JPS60128908A JP23735183A JP23735183A JPS60128908A JP S60128908 A JPS60128908 A JP S60128908A JP 23735183 A JP23735183 A JP 23735183A JP 23735183 A JP23735183 A JP 23735183A JP S60128908 A JPS60128908 A JP S60128908A
Authority
JP
Japan
Prior art keywords
output
circuit
bleed valve
time
delay timer
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP23735183A
Other languages
Japanese (ja)
Inventor
Seiya Nishiguchi
西口 誠也
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Toshiba Corp
Original Assignee
Toshiba Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Toshiba Corp filed Critical Toshiba Corp
Priority to JP23735183A priority Critical patent/JPS60128908A/en
Publication of JPS60128908A publication Critical patent/JPS60128908A/en
Pending legal-status Critical Current

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F01MACHINES OR ENGINES IN GENERAL; ENGINE PLANTS IN GENERAL; STEAM ENGINES
    • F01KSTEAM ENGINE PLANTS; STEAM ACCUMULATORS; ENGINE PLANTS NOT OTHERWISE PROVIDED FOR; ENGINES USING SPECIAL WORKING FLUIDS OR CYCLES
    • F01K7/00Steam engine plants characterised by the use of specific types of engine; Plants or engines characterised by their use of special steam systems, cycles or processes; Control means specially adapted for such systems, cycles or processes; Use of withdrawn or exhaust steam for feed-water heating
    • F01K7/34Steam engine plants characterised by the use of specific types of engine; Plants or engines characterised by their use of special steam systems, cycles or processes; Control means specially adapted for such systems, cycles or processes; Use of withdrawn or exhaust steam for feed-water heating the engines being of extraction or non-condensing type; Use of steam for feed-water heating
    • F01K7/345Control or safety-means particular thereto

Landscapes

  • Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Control Of Steam Boilers And Waste-Gas Boilers (AREA)

Abstract

PURPOSE:To prevent generation of water hammering and the like by using an on-delay timer and an off-delay timer, with closure of a steam extraction valve as one of their conditions of action, for controlling issuance of steam extraction valve opening command, and having said command issued by means of output of one of said timers. CONSTITUTION:In a control circuit which puts a steam extraction valve closing command 9 in ON state when drain water level ultimate height 8 of a feed- water heater (HTR) is in ON state or steam extraction valve complete closure 7 is effected and output of OR circuit OR1 is ''1'', AND5, which outputs ''1'' when steam extraction valve complete closure 7 is effected and the output of an AND circuit AND2 is ''1'', is provided. Then, an off-delay timer OFFT, causing the output to turn from ''1'' to ''0'' after a definite time from the time of change of the output of AND5 from ''1'' to ''0'', is provided. Further, an on-delay timer ONT3, which causes the output to come to ''1'' after a definite time in case both outputs of NOT circuit NOT5 and AND2 are ''1'', is provided and a steam extraction valve command 13 is put in ON state according to said output.

Description

【発明の詳細な説明】 [発明の技術分野〕 本発明は火力プラントにおいて、タービン又はその他の
蒸気を抽気して給水加熱器に供給する時に開く抽気弁を
シーケンス制御により開く場合の開度制御装置に関する
ものである。
Detailed Description of the Invention [Technical Field of the Invention] The present invention relates to an opening control device for opening a bleed valve that is opened when extracting steam from a turbine or other steam and supplying it to a feed water heater in a thermal power plant by sequence control. It is related to.

[発明の技術的背景コ 火力プラントには第1図に示すように、タービン又はそ
の他より抽気した蒸気1(以下抽気蒸気1という)でボ
イラへ送られる給水2を加熱し給水温度を上昇させて、
プラント効率を向上させるべく、給水加熱器3(以下H
TR3という)が設置されている。このHTR3は普通
、タービンを起動して発電機を系統に並列させた後に低
圧HTRから高圧HTRへと順番に起動される。ここで
HTRの起動とは、抽気弁4(ここで述べる抽気弁は電
動弁である。)を全開まで開いて抽気蒸気1をHTR3
へ送る事であるが、この開方法が悪い場合下記(A>、
(B)項で述べるような事態が発生し、機器に重大な損
傷を与える事がある。
[Technical Background of the Invention As shown in Figure 1, a thermal power plant uses steam 1 extracted from a turbine or other sources (hereinafter referred to as extracted steam 1) to heat feed water 2 sent to a boiler to raise the temperature of the feed water. ,
In order to improve plant efficiency, the feed water heater 3 (hereinafter referred to as H
TR3) is installed. The HTRs 3 are normally started in sequence from the low pressure HTR to the high pressure HTR after starting the turbine and paralleling the generator to the grid. Here, starting the HTR means opening the bleed valve 4 (the bleed valve described here is a motorized valve) until it is fully open and transferring the bleed steam 1 to the HTR 3.
However, if this opening method is incorrect, the following (A>,
The situation described in (B) may occur and cause serious damage to the equipment.

すなわち、 (A”)配管又はHT’R等の機器等に高温の水又は蒸
気等を急に多量に流すと、配管又は機器等は急激に加熱
され膨張する。この膨張が急激に起こるために配管又機
器等は異常に大きい振動及び音を発生する。これをウォ
ーターハンマーと言うが、このウォーターハンマーによ
り配管又機器に取付けである計装品に損傷を与えたり、
ときには配管を固定している支持物あるいは配管及び機
器自身にも損傷を与える。
In other words, (A”) When a large amount of high-temperature water or steam suddenly flows through piping or equipment such as HT'R, the piping or equipment will rapidly heat up and expand. Piping or equipment generates abnormally large vibrations and noise. This is called water hammer, and this water hammer can damage the instrumentation attached to the piping or equipment.
In some cases, it can also damage the supports to which the piping is fixed, or the piping and equipment themselves.

