JPH0722191A - Strobe voltage boosting circuit - Google Patents

Strobe voltage boosting circuit

Info

Publication number
JPH0722191A
JPH0722191A JP16356893A JP16356893A JPH0722191A JP H0722191 A JPH0722191 A JP H0722191A JP 16356893 A JP16356893 A JP 16356893A JP 16356893 A JP16356893 A JP 16356893A JP H0722191 A JPH0722191 A JP H0722191A
Authority
JP
Japan
Prior art keywords
voltage
charging
boosting
booster circuit
power supply
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP16356893A
Other languages
Japanese (ja)
Other versions
JP3414443B2 (en
Inventor
Yuji Imai
右二 今井
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Olympus Corp
Original Assignee
Olympus Optical Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Olympus Optical Co Ltd filed Critical Olympus Optical Co Ltd
Priority to JP16356893A priority Critical patent/JP3414443B2/en
Publication of JPH0722191A publication Critical patent/JPH0722191A/en
Application granted granted Critical
Publication of JP3414443B2 publication Critical patent/JP3414443B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Stroboscope Apparatuses (AREA)
  • Discharge-Lamp Control Circuits And Pulse- Feed Circuits (AREA)

Abstract

PURPOSE:To maintain the charging time and energy converting efficiency at a certain specified level without being influenced by the supply voltage, by changing over a boosting means in conformity to a charging time elapse signal given by a timer. CONSTITUTION:A CPU 60 puts an output terminal C4 into H level to actuate a trigger circuit 70, and a light emitting tube 29 is allowed to make light emitting. Then the CPU 60 puts another output terminal C5 into L, level to turn IGBT 71 off so that the light emission is terminated. At the time of charging, the CPU 60 actuates the first voltage boosting circuit by putting an output terminal C1 into L level, and the voltage of the input terminal C3 is A/D converted, and the charge voltage is monitored. When the count value of a timer attains the set value, the first booster circuit is stopped and the second booster circuit is started. Thereafter the charge voltage is monitored, and if the stop voltage is exceeded, the second booster circuit is stopped.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【産業上の利用分野】本発明は、閃光発光装置における
ストロボ昇圧回路に係り、特に定数の異なる複数のトラ
ンスを切換えて充電動作を行うストロボ昇圧回路に関す
る。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a strobe booster circuit in a flash light emitting device, and more particularly to a strobe booster circuit for switching a plurality of transformers having different constants for charging operation.

【0002】[0002]

【従来の技術】従来、閃光発光装置には発光素子を発光
させるために、内蔵するメインコンデンサを充電させる
充電制御装置すなわち、ストロボ昇圧回路が設けられて
いる。このストロボ昇圧回路としては、本出願人が提案
する特願平3−57293号において、昇圧特性の異な
るトランスを組み合わせて充電回路を形成し、充電電圧
が所定電圧以上になるとトランスを切換えて充電を行う
ものがある。
2. Description of the Related Art Conventionally, a flash light emitting device is provided with a charge control device for charging a built-in main capacitor in order to make a light emitting element emit light, that is, a strobe boosting circuit. As this strobe booster circuit, in Japanese Patent Application No. 3-57293 proposed by the present applicant, a charging circuit is formed by combining transformers having different boosting characteristics, and when the charging voltage becomes a predetermined voltage or more, the transformers are switched to perform charging. There is something to do.

【0003】また同様に、前述した切換え動作をトラン
スの2次側で行う手法が特開昭60−241775号公
報にて開示されている。さらに、類似の手法として特開
昭61−193400号公報,実開平2−39223号
公報においても提案されている。
Similarly, a method of performing the above-mentioned switching operation on the secondary side of the transformer is disclosed in Japanese Patent Laid-Open No. 60-241775. Further, similar techniques have been proposed in Japanese Patent Laid-Open Nos. 61-193400 and 2-39223.

【0004】図6には従来の昇圧回路の基本回路を示
し、前述した昇圧トランスの昇圧特性を充電中に切換え
る意義について、以下に説明する。この昇圧回路におい
て、電源電池100は、昇圧するためのトランス103
の1次巻線、流れる電流を制御するためのトランジスタ
102の電流通路が接続される。また、電源電池100
が、トランジスタ101のエミッタに接続し、コレクタ
は上記トランジスタ102のベースに接続される。
FIG. 6 shows a basic circuit of a conventional booster circuit, and the significance of switching the boosting characteristic of the above-described booster transformer during charging will be described below. In this booster circuit, the power supply battery 100 includes a transformer 103 for boosting voltage.
Of the primary winding of the transistor 102 is connected to the current path of the transistor 102 for controlling the flowing current. In addition, the power supply battery 100
Is connected to the emitter of the transistor 101, and the collector is connected to the base of the transistor 102.

【0005】そして、上記昇圧トランス103の2次巻
線の一方には、整流用のダイオード104を介して、発
光エネルギーを蓄えるためのメインコンデンサ105が
接続され、他方は、上記トランジスタ101のベースに
接続される。上記昇圧トランス103の2次巻線より流
れ出る電流値をI2 、メインコンデンサの容量値をC、
充電々圧をVMCとすると、(1)式が成立する。
A main capacitor 105 for storing light emission energy is connected to one of the secondary windings of the step-up transformer 103 via a rectifying diode 104, and the other is connected to the base of the transistor 101. Connected. The current value flowing from the secondary winding of the step-up transformer 103 is I 2 , the capacity value of the main capacitor is C,
When the charging pressure is V MC , the equation (1) is established.

【0006】[0006]

【数1】 ここで、左辺の積分期間は充電を開始してから、規定の
充電々圧VMCまで充電されるまでの期間である。そし
て、昇圧トランスの巻線比(二次巻線ターン数/一次巻
線ターン数)をn、昇圧トランスの一次巻線へ流れ込む
電流値をI1 とすると、
[Equation 1] Here, the integration period on the left side is the period from the start of charging to the time when it is charged to the specified charging voltage V MC . Then, when the winding ratio (the number of secondary winding turns / the number of primary winding turns) of the step-up transformer is n and the current value flowing into the primary winding of the step-up transformer is I 1 ,

【0007】[0007]

【数2】 また、電源電池100より流れ出る電流値をI0 、トラ
ンジスタ102の直流電流増幅率をβとすると、
[Equation 2] If the current value flowing from the power supply battery 100 is I 0 and the DC current amplification factor of the transistor 102 is β,

【0008】[0008]

【数3】 となる。[Equation 3] Becomes

【0009】従って、電源電池100より流れ出る電流
値の時間積分値すなわち、消費電流は、昇圧トランスの
巻線比nに比例する。ここで、消費電流を小さくし、電
源電池100のライフ性を良くするためには、昇圧トラ
ンスの巻線比nを出来るだけ小さくした方が良い。しか
し、巻線比nを小さくすると、充電時間が長くなる。
Therefore, the time integrated value of the current value flowing out from the power supply battery 100, that is, the consumed current is proportional to the winding ratio n of the step-up transformer. Here, in order to reduce the current consumption and improve the life of the power supply battery 100, it is better to make the winding ratio n of the step-up transformer as small as possible. However, if the winding ratio n is reduced, the charging time becomes longer.

