JPS60523B2 - Method of operating a combined cycle plant combining a gas turbine and a steam turbine - Google Patents

Method of operating a combined cycle plant combining a gas turbine and a steam turbine

Info

Publication number
JPS60523B2
JPS60523B2 JP774375A JP774375A JPS60523B2 JP S60523 B2 JPS60523 B2 JP S60523B2 JP 774375 A JP774375 A JP 774375A JP 774375 A JP774375 A JP 774375A JP S60523 B2 JPS60523 B2 JP S60523B2
Authority
JP
Japan
Prior art keywords
output
gas turbines
combined cycle
plant
cycle plant
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
JP774375A
Other languages
Japanese (ja)
Other versions
JPS5183948A (en
Inventor
好弘 内山
昭三 中村
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hitachi Ltd
Mitsubishi Power Ltd
Original Assignee
Babcock Hitachi KK
Hitachi Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Babcock Hitachi KK, Hitachi Ltd filed Critical Babcock Hitachi KK
Priority to JP774375A priority Critical patent/JPS60523B2/en
Publication of JPS5183948A publication Critical patent/JPS5183948A/en
Publication of JPS60523B2 publication Critical patent/JPS60523B2/en
Expired legal-status Critical Current

Links

Landscapes

  • Control Of Turbines (AREA)
  • Engine Equipment That Uses Special Cycles (AREA)

Description

【発明の詳細な説明】 〔発明の利用分野〕 本発明は発電用として使用され「複数台のガスタービン
と蒸気タービンとを組合せた複合サイクルプラントの運
転方法に関するものである。
DETAILED DESCRIPTION OF THE INVENTION [Field of Application of the Invention] The present invention relates to a method for operating a combined cycle plant that is used for power generation and that combines a plurality of gas turbines and steam turbines.

。〔発明の背景〕第1図乃至第4図により公知のガスタ
ービンと蒸気タービンを粗合せた複合サイクルプラント
の構成、及びこの複合サイクルプラントの運転方法、並
びにその問題点を説明する。
. [Background of the Invention] The configuration of a known combined cycle plant in which a gas turbine and a steam turbine are loosely combined, a method of operating this combined cycle plant, and problems thereof will be explained with reference to FIGS. 1 to 4.

第1図において、la,lbはコンブレツサ、2a,2
bは燃焼器、3a,3bはガスタービンである。
In Fig. 1, la, lb are combrezzars, 2a, 2
b is a combustor, and 3a and 3b are gas turbines.

コンブレツサla,lbにより大気中の空気A,,A2
が加圧され、燃焼器2a,2b内で燃料F,,F2を燃
焼させ、その燃料ガスはガスタービン3a,3bに入り
ここで動力を発生して発電機4a,4bで電気出力を得
る。ガスタービン3a,3bで仕事を終った排ガスはま
だかなりの高温にありL該排ガスを排ガスダクト5a,
5bを通して排熱回収ボィラ6a,6bに導き、ここで
排ガスの熱量と熱交換して蒸気を発生させる。9E熱回
収ボィラ6a,6bを出たガスはスタツグ9a,9bか
ら大気へ放出される。
Air in the atmosphere A, , A2 by combretsators la, lb
is pressurized and burns the fuels F, F2 in the combustors 2a, 2b, and the fuel gas enters the gas turbines 3a, 3b to generate power, and the generators 4a, 4b generate electrical output. The exhaust gas that has finished its work in the gas turbines 3a and 3b is still at a fairly high temperature and is transferred to the exhaust gas duct 5a,
5b to exhaust heat recovery boilers 6a, 6b, where it exchanges heat with the heat of the exhaust gas to generate steam. The gas leaving the 9E heat recovery boilers 6a, 6b is released into the atmosphere from the stugs 9a, 9b.

緋熱回収ボィラで発生した蒸気は配管10a,10b、
ボィラ出口弁13a,13b及び排気へッダ1 1を介
し蒸気配管10を通じて蒸気タービン12へ入る。蒸気
タービン12で発生する動力は発電機14で電気出力に
変換される。蒸気タービン12を出た排気蒸気はコンデ
ンサー6で復水となり「給水加熱器17及び給水ポンプ
18を備えた給水配管15及び15a,15bを通じて
排熱回収ボィラ6a,6bに循環される。ガスターピン
3a,3bの排ガスは通常運転中は前記の如く緋熱回収
ボィラ6a6bを通過するが、起動停止、あるいはガス
ターピン単独運転などの場合においては、バイパスダン
パ8a,8bを通ってスタツグ9a,9bに直接排出が
可能のようにボィラバイパスダクト7a,7bが設けら
れている。緋熱回収ボィラには、ここで発生する蒸気の
蒸気条件を向上するため、ボイラ入口において助燃用燃
料FS,,FS2が加えられ、不足の熱量を補うように
助燃されるが普通である。助燃用燃料FS,,FS2は
ガスタービン排ガス中に多量に残存する酸素により燃焼
される。このようなガスタービンと蒸気タービンとを粗
合せた複合サイクルプラントにおいては、各タービンの
経済的な単独出力、およびそれぞれにおいて利用可能な
エネルギーのバランスに応じて、複数台のガスタービン
およびそれと対になる緋熱回収ボィラと一合の蒸気ター
ビンによって構成されるのが一般である。
The steam generated in the scarlet heat recovery boiler is piped into pipes 10a, 10b,
It enters the steam turbine 12 through the steam pipe 10 via the boiler outlet valves 13a, 13b and the exhaust header 11. The power generated by the steam turbine 12 is converted into electrical output by the generator 14. Exhaust steam exiting the steam turbine 12 becomes condensate in the condenser 6 and is circulated to the exhaust heat recovery boilers 6a, 6b through the water supply pipes 15, 15a, 15b equipped with the feed water heater 17 and the water pump 18. During normal operation, the exhaust gas of 3b passes through the scarlet heat recovery boiler 6a, 6b as described above, but in cases such as startup/stop or single operation of the gas star pin, it passes through the bypass dampers 8a, 8b and is directly discharged to the stugs 9a, 9b. Boiler bypass ducts 7a and 7b are provided to make the boiler bypass ducts 7a and 7b possible.In order to improve the steam conditions of the steam generated here, auxiliary combustion fuels FS, FS2 are added at the boiler inlet. Normally, the auxiliary combustion is carried out to compensate for the insufficient amount of heat.The auxiliary combustion fuels FS, FS2 are combusted with a large amount of oxygen remaining in the gas turbine exhaust gas. In a coarsely combined combined cycle plant, multiple gas turbines and associated scarlet heat recovery boilers and a single steam generator are used, depending on the economical single output of each turbine and the balance of available energy in each. Generally, it is composed of a turbine.

