JPH11243609A - Method and device for controlling travel of train - Google Patents

Method and device for controlling travel of train

Info

Publication number
JPH11243609A
JPH11243609A JP3992998A JP3992998A JPH11243609A JP H11243609 A JPH11243609 A JP H11243609A JP 3992998 A JP3992998 A JP 3992998A JP 3992998 A JP3992998 A JP 3992998A JP H11243609 A JPH11243609 A JP H11243609A
Authority
JP
Japan
Prior art keywords
train
control
speed
running
atc
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP3992998A
Other languages
Japanese (ja)
Other versions
JP3345579B2 (en
Inventor
Osamu Ochiai
統 落合
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Mitsubishi Electric Corp
Original Assignee
Mitsubishi Electric Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Mitsubishi Electric Corp filed Critical Mitsubishi Electric Corp
Priority to JP3992998A priority Critical patent/JP3345579B2/en
Publication of JPH11243609A publication Critical patent/JPH11243609A/en
Application granted granted Critical
Publication of JP3345579B2 publication Critical patent/JP3345579B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Electric Propulsion And Braking For Vehicles (AREA)
  • Train Traffic Observation, Control, And Security (AREA)

Abstract

PROBLEM TO BE SOLVED: To make it possible to control the travel of a following train in such a way that, at the time when the aspect of an ATC signal by a preceding train is restored at a higher position, the following train is able to pass at the maximum speed corresponding to the upper signal just in an equivalent section. SOLUTION: A preceding train 21 predictively calculates the route clearing time of a passing track from its own position and speed after entering a shunting station and informs a following train of the time by a data-transmitting means. Then, the following train controls the travel of the train so as not to disobey a speed limiting signal by the preceding trains 21 in compliance with the predicted route clearing time of the through track transmitted from the preceding train.

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】この発明は、列車の走行制御
方法および装置、特に先行列車の駅待避時に、後続列車
が先行列車による速度制限を回避し、高速走行するため
の列車の走行制御方法および装置に関するものである。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a train running control method and apparatus, and more particularly to a train running control method for a high-speed running of a preceding train, while avoiding a speed limit of the preceding train when the preceding train is evacuating to a station. It concerns the device.

【0002】[0002]

【従来の技術】図9および図10は、例えば特開昭60
−76469号公報に示された従来の列車走行システム
の動作を示す概念図である。図9および図10におい
て、21は次駅で通過列車の待ち合わせをするために待
避する先行列車である。このとき、駅の待避側進路22
が開通している。23は先行列車によるATC信号パタ
ーンであり、先行列車21の在線位置に従って階段状に
信号が上がっている。24は後続列車であり、25は後
続列車24の走行軌跡である。
2. Description of the Related Art FIG. 9 and FIG.
FIG. 7 is a conceptual diagram showing an operation of a conventional train traveling system disclosed in Japanese Patent No. 76469/76. In FIGS. 9 and 10, reference numeral 21 denotes a preceding train evacuated to wait for a passing train at the next station. At this time, the station's evacuation route 22
Is open. Reference numeral 23 denotes an ATC signal pattern by the preceding train, and the signal rises in a stepwise manner according to the location of the preceding train 21. Reference numeral 24 denotes a following train, and reference numeral 25 denotes a traveling locus of the following train 24.

【0003】次に動作を説明する。図9は、先行列車2
1がやがて次到着駅に停止し、後続列車24の通過待ち
を行う予定の場合を示している。先行列車21は待避側
進路開通22によって待避側に進入して行く。先行列車
21によるATC信号パターン23は、先行列車21の
在線位置に従って定められ、後方に向かって階段状にア
ップしていく形になる。図9においては、後続列車24
は最高速度で走行しており、まだ先行列車21による速
度制限を受けていない位置にある。ここで、先行列車2
1が駅で通過待避する場合、分岐区間を完全に抜けた段
階で進路が通過側に切り替わり、ATC信号パターン2
3は一挙に上位のATC信号段に変化する。通常であれ
ば、後続列車24は先行列車21によるATC信号に影
響を受けることなく本線側が上位に変化した後にこの駅
区間を通過することになる。
Next, the operation will be described. FIG. 9 shows the preceding train 2
1 shows a case where the vehicle 1 will soon stop at the next arrival station and wait for the following train 24 to pass. The preceding train 21 enters the evacuation side by the evacuation side path opening 22. The ATC signal pattern 23 of the preceding train 21 is determined in accordance with the location of the preceding train 21, and takes the form of stepping up toward the rear. In FIG. 9, the following train 24
Is traveling at the maximum speed, and is at a position where the speed limitation by the preceding train 21 has not yet been performed. Here, the preceding train 2
When the vehicle 1 evacuates at the station, the course is switched to the passing side when the vehicle completely passes through the branch section, and the ATC signal pattern 2
3 changes at once to the upper ATC signal stage. Normally, the succeeding train 24 passes through this station section after the main line changes to a higher rank without being affected by the ATC signal from the preceding train 21.

【0004】ところが、図10に示す様に、先行列車2
1に何等かの影響で遅延が発生した場合、あるいは後続
列車24が早着し過ぎた場合に、後続列車24は先行列
車21に接近することになり、やがて先行列車21によ
るATC信号23の下位現示パターンにかかり、ATC
ブレーキが動作することになる。これによって接近すれ
ばするほど減速してしまうことが分かる。25は後続列
車24の走行軌跡を示す。次に、先行列車21が駅の退
避線側に完全に収納されると、本線側の進路は通過側に
切り替わり、これに伴い通過側のATC信号も先行列車
の影響がなくなるため、一挙に最高現示側に切り替わ
る。ところが、後続列車24はATC信号現示アップに
より加速を開始するが、既に減速してしまっているた
め、最高速度に達するのに時間がかかり、結果として走
行時間が余分にかかることになる。
[0004] However, as shown in FIG.
1, if a delay occurs due to some influence, or if the subsequent train 24 arrives too early, the subsequent train 24 will approach the preceding train 21 and eventually the lower order of the ATC signal 23 by the preceding train 21. According to the present pattern, ATC
The brake will operate. This shows that the closer the vehicle approaches, the more the vehicle decelerates. Reference numeral 25 denotes a running locus of the following train 24. Next, when the preceding train 21 is completely housed on the evacuation line side of the station, the route on the main line side is switched to the passing side, and the ATC signal on the passing side is no longer affected by the preceding train. The display switches to the present side. However, the subsequent train 24 starts accelerating upon the ATC signal being displayed, but since it has already been decelerated, it takes time to reach the maximum speed, and as a result, extra running time is required.

【0005】[0005]

【発明が解決しようとする課題】従来の列車の走行制御
システムでは、ATC装置で以上の動作が行われ、一旦
減速した後再加速するために走行時間が余計にかかると
いった問題点があった。
In the conventional running control system for a train, there has been a problem that the above operation is performed by the ATC device, and the running time is extra since the vehicle is once decelerated and then re-accelerated.

【0006】この発明は上記のような問題点を解消する
ためになされたもので、先行列車によるATC信号の現
示が上位に変化する時刻を予測演算し、その時刻に該当
区間に上位信号の最高速度で進入できるように後続列車
の走行を制御するようにした列車の走行制御方法および
装置を提供するものである。
SUMMARY OF THE INVENTION The present invention has been made to solve the above problems, and predicts and calculates the time at which the ATC signal present by the preceding train changes to a higher order. It is an object of the present invention to provide a train traveling control method and apparatus which controls traveling of a following train so that the train can enter at a maximum speed.

【0007】[0007]

【課題を解決するための手段】この発明に係る列車の走
行制御方法は、先行列車は、自列車の位置と速度から、
待避駅進入後における通過側進路の開通時刻を予測演算
し、データ伝送手段を用いて後続列車にその時刻を通知
し、後続列車は先行列車から伝送されてきた通過側進路
の開通予測時刻に合わせて先行列車による速度制限信号
に抵触しないように列車の走行を制御するようにしたも
のである。
According to the present invention, there is provided a method for controlling the running of a train, wherein the preceding train uses the position and speed of its own train.
Predicts the opening time of the passing route after entering the evacuation station, notifies the subsequent train using data transmission means, and adjusts the following train to the predicted opening time of the passing route transmitted from the preceding train. Thus, the running of the train is controlled so as not to conflict with the speed limit signal from the preceding train.

【0008】また、上記方法において、先行列車の待避
駅進入後における通過側進路の開通予測時刻は、先行列
車が自列車の現在速度と現在位置を基準に、駅待避側進
路区間の完全収納に至る走行軌跡を、予測される駅停止
に至るATC信号パターンの減速度に従って減速してい
くものとして演算し、その間の走行時間を求め、この時
間と予測される駅待避側進路区間への完全収納の結果、
通過側進路が開通し、後続列車に対するATC制限速度
信号パターンがアップするまでの時間を加算して求める
ようにしたものである。
In the above method, the predicted opening time of the passage on the passing side after the preceding train enters the evacuation station is determined by the preceding train based on the current speed and the current position of the own train. The running trajectory is calculated as decelerating in accordance with the predicted deceleration of the ATC signal pattern leading to the stop of the station, and the running time during that time is obtained. As a result,
The time required until the ATC speed limit signal pattern for the subsequent train is increased after the passage on the passing side is opened is calculated.