【0010】これについて、図7を用いて説明する。図
7(a)において、特性曲線106は巻線比nが高い場
合の充電特性を示す。また特性曲線107は、巻線比n
が低い場合の充電特性を示す。図7(a)に示す様に、
充電々圧がV1 になるまでは、巻線比nが低い方が短時
間で充電されるが、充電々圧がV1 より高くなると逆転
して、巻線比nが高い方が短時間で充電される。
This will be described with reference to FIG. In FIG. 7A, the characteristic curve 106 shows the charging characteristic when the winding ratio n is high. Further, the characteristic curve 107 shows that the winding ratio n
Shows the charging characteristics when is low. As shown in FIG. 7 (a),
Until the charging voltage becomes V 1 , the lower winding ratio n is charged in a shorter time, but when the charging voltage becomes higher than V 1 , the charging is reversed, and the higher the winding ratio n is, the shorter time is. Is charged with.

【0011】従って、充電中に巻線比nを切換えると、
図7(b)の様になる。例えば充電々圧がV1 の時に巻
線比を切換える様にすると、特性曲線108に示す様な
特性になる。この場合は、充電時間を損うことなく、あ
る程度エネルギー変換効率の高い充電を行うことができ
る。
Therefore, if the winding ratio n is changed during charging,
It becomes like FIG.7 (b). For example, when the winding ratio is switched when the charging voltage is V 1 , the characteristic shown by the characteristic curve 108 is obtained. In this case, charging with high energy conversion efficiency can be performed to some extent without impairing the charging time.

【0012】また、充電々圧がV1 より高いV2 で巻線
比nを切換える様にした場合、充電特性は109の様に
なり充電時間は若干遅くなるが、巻線比nの低いトラン
スで充電するエネルギーの割合が増えるので、エネルギ
ー変換効率は若干良くなる。
When the winding ratio n is switched at V 2 where the charging voltage is higher than V 1 , the charging characteristic becomes 109 and the charging time is slightly delayed, but the transformer with a low winding ratio n is used. The energy conversion efficiency is slightly improved because the ratio of the energy charged in is increased.

【0013】そして、充電々圧がV1 より低いV3 で巻
線比nを切換える様にすると、充電特性は110の様に
なり充電時間は若干速くなるが、巻線比nの低いトラン
スで充電するエネルギーの割合が減少するので、エネル
ギー変換効率は若干悪くなる。この様に、切換電圧を増
減することにより、充電時間を優先する切換設定あるい
は、エネルギー変換効率を優先する切換設定を切換える
ことができる。
When the winding ratio n is switched at V 3 where the charging voltage is lower than V 1 , the charging characteristic becomes 110 and the charging time is slightly faster, but in a transformer with a low winding ratio n. The energy conversion efficiency is slightly degraded because the proportion of energy to be charged is reduced. In this way, by increasing or decreasing the switching voltage, it is possible to switch the switching setting that gives priority to the charging time or the switching setting that gives priority to the energy conversion efficiency.

【0014】[0014]

【発明が解決しようとする課題】しかし、前述した従来
の巻線比nの異なる昇圧トランスを切換えて充電を行う
ストロボ昇圧回路では、昇圧トランスの巻線比nを変え
ることによって、トランスの切換えポイントが固定され
ているため、電源電圧が高いときは充電時間が短くてよ
いが、該電源電圧が低くなってくると充電時間の最短ポ
イントが変化することにより早い充電が行えないという
問題点があった。
However, in the strobe booster circuit for charging by switching the conventional step-up transformers having different winding ratios n, the switching point of the transformers is changed by changing the winding ratio n of the step-up transformers. Since the power supply voltage is fixed, the charging time may be short when the power supply voltage is high, but when the power supply voltage is low, the shortest point of the charging time may change, which prevents the quick charging. It was

【0015】たとえば低温等の状況下で電源電池の能力
が低下している時は、充電特性が図8の様に変化する。
図8において、巻線比nが高い場合は111の様な特性
になり、巻線比nが低い場合は112の様になる。すな
わち、切換電圧をV1 のままにすると、充電時間が極め
て遅くなる。
For example, when the capacity of the power supply battery is reduced under a low temperature condition, the charging characteristic changes as shown in FIG.
In FIG. 8, when the winding ratio n is high, the characteristic becomes like 111, and when the winding ratio n is low, it becomes like 112. That is, if the switching voltage is left at V 1 , the charging time becomes extremely slow.

【0016】またエネルギー変換効率を優先して切換電
圧をV1 より高くすると、場合によっては切換電圧レベ
ルまで、低い巻線比の昇圧トランスでは充電できなくな
る。そこで本発明は、電源電圧に影響されず、充電時間
及びエネルギー変換効率を一定の水準に維持させるスト
ロボ昇圧回路を提供することを目的とする。
If the switching voltage is set higher than V 1 by giving priority to the energy conversion efficiency, it may not be possible to charge the voltage up to the switching voltage level with the step-up transformer having a low winding ratio. Therefore, it is an object of the present invention to provide a strobe booster circuit that maintains a charging time and energy conversion efficiency at a constant level without being affected by a power supply voltage.

【0017】[0017]

【課題を解決するための手段】本発明は上記目的を達成
するために、電源電圧を昇圧して発光エネルギーを蓄え
るメインコンデンサへ充電を行う第1の昇圧手段と、上
記第1の昇圧手段よりも昇圧電圧が高い、第2の昇圧手
段と、充電開始時に動作を開始し、所定の時間後に時間
経過信号を出力するためのタイマ手段と、上記メインコ
ンデンサの充電するにあたり、まず始めに第1の昇圧手
段により充電を行い、上記タイマ手段からの時間経過信
号により、上記第2の昇圧手段に切り換えるための充電
制御手段とで構成されるストロボ昇圧回路を提供する。
To achieve the above object, the present invention comprises first boosting means for boosting a power supply voltage to charge a main capacitor for storing light emission energy, and the first boosting means. The second boosting means having a high boosting voltage, the timer means for starting the operation at the start of charging and outputting a time lapse signal after a predetermined time, and the first capacitor for charging the main capacitor are the first. And a charge control means for switching to the second boosting means in response to a time lapse signal from the timer means.

