JPH09226588A - Train operation control system - Google Patents

Train operation control system

Info

Publication number
JPH09226588A
JPH09226588A JP8036408A JP3640896A JPH09226588A JP H09226588 A JPH09226588 A JP H09226588A JP 8036408 A JP8036408 A JP 8036408A JP 3640896 A JP3640896 A JP 3640896A JP H09226588 A JPH09226588 A JP H09226588A
Authority
JP
Japan
Prior art keywords
train
depot
central command
vehicle
control device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP8036408A
Other languages
Japanese (ja)
Inventor
Tetsuo Yokoyama
哲雄 横山
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Mitsubishi Electric Corp
Original Assignee
Mitsubishi Electric Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Mitsubishi Electric Corp filed Critical Mitsubishi Electric Corp
Priority to JP8036408A priority Critical patent/JPH09226588A/en
Publication of JPH09226588A publication Critical patent/JPH09226588A/en
Pending legal-status Critical Current

Links

Landscapes

  • Train Traffic Observation, Control, And Security (AREA)

Abstract

PROBLEM TO BE SOLVED: To accurately and efficiently change train operation at operation arranging time by arranging an on-line transmission line between a comprehesive control device to control an inspection progress condition, a roadway staying condition or the like of the whole rolling stocks in a rolling stock base and a central command device to control trains on business roadways. SOLUTION: When a diagram of a train is disrupted, a monitor staying in a central command place inputs an operation arranging plan from a display terminal 2 connected to an operation control device 1. The changing content of rolling stock operation caused by inputted operational arrangement is transmitted to a rolling stock base. A comprehensive control device 11 in the base receives the changing content of the rolling stock operation, and buzzes a buzzer or the like to inform an operational change. The content of the operational change is displayed on a display terminal 13, and a controller in the base changes yard work, allocation of persons or the like on the basis of the displayed content. Therefore, The operation arranging plan is worked into transmission data to the comprehensive control device 11 by the operation control device 1, and is transmitted on line through a transmission line.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【発明の属する技術分野】この発明は、列車の運行を管
理する列車運行管理システムにおいて、列車ダイヤが乱
れた場合の運転整理に伴う車両運用変更業務に関するも
のである。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a train operation management system for managing train operation, and relates to a vehicle operation change work associated with rescheduling when a train schedule is disturbed.

【0002】[0002]

【従来の技術】図6は例えば特開平6−183349号
公報に示された従来の列車運行管理システムの概略構成
を示すブロック図である。図において、1は列車の運行
を監視、制御し、運転整理等の指令を行う運行管理装
置、2は運行管理装置1にそれぞれ接続されるキャラク
タまたはグラフィックのディスプレイ端末で、ダイヤが
乱れた場合の運転整理処理等はこれら端末から入力され
る。3は伝送系中央装置、4は伝送系中央装置3に伝送
路5を介して結ばれる伝送系駅装置、6はこれら伝送系
駅装置4にそれぞれ接続される連動装置、案内装置等の
被制御装置、7は運行表示盤8を駆動する表示論理装
置、9はダイヤが記録されているフロッピードライブ装
置、10は着発実績等を印字するプリンター装置であ
る。
2. Description of the Related Art FIG. 6 is a block diagram showing a schematic configuration of a conventional train operation management system disclosed in, for example, Japanese Patent Laid-Open No. 6-183349. In the figure, 1 is an operation management device that monitors and controls the operation of trains and issues commands such as operation rescheduling. 2 is a character or graphic display terminal connected to the operation management device 1, respectively, in the case where the timetable is disturbed. The traffic rescheduling process is input from these terminals. Reference numeral 3 is a transmission system central device, 4 is a transmission system station device connected to the transmission system central device 3 via a transmission line 5, and 6 is a controlled device such as an interlocking device and a guide device which are respectively connected to these transmission system station devices 4. An apparatus, 7 is a display logic device for driving the operation display panel 8, 9 is a floppy drive device in which a diamond is recorded, and 10 is a printer device for printing the arrival record and the like.

