JP7506480B2 - Beam reinforcement and its arrangement method - Google Patents

Beam reinforcement and its arrangement method Download PDF

Info

Publication number
JP7506480B2
JP7506480B2 JP2020011897A JP2020011897A JP7506480B2 JP 7506480 B2 JP7506480 B2 JP 7506480B2 JP 2020011897 A JP2020011897 A JP 2020011897A JP 2020011897 A JP2020011897 A JP 2020011897A JP 7506480 B2 JP7506480 B2 JP 7506480B2
Authority
JP
Japan
Prior art keywords
reinforcement
hanging
stirrup
reinforcing bar
rising
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2020011897A
Other languages
Japanese (ja)
Other versions
JP2021116631A (en
Inventor
大幸 市岡
浩史 川上
久之 岸田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Daiwa House Industry Co Ltd
Original Assignee
Daiwa House Industry Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Daiwa House Industry Co Ltd filed Critical Daiwa House Industry Co Ltd
Priority to JP2020011897A priority Critical patent/JP7506480B2/en
Publication of JP2021116631A publication Critical patent/JP2021116631A/en
Application granted granted Critical
Publication of JP7506480B2 publication Critical patent/JP7506480B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Reinforcement Elements For Buildings (AREA)

Description

本発明は、梁筋とその配筋方法に関する。 The present invention relates to beam reinforcement and a method for arranging the reinforcement.

建物の基礎梁や柱同士を繋ぐ梁を構成する梁筋の配筋に当たり、現場にて梁筋の長手方向に亘ってあばら筋間のピッチを測定しながら複数のあばら筋を配筋し、あばら筋を構成する縦筋に横筋(腹筋)を結束等にて取り付け、あばら筋の上下内側にそれぞれ複数の主筋を接続する作業を効率化するべく、所謂溶接鉄筋を使用する施工方法が適用されることがある。この溶接鉄筋は、工場等にて例えばあばら筋と横筋を予め溶接にてユニット化したものであり、このような溶接鉄筋を現場に搬入し、現場にて例えば上方のユニットと下方のユニットを接続することにより、閉鎖型のあばら筋を配筋する。そして、閉鎖型のあばら筋の上下の内側に上端主筋と下端主筋を配筋し、結束等することにより、梁筋が配筋される。 When arranging the beam bars that make up the foundation beams or beams that connect columns of a building, a construction method using so-called welded rebars may be applied to streamline the work of arranging multiple stirrups on site while measuring the pitch between the stirrups along the longitudinal direction of the beam bars, attaching horizontal bars (abdominal bars) to the vertical bars that make up the stirrups by bundling, etc., and connecting multiple main bars to the top and bottom insides of the stirrups. This welded rebar is made by welding the stirrups and horizontal bars together in advance in a factory, etc., and then transporting this welded rebar to the site and connecting the upper unit and lower unit, for example, on site to arrange closed stirrups. Then, the upper end main bars and lower end main bars are arranged on the top and bottom insides of the closed stirrups and bundling, etc., to arrange the beam bars.

ここで、複数のあばら筋が上端主筋と下端主筋によりユニット化された下方ユニットに対して、フックを有していないキャップタイを被せて配筋することにより形成される、梁筋の配筋構造と配筋方法が提案されている(例えば、特許文献1参照)。 Here, a reinforcement structure and method for beam reinforcement has been proposed, in which a lower unit in which multiple stirrups are unitized with upper and lower main reinforcements is covered with a cap tie that does not have a hook and reinforced (see, for example, Patent Document 1).

特開2016-29249号公報JP 2016-29249 A

しかしながら、特許文献1に記載の梁筋では、キャップタイである上方のあばら筋がフックを有していないことに加えて、下方のあばら筋に対してキャップタイが僅かにラップした状態で配筋されているに過ぎないことから、十分な強度を有している梁筋であるか否かは不明である。尚、鉄筋コンクリート造配筋指針・同解説 2010(日本建築学会)によれば、上記するキャップタイ形式の配筋においては、例えば、下方のあばら筋の上端に135度のフックを設け、この下方のあばら筋とキャップタイを8d(dは異形鉄筋の呼び名)の重ね継手長さで重ねる配筋仕様が記載されている。このような一般仕様に鑑みると、特許文献1に記載のキャップタイ形式の梁筋の強度が十分であるか否か、言い換えれば、上下のあばら筋同士が強度のある態様で閉鎖型の鉄筋を形成しているか否かが不明であると言わざるを得ない。 However, in the beam reinforcement described in Patent Document 1, the upper stirrup, which is a cap tie, does not have a hook, and the cap tie is only slightly wrapped around the lower stirrup, so it is unclear whether the beam reinforcement has sufficient strength. According to the Reinforcement Guidelines and Commentary for Reinforcement of Reinforced Concrete Construction 2010 (Architectural Institute of Japan), the above-mentioned cap tie type reinforcement has a reinforcement specification in which, for example, a 135-degree hook is provided at the upper end of the lower stirrup, and this lower stirrup and the cap tie are overlapped with a lap joint length of 8d (d is the name of deformed reinforcing bar). In view of such general specifications, it must be said that it is unclear whether the strength of the cap tie type beam reinforcement described in Patent Document 1 is sufficient, in other words, whether the upper and lower stirrup bars form a closed type reinforcement in a strong manner.

本発明は上記する問題に鑑みてなされたものであり、高強度で施工性に優れた梁筋とその配筋方法を提供することを目的としている。 The present invention was made in consideration of the above problems, and aims to provide a beam bar with high strength and excellent workability, and a method for arranging the same.

前記目的を達成すべく、本発明による梁筋の一態様は、
上方に開いたコの字状を呈し、底筋部と該底筋部の左右端から上方に立ち上がる立ち上がり筋部とを有する第一のあばら筋が所定のピッチで配設され、各第一のあばら筋同士が、対応する左右の前記立ち上がり筋部の上端内側に全強度溶接にて上端主筋に接続されてなる下方ユニットと、
下方に開いたコの字状を呈し、天端筋部と該天端筋部の左右端から下方に垂れて前記底筋部まで延びている垂れ筋部とを有する第二のあばら筋が所定のピッチで配設され、各第二のあばら筋同士が、対応する左右の前記垂れ筋部の外側の所定位置にて二段の横筋により溶接にて接続され、前記垂れ筋部の端部にフックを有していない上方ユニットと、から構成され、
前記第一のあばら筋を形成する前記底筋部と前記立ち上がり筋部の境界の曲げ部の内側に下端主筋が接続されることにより、梁筋が形成されており、
前記下方ユニットに前記上方ユニットが被せられた状態において、対応する前記第一のあばら筋の前記立ち上がり筋部と前記第二のあばら筋の前記垂れ筋部とがラップし、前記二段の横筋のうち、上段の該横筋が前記梁筋の高さの中央位置に配設され、下段の該横筋が前記底筋部の側方もしくは前記下端主筋の側方に配設されていることを特徴とする。
In order to achieve the above object, one aspect of the present invention is a beam reinforcement.
a lower unit in which first stirrups are arranged at a predetermined pitch, each having a U-shape that opens upward and a bottom reinforcement part and a rising reinforcement part that rises upward from the left and right ends of the bottom reinforcement part, and each first stirrup is connected to the upper end main reinforcement by full strength welding to the inside of the upper ends of the corresponding left and right rising reinforcement parts;
an upper unit in which second stirrups are arranged at a predetermined pitch, each having a U-shape that opens downward and a top reinforcement portion and a hanging reinforcement portion that hangs down from the left and right ends of the top reinforcement portion to the bottom reinforcement portion, each second stirrup is connected to the corresponding left and right hanging reinforcement portions at predetermined positions outside the hanging reinforcement portions by welding with two stages of horizontal reinforcement, and no hook is provided at the end of the hanging reinforcement portion;
The lower end main reinforcement is connected to the inside of the bent part at the boundary between the bottom reinforcement part and the rising reinforcement part that form the first stirrup, thereby forming a beam reinforcement,
When the upper unit is placed over the lower unit, the rising reinforcement portion of the corresponding first stirrup reinforcement and the hanging reinforcement portion of the corresponding second stirrup reinforcement overlap, and of the two stages of horizontal reinforcements, the upper horizontal reinforcement is arranged at the center position of the height of the beam reinforcement, and the lower horizontal reinforcement is arranged to the side of the bottom reinforcement portion or to the side of the lower end main reinforcement.

