 후단 방향으로 경사지게 굴착하고; 1차 발파공들의 외곽에 정사각형의 형태로 배치하여 4개의 2차 발파공을 형성하되, 이들이 피라미드형태를 이루도록 제2무장약공들을 거치는 수평연장선과 수직연장선의 교차지점으로부터 제1무장약공의 후단 쪽으로 경사지게 굴착하고; 2차 발파공들의 외곽에 정사각형의 형태로 배치하여 8개의 3차 발파공을 형성하되, 3차 발파공들을 제2무장약공들과 평행하게 굴착하고; 1차, 2차, 3차 발파공에 각각 폭약을 충전한 상태에서 1차 발파공으로부터 3차 발파공으로 시차를 두고 순차적으로 발파하는 것이다.The present invention relates to a method for blasting a tunnel deep hole to facilitate the formation of deep hole and to further reduce the vibration and noise caused by the blasting. The blasting method of the disclosed tunnel deep hole forms a first armed medicine hole in the center of the tunnel free surface; Forming four second armed holes parallel to the first armed holes at positions spaced apart from the first armed holes by a predetermined distance from the upper side, the lower side, the left side and the right side; Arranged in a square shape around the first armed medicament to form four primary blasting holes, each of which is inclined in the direction of the rear end of the first armed medicament from the center position between the second armed medicinal holes so that they form a pyramid shape; Four secondary blasting holes are formed in the shape of a square on the outside of the first blasting holes, and they are inclined to the rear end of the first arming pharmacy from the intersection of the horizontal extension line and the vertical extension line passing through the second arming holes so that they form a pyramid shape. and; Arranged in the shape of a square on the outside of the secondary blasting holes to form eight tertiary blasting holes, and excavating the tertiary blasting holes in parallel with the second armed medicines; The primary, secondary and tertiary blasting holes are filled with explosives, respectively, and are sequentially blasted with a time difference from the primary blasting hole to the third blasting hole.

Description

터널 심발공의 발파방법{BLAST METHOD FOR CENTER HOLE OF TUNNEL}Blast METHOD FOR CENTER HOLE OF TUNNEL}

본 발명은 터널발파공법에 관한 것으로, 특히 발파과정에서 터널 자유면 중심부에 형성되는 심발공을 보다 용이하게 형성할 수 있도록 하는 터널 심발공의 발파방법에 관한 것이다.The present invention relates to a tunnel blasting method, and more particularly, to a blasting method of a tunnel deep hole to facilitate the formation of a deep hole in the center of the tunnel free surface during the blasting process.

발파공법으로 터널을 굴착할 때는 터널 중심의 발파공들을 먼저 발파하여 심발공을 형성한 후, 심발공 주위에 배치된 발파공들과 외곽공 및 바닥공을 순차적으로 발파한다. 터널 중심부에 심발공을 형성하여 자유면이 확대되도록 한 상태에서 그 주위의 발파를 수행함으로써 발파효과를 높이고 발파에 따른 충격과 소음도 줄이는 것이다.When excavating a tunnel by the blasting method, the blasting holes in the center of the tunnel are first blasted to form a deep blasting hole, and then the blasting holes disposed around the deep blasting hole and the outer hole and the bottom hole are sequentially blasted. By forming a deep hole in the center of the tunnel, the blasting around the free surface is expanded to increase the blasting effect and reduce the impact and noise caused by the blasting.

도 1은 종래 터널의 발파공법에서 심발부의 천공상태를 나타낸 것이다. 도시한 바와 같이, 심발공(1)을 발파할 때는 터널의 자유면 중심부에 직경이 대략 350mm인 무장약공(2)을 형성한 후, 무장약공(2)의 주위에 정사각형의 형태로 4개의 1차 발파공(3)을 배치하고, 다시 그 외곽에 대략 마름모의 형태로 4개의 2차 발파공(4)을 배치하며, 2차 발파공들(4) 외곽에 다시 정사각형의 형태로 4개의 3차 발파공(5)을 배치하였다. 그리고 발파를 할 때는 1차 발파공들(3)을 먼저 발파시킨 후 이어서 2차 발파공(4)과 3차 발파공(5)을 시차를 두고 차례로 발파하였다.Figure 1 shows the puncture state of the heart portion in the conventional blasting method of the tunnel. As shown in the figure, when blasting the cardiac cavity 1, an armed medicine hole 2 having a diameter of approximately 350 mm is formed at the center of the free surface of the tunnel, and then four 1s are formed in a square shape around the armed medicine hole 2. The primary blasting hole (3) is disposed, and the four secondary blasting holes (4) in the form of a rhombus on the outside of the secondary blasting holes (4) and the four third blasting holes (in the form of a square again) 5) was placed. And when blasting, the first blasting holes (3) first blasting, and then the second blasting hole (4) and the third blasting hole (5) blasted in sequence with a time difference.

이는 1차 발파공들(3)이 발파될 때 발파압력이 중앙의 무장약공(2)으로 작용하여 암석들이 무장약공(2) 쪽으로 비산되면서 순조로운 발파가 진행되도록 하고, 발파에 따른 진동과 소음이 무장약공(2)에서 흡수될 수 있도록 한 것이다. When the first blasting holes (3) are blasted, the blasting pressure acts as an armed weak hole (2) in the center, so that the rocks are scattered toward the armed weakened hole (2), and smooth blasting proceeds, and vibration and noise caused by the blasting are prevented. It is to be absorbed in the armed medicine (2).

그러나 이러한 발파방법은 직경이 대략 350mm에 이르는 대구경의 무장약공(2)을 천공해야 하기 때문에 특수 천공장비를 이용해야 하는 등 천공에 따른 비용이 과다하게 소요되는 문제가 있었다. 또 1차 발파공(3)이 발파될 때 생기는 진동과 소음이 중심에 위치하는 하나의 무장약공(2)에 의해서만 감쇄되기 때문에 진동과 소음을 줄이는데 한계가 있었다.However, such a blasting method has a problem that excessive cost due to the drilling, such as the need to use a special drilling equipment because the large diameter armed holes (2) up to approximately 350mm in diameter must be drilled. In addition, the vibration and noise generated when the first blasting hole (3) is attenuated by only one armed medicine (2) located in the center, there was a limit in reducing the vibration and noise.

본 발명은 이러한 문제점들을 해결하기 위한 것으로, 본 발명의 목적은 심발공의 형성이 용이하고 발파에 따른 진동과 소음을 저감시킬 수 있도록 하는 터널 심발공의 발파방법을 제공하는 것이다.The present invention is to solve these problems, an object of the present invention is to provide a blasting method of the tunnel deep hole to facilitate the formation of the deep hole and to reduce the vibration and noise caused by the blast.

