KR100944007B1 - The bridge adjustable bearing for change off PC-beam puilling up system and the method - Google Patents

The bridge adjustable bearing for change off PC-beam puilling up system and the method Download PDF

Info

Publication number
KR100944007B1
KR100944007B1 KR1020070110127A KR20070110127A KR100944007B1 KR 100944007 B1 KR100944007 B1 KR 100944007B1 KR 1020070110127 A KR1020070110127 A KR 1020070110127A KR 20070110127 A KR20070110127 A KR 20070110127A KR 100944007 B1 KR100944007 B1 KR 100944007B1
Authority
KR
South Korea
Prior art keywords
fish
plate
bridge
rod
fish beam
Prior art date
Application number
KR1020070110127A
Other languages
Korean (ko)
Other versions
KR20070111435A (en
Inventor
우혜민
Original Assignee
우혜민
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 우혜민 filed Critical 우혜민
Priority to KR1020070110127A priority Critical patent/KR100944007B1/en
Publication of KR20070111435A publication Critical patent/KR20070111435A/en
Application granted granted Critical
Publication of KR100944007B1 publication Critical patent/KR100944007B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D22/00Methods or apparatus for repairing or strengthening existing bridges ; Methods or apparatus for dismantling bridges
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • E01D19/02Piers; Abutments ; Protecting same against drifting ice
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • E01D19/04Bearings; Hinges
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D2101/00Material constitution of bridges
    • E01D2101/20Concrete, stone or stone-like material
    • E01D2101/24Concrete

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

본 발명은 콘크리트교량(PC 빔교)의 교각 상부와 피시빔 저면부에 안착된 교좌장치를 교체보수하기 위한 피시빔 인상장치 및 방법에 관한 것으로, 종래 피시빔 저면부의 공간이 협소한 경우에는 교각의 상부면 폭방향 양편에 안착된 교좌장치(40)에 안착된 피시빔의 저부면중 교좌장치 외측편을 커버링하는 피시빔 폭 규격의 하판(110)과;하판(110)과 조립되는 측판체결볼트공(126)이 형성된 직사각판상의 중간부에 잭받침판(121)이 용접설치되고, 잭받침판의 상하 양편에 측판보강리브(122)가 일체로 용접설치된 잭받침판 중앙상부에는 T관 안착대(124)가 형성되고, 잭받침판의 상부에 해당되는 직사각판상의 상측편에 관통로드공(128)이 천공된 2개의 측판(120)과;상기, 측판(120)에 양편에 형성된 관통로드공(128)을 경유하는 피시빔관통로드(127)를 관삽입한체, 소켓 하단은 T관 안착대(124)에 거치되는 T관(123)과; 상기, T관(123)을 관삽입한 피시빔관통로드(127)의 일단을 체결하는 관통로드잠금너트(129)와;T관(123)을 관삽입한 피시빔관통로드(127)의 이단을 체결하도록 사각너트부재(130)로 구비된 교량 교좌장치 교체보수용 피시빔 인상장치및 방법에 관한 발명이다.BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a fish beam raising device and method for replacing and repairing a bridge device seated on an upper portion of a pier and a PC beam bottom of a concrete bridge (PC beam bridge). A lower plate 110 of a fish beam width standard covering an outer side of the teaching device among the bottom surfaces of the fish beams seated on the teaching device 40 seated on both sides of the upper surface; and a side plate fastening bolt assembled with the lower plate 110. Jack support plate 121 is welded and installed in the middle portion of the rectangular plate on which the ball 126 is formed, and the T support seat 124 is located at the center of the jack support plate in which the side plate reinforcement ribs 122 are integrally welded and installed on both sides of the jack support plate. And two side plates 120 formed with perforated rod holes 128 on an upper side of the rectangular plate corresponding to the upper portion of the jack support plate; and through rod holes 128 formed on both sides of the side plate 120. Through the fish beam through rod (127) through And T is a lower pipe 123 is mounted on the T pipe mounting board (124); The through-rod locking nut 129 for fastening one end of the fish beam through-rod 127 into which the T-tube 123 is inserted; and the second stage of the fish beam through-rod 127 through which the T-pipe 123 is inserted. The invention relates to a bridge beam device replacement repair beam beam lifting device and method provided with a square nut member 130 to fasten.

교량 교좌장치 교체보수용 피시빔 인상장치 및 방법 Fish beam lifting device and method for bridge bridge device replacement and repair

Description

교량 교좌장치 교체보수용 피시빔 인상장치 및 방법{The bridge adjustable bearing for change off PC-beam puilling up system and the method}The bridge adjustable bearing for change off PC-beam puilling up system and the method}

본 발명은 교량 교좌장치 교체보수용 피시빔 인상장치 및 방법에 관한 것으로, 특히 콘크리트교량(PC 빔교)의 교각상부와 PC빔 저면부 사이에 견고히 연결된 교좌장치를 교체보수하기 위한 피시빔 인상장치 및 방법에 관한 것이다.The present invention relates to a fish beam raising device and method for replacing and repairing a bridge bridge device, and in particular, a fish beam raising device for replacing and repairing a bridge device firmly connected between an upper portion of a bridge of a concrete bridge (PC beam bridge) and a PC beam bottom portion. It is about a method.

통상적으로 콘크리트교량(피시빔교)의 교각과 교각사이의 교각상부에는 차선에 따라 수개의 피시빔이 길이방향으로 안치되는데, 상기와 같은 피시빔의 저면부에 노출된체 매설된 앵커금속판과 교각상부 내부에 배근된 철근상에 교좌장치의 기초앵카를 용접과 같은 견고한 수단으로 고정시키는 실정이다.In general, several fish beams are placed in the longitudinal direction along the pier between the pier and the pier of the concrete bridge (fish beam bridge), the anchor metal plate and the pier top buried body exposed to the bottom of the fish beam as described above It is a situation to fix the foundation anchor of the stapling device on the reinforcement reinforced by the solid means such as welding.

이러한 교좌장치는 상판과 같은 교량상부구조물로부터 전달되는 하중이나,상판을 통행하는 차량,또는 지진과 같은 진동에 의해 미치는 반력을 전달하고 완충하는 기능을 담당하지만, 이러한 오래된 콘크리트교량에 설치된 교좌장치는 내진에 대비되지 않아 최근 내진설계에 대비된 교좌장치를 교체하는 보수공사를 진행되고 있는 실정이다.Such a bridge device is responsible for transmitting and buffering the force transmitted from the upper structure of the bridge, such as the top plate, the vehicle passing through the top plate, or the reaction force caused by vibrations such as earthquakes, but the bridge device installed in these old concrete bridges As it is not prepared for earthquake resistance, repair work is being carried out recently to replace the bridge device prepared for the seismic design.

상기와 같이 교각상부와 피시빔 저면부 사이에 견고하게 안치된 교좌장치를 교체보수하기 위한 종래의 기술로는 도 1과 도 2에 도시한 바와 같이, 각 피시빔에 안착된 교각상부의 양편 모서리 측방에 20Ø 구경, 20㎝ 깊이의 앵커볼트구멍이 각 12개 뚫린 정면도시 "

Figure 112007078304823-pat00001
"와 같은 잭받침부재(50)에 마련된 앵커볼트공(54)을 통해 12개의 앵커볼트(55)를 넣고 앵커볼트와셔(56)와 앵커볼트너트(57)로 상기와 같은 잭받침부재(50)를 고정시킨후, 잭받침부재 좌우 양편으로 돌출된체 절곡된 계지판(53)을 교각상부 모서리에 안치시키고, 계지판(53) 사이의 요홈부에는 교각상부 좌우로 일정폭의 지지판(52)이 견고하도록, 그 하부에 지지판리브(52)로 용접지지된 잭받침부재(50)를 교각상부에 고정설치후, 잭받침부재(50)에 마련된 지지판(51)과 피시빔 저면부(21)사이에 유압잭을 설치해 피시빔을 교각상부로부터 지탱시킨체, 교각상부와 피시빔 저면부에 견고하게 설치된 교좌장치(40)의 기초앵커부 매설부위의 콘트리트를 함마드릴로 깨트려 내부에 배근된 철근이 노출되도록 파쇄부(42)를 형성한후, 용접된 교좌장치를 제거하고 새로운 교좌장치를 교체하는 제1방식이다.As described above with reference to Fig. 1 and 2, the conventional technique for replacing and repairing the stabilization device securely placed between the pier upper portion and the fish beam bottom as described above, both edges of the pier upper portion seated on each fish beam Front view with 12 holes of 20 caliber and 20 cm deep anchor bolt holes on each side.
Figure 112007078304823-pat00001
Put the 12 anchor bolts 55 through the anchor bolt hole 54 provided in the jack support member 50, such as "jack support member 50 as the anchor bolt washer 56 and the anchor bolt nut (57). ) Is fixed, and the bent locking plate 53 protruding from the left and right sides of the jack support member is placed in the upper corner of the pier, and the recessed plate between the locking plate 53 has a predetermined width of the supporting plate 52 on the upper and left sides of the pier. After fixing the jack support member 50 welded and supported by the support plate rib 52 at the lower portion thereof to the top of the pier, the support plate 51 and the fish beam bottom portion 21 provided on the jack support member 50 are secured. The hydraulic jacks are installed between the piers to support the beams from the top of the piers. After forming the shredding part 42 to expose the reinforcing bar, remove the welded bridge device and A first method for replacing a left device.

한편, 국내 특허등록 제0378382호에 따르면, 강계용 유압잭 하부 받침장치의 경우에는 교각의 일측 상면을 덮으면서 교각의 양쪽 둘레면에 커버링되는 채널형 브래킷 양측에 안착부가 형성된 것이 특징이며, 상부받침장치는 교량의 종류에 따라 달라지는데, 특히 교량이 콘크리트 교일 경우에는 거더가 피시빔으로 구성되는데, 피시빔에 구성된 통상의 가설공을 이용한 것으로, 피시빔 저면에 밀착되는 베이스플레이트의 양측 상면에 사이드 브래킷을 체결부재로 고정하되, 피시빔의 가설 공 대응 위치의 사이드 브래킷 상부에는 상기 가설공에 관통되는 강봉 양단에 캡이 삽입지지되는 결합공을 구비하는 제2방식이 있으며, 상기 제2방식에서 강봉의 양단은 나사부를 형성해 너트를 체결할 수도 있음이 시사된바 있다.Meanwhile, according to Korean Patent Registration No. 0378382, in the case of the hydraulic jack lower support device for steel type, seating parts are formed on both sides of the channel bracket covered on both circumferential surfaces of the piers while covering the upper surface of one side of the piers. Depends on the type of bridge. Especially, if the bridge is a concrete bridge, the girder is composed of fish beams, and it uses the usual construction holes for the fish beams, and the side brackets are attached to the upper surfaces of both sides of the base plate that are in close contact with the bottom of the fish beams. It is fixed by the fastening member, the second side of the upper side bracket at the position corresponding to the temporary ball of the fish beam has a coupling hole for inserting the cap is supported on both ends of the steel rod penetrating the temporary hole, the second method of the steel bar It has been suggested that both ends may form a threaded portion to tighten the nut.

한편,국내 특허등록 제0338490호에 따르면 교각의 상부에 상부구조의 길이방향으로 다수개의 종방향 사각관을 설치하고, 상기 교각의 상부면에 지지됨과 더불어 상기 지지부재에 의해 지지되도록 클립을 이용하여 교각의 폭에 맞춰 잭을 설치할수 있도록 된 잭 받침부재를 설치하여, 상기 잭받침부재에 의해 잭을 설치하여 상부구조를 인상하는 것을 특징으로 하는 것으로 한다.Meanwhile, according to Korean Patent Registration No. 0338490, a plurality of longitudinal square tubes are installed in the longitudinal direction of the superstructure on the upper part of the pier, and are supported on the upper surface of the pier and are supported by the support member. It is characterized in that to install a jack support member to be able to install the jack in accordance with the width of the piers, to install the jack by the jack support member to raise the upper structure.

상기와 같이, 교량 교좌장치 교체보수용 각 인상장치에 있어서 예상되는 문제점은 다음과 같다.As described above, the expected problem in each of the lifting device for the bridge bridge replacement device replacement is as follows.

즉, 상기 제1방식에서 잭받침부재(50)를 제거한 다음, 상기 파쇄부(42)와 교각 상부 측방에 각 천공시킨 앵커볼트공은 콘트리트 몰탈로 메꾸는 것으로, 교좌 교체공사가 끝난 후에 콘크리트타설부(43)와 앵커볼트공메꿈부(44)의 흔적이 남을 뿐만 아니라, 폭 2m의 교각(30) 양측에 각 깊이 20㎝의 앵커볼트구멍이 천공되기 때문에 교각(30)에 균열이 발생되어 내구성이 저하되는 문제점을 안고 있는 실정이다.That is, after removing the jack support member 50 in the first method, each of the anchor bolt ball perforated in the crushing portion 42 and the upper side of the pier to fill with concrete mortar, concrete placement after completion of the bridge replacement work Not only the traces of the part 43 and the anchor bolt hole 44 are left, but the anchor bolt holes having a depth of 20 cm are drilled on both sides of the pier 30 having a width of 2 m, so that cracks are generated in the pier 30. The situation has a problem that the durability is reduced.

또한, 상기의 제2방식에서는 콘크리트 교에 설치되는 인상장치중 특히 상부받침장치로 피시빔 양측방에 천공된 가설공에 끼운 강봉을 베이스플레이트 양측 상면에 구성한 사이드브래킷에 끼운 베이스플레이트 하방에 마련된 안착부와 교각상부에 설치한 하부받침장치의 안착부 사이에 유압잭을 설치한다고 하였으나, 수평으로 설치된 교각과 교각간에 설치된 피시빔을 인상하는 경우에 적용하는 실정이다.In addition, in the second method described above, the steel bar inserted in the temporary hole drilled on both sides of the fish beam by the upper support device among the lifting devices installed in the concrete bridge is provided below the base plate inserted in the side bracket formed on the upper surface of both sides of the base plate. It is said that the hydraulic jack is installed between the seat and the seating portion of the lower support device installed on the upper part of the pier, but the situation is applied when the fish beam is installed between the pier and the pier horizontally installed.

그러나, 사면으로 이루어진 교량의 교각 상부와 피시빔 저면부에 설치된 교좌장치가 안착된 사이는 매우 협소하여 상부받침장치와 하부받침장치로 이루어진 상기와 같은 인상장치는 사용할 수 없게 되는 문제점을 안고 있다.However, there is a problem that the above-mentioned lifting device composed of an upper supporter and a lower supporter cannot be used between the upper part of the pier of the bridge consisting of the slope and the seating device installed on the bottom portion of the fish beam.

그리고, 상기의 제3방식에서의 잭받침부재는 교각상부에 설치된 교좌장치 양옆으로 설치된 다수개의 지지부재에 클립을 이용하여 교각의 폭에 맞춰 잭을 설치 하도록 된 잭받침부재는 교좌장치에 안치된 피시빔 마다 1개씩의 유압잭을 설치함에 따라, 인상작업중 교량의 상부에 동 하중이 가해지는 경우 이를 수용하지 못해 비틀림 응력을 받아 좌굴, 변형 등이 발생하여 유압잭과 피시빔의 중심점이 어긋나 유압잭이 튕겨나가는 안전사고가 발생할 소지를 갖고 있다.And, the jack support member in the third method is a jack support member to install the jack in accordance with the width of the piers by using a clip on a plurality of support members installed on both sides of the bridge device installed on the pier is placed in the bridge device As one hydraulic jack is installed for each fish beam, if a dynamic load is applied to the upper part of the bridge during the lifting operation, it cannot be accommodated, and under the torsional stress, buckling and deformation occur, causing the center of the hydraulic jack and the fish beam to deviate and the hydraulic jack bounces. There is a risk of outgoing safety accidents.

또한, 사면을 이루어진 교량의 교각 상부에 양쪽으로 분할되어 거치된 2개의 피시빔 저면부 상기 교각상부의 사이는 매우 협소하다.Further, two fish beam bottom portions which are divided and mounted on both sides of the pier upper part of the bridge having a slope are very narrow between the upper part of the pier.

때문에,상기 제3방식에 의하여 제안된 바와 같이, 길이방향으로 설치되는 종방향 사각관을 끼울 수 없는 경우에는 상기 지지부재에 클립으로 조립하는 잭받침부재를 설치하지 못하는 예가 많을 것으로 예견된다.Therefore, as suggested by the third method, when it is not possible to insert the longitudinal square tube installed in the longitudinal direction, it is expected that many examples that the jack support member to be assembled by the clip to the support member can not be installed.

이에 본 발명에서는 종래 교각 상부면과 피시빔 저면부의 공간이 협소하여 유압잭을 설치하지 못하는 사면을 이루는 교량의 경우에는 교각상부에 안착된 피시빔을 인상시키는 위한 장치로는 교각의 상부면 폭방향 양편에 안착된 교좌장치(40)에 안착된 피시빔의 저부면중 교좌장치 외측편을 커버링하는 피시빔 폭 규격의 하판(110)과;Accordingly, in the present invention, in the case of a bridge that forms a slope where the space of the upper portion of the pier and the bottom portion of the fish beam is narrow, and the hydraulic jack cannot be installed, the device for raising the fish beam seated on the upper portion of the pier is wide in both directions in the upper surface of the pier. A lower plate 110 of a fish beam width standard covering an outer side of the teaching apparatus among the bottom surfaces of the fish beams seated in the teaching apparatus 40 seated on the seating apparatus;

하판(110)의 절곡된 양측의 채널 브라킷에 형성된 상판볼트체결공(112)에 하판체결볼트(114)와 하판체결너트(113)로 조립되는 측판체결볼트공(126)이 하단에 형성된 직사각판상의 중간부에 잭받침판(121)이 용접설치되고, 잭받침판의 상하 양편에 삼각판상의 측판보강리브(122)가 일체로 용접설치되고, 잭받침판 중앙상부에는 T관 안착대(124)가 형성되고, 잭받침판의 상부에 해당되는 직사각판상의 상측편 에 관통로드공(128)이 천공된 2개의 측판(120)과;A rectangular plate shape having side plate fastening bolt holes 126 assembled at the bottom plate fastening bolts 112 and the bottom plate fastening nut 113 to the top plate bolt fastening holes 112 formed at the bent both side channel brackets of the bottom plate 110. The jack support plate 121 is welded and installed in the middle portion of the jack support plate, and the side plate reinforcement ribs 122 of the triangular plate are integrally welded to the upper and lower sides of the jack support plate, and the T pipe seat 124 is formed at the center of the jack support plate. And two side plates 120 having a through rod hole 128 drilled on an upper side of the rectangular plate corresponding to the upper portion of the jack support plate;

상기, 측판(120)에 양편에 형성된 관통로드공(128)을 경유하는 피시빔관통로드(127)를 관삽입한체, 소켓 하단은 T관 안착대(124)에 거치되는 T관(123)과;The tube 120 is inserted into the fish beam through rod 127 via the through rod hole 128 formed on both sides of the side plate 120, the lower end of the socket is mounted on the T pipe seat 124 T pipe 123 and;

상기, T관(123)을 관삽입한 피시빔관통로드(127)의 일단을 체결하는 관통로드잠금너트(129)와; A through rod locking nut 129 for fastening one end of the fish beam through rod 127 into which the T pipe 123 is inserted;

T관(123)을 관삽입한 피시빔관통로드(127)의 이단을 체결하도록 사각환봉체 양단에 너트가 형성된 사각너트부재(130)로 구비된 교량 교좌장치 교체보수용 피시빔 인상장치에 의하여, 피시빔을 인상시킴과 동시에 교각 상부에 길이방향으로 거치된 피시빔의 좌우측방에 각각의 유압잭을 설치하도록 하여, 교각상부나 측면을 를 파쇄하거나 훼손시키지 않고, 피시빔을 인상시켜 교좌장치를 용이하게 교체보수하도록 하였으며, 특히 인상작업중 교량의 상부에 동하중이 발생하여 좌굴이나 변형 등의 외부요소에 의해서도 유압잭의 안정성을 도모하도록 피시빔과 피시빔 사이의 교각상부에도 사각너트부재를 조립해 유압잭을 병행설치하여 안정성이 더욱 우수하도록 함은 물론 시공과 간편하여 공사비와 공기가 단축되도록 하는 교량 교좌장치 교체보수용 피시빔 인상장치 및 방법을 제공하도록 하였다.The bridge bridge device replacement and repair fish beam lifting device provided with a square nut member 130 having a nut formed at both ends of the square ring rod to fasten the two ends of the fish beam through rod 127 into which the T pipe 123 is inserted. By raising the fish beam and installing hydraulic jacks on the left and right sides of the fish beam mounted in the longitudinal direction on the upper part of the pier, the fish beam is raised by raising the fish beam without breaking or damaging the upper part or side of the pier. In order to improve the stability of the hydraulic jack even by external elements such as buckling or deformation due to the dynamic load on the upper part of the bridge during the lifting operation, the square nut member is assembled on the pier between the fish beam and the fish beam. For the bridge bridge device replacement and repair to reduce the construction cost and air as well as the construction and easy installation It was to provide an apparatus and method sibim impression.

이상 설명한 바와 같이, 본 발명에 따르면 교각 상부면과 피시빔 저면부의 공간이 협소하여 유압잭을 설치하지 못하는 사면을 이루는 교량의 교각상부에 거치된 피시빔을 인상시킴과 동시에, 교각 상부에 길이방향으로 거치된 피시빔의 좌우측방에 각각의 유압잭을 설치하도록 하여, 인상작업중 교량의 상부에 동하중이 발 생하여 좌굴이나 변형 등의 외부요소에 의해서도 유압잭의 안정성을 도모하고, 특히 피시빔과 피시빔 사이의 교각상부에도 유압잭을 병행설치하여 안정성이 더욱 우수하도록 함은 물론 시공 간편하여 공사비와 공기가 단축되도록 하는 효과가 있다.As described above, according to the present invention, the space between the upper portion of the pier and the bottom of the fish beam is narrow so that the fish beam mounted on the pier of the bridge forming the slope where the hydraulic jack cannot be installed is raised, The hydraulic jacks are installed on the left and right sides of the mounted fish beams, so that dynamic loads are generated on the upper part of the bridge during the lifting operation, which promotes stability of the hydraulic jacks due to external factors such as buckling and deformation, and especially between the fish beams and the fish beams. The hydraulic jack is also installed in parallel on the top of the pier to make the stability more excellent, as well as to simplify the construction cost and the effect of reducing the air.

참고로 종래 상기 제1방식에 의하여, 4차선 교량의 1스팬(span)의 교각에는 9개의 피시빔이 설치되는데, 9개의 피시빔에 안착된 교좌장치 총 18세트를 교체하는데 투입되는 시간은 1일 9시간 2일이 소요되며, 인력은 3인/1일, 장비는 크레인 1일 임대료 300,000원*2일분이 소요되며, 기타 소모품 함마드릴 1개(개당40,000원)와 앵커볼트 216개(개당 2,700원),발전기 2일간 유지료 100,000원,식간식비 포함하여 인당 매 22,000원이 지출되여 약 1,923,200원이 지출된다.For reference, according to the first method, nine fish beams are installed in a pier of one span of a four-lane bridge, and a time input for replacing a total of 18 sets of bridge devices seated on nine fish beams is 1. It takes 9 hours and 2 days a day, manpower for 3 persons / day, equipment costs 300,000 won per day for cranes and 2 days for one day. Other consumable hammer drills (40,000 won per piece) and 216 anchor bolts (per piece) 2,700 won), two days for the generator, 100,000 won for maintenance, and 22,000 won per person, including snacks, will cost about 1,923,200.

그러나, 본 발명에 따른 장치와 방법에 의한 공기단축효과와 공사비 절감효과는 3인을 투입하여, 총 6시간의 공기 인건비와 2시간의 크레인임대료만의 지출과 에어컴푸레셔 유지비등 약 365,000원이 소요되어 1,558,200원이 절감되는 효과를 나타낸 유용한 발명인 것이다. However, the air shortening effect and the construction cost saving effect by the apparatus and method according to the present invention are three people, totaling about 365,000 won, including the total labor cost of 6 hours, the rental cost of crane for 2 hours, and the maintenance of air compressor. It is a useful invention showing the effect of saving 1,558,200 won.

상기와 같은 목적을 달성하기 위한 본 발명의 일실시예를 첨부된 도면에 의하여 상세하게 설명한다.An embodiment of the present invention for achieving the above object will be described in detail by the accompanying drawings.

도 3은 본 발명에 따른 교량 교좌장치 교체보수용 인상장치 및 방법의 사용예시도이고, 도 4는 본 발명에 따른 피시빔 인상용 잭받침부재의 참고사시도이며, 도 5는 본 발명에 따라 피시빔의 피시빔가설공에 조립설치된 피시빔 인상용 잭받침부재의 분해사시도이고, 도 6은 본 발명 장치에 따른 피시빔 사이의 피시빔가설공 관통로드간에 조립된 사각너트부재의 사용상태참고사시도,도 7은 본 발명장치에 따른 하판의 참고도로 (ⅰ)은 측면도, (ⅱ)는 A-A선 단면도로서, Figure 3 is a view showing the use of the bridge bridge device replacement maintenance apparatus and method according to the present invention, Figure 4 is a reference perspective view of the jack beam member for raising the fish beam according to the present invention, Figure 5 is a fish in accordance with the present invention 6 is an exploded perspective view of a jack beam member for raising a fish beam assembled and installed in a fish beam placing hole of a beam, and FIG. 6 is a use state of a rectangular nut member assembled between a fish beam placing hole through rods between fish beams according to the present invention. 7 is a side view of the lower plate according to the present invention (i) is a side view, (ii) is a cross-sectional view taken along line AA,

교량의 상판(10)이 안착된 피시빔(20)의 피시빔저면부(21)와 교각(30) 상부면 사이에 안착된 교좌장치(40)를 교체보수하기 위해, 교각의 상부면에 안착된 피시빔 양단부 측방에 마련된 피시빔가설공(22)에 피시빔관통로드(127)을 삽입하여 유압잭(60)으로 피시빔(20)을 인상하기 위한 장치를 형성함에 있어서,In order to replace and repair the bridge device 40 seated between the fish beam bottom portion 21 and the bridge 30 upper surface of the fish beam 20 on which the top plate 10 of the bridge is seated, it is seated on the top surface of the bridge. In inserting the fish beam through rod 127 into the fish beam temporary hole 22 provided on both side ends of the fish beam formed, forming a device for pulling the fish beam 20 to the hydraulic jack 60,

교각의 상부면 폭방향 양편에 안착된 교좌장치(40)에 안착된 피시빔의 저부면중 교좌장치 외측편을 커버링하는 피시빔 폭 규격의 직사각판상의 채널 바닥면과 하측으로 절곡된 채널 브라킷 내측에 하판보강리브(111)가 보강용접되고, 절곡된 양측의 채널 브라킷에 상판볼트체결공(112)이 형성된 하판(110)과; Inside the channel bracket bent downward and the bottom of the channel on the rectangular plate of the fish beam width standard covering the outer side of the bridge of the bottom of the fish beam seated on the bridge device 40 seated on both sides in the width direction of the upper surface of the bridge A lower plate reinforcing rib 111 is welded to the lower plate 110, and the upper plate bolt fastening hole 112 is formed in the bent channel brackets;

상기, 하판(110)의 절곡된 양측의 채널 브라킷에 형성된 상판볼트체결공 (112)에 하판체결볼트(114)와 하판체결너트(113)로 조립되는 측판체결볼트공(126)이 하단에 형성된 직사각판상의 중간부에 잭받침판(121)이 용접설치됨과 동시에, 잭받침판의 상하 양편에 삼각판상의 측판보강리브(122)가 일체로 용접설치되고, 잭받침판 중앙상부에는 T관 안착대(124)가 형성되고, 잭받침판의 상부에 해당되는 직사각판상의 상측편에 관통로드공(128)이 천공된 2개의 측판(120)과;The lower plate fastening bolts 114 and the lower plate fastening bolts 114 and the lower plate fastening bolts 113 formed in the channel brackets on both sides of the lower plate 110 are formed at the bottom of the side plate fastening bolts 126. The jack support plate 121 is welded and installed in the middle portion of the rectangular plate, and the side plate reinforcement ribs 122 of the triangular plate are integrally welded to the upper and lower sides of the jack support plate, and the T pipe seat 124 is installed at the center of the jack support plate. Two side plates 120 are formed, the through-rod hole 128 is perforated on the upper side of the rectangular plate corresponding to the upper portion of the jack support plate;

상기, 측판(120)에 양편에 형성된 관통로드공(128)을 경유하는 피시빔관통로드(127)를 관 삽입한체, T관의 소켓 하단은 T관 안착대(124)에 거치되는 T관(123)과;The pipe is inserted into the fish beam through rod 127 via the through rod hole 128 formed on both sides of the side plate 120, the lower end of the socket of the T pipe is mounted on the T pipe seat 124 123;

상기, T관(123)을 관 삽입한 피시빔관통로드(127)의 일단을 체결하는 관통 로드잠금너트(129)와; A through rod locking nut 129 for fastening one end of the fish beam through rod 127 into which the T pipe 123 is inserted;

T관(123)을 관 삽입한 피시빔관통로드(127)의 이단을 체결하도록 사각환봉체 양단에 너트가 형성된 사각너트부재(130)로 구비된 것이다.T-tube 123 is provided with a square nut member 130 having a nut formed on both ends of the square ring rod to fasten the two ends of the fish beam through-rod 127 inserted into the tube.

상기에서, T관 안착대(124)는 평면도시"

Figure 112009064364264-pat00002
"와 같이 높이 20mm,두께20mm로 T관(123) 하단소켓의 직경으로 잔넬을 형성해, T관 안착대(124)의 평면도시 우측편에는 잠금바힌지볼트(125b)와 잠금바힌지너트(125c)를 체결하고, 이측단에 잠금바손잡이(125a)를 형성한 잠금바(125)를 개폐할 수 있게 구비한 것이다.In the above, the T-tube seat 124 is a plan view "
Figure 112009064364264-pat00002
"20mm in height, 20mm in thickness to form a channel with the diameter of the lower tube of the T tube 123, the locking bar bolt 125b and the locking hinge nut (125c) on the right side of the T pipe seat 124 in the plan view ) Is fastened to open and close the lock bar 125 formed with the lock bar handle 125a at the side end.

다음으로, 교량의 상판(10)이 안착된 피시빔(20)의 피시빔저면부(21)와 교각(30) 상부면 사이에 안착된 교좌장치(40)를 교체보수하기 위해, 교각의 상부면에 안착된 피시빔 양단부 측방에 마련된 피시빔가설공(22)에 피시빔관통로드(127)을 삽입하여 유압잭(60)으로 피시빔(20)을 인상하기 위한 방법에 있어서,Next, in order to replace and repair the bridge device 40 seated between the fish beam bottom portion 21 and the bridge 30 upper surface of the fish beam 20 on which the upper plate 10 of the bridge is seated, the top of the bridge In the method for pulling the fish beam 20 to the hydraulic jack 60 by inserting the fish beam through rod 127 into the fish beam temporary hole 22 provided on both sides of the fish beam seated on the surface,

상기, 피시빔 양단부 측방에 마련된 피시빔가설공(22)에 관통된 피시빔 관통로드(127)의 양단에는 측판체결볼트공(126)이 하단에 형성된 직사각판상의 중간부에 잭받침판(121)이 용접설치됨과 동시에, 잭받침판의 상하 양편에 삼각판상의 측판보강리브(122)가 일체로 용접설치되고, 잭받침판 중앙상부에는 T관 안착대(124)가 형성되고, 잭받침판의 일측편에 형성된 관통로드공(128)이 천공된 측판(120)을 각 설치하는 단계와;The jack support plate 121 is formed at an intermediate portion of a rectangular plate formed with side plate fastening bolt holes 126 formed at both ends of the fish beam through rod 127 penetrating through the fish beam temporary holes 22 provided at both ends of the fish beams. At the same time as the welding is installed, the triangular plate side plate reinforcing ribs 122 are integrally welded to the upper and lower sides of the jack support plate, and a T pipe seat 124 is formed at the center of the jack support plate, and on one side of the jack support plate. Installing each of the side plates 120 having the perforated rod holes 128 formed therein;

각 설치된 측판(120)의 관통로드공(128)을 통과시킨 피시빔 관통로드(127) 양단에는 T관(123)을 끼우되, T관 소켓 하단은 잭받침판(121) 중앙에 마련된 T관 안착대(124)에 잠금바(125)의 잠금바손잡이(125a)를 들어올려 거치시킨후 잠금바스톱퍼(125d)로 T관 소켓 하단을 구속시키는 단계와;T tube 123 is inserted into both ends of the fish beam through rod 127 passing through the through rod hole 128 of each installed side plate 120, but the lower end of the T tube socket is mounted in the center of the jack support plate 121. Restraining the bottom of the T-pipe socket by the locking bar stopper 125d after lifting and mounting the locking bar handle 125a of the locking bar 125 to the base 124;

교각의 상부면 폭방향 양편에 안착된 교좌장치(40) 외측편의 피시빔 저부면을 피시빔 폭 규격의 하판(110)을 커버링시켜, 하판 양측 채널 브라킷에 형성된 상판볼트체결공(112)과 각 설치된 측판(120)의 하단부에 형성된 측판체결볼트공(126)에 하판체결볼트(114)와 하판체결너트(113)로 조립하는 단계와;The upper plate bolt fastening hole 112 and the upper plate bolt fastening holes formed on both side channel brackets are formed by covering the lower plate 110 of the fish beam width standard on the bottom surface of the fish beam 40 seated on both sides in the width direction of the upper surface of the piers. Assembling the lower plate fastening bolt 114 and the lower plate fastening nut 113 to the side plate fastening bolt hole 126 formed at the lower end of the side plate 120 installed;

교각 상부면에 각 안착된 피시빔의 양외곽 외측으로 T관(123)이 관삽입된 피시빔관통로드(127)의 일단에 관통로드잠금너트(129)를 체결하는 단계와; Fastening the through rod locking nut 129 to one end of the fish beam through rod 127 into which the T pipe 123 is inserted into the outer periphery of each of the fish beams seated on the pier upper surface;

교각 상부면에 각 안착된 피시빔의 양외곽을 제외한 각 피시빔(20)간에 T관(123)을 관삽입한 피시빔관통로드(127) 각 양 단간에는 사각환봉체 양단에 너트가 형성된 사각너트부재(130)를 체결하는 단계와;A square with a nut formed at each end of the square ring rod between each end of the fish beam through rod 127, through which the T tube 123 is inserted between the fish beams 20, except for the outer periphery of the fish beams respectively seated on the top of the pier. Fastening the nut member 130;

교각 상부면에 각 안착된 피시빔 양단에 설치된 각 잭받침판(121)의 하단부와 교각 상부면간에는 유압잭(60)을 설치하고, 각 피시빔(20)간에 설치된 사각너트부재(130) 하방의 교각상부면에는 유압잭가이드(61)와 함께 유압잭(60)을 설치하여 교량 교좌장치 교체보수용 피시빔을 인상하는 단계를 포함하는 것을 특징으로 하는 교량 교좌장치 교체보수용 피시빔 인상방법에 관한 것이다.A hydraulic jack 60 is installed between the lower end of each jack support plate 121 installed on both ends of the fish beams mounted on the pier upper surface and the pier upper surface, and the pier below the square nut member 130 installed between the fish beams 20. The upper surface relates to a method for raising a bridge beam replaceable fish beam, characterized in that it comprises the step of raising the bridge bridge replaceable fish beam by installing the hydraulic jack 60 together with the hydraulic jack guide (61).

참고로 커브길의 교량에 설치된 교좌장치는 교각상부면의 높이가 계단식으로 이루어져 있다.For reference, the bridge device installed on the bridge of the curved road has the height of the top of the bridge stepped.

때문에 이와 같은 경우 피시빔 인상방법은 본 발명의 도 3에 도시된 바와 같이, 『교각 상부면에 각 안착된 피시빔의 양외곽을 제외한 각 피시빔(20)간에 T 관(123)을 관 삽입한 피시빔관통로드(127) 각 양 단간에는 사각환봉체 양단에 너트가 형성된 사각너트부재(130)를 체결하는 단계와;Therefore, in this case, as shown in FIG. 3 of the present invention, the method of raising the fish beam includes, `` inserting a T pipe 123 between the fish beams 20, except for the outer periphery of the fish beams respectively seated on the upper surface of the pier. Fastening a square nut member 130 having a nut formed at both ends of each of the fish-beam through rods 127;

교각 상부면에 각 안착된 피시빔 양단에 설치된 각 잭받침판(121)의 하단부와 교각 상부면간에는 유압잭(60)을 설치하고, 각 피시빔(20)간에 설치된 사각너트부재(130) 하방의 교각상부면에는 유압잭가이드(61)와 함께 유압잭(60)을 설치하여 교량 교좌장치 교체보수용 피시빔 인상하는 단계; 』을 생략하는 교량 교좌장치 교체보수용 피시빔 인상방법으로, 교각 상부면에 각 안착된 각 피시빔(20)간에 설치하는 사각너트부재(130)와 사각너트부재(130) 하방과 교각 상부면에 유압잭가이더(61)에 얹힌 유압잭(61)의 설치단계를 생략한체, 피시빔(20)을 인상하도록 하는 것이다.A hydraulic jack 60 is installed between the lower end of each jack support plate 121 installed on both ends of the fish beams mounted on the pier upper surface and the pier upper surface, and the pier below the square nut member 130 installed between the fish beams 20. Installing the hydraulic jack 60 together with the hydraulic jack guide 61 on the upper surface to raise the fish beam for bridge bridge repair replacement; In the bridge beam device replacement and repair of the fish beam lifting method to omit, the square nut member 130 and the square nut member 130 installed between each fish beam 20 seated on the upper surface of the bridge and the upper surface of the bridge nut In this case, the installation step of the hydraulic jack 61 mounted on the hydraulic jack guider 61 is omitted, and the fish beam 20 is raised.

도 1은 종래 교량 교좌장치 교체보수용 인상장치의 사용예시도.Figure 1 is an example of the use of the lifting device for conventional bridge bridge replacement repair.

도 2는 도 1의 부분발췌 참고사시도.Figure 2 is a partial perspective reference perspective view of Figure 1;

도 3은 본 발명에 따른 교량 교좌장치 교체보수용 인상장치 및 방법의 사용예시도.Figure 3 is an example of the use of the bridge bridge device replacement maintenance device and method according to the present invention.

도 4는 본 발명에 따른 피시빔 인상용 잭받침부재의 참고사시도.Figure 4 is a reference perspective view of the jack support member for raising the fish beam according to the present invention.

도 5는 본 발명에 따라 피시빔의 피시빔가설공에 조립설치된 피시빔 인상용 잭받침부재의 분해사시도.Figure 5 is an exploded perspective view of the jack support member for raising the fish beam assembly installed in the fish beam temporary hole of the fish beam according to the present invention.

도 6은 본 발명 장치에 따른 피시빔 사이의 피시빔가설공관통로드간에 조립된 사각너트부재의 사용상태참고사시도.Figure 6 is a reference state of use of the rectangular nut member assembled between the fish beam through-hole rod between the fish beam according to the present invention.

도 7은 본 발명장치에 따른 하판의 참고도로 (ⅰ)은 측면도, (ⅱ)는 A-A선 단면도.Figure 7 is a side view of the reference road (i) of the lower plate according to the present invention, (ii) is a cross-sectional view taken along the line A-A.

※도면의 주요 부분에 대한 부호의 설명※ Explanation of code for main part of drawing

10:상판 20:피시빔(PC BEAM)10: top plate 20: fish beam (PC BEAM)

21:피시빔 저면부 22:피시빔 가설공21: Fish beam bottom part 22: Fish beam temporary work

30:교각 40:교좌장치30: Pier 40: Bridge device

41:철근 42:파쇄부41: Reinforcement 42: Crushing part

43:콘크리트타설부 44:앵커볼트공 메꿈부43: concrete pouring part 44: anchor bolt ball filling part

50:잭받침 부재 51:지지판50: jack support member 51: support plate

52:지지판리브 53:계지판52: support plate rib 53: instrument plate

54:앵커볼트공 55:앵커볼트54: anchor bolt 55: anchor bolt

56:앵커볼트 와셔 57:앵커볼트너트56: anchor bolt washer 57: anchor bolt nut

60:유압잭 61:유압잭가이더60: hydraulic jack 61: hydraulic jack guider

100:피시빔인상용 잭받침부재 110:하판100: jack beam member for fish beam impression 110: lower plate

111:하판보강리브 112:상판볼트체결공111: bottom plate reinforcement rib 112: top bolt tightening

113:하판체결너트 114:하판체결볼트113: bottom plate tightening nut 114: bottom plate tightening bolt

120:측판 121:잭받침판120: side plate 121: jack support plate

122:측판보강리브 123:T관122: side plate reinforced rib 123: T tube

124:T관 안착대 125:잠금바124: T tube mounting stand 125: locking bar

125a:잠금바 손잡이 125b:잠금바힌지볼트125a: locking bar handle 125b: locking bar hinge bolt

125c:잠금바힌지너트 125d:잠금바스톱퍼125c: Locking bar hinge nut 125d: Locking bar stopper

126:측판체결볼트공 127:피시빔 관통로드126: side plate fastening bolt hole 127: fish beam through rod

128:관통로드공 129:관통로드 잠금너트128: through-hole ball 129: through-rod locking nut

130:사각너트 부재130: square nut member

Claims (3)

교량의 상판(10)이 안착된 피시빔(20)의 피시빔저면부(21)와 교각(30) 상부면 사이에 안착된 교좌장치(40)를 교체보수하기 위해, 교각의 상부면에 안착된 피시빔 양단부 측방에 마련된 피시빔가설공(22)에 피시빔관통로드(127)을 삽입하여 유압잭(60)으로 피시빔(20)을 인상하기 위한 장치를 형성함에 있어서,In order to replace and repair the bridge device 40 seated between the fish beam bottom portion 21 and the bridge 30 upper surface of the fish beam 20 on which the top plate 10 of the bridge is seated, it is seated on the top surface of the bridge. In inserting the fish beam through rod 127 into the fish beam temporary hole 22 provided on both side ends of the fish beam formed, forming a device for pulling the fish beam 20 to the hydraulic jack 60, 교각의 상부면 폭방향 양편에 안착된 교좌장치(40)에 안착된 피시빔의 저부면중 교좌장치 외측편을 커버링하는 피시빔 폭 규격의 직사각판상의 채널 바닥면과 하측으로 절곡된 채널 브라킷 내측에 하판보강리브(111)가 보강용접되고, 절곡된 양측의 채널 브라킷에 상판볼트체결공(112)이 형성된 하판(110)과; Inside the channel bracket bent downward and the bottom of the channel on the rectangular plate of the fish beam width standard covering the outer side of the bridge of the bottom of the fish beam seated on the bridge device 40 seated on both sides in the width direction of the upper surface of the bridge A lower plate reinforcing rib 111 is welded to the lower plate 110, and the upper plate bolt fastening hole 112 is formed in the bent channel brackets; 상기, 하판(110)의 절곡된 양측의 채널 브라킷에 형성된 상판볼트체결공 (112)에 하판체결볼트(114)와 하판체결너트(113)로 조립되는 측판체결볼트공(126)이 하단에 형성된 직사각판상의 중간부에 잭받침판(121)이 용접설치됨과 동시에, 잭받침판의 상하 양편에 삼각판상의 측판보강리브(122)가 일체로 용접설치되고, 잭받침판 중앙상부에는 T관 안착대(124)가 형성되고, 잭받침판의 상부에 해당되는 직사각판상의 상측편에 관통로드공(128)이 천공된 2개의 측판(120)과;The lower plate fastening bolts 114 and the lower plate fastening bolts 114 and the lower plate fastening bolts 113 formed in the channel brackets on both sides of the lower plate 110 are formed at the bottom of the side plate fastening bolts 126. The jack support plate 121 is welded and installed in the middle portion of the rectangular plate, and the side plate reinforcement ribs 122 of the triangular plate are integrally welded to the upper and lower sides of the jack support plate, and the T pipe seat 124 is installed at the center of the jack support plate. Two side plates 120 are formed, the through-rod hole 128 is perforated on the upper side of the rectangular plate corresponding to the upper portion of the jack support plate; 상기, 측판(120)에 양편에 형성된 관통로드공(128)을 경유하는 피시빔관통로드(127)를 관 삽입한체, T관의 소켓 하단은 T관 안착대(124)에 거치되는 T관(123)과;The pipe is inserted into the fish beam through rod 127 via the through rod hole 128 formed on both sides of the side plate 120, the lower end of the socket of the T pipe is mounted on the T pipe seat 124 123; 상기, T관(123)을 관 삽입한 피시빔관통로드(127)의 일단을 체결하는 관통 로드잠금너트(129)와; A through rod locking nut 129 for fastening one end of the fish beam through rod 127 into which the T pipe 123 is inserted; T관(123)을 관 삽입한 피시빔관통로드(127)의 이단을 체결하도록 사각환봉체 양단에 너트가 형성된 사각너트부재(130)가 포함됨을 특징으로 하는 교량 교좌장치 교체보수용 피시빔 인상장치.Lifting the bridge beam replacement device fish beams, characterized in that it comprises a square nut member 130 with a nut formed at both ends of the square ring rod to fasten the two ends of the fish beam through rod 127 into which the T pipe 123 is inserted. Device. 제1항에 있어서, T관 안착대(124)는 평면도시"
Figure 112009064364264-pat00003
"와 같이 높이 20mm,두께20mm로 T관(123) 하단소켓의 직경으로 잔넬을 형성해, T관 안착대(124)의 평면도시 우측편에는 잠금바힌지볼트(125b)와 잠금바힌지너트(125c)를 체결하고, 이측단에 잠금바손잡이(125a)를 형성한 잠금바(125)가 구비됨을 특징으로 하는 교량 교좌장치 교체보수용 피시빔 인상장치.
2. The T-tube seat 124 according to claim 1, wherein
Figure 112009064364264-pat00003
"20mm in height, 20mm in thickness to form a channel with the diameter of the lower tube of the T tube 123, the locking bar bolt 125b and the locking hinge nut (125c) on the right side of the T pipe seat 124 in the plan view ), And the bridge beam device replacement repair fish beam raising device, characterized in that the locking bar 125 is provided with a locking bar handle (125a) on the side end.
교량의 상판(10)이 안착된 피시빔(20)의 피시빔저면부(21)와 교각(30) 상부면 사이에 안착된 교좌장치(40)를 교체보수하기 위해, 교각의 상부면에 안착된 피시빔 양단부 측방에 마련된 피시빔가설공(22)에 피시빔관통로드(127)을 삽입하여 유압잭(60)으로 피시빔(20)을 인상하기 위한 방법에 있어서,In order to replace and repair the bridge device 40 seated between the fish beam bottom portion 21 and the bridge 30 upper surface of the fish beam 20 on which the top plate 10 of the bridge is seated, it is seated on the top surface of the bridge. In the method for pulling the fish beam 20 to the hydraulic jack 60 by inserting the fish beam through rod 127 into the fish beam temporary hole 22 provided on both side ends of the fish beam, 상기, 피시빔 양단부 측방에 마련된 피시빔가설공(22)에 관통된 피시빔 관통로드(127)의 양단에는 측판체결볼트공(126)이 하단에 형성된 직사각판상의 중간부에 잭받침판(121)이 용접설치됨과 동시에, 잭받침판의 상하 양편에 삼각판상의 측판보강리브(122)가 일체로 용접설치되고, 잭받침판 중앙상부에는 T관 안착대(124) 가 형성되고, 잭받침판의 일측편에 형성된 관통로드공(128)이 천공된 측판(120)을 각 설치하는 단계와;The jack support plate 121 is formed at an intermediate portion of a rectangular plate formed with side plate fastening bolt holes 126 formed at both ends of the fish beam through rod 127 penetrating through the fish beam temporary holes 22 provided at both ends of the fish beams. At the same time that the welding is installed, the side plate reinforcing rib 122 on the triangular plate is integrally welded to the upper and lower sides of the jack support plate, and a T pipe seat 124 is formed at the center of the jack support plate, and on one side of the jack support plate. Installing each of the side plates 120 having the perforated rod holes 128 formed therein; 각 설치된 측판(120)의 관통로드공(128)을 통과시킨 피시빔 관통로드(127) 양단에는 T관(123)을 끼우되, T관 소켓 하단은 잭받침판(121) 중앙에 마련된 T관 안착대(124)에 잠금바(125)의 잠금바손잡이(125a)를 들어올려 거치시킨후 잠금바스톱퍼(125d)로 T관 소켓 하단을 구속시키는 단계와;T tube 123 is inserted into both ends of the fish beam through rod 127 passing through the through rod hole 128 of each installed side plate 120, but the lower end of the T tube socket is mounted in the center of the jack support plate 121. Restraining the bottom of the T-pipe socket by the locking bar stopper 125d after lifting and mounting the locking bar handle 125a of the locking bar 125 to the base 124; 교각의 상부면 폭방향 양편에 안착된 교좌장치(40) 외측편의 피시빔 저부면을 피시빔 폭 규격의 하판(110)을 커버링시켜, 하판 양측 채널 브라킷에 형성된 상판볼트체결공(112)과 각 설치된 측판(120)의 하단부에 형성된 측판체결볼트공(126)에 하판체결볼트(114)와 하판체결너트(113)로 조립하는 단계와;The upper plate bolt fastening hole 112 and the upper plate bolt fastening holes formed on both side channel brackets are formed by covering the lower plate 110 of the fish beam width standard on the bottom surface of the fish beam 40 seated on both sides in the width direction of the upper surface of the piers. Assembling the lower plate fastening bolt 114 and the lower plate fastening nut 113 to the side plate fastening bolt hole 126 formed at the lower end of the side plate 120 installed; 교각 상부면에 각 안착된 피시빔의 양외곽 외측으로 T관(123)이 관삽입된 피시빔관통로드(127)의 일단에 관통로드잠금너트(129)를 체결하는 단계와; Fastening the through rod locking nut 129 to one end of the fish beam through rod 127 into which the T pipe 123 is inserted into the outer periphery of each of the fish beams seated on the pier upper surface; 교각 상부면에 각 안착된 피시빔의 양외곽을 제외한 각 피시빔(20)간에 T관(123)을 관삽입한 피시빔관통로드(127) 각 양 단간에는 사각환봉체 양단에 너트가 형성된 사각너트부재(130)를 체결하는 단계와;A square with a nut formed at each end of the square ring rod between each end of the fish beam through rod 127, through which the T tube 123 is inserted between the fish beams 20, except for the outer periphery of the fish beams respectively seated on the top of the pier. Fastening the nut member 130; 교각 상부면에 각 안착된 피시빔 양단에 설치된 각 잭받침판(121)의 하단부와 교각 상부면간에는 유압잭(60)을 설치하고, 각 피시빔(20)간에 설치된 사각너트부재(130) 하방의 교각상부면에는 유압잭가이드(61)와 함께 유압잭(60)을 설치하여 교량 교좌장치 교체보수용 피시빔을 인상하는 단계를 포함하는 것을 특징으로 하는 교량 교좌장치 교체보수용 피시빔 인상방법.A hydraulic jack 60 is installed between the lower end of each jack support plate 121 installed on both ends of the fish beams mounted on the pier upper surface and the pier upper surface, and the pier below the square nut member 130 installed between the fish beams 20. The hydraulic bridge on the upper surface by installing a hydraulic jack (60) with a hydraulic jack guide 61, bridge bridge device replacement maintenance fish beam lifting method comprising the step of raising the fish beam for repair.
KR1020070110127A 2007-10-31 2007-10-31 The bridge adjustable bearing for change off PC-beam puilling up system and the method KR100944007B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020070110127A KR100944007B1 (en) 2007-10-31 2007-10-31 The bridge adjustable bearing for change off PC-beam puilling up system and the method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020070110127A KR100944007B1 (en) 2007-10-31 2007-10-31 The bridge adjustable bearing for change off PC-beam puilling up system and the method

