KR100995501B1 - Temporary member and method for lifting up upper structure in steel box-girder bridge using the same - Google Patents

Temporary member and method for lifting up upper structure in steel box-girder bridge using the same Download PDF

Info

Publication number
KR100995501B1
KR100995501B1 KR1020100012495A KR20100012495A KR100995501B1 KR 100995501 B1 KR100995501 B1 KR 100995501B1 KR 1020100012495 A KR1020100012495 A KR 1020100012495A KR 20100012495 A KR20100012495 A KR 20100012495A KR 100995501 B1 KR100995501 B1 KR 100995501B1
Authority
KR
South Korea
Prior art keywords
steel box
box girder
girder bridge
upper structure
honeycomb
Prior art date
Application number
KR1020100012495A
Other languages
Korean (ko)
Inventor
송현섭
유경환
Original Assignee
극동엔지니어링(주)
아이컨엔지니어링(주)
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 극동엔지니어링(주), 아이컨엔지니어링(주) filed Critical 극동엔지니어링(주)
Priority to KR1020100012495A priority Critical patent/KR100995501B1/en
Application granted granted Critical
Publication of KR100995501B1 publication Critical patent/KR100995501B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D22/00Methods or apparatus for repairing or strengthening existing bridges ; Methods or apparatus for dismantling bridges
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66FHOISTING, LIFTING, HAULING OR PUSHING, NOT OTHERWISE PROVIDED FOR, e.g. DEVICES WHICH APPLY A LIFTING OR PUSHING FORCE DIRECTLY TO THE SURFACE OF A LOAD
    • B66F3/00Devices, e.g. jacks, adapted for uninterrupted lifting of loads
    • B66F3/24Devices, e.g. jacks, adapted for uninterrupted lifting of loads fluid-pressure operated
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D2/00Bridges characterised by the cross-section of their bearing spanning structure
    • E01D2/04Bridges characterised by the cross-section of their bearing spanning structure of the box-girder type

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Geology (AREA)
  • Mechanical Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

PURPOSE: A temporary member for a steel box girder bridge and a method for pulling up an upper structure of a steel box girder bridge using the temporary member are provided to prevent the deformation of steel girders when pulling up an upper structure of a steel box girder bridge. CONSTITUTION: A temporary member(200) for a steel box girder bridge is detachably installed in a pull-up position of an upper structure(100) to reinforce the upper structure. The temporary member includes a honeycomb structure part which is composed of a plurality of cells with an open top and bottom in a honeycomb structure.

Description

스틸박스 거더교용 가설부재 및 이를 이용한 스틸박스 거더교의 상부구조물 인상방법{TEMPORARY MEMBER AND METHOD FOR LIFTING UP UPPER STRUCTURE IN STEEL BOX-GIRDER BRIDGE USING THE SAME}Temporary member for steel box girder bridge and lifting method of upper structure of steel box girder bridge using same {{TEMPORARY MEMBER AND METHOD FOR LIFTING UP UPPER STRUCTURE IN STEEL BOX-GIRDER BRIDGE USING THE SAME}

본 발명은 토목분야에 관한 것으로서, 보다 상세하게는 스틸박스 거더교의 신설 또는 유지,보수시 스틸박스 거더교의 상부구조물을 인상하기 위한 것이다.The present invention relates to the field of civil engineering, and more particularly, to raise the upper structure of the steel box girder bridge during the construction or maintenance of the steel box girder bridge.

도 1을 참조하면, 일반적으로 거더교는 여러 형식의 교량 중 하나로서, 하부구조물(10)인 교대나 교각(12) 위에 있는 상부구조물(20)의 주부재가 거더(22)로 이루어진다.Referring to FIG. 1, generally, a girder bridge is one of various types of bridges, and the main portion of the upper structure 20 on the bridge or pier 12, which is the lower structure 10,

거더교는 구조형식에 따라 T형교, 판형교 (Plate Girder), 강상자형교 (Steel Box Girder), 강상판형교, PSC Box교 등으로 분류될 수 있다.Girder bridges can be classified into T-girder bridges, plate girder bridges, steel box girder bridges, steel plate bridge bridges, and PSC box bridges.

또한 거더교는 일반적으로 현장타설 또는 프리스트레스 공법에 의해 콘크리트로 형성되거나, 강재에 의해 형성된다.The girder bridges are generally formed of concrete by in-situ casting or prestressing, or by steel.

이와 같은 거더교의 상부구조물(20)은 하부구조물(10)과의 사이에 배치된 교량받침(30)(또는 탄성받침, 슈, 교좌 등이라고 한다) 위에 안착되는 것이 일반적이다. 따라서, 거더교의 상부구조물(20)은 신설 또는 교량받침(30)이나 하부구조물(10) 등의 유지,보수시 거더 하측에 설치되는 유압잭(50) 등의 인상장치에 의해 인상된다.The upper structure 20 of the girder bridges is generally mounted on a bridge support 30 (or an elastic support, a shoe, an eccentric bridge, etc.) disposed between the lower structure 10 and the bridge structure. Therefore, the upper structure 20 of the girder bridge is lifted by the lifting device such as the hydraulic jack 50 installed under the girder when the new construction or maintenance and repair of the bridge support 30 or the lower structure 10 and the like.