이러한 목적을 달성하기 위한 본 발명에 따른 터널 심발공의 발파방법은 터널 자유면 중심부에 제1무장약공을 형성하고; 상기 제1무장약공으로부터 상측, 하측, 좌측, 우측으로 일정 간격 이격된 위치에 상기 제1무장약공과 평행한 4개의 제2무장약공을 형성하고; 상기 제1무장약공 주위에 정사각형의 형태로 배치하여 4개의 1차 발파공을 형성하되, 이들이 피라미드 형태를 이루도록 각각 상기 제2무장약공들 사이의 중심 위치로부터 상기 제1무장약공의 후단 방향으로 경사지게 굴착하고; 상기 1차 발파공들의 외곽에 정사각형의 형태로 배치하여 4개의 2차 발파공을 형성하되, 이들이 피라미드형태를 이루도록 상기 제2무장약공들을 거치는 수평연장선과 수직연장선의 교차지점으로부터 상기 제1무장약공의 후단 쪽으로 경사지게 굴착하고; 상기 2차 발파공들의 외곽에 정사각형의 형태로 배치하여 8개의 3차 발파공을 형성하되, 3차 발파공들을 상기 제2무장약공들과 평행하게 굴착하고; 상기 1차, 2차, 3차 발파공에 각각 폭약을 충전한 상태에서 상기 1차 발파공으로부터 상기 3차 발파공으로 시차를 두고 순차적으로 발파하는 것을 특징으로 한다.Tunnel blasting method according to the present invention for achieving the above object is to form a first armed drug hole in the center of the tunnel free surface; Forming four second armed holes parallel to the first armed holes at positions spaced apart from the first armed holes by a predetermined distance from the upper side, the lower side, the left side and the right side; Four primary blasting holes are formed by forming a square shape around the first armed medicine, and they are inclined in the rear end direction of the first armed medicine from the central position between the second armed medicine so that they form a pyramid shape. and; Four secondary blasting holes are formed in the shape of a square on the outside of the first blasting holes, and the rear end of the first arming medicine from the intersection of the horizontal extension line and the vertical extension line passing through the second armored holes so that they form a pyramid shape Dig obliquely towards; Forming eight tertiary blasting holes by arranging the outer portion of the secondary blasting holes in a square shape, and excavating the tertiary blasting holes in parallel with the second armed holes; The primary, secondary, and tertiary blasting holes are filled with explosives, respectively, characterized in that the blasting sequentially with a time difference from the primary blasting hole to the third blasting hole.

또 본 발명에 따른 터널 심발공의 발파방법은 터널 자유면 중심부에 제1무장약공을 형성하고; 상기 제1무장약공으로부터 상측, 하측, 좌측, 우측으로 일정 간격 이격된 위치에 상기 제1무장약공과 평행한 4개의 제2무장약공을 형성하고; 상기 제1무장약공 주위에 정사각형의 형태로 배치하여 6개의 1차 발파공을 형성하되, 4개는 상기 제2무장약공들 사이의 중심 위치에 상기 제2무장약공과 평행하게 굴착하고, 2개는 상기 제1무장약공 좌측과 우측의 제2무장약공과의 중간지점으로부터 상기 제1무장약공의 후단 방향으로 경사지게 굴착하며; 상기 1차 발파공들의 외곽에 정사각형의 형태로 배치하여 4개의 2차 발파공을 형성하되, 이들이 피라미드형태를 이루도록 상기 제2무장약공들을 거치는 수평연장선과 수직연장선의 교차지점으로부터 상기 제1무장약공의 후단 쪽으로 경사지게 굴착하고; 상기 2차 발파공들의 외곽에 정사각형의 형태로 배치하여 8개의 3차 발파공을 형성하되, 3차 발파공들을 상기 제2무장약공들과 평행하게 굴착하고; 상기 1차, 2차, 3차 발파공에 각각 폭약을 충전한 상태에서 상기 1차 발파공으로부터 상기 3차 발파공으로 시차를 두고 순차적으로 발파하는 것을 특징으로 한다.In addition, the blasting method of the tunnel heart hole according to the present invention forms a first armed drug hole in the center of the tunnel free surface; Forming four second armed holes parallel to the first armed holes at positions spaced apart from the first armed holes by a predetermined distance from the upper side, the lower side, the left side and the right side; Six primary blasting holes are formed by forming a square around the first armed medicine hole, four drilled in parallel with the second armed medicine at the center position between the second armed medicine, and two Digging inclined in the direction of the rear end of the first armed medicine hole from the intermediate point between the second armed medicine ball on the left side and the right side of the first armed medicine ball; Four secondary blasting holes are formed in the shape of a square on the outside of the first blasting holes, and the rear end of the first arming medicine from the intersection of the horizontal extension line and the vertical extension line passing through the second armored holes so that they form a pyramid shape Dig obliquely towards; Forming eight tertiary blasting holes by arranging the outer portion of the secondary blasting holes in a square shape, and excavating the tertiary blasting holes in parallel with the second armed holes; The primary, secondary, and tertiary blasting holes are filled with explosives, respectively, characterized in that the blasting sequentially with a time difference from the primary blasting hole to the third blasting hole.

또 본 발명에 따른 터널 심발공의 발파방법은 터널 자유면 중심부에 제1무장약공을 형성하고; 상기 제1무장약공으로부터 상측, 하측, 좌측, 우측으로 일정 간격 이격된 위치에 상기 제1무장약공과 평행한 4개의 제2무장약공을 형성하고; 상기 제1무장약공 주위에 정사각형의 형태로 배치하여 6개의 1차 발파공을 형성하되, 4개는 피라미드 형태를 이루도록 각각 상기 제2무장약공들 사이의 중심 위치로부터 상기 제1무장약공의 후단 방향으로 경사지게 굴착하고 나머지 2개는 상기 제1무장약공 좌측과 우측의 제2무장약공과의 중간지점으로부터 상기 제1무장약공과 평행하게 굴착하며; 상기 1차 발파공들의 외곽에 정사각형의 형태로 배치하여 4개의 2차 발파공을 형성하되, 이들이 피라미드형태를 이루도록 상기 제2무장약공들을 거치는 수평연장선과 수직연장선의 교차지점으로부터 상기 제1무장약공의 후단 쪽으로 경사지게 굴착하고; 상기 2차 발파공들의 외곽에 정사각형의 형태로 배치하여 8개의 3차 발파공을 형성하되, 3차 발파공들을 상기 제2무장약공들과 평행하게 굴착하고; 상기 1차, 2차, 3차 발파공에 각각 폭약을 충전한 상태에서 상기 1차 발파공으로부터 상기 3차 발파공으로 시차를 두고 순차적으로 발파하는 것을 특징으로 한다.In addition, the blasting method of the tunnel heart hole according to the present invention forms a first armed drug hole in the center of the tunnel free surface; Forming four second armed holes parallel to the first armed holes at positions spaced apart from the first armed holes by a predetermined distance from the upper side, the lower side, the left side and the right side; It is arranged in the form of a square around the first armed holes to form six primary blasting holes, four in the direction of the rear end of the first armed medicine from the center position between the second armed medicine to form a pyramid shape, respectively Excavate at an angle and the other two are excavated in parallel with the first arm at the middle of the left arm and the second arm at the right; Four secondary blasting holes are formed in the shape of a square on the outside of the first blasting holes, and the rear end of the first arming medicine from the intersection of the horizontal extension line and the vertical extension line passing through the second armored holes so that they form a pyramid shape Dig obliquely towards; Forming eight tertiary blasting holes by arranging the outer portion of the secondary blasting holes in a square shape, and excavating the tertiary blasting holes in parallel with the second armed holes; The primary, secondary, and tertiary blasting holes are filled with explosives, respectively, characterized in that the blasting sequentially with a time difference from the primary blasting hole to the third blasting hole.