第1図では添字a,bで示したように2組のガスタービ
ン及び緋熱回収ボイラが図示されているが、これが数組
となる事もあり得る。各組の緋熱ボィラ6a,6bでの
発生蒸気はそれぞれ前記蒸気へッダ11で集められ1系
統となって蒸気配管10を通じて蒸気タービン12へ入
る。複数台のガスターピンの発生電力および蒸気タービ
ンでの発生電力を加算したものが本複合サイクルプラン
トの総出力として送電される。このような構成の複合サ
イクルプラントはその運転方法が多様である事が1つの
特徴となっている。例えばガスタービン台数が4台と、
蒸気タービン1台とが組み合された複合プラントにおい
てト同じ出力を得るにも、ガスタービン4台と蒸気ター
ビン1台が運転される場合、すなわち構成機器のすべて
が運転状態にある場合と、あるガスタービンを休止させ
、ガスタービン3台と蒸気タービン1台あるいはLガス
タービン2台と蒸気タービン1台の如き組合せで運転が
行なわれる場合がある。これらの場合のプラント総合出
力と発電効率の関係を図示したのが第2図である。図の
横軸は全部のタービンが運転されている場合の複合プラ
ントの最高出力を100%とし、現実のプラントの実出
力(P)を百分率で表したもので縦軸は複合サイクルプ
ラントの熱消費率(HR)すなわち次の式で定義される
ものをとっている。HR=投入発工生ネ旨旨ギ− HRはこのプラントにおいてIKW・日の電力を発生さ
せるのにどれだけのエネルギー(Kcal)を投入した
かを表し、この値が小さい程発電プラントとしての効率
が高いことを示している。
In FIG. 1, two sets of gas turbines and scarlet heat recovery boilers are shown as indicated by subscripts a and b, but there may be several sets. The steam generated in each set of the hot boilers 6a and 6b is collected by the steam header 11 and enters the steam turbine 12 through the steam piping 10 as one system. The sum of the power generated by the multiple gas turbine pins and the power generated by the steam turbine is transmitted as the total output of the combined cycle plant. One of the characteristics of such a combined cycle plant is that its operation methods are diverse. For example, if the number of gas turbines is 4,
In order to obtain the same output in a complex plant that combines one steam turbine, there are two cases: four gas turbines and one steam turbine are operated, that is, all of the component equipment is in operation. There are cases where the gas turbines are stopped and a combination of three gas turbines and one steam turbine or two L gas turbines and one steam turbine is operated. Figure 2 illustrates the relationship between the overall plant output and power generation efficiency in these cases. The horizontal axis of the figure is the actual output (P) of the actual plant expressed as a percentage, assuming that the maximum output of the combined plant when all turbines are in operation is 100%, and the vertical axis is the heat consumption of the combined cycle plant. The ratio (HR) is defined by the following formula. HR = Input power generation value HR represents how much energy (Kcal) was input to generate IKW/day of electricity in this plant, and the smaller this value is, the more efficient the power generation plant is. It shows that it is high.

第2図におけるカーブの番号は運転状態にあるガスター
ビンの台数(N)を示したものである。N=4の場合、
出力100%で最もHRが小さく、出力が減少するに従
い、タービン部分負荷効率の低下によりHRは上昇する
。N=3の場合もほぼ同じ傾向を示すがこの場合には発
生可能な最大出力はこの複合プラントの全出力のほぼ7
5%である。しかし同じ75%の電力を発生させる場合
でもガスタービンの運転台数が4台の場合よりは、3台
の方がプラント効率は高い。これはガスタービン運転台
が多い程、1台のガスタービンの受持つ出力が低くなり
、ガスタービンの効率が下るからである。。第2図から
わかるように、4台のガスタービンの運転ですべての出
力範囲の電力を発生させようとするとL低出力ではHR
は大幅に大となる。従って出力の変化に応じてガスター
ビン台数を順次切替える方がプラントの効率としては望
ましい。第2図中で点線で示した矢印はガスタービン運
転台数切替の位置を示すものである。P,,…P3は台
数の切替点の指標となる出力を示している。第3図は、
このような台数切替の方法を説明した、複合サイクルプ
ラントの出力変化の一例である。機軸は時間、縦軸は電
圧出力を示す。
The curve numbers in FIG. 2 indicate the number (N) of gas turbines in operation. If N=4,
The HR is the smallest at 100% output, and as the output decreases, the HR increases due to a decrease in turbine partial load efficiency. The case where N=3 shows almost the same tendency, but in this case the maximum output that can be generated is approximately 7 of the total output of this complex plant.
It is 5%. However, even when generating the same 75% of electricity, the plant efficiency is higher when three gas turbines are operated than when four gas turbines are operated. This is because the more gas turbine cabs there are, the lower the output that one gas turbine can handle, and the lower the efficiency of the gas turbine. . As can be seen from Figure 2, if you try to generate electric power in the entire output range by operating four gas turbines, the
becomes significantly larger. Therefore, it is desirable for plant efficiency to sequentially switch the number of gas turbines according to changes in output. The dotted arrows in FIG. 2 indicate the positions at which the number of gas turbines in operation is changed. P, . . . P3 indicates an output that is an index of the switching point of the number of units. Figure 3 shows
This is an example of a change in the output of a combined cycle plant, explaining a method for switching the number of units. The machine axis shows time, and the vertical axis shows voltage output.

Po,P・,P2,P3はガスタービン運転台数4台。
。3台,2台,1台時の最大出力、すなわち台数切替の
指標となる出力である。
Po, P・, P2, and P3 are four gas turbines in operation.
. This is the maximum output when 3, 2, and 1 units are used, that is, the output that serves as an index for switching the number of units.

この図で点線で示したPRはこのプラントに要求される
出力要求特性で、最初Po(ガスタービソ運転台数4台
)で運転していた状態から時刻t,より出力を一定率で
下げ、時刻tSでPeに達する。その後時刻らまで一定
値Peを保ちt9以後さらに出力を一定率で上昇させ、
t,3でもとの出力Poにもどる状態を示している。こ
のような複合サイクルプラントの出力要求特性を想定す
るとしてガスタービン台数の切替は出力下げに対し、4
台から3台に、出力上げに対し、3台から再び4台に移
行する形となる。実線で示したPAは本プラントの実際
の出力特性「PIは台数を4台から3台に、あるいは3
台から4台に切替える場合停止あるいは再起動するガス
タービンの負担する出力特性、PHは残りの3台が均等
に負担するガスタービン1台当りの出力特性である。ま
たNTは停止あるいは再起動するガスタービンの回転速
度を同じ時間軸(横軸)に対し、縦軸に回転数をとり併
記したものである。この第3図は出力要求特性PRに従
うように複合サイクルプラントの出力制御装置が働いて
いるものとして示したものである。
The PR indicated by the dotted line in this figure is the required output characteristic required for this plant.From the initial operating state Po (four gas turbines in operation), the output is lowered at a constant rate from time t, and at time tS. Reach Pe. After that, keep the constant value Pe until time t and further increase the output at a constant rate after t9,
It shows a state in which the output returns to the original Po at t,3. Assuming the output required characteristics of such a combined cycle plant, switching the number of gas turbines will reduce the output by 4.
In response to the increase in output, the number of units changed from three to four. The PA shown by the solid line is the actual output characteristic of this plant.
When switching from one gas turbine to four gas turbines, the output characteristic borne by the gas turbine that is stopped or restarted, PH, is the output characteristic per gas turbine that is equally borne by the remaining three gas turbines. Further, NT indicates the rotational speed of the gas turbine to be stopped or restarted with respect to the same time axis (horizontal axis) and the rotational speed on the vertical axis. This FIG. 3 is shown assuming that the output control device of the combined cycle plant is operating in accordance with the output request characteristic PR.

PAがPoに等しい時には、ガスタービン4台はフル運
転であり、各ガスタービンはPH,Piに示すように全
体の1/4に相当する出力P3を出している。
When PA is equal to Po, the four gas turbines are in full operation, and each gas turbine outputs an output P3 corresponding to 1/4 of the total as shown by PH and Pi.

