CN214995797U - Safety hanging basket for pipe truss overhead operation - Google Patents

Safety hanging basket for pipe truss overhead operation Download PDF

Info

Publication number
CN214995797U
CN214995797U CN202120916674.1U CN202120916674U CN214995797U CN 214995797 U CN214995797 U CN 214995797U CN 202120916674 U CN202120916674 U CN 202120916674U CN 214995797 U CN214995797 U CN 214995797U
Authority
CN
China
Prior art keywords
pipe truss
shaped clamp
basket
basket body
shaped
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202120916674.1U
Other languages
Chinese (zh)
Inventor
郑会芬
徐国友
张望
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Mcc Chongqing Construction Industry Co ltd
Original Assignee
Chongqing Steel Structure Co Ltd Of China Metallurgical Construction Engineering Group
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chongqing Steel Structure Co Ltd Of China Metallurgical Construction Engineering Group filed Critical Chongqing Steel Structure Co Ltd Of China Metallurgical Construction Engineering Group
Priority to CN202120916674.1U priority Critical patent/CN214995797U/en
Application granted granted Critical
Publication of CN214995797U publication Critical patent/CN214995797U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model discloses a basket is hung to safety for pipe truss high altitude construction, including hanging the basket body, hang the metal basket that the basket body is the uncovered setting in upper end, its characterized in that, it is equipped with two U-shaped clamps to hang basket body upper end, and two U-shaped clamps are located respectively and hang the basket body left and right sides and U-shaped clamp notch downwards and hang the basket body fixed to the diameter and the pipe truss diameter of U-shaped clamp segmental arc correspond, thereby be convenient for utilize two U-shaped clamps to hang the basket body and establish on the pipe truss, every U-shaped clamp middle part level is equipped with the detachable gag lever post, in order to establish pipe truss card between U-shaped clamp and gag lever post. The safe hanging basket can be stably hung on the pipe truss, and cannot shake, so that the working efficiency and the safety are improved.

