JPH11350897A - Construction method for underground structure - Google Patents

Construction method for underground structure

Info

Publication number
JPH11350897A
JPH11350897A JP10162439A JP16243998A JPH11350897A JP H11350897 A JPH11350897 A JP H11350897A JP 10162439 A JP10162439 A JP 10162439A JP 16243998 A JP16243998 A JP 16243998A JP H11350897 A JPH11350897 A JP H11350897A
Authority
JP
Japan
Prior art keywords
constructed
slab
single shield
pile
plate portion
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP10162439A
Other languages
Japanese (ja)
Other versions
JP3937588B2 (en
Inventor
Tomohisa Hagiwara
智寿 萩原
Koichi Tanaka
耕一 田中
Takuro Kosaka
琢郎 小坂
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kajima Corp
Original Assignee
Kajima Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kajima Corp filed Critical Kajima Corp
Priority to JP16243998A priority Critical patent/JP3937588B2/en
Publication of JPH11350897A publication Critical patent/JPH11350897A/en
Application granted granted Critical
Publication of JP3937588B2 publication Critical patent/JP3937588B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Excavating Of Shafts Or Tunnels (AREA)
  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)
  • Lining And Supports For Tunnels (AREA)

Abstract

PROBLEM TO BE SOLVED: To provide a construction method for underground structure capable of constructing a tunnel having a large cross section very economically, efficiently, and safely. SOLUTION: Inner periphery is lined with an outer shell part skeleton A consisting of a top panel part A2 , right and left side panel parts A1 , and a bottom panel part 5 to construct a tunnel which is constituted by arranging a column or a wall 6 between the top panel part A2 and the bottom panel part 5 and has a large cross section. First, the top panel part A2 and the right and left side panel parts A1 are constructed, and then a support pile or a support wall 16 is constructed below the top panel part A2 . Next, the ground below the top panel part A2 is digged down to a predetermined depth by stretching a strut 17 between the support pile or the support wall 16 and the right and left side panel part A1 . The bottom panel part 5 is constructed on a digged bottom by placing concrete.

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】この発明は、内周を頂版部と
左右側版部と底版部とからなる外殻部躯体で覆工し、か
つ前記頂版部と底版部間に柱または壁を配置してなる地
下構造物の施工方法に関する。
BACKGROUND OF THE INVENTION The present invention relates to a method for manufacturing a slab, comprising the steps of: covering an inner periphery with an outer shell frame composed of a top plate portion, left and right side plate portions, and a bottom plate portion; The present invention relates to a method for constructing an underground structure including a plurality of underground structures.

【0002】[0002]

【従来の技術及び発明が解決しようとする課題】当出願
人はこれまで、地下構造物の一例として、大断面のトン
ネルを効率良く、かつ経済的に施工する方法として、例
えば図11(a),(b)に図示するように、小断面の
単体シールドトンネルaを互いに近接させて複数掘進す
ると共に、この単体シールドトンネルaを径方向に互い
に接合し、かつこの単体シールドトンネルaの内側と単
体シールドトンネルa,a間にコンクリート30を連続
して打設することにより、単体シールドトンネルaの径
方向に連続する大断面の外殻部躯体Aを構築し、次にこ
の外殻部躯体Aの内側を掘削して大断面のトンネルBを
構築する大断面トンネルの施工方法を開発し、この件に
関しては既にいくつも出願している。
2. Description of the Related Art As an example of an underground structure, the present applicant has proposed a method of efficiently and economically constructing a large-section tunnel, for example, as shown in FIG. (B), a plurality of small shield tunnels a having a small cross section are dug in close proximity to each other, and the single shield tunnels a are joined to each other in the radial direction. By continuously casting concrete 30 between the shield tunnels a and a, a shell A having a large cross section continuous in the radial direction of the single shield tunnel a is constructed. A large section tunnel construction method has been developed in which a large section tunnel B is constructed by excavating the inside, and several applications have already been filed in this regard.

【0003】その際、各単体シールドトンネルaの内周
は、その周方向と軸方向に例えば、図12に図示するよ
うな鋼製セグメントに似た鋼殻31を互いに接合しなが
ら複数設置し、その内側にコンクリート30を打設する
ことにより、鋼製ライニングとコンクリートライニング
とからなる鋼コンクリート合成構造のトンネル覆工体で
覆工されている。
[0003] At this time, a plurality of steel shells 31 similar to steel segments as shown in FIG. The concrete 30 is cast on the inside of the tunnel, and the concrete 30 is covered with a tunnel lining body having a steel-concrete composite structure including a steel lining and a concrete lining.

【0004】また、隣接する単体シールドトンネルa,
a間にあっては、双方の単体トンネルaとaを仕切る隔
壁b(例えば、この部分に一次覆工材として設置されて
いる鋼殻31のスキンプレート)を撤去した後に、双方
の単体シールドトンネルaに連続してコンクリート30
を打設することにより単体シールドトンネルa,a同士
の一体化が図られている。
In addition, adjacent single shield tunnels a,
In the space between a and t, after removing the two unit tunnels a and the partition wall b (for example, the skin plate of the steel shell 31 installed as a primary lining material in this portion), the two unit tunnels a are removed. 30 concrete in a row
The single shield tunnels a are integrated with each other.

【0005】さらに、ここで使用される鋼殻31は、図
12に図示するように単体シールドトンネルaの周方向
と軸方向にそれぞれ連続する複数本の主桁32と縦リブ
33、継手板34および地山に接するスキンプレート3
5を有して形成され、特に主桁32はRC構造の主筋に
相当するものとして設置されている。
Further, as shown in FIG. 12, a plurality of main girders 32, longitudinal ribs 33, joint plates 34, which are continuous in the circumferential direction and the axial direction of a single shield tunnel a, are used as shown in FIG. And skin plate 3 in contact with the ground
The main girder 32 is provided so as to correspond to the main reinforcement of the RC structure.

【0006】しかし、トンネルBの断面が大きくなる
と、外殻部躯体Aのみで安定した構造にしようとする
と、外殻部躯体Aが相当厚くなり、さらにトンネルの全
周を鋼コンクリート合成構造で覆工すると、鋼材および
コンクリートの使用量が相当なものとなって大幅なコス
ト高になる等の課題があった。
However, when the cross section of the tunnel B becomes large, the outer shell frame A becomes considerably thicker in order to obtain a stable structure with only the outer shell frame A, and the entire periphery of the tunnel is covered with a steel-concrete composite structure. When the construction is performed, there is a problem that the amount of steel material and concrete used becomes considerable and the cost is greatly increased.

【0007】また、トンネルBの断面形が横方向に偏平
な形状をなす場合、外殻部躯体Aの内側を安全に掘削す
るには、外殻部躯体Aの頂版部を支持する必要があり、
仮設工事費が大幅に嵩む等の課題があった。
Further, when the cross section of the tunnel B has a flat shape in the lateral direction, it is necessary to support the top plate of the shell A in order to safely excavate the inside of the shell A. Yes,
There were problems such as the temporary construction cost increasing significantly.

