KR102402442B1 - Reinforced pre-assembly continuous v-tie construction method for reinforcement of new column and section enlargement reinforced column - Google Patents

Reinforced pre-assembly continuous v-tie construction method for reinforcement of new column and section enlargement reinforced column Download PDF

Info

Publication number
KR102402442B1
KR102402442B1 KR1020210052487A KR20210052487A KR102402442B1 KR 102402442 B1 KR102402442 B1 KR 102402442B1 KR 1020210052487 A KR1020210052487 A KR 1020210052487A KR 20210052487 A KR20210052487 A KR 20210052487A KR 102402442 B1 KR102402442 B1 KR 102402442B1
Authority
KR
South Korea
Prior art keywords
tie
reinforcing bar
continuous
column
reinforcement
Prior art date
Application number
KR1020210052487A
Other languages
Korean (ko)
Other versions
KR20210047292A (en
Inventor
양근혁
황용하
윤순구
최용수
Original Assignee
경기대학교 산학협력단
포엠 주식회사
주식회사 운진하이텍
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Priority claimed from KR1020190068015A external-priority patent/KR20200141567A/en
Application filed by 경기대학교 산학협력단, 포엠 주식회사, 주식회사 운진하이텍 filed Critical 경기대학교 산학협력단
Priority to KR1020210052487A priority Critical patent/KR102402442B1/en
Publication of KR20210047292A publication Critical patent/KR20210047292A/en
Application granted granted Critical
Publication of KR102402442B1 publication Critical patent/KR102402442B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C5/00Reinforcing elements, e.g. for concrete; Auxiliary elements therefor
    • E04C5/01Reinforcing elements of metal, e.g. with non-structural coatings
    • E04C5/06Reinforcing elements of metal, e.g. with non-structural coatings of high bending resistance, i.e. of essentially three-dimensional extent, e.g. lattice girders
    • E04C5/0604Prismatic or cylindrical reinforcement cages composed of longitudinal bars and open or closed stirrup rods

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Reinforcement Elements For Buildings (AREA)

Abstract

신축 기둥 및 단면확대 보강 기둥에서 크로스 타이를 대체하는 선조립된 연속 V-타이 보조띠철근을 배근하여 신축 기둥 및 단면확대 보강기둥에서 배근 시 시공성 및 연성능력이 향상되는 기둥의 보조띠철근 배근방법이 개시된다. 본 발명은 기둥의 주철근에 결합되는 보조띠철근 배근방법으로서, V-타이 고정용 철선에 기 설정된 배근 간격에 따라 V-타이가 고정되어 형성된 연속 V-타이를 상기 주철근에 배근시키는 것을 특징으로 하는 연속 V-타이를 이용한 기둥의 보조띠철근 배근방법을 제공한다.A method of reinforcing auxiliary band reinforcement for columns that improves workability and ductility when reinforcing in new columns and cross-section enlarged reinforcing columns by reinforcing the pre-assembled continuous V-tie auxiliary band reinforcing bars that replace cross ties in new columns and cross-section enlarged reinforcing columns This is initiated. The present invention is a method of reinforcing auxiliary bands coupled to the main reinforcing bars of a column, characterized in that the continuous V-ties formed by fixing V-ties to the main reinforcing bars according to a preset reinforcement interval on the V-tie fixing wire are provided. A method of reinforcing auxiliary bands of columns using continuous V-ties is provided.

Description

신축 기둥 및 단면확대 보강 기둥의 보조띠철근 배근을 위한 철근 선조립 연속 V-타이 시공 기술{Reinforced pre-assembly continuous v-tie construction method for reinforcement of new column and section enlargement reinforced column}Reinforced pre-assembly continuous v-tie construction method for reinforcement of new column and section enlargement reinforced column

본 발명은 신축 기둥 및 단면확대 보강 기둥의 보조 띠철근 배근을 위한 철근 선조립 연속 V-타이 시공기술에 관한 것으로 보다 상세하게는 신축 기둥 및 단면확대 보강 기둥에서 코어 콘크리트의 구속 및 주철근 조기좌굴 제어를 통해 기둥 연성 능력 향상을 위한 연속 V-타이 시공 기술에 관한 것이다.The present invention relates to a continuous V-tie construction technique for rebar line assembly for auxiliary band reinforcement of new construction columns and cross-sectional enlarged reinforcement columns, and more specifically, restraint of core concrete and control of early buckling of main reinforcing bars in new columns and cross-section enlarged reinforcing columns It relates to continuous V-tie construction technology to improve column ductility through

현재 건설현장에서는 사회 고령화 및 현장 기능공과 노무자의 현저한 감소로 인해 현장 공정을 최소화한 철근 선조립 공법에 대한 기술개발 요구가 증가하고 있다. 철근콘크리트 기둥에서 내진상세를 위해 요구하는 크로스타이를 대체하기 위해 개발된 V-타이는 국토교통부 건설 신기술 제808호에 나타나 있듯이 콘크리트를 구속하고 중간 주철근의 조기좌굴을 방지하는 역할을 함으로서 결국 기둥의 연성향상에 기여한다. 이 V-타이 기술은 2개 이상의 주철근을 상호 연결하는 크로스 타이와는 달리 개별 주철근에 배근되므로 주철근 배근 위치에 의한 간섭을 받지 않으며 시공성을 향상시킬 수 있다. 특히 크로스 타이는 기둥의 최대내력 이후 90° 갈고리가 풀림으로써 주철근의 조기좌굴과 함께 기둥의 연성이 급격히 감소하지만, V-타이는 기둥의 파괴 시까지 뽑힘 또는 풀림이 나타나지 않아 기둥 연성향상에 효과적이다.Currently, in construction sites, the demand for technology development for the rebar assembly method that minimizes the on-site process is increasing due to the aging of society and a significant decrease in the number of field technicians and laborers. The V-tie developed to replace the cross tie required for seismic detail in reinforced concrete columns, as shown in Construction New Technology No. Contributes to ductility improvement. Unlike cross ties that interconnect two or more main rebars, this V-tie technology is reinforcing individual reinforcing bars, so it is not interfered with by the location of main reinforcing bars and can improve workability. In particular, cross ties are effective in improving column ductility because the ductility of the column is rapidly reduced along with early buckling of the main reinforcing bar as the 90° hook is released after the maximum bearing capacity of the column. .

