JPS61191762A JP2991285A JP2991285A JPS61191762A JP S61191762 A JPS61191762 A JP S61191762A JP 2991285 A JP2991285 A JP 2991285A JP 2991285 A JP2991285 A JP 2991285A JP S61191762 A JPS61191762 A JP S61191762A
Authority
JP
Japan
Prior art keywords
frame
hanging
scaffold
scaffolding
suspended
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2991285A
Other languages
Japanese (ja)
Other versions
JPH0525986B2 (en
Inventor
見上 彰
信二 吉田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sumikin Kozai Kogyo KK
Original Assignee
Sumikin Kozai Kogyo KK
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sumikin Kozai Kogyo KK filed Critical Sumikin Kozai Kogyo KK
Priority to JP2991285A priority Critical patent/JPS61191762A/en
Publication of JPS61191762A publication Critical patent/JPS61191762A/en
Publication of JPH0525986B2 publication Critical patent/JPH0525986B2/ja
Granted legal-status Critical Current

Links

Landscapes

  • Bridges Or Land Bridges (AREA)
  • Movable Scaffolding (AREA)

Abstract

(57)【要約】本公報は電子出願前の出願データであるた
め要約のデータは記録されません。
(57) [Summary] This bulletin contains application data before electronic filing, so abstract data is not recorded.

Description

【発明の詳細な説明】 産業上の利用分野 この発明は、高架橋等で広く使用する吊り足場工法およ
びその吊り足場枠に関する。
DETAILED DESCRIPTION OF THE INVENTION Field of Industrial Application This invention relates to a suspended scaffold construction method widely used in elevated bridges and the like, and its suspended scaffold frame.

従来技術およびその問題点 主桁形式の橋梁うち、プレートガーダ−若しくはトラス
からなる主桁は定期的にペンキを塗替える等、定期的に
保守点検をおこなう必要がある。
Prior art and its problems Among main girder type bridges, main girders made of plate girders or trusses require periodic maintenance inspections such as periodic repainting.

従来、この種の保守点検作業は、橋梁より複数本のチェ
ーンを垂らし、このチェーン間に単管を架設するととも
にこの単管の上に別な単管を直角に架設し、さらにこの
単管の上に足場板を敷設することにより主桁下に作業足
場を構成し、この作業足場の上でおこなっていた。
Conventionally, this type of maintenance and inspection work involved hanging multiple chains from a bridge, constructing a single pipe between the chains, and constructing another single pipe at right angles to the single pipe. A work scaffold was constructed below the main girder by laying scaffolding boards on top, and work was carried out on this scaffold.

しかし、このような方法では、突風等で突発的にチェー
ンが切れる等の恐れがあり、構造的に強度上並びに安全
上着しい問題があった。また、高所作業であるためチェ
ーンに単管をさし込む場合トビ職が梁の上に垂り片手作
業するため非常に問題が多く落下事故等の恐れが多く安
全上、著しい問題があった。
However, with this method, there is a risk that the chain may suddenly break due to gusts of wind, etc., and there are problems in terms of structural strength and safety. In addition, since the work was carried out at heights, when inserting a single pipe into the chain, the worker had to hang down on the beam and work with one hand, which was very problematic and caused serious safety problems as there was a high risk of falling accidents. .

また、作業足場の設置に際し、多くの足場資材を一つ々
設置する必要があるため多くの手間・ひまを尽やし、足
場構築費や保守費が大幅に嵩むという欠点があった。
In addition, when installing a work scaffold, it is necessary to install many scaffolding materials one by one, which consumes a lot of time and effort, and has the disadvantage that scaffold construction and maintenance costs increase significantly.

発明の目的 この発明は、前記従来の問題点を解消するために提案さ
れたもので、所定規模の作業足場を短期間で、しかもき
わめて安全簡単に設置することができ、かつ強度的に勝
れ、きわめて安全に塗装作業等の各種保守作業をおこな
うことができる吊り足場工法およびその吊り足場枠を提
供することを目的とする。
Purpose of the Invention The present invention was proposed in order to solve the above-mentioned conventional problems, and it is possible to install a working scaffold of a predetermined scale in a short period of time, extremely safely and easily, and it also has superior strength. The object of the present invention is to provide a suspended scaffold construction method and its suspended scaffold frame that can perform various maintenance works such as painting work in an extremely safe manner.

発明の構成 この発明に係る吊り足場工法は、梁下にその長手方向に
沿って複数の吊り足場枠を相互に連結しつつ吊り下げる
ことによって梁の長手方向に連続する作業足場を構成し
、梁が平行に設置されている場合には各梁下に作業足場
を構成し、必要あるときはさらに左右作業足場間に単管
と足場板とからなる作業足場を構成するものである。
Structure of the Invention The suspended scaffolding construction method according to the present invention constitutes a working scaffold that is continuous in the longitudinal direction of the beam by suspending a plurality of suspended scaffolding frames under the beam while interconnecting them along the longitudinal direction of the beam. When the beams are installed in parallel, a work scaffold is constructed under each beam, and when necessary, a work scaffold consisting of a single pipe and a scaffold board is constructed between the left and right work scaffolds.

また、この発明の吊り足場工法に使用する吊り足場枠は
建枠下端部に布枠を起倒自在に連結し、この布枠先端部
と建枠上端部間にプレースをその両端を回転自在に連結
して架設するとともにこのプレースを折曲若しくは伸縮
自在に構成し、かつ前記建枠上端部に吊り下げ機構を、
前記布枠先端部に連結フックをそれぞれ設けることによ
り構成されている。
In addition, the hanging scaffolding frame used in the hanging scaffolding method of this invention has a cloth frame connected to the lower end of the building frame so that it can be raised and lowered, and a place is placed between the tip of the cloth frame and the upper end of the building frame so that both ends can be rotated. In addition to connecting and constructing the place, the place is configured to be bendable or expandable, and a hanging mechanism is provided at the upper end of the building frame.
It is constructed by providing connection hooks at the tips of the cloth frames.

実施例 以下、この発明を吊り足場枠から図示する一実施例に基
いて説明する。
EXAMPLE Hereinafter, the present invention will be explained based on an example illustrated from a suspended scaffolding frame.

吊り足場枠1は、縦長の長方形枠に構成された建枠2と
、横長の長方形枠に構成された布枠3とプレース4.4
とから構成されている。
The hanging scaffolding frame 1 consists of a building frame 2 configured as a vertically long rectangular frame, a cloth frame 3 configured as a horizontally long rectangular frame, and a place 4.4.
It is composed of.

建枠2の上端横部材5には吊り下げ機構6が構成されて
いる。
A hanging mechanism 6 is constructed on the upper end horizontal member 5 of the building frame 2.

吊り下げ機構6には、少なくとも吊シ下げ金具7、レバ
ー8 、8 、締付ポルト9および締付ナツト13が取
付けられている。
At least a hanging metal fitting 7, levers 8, 8, a tightening port 9, and a tightening nut 13 are attached to the hanging mechanism 6.

吊り下げ金具7は、真上に開口するU字型に形成されそ
の上端部にはフック7a、7aが形成されている。
The hanging fitting 7 is formed in a U-shape that opens directly above, and has hooks 7a, 7a formed at its upper end.

また、レバー8.8は逆り字型に形成され、吊り下げ金
具7の左右両側にポル)8bによって回転自在にボルト
止めされ、さらに左右レバー8゜8の下端部は、この部
分にスペーサ10を介在しかつポルト11によって連結
されている。
Further, the lever 8.8 is formed in an inverted shape, and is rotatably bolted to the left and right sides of the hanging fitting 7 by poles 8b, and furthermore, the lower ends of the left and right levers 8. and are connected by port 11.

このように構成された吊り下げ金具7およびレバー8,
8は建枠2の上端横部材5の左右両側に吊り下げ金具7
を上端横部材5に挿通することによって取付けられてい
る。
The hanging fitting 7 and lever 8 configured in this way,
8 is a hanging metal fitting 7 on both left and right sides of the upper end horizontal member 5 of the building frame 2.
It is attached by inserting it into the upper end horizontal member 5.

かかる場合、両側吊り下げ金具7,7のフック7a、7
aおよび左右レバー8.8のてこ部3a 、gaは相対
向し、かつ両側吊り下げ金具7.7はレバー8,8とと
もに上端横部材5の長手方向に自由に摺動することが可
能とされている。
In such a case, the hooks 7a, 7 of the hanging fittings 7, 7 on both sides
a and the lever portions 3a and ga of the left and right levers 8.8 face each other, and the hanging fittings 7.7 on both sides can freely slide in the longitudinal direction of the upper end horizontal member 5 together with the levers 8, 8. ing.

締付ポルト9,9の基端部は上端横部材5のほぼ中央部
にボルト止めされた固定金具12に回転自在に連結され
、他端部はスペーサー10 、10のほぼ中央部に形成
された小孔10aに挿通されその貫通部分に締付はナツ
ト13.13(以下、蝶ナツト13.13とする)が螺
合されている。
The base ends of the tightening ports 9, 9 are rotatably connected to a fixing metal fitting 12 bolted to approximately the center of the upper end horizontal member 5, and the other ends are formed approximately at the center of the spacers 10, 10. It is inserted into the small hole 10a, and a tightening nut 13.13 (hereinafter referred to as wing nut 13.13) is screwed into the penetrating portion.

かかる構成において、吊り下げ金具7のフック7aとレ
バー8のてこ部8a間にプレートガーダ−14の下部フ
ランジ14aの左右縁端部を係合するとともに蝶ナツ)
13.13をそれぞれ強く締付けることによりフック7
aとてこ部8a間で下部フランジ14aの縁端部を強く
挾持することが可能とされている(第4図参照)。
In this configuration, the left and right edges of the lower flange 14a of the plate girder 14 are engaged between the hook 7a of the hanging fitting 7 and the lever part 8a of the lever 8, and
13. By tightening each of 13 strongly, the hook 7
It is possible to firmly clamp the edge of the lower flange 14a between the lever portion 8a and the lever portion 8a (see FIG. 4).

布枠3は、その基端部を建枠2の下端横部材15に回転
自在に連結することにより建枠2に対して起倒自在とさ
れている。また、布枠3には床板16が敷設され、また
その左右腕杆17 、17の先端部には連結フック18
.18が取付けられている。
The cloth frame 3 can be raised and lowered relative to the building frame 2 by rotatably connecting its base end to the lower end horizontal member 15 of the building frame 2. Further, a floor plate 16 is laid on the cloth frame 3, and connecting hooks 18 are provided at the tips of the left and right arm rods 17, 17.
.. 18 is installed.

プレース4.4は、建枠2の上端部と布枠3の先端部間
に斜めに架設されている。
The place 4.4 is installed diagonally between the upper end of the building frame 2 and the tip of the cloth frame 3.

プレース4,4の上下両端部は、建枠2の左右脚杆19
,19および布枠3の左右腕杆17゜17にそれぞれ回
転自在に連結されている。またプレース4,4は少なく
とも2部材を回転自在に連結して形成することにより連
結部を中心に折曲自在とされている。
The upper and lower ends of places 4 and 4 are the left and right leg rods 19 of the building frame 2.
, 19 and the left and right arm rods 17° 17 of the cloth frame 3, respectively. Further, the places 4, 4 are formed by rotatably connecting at least two members, so that they can be bent around the connecting portion.

なお、プレース4は径の異なる複数本の鋼管を太い方に
細い方をその長手方向に摺動自在に挿通して連結するこ
とにより伸縮自在に構成してもよいものとする。
The place 4 may be configured to be expandable and retractable by connecting a plurality of steel pipes having different diameters by slidingly inserting the thicker one in the longitudinal direction and the thinner one in the longitudinal direction.

かかる構成において、吊り足場枠1の設置に際しては、
布枠3を水平に押し倒し、運搬・収納等に際しては布枠
3を起し、建枠2に沿わせておりたたむ。かかる場合、
布枠3の横幅を建枠2のそれより一回り小さくし、布枠
3が建枠2内に完全に収納できるように構成することに
より、全体が嵩張らないようにしである。
In such a configuration, when installing the suspended scaffolding frame 1,
The cloth frame 3 is pushed down horizontally, and when transporting, storing, etc., the cloth frame 3 is raised and folded along the building frame 2. In such case,
The width of the cloth frame 3 is made one size smaller than that of the building frame 2, and the cloth frame 3 is configured to be completely housed within the building frame 2, so that the whole structure is not bulky.

続いて、この発明に係る吊シ足場工法を順を追って説明
する(第7図〜第10図参照)。
Next, the suspended scaffolding construction method according to the present invention will be explained step by step (see FIGS. 7 to 10).

■ 最初の吊シ足場枠1を梁14の下に吊シ下げる(第
7図参照)。吊り足場枠1を吊り下げるには梁14の下
部フランジ14aの左右縁端部に吊り下げ金具7のフッ
ク7aとレバー8間を係合する左ともに蝶ナツト13を
強く締付ける(第4図参照)。続いて、布枠3を水平に
押し倒す。
■ Hang the first scaffolding frame 1 below the beam 14 (see Figure 7). To suspend the hanging scaffold frame 1, strongly tighten the wing nuts 13 on the left and right sides of the lower flange 14a of the beam 14, which engage between the hook 7a of the hanging fitting 7 and the lever 8 (see Fig. 4). . Next, push down the cloth frame 3 horizontally.

■ 続いて、第2番目の吊シ足場枠1を最初の吊り足場
枠1の左右連結フック18.18上に第2番目の吊り足
場枠1の下端横部材15を係合し、吊り足場枠1を起立
させて、前記最初の吊り足場枠1と同じ方法で梁14の
下に吊り下げ金具を固定することにより、最初の吊り足
場枠1と第2番目のそれとを連結する(第8図参照)。
■ Next, engage the lower end horizontal member 15 of the second suspended scaffolding frame 1 on the left and right connecting hooks 18, 18 of the first suspended scaffolding frame 1, and then The first suspended scaffolding frame 1 and the second one are connected by standing up the first suspended scaffolding frame 1 and fixing the hanging fittings under the beam 14 in the same manner as the first suspended scaffolding frame 1 (see Fig. 8). reference).

■ 以下、同様に第3番目、第4番目の順に吊り足場枠
1.・・・を吊り下げ、梁14の下にその長手方向に連
続する作業足場21を構成する(第9,10図参照)。
■ Thereafter, in the same way, the third and fourth hanging scaffold frames 1. ... is suspended, and a working scaffold 21 is constructed below the beam 14 and continuing in the longitudinal direction thereof (see FIGS. 9 and 10).

■ 梁14が平行に設置されている場合には各梁14の
下に作業足場21を構成し、必要あるときは、さらに左
右作業足場21.21間に単管20足場板22とから作
業足場23を構成する(第11図参照)。、 発明の効果 この発明は、以上の構成からなり、橋梁等の梁下に作業
足場を構成する際、複数の吊り足場枠を前後連結しつつ
吊り下げることによシ梁長手方向に連続する作業足場を
短期間で、しかもきわめて簡単に設置することができる
■ When the beams 14 are installed in parallel, a work scaffold 21 is constructed under each beam 14, and when necessary, a work scaffold is added between the left and right work scaffolds 21 and 21 with a single pipe 20 and a scaffold board 22. 23 (see FIG. 11). , Effects of the Invention This invention has the above configuration, and when constructing a work scaffold under a beam such as a bridge, a plurality of hanging scaffold frames are connected in the front and back and suspended, thereby allowing continuous work in the longitudinal direction of the beam. Scaffolding can be installed in a short period of time and extremely easily.