【0008】この発明は、以上の課題を解決するために
なされたもので、特に偏平な地下空間を有する地下空間
を有する地下構造物をきわめて経済的かつ効率的に、し
かもきわめて安全に構築できるようにした地下構造物の
施工方法を提供することを目的とする。
SUMMARY OF THE INVENTION The present invention has been made to solve the above-mentioned problems, and in particular, an underground structure having an underground space having a flat underground space can be constructed very economically, efficiently and extremely safely. It is an object of the present invention to provide a method of constructing an underground structure.

【0009】[0009]

【課題を解決するための手段】以上の課題を解決するた
めに、この発明に係る請求項1記載の地下構造物の施工
方法は、最初に頂版部と左右側版部を施工し、次に前記
頂版部の下方に支持杭または支持壁を施工し、次にこの
支持杭または支持壁と左右側版部間に切りばりを架け渡
しつつ、前記頂版部の下側地盤を所定の深さまで掘り下
げ、次に掘削底に底版部を施工する。
In order to solve the above problems, a method of constructing an underground structure according to claim 1 of the present invention comprises first constructing a top plate portion and left and right side plate portions. A support pile or a support wall is constructed below the top slab portion, and then a lower ground of the top slab portion is fixed to a predetermined height while bridging a cut between the support pile or the support wall and the left and right slab portions. Drill down to the depth and then install the bottom slab on the excavated bottom.

【0010】請求項2記載の地下構造物の施工方法は、
請求項1の記載において、小断面の単体シールドトンネ
ルを互いに近接させて複数掘進すると共に、この単体シ
ールドトンネルをその径方向に互いに接合し、この単体
シールドトンネル内と単体シールドトンネル間にコンク
リートを連続して打設することにより頂版部と左右側版
部を施工し、かつ底版部を場所打ちコンクリートで施工
する。
[0010] The construction method of the underground structure according to claim 2 is as follows.
2. The method according to claim 1, wherein a plurality of single-section shield tunnels having a small cross section are dug in close proximity to each other, and the single-section shield tunnels are joined to each other in a radial direction thereof. The top slab and the left and right slabs are constructed by casting and the bottom slab is constructed with cast-in-place concrete.

【0011】請求項3記載の地下構造物の施工方法は、
請求項1または2の記載において、頂版部の下側に、頂
版部の下側地盤を掘削して所定深さの作業空間を形成
し、この作業空間において支持杭または支持壁を施工す
る。
According to a third aspect of the invention, there is provided a method for constructing an underground structure.
The work according to claim 1 or 2, wherein a work space having a predetermined depth is formed by digging a ground under the top plate portion below the top plate portion, and a support pile or a support wall is constructed in the work space. .

【0012】請求項4記載の地下構造物の施工方法は、
請求項1、2または3の記載において、頂版部に補強ば
りを設け、この補強ばりに支持杭と支持壁の上端部を接
合する。
According to a fourth aspect of the present invention, there is provided a method for constructing an underground structure.
In the first, second or third aspect, a reinforcing beam is provided on the top plate portion, and the supporting pile and an upper end portion of the supporting wall are joined to the reinforcing beam.

【0013】請求項5記載の地下構造物の施工方法は、
請求項1、2または4の記載において、小断面の単体シ
ールドトンネルを互いに近接させて複数掘進し、次にこ
の単体シールドトンネル内で頂版部の下方に支持杭また
は支持壁を施工し、次にこの単体シールドトンネルの内
にコンクリートを連続して打設することにより補強ばり
を施工する。
According to a fifth aspect of the present invention, there is provided a method for constructing an underground structure,
The method according to claim 1, 2 or 4, wherein a plurality of small-section shield tunnels are dug near each other, and a support pile or a support wall is constructed below the top plate portion in the single shield tunnel. A reinforcing beam is constructed by continuously pouring concrete into this single shield tunnel.

【0014】請求項6記載の地下構造物の施工方法は、
小断面の単体シールドトンネルを互いに近接させて複数
掘進すると共に、この単体シールドトンネルをその径方
向に互いに接合し、この単体シールドトンネルの内側と
単体シールドトンネル間にコンクリートを連続して打設
することにより頂版部を施工し、次に頂版部の両側に山
留め壁を、中間部に山留め杭をそれぞれ施工し、次にこ
の山留め杭と左右山留め壁間に切りばりを架け渡しつつ
前記頂版部の下側地盤を所定の深さまで掘削し、次に山
留め壁の内側に側版部を、掘削底に底版部をそれぞれ施
工する。
[0014] The method for constructing an underground structure according to claim 6 is as follows.
Excavating a plurality of small-section shield tunnels in close proximity to each other, joining these shield tunnels together in the radial direction, and continuously casting concrete between the inside of the single shield tunnel and the single shield tunnel The top slab is constructed, then the mountain retaining wall is installed on both sides of the top slab, and the mountain retaining pile is constructed in the middle part, and then the top slab is bridged between the mountain retaining pile and the left and right mountain retaining walls. The lower ground of the portion is excavated to a predetermined depth, and then the side plate portion is installed inside the retaining wall, and the bottom plate portion is installed on the excavated bottom.

【0015】そして、請求項7記載の地下構造物の施工
方法は、請求項6の記載において、単体シールドトンネ
ル内を作業空間にして山留め杭を施工する。
According to a seventh aspect of the present invention, in the method for constructing an underground structure according to the sixth aspect, the pile retaining pile is constructed using the inside of the single shield tunnel as a working space.

【0016】[0016]

【発明の実施の形態】発明の実施の形態1.図1
(a),(b),(c),(d)は、地下構造物の一例
として、例えば地下高速道路などとして利用される大断
面のトンネルを示し、図において、トンネルBは偏平な
矩形の大断面形に構築されている。
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS Embodiment 1 of the Invention FIG.
(A), (b), (c), and (d) show a tunnel of a large section used as an example of an underground structure, for example, as an underground expressway. In the figure, a tunnel B is a flat rectangular. It is constructed in a large cross section.

【0017】また、トンネルBの天井部分と左右側壁部
分には、例えば図3に図示するような鋼製セグメントに
似た鋼殻1が、図2(a),(b)に図示するようにト
ンネルBの周方向と軸方向に互いに接合しながら二重に
設置されている。
A steel shell 1 similar to a steel segment as shown in FIG. 3, for example, is provided on the ceiling portion and the left and right side wall portions of the tunnel B as shown in FIGS. 2 (a) and 2 (b). The tunnel B is double-installed while being joined to each other in the circumferential direction and the axial direction.

【0018】また、二重に設置された外側と内側の鋼殻
1,1間にせん断補強材2がトンネルBの軸方向と周方
向に所定間隔に複数設置されている。
Further, a plurality of shear reinforcing members 2 are provided at predetermined intervals in the axial direction and the circumferential direction of the tunnel B between the outer and inner steel shells 1, 1 which are double installed.