そして時刻t,より出力要求値の低下に従い、PH,P
Iは同じように低下し、全体でPRに等しい実出力PA
を出す。時刻tsがガスタービンの運転台数を4台から
3台に切替える切替え時点である。時刻tsより停止さ
せる予定のガスタービンは複合サイクルプラントの出力
の自動制御系から切り離離されるが、これはまず第1図
で示した蒸気配管10b上のボィラ出口弁13b(停止
ガスタービンを添字b側とする)を徐々に閉じ、かわり
にタービンバイパス弁19bを開いて緋熱回収ボィラで
発生した蒸気をコンデンサ16へすてる。前記弁の切替
が終了するのに時刻t2である。。この間出力要求信号
に対する複合サイクルプラント全出力の調整は残り3台
のガスタービンに対して行なわれる。時刻t2において
弁の切替を完了した停止ガスタービンュニットは続いて
助燃料Fs2を徐々に減少する。この助燃量変化時には
もガスタービンの負荷変動にともなう助燃バーナ周囲の
ガス温度変化、流速変化等による燃焼の不安定化を防ぐ
ため一時的にガスタービンの出力変動を一切停止させ一
定値を保つという特別の配慮が必要である。勤燃料Fs
2の停止は時刻t3において完了し、続いて停止させる
ガスタービンは無負荷に向って再び燃料F2を下げ初め
る。。この過程でガスタービン3bとボィラ6bを完全
に切りはなすため「ガスタービン排ガスはバイパスダン
パ8bを開いて、バイパスダクト7bよりスタツグ9b
から大気中へ排出させる。残り3台のガスタービンの出
力PHは、出力の自動制御系により、すみやかにPAが
PRとなるように調整され、その結果時刻しで実出力P
A‘ま出力要求PRに到達する。停止させるガスタービ
ンの出力PIが零、すなわち無負荷になった状態で、燃
料F2をカットし「従ってタービンの回転数はNTに示
すように下り停止する。時刻t6において、ガスタービ
ンの運転台数切替動作は完全に終了し、プラントはガス
タービン運転台数3台で総出力Peを出す状態になる。
出力上昇にともなうガスタービン運転台数3台から4台
への切替は、時刻t7において開始される。
Then, from time t, as the output demand value decreases, PH, P
I decreases in the same way, and the actual output PA is equal to PR in total.
issue. Time ts is the point in time when the number of gas turbines in operation is changed from four to three. The gas turbine scheduled to be stopped from time ts is separated from the automatic control system for the output of the combined cycle plant. b side) is gradually closed, and instead the turbine bypass valve 19b is opened to discharge the steam generated in the scarlet heat recovery boiler to the condenser 16. It is time t2 when the switching of the valve ends. . During this time, the total output of the combined cycle plant is adjusted in response to the output request signal for the remaining three gas turbines. The stopped gas turbine unit, which has completed valve switching at time t2, then gradually reduces the auxiliary fuel Fs2. Even when this auxiliary combustion amount changes, in order to prevent combustion from becoming unstable due to changes in the gas temperature around the auxiliary combustion burner, flow velocity changes, etc. due to gas turbine load fluctuations, all output fluctuations of the gas turbine are temporarily stopped and a constant value is maintained. Requires special consideration. Service fuel Fs
The stop of No. 2 is completed at time t3, and the gas turbine that is subsequently stopped starts to reduce the fuel F2 again toward no load. . In this process, in order to completely disconnect the gas turbine 3b and boiler 6b, the gas turbine exhaust gas is transferred from the bypass damper 8b to the stator 9b through the bypass duct 7b.
into the atmosphere. The output PH of the remaining three gas turbines is adjusted by the automatic output control system so that PA quickly becomes PR, and as a result, the actual output P changes at the same time.
A' reaches the output request PR. When the output PI of the gas turbine to be stopped is zero, that is, there is no load, the fuel F2 is cut and the rotation speed of the turbine decreases as shown in NT and stops.At time t6, the number of operating gas turbines is switched. The operation is completely completed, and the plant is in a state where the three gas turbines in operation produce a total output Pe.
The switching from three to four gas turbines in operation due to the increase in output starts at time t7.

そして時刻t8までにガスタービンの昇速が完了してt
8から出力を出しはじめPIで示すように出力を上昇さ
せる。この過程でガスタービンの排ガスは、排熱ボィラ
バィパスダクト7b上のバイパスダンパ8bを閉める事
によって排ガスダクト5bを通じて緋熱ボィラ6bへ流
されくそこで蒸気を発生させるが、この蒸気はタービン
バイパス弁19bを経て、コンデンサ16へすてられる
。助燃料Fs2の燃焼再開は時刻t,oにおいて始めら
れ「時刻t,.で完了する。この間前記の理由でタービ
ンの出力変動は一切停止される。そして助燃料Fs2の
供給量が定格値になった時亥比,.において「タービン
バイパス弁19bは除々に閉じられ、反対にボィラ出力
弁13bが開かれて、発生蒸気弁は蒸気配管10bを通
じて蒸気タービン12へ流されるようになる。つまりこ
れらの蒸気弁の切替終了時点でガスタービンの運転台数
の3台から4台への切替は完了する。このような場合サ
イクルプラントにおけるガスタービンの運転台数の切替
は次のような特徴を有す。
Then, by time t8, the speed increase of the gas turbine is completed and t
The output starts from 8 and increases as shown by PI. In this process, the exhaust gas of the gas turbine is passed through the exhaust gas duct 5b to the scarlet boiler 6b by closing the bypass damper 8b on the exhaust heat boiler bypass duct 7b, and generates steam there. It is passed to the condenser 16 via the bypass valve 19b. Resumption of combustion of the auxiliary fuel Fs2 is started at time t,o and completed at time t,.During this period, all fluctuations in the output of the turbine are stopped for the above-mentioned reason.Then, the supply amount of the auxiliary fuel Fs2 reaches the rated value. At that time, the turbine bypass valve 19b is gradually closed, and the boiler output valve 13b is opened, so that the generated steam valve is allowed to flow to the steam turbine 12 through the steam pipe 10b. The switching of the number of operating gas turbines from three to four is completed when the switching of the steam valves is completed.In such a case, the switching of the number of operating gas turbines in the cycle plant has the following characteristics.

i ガスタービン運転台数の切替には、起動、停止の過
程でバイパスダンパ、バイパス弁等により外部へ無為に
捨てるガスタービン排ガスの保有熱量、あるいはガスタ
ービンの効率低下による損失がともなう。
i Switching the number of gas turbines in operation involves loss due to the retained heat of the gas turbine exhaust gas that is wasted to the outside by bypass dampers, bypass valves, etc. during the startup and shutdown process, or due to a decrease in the efficiency of the gas turbine.

従って台数を切替えるべきか、あるいは否かの判断は、
これらの損失と切替えによる効率向上の利得の両者のか
ね合いで決定される。ii ガスタービン運転台数の切
替にはガスタービンの出力下降ト降遠あるし、は昇遠、
出力上昇などに一定の時間が必要であり、従って短時間
に出力要求値がもとの値にもどるような急速な出力要求
変化に対してはガスタービン運転台数の切替操作が間に
合わない場合がある。
Therefore, the decision as to whether or not to switch the number of units is
The decision is made based on the balance between these losses and the gain of efficiency improvement due to switching. ii To switch the number of gas turbines in operation, there is a reduction in the output of the gas turbine, a rise in the output, and a rise in the output.
It takes a certain amount of time to increase the output, and therefore the switching operation of the number of gas turbines in operation may not be in time for rapid changes in output demand where the output demand returns to its original value in a short period of time. .

従って、複合プラントの運転については、常にこれらの
状況を考慮して切替するか、否かの判断を下さなければ
ならず、そのための適当な手段を持たねばならない。〔
発明の目的〕 本発明の目的は、電力系統内の発電プラントであるガス
タービンと蒸気タービンを組合わせた複合サイクルプラ
ントにおいて「ガスターピン運転台数の切替を、前記複
合サイクルプラントの熱効率が高く保持して行なえる様
にした運転方法を提供することにある。
Therefore, regarding the operation of a complex plant, it is necessary to always take these situations into account when deciding whether to switch over or not, and appropriate means must be provided for this purpose. [
Purpose of the Invention The purpose of the present invention is to provide a power generation plant in a power system, a combined cycle plant that combines a gas turbine and a steam turbine, by ``switching the number of gas turbines in operation while maintaining a high thermal efficiency of the combined cycle plant. The objective is to provide a driving method that makes it possible to perform the following tasks.

