JP3937588B2 - Construction method for underground structures - Google Patents

Construction method for underground structures Download PDF

Info

Publication number
JP3937588B2
JP3937588B2 JP16243998A JP16243998A JP3937588B2 JP 3937588 B2 JP3937588 B2 JP 3937588B2 JP 16243998 A JP16243998 A JP 16243998A JP 16243998 A JP16243998 A JP 16243998A JP 3937588 B2 JP3937588 B2 JP 3937588B2
Authority
JP
Japan
Prior art keywords
single shield
top plate
tunnel
plate portion
concrete
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP16243998A
Other languages
Japanese (ja)
Other versions
JPH11350897A (en
Inventor
智寿 萩原
耕一 田中
琢郎 小坂
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kajima Corp
Original Assignee
Kajima Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kajima Corp filed Critical Kajima Corp
Priority to JP16243998A priority Critical patent/JP3937588B2/en
Publication of JPH11350897A publication Critical patent/JPH11350897A/en
Application granted granted Critical
Publication of JP3937588B2 publication Critical patent/JP3937588B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Excavating Of Shafts Or Tunnels (AREA)
  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)
  • Lining And Supports For Tunnels (AREA)

Description

【0001】
【発明の属する技術分野】
この発明は、内周を頂版部と左右側版部と底版部とからなる外殻部躯体で覆工し、かつ前記頂版部と底版部間に柱または壁を配置してなる地下構造物の施工方法に関する。
【0002】
【従来の技術及び発明が解決しようとする課題】
当出願人はこれまで、地下構造物の一例として、大断面のトンネルを効率良く、かつ経済的に施工する方法として、例えば図11(a),(b)に図示するように、小断面の単体シールドトンネルaを互いに近接させて複数掘進すると共に、この単体シールドトンネルaを径方向に互いに接合し、かつこの単体シールドトンネルaの内側と単体シールドトンネルa,a間にコンクリート30を連続して打設することにより、単体シールドトンネルaの径方向に連続する大断面の外殻部躯体Aを構築し、次にこの外殻部躯体Aの内側を掘削して大断面のトンネルBを構築する大断面トンネルの施工方法を開発し、この件に関しては既にいくつも出願している。
【0003】
その際、各単体シールドトンネルaの内周は、その周方向と軸方向に例えば、図12に図示するような鋼製セグメントに似た鋼殻31を互いに接合しながら複数設置し、その内側にコンクリート30を打設することにより、鋼製ライニングとコンクリートライニングとからなる鋼コンクリート合成構造のトンネル覆工体で覆工されている。
【0004】
また、隣接する単体シールドトンネルa,a間にあっては、双方の単体トンネルaとaを仕切る隔壁b(例えば、この部分に一次覆工材として設置されている鋼殻31のスキンプレート)を撤去した後に、双方の単体シールドトンネルaに連続してコンクリート30を打設することにより単体シールドトンネルa,a同士の一体化が図られている。
【0005】
さらに、ここで使用される鋼殻31は、図12に図示するように単体シールドトンネルaの周方向と軸方向にそれぞれ連続する複数本の主桁32と縦リブ33、継手板34および地山に接するスキンプレート35を有して形成され、特に主桁32はRC構造の主筋に相当するものとして設置されている。
【0006】
しかし、トンネルBの断面が大きくなると、外殻部躯体Aのみで安定した構造にしようとすると、外殻部躯体Aが相当厚くなり、さらにトンネルの全周を鋼コンクリート合成構造で覆工すると、鋼材およびコンクリートの使用量が相当なものとなって大幅なコスト高になる等の課題があった。
【0007】
また、トンネルBの断面形が横方向に偏平な形状をなす場合、外殻部躯体Aの内側を安全に掘削するには、外殻部躯体Aの頂版部を支持する必要があり、仮設工事費が大幅に嵩む等の課題があった。
【0008】
この発明は、以上の課題を解決するためになされたもので、特に偏平な地下空間を有する地下空間を有する地下構造物をきわめて経済的かつ効率的に、しかもきわめて安全に構築できるようにした地下構造物の施工方法を提供することを目的とする。
【0009】
【課題を解決するための手段】
請求項1記載の地下構造物の施工方法は、頂版部と左右側版部と底版部とからなる外殻部躯体と、当該外殻部躯体内に配置された柱または壁とからなる地下構造物の施工方法において、頂版部、底版部および左右側版部を構築する工程と、前記頂版部に上部補強梁を構築する工程と、前記頂版部下に支持杭または支持壁を施工する工程と、当該支持杭または支持壁と前記側版部間に切りばりを架け渡しながら前記頂版部下の地盤を底版部の位置まで掘削する工程と、前記頂版部と底版部間に前記柱または壁を構築する工程とからなり、記頂版部と左右側版部は、複数の単体シールドトンネルを互いに近接させて掘進する工程と、隣接する単体シールドトンネル同士を連通した状態に接合する工程と、互いに連通する単体シールドトンネル内および単体シールド間にコンクリートを打設する工程によって構築し、前記上部補強梁は複数の単体シールドトンネルを互いに近接させて掘進する工程と、当該単体シールドトンネル内および単体シールドトンネル間に補強鉄筋を配筋し、かつコンクリートを打設する工程により構築し、前記底版部は場所打ちコンクリートによって構築し、前記単体シールドトンネルの内周は、トンネルの周方向に延びる複数の主桁を備えた複数の鋼殻とコンクリートからなる鋼殻コンクリートによって覆工することを特徴とするものである。
【0010】
請求項2記載の地下構造物の施工方法は、頂版部と左右側版部と底版部とからなる外殻部躯体と、当該外殻部躯体内に配置された柱または壁とからなる地下構造物の施工方法において、頂版部、底版部および左右側版部を構築する工程と、前記頂版部に上部補強梁を構築する工程と、前記頂版部下の両側に山留壁を、中間部に山留め杭をそれぞれ施工する工程と、前記山留壁と山留杭間に切ばりを架け渡しながら頂版部下の地盤を底版部の位置まで掘り下げる工程とからなり、最初に頂版部、次に山留壁と山留杭、次に左右側版部と底版部の順にそれぞれ構築し、前記頂版部は複数の単体シールドトンネルを互いに近接させて掘進する工程と、隣接する単体シールドトンネル同士を連通した状態に接合する工程と、互いに連通する単体シールドトンネル内および単体シールドトンネル間にコンクリートを打設する工程によって構築し、前記上部補強梁は複数の単体シールドトンネルを互いに近接させて掘進する工程と、当該単体シールドトンネル内および単体シールドトンネル間に補強鉄筋を配筋し、かつコンクリートを打設する工程により構築し、前記左右側版部および底版部は場所打ちコンクリートによって構築し、前記単体シールドトンネルの内周は、トンネルの周方向に延びる複数の主桁を備えた複数の鋼殻とコンクリートからなる鋼殻コンクリートによって覆工することを特徴とするものである。
【0011】
請求項3記載の地下構造物の施工方法は、請求項2記載の地下構造物の施工方法において、コンクリートを打設する前の単体シールドトンネル内で山留め杭を施工することを特徴とするものである。
【0012】
請求項4記載の地下構造物の施工方法は、請求項記載の地下構造物の施工方法において、頂版部の下側に当該頂版部下の地盤を掘削して作業空間を形成し、当該作業空間において支持杭または支持壁を施工することを特徴とするものである。
【0013】
請求項5記載の地下構造物の施工方法は、請求項1又は4記載の地下構造物の施工方法において、支持杭または支持壁の上端部を補強梁に接合することを特徴とするものである。
【0014】
請求項6記載の地下構造物の施工方法は、請求項1〜5のいずれかに記載の地下構造物の施工方法において、各単体シールドトンネルの鋼殻間の主桁同士および単体シールドトンネル間の主桁同士は高力ボルト接合によって接合することにより外殻部躯体の周方向に連続させることを特徴とするものである。
【0016】
【発明の実施の形態】
発明の実施の形態1.
図1(a),(b),(c),(d)は、地下構造物の一例として、例えば地下高速道路などとして利用される大断面のトンネルを示し、図において、トンネルBは偏平な矩形の大断面形に構築されている。
【0017】
また、トンネルBの天井部分と左右側壁部分には、例えば図3に図示するような鋼製セグメントに似た鋼殻1が、図2(a),(b)に図示するようにトンネルBの周方向と軸方向に互いに接合しながら二重に設置されている。
【0018】
また、二重に設置された外側と内側の鋼殻1,1間にせん断補強材2がトンネルBの軸方向と周方向に所定間隔に複数設置されている。
【0019】
さらに、外側と内側の鋼殻1,1間に軸方向補強鉄筋3がトンネルBの軸方向に複数配筋され、かつコンクリート4が打設されている。
【0020】
こうして、複数の鋼殻1からそれぞれ構成された外側と内側の鋼製ライニングとその内側のコンクリートライニングとからなる鋼コンクリート合成構造の外殻部躯体AによってトンネルBの天井部分と左右側壁部分の内周が連続して覆工されている。
【0021】
なお、ここでトンネルBの左右側壁部分を覆工している外殻部躯体を左右側版部A1 と、天井部分を覆工している外殻部躯体を頂版部A2 とする。
【0022】
また、トンネルBの床部分には鉄筋コンクリート構造の底版部5が施工され、さらにトンネルBの中間部には図1(a)〜(d)に図示するようにRC構造またはSRC構造の柱または壁6がトンネルBの軸方向に所定間隔に、または連続して構築されている。
【0023】
鋼殻1は、トンネルBの地山を保持する鋼製セグメントに相当するもので、例えば図3に図示するように単体シールドトンネルaの周方向に平行に延在する複数本の主桁7と単体シールドトンネルaの軸方向に延在する複数本の縦リブ8とトンネルBの地山に接するスキンプレート9等から形成されている。
【0024】
主桁7はRC構造の主筋に相当するもので、単体シールドトンネルaの軸方向に所定間隔に設置されている。
【0025】
また、単体シールドトンネルaの周方向に隣接する鋼殻1の主桁7どうしは、例えば双方の主桁7の端部間の片側又は両側に接合プレート10を設置し、かつ主桁7と接合プレート10を複数本の高力ボルト11で接合する、高力ボルト摩擦接合または溶接によって接合されている。
【0026】
また、隣接する単体シールドトンネルa,a間においても、トンネルBの周方向に隣接する主桁7どうしは、トンネルBの周方向に隣接する主桁7の端部間の片側または両側に接合プレート10を設置し、かつ主桁7と接合プレート10を複数本の高力ボルト11で接合する、高力ボルト摩擦接合または溶接によって接合されている。
【0027】
こうすることで、単体シールドトンネルaの周方向に隣接する鋼殻1どうし、さらにはトンネルBの周方向に隣接する鋼殻1どうしが接合されている。
【0028】
その際、単体シールドトンネルaの軸方向に隣接する鋼殻1どうしも、接合プレート10と高力ボルト11による高力ボルト摩擦接合または溶接によって一緒に接合されている。
【0029】
また、底版部5のコンクリート中に補強鉄筋または補強鋼材(図省略)が多数配筋され、そのトンネルBの周方向の両端部は左右側版部A1 のコンクリート4内に一体的に定着されている。
【0030】
こうすることで、外殻部躯体Aの左右側版部A1 と底版部5とがトンネルBの周方向に一体的に接合されている。なお、左右側版部A1 と底版部5との接合部に接合鉄筋または接合鋼材を多数埋設して左右側版部A1 と底版部5とを一体的に接合してもよい。
【0031】
縦リブ8は主に、単体シールドトンネルaを掘進する際の推進反力を得るための反力受けをなすもので、このため隣接する主桁7,7間に単体シールドトンネルaの軸方向に材軸が一致するように取り付けられ、また単体シールドトンネルaの周方向に所定間隔に取り付けられている。
【0032】
スキンプレート9は主に、掘進直後のトンネルの地山を保持するもので、複数の主桁7と縦リブ8とからなるセグメント軸組の外側にその表面を完全に覆うように取り付けられている。
【0033】
なお、主桁7と縦リブ8はいずれも、形鋼、平鋼、又は平鋼などを組み合わせたビルトアップ鋼材などから形成され、スキンプレート9は鋼板から形成されている。さらに、これらの部材は溶接またはボルト接合によって互いに一体的に接合されている。
【0034】
せん断補強材2は二重に設置された外側と内側の鋼殻1の主桁7,7間に、図2(a),(b)に図示するように垂直または斜めに設置され、その両端は主桁7にそれぞれ溶接またはボルト接合によって連結されている。
【0035】
なお、せん断補強材2も、主桁7などと同様に形鋼、平鋼、又は平鋼などを組み合わせたビルトアップ鋼材などから形成されている。
【0036】
こうして形成された複数の鋼殻1からそれぞれ構成された外側と内側の鋼製ライニング間に軸方向補強鉄筋3が複数配筋された後、コンクリート4が打設されている。
【0037】
その際、特に隣接する単体シールドトンネルa,a間においては、隣接する単体シールドトンネルa,a間の隔壁(例えば、鋼殻1の主桁7と縦リブ8のみを残しスキンプレート9を撤去する)を撤去した後にコンクリート4が打設されている。こうすることで、隣接する単体シールドトンネルa,aどうしの完全一体性が図られている。
【0038】
このような構成において、次にこの発明に係る地下構造物の施工方法を図4と図5に基づき、順を追って説明する。
▲1▼ 最初に、外殻部躯体Aの左右側版部A1 と頂版部A2 を構築するために単体シールドトンネルaを互いに近接させて複数掘進する(STEP.1)。
【0039】
その際、各単体シールドトンネルaの内周は、一次覆工材として鋼殻1を単体シールドトンネルaの周方向と軸方向に互いに接合しながら複数設置し、その内側に二次覆工材としてコンクリート4を所定の厚さに打設してそれぞれ覆工する。
【0040】