그러나 보조 띠철근으로서 V-타이는 개별적으로 주철근에 배근하는 작업을 수행하므로 많은 양의 V-타이를 배근하게 될 경우 시공성이 저하될 우려가 있다. V-타이의 장점을 살리면서 이러한 문제점을 해결하기 위해서 연속 V-타이 기술을 제시하게 되었다. However, since V-ties as auxiliary band reinforcing bars perform the work of individually reinforcing main reinforcing bars, if a large amount of V-ties are reinforcing, there is a concern that the workability may be deteriorated. In order to solve this problem while taking advantage of the advantages of the V-tie, continuous V-tie technology has been proposed.

등록특허 제1600007호는 근콘크리트 수직부재의 주근에 설치되는 내부 띠철근은 소정의 정착 길이를 확보한 V형 또는 U형 내부 띠철근으로 형성하여 상기 주근에 V형 또는 U형 내부 띠철근을 띠철근 고정수단으로 결합함으로써, 상기 주근의 좌굴과 횡방향 변위를 제어하는 기술을 개시하고 있으나, 많은 양의 V-타이를 배근하게 될 경우 발생하는 시공성 저하를 해소하기 위한 내용에 대하여는 언급하고 있지 않고 있다.Registered Patent No. 1600007 discloses that the inner band reinforcement installed on the main bar of the reinforced concrete vertical member is formed of a V- or U-shaped inner band reinforcing bar with a predetermined anchorage length, and the V- or U-shaped inner band reinforcing bar is attached to the main bar. Although the technology for controlling the buckling and lateral displacement of the main bar is disclosed by combining it with a reinforcing bar fixing means, it does not mention the content for solving the decrease in workability that occurs when a large amount of V-ties are reinforced. have.

등록특허 제1913818호는 콘크리트 증타에 의하여 기둥 보강시 기존 기둥 외부에 보강 주철근과 함께 보강 띠철근과 V형 띠철근을 배근함으로써, 크로스 타이 없이 기둥 주근의 좌굴을 방지하고 기둥 콘크리트의 구속 효과를 얻을 수 있는 기술을 개시하고 있으나, 많은 양의 V-타이를 배근하게 될 경우 발생하는 시공성 저하를 해소하기 위한 내용에 대하여는 언급하고 있지 않고 있다.Registered Patent No. 1913818 discloses that, when reinforcing a column by adding concrete, it prevents the buckling of the column main bar without cross ties and obtains the restraining effect of column concrete by reinforcing the reinforcing bar and V-shaped bar along with the reinforcing main bar on the outside of the existing column. It discloses a technology that can be used, but does not mention the contents for solving the decrease in workability that occurs when a large amount of V-ties are placed.

본 발명은 전술한 종래기술의 문제점을 해결하기 위하여 안출된 것으로서, 신축 기둥 및 단면확대 보강 기둥에서 크로스 타이를 대체하는 선조립된 연속 V-타이 보조띠철근을 배근하여 신축 기둥 및 단면확대 보강기둥에서 배근 시 시공성 및 연성능력이 향상되는 기둥의 보조띠철근 배근방법을 제공하고자 한다.The present invention has been devised to solve the problems of the prior art described above, and by reinforcing the pre-assembled continuous V-tie auxiliary band reinforcing bars that replace cross ties in the telescopic columns and the cross-section enlarged reinforcement columns, the extension columns and the cross-section enlarged reinforcement columns The purpose of this study is to provide a method of reinforcing auxiliary band reinforcement for columns that improves constructability and ductility during reinforcement.

상기 과제를 해결하기 위하여 본 발명은, 기둥의 주철근에 결합되는 보조띠철근 배근방법으로서, V-타이 고정용 철선에 기 설정된 배근 간격에 따라 V-타이가 고정되어 형성된 연속 V-타이를 상기 주철근에 배근시키는 것을 특징으로 하는 연속 V-타이를 이용한 기둥의 보조띠철근 배근방법을 제공한다.In order to solve the above problems, the present invention provides a method of reinforcing auxiliary bands to be coupled to the main reinforcing bars of a column. It provides a method of reinforcing auxiliary band reinforcement of a column using a continuous V-tie, characterized in that it is reinforced on the

또한, 상기 연속 V-타이는 상기 V-타이 고정용 철선에 상기 V-타이가 점용접된 것을 특징으로 하는 연속 V-타이를 이용한 기둥의 보조띠철근 배근방법을 제공한다.In addition, the continuous V-tie provides an auxiliary band reinforcement method of a column using a continuous V-tie, characterized in that the V-tie is spot welded to the V-tie fixing wire.

또한, 상기 V-타이 고정용 철선은 상기 V-타이의 절곡부 외부에 위치되는 것을 특징으로 하는 연속 V-타이를 이용한 기둥의 보조띠철근 배근방법을 제공한다.In addition, the V-tie for fixing the iron wire provides a method for reinforcing auxiliary band reinforcement of a column using a continuous V-tie, characterized in that it is located outside the bent portion of the V-tie.

또한, 상기 배근방법은 신축 기둥에 적용되는 것을 특징으로 하는 연속 V-타이를 이용한 기둥의 보조띠철근 배근방법을 제공한다.In addition, the reinforcement method provides an auxiliary band reinforcement method of a column using a continuous V-tie, characterized in that it is applied to the telescopic column.

