KR100944007B1 - The bridge adjustable bearing for change off PC-beam puilling up system and the method - Google Patents
The bridge adjustable bearing for change off PC-beam puilling up system and the method Download PDFInfo
- Publication number
- KR100944007B1 KR100944007B1 KR1020070110127A KR20070110127A KR100944007B1 KR 100944007 B1 KR100944007 B1 KR 100944007B1 KR 1020070110127 A KR1020070110127 A KR 1020070110127A KR 20070110127 A KR20070110127 A KR 20070110127A KR 100944007 B1 KR100944007 B1 KR 100944007B1
- Authority
- KR
- South Korea
- Prior art keywords
- fish
- plate
- bridge
- rod
- fish beam
- Prior art date
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D22/00—Methods or apparatus for repairing or strengthening existing bridges ; Methods or apparatus for dismantling bridges
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D19/00—Structural or constructional details of bridges
- E01D19/02—Piers; Abutments ; Protecting same against drifting ice
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D19/00—Structural or constructional details of bridges
- E01D19/04—Bearings; Hinges
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D2101/00—Material constitution of bridges
- E01D2101/20—Concrete, stone or stone-like material
- E01D2101/24—Concrete
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Bridges Or Land Bridges (AREA)
Abstract
본 발명은 콘크리트교량(PC 빔교)의 교각 상부와 피시빔 저면부에 안착된 교좌장치를 교체보수하기 위한 피시빔 인상장치 및 방법에 관한 것으로, 종래 피시빔 저면부의 공간이 협소한 경우에는 교각의 상부면 폭방향 양편에 안착된 교좌장치(40)에 안착된 피시빔의 저부면중 교좌장치 외측편을 커버링하는 피시빔 폭 규격의 하판(110)과;하판(110)과 조립되는 측판체결볼트공(126)이 형성된 직사각판상의 중간부에 잭받침판(121)이 용접설치되고, 잭받침판의 상하 양편에 측판보강리브(122)가 일체로 용접설치된 잭받침판 중앙상부에는 T관 안착대(124)가 형성되고, 잭받침판의 상부에 해당되는 직사각판상의 상측편에 관통로드공(128)이 천공된 2개의 측판(120)과;상기, 측판(120)에 양편에 형성된 관통로드공(128)을 경유하는 피시빔관통로드(127)를 관삽입한체, 소켓 하단은 T관 안착대(124)에 거치되는 T관(123)과; 상기, T관(123)을 관삽입한 피시빔관통로드(127)의 일단을 체결하는 관통로드잠금너트(129)와;T관(123)을 관삽입한 피시빔관통로드(127)의 이단을 체결하도록 사각너트부재(130)로 구비된 교량 교좌장치 교체보수용 피시빔 인상장치및 방법에 관한 발명이다.BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a fish beam raising device and method for replacing and repairing a bridge device seated on an upper portion of a pier and a PC beam bottom of a concrete bridge (PC beam bridge). A lower plate 110 of a fish beam width standard covering an outer side of the teaching device among the bottom surfaces of the fish beams seated on the teaching device 40 seated on both sides of the upper surface; and a side plate fastening bolt assembled with the lower plate 110. Jack support plate 121 is welded and installed in the middle portion of the rectangular plate on which the ball 126 is formed, and the T support seat 124 is located at the center of the jack support plate in which the side plate reinforcement ribs 122 are integrally welded and installed on both sides of the jack support plate. And two side plates 120 formed with perforated rod holes 128 on an upper side of the rectangular plate corresponding to the upper portion of the jack support plate; and through rod holes 128 formed on both sides of the side plate 120. Through the fish beam through rod (127) through And T is a lower pipe 123 is mounted on the T pipe mounting board (124); The through-rod locking nut 129 for fastening one end of the fish beam through-rod 127 into which the T-tube 123 is inserted; and the second stage of the fish beam through-rod 127 through which the T-pipe 123 is inserted. The invention relates to a bridge beam device replacement repair beam beam lifting device and method provided with a square nut member 130 to fasten.
교량 교좌장치 교체보수용 피시빔 인상장치 및 방법 Fish beam lifting device and method for bridge bridge device replacement and repair
Description
본 발명은 교량 교좌장치 교체보수용 피시빔 인상장치 및 방법에 관한 것으로, 특히 콘크리트교량(PC 빔교)의 교각상부와 PC빔 저면부 사이에 견고히 연결된 교좌장치를 교체보수하기 위한 피시빔 인상장치 및 방법에 관한 것이다.The present invention relates to a fish beam raising device and method for replacing and repairing a bridge bridge device, and in particular, a fish beam raising device for replacing and repairing a bridge device firmly connected between an upper portion of a bridge of a concrete bridge (PC beam bridge) and a PC beam bottom portion. It is about a method.
통상적으로 콘크리트교량(피시빔교)의 교각과 교각사이의 교각상부에는 차선에 따라 수개의 피시빔이 길이방향으로 안치되는데, 상기와 같은 피시빔의 저면부에 노출된체 매설된 앵커금속판과 교각상부 내부에 배근된 철근상에 교좌장치의 기초앵카를 용접과 같은 견고한 수단으로 고정시키는 실정이다.In general, several fish beams are placed in the longitudinal direction along the pier between the pier and the pier of the concrete bridge (fish beam bridge), the anchor metal plate and the pier top buried body exposed to the bottom of the fish beam as described above It is a situation to fix the foundation anchor of the stapling device on the reinforcement reinforced by the solid means such as welding.
이러한 교좌장치는 상판과 같은 교량상부구조물로부터 전달되는 하중이나,상판을 통행하는 차량,또는 지진과 같은 진동에 의해 미치는 반력을 전달하고 완충하는 기능을 담당하지만, 이러한 오래된 콘크리트교량에 설치된 교좌장치는 내진에 대비되지 않아 최근 내진설계에 대비된 교좌장치를 교체하는 보수공사를 진행되고 있는 실정이다.Such a bridge device is responsible for transmitting and buffering the force transmitted from the upper structure of the bridge, such as the top plate, the vehicle passing through the top plate, or the reaction force caused by vibrations such as earthquakes, but the bridge device installed in these old concrete bridges As it is not prepared for earthquake resistance, repair work is being carried out recently to replace the bridge device prepared for the seismic design.
상기와 같이 교각상부와 피시빔 저면부 사이에 견고하게 안치된 교좌장치를 교체보수하기 위한 종래의 기술로는 도 1과 도 2에 도시한 바와 같이, 각 피시빔에 안착된 교각상부의 양편 모서리 측방에 20Ø 구경, 20㎝ 깊이의 앵커볼트구멍이 각 12개 뚫린 정면도시 " "와 같은 잭받침부재(50)에 마련된 앵커볼트공(54)을 통해 12개의 앵커볼트(55)를 넣고 앵커볼트와셔(56)와 앵커볼트너트(57)로 상기와 같은 잭받침부재(50)를 고정시킨후, 잭받침부재 좌우 양편으로 돌출된체 절곡된 계지판(53)을 교각상부 모서리에 안치시키고, 계지판(53) 사이의 요홈부에는 교각상부 좌우로 일정폭의 지지판(52)이 견고하도록, 그 하부에 지지판리브(52)로 용접지지된 잭받침부재(50)를 교각상부에 고정설치후, 잭받침부재(50)에 마련된 지지판(51)과 피시빔 저면부(21)사이에 유압잭을 설치해 피시빔을 교각상부로부터 지탱시킨체, 교각상부와 피시빔 저면부에 견고하게 설치된 교좌장치(40)의 기초앵커부 매설부위의 콘트리트를 함마드릴로 깨트려 내부에 배근된 철근이 노출되도록 파쇄부(42)를 형성한후, 용접된 교좌장치를 제거하고 새로운 교좌장치를 교체하는 제1방식이다.As described above with reference to Fig. 1 and 2, the conventional technique for replacing and repairing the stabilization device securely placed between the pier upper portion and the fish beam bottom as described above, both edges of the pier upper portion seated on each fish beam Front view with 12 holes of 20 caliber and 20 cm deep anchor bolt holes on each side. Put the 12
한편, 국내 특허등록 제0378382호에 따르면, 강계용 유압잭 하부 받침장치의 경우에는 교각의 일측 상면을 덮으면서 교각의 양쪽 둘레면에 커버링되는 채널형 브래킷 양측에 안착부가 형성된 것이 특징이며, 상부받침장치는 교량의 종류에 따라 달라지는데, 특히 교량이 콘크리트 교일 경우에는 거더가 피시빔으로 구성되는데, 피시빔에 구성된 통상의 가설공을 이용한 것으로, 피시빔 저면에 밀착되는 베이스플레이트의 양측 상면에 사이드 브래킷을 체결부재로 고정하되, 피시빔의 가설 공 대응 위치의 사이드 브래킷 상부에는 상기 가설공에 관통되는 강봉 양단에 캡이 삽입지지되는 결합공을 구비하는 제2방식이 있으며, 상기 제2방식에서 강봉의 양단은 나사부를 형성해 너트를 체결할 수도 있음이 시사된바 있다.Meanwhile, according to Korean Patent Registration No. 0378382, in the case of the hydraulic jack lower support device for steel type, seating parts are formed on both sides of the channel bracket covered on both circumferential surfaces of the piers while covering the upper surface of one side of the piers. Depends on the type of bridge. Especially, if the bridge is a concrete bridge, the girder is composed of fish beams, and it uses the usual construction holes for the fish beams, and the side brackets are attached to the upper surfaces of both sides of the base plate that are in close contact with the bottom of the fish beams. It is fixed by the fastening member, the second side of the upper side bracket at the position corresponding to the temporary ball of the fish beam has a coupling hole for inserting the cap is supported on both ends of the steel rod penetrating the temporary hole, the second method of the steel bar It has been suggested that both ends may form a threaded portion to tighten the nut.