また、図10に図示するように各単体シールドトンネルaの外周と単体シールドトンネルa,aに裏込め材12を充填して各鋼殻1と地山間の隙間を塞ぐと共に、鋼殻1の周囲および単体シールドトンネルa,a間の地山を安定な地盤に地盤改良する。
▲2▼ 次に、各単体シールドトンネルa内にせん断補強材2を所定間隔に複数設置する。その際、せん断補強材2は、図2(a)に図示するように外殻部躯体Aの頂版部A2 を構成する単体シールドトンネルa内には垂直に、左右側版部A1 を構成する単体シールドトンネルa内には水平にそれぞれ設置する。
【0041】
なお、いずれの部分においても、図2(b)に図示するようにせん断補強材2をトラスを構成するように斜めに設置してもよい。
▲3▼ 次に、隣接する単体シールドトンネルa同士を互いに接合し、かつ各単体シールドトンネルa内、および隣接する単体シールドトンネルa,a間に軸方向補強鉄筋3を必要量配筋する。
【0042】
さらに、単体シールドトンネルa内および隣接する単体シールドトンネルa,a間にコンクリート4を連続して打設することにより、トンネルBの周方向に門形に連続する外殻部躯体Aの左右側版部A1,1 と頂版部A2 を構築する(STEP.2)。
【0043】
その際、特に隣接する単体シールドトンネルa,a間においては、地山を掘削し、かつ隣接する単体シールドトンネルa,a間の隔壁(例えば、鋼殻1の主桁7と縦リブ8のみを残しスキンプレート9を撤去する)を撤去して単体シールドトンネルaどうしを連通した後、コンクリート4を打設することにより隣接する単体シールドトンネルa,aどうしの一体性を図るものとする。
【0044】
また、頂版部A2 の、柱または壁6の上端部が接合される部分には、軸方向補強鉄筋13を多めに配筋し、さらに必要に応じてあばら筋をも配筋する等して頂版部A2 の軸方向に連続する上部補強ばり14を構築する。
【0045】
また、必要に応じて左右側版部A1 の下端部の周辺部を地盤改良する(以下、この部分を「地盤改良部15」とする)。
▲4▼ 次に、上部補強ばり14の下側に、この部分の地盤を所定深さまで掘削して作業空間Eを形成する((STEP.3)。
【0046】
その際、作業空間Eは上部補強ばり14の軸方向に先行掘削することによりトンネルBの軸方向に連続して形成してもよく、または柱または壁6を配置する部分のみを縦穴状に掘り下げてトンネルBの軸方向に所定間隔に形成してもよい。
【0047】
また、作業空間Eの両側の根切り面には適当な勾配の法面を付けて法面の崩落を防止することにより作業の安全性を図るものとする。
▲5▼ 次に、作業空間Eにおいて、柱または壁6を配置する部分に支持杭または支持壁16を構築する。その際、支持杭は深礎工法などによって、また支持壁は場所打ちコンクリート工法など、これまで一般に行われている施工方法で構築する。なお、支持杭または支持壁16は左右側版部A1 より深く施工する。
▲6▼ 次に、支持杭または支持壁16と上部補強ばり14とを一体的に接合する(STEP4)。その際、上部補強ばり14と支持杭または支持壁16間に定着用鋼材を多数配置し、かつ無収縮コンクリートを打設して上部補強ばり14と支持杭または支持壁16の上端部を一体的に接合する。
▲7▼ 次に、支持杭または支持壁16と左右側版部A1 間に切り梁17をそれぞれ架け渡しながら外殻部躯体A内の地盤を地盤改良部15の上まで徐々に掘り下げる。
▲8▼ 次に、掘削底に底版部5を鉄筋コンクリートで施工する。また、外殻部躯体A内に中間階の床スラブ、柱、壁などの必要な内部躯体を構築する。その際、底版部5と頂版部A2 間に頂版部A2 を保持するために施工した支持杭または支持壁16を、その外周に必要な仕上げを施して柱または壁6とする。
【0048】
以上、▲1▼〜▲8▼の工程により、大断面のトンネルBをきわめて経済的かつ効率的に、しかもきわめて安全に構築できる。
発明の実施の形態2.
図6と図7は、この発明の他の施工方法を示し、特に頂版部A2 の中央部に小断面の単体シールドトンネルaを上下および横に近接させて複数掘進する(STEP.1)。
【0049】
次に、この単体シールドトンネル内を作業空間Eとして、支持杭または支持壁16を施工する(STEP.2)。また、この単体シールドトンネルaの内側と単体シールドトンネルa,a間にコンクリート4を連続して打設することにより上部補強ばり14を施工する(STEP.3)。
【0050】
その際、隣接する単体シールドトンネルa,a間の隔壁(例えば、鋼殻1の主桁7と縦リブ8のみを残しスキンプレート9を撤去する)を撤去して単体シールドトンネルaどうしを連通した後、必要な補強鉄筋を配筋し、コンクリート4を連続して打設して補強ばり14を施工する。その他の方法は先に説明した施工方法と略同じである。
【0051】
この施工方法によれば、特に作業空間Eを形成するために地盤を掘り下げる必要がなく、また補強ばり14を頂版部A2 と並行して施工でき、きわめて効率的な施工が可能になる等の効果がある。
発明の実施の形態3.
図8と図9は、この発明の他の施工方法を示し、順を追って説明すると、
▲1▼ 最初に、外殻部躯体Aの頂版部A2 を構築するために、小断面の単体シールドトンネルaを横方向に互いに近接させて複数掘進する(STEP.1)。
【0052】
その際、特に頂版部A2 の左右両端部と中間部には、やや大きめの単体シールドトンネルa1 を掘進する。
▲2▼ 次に、左右両端部と中間部の単体シールドトンネルa1 内をそれぞれ作業空間Eとして、左右両端部と中間部に山留め杭18を単体シールドトンネルa1 の軸方向に所定間隔に施工する( STEP.2)。その際、山留め杭18には形鋼杭、PC杭、あるいは場所打ちコンクリート杭などを使用するものとする。
▲3▼ 次に、単体シールドトンネルa,a1 の内と単体シールドトンネル間にコンクリート4を連続して打設することにより頂版部A2 と上部補強ばり14を施工する(STEP.3)。
【0053】
その際、隣接する単体シールドトンネルa,a間の隔壁(例えば、鋼殻1の主桁7と縦リブ8のみを残し、スキンプレート9を撤去する)を撤去して単体シールドトンネルaどうしを連通した後、必要量の補強鉄筋を配筋し、かつコンクリート4を連続して打設して補強ばり14を施工する。
▲3▼ 次に、頂版部A2 の両端部と中間部において、それぞれ隣接する山止め杭18,18間に横矢板(図省略)を打ち込んで山止め壁を構築しつつ、かつ両端の山止め壁と中間の山止め杭18間に切り梁17を架け渡しながら、頂版部A2 の下側地盤を地盤改良部15まで徐々に掘り下げる。
▲4▼ 次に、掘削底に底版部5を、左右両側に左右側版部A1 をそれぞれ場所打ちコンクリートで施工する。その他の方法は先に説明した施工方法と略同じである。
【0054】
この施工方法によれば、左右側版部A1 と底版部5の両方を場所打ちコンクリートで施工し、頂版部A2 のみを鋼殻を使用する鋼コンクリート合成構造で施工するので、左右側版部と底版の両部分の鋼殻が不要になり、このため鋼材使用量、シールドマシンの稼働台数をさらに節約できて、大幅な経済施工が可能になる。
【0055】
なお、発明の実施の形態1〜3では、大断面のトンネルを構築する場合について説明したが、この種のトンネルの構築に限られるものではなく、駅ビルの地下街や建物の地下室の施工にも適用できることはいうまでもない。
【0056】
【発明の効果】
この発明に係る地下構造物の施工方法は、以上説明した構成からなり、特に外殻部躯体の頂版部と左右側版部は、小断面の単体シールドトンネルを互いに近接させて複数掘進すると共に、この単体シールドトンネルをその径方向に互いに接合し、かつこの単体シールドトンネル内と単体シールドトンネル間にコンクリートを連続して打設して構築するので、鋼コンクリート合成構造の外殻部躯体をきわめて安全にかつ効率的に施工できる効果がある。
【0057】
また、底版部は場所打ちコンクリートで施工するので、底版部の鋼殻が不要になり、このため鋼材使用量とシールドマシンの稼働台数を大幅に節約できて経済施工も図れる等の効果もある。
【0058】
また、頂版部の下方に支持杭または支持壁を施工し、この支持杭または支持壁で頂版部を支持しながら頂版部の下側地盤を掘り下げるので、外殻部躯体内の掘削もきわめて安全に行うことができる。
【0059】
また、頂版部の下側地盤を掘削して所定深さの作業空間を形成し、この作業空間において支持杭と支持壁をきわめて安全に施工できる。
【0060】
さらに、頂版部に補強ばりを設け、この補強ばりに支持杭と支持壁の上端部を接合するので、頂版部から荷重を補強ばりを介して支持杭と支持壁に伝達できるので、強度的にもきわめて安定している。
【図面の簡単な説明】
【図1】(a),(b),(c)は大断面に構築されたトンネルの軸直角方向の縦断面図、(d)はそのトンネル軸方向の縦断面図である。
【図2】(a),(b)は共に、トンネルの外殻部躯体の一部斜視図である。
【図3】鋼殻の一例を示す一部斜視図である。
【図4】施工方法の工程を示す断面図である。
【図5】施工方法の工程を示す断面図である。
【図6】施工方法の工程を示す断面図である。
【図7】施工方法の工程を示す断面図である。
【図8】施工方法の工程を示す断面図である。
【図9】施工方法の工程を示す断面図である。
【図10】単体シールドトンネルの断面図である。
【図11】(a)は大断面トンネルの断面図、(b)はその斜視図である。
【図12】鋼殻の従来例を示す一部斜視図ある。
【符号の説明】
A 外殻部躯体
1 側壁部
2 頂版部
B トンネル
a 単体シールドトンネル
1 単体シールドトンネル
1 鋼殻
2 せん断補強材
3 軸方向補強鉄筋
4 コンクリート
5 底版部
6 柱または壁
7 主桁
8 縦リブ
9 スキンプレート
10 接合プレート
11 高力ボルト
12 裏込め材
13 軸方向補強鉄筋
14 上部補強ばり
15 地盤改良部
16 支持杭または支持壁
17 切りばり
18 山留め杭
[0001]
BACKGROUND OF THE INVENTION
The present invention provides an underground structure in which an inner periphery is covered with an outer shell part housing composed of a top plate part, left and right side plate parts, and a bottom plate part, and a column or a wall is disposed between the top plate part and the bottom plate part. It relates to the construction method of things.
[0002]
[Prior art and problems to be solved by the invention]
As an example of an underground structure, the applicant of the present application has hitherto proposed a method for efficiently and economically constructing a tunnel with a large cross section, for example, as shown in FIGS. 11 (a) and 11 (b). A plurality of the single shield tunnels a are dug in close proximity to each other, the single shield tunnels a are joined together in the radial direction, and the concrete 30 is continuously connected between the inside of the single shield tunnel a and the single shield tunnels a and a. By laying, a large cross-section outer shell housing A continuous in the radial direction of the single shield tunnel a is constructed, and then a large cross-section tunnel B is constructed by excavating the inside of the outer shell housing A. A large-scale tunnel construction method has been developed, and many applications have already been filed for this matter.
[0003]
At that time, the inner circumference of each single shield tunnel a is installed in the circumferential direction and the axial direction, for example, by joining a plurality of steel shells 31 similar to steel segments as shown in FIG. By placing the concrete 30, it is covered with a tunnel lining body of a steel-concrete composite structure composed of a steel lining and a concrete lining.
[0004]
Further, between the adjacent single shield tunnels a and a, a partition wall b (for example, a skin plate of a steel shell 31 installed as a primary lining material in this portion) separating both the single tunnels a and a was removed. Later, the single shield tunnels a and a are integrated by placing concrete 30 continuously in both the single shield tunnels a.
[0005]
Furthermore, as shown in FIG. 12, the steel shell 31 used here has a plurality of main girders 32 and longitudinal ribs 33, joint plates 34, and natural ground that are continuous in the circumferential direction and the axial direction of the single shield tunnel a. In particular, the main girder 32 is installed as one corresponding to the main bar of the RC structure.
[0006]
However, when the cross section of the tunnel B becomes large, when trying to make a stable structure with only the outer shell housing A, the outer shell housing A becomes considerably thicker, and when the entire circumference of the tunnel is covered with a steel concrete composite structure, There was a problem that the amount of steel and concrete used was considerable and the cost was significantly increased.
[0007]
In addition, when the cross section of the tunnel B is flat in the lateral direction, it is necessary to support the top plate portion of the outer shell casing A in order to safely excavate the inner side of the outer shell casing A. There was a problem that construction costs increased significantly.
[0008]
The present invention has been made to solve the above problems, and in particular, an underground structure having an underground space having a flat underground space can be constructed very economically, efficiently and extremely safely. It aims at providing the construction method of a structure.
[0009]
[Means for Solving the Problems]
The construction method of an underground structure according to claim 1 is an underground structure comprising an outer shell part frame composed of a top plate part, left and right side plate parts and a bottom plate part, and a column or wall arranged in the outer shell part frame body. In the construction method of the structure, a step of constructing the top plate portion, the bottom plate portion, and the left and right side plate portions, a step of constructing an upper reinforcing beam on the top plate portion, and a support pile or a support wall are constructed below the top plate portion. A step of excavating the ground under the top plate portion to a position of the bottom plate portion while bridging a cut between the support pile or the support wall and the side plate portion, and the step between the top plate portion and the bottom plate portion. consists of a process for building a pillar or wall, front Kiitadaki plate portion and the left and right side plate portions includes the steps of excavation in proximity to several single shield tunnel together, bonded to a state communicating with the single shield tunnel adjacent to In a single shield tunnel that communicates with each other The upper reinforcing beam is constructed by digging a plurality of single shield tunnels close to each other, and reinforcing reinforcing bars are arranged in the single shield tunnel and between the single shield tunnels. The bottom slab portion is constructed of cast-in-place concrete, and the inner periphery of the single shield tunnel has a plurality of steel beams having a plurality of main girders extending in the circumferential direction of the tunnel. It is characterized by lining with steel shell concrete consisting of shell and concrete.
[0010]
The construction method for an underground structure according to claim 2 is an underground structure comprising an outer shell part frame composed of a top plate part, left and right side plate parts, and a bottom plate part, and a column or wall disposed in the outer shell part frame body. In the construction method of the structure, a step of building the top plate portion, the bottom plate portion and the left and right side plate portions, a step of building an upper reinforcing beam on the top plate portion, and a mountain retaining wall on both sides under the top plate portion, It consists of a process of constructing a pile pile in the middle part, and a process of digging the ground under the top plate part to the position of the bottom plate part while bridging a cut between the mountain retaining wall and the pile. Next, the mountain retaining wall and the mountain retaining pile, and then the left and right side plate portions and the bottom plate portion are constructed in this order, the top plate portion is a step of digging a plurality of single shield tunnels close to each other, and the adjacent single shield The process of joining the tunnels in a communicating state and the single seal that communicates with each other It is constructed by placing concrete in the tunnel and between the single shield tunnels, and the upper reinforcing beam is reinforced by making a plurality of single shield tunnels close to each other and in the single shield tunnel and between the single shield tunnels. It is constructed by a step of placing reinforcing bars and placing concrete, the left and right side plate portions and the bottom plate portion are constructed by cast-in-place concrete, and the inner periphery of the single shield tunnel has a plurality of extending in the circumferential direction of the tunnel. It is characterized by lining with steel shell concrete composed of a plurality of steel shells with a main girder and concrete.
[0011]
The construction method of the underground structure according to claim 3 is characterized in that in the construction method of the underground structure according to claim 2, the retaining pile is constructed in a single shield tunnel before placing concrete. is there.
[0012]
The construction method of the underground structure according to claim 4 is the construction method of the underground structure according to claim 1 , wherein a work space is formed by excavating the ground below the top plate portion below the top plate portion, A support pile or a support wall is constructed in the work space.
[0013]
The construction method of the underground structure according to claim 5 is characterized in that, in the construction method of the underground structure according to claim 1 or 4 , the upper end portion of the support pile or the support wall is joined to the reinforcing beam. .
[0014]
The construction method of the underground structure according to claim 6 is the construction method of the underground structure according to any one of claims 1 to 5, wherein the main beams between the steel shells of each single shield tunnel and between the single shield tunnels. The main girders are connected to each other in the circumferential direction of the outer shell body by joining with high-strength bolts.
[0016]
DETAILED DESCRIPTION OF THE INVENTION
Embodiment 1 of the Invention
1 (a), (b), (c), and (d) show a tunnel with a large cross section that is used as an example of an underground structure, for example, as an underground expressway. In the figure, tunnel B is flat. It is constructed in a rectangular large cross section.
[0017]
