JPH07317075A - Method of cast-in-place sloped form construction - Google Patents

Method of cast-in-place sloped form construction

Info

Publication number
JPH07317075A
JPH07317075A JP13821094A JP13821094A JPH07317075A JP H07317075 A JPH07317075 A JP H07317075A JP 13821094 A JP13821094 A JP 13821094A JP 13821094 A JP13821094 A JP 13821094A JP H07317075 A JPH07317075 A JP H07317075A
Authority
JP
Japan
Prior art keywords
mortar
frame
reinforcing bars
grid
concrete
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP13821094A
Other languages
Japanese (ja)
Other versions
JP2627879B2 (en
Inventor
Tomofumi Matsumoto
奉文 松本
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nisshoku Corp
Original Assignee
Nisshoku Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nisshoku Corp filed Critical Nisshoku Corp
Priority to JP13821094A priority Critical patent/JP2627879B2/en
Publication of JPH07317075A publication Critical patent/JPH07317075A/en
Application granted granted Critical
Publication of JP2627879B2 publication Critical patent/JP2627879B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)

Abstract

PURPOSE:To form a latticed-shaped bulged frame body having size and strength in accordance with specifications and consisting of mortar, etc., under the state, in which reinforcing bars are disposed positively at places determined in specifications, simply without requiring skill in a method of cast-in-place sloped form construction using no form. CONSTITUTION:Reinforcing bars 8 are arranged onto netlike bodies 7 laid on the face of a slope 6 in a latticed shape, and the reinforcing bars 8 and the netlike bodies 7 are bound. Inspecting measuring frames K, which are composed of arched members 1 having specified height and width and connecting members 2 connecting the mutual arched members 1 and in which wallings 3 are mounted rotatably at one ends of the arched members 1, are disposed at proper intervals so that the arched members 1 cross the reinforcing bars 8. Mortar or concrete 11 is sprayed under the state, in which the wallings 3 are bridged horizontally at places in specified height so as to be passed among the reinforcing bars 8 and the netlike bodies 7.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【産業上の利用分野】この発明は、例えば道路や造成地
などの法面を緑化するようなときに使用される現場打ち
法枠工法に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a cast-in-place method frame construction method used for, for example, greening a slope such as a road or a constructed land.

【0002】[0002]

【従来の技術】前記現場打ち法枠工法として、例えば特
公昭58−20338号公報に示される「法面安定工
法」がある。この工法は、法面に金網などの網状体を敷
設した後、この網状体上に鉄筋を格子状に配置し、この
鉄筋にモルタルまたはコンクリート(以下、モルタル等
と言う)を吹き付けてモルタル等よりなる格子状法枠を
形成するようにしたものであるので、従来のプレハブ式
や現場打ち法枠工法などに比べて、施工性や強度に優れ
ているとともに、使用する器材が少なく安価であるとい
った利点がある。
2. Description of the Related Art As the above-mentioned in-situ casting method frame construction method, for example, there is a "slope stabilization construction method" disclosed in Japanese Patent Publication No. 58-20338. In this method, after laying a mesh body such as a wire mesh on the slope, arrange reinforcing bars on this mesh shape in a grid pattern and spray mortar or concrete (hereinafter referred to as mortar etc.) on this reinforcing bar Since it is designed to form a grid-shaped method frame, it is superior in workability and strength compared to conventional prefabricated type and in-situ method frame construction methods, and it uses less equipment and is inexpensive. There are advantages.

【0003】[0003]

【発明が解決しようとする課題】ところで、現行の土木
基準では、前記格子状鉄筋を覆うモルタル等の厚み(こ
れを被り厚と言う)が鉄筋のどの面からも5cm以上で
あることが、所要強度の格子状法枠を得るための品質管
理基準として義務付けられている。しかしながら、前記
現場打ち法枠工法は、型枠を用いない現場打ち法枠工法
であるとともに、モルタル等の吹き付けは、法面上の不
安定な場所で現場作業として行われることから、格子状
鉄筋に対するモルタル等の吹付け厚さや幅が不均一とな
りやすく、所定寸法の格子状法枠を形成するのに相当の
熟練度を要するとともに、格子状法枠の寸法や強度にバ
ラツキを生じることを避けることができなかった。
By the way, according to the current civil engineering standards, it is required that the thickness of the mortar or the like covering the grid-like reinforcing bars (which is called the covering thickness) is 5 cm or more from any surface of the reinforcing bars. Mandatory as a quality control standard for obtaining a strong grid-like framework. However, the cast-in-place method frame method is a cast-in-place method frame method that does not use a formwork, and since spraying mortar and the like is performed as site work in an unstable place on the slope, grid-shaped reinforcing bars are used. The thickness and width of the mortar sprayed against the surface are likely to be non-uniform, and considerable skill is required to form a grid-like method frame of a predetermined size, while avoiding variations in the size and strength of the grid-like method frame. I couldn't.

【0004】また、上記現場打ち法枠工法においては、
鉄筋をアンカーに保持させるなどして網状体からやや浮
かせた状態で設置し、これを中心にしてモルタル等を吹
き付けるが、このモルタル等の吹き付けた後、鉄筋の周
囲を所定の厚みのモルタル等の層が形成されているかを
確認できないため、規格を満たさないモルタル等よりな
る格子状法枠が稀に形成されることがあった。
Further, in the above-mentioned in-situ casting method frame construction method,
Install it in a state that it is slightly floating from the reticulated body by holding the reinforcing bar to the anchor, and spray mortar etc. around this, but after spraying this mortar etc., the area around the reinforcing bar is Since it was not possible to confirm whether or not a layer was formed, a grid-like method frame made of mortar or the like that did not meet the standards was occasionally formed.

【0005】この発明は、上述の事柄に留意してなされ
たもので、型枠を用いない現場打ち法枠工法において、
規格通りの寸法および強度を有し、かつ、鉄筋を規格に
定められた位置に確実に配設した状態のモルタル等より
なる格子状法枠を熟練を要することなく簡単に形成する
ことができる現場打ち法枠工法を提供することを目的と
している。
The present invention has been made in consideration of the above-mentioned matters, and in a cast-in-place frame construction method using no formwork,
A site that has dimensions and strength according to the standard and can easily form a grid-shaped method frame made of mortar or the like in which the reinforcing bars are securely arranged at the positions specified in the standard without requiring skill. The purpose is to provide a driving method.

【0006】[0006]

【課題を解決するための手段】上記目的を達成するた
め、この出願の第1の発明は、法面に網状体を敷設した
後、この網状体上に鉄筋を格子状に配置し、この格子状
鉄筋にモルタルまたはコンクリートを吹き付けてモルタ
ルまたはコンクリートよりなる格子状法枠を形成する現
場打ち法枠工法において、鉄筋と網状体とを結束すると
ともに、所定の高さと幅を有する弓状部材と弓状部材ど
うしを連結する連結部材とからなり、弓状部材に横桟を
その一端において回動自在に設けた検測枠を、弓状部材
が前記鉄筋を跨ぐようにして適宜の間隔をおいて配置し
た後、前記横桟を回動してその遊端側を弓状部材の他方
の脚部に係止して水平に架設し、横桟によって鉄筋およ
び網状体を浮設保持した状態で、モルタルまたはコンク
リートを吹き付けることを特徴としている。
In order to achieve the above object, the first invention of this application is to lay a reticulated body on a slope, and then arrange rebars on the reticulated body in a grid pattern. In the cast-in-place method method of forming a grid-like method frame made of mortar or concrete by spraying mortar or concrete on the bar-shaped reinforcing bar, the reinforcing bar and the net are bound together, and an arcuate member and a bow having a predetermined height and width. And a connecting member for connecting the member-shaped members to each other, and a measuring frame in which a crosspiece is rotatably provided at one end of the bow-shaped member, and the bow-shaped member straddles the rebar at appropriate intervals. After arranging, the horizontal bar is rotated and its free end side is locked to the other leg of the arcuate member to be horizontally installed, and in the state where the horizontal bar floats and holds the reinforcing bars and the net-like body, Spray mortar or concrete It is characterized by a door.

【0007】また、この出願の第2の発明は、法面に網
状体を敷設した後、この網状体上に鉄筋を格子状に配置
し、この格子状鉄筋にモルタルまたはコンクリートを吹
き付けてモルタルまたはコンクリートよりなる格子状法
枠を形成する現場打ち法枠工法において、所定の高さと
幅を有する弓状部材と弓状部材どうしを連結する連結部
材とからなり、弓状部材に横桟をその一端において回動
自在に設けた検測枠を、弓状部材が前記鉄筋を跨ぐよう
にして適宜の間隔をおいて配置した後、前記横桟を回動
してその遊端側を弓状部材の他方の脚部に係止して水平
に架設し、横桟によって鉄筋を浮設保持した状態で、モ
ルタルまたはコンクリートを吹き付けることを特徴とし
ている。
In the second invention of this application, after the net-like body is laid on the slope, the reinforcing bars are arranged on the net-like body in a grid pattern, and the mortar or concrete is sprayed onto the grid-like reinforcing bar and the mortar or In the cast-in-place method frame method for forming a grid-like method frame made of concrete, it is composed of an arcuate member having a predetermined height and width and a connecting member for connecting the arcuate members, and the crosspiece is attached to the arcuate member at one end thereof. After arranging the inspection frame rotatably provided at a predetermined interval so that the arcuate member straddles the rebar, the horizontal bar is rotated to make the free end side of the arcuate member of the arcuate member. It is characterized in that the mortar or concrete is sprayed in a state in which the other leg is locked and laid horizontally, and the reinforcing bars are suspended and held by the horizontal rails.