【0009】また、先行列車からの速度制限信号に抵触
しないような後続列車の走行制御は、惰行制御により列
車を減速させた後、力行制御によって通過側進路の開通
予測時刻に通過側の制限速度が解除される地点を開通後
の最高速度で通過させるように、惰行制御開始地点を選
択することにより行うようにしたものである。
In the running control of a succeeding train that does not conflict with the speed limit signal from the preceding train, the train is decelerated by coasting control, and then the speed limit of the passing side is set at the predicted opening time of the passing side course by power running control. Is selected by selecting the coasting control start point so as to pass through the point where is canceled at the maximum speed after opening.

【0010】また、先行列車からの速度制限信号に抵触
しないような後続列車の走行制御は、減速制御により列
車を減速させた後、力行制御によって通過側進路の開通
予測時刻に通過側の制限速度が解除される地点を開通後
の最高速度で通過させるように、減速制御による減速指
令を選択することにより行うようにしたものである。
In the running control of a succeeding train that does not conflict with the speed limit signal from the preceding train, the train is decelerated by deceleration control, and then the speed limit of the passing side is predicted by the powering control at the predicted opening time of the passing side course. Is performed by selecting a deceleration command by the deceleration control so that the vehicle passes through the point where is canceled at the maximum speed after opening.

【0011】また、先行列車からの速度制限信号に抵触
しないような後続列車の走行制御は、減速制御により列
車を減速させた後、力行制御によって通過側進路の開通
予測時刻に通過側の制限速度が解除される地点を開通後
の最高速度で通過させるように、力行制御による力行指
令を選択することにより行うようにしたものである。
In the running control of a succeeding train that does not conflict with the speed limit signal from the preceding train, the train is decelerated by deceleration control, and then the speed limit of the passing side is set at the predicted opening time of the passage side by powering control. Is performed by selecting a powering command by powering control so as to pass through the point where is canceled at the maximum speed after opening.

【0012】また、先行列車からの速度制限信号に抵触
しないような後続列車の走行制御は、惰行制御により列
車を減速させた後、力行制御によって通過側進路の開通
予測時刻に通過側の制限速度が解除される地点を開通後
の最高速度で通過させるように、惰行制御開始地点を運
転士に通知することにより行うようにしたものである。
In the running control of the succeeding train which does not conflict with the speed limit signal from the preceding train, the train is decelerated by the coasting control, and then the speed limit of the passing side is set at the predicted opening time of the passing side course by the powering control. The coasting control start point is notified to the driver so as to pass through the point at which the is canceled at the maximum speed after opening.

【0013】また、先行列車からの速度制限信号に抵触
しないような後続列車の走行制御は、減速制御により列
車を減速させた後、力行制御によって通過側進路の開通
予測時刻に通過側の制限速度が解除される地点を開通後
の最高速度で通過させるように、減速制御による減速指
令を運転士に通知することにより行うようにしたもので
ある。
The running control of the succeeding train that does not conflict with the speed limit signal from the preceding train is performed by decelerating the train by deceleration control and then controlling the passing speed limit by the powering control at the predicted opening time of the passage on the passing side. Is notified by notifying the driver of a deceleration command by deceleration control so as to pass at the maximum speed after the opening of the vehicle where the vehicle is released.

【0014】また、先行列車からの速度制限信号に抵触
しないような後続列車の走行制御は、減速制御により列
車を減速させた後、力行制御によって通過側進路の開通
予測時刻に通過側の制限速度が解除される地点を開通後
の最高速度で通過させるように、力行制御による力行指
令を運転士に通知することにより行うようにしたもので
ある。
The running control of the succeeding train that does not conflict with the speed limit signal from the preceding train is performed by decelerating the train by deceleration control and then controlling the passing speed limit by the powering control at the predicted opening time of the passing side course. The driver is notified of a powering command by powering control so as to pass at the maximum speed after opening the vehicle at the point where is canceled.

【0015】また、この発明に係る列車の走行制御装置
は、列車に搭載されたATC受信装置、ATC制御装
置、推進制御装置、ブレーキ制御装置、走行制御装置、
データ伝送装置、および速度検出装置を備え、ATC制
御装置は、ATC受信装置で受信したATC信号により
ブレーキ制御装置にATCブレーキ指令を出してATC
制御を行い、走行制御装置によってATC受信装置から
得られるATC信号と、速度検出装置から得られる速度
信号と、データ伝送装置から得られる先行列車から伝送
されてきた通過側進路の開通予測時刻データとから、先
行列車による速度制限信号に抵触しないような力行指
令、ブレーキ指令、惰行指令を演算により求め、この演
算結果により推進制御装置およびブレーキ制御装置を制
御するようにしたものである。
[0015] The train traveling control device according to the present invention includes an ATC receiving device, an ATC control device, a propulsion control device, a brake control device, a traveling control device mounted on the train.
The ATC control device includes a data transmission device and a speed detection device. The ATC control device issues an ATC brake command to the brake control device based on the ATC signal received by the ATC reception device, and outputs the ATC brake command.
Control, the ATC signal obtained from the ATC receiving device by the traveling control device, the speed signal obtained from the speed detecting device, the predicted opening time of the passage on the passing side transmitted from the preceding train obtained from the data transmitting device, and Thus, a powering command, a brake command, and a coasting command that do not conflict with the speed limit signal of the preceding train are obtained by calculation, and the propulsion control device and the brake control device are controlled based on the calculation results.

【0016】また、上記構成において、表示操作器およ
び手動操作器を備え、走行制御装置は、ATC受信装置
から得られるATC信号と、速度検出装置から得られる
速度信号と、データ伝送装置から得られる先行列車から
伝送されてきた通過側進路の開通予測時刻データとか
ら、先行列車による速度制限信号に抵触しないような力
行指令、ブレーキ指令、惰行指令を演算により求め、こ
の演算結果を表示操作器に表示して、列車の運転士に、
手動操作器り推進制御装置およびブレーキ制御装置の動
作を促すようにしたものである。
[0016] In the above configuration, the vehicle further includes a display operation device and a manual operation device, and the travel control device obtains an ATC signal obtained from the ATC reception device, a speed signal obtained from the speed detection device, and a data transmission device. From the predicted opening time data of the passage on the passing side transmitted from the preceding train, a powering command, a brake command, and a coasting command that do not conflict with the speed limit signal by the preceding train are calculated, and the calculation result is displayed on the display controller. And show it to the train driver,
The operation of the manually operated propulsion control device and the operation of the brake control device are promoted.

【0017】[0017]

【発明の実施の形態】従来の方式に対し、後続列車が先
行列車に必要以上に接近せずに、現示アップ時に最高速
度を維持したまま駅を通過できれば、結果として走行時
間を短縮することができ、先行列車による遅れの影響を
減少させることができることになる。以下の実施の形態
では、通過側信号現示アップ時にアップ直前で最初にA
TC下位現示となる地点を最高速度のまま通過するよう
に列車の走行を制御する方法について述べる。
DESCRIPTION OF THE PREFERRED EMBODIMENTS In contrast to the conventional method, if the succeeding train can pass through the station without excessively approaching the preceding train and maintaining the maximum speed at the time of presenting up, the running time can be reduced as a result. Therefore, the effect of the delay caused by the preceding train can be reduced. In the following embodiment, when passing-side signal display is up, A
A method for controlling the running of the train so as to pass the TC lower indication point at the maximum speed will be described.

【0018】実施の形態1.以下この発明の実施の形態
1を図について説明する。図1において、1はATC信
号を流す軌道回路、2は軌道回路からのATC信号を受
ける受電器、3はATC信号を受信復調するATC受信
装置、4はATC受信装置3からのATC信号に従って
ATCブレーキ指令を出すATC制御装置、5はATC
制御装置4からのブレーキ指令に基づき列車のブレーキ
を制御するブレーキ制御装置である。6はLCXケーブ
ル、7はLCXケーブル6と結合するLCXアンテナ、
8はデータ伝送装置、9は走行制御装置、10は速度発
電機、11は推進制御装置、12は地上側のデータ伝送
装置である。
Embodiment 1 Hereinafter, a first embodiment of the present invention will be described with reference to the drawings. In FIG. 1, reference numeral 1 denotes a track circuit for flowing an ATC signal, 2 denotes a power receiver for receiving an ATC signal from the track circuit, 3 denotes an ATC receiving apparatus for receiving and demodulating an ATC signal, and 4 denotes an ATC signal according to an ATC signal from the ATC receiving apparatus 3. ATC control device that issues brake command, 5 is ATC
This is a brake control device that controls the brake of the train based on a brake command from the control device 4. 6 is an LCX cable, 7 is an LCX antenna coupled to the LCX cable 6,
8 is a data transmission device, 9 is a travel control device, 10 is a speed generator, 11 is a propulsion control device, and 12 is a ground-side data transmission device.