한편,국내 특허등록 제0338490호에 따르면 교각의 상부에 상부구조의 길이방향으로 다수개의 종방향 사각관을 설치하고, 상기 교각의 상부면에 지지됨과 더불어 상기 지지부재에 의해 지지되도록 클립을 이용하여 교각의 폭에 맞춰 잭을 설치할수 있도록 된 잭 받침부재를 설치하여, 상기 잭받침부재에 의해 잭을 설치하여 상부구조를 인상하는 것을 특징으로 하는 것으로 한다.Meanwhile, according to Korean Patent Registration No. 0338490, a plurality of longitudinal square tubes are installed in the longitudinal direction of the superstructure on the upper part of the pier, and are supported on the upper surface of the pier and are supported by the support member. It is characterized in that to install a jack support member to be able to install the jack in accordance with the width of the piers, to install the jack by the jack support member to raise the upper structure.
상기와 같이, 교량 교좌장치 교체보수용 각 인상장치에 있어서 예상되는 문제점은 다음과 같다.As described above, the expected problem in each of the lifting device for the bridge bridge replacement device replacement is as follows.
즉, 상기 제1방식에서 잭받침부재(50)를 제거한 다음, 상기 파쇄부(42)와 교각 상부 측방에 각 천공시킨 앵커볼트공은 콘트리트 몰탈로 메꾸는 것으로, 교좌 교체공사가 끝난 후에 콘크리트타설부(43)와 앵커볼트공메꿈부(44)의 흔적이 남을 뿐만 아니라, 폭 2m의 교각(30) 양측에 각 깊이 20㎝의 앵커볼트구멍이 천공되기 때문에 교각(30)에 균열이 발생되어 내구성이 저하되는 문제점을 안고 있는 실정이다.That is, after removing the
또한, 상기의 제2방식에서는 콘크리트 교에 설치되는 인상장치중 특히 상부받침장치로 피시빔 양측방에 천공된 가설공에 끼운 강봉을 베이스플레이트 양측 상면에 구성한 사이드브래킷에 끼운 베이스플레이트 하방에 마련된 안착부와 교각상부에 설치한 하부받침장치의 안착부 사이에 유압잭을 설치한다고 하였으나, 수평으로 설치된 교각과 교각간에 설치된 피시빔을 인상하는 경우에 적용하는 실정이다.In addition, in the second method described above, the steel bar inserted in the temporary hole drilled on both sides of the fish beam by the upper support device among the lifting devices installed in the concrete bridge is provided below the base plate inserted in the side bracket formed on the upper surface of both sides of the base plate. It is said that the hydraulic jack is installed between the seat and the seating portion of the lower support device installed on the upper part of the pier, but the situation is applied when the fish beam is installed between the pier and the pier horizontally installed.
그러나, 사면으로 이루어진 교량의 교각 상부와 피시빔 저면부에 설치된 교좌장치가 안착된 사이는 매우 협소하여 상부받침장치와 하부받침장치로 이루어진 상기와 같은 인상장치는 사용할 수 없게 되는 문제점을 안고 있다.However, there is a problem that the above-mentioned lifting device composed of an upper supporter and a lower supporter cannot be used between the upper part of the pier of the bridge consisting of the slope and the seating device installed on the bottom portion of the fish beam.
그리고, 상기의 제3방식에서의 잭받침부재는 교각상부에 설치된 교좌장치 양옆으로 설치된 다수개의 지지부재에 클립을 이용하여 교각의 폭에 맞춰 잭을 설치 하도록 된 잭받침부재는 교좌장치에 안치된 피시빔 마다 1개씩의 유압잭을 설치함에 따라, 인상작업중 교량의 상부에 동 하중이 가해지는 경우 이를 수용하지 못해 비틀림 응력을 받아 좌굴, 변형 등이 발생하여 유압잭과 피시빔의 중심점이 어긋나 유압잭이 튕겨나가는 안전사고가 발생할 소지를 갖고 있다.And, the jack support member in the third method is a jack support member to install the jack in accordance with the width of the piers by using a clip on a plurality of support members installed on both sides of the bridge device installed on the pier is placed in the bridge device As one hydraulic jack is installed for each fish beam, if a dynamic load is applied to the upper part of the bridge during the lifting operation, it cannot be accommodated, and under the torsional stress, buckling and deformation occur, causing the center of the hydraulic jack and the fish beam to deviate and the hydraulic jack bounces. There is a risk of outgoing safety accidents.
또한, 사면을 이루어진 교량의 교각 상부에 양쪽으로 분할되어 거치된 2개의 피시빔 저면부 상기 교각상부의 사이는 매우 협소하다.Further, two fish beam bottom portions which are divided and mounted on both sides of the pier upper part of the bridge having a slope are very narrow between the upper part of the pier.
때문에,상기 제3방식에 의하여 제안된 바와 같이, 길이방향으로 설치되는 종방향 사각관을 끼울 수 없는 경우에는 상기 지지부재에 클립으로 조립하는 잭받침부재를 설치하지 못하는 예가 많을 것으로 예견된다.Therefore, as suggested by the third method, when it is not possible to insert the longitudinal square tube installed in the longitudinal direction, it is expected that many examples that the jack support member to be assembled by the clip to the support member can not be installed.
이에 본 발명에서는 종래 교각 상부면과 피시빔 저면부의 공간이 협소하여 유압잭을 설치하지 못하는 사면을 이루는 교량의 경우에는 교각상부에 안착된 피시빔을 인상시키는 위한 장치로는 교각의 상부면 폭방향 양편에 안착된 교좌장치(40)에 안착된 피시빔의 저부면중 교좌장치 외측편을 커버링하는 피시빔 폭 규격의 하판(110)과;Accordingly, in the present invention, in the case of a bridge that forms a slope where the space of the upper portion of the pier and the bottom portion of the fish beam is narrow, and the hydraulic jack cannot be installed, the device for raising the fish beam seated on the upper portion of the pier is wide in both directions in the upper surface of the pier. A
하판(110)의 절곡된 양측의 채널 브라킷에 형성된 상판볼트체결공(112)에 하판체결볼트(114)와 하판체결너트(113)로 조립되는 측판체결볼트공(126)이 하단에 형성된 직사각판상의 중간부에 잭받침판(121)이 용접설치되고, 잭받침판의 상하 양편에 삼각판상의 측판보강리브(122)가 일체로 용접설치되고, 잭받침판 중앙상부에는 T관 안착대(124)가 형성되고, 잭받침판의 상부에 해당되는 직사각판상의 상측편 에 관통로드공(128)이 천공된 2개의 측판(120)과;A rectangular plate shape having side plate fastening
상기, 측판(120)에 양편에 형성된 관통로드공(128)을 경유하는 피시빔관통로드(127)를 관삽입한체, 소켓 하단은 T관 안착대(124)에 거치되는 T관(123)과;The
상기, T관(123)을 관삽입한 피시빔관통로드(127)의 일단을 체결하는 관통로드잠금너트(129)와; A through
T관(123)을 관삽입한 피시빔관통로드(127)의 이단을 체결하도록 사각환봉체 양단에 너트가 형성된 사각너트부재(130)로 구비된 교량 교좌장치 교체보수용 피시빔 인상장치에 의하여, 피시빔을 인상시킴과 동시에 교각 상부에 길이방향으로 거치된 피시빔의 좌우측방에 각각의 유압잭을 설치하도록 하여, 교각상부나 측면을 를 파쇄하거나 훼손시키지 않고, 피시빔을 인상시켜 교좌장치를 용이하게 교체보수하도록 하였으며, 특히 인상작업중 교량의 상부에 동하중이 발생하여 좌굴이나 변형 등의 외부요소에 의해서도 유압잭의 안정성을 도모하도록 피시빔과 피시빔 사이의 교각상부에도 사각너트부재를 조립해 유압잭을 병행설치하여 안정성이 더욱 우수하도록 함은 물론 시공과 간편하여 공사비와 공기가 단축되도록 하는 교량 교좌장치 교체보수용 피시빔 인상장치 및 방법을 제공하도록 하였다.The bridge bridge device replacement and repair fish beam lifting device provided with a
이상 설명한 바와 같이, 본 발명에 따르면 교각 상부면과 피시빔 저면부의 공간이 협소하여 유압잭을 설치하지 못하는 사면을 이루는 교량의 교각상부에 거치된 피시빔을 인상시킴과 동시에, 교각 상부에 길이방향으로 거치된 피시빔의 좌우측방에 각각의 유압잭을 설치하도록 하여, 인상작업중 교량의 상부에 동하중이 발 생하여 좌굴이나 변형 등의 외부요소에 의해서도 유압잭의 안정성을 도모하고, 특히 피시빔과 피시빔 사이의 교각상부에도 유압잭을 병행설치하여 안정성이 더욱 우수하도록 함은 물론 시공 간편하여 공사비와 공기가 단축되도록 하는 효과가 있다.As described above, according to the present invention, the space between the upper portion of the pier and the bottom of the fish beam is narrow so that the fish beam mounted on the pier of the bridge forming the slope where the hydraulic jack cannot be installed is raised, The hydraulic jacks are installed on the left and right sides of the mounted fish beams, so that dynamic loads are generated on the upper part of the bridge during the lifting operation, which promotes stability of the hydraulic jacks due to external factors such as buckling and deformation, and especially between the fish beams and the fish beams. The hydraulic jack is also installed in parallel on the top of the pier to make the stability more excellent, as well as to simplify the construction cost and the effect of reducing the air.
참고로 종래 상기 제1방식에 의하여, 4차선 교량의 1스팬(span)의 교각에는 9개의 피시빔이 설치되는데, 9개의 피시빔에 안착된 교좌장치 총 18세트를 교체하는데 투입되는 시간은 1일 9시간 2일이 소요되며, 인력은 3인/1일, 장비는 크레인 1일 임대료 300,000원*2일분이 소요되며, 기타 소모품 함마드릴 1개(개당40,000원)와 앵커볼트 216개(개당 2,700원),발전기 2일간 유지료 100,000원,식간식비 포함하여 인당 매 22,000원이 지출되여 약 1,923,200원이 지출된다.For reference, according to the first method, nine fish beams are installed in a pier of one span of a four-lane bridge, and a time input for replacing a total of 18 sets of bridge devices seated on nine fish beams is 1. It takes 9 hours and 2 days a day, manpower for 3 persons / day, equipment costs 300,000 won per day for cranes and 2 days for one day. Other consumable hammer drills (40,000 won per piece) and 216 anchor bolts (per piece) 2,700 won), two days for the generator, 100,000 won for maintenance, and 22,000 won per person, including snacks, will cost about 1,923,200.