【0019】さらに、外側と内側の鋼殻1,1間に軸方
向補強鉄筋3がトンネルBの軸方向に複数配筋され、か
つコンクリート4が打設されている。
Further, a plurality of reinforcing steel bars 3 in the axial direction are arranged between the outer and inner steel shells 1 and 1 in the axial direction of the tunnel B, and concrete 4 is cast.

【0020】こうして、複数の鋼殻1からそれぞれ構成
された外側と内側の鋼製ライニングとその内側のコンク
リートライニングとからなる鋼コンクリート合成構造の
外殻部躯体AによってトンネルBの天井部分と左右側壁
部分の内周が連続して覆工されている。
In this way, the outer shell skeleton A of the steel-concrete composite structure composed of the outer and inner steel linings composed of the plurality of steel shells 1 and the inner concrete lining respectively forms the ceiling portion and the left and right side walls of the tunnel B. The inner periphery of the part is lining continuously.

【0021】なお、ここでトンネルBの左右側壁部分を
覆工している外殻部躯体を左右側版部A1 と、天井部分
を覆工している外殻部躯体を頂版部A2 とする。
[0021] Here, the left and right side plate portions A 1 the outer shell skeleton that lining the lateral side walls of the tunnel B, the top plate portion outer shell skeleton that lining the ceiling of A 2 And

【0022】また、トンネルBの床部分には鉄筋コンク
リート構造の底版部5が施工され、さらにトンネルBの
中間部には図1(a)〜(d)に図示するようにRC構
造またはSRC構造の柱または壁6がトンネルBの軸方
向に所定間隔に、または連続して構築されている。
A slab 5 of a reinforced concrete structure is constructed on the floor of the tunnel B, and an RC or SRC structure as shown in FIGS. The columns or walls 6 are constructed at predetermined intervals or continuously in the axial direction of the tunnel B.

【0023】鋼殻1は、トンネルBの地山を保持する鋼
製セグメントに相当するもので、例えば図3に図示する
ように単体シールドトンネルaの周方向に平行に延在す
る複数本の主桁7と単体シールドトンネルaの軸方向に
延在する複数本の縦リブ8とトンネルBの地山に接する
スキンプレート9等から形成されている。
The steel shell 1 corresponds to a steel segment for holding the ground of the tunnel B. For example, as shown in FIG. 3, a plurality of main shells extending parallel to the circumferential direction of a single shield tunnel a are provided. It is composed of a spar 7, a plurality of longitudinal ribs 8 extending in the axial direction of the single shield tunnel a, a skin plate 9 in contact with the ground of the tunnel B, and the like.

【0024】主桁7はRC構造の主筋に相当するもの
で、単体シールドトンネルaの軸方向に所定間隔に設置
されている。
The main girder 7 corresponds to the main reinforcement of the RC structure, and is provided at a predetermined interval in the axial direction of the single shield tunnel a.

【0025】また、単体シールドトンネルaの周方向に
隣接する鋼殻1の主桁7どうしは、例えば双方の主桁7
の端部間の片側又は両側に接合プレート10を設置し、
かつ主桁7と接合プレート10を複数本の高力ボルト1
1で接合する、高力ボルト摩擦接合または溶接によって
接合されている。
The main girders 7 of the steel shell 1 adjacent to the single shield tunnel a in the circumferential direction are, for example, both main girders 7.
Place the joining plate 10 on one or both sides between the ends of
The main girder 7 and the joining plate 10 are connected to a plurality of high strength bolts 1
1, joined by high-strength bolt friction welding or welding.

【0026】また、隣接する単体シールドトンネルa,
a間においても、トンネルBの周方向に隣接する主桁7
どうしは、トンネルBの周方向に隣接する主桁7の端部
間の片側または両側に接合プレート10を設置し、かつ
主桁7と接合プレート10を複数本の高力ボルト11で
接合する、高力ボルト摩擦接合または溶接によって接合
されている。
Further, adjacent single shield tunnels a,
a, the main girder 7 adjacent in the circumferential direction of the tunnel B
A joint plate 10 is installed on one side or both sides between ends of the main girder 7 adjacent in the circumferential direction of the tunnel B, and the main girder 7 and the joint plate 10 are joined by a plurality of high-strength bolts 11. It is joined by high strength bolt friction welding or welding.

【0027】こうすることで、単体シールドトンネルa
の周方向に隣接する鋼殻1どうし、さらにはトンネルB
の周方向に隣接する鋼殻1どうしが接合されている。
By doing so, a single shield tunnel a
Steel shells 1 adjacent to each other in the circumferential direction
Are connected to each other in the circumferential direction.

【0028】その際、単体シールドトンネルaの軸方向
に隣接する鋼殻1どうしも、接合プレート10と高力ボ
ルト11による高力ボルト摩擦接合または溶接によって
一緒に接合されている。
At this time, the steel shells 1 adjacent to each other in the axial direction of the single shield tunnel a are also joined together by high-strength bolt friction welding or welding with the joining plate 10 and the high-strength bolts 11.

【0029】また、底版部5のコンクリート中に補強鉄
筋または補強鋼材(図省略)が多数配筋され、そのトン
ネルBの周方向の両端部は左右側版部A1 のコンクリー
ト4内に一体的に定着されている。
[0029] The reinforcing rebar or reinforcing steel in the concrete of the bottom plate portion 5 (Figure omitted) being a number Haisuji integrally in the circumferential direction of the both ends in the concrete 4 of the left and right side plate portions A 1 of the tunnel B Has been established.

【0030】こうすることで、外殻部躯体Aの左右側版
部A1 と底版部5とがトンネルBの周方向に一体的に接
合されている。なお、左右側版部A1 と底版部5との接
合部に接合鉄筋または接合鋼材を多数埋設して左右側版
部A1 と底版部5とを一体的に接合してもよい。
In this way, the left and right printing plates A 1 and the bottom printing plate 5 of the outer shell body A are integrally joined in the circumferential direction of the tunnel B. It is also possible to integrally bond the right side plate portion A 1 and the bottom plate portion 5 is embedded a large number of bonding rebar or joined steel at the junction of the left and right side plate portions A 1 and the bottom plate portion 5.

【0031】縦リブ8は主に、単体シールドトンネルa
を掘進する際の推進反力を得るための反力受けをなすも
ので、このため隣接する主桁7,7間に単体シールドト
ンネルaの軸方向に材軸が一致するように取り付けら
れ、また単体シールドトンネルaの周方向に所定間隔に
取り付けられている。
The vertical ribs 8 are mainly used for a single shield tunnel a.
For receiving a propulsion reaction force when excavating the ground, and is therefore mounted between the adjacent main girders 7, 7 so that the material axis coincides with the axial direction of the unitary shield tunnel a. A single shield tunnel a is attached at a predetermined interval in the circumferential direction.

