Method and equipment for mounting and dismounting jib to crane

Info

Publication number
JPH0192198A
JPH0192198A JP24795287A JP24795287A JPH0192198A JP H0192198 A JPH0192198 A JP H0192198A JP 24795287 A JP24795287 A JP 24795287A JP 24795287 A JP24795287 A JP 24795287A JP H0192198 A JPH0192198 A JP H0192198A
Authority
JP
Japan
Prior art keywords
jib
block
base
boom
rope
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP24795287A
Other languages
Japanese (ja)
Other versions
JP2547044B2 (en
Inventor
Mitsuo Okada
岡田 美津男
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kato Works Co Ltd
Kato Seisakusho Co Ltd
Original Assignee
Kato Works Co Ltd
Kato Seisakusho Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kato Works Co Ltd, Kato Seisakusho Co Ltd filed Critical Kato Works Co Ltd
Priority to JP62247952A priority Critical patent/JP2547044B2/en
Publication of JPH0192198A publication Critical patent/JPH0192198A/en
Application granted granted Critical
Publication of JP2547044B2 publication Critical patent/JP2547044B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Jib Cranes (AREA)

Abstract

PURPOSE: To facilitate the attaching and detaching operation of a jib and minimize the space in assembling and dividing by raising and extending or falling and contracting an extension boom by the quantity corresponding to the height of a jib block on all occasions of attachment or detachment of a jib block of the latter or former order. CONSTITUTION: A fallen extension boom 6 is slightly raised, and a first jib block 31 is suspended from the top part of a base bracket 21. A divided jib block of the latter order is successively suspended by a third winch rope 60 suspended from the through part of the base bracket 21, and mounted on a jib block of the former order, and the extension boom 6 is raised and/or extended by the quantity corresponding to the height of the jib block on all such occasions to successively assemble a jib. A loading work is performed by raising the jib and the extension boom, and the substantially reverse operation is performed after the loading is ended to disassemble and remove the jib from the top part of the extension boom 6. Thus, the attaching and detaching operation of the jib is facilitated, and a wide space is not required for the assembling or disassembling.

Description

【発明の詳細な説明】 (産業上の利用分野) この発明は、クレーンにおけるジブの装脱力法及び装置
、殊に大型クレーンにおける伸縮ブームの最内側ブーム
頂部に大型ジブの装脱を、簡易、迅速に行えるクレーン
におけるジブの装脱方法及び装置に関するものである。
Detailed Description of the Invention (Field of Industrial Application) The present invention provides a method and device for loading and unloading a jib in a crane, and in particular, a method and device for loading and unloading a jib on a crane, in particular, a method and apparatus for loading and unloading a large jib on the top of the innermost boom of a telescopic boom in a large crane. The present invention relates to a method and device for quickly mounting and dismounting a jib on a crane.

(従来の技術) 従来のクレーンにおけるジブの装脱方法及び装置として
は、クレーン車の車体上の旋回部に、デリックシリンダ
により起伏操作される伸縮ブームを設けると共に、該伸
縮ブームが基部を前記旋回部に軸着された最外側(第1
)ブームの内側に、油圧シリンダ等の伸縮手段により伸
縮操作される第2ブーム、第3ブーム及び第4(最内側
)ブームを、順次摺動可能に内挿することにより構成さ
れ、かつ前記最内側ブーム頂部にジブを起伏可能に設け
、このクレーン車を目的地に移動させ、アウトリガを張
出させて所定位置に設置した後、前記伸縮ブームの最内
側ブーム頂部に設けたヘッドブロックから垂下されるロ
ープ端部のフックブロックにより荷役操作する外、前記
最内側ブーム頂部に取付けたヘッドブロックに、まず、
分割された第1(基部)ジブブロックを起伏可能に軸着
した後、該第1ジブブロックの頂部に第2位以下のジブ
ブロックを、他のクレーン等により吊上げて順次取付け
、その頂部のシーブから吊下されるロープ端部のフック
ブロックにより、目的とする吊荷の荷役操作するものが
ある。
(Prior Art) As a conventional method and device for mounting and dismounting a jib in a crane, a telescoping boom that is operated to raise and lower by a derrick cylinder is provided at a revolving section on the body of a crane vehicle, and the telescoping boom moves the base of the crane into the swing section. The outermost (first
) A second boom, a third boom, and a fourth (innermost) boom, which are telescopically operated by an extensible means such as a hydraulic cylinder, are slidably inserted in order into the inside of the boom; A jib is installed at the top of the inner boom so that it can be raised and lowered, and after the crane truck is moved to the destination and the outriggers are extended and installed at a predetermined position, the jib is suspended from the head block installed at the top of the innermost boom of the telescopic boom. In addition to carrying out cargo handling operations using the hook block at the end of the rope, first, the head block attached to the top of the innermost boom is
After the divided first (base) jib block is pivoted so that it can be raised and lowered, the second and lower jib blocks are lifted and installed in sequence on the top of the first jib block using another crane, etc., and the sheave at the top is attached. There are some types of equipment that use a hook block at the end of a rope to handle the intended cargo.