상기 1차 발파공에는 그 길이의 60 ~ 75%에 폭약을 충전하고, 상기 2차 발파공에는 그 길이의 50 ~ 65%에 폭약을 충전하고, 상기 3차 발파공에는 그 길이의 45 ~ 60%에 폭약을 충전하는 것을 특징으로 한다.The primary blasting hole is filled with explosives at 60 to 75% of its length, the secondary blasting hole is charged with 50 to 65% of its length, and the tertiary blasting hole is charged at 45 to 60% of its length It is characterized by charging.

상기 제1 및 제2무장약공은 직경이 100 ~ 120mm, 길이가 1.5 ~ 2.5m 이고, 상기 1차 및 2차 발파공은 직경이 45 ~ 50mm, 길이가 1.1 ~ 2.0m 이고, 상기 3차 발파공은 직경이 45 ~ 50mm, 길이가 1.5 ~ 2.5m 인 것을 특징으로 한다.The first and second armed holes are 100 ~ 120mm in diameter, 1.5 ~ 2.5m in length, the primary and secondary blasting hole is 45 ~ 50mm in diameter, 1.1 ~ 2.0m in length, the third blasting hole is It is characterized in that the diameter is 45 ~ 50mm, the length is 1.5 ~ 2.5m.

본 발명에 따른 터널 심발공의 발파 방법은 제1무장약공의 외측에 제2무장약공들을 형성하고, 1차 발파공들을 제1무장약공과 제2무장약공 사이 또는 제2무장약공들 사이에 배치하기 때문에 발파에 따른 진동과 소음이 외측으로 전달되는 것을 최소화할 수 있고 용이한 발파를 구현할 수 있는 효과가 있다.Tunnel blasting method according to the present invention is to form a second armed medicinal holes on the outside of the first armed pharmacy, and to place the first blasting hole between the first armed and the second armed pharmacy or between the second armed pharmacy Therefore, the vibration and noise due to the blasting can be minimized to be transmitted to the outside, and there is an effect that can implement an easy blasting.

또 본 발명은 다수의 무장약공들을 심발부에 분산 형성하기 때문에 종래보다 무장약공의 크기를 작게 형성하는 것이 가능하여 심발부의 천공작업이 용이한 효과가 있다.In addition, the present invention is formed by dispersing a number of armed medicine in the heart hair, it is possible to form a smaller size of the armed medicine than in the prior art has the effect of easy drilling of the heart hair.

또 본 발명은 발파과정에서 1차 발파공들이 피라미드형태의 경사를 유지하기 때문에 발파에 따른 비산이 중심의 제1무장약공 쪽으로 유도되면서 중심부의 발파가 용이하게 이루어지고, 이때 발생하는 진동이 중심의 제1무장약공 뿐 아니라 제2무장약공들에 의해 흡수되기 때문에 발파진동이 효과적으로 감쇄되는 효과가 있다.In the present invention, since the first blasting holes maintain the slope of the pyramid shape in the blasting process, the blasting of the center is easily performed while the scattering caused by the blasting is induced toward the first arm of the medicine, and the vibration generated at this time is the center of the first blasting hole. Because it is absorbed by the second armed medicine as well as the first armed medicine, the blasting vibration is effectively attenuated.

또 본 발명은 심발부의 2차 발파가 이루어질 때 제2무장약공들이 발파에 따른 진동을 흡수하여 외측으로 전해지는 충격을 완화할 뿐 아니라 암반 등의 균열을 유도하기 때문에 심발부의 제거가 더욱 용이하여 자유면의 확보가 쉽도록 하는 효과가 있다.In addition, the second arm pharmacists absorb the vibrations of the blast when the second blasting of the heart blast is made to mitigate the impact transmitted to the outside as well as induces cracks, such as the rock is easier to remove the heart blast It is effective to secure the free surface.

도 1은 종래 터널 심발공의 천공도이다.
도 2는 본 발명의 발파방법을 설명하기 위한 터널 자유면의 천공도이다.
도 3은 본 발명의 제1실시 예에 따른 터널 심발공의 천공도이다.
도 4는 도 3의 Ⅲ-Ⅲ‘선에 따른 단면도이다.
도 5는 본 발명의 제2실시 예에 따른 터널 심발공의 천공도이다.
도 6은 도 5의 Ⅵ-Ⅵ‘선에 따른 단면도이다.
도 7은 본 발명의 제3실시 예에 따른 터널 심발공의 천공도이다.
도 8은 도 7의 Ⅷ-Ⅷ‘선에 따른 단면도이다.
도 9는 본 발명에 따른 심발공 발파방법에서 발파공별 폭약의 충전상태를 나타낸 것이다.
1 is a perforation diagram of a conventional tunnel deep hole.
Figure 2 is a perforated view of the tunnel free surface for explaining the blasting method of the present invention.
3 is a perforated view of a tunnel deep hole according to a first embodiment of the present invention.
4 is a cross-sectional view taken along line III-III ′ of FIG. 3.
5 is a perforated view of a tunnel deep hole according to a second embodiment of the present invention.
FIG. 6 is a cross-sectional view taken along line VI-VI ′ of FIG. 5.
7 is a perforated view of a tunnel deep hole according to a third embodiment of the present invention.
FIG. 8 is a cross-sectional view taken along the line VII-VII 'of FIG. 7.
Figure 9 shows the state of charge of the explosives by the blast hole in the heart blasting method according to the present invention.

이하에서는 본 발명에 따른 바람직한 실시 예를 첨부 도면을 참조하여 상세히 설명한다.Hereinafter, preferred embodiments of the present invention will be described in detail with reference to the accompanying drawings.

도 2는 본 발명의 발파방법을 설명하기 위한 터널 자유면의 천공도이고, 도 3은 본 발명의 요부인 심발공의 천공도이다. 도 2에 도시한 바와 같이, 터널을 발파할 때는 자유면(10)의 대략 중심부분에 심발공(20)의 형성을 위한 다수의 발파공들과 무장약공들을 형성하고, 그 주위에 이격된 간격으로 다수의 발파공들로 구성되는 1차 확대공(11), 2차 확대공(12), 외곽공(13), 바닥공(14)을 형성한다. Figure 2 is a perforated view of the tunnel free surface for explaining the blasting method of the present invention, Figure 3 is a perforated view of the heart blast hole that is the main part of the present invention. As shown in FIG. 2, when blasting a tunnel, a plurality of blasting holes and arming holes for forming the heart hole 20 are formed at approximately a central portion of the free surface 10, and spaced apart around them. The primary enlarged hole 11, the secondary enlarged hole 12, the outer hole 13, the bottom hole 14 is formed of a plurality of blast holes.

심발공(20)은 터널 자유면(10) 중심영역에 대략 2.25㎡ 넓이로 설정하고, 여기에는 도 3과 도 4에 도시한 바와 같이, 그 중심부로부터 제1무장약공(21), 제2무장약공들(22), 1차 발파공들(23), 2차 발파공들(24), 3차 발파공들(25)을 형성한다. The cardiac hole 20 is set to be approximately 2.25 m 2 in the center area of the tunnel free surface 10, and as shown in FIGS. 3 and 4, the first armed medicine hole 21 and the second armed body are located from the center thereof. Medicinal holes 22, primary blasting holes 23, secondary blasting holes 24, and tertiary blasting holes 25 are formed.

제1무장약공(21)은 심발공(20)의 중앙(자유면 중심부)에 형성한다. 그리고 제1무장약공(21)으로부터 상측, 하측, 좌측, 우측으로 일정 간격 이격된 위치에 제1무장약공(21)과 평행하도록 4개의 제2무장약공(22)을 형성한다. 즉 제2무장약공들(22)은 모서리부가 각각 제1무장약공(21)의 상하좌우에 위치하는 정사각형의 형태로 배치된다. 제1무장약공(21)과 제2무장약공(22)은 직경이 100 ~ 120mm 정도이고, 자유면(10)에 대해 수직인 방향으로 1.5 ~ 2.5m의 깊이로 천공한다. 이는 무장약공들(21,22)의 직경을 종래보다 작게 하여 터널의 천공 작업이 용이하고 천공에 따른 비용이 감소하도록 하면서도, 무장약공들(21,22)을 심발부의 중심 뿐 아니라 그 주위에 규칙적으로 분산 배치함으로써 발파소음과 진동을 흡수가 용이하도록 한 것이다. The first armed medicine hole 21 is formed in the center (free surface center) of the heart hole (20). Four second armed holes 22 are formed to be parallel to the first armed holes 21 at positions spaced apart from the first armed holes 21 by a predetermined distance from the upper side, the lower side, the left side and the right side. That is, the second armed holes 22 are disposed in the shape of a square in which corner portions are respectively positioned on the top, bottom, left, and right sides of the first armed medicine hole 21. The first armed medicine hole 21 and the second armed medicine hole 22 is about 100 ~ 120mm in diameter, and drilled to a depth of 1.5 ~ 2.5m in the direction perpendicular to the free surface (10). This makes the diameter of the armed holes 21 and 22 smaller than in the prior art, so that the drilling work of the tunnel is easy and the cost of the hole is reduced, while the armed holes 21 and 22 are not only centered around the core but also around the core. By distributing regularly, it is easy to absorb blast noise and vibration.

1차 발파공(23)은 제1무장약공(21) 주위에 정사각형의 배치를 이루도록 4개 굴착한다. 이들 1차 발파공(23)은 제2무장약공들(22) 사이의 중심위치(제2무장약공들을 연결하는 선의 중심부분)에 배치되고, 전체적으로 피라미드 형태를 이루도록 각각 제2무장약공들(22) 사이의 중심 위치로부터 제1무장약공(21)의 후단 방향으로 경사지게 굴착한다. 각 1차 발파공(23)은 길이가 1.1 ~ 2.0m, 직경이 45 ~ 50mm정도로 하고, 경사각(θ1)은 대략 10 ~ 15도 정도가 되도록 한다.Four primary blasting holes 23 are excavated to form a square arrangement around the first armed medicine hole 21. These primary blasting holes 23 are disposed at the center position (the central portion of the line connecting the second armed medicines) between the second armed medicines 22, and each of the second armed medicines 22 to form a pyramid as a whole. Excavation is carried out obliquely in the direction of the rear end of the first armed medicine hole 21 from the center position therebetween. Each primary blasting hole 23 has a length of 1.1 to 2.0m, a diameter of about 45 to 50mm, and the inclination angle θ1 is about 10 to 15 degrees.

2차 발파공(24)은 1차 발파공들(23)의 외곽에 역시 정사각형의 배치를 이루도록 4개 굴착한다. 이들 2차 발파공(24)은 제2무장약공들(22)을 거치는 수평연장선(26a)과 수직연장선(26b)의 교차지점에 배치되며, 역시 피라미드의 형태를 이루도록 수평연장선(26a)과 수직연장선(26b)의 교차지점으로부터 제1무장약공(21)의 후단 쪽으로 경사지게 굴착한다. 2차 발파공(24)은 길이가 1.1 ~ 2.0m, 직경이 45 ~ 50mm정도로 하고, 경사각(θ2)은 대략 20 ~ 30도 정도가 되도록 한다.The secondary blasting hole 24 excavates four to form a square arrangement on the outside of the primary blasting holes 23. These secondary blasting holes 24 are disposed at the intersection of the horizontal extension line 26a and the vertical extension line 26b passing through the second armed holes 22, and also have the horizontal extension line 26a and the vertical extension line to form a pyramid. Excavation is carried out obliquely toward the rear end of the first armed medicine hole 21 from the intersection point of 26b. The secondary blasting hole 24 has a length of 1.1 to 2.0 m, a diameter of about 45 to 50 mm, and an inclination angle θ2 of about 20 to 30 degrees.

3차 발파공(25)은 2차 발파공들(24)의 외곽 쪽에 정사각형의 배치를 이루도록 8개 굴착한다. 이들 3차 발파공들(25)은 제2무장약공들(22)과 평행하게 굴착한다. 3차 발파공(25)은 직경 45 ~ 50mm, 길이 1.5 ~ 2.5m정도로 한다. The third blast hole 25 excavates eight to form a square on the outer side of the secondary blast holes (24). These tertiary blasting holes 25 are excavated in parallel with the second armed holes (22). The third blast hole 25 is 45 ~ 50mm in diameter, 1.5 ~ 2.5m in length.

제1 및 제2무장약공(21,22)과 1차 내지 3차 발파공들(23,24,25)을 형성한 후에는 1차, 2차, 3차 발파공(23,24,25)에 각각 폭약을 충전한다. 폭약(27)은 도 9에 나타낸 바와 같이, 1차 발파공(23)에 그 길이의 60 ~ 75%, 2차 발파공(24)에 그 길이의 50 ~ 65%, 3차 발파공(25)에 그 길이의 45 ~ 60% 충전하고, 각각의 입구는 모래(28)로 폐쇄한다. 이는 심발공(20)의 중심으로부터 외곽 쪽으로 갈수록 폭약의 충전량을 점차 줄임으로써 터널의 경계면을 보호할 수 있도록 한 것이다. 또 1차 발파공(23)으로부터 3차 발파공(25)까지 시간을 두고 순차 발파를 할 때 3차 발파공(25)에 이르러서는 이미 1차 발파를 통해 자유면이 확대된 상태이기 때문에 점차 발파력을 줄이더라도 원활한 심발공(20)의 확보가 가능하기 때문이다.After the first and second armed holes 21 and 22 and the first to third blasting holes 23, 24 and 25 are formed, the first, second and third blasting holes 23, 24 and 25 are respectively formed. Charge the explosives. As shown in Fig. 9, the explosive 27 is 60 to 75% of its length in the primary blasting hole 23, 50 to 65% of its length in the secondary blasting hole 24, and is applied to the third blasting hole 25. Fill 45-60% of the length and close each inlet with sand 28. This is to protect the boundary of the tunnel by gradually reducing the amount of explosive charge toward the outer side from the center of the heart hole (20). In addition, when sequential blasting with a time from the first blasting hole (23) to the third blasting hole (25), the blasting force is gradually increased because the free surface is already expanded through the first blasting when the third blasting hole (25) is reached. This is because it is possible to secure a smooth heart hole (20) even if reduced.