【0018】また、電源電池と、上記電源電池の電圧を
昇圧して発光エネルギーを蓄えるメインコンデンサへ充
電を行う第1の昇圧手段と、上記第1の昇圧手段よりも
昇圧電圧が高い、第2昇圧手段と、充電開始時に動作を
開始し、所定の時間カウント後に時間経過信号を出力す
るためのタイマ手段と、上記メインコンデンサの充電す
るにあたり、まず始めに第1の昇圧手段により充電を行
い、上記タイマ手段からの時間経過信号により第2の昇
圧手段に切り換えるための切り換え手段とで構成される
ストロボ昇圧回路を提供する。さらに上記ストロボ昇圧
回路において、充電開始時のメインコンデンサの充電電
圧を測定する手段と、この測定する手段に応じてタイマ
手段のカウント時間を変更するための変更手段とで構成
されるストロボ昇圧回路を提供する。
Further, the power supply battery, the first boosting means for boosting the voltage of the power supply battery to charge the main capacitor for storing the light emission energy, and the second boosting voltage having a boosting voltage higher than that of the first boosting means. When charging the voltage boosting means, the timer means for starting the operation at the start of charging and outputting a time lapse signal after counting a predetermined time, and the main capacitor, first charging is performed by the first voltage boosting means, There is provided a strobe boosting circuit including switching means for switching to the second boosting means in response to a time lapse signal from the timer means. Furthermore, in the strobe booster circuit, a strobe booster circuit configured by means for measuring the charging voltage of the main capacitor at the start of charging and changing means for changing the count time of the timer means according to the measuring means is provided. provide.

【0019】[0019]

【作用】以上のような構成のストロボ昇圧回路は、第1
の昇圧手段により、電源電圧を昇圧して発光エネルギ―
を蓄えるメインコンデンサへ充電が行なわれ、タイマ手
段で予め設定された時間となる速い充電速度と高いエネ
ルギー変換と効率を両立すべきタイミングで、若しくは
その所定時間をカウントして、充電制御手段により第1
の昇圧手段から昇圧電圧が高い第2の昇圧手段に切換え
られ、メインコンデンサが充電される。
The strobe booster circuit having the above-described structure is the first
The power-supply voltage is boosted by the boosting means of
The main capacitor that stores the charge is charged, and the charging control unit counts a predetermined charging time at a timing at which a high charging rate, which is a time preset by the timer unit, and high energy conversion and efficiency are compatible with each other. 1
The boosting means is switched to the second boosting means having a high boosted voltage, and the main capacitor is charged.

【0020】さらに所定時間をカウントするタイマ手段
は、充電開始時のメインコンデンサの充電電圧を測定す
る手段による測定結果で、設定されるカウント時間が変
更される。
Further, the timer means for counting the predetermined time changes the set count time based on the measurement result by the means for measuring the charging voltage of the main capacitor at the start of charging.

【0021】[0021]

【実施例】以下、図面を参照して本発明の実施例を詳細
に説明する。図1は本発明のストロボ昇圧回路の概略的
な構成を示すブロック図である。このストロボ昇圧回路
において、電源電池1と、該電源電池1が供給する電圧
を昇圧するための第1昇圧回路部2と、同じ機能を有
し、第1昇圧回路部2よりも昇圧電圧が高い第2昇圧回
路部3と、上記第1昇圧回路部2若しくは第2昇圧回路
部3に昇圧された電圧を閃光発光のための発光エネルギ
ーとして蓄えるためのメインコンデンサ4と、充電開始
時に動作を開始し予め設定されたタイマ設定値をカウン
トとするタイマ5と、タイマ5が設定時間後に出力する
時間経過信号により、第1昇圧回路部2から第2昇圧回
路部3に切り換える切換部6とで構成される。
Embodiments of the present invention will now be described in detail with reference to the drawings. FIG. 1 is a block diagram showing a schematic configuration of a strobe boosting circuit of the present invention. In this strobe booster circuit, the power supply battery 1 and the first booster circuit unit 2 for boosting the voltage supplied by the power supply battery 1 have the same function, and the boosted voltage is higher than that of the first booster circuit unit 2. A second booster circuit unit 3, a main capacitor 4 for storing the voltage boosted by the first booster circuit unit 2 or the second booster circuit unit 3 as light emission energy for flash light emission, and an operation starts at the start of charging. A timer 5 that counts a preset timer set value, and a switching unit 6 that switches from the first booster circuit unit 2 to the second booster circuit unit 3 according to a time lapse signal that the timer 5 outputs after a preset time To be done.

【0022】次に図3には、本発明による実施例として
のストロボ昇圧回路の具体的な構成を示し説明する。こ
の図3は、測光,測距,露光,フィルムの巻き上げ等を
全て自動的に行うカメラ内に本実施例のストロボ昇圧回
路を設けた構成を示す。
Next, FIG. 3 shows a specific configuration of a strobe boosting circuit as an embodiment according to the present invention, which will be described. FIG. 3 shows a configuration in which the strobe boosting circuit of this embodiment is provided in a camera that automatically performs photometry, distance measurement, exposure, film winding, and the like.

【0023】図3に示すように、カメラの各部材の動作
を制御するシーケンスコントローラは、CPU60で構
成されており、測光および測距動作は、該CPU60で
制御される測光・測距駆動回路61により実施される。
As shown in FIG. 3, a sequence controller for controlling the operation of each member of the camera is composed of a CPU 60, and the photometry and distance measurement operations are controlled by the CPU 60. It is carried out by.

【0024】また、図示しない撮影レンズ系は、レンズ
駆動用モータM1で、シャッタはシャッタ駆動用モータ
M2で、フィルムは巻上用モータM3で、それぞれ動作
され、各モータM1〜M3はモータコントロール回路6
2により駆動される。
The taking lens system (not shown) is operated by a lens driving motor M1, the shutter is operated by a shutter driving motor M2, and the film is operated by a winding motor M3. The motors M1 to M3 are motor control circuits. 6
Driven by two.

【0025】さらに上記CPU60は、レリーズスイッ
チ63を1段押込んだ1stレリーズによって測光、測
距指令を発し、2段押込んだ2ndレリーズにより発光
判定、露出、巻き上げ再充電を行うようになっている。
Further, the CPU 60 issues a photometry and distance measurement command by the 1st release in which the release switch 63 is pushed in one step, and performs light emission determination, exposure, and rewinding recharge by the 2nd release in which the release switch 63 is pushed in two steps. There is.

