JP3008144U - Inspection frame for forming a legal frame with a reinforcing bar holding member - Google Patents

Inspection frame for forming a legal frame with a reinforcing bar holding member

Info

Publication number
JP3008144U
JP3008144U JP1994011520U JP1152094U JP3008144U JP 3008144 U JP3008144 U JP 3008144U JP 1994011520 U JP1994011520 U JP 1994011520U JP 1152094 U JP1152094 U JP 1152094U JP 3008144 U JP3008144 U JP 3008144U
Authority
JP
Japan
Prior art keywords
frame
reinforcing bar
holding member
bar holding
pair
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP1994011520U
Other languages
Japanese (ja)
Inventor
美津男 谷口
泰良 藤嶋
和正 柴田
要 堀
昭浩 松永
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nisshoku Corp
Original Assignee
Nisshoku Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nisshoku Corp filed Critical Nisshoku Corp
Priority to JP1994011520U priority Critical patent/JP3008144U/en
Application granted granted Critical
Publication of JP3008144U publication Critical patent/JP3008144U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)

Abstract

(57)【要約】 【目的】 型枠を用いない現場打ち法枠工法において、
規格通りの寸法および強度を有するモルタルなどよりな
る格子状法枠を熟練を要することなく、簡単に形成する
ことのできる法枠形成用の検測枠を提供すること。 【構成】 法面5に網状体6を敷設した後、この網状体
6上に鉄筋8を格子状に配置し、この格子状鉄筋8にモ
ルタルまたはコンクリート11を吹き付けてモルタルま
たはコンクリートよりなる格子状法枠12の寸法を規制
する法枠形成用の検測枠Kであって、長さ方向に適宜の
間隔をおいて設けられる所定の高さと幅とを有し、か
つ、正面視台形状、弓状、三角形状、多角形状、M字形
状、凹多角形状の一対の第1部材と、この第1部材どう
しを連結する第2部材を備えるとともに、第1部材の高
さ方向中間部において一対の脚部を結ぶ方向に鉄筋保持
部材を一つ横設したことを特徴としている。
(57) [Summary] [Purpose] In the in-situ casting method that does not use formwork,
(EN) Provided is an inspection frame for forming a law frame, which can easily form a lattice-like law frame made of mortar or the like having dimensions and strength according to specifications without requiring skill. [Structure] After laying the mesh 6 on the slope 5, the reinforcing bars 8 are arranged on the mesh 6 in a grid pattern, and the mortar or concrete 11 is sprayed onto the grid reinforcing bar 8 to form a grid pattern made of mortar or concrete. An inspection frame K for forming a legal frame that regulates the size of the legal frame 12, having a predetermined height and width provided at appropriate intervals in the length direction, and having a trapezoidal shape in front view, A pair of first members having an arcuate shape, a triangular shape, a polygonal shape, an M-shape, and a concave polygonal shape, and a second member that connects the first members to each other are provided, and a pair is provided at an intermediate portion in the height direction of the first member. One of the reinforcing bar holding members is provided laterally in the direction of connecting the legs of the.

Description

【考案の詳細な説明】[Detailed description of the device]

【0001】[0001]

【産業上の利用分野】[Industrial applications]

この考案は、例えば道路や造成地などの法面を緑化するようなときに施工され る、現場打ち法枠工法に使用する鉄筋保持部材を設けてなる法枠形成用の検測枠 に関する。 The present invention relates to an inspection frame for forming a legal frame, which is provided when a slope of a road or a constructed land is to be greened, and which is provided with a reinforcing bar holding member used for a cast-in-place method frame construction method.

【0002】[0002]

【従来の技術】[Prior art]

前記現場打ち法枠工法として、例えば特公昭58−20338号公報に示され る「法面安定工法」がある。この工法は、法面に金網などの網状体を敷設した後 、この網状体上に鉄筋を格子状に敷設し、この格子状鉄筋にモルタルまたはコン クリ−ト(以下、モルタル等と言う)を吹き付けてモルタル等よりなる格子状法 枠を形成するようにしたものであるので、従来のプレハブ式や現場打ち法枠工法 などに比べて、施工性や強度に優れているとともに、使用する基材が少なく安価 であるといった利点がある。 As the in-situ casting method frame construction method, there is, for example, the "slope stabilization method" disclosed in Japanese Patent Publication No. 58-20338. In this method, after laying a mesh body such as a wire mesh on the slope, laying reinforcing bars on this mesh body in a grid pattern, mortar or concrete (hereinafter referred to as mortar etc.) is laid on this grid reinforcing bar. Since it is formed by spraying to form a grid-shaped method frame made of mortar, etc., it is superior in workability and strength compared to the conventional prefabricated method and in-situ casting method, and the substrate used It has the advantages of low cost and low cost.

【0003】[0003]

【考案が解決しようとする課題】[Problems to be solved by the device]

ところで、現行の土木基準では、前記格子状鉄筋を覆うモルタル等の厚み(こ れを被り厚という)が鉄筋のどの面からも5cm以上であることが、所要強度の 格子状法枠を得るための品質管理基準として義務付けられている。しかしながら 、前記現場打ち法枠工法は、型枠を用いない現場打ち法枠工法であるとともに、 モルタル等の吹き付けは、法面上の不安定な場所で現場作業として行われること から、格子状鉄筋に対するモルタル等の吹付け厚さや幅が不均一となりやすく、 所定寸法の格子状法枠を形成するのに相当の熟練度を要するとともに、格子状法 枠の寸法や強度にバラツキを生じることを避けることができなかった。 By the way, according to the current civil engineering standards, the thickness of mortar, etc. that covers the grid-like reinforcing bars (this is called the covering thickness) is 5 cm or more from any surface of the reinforcing bars in order to obtain the grid-like frame with the required strength. Is required as a quality control standard. However, the above-mentioned cast-in-place method method is a cast-in-place method method that does not use a formwork, and spraying mortar etc. is performed as an on-site operation in an unstable place on the slope. The thickness and width of mortar etc. sprayed on the mortar are likely to be non-uniform, and considerable skill is required to form a grid-like method frame of a predetermined size, and variations in the size and strength of the grid-like method frame are avoided. I couldn't.

【0004】 この考案は、上述の事柄に留意してなされたもので、型枠を用いない現場打ち 法枠工法において、規格通りの寸法および強度を有するモルタル等よりなる格子 状法枠を熟練を要することなく簡単に形成することができる法枠形成用の検測枠 を提供することを目的としている。The present invention has been made in consideration of the above-mentioned matters, and in the field casting method construction method which does not use a formwork, it is necessary for a person skilled in the art to use a grid method frame made of mortar or the like having dimensions and strength according to the standard. The purpose is to provide an inspection frame for forming a legal frame that can be easily formed without requiring.

【0005】[0005]

【課題を解決するための手段】[Means for Solving the Problems]

上記目的を達成するため、この考案は、法面に網状体を敷設した後、この網状 体上に鉄筋を格子状に配置し、この格子状鉄筋にモルタルまたはコンクリ−トを 吹き付けて形成される、モルタルまたはコンクリ−トよりなる格子状法枠の寸法 を規制する法枠形成用の検測枠であって、長さ方向に適宜の間隔をおいて設けら れる所定の高さと幅を有する正面視台形状である一対の脚部を有する一対の第1 部材と、この第1部材どうしを連結する第2部材とを備えるとともに、第1部材 の高さ方向中間部において一対の脚部を結ぶ方向に鉄筋保持部材を一つ横設して あることを特徴としている。 In order to achieve the above-mentioned object, this invention is formed by laying a mesh on the slope, arranging reinforcing bars on the mesh in a grid pattern, and spraying mortar or concrete onto the grid reinforcing bar. A measuring frame for forming a legal frame that regulates the size of a grid-shaped legal frame made of mortar or concrete, and having a predetermined height and width provided at appropriate intervals in the length direction. A pair of first members having a pair of leg portions that are trapezoidal in shape and a second member that connects the first members to each other are provided, and the pair of legs is connected at an intermediate portion in the height direction of the first members. One of the features is that one reinforcing bar holding member is installed horizontally in the direction.