【0008】上記いずれの発明においても、弓状部材の
両下端部を折曲して沈み防止部を形成しておいたり、検
測枠を構成する部材として、が防錆加工を施した針金を
用いるようにしてもよい。
In any of the above-mentioned inventions, both lower ends of the arcuate member are bent to form a sunken portion, or as a member constituting the inspection frame, a wire rust-proofed is used. You may use it.

【0009】[0009]

【作用】この発明で用いる検測枠Kは、例えば図4に示
すように、所定の高さH(例えば10cm)と幅W(例
えば30cm)とを有する二つの弓状部材1とこれら二
つの弓状部材1を連結する二つの連結部材2とからなる
とともに、弓状部材1に一端が回動自在に係着された横
桟3を有している。この検測枠Kを構成する弓状部材
1、連結部材2および横桟3は、防錆加工を施した適宜
太さの針金よりなり、連結部材2は、弓状部材1に対し
てその適宜高さ位置において溶接またはハンダ付けによ
って固着されている。
The inspection frame K used in the present invention is, for example, as shown in FIG. 4, two arcuate members 1 having a predetermined height H (for example, 10 cm) and a width W (for example, 30 cm), and these two arcuate members 1. It has two connecting members 2 that connect the bow-shaped member 1, and has a cross rail 3 whose one end is rotatably attached to the bow-shaped member 1. The arcuate member 1, the connecting member 2 and the cross rails 3 which constitute the inspection frame K are made of wire with an appropriate thickness that has been subjected to rust prevention, and the connecting member 2 is appropriately arranged with respect to the arcuate member 1. It is fixed by welding or soldering at the height position.

【0010】そして、法面6に所定のモルタル等よりな
る格子状法枠12を形成するに際しては、法面6を整形
した後、図1に示すように、法面6全体に菱形金網など
の網状体7を敷設し、この網状体7上に鉄筋8を格子状
に敷設し、鉄筋8と網状体7とを結束線9を用いて適宜
箇所結束する。そして、前記検測枠Kを、弓状部材1が
鉄筋8を跨ぐようにして適宜の間隔をおいて配置する。
When forming the lattice-shaped frame 12 made of a predetermined mortar or the like on the slope 6, the slope 6 is shaped and then, as shown in FIG. The reticulated body 7 is laid, the reinforcing bars 8 are laid on the reticulated body 7 in a grid pattern, and the reinforcing bars 8 and the reticulated body 7 are bound at appropriate points by using binding wires 9. Then, the inspection frames K are arranged at appropriate intervals so that the arcuate member 1 straddles the reinforcing bar 8.

【0011】その後、検測枠Kの弓状部材1の一方の脚
部1aに一端を係着した横桟3をその係着点を中心に回
動させ、鉄筋8の下側を通すようにして、遊端側のフッ
ク部3bを他方の脚部1bに係止させて水平になるよう
に架設する。これにより、鉄筋8は網状体7とともに浮
設され、所定の高さ位置に保持される。この状態で、図
1および図3に示すように、格子状の鉄筋8にモルタル
等11を吹き付けるのである。
After that, the horizontal rail 3 whose one end is fastened to one leg 1a of the bow member 1 of the inspection frame K is rotated around the fastening point so that the lower side of the reinforcing bar 8 is passed through. Then, the hook portion 3b on the free end side is locked to the other leg portion 1b and installed so as to be horizontal. As a result, the reinforcing bar 8 is floated together with the mesh 7 and is held at a predetermined height position. In this state, as shown in FIGS. 1 and 3, mortar or the like 11 is sprayed onto the grid-shaped reinforcing bars 8.

【0012】このようにすることにより、鉄筋8が所定
の高さ位置に保持された鉄筋8の周囲に所定厚みのモル
タル等11を吹き付けることができ、所定寸法および強
度を有するモルタル等よりなる格子状法枠12を法面6
に確実に形成することができる。
By doing so, a mortar or the like 11 having a predetermined thickness can be sprayed around the reinforcing bar 8 held at a predetermined height position, and a grid made of mortar or the like having a predetermined size and strength. The slope 6 to the slope 6
Can be reliably formed.

【0013】[0013]

【実施例】図1〜図4は、第1の発明の現場打ち法枠工
法の一例を示すものである。まず、この発明において用
いる検測枠Kについて、図4を参照しながら説明する。
図4に示すように、検測枠Kは、所定の高さH(例えば
10cm)と幅W(例えば30cm)とを有する二つの
弓状部材1とこれら二つの弓状部材1の適宜高さの位置
(例えば高さHの半分の位置、この実施例では5cm)
において弓状部材1間を連結する二つの連結部材2A,
2Bとからなるとともに、両弓状部材1に一端が係着さ
れた横桟3からなる。
1 to 4 show an example of the in-situ casting method frame construction method of the first invention. First, the inspection frame K used in the present invention will be described with reference to FIG.
As shown in FIG. 4, the inspection frame K includes two arcuate members 1 having a predetermined height H (for example, 10 cm) and a width W (for example, 30 cm) and appropriate heights of these two arcuate members 1. Position (for example, half the height H, 5 cm in this embodiment)
Two connecting members 2A for connecting between the arcuate members 1 at
2B, and a horizontal rail 3 having one end fastened to both arcuate members 1.

【0014】すなわち、上記各部材1〜3は、例えば直
径4mm程度の防錆加工を施した針金からなる。そし
て、この実施例においては、弓状部材1の両下端部は、
適宜長さ(例えば5cm程度)例えば互いに向き合う方
向に折曲して沈み防止部4が形成されている。また、二
つの連結部材2A,2Bは、対向する二つの弓状部材1
の両脚部1a,1a間、1b,1b間をそれぞれ連結す
るよう、その両端部が溶接またははんだ付けされてい
て、弓状部材1とともに一つのフレームを形成してい
る。なお、符号5a,5bは、弓状部材1と連結部材2
A,2Bとの連結点である。
That is, each of the above-mentioned members 1 to 3 is made of, for example, a wire having a diameter of about 4 mm and subjected to anticorrosion treatment. Then, in this embodiment, both lower end portions of the arcuate member 1 are
An appropriate length (for example, about 5 cm) is bent, for example, in a direction facing each other to form the sunken portion 4. Further, the two connecting members 2A and 2B are the two arcuate members 1 facing each other.
Both ends of the legs 1a, 1a are welded or soldered so as to connect between the legs 1a, 1a, 1b, 1b, respectively, and together with the arcuate member 1, a frame is formed. In addition, reference numerals 5a and 5b denote arcuate member 1 and connecting member 2.
It is a connection point with A and 2B.

【0015】また、横桟3の一端側には、ループ部3a
が形成され、このループ部3aが弓状部材1の例えば一
方の脚部1aにおける弓状部材1と連結部材2との一方
の連結点5aの直ぐ上位の箇所に、図中矢印で示す方向
に回動できるように、遊嵌状態に係着される。そして、
横桟3の他端側にはフック部3bが形成され、横桟3が
連結部材2Aとほぼ平行な状態である第1状態(図中、
仮想線で示す)から両連結部材2A,2Bと直交する第
2状態(図中、実線で示す)にしたとき、フック部3b
を連結部材2Bに引っ掛け、第2状態を保持できるよう
に構成され、常時は第1状態にある。
A loop portion 3a is provided on one end of the horizontal rail 3.
The loop portion 3a is formed at a position immediately above the connecting point 5a between the arcuate member 1 and the connecting member 2 on one leg 1a of the arcuate member 1 in the direction indicated by the arrow in the figure. It is loosely fitted so as to be rotatable. And
A hook portion 3b is formed on the other end side of the horizontal rail 3, and the horizontal rail 3 is in a substantially parallel state with the connecting member 2A in a first state (in the figure,
When the second state (indicated by a solid line in the drawing) orthogonal to the connecting members 2A and 2B is changed from (indicated by an imaginary line) to the hook portion 3b.
Is hooked on the connecting member 2B to hold the second state, and is normally in the first state.

【0016】なお、この実施例では、連結部材2A,2
Bは、弓状部材1に対してその高さ方向のほぼ中間位置
に固着されているが、この高さに限られるものではな
い。連結部材2A,2Bの長さLは、網状体7上の鉄筋
8による格子枠の一つの辺の長さよりも短かくてよく、
適宜設定できるが、この実施例では、40〜50cm程
度である。
In this embodiment, the connecting members 2A, 2
B is fixed to the arcuate member 1 at a substantially intermediate position in the height direction, but is not limited to this height. The length L of the connecting members 2A, 2B may be shorter than the length of one side of the lattice frame formed by the reinforcing bars 8 on the mesh body 7,
It can be set appropriately, but in this embodiment, it is about 40 to 50 cm.

【0017】次に、上記検測枠Kを用いて行う現場打ち
法枠工法の一例について、図1〜図3をも参照しながら
説明する。図1および図2に示すように、予め整形され
た法面6に目合いが例えば5〜6cm程度の菱形金網な
どの網状体7を敷設する。この網状体7は、固定用アン
カー(図示してない)を用いて適宜法面6に固定され
る。そして、この網状体7上に鉄筋8を格子状に敷設
し、鉄筋8と網状体7とを結束線9を用いて適宜箇所結
束する。
Next, an example of the in-situ casting frame construction method using the inspection frame K will be described with reference to FIGS. As shown in FIGS. 1 and 2, a mesh 7 such as a rhombic wire mesh having a mesh size of, for example, about 5 to 6 cm is laid on a pre-shaped slope 6. The mesh 7 is appropriately fixed to the slope 6 by using a fixing anchor (not shown). Then, the reinforcing bars 8 are laid in a grid shape on the net-like body 7, and the reinforcing bars 8 and the net-like body 7 are bundled at appropriate points by using the binding wires 9.