(B)HTR3に流入した抽気蒸気1は給水2を加熱す
る事により冷却され、温水、即ち、ドレン5となる。こ
のドレンは水質の関係によりまず系外にブローされるが
、このブロー聞を調節することによりHTR3内のドレ
ン水位が一定になるように制御されている。この制御は
はHTR3に取付けである水位検出器6等により行われ
ている。
(B) The extracted steam 1 that has flowed into the HTR 3 is cooled by heating the feed water 2 and becomes hot water, that is, the drain 5. This drain is first blown out of the system due to water quality, but by adjusting this blowing distance, the drain water level in the HTR 3 is controlled to be constant. This control is performed by a water level detector 6 etc. attached to the HTR 3.

しかし、油気蒸気1の流入量が多いと、水位調節による
ブロー量が追いつかず、HTRa内のトン水位は高くな
る。このドレン水位が異常に高くなるとドレンは、抽気
管を通してタービンへ逆流する。これをウォーターイン
ダクションと言うが、このウォーターインダクションが
発生すると、タービンスラスト軸受の損傷、タービン翼
の損傷等重大事故の原因となる。
However, if the amount of inflow of oil vapor 1 is large, the amount of blowing due to water level adjustment cannot keep up, and the ton water level in HTRa becomes high. When this drain water level becomes abnormally high, the drain flows back to the turbine through the bleed pipe. This is called water induction, and when this water induction occurs, it can cause serious accidents such as damage to the turbine thrust bearing and damage to the turbine blades.

従って、このようなことを考慮し、一般的に第2図に示
すようなパターンで抽気弁4は開操作されている。
Therefore, taking this into consideration, the bleed valve 4 is generally opened in a pattern as shown in FIG.

第2図におい−C1横軸は時間を、そしてたて軸は抽気
弁開度を示しており、VPlはウォーターハンマー及び
ウォーターインダクションが発生しないように設定され
た開度(以下ウオーミング開度という)で、T1はウオ
ーミング開度■P1まで開するのに要する時間(以下微
開時間という)である。又T2はHTR3をウオーミン
グするために要する時間(以下ウオーミング時間という
)である。
In Fig. 2, the -C1 horizontal axis shows time, and the vertical axis shows the bleed valve opening, and VPl is the opening set so that water hammer and water induction will not occur (hereinafter referred to as warming opening). Here, T1 is the time required to open to the warming opening degree ■P1 (hereinafter referred to as slight opening time). Further, T2 is the time required to warm up the HTR3 (hereinafter referred to as warming time).

ところで従来、第2図に示すようなパターンでの開操作
を得るためには、第3図に示すような回路が使用されて
いた。すなわち、第3図は、抽気弁4の開閉指令の論理
回路の構成例を示すものであり、図において、N0T1
は抽気弁全閉7が成立する(ON>と出力を“0”°と
するノット回路で、ANDlはこのノット回路N0T1
の出力が“1°゛で、ざらにオア回路0R1出力が°゛
1″の時、” 1 ”を出力するアンド回路である。そ
して、OR1はHTRドレン水位極高8がONであるか
アンド回路A’N’DI出力が1″のどちらかの状態の
時、出力が゛1パとなるオア回路であり、オア回路6R
1出力が11111の時、抽気弁閉指令9はONとなる
。N0T2は、オア回路0R1出力が0″の時、出力゛
1′′となるフッ1〜回路である。
Conventionally, in order to obtain the opening operation in the pattern shown in FIG. 2, a circuit as shown in FIG. 3 has been used. That is, FIG. 3 shows an example of the configuration of a logic circuit for opening and closing commands for the bleed valve 4. In the figure, N0T1
is a knot circuit in which the bleed valve is fully closed 7 (ON> and the output is “0”°, and ANDl is this knot circuit N0T1
This is an AND circuit that outputs "1" when the output of the circuit is "1" and the output of the OR circuit 0R1 is "1". OR1 is an OR circuit whose output becomes 1 when either HTR drain water level extreme height 8 is ON or AND circuit A'N'DI output is 1'', and OR circuit 6R
When the 1 output is 11111, the bleed valve closing command 9 is turned ON. N0T2 is a circuit that outputs "1'' when the output of OR circuit 0R1 is 0".

N0丁3はト1TRドレン水位高10ではない時に出力
が“1″となるノット回路で、AND2はノット回路N
0T3出力が1″でシーケンス信号11及び前条件12
がONの時出力が“1″となるアンド回路である。0N
T1.0NT2はアンド回路AND2出力が1″′で時
間のカラン1へを始め設定された時間後に出力が1″と
なるオンディレィタイマーである。N0T4はオンディ
レィタイマー0NT1出力が0′°の時出力が“1″に
なるノット回路で、A、N’D3はノッ1〜回路N0T
4出力が1″でアンド回路A ’N D 2出力が°゛
1″で出力が′1′′となるアンド回路である。また、
OR2はアンド回路AN’D3出力が′1°′であるか
、オンディレィタイマーON ’r 2出力が1′°で
あるかの時出力゛1″となるオア回路である。A 、N
 D 4はオア回路○R2出力が“′1パでノット回路
N0T2出力が” 1 ”で出力が“1″となるアンド
回路である。
N0-3 is a knot circuit whose output is "1" when the water level of the To1TR drain is not 10, and AND2 is a knot circuit N.
0T3 output is 1'', sequence signal 11 and precondition 12
This is an AND circuit whose output becomes "1" when is ON. 0N
T1.0NT2 is an on-delay timer in which the output of the AND circuit AND2 starts at 1'' and the output becomes 1'' after a set time. N0T4 is a knot circuit whose output becomes "1" when the on-delay timer 0NT1 output is 0'°, and A and N'D3 are the knot circuits from knot 1 to circuit N0T.
This is an AND circuit in which 4 outputs are 1'' and the AND circuit A'N D 2 outputs are 1'' and the output is 1''. Also,
OR2 is an OR circuit that outputs "1" when the AND circuit AN'D3 output is "1°" or the ON delay timer ON'r2 output is 1'°.A, N
D4 is an AND circuit in which the output of the OR circuit ○R2 is "1", the output of the NOT circuit N0T2 is "1", and the output is "1".