그런데, 스틸박스 거더교는 거더(22)가 강재에 의해 내부가 빈 박스형태로 형성되기 때문에 상부구조물(20)의 인상시 도 1의 'A'에 점선으로 도시된 바와 같이 거더(22)가 인상장치에 의해 변형될 수 있다. However, in the steel box girder bridge, since the girder 22 is formed in a hollow box shape by steel, the girder 22 is pulled up as shown by a dotted line in 'A' of FIG. 1 when the upper structure 20 is raised. Device. ≪ / RTI >

따라서, 인상장치에 의해 거더(22)가 변형됨에 따라 상부구조물(20)이 인상되지 못하는 문제점이 발생되고 있다. 또한, 상부구조물(20)의 인상지점이 복수인 경우, 인상장치에 의해 거더(22)가 변형됨에 따라 상부구조물(20)이 기울어진 상태로 인상되어 추락 등의 사고가 발생되는 문제점이 발생되고 있다.Accordingly, there is a problem that the upper structure 20 can not be pulled up due to the deformation of the girder 22 by the pulling device. In addition, when there are a plurality of lifting points of the upper structure 20, as the girder 22 is deformed by the lifting device, the upper structure 20 is raised in an inclined state, causing an accident such as a fall. have.

본 발명은 상기와 같은 문제점을 해결하기 위하여 안출된 것으로서, 스틸박스 거더교의 인상시 강재 거더의 변형을 방지할 수 있는 스틸박스 거더교용 가설부재 및 이를 이용한 스틸박스 거더교의 상부구조물 인상방법을 제공함을 그 목적으로 한다.The present invention has been made to solve the above problems, to provide a steel box girder bridge temporary member that can prevent deformation of the steel girder when the steel box girder bridge is raised, and to provide a method of lifting the upper structure of the steel box girder bridge using the same. For that purpose.

상기한 과제를 해결하기 위해 본 발명은 스틸박스 거더교의 상부구조물(100)의 인상지점에 탈부착 가능토록 설치되어 상기 상부구조물(100)을 보강하며, 상하방향으로 개구된 복수의 셀(212)에 의해 허니컴 구조로 형성된 허니컴구조부(210)를 포함하는 것을 특징으로 하는 스틸박스 거더교용 가설부재(200)를 제시한다.In order to solve the above problems, the present invention is installed so as to be detachable at an impression point of the upper structure 100 of the steel box girder bridge to reinforce the upper structure 100, to the plurality of cells 212 opened in the vertical direction And a honeycomb structured portion 210 formed by a honeycomb structure.

상기 허니컴구조부(210)는 종이, 합성수지, 강판 중 적어도 어느 하나에 의해 형성될 수 있다.The honeycomb structure 210 may be formed of at least one of paper, synthetic resin, and steel sheet.

상기 허니컴구조부(210)는 복수개가 상하방향을 따라 배열되어 상호 분리 가능토록 결합될 수 있다.The honeycomb structure portion 210 may be coupled to be separated from each other are arranged along the vertical direction.

상기 복수의 셀(212) 중 적어도 일부는 충진재로 충진될 수 있다.At least some of the plurality of cells 212 may be filled with a filler.

상기 허니컴구조부(210)가 내부에 구비될 수 있도록 중공형으로 형성된 중공부재(220)를 더 포함할 수 있다.The honeycomb structure 210 may further include a hollow member 220 formed to be hollow.

상기 중공부재(220)는 강재로 형성될 수 있다.The hollow member 220 may be formed of a steel material.

상기 허니컴구조부(210) 및 상기 중공부재(220)가 일체로 형성된 허니컴블록(200A)은 복수개가 상하방향을 따라 배열되어 상호 분리 가능토록 결합될 수 있다.The honeycomb block 200A in which the honeycomb structure portion 210 and the hollow member 220 are integrally formed may be coupled to be separated from each other by being arranged along a vertical direction.

상기 허니컴블록(200A)의 중공부재(220)는 상하방향으로 인접한 허니컴블록(200A)의 중공부재(220)와 결합부재(250)에 의해 분리 가능토록 결합될 수 있도록, 외측에 상기 결합부재(250)가 결합되는 결합부(222)가 돌출 형성될 수 있다.The hollow member 220 of the honeycomb block 200A is coupled to the outer side so that the hollow member 220 and the coupling member 250 of the honeycomb block 200A adjacent to each other in the vertical direction can be separated. 250 may be coupled with each other.

상기 중공부재(220)의 결합부(222)는 상하방향으로 인접한 중공부재(220)의 결합부(222)와 상하방향으로 겹쳐질 수 있도록, 상기 중공부재(220)의 상,하측부에 각각 형성될 수 있다.The engaging portion 222 of the hollow member 220 is provided on the upper and lower portions of the hollow member 220 so as to be vertically overlapped with the engaging portion 222 of the hollow member 220 adjacent to the upper and lower direction Can be formed.

상기 허니컴구조부(210)와 상기 상부구조물(100)의 인상을 위한 인상장치 사이에 배치되며 높이 조절 가능한 높이가변부재(230)를 더 포함할 수 있다.The honeycomb structure 210 and the lifting device for the impression of the upper structure 100 is disposed between the height variable member 230 may be further included.

상기 높이가변부재(230)는 스크류 잭(232)을 포함할 수 있다.The height adjustable member 230 may include a screw jack 232.

상기 상부구조물(100)에 탈부착 가능토록 결합될 수 있다.And may be detachably coupled to the upper structure 100.