【0018】そして、横桟3が前記第1状態にある検測
枠Kを、その弓状部材1が鉄筋8を跨ぐようにして適宜
の間隔をおいて配置する。その後、検測枠Kの弓状部材
1の一方の脚部1aに一端を係着した横桟3をその係着
点を中心に回動させ、鉄筋8の下側を通すようにして、
遊端側のフック部3bを連結部材2Bに係止させて水平
になるように架設する(図2および図3参照)。これに
より、鉄筋8が網状体7とともに所定の高さ位置(この
場合、弓状部材1の高さの約半分の位置)に保持され
る。そして、鉄筋8を第2状態の横桟3に対して結束線
10を用いて結束する。
Then, the measuring frames K in which the horizontal rails 3 are in the first state are arranged at appropriate intervals so that the arcuate members 1 straddle the reinforcing bars 8. After that, the horizontal rail 3 whose one end is fastened to one leg portion 1a of the bow-shaped member 1 of the inspection frame K is rotated about the fastening point so that the lower side of the reinforcing bar 8 is passed through.
The hook portion 3b on the free end side is locked to the connecting member 2B and installed so as to be horizontal (see FIGS. 2 and 3). As a result, the reinforcing bar 8 is held at a predetermined height position (in this case, a position which is about half the height of the arcuate member 1) together with the mesh 7. Then, the reinforcing bars 8 are bound to the horizontal rails 3 in the second state by using the binding wires 10.

【0019】ところで、この発明で用いる検測枠Kは、
モルタル等の吹き付け幅および吹き付け高さの目安にな
るとともに、鉄筋8を網状体7とともに浮設保持するた
めのスペーサとなるものであるから、鉄筋8によって形
成される格子枠の辺に少なくとも一つ設けてあればよ
く、この実施例のように、辺の長さが1〜2m、検測枠
Kの長さLが40〜50cmのときは、各辺に一つの検
測枠Kを設けるだけでよい。また、前記辺の長さがより
大きくなったときは、前記寸法の検測枠Kを2以上設け
てもよいが、検測枠Kの長さLをより大きく(例えば
1.3〜1.5m程度)設定してもよい。さらに、検測
枠Kを辺全長に亘って設けてもよい。
By the way, the inspection frame K used in the present invention is
Since it serves as a guide for the spraying width and spraying height of mortar and the like, and serves as a spacer for floatingly holding the reinforcing bar 8 together with the net-like body 7, at least one is provided on the side of the lattice frame formed by the reinforcing bar 8. As long as the side length is 1 to 2 m and the length L of the inspection frame K is 40 to 50 cm as in this embodiment, only one inspection frame K is provided on each side. Good. Further, when the length of the side becomes larger, two or more inspection frames K having the above dimensions may be provided, but the length L of the inspection frame K is made larger (for example, 1.3 to 1. 5 m) may be set. Furthermore, the inspection frame K may be provided over the entire length of the side.

【0020】以上のように構成して浮設された鉄筋8
に、例えば含水率が7〜8%程度の低スランプのモルタ
ル等11をモルタルガン機などの土木用吹付機(図示し
てない)によって吹き付ける。この場合、鉄筋8によっ
て形成される格子枠の各辺には、モルタル等11の吹き
付け幅および吹き付け高さの目安となる検測枠Kが設け
てあるので、この検測枠Kにしたがってモルタル等11
の吹き付けを行うだけで、所定寸法のモルタル等よりな
る格子状法枠12を形成することができる。すなわち、
この実施例においては、下端幅30〜35cm、高さ1
0〜15cm程度のモルタル等よりなる格子状法枠12
を容易に形成することができ、所定寸法および所定強度
のモルタル等よりなる格子状法枠11を確実に形成でき
るのである。なお、図1および図3において、符号13
はモルタル等11を吹き付けるためのノズルである。
Reinforcing bar 8 constructed as described above and floated
For example, 11 such as a low slump mortar having a water content of about 7 to 8% is sprayed by a spraying machine for civil engineering (not shown) such as a mortar gun machine. In this case, since each side of the lattice frame formed by the reinforcing bars 8 is provided with an inspection frame K that serves as a guide for the spraying width and the spraying height of the mortar 11 or the like, the mortar or the like follows the inspection frame K. 11
It is possible to form the lattice-shaped method frame 12 made of mortar or the like having a predetermined size only by spraying. That is,
In this example, the lower end width is 30 to 35 cm and the height is 1.
Lattice-shaped method frame 12 made of mortar or the like having a size of 0 to 15 cm
Thus, the lattice-shaped method frame 11 made of mortar or the like having a predetermined size and a predetermined strength can be reliably formed. 1 and 3, reference numeral 13
Is a nozzle for spraying 11 such as mortar.

【0021】そして、格子枠を構成する鉄筋8は、網状
体7とともに検測枠Kの横桟3によって浮設保持される
ことにより、網状体7とともに法面6から所定高さだけ
浮いた状態に保持され、その周囲が所定厚み所定幅のモ
ルタル等11によって囲まれた状態になる。したがっ
て、鉄筋7の周囲を規格通りにモルタル等11によって
囲んだモルタル等よりなる格子状法枠12を容易にしか
も確実に形成することができる。
The reinforcing bars 8 constituting the lattice frame are floated and held together with the mesh body 7 by the horizontal rails 3 of the inspection frame K, so that the reinforcing bars 8 are floated together with the mesh body 7 from the slope 6 by a predetermined height. And is surrounded by mortar 11 having a predetermined thickness and a predetermined width. Therefore, the lattice-shaped method frame 12 made of mortar or the like in which the periphery of the reinforcing bar 7 is surrounded by the mortar 11 according to the standard can be easily and surely formed.

【0022】そして、上記検測枠Kは、その横桟3が回
動自在であり、非使用時には横桟3を連結部材2Aとほ
ぼ平行な状態にしておくことができ、したがって、嵩張
ることなく収容できるといった利点がある。
Further, in the above-mentioned inspection frame K, the horizontal rail 3 is rotatable, and when not in use, the horizontal rail 3 can be kept substantially parallel to the connecting member 2A, so that it does not become bulky. It has the advantage that it can be accommodated.

【0023】以上のようにして法面6に形成されたモル
タル等よりなる格子状法枠12内に、土壌、有機質材、
保水材(土壌改良材)などと芝草、野草、低木類などの
種子とを混合してなる植生材料を動力吹付け機などを用
いて吹き付けて植生層14(図1参照)を形成したり、
また、これに代えて、前記植生材料を粗目の袋体に充填
した植生袋(図示してない)を配置するなどして、従来
不可能とされていた岩盤法面などにも植生を導入するこ
とが可能となり、法面の景観の向上および植物の根や茎
などによる法面の恒久的安定に寄与するところが大き
い。
In the lattice-shaped method frame 12 made of mortar or the like formed on the slope 6 as described above, soil, organic material,
To form a vegetation layer 14 (see FIG. 1) by spraying a vegetation material obtained by mixing a water retaining material (soil improving material) and seeds such as turf grass, wild grass and shrubs with a power spraying machine,
Instead of this, a vegetation bag (not shown) in which a coarse bag body is filled with the vegetation material is arranged to introduce vegetation into a rock slope, which has been conventionally impossible. It is possible to improve the landscape of the slope and contribute to the permanent stabilization of the slope by the roots and stems of plants.

【0024】図5は、第2の発明を示すもので、この発
明においては、網状体7と鉄筋8とを結束せず、横桟3
によって鉄筋8のみを浮設保持するものである。この発
明においては、鉄筋8は所定の高さ位置(例えば5c
m)に保持され、網状体7はこれより低い位置にある。
このように構成することにより、鉄筋8のまわりには所
定の被り厚のモルタル等よりなる層が形成されるととも
に、前記植生材料の吹き付け厚さが5cm以下であった
場合、網状体7が吹き付けられた植生材料のほぼ中間に
位置し、その流亡を効果的に防止することができる。
FIG. 5 shows a second aspect of the present invention. In the present invention, the crosspiece 7 and the reinforcing bars 8 are not bound, but the horizontal rail 3
Therefore, only the reinforcing bar 8 is floated and held. In the present invention, the reinforcing bar 8 is at a predetermined height position (for example, 5c).
m) and the mesh 7 is at a lower position.
With this structure, a layer made of mortar or the like having a predetermined covering thickness is formed around the reinforcing bar 8, and when the spray thickness of the vegetation material is 5 cm or less, the reticulate body 7 is sprayed. It is located almost in the middle of the vegetation material and can effectively prevent its runoff.

【0025】この発明は、上述の実施例に限られるもの
ではなく、例えば検測枠Kを図6に示すように構成して
もよい。すなわち、この図6に示す検測枠Kにおいて
は、横桟3に、鉄筋8を保持する上向きの凹部3cを形
成している。このようにした検測枠Kにおいては、鉄筋
8をより確実に所定の状態に浮設することができる。
The present invention is not limited to the above-described embodiment, but the inspection frame K may be constructed as shown in FIG. 6, for example. That is, in the inspection frame K shown in FIG. 6, the horizontal crosspiece 3 is formed with an upward recess 3c for holding the reinforcing bar 8. In the inspection frame K thus configured, the reinforcing bar 8 can be more reliably floated in a predetermined state.