〔発明の概要〕[Summary of the invention]

本発明の要旨とするところは、多数の発電プラントを傘
下にもつ電力系統内の発電プラントとして、複数台のガ
スタービンと、それに対になった該ガスタービンの排ガ
スを熱源とする緋熱回収ボィラと、該ボィラから発生し
た蒸気により駆動される蒸気タービンとから構成される
複合サイクルプラントの運転方法において、ガスタービ
ンの運用台数の功替を前記複合サイクルプラントのガス
タービンの各運転台数による最大可能出力を台数切替の
指標出力とし、該複合サイクルプラントに発電スケジュ
ールとして与えられる指令出力が該指標出力に達する時
点をもって前記ガスターピンの運転台数を切替える判断
点とし「 この判断点に到達する直前の該複合サイクル
プラントでのガスタービン運転台数及び指令出力の増減
変化方向並びに判断点の所定時間後の指令出力の状況に
応じて前記複合サイクルプラントのガスタービン運転台
数を切替えるようにしたところにある。
The gist of the present invention is to use a plurality of gas turbines and a scarlet heat recovery boiler that uses the exhaust gas of the paired gas turbines as a heat source, as a power generation plant in an electric power system that has a large number of power generation plants under its umbrella. and a steam turbine driven by steam generated from the boiler, in which the number of gas turbines in operation can be changed to the maximum possible by the number of gas turbines in operation in the combined cycle plant. The output is used as an index output for switching the number of units, and the point in time when the command output given to the combined cycle plant as a power generation schedule reaches the index output is the judgment point for switching the number of Gaster pins in operation. The number of gas turbines in operation in the combined cycle plant is switched according to the number of gas turbines in operation in the cycle plant, the direction of increase/decrease in the command output, and the status of the command output after a predetermined period of time at a decision point.

〔発明の実施例〕[Embodiments of the invention]

本発明の具体的な実施例を説明する前に、発電プラント
に発電スケジュールとして与えられる指令出力について
説明する。
Before describing specific embodiments of the present invention, a command output given to a power generation plant as a power generation schedule will be described.

第4図は多数の発電所からなる電力系統において「最も
経済的な連用を行うシステム(EconomにLoad
Dispaにh略してELD)の概略を説明した図であ
る。
Figure 4 shows the most economical system (Load to Econom) in a power system consisting of many power plants.
It is a figure explaining the outline of Dispa (h abbreviated as ELD).

多数の発電所をかかえる電力系統において、要求される
出力に対し、最も経済的な運用を行うため、系統下の各
発電所に最適な出力分担量を決定する必要がある。Cは
中央の給電指令室であり、ここでは系統下の負荷変動の
予測値と系統下の各発電所の出力(P)−熱消費率(H
R)特性からこの負荷を満たし、総合的に最も発電コス
トが安くなる出力分担を解析し「その結果を出力指令特
性(PD−1〜PD−3)とし各発電所(PS−1〜P
S−3)に指令する。各発電所ではこの出力指令特性に
従い、出力の調整、あるいは起動停止を行なう。この場
合中央の出力指令室Cでは各発電所の出力−熱消費率特
性をすべて把握しておく必要がある。しかし複合サイク
ルプラントの場合には(第4図のPS−1)その構成要
素であるガスタービンの運転台数によって前記特性が変
り、例えばガスタービンを4台備えていると図示の如き
、4本の特性カーブが存在する。すなわち複合サイクル
プラントの運転モードの違いによって、同一出力でも多
数の熱消費率が存在することになるが、このことは発電
所の特性が把握出来ないので出力指令室Cで出力指令特
性を決定する際に極めて不都合な事である。そこで第5
図に示すように、この4本の曲線をまとめて、1本の曲
線で近似して表し「 これを本複合サイクルプラントの
代表特性として表す。
In an electric power system that has a large number of power plants, it is necessary to determine the optimal output sharing amount for each power plant under the system in order to perform the most economical operation for the required output. C is the central power dispatch control room, where predicted values of load fluctuations under the grid and output (P) - heat consumption rate (H) of each power plant under the grid are calculated.
R) From the characteristics, analyze the output sharing that satisfies this load and has the lowest overall power generation cost.
S-3). Each power plant adjusts its output or starts and stops it according to this output command characteristic. In this case, it is necessary for the central output control room C to grasp all the output-heat consumption rate characteristics of each power plant. However, in the case of a combined cycle plant (PS-1 in Figure 4), the above characteristics change depending on the number of operating gas turbines that are its constituent elements.For example, if it is equipped with four gas turbines, the four A characteristic curve exists. In other words, due to differences in the operation mode of a combined cycle plant, there are many heat consumption rates for the same output, but this means that the characteristics of the power plant cannot be grasped, so the output command characteristics are determined in the output command room C. This is extremely inconvenient. Therefore, the fifth
As shown in the figure, these four curves are summarized and approximated by one curve.This is expressed as the representative characteristic of this combined cycle plant.

すなわち本プラントは要求出力によってガスタービン台
数を切替える運転を通常の運転法とし、その特性を(H
R−1)(またはHR−2,HR−3)で代表させる。
(HR−2)はガスタービンの台数切替運転を行った場
合複合サイクルプラントの最も効率の高い点、(HR−
3)はこの逆の点を結んだものである。すなわち(HR
−2)で代表させると、実際の運転では平均的な効率が
この特性より多少悪くなり、(HR−3)で代表させる
とこの逆となる。(HR−1)はこの中間(平均)の特
性を示したものである。このように複合サイクルのガス
タービン運転台数による複雑な特性を簡単な一本の曲線
により代表させる。このようにすることにより、ELD
システムにより、複合サイクルプラントPS−1に第4
図に示すような、最も経済的な出力指令特性PD−1を
与えることができる。
In other words, the normal operation method for this plant is to switch the number of gas turbines depending on the required output, and its characteristics are expressed as (H
R-1) (or HR-2, HR-3).
(HR-2) is the point where the combined cycle plant has the highest efficiency when the number of gas turbines is switched.
3) connects the opposite points. That is, (HR
If it is represented by -2), the average efficiency in actual operation will be somewhat worse than this characteristic, and if it is represented by (HR-3), it will be the opposite. (HR-1) shows intermediate (average) characteristics. In this way, complex characteristics depending on the number of gas turbines in operation in a combined cycle are represented by a single simple curve. By doing this, the ELD
The system allows the combined cycle plant PS-1 to have a fourth
The most economical output command characteristic PD-1 as shown in the figure can be provided.

出力指令特性が与えられると、この特性を満足するため
複合サイクルプラントのガスタービンの運転台数が決定
されるが、その決定方法について説明する。
When the output command characteristics are given, the number of gas turbines in operation in the combined cycle plant is determined in order to satisfy the characteristics, and the method for determining this will be explained.

第6図は第4図に示した系統経済化運用方式の概念図に
本発明の趣旨を加えたものである。
FIG. 6 is a conceptual diagram of the system economical operation method shown in FIG. 4 with the gist of the present invention added.