【0003】このような従来の列車運行管理システムに
おいては、まず、フロッピードライブ装置9に記録され
ている当日用の列車ダイヤ(基本ダイヤ)を運行管理装
置1の磁気ディスク装置(図示せず)に読み出し、ディ
スプレイ端末2から入力された変更情報を上記基本ダイ
ヤに付加して制御ダイヤを作成する。運行管理装置1
は、制御ダイヤに基づいて、被制御装置6から伝送系駅
装置4、伝送路5および伝送系中央装置3を介して得ら
れた現場の信号系状態信号を用いて、列車の追跡、進路
制御、案内制御等を行う。これら制御情報は、伝送系中
央装置3、伝送路5および伝送系駅装置4を介して各被
制御装置6に出力される。また、現場の信号機等の状態
や列車の走行位置は表示論理装置7によって運行表示盤
8に出力される。さらに、着発の実績はプリンター装置
10に印字される。運行監視員は、運行標示盤8やディ
スプレイ端末2に出力された信号機や列車の状態を監視
し、ダイヤの乱れが発生した場合には、ただちに運転整
理等の制御入力を行う。
In such a conventional train operation management system, first, a train schedule (basic schedule) for the day recorded in the floppy drive device 9 is stored in a magnetic disk device (not shown) of the operation management device 1. The control diagram is created by adding the change information read and input from the display terminal 2 to the basic diagram. Operation management device 1
Uses the on-site signal system status signal obtained from the controlled device 6 via the transmission system station device 4, the transmission line 5 and the transmission system central device 3 based on the control diagram to track and control the train. , Guidance control, etc. The control information is output to each controlled device 6 via the transmission system central device 3, the transmission line 5, and the transmission system station device 4. Further, the status of traffic lights and the running position of the train at the site are output to the operation display panel 8 by the display logic device 7. Further, the arrival and departure record is printed on the printer device 10. The operation supervisor monitors the status of the traffic lights and trains output to the operation display panel 8 and the display terminal 2, and immediately when the disturbance of the timetable occurs, the control input such as rescheduling is performed.

【0004】次に、運転整理の処理について、図7のフ
ローチャートを参照しながら説明する。まず、運転整理
を入力すると(S1)、その入力データの妥当性をチェ
ックし(S2)、その結果がOKならば(S3でYES
のとき)、制御ダイヤを運転整理情報にしたがって修正
し(S4)、その結果を表示する(S5)。上記S3で
NOの場合は、S1にもどって運転整理入力をやり直
す。
Next, the operation rescheduling process will be described with reference to the flowchart of FIG. First, after inputting the rescheduling (S1), the validity of the input data is checked (S2), and if the result is OK (YES in S3).
In the case of), the control diagram is corrected according to the traffic rescheduling information (S4), and the result is displayed (S5). In the case of NO in S3 above, the operation rescheduling input is performed again by returning to S1.

【0005】[0005]

【発明が解決しようとする課題】上記のような従来の列
車運行管理システムでは、自然災害、車両故障等の原因
でダイヤが乱れ、その列車を車両基地に戻して別の車両
を車両基地から出庫してくる必要があるような車両運用
を変更する運転整理等を行った場合に、車両基地に対し
て、その運転整理情報を電話や手書き書面のFAXによ
り伝達していたため、十分な情報が伝達できなかった
り、誤った情報を送ってしまうといった問題点があっ
た。また、運行監視を行っている中央指令所において
は、車両基地内の車両の検査進捗状況や在線状況を逐次
把握していることが不可能であったので、運転整理時に
おいて、検査終了済みの車両を迅速に運用できない場合
があった。さらに、中央指令装置は営業路線上の列車を
管理するが、車両基地内の車両をオンラインで管理する
ことができなかったので、中央指令装置から運転整理を
入力してから列車運用が実施されるまで、多くの手間と
時間を要した。
In the conventional train operation management system as described above, the timetable is disturbed due to a natural disaster, vehicle failure, etc., the train is returned to the depot, and another vehicle is issued from the depot. Sufficient information is communicated to the vehicle depot when the vehicle rescheduling is performed to change the vehicle operation so that the vehicle relocation information is transmitted to the depot by telephone or handwritten FAX. There were problems such as not being able to do it and sending incorrect information. In addition, it was impossible for the central control station that is monitoring operation to keep track of the progress and inspection status of the vehicles in the depot, so at the time of rescheduling, the inspection was completed. There were cases where the vehicle could not be operated quickly. Furthermore, although the central command device manages trains on business lines, it was not possible to manage the vehicles in the depot online, so train operation is carried out after inputting operation adjustment from the central command device. It took a lot of trouble and time.