또한, 상기 배근은 상기 주철근, 외부 띠철근 및 상기 연속 V-타이를 포함하는 철근 선조립 유닛을 커플러 접합을 이용하여 하부 주철근과 연결하여 수행되는 것을 특징으로 하는 연속 V-타이를 이용한 기둥의 보조띠철근 배근방법을 제공한다.In addition, the reinforcement of the column using a continuous V-tie, characterized in that the reinforcement is performed by connecting the reinforcing bar line assembly unit including the main reinforcing bar, the external band reinforcing bar and the continuous V-tie with the lower main reinforcing bar using a coupler joint A method of reinforcing bar reinforcement is provided.

또한, 상기 배근은 주철근, 외부 띠철근 및 연속 V-타이 순으로 배근되는 것을 특징으로 하는 연속 V-타이를 이용한 기둥의 보조띠철근 배근방법을 제공한다.In addition, the reinforcement provides a secondary band reinforcement method of a column using a continuous V-tie, characterized in that the reinforcement in the order of the main reinforcing bar, the external band reinforcing bar and the continuous V-tie.

또한, 상기 배근방법은 단면확대 보강 기둥에 적용되는 것을 특징으로 하는 연속 V-타이를 이용한 기둥의 보조띠철근 배근방법을 제공한다.In addition, the reinforcement method provides an auxiliary band reinforcement method of a column using a continuous V-tie, characterized in that it is applied to the cross-section enlarged reinforcement column.

또한, 상기 배근은 상기 주철근, 외부 띠철근 및 상기 연속 V-타이를 포함하는 철근 선조립 유닛을 커플러 접합을 이용하여 기둥 각 면의 하부 주철근과 연결하고, 폐쇄형 외부 띠철근 형성을 위하여 기둥 모서리에서 U-타이 고정용 철선에 기 설정된 배근 간격에 따라 U-타이가 고정되어 형성된 연속 U-타이를 배근하여 수행되는 것을 특징으로 하는 연속 V-타이를 이용한 기둥의 보조띠철근 배근방법을 제공한다.In addition, the reinforcement connects the reinforcing bar line assembly unit including the main reinforcing bar, the external band reinforcing bar and the continuous V-tie with the lower main reinforcing bars of each side of the column using coupler bonding, and the corner of the column to form a closed external band reinforcing bar It provides a method for reinforcing auxiliary bands of columns using continuous V-ties, characterized in that the continuous U-ties formed by fixing U-ties according to the preset reinforcement intervals on the U-tie fixing wires are reinforced. .

본 발명은 V-타이가 고정용 철선에 연속으로 고정되어 형성된 연속 V-타이를 사용함으로써 V-타이가 회전되거나 이탈하는 것을 방지하고, 단면확대 보강 기둥에서 내부 기둥의 간섭이 없는 보조띠철근 배근으로 인한 구조적 안전성 및 시공성이 향상되며, 철근 선조립 공법을 사용함으로써 공사기간이 단축되어 경제성이 향상된다. The present invention prevents the V-tie from rotating or departing by using a continuous V-tie formed by continuously fixing the V-tie to the iron wire for fixing, and sub-bar reinforcement reinforcement without the interference of the internal column in the cross-section enlarged reinforcement column Structural safety and workability are improved due to this, and the construction period is shortened by using the rebar assembly method, thereby improving economic efficiency.

도 1은 본 발명에 따른 연속 V-타이를 나타낸 도면,
도 2는 본 발명에 따른 연속 V-타이가 주철근에 결합되는 모습을 나타낸 도면,
도 3은 본 발명의 일 실시예에 따라 신축 기둥에서 하부 주철근이 배근된 모습을 나타낸 도면,
도 4는 본 발명의 일 실시예에 따라 신축 기둥에서 철근 선조립 유닛과 하부 주철근이 커플러를 통해 결합된 모습을 나타낸 도면,
도 5는 본 발명의 일 실시예에 따라 신축 기둥에서 주철근이 배근된 모습을 나타낸 도면,
도 6은 본 발명의 일 실시예에 따라 신축 기둥에서 주철근에 외부 띠철근이 배근된 모습을 나타낸 도면,
도 7은 본 발명의 일 실시예에 따라 신축 기둥에서 연속 V-타이가 결합되는 모습을 나타낸 도면,
도 8은 본 발명의 일 실시예에 따라 단면확대 보강 기둥에서 하부 주철근이 배근된 모습을 나타낸 도면,
도 9는 본 발명의 일 실시예에 따라 단면확대 보강 기둥에서 철근 선조립 유닛과 하부 주철근이 커플러를 통해 결합된 모습을 나타낸 도면,
도 10은 본 발명의 일 실시예에 따라 단면확대 보강 기둥에서 연속 U-타이로 철근 선조립 유닛을 결합하는 모습을 나타낸 도면이다.
1 is a view showing a continuous V-tie according to the present invention;
2 is a view showing a state in which a continuous V-tie according to the present invention is coupled to the main reinforcing bar;
3 is a view showing a state in which the lower main reinforcing bar is reinforced in an expansion column according to an embodiment of the present invention;
4 is a view showing a state in which the reinforcing bar line assembly unit and the lower main reinforcing bar are combined through a coupler in an expansion column according to an embodiment of the present invention;
5 is a view showing a state in which the main reinforcing bar is reinforced in an expansion column according to an embodiment of the present invention;
6 is a view showing a state in which the external band reinforcement is reinforced on the main reinforcement in the expansion column according to an embodiment of the present invention;
7 is a view showing a state in which a continuous V-tie is coupled in a telescopic column according to an embodiment of the present invention;
8 is a view showing a state in which a lower main reinforcing bar is reinforced in a cross-sectional enlarged reinforcing column according to an embodiment of the present invention;
9 is a view showing a state in which a rebar line assembly unit and a lower main rebar are combined through a coupler in a cross-sectional enlarged reinforcement column according to an embodiment of the present invention;
10 is a view showing a state in which the reinforcing bar wire assembly unit is coupled with a continuous U-tie in a cross-sectional enlarged reinforcing column according to an embodiment of the present invention.