【0006】 前記正面視台形状の第1部材に変えて、正面視形状として、弓状、三角形、多 角形、M字形、上部に一つの凸部と二つの凹部を有する凹多角形の第1部材であ ってもよい。そして、鉄筋保持部材の両端を第1部材または第2部材に固着して あってもよいし、また、鉄筋保持部材の一端を第1部材の一方の脚部または第2 部材に遊動自在に設け、他端を他方の脚部または対応する第2部材に係止させる ようにしてもよく、さらに、鉄筋保持部材の両端を第1部材または第2部材に対 して着脱自在に取り付けられるようにしてあってもよく、さらにまた、鉄筋保持 部材が第2部材と矩形状を呈するよう一体的に形成されていてもよい。そして、 いずれの場合にあっても、第1部材の両下端部を折曲して沈み防止部を形成する ように構成してもよい。Instead of the first member having a trapezoidal shape in front view, the first shape is a bow shape, a triangle, a polygon, a M shape, and a concave polygonal shape having one convex portion and two concave portions on the upper portion. It may be a member. Further, both ends of the reinforcing bar holding member may be fixed to the first member or the second member, and one end of the reinforcing bar holding member is movably provided on one leg portion or the second member of the first member. , The other end may be locked to the other leg or the corresponding second member, and further, both ends of the reinforcing bar holding member may be detachably attached to the first member or the second member. The reinforcing bar holding member may be integrally formed with the second member so as to have a rectangular shape. In any case, both lower end portions of the first member may be bent to form the sunken portion.

【0007】[0007]

【作用】[Action]

この考案で用いる検測枠Kは、例えば図4に示すように、所定の高さH(例え ば10cm)と幅W(例えば30cm)とを有するように形成されるとともに、 一対の脚部1Bを有する一対の第1部材1と、この第1部材1どうしを連結する 第2部材2とを備えるとともに、第1部材1の高さ方向中間部において一対の脚 部1bを結ぶ方向に鉄筋保持部材3を一つ横設してなるものである。そして、第 1部材1の両下端部を例えば互いに向き合う方向に折曲して沈み防止部4が形成 されている。この検測枠Kを構成する第1部材1、第2部材2はおよび鉄筋保持 部材3は、例えば防錆加工を施した適宜太さの針金よりなり、第1部材と第2部 材2とは溶接またはハンダ付けによって連結されている。また、鉄筋保持部材3 は、例えば第1部材1の一対の脚部1Bどうしを連結するようにそれらに溶接さ れている。したがって、検測枠Kの構造が簡単で、その製作も容易であり、安価 である。 The inspection frame K used in the present invention is formed to have a predetermined height H (for example, 10 cm) and a width W (for example, 30 cm) as shown in FIG. 4, and also has a pair of legs 1B. And a second member 2 connecting the first members 1 to each other, and at the middle portion in the height direction of the first member 1, the reinforcing bar is held in a direction connecting the pair of legs 1b. One member 3 is provided horizontally. Then, both lower end portions of the first member 1 are bent, for example, in a direction facing each other to form a sink preventing portion 4. The first member 1, the second member 2 and the reinforcing bar holding member 3 which constitute the inspection frame K are made of, for example, a wire of an appropriate thickness that has been rust-proofed, and the first member and the second member 2 Are connected by welding or soldering. Further, the reinforcing bar holding member 3 is welded to, for example, the pair of leg portions 1B of the first member 1 so as to connect them. Therefore, the inspection frame K has a simple structure, is easy to manufacture, and is inexpensive.

【0008】 そして、法面5に所定のモルタルなどよりなる格子状法枠12を形成するに際 しては、法面5を整形した後、図1に示すように、法面5全体に菱形金網などの 網状体6を敷設し、この網状体6上に鉄筋8を格子状に配置する。そして、図2 に示すように、第1部材1が鉄筋8を跨ぎ、かつ、鉄筋8が上辺1Aと鉄筋保持 部材3との間に位置するように、つまり、鉄筋8を、上辺1Aと鉄筋保持部材3 とによって形成される空間9を挿通させるようにして、検測枠Kを網状体6上に 適宜の間隔をおいて配置し、その後、図1および図3に示すように、格子枠を形 成する鉄筋8にモルタルなど11を吹き付けるのである。Then, when forming the lattice-shaped method frame 12 made of a predetermined mortar or the like on the slope 5, after shaping the slope 5, as shown in FIG. A mesh body 6 such as a wire mesh is laid, and the reinforcing bars 8 are arranged on the mesh body 6 in a grid pattern. As shown in FIG. 2, the first member 1 straddles the reinforcing bar 8 and the reinforcing bar 8 is located between the upper side 1A and the reinforcing bar holding member 3, that is, the reinforcing bar 8 is connected to the upper side 1A and the reinforcing bar 8. The inspection frames K are arranged on the mesh 6 at appropriate intervals so that the space 9 formed by the holding member 3 is inserted therethrough, and then, as shown in FIG. 1 and FIG. Mortar 11 is sprayed onto the reinforcing bar 8 forming the.

【0009】 このようにすることにより、鉄筋8に対してモルタル等11を所定幅および高 さになるように確実に吹き付けることができ、所定強度を有するモルタル等より なる格子状法枠12を法面5に確実に形成することができる。By doing so, the mortar 11 or the like can be surely sprayed to the reinforcing bar 8 so as to have a predetermined width and height, and the grid-shaped method frame 12 made of mortar or the like having a predetermined strength is formed. The surface 5 can be reliably formed.

【0010】[0010]

【実施例】【Example】

図1〜図4は、この考案の検測枠およびこれを用いる法枠工法の一例を示すも のである。まず、図4において、Kは検測枠で、この検測枠Kは、所定の高さH (例えば10cm)と幅W(例えば30cm)とを有する一対の第1部材1と、 この第1部材1どうしを連結する第2部材2と、第1部材1の高さ方向中間部に おいて第1部材1に一対の脚部1Bを結ぶ方向に横設される鉄筋保持部材3とか ら構成されている。 1 to 4 show an example of an inspection frame of this invention and a method frame method using the same. First, in FIG. 4, K is an inspection frame, and this inspection frame K includes a pair of first members 1 having a predetermined height H (for example, 10 cm) and a width W (for example, 30 cm), and the first member. It is composed of a second member 2 that connects the members 1 and a reinforcing bar holding member 3 that is provided in the middle of the height direction of the first member 1 in a direction connecting the pair of legs 1B to the first member 1. Has been done.

【0011】 すなわち、第1部材1、第2部材2および鉄筋保持部材3は、例えば防錆加工 を施した適宜太さ(例えば直径4mm)の針金よりなる。第2部材2の両端部は 、溶接またはハンダ付けによって第1部材1の下端部よりやや上方位置に固着さ れている。そして、この実施例においては、第1部材1の両下端部を適宜長さ( 例えば3cm程度)例えば互いに向き合う方向に折曲して沈み防止部4を形成し ている。なお、第2部材2の長さLは、法面5に鉄筋8によって形成される格子 枠の一つの辺の長さよりも短く、例えば30cm程度でよい。That is, the first member 1, the second member 2 and the reinforcing bar holding member 3 are made of, for example, a wire having an appropriate thickness (for example, a diameter of 4 mm) that has been rust-proofed. Both ends of the second member 2 are fixed to a position slightly above the lower end of the first member 1 by welding or soldering. Then, in this embodiment, both the lower end portions of the first member 1 are bent to have an appropriate length (for example, about 3 cm), for example, in the directions facing each other to form the sinking prevention portion 4. The length L of the second member 2 may be shorter than the length of one side of the lattice frame formed by the reinforcing bars 8 on the slope 5 and may be, for example, about 30 cm.

【0011】 次に、上記検測枠Kを用いて行う現場打ち法枠工法の一例について、図1〜図 3を参照しながら説明する。予め整形された法面5に目合いが例えば5〜6cm 程度の菱形金網などの網状体6を敷設し、アンカ−7を適宜の間隔で法面5に打 ち込んで網状体6を法面5に固定する(図2および図3参照)。Next, an example of the in-situ casting method frame construction method using the inspection frame K will be described with reference to FIGS. 1 to 3. A mesh body 6 such as a diamond wire mesh having a mesh size of about 5 to 6 cm is laid on the pre-shaped slope 5, and anchors 7 are driven into the slope 5 at appropriate intervals to form the slope 6. 5 (see FIGS. 2 and 3).

【0012】 前記網状体6の上に例えば直径が6〜10mm程度の鉄筋8を一辺が1〜2m 程度の格子状に組み合わせて配置する(図1参照)。Reinforcing bars 8 having a diameter of, for example, about 6 to 10 mm are combined and arranged on the net-like body 6 in a lattice shape having one side of about 1 to 2 m (see FIG. 1).

【0013】 そして、鉄筋8からなる格子枠の各辺のほぼ中央に、第1部材1が鉄筋8を跨 ぎ、かつ、鉄筋8が上辺1Aと鉄筋保持部材3との間に位置するように、つまり 、鉄筋8が上辺1Aと鉄筋保持部材3とによって形成される空間9を挿通させる ようにして、検測枠Kを網状体6上に適宜の間隔をおいて配置する(図1および 図2参照)。この場合、第1部材1の下端に沈み防止部4が形成されているので 、法面5が盛土であるような場合、検測枠Kが法面5から沈み込むことが防止さ れる。なお、必要により、適宜の結束線10を用いて鉄筋8を鉄筋保持部材3に 結束してもよい(図2および図3参照)。Then, the first member 1 straddles the reinforcing bar 8 and the reinforcing bar 8 is positioned between the upper side 1 A and the reinforcing bar holding member 3 at approximately the center of each side of the lattice frame composed of the reinforcing bars 8. That is, the inspection frames K are arranged on the mesh body 6 at appropriate intervals so that the reinforcing bars 8 are inserted into the space 9 formed by the upper side 1A and the reinforcing bar holding member 3 (FIG. 1 and FIG. 2). In this case, since the sinking prevention portion 4 is formed at the lower end of the first member 1, the inspection frame K is prevented from sinking from the slope 5 when the slope 5 is embankment. If necessary, the reinforcing bar 8 may be bound to the reinforcing bar holding member 3 by using an appropriate binding wire 10 (see FIGS. 2 and 3).

【0014】 前記検測枠Kは、モルタル等11の吹き付け幅および吹き付け高さの目安とな るものであるから、格子枠の各辺に少なくとも一つ設けてあればよく、この実施 例のように、辺の長さが1〜2m、検測枠Kの長さLが30cmのときは、各辺 に一つの検測枠Kを設けるだけでよい。また、前記辺の長さがより大きくなった ときは、前記寸法の検測枠Kを2以上設けてもよいが、検測枠Kの長さLをより 大きく(例えば1.3〜1.5m程度)設定してもよい。さらに、検測枠Kを辺 全長に亘って設けてもよい。Since the inspection frame K serves as a guide for the spraying width and spraying height of the mortar 11 and the like, it is sufficient to provide at least one on each side of the lattice frame, as in this embodiment. In addition, when the length of the side is 1 to 2 m and the length L of the inspection frame K is 30 cm, it is sufficient to provide one inspection frame K for each side. Further, when the length of the side becomes larger, two or more inspection frames K having the above dimensions may be provided, but the length L of the inspection frame K is made larger (for example, 1.3 to 1. 5 m) may be set. Further, the inspection frame K may be provided over the entire length of the side.

【0015】 以上のように構成した格子状鉄筋8に、例えば含水率が7〜8%程度の低スラ ンプのモルタルなど11をモルタルガン機などの土木用吹付機(図示してない) によって吹き付ける。この場合、鉄筋8によって形成される格子枠の各辺には、 モルタルなど11の吹き付け幅および吹き付け高さの目安となる検測枠Kを設け てあるので、この検測枠Kにしたがってモルタルなど11の吹き付けを行うだけ で、所定寸法のモルタル等よりなる格子状法枠(以下、単に格子状法枠という) 12を容易に形成することができる。すなわち、この実施例においては、下端幅 30〜35cm、高さ10〜15cm程度の格子状法枠12を形成することがで き、所定寸法および所定強度の格子状法枠12を確実に形成できるのである。な お、図1および図3において、符号13はモルタルなど11を吹き付けるための ノズルである。On the grid-shaped reinforcing bar 8 configured as described above, for example, 11 such as a low-slump mortar having a water content of about 7 to 8% is sprayed with a spraying machine for civil engineering (not shown) such as a mortar gun machine. . In this case, since each side of the lattice frame formed by the reinforcing bars 8 is provided with an inspection frame K that serves as a guide for the spraying width and the spraying height of the mortar 11 and the like, the mortar etc. A lattice-shaped method frame (hereinafter, simply referred to as a lattice-shaped method frame) 12 made of mortar or the like having a predetermined size can be easily formed by only spraying 11. That is, in this embodiment, the lattice-shaped method frame 12 having a lower end width of 30 to 35 cm and a height of 10 to 15 cm can be formed, and the lattice-shaped method frame 12 having a predetermined size and a predetermined strength can be reliably formed. Of. In FIGS. 1 and 3, reference numeral 13 is a nozzle for spraying 11 such as mortar.

【0016】 以上のようにして法面5に形成された格子状法枠12内に、土壌、有機質材、 保水材(土壌改良材)などと芝草、野草、花、低木類などの種子とを混合してな る植生材料を動力吹付け機などを用いて吹き付けて植生層14(図1参照)を形 成したり、また、これに代えて、前記植生材料を粗目の袋体に充填した植生袋( 図示してない)を配置するなどして、従来不可能とされていた岩盤法面などにも 植生を導入することが可能となり、法面の景観の向上および植生の根や茎などに よる法面の恒久的安定に寄与するところが大きい。Soil, organic material, water retention material (soil conditioner), etc. and seeds of turfgrass, wild grass, flowers, shrubs, etc. are placed in the lattice-shaped method frame 12 formed on the slope 5 as described above. The mixed vegetation material was sprayed using a power sprayer or the like to form the vegetation layer 14 (see FIG. 1), or alternatively, the vegetation material was filled in a coarse bag. By arranging a vegetation bag (not shown), it becomes possible to introduce vegetation even on rock slopes, which were previously impossible, to improve the landscape of slopes and to improve roots and stems of vegetation. It greatly contributes to the permanent stability of the slope due to.

【0017】 この考案は、上述の実施例に限られるものではなく、種々に変形して実施でき る。以下、変形例を図に基ずいて説明する。なお、以下の図において、図1〜図 4までの符号と同一のものは同一物である。The present invention is not limited to the above-described embodiment, but can be modified in various ways. Hereinafter, modified examples will be described with reference to the drawings. In the following figures, the same parts as those in FIGS. 1 to 4 are the same.

【0018】 まず、図5は、鉄筋8と網状体6とを鉄筋保持部材3によって浮設保持した状 態でモルタルなど11を吹き付けた例を示している。すなわち、鉄筋8を鉄筋保 持部材3によって保持した後、網状体6を持ち上げ、適宜の結束線15を用いて 網状体6を鉄筋8あるいは鉄筋保持部材3に結束し、その状態でモルタルなど1 1を吹き付けるのである。First, FIG. 5 shows an example in which mortar 11 or the like is sprayed in a state in which the reinforcing bar 8 and the net-like body 6 are suspended and held by the reinforcing bar holding member 3. That is, after holding the reinforcing bar 8 by the reinforcing bar holding member 3, the reticulated body 6 is lifted up, and the reticulated body 6 is bound to the reinforcing bar 8 or the rebar holding member 3 by using an appropriate binding wire 15. Spray one.

【0019】 図6は、鉄筋8のみを浮設保持した実施態様を示している。このようにした場 合、格子状法枠12での植生層14の厚みが5cm未満の場合、網状体6が吹き 付け基材としての植生材料の流亡防止材として有効に作用する。この場合、適宜 のスぺーサ16を用いて、網状体6を浮設保持してもよい。なお、前記スぺーサ 16としては、例えば本願出願人に係る昭和63年意匠登録第4418号の「法 面の保護用ラススぺーサー」や、本願出願人に係る実公平5ー42118号公報 の「スぺーサーピン」を用いることができる。FIG. 6 shows an embodiment in which only the reinforcing bar 8 is suspended and held. In this case, when the thickness of the vegetation layer 14 in the lattice-shaped method frame 12 is less than 5 cm, the reticulate body 6 effectively acts as a runoff prevention material for the vegetation material as the spray base material. In this case, the mesh body 6 may be floated and held by using an appropriate spacer 16. The spacer 16 may be, for example, “Last Spacer for Slope Protection” of Design Registration No. 4418 of the applicant of the present application, or Japanese Utility Model Publication No. 5-42118 of the applicant of the present application. A "spacer pin" can be used.

【0020】 次に、検測枠Kの変形例を説明する。図7に示すように、検測枠Kにおいて、 二つの第1部材1が、二つの長辺17Aと二つの短辺17Bとからなる矩形体1 7によって連結するようにしてもよい。この矩形体17は、例えば防錆加工を施 した適宜太さの針金からなり、その二つの短辺17Bに二つの第1部材1が例え ば溶接によってそれぞれ固着されている。すなわち、この検測枠Kにおいては、 二つの長辺17Aが図4に示した検測枠Kにおける第2部材2に相当し、二つの 短辺17Bが鉄筋保持部材3として機能する。つまり、この例は、検測枠Kにお ける第2部材2と鉄筋保持部材3とを一体化したものである。このような検測枠 Kは、その製作がより簡単となる。なお、前記矩形体17は正方形であってもよ い。Next, a modified example of the inspection frame K will be described. As shown in FIG. 7, in the inspection frame K, the two first members 1 may be connected by a rectangular body 17 having two long sides 17A and two short sides 17B. The rectangular body 17 is made of, for example, a wire of an appropriate thickness that has been subjected to rust prevention processing, and the two first members 1 are fixed to the two short sides 17B of each by welding, for example. That is, in this inspection frame K, the two long sides 17A correspond to the second member 2 in the inspection frame K shown in FIG. 4, and the two short sides 17B function as the reinforcing bar holding member 3. That is, in this example, the second member 2 and the reinforcing bar holding member 3 in the inspection frame K are integrated. Such an inspection frame K becomes easier to manufacture. The rectangular body 17 may be square.