【0006】この発明は、上述のような課題を解決する
ためになされたもので、第1の目的は、中央指令装置か
ら入力された運転整理情報と、車両基地における車両の
検査進捗状況および在線状況とを相互に伝達しあえる列
車運行管理システムを得るものである。また、第2の目
的は、中央指令装置が営業路線上の列車と同様、車両基
地内の車両をも管理できる列車運行管理システムを得る
ものである。
The present invention has been made to solve the above problems. A first object of the present invention is to provide operation rescheduling information input from a central command device, a vehicle inspection progress status at a vehicle depot, and an on-rail station. The purpose is to obtain a train operation management system that can mutually communicate the situation. A second object is to obtain a train operation management system in which the central command device can manage the vehicles in the depot as well as the trains on the business routes.

【0007】[0007]

【課題を解決するための手段】この発明に係る列車運行
管理システムにおいては、営業路線を列車として走行さ
せるための車両を格納している車両基地内の全車両の検
査進捗状況、在線状況等を管理する総合管理装置と、上
記中央指令装置との間にオンライン伝送路を設けるもの
である。
In the train operation management system according to the present invention, the inspection progress status, the status of in-rails, etc. of all the vehicles in the depot storing the vehicles for traveling on a business line as a train are displayed. An online transmission line is provided between the integrated management device for management and the central command device.

【0008】また、車両基地における総合管理装置は、
中央指令装置から伝送されてきた運転整理情報をもと
に、基地内作業および作業分担を変更するものである。
In addition, the integrated management device at the depot is
Based on the traffic rescheduling information transmitted from the central command device, the work within the base and work sharing are changed.

【0009】また、中央指令装置は、総合管理装置から
伝送されてきた車両の検査進捗状況および在線状況を参
照しながら運転整理業務を行うものである。
Further, the central command device carries out a traffic rescheduling operation while referring to the vehicle inspection progress status and the on-rail status transmitted from the integrated control device.

【0010】また、中央指令装置は車両基地内の車両の
制御を行うものである。
The central command device controls the vehicles in the vehicle depot.

【0011】また、中央指令装置は車両基地内の車両の
在線状況を出力するものである。
Further, the central command device outputs the on-rail status of the vehicles in the depot.

【0012】[0012]

【発明の実施の形態】BEST MODE FOR CARRYING OUT THE INVENTION

実施の形態1.図1はこの発明の実施の一形態である列
車運行管理システムの概略構成を示すもので、図中1〜
10は図6に示したものと同一または相当部分である。
11は車両基地内の全車両の検査進捗状況、在線状況等
を管理している総合管理装置で、伝送路12を介してキ
ャラクタまたはグラフィックディスプレイ端末13が接
続されている。14は中央指令所の運行管理装置1と総
合管理装置11とをオンラインで結ぶための公衆回線等
の伝送路で、15は伝送系基地装置である。
Embodiment 1. FIG. 1 shows a schematic configuration of a train operation management system which is an embodiment of the present invention.
Reference numeral 10 is the same as or equivalent to that shown in FIG.
Reference numeral 11 denotes a comprehensive management device that manages the inspection progress status, status of on-rails, etc. of all vehicles in the depot, and a character or graphic display terminal 13 is connected via a transmission line 12. Reference numeral 14 is a transmission line such as a public line for connecting the operation management device 1 of the central command center and the comprehensive management device 11 online, and 15 is a transmission system base device.