한편, 도 3과 같이 심발부를 구성할 때 제1무장약공(21)과 1차 발파공(23)의 이격거리, 제1무장약공(21)과 제2무장약공(22)의 이격거리, 1차 발파공(23)과 2차 발파공(24)의 대각방향 이격거리, 2차 발파공(24)과 3차 발파공(25)의 대각 방향 이격거리는 대략 50 ~ 70cm 정도가 되도록 하는 것이 바람직하다.Meanwhile, when constituting the heart portion as shown in FIG. 3, the separation distance between the first armed medicine 21 and the primary blasting hole 23, the separation distance between the first armed medicine 21 and the second armed medicine 22, and primary Diagonal separation distance between the blasting hole 23 and the secondary blasting hole 24, the diagonal separation distance of the secondary blasting hole 24 and the tertiary blasting hole 25 is preferably about 50 ~ 70cm.

다음은 이처럼 심발부를 천공하고 폭약을 충전한 후 발파하는 동작에 대하여 설명한다.Next, a description will be given of the blasting after drilling the heart and charging the explosives.

발파할 때는 중심의 제1무장약공(21)과 가장 가까운 1차 발파공들(23)을 먼저 발파하고, 시차를 두고 2차 발파공들(24)을 발파하며, 이어서 다시 시차를 두고 3차 발파공들(25)을 발파한다. 이때 1차 발파공들(23)은 동시에 발파하거나 어느 한쪽부터 순차적으로 발파되도록 할 수 있고, 2차 및 3차 발파공들(24,25)도 같은 방식으로 발파할 수 있다.When blasting, the first blasting balls 23 closest to the central first armed medicine 21 are first blasted, blasting the second blasting balls 24 with parallax, and then again with a time difference to the third blasting balls. Blasting (25). In this case, the first blasting holes 23 may be simultaneously blasted or sequentially blasted from either side, and the second and third blasting holes 24 and 25 may be blasted in the same manner.

발파과정에서 1차 발파공들(23)이 먼저 발파되면, 이들이 피라미드형태의 경사를 유지하기 때문에 발파에 따른 비산이 중심의 제1무장약공(21) 쪽으로 유도되면서 중심부의 발파가 용이하게 이루어진다. 또 이때는 발파진동이 중심의 제1무장약공(21) 뿐 아니라 주위에 산재한 제2무장약공들(22)에 의해 흡수되기 때문에 발파진동이 효과적으로 감쇄된다.When the first blasting holes 23 are first blasted in the blasting process, since they maintain the slope of the pyramid shape, the blasting of the center is easily performed while the scattering caused by the blasting is induced toward the first armed medicine 21 in the center. In this case, the blasting vibration is effectively attenuated because the blasting vibration is absorbed by not only the first armed medicine 21 in the center but also the second armed medicines 22 scattered around.

1차 발파 후 2차 발파공들(24)을 발파하면, 1차 발파에 의해 심발부의 중심이 제거되어 자유면이 확대된 상태이므로 더 용이한 발파가 이루어진다. 특히 2차 발파공들(24)도 피라미드형태의 경사를 유지하기 때문에 발파에 따른 암석 등의 비산이 중심 쪽으로 유도되면서 용이한 발파가 이루어진다. 또 2차 발파가 이루어질 때 제2무장약공들(22)은 발파에 따른 진동을 흡수하여 외측으로 전해지는 충격을 완화할 뿐 아니라 그 배치방향으로 암반 등의 균열을 유도하기 때문에 자유면의 확보가 용이하도록 한다.When the second blasting holes 24 are blasted after the first blasting, the center of the heart portion is removed by the first blasting, and thus the free surface is expanded, thereby making the blasting easier. In particular, since the secondary blasting holes 24 also maintain the slope of the pyramid shape, easy blasting is made while the scattering of rocks and the like caused by the blasting is induced toward the center. In addition, when the second blasting is made, the second armed holes 22 not only absorb the vibrations of the blasting to mitigate the shock transmitted to the outside, but also induce the cracking of the rock in the arrangement direction, thereby securing a free surface. Make it easy.

2차 발파 후 3차 발파공들(25)을 발파하면, 2차 발파에 의해 심발부 중심에 1차 발파 때보다 더 큰 공간이 확보된 상태이므로 더 용이한 발파가 이루어지면서 심발공(20)을 확대하게 된다.When the third blasting holes 25 are blasted after the second blasting, since the larger space is secured in the center of the heart portion than the first blasting by the second blasting, the blasting is made easier while the blasting is made. To enlarge.

이처럼 심발부의 발파를 통해 심발공(20)을 형성한 후에는 도 2에 도시한 바와 같이, 그 외곽에 위치하는 1차 확대공(11), 2차 확대공(12), 외곽공(13), 바닥공들(14)을 발파하여 터널을 굴착한다.
After the heart hole 20 is formed through the blasting of the heart portion, as shown in FIG. 2, the primary enlarged hole 11, the secondary enlarged hole 12, and the outer hole 13 positioned at the outer portion thereof are illustrated. ), Blast the bottom holes 14 to dig a tunnel.

도 5는 본 발명의 제2실시 예에 따른 심발공의 천공도이고, 도 6은 도 5의 Ⅵ-Ⅵ‘선에 따른 단면도이다. 도시한 바와 같이, 제2실시 예는 제1무장약공(21) 주위에 정사각형의 형태를 이루도록 6개의 1차 발파공(23a,23b)을 형성하는 것이다. 또 1차 발파공들 중 4개(23a)는 제2무장약공들(22) 사이의 중심 위치에 제2무장약공(22)과 평행하게 굴착하고, 나머지 2개(23b)는 제1무장약공(21) 좌측과 우측의 제2무장약공(22)과의 중간지점으로부터 제1무장약공(21)의 후단 방향으로 경사지게 굴착하는 것이다.FIG. 5 is a perforated view of a cardiac pore according to a second embodiment of the present invention, and FIG. 6 is a cross-sectional view taken along line VI-VI ′ of FIG. 5. As shown, the second embodiment is to form the six primary blast holes (23a, 23b) to form a square around the first armed weak hole (21). In addition, four (23a) of the first blasting holes excavated in parallel with the second armed medicine 22 in the center position between the second armed medicines 22, the other two (23b) the first armed medicine ( 21) Excavation is inclined in the rear end direction of the first armed medicine hole 21 from the intermediate point between the second armed medicine hole 22 on the left side and the right side.

제2실시 예에서 1차 발파공들(23a,23b)의 발파는 제1무장약공(21) 좌측과 우측에 경사지게 형성된 발파공들(23b)을 먼저 발파함으로써 자유면의 확보가 용이하도록 하고, 연이어 나머지 4개의 발파공들(23a)을 발파한다.In the second embodiment, the blasting of the first blasting holes 23a and 23b is performed by first blasting the blasting holes 23b formed to be inclined to the left and right sides of the first armed medicine hole 21 so as to easily secure the free surface, and subsequently Four blast holes 23a are blasted.