Further, on the ceiling part and the left and right side wall parts of the tunnel B, for example, a steel shell 1 similar to a steel segment as shown in FIG. 3 is formed on the tunnel B as shown in FIGS. 2 (a) and 2 (b). It is installed twice while being joined to each other in the circumferential direction and the axial direction.
[0018]
In addition, a plurality of shear reinforcements 2 are installed at predetermined intervals in the axial direction and the circumferential direction of the tunnel B between the outer and inner steel shells 1 and 1 that are installed twice.
[0019]
Furthermore, a plurality of reinforcing bars 3 in the axial direction are arranged between the outer and inner steel shells 1 and 1 in the axial direction of the tunnel B, and concrete 4 is placed.
[0020]
Thus, the inner part of the ceiling part of the tunnel B and the right and left side wall parts are formed by the outer shell part casing A of the steel-concrete composite structure composed of the outer and inner steel linings and the inner concrete lining, each composed of a plurality of steel shells 1. The circumference is continuously lined.
[0021]
Here, the left and right side plate portions A 1 the outer shell skeleton that lining the lateral side walls of the tunnel B, and the outer shell skeleton that lining the ceiling of a top plate portion A 2.
[0022]
Further, a floor slab portion 5 of a reinforced concrete structure is constructed on the floor portion of the tunnel B, and a column or wall of an RC structure or an SRC structure as shown in FIGS. 1 (a) to 1 (d) at an intermediate portion of the tunnel B. 6 are constructed at predetermined intervals in the axial direction of the tunnel B or continuously.
[0023]
The steel shell 1 corresponds to a steel segment that holds the ground of the tunnel B. For example, as shown in FIG. 3, a plurality of main girders 7 extending parallel to the circumferential direction of the single shield tunnel a A plurality of vertical ribs 8 extending in the axial direction of the single shield tunnel a and a skin plate 9 in contact with the ground of the tunnel B are formed.
[0024]
The main girder 7 corresponds to the main reinforcement of the RC structure, and is installed at a predetermined interval in the axial direction of the single shield tunnel a.
[0025]
Further, the main girders 7 of the steel shells 1 adjacent to each other in the circumferential direction of the single shield tunnel a have, for example, a joining plate 10 installed on one side or both sides between the ends of both main girders 7 and joined to the main girder 7. The plate 10 is joined by high-strength bolt friction joining or welding in which a plurality of high-strength bolts 11 are joined.
[0026]
In addition, between the adjacent single shield tunnels a and a, the main beams 7 adjacent to each other in the circumferential direction of the tunnel B are joined to one or both sides between the ends of the main beams 7 adjacent to the circumferential direction of the tunnel B. 10 and the main girder 7 and the joining plate 10 are joined by a plurality of high-strength bolts 11 and joined by high-strength bolt friction joining or welding.
[0027]
By doing so, the steel shells 1 adjacent to each other in the circumferential direction of the single shield tunnel a and the steel shells 1 adjacent to each other in the circumferential direction of the tunnel B are joined.
[0028]
At that time, the steel shells 1 adjacent to each other in the axial direction of the single shield tunnel a are joined together by high-strength bolt friction joining or welding with the joining plate 10 and the high-strength bolt 11.
[0029]
Further, the bottom plate portion 5 of reinforcing rebar or reinforcing steel in concrete (although not shown) a number Haisuji, the circumferential opposite end portions of the tunnel B is fixed integrally in the concrete 4 of the left and right side plate portions A 1 ing.
[0030]
By doing so, the left and right side plate portions A 1 and the bottom plate portion 5 of the outer shell housing A are integrally joined in the circumferential direction of the tunnel B. Note that a large number of joining rebars or steel members may be embedded in the joint between the left and right side plate portions A 1 and the bottom plate portion 5 so that the left and right side plate portions A 1 and the bottom plate portion 5 are integrally joined.
[0031]
The vertical rib 8 mainly serves as a reaction force receiver for obtaining a propulsive reaction force when the single shield tunnel a is dug. For this reason, between the adjacent main beams 7 and 7, the vertical shield 8 is provided in the axial direction of the single shield tunnel a. The material axes are attached so as to coincide with each other, and are attached at a predetermined interval in the circumferential direction of the single shield tunnel a.
[0032]
The skin plate 9 mainly holds the ground of the tunnel immediately after excavation, and is attached so as to completely cover the surface of the segment shaft assembly composed of the plurality of main girders 7 and the vertical ribs 8. .
[0033]
Note that the main girder 7 and the longitudinal rib 8 are both formed from shaped steel, flat steel, or a built-up steel material that combines flat steel or the like, and the skin plate 9 is formed from a steel plate. Further, these members are integrally joined to each other by welding or bolt joining.
[0034]
The shear reinforcement material 2 is installed vertically or obliquely between the main girders 7 and 7 of the outer and inner steel shells 1 installed in a double or diagonal manner as shown in FIGS. 2 (a) and 2 (b). Are connected to the main beam 7 by welding or bolting, respectively.
[0035]
In addition, the shear reinforcement material 2 is also formed from the built-up steel material etc. which combined shape steel, flat steel, or flat steel etc. similarly to the main girder 7 grade | etc.,.
[0036]
After a plurality of reinforcing bars 3 in the axial direction are arranged between the outer and inner steel linings formed from the plurality of steel shells 1 formed in this way, concrete 4 is placed.
[0037]
At that time, particularly between the adjacent single shield tunnels a and a, the partition between the adjacent single shield tunnels a and a (for example, the skin plate 9 is removed leaving only the main girder 7 and the vertical rib 8 of the steel shell 1. ) Is removed and concrete 4 is placed. By doing so, perfect unity between adjacent single shield tunnels a and a is achieved.
[0038]
Next, the construction method of the underground structure according to the present invention in such a configuration will be described in order based on FIG. 4 and FIG.
{Circle around (1)} First, in order to construct the left and right side plate portions A 1 and the top plate portion A 2 of the outer shell portion housing A, a plurality of single shield tunnels a are moved close to each other (STEP. 1).
[0039]
At that time, the inner circumference of each single shield tunnel a is installed as a primary lining material while a plurality of steel shells 1 are joined together in the circumferential direction and the axial direction of the single shield tunnel a, and as a secondary lining material on the inside thereof. Concrete 4 is cast to a predetermined thickness and lining is performed.
[0040]
Further, as shown in FIG. 10, the outer periphery of each single shield tunnel a and the single shield tunnel a, a are filled with the backfilling material 12 to close the gap between each steel shell 1 and the ground, and the periphery of the steel shell 1 And the ground between the single shield tunnels a and a is improved to a stable ground.
(2) Next, a plurality of shear reinforcements 2 are installed at predetermined intervals in each single shield tunnel a. At that time, shear reinforcement 2 is perpendicular to the single shield tunnel a constituting the top plate portion A 2 of the outer shell precursor A as shown in FIG. 2 (a), the left and right side plate portions A 1 Each is installed horizontally in the single shield tunnel a.
[0041]
In any part, as shown in FIG. 2B, the shear reinforcement material 2 may be installed obliquely so as to constitute a truss.
(3) Next, adjacent single shield tunnels a are joined to each other, and a necessary amount of axial reinforcing reinforcing bars 3 are arranged in each single shield tunnel a and between adjacent single shield tunnels a and a.
[0042]
Furthermore, by placing concrete 4 continuously in the single shield tunnel a and between adjacent single shield tunnels a, a left and right side version of the outer shell housing A continuous in a gate shape in the circumferential direction of the tunnel B The parts A 1 and A 1 and the top plate part A 2 are constructed (STEP. 2 ).
[0043]
At that time, in particular, between the adjacent single shield tunnels a and a, a natural ground is excavated and a partition wall between the adjacent single shield tunnels a and a (for example, only the main girder 7 and the vertical rib 8 of the steel shell 1 is provided). The remaining skin plate 9 is removed) and the single shield tunnels a are communicated with each other, and then the concrete 4 is placed to make the adjacent single shield tunnels a and a integral.
[0044]
In addition, a large amount of reinforcing bars 13 in the axial direction are arranged at the portion of the top plate portion A 2 where the upper ends of the columns or the walls 6 are joined, and a stirrup is arranged as necessary. An upper reinforcing beam 14 that is continuous in the axial direction of the top plate A 2 is constructed.
[0045]
Further, the peripheral portion of the lower end portions of the left and right side plate portions A 1 to ground improvement if necessary (hereinafter, this portion is referred to as "ground improvement unit 15").
{Circle around (4)} Next, the ground of this portion is excavated to a predetermined depth below the upper reinforcing beam 14 to form a work space E (STEP 3).
[0046]
At that time, the work space E may be formed continuously in the axial direction of the tunnel B by excavating in advance in the axial direction of the upper reinforcing beam 14, or only the portion where the column or wall 6 is disposed is dug down into a vertical hole shape. Thus, they may be formed at predetermined intervals in the axial direction of the tunnel B.
[0047]
In addition, it is assumed that work safety is achieved by attaching slopes with appropriate slopes to the root surfaces on both sides of the work space E to prevent the slopes from collapsing.
(5) Next, in the work space E, a support pile or support wall 16 is constructed at a portion where the column or wall 6 is arranged. At that time, the support pile is constructed by a deep foundation method and the support wall is constructed by a conventional construction method such as a cast-in-place concrete method. The support piles or the support wall 16 is deeper construction than the left and right side plate portions A 1.
(6) Next, the support pile or support wall 16 and the upper reinforcing beam 14 are integrally joined (STEP 4). At that time, a large number of fixing steel materials are arranged between the upper reinforcing beam 14 and the supporting pile or the supporting wall 16 and non-shrinkable concrete is placed so that the upper reinforcing beam 14 and the upper end portion of the supporting pile or the supporting wall 16 are integrated. To join.
▲ 7 ▼ Next, dig slowly ground the outer shell precursor in A to the top of the ground improvement unit 15 while bridging respectively bearing pile or support wall 16 of the left and right side plate portions A cut between first beam 17.
(8) Next, the bottom plate portion 5 is constructed with reinforced concrete on the bottom of the excavation. In addition, necessary inner housings such as floor slabs, columns, walls, etc. on the intermediate floor are constructed in the outer shell housing A. At that time, the bearing pile or support wall 16 was constructed to hold the Itadakiban portion A 2 between the bottom plate 5 and the top plate portion A 2, and pillar or wall 6 is subjected to finish required on the outer periphery thereof.
[0048]
As described above, by the steps (1) to (8), the large-section tunnel B can be constructed extremely economically, efficiently and extremely safely.
Embodiment 2 of the Invention
6 and 7 show another construction method of the present invention, and in particular, a plurality of single shield tunnels a having a small cross section are made close to each other vertically and laterally in the center of the top plate portion A 2 (STEP. 1). .
[0049]
Next, a support pile or a support wall 16 is constructed using the inside of the single shield tunnel as a work space E (STEP. 2). Further, the upper reinforcing beam 14 is constructed by continuously placing the concrete 4 between the inside of the single shield tunnel a and the single shield tunnels a and a (STEP. 3).
[0050]
At that time, the partition between adjacent single shield tunnels a and a (for example, only the main girder 7 and the vertical rib 8 of the steel shell 1 are left and the skin plate 9 is removed) is removed, and the single shield tunnels a are communicated with each other. After that, necessary reinforcing reinforcing bars are arranged, and concrete 4 is continuously placed to construct the reinforcing beam 14. Other methods are substantially the same as the construction method described above.
[0051]
According to this construction method, it is not particularly necessary to dig up the ground in order to form the working space E, and the reinforcing beam 14 can be constructed in parallel with the top plate portion A 2 so that extremely efficient construction is possible. There is an effect.
Embodiment 3 of the Invention
8 and 9 show another construction method of the present invention and will be described in order.
{Circle around (1)} First, in order to construct the top plate portion A 2 of the outer shell housing A, a plurality of single shield tunnels a having a small cross section are brought close to each other in the lateral direction (STEP. 1).
[0052]
At that time, a slightly larger single-piece shield tunnel a 1 is dug especially at the left and right end portions and the middle portion of the top plate portion A 2 .
(2) Next, the inside of the single shield tunnel a 1 at the left and right end portions and the middle portion is set as the work space E, and the pile piles 18 are constructed at predetermined intervals in the axial direction of the single shield tunnel a 1. (STEP.2). At that time, a shape steel pile, a PC pile, a cast-in-place concrete pile, or the like is used as the mountain retaining pile 18.
(3) Next, the top plate portion A 2 and the upper reinforcing beam 14 are constructed by placing concrete 4 continuously between the single shield tunnels a and a 1 and the single shield tunnel (STEP.3). .
[0053]
At that time, the bulkhead between adjacent single shield tunnels a and a (for example, only the main girder 7 and the vertical rib 8 of the steel shell 1 are left and the skin plate 9 is removed) is removed, and the single shield tunnels a communicate with each other. After that, a reinforcing bar 14 is constructed by arranging a necessary amount of reinforcing bars and placing concrete 4 continuously.
(3) Next, at both ends and the middle portion of the top plate portion A 2 , while constructing a retaining wall by driving a lateral sheet pile (not shown) between the adjacent retaining piles 18, 18, The lower ground of the top plate portion A 2 is gradually dug down to the ground improvement portion 15 while the cut beam 17 is bridged between the mountain retaining wall and the intermediate mountain retaining pile 18.
▲ 4 ▼ Next, the bottom plate portion 5 in the drilling bottom and applying a lateral side plate section A 1 in place concrete on the left and right sides. Other methods are substantially the same as the construction method described above.
[0054]
According to this construction method, both the left and right side plate portions A 1 and the bottom plate portion 5 are constructed with cast-in-place concrete, and only the top plate portion A 2 is constructed with a steel concrete composite structure using a steel shell. The steel shells for both the plate and bottom plates are no longer necessary, which can further save on the amount of steel used and the number of shield machines in operation, enabling significant economic construction.
[0055]
In the first to third embodiments of the present invention, the case of constructing a tunnel with a large cross section has been described. However, the present invention is not limited to the construction of this type of tunnel, and is also applicable to the construction of an underground shopping center of a station building or a basement of a building. Needless to say, this is applicable.
[0056]
【The invention's effect】
The construction method of the underground structure according to the present invention has the above-described configuration, and in particular, the top plate part and the left and right side plate parts of the outer shell part casing are dug in a plurality with a single shield tunnel having a small cross section close to each other. Since this single shield tunnel is joined to each other in the radial direction and the concrete is continuously cast between the single shield tunnel and the single shield tunnel, the outer shell of the steel-concrete composite structure is extremely There is an effect that can be constructed safely and efficiently.
[0057]
In addition, since the bottom slab is constructed with cast-in-place concrete, the steel slab of the bottom slab is no longer necessary, which has the effect of greatly saving the amount of steel used and the number of shield machines in operation, and making economic construction possible.
[0058]
In addition, a support pile or support wall is installed below the top plate part, and the lower ground of the top plate part is dug while supporting the top plate part with this support pile or support wall, so excavation of the outer shell body is also possible. It can be done very safely.
[0059]
Further, a work space having a predetermined depth is formed by excavating the lower ground of the top plate portion, and the support pile and the support wall can be constructed extremely safely in this work space.
[0060]
In addition, a reinforcing beam is provided on the top plate, and the support pile and the upper end of the supporting wall are joined to the reinforcing beam, so that the load can be transmitted from the top plate to the supporting pile and the supporting wall via the reinforcing beam. Is very stable.
[Brief description of the drawings]
1A, 1B and 1C are longitudinal sectional views in a direction perpendicular to the axis of a tunnel constructed in a large section, and FIG. 1D is a longitudinal sectional view in the tunnel axis direction;
FIGS. 2A and 2B are partial perspective views of an outer shell housing of a tunnel.
FIG. 3 is a partial perspective view showing an example of a steel shell.
FIG. 4 is a cross-sectional view showing a process of a construction method.
FIG. 5 is a cross-sectional view showing a process of a construction method.
FIG. 6 is a cross-sectional view showing the steps of the construction method.
FIG. 7 is a cross-sectional view showing the steps of the construction method.
FIG. 8 is a cross-sectional view showing a process of a construction method.
FIG. 9 is a cross-sectional view showing a process of the construction method.
FIG. 10 is a cross-sectional view of a single shield tunnel.
11A is a cross-sectional view of a large-section tunnel, and FIG. 11B is a perspective view thereof.
FIG. 12 is a partial perspective view showing a conventional example of a steel shell.
[Explanation of symbols]
A Outer shell part A 1 Side wall part A 2 Top plate part B Tunnel a Single shield tunnel a 1 Single shield tunnel 1 Steel shell 2 Shear reinforcement 3 Axial reinforcing steel 4 Concrete 5 Bottom plate part 6 Column or wall 7 Main girder 8 Vertical rib 9 Skin plate 10 Joint plate 11 High-strength bolt 12 Backfilling material 13 Axial reinforcing bar 14 Upper reinforcing beam 15 Ground improvement part 16 Support pile or support wall 17 Cut-off 18 Mountain retaining pile