이하에서는 본 발명의 바람직한 실시예를 첨부한 도면을 참고하여 상세하게 설명한다. 본 발명을 설명함에 있어서 관련된 공지 기술에 대한 구체적인 설명이 본 발명의 요지를 흐리게 할 수 있다고 판단되는 경우 그 상세한 설명을 생략하기로 한다. 도면에서 본 발명을 명확하게 설명하기 위하여 설명과 관계없는 부분은 생략하였고, 명세서 전체를 통하여 유사한 부분에 대해서는 유사한 도면 부호를 부여하였으며, 본 발명의 세부구성 방향은 도면을 기준으로 하여 설명한다. 또한, 명세서 전체에서, 어떤 부분이 어떤 구성요소를 "포함"한다고 할 때, 이는 특별히 반대되는 기재가 없는 한, 다른 구성요소를 제외하는 것이 아니라 다른 구성요소를 더 포함할 수 있음을 의미한다.Hereinafter, preferred embodiments of the present invention will be described in detail with reference to the accompanying drawings. In describing the present invention, if it is determined that a detailed description of a related known technology may obscure the gist of the present invention, the detailed description thereof will be omitted. In order to clearly explain the present invention in the drawings, parts irrelevant to the description are omitted, and similar reference numerals are given to similar parts throughout the specification, and the detailed configuration direction of the present invention will be described with reference to the drawings. Also, throughout the specification, when a part "includes" a certain component, it means that other components may be further included, rather than excluding other components, unless otherwise stated.

본 발명은 기둥의 주철근(130)에 결합되는 보조띠철근 배근방법으로서, V-타이 고정용 철선(120)에 기 설정된 배근 간격(Sv)에 따라 V-타이(110)가 고정되어 형성된 연속 V-타이(100)를 상기 주철근(130)에 배근시키는 것을 특징으로 한다.The present invention is a method for reinforcing auxiliary bands coupled to the main reinforcing bars 130 of a column, and a continuous V formed by fixing the V-ties 110 according to a preset reinforcement interval (Sv) on the V-tie fixing wire 120 . - It is characterized in that the tie (100) is reinforced to the main reinforcing bar (130).

본 발명에서 상기 주철근(130)은 수직으로 고정 설치되는 I(직선)형 철근일 수 있고, 외부 띠철근(140)은 횡방향으로 고정 설치되며 직선형, ㄷ자형 또는 ㅁ형 철근일 수 있다.In the present invention, the main reinforcing bar 130 may be an I (straight line) reinforcing bar that is vertically fixed and installed, and the outer band reinforcing bar 140 is horizontally fixed and may be a straight, U-shaped, or ㅁ-shaped reinforcing bar.

본 발명에서 상기 V-타이(110)는 내부 콘트리트를 구속하고 중간 주철근(130)의 조기좌굴을 방지하여 기둥의 연성향상에 기여할 수 있다. 상기 V-타이(110)는 특정 형상으로 제조되어야 하나, 상기 V-타이(110)의 길이 등 세부 사항은 보강 대상이 되는 기둥이나 현장 상황에 따라 적절히 변경될 수 있으며, 상기 V-타이(110)의 내부 각도는 10~70°일 수 있고, 바람직하게는 30~60°일 수 있다. 또한, 묻힘 길이는 75mm 이상 및 V-타이(110)로 사용된 철근 직경의 6배 이상일 수 있으며, 상기 묻힘 길이는 상기 V-타이(110)의 다리 끝에서 주철근(130)까지의 순길이를 의미한다.In the present invention, the V-tie 110 may contribute to improving the ductility of the column by restraining the internal concrete and preventing premature buckling of the intermediate main reinforcing bar 130 . The V-tie 110 has to be manufactured in a specific shape, but details such as the length of the V-tie 110 may be appropriately changed according to the pillar to be reinforced or the field situation, and the V-tie 110 ) may have an internal angle of 10 to 70°, preferably 30 to 60°. In addition, the buried length may be 75 mm or more and 6 times or more of the diameter of the reinforcing bar used as the V-tie 110, and the buried length is the net length from the leg end of the V-tie 110 to the main reinforcing bar 130. it means.

도 1은 본 발명에 따른 연속 V-타이(100)를 나타낸 도면이고, 도 2는 본 발명에 따른 연속 V-타이(100)가 주철근(130)에 결합되는 모습을 나타낸 도면이다.1 is a view showing a continuous V-tie 100 according to the present invention, FIG. 2 is a view showing a state in which the continuous V-tie 100 according to the present invention is coupled to the main reinforcing bar 130 .

도 1을 참조하면, 상기 연속 V-타이(100)는 상기 V-타이 고정용 철선(120)에 상기 V-타이(110)가 기 설정된 배근 간격(Sv)에 따라 일렬로 점용접되어 고정될 수 있고, 상기 V-타이(110)는 상기 고정용 철선(120)에 점용접됨으로써 상기 V-타이(110)가 고정되어 상하 또는 좌우로의 회전 및 이탈을 방지할 수 있다.1, the continuous V-tie 100 is fixed to the V-tie fixing wire 120 by spot welding the V-tie 110 in a line according to a preset reinforcement interval (Sv). In addition, the V-tie 110 is spot-welded to the iron wire 120 for fixing, so that the V-tie 110 is fixed to prevent vertical or horizontal rotation and separation.