제1 및 제2무장약공(21,22)과 2차 및 3차 발파공들(24,25)은 제1실시 예와 동일하고 발파에 따른 효과도 실질적으로 동일하므로 이에 대한 설명을 생략한다.
Since the first and second armed holes 21 and 22 and the secondary and tertiary blasting holes 24 and 25 are the same as those of the first embodiment and the effects of the blasting are substantially the same, the description thereof will be omitted.

도 7은 본 발명의 제3실시 예에 따른 심발공의 천공도이고, 도 8은 도 7의 Ⅷ-Ⅷ‘선에 따른 단면도이다. 도시한 바와 같이 제3실시 예는 제1무장약공(21) 주위에 정사각형의 형태로 배치하여 6개의 1차 발파공(23c,23d)을 형성하는 것이다. 이 중 4개(23c)는 피라미드 형태를 이루도록 각각 제2무장약공들(22) 사이의 중심 위치로부터 제1무장약공(21)의 후단 방향으로 경사지게 굴착하고 나머지 2개(23d)는 제1무장약공(21) 좌측과 우측의 제2무장약공(22)과의 중간지점으로부터 제1무장약공(21)과 평행하게 굴착하는 것이다. 7 is a perforated view of the cardiac cavities according to the third embodiment of the present invention, Figure 8 is a cross-sectional view taken along the line VII 'of FIG. As shown in the drawing, the third embodiment forms six primary blasting holes 23c and 23d in a square shape around the first armed hole 21. Four of these 23c are excavated obliquely toward the rear end direction of the first armed medicine hole 21 from the center position between the second armed medicine holes 22 to form a pyramid shape, respectively, and the remaining two 23d are first armed. Excavation is performed in parallel with the first armed medicine hole 21 from the intermediate point between the second armed medicine hole 22 on the left side and the right side of the medicine hole 21.

제3실시 예에서 1차 발파공들(23c,23d)의 발파는 경사지게 형성된 사방의 4개의 발파공들(23c)을 먼저 발파한 후 제1무장약공(21) 좌측과 우측의 발파공들(23d)을 발파한다. 제3실시 예도 제1 및 제2무장약공(21,22)과 2차 및 3차 발파공들(24,25)은 제1실시 예와 동일하고 발파에 따른 효과도 실질적으로 동일하므로 이에 대한 설명을 생략한다.In the third embodiment, the blasting of the first blasting holes 23c and 23d is performed by first blasting the four blasting holes 23c formed in an inclined manner, and then the blasting holes 23d on the left and right sides of the first armed medicine 21. Blasting In the third embodiment, the first and second armed holes 21 and 22 and the second and third blast holes 24 and 25 are the same as those in the first embodiment, and the effects of the blasting are also substantially the same. Omit.

20: 심발공, 21: 제1무장약공,
22: 제2무장약공, 23: 1차 발파공,
24: 2차 발파공, 25: 3차 발파공,
27: 폭약, 28: 모래.
20: heart attack, 21: first armed medicine,
22: second armed pharmacy, 23: first blaster,
24: 2nd blast hole, 25: 3rd blast hole,
27: explosives, 28: sand.

Claims (5)