次に上記回路の作用について述べる。今、シーケンス信
号11がオンとなった時、゛′前条件12パ及び゛’H
TRドレン水位高10ではない″、が成立していればア
ンド回路AND 2出力は“1″となる。その時、オン
ディレィタイマー〇NTI出力はO゛であるのでアンド
回路AND3出力は111 I+となる。そして、オア
回路OR2及びアンド回路AND4出力も1″となり抽
気弁開指令13が出力され、抽気弁4は開動作する。そ
して、アンド回路AND3は、オンディーレイタイマー
0NT1が設定時間(第2図の微開時間T1)後に出力
“1″となり、ノット回路No下3出力が” o ”と
なるまで出力″′1″の状態を継続する。
Next, the operation of the above circuit will be described. Now, when the sequence signal 11 is turned on, the ``precondition 12'' and ``H''
If "TR drain water level height is not 10" is established, the AND2 output of the AND circuit becomes "1".At that time, the output of the on-delay timer〇NTI is O゛, so the output of the AND circuit AND3 becomes 111 I+. Then, the outputs of the OR circuit OR2 and the AND circuit AND4 also become 1'', the bleed valve opening command 13 is output, and the bleed valve 4 is opened. Then, the AND circuit AND3 outputs "1" after the on-delay timer 0NT1 has set time (slight opening time T1 in Fig. 2) and outputs "'1" until the lower three outputs of the NOT circuit No. become "o". Continue the state.

アンド回路AND3出力が0”となれば、オア回路0R
2出力が” o ”となり、アンド回路AND4出力も
°゛0″となるので抽気弁開指令9はオフとなり、抽気
弁4はウオーミング開度VP1の開度を維持する。そし
て、その後、オンディレィタイマー〇NT2が設定時間
(第2図ウオーミング時間T2)後に出力を“1″とす
ると、オア回路OR2出力が1″となり、アンド回路A
ND4出力も“1゛′となって抽気弁開指令13がオン
となるので抽気弁4は全開状態まで開かれる。
If the AND circuit AND3 output becomes 0'', the OR circuit 0R
2 output becomes "o" and the AND circuit AND4 output also becomes °'0", so the bleed valve opening command 9 turns off and the bleed valve 4 maintains the warming opening VP1. Then, after that, the on-delay When the timer NT2 outputs "1" after the set time (warming time T2 in Figure 2), the OR circuit OR2 output becomes 1", and the AND circuit A
The ND4 output also becomes "1'' and the bleed valve opening command 13 is turned on, so the bleed valve 4 is opened to the fully open state.

ところで、抽気弁4が開いている問に、HTR3内のド
レン水位がHTRドレン水位高10よりさらに高くなり
、HTRドレン水位極高8となると、ウォーターインダ
クションが発生する可能性が出てくるので、抽気弁開指
令9がオア回路OR1を通して出力され、抽気弁4は全
開状態まで閉じる。その時、オア回路0R1はアンド回
路AND1を経由して抽気弁全開となるまで自己保持さ
れ、同時に抽気弁開指令13用のアンド回路AND4の
入力のノット回路N0T2の出力をO″とし抽気弁開指
令13をロックしている。
By the way, if the drain water level in the HTR 3 becomes higher than the HTR drain water level height 10 and reaches the HTR drain water level extremely high 8 while the bleed valve 4 is open, there is a possibility that water induction will occur. The bleed valve open command 9 is outputted through the OR circuit OR1, and the bleed valve 4 is closed to the fully open state. At that time, the OR circuit 0R1 is self-held via the AND circuit AND1 until the bleed valve is fully open, and at the same time, the output of the NOT circuit N0T2, which is the input of the AND circuit AND4 for the bleed valve open command 13, is set to O'' to command the bleed valve to open. 13 is locked.

[背景技術の問題点] ところで、抽気弁4がウオーミングされているウオーミ
ング時間T2中にHTRドレン水位高が発生した場合を
(a)項で、そして抽気弁4が開いてる間、特にウオー
ミング時間T2経過後の開動作中にHTRドレン水位極
高8が発生した場合を(b)項で説明するが、この場合
ウオーミング開度が一定でなくなる可能性が生じる。
[Problems in the Background Art] By the way, the case where the HTR drain water level rises during the warming time T2 during which the bleed valve 4 is warmed is described in section (a), and the case where the HTR drain water level is high during the warming time T2 during which the bleed valve 4 is open is explained in paragraph (a). A case where the HTR drain water level extremely high 8 occurs during the opening operation after the elapse of time will be explained in section (b), but in this case, there is a possibility that the warming opening degree will not be constant.