Description

Safety hanging basket for pipe truss overhead operation
Technical Field
The utility model belongs to the technical field of the construction safety facility, concretely relates to a safe basket of hanging for managing truss aerial work.
Background
With the rapid development of the economy of China and the improvement of the living standard of China, people can recognize and pursue the beauty of buildings continuously, so that the large-span pipe truss structure with the advantages of light dead weight, high strength, good overall performance, easy modeling, beautiful appearance and the like is applied to the current building industry more and more widely. When a large-span pipe truss is constructed on site, the primary and secondary pipe trusses need to be connected in nodes, the existing method is that an operation platform is built on an upper chord pipe of a primary truss to connect the upper chord pipe of the primary and secondary pipe trusses in nodes, a temporary operation platform is built on a lower chord pipe of the primary truss to connect the lower chord pipe of the primary and secondary pipe trusses in nodes, but the temporary operation platform is generally formed by overlapping in a welding mode, and the installation and the disassembly are not convenient, so that the high-altitude operation hanging basket is frequently adopted for auxiliary construction later.
However, the following two technical problems often exist in the conventional hanging basket: firstly, the traditional steel wire rope hanging basket has the potential safety hazard that the steel wire rope is easy to wear in the using process; secondly, the existing cradle type on the market can not form a stable and reliable structure with the pipe truss, and the cradle is easy to shake when operating at the high position of the pipe truss, so that the cradle is not beneficial to construction of operating personnel, influences the working efficiency and has certain potential safety hazard.
Disclosure of Invention
The utility model aims at providing a safe basket of hanging that is used for managing truss high altitude construction, this safe basket of hanging can hang on managing the truss steadily, can not take place to rock to be favorable to improving work efficiency and security.
The technical scheme of the utility model is realized like this:
the utility model provides a safe basket of hanging for operation of pipe truss high altitude, is including hanging the basket body, it is the uncovered metal basket that sets up in upper end to hang the basket body, it is equipped with two U-shaped clamps to hang basket body upper end, and two U-shaped clamps are located respectively and hang the basket body left and right sides and U-shaped clamp notch downwards and hang the basket body fixed to the diameter of U-shaped clamp segmental arc corresponds with pipe truss diameter, thereby be convenient for utilize two U-shaped clamps will hang the basket body and establish on the pipe truss, and every U-shaped clamp middle part level is equipped with the detachable gag lever post and the distance of gag lever post to U-shaped clamp corresponds with pipe truss diameter tank bottom, in order to establish pipe truss card between U-shaped clamp and gag lever post.
During specific implementation, the gag lever post circumferential surface is equipped with the external screw thread, and U-shaped clamp middle part is equipped with two screw through-holes that supply the gag lever post to pass two screw through-holes in proper order to the gag lever post in the U-shaped clamp outside overlaps establishes the nut, fixes the gag lever post on the U-shaped clamp.
In specific implementation, the hanging basket body comprises four horizontal beams which are connected end to form a rectangular frame, and a support plate is arranged in the rectangular frame and used for providing a standing platform for an operator; the four vertexes of the rectangular frame are respectively and vertically provided with vertical rods, connecting rods are respectively arranged between the two vertical rods positioned at the left side and the right side, two ends of each connecting rod are respectively fixed with the top ends of the two corresponding vertical rods, and the U-shaped clamp is fixed on the connecting rod at the corresponding side.
During concrete implementation, the connecting rod adopts the angle steel to make, is equipped with a plurality of first connecting holes on the connecting rod, and two first connecting holes are a set of, and every first connecting hole of group sets up along perpendicular line symmetry in the connecting rod, and U-shaped clamp lower extreme is equipped with two second connecting holes that correspond with one of them first connecting hole of a set of, and the bolt passes second connecting hole and the first connecting hole that corresponds in order to fix U-shaped clamp and connecting rod.
During the concrete implementation, be equipped with a plurality of railings along the direction of height interval between two adjacent poles of setting for the safety of protection operation personnel.
During the concrete implementation, the corresponding edge all around of backup pad is equipped with the baseboard for avoid hanging the equipment of placing on the basket body and drop.
When the device is specifically implemented, a plurality of supporting rods are uniformly distributed below the supporting plate, and two ends of each supporting rod are respectively fixed with the two oppositely-arranged cross beams.
Compared with the prior art, the utility model discloses following beneficial effect has:
1. the utility model discloses well U-shaped clamp segmental arc can with the laminating of pipe truss, adopt the gag lever post to carry on spacingly for the pipe truss simultaneously for U-shaped clamp and pipe truss compress tightly the state for the laminating, the U-shaped clamp can not take place to rock on the pipe truss, thereby guarantee that the safety hangs the basket and can not take place to rock at the operation in-process, the operation personnel can carry out the operation in the safety is hung the basket better like this, and then are favorable to improving work efficiency and security.
2. Hang basket body and U-shaped clamp and be detachable construction, when carrying out high altitude construction to not unidimensional pipe truss, only need change the U-shaped clamp that suits, lower part is hung basket body and then repeatedly usable.
Drawings
Fig. 1-the structure of the present invention.
Fig. 2-mechanism schematic diagram of the use state of the present invention.
Wherein: 1-a cross beam; 2-erecting a rod; 3-a railing; 4-a connecting rod; 5-U-shaped clamp; 6-bolt; 7-a limiting rod; 8-a nut; 9-a support plate; 10-skirting board; 11-tube truss.
Detailed Description
The present invention will be described in further detail with reference to the accompanying drawings and specific embodiments.
Referring to fig. 1 and 2, a safe basket of hanging for pipe truss aerial work, including hanging the basket body, it is the uncovered metal basket that sets up in upper end to hang the basket body, it is equipped with two U-shaped clamps 5 to hang basket body upper end, and two U-shaped clamps 5 are located respectively and hang the basket body left and right sides and 5 notch of U-shaped clamp and fixed with hanging the basket body downwards to the diameter of U-shaped clamp segmental arc corresponds with pipe truss 11 diameter, thereby be convenient for utilize two U-shaped clamps to hang the basket body and establish on pipe truss 11, and every U-shaped clamp 5 middle part level is equipped with detachable gag lever post 7 and gag lever post 7 corresponds with pipe truss 11 diameter to the distance that will hang the basket body and establish pipe truss 11 card between U-shaped clamp 5 and gag lever post 7.