또한 상기한 과제를 해결하기 위해 본발명은 상술한 가설부재(200)를 스틸박스 거더교의 상부구조물(100)의 인상지점에 가설하는 단계; 상기 가설부재(200)의 하측에서 상기 가설부재(200)를 받칠 수 있도록 인상장치를 설치하는 단계; 상기 인상장치에 의해 상기 가설부재(200)가 가설된 상부구조물(100)을 인상하는 단계; 를 포함하는 것을 특징으로 하는 스틸박스 거더교의 상부구조물 인상방법을 제시한다.Further, in order to solve the above-described problems, the present invention provides a method of manufacturing a steel box girder bridge, comprising: laying the above-described pseudo-member 200 on a lifting point of an upper structure 100 of a steel box girder bridge; Installing an impression device to support the temporary member 200 at a lower side of the temporary member 200; Raising the upper structure 100 on which the temporary member 200 is installed by the pulling device; And an upper structure lifting method of the steel box girder bridge.

상기 상부구조물(100)은 스틸박스형 거더(102)를 포함하며, 상기 가설부재(200)는 상기 스틸박스형 거더(102)의 내부에 가설될 수 있다.The upper structure 100 may include a steel box girder 102, and the temporary member 200 may be installed inside the steel box girder 102.

상기 가설부재(200)는 상하방향으로 수직하게 가설될 수 있다.The hood member 200 may be vertically installed in a vertical direction.

본 발명은 유압잭 등의 인상장치에 의해서도 스틸박스 거더교가 용이하고 안정적으로 인상될 수 있다.The present invention can be easily and stably raised steel box girder bridge even by the lifting device such as a hydraulic jack.

도 1은 일반적인 거더교의 단면 개략도이다.
도 2 이하는 본발명에 관한 도면이며,
도 2 내지 도 5는 제1실시예에 따른 가설부재를 이용한 스틸박스 거더교의 상부구조물 인상방법을 설명하기 위한 것으로서,
도 2는 가설부재 가설상태 구성도.
도 3은 인상장치 설치상태 구성도.
도 4는 상부구조물 인상상태 구성도.
도 5는 도 4의 A-A선에 따른 단면도.
도 6은 제2실시예의 가설부재 가설상태 구성도.
도 7은 제2실시예의 상부구조물의 인상상태 구성도.
도 8은 제3실시예의 가설부재가 가설상태 구성도.
도 9는 제3실시예의 가설부재의 측면도.
도 10은 제3실시예의 가설부재의 분리 사시도.
1 is a schematic cross-sectional view of a general girder bridge.
2 is a view related to the present invention,
2 to 5 are views for explaining a method of lifting the upper structure of the steel box girder bridge using the temporary member according to the first embodiment,
2 is a schematic diagram of a temporary member construction state.
3 is a configuration diagram of the lifting device installation state.
Figure 4 is a configuration of the upper structure pulled up state.
5 is a cross-sectional view taken along line AA of FIG. 4.
6 is a configuration view of the hypothetical member in the second embodiment.
7 is a view showing the pull-up state of the superstructure of the second embodiment.
8 is a configuration diagram of a hypothetical state of the hypothetical member of the third embodiment;
Fig. 9 is a side view of the hypothetical member of the third embodiment. Fig.
10 is an exploded perspective view of the temporary member of the third embodiment;

이하, 첨부도면을 참조하여 본 발명의 실시예에 관하여 상세히 설명한다.Hereinafter, embodiments of the present invention will be described in detail with reference to the accompanying drawings.

도 2 내지 도 4는 본발명의 일 실시 예에 따른 스틸박스 거더교의 상부구조물 인상방법에 관한 것으로서, 본발명에 따른 스틸박스 거더교의 상부구조물의 인상방법은 다음과 같다.FIG. 2 to FIG. 4 show a method of lifting an upper structure of a steel box girder bridge according to an embodiment of the present invention, and a method of lifting an upper structure of a steel box girder bridge according to the present invention is as follows.

스틸박스 거더교의 상부구조물(100)을 신설하여 하부구조물(110) 위의 교량받침(120) 위에 안착시키거나, 교량받침(120)이나 하부구조물(110)의 유지,보수작업 등을 할 경우에는, 먼저 도 2에 도시된 바와 같이 허니컴 구조의 가설부재(200)를 상부구조물(100)에 가설한다.When the upper structure 100 of the steel box girder bridge is newly installed and placed on the bridge support 120 on the lower structure 110 or maintenance or repair work of the bridge support 120 or the lower structure 110 is performed First, as shown in FIG. 2, a temporary member 200 having a honeycomb structure is hypothesized to the upper structure 100.

이때, 허니컴 구조의 가설부재(200)는 상부구조물(100)의 하측에 설치되어 상구구조물을 인상하는 인상장치(예컨대, 유압잭(150)) 및 상부구조물(100) 사이에 배치될 수 있도록, 인상장치의 설치지점과 대응되는 상부구조물(100)의 인상지점에 가설됨이 바람직하다.At this time, the hypothetical member 200 of the honeycomb structure is installed on the lower side of the upper structure 100 to be placed between the upper structure 100 and the lifting device (for example, the hydraulic jack 150) It is preferable to be installed at the lifting point of the superstructure 100 corresponding to the installation point of the apparatus.

또한 허니컴 구조의 가설부재(200)는 상부구조물(100)이 인상장치에 의해 상하방향으로 수직하게 인상될 수 있도록, 상하방향으로 수직하게 가설되는 것이 바람직하다.In addition, the honeycomb temporary member 200 is preferably vertically installed in the vertical direction, so that the upper structure 100 can be vertically pulled up and down by the lifting device.

가설부재(200)는 상부구조물(100)의 인상시 스틸박스형 거더(102)가 변형되지 않도록 보강할 수 있다면 어떠한 위치에 가설되든 무방하다. The stiffening member 200 may be installed at any position as long as it can reinforce the steel box girder 102 so as not to be deformed when the upper structure 100 is pulled up.

다만, 가설부재(200)는 스틸박스형 거더(102)의 내부공간이 비어있는 바, 도시된 바와 같이 스틸박스형 거더(102)의 내부에 가설되는 것이 보다 바람직하다. 즉, 가설부재(200)의 가설을 위한 공간 확보가 용이하며, 가설부재(200)가 장애물의 방해없이 어디든 가설될 수 있기 때문에 인상지점의 결정이 용이하다.However, it is preferable that the internal space of the steel box type girder 102 is empty, and it is more preferably installed inside the steel box type girder 102 as shown in the figure. That is, it is easy to secure a space for the hypothesis of the temporary member 200, and since the temporary member 200 can be hypothesized anywhere without obstruction of the obstacle, it is easy to determine the impression point.

이와 같이 가설부재(200)가 가설되고 나면, 도 3에 도시된 바와 같이 가설부재(200)의 하측에서 가설부재(200)를 받칠 수 있도록 유압잭(150) 등의 인상장치를 설치한다. 이때, 인상장치는 도시된 바와 같이 하부구조물(110) 위에 바로 설치될 수도 있고, 하부구조물(110)에 가설되는 가설구조물 위에 설치될 수도 있다.3, a lifting device such as a hydraulic jack 150 is installed so as to support the hypothetical member 200 below the hypothetical member 200. As shown in FIG. At this time, the lifting device may be installed directly on the lower structure 110 as shown or may be installed on the temporary structure installed on the lower structure 110.

이후, 도 4에 도시된 바와 같이, 인상장치에 의해 가설부재(200)가 가설된 상부구조물(100)을 인상한다.Thereafter, as shown in FIG. 4, the upper structure 100 on which the temporary member 200 is installed is pulled up by the pulling device.

한편, 상부구조물(100)의 신설 및 유집,보수작업 후 상부구조물(100)이 교량받침(120) 위에 안착되고 나면, 가설부재(200)는 상부구조물(100)로부터 탈거할 수 있다.On the other hand, after the upper structure 100 is seated on the bridge support 120 after the establishment, collection, maintenance of the upper structure 100, the temporary member 200 can be removed from the upper structure (100).

이와 같이 허니컴 구조의 가설부재(200)를 이용하여 상부구조물(100)을 인상하면, 다음과 같은 효과를 얻을 수 있다.When the upper structure 100 is pulled up by using the hypothetical member 200 having the honeycomb structure, the following effects can be obtained.

첫째, 허니컴 구조의 가설부재(200)가 인상장치에 의한 하중을 직접적으로 받기 때문에, 상부구조물(100)의 변형이 방지될 수 있고, 이에 따라 스틸박스 거더교의 상부구조물(100)도 유압잭(150) 등의 인상장치에 의해 용이하고 안정적으로 인상될 수 있다.First, deformation of the upper structure 100 can be prevented since the honeycomb structural member 200 directly receives a load by the lifting device, whereby the upper structure 100 of the steel box girder bridge is also prevented from being deformed by the hydraulic jack 150 ) Can be easily and stably pulled up.

둘째, 허니컴 구조의 가설부재(200)는 상부구조물(100)에 영구 설치되는 대신 임시로 가설되며 반복사용될 수 있기 때문에, 허니컴 구조의 가설부재(200)로 인한 스틸박스 거더교의 시공비용에 대한 부담이 없다.Second, since the temporary member 200 of the honeycomb structure can be temporarily temporary and repeatedly used instead of being permanently installed on the upper structure 100, the burden on the construction cost of the steel box girder bridge due to the temporary member 200 of the honeycomb structure There is no

셋째, 허니컴 구조의 가설부재(200)는 가설되는 부재인 바, 현장상황에 따라 허니컴 구조의 가설부재(200)의 가설지점 결정 및 변경이 용이하고, 유압잭(150) 등의 인상장치의 거치지점의 결정 및 변경 또한 용이해질 수 있다.Thirdly, it is easy to determine and change the position of the hypothetical member 200 of the honeycomb structure according to the situation of the site, and it is easy to determine and change the installation point of the honeycomb structure, May also be facilitated.

넷째, 허니컴 구조의 가설부재(200)는 강성이 우수하면서도 중량이 가볍기 때문에 가설부재(200)의 운반 및 가설/가설해체작업이 용이하게 이루어질 수 있다.Fourth, since the honeycomb structural member 200 is excellent in rigidity and light in weight, it is easy to carry out the transportation and the hypothetical / hypothetical work of the hypothetical member 200.

다섯째, 허니컴 구조의 가설부재(200)는 속이 꽉 찬 솔리드(solid)구조의 가설부재(200)보다 소재소요량이 적기 때문에 저렴하게 제작될 수 있다.Fifth, the honeycomb structured temporary member 200 may be manufactured inexpensively because the material requirement is less than that of the solid member 200 having a full solid structure.

이와 같은 허니컴 구조의 가설부재(200)는 도 5 이하를 참조하는 바와 같이 여러가지로 실시될 수 있다.The temporary member 200 of the honeycomb structure as described above may be implemented in various ways as described below with reference to FIG. 5.

즉, 허니컴 구조의 가설부재(200)는 기본적으로 허니컴 구조를 갖기 위해, 상하방향으로 개구된 복수의 셀(212)에 의해 허니컴 구조로 형성된 허니컴구조부(210)를 포함할 수 있다.That is, the temporary member 200 of the honeycomb structure may include a honeycomb structure portion 210 formed in a honeycomb structure by a plurality of cells 212 opened in the vertical direction to have a honeycomb structure.

허니컴구조부(210)는 어떠한 소재로 형성되든 무방하나, 다만 손쉽게 구할 수 있고 허니컴 구조로의 제조가 용이하도록 건설,토목용으로서 충분한 내구성을 갖는 종이나 합성수지, 강판 중 적어도 어느 하나에 의해 형성되는 것이 보다 바람직하다할 수 있다.The honeycomb structure portion 210 may be formed of any material, but may be easily formed and formed by at least one of paper, synthetic resin, and steel sheet having sufficient durability for construction and civil engineering so as to be easily manufactured into a honeycomb structure. May be more preferable.

이와 같은 허니컴구조부(210)는 상하방향 길이가 긴 구조 등의 경우, 허니컴구조부(210)를 상하방향을 따라 복수개로 분할한 형상의 유닛 복수개가 하나로 일체화된 구조를 취할 수도 있다. 이때, 허니컴구조부(210)의 복수개의 유닛은 접합제나 용접방법 등에 의해 서로 분리되지 않도록 일체화될 수도 있고, 볼트체결방법 등에 의해 상호 탈부착 가능토록 결합될 수도 있다.The honeycomb structure 210 may have a structure in which a plurality of units having a shape in which the honeycomb structure 210 is divided into a plurality of portions along the up and down direction are integrated into one in the case of a structure having a long vertical length. At this time, the plurality of units of the honeycomb structure unit 210 may be integrated so as not to be separated from each other by a bonding agent, a welding method, or the like, or they may be combined so as to be removably attachable to each other by a bolt fastening method or the like.

한편, 허니컴구조부(210)의 복수의 셀(212)은 도시된 바와 같이 내부가 빈 상태로 제작되어 그대로 사용될 수도 있고, 강성 증대 등의 목적을 위해 적어도 일부의 셀(212)에 충진재(미도시)가 충진될 수도 있다. 충진재는 부직포나 스폰지 등이 경량체일 수도 있고 콘크리트 등의 중량체일 수도 있다.Meanwhile, the plurality of cells 212 of the honeycomb structure 210 may be manufactured in an empty state and used as they are, as shown in the drawing, or may be used as at least some of the cells 212 for the purpose of increasing rigidity, ) May be filled. The filler may be a lightweight body such as a nonwoven fabric or a sponge, or may be a heavy body such as concrete.

나아가 허니컴 구조의 가설부재(200)는 그 내부에 허니컴구조부(210)가 구비될 수 있도록 중공형으로 형성된 중공부재(220)를 더 포함할 수 있다. 즉 중공부재(220)의 내부에 허니컴구조부(210)가 일체로 형성될 수 있다.Furthermore, the temporary member 200 of the honeycomb structure may further include a hollow member 220 formed in a hollow shape so that the honeycomb structure 210 may be provided therein. That is, the honeycomb structure 210 may be integrally formed inside the hollow member 220.

따라서, 중공부재(220)에 의해 허니컴구조부(210)가 지지될 수 있기 때문에, 허니컴구조부(210)가 상하방향 또는 측면으로 외력이 작용하더라도 허니컴구조부(210)의 벌어짐 등의 변형이 방지될 수 있다.Therefore, even if an external force acts on the honeycomb structure 210 in the vertical direction or the lateral direction, the honeycomb structure 210 can be prevented from being deformed, have.

중공부재(220)는 허니컴구조부(210)와 따로 제작된 후 일체로 결합될 수도 있고, 중공부재(220)의 내부가 허니컴구조로 형성됨에 따라 허니컴구조부(210)와 일체로 형성될 수도 있다.The hollow member 220 may be integrally formed with the honeycomb structure 210 and then integrally formed with the honeycomb structure 210. The hollow member 220 may be integrally formed with the honeycomb structure 210 as the inside of the hollow member 220 is formed into a honeycomb structure.

이와 같은 중공부재(220)는 여러가지 소재로 형성될 수 있으며, 보다 바람직하게는 허니컴구조부(210)를 견고하게 지지하기에 충분한 강성을 가질 수 있는 소재로 형성되는 것이 바람직하며, 바람직한 일 예로서 강재로 형성될 수 있다. The hollow member 220 may be formed of various materials, and more preferably, the hollow member 220 may be formed of a material that may have sufficient rigidity to firmly support the honeycomb structure 210. It can be formed as.

한편, 본발명에 따른 허니컴 구조의 가설부재(200)는 특정 스틸박스 거더교에 한정되지 않고 형상, 크기 등에 상관없이 여러 스틸박스 거더교에 적용 가능한 것이 바람직하다. Meanwhile, the temporary member 200 of the honeycomb structure according to the present invention is not limited to a specific steel box girder bridge, but may be applicable to various steel box girder bridges regardless of shape or size.

이를 위한 방안 중 하나로서, 높이(즉, 상하방향 길이)로 인해 사용이 제한되지 않도록, 도 6 및 도 7에 도시된 바와 같이 본발명에 따른 가설부재(200)는 허니컴구조부(210) 또는 중공부재(220)와 일체화된 허니컴구조부(210)와 인상장치 사이에 배치되며 높이 조절 가능한 높이가변부재(230)를 더 포함할 수 있다.6 and 7, the hypothetical member 200 according to the present invention may include a honeycomb structure 210 or a hollow structure, such as a hollow structure, And a height adjustable member 230 disposed between the honeycomb structure 210 integrated with the member 220 and the lifting device.

높이가변부재(230)는 높이조절이 가능하면서 용이하다면 어떠한 구조를 취하든 무방하며, 건설, 토목용도로서는 바람직하게는 스크류 잭(232) 구조를 취할 수 있다.The height variable member 230 may take any structure as long as it is easy to adjust the height, and may have a screw jack 232 structure for construction and civil engineering purposes.

이와 같은 높이가변부재(230)는 허니컴구조부(210) 또는 중공부재(220)와 일체화된 허니컴구조부(210)에 고정될 수도 있고, 탈부착 가능토록 결합될 수도 있다. The height varying member 230 may be fixed to the honeycomb structure 210 or the honeycomb structure 210 integrated with the hollow member 220 or detachably attached thereto.

또는 도 8 내지 도 10에 도시된 바와 같이 본발명에 따른 가설부재(200)는 허니컴구조부(210) 및 중공부재(220)가 일체로 형성된 허니컴블록(200A) 복수개가 상하방향을 따라 배열되어 상호 분리 가능토록 결합된 구성을 취함으로써, 높이가 조절,가변될 수 있다.Alternatively, as shown in FIGS. 8 to 10, in the temporary member 200 according to the present invention, a plurality of honeycomb blocks 200A in which the honeycomb structure 210 and the hollow member 220 are integrally arranged are arranged along the vertical direction. By taking a detachably coupled configuration, the height can be adjusted and varied.

복수개의 허니컴블록(200A)은 여러가지방법으로 상호 탈부착 가능토록 결합될 수 있으며, 바람직한 결합방법으로는 볼트&너트, 핀 등의 결합부재(250)에 의한 것이 있다. 여기서, 각각의 허니컴블록(200A)의 중공부재(220)는, 상하방향으로 인접한 허니컴블록(200A)의 중공부재(220)와 결합부재(250)에 의해 분리 가능토록 결합될 수 있도록, 외측에 결합부재(250)가 결합되는 결합부(222)가 돌출 형성될 수 있다. 중공부재(220)의 결합부(222)는 상하방향으로 인접한 중공부재(220)의 결합부(222)와 상하방향으로 겹쳐질 수 있도록, 중공부재(220)의 상,하측부에 각각 형성될 수 있으며, 이에 따라 복수개의 허니컴블록(200A)이 보다 견고하고 안정적으로 상호 결합될 수 있다.The plurality of honeycomb blocks 200A may be coupled to be detachable from each other in various ways, and a preferred coupling method may include a coupling member 250 such as a bolt & nut or a pin. Here, the hollow member 220 of each honeycomb block (200A), the outer side so as to be detachably coupled by the hollow member 220 and the coupling member 250 of the adjacent honeycomb block (200A) in the vertical direction. An engaging portion 222 to which the engaging member 250 is engaged can be formed to protrude. Coupling portion 222 of the hollow member 220 may be formed in the upper and lower portions of the hollow member 220, so as to overlap in the vertical direction with the coupling portion 222 of the adjacent hollow member 220 in the vertical direction Accordingly, the plurality of honeycomb blocks 200A may be coupled to each other more robustly and stably.

물론, 중공부재(220)가 포함되지 않는 경우, 상술한 바와 같이 허니컴구조부(210)가 복수의 유닛에 의해 구성됨에 따라 허니컴구조부(210)의 높이가 조절,가변될 수 있다.Of course, in the case where the hollow member 220 is not included, the height of the honeycomb structure 210 can be adjusted and varied since the honeycomb structure 210 is composed of a plurality of units as described above.

이상은 본 발명에 의해 구현될 수 있는 바람직한 실시예의 일부에 관하여 설명한 것에 불과하므로, 주지된 바와 같이 본 발명의 범위는 위의 실시예에 한정되어 해석되어서는 안 될 것이며, 위에서 설명된 본 발명의 기술적 사상과 그 근본을 함께 하는 기술적 사상은 모두 본 발명의 범위에 포함된다고 할 것이다. Since the above has been described only with respect to some of the preferred embodiments that can be implemented by the present invention, the scope of the present invention, as is well known, should not be construed as limited to the above embodiments, the present invention described above It will be said that both the technical idea and the technical idea which together with the base are included in the scope of the present invention.

100; 상부구조물 102; 거더
110; 하부구조물 120; 교량받침
150; 유압잭 200; 가설부재
210; 허니컴구조부 220; 중공부재
230; 높이가변부재
100; Superstructure 102; Girder
110; Substructure 120; Bridge bearing
150; Hydraulic jack 200; Temporary member
210; Honeycomb structure 220; Hollow member
230; Height variable member

Claims (14)

스틸박스 거더교의 상부구조물(100)의 인상지점에 탈부착 가능토록 설치되어 상기 상부구조물(100)을 보강하며, 상하방향으로 개구된 복수의 셀(212)에 의해 허니컴 구조로 형성된 허니컴구조부(210)를 포함하는 것을 특징으로 하는 스틸박스 거더교용 가설부재(200).The honeycomb structure 210 is installed to be detachable at an impression point of the upper structure 100 of the steel box girder bridge to reinforce the upper structure 100 and formed in a honeycomb structure by a plurality of cells 212 opened in the vertical direction. (200) for a steel box girder bridge. 청구항 1에 있어서,
상기 허니컴구조부(210)는 종이, 합성수지, 강판 중 적어도 어느 하나에 의해 형성된 것을 특징으로 하는 스틸박스 거더교용 가설부재(200).
The method according to claim 1,
The honeycomb structure portion 210 is a steel box girder bridge temporary member 200, characterized in that formed by at least one of paper, synthetic resin, steel sheet.
청구항 1에 있어서,
상기 허니컴구조부(210)는 복수개가 상하방향을 따라 배열되어 상호 분리 가능토록 결합된 것을 특징으로 하는 스틸박스 거더교용 가설부재(200).
The method according to claim 1,
The honeycomb structure 210 is a steel box girder bridge temporary member 200, characterized in that the plurality is arranged so as to be separated from each other arranged along the vertical direction.
청구항 1에 있어서,
상기 복수의 셀(212) 중 적어도 일부는 충진재로 충진된 것을 특징으로 하는 스틸박스 거더교용 가설부재(200).
The method according to claim 1,
Steel box girder bridge temporary member 200, characterized in that at least some of the plurality of cells (212) is filled with a filler.
청구항 1에 있어서,
상기 허니컴구조부(210)가 내부에 구비될 수 있도록 중공형으로 형성된 중공부재(220)를 더 포함하는 것을 스틸박스 거더교용 가설부재(200).
The method according to claim 1,
Temporary member for steel box girder bridge further comprises a hollow member 220 is formed in a hollow so that the honeycomb structure 210 is provided inside.
청구항 5에 있어서,
상기 중공부재(220)는 강재로 형성된 것을 특징으로 하는 스틸박스 거더교용 가설부재(200).
The method according to claim 5,
Wherein the hollow member (220) is formed of a steel material.
청구항 5에 있어서,
상기 허니컴구조부(210) 및 상기 중공부재(220)가 일체로 형성된 허니컴블록(200A)은 복수개가 상하방향을 따라 배열되어 상호 분리 가능토록 결합된 것을 특징으로 하는 스틸박스 거더교용 가설부재(200).
The method according to claim 5,
Wherein the plurality of honeycomb blocks (200A) having the honeycomb structure (210) and the hollow member (220) formed integrally are arranged along the vertical direction and are detachably coupled to each other. .
청구항 7에 있어서,
상기 허니컴블록(200A)의 중공부재(220)는 상하방향으로 인접한 허니컴블록(200A)의 중공부재(220)와 결합부재(250)에 의해 분리 가능토록 결합될 수 있도록, 외측에 상기 결합부재(250)가 결합되는 결합부(222)가 돌출 형성된 것을 특징으로 하는 스틸박스 거더교용 가설부재(200).
The method according to claim 7,
The hollow member 220 of the honeycomb block 200A is detachably coupled to the hollow member 220 of the honeycomb block 200A adjacent to the honeycomb block 200A by the coupling member 250, Steel box girder bridge temporary member 200, characterized in that the coupling portion 222 is coupled to the protrusion 250 is formed.
청구항 8에 있어서,
상기 중공부재(220)의 결합부(222)는 상하방향으로 인접한 중공부재(220)의 결합부(222)와 상하방향으로 겹쳐질 수 있도록, 상기 중공부재(220)의 상,하측부에 각각 형성된 것을 특징으로 하는 스틸박스 거더교용 가설부재(200).
The method according to claim 8,
The engaging portion 222 of the hollow member 220 is provided on the upper and lower portions of the hollow member 220 so as to be vertically overlapped with the engaging portion 222 of the hollow member 220 adjacent to the upper and lower direction (200) for a steel box girder bridge.
청구항 1에 있어서,
상기 허니컴구조부(210)와 상기 상부구조물(100)의 인상을 위한 인상장치 사이에 배치되며 높이 조절 가능한 높이가변부재(230)를 더 포함하는 것을 특징으로 하는 스틸박스 거더교용 가설부재(200).
The method according to claim 1,
Further comprising a height adjustable member (230) disposed between the honeycomb structure (210) and the lifting device for pulling up the upper structure (100) and having a height adjustable.
청구항 10에 있어서,
상기 높이가변부재(230)는 스크류 잭(232)을 포함하는 것을 특징으로 하는 스틸박스 거더교용 가설부재(200).
The method according to claim 10,
The height variable member 230 is a steel box girder bridge temporary member 200, characterized in that it comprises a screw jack (232).
청구항 1 내지 청구항 11 중 어느 한 항의 가설부재(200)를 스틸박스 거더교의 상부구조물(100)의 인상지점에 가설하는 단계;
상기 가설부재(200)의 하측에서 상기 가설부재(200)를 받칠 수 있도록 인상장치를 설치하는 단계;
상기 인상장치에 의해 상기 가설부재(200)가 가설된 상부구조물(100)을 인상하는 단계; 를 포함하는 것을 특징으로 하는 스틸박스 거더교의 상부구조물 인상방법.
Installing the temporary member (200) of any one of claims 1 to 11 at an impression point of the upper structure (100) of the steel box girder bridge;
Installing a lifting device to support the hypothetical member (200) below the hypothetical member (200);
Lifting the upper structure (100) on which the temporary member (200) is installed by the lifting device; Wherein the upper portion of the steel box girder bridge is pulled upward.
청구항 12에 있어서,
상기 상부구조물(100)은 스틸박스형 거더(102)를 포함하며,
상기 가설부재(200)는 상기 스틸박스형 거더(102)의 내부에 가설되는 것을 특징으로 하는 스틸박스 거더교의 상부구조물 인상방법.
The method of claim 12,
The upper structure 100 includes a steel box girder 102,
The temporary member 200 is a steel box girder bridge of the upper structure lifting method, characterized in that is installed in the interior of the steel box girder (102).
청구항 12에 있어서,
상기 가설부재(200)는 상하방향으로 수직하게 가설되는 것을 특징으로 하는 스틸박스 거더교의 상부구조물 인상방법.
The method of claim 12,
The temporary member 200 is the upper structure lifting method of the steel box girder bridge, characterized in that the vertical installation in the vertical direction.
KR1020100012495A 2010-02-10 2010-02-10 Temporary member and method for lifting up upper structure in steel box-girder bridge using the same KR100995501B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020100012495A KR100995501B1 (en) 2010-02-10 2010-02-10 Temporary member and method for lifting up upper structure in steel box-girder bridge using the same