터널 자유면 중심부에 제1무장약공을 형성하고;
상기 제1무장약공으로부터 상측, 하측, 좌측, 우측으로 일정 간격 이격된 위치에 상기 제1무장약공과 평행한 4개의 제2무장약공을 형성하고;
상기 제1무장약공 주위에 정사각형의 형태로 배치하여 4개의 1차 발파공을 형성하되, 이들이 피라미드 형태를 이루도록 각각 상기 제2무장약공들 사이의 중심 위치로부터 상기 제1무장약공의 후단 방향으로 경사지게 굴착하고;
상기 1차 발파공들의 외곽에 정사각형의 형태로 배치하여 4개의 2차 발파공을 형성하되, 이들이 피라미드형태를 이루도록 상기 제2무장약공들을 거치는 수평연장선과 수직연장선의 교차지점으로부터 상기 제1무장약공의 후단 쪽으로 경사지게 굴착하고;
상기 2차 발파공들의 외곽에 정사각형의 형태로 배치하여 8개의 3차 발파공을 형성하되, 3차 발파공들을 상기 제2무장약공들과 평행하게 굴착하고;
상기 1차, 2차, 3차 발파공에 각각 폭약을 충전한 상태에서 상기 1차 발파공으로부터 상기 3차 발파공으로 시차를 두고 순차적으로 발파하는 터널 심발공의 발파방법에 있어서,
상기 제1무장약공의 후단에 대한 상기 1차 및 2차 발파공의 경사각은 상기 2차 발파공이 상기 1차 발파공보다 크게 마련되고,
상기 1차 내지 3차 발파공의 폭약 충전량은 상기 1차 발파공에서 상기 3차 발파공 쪽으로 갈수록 줄어들도록 마련된 것을 특징으로 하는 터널 심발공의 발파방법.
Forming a first armed medicine hole in the center of the tunnel free surface;
Forming four second armed holes parallel to the first armed holes at positions spaced apart from the first armed holes by a predetermined distance from the upper side, the lower side, the left side and the right side;
Four primary blasting holes are formed by forming a square shape around the first armed medicine, and they are inclined in the rear end direction of the first armed medicine from the central position between the second armed medicine so that they form a pyramid shape. and;
Four secondary blasting holes are formed in the shape of a square on the outside of the first blasting holes, and the rear end of the first arming medicine from the intersection of the horizontal extension line and the vertical extension line passing through the second armored holes so that they form a pyramid shape Dig obliquely towards;
Forming eight tertiary blasting holes by arranging the outer portion of the secondary blasting holes in a square shape, and excavating the tertiary blasting holes in parallel with the second armed holes;
In the blasting method of the tunnel heart hole blasting sequentially with a time difference from the primary blasting hole to the third blasting hole in the state filled with the explosive charge to the primary, secondary, and tertiary blasting hole, respectively
The inclination angles of the first and second blasting holes with respect to the rear end of the first armed medicine are provided with the second blasting hole larger than the first blasting hole,
The explosive charge amount of the first to third blast hole is characterized in that the tunnel blasting method characterized in that it is provided to decrease toward the third blast hole from the first blast hole.
터널 자유면 중심부에 제1무장약공을 형성하고;
상기 제1무장약공으로부터 상측, 하측, 좌측, 우측으로 일정 간격 이격된 위치에 상기 제1무장약공과 평행한 4개의 제2무장약공을 형성하고;
상기 제1무장약공 주위에 정사각형의 형태로 배치하여 6개의 1차 발파공을 형성하되, 4개는 상기 제2무장약공들 사이의 중심 위치에 상기 제2무장약공과 평행하게 굴착하고, 2개는 상기 제1무장약공 좌측과 우측의 제2무장약공과의 중간지점으로부터 상기 제1무장약공의 후단 방향으로 경사지게 굴착하며;
상기 1차 발파공들의 외곽에 정사각형의 형태로 배치하여 4개의 2차 발파공을 형성하되, 이들이 피라미드형태를 이루도록 상기 제2무장약공들을 거치는 수평연장선과 수직연장선의 교차지점으로부터 상기 제1무장약공의 후단 쪽으로 경사지게 굴착하고;
상기 2차 발파공들의 외곽에 정사각형의 형태로 배치하여 8개의 3차 발파공을 형성하되, 3차 발파공들을 상기 제2무장약공들과 평행하게 굴착하고;
상기 1차, 2차, 3차 발파공에 각각 폭약을 충전한 상태에서 상기 1차 발파공으로부터 상기 3차 발파공으로 시차를 두고 순차적으로 발파하는 터널 심발공의 발파방법에 있어서,
상기 제1무장약공 후단에 대해 경사지도록 마련된 상기 1차 및 2차 발파공의 경사각은 상기 2차 발파공이 상기 1차 발파공보다 크게 마련되고,
상기 1차 내지 3차 발파공의 폭약 충전량은 상기 1차 발파공에서 상기 3차 발파공 쪽으로 갈수록 줄어들도록 마련된 것을 특징으로 하는 터널 심발공의 발파방법.
Forming a first armed medicine hole in the center of the tunnel free surface;
Forming four second armed holes parallel to the first armed holes at positions spaced apart from the first armed holes by a predetermined distance from the upper side, the lower side, the left side and the right side;
Six primary blasting holes are formed by forming a square around the first armed medicine hole, four drilled in parallel with the second armed medicine at the center position between the second armed medicine, and two Digging inclined in the direction of the rear end of the first armed medicine hole from the intermediate point between the second armed medicine ball on the left side and the right side of the first armed medicine ball;
Four secondary blasting holes are formed in the shape of a square on the outside of the first blasting holes, and the rear end of the first arming medicine from the intersection of the horizontal extension line and the vertical extension line passing through the second armored holes so that they form a pyramid shape Dig obliquely towards;
Forming eight tertiary blasting holes by arranging the outer portion of the secondary blasting holes in a square shape, and excavating the tertiary blasting holes in parallel with the second armed holes;
In the blasting method of the tunnel heart hole blasting sequentially with a time difference from the primary blasting hole to the third blasting hole in the state filled with the explosive charge to the primary, secondary, and tertiary blasting hole, respectively
The inclination angles of the primary and secondary blasting holes provided to be inclined with respect to the rear end of the first armed medicine hole are provided with the secondary blasting hole larger than the primary blasting hole,
The explosive charge amount of the first to third blast hole is characterized in that the tunnel blasting method characterized in that it is provided to decrease toward the third blast hole from the first blast hole.
터널 자유면 중심부에 제1무장약공을 형성하고;
상기 제1무장약공으로부터 상측, 하측, 좌측, 우측으로 일정 간격 이격된 위치에 상기 제1무장약공과 평행한 4개의 제2무장약공을 형성하고;
상기 제1무장약공 주위에 정사각형의 형태로 배치하여 6개의 1차 발파공을 형성하되, 4개는 피라미드 형태를 이루도록 각각 상기 제2무장약공들 사이의 중심 위치로부터 상기 제1무장약공의 후단 방향으로 경사지게 굴착하고 나머지 2개는 상기 제1무장약공 좌측과 우측의 제2무장약공과의 중간지점으로부터 상기 제1무장약공과 평행하게 굴착하며;
상기 1차 발파공들의 외곽에 정사각형의 형태로 배치하여 4개의 2차 발파공을 형성하되, 이들이 피라미드형태를 이루도록 상기 제2무장약공들을 거치는 수평연장선과 수직연장선의 교차지점으로부터 상기 제1무장약공의 후단 쪽으로 경사지게 굴착하고;
상기 2차 발파공들의 외곽에 정사각형의 형태로 배치하여 8개의 3차 발파공을 형성하되, 3차 발파공들을 상기 제2무장약공들과 평행하게 굴착하고;
상기 1차, 2차, 3차 발파공에 각각 폭약을 충전한 상태에서 상기 1차 발파공으로부터 상기 3차 발파공으로 시차를 두고 순차적으로 발파하는 하는 터널 심발공의 발파방법에 있어서,
상기 제1무장약공 후단에 대해 경사지도록 마련된 상기 1차 및 2차 발파공의 경사각은 상기 2차 발파공이 상기 1차 발파공보다 크게 마련되고,
상기 1차 내지 3차 발파공의 폭약 충전량은 상기 1차 발파공에서 상기 3차 발파공 쪽으로 갈수록 줄어들도록 마련된 것을 특징으로 하는 터널 심발공의 발파방법.
Forming a first armed medicine hole in the center of the tunnel free surface;
Forming four second armed holes parallel to the first armed holes at positions spaced apart from the first armed holes by a predetermined distance from the upper side, the lower side, the left side and the right side;
It is arranged in the form of a square around the first armed holes to form six primary blasting holes, four in the direction of the rear end of the first armed medicine from the center position between the second armed medicine to form a pyramid shape, respectively Excavate at an angle and the other two are excavated in parallel with the first arm at the middle of the left arm and the second arm at the right;
Four secondary blasting holes are formed in the shape of a square on the outside of the first blasting holes, and the rear end of the first arming medicine from the intersection of the horizontal extension line and the vertical extension line passing through the second armored holes so that they form a pyramid shape Dig obliquely towards;
Forming eight tertiary blasting holes by arranging the outer portion of the secondary blasting holes in a square shape, and excavating the tertiary blasting holes in parallel with the second armed holes;
In the blasting method of the tunnel deep hole to blast sequentially from the primary blasting hole to the third blasting hole in the state filled with the explosive charge to the primary, secondary, and tertiary blasting hole, respectively,
The inclination angles of the primary and secondary blasting holes provided to be inclined with respect to the rear end of the first armed medicine hole are provided with the secondary blasting hole larger than the primary blasting hole,
The explosive charge amount of the first to third blast hole is characterized in that the tunnel blasting method characterized in that it is provided to decrease toward the third blast hole from the first blast hole.
제1항 내지 제3항 중 어느 한 항에 있어서,
상기 1차 발파공에는 그 길이의 60 ~ 75%에 폭약을 충전하고,
상기 2차 발파공에는 그 길이의 50 ~ 65%에 폭약을 충전하고,
상기 3차 발파공에는 그 길이의 45 ~ 60%에 폭약을 충전하는 것을 특징으로 하는 터널 심발공의 발파방법.
4. The method according to any one of claims 1 to 3,
The first blast hole is filled with explosives in 60 to 75% of the length,
The second blasting hole is filled with explosives in 50 to 65% of the length,
The blasting method of the tunnel heart blasting, characterized in that the third blasting hole is filled with explosives in 45 ~ 60% of the length.
제1항 내지 제3항 중 어느 한 항에 있어서,
상기 제1 및 제2무장약공은 직경이 100 ~ 120mm, 길이가 1.5 ~ 2.5m 이고,
상기 1차 및 2차 발파공은 직경이 45 ~ 50mm, 길이가 1.1 ~ 2.0m 이고,
상기 3차 발파공은 직경이 45 ~ 50mm, 길이가 1.5 ~ 2.5m 인 것을 특징으로 하는 터널 심발공의 발파방법.
4. The method according to any one of claims 1 to 3,
The first and second armed medicine is 100 ~ 120mm in diameter, 1.5 ~ 2.5m in length,
The primary and secondary blast holes are 45 ~ 50mm in diameter, 1.1 ~ 2.0m in length,
The third blast hole is 45 ~ 50mm in diameter, 1.5 ~ 2.5m in length tunnel blasting method characterized in that the hole.
KR1020100095799A 2010-10-01 2010-10-01 Blast method for center hole of tunnel KR101212606B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020100095799A KR101212606B1 (en) 2010-10-01 2010-10-01 Blast method for center hole of tunnel