그러나, 본 발명에 따른 장치와 방법에 의한 공기단축효과와 공사비 절감효과는 3인을 투입하여, 총 6시간의 공기 인건비와 2시간의 크레인임대료만의 지출과 에어컴푸레셔 유지비등 약 365,000원이 소요되어 1,558,200원이 절감되는 효과를 나타낸 유용한 발명인 것이다. However, the air shortening effect and the construction cost saving effect by the apparatus and method according to the present invention are three people, totaling about 365,000 won, including the total labor cost of 6 hours, the rental cost of crane for 2 hours, and the maintenance of air compressor. It is a useful invention showing the effect of saving 1,558,200 won.
상기와 같은 목적을 달성하기 위한 본 발명의 일실시예를 첨부된 도면에 의하여 상세하게 설명한다.An embodiment of the present invention for achieving the above object will be described in detail by the accompanying drawings.
도 3은 본 발명에 따른 교량 교좌장치 교체보수용 인상장치 및 방법의 사용예시도이고, 도 4는 본 발명에 따른 피시빔 인상용 잭받침부재의 참고사시도이며, 도 5는 본 발명에 따라 피시빔의 피시빔가설공에 조립설치된 피시빔 인상용 잭받침부재의 분해사시도이고, 도 6은 본 발명 장치에 따른 피시빔 사이의 피시빔가설공 관통로드간에 조립된 사각너트부재의 사용상태참고사시도,도 7은 본 발명장치에 따른 하판의 참고도로 (ⅰ)은 측면도, (ⅱ)는 A-A선 단면도로서, Figure 3 is a view showing the use of the bridge bridge device replacement maintenance apparatus and method according to the present invention, Figure 4 is a reference perspective view of the jack beam member for raising the fish beam according to the present invention, Figure 5 is a fish in accordance with the present invention 6 is an exploded perspective view of a jack beam member for raising a fish beam assembled and installed in a fish beam placing hole of a beam, and FIG. 6 is a use state of a rectangular nut member assembled between a fish beam placing hole through rods between fish beams according to the present invention. 7 is a side view of the lower plate according to the present invention (i) is a side view, (ii) is a cross-sectional view taken along line AA,
교량의 상판(10)이 안착된 피시빔(20)의 피시빔저면부(21)와 교각(30) 상부면 사이에 안착된 교좌장치(40)를 교체보수하기 위해, 교각의 상부면에 안착된 피시빔 양단부 측방에 마련된 피시빔가설공(22)에 피시빔관통로드(127)을 삽입하여 유압잭(60)으로 피시빔(20)을 인상하기 위한 장치를 형성함에 있어서,In order to replace and repair the
교각의 상부면 폭방향 양편에 안착된 교좌장치(40)에 안착된 피시빔의 저부면중 교좌장치 외측편을 커버링하는 피시빔 폭 규격의 직사각판상의 채널 바닥면과 하측으로 절곡된 채널 브라킷 내측에 하판보강리브(111)가 보강용접되고, 절곡된 양측의 채널 브라킷에 상판볼트체결공(112)이 형성된 하판(110)과; Inside the channel bracket bent downward and the bottom of the channel on the rectangular plate of the fish beam width standard covering the outer side of the bridge of the bottom of the fish beam seated on the
상기, 하판(110)의 절곡된 양측의 채널 브라킷에 형성된 상판볼트체결공 (112)에 하판체결볼트(114)와 하판체결너트(113)로 조립되는 측판체결볼트공(126)이 하단에 형성된 직사각판상의 중간부에 잭받침판(121)이 용접설치됨과 동시에, 잭받침판의 상하 양편에 삼각판상의 측판보강리브(122)가 일체로 용접설치되고, 잭받침판 중앙상부에는 T관 안착대(124)가 형성되고, 잭받침판의 상부에 해당되는 직사각판상의 상측편에 관통로드공(128)이 천공된 2개의 측판(120)과;The lower
상기, 측판(120)에 양편에 형성된 관통로드공(128)을 경유하는 피시빔관통로드(127)를 관 삽입한체, T관의 소켓 하단은 T관 안착대(124)에 거치되는 T관(123)과;The pipe is inserted into the fish beam through
상기, T관(123)을 관 삽입한 피시빔관통로드(127)의 일단을 체결하는 관통 로드잠금너트(129)와; A through
T관(123)을 관 삽입한 피시빔관통로드(127)의 이단을 체결하도록 사각환봉체 양단에 너트가 형성된 사각너트부재(130)로 구비된 것이다.T-
상기에서, T관 안착대(124)는 평면도시""와 같이 높이 20mm,두께20mm로 T관(123) 하단소켓의 직경으로 잔넬을 형성해, T관 안착대(124)의 평면도시 우측편에는 잠금바힌지볼트(125b)와 잠금바힌지너트(125c)를 체결하고, 이측단에 잠금바손잡이(125a)를 형성한 잠금바(125)를 개폐할 수 있게 구비한 것이다.In the above, the T-
다음으로, 교량의 상판(10)이 안착된 피시빔(20)의 피시빔저면부(21)와 교각(30) 상부면 사이에 안착된 교좌장치(40)를 교체보수하기 위해, 교각의 상부면에 안착된 피시빔 양단부 측방에 마련된 피시빔가설공(22)에 피시빔관통로드(127)을 삽입하여 유압잭(60)으로 피시빔(20)을 인상하기 위한 방법에 있어서,Next, in order to replace and repair the
상기, 피시빔 양단부 측방에 마련된 피시빔가설공(22)에 관통된 피시빔 관통로드(127)의 양단에는 측판체결볼트공(126)이 하단에 형성된 직사각판상의 중간부에 잭받침판(121)이 용접설치됨과 동시에, 잭받침판의 상하 양편에 삼각판상의 측판보강리브(122)가 일체로 용접설치되고, 잭받침판 중앙상부에는 T관 안착대(124)가 형성되고, 잭받침판의 일측편에 형성된 관통로드공(128)이 천공된 측판(120)을 각 설치하는 단계와;The
각 설치된 측판(120)의 관통로드공(128)을 통과시킨 피시빔 관통로드(127) 양단에는 T관(123)을 끼우되, T관 소켓 하단은 잭받침판(121) 중앙에 마련된 T관 안착대(124)에 잠금바(125)의 잠금바손잡이(125a)를 들어올려 거치시킨후 잠금바스톱퍼(125d)로 T관 소켓 하단을 구속시키는 단계와;
교각의 상부면 폭방향 양편에 안착된 교좌장치(40) 외측편의 피시빔 저부면을 피시빔 폭 규격의 하판(110)을 커버링시켜, 하판 양측 채널 브라킷에 형성된 상판볼트체결공(112)과 각 설치된 측판(120)의 하단부에 형성된 측판체결볼트공(126)에 하판체결볼트(114)와 하판체결너트(113)로 조립하는 단계와;The upper plate bolt fastening
교각 상부면에 각 안착된 피시빔의 양외곽 외측으로 T관(123)이 관삽입된 피시빔관통로드(127)의 일단에 관통로드잠금너트(129)를 체결하는 단계와; Fastening the through
교각 상부면에 각 안착된 피시빔의 양외곽을 제외한 각 피시빔(20)간에 T관(123)을 관삽입한 피시빔관통로드(127) 각 양 단간에는 사각환봉체 양단에 너트가 형성된 사각너트부재(130)를 체결하는 단계와;A square with a nut formed at each end of the square ring rod between each end of the fish beam through
교각 상부면에 각 안착된 피시빔 양단에 설치된 각 잭받침판(121)의 하단부와 교각 상부면간에는 유압잭(60)을 설치하고, 각 피시빔(20)간에 설치된 사각너트부재(130) 하방의 교각상부면에는 유압잭가이드(61)와 함께 유압잭(60)을 설치하여 교량 교좌장치 교체보수용 피시빔을 인상하는 단계를 포함하는 것을 특징으로 하는 교량 교좌장치 교체보수용 피시빔 인상방법에 관한 것이다.A
참고로 커브길의 교량에 설치된 교좌장치는 교각상부면의 높이가 계단식으로 이루어져 있다.For reference, the bridge device installed on the bridge of the curved road has the height of the top of the bridge stepped.
때문에 이와 같은 경우 피시빔 인상방법은 본 발명의 도 3에 도시된 바와 같이, 『교각 상부면에 각 안착된 피시빔의 양외곽을 제외한 각 피시빔(20)간에 T 관(123)을 관 삽입한 피시빔관통로드(127) 각 양 단간에는 사각환봉체 양단에 너트가 형성된 사각너트부재(130)를 체결하는 단계와;Therefore, in this case, as shown in FIG. 3 of the present invention, the method of raising the fish beam includes, `` inserting a
교각 상부면에 각 안착된 피시빔 양단에 설치된 각 잭받침판(121)의 하단부와 교각 상부면간에는 유압잭(60)을 설치하고, 각 피시빔(20)간에 설치된 사각너트부재(130) 하방의 교각상부면에는 유압잭가이드(61)와 함께 유압잭(60)을 설치하여 교량 교좌장치 교체보수용 피시빔 인상하는 단계; 』을 생략하는 교량 교좌장치 교체보수용 피시빔 인상방법으로, 교각 상부면에 각 안착된 각 피시빔(20)간에 설치하는 사각너트부재(130)와 사각너트부재(130) 하방과 교각 상부면에 유압잭가이더(61)에 얹힌 유압잭(61)의 설치단계를 생략한체, 피시빔(20)을 인상하도록 하는 것이다.A
도 1은 종래 교량 교좌장치 교체보수용 인상장치의 사용예시도.Figure 1 is an example of the use of the lifting device for conventional bridge bridge replacement repair.
도 2는 도 1의 부분발췌 참고사시도.Figure 2 is a partial perspective reference perspective view of Figure 1;
도 3은 본 발명에 따른 교량 교좌장치 교체보수용 인상장치 및 방법의 사용예시도.Figure 3 is an example of the use of the bridge bridge device replacement maintenance device and method according to the present invention.
도 4는 본 발명에 따른 피시빔 인상용 잭받침부재의 참고사시도.Figure 4 is a reference perspective view of the jack support member for raising the fish beam according to the present invention.
도 5는 본 발명에 따라 피시빔의 피시빔가설공에 조립설치된 피시빔 인상용 잭받침부재의 분해사시도.Figure 5 is an exploded perspective view of the jack support member for raising the fish beam assembly installed in the fish beam temporary hole of the fish beam according to the present invention.
도 6은 본 발명 장치에 따른 피시빔 사이의 피시빔가설공관통로드간에 조립된 사각너트부재의 사용상태참고사시도.Figure 6 is a reference state of use of the rectangular nut member assembled between the fish beam through-hole rod between the fish beam according to the present invention.
도 7은 본 발명장치에 따른 하판의 참고도로 (ⅰ)은 측면도, (ⅱ)는 A-A선 단면도.Figure 7 is a side view of the reference road (i) of the lower plate according to the present invention, (ii) is a cross-sectional view taken along the line A-A.
※도면의 주요 부분에 대한 부호의 설명※ Explanation of code for main part of drawing
10:상판 20:피시빔(PC BEAM)10: top plate 20: fish beam (PC BEAM)
21:피시빔 저면부 22:피시빔 가설공21: Fish beam bottom part 22: Fish beam temporary work
30:교각 40:교좌장치30: Pier 40: Bridge device
41:철근 42:파쇄부41: Reinforcement 42: Crushing part
43:콘크리트타설부 44:앵커볼트공 메꿈부43: concrete pouring part 44: anchor bolt ball filling part
50:잭받침 부재 51:지지판50: jack support member 51: support plate
52:지지판리브 53:계지판52: support plate rib 53: instrument plate
54:앵커볼트공 55:앵커볼트54: anchor bolt 55: anchor bolt
56:앵커볼트 와셔 57:앵커볼트너트56: anchor bolt washer 57: anchor bolt nut
60:유압잭 61:유압잭가이더60: hydraulic jack 61: hydraulic jack guider
100:피시빔인상용 잭받침부재 110:하판100: jack beam member for fish beam impression 110: lower plate
111:하판보강리브 112:상판볼트체결공111: bottom plate reinforcement rib 112: top bolt tightening
113:하판체결너트 114:하판체결볼트113: bottom plate tightening nut 114: bottom plate tightening bolt
120:측판 121:잭받침판120: side plate 121: jack support plate
122:측판보강리브 123:T관122: side plate reinforced rib 123: T tube
124:T관 안착대 125:잠금바124: T tube mounting stand 125: locking bar
125a:잠금바 손잡이 125b:잠금바힌지볼트125a: locking
125c:잠금바힌지너트 125d:잠금바스톱퍼125c: Locking
126:측판체결볼트공 127:피시빔 관통로드126: side plate fastening bolt hole 127: fish beam through rod
128:관통로드공 129:관통로드 잠금너트128: through-hole ball 129: through-rod locking nut
130:사각너트 부재130: square nut member
Claims (3)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020070110127A KR100944007B1 (en) | 2007-10-31 | 2007-10-31 | The bridge adjustable bearing for change off PC-beam puilling up system and the method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020070110127A KR100944007B1 (en) | 2007-10-31 | 2007-10-31 | The bridge adjustable bearing for change off PC-beam puilling up system and the method |
Publications (2)
Publication Number | Publication Date |
---|---|
KR20070111435A KR20070111435A (en) | 2007-11-21 |
KR100944007B1 true KR100944007B1 (en) | 2010-02-24 |
Family
ID=39090328
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR1020070110127A KR100944007B1 (en) | 2007-10-31 | 2007-10-31 | The bridge adjustable bearing for change off PC-beam puilling up system and the method |
Country Status (1)
Country | Link |
---|---|
KR (1) | KR100944007B1 (en) |
Families Citing this family (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR101004795B1 (en) * | 2008-04-14 | 2011-01-04 | (주)안풍건설 | Method for raising a bridge and the raising structure there of |
KR100977061B1 (en) * | 2010-02-12 | 2010-08-24 | 우혜민 | The bridge adjustable bearing for change off puilling up system laying pc-beam restitution system and the method |
KR101665071B1 (en) | 2016-03-07 | 2016-10-12 | 이분순 | Bridge bearing replacement device and replacement method |
CN110593083A (en) * | 2019-10-10 | 2019-12-20 | 南京林业大学 | Novel cross-shaped shear support connecting device and reinforcing method |
CN114112254A (en) * | 2021-11-22 | 2022-03-01 | 同济大学建筑设计研究院(集团)有限公司 | Static force loading test device for pier with mixed structure |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR100402954B1 (en) | 2002-08-12 | 2003-10-30 | Anpoong Construction Co Ltd | Bridge seat system for pulling and preventing fall of bridge beam and installation method thereof |
KR20030091169A (en) * | 2002-05-24 | 2003-12-03 | 이승영 | Lifting method and apparatus of the bridge beam |
KR20040034368A (en) * | 2003-08-22 | 2004-04-28 | 김해영 | bearing for jacking up upper structure of bridge |
KR20040038522A (en) * | 2002-11-01 | 2004-05-08 | 노윤근 | Apparatus for pulling up bridge composed of inside and outside bracket unit using steel plate, and constructing method for repairing and reinforcing bridge using the apparatus |
-
2007
- 2007-10-31 KR KR1020070110127A patent/KR100944007B1/en active IP Right Grant
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20030091169A (en) * | 2002-05-24 | 2003-12-03 | 이승영 | Lifting method and apparatus of the bridge beam |
KR100402954B1 (en) | 2002-08-12 | 2003-10-30 | Anpoong Construction Co Ltd | Bridge seat system for pulling and preventing fall of bridge beam and installation method thereof |
KR20040038522A (en) * | 2002-11-01 | 2004-05-08 | 노윤근 | Apparatus for pulling up bridge composed of inside and outside bracket unit using steel plate, and constructing method for repairing and reinforcing bridge using the apparatus |
KR20040034368A (en) * | 2003-08-22 | 2004-04-28 | 김해영 | bearing for jacking up upper structure of bridge |
Also Published As
Publication number | Publication date |
---|---|
KR20070111435A (en) | 2007-11-21 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
KR100837608B1 (en) | J.K Bracket Method | |
KR100966890B1 (en) | Pile pressure Method for repair of bridge and pressure apparatus | |
WO2006038620A1 (en) | Joined part structure of pedestal and method of joining pedestal | |
KR100707312B1 (en) | Bridge jacking and repair method using safety system | |
KR100944007B1 (en) | The bridge adjustable bearing for change off PC-beam puilling up system and the method | |
JP4437169B2 (en) | Simple foundation and aggregate of simple foundations | |
KR101026012B1 (en) | Bridge deck dismantling method by means of united pulling jack and pier | |
KR102072685B1 (en) | Bridge using connecting member and method of construction | |
KR100352646B1 (en) | Method to reinforce the endurance force of structure using tensile beam | |
KR100977061B1 (en) | The bridge adjustable bearing for change off puilling up system laying pc-beam restitution system and the method | |
JP2009256873A (en) | Bridge equipped with precast cross girder and precast stringer, and its construction method | |
KR101004795B1 (en) | Method for raising a bridge and the raising structure there of | |
JP5192251B2 (en) | Tower crane support structure and construction method thereof | |
KR100756517B1 (en) | Hollow type composite pier | |
JPH09316892A (en) | Pile foundation reinforcing structure | |
KR200439935Y1 (en) | device of fixing tower crane for bridge | |
KR100529517B1 (en) | Method for pulling up equally the upper structure of a bridge using a raising bracket supporting load dispersedly, having a displacement measuring instrument | |
KR20060072934A (en) | Bridge bearing for preventing upper-slab from falling and construction method thereof | |
JP2006316495A (en) | Foundation structure of bridge pier and its construction method | |
JP4324085B2 (en) | Seismic strengthening method and seismic strengthening structure for all directions of piers in existing bridges | |
KR101282333B1 (en) | Cross-type supporting structure and method for super-structure of bridge | |
KR100452495B1 (en) | The support and pulling up method using support and pulling up bracket for bridge up structure repair and reinforcement pulling up apparatus, and this | |
JP2003293323A (en) | Reinforcement structure of continuous girder bridge | |
KR200290739Y1 (en) | Jacking system of bridge repair | |
KR100393103B1 (en) | Method for reinforcing resistance force of a bridge using repulsing force of elastic fulcrum |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A201 | Request for examination | ||
E902 | Notification of reason for refusal | ||
E701 | Decision to grant or registration of patent right | ||
GRNT | Written decision to grant | ||
FPAY | Annual fee payment |
Payment date: 20130124 Year of fee payment: 4 |
|
FPAY | Annual fee payment |
Payment date: 20140128 Year of fee payment: 5 |
|
FPAY | Annual fee payment |
Payment date: 20150122 Year of fee payment: 6 |
|
FPAY | Annual fee payment |
Payment date: 20160126 Year of fee payment: 7 |
|
FPAY | Annual fee payment |
Payment date: 20170111 Year of fee payment: 8 |
|
FPAY | Annual fee payment |
Payment date: 20180102 Year of fee payment: 9 |
|
FPAY | Annual fee payment |
Payment date: 20200122 Year of fee payment: 11 |