また、各吊り足場枠はそれぞれ独立して梁に吊り下げら
れ、かつ相隣り合う吊り足場枠も相互に連結されている
ので、突風にあおられ、大きく揺”れる心配は全くなく
、強度上並びに安全上、きわめてすぐれている。
In addition, each suspended scaffolding frame is independently suspended from the beam, and adjacent suspended scaffolding frames are also connected to each other, so there is no risk of the scaffolding being swayed by gusts of wind. It is extremely safe in terms of safety.

また、この発明に係る吊り足場枠は構成がきわめて簡単
なうえ折りたたみが可能であるため、運搬、収納等取扱
いがきわめて容易で実用性が高い。
Furthermore, the suspended scaffolding frame according to the present invention has an extremely simple structure and is foldable, so it is extremely easy to transport, store, etc., and is highly practical.

【図面の簡単な説明】[Brief explanation of drawings]

第1図〜第11図は、この発明の一実施例を示したもの
で、第1図は吊り足場枠の斜視図、第2図、第3図はそ
の側面図、正面図、第4図は吊り下げ機構の正面図、第
5図および第6図は第4図におけるI−I線、■−■線
断面図、第7図〜第11図は吊り足場工法の工程を示す
もので、第7図〜第10図はその側面図、第11図は梁
が平行に設置されている場合の左右作業足場間に新たな
作業足場を構成した時の断面図である。 1・・吊り足場枠、2・・建枠、3・・布枠、4・・プ
レース、5・・上端横部材、 6・・吊り下げ機構、7・・吊り下げ金具、8・・レバ
ー、9・・締付ポルト、 10・・スペーサ、11・・連結ボルト、12・・取付
ポル)、13−・蝶ナツト、14・・梁、15・・下端
横部材、16・・床板17・・腕杆、18・・連結フッ
ク、 19・・脚杆、20・・単管、21・・作業足場22・
・足場板、23・・作業足場。 第1図 第6図      第5図 第7図 1ム 第8図 1ム 第 9 図 L
Figures 1 to 11 show an embodiment of the present invention, with Figure 1 being a perspective view of a hanging scaffold frame, Figures 2 and 3 being a side view, front view, and Figure 4. is a front view of the hanging mechanism, Figures 5 and 6 are cross-sectional views taken along lines I-I and ■-■ in Figure 4, and Figures 7 to 11 show the process of the hanging scaffolding method. 7 to 10 are side views thereof, and FIG. 11 is a sectional view when a new work scaffold is constructed between the left and right work scaffolds when the beams are installed in parallel. 1. Hanging scaffold frame, 2. Construction frame, 3. Cloth frame, 4. Place, 5. Upper end horizontal member, 6. Hanging mechanism, 7. Hanging metal fittings, 8. Lever, 9. Tightening port, 10. Spacer, 11. Connection bolt, 12. Mounting port), 13-. Wing nut, 14. Beam, 15. Lower end horizontal member, 16. Floor plate 17. Arm rod, 18... Connecting hook, 19... Leg rod, 20... Single pipe, 21... Work scaffolding 22.
・Scaffolding board, 23...Working scaffold. Figure 1 Figure 6 Figure 5 Figure 7 Figure 1m Figure 8 Figure 1m Figure 9 L

Claims (1)