本態様によれば、複数の第一のあばら筋が上端主筋にて一体化された下方ユニットの立ち上がり筋部と、複数の第二のあばら筋が二段の横筋にて一体化された上方ユニットの垂れ筋部がラップし、この際に、二段の横筋のうちの上段の横筋が梁筋の高さの中央位置に配設され、下段の横筋が底筋部の側方もしくは下端主筋の側方に配設されていることにより、高い強度で一体化された梁筋が形成される。二段の横筋はいずれも、垂れ筋部の外側に接続されている。ここで、「上段の横筋が梁筋の高さの中央位置に配設」されていることに関し、「梁筋の高さの中央位置」とは、厳密に梁筋の高さの中央位置であることの他、梁筋の高さの中央位置から上下に梁筋の高さの10%程度の範囲を含む意味である。また、下方ユニットにおいて第一のあばら筋と上端主筋が接続される「全強度溶接」とは、「全強度鉄筋交差溶接」とも言い、あばら筋のJIS規格降伏点以上の強度を溶接部が有し、主筋の伸びも溶接前の鉄筋のJIS規格値以上であり、溶接部のせん断強度があばら筋の短期の許容引張強度以上となるスポット溶接を意味する。尚、通常のスポット溶接は、溶接部が鉄筋のJIS規格降伏点の1/3乃至2/3程度を保証するものである。この全強度溶接は、通常のスポット溶接を二回以上繰り返すものであり、一度のスポット溶接後に溶接部が急冷する前に二度目のスポット溶接を行うことにより焼き鈍す溶接方法である。 According to this embodiment, the rising reinforcement part of the lower unit, in which multiple first stirrups are integrated with the upper end main reinforcement, and the hanging reinforcement part of the upper unit, in which multiple second stirrups are integrated with two stages of horizontal reinforcement, overlap, and in this case, the upper stage of the two stages of horizontal reinforcement is arranged at the center position of the beam reinforcement height, and the lower stage of the horizontal reinforcement is arranged on the side of the bottom reinforcement part or the side of the lower end main reinforcement, thereby forming a beam reinforcement integrated with high strength. Both of the two stages of horizontal reinforcement are connected to the outside of the hanging reinforcement part. Here, with regard to "the upper stage of horizontal reinforcement is arranged at the center position of the beam reinforcement height", "the center position of the beam reinforcement height" means not only the exact center position of the beam reinforcement height, but also includes a range of about 10% of the beam reinforcement height above and below the center position of the beam reinforcement height. In addition, the "full strength welding" that connects the first stirrup and the upper end main reinforcement in the lower unit is also called "full strength rebar cross welding" and means spot welding in which the weld has strength equal to or greater than the JIS standard yield point of the stirrup, the elongation of the main reinforcement is equal to or greater than the JIS standard value of the rebar before welding, and the shear strength of the weld is equal to or greater than the short-term allowable tensile strength of the stirrup. Note that normal spot welding ensures that the weld is about 1/3 to 2/3 of the JIS standard yield point of the rebar. This full strength welding is a welding method in which normal spot welding is repeated two or more times, and the weld is annealed by performing a second spot welding before the weld is rapidly cooled after one spot welding.

尚、下方ユニットに必ずしも含まれない下端主筋が、第一のあばら筋を形成する底筋部と立ち上がり筋部の境界の曲げ部の内側に接続されている。この下端主筋も、第一のあばら筋に対して全強度溶接にて接続されていてもよいし、結束線等で結束されてもよい。この第一のあばら筋に対する下端主筋の接続態様は、後述する配筋方法の相違によって異なってくるものである。 The lower end main reinforcement, which is not necessarily included in the lower unit, is connected to the inside of the bend at the boundary between the bottom reinforcement and the rising reinforcement that form the first stirrup. This lower end main reinforcement may also be connected to the first stirrup by full strength welding, or may be tied with a tie wire or the like. The connection mode of the lower end main reinforcement to the first stirrup will differ depending on the difference in the reinforcement method described later.

一方、上方ユニットにおいて複数の第二のあばら筋と横筋を接続する「溶接」は、全強度溶接の他、一般のスポット溶接を意味する広義の溶接を意味している。また、上方ユニットにおいて、複数の第二のあばら筋の垂れ筋の下端もしくは下端近傍(底筋部の側方もしくは下端主筋の側方)に下段の横筋が溶接されていることにより、この溶接された下段の横筋は、第二のあばら筋におけるフック代替筋となる。同様に、下方ユニットにおいて、溶接された上端主筋は、第一のあばら筋におけるフック代替筋となる。このようにフック代替筋である下段の横筋を備えていることにより、第二のあばら筋からはフックを不要にできる。同様に、フック代替筋である上端主筋を備えていることにより、第一のあばら筋からもフックを不要にできる。 On the other hand, the "welding" that connects the second stirrups and the cross bars in the upper unit means welding in a broad sense, meaning not only full strength welding but also general spot welding. Also, in the upper unit, the lower cross bars are welded to the lower ends or near the lower ends (side of the bottom bar or side of the lower end main bar) of the hanging bars of the second stirrups, so that the welded lower cross bars become hook substitute bars in the second stirrups. Similarly, in the lower unit, the welded upper end main bars become hook substitute bars in the first stirrups. Thus, by providing the lower cross bars as hook substitute bars, the second stirrups do not need hooks. Similarly, by providing the upper end main bars as hook substitute bars, the first stirrups do not need hooks.

本態様においては、対応する第一のあばら筋の立ち上がり筋部と、第二のあばら筋の垂れ筋部がラップするものの、このラップ長が所定の重ね継手長さを満たすことを不要にしており、原則的にラップ長に関する制限は設けていない。例えば、梁成の低い梁において、立ち上がり筋部と垂れ筋部のラップ箇所に対して所定の重ね継手長さを要求すると、所定の重ね継手長さを充足しない場合が生じ得る。そこで、本態様では、立ち上がり筋部と垂れ筋部のラップ箇所が所定の重ね継手長さを有していないものの、梁筋の高さの中央位置と下端位置(底筋部や下端主筋の側方)にそれぞれ横筋が配設されていることにより、対応する第一のあばら筋と第二のあばら筋の一体化を図ることにしている。 In this embodiment, the rising reinforcement part of the corresponding first stirrup reinforcement and the hanging reinforcement part of the corresponding second stirrup reinforcement overlap, but the overlap length does not need to meet the specified lap joint length, and in principle there is no restriction on the lap length. For example, in a beam with a low beam depth, if a specified lap joint length is required for the lap point of the rising reinforcement part and the hanging reinforcement part, there may be cases where the specified lap joint length is not met. Therefore, in this embodiment, although the lap points of the rising reinforcement part and the hanging reinforcement part do not have the specified lap joint length, the corresponding first stirrup reinforcement and second stirrup reinforcement are integrated by arranging horizontal reinforcements at the center position and the lower end position (side of the bottom reinforcement part and the lower end main reinforcement) of the beam reinforcement height.

また、本発明による梁筋の他の態様は、梁成が500mm以下の梁に適用されることを特徴とする。 Another aspect of the beam reinforcement according to the present invention is that it is applied to beams with a beam depth of 500 mm or less.

本態様によれば、梁成が500mm以下の梁成の低い梁において、立ち上がり筋部と垂れ筋部のラップ箇所が所定の重ね継手長さを有していないものの、梁筋の高さの中央位置と下端位置(底筋部の側方もしくは下端主筋の側方)にそれぞれ横筋が配設されていることにより、第一のあばら筋と第二のあばら筋の一体化が図られた梁筋を形成することができる。ここで、「柱成が500mm以下の梁」とは、例えば、梁成が400mm以上500mm以下の梁が挙げられる。 According to this aspect, in a beam with a low beam depth of 500 mm or less, the lapped portion of the rising reinforcement and the hanging reinforcement does not have a specified lap joint length, but the horizontal reinforcement is arranged at the center position of the beam reinforcement height and at the bottom end position (to the side of the bottom reinforcement or the side of the bottom end main reinforcement), so that a beam reinforcement can be formed in which the first stirrup reinforcement and the second stirrup reinforcement are integrated. Here, "a beam with a column depth of 500 mm or less" refers to, for example, a beam with a beam depth of 400 mm to 500 mm.

また、本発明による梁筋の他の態様は、前記垂れ筋部の外側において、前記二段の横筋が全強度溶接にて接続されていることを特徴とする。 Another aspect of the beam reinforcement according to the present invention is that the two tiers of horizontal reinforcement are connected by full strength welding on the outside of the hanging reinforcement section.

本態様によれば、第二のあばら筋と二段の横筋が通常のスポット溶接でなく、全強度溶接にて接続されていることにより、より一層強度の高い梁筋を形成することができる。 According to this embodiment, the second stirrup and the two-stage cross bars are connected by full-strength welding, rather than by ordinary spot welding, so that a beam bar with even higher strength can be formed.

