CN107883822B - A kind of reinforcement slotting correction structure and cut shot method - Google Patents

A kind of reinforcement slotting correction structure and cut shot method Download PDF

Info

Publication number
CN107883822B
CN107883822B CN201711055885.5A CN201711055885A CN107883822B CN 107883822 B CN107883822 B CN 107883822B CN 201711055885 A CN201711055885 A CN 201711055885A CN 107883822 B CN107883822 B CN 107883822B
Authority
CN
China
Prior art keywords
snubber
correction
reinforcement
main
depth
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201711055885.5A
Other languages
Chinese (zh)
Other versions
CN107883822A (en
Inventor
谢飞鸿
余禹江
周杰
吴杰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chengdu University
Original Assignee
Chengdu University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chengdu University filed Critical Chengdu University
Priority to CN201711055885.5A priority Critical patent/CN107883822B/en
Publication of CN107883822A publication Critical patent/CN107883822A/en
Application granted granted Critical
Publication of CN107883822B publication Critical patent/CN107883822B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F42AMMUNITION; BLASTING
    • F42DBLASTING
    • F42D1/00Blasting methods or apparatus, e.g. loading or tamping
    • F42D1/08Tamping methods; Methods for loading boreholes with explosives; Apparatus therefor
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F42AMMUNITION; BLASTING
    • F42DBLASTING
    • F42D3/00Particular applications of blasting techniques
    • F42D3/04Particular applications of blasting techniques for rock blasting

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Working Measures On Existing Buildindgs (AREA)

Abstract

The present invention relates to rock mass in tunnel sinking and blasting field of engineering technology, disclose a kind of reinforcement slotting correction structure and cut shot method, it include: that tunnel center line vallecular cavity midpoint apart from bottom plate specified distance is arranged vertically two reinforcement snubbers (1), three pairs of main snubbers (2) and two pairs of correction snubbers (3) are arranged symmetrically in reinforcement snubber (1) two sides, form compound reinforcement vertical wedge cut, the main snubber (2) is that aperture spacing is big, the closely spaced wedge shape of bottom hole, the longitudinal section of correction snubber (3) is rectangle, the cross section of the main snubber (2) is isosceles trapezoid;The depth for reinforcing snubber (1) is less than the depth of correction snubber (3), and the depth of correction snubber (3) is less than the depth of main snubber (2).The present invention can be reduced because explosion is undesirable caused by tunnel width is larger or formation hardness is larger, reaches preferable demolition effect, provides reference for the Tunnel Blasting tunneling construction work of same type.