【0019】最初に、先行列車による通過側のATC信
号がアップする時刻の予測方法について述べる。先行列
車が駅で待避のために停車する場合、図2に示すよう
に、先行列車の駅到着予測位置21Aを起点に階段状に
ATC信号パターン23が設定される。このパターン2
3は駅毎に定まっており、事前に知ることができる。先
行列車の走行制御装置9はマイクロコンピュータを用い
た装置であり、このATC信号パターン23をデータと
して内蔵しておくことができる。先行列車の走行制御装
置9は速度発電機10とATC受信装置3からの信号に
より、自列車の速度と位置を検出することができる。す
なわち、自列車の位置の検出は、ATC受信装置3から
のATC信号セクション切替え信号で位置補正し、速度
の検出は速度発電機10からの速度信号を積算すること
で得られる。
First, a method of predicting the time at which the ATC signal on the passing side of the preceding train will rise will be described. When the preceding train stops at the station for evacuation, as shown in FIG. 2, the ATC signal pattern 23 is set in a stepwise manner starting from the station arrival predicted position 21A of the preceding train. This pattern 2
3 is fixed for each station and can be known in advance. The traveling control device 9 of the preceding train is a device using a microcomputer, and can store the ATC signal pattern 23 as data. The traveling control device 9 of the preceding train can detect the speed and position of the own train based on signals from the speed generator 10 and the ATC receiving device 3. That is, the detection of the position of the own train is performed by correcting the position using the ATC signal section switching signal from the ATC receiving device 3, and the detection of the speed is obtained by integrating the speed signals from the speed generator 10.

【0020】先行列車の現在位置21Bから現在速度で
最初のATC下位信号に抵触するまで走行すると仮定す
ると、この間の走行時間T1は、現在位置から最初のA
TC下位信号に抵触するまでの距離をD1、現在速度を
V1とすれば、 T1=K1×D1/V1 K1は定数 となる。
Assuming that the vehicle travels from the current position 21B of the preceding train at the current speed until the first ATC lower signal is violated, the travel time T1 during this time is equal to the first ATC from the current position.
Assuming that the distance until contact with the TC lower signal is D1 and the current speed is V1, T1 = K1 × D1 / V1 K1 is a constant.

【0021】次に、下位のATC信号区間に進入すると
ATCブレーキが動作する。ATCブレーキは、例えば
常用最大ブレーキなど予め定められたブレーキ指令であ
るため、ATCブレーキによる列車の減速度はその区間
の等価勾配から予測することができる。これは、ブレー
キによる減速度と等価勾配による減速度と列車速度によ
る走行抵抗による減速度の和となるため、全て既定値と
して容易に求めることができる。
Next, when the vehicle enters the lower ATC signal section, the ATC brake operates. Since the ATC brake is a predetermined brake command such as a regular maximum brake, the deceleration of the train due to the ATC brake can be predicted from the equivalent gradient of the section. Since this is the sum of the deceleration due to the brake, the deceleration due to the equivalent gradient, and the deceleration due to the running resistance due to the train speed, all can be easily obtained as default values.

【0022】列車の減速度をαT、ATCブレーキによ
る減速度をαB、等価勾配による減速度をαG、列車速
度による走行抵抗による減速度をαRとすれば、 αT=αB+αG+αR となる。これらの値は列車速度と走行区間が分かれば一
意に定まるものである。該当区間の距離をD2、この区
間の列車進入速度をV2、列車進出速度をV3、とすれ
ばこれらの関係は V22 −V32 =7.2×αT×D2 となり、走行時間T2は、 T2=K2×(V2−V3)/αT K2は定数 となる。やがてATCブレーキによって制限速度以下に
なるとATCブレーキは自動緩解する。この後、列車は
ATC制限速度の一定下(例えば5Km/h)の速度か
ら惰行で走行するものとすれば、やはり同様に列車の走
行軌跡を予測演算することができる。さらに、同様に列
車は次の下位のATC制限速度区間に進入するとATC
ブレーキが動作するため、同様に走行時間を演算するこ
とができる。なお、図2において、26は先行列車の走
行軌跡、27は先行列車の走行予測軌跡である。
If the deceleration of the train is αT, the deceleration by the ATC brake is αB, the deceleration by the equivalent gradient is αG, and the deceleration by the running resistance by the train speed is αR, then αT = αB + αG + αR. These values are uniquely determined if the train speed and the running section are known. Assuming that the distance of the section is D2, the train entry speed in this section is V2, and the train exit speed is V3, these relationships are V2 2 −V3 2 = 7.2 × αT × D2, and the travel time T2 is T2 = K2 × (V2−V3) / αT K2 is a constant. Eventually, when the speed becomes lower than the speed limit due to the ATC brake, the ATC brake automatically releases. Thereafter, if it is assumed that the train runs by coasting at a speed below the ATC speed limit (for example, 5 km / h), the running locus of the train can be similarly predicted and calculated. Similarly, when the train enters the next lower ATC speed limit section, the ATC
Since the brake operates, the travel time can be calculated in the same manner. In FIG. 2, reference numeral 26 denotes a traveling locus of the preceding train, and 27 denotes a predicted traveling locus of the preceding train.

【0023】以上の演算を繰り返し、列車の最後尾が通
過側進路開通条件32を満たす運動区間を抜ける位置ま
で走行するまでの走行時間を演算する。この演算によっ
て、通過側進路開通のための条件が整うまでの時間が分
かることになる。この通過側進路開通のための条件が整
ってから、実際にポイントが転換し通過側進路が開通し
て通過側のATC信号が上位にアップするまでの時間
は、ATC信号システムの応答時間によって定まるある
一定値である。この一定値を加算することによって通過
側進路がアップする時刻を予測することができることに
なる。以上の演算により、先行列車が駅待避した後、通
過側進路のATC信号がアップする時刻(以下通過側ア
ップ時刻と呼ぶ)を予測することができる。
The above calculation is repeated to calculate the travel time until the tail of the train travels to the position where it passes through the movement section satisfying the passage-side track opening condition 32. By this calculation, it is possible to know the time until the conditions for opening the passage-side route are satisfied. The time from when the conditions for opening the passing-side route are established to when the point is actually changed, the passing-side route is opened, and the ATC signal on the passing side rises to the upper position is determined by the response time of the ATC signal system. It is a certain value. By adding this constant value, it is possible to predict the time at which the passing-side course goes up. With the above calculation, it is possible to predict the time at which the ATC signal on the passing side course goes up (hereinafter, referred to as passing side up time) after the preceding train has evacuated to the station.

【0024】先行列車で演算された通過側アップ時刻を
後続列車に伝送し、後続列車ではこのデータに基づき走
行制御を行う。ここで、先行列車から通過側アップ時刻
を後続列車に伝送する方法について述べる。この通過側
アップ時刻を後続列車に対してデータ伝送するための地
上と車上の走行制御装置間のデータ伝送手段としては、
図1に示すように、例えば新幹線等で使用されているL
CXアンテナ7およびLCXケーブル6を用いたデータ
伝送回線を使うことができる。先行列車21は、到着予
定駅と通過側アップ時刻をデータとして、例えばLCX
ケーブル6によるデータ伝送路を用いて地上側に伝送す
る。地上のデータ伝送装置12は該当する後続列車24
が在線する区間に対してこのデータを伝送する。後続列
車24はこのデータを受け取り自列車の走行制御を開始
する。後続列車24では、先行列車21により最初にA
TC信号が下位に変化する地点を、通過側アップ時刻に
最高速度のまま通過できるように走行制御を行う。この
先行列車により最初にATC信号が下位に変化する地点
を第1アップ地点35と呼ぶ。図3はATC信号と第1
アップ地点35との関係を示す図であり、34は通過側
進路開通語におけるATC信号パターンである。
The passing-side up time calculated by the preceding train is transmitted to the succeeding train, and the following train performs travel control based on this data. Here, a method of transmitting the passing-side up time from the preceding train to the succeeding train will be described. As the data transmission means between the ground and the on-vehicle travel control device for data transmission of this passing side up time to the subsequent train,
As shown in FIG. 1, for example, the L
A data transmission line using the CX antenna 7 and the LCX cable 6 can be used. The preceding train 21 uses, for example, the LCX
The data is transmitted to the ground side using the data transmission path by the cable 6. The data transmission device 12 on the ground is connected to the following train 24
This data is transmitted to the section where is located. The subsequent train 24 receives this data and starts running control of the own train. In the succeeding train 24, A
The travel control is performed so that the vehicle can pass through the point where the TC signal changes to the lower order with the maximum speed at the passing side up time. A point where the ATC signal first changes to a lower order due to the preceding train is referred to as a first up point 35. FIG. 3 shows the ATC signal and the first
It is a figure which shows the relationship with the up point 35, 34 is an ATC signal pattern in the passage side opening-path word.

【0025】以下、通過側アップ時刻に基づく列車の走
行制御について図3を参照して説明する。最初に、後続
列車24は現在の最高速度でそのまま走行した場合に、
第1アップ地点35を通過する予定の時刻を演算する。
この第1アップ地点通過予定時刻と通過側アップ時刻を
比較し、第1アップ地点通過予定時刻が通過側アップ時
刻よりも後であれば、そのまま最高速度による走行を続
ける。すなわち、この場合は最高速度のまま走行しても
第1アップ地点35の通過予定時刻には、第1アップ地
点以降のATC信号が既にアップし終わっており、その
まま最高速度による運行に支障がないことを示している
からである。通常、ダイヤ通り運行していればこの状態
となる。
Hereinafter, the running control of the train based on the passing side up time will be described with reference to FIG. First, if the subsequent train 24 runs at the current maximum speed,
The time at which the vehicle is to pass through the first up point 35 is calculated.
The scheduled time of passing the first up point is compared with the time of passing-side up. If the time of scheduled passing of the first up-point is later than the time of passing-side up, traveling at the maximum speed is continued. That is, in this case, even if the vehicle travels at the maximum speed, the ATC signal after the first up point has already been raised at the scheduled passage time of the first up point 35, and there is no obstacle to the operation at the maximum speed. This is because it indicates that. Normally, this is the case if the train runs on a diamond.

【0026】逆に第1アップ地点通過予定時刻が通過側
アップ時刻よりも前であれば、後続列車を減速し、第1
アップ地点通過時刻が通過側アップ時刻の直後になるよ
うに、以下に述べる走行制御を行う。すなわち、先行列
車21が何等かの影響により遅延したような場合は、後
続列車24がそのまま最高速度で走行を続ければ、通過
側信号が下位に落ちているままで該当区間に進入してし
まい、ATCブレーキの動作が避けられないことを示し
ている。従って以下に述べる制御方法によってこの事態
を避ける必要がある。
Conversely, if the scheduled time of passing through the first up point is earlier than the passing side up time, the following train is decelerated and the first train is decelerated.
The traveling control described below is performed so that the up point passage time is immediately after the passage side up time. That is, in the case where the preceding train 21 is delayed due to some influence, if the succeeding train 24 continues to run at the maximum speed as it is, the vehicle enters the corresponding section with the passing signal falling to the lower level, This indicates that the operation of the ATC brake cannot be avoided. Therefore, it is necessary to avoid this situation by the control method described below.

【0027】この走行制御方法について述べる。一般
に、図4に示すように、速度・距離座標(縦軸を速度、
機軸を距離とする)において、第1アップ地点35で最
高速度となるような最大力行加速ノッチによる走行軌跡
の曲線33を描く。この曲線33は勾配、曲線等の路線
状況と車両の力行特性により一意に定まるため、その都
度演算するのではなく、予め演算し、その結果をデータ
として持っておくことができる。この演算は第1アップ
地点35で、最高速度となる点から逆算してくることに
より求める。演算単位としては等価勾配(G)区間毎と
するのが現実的である。このときの列車の加減速度の算
出は、列車の走行抵抗として制御開始時あるいはその区
間の平均速度となる列車速度を用い、勾配および曲線に
よるものは等価勾配による加減速度値を用いる。また、
等価勾配が極端に長い間一定である場合は一定区間毎に
分割して計算することもある。さらに、トンネルの内外
では走行抵抗が異なるため、ある程度以上長いトンネル
では区間を区切ることも考えられる。列車の加減速度
は、最大力行ノッチによる加減速度と、等価勾配による
加減速度と、列車の走行抵抗による加減速度の和によっ
て求める。以上の方法で第1アップ地点35に最高速度
で到達する曲線を描くと図4のようになる。
This driving control method will be described. Generally, as shown in FIG. 4, speed / distance coordinates (vertical axis represents speed,
In this case, a curve 33 of a running trajectory with a maximum powering acceleration notch at which the maximum speed is reached at the first up point 35 is drawn. Since the curve 33 is uniquely determined by the road conditions such as the slope and the curve and the powering characteristics of the vehicle, the curve 33 is not calculated every time, but is calculated in advance, and the result can be stored as data. This calculation is obtained by calculating backward from the point at which the maximum speed is reached at the first up point 35. It is realistic to use a unit of operation for each equivalent gradient (G) section. In calculating the acceleration / deceleration of the train at this time, the train speed at the start of control or the average speed in the section is used as the running resistance of the train. Also,
If the equivalent gradient is constant for an extremely long time, the calculation may be performed by dividing the equivalent gradient into fixed intervals. Furthermore, since the running resistance is different inside and outside the tunnel, it is conceivable to separate sections in a tunnel longer than a certain length. The acceleration / deceleration of the train is determined by the sum of the acceleration / deceleration by the maximum power running notch, the acceleration / deceleration by the equivalent gradient, and the acceleration / deceleration by the running resistance of the train. FIG. 4 shows a curve that reaches the first up point 35 at the maximum speed by the above method.

【0028】列車位置と列車速度を表す式は次のように
なる。列車の加速度をαT、最大力行ノッチによる加速
度をαP、等価勾配による減速度をαG、列車速度によ
る走行抵抗による減速度をαRとすれば、 αT=αP+αG+αR となる。これらの値は列車速度と走行区間が分かれば一
意に定まるものである。該当区間の距離をD3、この区
間の進入速度をV4、進出速度をV5、とすればこれら
の関係は V42 −V52 =7.2×αT×D3 となり、走行時間T3は、 T3=K2×(V4−V5)/αT K2は定数 となる。この演算を等価勾配区間毎に行っていくことで
連続した走行曲線を描くことができる。
The equations representing the train position and the train speed are as follows. If the acceleration of the train is αT, the acceleration due to the maximum power running notch is αP, the deceleration due to the equivalent gradient is αG, and the deceleration due to the running resistance due to the train speed is αR, αT = αP + αG + αR. These values are uniquely determined if the train speed and the running section are known. Assuming that the distance of the section is D3, the approach speed of this section is V4, and the approach speed is V5, the relationship becomes V4 2 −V5 2 = 7.2 × αT × D3, and the travel time T3 is T3 = K2 × (V4-V5) / αTK2 is a constant. By performing this calculation for each equivalent gradient section, a continuous running curve can be drawn.

【0029】次に、本演算終了時点(例えば本演算に1
秒間を要する場合は1秒後)での列車走行予測位置から
惰行制御を行った場合に描くと予測される走行軌跡の曲
線を演算する。これは、実際に惰行制御を実施できるの
が演算終了後となるためである。惰行制御とは力行ノッ
チとブレーキノッチを共にオフして走行することを指
す。従って、惰行制御中は列車は等価勾配による加減速
度と走行抵抗による減速度によって走行する。この曲線
は列車走行予測地点をその地点通過時の速度で走行開始
するものとして演算を開始する。
Next, at the end of the main operation (for example, 1
A curve of a traveling locus predicted to be drawn when coasting control is performed from a train traveling predicted position at a time (one second after a second if required) is calculated. This is because the coasting control can be actually performed after the calculation is completed. Coasting control refers to running with both the powering notch and the brake notch off. Therefore, during the coasting control, the train travels with the acceleration / deceleration due to the equivalent gradient and the deceleration due to the running resistance. This curve starts calculation assuming that the train travel prediction point starts traveling at the speed at the time of passing the point.

【0030】列車位置と列車速度を表す式は次のように
なる。列車の加速度をαT、等価勾配による減速度をα
G、列車速度による走行抵抗による減速度をαRとすれ
ば、 αT=αG+αR となる。これらの値は列車速度と走行区間が分かれば一
意に定まるものである。該当区間の距離をD4、この区
間の列車進入速度をV6、列車進出速度をV7、とすれ
ばこれらの関係は V62 −V72 =7.2×αT×D4 となり、走行時間T4は、 T4=K2×(V6−V7)/αT K2は定数 となる。
The equations representing the train position and the train speed are as follows. The acceleration of the train is αT, and the deceleration due to the equivalent gradient is α
G, if the deceleration due to the running resistance due to the train speed is αR, then αT = αG + αR. These values are uniquely determined if the train speed and the running section are known. The distance of the corresponding section D4, the train approach speed of this leg V6, a train advancing speed V7, Tosureba these relationships V6 2 -V7 2 = 7.2 × αT × D4 , and the travel time T4 is, T4 = K2 × (V6-V7) / αT K2 is a constant.

【0031】図5は惰行制御開始地点による走行時間制
御の様子を示す図で、図5に示すように、この惰行制御
による曲線を描いていき、この曲線と第1アップ地点3
5において最高速度となる最大力行加速ノッチによる走
行軌跡の曲線との交点a1、a2、a3、a4を求め
る。この交点までを惰行制御で走行し、交点からは最大
力行ノッチにて走行した場合の走行軌跡で走行するもの
と仮定する。このときの走行時間を求める。これは各区
間での路線条件に応じた加減速度にて減速して交点に達
するまでの時間と、交点から第1アップ地点35までの
時間を積算することによって求められる。この走行予測
時間と現在時刻から、惰行制御を行った場合の第1アッ
プ地点35の到着時刻が予測できる。この第1アップ地
点到着予測時刻と通過側アップ時刻を比較し、第1アッ
プ地点到着予測時刻が通過側アップ時刻より後であれ
ば、そのまま最高速度による走行を続ける。すなわち、
まだ惰行制御を開始するには早すぎることを示している
からである。以降この演算を繰り返し、第1アップ地点
到着予測時刻が通過側アップ時刻のnl秒後(例えば1
0秒後)と一致する地点に達するまで最高速度のまま走
行を続ける。そして一致する地点に達した時点で惰行制
御に移行するようにする。
FIG. 5 is a diagram showing a state of the running time control at the start point of the coasting control. As shown in FIG. 5, a curve based on the coasting control is drawn.
At 5, the intersections a1, a2, a3, and a4 of the curve of the running locus due to the maximum powering acceleration notch at which the maximum speed is reached are determined. It is assumed that the vehicle travels by coasting control up to this intersection, and travels from the intersection on a traveling locus when traveling at the maximum power running notch. The running time at this time is obtained. This is obtained by integrating the time from deceleration at the acceleration / deceleration according to the route condition in each section to the intersection, and the time from the intersection to the first up point 35. From the predicted traveling time and the current time, the arrival time of the first up point 35 when the coasting control is performed can be predicted. The first arrival point arrival time is compared with the passing side up time, and if the first arrival point arrival time is later than the passing side up time, traveling at the maximum speed is continued. That is,
This is because it is too early to start the coasting control. Thereafter, this calculation is repeated so that the first up point arrival predicted time is nl seconds after the passing side up time (for example, 1
(After 0 seconds), continue running at the maximum speed until reaching the point that matches. Then, the control is shifted to the coasting control when reaching the coincident point.

【0032】図5に示すように、惰行制御開始地点P1
乃至P4のいずれかにより平均走行速度が変化するた
め、第1アップ地点35に到達する迄の走行時間も変化
することが分かる。早めに惰行制御を開始すれば平均走
行速度は低下し、走行時間もかかる。惰行制御開始を遅
らせれば平均走行速度は上がり、走行時間も短くなる。
惰行制御開始地点は連続的に変えることができるため、
走行時間も連続的に変えることができることになる。こ
のため、走行時間は一定範囲内の任意の値を得ることが
できることになる。
As shown in FIG. 5, the coasting control start point P1
Since the average traveling speed changes depending on any one of P4 to P4, the traveling time until reaching the first up point 35 also changes. If the coasting control is started earlier, the average traveling speed decreases, and it takes longer traveling time. If the start of the coasting control is delayed, the average traveling speed increases, and the traveling time also decreases.
Since the coasting control start point can be changed continuously,
The running time can also be changed continuously. Therefore, the travel time can have an arbitrary value within a certain range.

【0033】惰行制御開始地点P1乃至P4のいずれか
に到達した後は、惰行制御に移行することになる。惰行
制御の方法を以下に示す。惰行制御に移行すると直ちに
力行ノッチ若しくは制動ノッチをオフし、惰行走行状態
にする。図1において、走行制御装置9から推進制御装
置11への力行指令および、走行制御装置9からブレー
キ制御装置5へのブレーキ指令は共にオフされることに
なる。この惰行走行状態では列車の走行抵抗等により、
徐々に列車速度が低下して行く。やがて、惰行制御から
最大力行加速ノッチによる走行軌跡の曲線との交点a1
乃至a4のいずれかに達すると、最大力行ノッチによる
走行に切り替える。すなわち、走行制御装置9から推進
制御装置11への力行指令を最大力行ノッチに切り替え
る。この地点から最大力行ノッチの指令により列車は加
速して行き、やがて予測通り最高速度に達すると共に第
1アップ地点35に到達することになる。この制御によ
り、予定通りの時刻に、第1アップ地点35を最高速度
のまま通過できることになる。
After arriving at any of the coasting control start points P1 to P4, the process shifts to coasting control. The method of coasting control is shown below. Immediately after the transition to the coasting control, the powering notch or the braking notch is turned off, and the coasting state is set. In FIG. 1, a powering command from the travel control device 9 to the propulsion control device 11 and a brake command from the travel control device 9 to the brake control device 5 are both turned off. In this coasting running state, due to the running resistance of the train, etc.
The train speed gradually decreases. Eventually, the intersection a1 with the curve of the traveling locus due to the maximum powering acceleration notch from the coasting control
When the vehicle reaches any one of a to a4, the vehicle is switched to running with the maximum power running notch. That is, the powering command from the traveling control device 9 to the propulsion control device 11 is switched to the maximum powering notch. From this point, the train accelerates according to the command of the maximum powering notch, and eventually reaches the maximum speed as predicted and reaches the first up point 35. With this control, the vehicle can pass through the first up point 35 at the scheduled time with the maximum speed.

【0034】実施の形態2.上記の例とは逆に、この第
1アップ地点到着予測時刻と通過側アップ時刻を比較し
たとき、第1アップ地点到着予測時刻が通過側アップ時
刻より前であれば、惰行制御では早着となってしまうこ
とを示しており、この場合は減速による制御に移行する
必要がある。以下、減速による制御方法について述べ
る。図6は、本演算終了時点(例えば本演算に1秒間を
要する場合は1秒後)での列車走行位置(減速制御開始
地点Q)から最大減速制御(常用最大ブレーキ指令)を
行った場合の走行軌跡の曲線を示している。列車の加速
度をαT、最大減速ノッチによる加速度をαBX、等価
勾配による減速度をαG、列車速度による走行抵抗によ
る減速度をαRとすれば、列車位置と列車速度を表す式
は次のようになる。 αT=αBX+αG+αR となる。これらの値は列車速度と走行区間が分かれば一
意に定まるものである。該当区間の距離をD5、この区
間の列車の進入速度をV8、列車の進出速度をV9、と
すればこれらの関係は V82 −V92 =7.2×αT×D5 となり、走行時間T5は、 T5=K2×(V8−V9)/αT K2は定数 となる。
Embodiment 2 Contrary to the above example, when this first up point arrival predicted time is compared with the passing side up time, if the first up point arrival predicted time is earlier than the passing side up time, in the coasting control, early arrival is determined. In this case, it is necessary to shift to control by deceleration. Hereinafter, a control method by deceleration will be described. FIG. 6 shows a case where the maximum deceleration control (normal maximum brake command) is performed from the train traveling position (deceleration control start point Q) at the end of the main calculation (for example, one second after the main calculation requires one second). 3 shows a curve of a traveling locus. If the acceleration of the train is αT, the acceleration due to the maximum deceleration notch is αBX, the deceleration due to the equivalent gradient is αG, and the deceleration due to the running resistance due to the train speed is αR, the equations representing the train position and the train speed are as follows: . αT = αBX + αG + αR. These values are uniquely determined if the train speed and the running section are known. Assuming that the distance of the section is D5, the approach speed of the train in this section is V8, and the approach speed of the train is V9, the relationship is V8 2 −V9 2 = 7.2 × αT × D5, and the travel time T5 is , T5 = K2 × (V8−V9) / αT K2 is a constant.

【0035】この曲線と第1アップ地点において最高速
度となる最大力行加速ノッチによる走行軌跡の曲線との
交点b1を求める。この交点までを常用最大減速制御で
走行し、交点からは最大力行ノッチにて走行した場合の
走行軌跡で走行するものと仮定する。このときの走行時
間を求める。これは各区間での路線条件に応じた加減速
度にて減速して交点に達するまでの時間と、交点から第
1アップ地点35までの時間を積算することによって求
めることができる。この走行予測時間と現在時刻から第
1アップ地点35までの走行予測時間から、第1アップ
地点35の到着時刻が予測できる。この第1アップ地点
到着予測時刻と通過側アップ時刻を比較し、第1アップ
地点到着予測時刻が通過側アップ時刻より前であれば、
本制御の制御範囲外とし、例えば惰行制御に移行する。
この第1アップ地点到着予測時刻と通過側アップ時刻を
比較し、第1アップ地点到着予測時刻が通過側アップ時
刻より後であれば、次にブレーキ指令を常用最大ブレー
キの中間のブレーキノッチによる減速を行った場合の第
1アップ地点通過時刻を予測演算する。
The intersection point b1 of this curve and the curve of the running locus due to the maximum powering acceleration notch at the maximum speed at the first up point is determined. It is assumed that the vehicle travels up to this intersection under the normal maximum deceleration control and travels from the intersection on a traveling locus when traveling at the maximum power running notch. The running time at this time is obtained. This can be obtained by integrating the time from deceleration at the acceleration / deceleration according to the route condition in each section to the intersection, and the time from the intersection to the first up point 35. Based on the predicted travel time and the predicted travel time from the current time to the first up point 35, the arrival time of the first up point 35 can be predicted. This first arrival point arrival time is compared with the passing side up time, and if the first arrival point arrival time is earlier than the passing side up time,
The control is out of the control range of the present control, and the process shifts to, for example, coasting control.
This first arrival point arrival time is compared with the passing side up time. If the first arrival point arrival time is later than the passing side up time, the brake command is then decelerated by the middle brake notch of the normal maximum brake. Is calculated by predicting the passing time of the first up point in the case of performing the above.

