KR100864110B1 - Inserting method for casing and construction method for continuous wall thereof - Google Patents

Inserting method for casing and construction method for continuous wall thereof Download PDF

Info

Publication number
KR100864110B1
KR100864110B1 KR1020080054604A KR20080054604A KR100864110B1 KR 100864110 B1 KR100864110 B1 KR 100864110B1 KR 1020080054604 A KR1020080054604 A KR 1020080054604A KR 20080054604 A KR20080054604 A KR 20080054604A KR 100864110 B1 KR100864110 B1 KR 100864110B1
Authority
KR
South Korea
Prior art keywords
casing
forming
ground
continuous wall
piles
Prior art date
Application number
KR1020080054604A
Other languages
Korean (ko)
Inventor
김의재
Original Assignee
국진토건(주)
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Family has litigation
First worldwide family litigation filed litigation Critical https://patents.darts-ip.com/?family=40177204&utm_source=***_patent&utm_medium=platform_link&utm_campaign=public_patent_search&patent=KR100864110(B1) "Global patent litigation dataset” by Darts-ip is licensed under a Creative Commons Attribution 4.0 International License.
Application filed by 국진토건(주) filed Critical 국진토건(주)
Priority to KR1020080054604A priority Critical patent/KR100864110B1/en
Application granted granted Critical
Publication of KR100864110B1 publication Critical patent/KR100864110B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/20Bulkheads or similar walls made of prefabricated parts and concrete, including reinforced concrete, in situ
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/02Foundation pits
    • E02D17/04Bordering surfacing or stiffening the sides of foundation pits
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/66Mould-pipes or other moulds
    • E02D5/68Mould-pipes or other moulds for making bulkheads or elements thereof

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Bulkheads Adapted To Foundation Construction (AREA)

Abstract

A casing installation method is provided to prevent the formation of a gap between piles placed and solidified in a casing by forming a hole-shaped guide line to the appointed depth along a construction area of a continuous wall, thereby minimizing an error of straightness of a casing inserted perpendicular to the ground and keeping the casing not to be inclined, and a continuous wall construction method is provided to improve water cut-off capacity of a continuous wall by connecting many piles to overlap each other and forming a continuous wall, thereby preventing the formation of a gap between the piles. A casing installation method comprises the steps of: shaping partitioning models for modeling a continuous wall composed of many piles arranged continuously to the ground; forming a guide space to the ground for forming a hole-shaped guide line; locating the partitioning models in the center of the guide space formed in the ground; injecting fluid hardener to the guide space, and then solidifying; and forming a guide line by removing the partitioning models from the solidified hardener. A continuous wall construction method comprises the steps of: locating partitioning models to a guide space, injecting hardener and forming a hole-shaped guide line; inserting many first casings to the ground at regular intervals; forming many first piles by filling up each first casing with a fluid pile-forming material, removing the first casing from the ground; inserting each pipe-shaped second casing between adjacent first piles; and forming many second piles by filling up each second casing with a fluid pile-forming material and removing the second casing from the ground.

Description

케이싱 설치공법 및 그를 이용한 연속벽 시공방법{Inserting method for casing and construction method for continuous wall thereof}Casing installation method and continuous wall construction method using the same

본 발명은 케이싱 설치공법 및 그를 이용한 연속벽 시공방법에 관한 것으로, 좀더 구체적으로는 본 발명에 따른 케이싱 설치공법 및 그를 이용한 연속벽 시공방법은 다수개의 파일로 이루어진 연속벽과 동일한 단면형상의 홀을 형성한 안내라인을 형성하여 파일을 성형하는 케이싱의 수직도 오차가 최소화되도록 함으로써 케이싱 내부에 주입되는 고화되는 파일 사이에 틈이 발생되는 것이 방지될 수 있는 케이싱 설치공법 및 그를 이용한 연속벽 시공방법에 관한 것이다.The present invention relates to a casing installation method and a continuous wall construction method using the same. More specifically, a casing installation method and a continuous wall construction method using the same according to the present invention provide a hole having the same cross-sectional shape as a continuous wall composed of a plurality of piles. The casing installation method and the continuous wall construction method using the same may be prevented from forming a gap between the solidified piles injected into the casing by minimizing the verticality error of the casing forming the pile by forming the guide line. It is about.

각종 건축공사나 토목공사에서는 구조물의 설치 공간을 마련하기 위하여 터파기공사를 먼저 수행하게 되는데, 이와 같은 터파기공사에서는 주변지반이 구조물의 설치 공간으로 무너내리지 않도록 연속벽을 설치하여 주변지반의 토압에 견디도록 하는 것이 일반적이다.In various construction work or civil engineering work, it is necessary to carry out the digging work first in order to prepare the installation space of the structure. In such a digging work, the continuous ground is installed so that the surrounding ground does not fall down to the installation space of the structure. It is common to do so.

그리고, 연속벽은 상기와 같이 주변지반의 토압을 견디는 기능 이외에 주변 지반을 흐르는 물이 구조물의 설치공간으로 유입되지 않도록 하는 차수기능도 동시에 수행하게 된다.In addition, the continuous wall performs the order function to prevent water flowing in the surrounding ground from entering the installation space of the structure in addition to the ability to withstand the earth pressure of the surrounding ground as described above.

연속벽은 지반에 일정크기의 홀을 천공한 후 콘크리트나 모르타르를 충진시켜 형성되는 기둥형상의 파일(pile)의 연속체로 이루어지는 것이 일반적인데, 이와 같은 연속벽은 현재 다양한 형태의 시공방법이 적용되어 건설되고 있다.The continuous wall generally consists of a continuous pile of pillar-shaped piles formed by drilling holes of a certain size in the ground and then filling concrete or mortar. Such continuous walls are currently applied in various forms of construction. Is being built.

이와 같은 연속벽의 시공방법과 관련하여, 관형상으로 된 다수개의 케이싱(casing)을 지반에 일정깊이로 삽입하여 배열시키고, 이와 같은 케이싱이 일종의 거푸집 역할을 수행하도록 하여 케이싱의 내부로 콘크리트나 모르타르와 같은 파일형성물질을 주입한 후 고화시켜 파일 연속체로 된 연속벽이 형성되도록 하는 공법도 현재 안출되어 현장에서 적용되고 있다.In relation to the construction method of such a continuous wall, a plurality of casings having a tubular shape are inserted into the ground at a predetermined depth, and the casing serves as a form of formwork so that the casing plays a role of formwork. The method of injecting and then solidifying a pile forming material such as to form a continuous wall made of a pile continuous body is currently devised and applied in the field.

상기와 같이 케이싱을 이용한 연속벽 시공방법으로 대한민국 공개특허공보 공개번호 제10-2006-0002291호 "반월형 케이싱을 이용한 차수벽 흙막이 공법", 공개번호 특2003-0091836호 "원통기둥을 이용한 주열식 차수벽 및 그 설치공법", 등록특허공보 등록번호 제10-0752397호 "지중 차수벽 시공방법 및 이에 사용되는 보조케이싱" 등이 개시되고 있다.As described above, as a continuous wall construction method using a casing Republic of Korea Patent Application Publication No. 10-2006-0002291 "order wall mud blocking method using a half-wall casing", Publication No. 2003-0091836 "Casting lined wall using a cylindrical column and The installation method ", the registered patent publication No. 10-0752397," underground order wall construction method and auxiliary casing used for this, "and the like are disclosed.

이와 같은 종래의 연속벽 시공방법은 케이싱에 의해 형성되는 파일이 일정면적으로 접촉되도록 하여 서로 연접하는 파일 사이에 틈이 발생되지 않도록 하고 있으나, 각각의 파일이 서로 독립적으로 형성되어 단부가 서로 접합되면서 연속벽이 형성되는 구성이어서 파일이 지반에 정확하게 수직으로 형성되지 않게 되면 파일 사이에 틈이 발생하는 문제점이 있었다.Such a conventional continuous wall construction method allows the piles formed by the casing to be in contact with a predetermined area so that no gap is generated between the piles which are connected to each other. Since the continuous wall is formed so that the pile is not formed perpendicularly to the ground, there is a problem that a gap occurs between the piles.

상기와 같이 연속벽에 틈이 발생하면, 연속벽의 차수기능이 현저하게 떨어지게 되므로, 연속벽에 틈이 발생되지 않도록 케이싱이 지반에 수직으로 삽입되도록 하기 위한 방법의 개발이 요구되었다.If a gap occurs in the continuous wall as described above, since the order function of the continuous wall is remarkably deteriorated, it has been required to develop a method for inserting the casing perpendicularly to the ground so that the gap does not occur in the continuous wall.

이와 같이 케이싱이 지반에 수직으로 삽입되도록 하기 위한 시공방법으로 대한민국 등록특허공보 등록번호 제10-0801266호 "가이드부재가 구비된 지반굴착기용 케이싱 및 이를 이용한 차수벽 시공방법"이 현재 안출되어 있다.As such a construction method for inserting the casing perpendicularly to the ground as described in the Republic of Korea Patent Publication No. 10-0801266 "Ground Excavator Casing with a guide member and the order wall construction method using the same" is currently conceived.