【0026】そして、上記いずれの実施例においても、
検測枠Kをプラスチックによって一体成形によって形成
してもよい。そして、弓状部材1は3以上設けてあって
もよい。また、一つの辺に設けられる鉄筋7は必ずしも
1本でなくても複数本でもよく、その場合、鉄筋の交点
付近に4本の長目のアンカーを法面5に打ち込み、鉄筋
を井桁状に支承結束し、これを一段あるいは数段重ねる
ようにしてもよい。
In any of the above embodiments,
The inspection frame K may be integrally formed of plastic. Further, three or more arcuate members 1 may be provided. Further, the number of the reinforcing bars 7 provided on one side is not limited to one, but a plurality of reinforcing bars may be used. In that case, four long anchors are driven on the slope 5 near the intersection of the reinforcing bars to form the reinforcing bars in a cross beam shape. The support may be bundled and stacked in one or several steps.

【0027】[0027]

【発明の効果】以上説明したように、第1の発明におい
ては、法面に網状体を敷設した後、この網状体上に鉄筋
を格子状に配置し、この格子状鉄筋にモルタルまたはコ
ンクリートを吹き付けてモルタルまたはコンクリートよ
りなる格子状法枠を形成する現場打ち法枠工法におい
て、鉄筋と網状体とを結束するとともに、所定の高さと
幅を有する弓状部材と弓状部材どうしを連結する連結部
材とからなり、弓状部材に横桟をその一端において回動
自在に設けた検測枠を、弓状部材が前記鉄筋を跨ぐよう
にして適宜の間隔をおいて配置した後、前記横桟を回動
してその遊端側を弓状部材の他方の脚部に係止して水平
に架設し、横桟によって鉄筋および網状体を浮設保持し
た状態で、モルタルまたはコンクリートを吹き付けるよ
うにしており、また、第2の発明においては、法面に網
状体を敷設した後、この網状体上に鉄筋を格子状に配置
し、この格子状鉄筋にモルタルまたはコンクリートを吹
き付けてモルタルまたはコンクリートよりなる格子状法
枠を形成する現場打ち法枠工法において、所定の高さと
幅を有する弓状部材と弓状部材どうしを連結する連結部
材とからなり、弓状部材に横桟をその一端において回動
自在に設けた検測枠を、弓状部材が前記鉄筋を跨ぐよう
にして適宜の間隔をおいて配置した後、前記横桟を回動
してその遊端側を弓状部材の他方の脚部に係止して水平
に架設し、横桟によって鉄筋を浮設保持した状態で、モ
ルタルまたはコンクリートを吹き付けるようにしてい
る。
As described above, according to the first aspect of the present invention, after the reticulated body is laid on the slope, the rebars are arranged in a grid on the reticulated body, and the mortar or concrete is placed on the reticulated rebar. In a cast-in-place method frame method of spraying to form a grid-like method frame made of mortar or concrete, the reinforcing bars and nets are bound together, and the arched members having a predetermined height and width are joined together. And a horizontal frame on an arcuate member at one end of which a rotatable frame is rotatably provided, and the transverse frames are arranged at appropriate intervals such that the arcuate member straddles the rebar. Rotate to lock the free end side to the other leg of the bow member and erected horizontally, and spray the mortar or concrete with the rebar and the net body floating and held by the horizontal rail. And again In the second invention, after laying a net-like body on the slope, arranging reinforcing bars on the net-like body in a grid shape, and spraying mortar or concrete on the grid-like reinforcing bars, a grid-like method frame made of mortar or concrete. In the in-situ casting frame construction method of forming a slab, the crosspiece is composed of an arcuate member having a predetermined height and width and a connecting member for connecting the arcuate members, and the crosspiece is rotatably provided at one end of the arcuate member. After placing the inspection frame at an appropriate interval so that the bow member straddles the rebar, the horizontal bar is rotated to lock the free end side to the other leg of the bow member. It is installed horizontally, and the mortar or concrete is sprayed while the reinforcing bars are suspended and held by the horizontal rails.

【0028】したがって、上記第1の発明によれば、モ
ルタル等の吹き付けムラがなくなるとともに、鉄筋およ
び網状体を所定の高さ位置に保持することができ、鉄筋
のまわりに所定の被り厚を有する規格通りの寸法および
強度を有するモルタル等よりなる格子状法枠を容易に法
面に形成することができる。
Therefore, according to the first aspect of the present invention, the uneven spraying of mortar and the like can be eliminated, the reinforcing bar and the mesh can be held at a predetermined height position, and the reinforcing bar has a predetermined covering thickness. It is possible to easily form a lattice-shaped method frame made of mortar or the like having dimensions and strength according to the standard on the slope.

【0029】そして、上記第2の発明によれば、第1の
発明の効果の他に、植生材料の吹き付け厚さが5cm以
下のとき、網状体が吹き付けられた植生材料の流亡を効
果的に防止するといった効果を奏する。
According to the second aspect of the invention, in addition to the effect of the first aspect of the invention, when the spray thickness of the vegetation material is 5 cm or less, the vegetation material sprayed with the reticulate body can be effectively eliminated. It has the effect of preventing it.

【0030】そして、前記弓状部材に沈み防止部を形成
した場合には、法面が盛土で形成されているような場合
であっても、検測枠の沈みを防止でき、前記モルタル等
よりなる格子状法枠を所定寸法に確実に形成できる。
When the submergence prevention portion is formed on the arcuate member, the submergence of the inspection frame can be prevented even when the slope is formed by embankment. The grid-shaped method frame can be reliably formed to have a predetermined size.

【図面の簡単な説明】[Brief description of drawings]

【図1】第1の発明の現場打ち法枠工法の一例を示す図
である。
FIG. 1 is a diagram showing an example of a cast-in-place method frame construction method of the first invention.

【図2】前記工法の要部を示す図である。FIG. 2 is a diagram showing a main part of the construction method.

【図3】前記工法の要部を示す正面図である。FIG. 3 is a front view showing a main part of the construction method.

【図4】前記工法で用いる検測枠の一例を示す斜視図で
ある。
FIG. 4 is a perspective view showing an example of an inspection frame used in the construction method.

【図5】第2の発明の現場打ち法枠工法の要部を示す正
面図である。
FIG. 5 is a front view showing a main part of a cast-in-place method frame construction method of a second invention.

【図6】検測枠の他の例を示す斜視図である。FIG. 6 is a perspective view showing another example of the inspection frame.

【符号の説明】[Explanation of symbols]

1…弓状部材、2A,2B…連結部材、3…横桟、4…
沈み防止部、6…法面、7…網状体、8…鉄筋、11…
モルタルまたはコンクリート、12…格子状法枠、K…
検測枠。
DESCRIPTION OF SYMBOLS 1 ... Bow-shaped member, 2A, 2B ... Connection member, 3 ... Side rail, 4 ...
Sink prevention part, 6 ... Slope, 7 ... Reticulate body, 8 ... Reinforcing bar, 11 ...
Mortar or concrete, 12 ... Lattice frame, K ...
Inspection frame.

─────────────────────────────────────────────────────
─────────────────────────────────────────────────── ───

【手続補正書】[Procedure amendment]

【提出日】平成6年7月16日[Submission date] July 16, 1994

【手続補正1】[Procedure Amendment 1]

【補正対象書類名】明細書[Document name to be amended] Statement

【補正対象項目名】全文[Correction target item name] Full text

【補正方法】変更[Correction method] Change

【補正内容】[Correction content]

【書類名】 明細書[Document name] Statement

【発明の名称】 現場打ち法枠工法[Title of Invention] In-situ casting method

【特許請求の範囲】[Claims]

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【産業上の利用分野】この発明は、例えば道路や造成地
などの法面を緑化するようなときに使用される現場打ち
法枠工法に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a cast-in-place method frame construction method used for, for example, greening a slope such as a road or a constructed land.

【0002】[0002]

【従来の技術】前記現場打ち法枠工法として、例えば特
公昭58−20338号公報に示される「法面安定工
法」がある。この工法は、法面に金網などの網状体を敷
設した後、この網状体上に鉄筋を格子状に配置し、この
鉄筋にモルタルまたはコンクリート(以下、モルタル等
と言う)を吹き付けてモルタル等よりなる格子状法枠を
形成するようにしたものであるので、従来のプレハブ式
や現場打ち法枠工法などに比べて、施工性や強度に優れ
ているとともに、使用する器材が少なく安価であるとい
った利点がある。
2. Description of the Related Art As the above-mentioned in-situ casting method frame construction method, for example, there is a "slope stabilization construction method" disclosed in Japanese Patent Publication No. 58-20338. In this method, after laying a mesh body such as a wire mesh on the slope, arrange reinforcing bars on this mesh shape in a grid pattern and spray mortar or concrete (hereinafter referred to as mortar etc.) on this reinforcing bar Since it is designed to form a grid-shaped method frame, it is superior in workability and strength compared to conventional prefabricated type and in-situ method frame construction methods, and it uses less equipment and is inexpensive. There are advantages.

【0003】[0003]

【発明が解決しようとする課題】ところで、現行の土木
基準では、前記格子状鉄筋を覆うモルタル等の厚み(こ
れを被り厚と言う)が鉄筋のどの面からも5cm以上で
あることが、所要強度の格子状法枠を得るための品質管
理基準として義務付けられている。しかしながら、前記
現場打ち法枠工法は、型枠を用いない現場打ち法枠工法
であるとともに、モルタル等の吹き付けは、法面上の不
安定な場所で現場作業として行われることから、格子状
鉄筋に対するモルタル等の吹付け厚さや幅が不均一とな
りやすく、所定寸法の格子状法枠を形成するのに相当の
熟練度を要するとともに、格子状法枠の寸法や強度にバ
ラツキを生じることを避けることができなかった。
By the way, according to the current civil engineering standards, it is required that the thickness of the mortar or the like covering the grid-like reinforcing bars (which is called the covering thickness) is 5 cm or more from any surface of the reinforcing bars. Mandatory as a quality control standard for obtaining a strong grid-like framework. However, the cast-in-place method frame method is a cast-in-place method frame method that does not use a formwork, and since spraying mortar and the like is performed as site work in an unstable place on the slope, grid-shaped reinforcing bars are used. The thickness and width of the mortar sprayed against the surface are likely to be non-uniform, and considerable skill is required to form a grid-like method frame of a predetermined size, while avoiding variations in the size and strength of the grid-like method frame. I couldn't.