また、本発明による梁筋の配筋方法の一態様は、
上方に開いたコの字状を呈し、底筋部と該底筋部の左右端から上方に立ち上がる立ち上がり筋部とを有する第一のあばら筋が所定のピッチで配設され、各第一のあばら筋同士が、対応する左右の前記立ち上がり筋部の上端内側に全強度溶接にて上端主筋に接続されてなる下方ユニットを配筋する、下方ユニット設置工程と、
下方に開いたコの字状を呈し、天端筋部と該天端筋部の左右端から下方に垂れる垂れ筋部とを有する第二のあばら筋が所定のピッチで配設され、各第二のあばら筋同士が、対応する左右の前記垂れ筋部の外側の所定位置にて二段の横筋により溶接にて接続され、前記垂れ筋部の端部にフックを有していない上方ユニットを、前記下方ユニットに被せて配筋し、対応する前記第一のあばら筋の前記立ち上がり筋部と前記第二のあばら筋の前記垂れ筋部とをラップさせ、前記二段の横筋のうち、上段の該横筋を梁筋の高さの中央位置に配設し、下段の該横筋を前記底筋部の側方もしくはその近傍に配設して接続する、上下ユニット接続工程と、
前記第一のあばら筋を形成する前記底筋部と前記立ち上がり筋部の境界の曲げ部の内側に下端主筋を接続する、下端主筋接続工程と、を有することを特徴とする。
In addition, one aspect of the beam reinforcement method according to the present invention is to
a lower unit installation process in which a lower unit is arranged in which first stirrups, each having a U-shape that opens upward and a bottom reinforcement part and a rising reinforcement part that rises upward from the left and right ends of the bottom reinforcement part, are arranged at a predetermined pitch, and each first stirrup is connected to the upper end main reinforcement by full strength welding on the inside of the upper ends of the corresponding left and right rising reinforcement parts;
an upper and lower unit connecting process in which second stirrups, which have a U-shape that opens downward and have a top end reinforcing bar portion and a hanging reinforcing bar portion hanging downward from the left and right ends of the top end reinforcing bar portion, are arranged at a predetermined pitch, and each second stirrup is connected to the corresponding left and right hanging reinforcing bar portions by welding with two stages of horizontal bars, and an upper unit that does not have a hook at the end of the hanging reinforcing bar is placed over the lower unit to arrange the reinforcing bar portions, and the rising reinforcing bar portion of the corresponding first stirrup and the hanging reinforcing bar portion of the second stirrup are overlapped, and the upper stage horizontal bar of the two stages of horizontal bars is arranged at the center position of the beam reinforcing bar height, and the lower stage horizontal bar is arranged at the side of or near the bottom reinforcing bar and connected;
and a lower end main reinforcement connecting step for connecting a lower end main reinforcement to the inside of the bent portion at the boundary between the bottom reinforcement portion and the rising reinforcement portion that form the first stirrup.

本態様によれば、例えば工場にて製作された上方ユニットと下方ユニットを現場に搬送し、少なくとも第一のあばら筋の立ち上がり筋部と第二のあばら筋の垂れ筋部をラップさせ、上方ユニットの有する二段の横筋のうち、上段の横筋を梁筋の高さの中央位置に配設し、下段の横筋を底筋部の側方もしくはその近傍(後工程で配設される下端主筋の側方)に配設し、対応する立ち上がり筋部と垂れ筋部を結束等にて組み付けることにより、効率的に梁筋を配筋することができる。特に、下方ユニットが上端主筋を有していることにより、上方ユニットを構成する第二のあばら筋を下方ユニットの上方から被せた際に、上端主筋に第二のあばら筋を載置することができ、この載置状態において、二段の横筋を梁筋の高さの中央位置と下端位置(底筋部の側方もしくは下端主筋の側方)に自動的に配設できる。尚、本態様においては、下方ユニットが下端主筋を有しておらず、従って、上方ユニットと下方ユニットを結束した後、下方ユニットの第一のあばら筋を構成する底筋部と立ち上がり筋部の境界の曲げ部の内側に下端主筋を接続する。この接続は、例えば結束等にて行うことができる。また、本態様によれば、下方ユニットが下端主筋を備えていないことから、下方ユニットが下端主筋を有する場合と比較すると、同程度の重量の下方ユニットを製作する際に、下方ユニットの延長(梁筋の長手方向へのユニット長さ)を長くすることができる。 According to this embodiment, for example, the upper and lower units manufactured in a factory are transported to the site, at least the rising part of the first stirrup and the hanging part of the second stirrup are overlapped, and of the two levels of horizontal bars of the upper unit, the upper level horizontal bar is arranged at the center of the beam bar height, and the lower level horizontal bar is arranged on the side of the bottom bar or in its vicinity (on the side of the lower end main bar arranged in a later process), and the corresponding rising and hanging parts are assembled by bundling, etc., so that the beam bars can be arranged efficiently. In particular, since the lower unit has the upper end main bar, when the second stirrup constituting the upper unit is placed from above the lower unit, the second stirrup can be placed on the upper end main bar, and in this placed state, the two levels of horizontal bars can be automatically arranged at the center and lower end positions of the beam bar height (on the side of the bottom bar or the side of the lower end main bar). In this embodiment, the lower unit does not have a lower end main bar, and therefore, after the upper unit and the lower unit are tied together, the lower end main bar is connected to the inside of the bent part at the boundary between the bottom reinforcement part and the rising reinforcement part that constitute the first stirrup of the lower unit. This connection can be made, for example, by bundling. Also, according to this embodiment, since the lower unit does not have a lower end main bar, the extension of the lower unit (unit length in the longitudinal direction of the beam reinforcement) can be made longer when manufacturing a lower unit of approximately the same weight compared to when the lower unit has a lower end main bar.

また、本発明による梁筋の配筋方法の他の態様は、
上方に開いたコの字状を呈し、底筋部と該底筋部の左右端から上方に立ち上がる立ち上がり筋部とを有する第一のあばら筋が所定のピッチで配設され、各第一のあばら筋同士が、対応する左右の前記立ち上がり筋部の上端内側に全強度溶接にて上端主筋に接続され、かつ、前記底筋部と前記立ち上がり筋部の境界の内側に下端主筋が溶接にて接続されてなる下方ユニットを配筋する、下方ユニット設置工程と、
下方に開いたコの字状を呈し、天端筋部と該天端筋部の左右端から下方に垂れる垂れ筋部とを有する第二のあばら筋が所定のピッチで配設され、各第二のあばら筋同士が、対応する左右の前記垂れ筋部の外側の所定位置にて二段の横筋により溶接にて接続され、前記垂れ筋部の端部にフックを有していない上方ユニットを、前記下方ユニットに被せて配筋し、対応する前記第一のあばら筋の前記立ち上がり筋部と前記第二のあばら筋の前記垂れ筋部とをラップさせ、前記二段の横筋のうち、上段の該横筋を梁筋の高さの中央位置に配設し、下段の該横筋を前記底筋部の側方もしくは前記下端主筋の側方に配設して接続する、上下ユニット接続工程と、を有することを特徴とする。
Another aspect of the beam reinforcement method according to the present invention is as follows:
a lower unit installation process in which first stirrups, which have an upwardly open U-shape and have bottom reinforcement parts and rising reinforcement parts rising upward from the left and right ends of the bottom reinforcement parts, are arranged at a predetermined pitch, and each first stirrup is connected to the upper end main reinforcement by full strength welding on the inside of the upper ends of the corresponding left and right rising reinforcement parts, and the lower end main reinforcement is connected by welding to the inside of the boundary between the bottom reinforcement parts and the rising reinforcement parts;
an upper and lower unit connecting process in which second stirrups having a U-shape opening downward and having a top end reinforcing portion and hanging reinforcing portions hanging downward from the left and right ends of the top end reinforcing portion are arranged at a predetermined pitch, each second stirrup is connected to the corresponding left and right hanging reinforcing portions by welding with two stages of horizontal reinforcing portions, an upper unit having no hooks at the ends of the hanging reinforcing portions is placed over the lower unit to arrange the reinforcing portions, the rising reinforcing portions of the corresponding first stirrup reinforcing portions and the hanging reinforcing portions of the corresponding second stirrup reinforcing portions are overlapped, and the upper stage of the two stages of horizontal reinforcing portions is arranged at the center of the height of the beam reinforcing portions and the lower stage of the horizontal reinforcing portions is arranged at the side of the bottom reinforcing portion or the side of the bottom end main reinforcing portion to connect the two stages of horizontal reinforcing portions.