(a)第4図を参照して説明する。第4図において、ウ
オーミング開度vP1によりウオーミング中、時刻T3
で、HTRドレン水位高10が発生すると、アンド回路
AND2出力は゛1″から“O′′となり、オンディレ
ィタイマー〇NT1は出力” o ”となり、オンディ
レィタイマー0NT2は時間のカウントが零となる。そ
のため、抽気弁開指令まなくなり、また、このとき抽気
閉指令も出ないので、抽気弁はウオーミング開度■P1
に保たれる。この状態で、時刻T4の時点においてH,
TRドレン水位高10が復帰すると再びアンド回路AN
D2出力は1”となる。従って、アンド回路AND3は
再びオンディレィタイマー0′NT1出力が1″となる
微開時間T1だけ出力が1″となるので、′;Ir−ア
回路OR2及びアンド回路AND4を通して抽気弁開指
令13が出力され、抽気弁4は時刻T4より微開時間T
1分だけ更に開制伸されることになる。この時の開度V
P2をウオーミング開度VP2とすると、図のように抽
気弁はこの時点でVPlの2倍の開度に開かれてしまう
ことになる。そして、その後、時刻T4を基準としてオ
ンディレィタイマー〇NT2出力が1″となるウオーミ
ング時闇T2後に抽気弁4は全開となる。
(a) This will be explained with reference to FIG. In FIG. 4, during warming with the warming opening degree vP1, at time T3
When the HTR drain water level height 10 occurs, the output of the AND circuit AND2 changes from "1" to "O", the output of the on-delay timer 0NT1 becomes "o", and the time count of the on-delay timer 0NT2 becomes zero. Therefore, the bleed valve open command is no longer issued, and at this time, the bleed air close command is also not issued, so the bleed valve is set to the warming opening ■P1.
is maintained. In this state, at time T4, H,
When the TR drain water level returns to 10, the AND circuit AN is activated again.
The output of D2 becomes 1". Therefore, the output of the AND circuit AND3 becomes 1" for the slight opening time T1 during which the on-delay timer 0'NT1 output becomes 1", so that '; Ir-A circuit OR2 and the AND circuit The bleed valve opening command 13 is output through AND4, and the bleed valve 4 is slightly opened for a time T from time T4.
The opening speed will be increased by one minute. Opening degree V at this time
If P2 is the warming opening degree VP2, the bleed valve will be opened to twice the opening degree of VPl at this point, as shown in the figure. Thereafter, the bleed valve 4 is fully opened after the warming time T2 when the on-delay timer NT2 output becomes 1'' based on the time T4.

このよにウオーミング開度が大きくなると、抽気蒸気1
の量がふえるのでウォーターハンマーを発生したり、再
びHTR3内のドレン水位が高(なる原因となる。
When the warming opening is increased like this, the bleed steam 1
As the amount of water increases, it may cause water hammer or cause the drain water level in HTR3 to become high again.

(b)抽気弁4が開いている間にHTRドレン水位極高
8が発生した場合について、第5図を参 照して説明す
る。ウオーミング完了後の抽気弁4開動作中の時刻T5
において、HTRドレン水位高10が発生し、さらにH
TRドレン水位極高8まで発生すると、オア回路0R1
出力は1゛′となり抽気弁閉指令9が出力され、抽気弁
4は全開状態になるまで閉じられる。オア回路0R1は
出力が111 IIになると抽気弁閉指令9が出力され
る。
(b) The case where the HTR drain water level extremely high 8 occurs while the bleed valve 4 is open will be explained with reference to FIG. Time T5 during bleed valve 4 opening operation after completion of warming
, HTR drain water level high 10 occurred, and further H
When the TR drain water level reaches extremely high 8, OR circuit 0R1
The output becomes 1'', a bleed valve closing command 9 is output, and the bleed valve 4 is closed until it is fully open. When the output of the OR circuit 0R1 reaches 111 II, the bleed valve closing command 9 is output.

オア回路0R1はその出力が′1″になると以後、抽気
弁全閉7になり、アンド回路AND1出力がOIIとな
るまで自己保持されるので、HTRドレンレベル極高8
がオフとなっても出力1パを出し続け、従って、抽気弁
閉指令発令状態が維持される。さて、時刻下6になり、
HTRドレン水位高10が復帰すると、アンド回路AN
D2は“1″を出力するので、オア回路OR2出力はア
ンド回路AND3出力が1′°となることにより°“1
′°となる。そしてアンド回路AND4に″゛1″を出
力し、アンド回路AND4出力を”1パとじようとする
が、時刻T6から時刻T7まではオア回路0R1の出力
が1″であるために、アンド回路AND、4出力はO″
のままとなり、抽気弁開指令13は出ない。そして時刻
T7になると抽気弁全閉7であるので、オア回路0R1
出力が” o ”となるので、アンド回路AND4出力
はパ1′”となり、抽気弁開指令13が出力されて抽気
弁4は開く。ところが、抽気弁4の微開時間T1のカウ
ントは時刻T6より成されているので、今回のウオーミ
ング開度は第5図におけるVF6の開度にとどまる。そ
の後、時刻T6よりウオーミング時間T2経過後に抽気
弁4は全開まで開り、。
When the output of the OR circuit 0R1 becomes '1'', the bleed valve becomes fully closed 7, and it is self-held until the output of the AND circuit AND1 becomes OII, so the HTR drain level is extremely high 8.
Even when the valve is turned off, the output 1 continues to be output, and therefore, the bleed valve closing command issuing state is maintained. Now, the time is 6:00,
When the HTR drain water level returns to 10, the AND circuit AN
Since D2 outputs "1", the OR circuit OR2 output becomes "1" because the AND circuit AND3 output becomes 1'°.
′°. Then, an attempt is made to output "1" to the AND circuit AND4 and to combine the AND circuit AND4 output with "1", but since the output of the OR circuit 0R1 is 1" from time T6 to time T7, the AND circuit AND4 outputs "1". , 4 output is O''
It remains as it is, and the bleed valve open command 13 is not issued. Then, at time T7, the bleed valve is fully closed 7, so the OR circuit 0R1
Since the output becomes "o", the output of the AND circuit AND4 becomes "P1'", the bleed valve opening command 13 is output, and the bleed valve 4 is opened. However, the count of the slight opening time T1 of the bleed valve 4 is at time T6. Therefore, the warming opening degree this time remains at the opening degree of VF6 in FIG. 5. Thereafter, after the warming time T2 has elapsed from time T6, the bleed valve 4 is fully opened.