【0032】スキンプレート9は主に、掘進直後のトン
ネルの地山を保持するもので、複数の主桁7と縦リブ8
とからなるセグメント軸組の外側にその表面を完全に覆
うように取り付けられている。
The skin plate 9 mainly holds the ground of the tunnel immediately after excavation, and includes a plurality of main girders 7 and vertical ribs 8.
And is attached so as to completely cover the surface thereof outside of the segment shaft assembly composed of:

【0033】なお、主桁7と縦リブ8はいずれも、形
鋼、平鋼、又は平鋼などを組み合わせたビルトアップ鋼
材などから形成され、スキンプレート9は鋼板から形成
されている。さらに、これらの部材は溶接またはボルト
接合によって互いに一体的に接合されている。
The main girder 7 and the vertical ribs 8 are each made of a shaped steel, a flat steel, or a built-up steel material obtained by combining flat steels, and the like, and the skin plate 9 is made of a steel plate. Further, these members are integrally joined to each other by welding or bolting.

【0034】せん断補強材2は二重に設置された外側と
内側の鋼殻1の主桁7,7間に、図2(a),(b)に
図示するように垂直または斜めに設置され、その両端は
主桁7にそれぞれ溶接またはボルト接合によって連結さ
れている。
As shown in FIGS. 2 (a) and 2 (b), the shear reinforcing member 2 is installed vertically or obliquely between the main girders 7, 7 of the outer and inner steel shells 1 which are double installed. The two ends are connected to the main girder 7 by welding or bolting.

【0035】なお、せん断補強材2も、主桁7などと同
様に形鋼、平鋼、又は平鋼などを組み合わせたビルトア
ップ鋼材などから形成されている。
The shear reinforcing member 2 is also made of a shaped steel, a flat steel, or a built-up steel material which is a combination of a flat steel and the like, like the main girder 7 and the like.

【0036】こうして形成された複数の鋼殻1からそれ
ぞれ構成された外側と内側の鋼製ライニング間に軸方向
補強鉄筋3が複数配筋された後、コンクリート4が打設
されている。
After a plurality of reinforcing steel bars 3 in the axial direction are arranged between the outer and inner steel linings formed from the plurality of steel shells 1 thus formed, concrete 4 is cast.

【0037】その際、特に隣接する単体シールドトンネ
ルa,a間においては、隣接する単体シールドトンネル
a,a間の隔壁(例えば、鋼殻1の主桁7と縦リブ8の
みを残しスキンプレート9を撤去する)を撤去した後に
コンクリート4が打設されている。こうすることで、隣
接する単体シールドトンネルa,aどうしの完全一体性
が図られている。
At that time, especially between the adjacent single shield tunnels a, a partition wall between the adjacent single shield tunnels a, (for example, the skin plate 9 except for the main girder 7 and the vertical ribs 8 of the steel shell 1 only). Concrete 4 has been cast after the removal. In this manner, the adjacent single shield tunnels a, a are perfectly integrated with each other.

【0038】このような構成において、次にこの発明に
係る地下構造物の施工方法を図4と図5に基づき、順を
追って説明する。 最初に、外殻部躯体Aの左右側版部A1 と頂版部A
2 を構築するために単体シールドトンネルaを互いに近
接させて複数掘進する(STEP.1)。
In such a configuration, a method of constructing an underground structure according to the present invention will be described step by step with reference to FIGS. First, the left and right side plates of the outer shell precursor A portion A 1 and the top plate portion A
In order to construct No. 2, a plurality of single shield tunnels a are dug near each other (STEP. 1).

【0039】その際、各単体シールドトンネルaの内周
は、一次覆工材として鋼殻1を単体シールドトンネルa
の周方向と軸方向に互いに接合しながら複数設置し、そ
の内側に二次覆工材としてコンクリート4を所定の厚さ
に打設してそれぞれ覆工する。
At this time, the inner periphery of each single shield tunnel a is made of steel shell 1 as a primary lining material.
A plurality of concrete linings are installed while being joined to each other in the circumferential direction and the axial direction, and concrete 4 is cast as a secondary lining material to a predetermined thickness on the inside thereof, and lining is performed.

【0040】また、図10に図示するように各単体シー
ルドトンネルaの外周と単体シールドトンネルa,aに
裏込め材12を充填して各鋼殻1と地山間の隙間を塞ぐ
と共に、鋼殻1の周囲および単体シールドトンネルa,
a間の地山を安定な地盤に地盤改良する。 次に、各単体シールドトンネルa内にせん断補強材
2を所定間隔に複数設置する。その際、せん断補強材2
は、図2(a)に図示するように外殻部躯体Aの頂版部
2 を構成する単体シールドトンネルa内には垂直に、
左右側版部A1 を構成する単体シールドトンネルa内に
は水平にそれぞれ設置する。
As shown in FIG. 10, the backing material 12 is filled into the outer periphery of each single shield tunnel a and the single shield tunnel a, a to close the gap between each steel shell 1 and the ground, 1 and single shield tunnel a,
The ground between a is improved to a stable ground. Next, a plurality of shear reinforcing members 2 are installed at predetermined intervals in each single shield tunnel a. At that time, shear reinforcement 2
Is the single shield tunnel a constituting the top plate portion A 2 of the outer shell precursor A as shown in FIGS. 2 (a) vertically,
The single shield tunnel a constituting the left and right side plate portions A 1 is installed horizontally, respectively.

【0041】なお、いずれの部分においても、図2
(b)に図示するようにせん断補強材2をトラスを構成
するように斜めに設置してもよい。 次に、隣接する単体シールドトンネルa同士を互い
に接合し、かつ各単体シールドトンネルa内、および隣
接する単体シールドトンネルa,a間に軸方向補強鉄筋
3を必要量配筋する。
It should be noted that FIG.
As shown in (b), the shear reinforcement 2 may be installed diagonally so as to form a truss. Next, adjacent single shield tunnels a are joined to each other, and a necessary amount of reinforcing reinforcing bar 3 is arranged in each single shield tunnel a and between the adjacent single shield tunnels a.

【0042】さらに、単体シールドトンネルa内および
隣接する単体シールドトンネルa,a間にコンクリート
4を連続して打設することにより、トンネルBの周方向
に門形に連続する外殻部躯体Aの左右側版部A1,1
頂版部A2 を構築する(STEP.2)。
Further, the concrete 4 is continuously cast in the single shield tunnel a and between the adjacent single shield tunnels a, a, so that the outer shell skeleton A continuous in a gate shape in the circumferential direction of the tunnel B is formed. constructing a lateral side plate section a 1, a 1 and the top plate portion a 2 (STEP.2).

【0043】その際、特に隣接する単体シールドトンネ
ルa,a間においては、地山を掘削し、かつ隣接する単
体シールドトンネルa,a間の隔壁(例えば、鋼殻1の
主桁7と縦リブ8のみを残しスキンプレート9を撤去す
る)を撤去して単体シールドトンネルaどうしを連通し
た後、コンクリート4を打設することにより隣接する単
体シールドトンネルa,aどうしの一体性を図るものと
する。
At this time, the ground is excavated especially between the adjacent single shield tunnels a, a, and the partition wall between the adjacent single shield tunnels a, a (for example, the main girder 7 of the steel shell 1 and the vertical ribs). 8 and the skin plate 9 is removed), and the single shield tunnels a are communicated with each other. Then, concrete 4 is cast to assemble the adjacent single shield tunnels a with each other. .