本態様によれば、下方ユニットが第一のあばら筋に対して上端主筋も下端主筋も溶接にて接続された状態で有していることから、下方ユニットに対して上方ユニットを結束等にて組み付けた際に、梁筋の配筋を完成させることができる。すなわち、下方ユニットと上方ユニットの組み付けの後に下端主筋の配筋をさらに行う手間を解消することができる。また、本態様においても、上端主筋に第二のあばら筋を載置した際に、二段の横筋を梁筋の高さの中央位置と下端位置(底筋部の側方もしくは下端主筋の側方)に自動的に配設できる。 According to this embodiment, since the lower unit has both the upper end main reinforcement and the lower end main reinforcement connected to the first stirrup by welding, the beam reinforcement arrangement can be completed when the upper unit is assembled to the lower unit by bundling or the like. In other words, it is possible to eliminate the need to further arrange the lower end main reinforcement after assembling the lower unit and the upper unit. Also, in this embodiment, when the second stirrup is placed on the upper end main reinforcement, two levels of horizontal reinforcement can be automatically arranged at the center position and the lower end position (side of the bottom reinforcement or side of the lower end main reinforcement) of the beam reinforcement height.

以上の説明から理解できるように、本発明の梁筋とその配筋方法によれば、高強度で施工性に優れた梁筋を提供することができる。 As can be understood from the above explanation, the beam reinforcement and the reinforcement method of the present invention can provide beam reinforcement that is high in strength and has excellent workability.

第1の実施形態に係る梁筋の配筋方法の一例を説明する工程図である。FIG. 4 is a process diagram illustrating an example of a beam reinforcement arrangement method according to the first embodiment. 図1に続いて第1の実施形態に係る梁筋の配筋方法を説明する工程図であって、梁筋中間体の一例を示す図である。FIG. 2 is a process diagram illustrating the beam reinforcement arrangement method according to the first embodiment following FIG. 1, and shows an example of a beam reinforcement intermediate body. 図2に続いて第1の実施形態に係る梁筋の配筋方法を説明する工程図であって、かつ第1の実施形態に係る梁筋の一例を説明する図である。3 is a process diagram illustrating the beam reinforcement arrangement method according to the first embodiment following FIG. 2, and is also a diagram illustrating an example of beam reinforcement according to the first embodiment. FIG. 第2の実施形態に係る梁筋の配筋方法の一例を説明する工程図である。FIG. 11 is a process diagram illustrating an example of a beam reinforcement arrangement method according to the second embodiment. 図4に続いて第2の実施形態に係る梁筋の配筋方法を説明する工程図であって、かつ第2の実施形態に係る梁筋の一例を説明する図である。5 is a process diagram illustrating a beam reinforcement arrangement method according to the second embodiment following FIG. 4, and is also a diagram illustrating an example of a beam reinforcement according to the second embodiment. FIG.

以下、各実施形態に係る梁筋の配筋方法と各配筋方法にて形成された梁筋について、添付の図面を参照しながら説明する。尚、本明細書及び図面において、実質的に同一の構成要素については、同一の符号を付することにより重複した説明を省く場合がある。 Below, the beam reinforcement arrangement method according to each embodiment and the beam reinforcement formed by each arrangement method will be described with reference to the attached drawings. Note that in this specification and drawings, substantially identical components may be designated by the same reference numerals to avoid redundant description.

[第1の実施形態に係る梁筋とその配筋方法]
はじめに、図1乃至図3を参照して、第1の実施形態に係る梁筋の配筋方法の一例とこの配筋方法にて形成された梁筋の一例について説明する。ここで、図1乃至図3はこの順に、第1の実施形態に係る梁筋の配筋方法の一例を説明する工程図であり、図3はさらに、第1の実施形態に係る梁筋の一例を説明する図である。図1に示すように、本実施形態に係る梁筋の配筋方法は、工場等にて予め下方ユニット50と上方ユニット60を製作したものを現場搬送し、現場にて下方ユニット50と上方ユニット60を組み付けることにより梁筋の配筋を行うものである。
[Beam reinforcement and its reinforcing method according to the first embodiment]
First, an example of a beam reinforcement arrangement method according to the first embodiment and an example of a beam reinforcement formed by this method will be described with reference to Figs. 1 to 3. Here, Figs. 1 to 3 are process diagrams for explaining an example of a beam reinforcement arrangement method according to the first embodiment, in this order, and Fig. 3 is a diagram for further explaining an example of a beam reinforcement according to the first embodiment. As shown in Fig. 1, in the beam reinforcement arrangement method according to this embodiment, a lower unit 50 and an upper unit 60 are manufactured in advance in a factory or the like, transported to a site, and the lower unit 50 and the upper unit 60 are assembled on site to arrange the beam reinforcement.

図1に示すように、下方ユニット50は、上方に開いたコの字状を呈し、底筋部11と、底筋部11の左右端から上方に立ち上がる立ち上がり筋部12と、を有する第一のあばら筋10が、梁筋の長手方向であるZ方向に所定のピッチsで配設され、各第一のあばら筋10同士が、対応する左右の立ち上がり筋部12の上端内側において上端主筋30にて接続されることにより形成されている。 As shown in FIG. 1, the lower unit 50 has an upwardly open U-shape, and the first stirrups 10 each having a bottom reinforcement portion 11 and rising reinforcement portions 12 rising upward from the left and right ends of the bottom reinforcement portion 11 are arranged at a predetermined pitch s in the Z direction, which is the longitudinal direction of the beam reinforcement, and each first stirrup 10 is connected to the upper end main reinforcement 30 on the inside of the upper ends of the corresponding left and right rising reinforcement portions 12.

ここで、立ち上がり筋部12と上端主筋30の接続は、全強度溶接にて接続される。この全強度溶接は、通常のスポット溶接を二回以上繰り返す溶接であり、一度のスポット溶接後に溶接部が急冷する前に二度目のスポット溶接を行うことにより、焼き鈍す溶接方法である。この全強度溶接により、第一のあばら筋10と上端主筋30の溶接部が第一のあばら筋10のJIS規格降伏点以上の強度を有し、鉄筋の伸びも溶接前の鉄筋のJIS規格値以上であり、溶接部のせん断強度があばら筋の短期の許容引張強度以上を有することになり、双方の部材が高い接続強度にて接続されている。 Here, the rising reinforcing bar 12 and the upper end main reinforcing bar 30 are connected by full strength welding. This full strength welding is a welding method in which ordinary spot welding is repeated two or more times, and a second spot welding is performed before the welded part is rapidly cooled after one spot welding, thereby annealing the welded part. With this full strength welding, the welded part between the first stirrup 10 and the upper end main reinforcing bar 30 has a strength equal to or greater than the JIS standard yield point of the first stirrup 10, the elongation of the reinforcing bar is equal to or greater than the JIS standard value of the reinforcing bar before welding, and the shear strength of the welded part is equal to or greater than the short-term allowable tensile strength of the stirrup, so that both members are connected with high connection strength.

図示する所定のピッチsは、150mm、200mm等、コンクリート内における必要鉄筋量等から決定される。また、第一のあばら筋10は例えば異形棒鋼から形成され、直径10mm(D10)、D13等の鉄筋が適用され、これも上記所定のピッチsとの関連で必要鉄筋量等から決定される。 The specified pitch s shown in the figure is 150 mm, 200 mm, etc., and is determined based on the amount of reinforcing bars required in the concrete. The first stirrups 10 are formed, for example, from deformed steel bars, and reinforcing bars with diameters of 10 mm (D10), D13, etc. are used, and this is also determined based on the amount of reinforcing bars required in relation to the above-mentioned specified pitch s.

上端主筋30には所定径の異形棒鋼が適用され、図示例の上端主筋30は二本であることから、設計曲げモーメントや設計せん断力等を満たすようにその径が設定される。尚、必要鉄筋量の観点からは、最終的に配筋された状態において、二本の上端主筋30の間に1以上の別途の上端主筋30が配筋されてもよい。例えば、図示例においては、D19、D22等の異形棒鋼を適用できる(以上、下方ユニット設置工程)。 A deformed steel bar of a specified diameter is applied to the upper end main reinforcement 30, and since there are two upper end main reinforcement 30 in the illustrated example, the diameter is set to satisfy the design bending moment and design shear force. From the perspective of the required amount of reinforcing bars, one or more additional upper end main reinforcement 30 may be placed between the two upper end main reinforcement 30 in the final reinforcement state. For example, in the illustrated example, deformed steel bars such as D19 and D22 can be applied (above, lower unit installation process).

一方、上方ユニット60は、下方に開いたコの字状を呈し、天端筋部21と、天端筋部21の左右端から下方に垂れる垂れ筋部22と、を有する第二のあばら筋20が、第一のあばら筋10と同様に、梁筋の長手方向であるZ方向に所定のピッチsで配設され、各第二のあばら筋20同士が、対応する左右の垂れ筋部22の外側の所定位置において二段の横筋40(上段の横筋40Aと下段の横筋40B)に溶接にて接続されることにより形成されている。 On the other hand, the upper unit 60 has a U-shape that opens downward, and the second stirrups 20, which have a top end reinforcement section 21 and hanging reinforcement sections 22 that hang downward from the left and right ends of the top end reinforcement section 21, are arranged at a predetermined pitch s in the Z direction, which is the longitudinal direction of the beam reinforcement, in the same manner as the first stirrups 10, and are formed by connecting each second stirrup 20 to two tiers of horizontal reinforcements 40 (upper tier horizontal reinforcement 40A and lower tier horizontal reinforcement 40B) by welding at predetermined positions outside the corresponding left and right hanging reinforcement sections 22.