【0036】本演算終了時点(例えば本演算に1秒間を
要する場合は1秒後)での列車走行位置から中間減速制
御(常用最大との中間のブレーキ指令)を行った場合の
走行軌跡の曲線を描く。この曲線と第1アップ地点35
において最高速度となる力行最大加速ノッチによる走行
軌跡の曲線との交点b4を求める。この交点までを中間
減速制御で走行し、交点b4からは最大力行ノッチにて
走行した場合の走行軌跡で走行するものと仮定する。こ
のときの走行時間を求める。これは各区間での路線条件
に応じた加減速度にて減速して交点に達するまでの時間
と、交点から第1アップ地点35までの時間を積算する
ことによって求められる。この第1アップ地点到着予測
時刻と通過側アップ時刻を比較し、第1アップ地点到着
予測時刻が通過側アップ時刻より前であれば、次に中間
減速ノッチと常用最大ノッチのさらに中間ノッチによる
減速を行った場合の第1地点通過時刻を予測する。ま
た、この第1アップ地点到着予測時刻と通過側アップ時
刻を比較し、第1アップ地点到着予測時刻が通過側アッ
プ時刻より後であれば、次に中間減速ノッチとブレーキ
オフ側のさらに中間ノッチによる減速を行った場合の第
1地点通過時刻を予測する。この演算をブレーキノッチ
の分解能に達するまで繰り返す。以上の演算により第1
アップ地点到着予測時刻が通過側アップ時刻の直後とな
る最も近い減速ノッチを求めることができる。
Curve of the running locus when the intermediate deceleration control (brake command intermediate to the normal maximum) is performed from the train running position at the end of the main operation (for example, one second after the operation requires one second). Draw. This curve and the first up point 35
, An intersection b4 with the curve of the running locus due to the powering maximum acceleration notch at which the maximum speed is reached is determined. It is assumed that the vehicle travels up to this intersection under the intermediate deceleration control, and travels from the intersection b4 on the traveling locus when traveling at the maximum power running notch. The running time at this time is obtained. This is obtained by integrating the time from deceleration at the acceleration / deceleration according to the route condition in each section to the intersection, and the time from the intersection to the first up point 35. This first arrival point arrival time is compared with the passing side up time, and if the first arrival point arrival time is earlier than the passing side up time, then the intermediate deceleration notch and the normal maximum notch are further decelerated by the intermediate notch. Is predicted when the first point is passed. Also, the first arrival point arrival time is compared with the passing side up time, and if the first arrival point arrival time is later than the passing side up time, the intermediate deceleration notch and the further intermediate notch on the brake off side are next. The first point passing time when the vehicle is decelerated is predicted. This calculation is repeated until the resolution of the brake notch is reached. By the above operation, the first
The closest deceleration notch at which the predicted arrival time at the up point is immediately after the up time at the passing side can be obtained.

【0037】この減速ノッチが求められた後、このノッ
チによる減速制御に移行する。減速制御では、指定され
た制動ノッチを指令し、交点に到達するまで列車の減速
を続ける。最大力行ノッチによる走行曲線との交点に達
した後に、最大力行ノッチに切り替えることにより、最
大力行ノッチによる走行曲線に乗せることができ、予測
演算通り所定の時刻に第1アッブ地点に最高速度で到達
することができることになる。
After the deceleration notch is obtained, the flow shifts to deceleration control using the notch. In the deceleration control, a designated braking notch is commanded, and the train is decelerated until the intersection is reached. By switching to the maximum power running notch after reaching the intersection with the running curve due to the maximum power running notch, it is possible to ride on the running curve due to the maximum power running notch, and to reach the 1st Ab point at the maximum speed at a predetermined time according to the prediction calculation Will be able to do that.

【0038】以上のように列車の走行を制御すれば、所
定の時刻に所定の速度で第1アップ地点を通過すること
ができ、先行列車による遅れを効率良く回復することが
できる。
By controlling the running of the train as described above, it is possible to pass through the first up point at a predetermined time at a predetermined speed and efficiently recover the delay caused by the preceding train.

【0039】実施の形態3.さらに、走行時間を延長す
る方法として、図7に示すように、減速制御開始地点R
から最大減速ノッチで減速した後、最大力行ノッチから
最小力行ノッチまでの何れかの力行ノッチを選択し、力
行加速度を調整することによって走行時間を調整するこ
ともできる。この場合はまず、最大減速を行った場合の
走行曲線と最大力行ノッチとの交点c1を求め、その場
合の走行時間を求める。次に最大減速を行った場合の走
行曲線と最高速度に到達できる力行ノッチの内最小とな
る力行ノッチによる走行曲線との交点c4を求め、その
場合の走行時間を求める。さらに、これらの値から最も
必要な走行時間に近い力行ノッチを選択し、同様に走行
時間を求める。以上の演算を最も近い力行ノッチが求ま
るまで行い、出力すべき力行ノッチの値と出力すべき列
車位置を求める。これが求まれば同様に最大減速ノッチ
により列車を減速していった後、演算の結果求まった所
定の位置で所定の力行ノッチを実際に出力することで走
行制御を行えば、予測通りの走行制御ができることにな
る。
Embodiment 3 Further, as a method of extending the traveling time, as shown in FIG.
After the vehicle is decelerated with the maximum deceleration notch, the running time can be adjusted by selecting any of the powering notches from the maximum powering notch to the minimum powering notch and adjusting the powering acceleration. In this case, first, the intersection c1 between the running curve when maximum deceleration is performed and the maximum power running notch is obtained, and the running time in that case is obtained. Next, an intersection c4 between the running curve at the time of the maximum deceleration and the running curve by the power running notch which is the minimum of the power running notches that can reach the maximum speed is obtained, and the running time in that case is obtained. Further, a power running notch that is the closest to the required travel time is selected from these values, and the travel time is similarly obtained. The above calculation is performed until the closest powering notch is obtained, and the value of the powering notch to be output and the train position to be output are obtained. If this is obtained, the train is similarly decelerated by the maximum deceleration notch, and then the cruise control is performed by actually outputting the predetermined powering notch at the predetermined position obtained as a result of the calculation. Can be done.

【0040】実施の形態4.以上の制御は、自動運転装
置の一種である走行制御装置を用いて直接走行制御を行
う以外に、運転士による走行制御方法がある。すなわ
ち、走行制御装置が運転士に対し、走行方法のガイダン
スを行うものである。本方式による走行指令は簡単なた
めこの方法によっても十分な効果を得ることができる。
例えば惰行制御による走行を実施したければ、惰行開始
地点に達した時点でこれを運転士に通知すれば、運転士
は単に力行オフを行えばよいことになる。次に最大力行
開始地点に達すると、同様に運転士に最大力行ノッチ投
入タイミングを通知すれば、運転士はそれに応じて最大
力行ノッチを投入すればよい。
Embodiment 4 FIG. The above control includes a driving control method by a driver other than performing direct driving control using a driving control device which is a kind of automatic driving device. That is, the traveling control device provides guidance to the driver on the traveling method. Since the traveling command according to this method is simple, a sufficient effect can be obtained by this method.
For example, if it is desired to perform traveling by coasting control, if the driver is notified when the coasting start point is reached, the driver may simply perform powering-off. Next, when the maximum power running start point is reached, the driver may similarly notify the driver of the maximum power running notch input timing, and the driver may input the maximum power running notch accordingly.

【0041】図8において、13は表示操作器で、運転
士に対して操作指令を表示する。14は運転台操作器で
マスコンハンドルおよびブレーキハンドルである。運転
士はマスコンハンドル14の操作により推進制御装置1
1に対し力行指令を出力することができる。また、ブレ
ーキハンドル14の操作によりブレーキ制御装置6に対
しブレーキ指令を出力することができる。その他の構成
は図1によるものと同じである。図1に示す実施の形態
1では、走行制御装置9が推進制御装置11およびブレ
ーキ制御装置6に対して自動的に制御出力を出して制御
が行われるが、図8に示す実施の形態2では、運転士の
操作により列車の走行制御が行われる点が異なる。走行
制御装置9は実施の形態1と同様な演算を行い、走行制
御指令を出力する代わりに、表示操作器13に対し必要
な操作ガイダンスを表示させることになる。
In FIG. 8, reference numeral 13 denotes a display / operation device for displaying an operation command to a driver. Reference numeral 14 denotes a cab controller, which is a mass control handle and a brake handle. The driver operates the mass control handle 14 to operate the propulsion control device 1.
1 can output a powering command. In addition, a brake command can be output to the brake control device 6 by operating the brake handle 14. Other configurations are the same as those in FIG. In the first embodiment shown in FIG. 1, the travel control device 9 automatically outputs a control output to the propulsion control device 11 and the brake control device 6 to perform control, but in the second embodiment shown in FIG. In that the running control of the train is performed by the driver's operation. The travel control device 9 performs the same calculation as in the first embodiment, and causes the display / operation device 13 to display necessary operation guidance instead of outputting a travel control command.

【0042】次に、減速制御を行う場合は、同様に運転
士に対し指令すべきブレーキノッチの値と指令出力タイ
ミングを表示操作器13に表示して当該の操作を促す。
また、力行開始地点に到達する直前に同様に指令すべき
力行ノッチと指令タイミングを表示する。運転士は表示
に従って一度だけノッチを投入するだけの簡単な操作で
所期の目的を果たすことができる。
Next, when the deceleration control is performed, the value of the brake notch to be commanded and the command output timing are similarly displayed on the display / operation device 13 to prompt the driver to perform the operation.
Similarly, immediately before reaching the powering start point, a powering notch to be commanded and a command timing are displayed. The driver can achieve the intended purpose by simply operating the notch only once according to the display.