【0013】このように構成された列車運行管理システ
ムにおいても、従来と同様にして列車の追跡および制御
を行い、営業路線上の全列車を管理する。しかし、本実
施の形態例では、列車ダイヤが乱れた場合に入力された
運転整理の内容は、車両の運用に影響を及ぼす車両基地
に対して、オンラインで伝達される。図2は、車両運用
変更例を示す図である。図2(a)に示すように、計画
ダイヤにおいて、駅Zから駅Aまでを列車1で、駅Aで
折り返して駅Zまでは列車2で走行する編成Aと、当日
は運用が予定されていない編成Bとがあるとする。も
し、編成Aに故障等が発生して、列車1の駅Aへの到着
が遅れる場合、図2(b)に示すような運転整理で車両
運用変更を行う。この場合、編成Aは駅A到着後、列車
4(回送)として車両基地に入庫し、代わって編成Bが
列車3(回送)として出庫し、駅Aから駅Zまで列車2
として運用される。つまり、車両運用変更時には、車両
基地における運転整理の内容に応じた迅速な対応が重要
であるため、車両基地へ運転整理の内容を迅速かつ正確
に伝達しなければならないのである。
In the train operation management system configured as described above, the train tracking and control are performed in the same manner as in the conventional case, and all the trains on the business route are managed. However, in the present embodiment, the content of the traffic rescheduling input when the train schedule is disturbed is transmitted online to the vehicle depot that affects the operation of the vehicle. FIG. 2 is a diagram illustrating an example of vehicle operation change. As shown in FIG. 2A, in the plan diagram, train 1 runs from station Z to station A, train A turns around station A and runs to train Z by train 2, and operation is scheduled on the day. Suppose there is no formation B. If the train A delays the arrival of the train 1 at the station A due to a failure or the like, the vehicle operation is changed by rescheduling the train as shown in FIG. 2B. In this case, after the train set A arrives at station A, it enters the depot as train 4 (forwarding), and instead, train set B exits as train 3 (forwarding), and train 2 from station A to station Z
It is operated as. In other words, when the vehicle operation is changed, it is important to promptly respond to the content of the traffic rescheduling at the vehicle depot, so that the content of the traffic rescheduling must be transmitted to the vehicle depot quickly and accurately.

【0014】運転整理の内容が伝送される動作の流れを
図3のフローチャートを参照しながら説明する。列車の
ダイヤが乱れた場合には、中央指令所にいる監視員は運
行管理装置1に接続されているディスプレイ端末2より
運転整理案を入力する(T1)。入力された運転整理に
伴う車両運用の変更内容を車両基地に送信する(T
2)。車両基地内の総合管理装置11は、車両運用の変
更内容を受信し(T3)、運用変更を知らせるブザー等
を鳴動する(T4)。そして、運用変更の内容がディス
プレイ端末13に表示され(T5)、基地内の車両運
用、作業員の割り振り等を管理している管理者は、表示
された内容をもとに構内作業、人の割り振り等の変更を
行う(T6)。以上により、中央指令所で入力された運
転整理案が運行管理装置によって車両基地の総合管理装
置への送信データに加工され、伝送路を介してオンライ
ンで伝送されるので、入力された運転整理案が迅速にか
つ正確に車両基地に伝達できる。また、車両基地におい
ても、運転整理に伴う車両運用の変更がディスプレイ端
末上で確認することができるので、構内作業のスケジュ
ール等の変更を迅速に行える。
The flow of the operation for transmitting the details of the traffic rescheduling will be described with reference to the flowchart of FIG. When the train schedule is disturbed, the observer at the central command station inputs the rescheduling plan from the display terminal 2 connected to the operation management device 1 (T1). The change contents of the vehicle operation due to the input rescheduling are transmitted to the depot (T
2). The integrated management device 11 in the vehicle base receives the change content of the vehicle operation (T3) and sounds a buzzer or the like to notify the operation change (T4). Then, the contents of the operation change are displayed on the display terminal 13 (T5), and the administrator who manages the vehicle operation in the base, the allocation of workers, etc., can use the displayed contents to perform on-site work and personnel The allocation is changed (T6). As a result of the above, the rescheduling plan entered at the central command station is processed by the operation management system into transmission data to the general depot of the depot and transmitted online via the transmission line. Can be quickly and accurately transmitted to the depot. Also, at the depot, since changes in vehicle operation due to rescheduling can be confirmed on the display terminal, it is possible to swiftly change the schedule of premises work and the like.