中央の出力指令室Cにおける各発電所への出力指令特性
(PD−1),(PD−2),(PD−3)は指令装置
1で演算される。指令装置1には、この電力系統におけ
る負荷の予測値LDが入力され、これと系統内各発電所
(PS−1),(凶−2),(凶−3)の特性とから、
最も経済的な出力配分が決定され、これが出力指令特性
(一般には一日分の発電スケジュール)(PD−1),
(PD−2),(PD−3)として対応する各発電所へ
指令される。ここで、複合サイクル発電プラント(ここ
ではPS−1とする)の特性としては、第5図で示され
た代表的なプラントの特性カーブが与えられているもの
とする。指令装置1の演算は従来の電力系統のELD運
用で用いられているものと同じである。本発明では、こ
の従来の構成に新たにロなる運転モード決定装置を附付
する。
Output command characteristics (PD-1), (PD-2), and (PD-3) for each power plant in the central output command room C are calculated by the command device 1. The predicted value LD of the load in this power system is input to the command device 1, and from this and the characteristics of each power station (PS-1), (PS-2), (PS-3) in the system,
The most economical output distribution is determined, and this is the output command characteristic (generally a daily power generation schedule) (PD-1),
Commands are sent to the corresponding power plants as (PD-2) and (PD-3). Here, it is assumed that the characteristic curve of a typical plant shown in FIG. 5 is given as the characteristic of the combined cycle power plant (here PS-1). The calculations of the command device 1 are the same as those used in conventional ELD operation of electric power systems. In the present invention, an operation mode determining device B is newly added to this conventional configuration.

運転モード決定装置ロではこの出力指令特性(PD−1
)(1日先の発電スケジュール)を受けて、この指令特
性に従う出力運転を行った場合、最も経済的な運転モー
ド(指令出力を出すためのガスタービン運転台数)を決
定する。この運転モード決定装置0では次の判断基準に
よって行なわれる。
In the operation mode determination device B, this output command characteristic (PD-1
) (power generation schedule for one day ahead), and when output operation is performed according to this command characteristic, the most economical operation mode (the number of gas turbines to be operated to output the command output) is determined. In this driving mode determining device 0, the determination is made based on the following criteria.

m 運転モードすなわちガスタービンの運転台数の決定
は複合サイクルプラントでの出力指令特性の指令出力が
台数切替の指標出力(第5図、P,,P2,P3)を横
切る時に、現状のガスタービン運転台数維持か或は変更
かを判断すればよい。
m The operation mode, that is, the number of operating gas turbines, is determined when the command output of the output command characteristics in the combined cycle plant crosses the index output for switching the number of units (Fig. 5, P, , P2, P3). All you have to do is decide whether to maintain the number of units or change it.

例えば第7図に実線で示すような出力指令特性が複合サ
イクルプラントに前もって与えられた時、運転モード切
替えはこの世力指令曲線が台数切替の指標出力(P,,
P2,P3)を横切る各時点M,〜M8で判断される。
(2’ 各時点(M,〜M8)においての運転モード決
定の判断は各時点直前のガスタービン運転台数及び指令
出力の変化方向、および各時点以降の指令出力変化の状
態を考慮した次のごとき基準により判定する。
For example, when an output command characteristic as shown by the solid line in Fig. 7 is given in advance to a combined cycle plant, when switching the operation mode, this world power command curve is the index output (P, ,
P2, P3) is determined at each time point M, to M8.
(2' The determination of the operation mode at each time point (M, to M8) is as follows, taking into consideration the number of gas turbines in operation immediately before each time point, the direction of change in command output, and the state of change in command output after each time point. Judgment will be made based on the criteria.

すなわち、凶 ガスタービン運転台数切替においてはそ
の切替過程においてプラント外へ無為にすてる熱損失が
ともなう。
In other words, when switching the number of gas turbines in operation, there is heat loss that is wasted outside the plant during the switching process.

また起動停止の回数が増加するとメインテナンスのコス
トも増加する。
Furthermore, as the number of startups and stops increases, maintenance costs also increase.

従ってこの損失も考慮して台数の切替がよいか、あるい
は不変の状態がよいかの両ケースの経済比較(単位出力
当りの使用燃料量比較)を行い決定する。曲 複合サイ
クルプラントの指令出力が急変する場合にはガスタービ
ン運転台数の切替操作がそれに追従出来るかどうかを考
慮し、追従出来ない場合には切替を行なわない。
Therefore, taking this loss into account, it is decided by comparing the economics of both cases (comparing the amount of fuel used per unit output) whether it is better to switch the number of units or to leave them unchanged. When the command output of a combined cycle plant suddenly changes, consider whether the switching operation of the number of gas turbines in operation can follow it, and if it cannot follow it, do not switch.

‘C} 第7図に示したようにプラントの総出力を指標
出力「P,,P2,P3で区切り、区切られた各バンド
内B,,&,B3,B4では、そのバンド内での運転可
能なガスタービンの最低運転台数が決っている。
'C} As shown in Figure 7, the total output of the plant is divided into index outputs "P,, P2, P3, and within each divided band B,, &, B3, B4, the operation within that band is The minimum number of gas turbines that can be operated has been determined.

例えばB2では3台が最低運転台数で、3台ないし4台
では運転可能であるが2台では運転出来ない。あるバン
ド内でその最低運転台数でガスタービンを運転し、更に
その上のバンNこ複合サイクルプラントの出力を増加す
る時には必ずガスタービンの運転台数を増やさねばなら
ない。第7図の例における各バンドB,B2,&,B4
のガスタービン運転の最低台数はそれぞれ4,3,2,
1台である。
For example, in B2, the minimum number of vehicles that can be operated is 3, and 3 or 4 can be operated, but 2 can't be operated. When gas turbines are operated at the minimum operating number within a certain band and the output of the combined cycle plant is further increased, the number of operating gas turbines must be increased. Each band B, B2, &, B4 in the example of Fig. 7
The minimum number of gas turbines for operation is 4, 3, 2, and 2, respectively.
There is one.

‘3} 第7図において、各切替判定を必要とする点M
,,M2……において、モード切替が決定されたとき、
その切替を指令出力がM,点を通過する過程のどの時点
で開始するか、その出発点を定めてやる必要がある。
'3} In Fig. 7, the point M that requires each switching judgment
, , M2..., when mode switching is determined,
It is necessary to determine the starting point at which point in the process of the command output passing through point M, the switching starts.

経済性のみを考慮すると負荷を下げる場合には運転台数
が減少するから第2図に示すように熱消費率HRが切替
点で下るから切替開始は出来るだけ早く、上げる場合は
逆に出来るだけ遅い方がよい事がわかる。しかしながら
、切替の過程で第3図に示すごとく、勤燃操作にともな
いガスタービンの出力変化を一切とめるために出力指令
装置1の出力指令から実際の出力変化が大中に遅れる場
合などには、その追従性をも考慮する必要がある。第8
図は一定率で出力指令PRが降下する場合にその運転モ
ード切替開始点をS,,S2,S3の如く変えた場合で
あり、実際の出力はPA,,Pん,Pふの如く変化する
。すなわち、第3図で説明したように排ガスボィラ入口
での助燃料の操作の間はガスタービンの変化を一切停止
させ、一定値を保つ必要があるという要求より出力要求
PRの変化に拘らずPAは一定値に保たれた後再びPR
と一致するように変化する。このように出力指令への追
従性を考えて、モ−ド切替開始点をどこにとるかを決定
する必要がある。
Considering only economic efficiency, when reducing the load, the number of operating units decreases, so as shown in Figure 2, the heat consumption rate HR decreases at the switching point, so start switching as early as possible, and when increasing it, conversely, start switching as late as possible. I know it's better. However, as shown in Fig. 3, during the switching process, in order to prevent any change in the output of the gas turbine due to fuel operation, the actual output change may be delayed from the output command of the output command device 1. It is also necessary to consider the followability. 8th
The figure shows the case where the output command PR decreases at a constant rate and the operation mode switching start point is changed as S,, S2, S3, and the actual output changes as PA,, P, Pfu. . In other words, as explained in Fig. 3, during the operation of the auxiliary fuel at the exhaust gas boiler inlet, the change in the gas turbine must be completely stopped and a constant value must be maintained, so PA is maintained regardless of changes in the output demand PR. is maintained at a constant value and then PR again
change to match. In this way, it is necessary to consider the ability to follow the output command and decide where to start mode switching.