従って十分なウオーミングが成されないまま、全開とな
る。
Therefore, the engine is fully opened without sufficient warming.

さて、時刻T6とT7の間隔が微開時間T1より大きく
なると、ウオーミング開度VP、3は全開のままでいる
事も考えられる。この場合、抽気弁4はウオーミング時
間T2後、ウオーミングが成されないまま一気に全開と
なるので、ウォーターハンマーを発生したり、HTR内
のドレン水位が高くなったりする原因となっている。
Now, if the interval between times T6 and T7 becomes larger than the slight opening time T1, it is conceivable that the warming opening degree VP,3 remains fully open. In this case, the bleed valve 4 is fully opened all at once after the warming time T2 without being warmed up, which causes water hammer to occur and the drain water level in the HTR to rise.

[発明の目的] 本発明は上記のような事情に鑑みてなされたもので、そ
の目的は、HTRドレン水位高、l−1TRドレン水位
極高8が発生しても、その後の油気弁の開動作を制御し
、ウォーターハンマーの発生や)−1TR内のドレン水
位上昇を抑制して給水加熱器を安定に起動することので
きるようにした火力プラントの抽気弁の開度制御装置を
提供することにある。
[Object of the Invention] The present invention has been made in view of the above-mentioned circumstances, and its purpose is to prevent the subsequent oil valve from opening even if the HTR drain water level is high or the l-1TR drain water level is extremely high. To provide an opening degree control device for a bleed valve in a thermal power plant, which controls the opening operation and suppresses the occurrence of water hammer and rise in the drain water level in a -1TR, thereby stably starting a feed water heater. There is a particular thing.

[発明の概要コ 本発明はかかる目的を達成するため、火力ブラン1−に
おけるボイラへの給水温度を上昇させる給水加熱器の入
力側に設けられ、抽気された蒸気の該給水加熱器への送
り込みを制御する抽気弁の開度制御装置として、前記給
水加熱器のドレン水位が所定限度に達すると抽気弁が全
閉するまで抽気弁閉指令を与える手段と、抽気弁全閉時
に前記給水加熱器のドレン水位が所定レベルより低くな
ったとき、動作して所定時間後オフするオフディレィタ
イマーと、抽気弁開時に前記給水加熱器のドレン水位が
前記所定レベルより低くなったとき動作して所定時間後
、オンとなるオンディレータイマーと、抽気弁閉指令の
発令のない時、前記オンディレータイマーまたはけフデ
ィレータイマーのいずれか一方がオン状態にあれば抽気
弁開指令を発令する回路とより構成し、給水加熱器のド
レン水位が所定のレベルまたは所定限度に達した後にお
いて抽気弁のウオーミング開度を最初の開度と同じ開度
にさせることができるようにすることにより給水加熱器
を安定に起動する事を特徴とする。
[Summary of the Invention] In order to achieve the above object, the present invention provides a system which is provided on the input side of a feed water heater that increases the temperature of the feed water to the boiler in the thermal power branch 1-, and which feeds extracted steam to the feed water heater. As a bleed valve opening control device for controlling the bleed water heater, there is provided a means for giving a bleed valve closing command until the bleed valve is fully closed when the drain water level of the feed water heater reaches a predetermined limit; an off-delay timer that operates and turns off after a predetermined time when the drain water level of the feedwater heater becomes lower than the predetermined level; and an off-delay timer that operates and turns off after a predetermined time when the drain water level of the feed water heater becomes lower than the predetermined level when the bleed valve is opened. and a circuit that issues a bleed valve open command if either the on delay timer or the bleed delay timer is in the on state when the bleed valve close command is not issued. After the drain water level of the feedwater heater reaches a predetermined level or a predetermined limit, the warming opening of the bleed valve can be made to be the same as the initial opening, thereby stabilizing the feedwater heater. It is characterized by starting up.

[発明の実施例コ 以下本発明の一実施例を第6図を参照して説明する。第
6図は本発明による抽気弁の開閉指令を発生するための
論理回路の構成例を示すものであり、第3図と同一物に
ついては同一符号を付しである。
[Embodiment of the Invention] An embodiment of the present invention will be described below with reference to FIG. FIG. 6 shows an example of the configuration of a logic circuit for generating opening/closing commands for a bleed valve according to the present invention, and the same components as those in FIG. 3 are given the same reference numerals.