【0015】実施の形態2.なお、上記実施の形態1で
は中央指令所の運行管理装置1から車両基地の総合管理
装置11へ運転整理案を伝送する例を示したが、車両基
地の総合管理装置11から中央指令所の運行管理装置1
へ車両基地内の車両の状況を伝送するようにすれば、さ
らに効率のよい運転整理が実施できる。図4は、本実施
の形態2による動作を示すフローチャートである。車両
基地の総合管理装置11のディスプレイ端末13から、
各車両の検査や清掃の進捗状況を入力すると(U1)、
入力された情報は運行管理装置1に送信される(U
2)。運行管理装置1は上記情報を受信して(U3)、
運行管理装置1のディスプレイ端末2上に表示される
(U4)。上記により、中央指令所の監視員は車両基地
の車両のうちすぐにも運用にまわせる車両の種類、数な
どが把握できるので、最も効率的な運転整理案を入力す
ることが可能になる。
Embodiment 2 In the above-described first embodiment, an example in which the operation rescheduling plan is transmitted from the operation management device 1 of the central command station to the integrated management device 11 of the depot is shown. Management device 1
If the condition of the vehicle in the vehicle depot is transmitted to the vehicle depot, more efficient rescheduling can be performed. FIG. 4 is a flowchart showing the operation according to the second embodiment. From the display terminal 13 of the integrated management device 11 at the depot,
Enter the progress of inspection and cleaning of each vehicle (U1),
The entered information is transmitted to the operation management device 1 (U
2). The operation management device 1 receives the above information (U3),
It is displayed on the display terminal 2 of the operation management device 1 (U4). As described above, the observer at the central command station can immediately know the type and number of vehicles to be put into operation among the vehicles at the depot, so that the most efficient rescheduling plan can be input.

【0016】実施の形態3.なお、上記実施の形態2に
おいては、運行管理装置1は総合管理装置11から受信
した車両基地内の情報を運転整理入力の参考にするにと
どまっていたが、中央指令所において、車両基地内の車
両の在線状況の把握および進路制御による編成作成をも
可能とすることにより、より迅速かつ効率的な運転整理
が行える。図5は、運転整理の必要が生じた場合の運行
管理装置1における処理の流れを示したフローチャート
である。車両故障、自然災害等の要因が発生し(V
1)、運行ダイヤが乱れた場合(V2)、中央指令所に
いる監視員が運転整理を立案する中で、車両運用の変更
が必要となればその検討を行う(V3)。そして、車両
基地から予備編成を割り当てることに決定すれば(V
4)、該当する車両基地内の車両を選択する(V5)。
このとき、車両基地内の車両の在線状況をディスプレイ
端末に表示して確認し(V6)、検査作業が予定されて
いるか否かを確認する(V7)。当日検査が予定されて
いる場合は(V7でYのとき)、検査名、検査開始時
刻、検査進捗度合、および検査終了(予定)時刻等の進
捗状況を確認する(V8)。さらに、清掃作業の予定が
あるか否かおよび作業終了(予定)時刻を確認する(V
9)。当日の検査が無い場合は(V7でNのとき)、V
9に進んで清掃作業の予定を確認する。
Embodiment 3 In the second embodiment, the operation management device 1 only refers to the information in the vehicle depot received from the comprehensive management device 11 as a reference for the rescheduling input. By making it possible to grasp the status of vehicles on-track and to create a train set by controlling the route, it is possible to perform quicker and more efficient rescheduling. FIG. 5 is a flowchart showing the flow of processing in the operation management device 1 when the need for rescheduling arises. Factors such as vehicle breakdowns and natural disasters occur (V
1) If the operation timetable is disturbed (V2), a supervisor at the central command station makes a plan for rescheduling, and if there is a need to change the vehicle operation, it will be examined (V3). Then, if it is decided to allocate the preliminary formation from the depot (V
4) Select a vehicle in the corresponding depot (V5).
At this time, the on-rail status of the vehicle in the depot is displayed on the display terminal to confirm (V6), and it is confirmed whether or not the inspection work is scheduled (V7). When the inspection is scheduled on the day (when Y in V7), the progress status such as the inspection name, the inspection start time, the inspection progress degree, and the inspection end (scheduled) time is confirmed (V8). Further, it is confirmed whether or not there is a cleaning work schedule and the work end (planned) time (V
9). If there is no inspection on the day (V7 is N), V
Proceed to step 9 to check the cleaning schedule.