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020100095799A KR101212606B1 (en) 2010-10-01 2010-10-01 Blast method for center hole of tunnel

Publications (2)

Publication Number Publication Date
KR20120034328A KR20120034328A (en) 2012-04-12
KR101212606B1 true KR101212606B1 (en) 2012-12-14

Family

ID=46136726

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020100095799A KR101212606B1 (en) 2010-10-01 2010-10-01 Blast method for center hole of tunnel

Country Status (1)

Country Link
KR (1) KR101212606B1 (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106288996A (en) * 2016-08-24 2017-01-04 广西新港湾工程有限公司 The one construction method of groove presplit blasting under water
KR102267077B1 (en) * 2020-09-28 2021-06-17 에스케이에코플랜트(주) Excavation length improved tunnel blasting method using hole size adjustment
KR102267078B1 (en) * 2020-09-28 2021-06-18 에스케이에코플랜트(주) Center cut part multiplexing type tunnel blasting method
KR102301039B1 (en) * 2021-06-15 2021-09-09 기경철 The excavation method for preventing the over-break in tunnel and the micro-vibration blasting by applying the breaking line

Families Citing this family (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101318362B1 (en) * 2012-09-17 2013-10-15 코오롱글로벌 주식회사 Blasting method for tunnel
CN104482815B (en) * 2014-11-28 2016-08-24 中铁二十三局集团有限公司 Tunnel smooth blasting method
CN107655369B (en) * 2017-10-27 2020-01-07 成都大学 I-shaped reinforced cut structure and cut method
CN107883822B (en) * 2017-10-27 2019-12-03 成都大学 A kind of reinforcement slotting correction structure and cut shot method
CN107726933B (en) * 2017-10-27 2019-12-03 成都大学 A kind of middle font reinforces slotting structure and cut shot method
CN110030888B (en) * 2019-04-17 2021-04-27 中国人民解放军军事科学院国防工程研究院 Blast hole arrangement method for deep hole partition triangular mesh undermining one-time blasting well-forming construction method
CN110469333A (en) * 2019-09-03 2019-11-19 重庆城建控股(集团)有限责任公司 The driving method of small bore rocky tunnel
KR102532272B1 (en) * 2020-03-06 2023-05-12 안진현 Non-electric detonator deck charge blasting method with expanding free face
CN114674186B (en) * 2022-03-11 2024-03-26 北京中煤矿山工程有限公司 Method for tunneling straight-line cutting through deep hole blasting of tunnel shaft

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100323401B1 (en) 1998-12-07 2002-10-19 엘지건설 주식회사 Progressive Burnout Cart Blasting Method
KR100443578B1 (en) * 2002-01-05 2004-08-09 주식회사 성보이엔씨 blasting method relaxation before hand cut core hole for long hole blasting
KR100903576B1 (en) 2006-09-29 2009-06-23 주식회사 성보이엔씨 The method of tunnelblasting by using changeable blasting pattern

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100323401B1 (en) 1998-12-07 2002-10-19 엘지건설 주식회사 Progressive Burnout Cart Blasting Method
KR100443578B1 (en) * 2002-01-05 2004-08-09 주식회사 성보이엔씨 blasting method relaxation before hand cut core hole for long hole blasting
KR100903576B1 (en) 2006-09-29 2009-06-23 주식회사 성보이엔씨 The method of tunnelblasting by using changeable blasting pattern

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106288996A (en) * 2016-08-24 2017-01-04 广西新港湾工程有限公司 The one construction method of groove presplit blasting under water
CN106288996B (en) * 2016-08-24 2018-05-25 广西新港湾工程有限公司 A kind of underwater groove presplit blasting construction method
KR102267077B1 (en) * 2020-09-28 2021-06-17 에스케이에코플랜트(주) Excavation length improved tunnel blasting method using hole size adjustment
KR102267078B1 (en) * 2020-09-28 2021-06-18 에스케이에코플랜트(주) Center cut part multiplexing type tunnel blasting method
KR102301039B1 (en) * 2021-06-15 2021-09-09 기경철 The excavation method for preventing the over-break in tunnel and the micro-vibration blasting by applying the breaking line

Also Published As

Publication number Publication date
KR20120034328A (en) 2012-04-12

Similar Documents

Publication Publication Date Title
KR101212606B1 (en) Blast method for center hole of tunnel
KR100676914B1 (en) Excavating method of tunnel with slight vibration
CN104634198B (en) Close on controlled blasting construction method in the massif excavation of highway limit
CN105781560B (en) A kind of construction method of the remote base tunnel look-ahead explosion in super low coverage superimposing thread tunnel
KR101040787B1 (en) Blasting method in horizontal direction using deck charge
KR101244360B1 (en) Blasting method for preventing transmission of vibration
EP1336074B1 (en) Drillhole blasting
CN106767205A (en) The micro- Comprehensive Control blasting method of shaking of bustling urban district subway running tunnel
CN110514079A (en) A kind of right angled triangle presplit cut method
AU2002214200A1 (en) Drillhole blasting
KR101155780B1 (en) Arrangement of holes for cutting core part during tunnel construction in accordance with parallel hole cut method
CN106545344B (en) A kind of Karst area tunnel wall-hanging country rock face blast excavation method
KR100903576B1 (en) The method of tunnelblasting by using changeable blasting pattern
CN110924398B (en) High-strength rock slope widening excavation construction method under condition of traffic protection
KR101350065B1 (en) Method for blasting core center-cut
CN108061491A (en) A kind of Pile Diameter is the bridge cylinder pile foundation blasting method of 1.4-1.6m
KR20190123557A (en) tunnel blasting method
CN108061492A (en) A kind of Pile Diameter is the bridge cylinder pile foundation blasting method of 0.8-1m
KR102037939B1 (en) Ground Blasting Method and Apparatus for Interlocking a Separate Explosive Capsule and Air Layer for Rock Breaking
KR100852960B1 (en) method for blasting center-cut of tunnel
CN108088338A (en) A kind of Pile Diameter is the bridge cylinder pile foundation blasting method of 1.1-1.3m
CN107339921A (en) A kind of subway foundation pit blasting method
KR101318362B1 (en) Blasting method for tunnel
KR101303260B1 (en) Deck charge blasting method
CN209857781U (en) Mine blasting big gun hole structure

Legal Events

Date Code Title Description
A201 Request for examination
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20151006

Year of fee payment: 4

FPAY Annual fee payment

Payment date: 20161207

Year of fee payment: 5

FPAY Annual fee payment

Payment date: 20180117

Year of fee payment: 6

LAPS Lapse due to unpaid annual fee