Claims (6)

頂版部と左右側版部と底版部とからなる外殻部躯体と、当該外郭部躯体内に配置された柱または壁とからなる地下構造物の施工方法において、頂版部、底版部および左右側版部を構築する工程と、前記頂版部に上部補強梁を構築する工程と、前記頂版部下に支持杭または支持壁を構築する工程と、当該支持杭または支持壁と前記側版部間に切りばりを架け渡しながら前記頂版部下の地盤を底版部の位置まで掘削する工程と、前記頂版部と底版部間に前記柱または壁を構築する工程とからなり、記頂版部と左右側版部は、複数の単体シールドトンネルを互いに近接させて掘進する工程と、隣接する単体シールドトンネル同士を連通した状態に接合する工程と、互いに連通する単体シールドトンネル内および単体シールド間にコンクリートを打設する工程によって構築し、前記上部補強梁は複数の単体シールドトンネルを互いに近接させて掘進する工程と、当該単体シールドトンネル内および単体シールドトンネル間に補強鉄筋を配筋し、かつコンクリートを打設する工程により構築し、前記底版部は場所打ちコンクリートによって構築し、前記単体シールドトンネルの内周は、トンネルの周方向に延びる複数の主桁を備えた複数の鋼殻とコンクリートからなる鋼殻コンクリートによって覆工することを特徴とする地下構造物の施工方法。In a construction method of an underground structure comprising an outer shell part frame composed of a top plate part, left and right side plate parts, and a bottom plate part, and a column or wall disposed in the outer shell part, the top plate part, the bottom plate part, and A step of constructing a left-right plate portion, a step of constructing an upper reinforcing beam in the top plate portion, a step of constructing a support pile or a support wall under the top plate portion, the support pile or the support wall and the side plate a step of excavating the ground of the top plate subordinates while bridging the cut burr between parts to the position of the bottom plate portion, consists of a process for constructing the pillar or wall between said top plate and bottom plate section, front Kiitadaki The plate portion and the left and right side plate portions are a step of digging a plurality of single shield tunnels close to each other, a step of joining adjacent single shield tunnels in a connected state, a single shield tunnel and a single shield in communication with each other. Hitting concrete in between The upper reinforcing beam is constructed by digging a plurality of single shield tunnels close to each other, arranging reinforcing reinforcing bars in the single shield tunnel and between the single shield tunnels, and placing concrete. Constructed by a process, the bottom slab is constructed by cast-in-place concrete, and the inner circumference of the single shield tunnel is made of steel shell concrete comprising a plurality of steel shells and concrete having a plurality of main girders extending in the circumferential direction of the tunnel. An underground construction method characterized by lining. 頂版部と左右側版部と底版部とからなる外殻部躯体と、当該外郭部躯体内に配置された柱または壁とからなる地下構造物の施工方法において、頂版部、底版部および左右側版部を構築する工程と、前記頂版部に上部補強梁を構築する工程と、前記頂版部下の両側に山留壁を、中間部に山留め杭をそれぞれ構築する工程と、前記山留壁と山留杭間に切ばりを架け渡しながら頂版部下の地盤を底版部の位置まで掘り下げる工程とからなり、最初に頂版部、次に山留壁と山留杭、次に左右側版部と底版部の順にそれぞれ構築し、前記頂版部は複数の単体シールドトンネルを互いに近接させて掘進する工程と、隣接する単体シールドトンネル同士を連通した状態に接合する工程と、互いに連通する単体シールドトンネル内および単体シールドトンネル間にコンクリートを打設する工程によって構築し、前記上部補強梁は複数の単体シールドトンネルを互いに近接させて掘進する工程と、当該単体シールドトンネル内および単体シールドトンネル間に補強鉄筋を配筋し、かつコンクリートを打設する工程により構築し、前記左右側版部および底版部は場所打ちコンクリートによって構築し、前記単体シールドトンネルの内周は、トンネルの周方向に延びる複数の主桁を備えた複数の鋼殻とコンクリートからなる鋼殻コンクリートによって覆工することを特徴とする地下構造物の施工方法。  In a construction method of an underground structure including an outer shell part frame composed of a top plate part, left and right side plate parts, and a bottom plate part, and a column or wall arranged in the outer shell part, the top plate part, the bottom plate part, and A step of constructing a left-right plate portion, a step of constructing an upper reinforcing beam on the top plate portion, a step of constructing mountain retaining walls on both sides under the top plate portion, and a mountain retaining pile in an intermediate portion, and the mountain It consists of the process of digging the ground below the top plate part to the position of the bottom plate part while bridging the wall between the retaining wall and the mountain retaining pile. First, the top plate part, then the mountain retaining wall and the mountain retaining pile, and then left and right The side plate portion and the bottom plate portion are respectively constructed in order, and the top plate portion communicates with a step of digging a plurality of single shield tunnels close to each other, a step of joining adjacent single shield tunnels to each other, and a step of communicating with each other. Single shield tunnel and single shield tunnel The upper reinforcing beam is constructed by digging a plurality of single shield tunnels close to each other, arranging reinforcing reinforcing bars in the single shield tunnel and between the single shield tunnels, and The concrete is constructed by a step of placing concrete, the left and right side plate portions and the bottom plate portion are constructed by cast-in-place concrete, and the inner periphery of the single shield tunnel includes a plurality of main girders extending in the circumferential direction of the tunnel. A method for constructing an underground structure, characterized by covering with steel shell concrete made of steel shell and concrete. コンクリートを打設する前の単体シールドトンネル内で山留め杭を施工することを特徴とする請求項2記載の地下構造物の施工方法。  The construction method of an underground structure according to claim 2, wherein the pile pile is constructed in a single shield tunnel before placing concrete. 頂版部の下側に当該頂版部下の地盤を掘削して作業空間を形成し、当該作業空間において支持杭または支持壁を施工することを特徴とする請求項記載の地下構造物の施工方法。And drilling soil of the top plate subordinates to form a working space below the top plate portion, construction of underground structures according to claim 1, characterized in that the construction of the bearing pile or support walls in the working space Method. 支持杭または支持壁の上端部を補強梁に接合することを特徴とする請求項1または4記載の地下構造物の施工方法。The construction method for an underground structure according to claim 1 or 4 , wherein an upper end portion of the support pile or the support wall is joined to the reinforcing beam. 各単体シールドトンネルの鋼殻間の主桁同士および単体シールドトンネル間の主桁同士は高力ボルト接合によって接合することにより外郭部躯体の周方向に連続させることを特徴とする請求項1〜5のいずれかに記載の地下構造物の施工方法。  The main girders between the steel shells of each single shield tunnel and the main girds between the single shield tunnels are joined in the circumferential direction of the outer shell by joining them by high-strength bolts. The construction method of the underground structure in any one of.
JP16243998A 1998-06-10 1998-06-10 Construction method for underground structures Expired - Fee Related JP3937588B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP16243998A JP3937588B2 (en) 1998-06-10 1998-06-10 Construction method for underground structures