상기 가이드부재가 구비된 지반굴착기용 케이싱 및 이를 이용한 차수벽 시공방법에서 상기 가이드부재가 구비된 지반굴착기용 케이싱은 케이싱의 외부일측면에 케이싱의 삽입방향을 안내하는 삽입가이드부가 길이방향으로 고정설치되고, 외부타측면에 다른 케이싱의 외부일측면에 설치된 삽입가이드부가 수직방향으로 삽입되어 결합되는 가이드삽입홈부가 길이방향으로 고정설치되도록 구성된 것이다. 그리고, 이와 같은 케이싱을 이용한 차수벽 시공방법은 케이싱의 양측면에 서로 요철관계를 이루며 형성된 삽입가이드부와 가이드삽입홈부가 서로 결합되면서 다수개의 케이싱이 서로 평행하게 지반으로 삽입되도록 하고, 다수개의 케이싱의 내부로 콘크리트가 주입되어 고화되면서 차수벽이 형성되도록 하는 것이다.The ground excavator casing provided with the guide member and the ground excavator casing using the guide member are fixedly installed in the longitudinal direction with an insertion guide part for guiding the insertion direction of the casing on one side of the casing. The guide insertion groove is inserted into the vertical guide direction is installed in the outer one side of the other casing on the other side is configured to be fixed fixed in the longitudinal direction. In addition, the order wall construction method using such a casing is formed by forming an uneven relationship with each other on both sides of the casing, the insertion guide portion and the guide insertion groove portion are coupled to each other so that the casing is inserted into the ground parallel to each other, the inside of the plurality of casing As the concrete is injected and solidified, the order walls are formed.

상기 가이드부재가 구비된 지반굴착기용 케이싱을 이용한 차수벽 시공방법은 다수개의 케이싱이 서로 이웃하는 케이싱의 삽입가이드부와 가이드삽입홈부의 결합에 따라 수직으로 안내되면서 지반에 삽입됨에 따라 케이싱의 수직도 오차가 최소 화되는 장점이 있으나, 삽입가이드부와 가이드삽입홈부를 형성시킨 특정형상의 케이싱을 별도로 제작해야 함에 따라 시공비용이 증대되었고, 케이싱을 지반에 삽입할 시 서로 이웃하는 케이싱의 삽입가이드부와 가이드삽입홈부를 정확하게 맞추어야 하는 시공상의 번거로움이 있었다.The order wall construction method using the ground excavator casing provided with the guide member is a vertical error of the casing as a plurality of casing is vertically guided by the insertion guide portion and the guide insertion groove of the neighboring casing is inserted into the ground Although there is an advantage of minimizing the cost, the construction cost is increased by separately manufacturing a casing having a specific shape forming the insertion guide part and the guide insertion groove, and the insertion guide part of the casing adjacent to each other when inserting the casing into the ground There was a lot of trouble in construction to fit the guide insertion groove correctly.

또한, 상기와 같은 가이드부재가 구비된 지반굴착기용 케이싱을 이용한 차수벽 시공방법은 다수개의 케이싱 내부에 콘크리트가 주입되어 고화되는 과정에서 각각의 케이싱으로부터 성형되는 파일(pile)이 팽창하여 서로 접합되면서 차수벽이 형성되는 방식이어서 각각의 케이싱으로부터 성형되는 파일이 충분히 팽창되지 않을 경우에는 파일 사이에 틈이 발생하는 문제점이 있었다.In addition, the order wall construction method using a ground excavator casing provided with a guide member as described above is a pile (pile) formed from each casing in the process of concrete is injected into a plurality of casing is expanded and bonded to each other the order wall In this way, there is a problem that a gap occurs between the piles when the piles formed from the respective casings are not sufficiently inflated.

이에 따라, 케이싱을 사용한 연속벽 시공방법에 있어서, 지반에 수직으로 삽입되는 케이싱의 수직도 오차를 최소화시키면서 동시에 케이싱에 의해 성형되는 파일 사이에 틈이 발생되지 않도록 하는 연속벽 시공방법의 개발이 요구되고 있는 실정이라 하겠다.Accordingly, in the continuous wall construction method using the casing, there is a demand for the development of the continuous wall construction method which minimizes the verticality error of the casing inserted vertically into the ground and at the same time prevents gaps between piles formed by the casing. It is a situation that is becoming.

따라서 본 발명은 이와 같은 종래 기술의 문제점을 개선하여, 케이싱을 정위치시키는 홀형상의 안내라인을 연속벽이 시공될 영역을 따라 일정깊이로 형성시켜 지반에 수직으로 삽입되는 케이싱의 수직도 오차가 최소화되도록 함으로써 케이싱이 기울어지지 않게 되어 케이싱 내부에 주입되는 고화되는 파일 사이에 틈이 발생되는 것이 방지되는 새로운 형태의 케이싱 설치공법을 제공하는 것을 목적으로 한다.Accordingly, the present invention improves this problem of the prior art, by forming a hole-shaped guide line for positioning the casing to a certain depth along the area where the continuous wall is to be constructed, the verticality error of the casing inserted perpendicularly to the ground It is an object of the present invention to provide a new type of casing installation method in which the casing is not inclined so that a gap is generated between the solidified piles injected into the casing.

또한, 본 발명은 다수개의 파일이 서로 중첩되게 연결되면서 연속벽이 형성되도록 함으로써 파일 사이에 틈이 발생되지 않아 연속벽의 차수능력이 향상되는 연속벽 시공방법을 제공하는 것을 목적으로 한다.In addition, an object of the present invention is to provide a continuous wall construction method in which a plurality of piles are connected to each other while the continuous wall is formed so that no gap is generated between the piles, thereby improving the orderability of the continuous walls.

상술한 목적을 달성하기 위한 본 발명의 특징에 의하면, 본 발명은 지반에 연속해서 배치된 다수개의 케이싱(casing) 내부로 파일형성물질이 주입되어 성형된 파일이 연속체를 이루며 형성되는 연속벽을 시공하기 위하여, 다수개의 케이싱을 지반에 삽입하기 위한 케이싱 설치공법에 있어서, 다수개의 파일로 이루어진 연속벽의 전체단면 형상을 정해진 개수로 분할한 분할단면 형상과 동일한 단면형상을 가진 정해진 개수의 분할모형을 성형하는 분할모형 성형단계와; 상기 다수개의 케 이싱이 배치될 영역을 따라 지반을 상기 케이싱의 폭보다 넓은 폭으로 정해진 깊이까지 굴착하면서 굴착물을 제거하여 안내공간을 형성시키는 안내공간 형성단계와; 상기 안내공간에 상기 분할모형을 위치시키고, 상기 안내공간으로 유동성이 있는 결합경화제를 주입하여 고화시키는 결합경화제 주입단계와; 상기 안내공간에 주입되어 고화된 상기 결합경화제로부터 상기 분할모형을 인발하여 제거시켜 상기 안내공간에 홀형상의 안내라인을 형성시키는 안내라인 형성단계를 포함하여, 상기 다수개의 케이싱이 상기 안내라인에 의해 정위치되어 지반으로 삽입되도록 하는 것을 특징으로 한다.According to a feature of the present invention for achieving the above object, the present invention constructs a continuous wall in which pile forming material is injected into a plurality of casing (continuously disposed on the ground) to form a continuous pile formed To this end, in a casing installation method for inserting a plurality of casings into the ground, a predetermined number of split models having the same cross-sectional shape as the divided cross-sectional shape obtained by dividing the entire cross-sectional shape of the continuous wall composed of a plurality of piles into a predetermined number A split model molding step of molding; A guide space forming step of forming a guide space by removing excavations while excavating the ground along a region where the plurality of casings are to be disposed to a predetermined depth wider than the width of the casing; Placing the splitting model in the guide space, and injecting and solidifying the binding hardener having fluidity into the guide space; And a plurality of casings formed by the guide lines, including a guide line forming step of drawing and removing the divided model from the bonding hardener which is injected into the guide space to form a hole-shaped guide line in the guide space. It is characterized in that the position is inserted into the ground.

이와 같은 본 발명에 따른 케이싱 설치공법에서 상기 분할모형은 다수개의 파일로 이루어진 연속벽의 전체단면 형상을 정해진 개수로 분할한 분할단면 형상과 동일한 단면 형상의 캐비티(cavity)가 형성된 주형틀에 유동성이 있는 분할모형 형성물질이 주입되어 고화되면서 형성되는 것을 특징으로 한다.In the casing installation method according to the present invention, the split model has fluidity in a mold formed with a cavity having the same cross-sectional shape as the divided cross-sectional shape obtained by dividing the entire cross-sectional shape of the continuous wall consisting of a plurality of piles into a predetermined number. Characterized in that the divided model forming material is injected and solidified.