また第6図におけるモード決定装置ロでは以上のような
考慮および判断基準により、複合サイクルプラントの出
力指令特性から運転モードを切替えるか杏か、切替後の
ガスタービン運転台数N、開始時刻TSあるいはその出
力PSを決定し、これを複合サイクルプラント(PS−
1)へ指示する。
In addition, the mode determination device B in Fig. 6 uses the above considerations and judgment criteria to decide whether to switch the operation mode based on the output command characteristics of the combined cycle plant, the number of gas turbines in operation after switching N, the start time TS, or the following. Determine the output PS and convert it into a combined cycle plant (PS-
1).

複合サイクルプラント(PS−1)では〜 これら(P
D−1),N.TS,PSをうけて該プラントを運転す
る。以上に述べた本発明の基本思想を機能別に分類する
と次のようにわけられる。
In the combined cycle plant (PS-1) ~ these (P
D-1), N. Operate the plant after receiving TS and PS. The basic idea of the present invention described above can be classified by function as follows.

川 最適配分によって決定される出力指令特性(時間関
数)に沿って、運転モード切替をするか否かの判定を実
施する時期を決定する部分、{o}【ィ}で決定された
時点において、指令出力の変化方向(上げ,下げ)と判
定時点直前のガスタービンの運転台数等により、経済性
の判定を行なうまでもなく、運転モードの決定を判定す
る部分、し一 {ィ}で決定された時点において、この
後の出力指令特性で運転モードを変更した場合と変更し
ない場合の複合サイクルプラント運転コスト等経済性の
比較を行い、どちらをとるべきかを判定する部分、次に
示した第1表はモード決定装置mこおける判断の具体的
方法の一例をまとめたものである。
The part that determines the timing to determine whether or not to switch the operation mode according to the output command characteristics (time function) determined by the optimal distribution, at the time determined by {o} [i], Based on the direction of change of the command output (increase or decrease) and the number of gas turbines in operation immediately before the determination time, the determination of the operation mode is determined in the part that determines the operation mode without making a determination of economic efficiency. At this point, we will compare the economic efficiency, such as the combined cycle plant operating cost, between changing the operation mode and not changing the operation mode based on the output command characteristics, and decide which option to take. Table 1 summarizes an example of a specific method of determination in the mode determination device m.

第1表第1表に示した例は、複合サイクルプラントの出
力指令特性により第7図のように決定される各点Miに
おいて「運転モードの切替を行うかどうかを判定する基
準を示したもので、この判定は上記Mi点直前の状態に
対する第1判定とMi点後の出力指令特性の状態に対す
る第2判定によるもので、この二つの判定のチェックに
より最終判定が下される。
Table 1 The example shown in Table 1 shows the criteria for determining whether to switch the operation mode at each point Mi determined as shown in Figure 7 based on the output command characteristics of the combined cycle plant. This determination is based on the first determination for the state immediately before the Mi point and the second determination for the state of the output command characteristic after the Mi point, and the final determination is made by checking these two determinations.

まず該当するMi点の台数切替の指標出力P車(P,,
P2,P3)によって第1表を使用する点が分けられ、
次いで1次判定では、Mi点直前のガスタービン台数N
i、出力変化の方向(上げ,下げ)により「二次判定を
すべきかどうかが判断される。
First, index output vehicle P (P,,
The points to use Table 1 are divided by P2, P3),
Next, in the first determination, the number N of gas turbines immediately before the Mi point is determined.
i. Depending on the direction of the output change (increase, decrease), it is determined whether or not a secondary judgment should be made.

二次判定が不用の場合には直ちに最終判定が決り、二次
判定が必要な場合には次のステップとしてMi点以後の
出力指令特性の状態により二次判定がなされ、最終判定
が決る。
If the secondary determination is unnecessary, the final determination is made immediately; if the secondary determination is necessary, the next step is to perform the secondary determination based on the state of the output command characteristics after the Mi point, and the final determination is determined.

最終判定の結果■ガスタービン運転台数切替を行なわな
い、或は■ガスタービン運転台数を何台に切替えるのど
ちらかの指令が与えられる。例えば、M点の負荷がP,
でN=3出力変化方向上げの場合には二次判定は不要で
ある。
As a result of the final judgment, a command is given to either (1) not to change the number of gas turbines in operation, or (2) to change the number of gas turbines in operation. For example, the load at point M is P,
If N=3, the output change direction is increased, the secondary determination is not necessary.

これは二次判定の結果をまたずとも、最終判定に示した
ようにガスタービン運転台数を現状3台から4台に切替
える必要がある事がわかる。これは前述の判断基準(2
}−(C)に示したように本ケースでは指令出力はMi
点を通過後第7図に示したバンドB,に入り、このバン
ドでのガスタービン運転の最低台数は4台であるからで
ある。またP:P,,N=4出力変化方向下げ(Dn)
の場合には一次判定だけでは判定ができなく二次判定が
要となる。
This shows that it is necessary to switch the number of gas turbines in operation from the current three to four, as shown in the final judgment, without looking at the results of the secondary judgment. This is based on the judgment criterion (2) mentioned above.
}-(C), in this case, the command output is Mi
This is because after passing the point, the gas turbine enters band B shown in FIG. 7, and the minimum number of gas turbines operating in this band is four. Also, P: P,, N = 4 output change direction lowering (Dn)
In this case, it is not possible to make a determination using only the primary determination, and a secondary determination is essential.

二次判定では点Mjから以降の出力指令特性の状態を見
て、指令出力がMi点を出発してからある定められた時
間TC内にバンドB,へもどってくるか(R)、あるい
はもどってこないか(服)によって2つのケースにわけ
られる。この場合には前記2つのケースのみを判断すれ
ばよく、他のバンドB2,B3,B4には全く無関係で
ある。指令出力が時間TC内にバンドB,にもどる(R
)ならば、ガスタービン運転台数の切替は行なわない。
もし時間TC内にバンドB,にもどらない(脈)ならば
ガスタービン運転台数は4台から3台に切替えるべきで
ある。これが二次判定により得られる最終判定である。
すなわちここでいうTCは前述の判断基準の{2〕−(
A),(B)により決定されるもので、TCの意味する
ものにはこの時間内に指令出力がバンドB,へもどるな
らばガスタービンの運転台数を切替えない方が台数を4
台→3台→4台→のように切替えるよりは、燃料消費量
が低くなるか、あるいは4台→3台→4台のような切替
がこの時間内では時間的に間に合わないという限界値で
ある。云い換えれば(厭)であれば指令出力がTC時間
経過後に再びバンドBにもどるような事があってもガス
タービンの運転台数は4台→3台→4台のように切替え
た方が経済的であり、従って今Mi点では該台数を4台
から3台に切替えた方がよいということを意味している
。時間TCはこのようなケースにおける経済比較を別途
行い、あらかじめ定めておくことが出来る値である。功
替点P2はバンド&とB3の間にありLバンドB2内で
の運転可能なガスタービン台数は4台,3台,2台の3
つの場合がある。
In the secondary judgment, we look at the state of the output command characteristics from point Mj onward and determine whether the command output returns to band B within a certain time TC after leaving point Mi (R) or not. There are two cases depending on the type of clothing. In this case, it is only necessary to judge the above two cases, and the other bands B2, B3, and B4 are completely unrelated. The command output returns to band B within time TC (R
), the number of gas turbines in operation is not changed.
If it does not return to band B within time TC, the number of gas turbines in operation should be changed from four to three. This is the final judgment obtained by the secondary judgment.
In other words, the TC here is based on the above-mentioned criterion of {2}-(
It is determined by A) and (B), and what TC means is that if the command output returns to band B within this time, it is better not to switch the number of gas turbines in operation, because the number of gas turbines is 4.
Either the fuel consumption will be lower than switching from 4 units to 3 units to 4 units, or the limit value will be such that switching from 4 units to 3 units to 4 units cannot be completed within this time. be. In other words, if you don't like it, it would be more economical to switch the number of gas turbines in operation from 4 to 3 to 4 even if the command output returns to band B after the TC time has passed. Therefore, it means that it is better to switch the number of devices from 4 to 3 at the current point Mi. The time TC is a value that can be determined in advance by separately performing an economic comparison in such cases. The advantageous point P2 is between bands & and B3, and the number of gas turbines that can be operated within L band B2 is 4, 3, and 2.
There are two cases.