【0021】 上述の実施例は、いずれも鉄筋保持部材3,17Bを固定的に設けたものであ ったが、図8に示すように構成してもよい。すなわち、この図において、18は 鉄筋保持部材で、例えば防錆加工を施した適宜太さの針金からなる。この鉄筋保 持部材18の一端側には、ループ部18Aが形成され、このループ部18Aが第 1部材1の例えば一方の脚部1Bにおける第1部材1と第2部材2との一方の連 結点の直ぐ上位の箇所に、図中矢印で示す方向に回動できるように、遊動状態に 係着されている。そして、鉄筋保持部材18の他端側には、フック部18Bが形 成され、第2部材2とほぼ平行な状態である第1状態から第2部材2と直交する 第2状態(鉄筋保持部材18が一対の脚部1Bを結ぶ方向、図中、実線で示す) にしたとき、フック部18Bを連結部材2に引っ掛けることにより第2状態を保 持できるように構成され、常時は第1状態にある。In all of the above-described embodiments, the reinforcing bar holding members 3 and 17B are fixedly provided, but they may be configured as shown in FIG. That is, in this figure, reference numeral 18 denotes a reinforcing bar holding member, which is made of, for example, a wire of an appropriate thickness that has been subjected to rust prevention processing. A loop portion 18A is formed on one end side of the reinforcing bar holding member 18, and the loop portion 18A connects one of the first member 1 and the second member 2 in the leg portion 1B of the first member 1, for example. It is attached to a position immediately above the junction in a floating state so that it can rotate in the direction indicated by the arrow in the figure. A hook portion 18B is formed on the other end side of the reinforcing bar holding member 18, and the hook member 18B is formed substantially parallel to the second member 2 from a first state to a second state (reinforcing bar holding member) orthogonal to the second member 2. 18 is a direction connecting the pair of leg portions 1B, which is indicated by a solid line in the drawing), the hook portion 18B is hooked on the connecting member 2 so that the second state can be maintained, and the first state is normally set. It is in.

【0022】 このように構成された検測枠Kは、常時は、鉄筋保持部材18が第2部材2と ほぼ平行である第2状態にあるので、保管や運搬などにおいて、検測枠Kをコン パクトに重ね合わせることができる。In the inspection frame K configured as described above, the reinforcing bar holding member 18 is normally in the second state in which the reinforcing bar holding member 18 is substantially parallel to the second member 2. Therefore, the inspection frame K is stored and transported. Can be stacked compactly.

【0023】 なお、図8に示した検測枠Kにおいては、鉄筋保持部材18のループ部18A を第1部材1の一方の脚部1Bに設けていたが、第2部材2に設けるようにして もよい。また、鉄筋保持部材18のフック部18Bを第1部材1の他の脚部1B に引っ掛けるようにしてもよい。In the inspection frame K shown in FIG. 8, the loop portion 18A of the reinforcing bar holding member 18 is provided on the one leg portion 1B of the first member 1, but it may be provided on the second member 2. May be. Further, the hook portion 18B of the reinforcing bar holding member 18 may be hooked on the other leg portion 1B of the first member 1.

【0024】 上述した実施例においては、鉄筋保持部材3,17B,18は、それらの両端 または一方が検測枠Kの主たる構成部材である第1部材1または第2部材2に固 着または係着されていたが、これを着脱自在に設けるようにしてもよい。図9は このように構成した例を示すもので、この図において、19は例えば防錆加工を 施した適宜太さおよび適宜長さの針金で、対向する第2部材2間に掛けわたされ 、両端部において適宜の結束線20を用いて第2部材2に結束固定されて、鉄筋 保持部材19に形成されている。In the above-described embodiment, the reinforcing bar holding members 3, 17 B, 18 are fixed or attached to the first member 1 or the second member 2, which is the main constituent member of the inspection frame K, at one or both ends thereof. Although it was worn, it may be detachably provided. FIG. 9 shows an example of such a configuration. In this figure, 19 is, for example, a wire with an appropriate thickness and an appropriate length that has been subjected to rust prevention processing, and is hung between the opposing second members 2. Both ends are bound and fixed to the second member 2 by using appropriate binding wires 20, and are formed on the reinforcing bar holding member 19.

【0025】 このように構成した検測枠Kにおいては、その本体が、常時は第1部材1と第 2部材2とからなるので、コンパクトとなり、保管や運搬などにおいて好都合で ある。また、この実施例において、鉄筋保持部材19の第2部材2への結束は、 検測枠Kを鉄筋8に対してセットする際行う方法と、予め行っておく方法とがあ るが、セットの際結束を行う方が、鉄筋8の保持を行うための作業をより行いや すい。In the inspection frame K configured as described above, the main body is always composed of the first member 1 and the second member 2, so that it is compact and convenient for storage and transportation. In this embodiment, the binding of the reinforcing bar holding member 19 to the second member 2 may be performed when setting the inspection frame K on the reinforcing bar 8 or may be performed in advance. It is easier to carry out the work for holding the reinforcing bars 8 by binding them.

【0026】 図9に示した実施例においては、鉄筋保持部材19を結束線20によって固定 していたが、これに代えて、図10に示すようにしてもよい。すなわち、この図 に示す例では、例えば防錆加工を施した適宜太さおよび適宜長さの針金21に両 端部を例えば同じ方向に折曲してフック部21Aを形成し、このフック部21A を第2部材2に係合させるようにして鉄筋保持部材21としている。なお、この 実施例において、フック部21Aを第1部材1の脚部1Bにおける第2部材2と の連結部分より上方において係合させるようにしてもよい。In the embodiment shown in FIG. 9, the reinforcing bar holding member 19 is fixed by the binding wire 20, but instead of this, it may be made as shown in FIG. That is, in the example shown in this figure, both ends are bent in the same direction, for example, to form a hook portion 21A on a wire 21 having an appropriate thickness and an appropriate length that has been subjected to rust prevention processing. Are engaged with the second member 2 to form the reinforcing bar holding member 21. In this embodiment, the hook portion 21A may be engaged above the connecting portion of the leg portion 1B of the first member 1 with the second member 2.

【0027】 図10に示したように構成した検測枠Kにおいては、図9に示した検測枠Kと 同様の効果があるとともに、さらに、鉄筋保持部材21の取り付けにおいて結束 線を必要としないほか、その取り付けを容易に行なえるといった利点がある。The inspection frame K configured as shown in FIG. 10 has the same effect as the inspection frame K shown in FIG. 9, and further requires a binding wire for attaching the reinforcing bar holding member 21. Besides, there is an advantage that it can be easily attached.

【0028】 図11は、図10に示した実施例に変形例を示すもので、この実施例において は、鉄筋保持部材21の長さ方向の中間部において鉄筋保持部材21をやや折曲 し、鉄筋8を安定に保持するための安定保持部22を形成している。図示する例 では、鉄筋保持部材21のほぼ中央部を下方に屈曲し、この部分22に鉄筋8( 図示してない)を安定に保持できるようにしている。そして、この実施例におい ては、第2部材2を第1部材1の脚部1Bのかなり上方において固着している。 これは、所定の被り厚が得られるように鉄筋8を保持するためである。FIG. 11 shows a modification of the embodiment shown in FIG. 10. In this embodiment, the reinforcing bar holding member 21 is slightly bent at an intermediate portion in the longitudinal direction of the reinforcing bar holding member 21, A stable holding portion 22 for stably holding the reinforcing bar 8 is formed. In the illustrated example, the reinforcing bar holding member 21 is bent at a substantially central portion thereof so that the reinforcing bar 8 (not shown) can be stably held in this portion 22. Then, in this embodiment, the second member 2 is fixed to a position considerably above the leg portion 1B of the first member 1. This is for holding the reinforcing bar 8 so that a predetermined covering thickness can be obtained.

【0029】 なお、前記安定保持部22は、鉄筋保持部材21に上方に開いた凹部を形成す るなどにより形成してもよく、この場合、鉄筋保持部材21を必ずしも屈曲させ る必要はない。また、図4,図7〜図9にそれぞれ示した鉄筋保持部材3,17 B,18,19においても、図11に示した鉄筋保持部材21と同様の安定保持 部22を形成しあってもよい。The stable holding portion 22 may be formed by forming a concave portion that opens upward in the reinforcing bar holding member 21. In this case, the reinforcing bar holding member 21 does not necessarily have to be bent. Further, also in the reinforcing bar holding members 3, 17 B, 18, 19 shown in FIGS. 4, 7 to 9, respectively, even if the stable holding portion 22 similar to the reinforcing bar holding member 21 shown in FIG. 11 is formed. Good.