ここで、垂れ筋部22の長さはLであり、図2に示す梁筋中間体100'が形成された状態において、第一のあばら筋10の底筋部11に到達する長さを有している。そして、上段の横筋40Aと下段の横筋40Bのそれぞれの垂れ筋部22に対する取り付け位置に関し、上段の横筋40Aの取り付け位置は、垂れ筋部22の長さLの中間のL/2の位置(梁筋中間体100'の高さの中間位置(L/2の位置))である。一方、下段の横筋40Bの取り付け位置は、垂れ筋部22の下端もしくは下端近傍の位置(図2における底筋部11の側方位置、もしくは図3に示す梁筋100における下端主筋70の側方位置)である。 Here, the length of the hanging bar portion 22 is L, and has a length that reaches the bottom bar portion 11 of the first stirrup 10 when the beam bar intermediate body 100' shown in FIG. 2 is formed. With regard to the attachment positions of the upper horizontal bar 40A and the lower horizontal bar 40B to the hanging bar portion 22, the attachment position of the upper horizontal bar 40A is the middle position L/2 of the length L of the hanging bar portion 22 (the middle position (L/2 position) of the height of the beam bar intermediate body 100'). On the other hand, the attachment position of the lower horizontal bar 40B is the lower end or a position near the lower end of the hanging bar portion 22 (the lateral position of the bottom bar portion 11 in FIG. 2, or the lateral position of the lower end main bar 70 in the beam bar 100 shown in FIG. 3).

そして、垂れ筋部22に対し、二段の横筋40はいずれも溶接により接続されている。この溶接は、通常のスポット溶接でもよいが、下方ユニット50における第一のあばら筋10と上端主筋30の溶接と同様に、全強度溶接にて接続されるのが好ましい。 The two horizontal bars 40 are connected to the hanging bars 22 by welding. This welding may be a normal spot welding, but it is preferable to connect them by full strength welding, similar to the welding of the first stirrup 10 and the upper end main bar 30 in the lower unit 50.

また、第二のあばら筋20の垂れ筋部22の下端はフックを有しておらず、下端もしくはその近傍において溶接にて下段の横筋40Bが接続されていることにより、この下段の横筋40Bがフックに代わるフック代替筋となる。このように、第二のあばら筋20が垂れ筋部22の端部にフックを具備しないものの、下段の横筋40Bが溶接にて、好ましくは全強度溶接にて接続されていることから、フックに期待される第二のあばら筋20のコンクリート内における良好な定着性が保証される。 The lower end of the hanging reinforcing bar 22 of the second stirrup 20 does not have a hook, and the lower horizontal reinforcing bar 40B is connected by welding at or near the lower end, so that the lower horizontal reinforcing bar 40B serves as a hook substitute. In this way, although the second stirrup 20 does not have a hook at the end of the hanging reinforcing bar 22, the lower horizontal reinforcing bar 40B is connected by welding, preferably by full strength welding, so that the good fixation of the second stirrup 20 in the concrete expected from the hook is guaranteed.

また、同様に、下方ユニット50においては、第一のあばら筋10が立ち上がり筋部12の端部にフックを具備しないものの、上端主筋30が溶接にて接続されていることにより、この上端主筋30がフックに代わるフック代替筋となる。このように、第一のあばら筋10の端部に上端主筋30が全強度溶接にて接続されていることから、フックに期待される第一のあばら筋10のコンクリート内における良好な定着性が保証される。 Similarly, in the lower unit 50, the first stirrup 10 does not have a hook at the end of the rising reinforcing bar 12, but the upper end main reinforcing bar 30 is connected by welding, so that the upper end main reinforcing bar 30 serves as a hook substitute reinforcing bar. In this way, the upper end main reinforcing bar 30 is connected to the end of the first stirrup 10 by full strength welding, so that the good anchorage of the first stirrup 10 in the concrete expected from a hook is guaranteed.

尚、図示例の下方ユニット50と上方ユニット60は、いずれも5本ずつの第一のあばら筋10と第二のあばら筋20を同ピッチsにて有するものであるが、現場への搬送性の他、現場における運搬性等の施工性の観点から、6本以上のあばら筋を有して可能な限りZ方向に長いユニットとしてもよい。 In the illustrated example, the lower unit 50 and upper unit 60 each have five first stirrups 10 and five second stirrups 20 at the same pitch s, but from the standpoint of ease of transport to the site as well as ease of construction at the site, such as portability, they may have six or more stirrups and be as long as possible in the Z direction.

特に、下方ユニット50が主筋として上端主筋30のみを有し、下端主筋を有していないことから、後述する第2の実施形態に係る配筋方法で適用される下方ユニットと比べて下方ユニット50の重量が相対的に軽量になっている。そのため、下端主筋を有する第2の実施形態に係る下方ユニットと比べて、Z方向により一層長い下方ユニット50とすることができる。また、このようにより一層長い下方ユニット50を用意した場合は、上方ユニット60も、この長い下方ユニット50に対応する長さのものが用意される。 In particular, since the lower unit 50 has only the upper end main reinforcement 30 as the main reinforcement and does not have the lower end main reinforcement, the weight of the lower unit 50 is relatively lighter than the lower unit applied in the reinforcement arrangement method according to the second embodiment described below. Therefore, the lower unit 50 can be made longer in the Z direction than the lower unit according to the second embodiment, which has the lower end main reinforcement. Furthermore, when such a longer lower unit 50 is prepared, the upper unit 60 is also prepared to have a length corresponding to this longer lower unit 50.

次に、図2に示すように、上方ユニット60を下方ユニット50に被せて配筋し、対応する第一のあばら筋10の立ち上がり筋部12と第二のあばら筋20の垂れ筋部22とをラップさせて接続することにより、梁筋中間体100'を施工する(上下ユニット接続工程)。 Next, as shown in FIG. 2, the upper unit 60 is placed over the lower unit 50 and the corresponding rising reinforcement portion 12 of the first stirrup 10 and the hanging reinforcement portion 22 of the second stirrup 20 are overlapped and connected to construct the beam reinforcement intermediate body 100' (upper and lower unit connection process).

この上下ユニット接続工程では、下方ユニット50が上端主筋30を有していることにより、上方ユニット60を構成する第二のあばら筋20を下方ユニット50の上方から被せた際に、二条の上端主筋30の上に第二のあばら筋20を載置することができる。 In this upper and lower unit connection process, because the lower unit 50 has the upper end main reinforcement 30, when the second stirrup 20 constituting the upper unit 60 is placed over the lower unit 50 from above, the second stirrup 20 can be placed on top of the two upper end main reinforcement 30.

次に、図3に示すように、各第一のあばら筋10を形成する底筋部11と立ち上がり筋部12の境界の曲げ部の内側に下端主筋70を配筋し、接続することにより、第1の実施形態に係る梁筋100が配筋される(下端主筋接続工程)。ここで、第一のあばら筋10に対する下端主筋70の接続は、結束線等による結束にて行われる。 Next, as shown in FIG. 3, the lower end main reinforcement 70 is arranged and connected inside the bend at the boundary between the bottom reinforcement portion 11 and the rising reinforcement portion 12 that form each first stirrup 10, thereby forming the beam reinforcement 100 according to the first embodiment (lower end main reinforcement connection process). Here, the lower end main reinforcement 70 is connected to the first stirrup 10 by tying with a tie wire or the like.

ここで、図示例の梁筋100により形成される梁は、梁成が500mm以下と低い梁を対象としている。より具体的には、図示例の梁筋100は、梁成が400mm以上500mm以下の梁に好適である。そのため、立ち上がり筋部12と垂れ筋部22のラップ箇所(ラップ長は、立ち上がり筋部12と垂れ筋部22の長さL)の長さは、所定の重ね継手長さ(例えば、垂れ筋部22の径dの25倍の重ね継手長さ)を有していない。 The beam formed by the beam reinforcement 100 in the illustrated example is intended for beams with a low beam depth of 500 mm or less. More specifically, the beam reinforcement 100 in the illustrated example is suitable for beams with a beam depth of 400 mm to 500 mm. Therefore, the length of the lap portion of the rising reinforcement portion 12 and the hanging reinforcement portion 22 (lap length is the length L of the rising reinforcement portion 12 and the hanging reinforcement portion 22) does not have a specified lap joint length (for example, a lap joint length 25 times the diameter d of the hanging reinforcement portion 22).