상술한 목적을 달성하기 위한 본 발명의 다른 특징에 의하면, 본 발명은 지반에 연속해서 배치된 다수개의 케이싱 내부로 파일형성물질이 주입되어 성형된 파일이 연속체를 이루며 형성되는 연속벽을 시공하기 위한 연속벽 시공방법에 있어서, 다수개의 파일로 이루어진 연속벽의 전체단면 형상을 정해진 개수로 분할한 분할단면 형상과 동일한 단면형상을 가진 정해진 개수의 분할모형을 성형하는 분할모형 성형단계와; 상기 다수개의 케이싱이 배치될 영역을 따라 지반을 상기 케이싱의 폭보다 넓은 폭으로 정해진 깊이까지 굴착하면서 굴착물을 제거하여 안내공간을 형성시키는 안내공간 형성단계와; 상기 안내공간에 상기 분할모형을 위치시키고, 상기 안내공간으로 유동성이 있는 결합경화제를 주입하여 고화시키는 결합경화제 주입단계와; 상기 안내공간에 주입되어 고화된 상기 결합경화제로부터 상기 분할모형을 인발하여 제거시켜 상기 안내공간에 홀형상의 안내라인을 형성시키는 안내라인 형성단계와; 다수개의 제1차 케이싱을 정해진 간격으로 이격시켜 지반에 삽입하되, 상기 다수개의 제1차 케이싱이 각각 상기 안내라인에 정위치되면서 삽입되도록 하는 제1차 케이싱 삽입단계와; 유동성을 가진 파일형성물질을 각각의 제1차 케이싱 내부에 충진시키고 상기 제1차 케이싱을 지반으로부터 인발하여 제거시켜 정해진 간격으로 이격되게 배열되는 다수개의 제1차 파일(pile)이 형성되도록 하는 제1차 파일형성단계와; 서로 이웃한 제1차 파일 사이에 관형상으로 된 하나의 제2차 케이싱을 각각 삽입시키되, 상기 제2차 케이싱이 상기 안내라인에 정위치되면서 삽입되도록 하는 한편, 서로 이웃한 제1차 파일의 단부를 절삭시켜 형성된 공간으로 상기 제2차 케이싱의 양단부가 삽입되도록 하여 서로 이웃한 제1차 파일에 상기 제2차 케이싱의 양단부가 중첩되면서 다수개의 제1차 파일 사이 공간이 다수개의 제2차 케이싱으로 메워지도록 하는 제2차 케이싱 삽입단계와; 유동성을 가진 파일형성물질을 상기 각각의 제2차 케이싱 내부에 충진시키고 상기 제2차 케이싱을 지반으로부터 인발하여 제거시켜 다수개의 제2차 파일이 형성되도록 하는 제2차 파일형성단계를 포함하여, 상기 제2차 파일형성단계에서 상기 다수개의 제2차 파일이 상기 다수개의 제1차 파일과 일체로 고화되면서 상기 다수개의 제1차 파일과 상기 다수개 의 제2차 파일로 이루어지는 연속벽이 형성되도록 하는 것을 특징으로 한다.According to another feature of the present invention for achieving the above object, the present invention is for constructing a continuous wall in which pile forming material is injected into a plurality of casing disposed continuously on the ground to form a continuous pile formed A continuous wall construction method comprising: a split model molding step of molding a predetermined number of split models having the same cross-sectional shape as a divided cross-sectional shape obtained by dividing an entire cross-sectional shape of a continuous wall composed of a plurality of piles into a predetermined number; A guide space forming step of forming a guide space by removing the excavation while excavating the ground along a region where the plurality of casings are to be disposed to a predetermined depth wider than the width of the casing; Placing the splitting model in the guide space, and injecting and solidifying the binding hardener having fluidity into the guide space; A guide line forming step of forming a hole-shaped guide line in the guide space by drawing and removing the divided model from the bonding hardener which is injected into the guide space and solidified; A first casing insertion step of inserting a plurality of primary casings at a predetermined interval and inserting them into the ground, wherein the plurality of primary casings are inserted while being positioned in the guide line; Filling fluid-forming material in each primary casing and removing the primary casing from the ground to form a plurality of primary piles arranged to be spaced apart at predetermined intervals. A primary file forming step; Each of the secondary casings having a tubular shape is inserted between the neighboring primary piles, and the secondary casings are inserted while being positioned in the guide line. Both ends of the secondary casing are inserted into a space formed by cutting an end portion, so that both ends of the secondary casing overlap each other with the primary piles adjacent to each other, so that a plurality of secondary piles have a space between the primary piles. A second casing insertion step for filling the casing; And a secondary pile forming step of filling a fluid forming pile material into each of the secondary casings and removing the secondary casings from the ground to form a plurality of secondary piles. In the second file forming step, the plurality of secondary files are solidified integrally with the plurality of primary files to form a continuous wall including the plurality of primary files and the plurality of secondary files. It is characterized by that.

본 발명에 의한 케이싱 설치공법 및 그를 이용한 연속벽 시공방법에 의하면 케이싱이 정위치되어 지반에 수직으로 삽입됨에 따라 케이싱이 기울어지지 않게 되어 케이싱 내부에 주입되어 고화되는 파일 사이에 틈이 발생되는 것이 방지되어 연속벽의 차수능력이 향상되는 효과를 가진다.According to the casing installation method and the continuous wall construction method using the same according to the present invention, as the casing is positioned in the vertical position and inserted vertically into the ground, the casing is not inclined to prevent the gap between the piles injected into the casing and solidified. This has the effect of improving the ordering ability of the continuous wall.

이하, 본 발명의 실시예를 첨부된 도면 도 1 내지 도 8에 의거하여 상세히 설명한다. 한편, 도면과 상세한 설명에서 일반적인 케이싱 설치공법이나 연속벽 시공방법으로부터 이 분야의 종사자들이 용이하게 알 수 있는 구성 및 작용에 대한 도시 및 언급은 간략히 하거나 생략하였다. 특히 도면의 도시 및 상세한 설명에 있어서 본 발명의 기술적 특징과 직접적으로 연관되지 않는 요소의 구체적인 기술적 구성 및 작용에 대한 상세한 설명 및 도시는 생략하고, 본 발명과 관련되는 기술적 구성만을 간략하게 도시하거나 설명하였다.Hereinafter, exemplary embodiments of the present invention will be described in detail with reference to FIGS. 1 to 8. On the other hand, in the drawings and detailed description showing and referring to the configuration and operation easily understood by those skilled in the art from the general casing installation method or continuous wall construction method is briefly or omitted. In particular, in the drawings and detailed description of the drawings, detailed descriptions and illustrations of specific technical configurations and operations of elements not directly related to technical features of the present invention are omitted, and only the technical configurations related to the present invention are briefly shown or described. It was.

도 1은 본 발명에 따른 케이싱 설치공법의 블록도이고, 도 2의 (a) 내지 (e)는 본 발명에 따른 케이싱 설치공법에서 분할모형 성형단계를 설명하기 위한 도면이며, 도 3은 본 발명의 실시예에 따른 케이싱 설치공법에서 안내공간 형성단계에 서 형성된 안내공간을 보여주기 위한 도면이고, 도 4는 본 발명의 실시예에 따른 케이싱 설치공법에서 결합경화제 주입단계에서 안내공간에 분할모형을 배치시킨 상태를 보여주기 위한 도면이며, 도 5는 본 발명의 실시예에 따른 케이싱 설치공법에서 결합경화제 주입단계에서 결합경화제가 주입된 안내공간을 보여주기 위한 도면이고, 도 6은 본 발명의 실시예에 따른 케이싱 설치공법에서 안내라인 형성단계에서 형성된 안내라인을 보여주기 위한 도면이며, 도 7은 본 발명에 따른 연속벽 시공방법의 블록도이고, 도 8은 본 발명에 따른 연속벽 시공방법을 이루는 각 단계를 보여주기 위한 개략도이다.1 is a block diagram of a casing installation method according to the present invention, Figure 2 (a) to (e) is a view for explaining the split model forming step in the casing installation method according to the invention, Figure 3 Figure 4 is a view showing a guide space formed in the guide space forming step in the casing installation method according to an embodiment of the present invention, Figure 4 is a split model in the guide space in the binding step of the curing agent in the casing installation method according to the present invention 5 is a view for showing the arrangement state, Figure 5 is a view for showing a guide space in which the binder hardener is injected in the step of injecting the binder in the casing installation method according to an embodiment of the present invention, Figure 6 is an embodiment of the present invention Figure 7 is a view showing a guide line formed in the guide line forming step in the casing installation method according to the example, Figure 7 is a block diagram of a continuous wall construction method according to the invention, 8 is a schematic view showing each step of forming a continuous wall construction method according to the present invention.

본 발명에 따른 케이싱 설치공법 및 그를 이용한 연속벽 시공방법은 다수개의 케이싱(casing)(10a)을 지반에 삽입하고, 지반에 삽입되어 연속해서 배치된 다수개의 케이싱(10a)(10b) 내부로 파일형성물질을 주입하여 성형된 파일(pile)(20a)(20b)이 연속체를 이루며 연속벽(100)을 형성하도록 하는 것이다. 이와 같은 본 발명에 따른 케이싱 설치공법 및 그를 이용한 연속벽 시공방법은 케이싱(10a)(10b)이 정위치에서 지반으로 삽입되도록 케이싱(10a)(10b)을 안내하는 안내라인(7)을 연속벽(100)이 형성될 지반에 형성시키는 것을 기술적 특징으로 한다. 이에 따라 지반에 수직으로 삽입되는 케이싱(10a)(10b)의 수직도 오차가 최소화된다.Casing installation method and a continuous wall construction method using the same according to the present invention is inserted into a plurality of casing (casing) (10a) into the ground, the pile is inserted into the ground into a plurality of casing (10a) (10b) arranged continuously By injecting the forming material, the formed piles 20a and 20b form a continuous body to form the continuous wall 100. The casing installation method and the continuous wall construction method using the same according to the present invention is a continuous wall guide line (7) for guiding the casing (10a) (10b) so that the casing (10a) (10b) is inserted into the ground at the correct position It is a technical feature to form on the ground to be formed (100). Accordingly, the verticality error of the casings 10a and 10b vertically inserted into the ground is minimized.

여기서, 케이싱(10a)(10b)은 관형상으로 이루어져 내부로 콘크리트나 모르타르와 같은 유동성을 가진 파일형성물질이 주입되는 것이고, 파일(20a)(20b)은 연속 벽(100)을 이루는 것으로서 케이싱(10a)(10b)에 주입된 파일형성물질이 고화되면서 형성되는 것이다.Here, the casing (10a) (10b) is made of a tubular shape is to be injected into the pile-forming material having fluidity such as concrete or mortar, and the pile (20a) (20b) as a continuous wall 100 as a casing ( The pile forming material injected into 10a) and 10b is formed while solidifying.

먼저, 본 발명에 따른 케이싱 설치공법은 도 1과 같이 분할모형 성형단계, 안내공간 형성단계, 결합경화제 주입단계, 안내라인 형성단계를 거쳐 형성된 홀(hole)형상의 안내라인(7)에 다수개의 케이싱(10a)(10b)이 정위치되어 지반으로 삽입되도록 하는 시공방법을 제공한다.First, the casing installation method according to the present invention has a plurality of hole-shaped guide lines (7) formed through a split model molding step, a guide space forming step, a bonding hardener injection step, a guide line forming step as shown in FIG. It provides a construction method for the casing (10a) (10b) is in place to be inserted into the ground.

분할모형 성형단계는 도 2의 (a)와 같이 지반에 연속해서 배치되는 다수개의 파일(20a)(20b)로 이루어진 연속벽(100)을 모형화하기 위한 것으로, 정해진 개수의 분할모형(5a)(5b)을 성형하게 된다. 이와 같은 정해진 개수의 분할모형(5a)(5b)은 서로 조합됨으로써 지반에 연속해서 배치되는 다수개의 파일(20a)(20b)로 이루어진 연속벽(100)의 전체 형상을 모형화하게 된다.The split model molding step is for modeling the continuous wall 100 made up of a plurality of piles 20a and 20b continuously disposed on the ground as shown in FIG. 2 (a), and a predetermined number of split models 5a ( 5b) is formed. The predetermined number of divisional models 5a and 5b are combined with each other to model the overall shape of the continuous wall 100 made up of a plurality of piles 20a and 20b arranged continuously on the ground.

여기서, 정해진 개수의 분할모형(5a)(5b)은 연속벽(100)의 수평단면 형상을 모형화하는 것으로, 연속벽(100)보다 작은 높이를 가진다. 즉, 본 발명에 따른 케이싱 설치공법은 케이싱(10a)(10b)을 정위치시키기 위한 홀형상의 안내라인(7)을 형성시키는 것이 목적이므로, 홀형상의 안내라인(7)을 형성시키는 분할모형(5a)(5b)은 케이싱(10a)(10b)이 지반에 수직으로 삽입될 시 케이싱(10a)(10b)이 흔들리지 않고 정위치될 정도의 깊이를 가지는 안내라인(7)이 형성되는 높이를 가지도록 한다. 이는 분할모형(5a)(5b)을 이루는 소재와, 안내라인(7)을 형성시키는 결합경화제의 낭비를 최소화하기 위함이다.Here, the predetermined number of divided models 5a and 5b model the horizontal cross-sectional shape of the continuous wall 100 and have a height smaller than that of the continuous wall 100. That is, the casing installation method according to the present invention is intended to form the hole-shaped guide line 7 for positioning the casing (10a, 10b), the division model for forming the hole-shaped guide line (7) (5a) (5b) is the height at which the guide line (7) having a depth such that the casing (10a, 10b) is fixed without being shaken when the casing (10a, 10b) is inserted perpendicular to the ground Have it. This is to minimize the waste of the materials forming the split models 5a and 5b and the bonding hardener forming the guide line 7.

본 발명에 따른 분할모형 성형단계에서 분할모형(5a)(5b)을 성형하는 과정은 도 2의 (b) 내지 (e)에 도시되어 있는데, 먼저, 도 2의 (b)에서와 같이 서로 연속되는 다수개의 파일(20a)(20b)로 이루어진 연속벽(100)의 전체단면(1) 형상을 정해진 개수로 분할하여, 도 2의 (c)에서와 같이 분할단면(2a)(2b)을 형성시킨다. 도 2의 (a)와 (b)에서와 같이 본 발명의 실시예에 따른 연속벽(100)은 대칭을 이루는 단순한 형상으로 이루어져 있음에 따라 연속벽(100)의 양단부에 해당되는 분할단면(2a)과, 연속벽(100)의 양단부 사이에 위치되는 연속벽(100) 부위를 균등하게 분할하여 형성되는 분할단면(2b)으로 구분되어 분할단면(2a)(2b)이 형성되고, 이와 같은 각각의 분할단면(2a)(2b)에 대응하여 각각의 분할단면(2a)(2b)과 동일한 단면형상을 가진 분할모형(5a)(5b)을 각각 성형시키게 된다.The process of molding the divided models 5a and 5b in the divided model forming step according to the present invention is illustrated in FIGS. 2 (b) to 2 (e). First, as shown in FIG. The overall cross section 1 shape of the continuous wall 100 made up of a plurality of piles 20a and 20b is divided into a predetermined number to form divided cross sections 2a and 2b as shown in FIG. Let's do it. As shown in (a) and (b) of FIG. 2, the continuous wall 100 according to the embodiment of the present invention has a simple shape that forms symmetry, so that the divided sections 2a corresponding to both ends of the continuous wall 100 are formed. ) And the divided end surface 2b formed by equally dividing the portion of the continuous wall 100 positioned between both ends of the continuous wall 100 to form the divided end surfaces 2a and 2b, respectively. The divided models 5a and 5b each having the same cross-sectional shape as the respective divided sections 2a and 2b are formed in correspondence with the divided sections 2a and 2b of the respective sections.

여기서, 분할모형(5a)(5b)은 다양한 방법으로 성형될 수 있는데, 본 발명의 바람직한 실시예에 따른 케이싱 설치공법에서는 도 2의 (c)에서와 같이 상기한 분할단면(2a)(2b)의 형상과 동일한 단면 형상을 가진 캐비티(cavity)(4a)(4b)가 각각 형성된 주형틀(3a)(3b)을 구비하고, 주형틀(3a)(3b)의 캐비티(4a)(4b)에 콘크리트나 모르타르와 같은 유동성이 있는 분할모형 형성물질을 주입하여 고화시켜 각각의 분할모형(5a)(5b)을 성형하게 된다.Here, the split model (5a) (5b) can be molded in a variety of ways, in the casing installation method according to a preferred embodiment of the present invention as shown in (c) of Figure 2 divided cross-section (2a) (2b) A cavity (3a) (3b) formed with cavities (4a) (4b) having a cross-sectional shape that is the same as the cross-sectional shape, respectively, in the cavities (4a) (4b) of the mold (3a) (3b) Each split model 5a, 5b is formed by injecting and solidifying a flowable split model forming material such as concrete or mortar.

이와 달리 목재나 금속재, 토사와 같은 소재로 분할모형(5a)(5b)을 성형할 수 있음은 물론이다.On the contrary, the division models 5a and 5b may be formed of materials such as wood, metal, and earth and sand.

상기와 같이 성형되는 분할모형(5a)(5b)의 개수는 각각의 분할모형(5a)(5b) 이 서로 조합될 시 연속벽(100)의 전체단면(1) 형상과 동일한 단면 형상이 형성되도록 하는 개수에 맞춘다. The number of divided models 5a and 5b formed as described above is such that when the divided models 5a and 5b are combined with each other, the same cross-sectional shape as that of the entire cross section 1 of the continuous wall 100 is formed. We match to number to say.

한편, 본 발명에 따른 케이싱 설치공법에서는 상기와 같은 분할모형 성형단계와 더불어 안내공간 형성단계가 수행되는데, 안내공간 형성단계는 홀형상의 안내라인(7)을 형성시키기 위한 공간을 마련하기 위한 단계이다.Meanwhile, in the casing installation method according to the present invention, a guide space forming step is performed in addition to the split model molding step as described above, and the guide space forming step is a step for providing a space for forming the hole-shaped guide line 7. to be.

본 발명에 따른 안내공간 형성단계에서 형성되는 안내공간(6)은 연속벽(100)을 이루는 다수개의 파일(20a)(20b)을 성형시키기 위한 다수개의 케이싱(10a)(10b)이 배치될 영역을 따라 형성되는데, 이와 같은 안내공간(6)은 지반을 케이싱(10a)(10b)의 폭보다 넓은 폭으로 정해진 깊이까지 굴착하고, 굴착된 굴착물을 외부로 제거함으로써 도 3과 같이 지반에 일정깊이로 형성되게 된다.The guide space 6 formed in the guide space forming step according to the present invention is a region in which a plurality of casings 10a and 10b for forming a plurality of piles 20a and 20b constituting the continuous wall 100 are arranged. It is formed along the guide space 6 such that the ground is excavated to a predetermined depth wider than the width of the casing (10a) (10b), by removing the excavated excavation to the outside as shown in Figure 3 It will be formed to depth.

상기와 같이 분할모형 성형단계에서 분할모형(5a)(5b)을 성형하고, 안내공간 형성단계에서 안내공간(6)을 지반에 형성하게 되면, 결합경화제 주입단계를 수행하게 되는데, 본 발명의 실시예에 따른 결합경화제 주입단계는 도 4와 같이 지반에 형성된 안내공간(6)의 중앙부에 정해진 개수의 분할모형(5a)(5b)을 위치시킨 후, 도 5와 같이 안내공간(6)으로 유동성이 있는 결합경화제를 주입하여 고화시키는 단계이다.As described above, when the split model 5a and 5b are molded in the split model molding step, and the guide space 6 is formed on the ground in the guide space forming step, the step of injecting the binder hardening agent is performed. In the binding curing agent injection step according to the example, the predetermined number of divided models 5a and 5b are positioned at the center of the guide space 6 formed on the ground as shown in FIG. 4, and then the fluidity is transferred to the guide space 6 as shown in FIG. 5. This step is solidified by injecting a binder hardener.

여기서, 안내공간(6)의 중앙부에 위치되는 정해진 개수의 분할모형(5a)(5b)은 서로 조합되어 연속벽(100)의 전체단면(1) 형상과 동일한 단면형상을 이루고 있 다.Here, the predetermined number of divided models 5a and 5b positioned at the center of the guide space 6 are combined with each other to form the same cross-sectional shape as the overall cross-sectional shape 1 of the continuous wall 100.

본 발명에 따른 결합경화제 주입단계에서 사용되는 유동성이 있는 결합경화제로는 콘크리트와 모르타르 등 다양한 소재가 사용될 수 있는데, 본 발명의 실시예에 따른 케이싱 설치공법에서는 콘크리트(8)가 사용되고 있다.Various materials such as concrete and mortar may be used as the fluidized binder hardener used in the binder hardener injection step according to the present invention. In the casing installation method according to the embodiment of the present invention, concrete 8 is used.

한편, 결합경화제 주입단계에서 주입되는 결합경화제와 안내공간(6)에 위치되는 정해진 개수의 분할모형(5a)(5b)이 서로 접합되지 않도록 분할모형(5a)(5b)의 외주면에는 미세막을 형성시키는 막형성물질이 도포된다.On the other hand, a fine film is formed on the outer circumferential surface of the division models 5a and 5b so that the bonding agent and the predetermined number of division models 5a and 5b positioned in the guide space 6 are not bonded to each other. A film forming material is applied.

그리고, 본 발명에 따른 결합경화제 주입단계에서는 안내공간(6)에 위치되는 분할모형(5a)(5b)의 높이보다 안내공간(6)으로 주입된 결합경화제의 표층 높이가 낮도록 하여 결합경화제가 고화된 다음에는 분할모형(5a)(5b)이 안내공간(6)의 고화된 결합경화제로부터 원활하게 인발될 수 있도록 한다.In the binder hardening agent injection step according to the present invention, the height of the surface layer of the binder hardener injected into the guide space 6 is lower than that of the split models 5a and 5b positioned in the guide space 6 so that the binder hardener is After the solidification, the division models 5a and 5b can be smoothly drawn from the solidified binder hardener of the guide space 6.

마지막으로, 안내라인 형성단계가 수행되는데, 이와 같은 안내라인 형성단계는 상기와 같이 결합경화제 주입단계에서 주입된 결합경화제가 고화되면, 고화된 결합경화제로부터 분할모형(5a)(5b)을 인발하여 제거시킴으로써 도 6에서와 같이 안내공간(6)에 홀형상의 안내라인(7)이 형성되도록 한다.Finally, the guide line forming step is performed. When the binder hardener injected in the binder hardening agent injection step is solidified as described above, the division model 5a (5b) is drawn from the solidified binder hardener. As a result, as shown in FIG. 6, a hole-shaped guide line 7 is formed in the guide space 6.

이와 같이 홀형상으로 이루어진 안내라인(7)은 연속벽(100)의 전체단면(1)의 형상과 동일한 단면형상으로 이루어져 연속벽(100)을 형성하는 다수개의 파일(20a)(20b)을 성형시키기 위한 다수개의 케이싱(10a)(10b)이 정위치되면서 지반으로 삽입되게 한다.As described above, the guide line 7 having a hole shape is formed in the same cross-sectional shape as the shape of the entire cross section 1 of the continuous wall 100 to form a plurality of piles 20a and 20b forming the continuous wall 100. A plurality of casing (10a) (10b) to be inserted into the ground while being in place.

즉, 각각의 케이싱(10a)(10b)의 외주면이 홀형상으로 이루어진 안내라인(7)에 밀착되어 정위치된 상태에서 케이싱(10a)(10b)이 지반으로 삽입되게 되는데, 각각의 케이싱(10a)(10b)이 지반으로 삽입될 시 일정깊이로 형성된 안내라인(7)이 지속적으로 케이싱(10a)(10b)을 측방에서 지지함에 따라 케이싱(10a)(10b)이 흔들리거나 기울어지지 않고 정확하게 수직으로 지반에 삽입되게 된다. 이에 따라, 본 발명에 따른 케이싱 설치공법에서는 지반에 수직으로 삽입되는 케이싱(10a)(10b)의 수직도 오차가 최소화되는 것이다.That is, the casing 10a and 10b are inserted into the ground in the state where the outer circumferential surface of each casing 10a and 10b is in close contact with the guide line 7 having a hole shape, and each casing 10a is inserted into the ground. When the 10b is inserted into the ground, the guide lines 7 formed to a predetermined depth continuously support the casings 10a and 10b from the side, so that the casings 10a and 10b are not vertically shaken or tilted. It will be inserted into the ground. Accordingly, in the casing installation method according to the present invention is to minimize the vertical error of the casing (10a, 10b) is inserted into the ground vertically.

이와 같은 본 발명에 따른 케이싱 설치공법은 케이싱(10a)(10b)을 이용하여 연속벽(100)을 형성시키는 다양한 시공방법에 적용될 수 있는데, 본 출원인에 의해 기출원된 출원번호 제10-2008-0053413호 "겹 케이싱-파일 공법"에도 적용될 수 있다.Such a casing installation method according to the present invention can be applied to various construction methods for forming the continuous wall 100 by using the casing (10a, 10b), the application No. 10-2008- filed by the applicant It may also be applied to 0053413 "double casing-pile method".

본 발명에 따른 케이싱 설치공법이 상기한 겹 케이싱-파일 공법에 적용된 본 발명에 따른 연속벽 시공방법은 도 7과 같이 상기한 본 발명에 따른 케이싱 설치공법의 분할모형 성형단계, 안내공간 형성단계, 결합경화제 주입단계, 안내라인 형성단계를 거쳐 안내라인을 형성시킨 후, 제1차 케이싱 삽입단계, 제1차 파일 형성단계, 제2차 케이싱 삽입단계, 제2차 파일 형성단계를 거쳐 연속벽(100)을 시공하게 된다.The casing installation method according to the present invention is applied to the casing-pile method described above, the continuous wall construction method according to the present invention is a split model molding step, guide space forming step of the casing installation method according to the present invention as shown in FIG. After forming the guide line through the binder hardening agent injection step, guide line forming step, the continuous wall through the first casing inserting step, the first pile forming step, the second casing inserting step, the second pile forming step ( 100) will be installed.

본 발명에 따른 연속벽 시공방법은 케이싱(10a)(10b)을 정위치시키는 홀형상의 안내라인(7)을 연속벽(100)이 시공될 영역을 따라 일정깊이로 형성시켜 지반에 수직으로 삽입되는 케이싱(10a)(10b)의 수직도 오차가 최소화되도록 하는 동시에 지반으로 삽입되는 케이싱(10a)(10b)에 의해 성형되는 다수개의 파일(20a)(20b)이 서로 중첩되게 연결되면서 연속벽(100)이 형성되도록 하기 위한 방법으로, 이와 같은 본 발명에 따른 연속벽 시공방법이 적용된 연속벽(100)은 케이싱(10a)(10b)이 기울어지지 않게 되고 정확하게 수직으로 지반에 삽입된 상태에서 다수개의 파일(20a)(20b)이 중첩되게 성형됨에 따라 서로 이웃한 파일(20a)(20b) 사이에 틈이 발생되는 것이 방지되어 연속벽(100)의 차수능력이 향상되게 된다.In the continuous wall construction method according to the present invention, the hole-shaped guide line 7 for positioning the casings 10a and 10b is formed at a predetermined depth along the area in which the continuous wall 100 is to be constructed, and is vertically inserted into the ground. The plurality of piles 20a and 20b formed by the casings 10a and 10b inserted into the ground are connected to each other so that vertical errors of the casings 10a and 10b are minimized, and the continuous wall ( As a method for forming 100, the continuous wall 100 to which the continuous wall construction method according to the present invention is applied has a large number of casings 10a and 10b that are not inclined and are inserted into the ground exactly vertically. As the piles 20a and 20b are overlapped, gaps are prevented from being generated between the piles 20a and 20b adjacent to each other, thereby improving the ordering capacity of the continuous wall 100.

이와 같은 본 발명에 따른 연속벽 시공방법의 각 단계는 도 8에 개략적으로 도시되어 있는데, 본 발명에 따른 연속벽 시공방법은 먼저, 상술한 본 발명에 따른 케이싱 설치공법의 안내공간 형성단계에서 형성된 안내공간(6)에, 상술한 본 발명에 따른 케이싱 설치공법의 분할모형 성형단계에서 정해진 개수로 성형된 분할모형(5a)(5b)을 위치시킨 후, 상술한 본 발명에 따른 케이싱 설치공법의 결합경화제 주입단계 및 안내라인 형성단계을 거쳐 홀형상의 안내라인(7)이 형성되도록 한다.Each step of the continuous wall construction method according to the present invention is schematically shown in Figure 8, the continuous wall construction method according to the present invention, first formed in the guide space forming step of the casing installation method according to the present invention described above After placing the divided models 5a and 5b formed in a predetermined number in the split model molding step of the casing installation method according to the present invention described above, the guide space 6 of the casing installation method according to the present invention Through the binder hardening agent injection step and the guide line forming step, the hole-shaped guide line 7 is formed.

그리고, 제1차 케이싱 삽입단계를 수행하는데, 이와 같은 제1차 케이싱 삽입단계는 다수개의 제1차 케이싱(10a)을 정해진 간격으로 이격시켜 지반에 삽입하는 단계이다. 여기서, 본 발명의 실시예에 따른 제1차 케이싱 삽입단계는 서로 이웃한 제1차 케이싱(10a) 사이에 하나의 제2차 케이싱(10b)이 위치되도록 다수개의 제1차 케이싱(10a)을 이격시킨다.Then, the first casing insertion step is performed, and the first casing insertion step is a step of inserting the plurality of primary casings 10a at a predetermined interval and inserting them into the ground. Here, in the inserting of the primary casing according to the embodiment of the present invention, the plurality of primary casings 10a are positioned such that one secondary casing 10b is positioned between the neighboring primary casings 10a. Spaced apart.

이와 같은 본 발명의 실시예에 따른 제1차 케이싱 삽입단계에서 제1차 케이싱(10a)은 외주면이 홀형상으로 이루어진 안내라인(7)에 밀착되어 정위치된 상태에서 정확하게 수직을 유지하며 지반에 삽입되게 된다.In the first casing insertion step according to an embodiment of the present invention as described above, the primary casing 10a is in close contact with the guide line 7 having an outer circumferential surface formed in a hole shape, and is kept vertically precisely on the ground. Will be inserted.

다음으로, 제1차 파일형성단계가 수행되는데, 이와 같은 제1차 파일형성단계는 유동성을 가진 파일형성물질을 각각의 제1차 케이싱(10a) 내부에 충진시키고, 제1차 케이싱(10a)을 지반으로부터 인발하여 제거시킴으로써, 정해진 간격으로 이격되게 배열되는 다수개의 제1차 파일(20a)이 형성되도록 한다.Next, a first pile forming step is performed. The first pile forming step fills the fluid forming material having fluidity in each of the primary casings 10a, and the primary casing 10a. By removing the material from the ground, a plurality of primary piles 20a are arranged to be spaced apart at predetermined intervals.

그리고, 제2차 케이싱 삽입단계가 수행되는데, 이와 같은 제2차 케이싱 삽입단계는 서로 이웃한 제1차 파일(20a) 사이에 관형상으로 된 하나의 제2차 케이싱(10b)을 각각 삽입시키는 단계이다. Then, the secondary casing insertion step is performed, and this secondary casing insertion step inserts each of the secondary casings 10b having a tubular shape between the adjacent primary files 20a. Step.

본 발명의 실시예에 따른 제2차 케이싱 삽입단계에서 제2차 케이싱(10b)은 외주면이 홀형상으로 이루어진 안내라인(7)에 밀착되어 정위치된 상태에서 정확하게 수직을 유지하며 지반에 삽입되게 된다.In the secondary casing insertion step according to the embodiment of the present invention, the secondary casing 10b is inserted into the ground while maintaining its verticality in a precisely positioned state with the outer circumferential surface closely contacting the guide line 7 having a hole shape. do.

여기서, 제2차 케이싱(10b)은 서로 이웃한 제1차 파일(20a)의 단부를 절삭시켜 형성된 공간으로 제2차 케이싱(10b)의 양단부가 삽입되도록 하여 서로 이웃한 제1차 파일(20a)에 제2차 케이싱(10b)의 양단부가 중첩되면서 다수개의 제1차 파일(20a) 사이 공간이 다수개의 제2차 케이싱(10b)으로 메워지도록 하게 된다.Here, the secondary casing 10b is a space formed by cutting the ends of the neighboring primary piles 20a so that both ends of the secondary casing 10b are inserted into the space formed by cutting the neighboring primary piles 20a. ) Both ends of the secondary casing (10b) to overlap the space between the plurality of primary pile (20a) to a plurality of secondary casing (10b).

마지막으로, 제2차 파일 형성단계가 수행되는데, 이와 같은 제2차 파일 형성단계는 유동성을 가진 파일형성물질을 각각의 제2차 케이싱(10b) 내부에 충진시키고, 제2차 케이싱(10b)을 지반으로부터 인발하여 제거시켜 다수개의 제2차 파일이 형성되도록 하는 단계로서, 다수개의 제2차 파일(20b)이 다수개의 제1차 파일(20a)과 일체로 고화되면서 다수개의 제1차 파일(20a)과 다수개의 제2차 파일(20b)로 이루어지는 연속벽이 형성되게 된다.Finally, a secondary pile forming step is performed. The secondary pile forming step fills the fluid forming material having fluidity into each of the secondary casings 10b, and the secondary casing 10b. Drawing a plurality of secondary files by removing them from the ground to form a plurality of secondary files, wherein the plurality of secondary files 20b is solidified integrally with the plurality of primary files 20a A continuous wall consisting of 20a and a plurality of secondary piles 20b is formed.

이와 같은 본 발명에 따른 연속벽 시공방법을 이루는 제1차 케이싱 삽입단계, 제1차 파일 형성단계, 제2차 케이싱 삽입단계, 제2차 파일 형성단계의 상세한 작업과정은 본 출원인에 의해 기출원된 출원번호 제10-2008-0053413호 "겹 케이싱-파일 공법"에 서술되어 있다.The detailed operation of the first casing insertion step, the first pile forming step, the second casing insertion step and the second file forming step constituting the continuous wall construction method according to the present invention is described by the present applicant. Application No. 10-2008-0053413, entitled "Fold Casing-Pile Method".

상술한 바와 같은, 본 발명의 실시예에 따른 케이싱 설치공법 및 그를 이용한 연속벽 시공방법을 상기한 설명 및 도면에 따라 도시하였지만, 이는 예를 들어 설명한 것에 불과하며 본 발명의 기술적 사상을 벗어나지 않는 범위 내에서 다양한 변화 및 변경이 가능하다는 것을 이 분야의 통상적인 기술자들은 잘 이해할 수 있을 것이다.As described above, the casing installation method and the continuous wall construction method using the same according to the embodiment of the present invention have been shown in accordance with the above description and the drawings, but this is only an example and the scope does not depart from the spirit of the present invention. It will be apparent to those skilled in the art that various changes and modifications can be made therein.

도 1은 본 발명에 따른 케이싱 설치공법의 블록도;1 is a block diagram of a casing installation method according to the present invention;

도 2의 (a) 내지 (e)는 본 발명에 따른 케이싱 설치공법에서 분할모형 성형단계를 설명하기 위한 도면;Figure 2 (a) to (e) is a view for explaining the step of forming a split model in the casing installation method according to the present invention;

도 3은 본 발명의 실시예에 따른 케이싱 설치공법에서 안내공간 형성단계에서 형성된 안내공간을 보여주기 위한 도면;3 is a view showing a guide space formed in the guide space forming step in the casing installation method according to an embodiment of the present invention;

도 4는 본 발명의 실시예에 따른 케이싱 설치공법에서 결합경화제 주입단계에서 안내공간에 분할모형을 배치시킨 상태를 보여주기 위한 도면;Figure 4 is a view for showing a state in which the split model is placed in the guide space in the step of injecting the curing hardener in the casing installation method according to an embodiment of the present invention;

도 5는 본 발명의 실시예에 따른 케이싱 설치공법에서 결합경화제 주입단계에서 결합경화제가 주입된 안내공간을 보여주기 위한 도면;5 is a view showing a guide space in which the binder hardener is injected in the step of injecting the binder in the casing installation method according to an embodiment of the present invention;

도 6은 본 발명의 실시예에 따른 케이싱 설치공법에서 안내라인 형성단계에서 형성된 안내라인을 보여주기 위한 도면;6 is a view for showing a guide line formed in the guide line forming step in the casing installation method according to an embodiment of the present invention;

도 7은 본 발명에 따른 연속벽 시공방법의 블록도;7 is a block diagram of a continuous wall construction method according to the present invention;

도 8은 본 발명에 따른 연속벽 시공방법을 이루는 각 단계를 보여주기 위한 개략도이다.8 is a schematic view showing each step of forming a continuous wall construction method according to the present invention.

*도면의 주요부분에 대한 부호의 설명** Description of the symbols for the main parts of the drawings *

1 : 연속벽 전체단면 2a, 2b : 연속벽 분할단면1: Cross section of continuous wall 2a, 2b: Cross section of continuous wall

3a, 3b : 주형틀 4a, 4b : 캐비티3a, 3b: mold 4a, 4b: cavity

5a, 5b : 분할모형 6 : 안내공간5a, 5b: Split Model 6: Information Space

7 : 안내라인 8 : 콘크리트7: guide line 8: concrete

10a : 제1차 케이싱 10b : 제2차 케이싱10a: primary casing 10b: secondary casing

20a : 제1차 파일 20b : 제2차 파일20a: primary file 20b: secondary file

100 : 연속벽100: continuous wall

Claims (3)

지반에 연속해서 배치된 다수개의 케이싱(casing) 내부로 파일형성물질이 주입되어 성형된 파일이 연속체를 이루며 형성되는 연속벽을 시공하기 위하여, 다수개의 케이싱을 지반에 삽입하기 위한 케이싱 설치공법에 있어서,In the casing installation method for inserting a plurality of casings into the ground in order to construct a continuous wall in which pile forming material is injected into a plurality of casing (continuously arranged in the ground) formed by forming a continuous body formed in the casing , 다수개의 파일로 이루어진 연속벽의 전체단면 형상을 정해진 개수로 분할한 분할단면 형상과 동일한 단면형상을 가진 정해진 개수의 분할모형을 성형하는 분할모형 성형단계와;A split model molding step of molding a predetermined number of divided models having the same cross-sectional shape as a divided cross-sectional shape obtained by dividing the entire cross-sectional shape of the continuous wall composed of a plurality of piles into a predetermined number; 상기 다수개의 케이싱이 배치될 영역을 따라 지반을 상기 케이싱의 폭보다 넓은 폭으로 정해진 깊이까지 굴착하면서 굴착물을 제거하여 안내공간을 형성시키는 안내공간 형성단계와;A guide space forming step of forming a guide space by removing the excavation while excavating the ground along a region where the plurality of casings are to be disposed to a predetermined depth wider than the width of the casing; 상기 안내공간에 상기 분할모형을 위치시키고, 상기 안내공간으로 유동성이 있는 결합경화제를 주입하여 고화시키는 결합경화제 주입단계와;Placing the splitting model in the guide space, and injecting and solidifying the binding hardener having fluidity into the guide space; 상기 안내공간에 주입되어 고화된 상기 결합경화제로부터 상기 분할모형을 인발하여 제거시켜 상기 안내공간에 홀형상의 안내라인을 형성시키는 안내라인 형성단계를 포함하여,And a guide line forming step of forming a hole-shaped guide line in the guide space by drawing and removing the divided model from the bonding hardener which is injected into the guide space and solidified. 상기 다수개의 케이싱이 상기 안내라인에 의해 정위치되어 지반으로 삽입되도록 하는 것을 특징으로 하는 케이싱 설치공법.Casing installation method characterized in that the plurality of casing is positioned by the guide line is inserted into the ground. 제 1항에 있어서,The method of claim 1, 상기 분할모형은 다수개의 파일로 이루어진 연속벽의 전체단면 형상을 정해진 개수로 분할한 분할단면 형상과 동일한 단면 형상의 캐비티(cavity)가 형성된 주형틀에 유동성이 있는 분할모형 형성물질이 주입되어 고화되면서 형성되는 것을 특징으로 하는 케이싱 설치공법.The split model is solidified by injecting a fluid split model forming material into a mold formed with a cavity having the same cross-sectional shape as a divided cross-sectional shape obtained by dividing the entire cross-sectional shape of a continuous wall composed of a plurality of piles into a predetermined number. Casing installation method characterized in that formed. 지반에 연속해서 배치된 다수개의 케이싱(casing) 내부로 파일형성물질이 주입되어 성형된 파일이 연속체를 이루며 형성되는 연속벽을 시공하기 위한 연속벽 시공방법에 있어서,In the continuous wall construction method for constructing a continuous wall in which pile forming material is injected into a plurality of casing (casing) disposed continuously on the ground to form a continuous pile, 다수개의 파일로 이루어진 연속벽의 전체단면 형상을 정해진 개수로 분할한 분할단면 형상과 동일한 단면형상을 가진 정해진 개수의 분할모형을 성형하는 분할모형 성형단계와;A split model molding step of molding a predetermined number of divided models having the same cross-sectional shape as a divided cross-sectional shape obtained by dividing the entire cross-sectional shape of the continuous wall composed of a plurality of piles into a predetermined number; 상기 다수개의 케이싱이 배치될 영역을 따라 지반을 상기 케이싱의 폭보다 넓은 폭으로 정해진 깊이까지 굴착하면서 굴착물을 제거하여 안내공간을 형성시키는 안내공간 형성단계와;A guide space forming step of forming a guide space by removing the excavation while excavating the ground along a region where the plurality of casings are to be disposed to a predetermined depth wider than the width of the casing; 상기 안내공간에 상기 분할모형을 위치시키고, 상기 안내공간으로 유동성이 있는 결합경화제를 주입하여 고화시키는 결합경화제 주입단계와;Placing the splitting model in the guide space, and injecting and solidifying the binding hardener having fluidity into the guide space; 상기 안내공간에 주입되어 고화된 상기 결합경화제로부터 상기 분할모형을 인발하여 제거시켜 상기 안내공간에 홀형상의 안내라인을 형성시키는 안내라인 형성단계와;A guide line forming step of forming a hole-shaped guide line in the guide space by drawing and removing the divided model from the bonding hardener which is injected into the guide space and solidified; 다수개의 제1차 케이싱(casing)을 정해진 간격으로 이격시켜 지반에 삽입하 되, 상기 다수개의 제1차 케이싱이 각각 상기 안내라인에 정위치되면서 삽입되도록 하는 제1차 케이싱 삽입단계와;A first casing inserting step of inserting a plurality of first casings at a predetermined interval to be inserted into the ground, wherein the plurality of first casings are inserted while being positioned in the guide line; 유동성을 가진 파일형성물질을 각각의 제1차 케이싱 내부에 충진시키고 상기 제1차 케이싱을 지반으로부터 인발하여 제거시켜 정해진 간격으로 이격되게 배열되는 다수개의 제1차 파일(pile)이 형성되도록 하는 제1차 파일형성단계와;Filling fluid-forming material in each primary casing and removing the primary casing from the ground to form a plurality of primary piles arranged to be spaced apart at predetermined intervals. A primary file forming step; 서로 이웃한 제1차 파일 사이에 관형상으로 된 하나의 제2차 케이싱을 각각 삽입시키되, 상기 제2차 케이싱이 상기 안내라인에 정위치되면서 삽입되도록 하는 한편, 서로 이웃한 제1차 파일의 단부를 절삭시켜 형성된 공간으로 상기 제2차 케이싱의 양단부가 삽입되도록 하여 서로 이웃한 제1차 파일에 상기 제2차 케이싱의 양단부가 중첩되면서 다수개의 제1차 파일 사이 공간이 다수개의 제2차 케이싱으로 메워지도록 하는 제2차 케이싱 삽입단계와;Each of the secondary casings having a tubular shape is inserted between the neighboring primary piles, and the secondary casings are inserted while being positioned in the guide line. Both ends of the secondary casing are inserted into a space formed by cutting an end portion, so that both ends of the secondary casing overlap each other with the primary piles adjacent to each other, so that a plurality of secondary piles have a space between the primary piles. A second casing insertion step for filling the casing; 유동성을 가진 파일형성물질을 상기 각각의 제2차 케이싱 내부에 충진시키고 상기 제2차 케이싱을 지반으로부터 인발하여 제거시켜 다수개의 제2차 파일이 형성되도록 하는 제2차 파일형성단계를 포함하여, And a secondary pile forming step of filling a fluid forming pile material into each of the secondary casings and removing the secondary casings from the ground to form a plurality of secondary piles. 상기 제2차 파일형성단계에서 상기 다수개의 제2차 파일이 상기 다수개의 제1차 파일과 일체로 고화되면서 상기 다수개의 제1차 파일과 상기 다수개의 제2차 파일로 이루어지는 연속벽이 형성되는 것을 특징으로 하는 연속벽 시공방법.In the second file forming step, the plurality of secondary files are solidified integrally with the plurality of primary files, and a continuous wall including the plurality of primary files and the plurality of secondary files is formed. Continuous wall construction method characterized in that.
KR1020080054604A 2008-06-11 2008-06-11 Inserting method for casing and construction method for continuous wall thereof KR100864110B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020080054604A KR100864110B1 (en) 2008-06-11 2008-06-11 Inserting method for casing and construction method for continuous wall thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020080054604A KR100864110B1 (en) 2008-06-11 2008-06-11 Inserting method for casing and construction method for continuous wall thereof

Publications (1)

Publication Number Publication Date
KR100864110B1 true KR100864110B1 (en) 2008-10-16

Family

ID=40177204

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020080054604A KR100864110B1 (en) 2008-06-11 2008-06-11 Inserting method for casing and construction method for continuous wall thereof

Country Status (1)

Country Link
KR (1) KR100864110B1 (en)

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100927186B1 (en) 2009-03-24 2009-11-18 이규철 Method of constructing cantilevered continuous wallsfor retaining earth and cutting off water
KR101725735B1 (en) 2016-07-25 2017-04-11 트윈이엔지 주식회사 Excavate casing guide device for Excavator
CN107142931A (en) * 2017-06-19 2017-09-08 中冶成都勘察研究总院有限公司 A kind of jet grouting pile construction preexisting hole wall protecting method
KR101840226B1 (en) * 2016-10-28 2018-03-20 김도현 The guide holes of the form for soil auger dredges
KR20180062030A (en) 2016-11-30 2018-06-08 강성봉 Guide structure of pile and installation method using the same
CN110374100A (en) * 2019-05-31 2019-10-25 中山大学 A kind of antidumping anti-dropout steel bushing suitable for karst pile foundation construction
KR102301700B1 (en) 2021-02-15 2021-09-14 (주)희송지오텍 Partial Casing Installation Method
KR20220091308A (en) 2020-12-23 2022-06-30 에스제이토건(주) Excavate casing guide device for Excavator
KR102423227B1 (en) 2022-01-10 2022-07-19 이창일 Casing guide device for overlap pile construction
KR102442832B1 (en) 2022-02-23 2022-09-13 이창일 Casing guide device for overlap pile construction
KR102548904B1 (en) 2022-06-02 2023-06-29 오피건설 주식회사 Casing guide block for tilting facility and construction method of overlapping concrete pile using the same

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH07145615A (en) * 1993-11-24 1995-06-06 Kengi Kaihatsu Kk Construction method of column strip continuous underground wall
KR19990078704A (en) * 1999-07-30 1999-11-05 성학중 Method for sheet piling after pre-boring
KR20020046904A (en) * 2001-08-04 2002-06-21 김영길 A method of construction for the breast wall
KR100832490B1 (en) * 2006-12-29 2008-05-26 김광민 A foundation method of continuous and cut off wall by overlap casing

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH07145615A (en) * 1993-11-24 1995-06-06 Kengi Kaihatsu Kk Construction method of column strip continuous underground wall
KR19990078704A (en) * 1999-07-30 1999-11-05 성학중 Method for sheet piling after pre-boring
KR20020046904A (en) * 2001-08-04 2002-06-21 김영길 A method of construction for the breast wall
KR100832490B1 (en) * 2006-12-29 2008-05-26 김광민 A foundation method of continuous and cut off wall by overlap casing

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100927186B1 (en) 2009-03-24 2009-11-18 이규철 Method of constructing cantilevered continuous wallsfor retaining earth and cutting off water
KR101725735B1 (en) 2016-07-25 2017-04-11 트윈이엔지 주식회사 Excavate casing guide device for Excavator
KR101840226B1 (en) * 2016-10-28 2018-03-20 김도현 The guide holes of the form for soil auger dredges
KR20180062030A (en) 2016-11-30 2018-06-08 강성봉 Guide structure of pile and installation method using the same
CN107142931A (en) * 2017-06-19 2017-09-08 中冶成都勘察研究总院有限公司 A kind of jet grouting pile construction preexisting hole wall protecting method
CN110374100A (en) * 2019-05-31 2019-10-25 中山大学 A kind of antidumping anti-dropout steel bushing suitable for karst pile foundation construction
KR20220091308A (en) 2020-12-23 2022-06-30 에스제이토건(주) Excavate casing guide device for Excavator
KR102301700B1 (en) 2021-02-15 2021-09-14 (주)희송지오텍 Partial Casing Installation Method
KR102423227B1 (en) 2022-01-10 2022-07-19 이창일 Casing guide device for overlap pile construction
KR102442832B1 (en) 2022-02-23 2022-09-13 이창일 Casing guide device for overlap pile construction
KR102548904B1 (en) 2022-06-02 2023-06-29 오피건설 주식회사 Casing guide block for tilting facility and construction method of overlapping concrete pile using the same

Similar Documents

Publication Publication Date Title
KR100864110B1 (en) Inserting method for casing and construction method for continuous wall thereof
KR100939535B1 (en) Guide for execution of underground diaphragm wall
KR100927186B1 (en) Method of constructing cantilevered continuous wallsfor retaining earth and cutting off water
KR20160088059A (en) CFT pile Construction Method and the Shoring Method using the same file
KR20180124795A (en) An Earth Retaining Wall with Underground Buttresses and A Method of Constructing the same
JP6186267B2 (en) How to build an underground tunnel
KR100850028B1 (en) Construction method using concrete mould for concrete piles cast in position
KR101840226B1 (en) The guide holes of the form for soil auger dredges
KR102113291B1 (en) Soil retaining wall using phc pile and construction method thererof
KR100849226B1 (en) C.i.p temporary wall and method for constructing thereof
KR102382034B1 (en) Construction method of continuous cut off wall
JP2005068710A (en) Form block for wall, and wall structure, and method for constructing subterranean structure
KR101275468B1 (en) The structure assembly for building a tunnel and building method thereof
JP6307136B2 (en) Open shield method
JP2018053466A (en) Open shield method
KR20210146507A (en) Apparatus of guide casing for a ground excavator
KR101219451B1 (en) Concrete structure and construction method for the same, constructing method of underground wall as a retaining structural wall used in the same
KR20230122728A (en) CIP method using vertical guide casing
KR100654973B1 (en) Earth Retaining Wall Structure Using Precast Concrete Pile and Construction Method Thereof
JPS6011178B2 (en) How to install standard piles for continuous underground wall construction
KR200354672Y1 (en) Wall Structure by Steel-column Pile Recovery Process
KR101219452B1 (en) Concavo-convex member for wall structure and construction method for wall used in the same
KR20190142492A (en) PHC pile to facilitate soil guard and construction method of soil guard structure using the same
KR102610909B1 (en) Method and structure of steel pipe propulsion using anchor installation inside steel pipe to prevent sinking
JP4322688B2 (en) Construction method of large section tunnel

Legal Events

Date Code Title Description
A201 Request for examination
A302 Request for accelerated examination
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20121010

Year of fee payment: 5

FPAY Annual fee payment

Payment date: 20131002

Year of fee payment: 6

FPAY Annual fee payment

Payment date: 20141001

Year of fee payment: 7

FPAY Annual fee payment

Payment date: 20151210

Year of fee payment: 8

FPAY Annual fee payment

Payment date: 20161010

Year of fee payment: 9

FPAY Annual fee payment

Payment date: 20170810

Year of fee payment: 10

J206 Request for trial to confirm the scope of a patent right
J301 Trial decision

Free format text: TRIAL NUMBER: 2020100001802; TRIAL DECISION FOR CONFIRMATION OF THE SCOPE OF RIGHT_DEFENSIVE REQUESTED 20200615

Effective date: 20201106

J302 Written judgement (patent court)

Free format text: TRIAL NUMBER: 2020200007456; JUDGMENT (PATENT COURT) FOR CONFIRMATION OF THE SCOPE OF RIGHT_DEFENSIVE REQUESTED 20201209

Effective date: 20210813