【0030】 上記実施例においてはいずれも、検測枠Kにおける第1部材1の正面視形状が 台形であったが、この考案はこれに限られるものではなく、図12に示すように 三角形(図示する例では二等辺三角形)に形成してもよい。この図において、符 合23は第1部材、24は第1部材23の脚部(等辺)間に横設される鉄筋保持 部材である。このように構成した検測枠Kにおいても、上記各実施例と同様の効 果があり、また、これを用いた法枠工法においても同様の効果を奏する。さらに 、第1部材23が力学的に安定な三角形であるので、検測枠Kとしてより安定度 が大きい。In each of the above embodiments, the front view shape of the first member 1 in the inspection frame K is trapezoidal, but the present invention is not limited to this, and as shown in FIG. It may be formed in an isosceles triangle in the illustrated example. In this figure, reference numeral 23 is a first member, and reference numeral 24 is a reinforcing bar holding member provided laterally between leg portions (equal sides) of the first member 23. The inspection frame K configured as described above also has the same effects as those of the above-described respective examples, and the same effect can be obtained in the method of frame construction using the same. Furthermore, since the first member 23 is a mechanically stable triangle, the stability of the inspection frame K is higher.

【0031】 図13は、第1部材の正面視形状を左右対称形の五角形に形成したもので、こ の図において、符号25は第1部材、26は第1部材25の脚部25B間の横設 される鉄筋保持部材である。このように構成した検測枠Kにおいても、上記各実 施例と同様の効果があり、また、これを用いた法枠工法においても同様の効果を 奏する。そして、この実施例の検測枠Kによれば、頂点25aを目安にしてモル タルなど11を吹き付けるだけで、所定の被り厚を有する格子状法枠12を形成 することができる。なお、図示しないが、第1部材25を左右対称形または非対 称形の五角形以上に多角形状としてもよい。In FIG. 13, the front view shape of the first member is formed into a left-right symmetrical pentagonal shape. In this figure, reference numeral 25 is a first member, and 26 is a space between legs 25 B of the first member 25. It is a reinforcing bar holding member installed horizontally. The inspection frame K configured as described above also has the same effects as those of the above-described respective embodiments, and also the same effect can be obtained in the legal frame construction method using the same. Then, according to the inspection frame K of this embodiment, the lattice-shaped method frame 12 having a predetermined covering thickness can be formed only by spraying 11 such as mortar with the apex 25a as a guide. Although not shown, the first member 25 may have a polygonal shape having a bilaterally symmetrical or asymmetrical pentagon.

【0032】 図14は、第1部材に正面視形状を左右対称形の凹多角形としたもので、より 詳しくは、第1部材27として、上部に一つの凸部27aと二つの凹部27bを 有する凹多角形(左右対称形が好ましい)に形成されている。28は第1部材2 7の脚部27B間を連結するように横設される鉄筋保持部材である。このように 構成された検測枠Kにおいても、上記各実施例と同様の効果があり、また、これ を用いた法枠工法においても同様の効果を奏する。そして、この実施例の検測枠 Kにおいては、図示するように、二つの凹部27bに2本の鉄筋8を安定に保持 でき、鉄筋保持部材28にも2本の鉄筋8を保持でき、所謂4本配筋構造の格子 状法枠など背の高い格子状法枠を形成するのに好都合である。なお、鉄筋保持部 材28に1本の鉄筋8を配置してもよいことは言うまでもない。In FIG. 14, the first member is a left-right symmetrical polygonal concave polygon, and more specifically, as the first member 27, one convex portion 27a and two concave portions 27b are provided on the upper portion. It has a concave polygonal shape (preferably a left-right symmetrical shape). Reference numeral 28 is a reinforcing bar holding member that is provided so as to connect between the leg portions 27B of the first member 27. The inspection frame K configured in this way also has the same effects as those of the above-described respective embodiments, and the same method effect can be obtained in the legal frame construction method using the same. In the inspection frame K of this embodiment, as shown in the drawing, the two reinforcing bars 8 can be stably held in the two recesses 27b, and the two reinforcing bars 8 can also be held in the reinforcing bar holding member 28. It is convenient to form a tall grid-shaped frame such as a grid-shaped frame with four reinforcing bars. It goes without saying that one reinforcing bar 8 may be arranged on the reinforcing bar holding member 28.

【0033】 また、この実施例の検測枠Kを用いた場合、第1部材27の上部のほぼ中央2 7aが上方に突出し、さらに、この凸部27aの両側に形成される二つの凹部2 7bの他方にも凸部27cが形成されているので、モルタルなど11の吹き付け 時には、これらの凸部27a,27cを目安にして吹き付ければ、所定の被り厚 の格子状法枠12を形成することができ、後述するような検測ピン33(図16 および図18参照)を用いなくてもよい。Further, when the inspection frame K of this embodiment is used, substantially the center 27a of the upper portion of the first member 27 projects upward, and further, the two concave portions 2 formed on both sides of the convex portion 27a. Since the convex portion 27c is also formed on the other side of 7b, when the mortar 11 is sprayed, if these convex portions 27a and 27c are sprayed as a guide, the lattice-shaped frame 12 having a predetermined covering thickness is formed. However, it is not necessary to use the inspection pin 33 (see FIGS. 16 and 18) as described later.

【0034】 図15は、この検測枠Kに用いる鉄筋保持部材28の変形例を示している。こ の図において図14に示すものと同じ符合が付された部材は同一または同等の部 材であるので、その詳細な説明を省略する。この鉄筋保持部材28は、2つの鉄 筋保持部28Cを設けるよう、凹部が2つ設けられている。このように構成する と、鉄筋の保持部が正確に決まるとともに、鉄筋の保持がより安定にできる効果 を有する。なお、図15においては、沈み防止部4を他の実施例は互いに向き合 う方向に曲折して形成していたのを、外側に曲折した実施例を示しており、他の 実施例における検測枠においても同様に形成してよいことは言うまでもない。FIG. 15 shows a modification of the reinforcing bar holding member 28 used for the inspection frame K. In this figure, the members denoted by the same reference numerals as those shown in FIG. 14 are the same or equivalent members, and thus detailed description thereof will be omitted. The reinforcing bar holding member 28 is provided with two recesses so as to provide two reinforcing bar holding portions 28C. With this structure, the holding portion of the reinforcing bar is accurately determined, and the holding of the reinforcing bar can be made more stable. In addition, in FIG. 15, the sink preventing portion 4 is formed by bending in a direction facing each other in the other embodiments, but an example is shown in which the sink preventing portion 4 is bent outward. It goes without saying that the measurement frame may be formed in the same manner.

【0035】 図16は、第1部材の正面視形状をM字状(左右対称形が好ましい)に形成し たもので、この図において、符号29は第1部材、30は第1部材29の脚部2 9B間を連結するように横設される鉄筋保持部材である。このように構成された 検測枠Kにおいても、上記各実施例と同様の効果があり、また、これを用いた法 枠工法においても同様の効果を奏する。FIG. 16 shows the front view of the first member formed in an M-shape (a symmetrical shape is preferable). In this figure, reference numeral 29 is the first member and 30 is the first member 29. It is a reinforcing bar holding member which is installed laterally so as to connect between the leg portions 29B. The inspection frame K configured in this way also has the same effects as those of the above-described respective examples, and the same method and frame frame construction method also has the same effects.

【0036】 さらに、この実施例の検測枠Kを用いた場合、第1部材29の上部のほぼ中央 が下方に凹んでいるので、この凹み部分29aの高さ位置を所定の被り厚が得ら れるように設置すれば、この部分29aによって鉄筋8を、鉄筋保持部材30に よって保持される鉄筋8とは別に、安定した状態で保持させることができる。つ まり、この構造の検測枠Kは、格子状法枠12の寸法を規制する機能のほかに、 鉄筋8を上下方向に2段に保持する機能も有するので、より高い格子状法枠12 を形成するような場合、好都合であるといった利点がある。なお、この図におい て、符号33はモルタルなど11の吹付け厚を規定するため、法面5に立設され る検測ピンである。Further, in the case of using the inspection frame K of this embodiment, the upper portion of the first member 29 has a substantially center recessed downward, so that the height position of the recessed portion 29a is set to a predetermined covering thickness. If installed so as to be released, the rebar 8 can be held in a stable state by the portion 29a separately from the rebar 8 held by the rebar holding member 30. In other words, the inspection frame K of this structure has not only the function of restricting the size of the lattice-shaped frame 12 but also the function of holding the reinforcing bars 8 in two stages in the vertical direction. In the case of forming, there is an advantage that it is convenient. In this figure, reference numeral 33 is an inspection pin which is erected on the slope 5 in order to define the spraying thickness of the mortar 11 or the like.