【0044】また、頂版部A2 の、柱または壁6の上端
部が接合される部分には、軸方向補強鉄筋13を多めに
配筋し、さらに必要に応じてあばら筋をも配筋する等し
て頂版部A2 の軸方向に連続する上部補強ばり14を構
築する。
Further, a portion of the top plate portion A 2 to which the upper end portion of the column or wall 6 is joined is provided with an extra reinforcing reinforcing bar 13 and, if necessary, stirrups. equal to and building the upper reinforcing beams 14 continuous in the axial direction of the top plate portion a 2.

【0045】また、必要に応じて左右側版部A1 の下端
部の周辺部を地盤改良する(以下、この部分を「地盤改
良部15」とする)。 次に、上部補強ばり14の下側に、この部分の地盤
を所定深さまで掘削して作業空間Eを形成する((ST
EP.3)。
Further, the peripheral portion of the lower end portions of the left and right side plate portions A 1 to ground improvement if necessary (hereinafter, this portion is referred to as "ground improvement unit 15"). Next, under this upper reinforcing beam 14, the ground of this portion is excavated to a predetermined depth to form a work space E ((ST
EP. 3).

【0046】その際、作業空間Eは上部補強ばり14の
軸方向に先行掘削することによりトンネルBの軸方向に
連続して形成してもよく、または柱または壁6を配置す
る部分のみを縦穴状に掘り下げてトンネルBの軸方向に
所定間隔に形成してもよい。
At this time, the working space E may be formed continuously in the axial direction of the tunnel B by excavating in advance in the axial direction of the upper reinforcing beam 14, or only the portion where the column or the wall 6 is arranged may be formed by a vertical hole. The tunnel B may be formed at predetermined intervals in the axial direction.

【0047】また、作業空間Eの両側の根切り面には適
当な勾配の法面を付けて法面の崩落を防止することによ
り作業の安全性を図るものとする。 次に、作業空間Eにおいて、柱または壁6を配置す
る部分に支持杭または支持壁16を構築する。その際、
支持杭は深礎工法などによって、また支持壁は場所打ち
コンクリート工法など、これまで一般に行われている施
工方法で構築する。なお、支持杭または支持壁16は左
右側版部A1 より深く施工する。 次に、支持杭または支持壁16と上部補強ばり14
とを一体的に接合する(STEP4)。その際、上部補
強ばり14と支持杭または支持壁16間に定着用鋼材を
多数配置し、かつ無収縮コンクリートを打設して上部補
強ばり14と支持杭または支持壁16の上端部を一体的
に接合する。 次に、支持杭または支持壁16と左右側版部A1
に切り梁17をそれぞれ架け渡しながら外殻部躯体A内
の地盤を地盤改良部15の上まで徐々に掘り下げる。 次に、掘削底に底版部5を鉄筋コンクリートで施工
する。また、外殻部躯体A内に中間階の床スラブ、柱、
壁などの必要な内部躯体を構築する。その際、底版部5
と頂版部A2 間に頂版部A2 を保持するために施工した
支持杭または支持壁16を、その外周に必要な仕上げを
施して柱または壁6とする。
The roots on both sides of the work space E are provided with slopes having an appropriate slope to prevent the slope from collapsing, thereby ensuring the safety of the work. Next, in the work space E, a support pile or a support wall 16 is constructed in a portion where the column or the wall 6 is to be arranged. that time,
The supporting pile will be constructed by the deep foundation method and the supporting wall will be constructed by the generally used construction method such as the cast-in-place concrete method. The support piles or the support wall 16 is deeper construction than the left and right side plate portions A 1. Next, the support pile or support wall 16 and the upper reinforcing beam 14
Are integrally joined (STEP 4). At this time, a large number of fixing steel materials are arranged between the upper reinforcing beam 14 and the supporting pile or the supporting wall 16, and non-shrinkage concrete is cast to integrally connect the upper reinforcing beam 14 and the upper end of the supporting pile or the supporting wall 16. To join. Then, dig slowly ground the outer shell precursor in A to the top of the ground improvement unit 15 while bridging respectively bearing pile or support wall 16 of the left and right side plate portions A cut between first beam 17. Next, the bottom slab 5 is constructed on the excavated bottom with reinforced concrete. Also, floor slabs, columns,
Build necessary internal structures such as walls. At that time, the bottom plate 5
And a bearing pile or support wall 16 was constructed to hold the Itadakiban portion A 2 between the top plate portion A 2, and pillar or wall 6 is subjected to finish required on the outer periphery thereof.

【0048】以上、〜の工程により、大断面のトン
ネルBをきわめて経済的かつ効率的に、しかもきわめて
安全に構築できる。 発明の実施の形態2.図6と図7は、この発明の他の施
工方法を示し、特に頂版部A2 の中央部に小断面の単体
シールドトンネルaを上下および横に近接させて複数掘
進する(STEP.1)。
Through the above steps (1) to (4), the tunnel B having a large cross section can be constructed very economically and efficiently and very safely. Embodiment 2 of the Invention Figure 6 and Figure 7 shows another construction method of the present invention, in particular to close the small section of a single shield tunnel a in the center portion of the top plate portion A 2 in the vertical and horizontal plural excavation by (STEP.1) .

【0049】次に、この単体シールドトンネル内を作業
空間Eとして、支持杭または支持壁16を施工する(S
TEP.2)。また、この単体シールドトンネルaの内
側と単体シールドトンネルa,a間にコンクリート4を
連続して打設することにより上部補強ばり14を施工す
る(STEP.3)。
Next, a support pile or a support wall 16 is constructed using the inside of the single shield tunnel as a work space E (S).
TEP. 2). Further, the upper reinforcing beam 14 is constructed by continuously casting concrete 4 inside the single shield tunnel a and between the single shield tunnels a, a (STEP 3).

【0050】その際、隣接する単体シールドトンネル
a,a間の隔壁(例えば、鋼殻1の主桁7と縦リブ8の
みを残しスキンプレート9を撤去する)を撤去して単体
シールドトンネルaどうしを連通した後、必要な補強鉄
筋を配筋し、コンクリート4を連続して打設して補強ば
り14を施工する。その他の方法は先に説明した施工方
法と略同じである。
At this time, the partition walls (for example, the skin plate 9 is removed while leaving only the main girder 7 and the vertical ribs 8 of the steel shell 1) between the adjacent single shield tunnels a, a are removed to separate the single shield tunnels a. After that, the necessary reinforcing reinforcing bars are arranged, and the concrete 4 is continuously driven to form the reinforcing beams 14. Other methods are substantially the same as the construction method described above.