【0017】上記の確認を経て、検査、清掃ともに終了
し運用可能な車両を選択し、充当車両を決定する(V1
0)。その後、決定した運用変更の内容を総合管理装置
11に伝達し(V11)、総合管理装置11はその内容
を確認する(V12)。さらに、決定した変更内容にし
たがって該当車両の進路制御を行い、編成を作成する
(V13)。そして、運転整理に応じたタイミングで作
成された編成を営業路線上に移動させた後は(V1
4)、他の列車と同様に管理することとなる。なお、営
業路線上を走行していた列車が車両基地内にもどるケー
スにおいても同様に管理できることはいうまでもない。
これにより、車両基地内で車両を移動させる場合に、営
業路線の使用されない時間を見計らって営業路線区間経
由で移動させることも可能になる。以上のように、運行
管理装置で営業路線上の列車と車両基地内の車両とを一
元管理することにより、実際の列車の運行にあわせた効
率的な車両の管理ができる。
After the above-mentioned confirmation, the inspection and cleaning are completed and the operable vehicle is selected, and the applicable vehicle is determined (V1
0). After that, the content of the determined operation change is transmitted to the comprehensive management apparatus 11 (V11), and the comprehensive management apparatus 11 confirms the content (V12). Further, the course of the vehicle is controlled according to the determined change contents to create a train (V13). Then, after moving the formation created at the timing according to the traffic rescheduling to the business line, (V1
4) It will be managed in the same way as other trains. Needless to say, the same management can be performed even when the train running on the business route returns to the depot.
As a result, when the vehicle is moved within the depot, it is possible to move the vehicle through the commercial route section in anticipation of the unused time of the commercial route. As described above, by centrally managing the trains on the sales route and the cars in the depot by the operation management device, it is possible to efficiently manage the cars according to the actual train operation.

【0018】[0018]

【発明の効果】この発明は、以上説明したように構成さ
れているので、以下に示すような効果を奏する。
Since the present invention is constructed as described above, it has the following effects.

【0019】車両基地内の全車両の検査進捗状況、在線
状況等を管理する総合管理装置と、営業路線上の列車の
管理を行う中央指令装置との間にオンライン伝送路を設
けてデータ授受を行うようにしたので、運転整理時の列
車運用の変更が正確かつ効率良く行える。
An online transmission line is provided between the integrated control device for managing the inspection progress status and the status of existing trains of all vehicles in the depot, and the central command device for managing the trains on the business routes to exchange data. Since this is done, the train operation can be changed accurately and efficiently when rescheduling.

【0020】また、車両基地における総合管理装置は、
中央指令装置から伝送されてきた運転整理情報をもとに
基地内作業および作業分担を変更するようにしたので、
車両基地内の人の割り振り等の変更が迅速に行える。
Further, the integrated management device at the depot is
Based on the traffic rescheduling information transmitted from the central command unit, the work inside the base and the work sharing were changed.
It is possible to quickly change the allocation of people in the depot.

【0021】また、中央指令装置は総合管理装置から伝
送されてきた車両の検査進捗状況および在線状況を参照
しながら運転整理業務を行うようにしたので、車両の準
備状況を考慮した適切な運転整理を行える。
Further, since the central command device is designed to perform the traffic rescheduling work while referring to the vehicle inspection progress status and on-rail status transmitted from the general control device, the appropriate traffic rescheduling in consideration of the vehicle preparation status. Can be done.

【0022】また、中央指令装置は車両基地内の車両の
制御を行うようにしたので、運転整理および車両運用変
更を中央指令装置から一元管理でき、車両運用を含めた
運行管理業務がより効率的に行える。
Further, since the central command device controls the vehicles in the depot, it is possible to centrally manage the rescheduling and vehicle operation changes from the central command device, and the operation management work including the vehicle operation is more efficient. You can do it.

【0023】また、中央指令装置は車両基地内の車両の
在線状況を出力するようにしたので、中央指令装置から
車両基地内の車両を制御して編成を作成するする際に、
最も適切な動作が可能となる。
Further, since the central command device outputs the on-rail status of the vehicles in the depot, when the central command device controls the vehicles in the depot to create a formation,
The most appropriate operation is possible.

【図面の簡単な説明】[Brief description of drawings]

【図1】 この発明の実施の一形態による列車運行管理
システムの概略構成を示す図である。
FIG. 1 is a diagram showing a schematic configuration of a train operation management system according to an embodiment of the present invention.

【図2】 車両運用変更例を示す図2である。FIG. 2 is a diagram showing an example of vehicle operation change.

【図3】 この発明の実施の形態1による運転整理入力
時の動作を示すフローチャートである。
FIG. 3 is a flowchart showing an operation at the time of rescheduling input according to the first embodiment of the present invention.

【図4】 この発明の実施の形態2による車両の準備進
捗状況入力時の動作を示すフローチャートである。
FIG. 4 is a flowchart showing an operation when a vehicle preparation progress status is input according to the second embodiment of the present invention.