【0037】 その他の実施例として、検測枠Kにおける第1部材1の正面視形状を、例えば 図17に示すように弓状に形成してもよい。この図において、符合31は第1部 材、32は第1部材31の脚部(等辺)間に横設される鉄筋保持部材である。こ のように構成した検測枠Kにおいても、上記各実施例と同様の効果があり、また 、これを用いた法枠工法においても同様の効果を奏する。さらに、第1部材31 が形成しようとする格子状法枠の形状そのものであるため、この検測枠Kの形状 に併せてモルタルなど11を吹き付けるだけで、規定通りで所定の被り厚を有す る格子状法枠12を形成することができる。As another example, the front view shape of the first member 1 in the inspection frame K may be formed in an arc shape as shown in FIG. 17, for example. In this figure, reference numeral 31 is a first member, and 32 is a reinforcing bar holding member provided laterally between leg portions (equal sides) of the first member 31. The inspection frame K configured as described above also has the same effect as that of each of the above-described embodiments, and the method of frame construction using this also has the same effect. Further, since the first member 31 is the shape of the grid-shaped method frame itself to be formed, only by spraying mortar 11 together with the shape of the inspection frame K, a predetermined covering thickness can be obtained. The grid-shaped method frame 12 can be formed.

【0038】 図18は、鉄筋8を上下2段に設ける他の実施態様を示すもので、この例にお いては、図4に示したような正面視形状が台形の第1部材1を有する検測枠Kを 用い、第1部材1の水平な上辺1Aによっても鉄筋8を保持させるようにして、 上下2段に鉄筋8を保持させるようにしている。この場合も検測ピン33を用い て、モルタルなど11の吹付け厚を規定している。FIG. 18 shows another embodiment in which the reinforcing bars 8 are provided in upper and lower two stages. In this example, the first member 1 having a trapezoidal shape in a front view as shown in FIG. 4 is provided. The inspection frame K is used to hold the reinforcing bar 8 by the horizontal upper side 1A of the first member 1 so that the reinforcing bar 8 is held in two upper and lower stages. In this case as well, the spraying thickness of the mortar 11 or the like is specified using the inspection pin 33.

【0039】 また、実施例として示したいずれの検測枠Kにおいても、鉄筋保持部材に、図 11に示した鉄筋保持部材21と同様に、安定保持部22を形成してもよいこと は言うまでもない。Further, in any of the inspection frames K shown as examples, it goes without saying that a stable holding portion 22 may be formed on the reinforcing bar holding member, similar to the reinforcing bar holding member 21 shown in FIG. Yes.

【0040】 また、前記いずれの実施例においても、検測枠Kにおける第1部材の下端部を 折曲して沈み防止部4を形成してあったが、前記下端部を折曲しないでストレー トな状態にしてあってもよいことは言うまでもない。Further, in any of the above-described embodiments, the lower end of the first member of the inspection frame K is bent to form the sunken portion 4, but the stray is not bent at the bottom. It goes without saying that it may be in good condition.

【0041】 さらに、前記いずれの実施例においても、検測枠Kにおける第2部材2の設置 高さは任意であるが、鉄筋8の被り厚を所定値以上確保したい場合は、第1部材 の高い位置に固定するのが望ましい。また、第1部材は3以上設けてあってもよ し、検測枠Kをプラスチックによって一体成形によって形成してあってもよい。Further, in any of the above-mentioned embodiments, the installation height of the second member 2 in the inspection frame K is arbitrary, but when it is desired to secure the covering thickness of the reinforcing bar 8 at a predetermined value or more, It is desirable to fix it in a high position. Further, three or more first members may be provided, and the inspection frame K may be integrally formed of plastic.

【0042】 さらにそして、鉄筋保持部材によって2あるいはこれ以上の複数の鉄筋8を適 宜の間隔をおいて保持させるようにしてもよく、その場合、これらの鉄筋保持部 材に、図11に示すような安定保持部22を形成してもよいことは言うまでもな い。また、格子枠の一つの辺に設けられる鉄筋8は必ずしも1本でなくても複数 本でもよく、その場合、鉄筋8の交点付近に4本の長目のアンカーを法面5に打 ち込み、鉄筋を井桁状に支承結束し、これを一段あるいは数段重ねるようにして もよい。Further, two or more reinforcing bars 8 may be held at appropriate intervals by a reinforcing bar holding member. In that case, these reinforcing bar holding members are shown in FIG. It goes without saying that such a stable holding portion 22 may be formed. Further, the number of the reinforcing bars 8 provided on one side of the lattice frame is not necessarily one and may be plural. In that case, four long anchors are driven on the slope 5 near the intersection of the reinforcing bars 8. , Reinforcing bars may be bound and supported in the shape of double girders, and they may be stacked in one or several steps.

【0043】 さらにまた、いずれの実施例においても、鉄筋保持部材は第1部材あるいは第 2部材に、溶接またはハンダ付けさらには番線等による結束手段により固着して もよいし、図7に示した矩形体による連結手段により鉄筋保持部材を構成しても よい。さらに、鉄筋保持部材の一端側にループ部を形成し、他端側にはフック部 を形成して、鉄筋保持部材が遊動自在にして第1部材あるいは第2部材に係止で きるようにしてもよいし、鉄筋保持部材の両端にフック部を形成して、第1部材 あるいは第2部材に係止できるようにしてもよい。Furthermore, in any of the embodiments, the reinforcing bar holding member may be fixed to the first member or the second member by welding or soldering, or by a binding means such as a numbering wire, as shown in FIG. The reinforcing bar holding member may be configured by a connecting means having a rectangular shape. Further, a loop portion is formed on one end side of the reinforcing bar holding member, and a hook portion is formed on the other end side thereof so that the reinforcing bar holding member can freely move and can be locked to the first member or the second member. Alternatively, hook portions may be formed at both ends of the reinforcing bar holding member so that the reinforcing member holding member can be engaged with the first member or the second member.

【0044】[0044]

【考案の効果】[Effect of device]

この考案は以上説明した通りであり、この考案の検測枠は、構造が簡単であり 、容易かつ安価に製造できるとともに、その取扱いが簡単である。そして、検測 枠に設けた鉄筋保持部材によって、格子状法枠に中心部材となる鉄筋を安定に保 持することができる。 The invention is as described above, and the inspection frame of the invention has a simple structure, can be manufactured easily and inexpensively, and is easy to handle. Then, the reinforcing bar holding member provided in the inspection frame can stably hold the reinforcing bar to be the central member in the grid-shaped method frame.

【0045】 また、この検測枠を用いる法枠工法においては、モルタルなどの吹き付けムラ がなくなり、鉄筋のまわりに所定の被り厚を有する規格通りの寸法および強度を 有するモルタルなどよりなる格子状法枠を容易に法面に形成することができる。In addition, in the method frame method using this inspection frame, the spraying unevenness of mortar and the like is eliminated, and the grid-like method is made of mortar and the like having the prescribed size and strength with a predetermined covering thickness around the rebar. The frame can be easily formed on the slope.

【0046】 そして、請求項8に記載の考案によれば、検測枠の構造が簡単であり、その保 管や運搬における形態がコンパクトになり、簡単に取り扱うことができる。According to the invention as set forth in claim 8, the structure of the inspection frame is simple, and the form of storage and transportation thereof is compact and can be easily handled.

【0047】 さらにまた、請求項11に記載の考案によれば、法面が盛土で形成されている ような場合であっても、検測枠の沈みを防止でき、前記モルタルなどよりなる格 子状法枠を所定寸法に確実に形成できる。Further, according to the invention as set forth in claim 11, even when the slope is formed by embankment, it is possible to prevent the inspection frame from sinking, and the mortar or the like is used. The contour frame can be reliably formed to have a predetermined size.

【図面の簡単な説明】[Brief description of drawings]

【図1】この考案の検測枠を使用した現場打ち法枠工法
の一例を示す図である。
FIG. 1 is a diagram showing an example of a cast-in-place method frame construction method using the inspection frame of the present invention.

【図2】この考案の検測枠を使用した現場打ち法枠工法
の要部を示す図である。
FIG. 2 is a view showing a main part of a field casting method frame construction method using the inspection frame of the present invention.

【図3】この考案の検測枠を使用した現場打ち法枠工法
の要部を示す正面図である。
FIG. 3 is a front view showing a main part of a cast-in-place frame method using the inspection frame of the present invention.

【図4】この考案の検測枠の一例を示す斜視図である。FIG. 4 is a perspective view showing an example of the inspection frame of the present invention.

【図5】この考案の検測枠を使用した現場打ち法枠工法
によって形成される格子状法枠の一例を示す縦断面図で
ある。
FIG. 5 is a vertical cross-sectional view showing an example of a lattice method frame formed by the in-situ method frame method using the inspection frame of the present invention.