【0051】この施工方法によれば、特に作業空間Eを
形成するために地盤を掘り下げる必要がなく、また補強
ばり14を頂版部A2 と並行して施工でき、きわめて効
率的な施工が可能になる等の効果がある。発明の実施の
形態3.図8と図9は、この発明の他の施工方法を示
し、順を追って説明すると、 最初に、外殻部躯体Aの頂版部A2 を構築するため
に、小断面の単体シールドトンネルaを横方向に互いに
近接させて複数掘進する(STEP.1)。
[0051] According to this construction method, there is no need to dig into the ground in order in particular to form a working space E, also the reinforcing beams 14 can laid parallel with the top plate portion A 2, can be very efficient construction There are effects such as becoming. Embodiment 3 of the Invention 8 and 9 show another construction method of the present invention, when sequentially described, initially, in order to construct the top plate portion A 2 of the outer shell precursor A, alone shield tunnel a small cross-section Are excavated a plurality of times in the lateral direction (STEP. 1).

【0052】その際、特に頂版部A2 の左右両端部と中
間部には、やや大きめの単体シールドトンネルa1 を掘
進する。 次に、左右両端部と中間部の単体シールドトンネル
1 内をそれぞれ作業空間Eとして、左右両端部と中間
部に山留め杭18を単体シールドトンネルa1の軸方向
に所定間隔に施工する( STEP.2)。その際、山
留め杭18には形鋼杭、PC杭、あるいは場所打ちコン
クリート杭などを使用するものとする。 次に、単体シールドトンネルa,a1 の内と単体シ
ールドトンネル間にコンクリート4を連続して打設する
ことにより頂版部A2 と上部補強ばり14を施工する
(STEP.3)。
[0052] At that time, particularly in the left and right end portions and an intermediate portion of the top plate portion A 2, slightly excavation the larger unitary shield tunnel a 1. Then, as each work space E unitary shield tunnel a 1 of the left and right end portions and the intermediate portion, and construction to a predetermined interval Retaining pile 18 in left and right end portions and an intermediate portion in the axial direction of the single shield tunnel a 1 (STEP .2). At this time, a section steel pile, a PC pile, a cast-in-place concrete pile, or the like is used as the retaining pile 18. Next, single shield tunnel a, and applying a top plate portion A 2 and the upper reinforcing beams 14 by pouring continuously concrete 4 between the inner and single shield tunnel a 1 (STEP.3).

【0053】その際、隣接する単体シールドトンネル
a,a間の隔壁(例えば、鋼殻1の主桁7と縦リブ8の
みを残し、スキンプレート9を撤去する)を撤去して単
体シールドトンネルaどうしを連通した後、必要量の補
強鉄筋を配筋し、かつコンクリート4を連続して打設し
て補強ばり14を施工する。 次に、頂版部A2 の両端部と中間部において、それ
ぞれ隣接する山止め杭18,18間に横矢板(図省略)
を打ち込んで山止め壁を構築しつつ、かつ両端の山止め
壁と中間の山止め杭18間に切り梁17を架け渡しなが
ら、頂版部A2 の下側地盤を地盤改良部15まで徐々に
掘り下げる。 次に、掘削底に底版部5を、左右両側に左右側版部
1 をそれぞれ場所打ちコンクリートで施工する。その
他の方法は先に説明した施工方法と略同じである。
At this time, the partition wall between the adjacent single shield tunnels a, a (for example, leaving only the main girder 7 and the vertical ribs 8 of the steel shell 1 and removing the skin plate 9) is removed to remove the single shield tunnel a. After the communication, the required amount of reinforcing steel is arranged, and the concrete 4 is continuously driven to form the reinforcing beam 14. Next, at both end portions and the intermediate portion of the top plate portion A 2 , a horizontal sheet pile (not shown) is provided between the adjacent stakes 18.
While constructing a Yamadome wall by implanting, and while bridging the cut beams 17 between both ends of Yamadome walls and intermediate Yamadome piles 18, gradually lower ground of the top plate portion A 2 to ground improvement unit 15 Dig into Then, the bottom plate portion 5 in the drilling bottom and applying a lateral side plate section A 1 in place concrete on the left and right sides. Other methods are substantially the same as the construction method described above.

【0054】この施工方法によれば、左右側版部A1
底版部5の両方を場所打ちコンクリートで施工し、頂版
部A2 のみを鋼殻を使用する鋼コンクリート合成構造で
施工するので、左右側版部と底版の両部分の鋼殻が不要
になり、このため鋼材使用量、シールドマシンの稼働台
数をさらに節約できて、大幅な経済施工が可能になる。
[0054] According to this construction method, both the left and right side plate portions A 1 and the bottom plate portion 5 was applied by place concrete, since only the top plate portion A 2 for construction steel-concrete composite structures using steel shell This eliminates the need for steel shells on both the left and right slabs and the bottom slab, thus further reducing the amount of steel used and the number of operating shield machines, and enabling significant economic construction.

【0055】なお、発明の実施の形態1〜3では、大断
面のトンネルを構築する場合について説明したが、この
種のトンネルの構築に限られるものではなく、駅ビルの
地下街や建物の地下室の施工にも適用できることはいう
までもない。
In the first to third embodiments of the present invention, the case of constructing a tunnel having a large cross section has been described. It goes without saying that it can be applied to construction.

【0056】[0056]

【発明の効果】この発明に係る地下構造物の施工方法
は、以上説明した構成からなり、特に外殻部躯体の頂版
部と左右側版部は、小断面の単体シールドトンネルを互
いに近接させて複数掘進すると共に、この単体シールド
トンネルをその径方向に互いに接合し、かつこの単体シ
ールドトンネル内と単体シールドトンネル間にコンクリ
ートを連続して打設して構築するので、鋼コンクリート
合成構造の外殻部躯体をきわめて安全にかつ効率的に施
工できる効果がある。
The method for constructing an underground structure according to the present invention has the above-described structure. In particular, the top plate portion and the left and right plate portions of the outer shell are made to have small shield tunnels close to each other. In addition to excavating multiple steel tunnels, connecting the single shield tunnels to each other in the radial direction, and continuously casting concrete inside the single shield tunnel and between the single shield tunnels, the construction is performed outside the steel-concrete composite structure. There is an effect that the shell skeleton can be extremely safely and efficiently constructed.

【0057】また、底版部は場所打ちコンクリートで施
工するので、底版部の鋼殻が不要になり、このため鋼材
使用量とシールドマシンの稼働台数を大幅に節約できて
経済施工も図れる等の効果もある。
Further, since the bottom slab is constructed of cast-in-place concrete, a steel shell of the bottom slab is not required, so that the amount of steel used and the number of operating shield machines can be significantly reduced, and economic construction can be achieved. There is also.

【0058】また、頂版部の下方に支持杭または支持壁
を施工し、この支持杭または支持壁で頂版部を支持しな
がら頂版部の下側地盤を掘り下げるので、外殻部躯体内
の掘削もきわめて安全に行うことができる。
Further, a support pile or a support wall is constructed below the top slab, and the ground under the top slab is dug down while supporting the top slab with the support pile or the support wall. Excavation can be done very safely.