Publications (2)

Publication Number Publication Date
KR20070111435A KR20070111435A (en) 2007-11-21
KR100944007B1 true KR100944007B1 (en) 2010-02-24

Family

ID=39090328

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020070110127A KR100944007B1 (en) 2007-10-31 2007-10-31 The bridge adjustable bearing for change off PC-beam puilling up system and the method

Country Status (1)

Country Link
KR (1) KR100944007B1 (en)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101004795B1 (en) * 2008-04-14 2011-01-04 (주)안풍건설 Method for raising a bridge and the raising structure there of
KR100977061B1 (en) * 2010-02-12 2010-08-24 우혜민 The bridge adjustable bearing for change off puilling up system laying pc-beam restitution system and the method
KR101665071B1 (en) 2016-03-07 2016-10-12 이분순 Bridge bearing replacement device and replacement method
CN110593083A (en) * 2019-10-10 2019-12-20 南京林业大学 Novel cross-shaped shear support connecting device and reinforcing method
CN114112254A (en) * 2021-11-22 2022-03-01 同济大学建筑设计研究院(集团)有限公司 Static force loading test device for pier with mixed structure

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100402954B1 (en) 2002-08-12 2003-10-30 Anpoong Construction Co Ltd Bridge seat system for pulling and preventing fall of bridge beam and installation method thereof
KR20030091169A (en) * 2002-05-24 2003-12-03 이승영 Lifting method and apparatus of the bridge beam
KR20040034368A (en) * 2003-08-22 2004-04-28 김해영 bearing for jacking up upper structure of bridge
KR20040038522A (en) * 2002-11-01 2004-05-08 노윤근 Apparatus for pulling up bridge composed of inside and outside bracket unit using steel plate, and constructing method for repairing and reinforcing bridge using the apparatus

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20030091169A (en) * 2002-05-24 2003-12-03 이승영 Lifting method and apparatus of the bridge beam
KR100402954B1 (en) 2002-08-12 2003-10-30 Anpoong Construction Co Ltd Bridge seat system for pulling and preventing fall of bridge beam and installation method thereof
KR20040038522A (en) * 2002-11-01 2004-05-08 노윤근 Apparatus for pulling up bridge composed of inside and outside bracket unit using steel plate, and constructing method for repairing and reinforcing bridge using the apparatus
KR20040034368A (en) * 2003-08-22 2004-04-28 김해영 bearing for jacking up upper structure of bridge

Also Published As

Publication number Publication date
KR20070111435A (en) 2007-11-21

Similar Documents

Publication Publication Date Title
KR100837608B1 (en) J.K Bracket Method
KR100966890B1 (en) Pile pressure Method for repair of bridge and pressure apparatus
WO2006038620A1 (en) Joined part structure of pedestal and method of joining pedestal
KR100707312B1 (en) Bridge jacking and repair method using safety system
KR100944007B1 (en) The bridge adjustable bearing for change off PC-beam puilling up system and the method
JP4437169B2 (en) Simple foundation and aggregate of simple foundations
KR101026012B1 (en) Bridge deck dismantling method by means of united pulling jack and pier
KR102072685B1 (en) Bridge using connecting member and method of construction
KR100352646B1 (en) Method to reinforce the endurance force of structure using tensile beam
KR100977061B1 (en) The bridge adjustable bearing for change off puilling up system laying pc-beam restitution system and the method
JP2009256873A (en) Bridge equipped with precast cross girder and precast stringer, and its construction method
KR101004795B1 (en) Method for raising a bridge and the raising structure there of
JP5192251B2 (en) Tower crane support structure and construction method thereof
KR100756517B1 (en) Hollow type composite pier
JPH09316892A (en) Pile foundation reinforcing structure
KR200439935Y1 (en) device of fixing tower crane for bridge
KR100529517B1 (en) Method for pulling up equally the upper structure of a bridge using a raising bracket supporting load dispersedly, having a displacement measuring instrument
KR20060072934A (en) Bridge bearing for preventing upper-slab from falling and construction method thereof
JP2006316495A (en) Foundation structure of bridge pier and its construction method
JP4324085B2 (en) Seismic strengthening method and seismic strengthening structure for all directions of piers in existing bridges
KR101282333B1 (en) Cross-type supporting structure and method for super-structure of bridge
KR100452495B1 (en) The support and pulling up method using support and pulling up bracket for bridge up structure repair and reinforcement pulling up apparatus, and this
JP2003293323A (en) Reinforcement structure of continuous girder bridge
KR200290739Y1 (en) Jacking system of bridge repair
KR100393103B1 (en) Method for reinforcing resistance force of a bridge using repulsing force of elastic fulcrum

Legal Events

Date Code Title Description
A201 Request for examination
E902 Notification of reason for refusal
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20130124

Year of fee payment: 4

FPAY Annual fee payment

Payment date: 20140128

Year of fee payment: 5

FPAY Annual fee payment

Payment date: 20150122

Year of fee payment: 6

FPAY Annual fee payment

Payment date: 20160126

Year of fee payment: 7

FPAY Annual fee payment

Payment date: 20170111

Year of fee payment: 8

FPAY Annual fee payment

Payment date: 20180102

Year of fee payment: 9

FPAY Annual fee payment

Payment date: 20200122

Year of fee payment: 11