第6図において、その基本構成は第3図のものと変りは
ないので、ここでは新たに付加された部分について説明
する。図におけるAND5はアンド回路AND2出力が
′1″で抽気弁全開70時出力が゛1″となるアンド回
路で、0FFTはアンド回路AND5出力が1″から0
″に変化したその時点より一定時間(第2図微間時間T
I)後に出力がII 1 IIからO°′になるオフデ
ィレータイマーである。このオフディレータイマー0F
FTはアンド回路AND5出力が1″の時は出力は1″
となる。N0T5は抽気弁全閉7でない時、出力が1″
となるノット回路であり、AND6はアンド回路AND
2出力が′1″でノット回路5出力が1″の時出力が′
1′′となるアンド回路である。0NT3はアンド回路
AND6出力が1″になって一定時間(第2図ウオーミ
ング時間T2)mに出力が°′1′°となるオンディレ
ィタイマーである。
In FIG. 6, the basic configuration is the same as that in FIG. 3, so newly added parts will be explained here. AND5 in the figure is an AND circuit in which the AND circuit AND2 output is ``1'' and the output at 70 when the bleed valve is fully open is ``1'', and 0FFT is the AND circuit AND5 output is ``1'' to 0.
'' for a certain period of time (Fig. 2 minute time T
I) It is an off-delay timer whose output later becomes O°' from II 1 II. This off-delay timer 0F
FT is an AND circuit AND5 output is 1'' when output is 1''
becomes. N0T5 has an output of 1'' when the bleed valve is not fully closed 7.
is a NOT circuit, and AND6 is an AND circuit AND
When output 2 is '1'' and output of knot circuit 5 is 1'', the output is '
1'' is an AND circuit. 0NT3 is an on-delay timer in which the output of the AND circuit AND6 becomes 1'' and the output becomes 1'' for a fixed time m (warming time T2 in FIG. 2).

次に上記構成の回路の作用について述べる。抽気弁閉指
令9は従来の回路と同様に作用する。そして、シーケン
ス信号11がオンとなり、アンド回路AND2出力が1
゛となると、その時、抽見回4は全閉7であるので、ア
ンド回路AND5出力が” 1 ”となる。このアンド
回路AND5出力が゛1″となるとオフディレィタイマ
ー0FFT出力が” 1 ”となり、抽気弁開指令13
が出力されて抽気弁4は開く。抽気弁4が全閉7でな(
なるとアンド回路AND5出力はO″となるので、オフ
ディレィタイマー0FFT出力は微開時1111TI後
に1101+となる。従って抽気弁4は微開時間T1だ
け開くことになる。そして又、抽気弁4が全閉7でなく
なった時からアンド回路AND6出力は“1゛′となる
のでオンディレィタイマー0NT3はその時からカウン
トを始め、ウオーミング時間T2を経過後、出力が1″
になり、これにより抽気弁開指令13が出力されて抽気
弁4は全開となる。
Next, the operation of the circuit with the above configuration will be described. The bleed valve close command 9 operates in the same manner as in the conventional circuit. Then, the sequence signal 11 turns on, and the output of the AND circuit AND2 becomes 1.
At that time, the drawing circuit 4 is fully closed 7, so the output of the AND circuit AND5 becomes "1". When the output of this AND circuit AND5 becomes "1", the off-delay timer 0FFT output becomes "1", and the bleed valve open command 13
is output and the bleed valve 4 opens. Bleed valve 4 is fully closed 7 (
Then, the output of the AND circuit AND5 becomes O'', so the off-delay timer 0FFT output becomes 1101+ after 1111TI during the slight opening. Therefore, the bleed valve 4 is opened for the slight opening time T1. Since the output of the AND circuit AND6 becomes "1" from the time when the closed state is no longer 7, the on-delay timer 0NT3 starts counting from that time, and after the warming time T2 has elapsed, the output becomes "1".
As a result, the bleed valve open command 13 is output, and the bleed valve 4 is fully opened.

さて、従来の回路で問題となった項目について、本発明
による回路によりどのように改善されたかを従来の回路
の説明と対応させて、(I)、(II)項に分けて説明
する。
Now, how the circuit according to the present invention improves the problems caused by the conventional circuit will be explained in sections (I) and (II) in correspondence with the explanation of the conventional circuit.

(I>第4゛図に示された、時刻T3にHTRドレン水
位高が発生し時刻T4で復帰した場合、時刻T3でアン
ド回路AND2出力が0゛°となるので、第6図の回路
においてはオンディレィタイマー0NT3は、アンド回
路AND6出力が′0゛′となることにより時間のカウ
ントが零となる。その後時刻T4において、l−1T 
Rドレン水位高が復帰するとアンド回路AND2出力は
再び“1″となる。この時、抽気弁4は全閉7ではなく
ウオーミング開度であるのでアンド回路AND5出力は
“0″のままで変化しないから、オフディレィタイマー
0FFTの出力も“O′″のまま変化をしない。従って
、従来の回路では時刻T4より開指令が出力されていた
が、第6図に示す本発明による回路では、時刻T4以後
の開度もウオーミング開度VP1一定の開度とすること
が出来る。そして時刻T4よりオンディレィタイマー0
NT3によるウオーミング時間接抽気弁は全開となる。
(I> As shown in Figure 4, if the HTR drain water level rises at time T3 and recovers at time T4, the output of the AND circuit AND2 becomes 0° at time T3, so in the circuit shown in Figure 6) In the on-delay timer 0NT3, the time count becomes zero when the output of the AND circuit AND6 becomes '0'.Thereafter, at time T4, l-1T
When the R drain water level returns to high, the output of the AND circuit AND2 becomes "1" again. At this time, the bleed valve 4 is not fully closed 7 but at a warming opening, so the output of the AND circuit AND5 remains at "0" and does not change, so the output of the off-delay timer 0FFT also remains at "O'" and does not change. Therefore, in the conventional circuit, the opening command is output from time T4, but in the circuit according to the present invention shown in FIG. 6, the opening degree after time T4 can also be kept constant at the warming opening degree VP1. Then, from time T4, on-delay timer 0
During the warming time by NT3, the air inlet/bleed valve is fully open.