Description

A kind of reinforcement slotting correction structure and cut shot method
Technical field
The present invention relates to rock mass in tunnel sinking and blasting field of engineering technology more particularly to a kind of reinforcement slotting correction structure and Cut shot method.
Background technique
In Tunnel Blasting tunneling construction, V-cut mode is mostly used, is the operation letter because this cutting method is easy It is single, but when tunnel width is larger or formation hardness is larger, blasting efficiency is often not satisfactory.The main reason for this problem is to draw Slot is difficult, and the quality of slotting decides that blasting efficiency, good cutting method can improve demolition effect, improves explosion effect Rate.
Summary of the invention
The present invention provides a kind of reinforcement slotting correction structure and cut shot method, and the V-cut mode in the prior art that solves is worked as When tunnel width is larger or formation hardness is larger, the technical issues of blasting efficiency is often not satisfactory.
The purpose of the present invention is what is be achieved through the following technical solutions:
A kind of reinforcement slotting correction structure, comprising: tunnel center line vallecular cavity midpoint is apart from the vertical cloth of bottom plate specified distance Two reinforcement snubbers 1 are set, are arranged symmetrically three pairs of main snubbers 2 and two pairs of correction snubbers in 1 two sides of reinforcement snubber 3, compound reinforcement vertical wedge cut is formed, the main snubber 2 is that aperture spacing is big, and the closely spaced wedge shape of bottom hole is described to change The longitudinal section of positive snubber 3 is rectangle, and the cross section of the main snubber 2 is isosceles trapezoid;The reinforcement snubber 1 Depth is less than the depth of the correction snubber 3, and the depth of the correction snubber 3 is less than the depth of main snubber 2.
A kind of cut shot method for reinforcing slotting correction structure, comprising:
It draws center line, reinforce snubber, main snubber and the location and shape for correcting snubber;
Same millisecond blasting reinforces snubber and main snubber;
After reinforcing snubber and main snubber explosion, snubber is corrected in explosion.
The present invention provides a kind of reinforcement slotting correction structure and cut shot method, according to.
The present invention can be reduced using the cutting method for reinforcing snubber and correction snubber because tunnel width is larger or rock Explosion caused by hardness is larger is undesirable, reaches preferable demolition effect, mentions for the Tunnel Blasting tunneling construction work of same type For reference.
Detailed description of the invention
It in order to more clearly explain the embodiment of the invention or the technical proposal in the existing technology, below will be to institute in embodiment Attached drawing to be used is needed to be briefly described, it should be apparent that, the accompanying drawings in the following description is only some implementations of the invention Example, for those of ordinary skill in the art, without any creative labor, can also obtain according to these attached drawings Obtain other attached drawings.
Fig. 1 is that the structural schematic diagram of structure is corrected in a kind of reinforcement slotting of the embodiment of the present invention.
Specific embodiment
In order to make the foregoing objectives, features and advantages of the present invention clearer and more comprehensible, with reference to the accompanying drawing and specific real Applying mode, the present invention is described in further detail.
As shown in Figure 1, for a kind of reinforcement slotting correction structure provided in an embodiment of the present invention, comprising: tunnel center wire casing Chamber midpoint is arranged vertically two reinforcement snubbers 1 apart from bottom plate specified distance, is arranged symmetrically in 1 two sides of reinforcement snubber Three pairs of main snubbers 2 and two pairs of correction snubbers 3, form compound reinforcement vertical wedge cut, the main snubber 2 is between aperture Away from big, the closely spaced wedge shape of bottom hole, the longitudinal section of the correction snubber 3 is rectangle, and the cross section of the main snubber 2 is equal For isosceles trapezoid;The depth for reinforcing snubber 1 is less than the depth of the correction snubber 3, the depth of the correction snubber 3 Degree is less than the depth of main snubber 2.
Wherein, the reinforcement snubber 1 is overlapped with tunnel center line, and depth is 2.0~3.5m.
Aperture spacing between the main snubber 2 is 2.4~4.0m, and bottom hole spacing is 0.2m, the main snubber 2 Depth is 3.0~5.0m.
The aperture spacing of the correction snubber 3 and main snubber 2 is 0.1m.
The depth for reinforcing snubber 1 is 2.0~3.0m, and the depth of the main snubber 2 is 3.0~5.0m, described The depth for correcting snubber 3 is 2.5~4.0m.
The aperture base angle reinforced snubber 1 and correct snubber 3 is 90 °, the aperture base angle of the main snubber 2 It is 65 °~70 °.
The present invention can be reduced using the cutting method for reinforcing snubber and correction snubber because tunnel width is larger or rock Explosion caused by hardness is larger is undesirable, reaches preferable demolition effect, mentions for the Tunnel Blasting tunneling construction work of same type For reference.
The embodiment of the invention also provides a kind of cut shot method of reinforcement slotting correction structure, comprising:
It draws center line, reinforce snubber 1, main snubber 2 and the location and shape for correcting snubber 3;
Same millisecond blasting reinforces snubber 1 and main snubber 2;
After reinforcing snubber 1 and 2 explosion of main snubber, snubber 3 is corrected in explosion.
Wherein, the reinforcement snubber 1 and main snubber 2 select two sections of blasting cap initiations, and correction snubber 3 is risen using four sections It is quick-fried.
The present invention is described in detail above, specific case used herein is to the principle of the present invention and embodiment party Formula is expounded, and the above description of the embodiment is only used to help understand the method for the present invention and its core ideas;Meanwhile it is right In those of ordinary skill in the art, according to the thought of the present invention, change is had in specific embodiments and applications Place, in conclusion the contents of this specification are not to be construed as limiting the invention.

Claims (6)

1. structure is corrected in a kind of reinforcement slotting characterized by comprising tunnel center line vallecular cavity midpoint is apart from bottom plate specific range Place is arranged vertically two reinforcement snubbers (1), reinforcement snubber (1) two sides be arranged symmetrically three pairs of main snubbers (2) and Two pairs of correction snubbers (3) form compound reinforcement vertical wedge cut, and the main snubber (2) is that aperture spacing is big, between bottom hole Away from small wedge shape, the longitudinal section of correction snubber (3) is rectangle, and the cross section of the main snubber (2) is isosceles It is trapezoidal;The depth for reinforcing snubber (1) is less than the depth of correction snubber (3), the depth of correction snubber (3) Degree is less than the depth of main snubber (2);
The reinforcement snubber (1) is overlapped with tunnel center line, and depth is 2.0~3.5m, between the main snubber (2) Aperture spacing is 2.4~4.0m, and bottom hole spacing is 0.2m, and the depth of the main snubber (2) is 3.0~5.0m.
2. structure is corrected in reinforcement slotting according to claim 1, which is characterized in that the correction snubber (3) is drawn with master The aperture spacing of slotted eyes (2) is 0.1m.
3. structure is corrected in reinforcement slotting according to claim 1, which is characterized in that the depth for reinforcing snubber (1) For 2.0~3.0m, the depth of correction snubber (3) is 2.5~4.0m.
4. structure is corrected in reinforcement slotting according to claim 1, which is characterized in that the reinforcement snubber (1) and correction The aperture base angle of snubber (3) is 90 °, and the aperture base angle of the main snubber (2) is 65 °~70 °.
5. a kind of cut shot method using such as reinforcement slotting correction structure of any of claims 1-4, feature exist In, comprising:
The location and shape drawn center line, reinforce snubber (1), main snubber (2) and correction snubber (3);
Same millisecond blasting reinforces snubber (1) and main snubber (2);
After reinforcing snubber (1) and main snubber (2) explosion, snubber (3) are corrected in explosion.
6. the cut shot method according to claim 5 for reinforcing slotting correction structure, which is characterized in that the reinforcement snubber (1) and main snubber (2) selects two sections of blasting cap initiations, and correction snubber (3) is using four sections of detonations.
CN201711055885.5A 2017-10-27 2017-10-27 A kind of reinforcement slotting correction structure and cut shot method Active CN107883822B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711055885.5A CN107883822B (en) 2017-10-27 2017-10-27 A kind of reinforcement slotting correction structure and cut shot method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711055885.5A CN107883822B (en) 2017-10-27 2017-10-27 A kind of reinforcement slotting correction structure and cut shot method

Publications (2)

Publication Number Publication Date
CN107883822A CN107883822A (en) 2018-04-06
CN107883822B true CN107883822B (en) 2019-12-03

Family

ID=61783514

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711055885.5A Active CN107883822B (en) 2017-10-27 2017-10-27 A kind of reinforcement slotting correction structure and cut shot method

Country Status (1)

Country Link
CN (1) CN107883822B (en)

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101349533A (en) * 2008-08-05 2009-01-21 山东科技大学科技产业总公司 Dip laneway digging hole layout mode
CN102914226A (en) * 2012-11-08 2013-02-06 中国矿业大学(北京) Hollow-hole rhombic parallel cut blasting damping method
CN103557758A (en) * 2013-11-01 2014-02-05 中铁四局集团有限公司 Expanded excavation area hole inside and outside combined delay subarea differential initiation network in tunnel blasting
CN103615941A (en) * 2013-12-11 2014-03-05 中铁二十三局集团有限公司 Method for blasting shallow section of modernization railway tunnel
CN103983146A (en) * 2014-05-16 2014-08-13 河南理工大学 Medium-length hole mixed wedge cut blasting method capable of realizing directed fracture using cutting cartridge bag for solid rock roadway
CN104180729A (en) * 2014-08-20 2014-12-03 深圳市中金岭南有色金属股份有限公司凡口铅锌矿 Method for arrangement of blast holes of driving working face of driving trolley and detonator grading
CN204177294U (en) * 2014-03-31 2015-02-25 江西稀有金属钨业控股集团有限公司 A kind of road driving undercut blast hole structure
CN104613830A (en) * 2014-12-18 2015-05-13 招金矿业股份有限公司夏甸金矿 One-time-formed smooth blasting method for laneway
CN104864782A (en) * 2015-05-16 2015-08-26 周忠国 Hard stone drift composite reinforcing vertical wedge cutting method
CN106225613A (en) * 2016-08-25 2016-12-14 中铁十局集团第三工程有限公司 A kind of efficient segmentation method of ignition in tunnel excavating process

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR970007384B1 (en) * 1994-07-13 1997-05-08 Sunkyong Const Co Method for excavating a working face
KR101212606B1 (en) * 2010-10-01 2012-12-14 흥도이엔지 주식회사 Blast method for center hole of tunnel

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101349533A (en) * 2008-08-05 2009-01-21 山东科技大学科技产业总公司 Dip laneway digging hole layout mode
CN102914226A (en) * 2012-11-08 2013-02-06 中国矿业大学(北京) Hollow-hole rhombic parallel cut blasting damping method
CN103557758A (en) * 2013-11-01 2014-02-05 中铁四局集团有限公司 Expanded excavation area hole inside and outside combined delay subarea differential initiation network in tunnel blasting
CN103615941A (en) * 2013-12-11 2014-03-05 中铁二十三局集团有限公司 Method for blasting shallow section of modernization railway tunnel
CN204177294U (en) * 2014-03-31 2015-02-25 江西稀有金属钨业控股集团有限公司 A kind of road driving undercut blast hole structure
CN103983146A (en) * 2014-05-16 2014-08-13 河南理工大学 Medium-length hole mixed wedge cut blasting method capable of realizing directed fracture using cutting cartridge bag for solid rock roadway
CN104180729A (en) * 2014-08-20 2014-12-03 深圳市中金岭南有色金属股份有限公司凡口铅锌矿 Method for arrangement of blast holes of driving working face of driving trolley and detonator grading
CN104613830A (en) * 2014-12-18 2015-05-13 招金矿业股份有限公司夏甸金矿 One-time-formed smooth blasting method for laneway
CN104864782A (en) * 2015-05-16 2015-08-26 周忠国 Hard stone drift composite reinforcing vertical wedge cutting method
CN106225613A (en) * 2016-08-25 2016-12-14 中铁十局集团第三工程有限公司 A kind of efficient segmentation method of ignition in tunnel excavating process

Also Published As

Publication number Publication date
CN107883822A (en) 2018-04-06

Similar Documents

Publication Publication Date Title
CN205399157U (en) Template device for concrete placement
CN107883822B (en) A kind of reinforcement slotting correction structure and cut shot method
CN205444885U (en) Adopt wall body negative and positive angle construction structures of little steel mould of combination
CN204023897U (en) Slding form operation vertical reinforcement fastening devices
CN204357007U (en) A kind of vertical reinforcement posting
CN204663543U (en) A kind of concrete lining mould of assembled arcuated stalk tunnel
CN207600321U (en) A kind of reinforcement slotting correction structure
CN204934980U (en) Bar splicing plumb joint assistor
CN202280152U (en) Structure for arranging embedded part at bottom of reinforced concrete plate
CN103132691A (en) Large steel formwork corner reinforcing device
CN203462466U (en) Reinforced structure for rectifying deviation of pile foundation and reinforcing broken pile
CN204081494U (en) A kind of multi-functional mountain type card structure of reinforcing template
CN103362302A (en) Steel tube lengthened connector, manufacturing method and formwork supporting frame
CN207377122U (en) A kind of mold fixing piece and fixed frame
CN203879003U (en) Template reinforcing and inner supporting structure
CN107726933B (en) A kind of middle font reinforces slotting structure and cut shot method
CN207487522U (en) A kind of I-shaped reinforcement slotting structure
CN208953317U (en) It is a kind of for mending the deflecting wedge for taking coal core
CN104929659A (en) Bi-arched tunnel middle-partition top surrounding rock strengthening system
CN110173001B (en) Construction method and structure of embedded channel steel
CN103470276B (en) Hollow-pipe concrete support
CN204200077U (en) A kind of down-the-hole air hammer
CN105155589A (en) Transverse joint waterproof structure based on EPDM (Ethylene-Propylene-Diene Monomer) water bars
CN103046747B (en) Use the inclination concrete structure pouring technique that spiral protective sheath carries out
CN211257013U (en) Side slope support pile

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant