CN209194354U - High-altitude long-span binder base-supporting shellfish thunder support construction - Google Patents

High-altitude long-span binder base-supporting shellfish thunder support construction Download PDF

Info

Publication number
CN209194354U
CN209194354U CN201821935488.7U CN201821935488U CN209194354U CN 209194354 U CN209194354 U CN 209194354U CN 201821935488 U CN201821935488 U CN 201821935488U CN 209194354 U CN209194354 U CN 209194354U
Authority
CN
China
Prior art keywords
anchor ear
plate
span
connecting plate
bailey
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201821935488.7U
Other languages
Chinese (zh)
Inventor
王安文
吴曼
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Road and Bridge International Co Ltd
Original Assignee
Road and Bridge International Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Road and Bridge International Co Ltd filed Critical Road and Bridge International Co Ltd
Priority to CN201821935488.7U priority Critical patent/CN209194354U/en
Application granted granted Critical
Publication of CN209194354U publication Critical patent/CN209194354U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)

Abstract

The utility model relates to a kind of high-altitude long-span binder base-supporting shellfish thunder support constructions, for the constructing tie beam between pier stud, including being separately mounted to be located at binder design position two anchor ear below on two pier studs, the connecting plate of each anchor ear be located at pier stud two sides at the top of the two anchor ear connecting plates of two pier stud the same sides between be erected with Bailey beam, be erected with distribution beam between the lower boom of two Bailey beams.The utility model is using the anchor ear that is mounted on cylinder pier as supporting point, using Bailey beam as main spandrel girder, distribution beam is erected on the lower boom of Bei Lei, Bailey beam can be used as guardrail, eliminated and installed guardrail operation at distribution beam both ends, and idle job risk is reduced, improve installation progress, Bailey beam for the constructing tie beam strong applicability of large span, while improving the safety of work progress since itself bending stiffness is big.

Description

High-altitude long-span binder base-supporting shellfish thunder support construction
Technical field
The utility model belongs to technical field of bridge construction, is related to the constructing tie beam of Bridge High-pier intercolumniation, and in particular to one Support construction used in kind high-altitude constructing tie beam.
Background technique
It is conservation of nature ecological environment and limited cultivated land resource when expressway design, few dig as far as possible is filled out less, multi rack bridge Beam, and column type pillarwork is largely used in bridge foundation design, it is connected among high pier stud using binder, to increase Overall stability.
In practice of construction, for stake top binder, due to being near or at ground location, template can be mounted directly and pour coagulation Soil.And it just needs to set up floor stand or bracket is constructed for the binder in certain altitude.Floor stand is applicable in In the constructing tie beam not high apart from ground, there is certain limitation, it is such as costly, and support stability is poor, construction risk is high; Bracket is suitable for the higher binder that should not be constructed using floor stand in position, using anchor ear or in pier usually on cylinder pier Column preformed hole crosses rod iron as supporting point, sets up fashioned iron spandrel girder between the supporting point of two pier studs, lateral cloth again on spandrel girder If distribution beam is as main support structure;To protect construction personnel's high-altitude working safety, guardrail to be installed at distribution beam both ends.This When method is for pier spacing biggish constructing tie beam, the bending stiffness of spandrel girder is required very high, normal section steel spandrel girder is discontented Sufficient force request;In high-altitude, installation guardrail increases one of flow chart simultaneously, and operating risk is high.
Summary of the invention
The purpose of the utility model is to provide a kind of easy for installation, it is able to satisfy structure stress requirement, and operation peace can be improved The high-altitude long-span binder support construction of full property.
The technical solution of the utility model is as follows:
A kind of high-altitude long-span binder base-supporting shellfish thunder support construction, including be separately mounted to set on two pier studs positioned at binder Position two anchor ear below is counted, each anchor ear includes two semicircular anchor ear plates, and the two sides of each anchor ear plate are respectively equipped with perpendicular To connecting plate, for two anchor ear plates to being buckled on pier stud, blending bolt connects the opposite connecting plate of two anchor ear plates, fastens anchor ear On pier stud;The connecting plate of each anchor ear is located at pier stud two sides;It is characterized by: the two anchor ear connecting plates in two pier stud the same sides It is erected with Bailey beam between top, is erected with distribution beam between the lower boom of two Bailey beams.
The utility model is a kind of strong applicability proposed on the basis of synthesis existing support construction, highly-safe binder Construction support construction, anchor ear of this structure to be mounted on cylinder pier are held using installation Bailey beam as master as supporting point Weight beam, distribution beam are erected on the lower boom of Bei Lei, and the guardrail of the alternative binder two sides of Bailey beam uses at this time, are eliminated and are being divided Guardrail operation is installed with beam both ends, reduces construction personnel's high altitude operation risk, improves bracket installation progress;It is installed on anchor ear very heavy Top, can pass through jack flexible modulation formwork elevation measuring;Bailey beam is since itself bending stiffness is big, for the constructing tie beam of large span Strong applicability, while improving the safety of work progress.
Detailed description of the invention
Fig. 1 is the schematic view of facade structure of the utility model;
Fig. 2 is planar structure schematic diagram at 1 I-I in figure;
Fig. 3 is the anchor ear overlooking structure diagram that the utility model uses;
Fig. 4 is the side structure schematic view of anchor ear.
Specific embodiment
As shown in Figure 1 and Figure 2, a kind of high-altitude long-span binder base-supporting shellfish thunder support construction provided by the utility model, packet It includes and is separately mounted to be located on two pier studs 12 design position of binder, two anchor ear 3 below, each anchor ear 3 includes two semicircular Anchor ear plate, the two sides of each anchor ear plate are respectively equipped with vertical connecting plate 31, and two anchor ear plates are to being buckled on pier stud, blending bolt 32 The opposite connecting plate 31 of two anchor ear plates is connected, is fastened on anchor ear 3 on pier stud 1;The connecting plate 3 of each anchor ear is located at pier stud two Side;It is erected with Bailey beam 4 between 31 top of connecting plate of two anchor ears 3 of two pier studs, 1 the same side, in the lower edge of two Bailey beams 4 Distribution beam 5 is erected between bar.
The Support bracket of above structure composition constructing tie beam.Since 4 height of Bailey beam is higher, and distribution beam 5 rides upon shellfish On the lower boom of thunder beam 4, template is laid in distribution beam and is constructed, therefore Bailey beam 5 can also be as construction guardrail.It is supporting After the completion of structure is set up, also needed sometimes to being highly adjusted, to adjust formwork elevation measuring;It also needs after bracket disassembly to height It is reduced so as to demoulding.To adapt to the adjustment of bracket height, jack 6 is arranged on anchor ear, passes through jack 6 for the utility model Lifting realize bracket height adjustment.
As shown in Figure 3, Figure 4, to be installed convenient for jack, anchor ear 3 used by the utility model, in anchor ear connecting plate 31 Top margin welding is equipped with horizontal top plate 33, and the top plate 33 is also welded with the outer wall of shroud ring simultaneously;Two anchor ear plates pass through connecting plate After connection, the connecting plate 31 and top plate 33 of entire anchor ear form one N of leg-like structures.
Shown in as shown in Figure 1, Figure 2, jack 6 is arranged on the top plate of each anchor ear 3, and be provided at the top of jack Backing plate, the both ends of the Bailey beam 4 are ridden upon respectively on the backing plate at 6 top of jack on two anchor ear top plates.

Claims (3)