【0004】また、上記現場打ち法枠工法においては、
鉄筋をアンカーに保持させるなどして網状体からやや浮
かせた状態で設置し、これを中心にしてモルタル等を吹
き付けるが、このモルタル等の吹き付けた後、鉄筋の周
囲を所定の厚みのモルタル等の層が形成されているかを
確認できないため、規格を満たさないモルタル等よりな
る格子状法枠が稀に形成されることがあった。
Further, in the above-mentioned in-situ casting method frame construction method,
Install it in a state that it is slightly floating from the reticulated body by holding the reinforcing bar to the anchor, and spray mortar etc. around this, but after spraying this mortar etc., the area around the reinforcing bar is Since it was not possible to confirm whether or not a layer was formed, a grid-like method frame made of mortar or the like that did not meet the standards was occasionally formed.

【0005】この発明は、上述の事柄に留意してなされ
たもので、型枠を用いない現場打ち法枠工法において、
規格通りの寸法および強度を有し、かつ、鉄筋を規格に
定められた位置に確実に配設した状態のモルタル等より
なる格子状法枠を熟練を要することなく簡単に形成する
ことができる現場打ち法枠工法を提供することを目的と
している。
The present invention has been made in consideration of the above-mentioned matters, and in a cast-in-place frame construction method using no formwork,
A site that has dimensions and strength according to the standard and can easily form a grid-shaped method frame made of mortar or the like in which the reinforcing bars are securely arranged at the positions specified in the standard without requiring skill. The purpose is to provide a driving method.

【0006】[0006]

【課題を解決するための手段】上記目的を達成するた
め、この出願の第1の発明は、法面に網状体を敷設した
後、この網状体上に鉄筋を格子状に配置し、この格子状
鉄筋にモルタルまたはコンクリートを吹き付けてモルタ
ルまたはコンクリートよりなる格子状法枠を形成する現
場打ち法枠工法において、鉄筋と網状体とを結束すると
ともに、所定の高さと幅を有する弓状部材と弓状部材ど
うしを連結する連結部材とからなり、弓状部材に横桟を
その一端において回動自在に設けた検測枠を、弓状部材
が前記鉄筋を跨ぐようにして適宜の間隔をおいて配置し
た後、前記横桟を回動してその遊端側を弓状部材の他方
の脚部に係止して水平に架設し、横桟によって鉄筋およ
び網状体を浮設保持した状態で、モルタルまたはコンク
リートを吹き付けることを特徴としている。
In order to achieve the above object, the first invention of this application is to lay a reticulated body on a slope, and then arrange rebars on the reticulated body in a grid pattern. In the cast-in-place method method of forming a grid-like method frame made of mortar or concrete by spraying mortar or concrete on the bar-shaped reinforcing bar, the reinforcing bar and the net are bound together, and an arcuate member and a bow having a predetermined height and width. And a connecting member for connecting the member-shaped members to each other, and a measuring frame in which a crosspiece is rotatably provided at one end of the bow-shaped member, and the bow-shaped member straddles the rebar at appropriate intervals. After arranging, the horizontal bar is rotated and its free end side is locked to the other leg of the arcuate member to be horizontally installed, and in the state where the horizontal bar floats and holds the reinforcing bars and the net-like body, Spray mortar or concrete It is characterized by a door.

【0007】また、この出願の第2の発明は、法面に網
状体を敷設した後、この網状体上に鉄筋を格子状に配置
し、この格子状鉄筋にモルタルまたはコンクリートを吹
き付けてモルタルまたはコンクリートよりなる格子状法
枠を形成する現場打ち法枠工法において、所定の高さと
幅を有する弓状部材と弓状部材どうしを連結する連結部
材とからなり、弓状部材に横桟をその一端において回動
自在に設けた検測枠を、弓状部材が前記鉄筋を跨ぐよう
にして適宜の間隔をおいて配置した後、前記横桟を回動
してその遊端側を弓状部材の他方の脚部に係止して水平
に架設し、横桟によって鉄筋を浮設保持した状態で、モ
ルタルまたはコンクリートを吹き付けることを特徴とし
ている。
In the second invention of this application, after the net-like body is laid on the slope, the reinforcing bars are arranged on the net-like body in a grid pattern, and the mortar or concrete is sprayed onto the grid-like reinforcing bar and the mortar or In the cast-in-place method frame method for forming a grid-like method frame made of concrete, it is composed of an arcuate member having a predetermined height and width and a connecting member for connecting the arcuate members, and the crosspiece is attached to the arcuate member at one end thereof. After arranging the inspection frame rotatably provided at a predetermined interval so that the arcuate member straddles the rebar, the horizontal bar is rotated to make the free end side of the arcuate member of the arcuate member. It is characterized in that the mortar or concrete is sprayed in a state in which the other leg is locked and laid horizontally, and the reinforcing bars are suspended and held by the horizontal rails.

【0008】上記いずれの発明においても、弓状部材の
両下端部を折曲して沈み防止部を形成しておいたり、検
測枠を構成する部材として、が防錆加工を施した針金を
用いるようにしてもよい。
In any of the above-mentioned inventions, both lower ends of the arcuate member are bent to form a sunken portion, or as a member constituting the inspection frame, a wire rust-proofed is used. You may use it.

【0009】[0009]

【作用】この発明で用いる検測枠Kは、例えば図4に示
すように、所定の高さH(例えば10cm)と幅W(例
えば30cm)とを有する二つの弓状部材1とこれら二
つの弓状部材1を連結する二つの連結部材2とからなる
とともに、弓状部材1に一端が回動自在に係着された横
桟3を有している。この検測枠Kを構成する弓状部材
1、連結部材2および横桟3は、防錆加工を施した適宜
太さの針金よりなり、連結部材2は、弓状部材1に対し
てその適宜高さ位置において溶接またはハンダ付けによ
って固着されている。
The inspection frame K used in the present invention is, for example, as shown in FIG. 4, two arcuate members 1 having a predetermined height H (for example, 10 cm) and a width W (for example, 30 cm), and these two arcuate members 1. It has two connecting members 2 that connect the bow-shaped member 1, and has a cross rail 3 whose one end is rotatably attached to the bow-shaped member 1. The arcuate member 1, the connecting member 2 and the cross rails 3 which constitute the inspection frame K are made of wire with an appropriate thickness that has been subjected to rust prevention, and the connecting member 2 is appropriately arranged with respect to the arcuate member 1. It is fixed by welding or soldering at the height position.

【0010】そして、法面6に所定のモルタル等よりな
る格子状法枠12を形成するに際しては、法面6を整形
した後、図1に示すように、法面6全体に菱形金網など
の網状体7を敷設し、この網状体7上に鉄筋8を格子状
に敷設し、鉄筋8と網状体7とを結束線9を用いて適宜
箇所結束する。そして、前記検測枠Kを、弓状部材1が
鉄筋8を跨ぐようにして適宜の間隔をおいて配置する。
When forming the lattice-shaped frame 12 made of a predetermined mortar or the like on the slope 6, the slope 6 is shaped and then, as shown in FIG. The reticulated body 7 is laid, the reinforcing bars 8 are laid on the reticulated body 7 in a grid pattern, and the reinforcing bars 8 and the reticulated body 7 are bound at appropriate points by using binding wires 9. Then, the inspection frames K are arranged at appropriate intervals so that the arcuate member 1 straddles the reinforcing bar 8.

【0011】その後、検測枠Kの弓状部材1の一方の脚
部1aに一端を係着した横桟3をその係着点を中心に回
動させ、鉄筋8の下側を通すようにして、遊端側のフッ
ク部3bを他方の脚部1bに係止させて水平になるよう
に架設する。これにより、鉄筋8は網状体7とともに浮
設され、所定の高さ位置に保持される。この状態で、図
1および図3に示すように、格子状の鉄筋8にモルタル
等11を吹き付けるのである。
After that, the horizontal rail 3 whose one end is fastened to one leg 1a of the bow member 1 of the inspection frame K is rotated around the fastening point so that the lower side of the reinforcing bar 8 is passed through. Then, the hook portion 3b on the free end side is locked to the other leg portion 1b and installed so as to be horizontal. As a result, the reinforcing bar 8 is floated together with the mesh 7 and is held at a predetermined height position. In this state, as shown in FIGS. 1 and 3, mortar or the like 11 is sprayed onto the grid-shaped reinforcing bars 8.

【0012】このようにすることにより、鉄筋8が所定
の高さ位置に保持された鉄筋8の周囲に所定厚みのモル
タル等11を吹き付けることができ、所定寸法および強
度を有するモルタル等よりなる格子状法枠12を法面6
に確実に形成することができる。
By doing so, a mortar or the like 11 having a predetermined thickness can be sprayed around the reinforcing bar 8 held at a predetermined height position, and a grid made of mortar or the like having a predetermined size and strength. The slope 6 to the slope 6
Can be reliably formed.

【0013】[0013]

【実施例】図1〜図4は、第1の発明の現場打ち法枠工
法の一例を示すものである。まず、この発明において用
いる検測枠Kについて、図4を参照しながら説明する。
図4に示すように、検測枠Kは、所定の高さH(例えば
10cm)と幅W(例えば30cm)とを有する二つの
弓状部材1とこれら二つの弓状部材1の適宜高さの位置
(例えば高さHの半分の位置、この実施例では5cm)
において弓状部材1間を連結する二つの連結部材2A,
2Bとからなるとともに、両弓状部材1に一端が係着さ
れた横桟3からなる。
1 to 4 show an example of the in-situ casting method frame construction method of the first invention. First, the inspection frame K used in the present invention will be described with reference to FIG.
As shown in FIG. 4, the inspection frame K includes two arcuate members 1 having a predetermined height H (for example, 10 cm) and a width W (for example, 30 cm) and appropriate heights of these two arcuate members 1. Position (for example, half the height H, 5 cm in this embodiment)
Two connecting members 2A for connecting between the arcuate members 1 at
2B, and a horizontal rail 3 having one end fastened to both arcuate members 1.

【0014】すなわち、上記各部材1〜3は、例えば直
径4mm程度の防錆加工を施した針金からなる。そし
て、この実施例においては、弓状部材1の両下端部は、
適宜長さ(例えば5cm程度)例えば互いに向き合う方
向に折曲して沈み防止部4が形成されている。また、二
つの連結部材2A,2Bは、対向する二つの弓状部材1
の両脚部1a,1a間、1b,1b間をそれぞれ連結す
るよう、その両端部が溶接またははんだ付けされてい
て、弓状部材1とともに一つのフレームを形成してい
る。なお、符号5a,5bは、弓状部材1と連結部材2
A,2Bとの連結点である。
That is, each of the above-mentioned members 1 to 3 is made of, for example, a wire having a diameter of about 4 mm and subjected to anticorrosion treatment. Then, in this embodiment, both lower end portions of the arcuate member 1 are
An appropriate length (for example, about 5 cm) is bent, for example, in a direction facing each other to form the sunken portion 4. Further, the two connecting members 2A and 2B are the two arcuate members 1 facing each other.
Both ends of the legs 1a, 1a are welded or soldered so as to connect between the legs 1a, 1a, 1b, 1b, respectively, and together with the arcuate member 1, a frame is formed. In addition, reference numerals 5a and 5b denote arcuate member 1 and connecting member 2.
It is a connection point with A and 2B.

【0015】また、横桟3の一端側には、ループ部3a
が形成され、このループ部3aが弓状部材1の例えば一
方の脚部1aにおける弓状部材1と連結部材2との一方
の連結点5aの直ぐ上位の箇所に、図中矢印で示す方向
に回動できるように、遊嵌状態に係着される。そして、
横桟3の他端側にはフック部3bが形成され、横桟3が
連結部材2Aとほぼ平行な状態である第1状態(図中、
仮想線で示す)から両連結部材2A,2Bと直交する第
2状態(図中、実線で示す)にしたとき、フック部3b
を連結部材2Bに引っ掛け、第2状態を保持できるよう
に構成され、常時は第1状態にある。
A loop portion 3a is provided on one end of the horizontal rail 3.
The loop portion 3a is formed at a position immediately above the connecting point 5a between the arcuate member 1 and the connecting member 2 on one leg 1a of the arcuate member 1 in the direction indicated by the arrow in the figure. It is loosely fitted so as to be rotatable. And
A hook portion 3b is formed on the other end side of the horizontal rail 3, and the horizontal rail 3 is in a substantially parallel state with the connecting member 2A in a first state (in the figure,
When the second state (indicated by a solid line in the drawing) orthogonal to the connecting members 2A and 2B is changed from (indicated by an imaginary line) to the hook portion 3b.
Is hooked on the connecting member 2B to hold the second state, and is normally in the first state.

【0016】なお、この実施例では、連結部材2A,2
Bは、弓状部材1に対してその高さ方向のほぼ中間位置
に固着されているが、この高さに限られるものではな
い。連結部材2A,2Bの長さLは、網状体7上の鉄筋
8による格子枠の一つの辺の長さよりも短かくてよく、
適宜設定できるが、この実施例では、40〜50cm程
度である。
In this embodiment, the connecting members 2A, 2
B is fixed to the arcuate member 1 at a substantially intermediate position in the height direction, but is not limited to this height. The length L of the connecting members 2A, 2B may be shorter than the length of one side of the lattice frame formed by the reinforcing bars 8 on the mesh body 7,
It can be set appropriately, but in this embodiment, it is about 40 to 50 cm.

【0017】次に、上記検測枠Kを用いて行う現場打ち
法枠工法の一例について、図1〜図3をも参照しながら
説明する。図1および図2に示すように、予め整形され
た法面6に目合いが例えば5〜6cm程度の菱形金網な
どの網状体7を敷設する。この網状体7は、固定用アン
カー(図示してない)を用いて適宜法面6に固定され
る。そして、この網状体7上に鉄筋8を格子状に敷設
し、鉄筋8と網状体7とを結束線9を用いて適宜箇所結
束する。
Next, an example of the in-situ casting frame construction method using the inspection frame K will be described with reference to FIGS. As shown in FIGS. 1 and 2, a mesh 7 such as a rhombic wire mesh having a mesh size of, for example, about 5 to 6 cm is laid on a pre-shaped slope 6. The mesh 7 is appropriately fixed to the slope 6 by using a fixing anchor (not shown). Then, the reinforcing bars 8 are laid in a grid shape on the net-like body 7, and the reinforcing bars 8 and the net-like body 7 are bundled at appropriate points by using the binding wires 9.

【0018】そして、横桟3が前記第1状態にある検測
枠Kを、その弓状部材1が鉄筋8を跨ぐようにして適宜
の間隔をおいて配置する。その後、検測枠Kの弓状部材
1の一方の脚部1aに一端を係着した横桟3をその係着
点を中心に回動させ、鉄筋8の下側を通すようにして、
遊端側のフック部3bを連結部材2Bに係止させて水平
になるように架設する(図2および図3参照)。これに
より、鉄筋8が網状体7とともに所定の高さ位置(この
場合、弓状部材1の高さの約半分の位置)に保持され
る。そして、鉄筋8を第2状態の横桟3に対して結束線
10を用いて結束する。
Then, the measuring frames K in which the horizontal rails 3 are in the first state are arranged at appropriate intervals so that the arcuate members 1 straddle the reinforcing bars 8. After that, the horizontal rail 3 whose one end is fastened to one leg portion 1a of the bow-shaped member 1 of the inspection frame K is rotated about the fastening point so that the lower side of the reinforcing bar 8 is passed through.
The hook portion 3b on the free end side is locked to the connecting member 2B and installed so as to be horizontal (see FIGS. 2 and 3). As a result, the reinforcing bar 8 is held at a predetermined height position (in this case, a position which is about half the height of the arcuate member 1) together with the mesh 7. Then, the reinforcing bars 8 are bound to the horizontal rails 3 in the second state by using the binding wires 10.

【0019】ところで、この発明で用いる検測枠Kは、
モルタル等の吹き付け幅および吹き付け高さの目安にな
るとともに、鉄筋8を網状体7とともに浮設保持するた
めのスペーサとなるものであるから、鉄筋8によって形
成される格子枠の辺に少なくとも一つ設けてあればよ
く、この実施例のように、辺の長さが1〜2m、検測枠
Kの長さLが40〜50cmのときは、各辺に一つの検
測枠Kを設けるだけでよい。また、前記辺の長さがより
大きくなったときは、前記寸法の検測枠Kを2以上設け
てもよいが、検測枠Kの長さLをより大きく(例えば
1.3〜1.5m程度)設定してもよい。さらに、検測
枠Kを辺全長に亘って設けてもよい。
By the way, the inspection frame K used in the present invention is
Since it serves as a guide for the spraying width and spraying height of mortar and the like, and serves as a spacer for floatingly holding the reinforcing bar 8 together with the net-like body 7, at least one is provided on the side of the lattice frame formed by the reinforcing bar 8. As long as the side length is 1 to 2 m and the length L of the inspection frame K is 40 to 50 cm as in this embodiment, only one inspection frame K is provided on each side. Good. Further, when the length of the side becomes larger, two or more inspection frames K having the above dimensions may be provided, but the length L of the inspection frame K is made larger (for example, 1.3 to 1. 5 m) may be set. Furthermore, the inspection frame K may be provided over the entire length of the side.

【0020】以上のように構成して浮設された鉄筋8
に、例えば含水率が7〜8%程度の低スランプのモルタ
ル等11をモルタルガン機などの土木用吹付機(図示し
てない)によって吹き付ける。この場合、鉄筋8によっ
て形成される格子枠の各辺には、モルタル等11の吹き
付け幅および吹き付け高さの目安となる検測枠Kが設け
てあるので、この検測枠Kにしたがってモルタル等11
の吹き付けを行うだけで、所定寸法のモルタル等よりな
る格子状法枠12を形成することができる。すなわち、
この実施例においては、下端幅30〜35cm、高さ1
0〜15cm程度のモルタル等よりなる格子状法枠12
を容易に形成することができ、所定寸法および所定強度
のモルタル等よりなる格子状法枠11を確実に形成でき
るのである。なお、図1および図3において、符号13
はモルタル等11を吹き付けるためのノズルである。
Reinforcing bar 8 constructed as described above and floated
For example, 11 such as a low slump mortar having a water content of about 7 to 8% is sprayed by a spraying machine for civil engineering (not shown) such as a mortar gun machine. In this case, since each side of the lattice frame formed by the reinforcing bars 8 is provided with an inspection frame K that serves as a guide for the spraying width and the spraying height of the mortar 11 or the like, the mortar or the like follows the inspection frame K. 11
It is possible to form the lattice-shaped method frame 12 made of mortar or the like having a predetermined size only by spraying. That is,
In this example, the lower end width is 30 to 35 cm and the height is 1.
Lattice-shaped method frame 12 made of mortar or the like having a size of 0 to 15 cm
Thus, the lattice-shaped method frame 11 made of mortar or the like having a predetermined size and a predetermined strength can be reliably formed. 1 and 3, reference numeral 13
Is a nozzle for spraying 11 such as mortar.

【0021】そして、格子枠を構成する鉄筋8は、網状
体7とともに検測枠Kの横桟3によって浮設保持される
ことにより、網状体7とともに法面6から所定高さだけ
浮いた状態に保持され、その周囲が所定厚み所定幅のモ
ルタル等11によって囲まれた状態になる。したがっ
て、鉄筋7の周囲を規格通りにモルタル等11によって
囲んだモルタル等よりなる格子状法枠12を容易にしか
も確実に形成することができる。
The reinforcing bars 8 constituting the lattice frame are floated and held together with the mesh body 7 by the horizontal rails 3 of the inspection frame K, so that the reinforcing bars 8 are floated together with the mesh body 7 from the slope 6 by a predetermined height. And is surrounded by mortar 11 having a predetermined thickness and a predetermined width. Therefore, the lattice-shaped method frame 12 made of mortar or the like in which the periphery of the reinforcing bar 7 is surrounded by the mortar 11 according to the standard can be easily and surely formed.

【0022】そして、上記検測枠Kは、その横桟3が回
動自在であり、非使用時には横桟3を連結部材2Aとほ
ぼ平行な状態にしておくことができ、したがって、嵩張
ることなく収容できるといった利点がある。
Further, in the above-mentioned inspection frame K, the horizontal rail 3 is rotatable, and when not in use, the horizontal rail 3 can be kept substantially parallel to the connecting member 2A, so that it does not become bulky. It has the advantage that it can be accommodated.

【0023】以上のようにして法面6に形成されたモル
タル等よりなる格子状法枠12内に、土壌、有機質材、
保水材(土壌改良材)などと芝草、野草、低木類などの
種子とを混合してなる植生材料を動力吹付け機などを用
いて吹き付けて植生層14(図1参照)を形成したり、
また、これに代えて、前記植生材料を粗目の袋体に充填
した植生袋(図示してない)を配置するなどして、従来
不可能とされていた岩盤法面などにも植生を導入するこ
とが可能となり、法面の景観の向上および植物の根や茎
などによる法面の恒久的安定に寄与するところが大き
い。
In the lattice-shaped method frame 12 made of mortar or the like formed on the slope 6 as described above, soil, organic material,
To form a vegetation layer 14 (see FIG. 1) by spraying a vegetation material obtained by mixing a water retaining material (soil improving material) and seeds such as turf grass, wild grass and shrubs with a power spraying machine,
Instead of this, a vegetation bag (not shown) in which a coarse bag body is filled with the vegetation material is arranged to introduce vegetation into a rock slope, which has been conventionally impossible. It is possible to improve the landscape of the slope and contribute to the permanent stabilization of the slope by the roots and stems of plants.

【0024】図5は、第2の発明を示すもので、この発
明においては、網状体7と鉄筋8とを結束せず、横桟3
によって鉄筋8のみを浮設保持するものである。この発
明においては、鉄筋8は所定の高さ位置(例えば5c
m)に保持され、網状体7はこれより低い位置にある。
このように構成することにより、鉄筋8のまわりには所
定の被り厚のモルタル等よりなる層が形成されるととも
に、前記植生材料の吹き付け厚さが5cm以下であった
場合、網状体7が吹き付けられた植生材料のほぼ中間に
位置し、その流亡を効果的に防止することができる。
FIG. 5 shows a second aspect of the present invention. In the present invention, the crosspiece 7 and the reinforcing bars 8 are not bound, but the horizontal rail 3
Therefore, only the reinforcing bar 8 is floated and held. In the present invention, the reinforcing bar 8 is at a predetermined height position (for example, 5c).
m) and the mesh 7 is at a lower position.
With this structure, a layer made of mortar or the like having a predetermined covering thickness is formed around the reinforcing bar 8, and when the spray thickness of the vegetation material is 5 cm or less, the reticulate body 7 is sprayed. It is located almost in the middle of the vegetation material and can effectively prevent its runoff.

【0025】この発明は、上述の実施例に限られるもの
ではなく、例えば検測枠Kを図6に示すように構成して
もよい。すなわち、この図6に示す検測枠Kにおいて
は、横桟3に、鉄筋8を保持する上向きの凹部3cを形
成している。このようにした検測枠Kにおいては、鉄筋
8をより確実に所定の状態に浮設することができる。
The present invention is not limited to the above-described embodiment, but the inspection frame K may be constructed as shown in FIG. 6, for example. That is, in the inspection frame K shown in FIG. 6, the horizontal crosspiece 3 is formed with an upward recess 3c for holding the reinforcing bar 8. In the inspection frame K thus configured, the reinforcing bar 8 can be more reliably floated in a predetermined state.

【0026】そして、上記いずれの実施例においても、
検測枠Kをプラスチックによって一体成形によって形成
してもよい。そして、弓状部材1は3以上設けてあって
もよい。また、一つの辺に設けられる鉄筋7は必ずしも
1本でなくても複数本でもよく、その場合、鉄筋の交点
付近に4本の長目のアンカーを法面5に打ち込み、鉄筋
を井桁状に支承結束し、これを一段あるいは数段重ねる
ようにしてもよい。さらに、上記各実施例において、両
下端部の沈み防止部を形成していない弓状部材1を用い
てもよい(図7参照)。
In any of the above embodiments,
The inspection frame K may be integrally formed of plastic. Further, three or more arcuate members 1 may be provided. Further, the number of the reinforcing bars 7 provided on one side is not limited to one, but a plurality of reinforcing bars may be used. In that case, four long anchors are driven on the slope 5 near the intersection of the reinforcing bars to form the reinforcing bars in a cross beam shape. The support may be bundled and stacked in one or several steps. Furthermore, in each of the above embodiments, both
Using the bow-shaped member 1 which does not have the sunken portion at the lower end
(See FIG. 7).

【0027】[0027]

【発明の効果】以上説明したように、第1の発明におい
ては、法面に網状体を敷設した後、この網状体上に鉄筋
を格子状に配置し、この格子状鉄筋にモルタルまたはコ
ンクリートを吹き付けてモルタルまたはコンクリートよ
りなる格子状法枠を形成する現場打ち法枠工法におい
て、鉄筋と網状体とを結束するとともに、所定の高さと
幅を有する弓状部材と弓状部材どうしを連結する連結部
材とからなり、弓状部材に横桟をその一端において回動
自在に設けた検測枠を、弓状部材が前記鉄筋を跨ぐよう
にして適宜の間隔をおいて配置した後、前記横桟を回動
してその遊端側を弓状部材の他方の脚部に係止して水平
に架設し、横桟によって鉄筋および網状体を浮設保持し
た状態で、モルタルまたはコンクリートを吹き付けるよ
うにしており、また、第2の発明においては、法面に網
状体を敷設した後、この網状体上に鉄筋を格子状に配置
し、この格子状鉄筋にモルタルまたはコンクリートを吹
き付けてモルタルまたはコンクリートよりなる格子状法
枠を形成する現場打ち法枠工法において、所定の高さと
幅を有する弓状部材と弓状部材どうしを連結する連結部
材とからなり、弓状部材に横桟をその一端において回動
自在に設けた検測枠を、弓状部材が前記鉄筋を跨ぐよう
にして適宜の間隔をおいて配置した後、前記横桟を回動
してその遊端側を弓状部材の他方の脚部に係止して水平
に架設し、横桟によって鉄筋を浮設保持した状態で、モ
ルタルまたはコンクリートを吹き付けるようにしてい
る。
As described above, according to the first aspect of the present invention, after the reticulated body is laid on the slope, the rebars are arranged in a grid on the reticulated body, and the mortar or concrete is placed on the reticulated rebar. In a cast-in-place method frame method of spraying to form a grid-like method frame made of mortar or concrete, the reinforcing bars and nets are bound together, and the arched members having a predetermined height and width are joined together. And a horizontal frame on an arcuate member at one end of which a rotatable frame is rotatably provided, and the transverse frames are arranged at appropriate intervals such that the arcuate member straddles the rebar. Rotate to lock the free end side to the other leg of the bow member and erected horizontally, and spray the mortar or concrete with the rebar and the net body floating and held by the horizontal rail. And again In the second invention, after laying a mesh body on the slope, arranging reinforcing bars on the mesh body in a grid pattern, and spraying mortar or concrete onto the grid reinforcing bar, a grid-like method frame made of mortar or concrete. In the in-situ casting frame construction method of forming a slab, the crosspiece is composed of an arcuate member having a predetermined height and width and a connecting member for connecting the arcuate members, and the crosspiece is rotatably provided at one end thereof After placing the inspection frame at an appropriate interval so that the bow member straddles the rebar, the horizontal bar is rotated to lock the free end side to the other leg of the bow member. It is installed horizontally, and the mortar or concrete is sprayed while the reinforcing bars are suspended and held by the horizontal rails.

【0028】したがって、上記第1の発明によれば、モ
ルタル等の吹き付けムラがなくなるとともに、鉄筋およ
び網状体を所定の高さ位置に保持することができ、鉄筋
のまわりに所定の被り厚を有する規格通りの寸法および
強度を有するモルタル等よりなる格子状法枠を容易に法
面に形成することができる。
Therefore, according to the first aspect of the present invention, the uneven spraying of mortar and the like can be eliminated, the reinforcing bar and the mesh can be held at a predetermined height position, and the reinforcing bar has a predetermined covering thickness. It is possible to easily form a lattice-shaped method frame made of mortar or the like having dimensions and strength according to the standard on the slope.

【0029】そして、上記第2の発明によれば、第1の
発明の効果の他に、植生材料の吹き付け厚さが5cm以
下のとき、網状体が吹き付けられた植生材料の流亡を効
果的に防止するといった効果を奏する。
According to the second aspect of the invention, in addition to the effect of the first aspect of the invention, when the spray thickness of the vegetation material is 5 cm or less, the vegetation material sprayed with the reticulate body can be effectively eliminated. It has the effect of preventing it.

【0030】そして、前記弓状部材に沈み防止部を形成
した場合には、法面が盛土で形成されているような場合
であっても、検測枠の沈みを防止でき、前記モルタル等
よりなる格子状法枠を所定寸法に確実に形成できる。
When the submergence prevention portion is formed on the arcuate member, the submergence of the inspection frame can be prevented even when the slope is formed by embankment. The grid-shaped method frame can be reliably formed to have a predetermined size.

【図面の簡単な説明】[Brief description of drawings]

【図1】第1の発明の現場打ち法枠工法の一例を示す図
である。
FIG. 1 is a diagram showing an example of a cast-in-place method frame construction method of the first invention.

【図2】前記工法の要部を示す図である。FIG. 2 is a diagram showing a main part of the construction method.

【図3】前記工法の要部を示す正面図である。FIG. 3 is a front view showing a main part of the construction method.

【図4】前記工法で用いる検測枠の一例を示す斜視図で
ある。
FIG. 4 is a perspective view showing an example of an inspection frame used in the construction method.

【図5】第2の発明の現場打ち法枠工法の要部を示す正
面図である。
FIG. 5 is a front view showing a main part of a cast-in-place method frame construction method of a second invention.

【図6】検測枠の他の例を示す斜視図である。 FIG. 6 is a perspective view showing another example of the inspection frame.

【図7】弓状部材の別実施例を示す斜視図である。FIG. 7 is a perspective view showing another embodiment of the arcuate member.

【符号の説明】 1…弓状部材、2A,2B…連結部材、3…横桟、4…
沈み防止部、6…法面、7…網状体、8…鉄筋、11…
モルタルまたはコンクリート、12…格子状法枠、K…
検測枠。
[Explanation of Codes] 1 ... Bow-shaped member, 2A, 2B ... Connection member, 3 ... Cross rail, 4 ...
Sink prevention part, 6 ... Slope, 7 ... Reticulate body, 8 ... Reinforcing bar, 11 ...
Mortar or concrete, 12 ... Lattice frame, K ...
Inspection frame.

【手続補正2】[Procedure Amendment 2]

【補正対象書類名】図面[Document name to be corrected] Drawing

【補正対象項目名】図7[Name of item to be corrected] Figure 7

【補正方法】追加[Correction method] Added

【補正内容】[Correction content]

【図7】 [Figure 7]

Claims (4)

【特許請求の範囲】[Claims] 【請求項1】 法面に網状体を敷設した後、この網状体
上に鉄筋を格子状に配置し、この格子状鉄筋にモルタル
またはコンクリートを吹き付けてモルタルまたはコンク
リートよりなる格子状法枠を形成する現場打ち法枠工法
において、鉄筋と網状体とを結束するとともに、所定の
高さと幅を有する弓状部材と弓状部材どうしを連結する
連結部材とからなり、弓状部材に横桟をその一端におい
て回動自在に設けた検測枠を、弓状部材が前記鉄筋を跨
ぐようにして適宜の間隔をおいて配置した後、前記横桟
を回動してその遊端側を弓状部材の他方の脚部に係止し
て水平に架設し、横桟によって鉄筋および網状体を浮設
保持した状態で、モルタルまたはコンクリートを吹き付
けることを特徴とする現場打ち法枠工法。
1. After laying a reticulate body on the slope, arranging reinforcing bars on the reticulated body in a grid pattern, and spraying mortar or concrete on the grid rebar to form a grid-like method frame made of mortar or concrete. In the cast-in-place frame construction method, the reinforcing bar and the net-like body are bound together, and the bow-shaped member has a predetermined height and width and a connecting member that connects the bow-shaped members together. The inspection frame rotatably provided at one end is arranged at an appropriate interval so that the arcuate member straddles the rebar, and then the horizontal bar is rotated to move the free end side of the arcuate member. The method of in-situ casting method is characterized in that the mortar or concrete is sprayed while being horizontally erected while being locked to the other leg of the, and the reinforcing bars and the net-like body are suspended and held by the horizontal rail.
【請求項2】 法面に網状体を敷設した後、この網状体
上に鉄筋を格子状に配置し、この格子状鉄筋にモルタル
またはコンクリートを吹き付けてモルタルまたはコンク
リートよりなる格子状法枠を形成する現場打ち法枠工法
において、所定の高さと幅を有する弓状部材と弓状部材
どうしを連結する連結部材とからなり、弓状部材に横桟
をその一端において回動自在に設けた検測枠を、弓状部
材が前記鉄筋を跨ぐようにして適宜の間隔をおいて配置
した後、前記横桟を回動してその遊端側を弓状部材の他
方の脚部に係止して水平に架設し、横桟によって鉄筋を
浮設保持した状態で、モルタルまたはコンクリートを吹
き付けることを特徴とする現場打ち法枠工法。
2. After laying a mesh body on the slope, arranging reinforcing bars on the mesh body in a grid shape, and spraying mortar or concrete on the grid reinforcing bar to form a grid-like frame made of mortar or concrete. In the in-situ casting frame construction method, the inspection is composed of an arcuate member having a predetermined height and width and a connecting member for connecting the arcuate members together, and the crosspiece is rotatably provided at one end of the arcuate member. After arranging the frame at an appropriate interval so that the arcuate member straddles the reinforcing bar, the cross rail is rotated to lock the free end side thereof to the other leg of the arcuate member. This is a cast-in-place frame construction method characterized by spraying mortar or concrete in a state where it is laid horizontally and the reinforcing bars are suspended and held by a horizontal rail.
【請求項3】 弓状部材の両下端部を折曲して沈み防止
部を形成してなる請求項1または2に記載の現場打ち法
枠工法。
3. The cast-in-place frame construction method according to claim 1, wherein both end portions of the arcuate member are bent to form a sink preventing portion.
【請求項4】 検測枠を構成する部材が防錆加工を施し
た針金からなる請求項1〜3のいずれかに記載の現場打
ち法枠工法。
4. The cast-in-place frame construction method according to claim 1, wherein the member constituting the inspection frame is made of rust-proof wire.
JP13821094A 1994-05-28 1994-05-28 Cast-in-place method Expired - Fee Related JP2627879B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP13821094A JP2627879B2 (en) 1994-05-28 1994-05-28 Cast-in-place method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP13821094A JP2627879B2 (en) 1994-05-28 1994-05-28 Cast-in-place method

Publications (2)

Publication Number Publication Date
JPH07317075A true JPH07317075A (en) 1995-12-05
JP2627879B2 JP2627879B2 (en) 1997-07-09

Family

ID=15216662

Family Applications (1)

Application Number Title Priority Date Filing Date
JP13821094A Expired - Fee Related JP2627879B2 (en) 1994-05-28 1994-05-28 Cast-in-place method

Country Status (1)

Country Link
JP (1) JP2627879B2 (en)

Also Published As

Publication number Publication date
JP2627879B2 (en) 1997-07-09

Similar Documents

Publication Publication Date Title
JP3527059B2 (en) Inspection frame for forming legal frame and legal frame construction method using it
JPH07317075A (en) Method of cast-in-place sloped form construction
JP2694326B2 (en) Cast-in-place method
JP3025094U (en) Frame for forming legal frame
JP2694327B2 (en) Cast-in-place method
JP2627878B2 (en) Cast-in-place method
JP3119291B2 (en) Construction method of cast-in-place frame
JP2855263B2 (en) A frame for forming a legal frame and a legal frame method using the same
JP3008144U (en) Inspection frame for forming a legal frame with a reinforcing bar holding member
JP2997407B2 (en) Test wire
JP4681145B2 (en) Method frame forming frame and method frame method using the same
JP3443275B2 (en) Inspection frame for forming legal frame and legal frame method using it
JP2627877B2 (en) Cast-in-place method
JP3527058B2 (en) Inspection frame for forming legal frame and legal frame construction method using it
JP3332309B2 (en) Cast-in-place method
JP3008622U (en) Inspection frame for forming a legal frame with a reinforcing bar holding member
JPH09144008A (en) Measuring coil for forming cast-in-place sloped form
JP2748259B2 (en) Frame for forming legal frame and legal method using the frame
JP2694331B2 (en) Inspection frame for legal frame formation and legal frame construction method using it
JP2748262B2 (en) Inspection frame for forming a legal frame provided with a reinforcing bar holding member and a legal frame construction method using the same
JP3007853U (en) Inspection frame for forming legal frame
JP3008215U (en) Inspection frame for forming a legal frame provided with a reinforcing bar holding member
JP3014435U (en) Frame for forming legal frame
JP2694332B2 (en) Frame for forming legal frame and legal frame method using this frame
JPH09144013A (en) Cast-in-place slope protection frame work

Legal Events

Date Code Title Description
FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20080418

Year of fee payment: 11

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090418

Year of fee payment: 12

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090418

Year of fee payment: 12

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100418

Year of fee payment: 13

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100418

Year of fee payment: 13

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110418

Year of fee payment: 14

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120418

Year of fee payment: 15

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130418

Year of fee payment: 16

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20140418

Year of fee payment: 17

LAPS Cancellation because of no payment of annual fees