仮に、このように梁成の低い梁に対して、立ち上がり筋部12と垂れ筋部22のラップ箇所に所定の重ね継手長さを要求すると、所定の重ね継手長さを充足しない場合が生じ得る。 If a specified lap joint length is required for the lap points of the rising reinforcement section 12 and the hanging reinforcement section 22 for beams with such low beam depth, there may be cases where the specified lap joint length is not met.

そこで、梁筋100においては、立ち上がり筋部12と垂れ筋部22のラップ箇所が所定の重ね継手長さを有していないものの、ラップ箇所のラップ長が梁筋100の高さL確保された上で、梁筋100の高さの中央位置と下端位置(底筋部11や下端主筋70の側方)にそれぞれ上段の横筋40Aと下段の横筋40Bが配設されていることにより、対応する第一のあばら筋10と第二のあばら筋20を、高い強度で一体化することができる。 Thus, in the beam reinforcement 100, although the overlap points of the rising reinforcement section 12 and the hanging reinforcement section 22 do not have a specified lap joint length, the overlap length of the overlap points is ensured to be the height L of the beam reinforcement 100, and the upper horizontal reinforcement 40A and the lower horizontal reinforcement 40B are arranged at the center position and the lower end position (to the side of the bottom reinforcement section 11 and the lower end main reinforcement 70) of the height of the beam reinforcement 100, respectively, so that the corresponding first stirrup reinforcement 10 and second stirrup reinforcement 20 can be integrated with high strength.

また、梁筋100の高さの中央位置と下端位置(底筋部11や下端主筋70の側方)にそれぞれ上段の横筋40Aと下段の横筋40Bを配設したことにより、曲げ破壊先行型の梁を形成することができ、脆性破壊が抑制された梁に供される梁筋100となる。 In addition, by arranging the upper horizontal reinforcement 40A and the lower horizontal reinforcement 40B at the center position and the lower end position (to the side of the bottom reinforcement 11 and the lower end main reinforcement 70) of the height of the beam reinforcement 100, respectively, a beam that is prone to bending failure can be formed, resulting in beam reinforcement 100 that is used for a beam in which brittle fracture is suppressed.

すなわち、第一のあばら筋10の立ち上がり筋部12と第二のあばら筋20の垂れ筋部22がラップして梁筋100が形成されていることから、このラップ箇所を有する少なくとも梁筋100の高さ上方の領域では、あばら筋がダブルに配置されており、梁筋100の高さ下方の領域に比べて鉄筋量(あばら筋量)が多くなっている。例えば、仮に上段の横筋40Aを梁筋100の高さ中央よりも上方の領域に梁筋すると、上記するようにあばら筋量が多いことに加えて上段の横筋40Aが鉄筋量に加算され、上側引張りの曲げモーメントが卓越し易い梁の両端部における曲げ耐力が大きくなり過ぎる恐れがあり、せん断破壊先行型の梁となる可能性が高くなる。そこで、図示する梁筋100においては、上段の横筋40Aを梁筋100の高さLの中央位置に配設することにより、梁の両端部における曲げ耐力を低減し、せん断破壊先行型でなくて曲げ破壊先行型の梁を形成し易くできる。 That is, since the beam reinforcement 100 is formed by overlapping the rising reinforcement portion 12 of the first stirrup 10 and the hanging reinforcement portion 22 of the second stirrup 20, the stirrup is doubled at least in the region above the height of the beam reinforcement 100 where the overlapping portion is located, and the amount of reinforcing bars (stirrup amount) is greater than that in the region below the height of the beam reinforcement 100. For example, if the upper horizontal reinforcement 40A is placed in a region above the center of the height of the beam reinforcement 100, in addition to the large amount of stirrup reinforcement as described above, the upper horizontal reinforcement 40A is added to the amount of reinforcing bars, and the bending strength at both ends of the beam where the bending moment of the upper tension is likely to be dominant may become too large, and the beam may become a shear failure-first type. Therefore, in the illustrated beam reinforcement 100, the upper horizontal reinforcement 40A is arranged at the center of the height L of the beam reinforcement 100, thereby reducing the bending strength at both ends of the beam, making it easier to form a beam that is flexurally fractured rather than shear fractured.

[第2の実施形態に係る梁筋とその配筋方法]
次に、図4及び図5を参照して、第2の実施形態に係る梁筋の配筋方法の一例と、この配筋方法にて形成された第2の実施形態に係る梁筋の一例について説明する。ここで、図4と図5はこの順に、第2の実施形態に係る梁筋の配筋方法の一例を説明する工程図であり、図5はさらに、第2の実施形態に係る梁筋の一例を説明する図である。図4に示すように、本実施形態に係る梁筋の配筋方法においても、第1の実施形態の配筋方法と同様に、工場等にて予め下方ユニット50Aと上方ユニット60Aを製作したものを現場搬送し、現場にて下方ユニット50Aと上方ユニット60Aを組み付けることにより梁筋の配筋を行うものである。尚、以下の説明では、第1の実施形態の配筋方法との相違点を述べることにより、第2の実施形態の配筋方法や梁筋の構成の理解が容易となることから、図1乃至図3も適宜参照しながら、第2の実施形態の配筋方法及び梁筋について説明する。
[Beam reinforcement and its reinforcing method according to the second embodiment]
Next, with reference to Fig. 4 and Fig. 5, an example of a beam reinforcement arrangement method according to the second embodiment and an example of a beam reinforcement according to the second embodiment formed by this reinforcement arrangement method will be described. Here, Fig. 4 and Fig. 5 are process diagrams for explaining an example of a beam reinforcement arrangement method according to the second embodiment, in this order, and Fig. 5 is a diagram for explaining an example of a beam reinforcement according to the second embodiment. As shown in Fig. 4, in the beam reinforcement arrangement method according to this embodiment, similar to the reinforcement arrangement method of the first embodiment, a lower unit 50A and an upper unit 60A are manufactured in advance at a factory or the like, transported to the site, and the lower unit 50A and the upper unit 60A are assembled at the site to arrange the beam reinforcement. In the following description, the differences from the reinforcement arrangement method of the first embodiment will be described to facilitate understanding of the reinforcement arrangement method and the configuration of the beam reinforcement of the second embodiment, so that the reinforcement arrangement method and the beam reinforcement of the second embodiment will be described with appropriate reference to Figs. 1 to 3.

図1と図4を比較すると明らかなように、第2の実施形態に係る配筋方法では、下方ユニット50Aが、第一のあばら筋10の左右の立ち上がり筋部12の上端内側に全強度溶接にて上端主筋30を有していることに加えて、底筋部11と立ち上がり筋部12の境界の内側に全強度溶接にて下端主筋70を有している。すなわち、下方ユニット設置工程により、上端主筋30と下端主筋70が同時に配筋されることが特徴である。 As is clear from a comparison of Figures 1 and 4, in the reinforcement method according to the second embodiment, the lower unit 50A has the upper end main reinforcement 30 welded at full strength to the inside of the upper ends of the left and right rising reinforcement sections 12 of the first stirrup 10, and also has the lower end main reinforcement 70 welded at full strength to the inside of the boundary between the bottom reinforcement section 11 and the rising reinforcement section 12. In other words, the lower unit installation process is characterized in that the upper end main reinforcement 30 and the lower end main reinforcement 70 are simultaneously arranged.

尚、第1の実施形態における下方ユニット50と異なり、第2の実施形態における下方ユニット50Aは下端主筋70を有している分だけユニット重量が増加することから、例えば下方ユニット50と同重量の下方ユニット50Aを製作しようとした際に、同程度の施工性を保証するには、梁筋の長手方向であるZ方向の長さを相対的に短くすることを要する。例えば、図1における下方ユニット50が所定間隔sを有した5本の第一のあばら筋10を備えているのに対して、図4における下方ユニット50Aは所定間隔sを有した4本の第一のあばら筋10を備えていて、例えば全体の重量が同程度になっている。尚、上方ユニット60Aも、下方ユニット50Aに応じて、所定間隔sを有した4本の第二のあばら筋20を備えている。 Unlike the lower unit 50 in the first embodiment, the lower unit 50A in the second embodiment has a lower end main reinforcement 70, and therefore the weight of the unit increases accordingly. For example, when manufacturing a lower unit 50A of the same weight as the lower unit 50, in order to ensure the same level of workability, it is necessary to relatively shorten the length in the Z direction, which is the longitudinal direction of the beam reinforcement. For example, the lower unit 50 in FIG. 1 has five first stirrups 10 with a predetermined interval s, while the lower unit 50A in FIG. 4 has four first stirrups 10 with a predetermined interval s, and for example, the overall weight is about the same. The upper unit 60A also has four second stirrups 20 with a predetermined interval s according to the lower unit 50A.