(発明が解決しようとする問題点) しかしながら、このような従来のクレーンにおけるジブ
の装脱方法及び装置にあっては、そのジブ利用による荷
役作業開始の都度、車体上の旋回部に倒伏させた伸縮ブ
ームの最内側のブーム頂部に固定されたヘッドブロック
に、当該ジブの基部をなす第1ジブ(取付)ブロックの
基部をヘッドブロックに軸着し、次いで該第1ジブブロ
ックに頂部に順次所要数のジブブロックを取付けて組立
てたジブ及び伸縮ブームを起立させ、その頂部のシーブ
から吊下されるメインロープ端部のフックブロックによ
り、目的とする吊荷の荷役作業をし、また、このジブに
よる荷役作業の終了の都度、これとは逆にジブを伸縮ブ
ームと共に旋回部上に倒伏させた後、該ジブをその頂部
のジブロックから順次分解すると共に、その第1ジブブ
ロックを前記最内側ブームの頂部から取外す必要があっ
たため、そのジブの装脱操作が面倒であり、殊に近時多
用される大型クレーンにあっては、大型化したジブを構
成する各ジブブロックが大型化して大重量のものとなる
か、又は短小の多数に分割して軽量化を計る必要があり
、何れにしてもその装脱操作が容易でなく、また、旋回
部上に倒伏する伸縮ブームの最内側ブーム頂部に固定さ
れたベースブラケットの延長線上に、第1ジブブロック
及びそれに続く全ジブブロックを並べて組立て又は分割
するものであったから、その組立又は分割時に広大なス
ペースを要するという問題点があった。
(Problems to be Solved by the Invention) However, in the conventional method and device for mounting and dismounting the jib in a crane, the jib is lowered onto the swivel part on the car body each time cargo handling operations are started using the jib. The base of the first jib (attachment) block, which forms the base of the jib, is pivoted to the head block fixed to the top of the innermost boom of the telescopic boom, and then the first jib block is attached to the top as required in order. The jib and telescopic boom assembled by attaching several jib blocks are erected, and the hook block at the end of the main rope suspended from the sheave at the top is used to carry out cargo handling work. Each time cargo handling work is completed, the jib is lowered together with the telescopic boom onto the revolving section, and then the jib is sequentially disassembled starting from the top jib block, and the first jib block is moved to the innermost side. Since it was necessary to remove the jib from the top of the boom, mounting and dismounting the jib was troublesome, especially in the case of large cranes that are frequently used these days. Either it is heavy, or it is necessary to reduce the weight by dividing it into many short and small pieces, and in any case, it is difficult to install and remove it, and the innermost boom of a telescopic boom that lies down on the revolving part. Since the first jib block and all subsequent jib blocks are assembled or divided side by side on the extension line of the base bracket fixed to the top, there is a problem in that a vast space is required for the assembly or division.

さらに、このような従来のクレーンにおけるジブの装脱
方法及び装置にあっては、組立て後のジブを単独又は伸
縮ブームと共に起立させる際、ジブ端部のシーブから吊
下されるメインロープ端部のフックブロックが、ジブ起
立時の旋回に基づく遠心力を受けて、同ジブ端部より大
回りするフックブロックが回動するジブ端部まわりの器
物や建物等に衝突して損傷を与える恐れがあるため、当
該クレーンまわりに前記ジブ先端の回動軌跡を越える充
分なスペースを確保する必要がある等、このジブの組立
てにはかなりの熟練と長時間を要するという問題点もあ
った。
Furthermore, in such conventional methods and devices for mounting and dismounting jib in cranes, when the assembled jib is erected alone or together with the telescopic boom, the end of the main rope suspended from the sheave at the end of the jib is Because the hook block receives centrifugal force due to the rotation when the jib is raised, the hook block, which rotates more than the end of the jib, may collide with equipment or buildings around the rotating end of the jib, causing damage. There is also the problem that assembling this jib requires considerable skill and a long time, such as the need to secure enough space around the crane to exceed the rotation locus of the tip of the jib.

この発明は、このような従来例に鑑み、荷役作業の開始
に当り、まず、倒伏する伸縮ブームを僅かに起立させ、
その頂部に取付けたベースブラケットの頂部から前記第
1ジブブロックを垂下させ、次いで、前記ベースブラケ
ットの前後方向貫通部を通過して吊下する第3ウィンチ
ロープにより、分割された後順位のジブブロックを順次
吊上げてその下部を、前順位のジブブロックの頂部に連
結してジブを組立て、次いで、該ジブ及び伸縮ブームを
起立させることにより荷役作業をし得るようにし、また
荷役作業の終了後、これと略々逆の操作をして、伸縮ブ
ームの頂部からジブを分解して取外し得るようにするこ
とにより、前記のような問題点のないクレーンにおける
ジブの装脱方法及び装置を提供しようとするものである
In view of such conventional examples, the present invention, at the start of cargo handling work, first slightly raises the retractable boom that is lying down,
The first jib block is suspended from the top of the base bracket attached to the top of the first jib block, and then the next jib block is divided by a third winch rope that passes through the front-back penetration part of the base bracket and is suspended. The jib is assembled by sequentially lifting the lower part of the jib block and connecting it to the top of the preceding jib block, and then the jib and telescopic boom are erected to enable cargo handling work.After the cargo handling work is completed, An attempt is made to provide a method and device for mounting and removing a jib on a crane that does not have the above-mentioned problems by performing almost the opposite operation to allow the jib to be disassembled and removed from the top of the telescopic boom. It is something to do.

(問題点を解決するための手段) この発明は、前記のような従来例の問題点を解決するた
め、旋回台上で起伏する伸縮ブームの最内側ブーム頂部
に取付けたベースブラケットの頂部に、第1ジブブロッ
クの基部を軸着すると共に、前記ベースブラケットの前
後方向の貫通部から垂下する第3ウィンチロープにより
、当該ジブの分割された第2位以下のジブブロックを順
次吊上げて前順位のジブブロックに取付け、又は組立て
られた当該ジブの後順位のジブブロックから順次前順位
のジブブロックを吊下げて取り外し、かつ前記後順位の
ジブブロックの取付は又は前順位のジブプロッタの取外
しの都度、後順位又は前順位のジブブロックの高さ相応
量、前記伸縮ブームを起立及び又は伸長させ、又は倒伏
及び又は縮小させるクレーンにおけるジブの装脱方法で
あり。
(Means for Solving the Problems) In order to solve the problems of the conventional example as described above, the present invention has a base bracket attached to the top of the innermost boom of a telescopic boom that rises and falls on a swivel platform. The base of the first jib block is pivoted, and a third winch rope that hangs down from the front-rear penetration part of the base bracket is used to sequentially lift the second and lower jib blocks of the divided jib to the previous one. Suspend and remove the preceding jib block from the rear jib block of the jib that is attached or assembled to the jib block, and each time the rear jib block is installed or the preceding jib plotter is removed, A method for mounting and dismounting a jib in a crane, in which the telescopic boom is raised and/or extended, or lowered and/or contracted, by an amount corresponding to the height of a rear or front jib block.

また、旋回部に対して起伏可能な伸縮ブームの最内側ブ
ーム頂部に基部が取付けられ、前後方向の貫通部を有す
るベースブラケットの頂部に、第1ジブブロックの基部
を軸着すると共に、前記ベースブラケットと第1ジブブ
ロックとの軸着部まわりにマストの基部を回動可能に軸
着し、かつ、前記ベースブラケットの前後方向の貫通部
に、分割されたジブブロック等の操作用第3ウィンチロ
ープを貫挿吊下したものである。
Further, the base is attached to the innermost boom top of the telescopic boom that can be raised and lowered with respect to the rotating part, and the base of the first jib block is pivotally attached to the top of the base bracket having a penetration part in the front and rear direction. The base of the mast is rotatably attached around the pivoting portion between the bracket and the first jib block, and a third winch for operating the divided jib block, etc. is provided in the longitudinally penetrating portion of the base bracket. A rope is inserted through it and suspended.