【図6】この考案の検測枠を使用した現場打ち法枠工法
によって形成される格子状法枠の他の例を示す縦断面図
である。
FIG. 6 is a vertical cross-sectional view showing another example of the grid-shaped method frame formed by the in-situ method frame method using the inspection frame of the present invention.

【図7】この考案の検測枠の他の例を示す斜視図であ
る。
FIG. 7 is a perspective view showing another example of the inspection frame of the present invention.

【図8】この考案の検測枠の他の例を示す斜視図であ
る。
FIG. 8 is a perspective view showing another example of the inspection frame of the present invention.

【図9】この考案の検測枠の他の例を示す斜視図であ
る。
FIG. 9 is a perspective view showing another example of the inspection frame of the present invention.

【図10】この考案の検測枠の他の例を示す斜視図であ
る。
FIG. 10 is a perspective view showing another example of the inspection frame of the present invention.

【図11】この考案の検測枠の他の例を示す正面図であ
る。
FIG. 11 is a front view showing another example of the inspection frame of the present invention.

【図12】この考案の検測枠の他の例を示す正面図であ
る。
FIG. 12 is a front view showing another example of the inspection frame of the present invention.

【図13】この考案の検測枠の他の例を示す正面図であ
る。
FIG. 13 is a front view showing another example of the inspection frame of the present invention.

【図14】この考案の検測枠の他の例を示す正面図であ
る。
FIG. 14 is a front view showing another example of the inspection frame of the present invention.

【図15】この考案の検測枠の他の例を示す正面図であ
る。
FIG. 15 is a front view showing another example of the inspection frame of the present invention.

【図16】この考案の検測枠の他の例を示す正面図であ
る。
FIG. 16 is a front view showing another example of the inspection frame of the present invention.

【図17】この考案の検測枠の他の例を示す正面図であ
る。
FIG. 17 is a front view showing another example of the inspection frame of the present invention.

【図18】この考案の検測枠の他の例を示す正面図であ
る。
FIG. 18 is a front view showing another example of the inspection frame of the present invention.

【符号の説明】[Explanation of symbols]

1;第1部材、2;第2部材、3;鉄筋保持部材、4;
沈み防止部、5;法面、6;網状体、7;小アンカー、
8;鉄筋、9;上辺と鉄筋保持部材とによって形成され
る空間、10;結束線、11;モルタルなど、12;格子状法
枠、13;ノズル、14;植生層、15;結束線、16;スペー
サー、17;矩形体、18;鉄筋保持部材、19;針金、20;
結束線、21;鉄筋保持部材、22;安定保持部、23;第1
部材、24;鉄筋保持部材、25;第1部材、26;鉄筋保持
部材、27;第1部材、28;鉄筋保持部材、29;第1部
材、30;鉄筋保持部材、31;第1部材、32;鉄筋保持部
材、33;検測ピン。
1; 1st member, 2; 2nd member, 3; Reinforcing bar holding member, 4;
Anti-sink part, 5; slope, 6; reticulate body, 7; small anchor,
8: Reinforcing bar, 9: Space formed by upper side and reinforcing bar holding member, 10: Bundling wire, 11: Mortar, etc., 12: Lattice-like frame, 13; Nozzle, 14; Vegetation layer, 15: Bundling wire, 16 Spacer, 17; Rectangular body, 18; Reinforcing bar holding member, 19; Wire, 20;
Binding wire, 21; Reinforcing bar holding member, 22; Stable holding part, 23; First
Member, 24; Reinforcing bar holding member, 25; First member, 26; Reinforcing bar holding member, 27; First member, 28; Reinforcing bar holding member, 29; First member, 30; Reinforcing bar holding member, 31; First member, 32: Reinforcing bar holding member, 33: Inspection pin.

フロントページの続き (72)考案者 堀 要 岡山県津山市高尾590番地の1 日本植生 株式会社内 (72)考案者 松永 昭浩 岡山県津山市高尾590番地の1 日本植生 株式会社内Front Page Continuation (72) Inventor Kaname Hori, Japan vegetation Co., Ltd. 1 at 590 Takao, Tsuyama City, Okayama Prefecture.

Claims (11)