【図5】 この発明の実施の形態3による運転整理入力
時の動作を示すフローチャートである。
FIG. 5 is a flowchart showing an operation at the time of rescheduling input according to the third embodiment of the present invention.

【図6】 従来の列車運行管理システムの概略構成を示
す図である。
FIG. 6 is a diagram showing a schematic configuration of a conventional train operation management system.

【図7】 従来の列車運行管理システムによる運転整理
時の動作を示すフローチャートである。
FIG. 7 is a flowchart showing an operation at the time of rescheduling by the conventional train operation management system.

【符号の説明】[Explanation of symbols]

1 運行管理装置、2 中央側ディスプレイ端末、3
伝送系中央装置、4 伝送系駅装置、6 被制御装置、
7 表示論理装置、8 運行表示盤、11 総合管理装
置、13 基地側ディスプレイ端末、14 伝送路、1
5 伝送系基地装置。
1 operation management device, 2 central display terminal, 3
Transmission central equipment, 4 transmission station equipment, 6 controlled equipment,
7 display logic device, 8 operation display panel, 11 integrated management device, 13 base side display terminal, 14 transmission line, 1
5 Transmission system base equipment.

Claims (5)

【特許請求の範囲】[Claims] 【請求項1】 営業路線上の列車の運行を管理し、列車
ダイヤが乱れた場合に平常ダイヤに戻す目的である運転
整理機能を持つ中央指令装置を備えた列車運行管理シス
テムにおいて、 上記営業路線を列車として走行させるための車両を格納
している車両基地内の全車両の検査進捗状況、在線状況
等を管理する総合管理装置と、上記中央指令装置との間
にオンライン伝送路を設け、上記中央指令装置と上記総
合管理装置との間でデータ授受を行うことを特徴とする
列車運行管理システム。
1. A train operation management system comprising a central command device having a traffic control function for managing the operation of trains on a business line and returning to a normal timetable when the train timetable is disturbed. An on-line transmission path is provided between the central control device and a comprehensive management device that manages the inspection progress status of all the vehicles in the depot that stores the vehicles for traveling as a train, and the above-mentioned central command device. A train operation management system, wherein data is transmitted and received between a central command device and the integrated management device.
【請求項2】 車両基地における総合管理装置は、中央
指令装置から伝送されてきた運転整理情報をもとに、基
地内作業および作業分担を変更することを特徴とする請
求項1記載の列車運行管理システム。
2. The train operation according to claim 1, wherein the integrated management device at the rolling stock depot changes the work within the depot and work distribution based on the traffic rescheduling information transmitted from the central command device. Management system.
【請求項3】 中央指令装置は、総合管理装置から伝送
されてきた車両の検査進捗状況および在線状況を参照し
ながら運転整理業務を行うことを特徴とする請求項1ま
たは2記載の列車運行管理システム。
3. The train operation management according to claim 1 or 2, wherein the central command device performs the traffic rescheduling work while referring to the inspection progress status and the on-rail status of the vehicle transmitted from the integrated management device. system.
【請求項4】 中央指令装置は、車両基地内の車両の制
御を行うことを特徴とする請求項1ないし3のいずれか
に記載の列車運行管理システム。
4. The train operation management system according to claim 1, wherein the central command device controls the vehicles in the depot.
【請求項5】 中央指令装置は、車両基地内の車両の在
線状況を出力することを特徴とする請求項4記載の列車
運行管理システム。
5. The train operation management system according to claim 4, wherein the central command device outputs the on-rail status of the vehicles in the depot.
JP8036408A 1996-02-23 1996-02-23 Train operation control system Pending JPH09226588A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP8036408A JPH09226588A (en) 1996-02-23 1996-02-23 Train operation control system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP8036408A JPH09226588A (en) 1996-02-23 1996-02-23 Train operation control system

Publications (1)

Publication Number Publication Date
JPH09226588A true JPH09226588A (en) 1997-09-02

Family

ID=12469017

Family Applications (1)

Application Number Title Priority Date Filing Date
JP8036408A Pending JPH09226588A (en) 1996-02-23 1996-02-23 Train operation control system

Country Status (1)

Country Link
JP (1) JPH09226588A (en)