(作用) この発明は、前記のような構成を有するから、旋回台上
で起伏する伸縮ブームの最内側ブーム頂部に取付けたベ
ースブラケットの頂部に、第1ジブブロックの基部を軸
着すると共に、前記ベースブラケットの貫通部から垂下
する第3ウィンチロープにより、当該ジブの分割された
第2位以下のジブブロックを順次の吊上げて前順位のジ
ブブロックに取付け、又は組立てられた当該ジブの後順
位のジブプロッタから順次前順位のジブブロックを吊下
げて取り外し、かつ前記後順位のジブブロックの取付は
又は前順位のジブプロッタの取外しの都度、後順位又は
前順位のジブブロックの高さ相応量、前記伸縮ブームを
起立及び又は伸長させ、又は倒伏及び又は縮小させるこ
とにより、当該フレレーンの第3ウィンチロープにより
、旋回台上で起伏する伸縮ブームの頂部にジブを組立て
、又は組立てられたジブを分割する。
(Function) Since the present invention has the above-described configuration, the base of the first jib block is pivoted to the top of the base bracket attached to the top of the innermost boom of the telescopic boom that rises and falls on the swivel base, and The third winch rope hanging down from the penetration part of the base bracket sequentially lifts the second and lower divided jib blocks of the jib and attaches them to the front jib block, or the rear jib block of the assembled jib. The jib blocks in the front position are suspended and removed from the jib plotter in sequence, and each time the jib block in the rear position is installed or the jib block in the front position is removed, an amount corresponding to the height of the jib block in the rear position or the front position, By raising and/or extending the telescopic boom, or lowering and/or contracting the telescopic boom, the third winch rope of the relevant flare lane is used to assemble a jib on the top of the telescopic boom that is undulating on the swivel platform, or to split the assembled jib. .

(実施例) 以下、この発明に係るクレーンにおけるジブの装脱方法
及び装置を、同方法を実施するのに好適な装置の一実施
例を示す添付の図面を参照して説明する。
(Embodiment) Hereinafter, a method and apparatus for mounting and dismounting a jib in a crane according to the present invention will be described with reference to the accompanying drawings showing an embodiment of a suitable apparatus for carrying out the method.

図において、1はクレーン車、2は車体、3は車体2上
の旋回部、4はアウトリガ、5はデリックシリンダ、6
は伸縮ブームで、該伸縮ブーム6は基部が前記旋回部3
に軸承され、デリックシリンダ5により起伏操作される
第1(最外側)ブーム7と、該第1ブーム7の内側に順
次摺動可能に挿入され、図示しない油圧シリンダ、ロー
プ等の適宜伸縮手段により伸縮操作される第2ブーム8
、第3ブーム9及び第4(最内側)ブーム10により、
4段伸縮ブームとして構成される。11は第4ブーム1
oの頂部、12は第4ブーム10の頂部11まわりに軸
13着され、その頂部11上面又は側面(第1図の状態
)に固定されるヘッドブロック、14はシーブである。
In the figure, 1 is a crane truck, 2 is a car body, 3 is a rotating part on the car body 2, 4 is an outrigger, 5 is a derrick cylinder, and 6 is a derrick cylinder.
is a telescopic boom, and the base of the telescopic boom 6 is connected to the rotating part 3.
A first (outermost) boom 7 is supported by a shaft and is raised and lowered by a derrick cylinder 5, and a first (outermost) boom 7 is slidably inserted into the inside of the first boom 7 and is moved by an appropriate expansion/contraction means such as a hydraulic cylinder or a rope (not shown). Second boom 8 that is telescopically operated
, the third boom 9 and the fourth (innermost) boom 10,
It is configured as a 4-stage telescopic boom. 11 is the 4th boom 1
12 is a head block attached to the shaft 13 around the top 11 of the fourth boom 10 and fixed to the top or side surface of the top 11 (as shown in FIG. 1), and 14 is a sheave.

2oはジブ30を伸縮ブーム6の最内側ブーム10頂部
11に取付ける取付部材で、該取付部材20は基部に第
4ブーム10頂部11への取付手段としてのピン22を
備えるペースブラケッ、ト21と、同ベースブラケット
21の頂部23に、頂部にジブブロック32の取付手段
としてのピン39を有する第1ジブブロック31の基部
を軸27着することによりその要部が構成される。21
Aはベースブラケット21の中央部の前後(第3図では
上下)方向に向う貫通部で、該貫通部21Aの内側下部
(同図では左側)にはガイドシーブ24が設けられ、貫
通部2LAに挿入、吊下される第3ウィンチロープ60
をガイドする。
2o is a mounting member for mounting the jib 30 to the top 11 of the innermost boom 10 of the telescopic boom 6, and the mounting member 20 includes a pace bracket 21 having a pin 22 at its base as a means for mounting to the top 11 of the fourth boom 10; The main part is constructed by attaching the base of the first jib block 31, which has a pin 39 on the top as a means for attaching the jib block 32, to the top 23 of the base bracket 21, and attaches it to the shaft 27. 21
A is a penetrating portion extending in the front-rear (up and down in FIG. 3) direction at the center of the base bracket 21, and a guide sheave 24 is provided at the inner lower part of the penetrating portion 21A (on the left side in the figure), and a guide sheave 24 is provided in the penetrating portion 2LA. Third winch rope 60 inserted and suspended
to guide you.

なお、この貫通部21Aは第1ジブブロック31をベー
スブラケット21側に折り畳んだ状態に   −おいて
、第3ウィンチロープ60によるジブブロック32ない
し36等の操作の妨げにならない位置に形成すればよく
、通常はその中央部ないしその下部よりの前後方向で、
同ロープ60が自由に移動できる大きさのものとして形
成される。また、24Aは第3ウィンチロープ60の適
者検出具、24Bは同ロープ60の過巻き防止ウェイト
である。
Note that this penetrating portion 21A may be formed in a position where it does not interfere with the operation of the jib blocks 32 to 36, etc. by the third winch rope 60 when the first jib block 31 is folded toward the base bracket 21 side. , usually in the front-back direction from the center or the bottom,
The rope 60 is formed to have a size that allows it to move freely. Further, 24A is a suitable person detection device for the third winch rope 60, and 24B is a weight for preventing overwinding of the third winch rope 60.