Two U-shaped clamps are arranged along the longitudinal direction of the pipe truss, wherein the left and the right correspond to the longitudinal ends of the pipe truss.
Like this, U-shaped clamp segmental arc can with the laminating of pipe truss, adopt the gag lever post to carry on spacingly for the pipe truss simultaneously for U-shaped clamp and pipe truss compress tightly the state for the laminating, the U-shaped clamp can not take place to rock on the pipe truss, thereby guarantee that the safety hangs the basket and can not take place to rock at the operation in-process, the operation personnel can carry out the operation in the safety hangs the basket better like this, and then are favorable to improving work efficiency and security.
During specific implementation, 7 circumferential surfaces of gag lever post are equipped with the external screw thread, and 5 middle parts of U-shaped clamp are equipped with two screw through-holes that supply gag lever post 7 to pass, and the gag lever post passes two screw through-holes in proper order to the nut 8 is established to the cover on gag lever post 7 in the 5 outsides of U-shaped clamp, fixes gag lever post 7 on U-shaped clamp 5.
The limiting rod is equivalent to a stud, so that the safe hanging basket can be moved by loosening the nut, the nut can be screwed up during the operation of the hanging basket, the safe hanging basket is prevented from shaking, and the safety is guaranteed.
In specific implementation, the hanging basket body comprises four horizontal beams 1, the four beams 1 are connected end to form a rectangular frame, and a support plate 9 is arranged in the rectangular frame and used for providing a standing platform for an operator; the four summits punishment at the rectangle frame do not vertically are equipped with pole setting 2, are located and are equipped with connecting rod 4 respectively between two pole settings 2 of the left and right sides, and every connecting rod 4 both ends are fixed with two pole setting 2 tops that correspond respectively, U-shaped clamp 5 is fixed on the connecting rod 4 that corresponds the side.
During concrete implementation, connecting rod 4 adopts the angle steel to make, is equipped with a plurality of first connecting holes on connecting rod 4, and two first connecting holes are a set of, and every first connecting hole of group sets up along connecting rod 4 median perpendicular symmetry, and 5 lower extremes of U-shaped clamp are equipped with two second connecting holes that correspond with one of them a set of first connecting hole, and bolt 6 passes second connecting hole and the first connecting hole that corresponds in order to fix U-shaped clamp 5 and connecting rod 4.
As shown in fig. 1, the U-shaped clamp in this embodiment is formed by bending an angle steel according to the size of the main pipe of the pipe truss, so that a right-angle side of the U-shaped clamp is fixed to the connecting rod, and the other right-angle side is used for arranging the limiting rod. The U-shaped hoop is made of angle steel with the thickness of more than 8mm, and the strength of the U-shaped hoop serving as a connecting piece is guaranteed. Before the operation of the pipe truss at the high position, a plurality of sets of U-shaped clamps with the adaptive sizes can be bent in a workshop in advance according to the section type of the pipe truss main pipe on site, so that different U-shaped clamps can be selected and used on site according to the section sizes of different pipe truss main pipes. When carrying out high altitude construction to the not unidimensional pipe truss, only need change the U-shaped clamp that suits, but lower part hangs basket body once the preparation can be general.
During the concrete implementation, 2 are equipped with a plurality of railings 3 along the direction of height interval between two adjacent pole settings for the safety of protection operation personnel.
During specific implementation, skirting boards 10 are arranged at corresponding edges around the supporting plate 9 and used for preventing construction tools placed in the hanging basket body from falling.
In specific implementation, a plurality of support rods (not shown in the figure) are uniformly distributed below the support plate 9, and two ends of each support rod are respectively fixed with the two oppositely arranged cross beams and are used for supporting and reinforcing the support plate.
The supporting plate is made of a pattern steel plate with the thickness of 4mm, and the skirting board is also made of a steel plate with the thickness of 4mm, so that the dead weight of the safe hanging basket is reduced.
The safe hanging basket is utilized to carry out operation on the pipe truss elevated position, and two parts of structures of the safe hanging basket are manufactured in advance: and the U-shaped hoop and the hanging basket body are matched with the cross section of the pipe truss in size. When the hanging basket is used in field, before one section of pipe truss is hoisted, the U-shaped clamp hoop with the size matched with that of the lower chord main pipe of the section of pipe truss is sleeved on the lower chord main pipe of the pipe truss on the ground, then the U-shaped clamp hoop is fixedly connected with the hanging basket body, then the limiting rod penetrates through the threaded through hole in the middle of the U-shaped clamp hoop, and the nut is screwed, so that the high-altitude operation safety hanging basket is fixedly and firmly fixed on the pipe truss before the pipe truss is hoisted, and is hoisted to the air along with the pipe truss. After the connection operation of one primary and secondary pipe truss node is completed, firstly, the limiting rod in the middle of the U-shaped hoop and the bolt of the U-shaped hoop and the connecting rod are detached by means of lifting equipment, the primary and secondary pipe truss node is bypassed, the safety hanging basket and the U-shaped hoop are hoisted to the next primary and secondary pipe truss node, then the bolt on the U-shaped hoop and the connecting rod and the limiting rod in the middle of the U-shaped hoop are connected, the safety hanging basket is fixed on a lower chord main pipe of the pipe truss again, the connection operation of the primary and secondary pipe truss node is performed, the connection operation of all the primary and secondary pipe truss nodes is completed in this way, then the limiting rod in the middle of the U-shaped hoop and the bolt of the U-shaped hoop and the connecting rod are detached by means of the lifting equipment, the safety hanging basket is detached and transported to the ground, and the safety hanging basket can be well maintained and applied to the pipe truss high position operation of other projects.
Finally, it should be noted that the above-mentioned embodiments of the present invention are only examples for illustrating the present invention, and are not limitations to the embodiments of the present invention. Variations and modifications in other variations will occur to those skilled in the art upon reading the foregoing description. Not all embodiments are exhaustive. All obvious changes or variations which are introduced by the technical solution of the present invention are still within the scope of the present invention.