ガスタービンの運転台数が4台(各タービンは非常に小
さい出力で運転されている。)で、指令出力がバンド&
から&に変化した場合には、表1でP=P2,Ni=4
,UPで二次判定要となり、功替点通過後Tc時間内に
指令出力がバンドB,に入るなら4台の状態を維持する
。バンドBに入らなければ、3台に切替える。同じく判
定前運転台数4台で指令出力変化方向Dnの場合、二次
判定が要であり、定められた時間Tc内に指令出力がバ
ンドBに入れば、切替を行わず、時間Tc内にバンドB
に入らなければ、更に、時間Tc内にバンド&に入るか
否かを判定し、入れば、台数を3台に切替える。
The number of gas turbines in operation is four (each turbine is operated at a very low output), and the command output is within the band &
In Table 1, P=P2, Ni=4
, UP becomes a secondary judgment, and if the command output enters band B within time Tc after passing the transfer point, the state of four units is maintained. If it doesn't fall into Band B, switch to 3 units. Similarly, if the number of operating units before judgment is 4 and the direction of command output change is Dn, a secondary judgment is necessary. B
If the device does not enter band &, it is further determined whether or not the device enters band & within time Tc, and if it does, the number of devices is switched to three.

入らなければ2台に切替えることを示している。第9図
は表1に示した判定法を具体化する場合の機能構成を示
したものである。
This indicates that if it does not fit, switch to two units. FIG. 9 shows the functional configuration when implementing the determination method shown in Table 1.

第9図においてaは指令出力変化方向判定部、bは指令
出力があらかじめ指定した台数切替の指標出力Pjにあ
るかどうかをチェックする切替点出力指標部である。こ
の功替点出力指標部bにより出力指令特性PDの指令出
力が台数切替指標出力に達したと判定されると、その指
標出力Piと指令出力変化方向判定部aによって判定さ
れた、その時点における指令出力の変化方向(下げ,上
げ)DOUおよび判定直前のガスタービン運転台数Nに
よって「一次判定要素cにより第一次の判定J,が行な
われる。一次判定J,では、これだけで運転モード切替
の判断が下される場合D,と、さらに二次判定J2が必
要な場合D,′にわけられる。D,は直ちに運転台数指
示要素fへ送られる。D,′の場合は帰還時間演算要素
dに送られる。帰還時間演算要素dは、指令出力が台数
切替の指標出力を通過した後の指令出力特性PDをチェ
ックし、指令出力があらかじめ定めた出力バンドBiに
帰還するまでの時間TBiを算出する。eは帰還時間演
算要素dによって演算された時間TBiとあらかじめ定
めた帰還時間の指標TCと比較し「その大小によって運
転モード変更の有無と台数を判断する帰還、否帰還判定
部である。この結果は、判定D2として、運転台数指票
要素fへ送られる。この運転台数指標要素fからは判定
された結果として次のステップのガスタービン運転台数
Nが指示される。第9図において点線で囲まれたJ,,
J2の部分が第1表における一次,二次判定に相当する
。本発明においては複合サイクルプラントに対するこの
ような判定機構を有する運転モード決定装置□を備えさ
せたので運転モード決定装置01こおいての第1表に例
示したような判定を容易に行うことができる。
In FIG. 9, a is a command output change direction determination section, and b is a switching point output index section that checks whether the command output is at a predetermined index output Pj for switching the number of units. When the command output of the output command characteristic PD is determined to have reached the number switching index output by this merit point output index section b, the index output Pi and the command output change direction determined by the command output change direction determination section a are determined at that point in time. The first judgment J is made by the primary judgment element c, depending on the command output change direction (downward, upward) DOU and the number N of gas turbines in operation immediately before the judgment. If a decision is made, it is divided into D, and if a secondary judgment J2 is required, it is divided into D,'.D, is immediately sent to the operation number indicating element f.In the case of D,', the return time calculation element d The feedback time calculation element d checks the command output characteristic PD after the command output passes the index output for switching the number of units, and calculates the time TBi until the command output returns to the predetermined output band Bi. e is a return/no-return determination unit that compares the time TBi calculated by the return time calculation element d with a predetermined return time index TC and determines whether or not the operation mode should be changed and the number of units depending on the magnitude. This result is sent as determination D2 to the operating number index element f.The operating number index element f indicates the number N of gas turbines in operation for the next step as the determined result.In FIG. J surrounded by,,
Part J2 corresponds to the primary and secondary determinations in Table 1. In the present invention, since the operation mode determination device □ having such a determination mechanism for the combined cycle plant is provided, determinations such as those illustrated in Table 1 in the operation mode determination device 01 can be easily performed. .

〔発明の効果〕〔Effect of the invention〕

本発明により次の効果が得られる。 The present invention provides the following effects.

複雑な性能特性を示すガスタービンと蒸気タービンを組
合せた複合サイクルプラントを電力系統運用に組み込む
事が出来、ガスタ−ビンと蒸気タービンを組合せた複合
サイクルプラントの運転操作のうち、特に困難であった
ガスタービン運転台数の運転モードの切替の判断決定が
自動化され、複合サイクルプラント運用の経済性のみな
らず「安全な運転が可能となる。
A combined cycle plant that combines a gas turbine and a steam turbine, which exhibits complex performance characteristics, can be incorporated into the power system operation, and the operation of a combined cycle plant that combines a gas turbine and a steam turbine has been particularly difficult. The decision to switch the operation mode for the number of gas turbines in operation is automated, making combined cycle plant operation not only more economical but also safer.

【図面の簡単な説明】[Brief explanation of the drawing]