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2005007483A1 (en) * 2003-07-18 2005-01-27 Hitachi, Ltd. Device for supporting vehicle replacement schedule generation
JP2008168906A (en) * 2008-03-31 2008-07-24 Tobu Railway Co Ltd Operation arranging device of train operation control system
JP2008222223A (en) * 2008-03-31 2008-09-25 Tobu Railway Co Ltd Railroad traffic operation arrangement apparatus of train operation control system
JP2010064548A (en) * 2008-09-09 2010-03-25 Toshiba Corp Vehicular information management device
EP2426027A2 (en) 2010-09-03 2012-03-07 Hitachi Ltd. Vehicle operation management method and server
WO2015068231A1 (en) 2013-11-07 2015-05-14 株式会社 日立製作所 Plan linking system and plan linking method
JP2016155397A (en) * 2015-02-23 2016-09-01 株式会社日立製作所 Operation arrangement support system
JP2017081271A (en) * 2015-10-26 2017-05-18 東日本旅客鉄道株式会社 Business assisting system for vehicle operation
JP2018090140A (en) * 2016-12-06 2018-06-14 東日本旅客鉄道株式会社 Vehicle application total management system
JP2018090139A (en) * 2016-12-06 2018-06-14 東日本旅客鉄道株式会社 Vehicle application business support system

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2005007483A1 (en) * 2003-07-18 2005-01-27 Hitachi, Ltd. Device for supporting vehicle replacement schedule generation
JP2008168906A (en) * 2008-03-31 2008-07-24 Tobu Railway Co Ltd Operation arranging device of train operation control system
JP2008222223A (en) * 2008-03-31 2008-09-25 Tobu Railway Co Ltd Railroad traffic operation arrangement apparatus of train operation control system
JP2010064548A (en) * 2008-09-09 2010-03-25 Toshiba Corp Vehicular information management device
EP2426027A2 (en) 2010-09-03 2012-03-07 Hitachi Ltd. Vehicle operation management method and server
JP2012051519A (en) * 2010-09-03 2012-03-15 Hitachi Ltd Vehicle operation management method and server
WO2015068231A1 (en) 2013-11-07 2015-05-14 株式会社 日立製作所 Plan linking system and plan linking method
JP2016155397A (en) * 2015-02-23 2016-09-01 株式会社日立製作所 Operation arrangement support system
JP2017081271A (en) * 2015-10-26 2017-05-18 東日本旅客鉄道株式会社 Business assisting system for vehicle operation
JP2018090140A (en) * 2016-12-06 2018-06-14 東日本旅客鉄道株式会社 Vehicle application total management system
JP2018090139A (en) * 2016-12-06 2018-06-14 東日本旅客鉄道株式会社 Vehicle application business support system

Similar Documents

Publication Publication Date Title
CN108528477B (en) A kind of metro depot/parking lot complex automatic system
US8380373B2 (en) System and method for dispatching by exception
JPH09226588A (en) Train operation control system
Roth et al. Understanding how train dispatchers manage and control trains: results of a cognitive task analysis
CN111137328B (en) Tramcar driving dispatching management system
JP4573661B2 (en) Distributed train operation management system and control method thereof
TWI276561B (en) Management system of train operation
EP0719224B1 (en) Traffic control system to control operations and traffic flow in rail transport
JP2018090139A (en) Vehicle application business support system
JP4966832B2 (en) Notification transmission system
KR101051793B1 (en) Methods and systems to help move the working train
JPH06144230A (en) Train diagram automatic generating device
JP7122107B2 (en) TRAFFIC OPERATION INFORMATION INTEGRATED MANAGEMENT SYSTEM, TRAFFIC OPERATION INFORMATION INTEGRATED MANAGEMENT METHOD
JP2008184032A (en) Diagram preparation device
KR102397566B1 (en) System for planning management of train crew
JP3572479B2 (en) Station automatic course control device
JPH0733025A (en) Train operation control device
WO2001063536A1 (en) Method and apparatus for notifying passengers of delay exception events in transit systems
JPH1178888A (en) Information providing system for transport facility utilization
JP2000172894A (en) Something found management system
JP3183777B2 (en) Train operation management system
JPH04118358A (en) Train operational regulating system
JPH0966833A (en) Train operation managing device
JP4221254B2 (en) Vehicle base diamond creation device
JPH07132827A (en) Total traffic control device