Claims (7)

1. The utility model provides a safe basket of hanging for operation of pipe truss high altitude, is including hanging the basket body, hang the metal basket that the basket body is the uncovered setting in upper end, its characterized in that, it is equipped with two U-shaped clamps to hang basket body upper end, and two U-shaped clamps are located respectively and hang the basket body left and right sides and U-shaped clamp notch downwards and hang the basket body fixed to the diameter and the pipe truss diameter of U-shaped clamp arc section correspond, thereby be convenient for utilize two U-shaped clamps will hang the basket body and establish on the pipe truss, and every U-shaped clamp middle part level is equipped with the distance that detachable gag lever post and gag lever post reach U-shaped clamp tank bottom and corresponds with pipe truss diameter to establish pipe truss card between U-shaped clamp and gag lever post.
2. The safety hanging basket for pipe truss aerial work of claim 1, wherein the limiting rod is provided with external threads on the circumferential surface, two threaded through holes for the limiting rod to pass through are formed in the middle of the U-shaped clamp, the limiting rod passes through the two threaded through holes in sequence, and a nut is sleeved on the limiting rod outside the U-shaped clamp to fix the limiting rod on the U-shaped clamp.
3. The safety hanging basket for pipe truss aerial work according to claim 1, wherein the hanging basket body comprises four horizontal cross beams, the four cross beams are connected end to form a rectangular frame, and a support plate is arranged in the rectangular frame and used for providing a standing platform for workers; the four vertexes of the rectangular frame are respectively and vertically provided with vertical rods, connecting rods are respectively arranged between the two vertical rods positioned at the left side and the right side, two ends of each connecting rod are respectively fixed with the top ends of the two corresponding vertical rods, and the U-shaped clamp is fixed on the connecting rod at the corresponding side.
4. The safety hanging basket for pipe truss aerial work of claim 3, wherein the connecting rod is made of angle steel, the connecting rod is provided with a plurality of first connecting holes, two first connecting holes are arranged in a group, each group of first connecting holes is symmetrically arranged along a perpendicular line in the connecting rod, the lower end of the U-shaped hoop is provided with two second connecting holes corresponding to one group of first connecting holes, and the bolt penetrates through the second connecting holes and the corresponding first connecting holes to fix the U-shaped hoop and the connecting rod.
5. The safety hanging basket for pipe truss aerial work according to claim 3, wherein a plurality of railings are arranged between two adjacent vertical rods at intervals along the height direction for protecting the safety of workers.
6. The safety hanging basket for pipe truss overhead work as claimed in claim 3, wherein skirting boards are arranged at corresponding edges around the supporting plates for preventing equipment placed on the hanging basket body from falling off.
7. The safety hanging basket for pipe truss aerial work according to claim 6, wherein a plurality of support rods are uniformly distributed below the support plate, and two ends of each support rod are respectively fixed with the two cross beams which are oppositely arranged.
CN202120916674.1U 2021-04-29 2021-04-29 Safety hanging basket for pipe truss overhead operation Active CN214995797U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202120916674.1U CN214995797U (en) 2021-04-29 2021-04-29 Safety hanging basket for pipe truss overhead operation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202120916674.1U CN214995797U (en) 2021-04-29 2021-04-29 Safety hanging basket for pipe truss overhead operation