【0026】そして、第1昇圧回路部は、電源電池1に
並列に接続されたトランジスタ12,13、抵抗14の
直列回路、上記電源電池1に並列に接続されたトランス
16の1次巻線16a−16b、上記トランス16の1
次側端子16bと接続されるトランジスタ17の直列回
路、トランジスタ13とトランジスタ17を結ぶ抵抗1
5、およびダイオード24、トランス16の2次巻線、
抵抗18の直列回路が図示のように結線されて構成され
ている。
The first booster circuit section is a series circuit of transistors 12 and 13 and a resistor 14 connected in parallel to the power supply battery 1, and a primary winding 16a of a transformer 16 connected in parallel to the power supply battery 1. -16b, 1 of the transformer 16
A series circuit of the transistor 17 connected to the secondary terminal 16b, a resistor 1 connecting the transistor 13 and the transistor 17
5, and the diode 24, the secondary winding of the transformer 16,
A series circuit of the resistors 18 is connected and configured as shown.

【0027】このように構成された第1昇圧回路部にお
いて、トランジスタ12のベースにオン信号(ベースを
Lレベルにする。)がCPU60より入力されると、ト
ランジスタ12のエミッタ−コレクタ間→トランジスタ
13のエミッタ−ベース間→抵抗18に電流が流され、
トランジスタ13のエミッタ−コレクタ間→抵抗15→
トランジスタ17のベース−エミッタ間に電流が流れる
ことにより、トランス16の1次巻線16a−16b間
→トランジスタ17のコレクタ−エミッタ間に電流が流
れ、トランス16の1次巻線の2次巻線に対する鎖交磁
束により、2次巻線には高電圧が誘起され、これによっ
て充電電流は、ダイオード24→ダイオード25を通り
メインコンデンサ4に流れる。
In the thus constructed first booster circuit section, when an ON signal (the base is set to the L level) is inputted from the CPU 60 to the base of the transistor 12, the emitter-collector portion of the transistor 12 → the transistor 13 is inputted. Between the emitter and the base of → the current flows through the resistor 18,
Between the emitter and collector of the transistor 13 → resistor 15 →
A current flows between the base and the emitter of the transistor 17, so that a current flows between the primary windings 16a and 16b of the transformer 16 and between the collector and the emitter of the transistor 17, and the secondary winding of the primary winding of the transformer 16 is generated. A high voltage is induced in the secondary winding due to the interlinkage magnetic flux with respect to, whereby the charging current flows through the diode 24 → diode 25 to the main capacitor 4.

【0028】この充電電流は、トランジスタ17のベー
ス電流が増加するため、この増加に従って、トランジス
タ17のコレクタ電流が増加し、メインコンデンサ4と
トリガコンデンサ31への充電電流の増加を助長し、こ
の正帰還作用によってトランジスタ17は飽和状態とな
る。
Since the base current of the transistor 17 increases, the charging current increases the collector current of the transistor 17 in accordance with this increase, which promotes the increase of the charging currents to the main capacitor 4 and the trigger capacitor 31. The feedback action puts the transistor 17 in a saturated state.

【0029】この結果、トランジスタ16の1次側の電
流変化が無くなるために、2次側の磁束変化もなくな
る。よって、トランス16の2次側には、ダイオード2
4を逆バイアスする方向のエネルギーが発生し、トラン
ジスタ13を逆バイアスすることにより、トランジスタ
13のコレクタ電流が止まりトランジスタ17もオフす
る。
As a result, the change in the current on the primary side of the transistor 16 is eliminated, and the change in magnetic flux on the secondary side is also eliminated. Therefore, the diode 2 is provided on the secondary side of the transformer 16.
Energy is generated in the direction for reverse biasing 4 and reverse biasing the transistor 13 stops the collector current of the transistor 13 and turns off the transistor 17.

【0030】ここで、2次側巻線には振動が起こり、ト
ランジスタ13へ正バイアスする半波のとき、トランジ
スタ13が再びオンされ、上記初期状態に戻り、次のサ
イクル動作を開始する。
Here, vibration occurs in the secondary winding, and when the half-wave that positively biases the transistor 13, the transistor 13 is turned on again, returns to the initial state, and starts the next cycle operation.

【0031】このような発振動作を行って、メインコン
デンサ4の充電を行うが、この第1昇圧回路部は、メイ
ンコンデンサ4の電圧を発光管29が発光可能となる電
圧まで、充電はできないが、コンデンサ電圧が低いとき
の充電時間が短くエネルギー変換効率が良いと言う特性
を持っている。
Although the main capacitor 4 is charged by performing such an oscillating operation, the first booster circuit unit cannot charge the voltage of the main capacitor 4 to a voltage at which the arc tube 29 can emit light. The characteristic is that the charging time is short when the capacitor voltage is low and the energy conversion efficiency is good.

【0032】そして、第2昇圧回路部は、電源電池1に
並列に接続されたトランジスタ19、,20、抵抗21
の直列回路、上記電源電池1に並列に接続されたトラン
ジスタ16の1次巻線16a−16c間、上記トランス
16の1次巻線端子16cと接続されるトランジスタ2
3の直列回路、トランジスタ20とトランジスタ23を
結ぶ抵抗22およびダイオード24、トランス16の2
次巻線、抵抗18の直列回路が図示するように結線され
構成されている。なお、トランス16、抵抗18、ダイ
オード24は、第1昇圧回路部と第2昇圧回路部で共有
し、トランス16に関しては、第1昇圧回路部は1次巻
線端子16bで接続され、第2昇圧回路部は1次巻線端
子16cで接続されている。
The second booster circuit section includes transistors 19, 20 and a resistor 21 connected in parallel to the power supply battery 1.
Of the transistor 16 connected in parallel to the power supply battery 1 between the primary windings 16a-16c of the transistor 16 and the primary winding terminal 16c of the transformer 16.
3 series circuit, resistor 22 connecting transistor 20 and transistor 23 and diode 24, transformer 2
A series circuit of a secondary winding and a resistor 18 is connected and configured as shown. The transformer 16, the resistor 18, and the diode 24 are shared by the first booster circuit unit and the second booster circuit unit. As for the transformer 16, the first booster circuit unit is connected by the primary winding terminal 16b, and the second booster circuit unit is connected. The booster circuit section is connected to the primary winding terminal 16c.