【0043】さらに、加速制御の場合も同様に、指令す
べき地点と指令値を表示操作器13により表示し、同様
に運転士に当該操作を促す。この場合も加速指令への移
行は一度だけであり、力行ノッチの投入もやはり一度だ
けで済み、簡単な操作のみで所期の目的を果たすことが
できるため、運転士への負担も最小限に止めることがで
きる。
Further, in the case of acceleration control, similarly, a point to be commanded and a command value are displayed by the display / operation device 13, and the driver is similarly prompted to perform the operation. In this case as well, the shift to the acceleration command is performed only once, and the powering notch only needs to be input once, and the intended purpose can be achieved with only simple operations, minimizing the burden on the driver. You can stop it.

【0044】[0044]

【発明の効果】この発明によれば、先行列車によるAT
C信号の現示が上位に回復した時点で、後続列車は丁度
該当区間にその上位信号に相当する最高速度で通過可能
なように後続列車の走行を制御するため、後続列車は最
も効率的かつ高速に走行することができ、次駅までの走
行時間を短縮することができるようになる。
According to the present invention, the AT by the preceding train
When the indication of the C signal is restored to the higher rank, the succeeding train controls the running of the subsequent train so that it can pass at the maximum speed corresponding to the higher rank signal in the corresponding section. The vehicle can travel at high speed, and the traveling time to the next station can be reduced.

【0045】また、表示操作器により運転士に通知する
方法を用いれば、自動運転装置を設置することなく上述
の効果を得ることができ、より低コストなシステムが実
現できる。
If the method of notifying the driver using the display / operation device is used, the above-described effects can be obtained without installing an automatic driving device, and a lower cost system can be realized.

【図面の簡単な説明】[Brief description of the drawings]

【図1】 この発明の実施の形態1に係る列車走行制御
方法を採用したシステムの構成図である。
FIG. 1 is a configuration diagram of a system that employs a train traveling control method according to Embodiment 1 of the present invention.

【図2】 実施の形態1の先行列車の待避駅進入時の走
行予測軌跡を示す図である。
FIG. 2 is a diagram showing a predicted traveling trajectory of a preceding train according to the first embodiment when entering a shunting station.

【図3】 実施の形態1の先行列車の待避による後続列
車の速度制限解除を示す図である。
FIG. 3 is a diagram illustrating cancellation of a speed limit of a succeeding train by evacuating a preceding train according to the first embodiment;

【図4】 この発明における最大力行ノッチによる列車
の走行曲線を示す図である。
FIG. 4 is a diagram showing a running curve of a train due to a maximum power running notch according to the present invention.

【図5】 実施の形態1の惰行制御による列車の走行時
間制御を説明する図である。
FIG. 5 is a diagram for explaining control of a running time of a train by coasting control according to the first embodiment.

【図6】 この発明の実施の形態2の減速制御による列
車の走行時間制御を説明する図である。
FIG. 6 is a diagram for explaining train traveling time control by deceleration control according to Embodiment 2 of the present invention.

【図7】 この発明の実施の形態3の加速制御による列
車の走行時間制御を説明する図である。
FIG. 7 is a diagram illustrating control of a running time of a train by acceleration control according to Embodiment 3 of the present invention.

【図8】 この発明の実施の形態4に係る列車走行制御
方法を採用したシステムの構成図である。
FIG. 8 is a configuration diagram of a system that employs a train traveling control method according to Embodiment 4 of the present invention.

【図9】 従来の先行列車による後続列車への速度制限
パターンを示す図である。
FIG. 9 is a diagram showing a conventional speed limiting pattern for a preceding train to a succeeding train.

【図10】 従来の先行列車による速度制限に後続列車
が抵触した場合の走行軌跡を示す図である。
FIG. 10 is a diagram showing a traveling locus when a succeeding train collides with a speed limit of a conventional preceding train.

【符号の説明】[Explanation of symbols]

1 軌道回路、2 受電器、3 ATC受信装置、4
ATC制御装置、5 プレーキ制御装置、6 LCXケ
ーブル、7 LCXアンテナ、8 データ伝送装置、9
走行制御装置、10 速度発電機、11 推進制御装
置、12 地上側のデータ伝送装置、13 表示操作
器、14 マスコンおよびブレーキハンドル、21 先
行列車、24 後続列車。
1 track circuit, 2 power receiver, 3 ATC receiver, 4
ATC control device, 5 rake control device, 6 LCX cable, 7 LCX antenna, 8 data transmission device, 9
Running control device, 10 speed generator, 11 propulsion control device, 12 ground-side data transmission device, 13 display operation device, 14 mascon and brake handle, 21 preceding train, 24 following train.

Claims (10)