従って、図5に示すように、上方ユニット60Aを下方ユニット50Aに被せて配筋し、対応する第一のあばら筋10の立ち上がり筋部12と第二のあばら筋20の垂れ筋部22とをラップさせて結束等にて接続することにより、自動的に梁筋100Aの配筋が完了する(上下ユニット接続工程)。 As shown in FIG. 5, the upper unit 60A is placed over the lower unit 50A, and the corresponding rising reinforcement portion 12 of the first stirrup 10 and the hanging reinforcement portion 22 of the second stirrup 20 are wrapped and connected by bundling or the like, thereby automatically completing the reinforcement of the beam reinforcement 100A (upper and lower unit connection process).

この配筋方法によれば、下方ユニット50Aと上方ユニット60Aの組み付けの後に、下端主筋70の配筋をさらに行う手間を解消することができ、より一層高い効率性の下で梁筋の配筋を行うことができる。 This reinforcement method eliminates the need to perform additional reinforcement of the lower end main reinforcement 70 after assembling the lower unit 50A and the upper unit 60A, allowing for more efficient reinforcement of the beam reinforcement.

そして、形成された梁筋100Aにおいても、上段の横筋40Aが梁筋100Aの高さLの中央位置に配設されていることにより、梁の両端部における曲げ耐力を低減することができ、曲げ破壊先行型の梁の形成に供される梁筋となっている。 In addition, in the formed beam reinforcement 100A, the upper horizontal reinforcement 40A is arranged at the center position of the height L of the beam reinforcement 100A, which reduces the bending strength at both ends of the beam, making it a beam reinforcement that can be used to form a bending failure-first type beam.

尚、上記実施形態に挙げた構成等に対し、その他の構成要素が組み合わされるなどした他の実施形態であってもよく、ここで示した構成に本発明が何等限定されるものではない。この点に関しては、本発明の趣旨を逸脱しない範囲で変更することが可能であり、その応用形態に応じて適切に定めることができる。 Note that the configurations described in the above embodiments may be combined with other components, and the present invention is not limited to the configurations shown here. In this regard, changes can be made without departing from the spirit of the present invention, and can be determined appropriately according to the application form.

10:第一のあばら筋
11:底筋部
12:立ち上がり筋部
20:第二のあばら筋
21:天端筋部
22:垂れ筋部
30:上端主筋
40:横筋
40A:上段の横筋
40B:下段の横筋
50,50A:下方ユニット
60,60A:上方ユニット
70:下端主筋
100,100A:梁筋
10: First stirrup 11: Bottom reinforcement 12: Rising reinforcement 20: Second stirrup 21: Top reinforcement 22: Hanging reinforcement 30: Upper end main reinforcement 40: Horizontal reinforcement 40A: Upper horizontal reinforcement 40B: Lower horizontal reinforcement 50, 50A: Lower unit 60, 60A: Upper unit 70: Lower end main reinforcement 100, 100A: Beam reinforcement

Claims (5)

上方に開いたコの字状を呈し、底筋部と該底筋部の左右端から上方に立ち上がる立ち上がり筋部とを有する第一のあばら筋が所定のピッチで配設され、各第一のあばら筋同士が、対応する左右の前記立ち上がり筋部の上端内側に全強度溶接にて上端主筋に接続されてなる下方ユニットと、
下方に開いたコの字状を呈し、天端筋部と該天端筋部の左右端から下方に垂れて前記底筋部まで延びている垂れ筋部とを有する第二のあばら筋が所定のピッチで配設され、各第二のあばら筋同士が、対応する左右の前記垂れ筋部の外側の所定位置にて二段の横筋により溶接にて接続され、前記垂れ筋部の端部にフックを有していない上方ユニットと、から構成され、
前記天端筋部が前記上端主筋に当接するようにして前記上方ユニットが被せられた状態の前記下方ユニットの前記第一のあばら筋を形成する前記底筋部と、前記立ち上がり筋部の境界の曲げ部の内側に下端主筋が接続されることにより、梁成の低い梁に適用される梁筋が形成されており、
前記下方ユニットに前記上方ユニットが被せられた状態において、対応する前記第一のあばら筋の前記立ち上がり筋部と前記第二のあばら筋の前記垂れ筋部とがラップするものの、ラップ長は所定の重ね継手長さを満たしておらず、かつ、ラップ長は前記立ち上がり筋部と前記垂れ筋部の長さに相当し、前記二段の横筋のうち、上段の該横筋が前記梁筋の高さの中央位置に配設され、下段の該横筋が前記底筋部の側方もしくは前記下端主筋の側方に配設されていることを特徴とする、梁筋。
a lower unit in which first stirrups are arranged at a predetermined pitch, each having a U-shape that opens upward and a bottom reinforcement part and a rising reinforcement part that rises upward from the left and right ends of the bottom reinforcement part, and each first stirrup is connected to the upper end main reinforcement by full strength welding to the inside of the upper ends of the corresponding left and right rising reinforcement parts;
an upper unit in which second stirrups are arranged at a predetermined pitch, each having a U-shape that opens downward and a top reinforcement portion and a hanging reinforcement portion that hangs down from the left and right ends of the top reinforcement portion to the bottom reinforcement portion, each second stirrup is connected to the corresponding left and right hanging reinforcement portions at predetermined positions outside the hanging reinforcement portions by welding with two stages of horizontal reinforcement, and no hook is provided at the end of the hanging reinforcement portion;
The bottom reinforcement portion forms the first stirrup of the lower unit when the upper unit is placed over it so that the top reinforcement portion abuts against the upper end main reinforcement, and the lower end main reinforcement is connected to the inside of the bend at the boundary of the rising reinforcement portion, thereby forming a beam reinforcement that is applicable to beams with a low beam depth ,
When the upper unit is placed on the lower unit, the rising reinforcement portion of the corresponding first stirrup reinforcement and the hanging reinforcement portion of the corresponding second stirrup reinforcement overlap, but the lap length does not satisfy a predetermined lap joint length, and the lap length corresponds to the length of the rising reinforcement portion and the hanging reinforcement portion, and among the two stages of horizontal reinforcements, the upper horizontal reinforcement is disposed at the center position of the height of the beam reinforcement, and the lower horizontal reinforcement is disposed at the side of the bottom reinforcement portion or the side of the lower end main reinforcement.
梁成が500mm以下の梁に適用されることを特徴とする、請求項1に記載の梁筋。 The beam reinforcement according to claim 1, which is applied to beams with a beam width of 500 mm or less. 前記垂れ筋部の外側において、前記二段の横筋が全強度溶接にて接続されていることを特徴とする、請求項1又は2に記載の梁筋。 The beam reinforcement according to claim 1 or 2, characterized in that the two stages of horizontal reinforcement are connected by full strength welding on the outside of the hanging reinforcement section. 上方に開いたコの字状を呈し、底筋部と該底筋部の左右端から上方に立ち上がる立ち上がり筋部とを有する第一のあばら筋が所定のピッチで配設され、各第一のあばら筋同士が、対応する左右の前記立ち上がり筋部の上端内側に全強度溶接にて上端主筋に接続されてなる下方ユニットを配筋する、下方ユニット設置工程と、
下方に開いたコの字状を呈し、天端筋部と該天端筋部の左右端から下方に垂れる垂れ筋部とを有する第二のあばら筋が所定のピッチで配設され、各第二のあばら筋同士が、対応する左右の前記垂れ筋部の外側の所定位置にて二段の横筋により溶接にて接続され、前記垂れ筋部の端部にフックを有していない上方ユニットを、前記下方ユニットに被せて配筋し、対応する前記第一のあばら筋の前記立ち上がり筋部と前記第二のあばら筋の前記垂れ筋部とをラップさせるものの、ラップ長は所定の重ね継手長さを満たしておらず、かつ、ラップ長は前記立ち上がり筋部と前記垂れ筋部の長さに相当し、前記二段の横筋のうち、上段の該横筋を梁筋の高さの中央位置に配設し、下段の該横筋を前記底筋部の側方もしくはその近傍に配設して接続する、上下ユニット接続工程と、
前記天端筋部が前記上端主筋に当接するようにして前記上方ユニットが被せられた状態の前記下方ユニットの前記第一のあばら筋を形成する前記底筋部と、前記立ち上がり筋部の境界の曲げ部の内側に下端主筋を接続することにより、梁成の低い梁に適用される梁筋を形成する、下端主筋接続工程と、を有することを特徴とする、梁筋の配筋方法。
a lower unit installation process in which a lower unit is arranged in which first stirrups, each having a U-shape that opens upward and a bottom reinforcement part and a rising reinforcement part that rises upward from the left and right ends of the bottom reinforcement part, are arranged at a predetermined pitch, and each first stirrup is connected to the upper end main reinforcement by full strength welding on the inside of the upper ends of the corresponding left and right rising reinforcement parts;
an upper and lower unit connecting process, in which second stirrups having a U-shape opening downward and having a top end reinforcing bar portion and a hanging reinforcing bar portion hanging downward from the left and right ends of the top end reinforcing bar portion are arranged at a predetermined pitch, each second stirrup is connected to the corresponding left and right hanging reinforcing bar portion by welding with two stages of horizontal bars, and an upper unit having no hooks at the ends of the hanging reinforcing bars is placed over the lower unit to arrange the upper unit, and the rising reinforcing bar portion of the corresponding first stirrup reinforcing bar and the hanging reinforcing bar portion of the corresponding second stirrup reinforcing bar are overlapped, but the overlap length does not meet the predetermined lap joint length and corresponds to the length of the rising reinforcing bar portion and the hanging reinforcing bar portion, and the upper stage horizontal bar of the two stages of horizontal bars is arranged at the center of the height of the beam reinforcing bar, and the lower stage horizontal bar is arranged at the side of or in the vicinity of the bottom reinforcing bar and connected;
a bottom reinforcement section that forms the first stirrup of the lower unit when the upper unit is placed over it so that the top reinforcement section abuts against the upper end main reinforcement; and a bottom end main reinforcement connecting process that forms beam reinforcement to be applied to beams with low beam depth by connecting the bottom end main reinforcement to the inside of the bend at the boundary of the rising reinforcement section.
上方に開いたコの字状を呈し、底筋部と該底筋部の左右端から上方に立ち上がる立ち上がり筋部とを有する第一のあばら筋が所定のピッチで配設され、各第一のあばら筋同士が、対応する左右の前記立ち上がり筋部の上端内側に全強度溶接にて上端主筋に接続され、かつ、前記底筋部と前記立ち上がり筋部の境界の内側に下端主筋が溶接にて接続されてなる下方ユニットを配筋する、下方ユニット設置工程と、
下方に開いたコの字状を呈し、天端筋部と該天端筋部の左右端から下方に垂れる垂れ筋部とを有する第二のあばら筋が所定のピッチで配設され、各第二のあばら筋同士が、対応する左右の前記垂れ筋部の外側の所定位置にて二段の横筋により溶接にて接続され、前記垂れ筋部の端部にフックを有していない上方ユニットを、該天端筋部が前記上端主筋に当接するようにして前記下方ユニットに被せて配筋し、対応する前記第一のあばら筋の前記立ち上がり筋部と前記第二のあばら筋の前記垂れ筋部とをラップさせるものの、ラップ長は所定の重ね継手長さを満たしておらず、かつ、ラップ長は前記立ち上がり筋部と前記垂れ筋部の長さに相当し、前記二段の横筋のうち、上段の該横筋を梁筋の高さの中央位置に配設し、下段の該横筋を前記底筋部の側方もしくは前記下端主筋の側方に配設して接続することにより、梁成の低い梁に適用される梁筋を形成する、上下ユニット接続工程と、を有することを特徴とする、梁筋の配筋方法。
a lower unit installation process in which first stirrups, which have an upwardly open U-shape and have bottom reinforcement parts and rising reinforcement parts rising upward from the left and right ends of the bottom reinforcement parts, are arranged at a predetermined pitch, and each first stirrup is connected to the upper end main reinforcement by full strength welding on the inside of the upper ends of the corresponding left and right rising reinforcement parts, and the lower end main reinforcement is connected by welding to the inside of the boundary between the bottom reinforcement parts and the rising reinforcement parts;
The second stirrups are arranged at a predetermined pitch, each having a U-shape that opens downward and a top end reinforcing bar portion and a hanging reinforcing bar portion that hangs downward from the left and right ends of the top end reinforcing bar portion. The second stirrups are connected to each other by welding with two stages of horizontal bars at predetermined positions outside the corresponding left and right hanging reinforcing bar portions. An upper unit that does not have a hook at the end of the hanging reinforcing bar portion is placed over the lower unit so that the top end reinforcing bar portion abuts against the upper end main reinforcing bar. The rising reinforcing bar portion of the corresponding first stirrups and the and an upper and lower unit connecting step of overlapping the hanging reinforcement part of the second stirrup reinforcement with a lap length that does not meet a predetermined lap joint length and that corresponds to the length of the rising reinforcement part and the hanging reinforcement part, and forming beam reinforcement applicable to a beam with a low beam depth by arranging the upper horizontal reinforcement of the two stages of horizontal reinforcement at the center position of the beam reinforcement height and arranging and connecting the lower horizontal reinforcement to the side of the bottom reinforcement part or the side of the lower end main reinforcement.
JP2020011897A 2020-01-28 2020-01-28 Beam reinforcement and its arrangement method Active JP7506480B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2020011897A JP7506480B2 (en) 2020-01-28 2020-01-28 Beam reinforcement and its arrangement method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2020011897A JP7506480B2 (en) 2020-01-28 2020-01-28 Beam reinforcement and its arrangement method

Publications (2)

Publication Number Publication Date
JP2021116631A JP2021116631A (en) 2021-08-10
JP7506480B2 true JP7506480B2 (en) 2024-06-26

Family

ID=77174318

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2020011897A Active JP7506480B2 (en) 2020-01-28 2020-01-28 Beam reinforcement and its arrangement method

Country Status (1)

Country Link
JP (1) JP7506480B2 (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2018165456A (en) 2017-03-28 2018-10-25 大和ハウス工業株式会社 Beam bar
JP2019065462A (en) 2017-09-28 2019-04-25 大和ハウス工業株式会社 Reinforcement unit and reinforced concrete beam
JP2019116795A (en) 2017-12-27 2019-07-18 大和ハウス工業株式会社 Beam reinforcement and method of arranging the same
JP2021085161A (en) 2019-11-25 2021-06-03 大和ハウス工業株式会社 Beam reinforcement and reinforcement arrangement method

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2018165456A (en) 2017-03-28 2018-10-25 大和ハウス工業株式会社 Beam bar
JP2019065462A (en) 2017-09-28 2019-04-25 大和ハウス工業株式会社 Reinforcement unit and reinforced concrete beam
JP2019116795A (en) 2017-12-27 2019-07-18 大和ハウス工業株式会社 Beam reinforcement and method of arranging the same
JP2021085161A (en) 2019-11-25 2021-06-03 大和ハウス工業株式会社 Beam reinforcement and reinforcement arrangement method

Also Published As

Publication number Publication date
JP2021116631A (en) 2021-08-10

Similar Documents

Publication Publication Date Title
JP6920985B2 (en) Beam reinforcement and its reinforcement method
KR100971736B1 (en) Shear reinforcement with dual anchorage function each up and down
CN106545088B (en) Conversion node of upper concrete column and lower concrete-filled steel tubular column and implementation method
KR101404515B1 (en) Hybrid beam with separated double swellings and assembling method thereof
JP7438727B2 (en) Beam reinforcement and its reinforcement method
JP7506480B2 (en) Beam reinforcement and its arrangement method
CN113638487B (en) Staggered connection structure of local superposed beam and prefabricated column node steel bar and construction method thereof
JP4819605B2 (en) Precast prestressed concrete beams using tendons with different strength at the end and center
JP5158650B2 (en) Concrete member joint structure
JP7132767B2 (en) Beam reinforcement and its reinforcement method
JP3225556U (en) Seismic strap
JP3825710B2 (en) Double reinforcement structure of reinforced concrete foundation
JP4557711B2 (en) Reinforcement structure around openings in reinforced concrete beams
JP6554456B2 (en) RC beam shear unit and construction method of RC beam
JP3658337B2 (en) Spot welding method for shear reinforcement
CN213390768U (en) Bottom plate for assembling type concrete prestress overlapping
JP7219569B2 (en) composite deck slabs
CN113175087A (en) Semi-steel bone beam assembly
KR102402442B1 (en) Reinforced pre-assembly continuous v-tie construction method for reinforcement of new column and section enlargement reinforced column
KR20090093419A (en) Vertical RC structure construction method using prefabricated steel bar multi story unit
JP5095967B2 (en) Joint structure of column beam joint
CN214833467U (en) Semi-steel bone beam assembly
JP2002285678A (en) Beam frame unit for single bar arrangement of reinforced concrete beam, joint bar unit and joint structure
JP2006322273A (en) Connecting structure
CN106760204A (en) Concrete beam or column capable of improving torsional bearing capacity and construction method thereof

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20230104

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20231027

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20231107

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20231205

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20240123

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20240315

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20240521

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20240614

R150 Certificate of patent or registration of utility model

Ref document number: 7506480

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150