【0059】また、頂版部の下側地盤を掘削して所定深
さの作業空間を形成し、この作業空間において支持杭と
支持壁をきわめて安全に施工できる。
Further, a work space having a predetermined depth is formed by excavating the lower ground of the top plate portion, and the support pile and the support wall can be extremely safely constructed in this work space.

【0060】さらに、頂版部に補強ばりを設け、この補
強ばりに支持杭と支持壁の上端部を接合するので、頂版
部から荷重を補強ばりを介して支持杭と支持壁に伝達で
きるので、強度的にもきわめて安定している。
Further, a reinforcing beam is provided on the top slab, and the support pile and the upper end of the support wall are joined to this reinforcing beam, so that the load can be transmitted from the top slab to the support pile and the support wall via the reinforcing beam. Therefore, the strength is extremely stable.

【図面の簡単な説明】[Brief description of the drawings]

【図1】(a),(b),(c)は大断面に構築された
トンネルの軸直角方向の縦断面図、(d)はそのトンネ
ル軸方向の縦断面図である。
1 (a), 1 (b) and 1 (c) are longitudinal sectional views in a direction perpendicular to the axis of a tunnel constructed in a large section, and FIG. 1 (d) is a longitudinal sectional view in the tunnel axial direction.

【図2】(a),(b)は共に、トンネルの外殻部躯体
の一部斜視図である。
FIGS. 2A and 2B are partial perspective views of a shell of a tunnel. FIG.

【図3】鋼殻の一例を示す一部斜視図である。FIG. 3 is a partial perspective view showing an example of a steel shell.

【図4】施工方法の工程を示す断面図である。FIG. 4 is a cross-sectional view showing steps of a construction method.

【図5】施工方法の工程を示す断面図である。FIG. 5 is a cross-sectional view showing steps of a construction method.

【図6】施工方法の工程を示す断面図である。FIG. 6 is a cross-sectional view showing steps of a construction method.

【図7】施工方法の工程を示す断面図である。FIG. 7 is a cross-sectional view showing steps of a construction method.

【図8】施工方法の工程を示す断面図である。FIG. 8 is a cross-sectional view showing steps of a construction method.

【図9】施工方法の工程を示す断面図である。FIG. 9 is a cross-sectional view illustrating steps of a construction method.

【図10】単体シールドトンネルの断面図である。FIG. 10 is a sectional view of a single shield tunnel.

【図11】(a)は大断面トンネルの断面図、(b)は
その斜視図である。
11A is a sectional view of a large-section tunnel, and FIG. 11B is a perspective view thereof.

【図12】鋼殻の従来例を示す一部斜視図ある。FIG. 12 is a partial perspective view showing a conventional example of a steel shell.

【符号の説明】[Explanation of symbols]

A 外殻部躯体 A1 側壁部 A2 頂版部 B トンネル a 単体シールドトンネル a1 単体シールドトンネル 1 鋼殻 2 せん断補強材 3 軸方向補強鉄筋 4 コンクリート 5 底版部 6 柱または壁 7 主桁 8 縦リブ 9 スキンプレート 10 接合プレート 11 高力ボルト 12 裏込め材 13 軸方向補強鉄筋 14 上部補強ばり 15 地盤改良部 16 支持杭または支持壁 17 切りばり 18 山留め杭A Outer shell frame A 1 Side wall A 2 Top plate B Tunnel a Single shield tunnel a 1 Single shield tunnel 1 Steel shell 2 Shear reinforcement 3 Axial reinforcement 4 Concrete 5 Bottom plate 6 Column or wall 7 Main girder 8 Vertical rib 9 Skin plate 10 Joint plate 11 High-strength bolt 12 Backing material 13 Axial reinforcing steel 14 Upper reinforcing beam 15 Ground improvement part 16 Support pile or support wall 17 Cut-out 18 Mountain retaining pile

Claims (7)

【特許請求の範囲】[Claims] 【請求項1】 内周を頂版部と左右側版部と底版部とか
らなる外殻部躯体で覆工し、かつ前記頂版部と底版部間
に柱または壁を配置してなる地下構造物の施工方法にお
いて、最初に頂版部と左右側版部を施工し、次に前記頂
版部の下方に支持杭または支持壁を施工し、次にこの支
持杭または支持壁と左右側版部間に切りばりを架け渡し
つつ、前記頂版部の下側地盤を所定の深さまで掘り下
げ、次に掘削底に底版部を施工することを特徴とする地
下構造物の施工方法。
An underground in which the inner periphery is covered with an outer shell body composed of a top plate portion, left and right side plate portions, and a bottom plate portion, and columns or walls are arranged between the top plate portion and the bottom plate portion. In the construction method of a structure, first, a top plate portion and a left and right side plate portion are constructed, then a support pile or a support wall is constructed below the top plate portion, and then the support pile or the support wall and the left and right side A method for constructing an underground structure, comprising: digging down a lower ground of the top slab to a predetermined depth while bridging a slab between the slabs, and then constructing a bottom slab at an excavated bottom.
【請求項2】 小断面の単体シールドトンネルを互いに
近接させて複数掘進すると共に、この単体シールドトン
ネルをその径方向に互いに接合し、かつこの単体シール
ドトンネル内と単体シールドトンネル間にコンクリート
を連続して打設することにより頂版部と左右側版部を施
工し、かつ底版部を場所打ちコンクリートで施工するこ
とを特徴とする請求項1記載の地下構造物の施工方法。
2. A single shield tunnel having a small cross section is dug plurally in close proximity to each other, the single shield tunnels are joined to each other in a radial direction thereof, and concrete is continuously provided in the single shield tunnel and between the single shield tunnels. 2. The method according to claim 1, wherein the top slab and the left and right slabs are constructed by casting and the bottom slab is constructed with cast-in-place concrete.
【請求項3】 頂版部の下側に、頂版部の下側地盤を掘
削して所定深さの作業空間を形成し、この作業空間にお
いて支持杭または支持壁を施工することを特徴とする請
求項1または2記載の地下構造物の施工方法。
3. A work space having a predetermined depth is formed by excavating a lower ground of the top slab under the top slab, and a support pile or a support wall is constructed in the work space. The method for constructing an underground structure according to claim 1.
【請求項4】 頂版部に補強ばりを設け、この補強ばり
に支持杭と支持壁の上端部を接合することを特徴とする
請求項1、2または3記載の地下構造物の施工方法。
4. The construction method for an underground structure according to claim 1, wherein a reinforcing beam is provided on the top plate portion, and the supporting pile and an upper end portion of the supporting wall are joined to the reinforcing beam.
【請求項5】 小断面の単体シールドトンネルを互いに
近接させて複数掘進し、次にこの単体シールドトンネル
内で頂版部の下方に支持杭または支持壁を施工し、次に
この単体シールドトンネル内にコンクリートを連続して
打設することにより補強ばりとすることを特徴とする請
求項1、2または4記載の地下構造物の施工方法。
5. Excavating a plurality of small-section shield tunnels in close proximity to each other, then constructing a support pile or a support wall below the top plate in the single shield tunnel, The method for constructing an underground structure according to claim 1, wherein the reinforcing beam is formed by continuously casting concrete on the underground structure.
【請求項6】 小断面の単体シールドトンネルを互いに
近接させて複数掘進すると共に、この単体シールドトン
ネルをその径方向に互いに接合し、この単体シールドト
ンネル内と単体シールドトンネル間にコンクリートを連
続して打設することにより頂版部を施工し、次に頂版部
の両側に山留め壁を、中間部に山留め杭をそれぞれ施工
し、次にこの山留め杭と左右山留め壁間に切りばりを架
け渡しながら、前記頂版部の下側地盤を所定の深さまで
掘削し、次に山留め壁の内側に側版部を、掘削底に底版
部をそれぞれ施工することを特徴とする地下構造物の施
工方法。
6. A plurality of small-section shield tunnels are dug in close proximity to each other, and the single shield tunnels are joined to each other in a radial direction thereof, and concrete is continuously formed in the single shield tunnel and between the single shield tunnels. The top slab part is constructed by casting, then a retaining wall is installed on both sides of the top slab part, and a retaining pile is constructed in the middle part, and then a bridge is bridged between this retaining pile and the left and right retaining walls. A method of constructing an underground structure, wherein the lower ground of the top slab is excavated to a predetermined depth, and then the side slab is installed inside the retaining wall and the bottom slab is installed at the excavated bottom. .
【請求項7】 単体シールドトンネル内を作業空間にし
て山留め杭を施工することを特徴とする請求項6記載の
地下構造物の施工方法。
7. The method for constructing an underground structure according to claim 6, wherein the pile retaining pile is constructed by using the inside of a single shield tunnel as a working space.
JP16243998A 1998-06-10 1998-06-10 Construction method for underground structures Expired - Fee Related JP3937588B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP16243998A JP3937588B2 (en) 1998-06-10 1998-06-10 Construction method for underground structures