또한, 상기 기 설정된 배근 간격(Sv)은 건설 현장의 설계에 따라 조절될 수 있으며, 상기 V-타이(110)의 배근은 ACI 318-14의 설계기준에 따라 조절 가능하다.In addition, the preset reinforcement interval (Sv) may be adjusted according to the design of the construction site, and the reinforcement of the V-tie 110 is adjustable according to the design criteria of ACI 318-14.

도 2를 참조하면, 상기 V-타이 고정용 철선(120)은 상기 V-타이(110)의 절곡부 외부에 위치되는 것이 바람직하며, 상기 고정용 철선(120)의 직경은 2~10mm일 수 있고, 바람직하게는 4~8mm일 수 있고, 가장 바람직하게는 6mm이다.Referring to FIG. 2 , the V-tie fixing wire 120 is preferably located outside the bent portion of the V-tie 110 , and the fixing wire 120 may have a diameter of 2 to 10 mm. and may be preferably 4 to 8 mm, and most preferably 6 mm.

본 발명에서 상기 V-타이(110)의 절곡부 외부와 상기 고정용 철선(120)이 접촉하는 부분에 점용접이 수행될 수 있고, 상기 V-타이 고정용 철선(120)이 상기 V-타이(110)의 절곡부 외부에 위치하는 경우, 상기 V-타이(110) 배근 시 상기 주철근(130)과의 이격을 최소화하면서 원활한 배근을 할 수 있다.In the present invention, spot welding may be performed on a portion in which the outside of the bent portion of the V-tie 110 and the iron wire 120 for fixing contact, and the iron wire 120 for fixing the V-tie is the V-tie. In the case of being located outside the bent portion of 110 , smooth reinforcement can be performed while minimizing the separation from the main reinforcing bar 130 when the V-tie 110 is reinforced.

또한, 상기 V-타이(110)를 상기 주철근(130)에 고정하는 경우, 상기 고정은 결속선, 용접 등을 통해 수행될 수 있다.In addition, when the V-tie 110 is fixed to the main reinforcing bar 130 , the fixing may be performed through a binding wire, welding, or the like.

본 발명에서 상기 배근방법은 신축 기둥 또는 단면확대 보강 기둥에 적용될 수 있다.In the present invention, the reinforcement method may be applied to a telescopic column or a cross-sectional enlarged reinforcing column.

도 3은 본 발명의 일 실시예에 따라 신축 기둥에서 하부 주철근(131)이 배근된 모습을 나타낸 도면, 도 4는 본 발명의 일 실시예에 따라 신축 기둥에서 철근 선조립 유닛(150)과 하부 주철근(131)이 커플러(C)를 통해 결합된 모습을 나타낸 도면, 도 5는 본 발명의 일 실시예에 따라 신축 기둥에서 주철근(130)이 배근된 모습을 나타낸 도면, 도 6은 본 발명의 일 실시예에 따라 신축 기둥에서 주철근(130)에 외부 띠철근(140)이 배근된 모습을 나타낸 도면, 도 7은 본 발명의 일 실시예에 따라 신축 기둥에서 연속 V-타이(100)가 결합되는 모습을 나타낸 도면이다.3 is a view showing a state in which the lower main reinforcing bar 131 is reinforced in the telescopic column according to an embodiment of the present invention. A view showing a state in which the main reinforcing bars 131 are coupled through a coupler (C), FIG. 5 is a view showing a state in which the main reinforcing bars 130 are reinforced in a telescopic column according to an embodiment of the present invention, FIG. 6 is a view of the present invention According to an embodiment, a view showing a state in which the external band reinforcement 140 is reinforced to the main reinforcing bar 130 in the expansion pillar according to an embodiment, FIG. 7 is a continuous V-tie 100 in the expansion pillar according to an embodiment of the present invention is coupled It is a drawing showing what it will look like.

도 3 및 도 4를 참조하면 상기 신축 기둥에 따른 배근은 상기 주철근(130), 외부 띠철근(140) 및 상기 연속 V-타이(100)를 포함하는 철근 선조립 유닛(150)을 커플러(C) 접합을 이용하여 하부 주철근(131)과 연결하여 수행될 수 있다.Referring to FIGS. 3 and 4, the reinforcement along the expansion and contraction columns is a coupler (C) ) can be performed by connecting with the lower main reinforcing bar 131 using a joint.

상기 주철근(130), 상기 외부 띠철근(140) 및 상기 연속 V-타이(100)를 포함하는 상기 철근 선조립 유닛(150)은 공장에서 일체형으로 제작될 수 있으며, 상기 철근 선조립 유닛(150)은 주철근(130)이 배근되고, 외부 띠철근(140)이 횡방향으로 상기 주철근(130)에 배근된 후, V-타이(110)가 고정용 철선(120)에 점용접되어 형성된 연속 V-타이(100)를 상기 외부 띠철근(140)이 배근된 주철근(130)을 감싸도록 배근하고, 고정하여 제작될 수 있으며, 상기 고정은 다양한 방법으로 수행될 수 있으며, 예컨대 용접, 결속선 등을 이용할 수 있다. The reinforcing bar line assembly unit 150 including the main reinforcing bar 130, the external band reinforcing bar 140 and the continuous V-tie 100 may be manufactured integrally in a factory, and the rebar line assembly unit 150 ) is a continuous V formed by the main reinforcing bar 130 being reinforced, the external band reinforcing bar 140 being reinforced to the main reinforcing bar 130 in the transverse direction, and then spot welding the V-tie 110 to the fixing iron wire 120 . - The tie 100 may be reinforced and fixed so that the outer band reinforcement 140 surrounds the reinforced main reinforcement 130, and the fixing may be performed in various ways, for example, welding, binding wire, etc. is available.

구체적으로 신축 기둥에서 상기 배근은 신축 기둥이 형성될 자리에 먼저 하부 주철근(131)이 배근되고, 상기 하부 주철근(131)에 커플러(C)가 결합된다. 이후 상기 제작된 철근 선조립 유닛(150)의 주철근(130)을 상기 하부 주철근(131)에 결합된 커플러(C)에 결합시켜 상기 하부 주철근(131)과 상기 철근 선조립 유닛(150)을 결합함으로써 이루어질 수 있다. 상기 커플러(C)를 이용한 접합은 상부 하중의 전달을 용이하게 하며, 상기 철근 선조립 유닛(150)이 일체형으로 제작됨으로써 시공성이 향상되어 공사 시간을 단축할 수 있다.Specifically, in the telescopic column, the lower main reinforcing bar 131 is first reinforced at the location where the telescopic column is to be formed, and the coupler C is coupled to the lower main reinforcing bar 131 . Thereafter, the main reinforcing bar 130 of the manufactured rebar line assembly unit 150 is coupled to the coupler C coupled to the lower main reinforcing bar 131 to combine the lower main rebar 131 and the rebar line assembly unit 150. This can be done by Bonding using the coupler (C) facilitates the transfer of the upper load, and since the rebar line assembly unit 150 is integrally manufactured, the workability is improved and the construction time can be shortened.

도 5 내지 도 7을 참조하면, 상기 배근은 상기 주철근(130), 상기 외부 띠철근(140) 및 상기 연속 V-타이(100) 순으로 배근될 수 있다.5 to 7 , the reinforcement may be in the order of the main reinforcing bar 130 , the external band reinforcing bar 140 , and the continuous V-tie 100 .

구체적으로 현장상황에 따라 철근 선조립 유닛(150)을 현장에서 배근할 수 없는 경우, 상기 주철근(130), 상기 외부 띠철근(140) 및 상기 연속 V-타이(100)를 공장에서 일체형으로 제작하지 않고, 현장 상황에 맞추어 배근하게 된다. 먼저, 신축 기둥이 형성될 자리에 상기 주철근(130)을 배근한 후, 상기 주철근(130) 외부에 상기 외부 띠철근(140)을 횡방향으로 배근한다. 이후 상기 주철근(130) 및 외부 띠철근(140)이 배근된 상태에서 상기 연속 V-타이(100)의 V-타이(110)가 외측에서 주철근(130)을 감싸면서 배근되고, 결속선 또는 용접 등을 이용하여 상기 연속 V-타이(100)를 상기 주철근(130)에 고정시켜 배근을 완료한다. 이처럼 상기 주철근(130), 상기 외부 띠철근(140), 및 상기 연속 V-타이(100)를 공장에서 일체형으로 제작하지 않는 경우, 현장 상황에 따라 배근방법을 변경할 수 있다.Specifically, when the reinforcing bar line assembly unit 150 cannot be reinforced at the site depending on the site situation, the main reinforcing bar 130, the external band reinforcing bar 140, and the continuous V-tie 100 are integrally manufactured at the factory. Instead, they will be assigned according to the on-site situation. First, after reinforcing the main reinforcing bar 130 at a location where the expansion column is to be formed, the external band reinforcing bar 140 is horizontally reinforcing the outside of the main reinforcing bar 130 . Thereafter, in the state in which the main reinforcing bar 130 and the external band reinforcing bar 140 are reinforced, the V-tie 110 of the continuous V-tie 100 is reinforced while surrounding the main reinforcing bar 130 from the outside, and a binding line or welding The continuous V-tie 100 is fixed to the main reinforcing bar 130 using such as to complete the reinforcement. As such, when the main reinforcing bar 130 , the external band reinforcing bar 140 , and the continuous V-tie 100 are not manufactured as one piece at the factory, the arrangement method may be changed according to the field situation.

이와 같이 신축 기둥에 연속 V-타이(100)를 포함하는 철근 선조립 유닛(150)을 이용하는 경우 외부 띠철근의 원활한 배근, 주철근(130) 정착을 통한 안정적인 하중 전달 및 현장공정을 최소화할 수 있다.In this way, when the rebar line assembly unit 150 including the continuous V-tie 100 is used in the expansion column, it is possible to minimize the stable load transmission and on-site process through the smooth reinforcement of the external band reinforcing bar and the fixation of the main reinforcing bar 130 . .

본 발명은 연속 V-타이(100)를 이용한 보조 띠철근 배근방법에 의해 신축 기둥 형성 시, 내진상세를 갖는 외부 띠철근(140)의 원활한 배근, 주철근(130) 정착을 통한 안정적인 하중 전달, 현장공정을 최소화하여 기둥의 단면 확대 보강의 공기단축 및 구조 안전성을 확보할 수 있다.The present invention provides smooth reinforcement of the external belt reinforcement 140 having seismic resistance details, stable load transmission through fixing the main reinforcement 130, and field By minimizing the process, it is possible to shorten the construction period and secure the structural safety of the reinforcement of the cross-section of the column.

도 8은 본 발명의 일 실시예에 따라 단면확대 보강 기둥에서 하부 주철근(131)이 배근된 모습을 나타낸 도면, 도 9는 본 발명의 일 실시예에 따라 단면확대 보강 기둥에서 철근 선조립 유닛(160)과 하부 주철근(131)이 커플러(C)를 통해 결합된 모습을 나타낸 도면, 도 10은 본 발명의 일 실시예에 따라 단면확대 보강 기둥에서 연속 U-타이(170)로 철근 선조립 유닛(160)을 결합하는 모습을 나타낸 도면이다.8 is a view showing a state in which the lower main reinforcing bar 131 is reinforced in a cross-sectional enlarged reinforcing column according to an embodiment of the present invention, and FIG. 9 is a reinforcing bar line assembly unit ( 160) and the lower main reinforcing bar 131 are coupled through a coupler (C), FIG. 10 is a reinforcing bar line assembly unit with a continuous U-tie 170 in a cross-sectional enlarged reinforcing column according to an embodiment of the present invention It is a diagram showing the state of combining (160).

도 8 내지 도 10을 참조하면, 상기 배근은 상기 주철근(130), 외부 띠철근(140) 및 상기 연속 V-타이(100)를 포함하는 철근 선조립 유닛(160)을 커플러(C) 접합을 이용하여 기둥 각 면의 하부 주철근(131)과 연결하고, 폐쇄형 외부 띠철근 형성을 위하여 기둥 모서리에 U-타이 고정용 철선(172)에 기 설정된 배근 간격에 따라 U-타이(171)가 고정되어 형성된 연속 U-타이(170)를 배근하여 수행될 수 있다.8 to 10, the reinforcement is a coupler (C) bonding of the reinforcing bar line assembly unit 160 including the main reinforcing bar 130, the outer band reinforcing bar 140 and the continuous V-tie 100 U-tie 171 is fixed according to the preset reinforcement spacing on the U-tie fixing wire 172 at the edge of the column to connect to the lower main reinforcing bar 131 of each side of the column using the It can be performed by backing the formed continuous U-tie 170 .

구체적으로 상기 배근은 기존 기둥의 각면에 커플러(C)가 연결된 하부 주철근(131)을 배근하고, 공장에서 일체형으로 제작된 상기 주철근(130), 상기 외부 띠철근(140) 및 상기 연속 V-타이(100)를 포함하는 상기 철근 선조립 유닛(160)을 상기 하부 주철근(131)에 연결된 커플러(C)에 연결할 수 있으며, 상기 커플러(C)에 상기 철근 선조립 유닛(160)의 주철근(130)을 연결할 수 있다. Specifically, the reinforcement is the lower main reinforcing bar 131 connected to the coupler (C) on each side of the existing column, and the main reinforcing bar 130, the external band reinforcing bar 140 and the continuous V-tie manufactured integrally at the factory. The rebar line assembly unit 160 including 100 can be connected to a coupler (C) connected to the lower main reinforcing bar 131, and the main rebar 130 of the rebar line assembly unit 160 to the coupler (C). ) can be connected.

또한, U-타이 고정용 철선(172)에 기 설정된 배근 간격에 따라 U-타이(1710)가 연속으로 고정되어 형성된 연속 U-타이(170)를 이용하여 인접한 상기 철근 선조립 유닛(160)의 주철근(130)을 서로 연결함으로써 폐쇄형 외부 띠철근(140)을 형성할 수 있으며, 우수한 내진성능을 확보할 수 있고, 기존 기둥의 간섭을 최소화하여 단면확대 보강이 이루어지므로 기둥의 구속 및 주철근 좌굴방지에 효과적이다. In addition, using the continuous U-ties 170 formed by continuously fixing U-ties 1710 according to the preset spacing to the U-tie fixing wire 172, the adjacent reinforcing bar wire assembly unit 160 of By connecting the main reinforcing bars 130 to each other, it is possible to form the closed external band reinforcing bars 140, and to secure excellent seismic performance, and to minimize the interference of existing columns to reinforce the cross-section by minimizing the interference of the existing columns. effective in preventing

상기 연속 U-타이(170)는 현장에서 배근될 수 있으며, 결속선을 이용하여 상기 주철근(130)에 고정될 수 있으며, 상기 연속 U-타이(170)의 기 설정된 배근 간격은 건설 현장의 설계에 따라 조절될 수 있으며, 상기 U-타이(171)의 배근은 ACI 318-14의 설계기준에 따라 조절 가능하다.The continuous U-tie 170 may be reinforced at the site, and may be fixed to the main reinforcing bar 130 using a binding line, and the preset reinforcement interval of the continuous U-tie 170 may be determined by the design of the construction site. can be adjusted, and the backing of the U-tie 171 can be adjusted according to the design criteria of ACI 318-14.

또한, 상기 U-타이(171)의 묻힘 길이는 상기 V-타이(110)와 동일하게 제작되는 것이 바람직하며, 상기 연속 U-타이의 고정용 철선(172) 또한 연속 V-타이의 고정용 철선(120)과 동일한 것이 바람직하다. 또한, 상기 연속 U-타이(170)는 기둥 각 면에 설치된 철근 선조립 유닛(160)의 모서리에 배근되기 때문에 기존 기둥의 간섭없이 폐쇄형 외부 띠철근을 형성시킬 수 있다. In addition, it is preferable that the buried length of the U-tie 171 is the same as that of the V-tie 110 , and the continuous U-tie fixing iron wire 172 and the continuous V-tie fixing iron wire The same as (120) is preferred. In addition, since the continuous U-ties 170 are reinforced at the corners of the reinforcing bar line assembly unit 160 installed on each side of the column, it is possible to form a closed external band reinforcing bar without interference of the existing column.

이와 같이, 본 발명에 따른 기둥의 주철근(130)에 결합되는 보조띠철근 배근방법은 신축 기둥 및 단면확대 보강 기둥에 모두 적용할 수 있으며, 현장상황에 따라 공장에서 일체형으로 제작된 철근 선조립 유닛(150, 160)을 사용하거나, 현장에서 직접 배근할 수 있다. 또한, 일체형으로 제작된 철근 선조립 유닛(150, 160) 사용 시, 외부 띠철근(140)의 원활한 배근 및 주철근(130) 정착을 통한 안정적인 하중 전달, 현장 공장 최소화를 통한 시공성 향상으로 인한 공기단축 및 구조 안정성을 확보할 수 있다.As described above, the auxiliary band reinforcement method coupled to the main reinforcing bar 130 of the column according to the present invention can be applied to both the expansion-contracting column and the cross-sectional enlarged reinforcing column. (150, 160) can be used, or direct assignment can be made on site. In addition, when using the integrated rebar assembly units 150 and 160, stable load transmission through smooth reinforcement of the external strip reinforcing bars 140 and fixation of the main reinforcing bars 130, and shortening of construction period due to improvement in constructability through minimization of on-site factories and structural stability.