1. a kind of high-altitude long-span binder base-supporting shellfish thunder support construction, including be separately mounted to be located at binder design on two pier studs Position two anchor ear below, each anchor ear include two semicircular anchor ear plates, and the two sides of each anchor ear plate are respectively equipped with vertically Connecting plate, for two anchor ear plates to being buckled on pier stud, blending bolt connects the opposite connecting plate of two anchor ear plates, is fastened on anchor ear On pier stud;The connecting plate of each anchor ear is located at pier stud two sides;It is characterized by: on the two anchor ear connecting plate tops of two pier stud the same sides It is erected with Bailey beam between portion, is erected with distribution beam between the lower boom of two Bailey beams.
2. high-altitude long-span binder base-supporting shellfish thunder support construction according to claim 1, it is characterised in that: the anchor ear Connecting plate top margin welding be equipped with horizontal top plate, the top plate simultaneously also with hoop plate outer wall weld;Two anchor ear plates pass through company After fishplate bar connection, connecting plate and top plate form one N of leg-like structures.
3. high-altitude long-span binder base-supporting shellfish thunder support construction according to claim 2, it is characterised in that: each anchor ear Top plate be equipped with jack, and backing plate is provided at the top of jack, the both ends of the Bailey beam ride upon two anchor ears respectively On the backing plate at the top of jack on top plate.
CN201821935488.7U 2018-11-22 2018-11-22 High-altitude long-span binder base-supporting shellfish thunder support construction Active CN209194354U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821935488.7U CN209194354U (en) 2018-11-22 2018-11-22 High-altitude long-span binder base-supporting shellfish thunder support construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821935488.7U CN209194354U (en) 2018-11-22 2018-11-22 High-altitude long-span binder base-supporting shellfish thunder support construction

Publications (1)

Publication Number Publication Date
CN209194354U true CN209194354U (en) 2019-08-02

Family

ID=67425502

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821935488.7U Active CN209194354U (en) 2018-11-22 2018-11-22 High-altitude long-span binder base-supporting shellfish thunder support construction

Country Status (1)

Country Link
CN (1) CN209194354U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110593115A (en) * 2019-09-27 2019-12-20 宁波大学 Cast-in-place box girder support system and construction method thereof
CN111535199A (en) * 2020-05-27 2020-08-14 中交路桥建设有限公司 Integral type edge-facing protection device and structure for pier column, middle tie beam and bent cap construction

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110593115A (en) * 2019-09-27 2019-12-20 宁波大学 Cast-in-place box girder support system and construction method thereof
CN111535199A (en) * 2020-05-27 2020-08-14 中交路桥建设有限公司 Integral type edge-facing protection device and structure for pier column, middle tie beam and bent cap construction

Similar Documents

Publication Publication Date Title
CN103469733B (en) A kind of from falling molding box joist steel Guan Beilei door opening support and bearing method thereof
WO2022142999A1 (en) Hoisting device for bridge water surface pile tie beam and construction method therefor
CN103184722B (en) Large-span double-layer Bailey truss structure and construction method thereof
CN106120559A (en) A kind of bridge limited bracket construction method and bridge
CN204753354U (en) Cover worker's board landing stage
CN103866696A (en) Cast-in-situ support of long-cantilever zero segment of short-pylon cable-stayed bridge
CN209194354U (en) High-altitude long-span binder base-supporting shellfish thunder support construction
CN207159827U (en) No. 1 plate installation and positioning structure in No. 0 block of Wavelike steel webplate bridge
CN112411348A (en) Construction trestle
CN110409624B (en) Reverse calculation and construction method for large equipment installation and main body structure
CN205662832U (en) Under hold formula beiLei beam steel suspension bridge
CN202000265U (en) Concrete construction formwork for high pier of bridge
CN203144907U (en) Large-span dual-layer bailey truss structure
CN209780193U (en) Suspension type scaffold
CN209194347U (en) The operation platform of bridge coping
CN110792042A (en) Anti-overturning reinforcing method for rectangular single-column pier bridge
CN216040719U (en) Template support cantilever bearing structure
CN102619335A (en) Construction method of large-height small-sized cast-in-place concrete beam slab
CN203429556U (en) System for quickly installing and positioning cable saddle
CN206015523U (en) The built-in steel anchor beam accurate positioning device of free-standing Sarasota
CN211473320U (en) Tool type external hanging rack for corridor
CN110295537B (en) Bridge adds base device of sound barrier
CN211689927U (en) Operating platform device for construction in bridge tower
CN103938877B (en) The installation method of crab-bolt stock
CN112726416A (en) Support structure meeting field construction security and construction method

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant