KR100659470B1 - Bridge bearing for preventing upper-slab from falling and construction method thereof - Google Patents

Bridge bearing for preventing upper-slab from falling and construction method thereof Download PDF

Info

Publication number
KR100659470B1
KR100659470B1 KR1020040111727A KR20040111727A KR100659470B1 KR 100659470 B1 KR100659470 B1 KR 100659470B1 KR 1020040111727 A KR1020040111727 A KR 1020040111727A KR 20040111727 A KR20040111727 A KR 20040111727A KR 100659470 B1 KR100659470 B1 KR 100659470B1
Authority
KR
South Korea
Prior art keywords
bridge
bolt
iron plate
insertion hole
plate
Prior art date
Application number
KR1020040111727A
Other languages
Korean (ko)
Other versions
KR20060072934A (en
Inventor
이계근
Original Assignee
신특수건설 주식회사
이계근
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 신특수건설 주식회사, 이계근 filed Critical 신특수건설 주식회사
Priority to KR1020040111727A priority Critical patent/KR100659470B1/en
Publication of KR20060072934A publication Critical patent/KR20060072934A/en
Application granted granted Critical
Publication of KR100659470B1 publication Critical patent/KR100659470B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • E01D19/04Bearings; Hinges
    • E01D19/041Elastomeric bearings
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D22/00Methods or apparatus for repairing or strengthening existing bridges ; Methods or apparatus for dismantling bridges
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16FSPRINGS; SHOCK-ABSORBERS; MEANS FOR DAMPING VIBRATION
    • F16F15/00Suppression of vibrations in systems; Means or arrangements for avoiding or reducing out-of-balance forces, e.g. due to motion
    • F16F15/02Suppression of vibrations of non-rotating, e.g. reciprocating systems; Suppression of vibrations of rotating systems by use of members not moving with the rotating systems
    • F16F15/04Suppression of vibrations of non-rotating, e.g. reciprocating systems; Suppression of vibrations of rotating systems by use of members not moving with the rotating systems using elastic means

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Acoustics & Sound (AREA)
  • Aviation & Aerospace Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

본 발명의 하중전달과 변형흡수를 위해 교량상판과 교각 또는 교대 사이에 설치되는 교좌장치에서 집중호우, 태풍, 지진 등에 의해 유발되는 상향력에 저항하여 교량상판의 낙교를 방지함은 물론 기존 교량에도 용이하게 교체 설치하여 보수보강할 수 있도록 한 낙교방지를 위한 교량 교좌장치 및 이를 이용한 교량 보수보강방법에 관한 것이다.In the bridge device installed between the bridge deck and the bridge or shift for load transfer and deformation absorption of the present invention, it prevents falling of the bridge deck by resisting upward force caused by heavy rain, typhoon, earthquake, etc. A bridge bridge device for preventing falling bridges and a bridge reinforcing method using the same, which can be easily replaced and repaired.

본 발명은 상부철판, 탄성받침 및 하부철판으로 구성된 교량 교좌장치에서 상부철판, 탄성받침 및 하부철판을 연결 구속하는 볼트를 더 포함하여 구성되는 것을 특징으로 한다. 이를 위해 본 발명은 볼트삽입홀이 형성된 상부철판; 볼트삽입홀이 형성된 하부철판; 상기 상부철판과 하부철판 사이에 놓여지며, 볼트삽입홀이 형성된 탄성받침; 상기 상부철판, 하부철판 및 탄성받침의 볼트삽입홀에 삽입 설치되는 것으로 하단부가 상기 하부철판 아래로 돌출되는 볼트; 및, 상기 돌출된 볼트의 하단부를 여유있게 수용하면서 상기 하부철판의 볼트삽입홀을 덮도록 하부철판에 고정 설치되는 하부캡;을 포함하여 구성되되, 상기 탄성받침 및 하부철판의 볼트삽입홀은 볼트의 직경보다 큰 크기를 가지는 것을 특징으로 하는 낙교방지를 위한 교량 교좌장치를 제공한다.The present invention is characterized in that it further comprises a bolt for connecting and restraining the upper steel plate, the elastic support and the lower iron plate in the bridge bridge device consisting of the upper plate, the elastic support and the lower plate. To this end, the present invention is the upper iron plate formed with a bolt insertion hole; A lower iron plate having a bolt insertion hole formed therein; An elastic bearing placed between the upper iron plate and the lower iron plate and having a bolt insertion hole formed therein; A bolt having a lower end protruding below the lower iron plate to be inserted into the upper steel plate, the lower iron plate, and the bolt insertion hole of the elastic bearing; And a lower cap fixedly installed on the lower iron plate to cover the bolt insertion hole of the lower iron plate while accommodating the lower end of the protruding bolt with a margin. The elastic support and the bolt insertion hole of the lower iron plate are bolts. It provides a bridge bridge for preventing falling bridge, characterized in that having a size larger than the diameter of.

낙교, 교좌장치, 볼트, 상향력, 교량Bridge, bridge, bolt, uplift, bridge

Description

낙교방지를 위한 교량 교좌장치 및 이를 이용한 교량 보수보강방법{Bridge bearing for preventing upper-slab from falling and construction method thereof} Bridge bearing for preventing upper bridge and bridge reinforcement method using same             

도 1은 종래의 교량 교좌장치를 도시한 도면이다.1 is a view showing a conventional bridge bridge device.

도 2 내지 도 4는 본 발명의 낙교방지를 위한 교량 교좌장치의 실시예를 도시한 분해사시도이다.2 to 4 is an exploded perspective view showing an embodiment of a bridge bridge device for preventing falling of the present invention.

도 5 내지 도 7은 본 발명의 낙교방지를 위한 교량 교좌장치가 설치된 상태를 도시한 설치단면도이다. 5 to 7 is an installation cross-sectional view showing a state in which the bridge bridge device for preventing falling of the present invention is installed.

도 8 및 도 9는 본 발명의 낙교방지를 위한 교량 교좌장치의 작용 상태를 도시한 단면도이다.8 and 9 are cross-sectional views showing the operating state of the bridge bridge device for preventing falling of the present invention.

도 10은 본 발명의 낙교방지를 위한 교량 교좌장치를 이용한 교량 보수보강방법을 도시한 순서도이다.10 is a flowchart illustrating a bridge maintenance reinforcement method using a bridge bridge device for preventing falling of the present invention.

<도면의 주요부분에 대한 부호의 설명><Description of the symbols for the main parts of the drawings>

10: 상부철판 20: 탄성받침10: upper plate 20: elastic bearing

21: 간격재 30: 하부철판21: spacer 30: lower plate

10a, 20a, 30a: 볼트삽입홀10a, 20a, 30a: bolt insertion hole

40: 볼트 45: 볼트머리40: bolt 45: bolt head

50: 너트 60: 하부캡50: nut 60: lower cap

70: 상부캡 80: 그리스70: upper cap 80: grease

B: 교량상판 C: 교각 혹은 교대B: bridge deck C: bridge or shift

H: 천공홀 M: 받침몰탈H: Drilling hole M: Support mortar

본 발명은 낙교방지를 위한 교량 교좌장치 및 이를 이용한 교량 보수보강방법에 관한 것으로, 더욱 상세하게는 하중전달과 변형흡수를 위해 교량상판과 교각 또는 교대 사이에 설치되는 교좌장치에서 집중호우, 태풍, 지진 등에 의해 유발되는 상향력에 저항하여 교량상판의 낙교를 방지함은 물론 기존 교량에도 용이하게 교체 설치하여 보수보강할 수 있도록 한 낙교방지를 위한 교량 교좌장치 및 이를 이용한 교량 보수보강방법에 관한 것이다.The present invention relates to a bridge bridge device for preventing falling bridges and a bridge reinforcement method using the same, and more specifically, in the bridge device installed between the bridge deck and bridge or bridge for load transfer and deformation absorption, heavy rain, typhoon, The present invention relates to a bridge bridge device for preventing falling bridges and to a bridge reinforcing method using the same, which prevents the fall of bridge decks by preventing an upward force caused by an earthquake. .

교량에서 상부구조인 교량상판(슬래브)과 하부구조인 교각 또는 교대 사이에는 교좌장치를 설치하게 되는데, 이는 상부구조에 작용하는 하중을 하부구조에 전달하고, 온도, 건조수축, 크리프(creep)와 활하중의 이동과 회전으로 인하여 발생하는 상부구조의 변위, 변형을 원활하게 함으로써 교량내에 발생하는 2차응력을 최 소화하기 위함이다. In the bridge, a bridge device is installed between the superstructure bridge (slab) and the substructure pier or shift, which transmits the load acting on the superstructure to the substructure, and the temperature, dry shrinkage, creep and This is to minimize the secondary stress generated in the bridge by smoothing the displacement and deformation of the superstructure caused by the movement and rotation of the live load.

상기와 같은 역할을 수행하는 교좌장치로는 상부철판, 하부철판 및 상기 상부철판과 하부철판 사이에 위치하는 탄성받침으로 구성되는 탄성받침 교좌장치가 있다. 즉, 탄성받침 교좌장치는 상부철판과 하부철판은 각각 교량의 상부구조와 하부구조에 고정 설치되며, 그 사이에 위치하는 탄성받침이 상부구조에 작용하는 하중을 하부구조에 효율적으로 전달시키고 구조물의 변형(신축, 회전)을 고무의 전단변형 및 탄성변형에 의하여 흡수시키는 구조로 되어 있다. 도 1은 대표적인 탄성받침 교좌장치가 도시된 도면이다. As a teaching apparatus for performing the above role, there is an elastic bearing apparatus consisting of an upper plate, a lower plate and an elastic bearing positioned between the upper plate and the lower plate. That is, in the elastic support bridge device, the upper steel plate and the lower steel plate are fixedly installed on the upper structure and the lower structure of the bridge, respectively, and the elastic support positioned therebetween efficiently transfers the load acting on the upper structure to the lower structure and It is a structure in which deformation (stretching and rotation) is absorbed by shear deformation and elastic deformation of rubber. 1 is a view showing a representative elastic bearing device.

도 1의 교좌장치는 상·하부철판에 쐐기가 더 접합된 것으로, 상기 쐐기는 상·하부철판에 접합되어 상호 걸림작용에 의해 수평방향(교축 및/또는 교축직각방향)의 변위를 제어하는 역할을 한다. 이와 같은 도 1의 교좌장치는 상·하부철판이 분리되는 구조를 이루기 때문에, 집중호우, 태풍, 지진 등에 의해 상향력이 작용하여 허용변위량을 초과하는 경우에는 교량상판이 인발하게 되고 인발시 상호 걸려있던 쐐기가 그 걸림범위를 벗어날 우려가 있으며 이는 곧 교량상판이 낙교되는 문제로 이어진다.1, the wedge is further bonded to the upper and lower iron plate, the wedge is bonded to the upper and lower iron plate to control the displacement in the horizontal direction (orthogonal and / or orthogonal direction) by the interlocking action Do it. Since the bridge device of FIG. 1 forms a structure in which the upper and lower steel plates are separated, when the upward force acts due to a heavy rain, a typhoon or an earthquake, and the allowable displacement exceeds the allowable displacement, the bridge deck is pulled out and caught when drawn. The wedge may be out of range, leading to the bridge deck falling off.

이와 같은 도 1의 교좌장치가 갖는 문제를 개선하고자 탄성받침 중앙에 복원력이 우수한 납심을 삽입한 납면진받침(Lead Rubber Bearing)이 제안된 바 있다. 그러나 납심은 지진력의 감쇠기능을 부담하는 것에 불과하므로 납면진받침을 채용 한 교좌장치라 하더라도 여전히 납면진받침은 상·하부철판과 분리되기 때문에 낙교방지가 원천적으로 해결되는 것은 아니다. 다시 말해 소규모의 지진이나 풍하중과 같은 단기하중이 작용하는 경우에는 납심이 초기강성으로 이를 제어하고 온도변화와 같이 장기하중이 작용하는 경우에는 납심의 항복으로 이를 제어할 수 있으나, 집중하중, 태풍, 강진 등에 의하여 상향력이 작용하여 허용변위량을 초과하는 경우에까지 교량상판이 인발하여 낙교되는 것을 억제하기는 어렵다.In order to improve the problem of the apparatus of FIG. 1, a lead rubber bearing having a lead core having excellent restoring force in the center of the elastic bearing has been proposed. However, because the lead core only bears the damping function of seismic force, even if the device adopts the lead isolation bearing, the lead isolation is still separated from the upper and lower steel plates, so prevention of stigma is not fundamentally solved. In other words, in the case of short-term loads such as small earthquakes or wind loads, the lead core can be controlled to initial stiffness, and in the case of long-term loads such as temperature changes, it can be controlled by yielding the lead core. It is difficult to prevent the bridge deck from being pulled out and failed until the upward force acts due to the earthquake or the like and exceeds the allowable displacement amount.

이에, 본 발명자는 상향력이 작용하는 경우 교량상판이 인발하여 낙교되는 것을 원천적으로 봉쇄하기 위해 탄성받침 교좌장치에서 상·하부철판과 탄성받침이 일체화된 교좌장치를 개발하게 되었다.Thus, the inventors have developed a bridge device in which the upper and lower steel plates and the elastic bearing are integrated in the elastic bearing bridge device to block the bridge top plate from being pulled out when the upward force is applied.

본 발명은 상기한 종래의 문제점을 개선하고자 안출된 것으로서, 하중전달과 변형흡수를 위해 교량상판과 교각 또는 교대 사이에 설치되는 교좌장치에서 상·하부철판을 연결 구속하는 볼트를 구비함으로써 집중호우, 태풍, 지진 등에 의해 유발되는 상향력에 저항하여 교량상판의 낙교를 방지하고 볼트의 유동공간를 확보함으로써 수평 및 회전변위에 저항하도록 한 교량 교좌장치를 제공하는데 그 목적이 있다.The present invention has been made to improve the above-mentioned conventional problems, by providing a heavy rain, bolts for connecting and restraining the upper and lower iron plate in the bridge device installed between the bridge top plate and the bridge or alternator for load transfer and deformation absorption, The object of the present invention is to provide a bridge bridge device that resists horizontal and rotational displacement by preventing the fall of bridge decks and securing the flow space of bolts against the upward force caused by typhoons and earthquakes.

본 발명의 다른 목적은 기존 교량에도 용이하게 교체 설치하여 보수보강할 수 있도록 한 낙교방지를 위한 교량 교좌장치를 이용한 보수보강방법을 제공하는 것이다.
Another object of the present invention is to provide a reinforcement reinforcement method using a bridge bridge device for preventing falling bridge to easily replace and install the existing bridges.

상기한 목적에 달성하고자 본 발명은 하중전달과 변형흡수를 위해 교량상판과 교각 또는 교대 사이에 설치되는 교좌장치에서, 볼트삽입홀이 형성된 상부철판; 볼트삽입홀이 형성된 하부철판; 상기 상부철판과 하부철판 사이에 놓여지며, 볼트삽입홀이 형성된 탄성받침; 상기 상부철판, 하부철판 및 탄성받침의 볼트삽입홀에 삽입 설치되는 것으로 하단부가 상기 하부철판 아래로 돌출되는 볼트; 및, 상기 돌출된 볼트의 하단부를 여유있게 수용하면서 상기 하부철판의 볼트삽입홀을 덮도록 하부철판에 고정 설치되는 하부캡;을 포함하여 구성되되, 상기 탄성받침 및 하부철판의 볼트삽입홀은 볼트의 직경보다 큰 크기를 가지는 것을 특징으로 하는 낙교방지를 위한 교량 교좌장를 위한 교량 교좌장치를 제공한다. In order to achieve the above object, the present invention is a bridge device installed between the bridge top plate and the bridge or alternator for load transfer and deformation absorption, the upper plate is formed with a bolt insertion hole; A lower iron plate having a bolt insertion hole formed therein; An elastic bearing placed between the upper iron plate and the lower iron plate and having a bolt insertion hole formed therein; A bolt having a lower end protruding below the lower iron plate to be inserted into the upper steel plate, the lower iron plate, and the bolt insertion hole of the elastic bearing; And a lower cap fixedly installed on the lower iron plate to cover the bolt insertion hole of the lower iron plate while accommodating the lower end of the protruding bolt with a margin. The elastic support and the bolt insertion hole of the lower iron plate are bolts. It provides a bridge bridge device for the bridge bridge for preventing falling falls, characterized in that having a size larger than the diameter of.

상기 탄성받침 및 하부철판의 볼트삽입홀은 볼트의 직경보다 큰 크기의 장방형으로 형성되도록 하는 것이 바람직하다. 상기 하부캡 내에는 그리스가 주입될 수 있다. 상기 탄성받침의 볼트삽입홀에는 간격재가 구비될 수 있으며, 상기 볼트는 그 하단에 나사산이 형성되고 상기 볼트 하단의 나사산과 체결하는 것으로 하부철판의 볼트삽입홀보다 큰 크기를 가지며 반구형상으로 형성된 너트를 더 포함하여 구성될 수 있다.The bolt insertion hole of the elastic support and the lower iron plate is preferably formed to have a rectangular shape larger than the diameter of the bolt. Grease may be injected into the lower cap. A spacer may be provided in the bolt insertion hole of the elastic support, and the bolt has a screw thread formed at a lower end thereof, and is fastened with a screw thread at the lower end of the bolt to have a larger size than the bolt insertion hole of the lower steel plate and has a hemispherical nut. It may be configured to include more.

상기 상부철판의 볼트삽입홀과 상기 볼트 상단에는 나사산이 형성되어 서로 나사체결하는 구성으로 이루어지거나, 상기 볼트는 그 상단부가 상부철판 위로 돌출되고 상기 상부철판 위로 돌출된 볼트의 상단부을 덮으면서 상부철판에 고정 설치되는 상부캡을 더 포함하여 구성되되 상기 상부캡 내에는 그리스가 주입되도록 구성할 수 있다.The bolt insertion hole of the upper steel plate and the upper end of the bolt is formed of a screw thread is formed in the configuration, or the bolt is formed on the upper iron plate while the upper end of the upper projecting over the upper steel plate and covering the upper end of the bolt protruding over the upper steel plate It is configured to further include a fixed upper cap, but may be configured to inject grease into the upper cap.

또한, 본 발명은 이미 구축된 슬래브교량에서 하중전달과 변형흡수를 위해 교량상판과 교각 또는 교대 사이에 교좌장치를 설치하여 교량을 보수 보강함에, 교량상판을 인상하는 단계; 교좌장치가 설치되는 위치의 교량상판을 상부 또는 하부에서 천공하여 교량상판 하부면에 천공홀을 형성시키는 단계; 상기 교량 교좌장치를 설치하되, 볼트가 상기 교량상판의 천공홀까지 연장 삽입되도록 교각 또는 교대 위에 위치시키는 단계; 교량상판을 인하하여 안착시키는 단계; 교각 또는 교대 위 하부철판 아래로 받침몰탈을 타설하여 상기 교량 교좌장치의 하부캡을 매립시키는 단계; 및, 교량상판의 천공홀에 에폭시를 주입하는 단계;를 포함하여 이루어지는 낙교방지를 위한 교량 교좌장치를 이용한 교량 보수보강방법을 제공한다.In addition, the present invention is to install a bridge device between the bridge deck and the bridge or bridge for load transfer and deformation absorption in the already built slab bridge to raise and strengthen the bridge, raising the bridge deck; Forming a hole in the lower surface of the bridge plate by drilling a bridge top plate at a position where the bridge device is installed; Installing the bridge bridge device, and placing a bolt on the bridge or the shift so that the bolt is extended to the drilling hole of the bridge deck; Lowering and seating the bridge deck; Embedding a bottom mortar under the lower steel plate above the bridge or shift to fill the lower cap of the bridge bridge device; And, injecting epoxy into the boring hole of the bridge deck, and providing a bridge repair and reinforcement method using a bridge bridge device for preventing falling.

이하, 본 발명을 첨부한 도면과 실시예에 따라 상세히 설명한다.Hereinafter, the present invention will be described in detail with reference to the accompanying drawings and examples.

본 발명은 도 2에서 도시한 바와 같이 상부철판(10), 탄성받침(20) 및 하부철판(30)으로 구성된 교량 교좌장치에서 상부철판, 탄성받침 및 하부철판을 연결 구속하는 볼트(40)를 더 포함하여 구성되는 것을 특징으로 한다. The present invention, as shown in Figure 2 in the bridge bridge device consisting of the upper iron plate 10, the elastic support 20 and the lower iron plate 30, the bolt 40 for connecting and restraining the upper iron plate, the elastic support and the lower iron plate It is characterized in that it further comprises.

상부철판(10)은 교량상판에 고정 설치되어 교량상판(B)에 변위가 발생하면 상부철판(10)도 따라 변위가 발생하는 것으로, 볼트삽입홀(10a)이 형성되어 볼트(40)가 삽입된다. 상기 볼트(40)는 상부철판(10)에 고정단 또는 자유단으로 구속 된다. 다만, 상기 상부철판의 볼트삽입홀(10a)에 볼트(40)가 자유단으로 구속되면 그 형상은 후술하는 탄성받침의 볼트삽입홀(20a)과 동일하게 형성시킨다.The upper steel plate 10 is fixedly installed on the bridge top plate, and when the displacement occurs in the bridge top plate B, the displacement occurs along the upper steel plate 10, and the bolt insertion hole 10a is formed to insert the bolt 40. do. The bolt 40 is constrained by the fixed end or the free end to the upper plate 10. However, when the bolt 40 is constrained to the free end of the bolt insertion hole 10a of the upper iron plate, the shape thereof is formed in the same manner as the bolt insertion hole 20a of the elastic support described later.

본 발명의 교좌장치의 배치위치에 따른 요구성능(교좌장치의 가동여부 및 가동방향)을 고려하면 상부철판(10)의 저면에 도 3에서와 같이 쐐기(12)를 더 접합할 수 있다. 상기 상부철판의 쐐기(12)는 후술하는 하부철판의 쐐기(32)와 함께 작용하여 수평방향의 변위를 제어하는 역할을 한다. Considering the required performance according to the arrangement position of the teaching apparatus of the present invention (whether the movement of the teaching apparatus and the moving direction), the wedge 12 can be further bonded to the bottom of the upper steel plate 10 as shown in FIG. The wedge 12 of the upper iron plate acts together with the wedge 32 of the lower iron plate to be described later serves to control the displacement in the horizontal direction.

상부철판(10)의 상면에는 스터드볼트(11)가 접합되며, 도 5와 같이 이를 교량상판(B)에 매립시키는 방법으로 상부철판(10)을 고정 설치하게 된다. 다만 기존 교량에 설치하는 경우에는 도 6 및 도 7에서와 같이 상부철판에 스터드 볼트가 접합되는 것을 생략될 수 있는데 이 경우에는 몰탈 및 에폭시 또는 용접 등의 방법으로 고정 설치한다. 도 6은 교량상판(B) 하부에 기설치된 플레이트(P)에 용접을 통해 교좌장치를 설치한 상태를 도시하고 있고, 도 7은 교량상판(B) 하부에 천공하고 몰탈로 바른 후 에폭시(90)를 주입하여 교좌장치를 설치한 상태를 도시하고 있다. The stud bolt 11 is bonded to the upper surface of the upper iron plate 10, and the upper iron plate 10 is fixedly installed by embedding it in the bridge upper plate (B) as shown in FIG. However, in the case of installing in the existing bridge, it can be omitted that the stud bolt is bonded to the upper iron plate, as shown in Figure 6 and 7 in this case, it is fixed by the method of mortar and epoxy or welding. FIG. 6 illustrates a state in which a bridge device is installed by welding to a plate P installed in a lower portion of the bridge upper plate B. FIG. 7 shows an epoxy 90 after drilling and mortaring the lower portion of the bridge upper plate B. ) Shows a state where the teaching device is installed.

하부철판(30)은 교각 또는 교대(C)에 고정 설치되는 것으로, 상기 상부철판(10)과 마찬가지로 볼트삽입홀(30a)이 형성되어 볼트(40)가 삽입된다. 상기 볼트(40)는 하부철판(30)에 고정단 또는 자유단으로 구속된다. 다만, 상기 하부철판의 볼트삽입홀(30a)에 볼트(40)가 자유단으로 구속되면 그 형상은 후술하는 탄성받침의 볼트삽입홀(20a)과 동일하게 형성시킨다. The lower iron plate 30 is to be fixed to the pier or alternating (C), the bolt insertion hole (30a) is formed in the same way as the upper iron plate 10, the bolt 40 is inserted. The bolt 40 is fixed to the lower iron plate 30 by a fixed end or a free end. However, when the bolt 40 is constrained to the free end of the bolt insertion hole 30a of the lower iron plate, the shape thereof is formed in the same manner as the bolt insertion hole 20a of the elastic support described later.

도 3에서와 같이 하부철판(30)의 상면에도 상부철판(10)에 접합된 쐐기(11) 와 대응하는 쐐기(32)가 더 접합될 수 있다. 하부철판(30)의 저면에는 스터드볼트(31)가 접합되며 이를 교대 또는 교각(C)에 매립시킴으로써 하부철판(10)은 교각 또는 교대(C)에 고정 설치하게 된다.As shown in FIG. 3, the wedge 11 and the wedge 32 corresponding to the upper iron plate 10 may be further bonded to the upper surface of the lower iron plate 30. The stud bolt 31 is bonded to the bottom of the lower iron plate 30, and the lower iron plate 10 is fixed to the pier or alternator C by being embedded in the alternating or pier C.

탄성받침(20)은 상기 상부철판(10) 및 하부철판(30) 사이에 놓여지는 것으로, 교량상판(B)의 충격하중을 흡수하여 하부구조로 전달되지 못하도록 하는 역할을 한다. 탄성받침(20)에는 볼트삽입홀(20a)이 형성되어 상·하부철판(10, 30)과 함께 볼트(40)가 삽입된다. 상기 탄성받침(20)으로는 보강판과 고무(네오프렌)가 적층되어 형성된 탄성받침을 채택 적용하는 것이 바람직하다. 보강판이 고무의 변형을 구속하여 내하력을 증대시키고 연직하중을 지지하여 팽창량을 줄일 수 있기 때문이다.The elastic bearing 20 is placed between the upper iron plate 10 and the lower iron plate 30, and serves to absorb the impact load of the bridge upper plate B and prevent it from being transferred to the lower structure. The elastic support 20 has a bolt insertion hole 20a formed therein so that the bolt 40 is inserted together with the upper and lower iron plates 10 and 30. As the elastic support 20, it is preferable to adopt an elastic support formed by stacking a reinforcing plate and rubber (neoprene). This is because the reinforcing plate can restrain the deformation of the rubber to increase the load capacity and to support the vertical load to reduce the amount of expansion.

상기 탄성받침(20)에는 볼트삽입홀(20a)이 형성되는데, 상기 볼트삽입홀(20a)은 볼트와 동일하게 원형단면으로 제작되며, 다만 교좌장치의 배치위치에 따른 요구성능을 고려하여 그 크기와 형상을 달리 제작할 수도 있다. 즉, 교좌장치는 배치위치에 따라 교축 및/또는 교축의 직각방향의 가동가능여부가 결정될 수 있는데, 일방향 가동의 교좌장치의 경우에는 볼트삽입홀(20a)을 가동방향으로 장방형이 되도록 형성시키고 양방향 가동의 교좌장치의 경우에는 볼트삽입홀(20a)을 십자형으로 형성시켜 교좌장치의 가동가능여부 및 가동방향에 따라 적절히 대응할 수 있도록 한다. The elastic support 20 is formed with a bolt insertion hole (20a), the bolt insertion hole (20a) is made of a circular cross-section similar to the bolt, but the size in consideration of the required performance according to the arrangement position of the teaching device You can also produce different shapes. That is, whether or not the teaching apparatus is movable in the perpendicular direction of the teaching shaft and / or the teaching shaft according to the arrangement position, in the case of the teaching apparatus of the one-way operation, the bolt insertion hole 20a is formed to be rectangular in the movable direction and bidirectional. In the case of a movable chair device, the bolt insertion hole 20a is formed in a cross shape so as to correspond appropriately depending on whether the chair device is movable and the moving direction.

상기 탄성받침의 볼트삽입홀(20a)은 통상의 탄성받침을 천공한 후 고무관을 삽입하여 형성시킬 수 있으며 나아가 도 2에서와 같이 볼트삽입홀(20a)에는 간격재(21)가 더 구비될 수 있는데 상기 간격재(21)는 볼트삽입홀(20a) 내에서의 볼트(40)의 설치유관을 확보하여 볼트(40)의 이동을 자유롭게 하기 위함이다.The bolt insertion hole 20a of the elastic support may be formed by inserting a rubber tube after punching the ordinary elastic support, and further, a spacer 21 may be further provided in the bolt insertion hole 20a as shown in FIG. 2. The spacer 21 is to free the movement of the bolt 40 by securing the installation pipe of the bolt 40 in the bolt insertion hole 20a.

볼트(40)는 상기 상·하부철판(10, 30)과 탄성받침(20)에 형성된 볼트삽입홀(10a, 20a, 30a)에 삽입 설치되어 이들을 하나로 연결 구속하면서 집중하중, 태풍, 지진 등의 상향력이 작용하는 경우 교량상판의 인발을 억제하는 역할을 한다. 이에 본 발명의 교좌장치가 교량상판(B)과 교대 또는 교각(C) 사이에 설치되면, 볼트(40)의 구속으로 교좌장치의 구성요소(상·하부철판, 탄성받침)는 일체화됨으로써 교각 또는 교대(C)와 교량상판(B) 또한 일체화되며 그 결과 교량상판(B)의 낙교 위험이 제거된다. 아울러 상기 볼트(40)는 상·하부철판(10, 30) 중 어느 하나 이상과 고정 결합되지 않은 자유단 상태를 유지하므로 탄성받침의 볼트삽입홀(20a) 내에서 수평변위 혹은 회전변위의 발생에 따라 이동하면서 이를 저항하게 된다. 도 8 및 도 9는 각각 수평변위 및 회전변위의 따라 볼트(40)가 저항하는 상태가 도시되어 있다.Bolt 40 is inserted into the bolt insertion holes (10a, 20a, 30a) formed in the upper and lower iron plates (10, 30) and the elastic support 20 is connected to each other constrained, such as concentrated load, typhoon, earthquake, etc. If the upward force acts to inhibit the drawing of the bridge deck. Thus, when the bridge device of the present invention is installed between the bridge plate (B) and the alternating or bridge (C), the components of the bridge device (upper, lower steel plate, elastic bearing) by the restriction of the bolt 40 is integrated to the bridge or The alternation (C) and the bridge deck (B) are also integrated, thereby eliminating the risk of falling on the bridge deck (B). In addition, since the bolt 40 maintains a free end state that is not fixedly coupled to any one or more of the upper and lower iron plates 10 and 30, the bolt 40 may be used to generate horizontal displacement or rotational displacement within the bolt insertion hole 20a of the elastic support. It moves along and resists it. 8 and 9 illustrate a state in which the bolt 40 resists the horizontal displacement and the rotation displacement, respectively.

상기 도 2 내지 도 4에서는 볼트(40)의 구속방법에 따른 본 발명의 실시예가 도시되어 있다. 즉, 도 2 및 도 3에서는 볼트(40)가 상부철판(10)에 고정되어 볼트(40)의 하단부만이 자유단 상태를 가지는 교좌장치가 도시되어 있고, 도 4에서는 볼트(40)가 상·하부철판(10, 30) 어디에도 고정되지 않는 교좌장치가 도시되어 있다. 도시하지는 않았지만 볼트(40)의 상단부가 자유단 상태를 가지는 교좌장치라도 무방하나(이 경우에는 도 2 및 도 3과 같은 교좌장치를 상하 뒤집으면 됨. 즉, 상부철판이 하부철근이고 되고 하부철판이 상부철판이 되면서 하부캡이 상부캡이 되도록 구성함), 이미 교량상판(B)이 설치된 상태(기존 교량에서 교좌장치를 교체하거나 새로 설치하는 경우)에서의 적용성을 고려하면 도 2 및 도 3과 같이 상단부는 고정단이 되고 하단부는 자유단이 되도록 구성하는 것이 바람직하다. 2 to 4 illustrate an embodiment of the present invention according to the restraint method of the bolt 40. That is, in FIG. 2 and FIG. 3, the bolt device 40 is fixed to the upper steel plate 10 so that only the lower end of the bolt 40 has a free end state, and in FIG. 4, the bolt 40 is raised. A scaffold device is shown which is not fixed anywhere on the bottom steel plates 10, 30. Although not shown, the upper end of the bolt 40 may be a device having a free end state (in this case, the device may be flipped upside down as shown in FIGS. 2 and 3. That is, the upper steel plate is the lower steel bar and the lower steel plate The upper steel plate is configured to be the lower cap to the upper cap), considering the applicability in the state in which the bridge upper plate (B) is already installed (when replacing the bridge device or newly installed in the existing bridge) Figure 2 and Figure As shown in FIG. 3, the upper end is preferably a fixed end and the lower end is a free end.

자유단으로 구성한 볼트(40)의 단부에는 캡(상부캡(70) 또는 하부캡(60))을 씌워 볼트(40)의 유동공간을 확보하도록 하고, 상기 캡(60, 70) 내부에 그리스(80)를 주입하여 변형에 따른 볼트(40)의 이동이 원활히 이루어지도록 한다. 즉, 하부철판(30)이 콘크리트의 교각 또는 교대(C)에 접하여 설치하게 되는 경우 하부철판(30) 아래로 돌출된 볼트(40)는 교각 또는 교대에 매립되는데, 이때 하부캡(60)을 씌운 상태에서 볼트를 매립함으로써 볼트는 여전히 자유단으로 유지할 수 있게 되는 것이다. A cap (upper cap 70 or lower cap 60) is put on an end of the bolt 40 configured as a free end to secure a flow space of the bolt 40, and grease (c) is formed inside the caps 60 and 70. 80 is injected to smoothly move the bolt 40 according to the deformation. That is, when the lower iron plate 30 is installed in contact with the pier or alternating (C) of the concrete bolt 40 protruding below the lower iron plate 30 is embedded in the pier or alternating, the lower cap 60 By embedding the bolt in the covered state, the bolt can still be held at the free end.

도 2 및 도 3에서 도시하고 있는 본 발명의 교좌장치는 상부철판의 볼트삽입홀(10a)과 볼트(40) 상단에 나사산(45)을 형성시켜 서로 나사체결하도록 함으로써 볼트(40) 상단부는 상부철판(10)에 고정 구속시키고 하단부는 하부철판(30)에 고정되지 않고 자유단으로 이동가능케 한 구성을 취하고 있다. 이때, 볼트(40)를 상부철판(10)을 관통하여 위로 돌출하도록 나사체결하면 돌출된 볼트(40)를 교량상판(B)에 정착시킬 수 있는 바, 상기 볼트(40)는 정착구로서 역할하게 된다. 2 and 3 of the present invention, the screw device 45 is formed on the upper end of the bolt insertion hole 10a of the upper steel plate and the upper end of the bolt 40 to be screwed together so that the upper end of the bolt 40 is upper. It is fixed to the iron plate 10 and the lower end is not fixed to the lower iron plate 30 has a configuration that allows to move freely. At this time, if the bolt 40 is screwed to protrude upward through the upper plate 10, it is possible to fix the protruding bolt 40 to the bridge top plate (B), the bolt 40 to act as a fixing hole do.

도시한 바와 같이 자유단의 볼트(40) 하단부에는 나사산이 형성되고, 하부철판의 볼트삽입홀(30a)보다 큰 크기를 가지며 반구형상으로 형성된 너트(50)가 상기 볼트(40) 하단부의 나사산과 체결하고 있으며, 다만 상기 너트는 렌치에 의한 체결 작업의 편의를 위해 외주면의 일부가 육각으로 가공된다. 본 발명의 교좌장치는 각 구성요소들이 분리 또는 독립한 상태로 운반될 수 있으나, 특히 너트(50)의 도입은 본 발명의 교좌장치가 분리되지 않고 하나로 결합된 상태로 운반하는 것을 가능케 하여 현장작업의 수고를 덜게 해주며, 이때 너트를 반구형상으로 형성시키면 볼트(40)의 회전과 이동을 원활하게 유도하기는데 더욱 유리하다. 상기 너트(50) 대신에 볼트의 하단부를 볼트와 일체화된 반구형상의 볼트머리(41)로 형성시켜도 무방하다. As shown, a screw thread is formed at the lower end of the bolt 40 at the free end, and the nut 50 having a hemispherical shape is larger than the bolt insertion hole 30a of the lower steel plate, and the thread of the bolt 40 at the lower end of the bolt 40. However, the nut is a part of the outer circumferential surface of the nut for the convenience of the tightening operation by the wrench is processed into a hexagon. The teaching device of the present invention can be transported in a separate or independent state of each component, in particular the introduction of the nut 50 allows the teaching device of the present invention to be transported in a combined state without being separated into a field work To reduce the effort of, the hemispherical shape of the nut is more advantageous to induce smooth rotation and movement of the bolt (40). Instead of the nut 50, the lower end of the bolt may be formed by a hemispherical bolt head 41 integrated with the bolt.

도 4에서 도시하고 있는 본 발명의 교좌장치는 볼트(40)의 양단부가 모두 자유단인 상태를 가진 구성을 취하고 있다. 즉, 볼트(40)의 하단부는 물론 상단부 또한 상부철판(10) 위로 돌출되고 상기 상부철판(10) 위로 돌출된 볼트(40)의 상단을 덮으면서 상부철판에 고정 설치되는 상부캡(70)을 더 포함하여 구성된다.The stapling device of the present invention shown in FIG. 4 has a configuration in which both ends of the bolt 40 are free ends. That is, the lower end of the bolt 40 as well as the upper end protrudes over the upper plate 10 and the upper cap 70 is fixed to the upper plate while covering the upper end of the bolt 40 protruding above the upper plate 10 It is configured to include more.

도시된 바와 같이 이와 같은 경우의 교좌장치는 볼트(40) 상단부는 반구형상의 볼트머리(41)로 형성시키고 볼트(40) 하단부는 반구형상의 너트(50)가 체결되도록 구성하며, 그 반대의 구성도 가능하다.As shown in the drawing device, the upper end of the bolt 40 is formed with a hemispherical bolt head 41 and the lower part of the bolt 40 is configured to fasten the hemispherical nut 50, and vice versa. It is possible.

상기와 같은 구성을 갖는 교량 교좌장치는 볼트를 이용하여 상부철판, 탄성받침 및 하부철판을 일체화시키는 과정을 추가적으로 포함할 뿐, 기존의 교좌장치의 설치방법을 그대로 적용할 수 있다. 이에 본 발명의 교량 교좌장치를 신축 교량에 채택하는 방법에 대한 상세한 설명은 생략하기로 하고, 이하에서는 본 발명의 교량 교좌장치를 채택함으로써 기존의 방법과 차이가 날 수 있는 방법으로서 교량을 보수보강하는 방법에 대하여만 설명한다. 교량 보수보강방법은 크게 두가지로 구분할 수 있는데, 교량상판을 인상한 후 추가적인 보강구조물을 시공하는 방법과 교좌장치만을 교체하거나 추가로 설치하는 방법이 그것이다.Bridge bridge device having the configuration as described above further includes the process of integrating the upper plate, the elastic support and the lower plate using a bolt, it is possible to apply the existing method of installing the bridge device as it is. Therefore, a detailed description of the method of adopting the bridge bridge device of the present invention to a new bridge will be omitted. Hereinafter, by adopting the bridge bridge device of the present invention, the bridge may be repaired and reinforced. Only how to do this will be described. The bridge reinforcement method can be divided into two types, namely, the method of constructing additional reinforcement structure after raising the bridge deck and replacing or installing only the bridge device.

우선 교량상판을 인상한 후 추가적인 보강구조물을 시공하는 방법을 설명한다. 이러한 방법은 보강구조물을 추가적인 시공하기 위해서는 인상높이가 70㎝내외 정도가 될 것이고, 이로써 교량상판과 교각 또는 교각 사이에 교량 교좌장치를 설치할 수 있는 충분한 작업공간이 확보된다는 점에 특징이 있다. First, the method of raising the bridge deck and then constructing additional reinforcement structures will be explained. This method is characterized by the fact that the lifting height will be around 70cm for the additional construction of the reinforcement structure, thereby ensuring sufficient working space to install the bridge bridge device between the bridge deck and the bridge or piers.

가장 먼저 교각 또는 교대(C) 상단 측면에 잭(J)을 설치하여 교량상판(B)을 인상한다. 통상의 방법처럼 먼저 교각 또는 교대 상단 측면에 가설 브라켓을 설치하고 브라켓에 잭을 설치함으로써 교량상판을 인상하게 된다. 교량상판 하부에서 천공하여 천공홀을 형성시킨다. 충분히 인상하였기 때문에 천공작업을 위한 작업공간을 확보할 수 있게 되는 바, 교량상판 하부에서 직접 천공홀을 형성시킬 수 있다. 상기 천공홀은 본 발명의 교좌장치에서 볼트가 삽입되어 상부철판을 교량상판에 고정시키기 위한 것이다. First, the jack (J) is installed on the upper side of the bridge or shift (C) to raise the bridge deck (B). As usual, the bridge deck is raised by installing a temporary bracket on the side of the pier or the top of the shift and then installing a jack on the bracket. Perforations are formed in the lower part of the bridge deck to form perforations. Since it is sufficiently raised, it is possible to secure a working space for the drilling work, and it is possible to form a drilling hole directly under the bridge deck. The drilling hole is for fixing the upper iron plate to the bridge top plate is inserted into the bolt in the bridge device of the present invention.

이어 상기 잭(J)을 교각 또는 교대 상부로 이동시키고 추가로 인상하여 잭 아래에 받침강관을 설치하며, 상기 받침강관은 상단부 일부를 제외하고 내부에 콘크리트가 타설된 것으로서, 교대 또는 교각(C)을 보강하는 역할을 한다. 받침강관을 설치한 후에는 콘크리트를 타설하여 받침강관을 교대 또는 교각에 정착시키고, 이때 보다 확보한 보강구조물의 시공을 위해 받침강관 주변에 앵커철근을 배근하고 콘크리트를 타설하는 방법으로 진행할 수 있다. 다만, 교량 교좌장치로서 하부철판(30)의 저면에 스터드볼트(31)가 접합된 것을 채택하는 경우에는 받침강관 상단이 돌출되도록 콘크리트를 일부만 타설한다.Subsequently, the jack (J) is moved to the pier or the upper part of the pier and further raised to install a supporting steel pipe under the jack, and the supporting steel pipe is cast concrete inside except for a part of the upper part, and the shift or the pier (C). It serves to reinforce the. After installing the supporting steel pipe, the concrete can be poured to fix the supporting steel pipe on the alternating or pier, and at this time, it is possible to proceed with the method of reinforcing the anchor reinforcement around the supporting steel pipe and placing concrete for the construction of the secured reinforcing structure. However, when adopting the stud bolt 31 is bonded to the bottom of the lower steel plate 30 as a bridge bridge device, only part of the concrete is poured so that the top of the supporting steel pipe protrudes.

전술한 본 발명의 교량 교좌장치를 준비한 후 볼트(40)가 상기 교량상판(B)의 천공홀(H)까지 연장 삽입되고 하부캡(60)이 받침강관 내부에 삽입되도록 교량상판과 받침강관 사이에 위치하도록 설치한다. After preparing the bridge bridge device of the present invention described above, the bolt 40 is inserted into the boring hole (H) of the bridge upper plate (B) and the lower cap 60 is inserted between the bridge upper plate and the supporting steel pipe so as to be inserted into the supporting steel pipe. Install it at

교량상판(B)이 충분히 인상되었기 때문에 작업공간을 확보할 수 있게 되는 바, 볼트(40) 및 너트(50)의 조임을 통해 일체화시키는 본 발명의 교량 교좌장치의 설치는 가능해진다. 만약 교량 교좌장치로서 상부철판(10) 상면에 스터드볼트(11)가 접합된 것을 채택하는 경우에는 교량상판에 스터드볼트(11)가 매립되기 위한 앵커홀을 천공한 후 스터드볼트가 상기 앵커홀에 삽입되도록 한다.Since the bridge top plate B is sufficiently raised, the working space can be secured, and thus the bridge bridge device of the present invention can be installed by integrating the bolt 40 and the nut 50. If the stud bolt 11 is joined to the upper surface of the upper plate 10 as a bridge bridge device, after drilling the anchor hole for embedding the stud bolt 11 in the bridge top plate stud bolt to the anchor hole To be inserted.

교량 교좌장치가 소정의 위치에 설치되면 상기 교량 교좌장치가 교량상판에 밀착하여 볼트가 천공홀에 삽입되면서 상기 받침강관에 의해 지지될 때까지 교량상판을 인하하여 안착시킨다. 이로써, 교량 교좌장치의 볼트(40)는 교량상판의 천공홀(H)까지 삽입되고 하부캡(60)은 받침강관 내부에 삽입 수용된다. 그 결과 교량 교좌장치의 상부철판(10)은 교량상판(B)에 고정되므로 교량상판(B)의 변위 발생에 따라 교좌장치의 상부철판(10) 또한 함께 거동하게 된다.When the bridge bridge device is installed at a predetermined position, the bridge bridge device is brought into close contact with the bridge top plate, and bolts are inserted into the drilling holes to lower the bridge top plate until it is supported by the supporting steel pipe. Thus, the bolt 40 of the bridge bridge device is inserted up to the hole (H) of the bridge top plate and the lower cap 60 is inserted into the receiving steel pipe. As a result, the upper iron plate 10 of the bridge bridge device is fixed to the bridge plate (B), so that the upper plate 10 of the bridge device also behaves together as the displacement of the bridge plate (B).

교량상판(B)을 안착시키고 난 후에는 교량 교좌장치를 교량상판(B) 및 교각 또는 교대(C)에 정착시키게 되는데, 교량 교좌장치의 하부철판(30)을 받침강관에 용접접합함으로써 교각 또는 교대에 정착시키게 되며, 다만 교량 교좌장치로서 하부철판의 저면에 스터드볼트가 접합된 것을 채택하는 경우에는 돌출된 받침강관 높이까지 받침몰탈을 타설한다. 또한, 받침강관 내부 및 교량 교좌장치의 하부캡 사이에도 에폭시를 주입하여 교량 교좌장치의 하부철판이 교각 또는 교대에 완전히 정착되도록 한다. 교량상판 및 교량 교좌장치의 상부철판 사이의 천공홀에는 에폭시를 주입하여 상부철판을 교량상판에 정착시키게 된다. After the bridge top plate (B) is seated, the bridge bridge device is settled on the bridge top plate (B) and the bridge or bridge (C), by welding the lower steel plate 30 of the bridge bridge device to the supporting steel pipes However, if the stud bolts are joined to the bottom of the lower steel plate as a bridge bridge device, the supporting mortar is to be raised up to the height of the protruding supporting steel pipe. In addition, epoxy is also injected between the inside of the supporting steel pipe and the lower cap of the bridge bridge device so that the lower steel plate of the bridge bridge device is completely fixed to the bridge or the bridge. The perforated hole between the bridge plate and the upper steel plate of the bridge bridge device is injected with epoxy to fix the upper steel plate to the bridge plate.

다음은 교좌장치를 교체하거나 추가로 설치하는 방법에 대하여 도 10을 참고하여 설명한다. 전술한 추가적인 보강구조물을 시공하는 방법과는 달리 인상높이가 20㎝정도로 비교적 낮아 교량상판(B)과 교각 또는 교대(C) 사이에 충분한 작업공간을 확보하지 못하는 경우에 채택될 수 있는 방법이다.Next, a method of replacing or additionally installing the teaching apparatus will be described with reference to FIG. 10. Unlike the method of constructing the additional reinforcement structure described above, the height of the lift is relatively low, such as 20 cm, and may be adopted when a sufficient working space is not secured between the bridge deck (B) and the bridge or shift (C).

먼저 교량상판(B)을 인상한다. 교량상판(B)의 인상은 교각 또는 교대(C) 상단 측면에 잭(J)을 설치하여 유압을 가하면서 이루어지며, 어느 정도 인상이되면 도 10의 (a)에서와 같이 교각 또는 교대 상부로 이동시킨다. 이어 교좌장치가 설치되는 위치의 교량상판을 상부에서 천공하여 교량상판(B)을 관통하는 천공홀(H)을 형성시킨다(도 10의 (b) 참고). 교량상판 하부에서 직접 천공하기 위한 작업공간의 확보가 어려우므로 교량상판 상부에서 천공작업이 이루어지게 되는 바, 천공홀(H)을 교량상판이 관통되도록 형성시키는 것은 불가피하다. 상기 천공홀(H)은 교좌장치를 교량상판에 고정시키기 위한 것이다.First, the bridge deck B is raised. The lifting of the bridge deck (B) is made while applying a hydraulic pressure by installing the jack (J) on the top side of the bridge or alternating (C), if the impression to some extent as shown in Figure 10 (a) to the top of the bridge or alternating Move it. Subsequently, the bridge top plate at the position where the bridge device is installed is drilled from the top to form a hole H penetrating the bridge plate B (see FIG. Since it is difficult to secure a work space for directly drilling the lower portion of the bridge top plate, the drilling operation is performed at the upper portion of the bridge top plate, and thus it is inevitable to form the hole H through the bridge top plate. The drilling hole (H) is for fixing the bridge device to the bridge top plate.

전술한 본 발명의 교량 교좌장치를 설치하되, 볼트(40)가 상기 교량상판(B) 의 천공홀(H)까지 연장 삽입되도록 교각 또는 교대 위 교좌장치의 설치위치에 위치시킨다(도 10의 (c) 참고). 교좌장치가 소정의 위치에 설치되면 상기 교량상판(B)을 인하하여 안착시킨다(도 10의 (d) 참고). 이로써 볼트(40)가 천공홀(H)까지 삽입되어 정착됨으로써 교량 교좌장치의 상부철판(10)이 교량상판(B)에 고정되며, 그 결과 교량상판(B)의 변위 발생에 따라 교좌장치의 상부철판(10) 또한 함께 거동하게 된다.The bridge bridge device of the present invention described above is installed, but the bolt 40 is positioned at the installation position of the bridge device on the bridge or the shift so that the bolt 40 is extended to be inserted into the drilling hole H of the bridge plate B (Fig. 10 ( c) reference). When the bridge device is installed at a predetermined position, the bridge top plate B is lowered and seated (see FIG. 10 (d)). As a result, the bolt 40 is inserted and fixed to the drilling hole H so that the upper steel plate 10 of the bridge bridge device is fixed to the bridge plate B. As a result, the displacement of the bridge plate B causes the The upper plate 10 also behaves together.

이어 하부철판(30) 아래에 받침몰탈(M)을 타설하여 상기 교량 교좌장치의 하부캡(60)을 받침몰탈(M)에 매립시키고, 결국 교량 교좌장치의 하부철판(30)이 교각 또는 교대(C)에 완전히 정착되도록 한다(도 10의 (f) 참고). 교량상판(B) 상부에서 천공홀(H)에 에폭시를 주입하여 마무리한다(도 10의 (e) 참고). 받침몰탈 타설과 에폭시 주입의 순서를 바꿔도 무방하며, 동시에 진행할 수도 있다.Subsequently, the base mortar (M) is placed below the lower iron plate (30) to bury the lower cap 60 of the bridge bridge device in the mortar (M), and eventually the lower plate (30) of the bridge bridge device bridges or shifts Allow complete settling in (C) (see FIG. 10 (f)). Injecting epoxy into the drilling hole (H) from the top of the bridge top plate (B) to finish (see FIG. 10 (e)). The order of supporting mortar casting and epoxy injection can be reversed and can be performed simultaneously.

이상에서 본 발명은 기재된 실시예들에 의하여 상세히 설명되었으나, 본 발명이 속하는 기술 분야에서 통상의 지식을 가진 자라면 상기에서 설명된 기술적 사상을 벗어나지 않는 범위 내에서 여러가지 치환, 부가 및 변형이 가능할 것임은 당연한 것으로, 이와 같은 변형된 실시 형태들 역시 아래에 첨부한 특허청구범위에 의하여 정하여지는 본 발명의 보호 범위에 속하는 것으로 이해되어야 할 것이다.Although the present invention has been described in detail by the embodiments described above, those skilled in the art to which the present invention pertains will be capable of various substitutions, additions and modifications without departing from the technical spirit described above. It is to be understood that such modified embodiments also fall within the protection scope of the present invention as defined by the appended claims below.

이상과 같은 본 발명의 교량 교좌장치에 따르면, 하중전달과 변형흡수를 위 해 교량상판과 교각 또는 교대 사이에 설치되는 교좌장치에서 상·하부철판을 연결 구속하는 볼트를 구비함으로써 집중호우, 태풍 등에 의해 유발되는 상향력에도 저항하여 교량상판의 낙교를 방지할 수 있게 된다. According to the bridge bridge device of the present invention as described above, by providing a bolt for connecting and restraining the upper and lower iron plate in the bridge device installed between the bridge top plate and the bridge or alternator for load transfer and deformation absorption, heavy rain, typhoon, etc. It can also resist the upward force caused by the fall of bridge decks.

아울러, 본 발명의 교량 교좌장치의 배치 위치에 따라 볼트가 삽입되는 볼트삽입홀의 크기 및 형상을 조절 선택하여 필요한 경우 유동공간을 충분히 확보할 수 있도록 함으로써 수평변위 및 회전변위에 대하여 저항할 수 있게 된다. In addition, it is possible to resist horizontal displacement and rotation displacement by adjusting the size and shape of the bolt insertion hole into which the bolt is inserted according to the arrangement position of the bridge bridge device of the present invention to ensure sufficient flow space if necessary. .

이와 같은 낙교방지를 위한 교량 교좌장치를 이용하면 기존 교량에도 용이하게 교체 설치하여 보수보강할 수 있게 된다.By using the bridge bridge device for preventing falling bridges, it is possible to easily replace and install the existing bridges.

Claims (8)

하중전달과 변형흡수를 위해 교량상판과 교각 또는 교대 사이에 설치되는 교좌장치에서,In the bridge system installed between bridge deck and bridge or shift for load transfer and deformation absorption, 볼트삽입홀이 형성된 상부철판;An upper steel plate having a bolt insertion hole formed therein; 볼트삽입홀이 형성된 하부철판;A lower iron plate having a bolt insertion hole formed therein; 상기 상부철판과 하부철판 사이에 놓여지며, 볼트삽입홀이 형성된 탄성받침;An elastic bearing placed between the upper iron plate and the lower iron plate and having a bolt insertion hole formed therein; 상기 상부철판, 하부철판 및 탄성받침의 볼트삽입홀에 삽입 설치되는 것으로 하단부가 상기 하부철판 아래로 돌출되는 볼트; 및,A bolt having a lower end protruding below the lower iron plate to be inserted into the upper steel plate, the lower iron plate, and the bolt insertion hole of the elastic bearing; And, 상기 돌출된 볼트의 하단부를 여유있게 수용하면서 상기 하부철판의 볼트삽입홀을 덮도록 하부철판에 고정 설치되는 하부캡;을 포함하여 구성되되,And a lower cap fixedly installed on the lower iron plate to cover the bolt insertion hole of the lower iron plate while accommodating the lower end of the protruding bolt with ease. 상기 탄성받침 및 하부철판의 볼트삽입홀은 볼트의 직경보다 큰 크기를 가지는 것을 특징으로 하는 낙교방지를 위한 교량 교좌장치.The bolt insertion hole of the elastic support and the lower steel plate bridge bridge device for preventing falling bridge, characterized in that having a size larger than the diameter of the bolt. 제1항에서,In claim 1, 상기 탄성받침 및 하부철판의 볼트삽입홀은 볼트의 직경보다 큰 크기의 원형, 장방형 및 십자형 중 어느 하나의 형상으로 형성되는 것을 특징으로 하는 낙교방지를 위한 교량 교좌장치.The bolt insertion hole of the elastic support and the lower iron plate is bridge bridge device for preventing falling, characterized in that formed in the shape of any one of a circular, rectangular and cross shape larger than the diameter of the bolt. 제1항 또는 제2항에서,The method of claim 1 or 2, 상기 하부캡 내에는 그리스가 주입되는 것을 특징으로 하는 낙교방지를 위한 교량 교좌장치.Bridge bridge for preventing falling bridge, characterized in that the grease is injected into the lower cap. 제3항에서,In claim 3, 상기 상부철판의 볼트삽입홀과 상기 볼트 상단에는 나사산이 형성되어 서로 나사체결하는 것을 특징으로 하는 낙교방지를 위한 교량 교좌장치.The bolt insertion hole of the upper steel plate and the upper end of the bolt is formed with a screw thread is bridge bridge device for preventing falling. 제3항에서.In claim 3. 상기 볼트는 그 상단부가 상부철판 위로 돌출되고,The bolt has an upper end projecting over the upper steel plate, 상기 상부철판의 볼트삽입홀은 볼트의 직경보다 큰 크기를 가지며,The bolt insertion hole of the upper iron plate has a size larger than the diameter of the bolt, 상기 상부철판 위로 돌출된 볼트의 상단부를 여유있게 수용하면서 상기 상부철판의 볼트삽입홀을 덮도록 상부철판에 고정 설치되는 상부캡을 더 포함하여 구성되되, 상기 상부캡 내에는 그리스가 주입되는 것을 특징으로 하는 낙교방지를 위한 교량 교좌장치.And further comprising an upper cap fixed to the upper iron plate to cover the bolt insertion hole of the upper iron plate while accommodating the upper end portion of the bolt protruding from the upper iron plate, wherein grease is injected into the upper cap. Bridge device for preventing falling. 제1항 또는 제2항에서,The method of claim 1 or 2, 상기 탄성받침의 볼트삽입홀에는 간격재가 구비되는 것을 특징으로 하는 낙교방지를 위한 교량 교좌장치.The bridge insertion device for preventing falling bridge, characterized in that the spacer is provided in the bolt insertion hole of the elastic support. 제6항에서,In claim 6, 상기 볼트는 그 하단에 나사산이 형성되며,The bolt is threaded at the bottom thereof, 상기 볼트 하단의 나사산과 체결하는 것으로 하부철판의 볼트삽입홀보다 큰 크기를 가지며 반구형상으로 형성된 너트를 더 포함하는 것을 특징으로 하는 낙교 방지를 위한 교량 교좌장치.And a nut formed in a hemispherical shape having a size larger than that of the bolt insertion hole of the lower steel plate by fastening with the screw thread of the lower end of the bolt. 이미 구축된 슬래브교량에서 하중전달과 변형흡수를 위해 교량상판과 교각 또는 교대 사이에 교좌장치를 설치하여 교량을 보수 보강함에,To repair and reinforce the bridges by installing bridge devices between bridge decks and bridges or shifts for load transfer and deformation absorption in already constructed slab bridges. 교량상판을 인상하는 단계;Raising the bridge deck; 교좌장치가 설치되는 위치의 교량상판을 상부 또는 하부에서 천공하여 교량상판 하부면에 천공홀을 형성시키는 단계;Forming a hole in the lower surface of the bridge plate by drilling a bridge top plate at a position where the bridge device is installed; 제1항의 교량 교좌장치를 설치하되, 볼트가 상기 교량상판 하부면의 천공홀까지 연장 삽입되도록 교각 또는 교대 위에 위치시키는 단계;Installing the bridge bridge device of claim 1, wherein the step of placing a bolt on the bridge or alternating so that the bolt extends to the drilling hole of the lower surface of the bridge deck; 교량상판을 인하하여 안착시키는 단계;Lowering and seating the bridge deck; 교각 또는 교대 위 하부철판 아래로 받침몰탈을 타설하여 상기 교량 교좌장치의 하부캡을 매립시키는 단계; 및,Embedding a bottom mortar under the lower steel plate above the bridge or shift to fill the lower cap of the bridge bridge device; And, 교량상판의 천공홀에 에폭시를 주입하는 단계;Injecting epoxy into the drilled hole of the bridge deck; 를 포함하여 이루어지는 것을 특징으로 하는 낙교방지를 위한 교량 교좌장치를 이용한 교량 보수보강방법.Bridge reinforcement method using the bridge bridge device for preventing falling bridge, characterized in that comprises a.
KR1020040111727A 2004-12-24 2004-12-24 Bridge bearing for preventing upper-slab from falling and construction method thereof KR100659470B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020040111727A KR100659470B1 (en) 2004-12-24 2004-12-24 Bridge bearing for preventing upper-slab from falling and construction method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020040111727A KR100659470B1 (en) 2004-12-24 2004-12-24 Bridge bearing for preventing upper-slab from falling and construction method thereof

Publications (2)

Publication Number Publication Date
KR20060072934A KR20060072934A (en) 2006-06-28
KR100659470B1 true KR100659470B1 (en) 2006-12-20

Family

ID=37166066

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020040111727A KR100659470B1 (en) 2004-12-24 2004-12-24 Bridge bearing for preventing upper-slab from falling and construction method thereof

Country Status (1)

Country Link
KR (1) KR100659470B1 (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101404814B1 (en) * 2012-12-06 2014-06-12 조선대학교산학협력단 Construction method of vibration isolation swing slab
WO2014088366A1 (en) * 2012-12-06 2014-06-12 조선대학교산학협력단 Base-isolated swing slab supporting apparatus and method for constructing base-isolated swing slab using same
KR101415731B1 (en) * 2012-12-06 2014-07-04 조선대학교산학협력단 Suspension device for vibration isolation swing slab
KR101668465B1 (en) * 2016-03-10 2016-10-24 삼영엠텍(주) Bridge bearing device including a rotatable anchor system maintenance is possible
KR101737064B1 (en) * 2016-08-24 2017-05-17 주식회사 후레씨네코리아 Method and structure of constructing bridge
KR20190130706A (en) 2018-05-14 2019-11-25 아이컨 주식회사 Installing method of the seismic damping device on exiting falling prevention device

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
TW200630852A (en) * 2005-02-24 2006-09-01 Sonix Technology Co Ltd Image output and input systems
KR100731788B1 (en) * 2006-09-19 2007-06-28 (주) 국제이엔씨 Elastic Rubber Bearing as One body, made the most of Magnetic attraction key
KR100857160B1 (en) * 2008-05-23 2008-09-05 주식회사 신영이엔씨 Apparatus for diagnostic hang down of bridge upper intrastructure
WO2012169669A1 (en) * 2011-06-08 2012-12-13 Cho, Yeoung Cheol Elastic device and mechanism to control horizontal displacement utilizing a horizontal component of elastic force and bridge bearing using the same
KR101636960B1 (en) * 2014-09-01 2016-07-07 건국대학교 산학협력단 Offshore multi-piled concrete foundation using transition pieces and the construction method therefor
KR102374688B1 (en) * 2021-02-18 2022-03-16 진형건설(주) Bridge supporter with air pocket

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101404814B1 (en) * 2012-12-06 2014-06-12 조선대학교산학협력단 Construction method of vibration isolation swing slab
WO2014088366A1 (en) * 2012-12-06 2014-06-12 조선대학교산학협력단 Base-isolated swing slab supporting apparatus and method for constructing base-isolated swing slab using same
KR101415731B1 (en) * 2012-12-06 2014-07-04 조선대학교산학협력단 Suspension device for vibration isolation swing slab
KR101668465B1 (en) * 2016-03-10 2016-10-24 삼영엠텍(주) Bridge bearing device including a rotatable anchor system maintenance is possible
KR101737064B1 (en) * 2016-08-24 2017-05-17 주식회사 후레씨네코리아 Method and structure of constructing bridge
KR20190130706A (en) 2018-05-14 2019-11-25 아이컨 주식회사 Installing method of the seismic damping device on exiting falling prevention device

Also Published As

Publication number Publication date
KR20060072934A (en) 2006-06-28

Similar Documents

Publication Publication Date Title
KR100659470B1 (en) Bridge bearing for preventing upper-slab from falling and construction method thereof
JP4040422B2 (en) Bearing exchange method for existing bearing device and bearing device
CN110541354B (en) Single-section prefabricated anti-seismic pier and construction method thereof
KR101002232B1 (en) Installation method of construction of bridge bearing where shear resistance equipment for aseismic reinforcement was adherent and this
KR100948359B1 (en) The bridge upper structure lifting method for which bridge upper structure lifter which does the bridge shue function and this were used
KR100662811B1 (en) Non-synthetic complex steel pipe columm having tie ends for filling a steel soncrete and construction method thereof
WO2010097642A1 (en) Hydraulic tie rod for construction projects
KR100837608B1 (en) J.K Bracket Method
KR100589289B1 (en) Improvement of seismic performance of bridges using the circular steel members, and a seismic retrofit method of bridges
KR101256490B1 (en) Segmental concrete-filled-steel tube column construction method
CN112627547A (en) Construction method of placing platform for placing shock insulation rubber support
KR200429970Y1 (en) Multi-function anchor socket for bridge support bearing
WO2023076172A1 (en) System and method for protection of under-slab utilities from changes in soil volume
CN113668368B (en) Plastic hinge area enlarged section assembled type swing pier and construction method thereof
JP4274557B2 (en) Horizontal load elastic support device
KR100944007B1 (en) The bridge adjustable bearing for change off PC-beam puilling up system and the method
CN212478159U (en) Pre-buried steel sheet erection joint structure under isolation bearing
CN210369312U (en) Steel column base connection structure
JP4324085B2 (en) Seismic strengthening method and seismic strengthening structure for all directions of piers in existing bridges
KR101341847B1 (en) Seismic reinforce device structure for bridge and construction method
KR102452249B1 (en) Elevation Control Anchor and Bridge Bearing System using it
KR102157577B1 (en) Elastic bearing for bridge using shear-reinforcing anchor-socket and construction method thereof
JP2010215251A (en) Method and structure for improving earthquake-proof performance of existing pc tank
KR20060048843A (en) Reinforcement structure for a foundation pile
KR20080105208A (en) Bridge structure and construction method thereof

Legal Events

Date Code Title Description
A201 Request for examination
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right
N231 Notification of change of applicant
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20091210

Year of fee payment: 4

LAPS Lapse due to unpaid annual fee