第1図はガスタービンと蒸気タービンとを組合せた複合
サイクルプラントの概要を示す系統図、第2図は複合サ
イクルプラントの出力と熱消費率との関係を示す特性図
、第3図は複合サイクルプラントのガスタービン運転台
数切替を行なう運転モード切替操作を示す説明図、第4
図は電力系統の経済的運用方式を示す概念説明図、第5
図は本発明を適用した複合サイクルプラントの特性説明
図、第6図は本発明を適用した複合サイクルプラントを
組込んだ電力系統の経済的運用方式を示す説明図、第7
図乃至第9図は本発明の実施例であの、第1図及び第8
図は複合サイクルプラントのガスタービン運転台数切替
を行なう運転モード切替操作を示す説明図、第9図は複
合サイクルプラントにおけるガスタービン運転台数の切
替判定を行なう装置説明図である。 3…・・・ガスタービン、6……9E熱ボィラ、12…
・・・蒸気タービン、N…・・・ガスタービン運転台数
、PD・・・・・・出力指令特性、DOU・・…・指令
出力変化方向、P1・…・・台数切替の指標となる出力
「TCi…・・・判定時間「TS…・・・功替開始点、
TBi・・・…帰還時間、a・…・・指令出力変化方向
判定部、b・…・・切替点出力指標部、c・・・・・・
一次切替台数判定部、d・・・・・・帰還時間演算要素
、e・・・・・・帰還,否帰還判定部、f・・・…運転
台数指示部。 髪’因 多2図 多3菌 髪4図 努ぶ菌 髪8図 髪5図 多7図 髪q図
Figure 1 is a system diagram showing an overview of a combined cycle plant that combines a gas turbine and a steam turbine. Figure 2 is a characteristic diagram showing the relationship between the output and heat consumption rate of the combined cycle plant. Figure 3 is a combined cycle plant diagram. Explanatory diagram showing an operation mode switching operation for switching the number of gas turbines in operation in a plant, No. 4
Figure 5 is a conceptual explanatory diagram showing the economical operation method of the power system.
Fig. 6 is an explanatory diagram showing the characteristics of a combined cycle plant to which the present invention is applied; Fig. 6 is an explanatory diagram showing an economical operation method of a power system incorporating a combined cycle plant to which the present invention is applied;
FIGS. 1 to 9 show examples of the present invention, and FIGS.
FIG. 9 is an explanatory diagram showing an operation mode switching operation for switching the number of gas turbines in operation in a combined cycle plant, and FIG. 9 is an explanatory diagram of a device for determining whether to switch the number of gas turbines in operation in a combined cycle plant. 3...Gas turbine, 6...9E heat boiler, 12...
...Steam turbine, N...Number of gas turbines in operation, PD...Output command characteristics, DOU...Direction of change in command output, P1...Output that serves as an index for switching the number of units. TCi... Judgment time "TS... Successive start point,
TBi...Return time, a...Command output change direction determination section, b...Switching point output indicator section, c......
Primary switching unit number determination unit, d...Return time calculation element, e...Return, return failure determination unit, f...Operating number of units instruction unit. Hair 'Cause 2 Figure 3 Fungus Hair 4 Figure Striving Fungus Hair 8 Figure Hair 5 Figure Lot 7 Figure Hair q Figure

Claims (1)

【特許請求の範囲】[Claims] 1 多数の発電プラントを傘下にもつ電力系統内発電プ
ラントとして複数台のガスタービンと、該ガスタービン
の排ガスを熱源とする排熱回収ボイラと、該ボイラで発
生した蒸気により駆動される蒸気タービンとから構成さ
れる複合サイクルプラントと、該プラントの複数台のガ
スタービンの運転台数を決定する運転モード決定装置を
もつプラントの運転方法において、ガスタービンの運転
台数の切替を前記複合サイクルプラントのガスタービン
各運転台数による最大可能出力をガスタービン運転台数
の切替の指標出力とし、該複合サイクルプラントに与え
られる出力指令特性の指令出力が前記指標出力に達する
時点をもって前記ガスタービンの運転台数を切替える判
断点とし、この判断点に到達する直前の該複合サイクル
プラントでのガスタービン運転台数及び前記指令出力の
増減変化方向及び前記指令出力が前記判断点からあらか
じめ定めた時間内に前記標令出力で区切られる特定の出
力バンド内に入るか否かにより前記複合サイクルプラン
トのガスタービン運転台数の切替え、及び台数を決定す
ることを特徴とするガスタービンと蒸気タービンとを組
合せた複合サイクルプラントの運転方法。
1. A power generation plant in an electric power system that has many power generation plants under its umbrella includes multiple gas turbines, an exhaust heat recovery boiler that uses the exhaust gas of the gas turbine as a heat source, and a steam turbine that is driven by the steam generated by the boiler. In a method of operating a plant having a combined cycle plant comprising a combined cycle plant and an operation mode determining device for determining the number of operating gas turbines of the plant, the number of gas turbines in operation is switched between the gas turbines of the combined cycle plant. The maximum possible output for each number of operating gas turbines is set as an index output for switching the number of operating gas turbines, and the point at which the command output of the output command characteristic given to the combined cycle plant reaches the index output is the decision point for switching the number of operating gas turbines. and the number of gas turbines in operation in the combined cycle plant immediately before reaching this judgment point, the direction of increase/decrease in the command output, and the command output are separated by the target output within a predetermined time from the judgment point. A method for operating a combined cycle plant that combines a gas turbine and a steam turbine, characterized in that the number of gas turbines in operation in the combined cycle plant is switched and the number is determined depending on whether or not the output falls within a specific output band.
JP774375A 1975-01-20 1975-01-20 Method of operating a combined cycle plant combining a gas turbine and a steam turbine Expired JPS60523B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP774375A JPS60523B2 (en) 1975-01-20 1975-01-20 Method of operating a combined cycle plant combining a gas turbine and a steam turbine

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP774375A JPS60523B2 (en) 1975-01-20 1975-01-20 Method of operating a combined cycle plant combining a gas turbine and a steam turbine

Publications (2)

Publication Number Publication Date
JPS5183948A JPS5183948A (en) 1976-07-22
JPS60523B2 true JPS60523B2 (en) 1985-01-08

Family

ID=11674171

Family Applications (1)

Application Number Title Priority Date Filing Date
JP774375A Expired JPS60523B2 (en) 1975-01-20 1975-01-20 Method of operating a combined cycle plant combining a gas turbine and a steam turbine

Country Status (1)

Country Link
JP (1) JPS60523B2 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US9732635B2 (en) * 2015-04-29 2017-08-15 General Electric Company Method for enhanced cold steam turbine start in a supplementary fired multi gas turbine combined cycle plant

Also Published As

Publication number Publication date
JPS5183948A (en) 1976-07-22

Similar Documents

Publication Publication Date Title
US8104283B2 (en) Steam temperature control in a boiler system using reheater variables
CN111852597A (en) Variable-parameter multi-element cascade thermoelectric decoupling system of thermal power heat supply unit and adjusting method
Wang et al. Enhancing peak shaving capability by optimizing reheat-steam temperature control of a double-reheat boiler
CN110792482A (en) Control system and method for ultra-supercritical secondary reheating unit to participate in primary frequency modulation of power grid
WO1983001650A1 (en) Method for operating a steam turbine with an overload valve
CN111255530B (en) Thermal power unit load adjusting system and method with low-pressure cylinder butterfly valve assistance
JPH08260912A (en) Combined cycle power plant
CN209978005U (en) Primary frequency modulation control system for secondary reheating unit
CN212296519U (en) Variable-parameter multi-element cascade thermoelectric decoupling system of thermal power heat supply unit
GB2166198A (en) Improved steam turbine load control in a combined cycle electrical power plant
JP4718333B2 (en) Once-through exhaust heat recovery boiler
JPS60523B2 (en) Method of operating a combined cycle plant combining a gas turbine and a steam turbine
US10519816B2 (en) Low load turndown for combined cycle power plants
CN112082147A (en) Low-pressure superheater system of waste heat boiler
JPH05209503A (en) Compound generating plant having steam drum
JP2005214047A (en) Combined cycle power generation plant and method of operating the same
CN217001995U (en) High-parameter combined cycle super-humidity generation and cooling unit
JP3641518B2 (en) Steam temperature control method and apparatus for combined cycle plant
CN210889050U (en) Control system for ultra-supercritical secondary reheating unit to participate in primary frequency modulation of power grid
CN116122929A (en) Flexible peak regulation system of generator set and operation method thereof
WO2023168680A1 (en) Full-load efficient steam turbine unit, thermodynamic system and operation method
CN113464226B (en) System and method for quick response of unit frequency modulation
CN113294219A (en) High-parameter combined cycle super-humidification cooling unit and operation method thereof
Berezinets et al. Technology used to operate the 300-MW power unit topped with a GTE-110 gas turbine
CN116838442A (en) Gas turbine combined cycle control method based on parameter identification