【0033】この第2昇圧回路部の動作は、上記第1昇
圧回路部の動作と同等であり、その詳しい説明は省略す
る。上記第2昇圧回路部は、メインコンデンサ4の電圧
を発光管29が発光可能となる電圧まで充電は可能であ
るが、コンデンサ電圧が低いときの充電時間は、第1昇
圧回路部の充電時間よりも長く効率も悪い特性を持って
いる。
The operation of the second booster circuit section is the same as that of the first booster circuit section, and detailed description thereof will be omitted. The second booster circuit unit can charge the voltage of the main capacitor 4 to a voltage at which the arc tube 29 can emit light, but the charging time when the capacitor voltage is low is less than the charging time of the first booster circuit unit. It has a long and inefficient characteristic.

【0034】またメインコンデンサ電圧検出部は、メイ
ンコンデンサ4と並列に、ダイオード25、抵抗27,
28が図示するように接続され、第1昇圧回路部と第2
昇圧回路部の充電電流の一部を抵抗27と抵抗28に流
すことにより、抵抗28の両端に発生した電圧をCPU
60のC3端子に入力する。
Further, the main capacitor voltage detecting section is provided with a diode 25, a resistor 27,
28 is connected as shown in the drawing, and is connected to the first booster circuit section and the second booster circuit section.
By passing a part of the charging current of the booster circuit section through the resistors 27 and 28, the voltage generated across the resistor 28 is applied to the CPU.
Input to the C3 terminal of 60.

【0035】上記CPU60のC3端子は、A/D変換
入力端子になっており、この端子に入力された電圧をA
/D変換することにより、メインコンデンサ4に充電さ
れた電圧を検出することができる。
The C3 terminal of the CPU 60 is an A / D conversion input terminal, and the voltage input to this terminal is A
The voltage charged in the main capacitor 4 can be detected by the / D conversion.

【0036】このストロボ昇圧回路において、上記メイ
ンコンデンサ4の両端に接続する放電発光管29と、該
発光管29を発光させるためのトリガ回路70とが設け
られている。上記CPU60のC5端子より出力される
発光開始信号により動作して、発光管29を発光させ
る。また上記発光管29の一端には、流れる電流をオン
/オフするIGBT(絶縁ゲート型バイポーラ・トラン
ジスタ)71が接続され、IGBT71はバッファ72
により駆動される。
In this strobe boosting circuit, a discharge arc tube 29 connected to both ends of the main capacitor 4 and a trigger circuit 70 for causing the arc tube 29 to emit light are provided. It operates in response to a light emission start signal output from the C5 terminal of the CPU 60 to cause the arc tube 29 to emit light. An IGBT (insulated gate bipolar transistor) 71 for turning on / off a flowing current is connected to one end of the arc tube 29. The IGBT 71 is a buffer 72.
Driven by.

【0037】図4に示すフローチャートを参照して、こ
のように構成された本実施例のストロボ昇圧回路の充電
動作について説明する。まず、カメラのレリーズスイッ
チ63を1段押込み(ステップS1)、1stレリーズ
がオンされると(YES)、測光(ステップS2)、測
距(ステップS3)を行い、そのデータをCPU60は
メモリする。
With reference to the flow chart shown in FIG. 4, the charging operation of the strobe booster circuit of the present embodiment thus configured will be described. First, when the release switch 63 of the camera is pushed down one step (step S1) and the first release is turned on (YES), photometry (step S2) and distance measurement (step S3) are performed, and the CPU 60 stores the data.

【0038】次に、2ndレリーズが押されたか否か判
定し(ステップS4)、2ndレリーズが押された場合
に(YES)、発光許可の判断を行い(ステップS
5)、閃光発光が不必要ならば(NO)、シャッタを開
き露光させ(ステップS6)、後述するステップS9に
移行する。しかし閃光発光が必要ならば(YES)、シ
ャッタを開き(ステップS7)、トリガ回路70に発光
信号を出力し、閃光発光を行い(ステップS8)、シャ
ッタを閉じて露光を終了させ(ステップS9)、フィル
ムを1コマ巻き上げ(ステップS10)、その後、充電
を行い初期状態に戻る(ステップS11)。
Next, it is determined whether or not the 2nd release is pressed (step S4), and if the 2nd release is pressed (YES), the light emission permission is determined (step S4).
5) If flash light emission is not necessary (NO), the shutter is opened and exposure is performed (step S6), and the process proceeds to step S9 described later. However, if flash light emission is required (YES), the shutter is opened (step S7), a light emission signal is output to the trigger circuit 70, flash light emission is performed (step S8), and the shutter is closed to end the exposure (step S9). The film is wound up one frame (step S10), then charged and returned to the initial state (step S11).

【0039】また、前記ステップS4において、2nd
レリーズがオンしていない場合(NO)、1stレリー
ズのオフか否か判定し(ステップS12)、オン状態な
らば(NO)ステップS4に戻り、1stレリーズがオ
フ状態ならば(YES)、ステップS1に戻る。
In step S4, 2nd
If the release is not on (NO), it is determined whether or not the 1st release is off (step S12). If it is on (NO), the process returns to step S4. If the 1st release is off (YES), step S1. Return to.

【0040】次に、前述した図4のステップS8の発光
のシーケンスの詳細について説明する。図示していない
が、まずストロボの発光量を計算する。ストロボの発光
量は、ステップS3の測距のサブルーチンで求められた
被写体距離と、フィルム感度によって計算される。
Next, details of the light emission sequence of step S8 in FIG. 4 described above will be described. Although not shown, first, the flash emission amount is calculated. The amount of strobe light emission is calculated based on the subject distance obtained in the distance measurement subroutine of step S3 and the film sensitivity.

【0041】この発光量に従い、図2の示すタイミング
チャートにより発光を行う。まず、時刻t0 において、
CPU60はC5出力端子を“H”レベルにしてIGB
T71のゲートに“H”レベルの電圧を印加する。この
結果IGBT71はオン状態になる。
Light emission is performed according to the light emission amount according to the timing chart shown in FIG. First, at time t 0 ,
CPU60 sets C5 output terminal to "H" level and IGB
A voltage of "H" level is applied to the gate of T71. As a result, the IGBT 71 is turned on.

【0042】次に時刻t1 において、CPU60はC4
出力端子を“H”レベルにして、トリガ回路70を動作
状態にする。その結果、発光管29は励起状態となり発
光を開始する。次に時刻t2 において、CPU60はC
5出力端子を“L”レベルにしてIGBT71をオフ状
態とする。その結果、発光が終了する。
Next, at time t 1 , the CPU 60 executes C4
The output terminal is set to the “H” level to activate the trigger circuit 70. As a result, the arc tube 29 enters an excited state and starts emitting light. Next, at time t 2 , the CPU 60 causes C
The 5th output terminal is set to "L" level to turn off the IGBT 71. As a result, the light emission ends.

【0043】図2の最下段は発光電流波形を示す。t1
〜t2 の間は発光期間であり、計算された発光量により
決定される。被写体の距離が遠く、フル発光させる場合
は、IGBTのON信号を時刻t3 にオフする。その結
果、発光電流波形は点線の様になり、フル発光状態とな
る。
The bottom row of FIG. 2 shows the emission current waveform. t 1
The period from to t 2 is the light emission period, which is determined by the calculated light emission amount. When the distance to the subject is long and full light emission is to be performed, the ON signal of the IGBT is turned off at time t 3 . As a result, the light emission current waveform becomes like a dotted line, and a full light emission state is achieved.

【0044】次に図5に示すフローチャートを参照し
て、前述した図4のステップS11の充電のサブルーチ
ンについて説明する。まず、CPU60はC1出力端子
を“L”レベルにすることによって、第1昇圧回路部を
起動する(ステップS20)。次に、CPU60はC3
入力端子の電圧をA/D変換して、充電々圧をモニター
する(ステップS21)。
Next, with reference to the flow chart shown in FIG. 5, the charging subroutine of step S11 in FIG. 4 will be described. First, the CPU 60 activates the first booster circuit unit by setting the C1 output terminal to the “L” level (step S20). Next, the CPU 60 sets C3
The voltage of the input terminal is A / D converted and the charging voltage is monitored (step S21).

【0045】そしてタイマ5を以下の表1に示すような
のタイマ設定値により設定する(ステップS22)。こ
のタイマ設定値はステップS21で検出した充電々圧に
応じて変動した値である。即ち、前述した図7に示すよ
うな充電特性に基づき、種々の状況で、速い充電速度と
高いエネルギー変換効率を両立すべきタイミングを選択
したものである。CPU60は内蔵するROMに、この
表1に示すテーブルを持っており、テーブル参照を行う
ことにより、タイマ設定値を選択して設定する。
Then, the timer 5 is set by the timer set values as shown in Table 1 below (step S22). This timer set value is a value that fluctuates in accordance with the charging constant pressure detected in step S21. That is, the timing at which the high charging speed and the high energy conversion efficiency are compatible with each other is selected in various situations based on the charging characteristics as shown in FIG. The CPU 60 has the table shown in Table 1 in the built-in ROM, and by referring to the table, the timer set value is selected and set.

【0046】[0046]

【表1】 次に第1昇圧回路部から第2昇圧回路部に切換えるため
に、タイマ5をリセットしスタートする(ステップS2
3)。そしてタイマ5のカウント値をチェックし(ステ
ップS24)、カウント値が設定値になったならば(Y
ES)、第1昇圧回路部を停止し(ステップS26)、
第2昇圧回路部を起動する(ステップS27)。
[Table 1] Next, in order to switch from the first booster circuit section to the second booster circuit section, the timer 5 is reset and started (step S2).
3). Then, the count value of the timer 5 is checked (step S24), and if the count value reaches the set value (Y
ES), stop the first booster circuit section (step S26),
The second booster circuit unit is activated (step S27).

【0047】しかし、ステップS24の判定で、カウン
ト値が設定値になっていなければ(NO)、充電々圧の
モニターを行い、停止電圧以上か否か判定し(ステップ
S25)、停止電圧以上ならば(YES)、第1昇圧回
路部を停止し(ステップS30)、リターンする。しか
し、充電々圧が停止電圧に達していなければ(NO)、
ステップS24に戻る。
However, if it is determined in step S24 that the count value does not reach the set value (NO), the charging voltage is monitored and it is determined whether it is the stop voltage or more (step S25). If (YES), the first booster circuit unit is stopped (step S30), and the process returns. However, if the charge pressure does not reach the stop voltage (NO),
It returns to step S24.

【0048】次に、ステップS27で第2昇圧回路部を
起動した後、充電々圧をモニターし、充電々圧が停止電
圧以上か否か判定し(ステップS28)、停止電圧以上
ならば、(YES)、第2昇圧回路部を停止し(ステッ
プS)29、リターンする。
Next, after activating the second booster circuit section in step S27, the charging voltage is monitored to determine whether the charging voltage is equal to or higher than the stop voltage (step S28). If YES, the second booster circuit unit is stopped (step S) 29, and the process returns.

【0049】この実施例では、2つの昇圧回路を用いた
が、昇圧比の異なる昇圧回路を3つ以上用いて、所定の
時間間隔で順次切換える様にしてもかまわない。以上の
ことから、本実施例によるストロボ昇圧回路は、第1昇
圧回路部と第2昇圧回路部の切換えのタイミングをメイ
ンコンデンサの初期充電電圧によって、制御するように
したので、電源(電池)の供給電圧の状態を考慮する必
要がなく、そのため、電池の状態を検出する部材を設け
る必要がない。
In this embodiment, two boosting circuits are used. However, three or more boosting circuits having different boosting ratios may be used and they may be sequentially switched at a predetermined time interval. From the above, in the strobe booster circuit according to the present embodiment, the switching timing of the first booster circuit section and the second booster circuit section is controlled by the initial charging voltage of the main capacitor. It is not necessary to consider the state of the supply voltage, and therefore it is not necessary to provide a member for detecting the state of the battery.

【0050】また、速い充電速度と高いエネルギー変換
効率を両立すべきタイミングを自動的に選択することが
できる。また本発明は、前述した実施例に限定されるも
のではなく、他にも発明の要旨を逸脱しない範囲で種々
の変形や応用が可能であることは勿論である。
Further, it is possible to automatically select the timing at which both the high charging speed and the high energy conversion efficiency should be compatible. Further, the present invention is not limited to the above-described embodiments, and it goes without saying that various modifications and applications can be made without departing from the scope of the invention.

【0051】[0051]

【発明の効果】以上詳述したように本発明によれば、電
源電圧に影響されず、充電時間及びエネルギー変換効率
を一定の水準に維持させるストロボ昇圧回路を提供する
ことができる。
As described above in detail, according to the present invention, it is possible to provide a strobe booster circuit which maintains the charging time and the energy conversion efficiency at a constant level without being affected by the power supply voltage.

【図面の簡単な説明】[Brief description of drawings]

【図1】本発明のストロボ昇圧回路の概略的な構成を示
すブロック図である。
FIG. 1 is a block diagram showing a schematic configuration of a strobe boosting circuit of the present invention.

【図2】本実施例のストロボ昇圧回路の発光のタイミン
グチャートである。
FIG. 2 is a timing chart of light emission of the strobe boosting circuit of this embodiment.

【図3】本発明による実施例としてのストロボ昇圧回路
の具体的な構成を示す図である。
FIG. 3 is a diagram showing a specific configuration of a strobe boosting circuit as an embodiment according to the present invention.

【図4】本実施例のストロボ昇圧回路の充電動作につい
て説明するためのフローチャートである。
FIG. 4 is a flowchart for explaining a charging operation of the strobe boosting circuit of this embodiment.

【図5】図4に示した充電のサブルーチンについて説明
するためのフローチャートである。
5 is a flowchart for explaining a charging subroutine shown in FIG.

【図6】従来の昇圧回路の基本的な構成を示す図であ
る。
FIG. 6 is a diagram showing a basic configuration of a conventional booster circuit.

【図7】従来の昇圧回路の充電特性を示す図である。FIG. 7 is a diagram showing charging characteristics of a conventional booster circuit.

【図8】従来の低温等の状況下で電源電池の能力が低下
している時の充電特性を示す図である。
FIG. 8 is a diagram showing a charging characteristic when the capacity of a power supply battery is reduced in a conventional condition such as low temperature.

【符号の説明】[Explanation of symbols]

1…電源電池、2…第1昇圧回路部、3…第2昇圧回路
部、4…メインコンデンサ、5…タイマ、6…切換部、
12,13,17,19,20,23…トランジスタ、
14,15,18,21,22,27,28…抵抗、1
6…トランス、24,25…ダイオード、29…放電発
光管、61…測光・測距駆動回路、62…モータコント
ロール回路、63…レリーズスイッチ、70…トリガ回
路、71…IGBT(絶縁ゲート型バイポーラ・トラン
ジスタ)、72…バッファ。
DESCRIPTION OF SYMBOLS 1 ... Power supply battery, 2 ... 1st boost circuit part, 3 ... 2nd boost circuit part, 4 ... Main capacitor, 5 ... Timer, 6 ... Switching part,
12, 13, 17, 19, 20, 23 ... Transistor,
14, 15, 18, 21, 22, 27, 28 ... Resistance, 1
6 ... Transformer, 24, 25 ... Diode, 29 ... Discharge arc tube, 61 ... Photometry / distance measurement drive circuit, 62 ... Motor control circuit, 63 ... Release switch, 70 ... Trigger circuit, 71 ... IGBT (insulated gate type bipolar. Transistor), 72 ... buffer.

【手続補正書】[Procedure amendment]

【提出日】平成5年11月8日[Submission date] November 8, 1993

【手続補正1】[Procedure Amendment 1]

【補正対象書類名】明細書[Document name to be amended] Statement

【補正対象項目名】0009[Correction target item name] 0009

【補正方法】変更[Correction method] Change

【補正内容】[Correction content]

【0009】従って、電源電池100より流れ出る電流
値の時間積分値すなわち、消費電流は、昇圧トランスの
巻線比nにほぼ比例する。ここで、消費電流を小さく
し、電源電池100のライフ性を良くするためには、昇
圧トランスの巻線比nを出来るだけ小さくした方が良
い。しかし、巻線比nを小さくすると、充電時間が長く
なる。
Therefore, the time-integrated value of the current value flowing out from the power supply battery 100, that is, the consumed current is substantially proportional to the winding ratio n of the step-up transformer. Here, in order to reduce the current consumption and improve the life of the power supply battery 100, it is better to make the winding ratio n of the step-up transformer as small as possible. However, if the winding ratio n is reduced, the charging time becomes longer.

【手続補正2】[Procedure Amendment 2]

【補正対象書類名】明細書[Document name to be amended] Statement

【補正対象項目名】0025[Name of item to be corrected] 0025

【補正方法】変更[Correction method] Change

【補正内容】[Correction content]

【0025】さらに上記CPU60は、レリーズスイッ
チ63を1段押込んだ1stレリーズ63−1によって
測光、測距指令を発し、2段押込んだ2ndレリーズ
3−2により発光判定、露出、巻き上げ再充電を行うよ
うになっている。
Further, the CPU 60 issues a photometry and distance measuring command by the 1st release 63-1 in which the release switch 63 is pushed in one step, and the 2nd release 6 in which it is pushed in two steps.
According to 3-2 , light emission determination, exposure, and winding recharge are performed.

【手続補正3】[Procedure 3]

【補正対象書類名】明細書[Document name to be amended] Statement

【補正対象項目名】0045[Name of item to be corrected] 0045

【補正方法】変更[Correction method] Change

【補正内容】[Correction content]

【0045】そしてタイマを以下の表1に示すようなの
タイマ設定値により設定する(ステップS22)。この
タイマ設定値はステップS21で検出した充電々圧に応
じて変動した値である。即ち、前述した図7に示すよう
な充電特性に基づき、種々の状況で、速い充電速度と高
いエネルギー変換効率を両立すべきタイミングを選択し
たものである。CPU60は内蔵するROMに、この表
1に示すテーブルを持っており、テーブル参照を行うこ
とにより、タイマ設定値を選択して設定する。
[0045] and set by the timer setting value as shown in Table 1 below timer (step S22). This timer set value is a value that fluctuates in accordance with the charging constant pressure detected in step S21. That is, the timing at which the high charging speed and the high energy conversion efficiency are compatible with each other is selected in various situations based on the charging characteristics as shown in FIG. The CPU 60 has the table shown in Table 1 in the built-in ROM, and by referring to the table, the timer set value is selected and set.

【手続補正4】[Procedure amendment 4]

【補正対象書類名】明細書[Document name to be amended] Statement

【補正対象項目名】0046[Correction target item name] 0046

【補正方法】変更[Correction method] Change

【補正内容】[Correction content]

【0046】[0046]

【表1】 次に第1昇圧回路部から第2昇圧回路部に切換えるため
のタイマをリセットしスタートする(ステップS2
3)。そしてタイマのカウント値をチェックし(ステッ
プS24)、カウント値が設定値になったならば(YE
S)、第1昇圧回路部を停止し(ステップS26)、第
2昇圧回路部を起動する(ステップS27)。
[Table 1] Next, to switch from the first booster circuit section to the second booster circuit section
Reset and start the timer (step S2
3). And to check the count value of the timer (step S24), and if the count value reaches the set value (YE
S), the first booster circuit unit is stopped (step S26), and the second booster circuit unit is activated (step S27).