【実用新案登録請求の範囲】[Scope of utility model registration request] 【請求項1】 法面に網状体を敷設した後、この網状体
上に鉄筋を格子状に配置し、この格子状鉄筋にモルタル
またはコンクリ−トを吹き付けて形成される、モルタル
またはコンクリ−トよりなる格子状法枠の寸法を規制す
る法枠形成用の検測枠であって、長さ方向に適宜の間隔
をおいて設けられる所定の高さと幅を有する正面視台形
状である一対の脚部を有する一対の第1部材と、この第
1部材どうしを連結する第2部材とを備えるとともに、
第1部材の高さ方向中間部において一対の脚部を結ぶ方
向に鉄筋保持部材を一つ横設してあることを特徴とする
鉄筋保持部材を設けてなる法枠形成用の検測枠。
1. A mortar or concrete which is formed by laying a mesh body on a slope, arranging reinforcing bars on the mesh body in a grid pattern, and spraying mortar or concrete onto the grid reinforcing bar. An inspection frame for forming a legal frame that regulates the dimensions of a lattice-shaped legal frame consisting of a pair of trapezoidal front views with a predetermined height and width provided at appropriate intervals in the length direction. A pair of first members having legs and a second member connecting the first members are provided,
An inspection frame for forming a legal frame comprising a reinforcing bar holding member, wherein one reinforcing bar holding member is laterally provided in a direction connecting a pair of legs at an intermediate portion in the height direction of the first member.
【請求項2】 法面に網状体を敷設した後、この網状体
上に鉄筋を格子状に配置し、この格子状鉄筋にモルタル
またはコンクリ−トを吹き付けて形成される、モルタル
またはコンクリ−トよりなる格子状法枠の寸法を規制す
る法枠形成用の検測枠であって、長さ方向に適宜の間隔
をおいて設けられる所定の高さと幅を有する正面視弓状
である一対の脚部を有する一対の第1部材と、この第1
部材どうしを連結する第2部材とを備えるとともに、第
1部材の高さ方向中間部において一対の脚部を結ぶ方向
に鉄筋保持部材を一つ横設してあることを特徴とする鉄
筋保持部材を設けてなる法枠形成用の検測枠。
2. A mortar or concrete which is formed by laying a mesh body on a slope, arranging reinforcing bars on the mesh body in a grid pattern, and spraying mortar or concrete onto the grid reinforcing bar. An inspection frame for forming a legal frame that regulates the size of a lattice-shaped legal frame consisting of a pair of bow-shaped front views having a predetermined height and width provided at appropriate intervals in the length direction. A pair of first members having legs, and the first member
A reinforcing bar holding member, comprising: a second member connecting members to each other; and a reinforcing bar holding member laterally provided in a direction connecting a pair of legs at an intermediate portion in the height direction of the first member. Inspection frame for forming a legal frame that is provided with.
【請求項3】 法面に網状体を敷設した後、この網状体
上に鉄筋を格子状に配置し、この格子状鉄筋にモルタル
またはコンクリ−トを吹き付けて形成される、モルタル
またはコンクリ−トよりなる格子状法枠の寸法を規制す
る法枠形成用の検測枠であって、長さ方向に適宜の間隔
をおいて設けられる所定の高さと幅を有する正面三角形
状である一対の脚部を有する一対の第1部材と、この第
1部材どうしを連結する第2部材とを備えるとともに、
第1部材の高さ方向中間部において一対の脚部を結ぶ方
向に鉄筋保持部材を一つ横設してあることを特徴とする
鉄筋保持部材を設けてなる法枠形成用の検測枠。
3. A mortar or concrete which is formed by laying a mesh body on the slope, arranging reinforcing bars on the mesh body in a grid pattern, and spraying mortar or concrete onto the grid reinforcing bar. A pair of legs having a front triangular shape having a predetermined height and width that are provided at appropriate intervals in the length direction and that are inspection frames for forming a legal frame that regulates the dimensions of a lattice-shaped method frame made of A pair of first members having a portion, and a second member that connects the first members together,
An inspection frame for forming a legal frame comprising a reinforcing bar holding member, wherein one reinforcing bar holding member is laterally provided in a direction connecting a pair of legs at an intermediate portion in the height direction of the first member.
【請求項4】 法面に網状体を敷設した後、この網状体
上に鉄筋を格子状に配置し、この格子状鉄筋にモルタル
またはコンクリ−トを吹き付けて形成される、モルタル
またはコンクリ−トよりなる格子状法枠の寸法を規制す
る法枠形成用の検測枠であって、長さ方向に適宜の間隔
をおいて設けられる所定の高さと幅を有する正面視多角
形状である一対の脚部を有する一対の第1部材と、この
第1部材どうしを連結する第2部材とを備えるととも
に、第1部材の高さ方向中間部において一対の脚部を結
ぶ方向に鉄筋保持部材を一つ横設してあることを特徴と
する鉄筋保持部材を設けてなる法枠形成用の検測枠。
4. A mortar or concrete which is formed by laying a mesh body on a slope, arranging reinforcing bars on the mesh body in a grid pattern, and spraying mortar or concrete onto the grid reinforcing bar. An inspection frame for forming a legal frame that regulates the size of a lattice-shaped legal frame consisting of a pair of front view polygonal shapes having a predetermined height and width provided at appropriate intervals in the length direction. A first member having a pair of legs and a second member connecting the first members to each other are provided, and a reinforcing bar holding member is provided in a direction connecting the pair of legs at an intermediate portion in the height direction of the first member. An inspection frame for forming a legal frame, which is provided with a reinforcing bar holding member, which is characterized by being installed horizontally.
【請求項5】 法面に網状体を敷設した後、この網状体
上に鉄筋を格子状に配置し、この格子状鉄筋にモルタル
またはコンクリ−トを吹き付けて形成される、モルタル
またはコンクリ−トよりなる格子状法枠の寸法を規制す
る法枠形成用の検測枠であって、長さ方向に適宜の間隔
をおいて設けられる所定の高さと幅を有する正面視M字
形状である一対の脚部を有する一対の第1部材と、この
第1部材どうしを連結する第2部材とを備えるととも
に、第1部材の高さ方向中間部において一対の脚部を結
ぶ方向に鉄筋保持部材を一つ横設してあることを特徴と
する鉄筋保持部材を設けてなる法枠形成用の検測枠。
5. A mortar or concrete which is formed by laying a mesh body on the slope, arranging reinforcing bars on the mesh body in a grid pattern, and spraying mortar or concrete onto the grid reinforcing bar. A pair of inspection frames for forming a legal frame that regulates the size of a lattice-shaped legal frame, which are M-shaped in a front view and have a predetermined height and width provided at appropriate intervals in the length direction. A pair of first members having a pair of legs, and a second member connecting the first members to each other, and a reinforcing bar holding member in a direction connecting the pair of legs at an intermediate portion in the height direction of the first member. An inspection frame for forming a legal frame, which is provided with one reinforcing bar holding member.
【請求項6】 法面に網状体を敷設した後、この網状体
上に鉄筋を格子状に配置し、この格子状鉄筋にモルタル
またはコンクリ−トを吹き付けて形成される、モルタル
またはコンクリ−トよりなる格子状法枠の寸法を規制す
る法枠形成用の検測枠であって、長さ方向に適宜の間隔
をおいて設けられる所定の高さと幅を有する上部に一つ
の凸部と二つの凹部を有する正面視凹多角形状である一
対の脚部を有する一対の第1部材と、この第1部材どう
しを連結する第2部材とを備えるとともに、第1部材の
高さ方向中間部において一対の脚部を結ぶ方向に鉄筋保
持部材を一つ横設してあることを特徴とする鉄筋保持部
材を設けてなる法枠形成用の検測枠。
6. A mortar or concrete, which is formed by laying a mesh body on a slope, arranging reinforcing bars on the mesh body in a grid pattern, and spraying mortar or concrete onto the grid reinforcing bar. An inspection frame for forming a method frame for controlling the size of a grid-like method frame, which has a predetermined height and width provided at appropriate intervals in the length direction and has one convex portion and two A pair of first members having a pair of legs having a concave polygonal shape in front view having two recesses and a second member connecting the first members to each other are provided, and at a middle portion in the height direction of the first member. An inspection frame for forming a legal frame comprising a reinforcing bar holding member, wherein one reinforcing bar holding member is provided in a direction connecting a pair of legs.
【請求項7】 鉄筋保持部材の両端を第1部材または第
2部材に固着してある請求項1〜6のいずれかに記載の
鉄筋保持部材を設けてなる法枠形成用の検測枠。
7. An inspection frame for forming a legal frame, comprising the reinforcing bar holding member according to claim 1, wherein both ends of the reinforcing bar holding member are fixed to the first member or the second member.
【請求項8】 鉄筋保持部材の一端を第1部材の一方の
脚部または第2部材に遊動自在に設け、他端を他方の脚
部または対応する第2部材に係止させるようにしてなる
請求項1〜6のいずれかに記載の鉄筋保持部材を設けて
なる法枠形成用の検測枠。
8. One end of the reinforcing bar holding member is movably provided to one leg portion or the second member of the first member, and the other end is locked to the other leg portion or the corresponding second member. An inspection frame for forming a normal frame, comprising the reinforcing bar holding member according to claim 1.
【請求項9】 鉄筋保持部材の両端を第1部材または第
2部材に対して着脱自在に取り付けられるようにしてあ
る請求項1〜6のいずれかに記載の鉄筋保持部材を設け
てなる法枠形成用の検測枠。
9. A method frame provided with the reinforcing bar holding member according to claim 1, wherein both ends of the reinforcing bar holding member are detachably attached to the first member or the second member. Inspection frame for formation.
【請求項10】 鉄筋保持部材が第2部材と矩形状を呈す
るよう一体的に形成されてなる請求項1〜6のいずれか
に記載の鉄筋保持部材を設けてなる法枠形成用の検測
枠。
10. The inspection for forming a legal frame comprising the reinforcing bar holding member according to claim 1, wherein the reinforcing bar holding member is integrally formed with the second member so as to have a rectangular shape. frame.
【請求項11】 第1部材の両下端部を折曲して沈み防止
部を形成してなる請求項1〜10のいずれかに記載の鉄筋
保持部材を設けてなる法枠形成用の検測枠。
11. The inspection for forming a legal frame, comprising the reinforcing bar holding member according to claim 1, wherein both lower end portions of the first member are bent to form a sunken portion. frame.
JP1994011520U 1994-08-22 1994-08-22 Inspection frame for forming a legal frame with a reinforcing bar holding member Expired - Lifetime JP3008144U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP1994011520U JP3008144U (en) 1994-08-22 1994-08-22 Inspection frame for forming a legal frame with a reinforcing bar holding member

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP1994011520U JP3008144U (en) 1994-08-22 1994-08-22 Inspection frame for forming a legal frame with a reinforcing bar holding member

Publications (1)

Publication Number Publication Date
JP3008144U true JP3008144U (en) 1995-03-07

Family

ID=43143981

Family Applications (1)

Application Number Title Priority Date Filing Date
JP1994011520U Expired - Lifetime JP3008144U (en) 1994-08-22 1994-08-22 Inspection frame for forming a legal frame with a reinforcing bar holding member

Country Status (1)

Country Link
JP (1) JP3008144U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0565842U (en) * 1992-02-13 1993-08-31 株式会社ユニオンインターナショナル Gift container assembly
JP3451055B2 (en) 2000-06-06 2003-09-29 日本植生株式会社 Horizontal frame for forming a legal frame

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0565842U (en) * 1992-02-13 1993-08-31 株式会社ユニオンインターナショナル Gift container assembly
JP3451055B2 (en) 2000-06-06 2003-09-29 日本植生株式会社 Horizontal frame for forming a legal frame

Similar Documents

Publication Publication Date Title
JP3527059B2 (en) Inspection frame for forming legal frame and legal frame construction method using it
JP3008144U (en) Inspection frame for forming a legal frame with a reinforcing bar holding member
JP3008215U (en) Inspection frame for forming a legal frame provided with a reinforcing bar holding member
JP3007853U (en) Inspection frame for forming legal frame
JP2694331B2 (en) Inspection frame for legal frame formation and legal frame construction method using it
JP2694326B2 (en) Cast-in-place method
JP3443275B2 (en) Inspection frame for forming legal frame and legal frame method using it
JP2694330B2 (en) Inspection frame for legal frame formation and legal frame construction method using it
JP3088648U (en) Inspection frame for legal frame formation
JP2627264B2 (en) Frame for forming legal frame and legal method using the frame
JP3119291B2 (en) Construction method of cast-in-place frame
JP3008623U (en) Frame for forming legal frame
JP3527058B2 (en) Inspection frame for forming legal frame and legal frame construction method using it
JP2855263B2 (en) A frame for forming a legal frame and a legal frame method using the same
JP2997407B2 (en) Test wire
JP2694327B2 (en) Cast-in-place method
JP3008622U (en) Inspection frame for forming a legal frame with a reinforcing bar holding member
JP2627878B2 (en) Cast-in-place method
JP3025094U (en) Frame for forming legal frame
JP2748262B2 (en) Inspection frame for forming a legal frame provided with a reinforcing bar holding member and a legal frame construction method using the same
JP3061358B2 (en) Cast-in-place method
JP2627877B2 (en) Cast-in-place method
JPH1046591A (en) Detecting measuring frame to form slope frame and slope frame construction method using this
JP2627879B2 (en) Cast-in-place method
JP2694332B2 (en) Frame for forming legal frame and legal frame method using this frame