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP16243998A JP3937588B2 (en) 1998-06-10 1998-06-10 Construction method for underground structures

Publications (2)

Publication Number Publication Date
JPH11350897A true JPH11350897A (en) 1999-12-21
JP3937588B2 JP3937588B2 (en) 2007-06-27

Family

ID=15754644

Family Applications (1)

Application Number Title Priority Date Filing Date
JP16243998A Expired - Fee Related JP3937588B2 (en) 1998-06-10 1998-06-10 Construction method for underground structures

Country Status (1)

Country Link
JP (1) JP3937588B2 (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2005068903A (en) * 2003-08-27 2005-03-17 Ishikawajima Harima Heavy Ind Co Ltd Segment cutting device and method
CN102011351A (en) * 2010-11-04 2011-04-13 北京首钢建设集团有限公司 Railway reinforced construction method
JP2011202402A (en) * 2010-03-25 2011-10-13 Taisei Corp Method of construction of underground structure
WO2017084573A1 (en) * 2015-11-16 2017-05-26 彭高培 Upheaval-resisting support structure
CN107100629A (en) * 2017-06-30 2017-08-29 中铁第四勘察设计院集团有限公司 A kind of control method and structure of shield tunnel auger ground plastic deformation
CN113356290A (en) * 2021-06-25 2021-09-07 中铁二院华东勘察设计有限责任公司 Longitudinal wall beam type pile foundation underpinning construction method for underground passage construction

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101560527B1 (en) * 2015-06-25 2015-10-14 함정아 Construction method for tunneling

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2005068903A (en) * 2003-08-27 2005-03-17 Ishikawajima Harima Heavy Ind Co Ltd Segment cutting device and method
JP4495424B2 (en) * 2003-08-27 2010-07-07 大成建設株式会社 Segment cutting apparatus and method
JP2011202402A (en) * 2010-03-25 2011-10-13 Taisei Corp Method of construction of underground structure
CN102011351A (en) * 2010-11-04 2011-04-13 北京首钢建设集团有限公司 Railway reinforced construction method
WO2017084573A1 (en) * 2015-11-16 2017-05-26 彭高培 Upheaval-resisting support structure
CN107100629A (en) * 2017-06-30 2017-08-29 中铁第四勘察设计院集团有限公司 A kind of control method and structure of shield tunnel auger ground plastic deformation
CN107100629B (en) * 2017-06-30 2023-11-07 中铁第四勘察设计院集团有限公司 Control method and structure for plastic deformation of soft soil layer lying under shield tunnel
CN113356290A (en) * 2021-06-25 2021-09-07 中铁二院华东勘察设计有限责任公司 Longitudinal wall beam type pile foundation underpinning construction method for underground passage construction
CN113356290B (en) * 2021-06-25 2023-03-10 中铁二院华东勘察设计有限责任公司 Longitudinal wall beam type pile foundation underpinning construction method for underground passage construction

Also Published As

Publication number Publication date
JP3937588B2 (en) 2007-06-27

Similar Documents

Publication Publication Date Title
JP2006322222A (en) Construction method of large-sectional tunnel
JP5619646B2 (en) Construction method of underground structure and underground structure
KR100313720B1 (en) Composite Underground Structure Construction Method
JP5764245B2 (en) Construction method of underground structure and underground structure
JPH11350897A (en) Construction method for underground structure
JP4037187B2 (en) Underground structure construction method and underground structure
JP4083334B2 (en) Underground structure having arch roof and method for constructing the same
JP5619647B2 (en) Underground structure and construction method of underground structure
JP5875651B2 (en) Underground structure and construction method of underground structure
JP4760548B2 (en) Side-by-side tunnel structure and its construction method
JPH10227199A (en) Construction method of large sectional tunnel
JP3900684B2 (en) Construction method for underground structures
JP5679849B2 (en) Underground structure
KR100620366B1 (en) Construction method of underground structures comprising composite reinforced concrete girders and beams using FRP
JPH11152762A (en) Structure and its construction method
JP4500221B2 (en) Construction method of underground structure
JP2571426B2 (en) Construction method of retaining wall
JP3900683B2 (en) Construction method of branch / merge part of main line tunnel and rampway
JP3673508B2 (en) Intermediate shaft construction method and intermediate shaft
JP7403390B2 (en) Synthetic structure and method of constructing the synthetic structure
KR102649945B1 (en) Underground structure with precast concrete pile and composite diaphragm wall and the construction method thereof
JP6756892B1 (en) Underground skeleton and how to build an underground skeleton
JP3406370B2 (en) Horizontal shaft construction method
JP2673180B2 (en) Construction method of tubular wall for lining of drilling hole
KR100694762B1 (en) Method for constructing underground slabs and walls without preliminary wall-attached supports

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20040915

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20060831

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20060912

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20061113

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20061212

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20070122

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20070306

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20070319

R150 Certificate of patent or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100406

Year of fee payment: 3

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130406

Year of fee payment: 6

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20160406

Year of fee payment: 9

LAPS Cancellation because of no payment of annual fees