【特許請求の範囲】[Claims] 【請求項1】 先行列車は、自列車の位置と速度から、
待避駅進入後における通過側進路の開通時刻を予測演算
し、データ伝送手段を用いて後続列車にその時刻を通知
し、後続列車は先行列車から伝送されてきた通過側進路
の開通予測時刻に合わせて先行列車による速度制限信号
に抵触しないように列車の走行を制御するようにしたこ
とを特徴とする列車の走行制御方法。
1. The preceding train is determined from the position and speed of the own train.
Predicts the opening time of the passing route after entering the evacuation station, notifies the subsequent train using data transmission means, and adjusts the following train to the predicted opening time of the passing route transmitted from the preceding train. The running of the train is controlled so as not to conflict with the speed limit signal from the preceding train.
【請求項2】 先行列車の待避駅進入後における通過側
進路の開通予測時刻を、先行列車が自列車の現在速度と
現在位置を基準に、駅待避側進路区間の完全収納に至る
走行軌跡を、予測される駅停止に至るATC信号パター
ンの減速度に従って減速して行くものとして演算し、そ
の間の走行時間を求め、この時間と予測される駅待避側
進路区間への完全収納の結果、通過側進路が開通し、後
続列車に対するATC制限速度信号パターンがアップす
るまでの時間を加算して求めるようにしたことを特徴と
する請求項1記載の列車の走行制御方法。
2. Predicting the opening time of the passage on the passing side after the preceding train has entered the evacuation station, and determining the running locus of the preceding train to complete storage of the section on the evacuation side of the station based on the current speed and current position of the own train. Calculate assuming that the vehicle decelerates according to the predicted deceleration of the ATC signal pattern leading to the stop of the station. 2. The train running control method according to claim 1, wherein a time until the side track is opened and the ATC speed limit signal pattern for the subsequent train is increased is obtained.
【請求項3】 先行列車からの速度制限信号に抵触しな
いような後続列車の走行制御は、惰行制御により列車を
減速させた後、力行制御によって通過側進路の開通予測
時刻に通過側の制限速度が解除される地点を開通後の最
高速度で通過させるように、惰行制御開始地点を選択す
ることにより行うようにしたことを特徴とする請求項1
または請求項2記載の列車の走行制御方法。
3. The running control of a succeeding train that does not conflict with the speed limit signal from the preceding train is performed by decelerating the train by coasting control and then controlling the passing speed limit at the predicted opening time of the passing side course by power running control. The coasting control start point is selected so as to pass through the point where is canceled at the maximum speed after opening.
Or the train traveling control method according to claim 2.
【請求項4】 先行列車からの速度制限信号に抵触しな
いような後続列車の走行制御は、減速制御により列車を
減速させた後、力行制御によって通過側進路の開通予測
時刻に通過側の制限速度が解除される地点を開通後の最
高速度で通過させるように、減速制御による減速指令を
選択することにより行うようにしたことを特徴とする請
求項1または請求項2記載の列車の走行制御方法。
4. The running control of the following train which does not conflict with the speed limit signal from the preceding train is performed by decelerating the train by deceleration control, and then controlling the passing side speed limit by the power running control at the predicted opening time of the passing side course. 3. The train travel control method according to claim 1, wherein a deceleration command by a deceleration control is selected so as to pass at a maximum speed after the traffic is opened at a point where the train is canceled. .
【請求項5】 先行列車からの速度制限信号に抵触しな
いような後続列車の走行制御は、減速制御により列車を
減速させた後、力行制御によって通過側進路の開通予測
時刻に通過側の制限速度が解除される地点を開通後の最
高速度で通過させるように、力行制御による力行指令を
選択することにより行うようにしたことを特徴とする請
求項1または請求項2記載の列車の走行制御方法。
5. The running control of the following train which does not conflict with the speed limit signal from the preceding train is performed by decelerating the train by deceleration control, and then controlling the passing side speed limit at the predicted opening time of the passing side course by power running control. 3. The train running control method according to claim 1 or 2, wherein the power running command is selected by power running control so as to pass the point at which the vehicle is released at the maximum speed after opening. .
【請求項6】 先行列車からの速度制限信号に抵触しな
いような後続列車の走行制御は、惰行制御により列車を
減速させた後、力行制御によって通過側進路の開通予測
時刻に通過側の制限速度が解除される地点を開通後の最
高速度で通過させるように、惰行制御開始地点を運転士
に通知することにより行うようにしたことを特徴とする
請求項1または請求項2記載の列車の走行制御方法。
6. The running control of a succeeding train that does not conflict with the speed limit signal from the preceding train is performed by decelerating the train by coasting control, and then controlling the passing speed limit at the predicted opening time of the passing side course by power running control. The running of the train according to claim 1 or 2, wherein the driving is performed by notifying a driver of a coasting control start point so as to pass the point where the vehicle is canceled at the maximum speed after opening. Control method.
【請求項7】 先行列車からの速度制限信号に抵触しな
いような後続列車の走行制御は、減速制御により列車を
減速させた後、力行制御によって通過側進路の開通予測
時刻に通過側の制限速度が解除される地点を開通後の最
高速度で通過させるように、減速制御による減速指令を
運転士に通知することにより行うようにしたことを特徴
とする請求項1または請求項2記載の列車の走行制御方
法。
7. The running control of a succeeding train that does not conflict with the speed limit signal from the preceding train is performed by decelerating the train by deceleration control, and then controlling the passing speed at the predicted opening time of the passing road by power running control. The train according to claim 1 or 2, wherein the driver is notified of a deceleration command by deceleration control so as to pass the point at which the vehicle is released at the maximum speed after opening. Travel control method.
【請求項8】 先行列車からの速度制限信号に抵触しな
いような後続列車の走行制御は、減速制御により列車を
減速させた後、力行制御によって通過側進路の開通予測
時刻に通過側の制限速度が解除される地点を開通後の最
高速度で通過させるように、力行制御による力行指令を
運転士に通知することにより行うようにしたことを特徴
とする請求項1または請求項2記載の列車の走行制御方
法。
8. The running control of the following train which does not conflict with the speed limit signal from the preceding train is performed by decelerating the train by deceleration control, and then controlling the passing side speed limit at the predicted opening time of the passing side course by power running control. 3. The train according to claim 1 or 2, wherein the driver is notified of a powering command by powering control so as to pass the point at which the vehicle is released at the maximum speed after opening. Travel control method.
【請求項9】 列車に搭載されたATC受信装置、AT
C制御装置、推進制御装置、ブレーキ制御装置、走行制
御装置、データ伝送装置、および速度検出装置を備え、
ATC制御装置は、ATC受信装置で受信したATC信
号によりブレーキ制御装置にATCブレーキ指令を出し
てATC制御を行い、走行制御装置によってATC受信
装置から得られるATC信号と、速度検出装置から得ら
れる速度信号と、データ伝送装置から得られる先行列車
から伝送されてきた通過側進路の開通予測時刻データと
から、先行列車による速度制限信号に抵触しないような
力行指令、ブレーキ指令、惰行指令を演算により求め、
この演算結果により推進制御装置およびブレーキ制御装
置を制御するようにしたことを特徴とする列車の走行制
御装置。
9. An ATC receiver mounted on a train, AT
C control device, propulsion control device, brake control device, travel control device, data transmission device, and speed detection device,
The ATC control device issues an ATC brake command to the brake control device based on the ATC signal received by the ATC receiving device to perform ATC control, and the ATC signal obtained from the ATC receiving device by the traveling control device and the speed obtained from the speed detecting device. From the signal and the predicted opening time data of the passing route transmitted from the preceding train obtained from the data transmission device, a powering command, a brake command, and a coasting command that do not conflict with the speed limit signal by the preceding train are calculated. ,
A travel control device for a train, wherein the propulsion control device and the brake control device are controlled based on the calculation result.
【請求項10】 表示操作器および手動操作器を備え、
走行制御装置は、ATC受信装置から得られるATC信
号と、速度検出装置から得られる速度信号と、データ伝
送装置から得られる先行列車から伝送されてきた通過側
進路の開通予測時刻データとから、先行列車による速度
制限信号に抵触しないような力行指令、ブレーキ指令、
惰行指令を演算により求め、この演算結果を表示操作器
に表示して、列車の運転士に、手動操作器り推進制御装
置およびブレーキ制御装置の動作を促すようにしたこと
を特徴とする請求項9記載の列車の走行制御装置。
10. A display operation device and a manual operation device,
The cruise control device obtains the leading time based on the ATC signal obtained from the ATC receiving device, the speed signal obtained from the speed detecting device, and the predicted opening time data of the passing route transmitted from the preceding train obtained from the data transmitting device. Powering commands, braking commands, etc. that do not conflict with the speed limit signal from the train,
The coasting command is obtained by calculation, and the calculation result is displayed on a display / operation device to prompt the train driver to operate the manual operation device propulsion control device and the brake control device. 9. The running control device for a train according to 9.
JP3992998A 1998-02-23 1998-02-23 Train running control method Expired - Fee Related JP3345579B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP3992998A JP3345579B2 (en) 1998-02-23 1998-02-23 Train running control method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP3992998A JP3345579B2 (en) 1998-02-23 1998-02-23 Train running control method

Publications (2)

Publication Number Publication Date
JPH11243609A true JPH11243609A (en) 1999-09-07
JP3345579B2 JP3345579B2 (en) 2002-11-18

Family

ID=12566644

Family Applications (1)

Application Number Title Priority Date Filing Date
JP3992998A Expired - Fee Related JP3345579B2 (en) 1998-02-23 1998-02-23 Train running control method

Country Status (1)

Country Link
JP (1) JP3345579B2 (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2005269764A (en) * 2004-03-18 2005-09-29 Mitsubishi Electric Corp High-speed operation assisting apparatus
JP2008005585A (en) * 2006-06-21 2008-01-10 Hitachi Ltd Vehicle control system
JP2008247246A (en) * 2007-03-30 2008-10-16 Kyosan Electric Mfg Co Ltd Train position abnormality detection system
US8774992B2 (en) 2010-01-18 2014-07-08 Mitsubishi Electric Corporation Operation support device and automatic operation device
JP2014193098A (en) * 2013-03-28 2014-10-06 Railway Technical Research Institute Railroad train optimal stop determination method and operator support system thereof
JP2017506603A (en) * 2014-07-29 2017-03-09 ミツビシ・エレクトリック・アールアンドディー・センター・ヨーロッパ・ビーヴィMitsubishi Electric R&D Centre Europe B.V. Method and apparatus for reducing the operating delay of a vehicle that should arrive at a destination
CN115123344A (en) * 2022-05-31 2022-09-30 中国铁路通信信号股份有限公司 Train operation control method and device, electronic equipment and storage medium

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2005269764A (en) * 2004-03-18 2005-09-29 Mitsubishi Electric Corp High-speed operation assisting apparatus
JP4518820B2 (en) * 2004-03-18 2010-08-04 三菱電機株式会社 High-speed driving support device
JP2008005585A (en) * 2006-06-21 2008-01-10 Hitachi Ltd Vehicle control system
JP2008247246A (en) * 2007-03-30 2008-10-16 Kyosan Electric Mfg Co Ltd Train position abnormality detection system
US8774992B2 (en) 2010-01-18 2014-07-08 Mitsubishi Electric Corporation Operation support device and automatic operation device
JP2014193098A (en) * 2013-03-28 2014-10-06 Railway Technical Research Institute Railroad train optimal stop determination method and operator support system thereof
JP2017506603A (en) * 2014-07-29 2017-03-09 ミツビシ・エレクトリック・アールアンドディー・センター・ヨーロッパ・ビーヴィMitsubishi Electric R&D Centre Europe B.V. Method and apparatus for reducing the operating delay of a vehicle that should arrive at a destination
CN115123344A (en) * 2022-05-31 2022-09-30 中国铁路通信信号股份有限公司 Train operation control method and device, electronic equipment and storage medium

Also Published As

Publication number Publication date
JP3345579B2 (en) 2002-11-18

Similar Documents

Publication Publication Date Title
JP3234925B2 (en) Train control device
KR100747375B1 (en) Train operation control system
JP3653954B2 (en) Mobile device for mobile traffic control system, control station for mobile traffic control system, mobile traffic control system
US8374739B2 (en) Train control device having a target speed calculation function
WO2011013203A1 (en) Vehicle control device, vehicle control method, and vehicle control system
CN102470869A (en) Vehicle control device, vehicle control method, and vehicle control system
KR20180131595A (en) Train control device, method and program
JP3345579B2 (en) Train running control method
JP2005231447A (en) Train operation support device
KR100283828B1 (en) Train operation management system
JPH1019595A (en) Driving supporting apparatus
JP2001154733A (en) Method and device for controlling automatic travel of vehicle
JP3865337B2 (en) Vehicle speed control device
JP5476070B2 (en) Train control system
JP4005541B2 (en) Train travel control system and train travel control method
JPH0976914A (en) Train running operation control method and device
JPH0799708A (en) Automatically driving device for train
JP3474709B2 (en) Train operation control device
JPH11234813A (en) Automatic operation controller for train
JPH0656036A (en) Train operation control system
JP3663303B2 (en) Vehicle operation control method and vehicle operation support device
CN103640573A (en) Vehicle control device, vehicle control method and vehicle control system
CN110626391A (en) Information prediction method of passenger information system
JP3571426B2 (en) Moving stop type train stop position control method and apparatus
JP7465784B2 (en) Train Control Device

Legal Events

Date Code Title Description
LAPS Cancellation because of no payment of annual fees