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020100012495A KR100995501B1 (en) 2010-02-10 2010-02-10 Temporary member and method for lifting up upper structure in steel box-girder bridge using the same

Publications (1)

Publication Number Publication Date
KR100995501B1 true KR100995501B1 (en) 2010-11-22

Family

ID=43409927

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020100012495A KR100995501B1 (en) 2010-02-10 2010-02-10 Temporary member and method for lifting up upper structure in steel box-girder bridge using the same

Country Status (1)

Country Link
KR (1) KR100995501B1 (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103741603A (en) * 2013-12-26 2014-04-23 武汉二航路桥特种工程有限责任公司 Method for conducting gapless bridge dropping after bridge is lifted for large height and height adjusting device thereof
CN111719430A (en) * 2020-06-19 2020-09-29 中国建筑第八工程局有限公司 Prefabricated box girder centering and rollover prevention control device and prefabricated box girder erection method
KR102275158B1 (en) 2020-11-30 2021-07-08 한우물중공업 주식회사 Steel box girder bridge
CN113459934A (en) * 2021-07-06 2021-10-01 中铁十六局集团第三工程有限公司 Steel box girder transportation device and method
CN114164775A (en) * 2021-12-28 2022-03-11 四川交大工程检测咨询有限公司 Fine adjustment and rejuvenation method based on bridge track defect elimination jacking process

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103741603A (en) * 2013-12-26 2014-04-23 武汉二航路桥特种工程有限责任公司 Method for conducting gapless bridge dropping after bridge is lifted for large height and height adjusting device thereof
CN103741603B (en) * 2013-12-26 2016-01-20 武汉二航路桥特种工程有限责任公司 The large height of bridge raise after gapless to fall beam method and adjustable height device thereof
CN111719430A (en) * 2020-06-19 2020-09-29 中国建筑第八工程局有限公司 Prefabricated box girder centering and rollover prevention control device and prefabricated box girder erection method
KR102275158B1 (en) 2020-11-30 2021-07-08 한우물중공업 주식회사 Steel box girder bridge
CN113459934A (en) * 2021-07-06 2021-10-01 中铁十六局集团第三工程有限公司 Steel box girder transportation device and method
CN114164775A (en) * 2021-12-28 2022-03-11 四川交大工程检测咨询有限公司 Fine adjustment and rejuvenation method based on bridge track defect elimination jacking process

Similar Documents

Publication Publication Date Title
KR100995501B1 (en) Temporary member and method for lifting up upper structure in steel box-girder bridge using the same
KR101300073B1 (en) Lifting device for girder
CN103161126A (en) Road bridge variable section hollow high pier slip-form construction method
CN202247687U (en) Universal cast-in-situ trestle for bridge
CN101525871B (en) Multifunctional complete cantilever form and concrete pouring method thereby
CN103866693A (en) Installing method of reinforced concrete bowstring rod arch bridge arch ribs and hanging auxiliary bridge
CN107988921B (en) Single-point continuous pushing construction method for overpass bridge over railway and highway
KR100977061B1 (en) The bridge adjustable bearing for change off puilling up system laying pc-beam restitution system and the method
CN106087711A (en) Antinode work beam-steel concrete top board-external prestressing combines T-shaped simply supported beam
JP6966853B2 (en) How to place concrete on an inclined surface and mobile formwork equipment
JP6074378B2 (en) Expansion device replacement method and temporary lining plate structure
KR20110002343A (en) Pylon of cable-stayed bridge having composite combination structure and construction method thereof
KR20200085573A (en) Gravity type leveling method for precast members including expansion joint
KR101066837B1 (en) Lifting and bearing apparatus preventing fracture on the pier or abutment of bridge
CN105735099A (en) Simply supported-to-continuous girder bridge adopting external prestressed force in construction period and construction method thereof
CN202882446U (en) Horse stool suspended by steel bars
CN210732811U (en) Pedestal bottom die structure for pouring prestressed beam
CN210458919U (en) Steel-concrete composite beam and concrete pier connecting structure
CN209194354U (en) High-altitude long-span binder base-supporting shellfish thunder support construction
CN208121776U (en) A kind of recyclable steel concrete combined type foundation pit trestle work structure of assembled
CN208167484U (en) The steel construction overline bridge being easily installed
KR101862998B1 (en) Finger joint prevention of escape
CN202849936U (en) Bridge beam slab operation frame
KR101043710B1 (en) Through bridge construction method by side beam and slab by box structure without lateral prestressing
CN208717939U (en) A kind of efficiently molding building hoist foundation structure

Legal Events

Date Code Title Description
A201 Request for examination
A302 Request for accelerated examination
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20131107

Year of fee payment: 4

FPAY Annual fee payment

Payment date: 20141114

Year of fee payment: 5

FPAY Annual fee payment

Payment date: 20151116

Year of fee payment: 6

FPAY Annual fee payment

Payment date: 20161115

Year of fee payment: 7

FPAY Annual fee payment

Payment date: 20181115

Year of fee payment: 9