Publications (1)

Publication Number Publication Date
CN214995797U true CN214995797U (en) 2021-12-03

Family

ID=79089597

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202120916674.1U Active CN214995797U (en) 2021-04-29 2021-04-29 Safety hanging basket for pipe truss overhead operation

Country Status (1)

Country Link
CN (1) CN214995797U (en)

Similar Documents

Publication Publication Date Title
CN205688642U (en) A kind of large space ceiling decoration supporting construction
CN101775896B (en) Rigid suspended scaffold for installing pipeline of steel roof equipment
CN108532968A (en) A kind of assembled support device of steel bar truss floor support plate composite floor system
CN107327068A (en) Steel construction truss string structure system roof system ceiling structure and its construction method
CN205369873U (en) Handling frame is hung to circular steel construction of encorbelmenting
CN108894329B (en) Overhanging type pipe truss and mounting method of supporting rod thereof
CN214995797U (en) Safety hanging basket for pipe truss overhead operation
CN201635377U (en) Rigid suspended type scaffold provided with large-span steel roof equipment pipeline
CN212385315U (en) Positioning device for assembling cross steel pull rod
CN203271096U (en) Operating platform
CN208534069U (en) The assembled support device of steel bar truss floor support plate composite floor system
CN205840289U (en) A kind of suspension type vertical operating platform
CN213115585U (en) Stable form bearing structure that building engineering used
CN113550550A (en) Overhanging unit type scaffold convenient to assemble and disassemble
CN109594795A (en) A kind of bolt-type detachably assembles support frame
CN212478241U (en) Novel steel structure spherical net rack ceiling conversion layer connecting structure
CN113123583A (en) Construction method for lower chord node of large-span pipe truss
CN105274977B (en) Truss framed leg steel wire rope scaffold device and mounting method
CN114033189A (en) Large-area high-altitude grid structure aluminum grid ceiling construction device and construction method
CN111608377B (en) Comprehensive construction method for building overhanging scaffold
CN211257761U (en) Lifting type elevator shaft operating platform
CN204357138U (en) Simple steel structure lifting upending frame
CN209874434U (en) Simple and easy scaffold frame of encorbelmenting of building high latitude
CN212984578U (en) Novel high altitude steel construction installation work is supplementary device
CN212271579U (en) Portable standardized stair structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP01 Change in the name or title of a patent holder

Address after: No.39-1 Jianshe Avenue, Banan District, Chongqing 400054

Patentee after: MCC Chongqing Construction Industry Co.,Ltd.

Address before: No.39-1 Jianshe Avenue, Banan District, Chongqing 400054

Patentee before: Chongqing Steel Structure Co., Ltd. of China Metallurgical Construction Engineering Group

CP01 Change in the name or title of a patent holder