(II)第5図に示されたように、時刻T5でHTRド
レン水位極高8が発生し、時刻T6でHTRドレン水位
高10が復帰した場合、第6図に示す本発明回路では油
気弁4は従来の回路同様、全開方向に閉じるように制御
する。そして時刻T6でHTRドレン水位高10が復帰
すると、アンド回路AND2出力が′1″となる。しか
し、ウオーミング開度VPl用のオフディレィタイマー
OF’FT入力であるアンド回路AND5の一方の入力
は抽気弁全閉7である。従ってアンド回路AND5出力
が“1″となるのは時刻T7の抽気弁が全閉7となった
時でありその時刻T7より抽気弁4はオフディレィタイ
、マー0FFTにより指定される微開時間T1だけ開く
ことになる。そしてその開度は最初のウオーミング開度
VP1と同じ開度となる。そしてウオーミング時111
T2も時刻T7よりカウントされることになる。従って
、ウオーミング開度VP1で抽気できる。
(II) As shown in FIG. 5, when the HTR drain water level extremely high 8 occurs at time T5 and the HTR drain water level returns to high 10 at time T6, the circuit of the present invention shown in FIG. The valve 4 is controlled to be closed in the fully open direction as in the conventional circuit. Then, at time T6, when the HTR drain water level returns to 10, the AND circuit AND2 output becomes '1''. However, one input of the AND circuit AND5, which is the off-delay timer OF'FT input for the warming opening degree VPl, is The valve is fully closed 7. Therefore, the output of the AND circuit AND5 becomes "1" when the bleed valve becomes fully closed 7 at time T7, and from that time T7, the bleed valve 4 is closed due to the off-delay time and Mar0FFT. It will open for the specified slight opening time T1.The opening degree will be the same as the initial warming opening degree VP1.Then, during warming 111
T2 will also be counted from time T7. Therefore, air can be extracted at the warming opening degree VP1.

[発明の効!!] 以上述べたように本発明は抽気弁開指令発令制御用に抽
気弁閉を動作条件の一つ5とするオンディレィタイマー
及びオフディレィタイマーを用い、これらのうちいずれ
か一方の出力があるとき、抽気弁開指令発令可能にして
、これらディレィタイマーにより抽気弁開指令の発令を
制御できるようにしたのでHTRドレン水位高、HTR
ドレン水位極高が発生した後においても、抽気弁のウオ
ーミング開度を最初に設定したウオーミング開度■P1
と同じ開度にすることが可能となり、従って、ウォータ
ハンマー発生やHTRTR−ン水位が^くなることを防
止できる火力プラントの抽気弁開度制御装置を提供でき
る。
[Efficacy of invention! ! ] As described above, the present invention uses an on-delay timer and an off-delay timer that have the bleed valve closed as one of the operating conditions 5 for the bleed valve open command issuance control. By making it possible to issue the bleed valve open command and control the issuance of the bleed valve open command using these delay timers, the HTR drain water level height, HTR
Even after the extremely high drain water level occurs, the warming opening of the bleed valve remains the initially set warming opening ■P1
Therefore, it is possible to provide a bleed valve opening control device for a thermal power plant that can prevent water hammer from occurring and the HTRTR water level from dropping.

【図面の簡単な説明】[Brief explanation of the drawing]

第1図は給水加熱器及び配管の略図、第2図は現在一般
に実施されている抽気弁の開方法を説明するための図、
第3図は従来使用されていた抽気弁の開閉指令の論理回
路の構成例、第4図は従来の回路によりウオーミング時
間中にHTRドレン水位高が発生し復帰した時の抽気弁
の開状態図、第5図は従来の回路において、抽気弁が間
中にHTRドレン水位極高が発生し、その抽気弁が閉動
作中にHTRドレン水位高が復帰した時の抽気弁の開状
態図、第6図は本発明による抽気弁の開閉指令の論理回
路の構成例を示す図である。 1・・・抽気蒸気、2・・・給水、3・・・給水加熱器
、4・・・抽気弁、5・・・ドレン、6・・・水位検出
器、T1・・・微開時間、T2・・・ウオーミング時間
、VPl・・・ウオーミング開度、7・・・抽気弁全閉
、8・・・HTRドレン水位極高、9・・・抽気弁閉指
令、1O・・・HTRドレン水位高、11・・・シーケ
ンス信号、12・・・前条件、ANDl、AND2.A
ND3.AND4・・・アンド回路、OR1,OR2・
・・オア回路、N。 T1.N0T2. NoT3.N0T4・・・ノッ1へ
回路、0NT1,0NT2・・・オンディレィタイマー
、T3・・・HTRドレン水位高発生時刻、T4・・・
HTRドレン水位高復帰時刻、T5・・・HTRドレン
水位極高発生時刻、T6・・・HTRドレン水位高復帰
時刻、T7・・・抽気弁全閉時刻、△N D 5 、 
’A N D6・・・アンド回路、N0T5・・・ノッ
ト回路、OF ’FT・・・オフディレィタイマー、O
N丁3・・・オンディレィタイマー。 出願人代理人 弁理士 鈴江武彦 第1図 第2図 第3図 第4図 第6図
Figure 1 is a schematic diagram of the feed water heater and piping, Figure 2 is a diagram for explaining the currently commonly used method of opening the bleed valve.
Figure 3 is an example of the configuration of a conventional logic circuit for commanding the opening and closing of a bleed valve, and Figure 4 is a diagram of the open state of the bleed valve when the HTR drain water level rises and returns to normal during the warming period using the conventional circuit. , Fig. 5 is a diagram of the open state of the bleed valve when, in a conventional circuit, the HTR drain water level becomes extremely high while the bleed valve is closed, and the HTR drain water level returns to high level while the bleed valve is closed. FIG. 6 is a diagram showing an example of the configuration of a logic circuit for commanding the opening and closing of the bleed valve according to the present invention. 1... Bleed steam, 2... Water supply, 3... Feed water heater, 4... Bleed valve, 5... Drain, 6... Water level detector, T1... Slight opening time, T2...Warming time, VPl...Warming opening degree, 7...Bleed valve fully closed, 8...HTR drain water level extremely high, 9...Bleed valve close command, 1O...HTR drain water level High, 11...Sequence signal, 12...Precondition, ANDl, AND2. A
ND3. AND4...AND circuit, OR1, OR2・
...OR circuit, N. T1. N0T2. NoT3. N0T4...Circuit to No.1, 0NT1,0NT2...On delay timer, T3...HTR drain water level high occurrence time, T4...
HTR drain water level high return time, T5...HTR drain water level extremely high occurrence time, T6...HTR drain water level high return time, T7...bleed valve fully closed time, △N D5,
'A N D6...AND circuit, N0T5...NOT circuit, OF'FT...Off delay timer, O
Ncho 3...On delay timer. Applicant's Representative Patent Attorney Takehiko Suzue Figure 1 Figure 2 Figure 3 Figure 4 Figure 6