25は基部をベースブラケット21の頂部23外側(第
1図では上側)に軸26着した第1(補助)マスト、2
7は第1マスト25の頂部とベースブラケット21の基
部とを連結する連結部材としての所要長さの第10−プ
である。28は第10−プ27の伸長時(第5図)に、
その中央部をクリップ29して前記ベースブラケット2
1頂部23の第1マスト25基部の軸着部まわりから吊
下支承する補助ロープである。
Reference numeral 25 denotes a first (auxiliary) mast whose base is attached to a shaft 26 on the outside (upper side in FIG. 1) of the top 23 of the base bracket 21;
Reference numeral 7 designates a tenth rope having a required length as a connecting member that connects the top of the first mast 25 and the base of the base bracket 21. 28, when the 10th-pull 27 is expanded (Fig. 5),
Clip 29 the center part of the base bracket 2
This is an auxiliary rope that is suspended and supported from around the shaft attachment part of the base of the first mast 25 of the first mast 25 of the top part 23.

30はジブ、31は基部をベースブラケット21の頂部
に軸37着したジブ30の基部としての第1シブプロツ
タ、32は基部を取付部材としてのピン39により、第
1ジブブロック31の頂部に接続される第2ジブブロッ
ク、33ないし35はこれと同様な第3ないし第5ジブ
ブロック、36は第6(頂部)ジブブロックで、これら
は第2ジブブロック32の頂部(第5図では下部)に、
順次前者と同様にピン39止めされる。38は第6ジブ
ブロック36頂部のシーブである。
Reference numeral 30 denotes a jib, 31 a first sib protector as the base of the jib 30 whose base is attached to the top of the base bracket 21 by a shaft 37, and 32 the base connected to the top of the first jib block 31 by a pin 39 as a mounting member. 33 to 35 are similar third to fifth jib blocks, and 36 is a sixth (top) jib block. ,
They are sequentially secured with pins 39 in the same manner as the former. 38 is a sheave at the top of the sixth jib block 36.

41は第1ジブブロック31基部のブラケットに軸着し
た二叉ブラケット、42は該二叉ブラケット41に基部
を軸着した第2マスト、43は同第2マスト42頂部の
シーブ、44は第1マスト25頂部と第2マスト42頂
部とを連結する第20−プ、46は二叉ブラケット41
と一体状をなす第3マスト、47は第3マスト46頂部
のシーブ、48は第2マスト42と第2マスト46との
頂部を連結する第3連結部材(イコライザリンク)、4
9は第3マスト46と第1ジブブロック31との頂部を
連結する第40−プで、第10−プ25、第20−プ4
4、第3連結部材48、第40−プ49は、それぞれに
より連結されるベースブラケット21、第1ないし第3
マスト25.42.46及び第1ジブブロック31相互
間の最大開放角度を制限すると共に、ベースブラケット
21と第1ジブブロック31との近接角度αの最小値を
制限し、両者21と31との内側の当接を防止する。
41 is a two-pronged bracket pivoted to the bracket at the base of the first jib block 31, 42 is a second mast whose base is pivoted to the two-pronged bracket 41, 43 is a sheave at the top of the second mast 42, and 44 is the first A 20th bracket 46 connects the top of the mast 25 and the top of the second mast 42 to a two-pronged bracket 41.
47 is a sheave at the top of the third mast 46; 48 is a third connecting member (equalizer link) connecting the tops of the second mast 42 and the second mast 46;
9 is a 40th pipe connecting the tops of the third mast 46 and the first jib block 31;
4. The third connecting member 48 and the 40th-group 49 are connected to the base bracket 21 and the first to third connecting members, respectively.
The maximum opening angle between the mast 25, 42, 46 and the first jib block 31 is limited, and the minimum value of the proximity angle α between the base bracket 21 and the first jib block 31 is limited. Prevents inside abutment.

50は第6ジブブロック36の頂部に、基部を軸51着
したサブジブ、52はサブジブ50頂部のシーブ、53
は第4マスト、54はメインジブ30に対するサブジブ
50の起伏角度を設定するための第2テンシヨンロープ
、55は第3マスト46頂部とジブ30頂部間に設けた
第1テンシヨンロープである。
50 is a sub-jib whose base is attached to the shaft 51 at the top of the sixth jib block 36; 52 is a sheave at the top of the sub-jib 50; 53
is a fourth mast, 54 is a second tension rope for setting the up-and-down angle of the sub-jib 50 with respect to the main jib 30, and 55 is a first tension rope provided between the top of the third mast 46 and the top of the jib 30.

56はメイン(第1ウィンチ)ロープ、57は同ロープ
56端部のメインフックブロック、58は端部が第2マ
スト42の頂部の突子59に固定されたサブ(第2)ウ
ィンチロープで、該ロープ58をクレーン車1上の図示
しないウィンチで巻取り巻戻すことにより、第1マスト
25の頂部を介して第2マスト42の頂部を張引し、さ
らに第3連結部材48、第3マスト46、第40−プ4
9を介して第1ジブブロック31を張引し、これにより
第1ジブブロック31のベースブラケット21に対する
開度を規制する。
56 is a main (first winch) rope, 57 is a main hook block at the end of the rope 56, 58 is a sub (second) winch rope whose end is fixed to a protrusion 59 at the top of the second mast 42, By winding and unwinding the rope 58 with a winch (not shown) on the crane vehicle 1, the top of the second mast 42 is pulled through the top of the first mast 25, and the third connecting member 48 and the third mast 46, 40th-P4
9, the first jib block 31 is pulled, thereby regulating the opening degree of the first jib block 31 with respect to the base bracket 21.

60は第3ウィンチロープで、この第3ウィンチロープ
60はベースブラケット21の貫通部21Aを通して垂
下し、その端部に第3フツクブロツク61が設けられる
。71及び72は玉掛ロープである。
60 is a third winch rope, and this third winch rope 60 hangs down through the penetrating portion 21A of the base bracket 21, and a third hook block 61 is provided at the end thereof. 71 and 72 are sling ropes.

次に、この実施例の作用を゛説明する。Next, the operation of this embodiment will be explained.

まず、クレーン車1を目的とする荷役個所へ移動させ、
アウトリガ4によりその車体2を所定位置に設置した後
、伸縮ブーム6をクレーン車1の旋回部上に倒し、その
第4ブーム10頂部11の上側にヘッドブロック12が
設けられている場合には、同ヘッドブロック12をその
軸13着部まわりの反時計方向(第3図)へ回まわして
頂部11の外側(同図上側)に固定する。
First, move the crane truck 1 to the target cargo handling location,
After the car body 2 is installed in a predetermined position by the outrigger 4, the telescopic boom 6 is lowered onto the revolving part of the crane truck 1, and when the head block 12 is provided above the top part 11 of the fourth boom 10, The head block 12 is fixed to the outside of the top portion 11 (on the upper side of the figure) by rotating the head block 12 counterclockwise (FIG. 3) around the mounting portion of the shaft 13.

次いで、第1ジブブロック31の基部及び第1マスト2
5の基部を、ベースブラケット21の頂部に軸37.2
6着すると共に、第1ジブブロック31の基部に第2、
第3マスト42.46の基部を二叉ブラケット41を介
して軸着した取付部材20を、その第1ないし第3マス
ト25.42.46の何れかにより吊上げ、そのベース
ブラケット21の基部をピン22により最内側ブーム1
0頂部11に第2図のように取付ける。なお、この吊上
げの際、ベースブラケット21と第1ジブブロック31
とを水平状に維持すれば、吊上げ時におけるその地上高
を低くできるから、最内側ブーム10頂部11への取付
部材20の取付は操作が一層容易となる。また、この際
、メインローブ56及び基部を第3マスト頂部に連結し
た第1テンシヨンロープ55を第1ジブブロック31の
前方に垂下させる。
Next, the base of the first jib block 31 and the first mast 2
The base of the shaft 37.2 is attached to the top of the base bracket 21.
6, and a second jib block 31 at the base of the first jib block 31.
The mounting member 20 with the base of the third mast 42.46 pivoted via the bifurcated bracket 41 is lifted by any of the first to third masts 25, 42, 46, and the base of the base bracket 21 is pinned. 22 to the innermost boom 1
0 top part 11 as shown in Fig. 2. Note that during this lifting, the base bracket 21 and the first jib block 31
By maintaining the boom horizontally, the height above the ground during lifting can be lowered, so that the operation of attaching the attachment member 20 to the top 11 of the innermost boom 10 becomes easier. Also, at this time, the first tension rope 55 whose main lobe 56 and base are connected to the top of the third mast is suspended in front of the first jib block 31.

次に、伸縮ブーム6を僅かに起立させると共に、第2ウ
ィンチロープ58を緩めて第1ジブブロック31を、第
1図のようにその頂部の軸37着部から垂下させる。た
だし、この状態では第2ジブブロック32は、末だ装着
されていない。
Next, the telescopic boom 6 is raised slightly, and the second winch rope 58 is loosened to allow the first jib block 31 to hang from the shaft 37 at the top thereof as shown in FIG. However, in this state, the second jib block 32 is not yet attached.

しかる後、第3ウィンチロープ60端部の第3フツクブ
ロツク61により、玉掛ロープ71を介して第2ジブブ
ロック32の重心G位まわりを吊上げ、その下部(第1
図では右側)を第1ジブブロック31頂部(同図では下
部)にピン39止めし、これに前後して伸縮ブーム6を
第2ジブ32の長さ相応量起立及び又は伸長させて第1
ジブブロック31を上昇させた後、第3ウィンチロープ
60を緩めて第2ジブブロック32を第1ジブブロック
31の下方に垂下させる一方、メインロープ56端部の
メインフックブロック57により、玉掛ロープ72を介
して第2ジブブロック32を反時計方向に引き、その下
部他側を第1ジブプロッタ31頂部の他側にピン39止
めして第4図のように取付けた後、第3フツクブロツク
61及びメインフックブロック57の玉掛ロープ71.
72を、第2ジブブロック32から外す。
Thereafter, the third hook block 61 at the end of the third winch rope 60 lifts the second jib block 32 around the center of gravity G via the sling rope 71, and
The right side in the figure) is fixed to the top of the first jib block 31 (lower part in the figure) with a pin 39, and before and after this, the telescopic boom 6 is raised and/or extended by an amount corresponding to the length of the second jib 32.
After raising the jib block 31, the third winch rope 60 is loosened to allow the second jib block 32 to hang below the first jib block 31. After pulling the second jib block 32 counterclockwise through the pin 39 and fixing the other side of its lower part to the other side of the top of the first jib plotter 31 as shown in FIG. 4, the third hook block 61 and the main Sling rope 71 for hook block 57.
72 from the second jib block 32.

なお、第1ジブブロック31頂部への第2ジブブロック
32の取付けに当り、予め第2ジブブロック32の高さ
相応量、垂下する第1ジブブロック31を上昇させてか
ら両者を接続する場合には、第2ジブブロック32基部
の一側を第1ジブブロック31頂部の一側にピン39止
めした後、第2ジブブロック32を反時計方向へ回動さ
せる際、すなわち、両者の取付途上において、第1ジブ
ブロック31を第2ジブブロック32の高さ相応及上昇
させる必要はないが、この場合には両ジブブロック31
と32との両側のピン39.39止め位置が、共に第2
ジブブロック32の高さ位の高所となる。
In addition, when attaching the second jib block 32 to the top of the first jib block 31, first raise the hanging first jib block 31 by an amount corresponding to the height of the second jib block 32, and then connect the two. After fixing one side of the base of the second jib block 32 to one side of the top of the first jib block 31 with a pin 39, when rotating the second jib block 32 counterclockwise, that is, while the two are being attached, , it is not necessary to raise the first jib block 31 to the height of the second jib block 32, but in this case both jib blocks 31
The pins 39 and 39 on both sides of and 32 are both in the second position.
This is a high place at about the height of the jib block 32.

次いで、前記両ジブブロック31.32と略々同様な取
付要領で、伸縮ブーム6をさらに起立及び又は伸長させ
ると共に第3ウィンチロープ60端部の第3フツクブロ
ツク61と係合する玉掛ロープ71により、第3ジブブ
ロック33の重心部まわりを吊上げ、第2ジブブロック
32の頂部(第4図では下位)にピン39.39止めし
、以下同様に第4、第5、第6(頂部)シブブロック3
4.35.36を順次ピン39.39止め接続し、ジブ
30を第5図のように組立て、その頂部と第4マスト4
6頂部とに第2テンシヨンロープ55の両端部を取付け
る。しかる後、第2ウィンチロープ58を巻込み、第2
マスト42、第3連結部材48、第3マスト46、第1
テンシヨンロープ55を介してジブ30を反時計方向(
第5図)に回動して起立させ、その頂部のシーブ38か
ら垂下するフックブロック57により通常の荷役操作を
する。
Then, in substantially the same manner as the two jib blocks 31, 32, the telescopic boom 6 is further erected and/or extended, and the sling rope 71 engages with the third hook block 61 at the end of the third winch rope 60. The center of gravity of the third jib block 33 is lifted up, and pins 39.39 are fixed to the top (lower in Fig. 4) of the second jib block 32, and in the same manner, the fourth, fifth, and sixth (top) shib blocks 3
4. Connect 35 and 36 with pins 39 and 39 in sequence, assemble the jib 30 as shown in Fig. 5, and attach the top of the jib 30 to the fourth mast 4.
Both ends of the second tension rope 55 are attached to the top of the tension rope 55. After that, the second winch rope 58 is reeled in, and the second
Mast 42, third connecting member 48, third mast 46, first
The jib 30 is rotated counterclockwise (
The hook block 57 hanging from the sheave 38 at the top of the hook block 57 is used for normal cargo handling operations.

なお、図示しないが、前順位のジブブロックを充分吊上
げれば、第3ウィンチロープ58により後順位のジブブ
ロックを垂直状に吊上げて、前順位のものに連結できる
Although not shown, if the front jib block is sufficiently lifted, the third winch rope 58 can vertically lift the rear jib block and connect it to the front jib block.

次に、第5図のように組立てたジブ30の頂部にサブジ
ブ50を取付ける要領を説明する(図示省略)。
Next, a procedure for attaching the sub-jib 50 to the top of the jib 30 assembled as shown in FIG. 5 will be explained (not shown).

まず、起立伸長する伸縮ブーム6の最内側ブーム10頂
部に取付けたベースブラケット21の貫通部2LAから
第3ウィンチロープ60を重下させ、その端部のフック
ブロック61により、玉掛ロープ71をサブジブ50の
重心部に掛けて引寄せ、同サブジブ50の基部を垂下す
るジブ30の頂部に合せて軸38着し、玉掛ロープをサ
ブジブ50から取外す。
First, the third winch rope 60 is lowered from the penetration part 2LA of the base bracket 21 attached to the top of the innermost boom 10 of the telescopic boom 6 that is standing up and extending, and the sling rope 71 is attached to the sub-jib 50 by the hook block 61 at the end of the third winch rope 60. The base of the sub-jib 50 is attached to the shaft 38 in alignment with the top of the hanging jib 30, and the sling rope is removed from the sub-jib 50.

次いで、デリックシリンダ5により伸縮ブーム6をさら
に起立させる一方、サブロープ58及びメインロープ5
6を巻いて、ジブ30及びサブジブ50を反時計方向(
第5図)に回動させて第6図のように起立させ、第2ウ
ィンチロープ58によりその起立角度を一応設定し、サ
ブジブ50頂部のジープ52からロープ56を介してフ
ックブロック57を吊下させる。その後の荷役作業要領
等は通常のクレーンと同様である。
Next, while the telescopic boom 6 is further erected by the derrick cylinder 5, the sub rope 58 and the main rope 5 are
6 and rotate the jib 30 and sub-jib 50 counterclockwise (
The hook block 57 is suspended from the jeep 52 at the top of the sub-jib 50 via the rope 56. let The subsequent cargo handling procedures are the same as for ordinary cranes.

次に、荷役作業の終了後におけるジブ30及びサブジブ
50の最内側ブーム10頂部からの取外し要領は、まず
、第6図の状態からサブジブ50の起伏操作ロープを緩
めてサブジブ50を軸51まわりを時計方向に回動垂下
させる一方、サブロープ58を緩めてジブ30を同方向
に回動させ、第3ウィンチロープ60端部のフックブロ
ック61の玉掛ロープにより、垂下したサブジブ50を
軸51まわりを、さらに時計方向へ回動させて水平状と
した後地上に降し、軸51を抜いてジブ30頂部から分
離する。
Next, the procedure for removing the jib 30 and sub-jib 50 from the top of the innermost boom 10 after cargo handling work is to first loosen the hoisting rope of the sub-jib 50 from the state shown in FIG. While rotating and hanging clockwise, the sub rope 58 is loosened and the jib 30 is rotated in the same direction, and the suspended sub jib 50 is rotated around the shaft 51 by the sling rope of the hook block 61 at the end of the third winch rope 60. Further, it is rotated clockwise to make it horizontal, and then lowered to the ground, and the shaft 51 is pulled out and separated from the top of the jib 30.

次に、ジブ30を分割するには、第5図のように垂下す
るジブ30の頂部(第6)ジブプロツタ36基部の外側
(同図右側)のピン39を抜いた後、同第6ジブロツク
36頂部に玉掛ロープ71を掛けて第3ウィンチロープ
60のフックブロック61により、内方(左側)へ引い
て水平状にすると共に、伸縮ブーム6を縮めて同第6ジ
ブブロック36を地上に置き(第7図)、他側のピン3
9を抜いて第5ジブブロック35の頂部から分離する。
Next, to divide the jib 30, as shown in FIG. Hang the sling rope 71 on the top and pull it inward (to the left) using the hook block 61 of the third winch rope 60 to make it horizontal, then retract the telescopic boom 6 and place the sixth jib block 36 on the ground ( Figure 7), pin 3 on the other side
9 and separate it from the top of the fifth jib block 35.

なお、この際、玉掛ロープ71を第6ジブブロックの重
心部に掛け、同ジブプロッタ36を水平状に吊下すれば
、第6シブブロツク36を地上に載置することなく第5
ジブブロックから分離できる。
At this time, if the sling rope 71 is hung around the center of gravity of the sixth jib block and the jib plotter 36 is suspended horizontally, the fifth jib block 36 can be suspended without placing the sixth jib block 36 on the ground.
Can be separated from the jib block.

また、第5ないし第2ジブブロック35ないし32の分
割要領もこれと同様で、まず、各ジブブロックの連結基
部の一側(外側)のピン39を抜いた後、第3ウィンチ
ロープ60の玉掛ロープ71付ブツクブロツク61によ
り水平状に引張った後、他方のピン39を抜いて分離す
る。
Furthermore, the procedure for dividing the fifth to second jib blocks 35 to 32 is similar to this. First, the pin 39 on one side (outside) of the connection base of each jib block is removed, and then the third winch rope 60 is slinged. After horizontally pulling the block 61 with the rope 71, the other pin 39 is pulled out and separated.

また、第6ない第2ジブプロツタ36ないし32の重心
部を玉掛ロープにより吊下すれば1分離後の各ジブブロ
ック36ないし32を、当該伸縮ブーム6を旋回させる
ことにより、第3ウィンチロープで吊下したまま適所へ
搬出できる。
Furthermore, if the center of gravity of the sixth or second jib block 36 to 32 is suspended by a sling rope, each jib block 36 to 32 after one minute can be suspended by the third winch rope by rotating the telescopic boom 6. It can be transported to the appropriate location with it down.

なお、図示しないが、サブジブ50が適宜数に分割可能
に構成されたものについても、前記ジブ30の組立て、
分割と同様な要領により、その組立て5分割を行えるこ
とはいうまでもない。
Although not shown in the drawings, the assembly of the jib 30,
Needless to say, the assembly can be divided into five parts in the same manner as the division.

また、ベースブラケット21付第1ジブブロック31を
、適宜手段により何れかのマストにより水平状に吊上げ
、最内側ブーム10頂部11から取外す。
Further, the first jib block 31 with the base bracket 21 is lifted horizontally by any mast using appropriate means and removed from the top portion 11 of the innermost boom 10.

(発明の効果) この発明は、前記のような構成を有し、作用をするから
、次のような効果が得られる。
(Effects of the Invention) Since the present invention has the configuration and operates as described above, the following effects can be obtained.

(1) 他のクレーン等の荷役装置を要することなく、
当該クレーンの伸縮ブーム及び第3ウィンチロープ等に
より、ジブの組立て及び分割等を行える。
(1) Without the need for other cargo handling equipment such as cranes,
The jib can be assembled and divided using the crane's telescopic boom and third winch rope.

(2) 当該クレーンの第3ウィンチロープにより、各
ジブブロック等の吊上げ、吊下げ操作を行えるから、大
型ジブにっても細分することなく比較的大きな小数の大
型ジブブロックとして分割構成しても、その組立、分割
に大きな労力を要さない。
(2) Since the crane's third winch rope can lift and suspend each jib block, etc., even large jibs can be divided into relatively large small numbers of large jib blocks without having to be subdivided. , it does not require much effort to assemble or separate.

(3) 大型ジブを比較的小数のジブブロックとして分
割構成できるから、ジブブロックの組付は回数が減小し
、ひいては、大型ジブブロックの組立時間を単相できる
(3) Since the large jib can be divided into a relatively small number of jib blocks, the number of times the jib blocks must be assembled is reduced, and the time required to assemble the large jib blocks can be reduced to a single phase.

(4) ジブの組立て及び分割を、伸縮ブームの起伏及
び又は伸縮と、第3ウィンチロープの巻上げ、巻戻しに
より行えるから、その組立時に広大なスペースを必要と
しない。
(4) Since the jib can be assembled and divided by raising and/or extending the telescopic boom and hoisting and unwinding the third winch rope, a large space is not required when assembling the jib.

なお、組立後のジブを起立させる際、ジブ頂部のシーブ
から垂下するフックブロックを、第3ウィンチロープに
より張引係止させ得るから、ジブ及び伸縮ブームの起伏
及び又は旋回時に加えられる遠心力により、フックブロ
ックをみだりにふらつかせず、ジブ頂部の移動軌跡まわ
りの器物、建物等に不用意な損傷を与える恐れがない。
Furthermore, when the jib is erected after assembly, the hook block hanging from the sheave at the top of the jib can be tensioned and locked by the third winch rope. , the hook block does not swing unnecessarily, and there is no risk of inadvertently damaging property, buildings, etc. around the movement path of the top of the jib.

なお、ベースブラケットの前後方向貫通部の前側下位に
ガイドシーブを設ければ、第3ウィンチロープをスムー
ズに動作させ得る。
In addition, if a guide sheave is provided at the lower front side of the longitudinal direction penetration part of the base bracket, the third winch rope can be operated smoothly.

【図面の簡単な説明】[Brief explanation of the drawing]

図面は、この発明に係るクレーンにおけるジブの装脱方
法を実施するのに好適な装置の一実施例を示すもので、
第1図、第2図、第4図及び第5図は、この装置による
ジブの組立工程毎の概略構造を示す側面図、第3図はこ
の装置の要部をなすベースブラケット基部まわりの側面
図、第6図はこの装置を実施したクレーンの組立状態の
概略側面図、第7図は頂部ジブブロックの分割要領説明
図である。 3・・・・・・旋回部、       6・・・・・・
伸縮ブーム、10・・・・・・第4(最内側)ブーム、
11・・・・・・頂部、14・・・・・・シーブ、  
     20・・・・・・取付部材、21・・・・・
・ベースブラケット、 21A・・・・・・貫通部、2
3・・・・・・頂部、       24・・・・・・
シーブ、25・・・・・・(第1)マスト、  30・
・・・・・ジブ、31・・・・・・第1ジブブロック、 32〜36・・・・・・第2〜第6ジブブロック、37
・・・・・・軸、         39・・・・・・
ピン、41.46・・・・・・(第2、第3)マスト、
60・・・・・・第3ウィンチロープ。
The drawing shows an embodiment of a device suitable for carrying out the method for mounting and dismounting a jib in a crane according to the present invention.
Figures 1, 2, 4, and 5 are side views showing the schematic structure of each jib assembly process using this device, and Figure 3 is a side view of the area around the base of the base bracket, which forms the main part of this device. FIG. 6 is a schematic side view of the assembled state of a crane implementing this device, and FIG. 7 is an explanatory diagram of how the top jib block is divided. 3... Swivel part, 6...
Telescopic boom, 10... Fourth (innermost) boom,
11... Top, 14... Sheave,
20...Mounting member, 21...
・Base bracket, 21A...Penetration part, 2
3...Top, 24...
Sheave, 25... (1st) Mast, 30.
...Jib, 31...First jib block, 32-36...Second to sixth jib block, 37
...Axis, 39...
Pin, 41.46... (2nd, 3rd) mast,
60...Third winch rope.