【手続補正5】[Procedure Amendment 5]

【補正対象書類名】図面[Document name to be corrected] Drawing

【補正対象項目名】図2[Name of item to be corrected] Figure 2

【補正方法】変更[Correction method] Change

【補正内容】[Correction content]

【図2】 [Fig. 2]

【手続補正6】[Procedure correction 6]

【補正対象書類名】図面[Document name to be corrected] Drawing

【補正対象項目名】図3[Name of item to be corrected] Figure 3

【補正方法】変更[Correction method] Change

【補正内容】[Correction content]

【図3】 [Figure 3]

【手続補正7】[Procedure Amendment 7]

【補正対象書類名】図面[Document name to be corrected] Drawing

【補正対象項目名】図6[Name of item to be corrected] Figure 6

【補正方法】変更[Correction method] Change

【補正内容】[Correction content]

【図6】 [Figure 6]

Claims (3)

【特許請求の範囲】[Claims] 【請求項1】 電源電圧又は電源電池の電圧を昇圧して
発光エネルギ―を蓄えるメインコンデンサへ充電を行う
第1の昇圧手段と、 上記第1の昇圧手段よりも昇圧電圧が高い、第2の昇圧
手段と、 充電開始時に動作を開始し、所定の時間後に時間経過信
号を出力するためのタイマ手段と、 上記メインコンデンサの充電するにあたり、始めに第1
の昇圧手段により充電を行い、上記タイマ手段からの時
間経過信号により、上記第2の昇圧手段に切り換えるた
めの充電制御手段と、 を具備することを特徴とするストロボ昇圧回路。
1. A first boosting means for boosting a power supply voltage or a voltage of a power supply battery to charge a main capacitor for storing light emission energy; and a second boosting voltage having a boosting voltage higher than that of the first boosting means. The boosting means, the timer means for starting the operation at the start of charging, and outputting the time lapse signal after a predetermined time, and the charging of the main capacitor, the first
And a charge control means for switching to the second boosting means in response to a time lapse signal from the timer means, the strobe boosting circuit.
【請求項2】 電源電圧又は電源電池と、 上記電源電圧又は電源電池の電圧を昇圧して発光エネル
ギ―を蓄えるメインコンデンサへ充電を行う第1の昇圧
手段と、 上記第1の昇圧手段よりも昇圧電圧が高い、第2昇圧手
段と、 充電開始時に動作を開始し、所定の時間カウント後に時
間経過信号を出力するためのタイマ手段と、 上記メインコンデンサの充電するにあたり、始めに第1
の昇圧手段により充電を行い、上記タイマ手段からの時
間経過信号により第2の昇圧手段に切り換えるための切
り換え手段と、 を具備することを特徴とするストロボ昇圧回路。
2. A power supply voltage or a power supply battery, first boosting means for boosting the power supply voltage or the voltage of the power supply battery to charge a main capacitor for storing light emission energy, and more than the first boosting means. The second boosting means having a high boosted voltage, the timer means for starting the operation at the start of charging and outputting a time lapse signal after counting a predetermined time, and the first capacitor for charging the main capacitor
And a switching means for switching to the second boosting means in response to a time lapse signal from the timer means, the strobe boosting circuit.
【請求項3】 請求項2記載のストロボ昇圧回路におい
て、さらに、 充電開始時のメインコンデンサの充電電圧を測定する手
段と、 この測定する手段に応じてタイマ手段のカウント時間を
変更するための変更手段と、 を具備することを特徴とするストロボ昇圧回路。
3. The strobe booster circuit according to claim 2, further comprising means for measuring the charging voltage of the main capacitor at the start of charging, and a change for changing the count time of the timer means according to the measuring means. A strobe booster circuit comprising:
JP16356893A 1993-07-01 1993-07-01 Strobe booster circuit Expired - Fee Related JP3414443B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP16356893A JP3414443B2 (en) 1993-07-01 1993-07-01 Strobe booster circuit

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP16356893A JP3414443B2 (en) 1993-07-01 1993-07-01 Strobe booster circuit

Publications (2)

Publication Number Publication Date
JPH0722191A true JPH0722191A (en) 1995-01-24
JP3414443B2 JP3414443B2 (en) 2003-06-09

Family

ID=15776388

Family Applications (1)

Application Number Title Priority Date Filing Date
JP16356893A Expired - Fee Related JP3414443B2 (en) 1993-07-01 1993-07-01 Strobe booster circuit

Country Status (1)

Country Link
JP (1) JP3414443B2 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0781078A3 (en) * 1995-12-21 1998-01-28 Patent-Treuhand-Gesellschaft für elektrische Glühlampen mbH Circuit for operating dielectric barrier lamps by pulses

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0781078A3 (en) * 1995-12-21 1998-01-28 Patent-Treuhand-Gesellschaft für elektrische Glühlampen mbH Circuit for operating dielectric barrier lamps by pulses

Also Published As

Publication number Publication date
JP3414443B2 (en) 2003-06-09

Similar Documents

Publication Publication Date Title
KR100353756B1 (en) Flash apparatus
JPH0722191A (en) Strobe voltage boosting circuit
JP2000241860A (en) Stroboscopic device
US20020047626A1 (en) Flash apparatus and camera having the flash apparatus
JP3447327B2 (en) Flash light emitting device charge control device
JP2001183728A (en) Electronic flash device
JP4564691B2 (en) Capacitor charging device and strobe device
JP3651971B2 (en) Electronic flash device
JP3315499B2 (en) camera
JPH08122869A (en) Stroboscopic device
JPH0675270A (en) Power circuit for camera
JP2001210492A (en) Stroboscope charging circuit
JP3196039B2 (en) DC-DC converter
JP2007227153A (en) Electronic flash device
JP2002014392A (en) Stroboscopic device and camera provided therewith
JPH06188088A (en) Flashing light emitting device
JPS60241775A (en) Dc/dc converter circuit
JPH02177299A (en) Power circuit for flash device having no feedback winding
JP2002196402A (en) Flashing device and camera
JP2003347093A (en) Electronic flash device and camera
JPH10123596A (en) Capacitor boosting circuit
JP2001215571A (en) Stroboscope charging circuit
JPH09329738A (en) Camera focus detector
JPH0785988A (en) Strobe device
JP2002122909A (en) Stroboscope charge circuit

Legal Events

Date Code Title Description
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20030304

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090404

Year of fee payment: 6

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090404

Year of fee payment: 6

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100404

Year of fee payment: 7

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110404

Year of fee payment: 8

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120404

Year of fee payment: 9

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130404

Year of fee payment: 10

LAPS Cancellation because of no payment of annual fees