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP16243998A JP3937588B2 (en) 1998-06-10 1998-06-10 Construction method for underground structures

Publications (2)

Publication Number Publication Date
JPH11350897A JPH11350897A (en) 1999-12-21
JP3937588B2 true JP3937588B2 (en) 2007-06-27

Family

ID=15754644

Family Applications (1)

Application Number Title Priority Date Filing Date
JP16243998A Expired - Fee Related JP3937588B2 (en) 1998-06-10 1998-06-10 Construction method for underground structures

Country Status (1)

Country Link
JP (1) JP3937588B2 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101560527B1 (en) * 2015-06-25 2015-10-14 함정아 Construction method for tunneling

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4495424B2 (en) * 2003-08-27 2010-07-07 大成建設株式会社 Segment cutting apparatus and method
JP5597800B2 (en) * 2010-03-25 2014-10-01 大成建設株式会社 Construction method of underground structure
CN102011351A (en) * 2010-11-04 2011-04-13 北京首钢建设集团有限公司 Railway reinforced construction method
CN106284414A (en) * 2015-11-16 2017-01-04 彭高培 Anti-grand supporting construction
CN107100629B (en) * 2017-06-30 2023-11-07 中铁第四勘察设计院集团有限公司 Control method and structure for plastic deformation of soft soil layer lying under shield tunnel
CN113356290B (en) * 2021-06-25 2023-03-10 中铁二院华东勘察设计有限责任公司 Longitudinal wall beam type pile foundation underpinning construction method for underground passage construction

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101560527B1 (en) * 2015-06-25 2015-10-14 함정아 Construction method for tunneling

Also Published As

Publication number Publication date
JPH11350897A (en) 1999-12-21

Similar Documents

Publication Publication Date Title
JP2006322222A (en) Construction method of large-sectional tunnel
JP3937588B2 (en) Construction method for underground structures
JP4183470B2 (en) Underground structure and its construction method
JP4022687B2 (en) Construction method for underground structures
JP5619647B2 (en) Underground structure and construction method of underground structure
JP4083334B2 (en) Underground structure having arch roof and method for constructing the same
JP5875651B2 (en) Underground structure and construction method of underground structure
JP3900684B2 (en) Construction method for underground structures
JPH10227199A (en) Construction method of large sectional tunnel
JP4760548B2 (en) Side-by-side tunnel structure and its construction method
JPH05280296A (en) Large scale underground structure and construction method thereof
JP3900683B2 (en) Construction method of branch / merge part of main line tunnel and rampway
JP6756892B1 (en) Underground skeleton and how to build an underground skeleton
JP7403390B2 (en) Synthetic structure and method of constructing the synthetic structure
JP2571426B2 (en) Construction method of retaining wall
JP3584416B2 (en) Tunnel and its construction method
JP3673508B2 (en) Intermediate shaft construction method and intermediate shaft
JP5679849B2 (en) Underground structure
JP2667350B2 (en) Underground structures and construction methods
JP3646698B2 (en) Construction method for underground structures
JP4500221B2 (en) Construction method of underground structure
JP4665834B2 (en) Side-by-side tunnel structure and its construction method
JP2725972B2 (en) Underground structure construction method and segment piece used therefor
JP4343078B2 (en) Underground structure and method for constructing underground structure
JP2673180B2 (en) Construction method of tubular wall for lining of drilling hole

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20040915

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20060831

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20060912

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20061113

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20061212

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20070122

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20070306

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20070319

R150 Certificate of patent or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100406

Year of fee payment: 3

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130406

Year of fee payment: 6

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20160406

Year of fee payment: 9

LAPS Cancellation because of no payment of annual fees