Claims (3)

【特許請求の範囲】[Claims] (1)旋回台上で起伏する伸縮ブームの最内側ブーム頂
部に取付けたベースブラケットの頂部に、第1ジブブロ
ックの基部を軸着すると共に、前記ベースブラケットの
前後方向の貫通部から垂下する第3ウインチロープによ
り、当該ジブの分割された第2位以下のジブブロックを
順次吊上げて前順位のジブブロックに取付け、又は組立
てられた当該ジブの後順位のジブブロックから順次前順
位のジブブロックを吊下げて取り外し、かつ前記後順位
のジブブロックの取付け又は前順位のジブブロックの取
外しの都度、後順位又は前順位のジブブロックの高さ相
応量、前記伸縮ブームを起立及び又は伸長させ、又は倒
伏及び又は縮小させることを特徴とするクレーンにおけ
るジブの装脱方法。
(1) The base of the first jib block is pivotally attached to the top of the base bracket attached to the top of the innermost boom of the telescopic boom that rises and falls on the swivel platform, and the 3 Using the winch rope, lift the second and lower divided jib blocks of the jib in sequence and attach them to the previous jib block, or sequentially lift the jib blocks of the previous jib from the jib block after the assembled jib. lifting and removing, and each time the rear jib block is installed or the front jib block is removed, the telescopic boom is erected and/or extended by an amount corresponding to the height of the rear or front jib block, or A method for mounting and dismounting a jib in a crane, characterized by lodging and/or reducing the jib.
(2)旋回部に対して起伏可能な伸縮ブームの最内側ブ
ーム頂部に基部が取付けられ、前後方向の貫通部を有す
るベースブラケットの頂部に、第1ジブブロックの基部
を軸着すると共に、前記ベースブラケットと第1ジブブ
ロックとの軸着部まわりにマストの基部を回動可能に軸
着し、かつ、前記ベースブラケットの前後方向の貫通部
に、分割されたジブブロック等の操作用第3ウインチロ
ープを貫挿吊下したことを特徴とするクレーンにおける
ジブの装脱装置。
(2) The base is attached to the innermost boom top of the telescopic boom that can be raised and lowered with respect to the rotating part, and the base of the first jib block is pivoted to the top of the base bracket that has a penetration part in the front and rear direction, and The base of the mast is rotatably pivoted around the pivoting part between the base bracket and the first jib block, and a third part for operating the divided jib block, etc. is provided in the longitudinally penetrating part of the base bracket. A jib loading/unloading device for a crane, characterized by a winch rope inserted through and suspended.
(3)前記ベースブラケットの前後方向の貫通部の前側
下位に、前記第3ウインチロープのガイドシーブを設け
たことを特徴とする特許請求の範囲第1項記載のクレー
ンにおけるジブの装脱装置。
(3) The jib mounting/detaching device for a crane according to claim 1, wherein a guide sheave for the third winch rope is provided at a lower front side of the penetration portion of the base bracket in the longitudinal direction.
JP62247952A 1987-10-02 1987-10-02 Jib loading and unloading method and device in crane Expired - Fee Related JP2547044B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP62247952A JP2547044B2 (en) 1987-10-02 1987-10-02 Jib loading and unloading method and device in crane

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP62247952A JP2547044B2 (en) 1987-10-02 1987-10-02 Jib loading and unloading method and device in crane

Publications (2)

Publication Number Publication Date
JPH0192198A true JPH0192198A (en) 1989-04-11
JP2547044B2 JP2547044B2 (en) 1996-10-23

Family

ID=17170990

Family Applications (1)

Application Number Title Priority Date Filing Date
JP62247952A Expired - Fee Related JP2547044B2 (en) 1987-10-02 1987-10-02 Jib loading and unloading method and device in crane

Country Status (1)

Country Link
JP (1) JP2547044B2 (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2005054109A1 (en) * 2003-12-02 2005-06-16 Tadano Co., Ltd. Mobile crane
JP2009107843A (en) * 2007-10-29 2009-05-21 Liebherr Werk Ehingen Gmbh Raising method of crane boom
JP2009107842A (en) * 2007-10-29 2009-05-21 Liebherr Werk Ehingen Gmbh Erecting method of crane boom
WO2021104999A1 (en) * 2019-11-26 2021-06-03 Liebherr-Werk Ehingen Gmbh Crane comprising a tiltable jib extension, and method for assembling a luffing jib

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2005054109A1 (en) * 2003-12-02 2005-06-16 Tadano Co., Ltd. Mobile crane
JP2009107843A (en) * 2007-10-29 2009-05-21 Liebherr Werk Ehingen Gmbh Raising method of crane boom
JP2009107842A (en) * 2007-10-29 2009-05-21 Liebherr Werk Ehingen Gmbh Erecting method of crane boom
US9725285B2 (en) * 2007-10-29 2017-08-08 Liebherr-Werk Ehingen Gmbh Method of raising a crane boom
WO2021104999A1 (en) * 2019-11-26 2021-06-03 Liebherr-Werk Ehingen Gmbh Crane comprising a tiltable jib extension, and method for assembling a luffing jib

Also Published As

Publication number Publication date
JP2547044B2 (en) 1996-10-23

Similar Documents

Publication Publication Date Title
EP2492235B1 (en) Method of assembling a mobile lift crane
JP2004075294A (en) Jib strut self-assembling method for tower crane
JP4835209B2 (en) Crane winch removal method and upper swing body
JPH0192198A (en) Method and equipment for mounting and dismounting jib to crane
JP4422845B2 (en) Counterweight mounting method and frame support means
JP7298419B2 (en) Crane assembly method and crane
JP2003054876A (en) Device and method for attaching and detaching side frame
JPH11292471A (en) Back tension device for luffing jib
JP6984395B2 (en) Crane and crane assembly method
JP7416034B2 (en) How to assemble the crane
WO2024018911A1 (en) Crane and method for assembling and disassembling crane
JPH07187574A (en) Jib device of crane
JP3012132B2 (en) Method and apparatus for assembling ground drill
JP2547040B2 (en) Mounting structure of jib etc. in crane
JP4848094B2 (en) Roughing jib equipment for self-propelled crane
JPH0455027Y2 (en)
JP2004256240A6 (en) crane
JP2009143710A (en) Auxiliary jib for movable crane
JP3917236B2 (en) Roughing jib crane
JP2004256240A (en) Crane
JP2660838B2 (en) Attachment structure such as jib for crane
JPH07291586A (en) Crane
JPS6323431Y2 (en)
JP3347882B2 (en) crane
JPH0427915Y2 (en)

Legal Events

Date Code Title Description
R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

LAPS Cancellation because of no payment of annual fees