【特許請求の範囲】 (1、)梁下にその長手方向に沿つて複数の吊り足場枠
を相互に連結しつつ吊り下げることを特徴とする吊り足
場工法。 (2、)建枠下端部に布枠を起倒自在に連結し、この布
枠先端部と建枠上端部間にプレースをその両端を回転自
在に連結して架設するとともにこのブレースを折曲若し
くは伸縮自在に構成し、かつ前記建枠上端部に吊り下げ
機構を、前記布枠先端部に連結フックをそれぞれ設けて
なることを特徴とする吊り足場枠。
[Claims] (1.) A suspended scaffold construction method characterized by suspending a plurality of suspended scaffolding frames under a beam along its longitudinal direction while interconnecting them. (2.) A cloth frame is connected to the lower end of the building frame so that it can be raised and lowered, and a place is erected between the tip of the cloth frame and the upper end of the building frame by connecting both ends of the place so that it can rotate, and the brace is bent. Alternatively, a hanging scaffolding frame is configured to be extendable and contractible, and is provided with a hanging mechanism at the upper end of the building frame and a connecting hook at the tip of the fabric frame.
JP2991285A 1985-02-18 1985-02-18 Suspension scaffold construction method and suspension scaffold frame Granted JPS61191762A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2991285A JPS61191762A (en) 1985-02-18 1985-02-18 Suspension scaffold construction method and suspension scaffold frame

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2991285A JPS61191762A (en) 1985-02-18 1985-02-18 Suspension scaffold construction method and suspension scaffold frame

Publications (2)

Publication Number Publication Date
JPS61191762A true JPS61191762A (en) 1986-08-26
JPH0525986B2 JPH0525986B2 (en) 1993-04-14

Family

ID=12289199

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2991285A Granted JPS61191762A (en) 1985-02-18 1985-02-18 Suspension scaffold construction method and suspension scaffold frame

Country Status (1)

Country Link
JP (1) JPS61191762A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH04140363A (en) * 1990-09-28 1992-05-14 Shinsei Kogyo:Kk Assembly of suspended scaffolding
JPH0459238U (en) * 1990-09-28 1992-05-21

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP7350535B2 (en) * 2019-06-28 2023-09-26 日軽エンジニアリング株式会社 Scaffolding for bridge inspection

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5383818U (en) * 1976-12-13 1978-07-11
JPS58185856A (en) * 1982-04-21 1983-10-29 清水建設株式会社 Support for use with working scaffold for constructing src structural beam

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5383818U (en) * 1976-12-13 1978-07-11
JPS58185856A (en) * 1982-04-21 1983-10-29 清水建設株式会社 Support for use with working scaffold for constructing src structural beam

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH04140363A (en) * 1990-09-28 1992-05-14 Shinsei Kogyo:Kk Assembly of suspended scaffolding
JPH0459238U (en) * 1990-09-28 1992-05-21

Also Published As

Publication number Publication date
JPH0525986B2 (en) 1993-04-14

Similar Documents

Publication Publication Date Title
CN108894329B (en) Overhanging type pipe truss and mounting method of supporting rod thereof
JPS61191762A (en) Suspension scaffold construction method and suspension scaffold frame
US5320470A (en) Device for installation of building material
JPH04140363A (en) Assembly of suspended scaffolding
CN212201400U (en) Assembled steel structure external hanging type protective frame
JP3568167B2 (en) Temporary hanging stairs
CN113550550A (en) Overhanging unit type scaffold convenient to assemble and disassemble
CN109610802B (en) External hanging frame operation platform
JP2003082848A (en) Simple hanging scaffolding device
CN214995797U (en) Safety hanging basket for pipe truss overhead operation
CN216840496U (en) Steel truss bottom suspension type temporary operation platform
JPS60212562A (en) Foldable funnel-shaped urinal apparatus
JPH061988Y2 (en) Panel lift
JP2669254B2 (en) Side wall panel mounting method
JPH11107523A (en) Hanging scaffold, method for constructing the same, and mounting bracket for standard pipe, etc.
CN212271579U (en) Portable standardized stair structure
JP3100574B2 (en) Suspended scaffold and its erection method
JPH028030Y2 (en)
JPH0740595Y2 (en) Suspension for scaffolding and dismantling work
JPH0635054Y2 (en) Scaffolding equipment
JP2768885B2 (en) Scaffolding equipment
JPH0321569Y2 (en)
JPS6030706A (en) Hanging scaffold for bridge
JP2513480Y2 (en) Assembly scaffolding
JPH0559809A (en) Hanging scaffolding

Legal Events

Date Code Title Description
R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

EXPY Cancellation because of completion of term