Claims (1)

【特許請求の範囲】[Claims] 火力プラントにおけるボイラへの給水温度を上昇させる
給水加熱器の入力側に設けられ、抽気された蒸気の該給
水加熱器への送り込みを制御する抽き弁の開度制御装置
として、前記給水加熱器のドレン水位が所定限度に達す
ると抽気弁が全閉するまで抽気弁閉指令を与える手段と
、抽気弁全開時に前記給水加熱器のドレン水位が所定レ
ベルより低くなったとき、動作して所定時間後オフする
オフディレィタイマーと、抽気弁開時に1記給水加熱器
のドレン水位が前記所定レベルより低くなったとき動作
して所定時間後、オンとなるオンディレータイマーと、
抽気弁閉指令の発令のない時、前記オンディレータイマ
ーまたはオフディレータイマーのいずれか一方がオン状
態にあれば抽気弁開指令を発令する回路とより構成した
ことを特徴とする火力プラントの抽気弁開度制御装置。
The feedwater heater is installed on the input side of a feedwater heater that increases the temperature of feedwater to a boiler in a thermal power plant, and is used as an opening control device for an extraction valve that controls sending of extracted steam to the feedwater heater. means for giving a command to close the bleed valve until the bleed valve is fully closed when the drain water level of the feed water heater reaches a predetermined limit; an off-delay timer that turns off after a predetermined period of time; and an on-delay timer that operates when the drain water level of the feed water heater becomes lower than the predetermined level when the bleed valve is opened and turns on after a predetermined time;
A bleed valve for a thermal power plant, comprising a circuit that issues a bleed valve open command if either the on-delay timer or the off-delay timer is in an on state when a bleed valve close command is not issued. Opening control device.
JP23735183A 1983-12-16 1983-12-16 Opening control device for steam extraction valve of thermopower plant Pending JPS60128908A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP23735183A JPS60128908A (en) 1983-12-16 1983-12-16 Opening control device for steam extraction valve of thermopower plant

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP23735183A JPS60128908A (en) 1983-12-16 1983-12-16 Opening control device for steam extraction valve of thermopower plant

Publications (1)

Publication Number Publication Date
JPS60128908A true JPS60128908A (en) 1985-07-10

Family

ID=17014100

Family Applications (1)

Application Number Title Priority Date Filing Date
JP23735183A Pending JPS60128908A (en) 1983-12-16 1983-12-16 Opening control device for steam extraction valve of thermopower plant

Country Status (1)

Country Link
JP (1) JPS60128908A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20130204453A1 (en) * 2010-10-12 2013-08-08 Mitsubishi Heavy Industries, Ltd. Control system and method for nuclear power facility

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20130204453A1 (en) * 2010-10-12 2013-08-08 Mitsubishi Heavy Industries, Ltd. Control system and method for nuclear power facility
EP2629301A1 (en) * 2010-10-12 2013-08-21 Mitsubishi Heavy Industries, Ltd. Control system for nuclear power facility
EP2629301A4 (en) * 2010-10-12 2014-03-19 Mitsubishi Heavy Ind Ltd Control system for nuclear power facility
US9627877B2 (en) 2010-10-12 2017-04-18 Mitsubishi Heavy Industries, Ltd. Control system and method for nuclear power facility

Similar Documents

Publication Publication Date Title
JPS61105003A (en) Method and device for connecting boiler to pressurized steamsupply line in fluid manner
JPH0454802B2 (en)
EP0928882B1 (en) Steam cooling apparatus for gas turbine
JPS60128908A (en) Opening control device for steam extraction valve of thermopower plant
JPS58197408A (en) Starting device for combined plant
JPS5925853B2 (en) Power plant operation control method and device for implementing this method
US3359732A (en) Method and apparatus for starting a steam generating power plant
JPS6239646B2 (en)
JPH10131716A (en) Method and device for controlling steam cooling system of gas turbine
JP2953794B2 (en) Steam control valve chest warming method
JP3112579B2 (en) Pressure control device
JPS5929901A (en) Controller for water level of drum of waste heat recovery boiler
JP2549190B2 (en) Combined Cycle Power Plant Controller
JPH0587303A (en) Starting of variable pressure operation boiler
JPH02130202A (en) Combined plant
JPS5870007A (en) Apparatus for controlling combined cycle power plant
JPH0128202B2 (en)
JPH0443996A (en) Steam flow rate controller for fast reactor plant
JPH0330687B2 (en)
JPH0223929Y2 (en)
JPS6032082B2 (en) Feed water temperature control device
JPH0223928Y2 (en)
JPS60164606A (en) Piping warming up control device
JPS5929761B2 (en) Steam pressure control device during hot standby in nuclear power plants
JP3044159B2 (en) High-speed standby operation device of fast reactor