또한, 연속 V-타이(100) 및 연속 U-타이(170)를 사용함으로써 단면확대 보강 시, 기존 기둥의 구속 효과 및 주철근 좌굴 방지 효과를 극대화 시킬 수 있으며, 기둥의 내진설계 기준에서 폐쇄형 외부 띠철근을 원할하게 설치할 수 있다. In addition, by using continuous V-ties (100) and continuous U-ties (170), it is possible to maximize the restraint effect of the existing column and the effect of preventing buckling of the main rebar when reinforcing the enlarged section, and it is possible to The strip rebar can be installed smoothly.

이상으로 본 발명의 바람직한 실시예를 도면을 참고하여 상세하게 설명하였다. 본 발명의 설명은 예시를 위한 것이며, 본 발명이 속하는 기술분야에서 통상의 지식을 가진 자는 본 발명의 기술적 사상이나 필수적인 특징을 변경하지 않고서 다른 구체적인 형태로 쉽게 변형이 가능하다는 것을 이해할 수 있을 것이다.As above, preferred embodiments of the present invention have been described in detail with reference to the drawings. The description of the present invention is for illustrative purposes, and those skilled in the art to which the present invention pertains will understand that it can be easily modified into other specific forms without changing the technical spirit or essential features of the present invention.

따라서, 본 발명의 범위는 상기 발명의 설명보다는 후술하는 청구범위에 의하여 나타내어지며, 청구범위의 의미, 범위 및 그 균등 개념으로부터 도출되는 모든 변경 또는 변형된 형태가 본 발명의 범위에 포함되는 것으로 해석되어야 한다.Accordingly, the scope of the present invention is indicated by the following claims rather than the description of the invention, and all changes or modifications derived from the meaning, scope, and equivalent concept of the claims are interpreted as being included in the scope of the present invention. should be

100 : 연속 V-타이 110 : V-타이
120 : V-타이 고정용 철선 130 : 주철근
131 : 하부 주철근 140 : 외부 띠철근
150 : 신축 기둥의 철근 선조립 유닛
160 : 보강 기둥의 철근 선조립 유닛
170 : 연속 U-타이 171 : U-타이
172 : U-타이 고정용 철선 Sv : 배근 간격
C : 커플러
100: continuous V-tie 110: V-tie
120: V-tie fixing wire 130: main reinforcing bar
131: lower main reinforcing bar 140: external band reinforcing bar
150: rebar line assembly unit of the expansion column
160: rebar line assembly unit of reinforcing columns
170: continuous U-tie 171: U-tie
172: U-tie fixing wire Sv: reinforcement spacing
C: coupler

Claims (1)

신축 기둥에 적용되는 배근방법으로서,
주철근, 외부 띠철근 및 연속 V-타이를 포함하는 철근 선조립 유닛을 일체형으로 미리 제작한 후, 커플러 접합을 이용하여 상기 선조립 유닛 중 주철근을 신축 기둥이 형성될 자리에 먼저 배근된 하부 주철근에 연결하여 배근하되,
상기 외부 띠철근은 ㅁ형 철근으로서, 횡방향으로 상기 주철근을 감싸도록 고정 설치되고,
상기 연속 V-타이는 V-타이 고정용 철선에 기 설정된 배근 간격에 따라 V-타이가 점용접으로 고정되어 형성되되, 상기 V-타이 고정용 철선은 상기 V-타이의 절곡부 외부에 위치되어, 상기 V-타이의 절곡부 외부와 상기 V-타이 고정용 철선이 접촉하는 부분이 점용접되고,
상기 연속 V-타이는 상기 외부 띠철근이 배근된 주철근을 감싸도록, 상기 V-타이의 절곡부 내부와 상기 주철근이 접촉하는 부분을 용접하여 고정된 것을 특징으로 하는 배근방법.
As a reinforcement method applied to a new column,
After prefabricating the reinforcing bar line assembly unit including the main reinforcing bar, the external band reinforcing bar and the continuous V-tie as an integral part, the main rebar among the pre-assembled units using the coupler connection is first placed on the lower main reinforcing bar at the place where the expansion column will be formed. Connect and deploy,
The external band reinforcing bar is a ㅁ-shaped reinforcing bar, and is fixedly installed to surround the main reinforcing bar in the transverse direction,
The continuous V-tie is formed by fixing the V-tie by spot welding according to a preset reinforcement interval on the V-tie fixing wire, and the V-tie fixing wire is located outside the bending portion of the V-tie. , A portion where the outside of the bent portion of the V-tie and the iron wire for fixing the V-tie are in contact is spot-welded,
The continuous V-tie is a reinforcement method, characterized in that it is fixed by welding the inside of the bent portion of the V-tie and the portion in contact with the main reinforcing bar so that the outer band reinforcing bar surrounds the reinforced main reinforcing bar.
KR1020210052487A 2019-06-10 2021-04-22 Reinforced pre-assembly continuous v-tie construction method for reinforcement of new column and section enlargement reinforced column KR102402442B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020210052487A KR102402442B1 (en) 2019-06-10 2021-04-22 Reinforced pre-assembly continuous v-tie construction method for reinforcement of new column and section enlargement reinforced column

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
KR1020190068015A KR20200141567A (en) 2019-06-10 2019-06-10 Reinforced pre-assembly continuous v-tie construction method for reinforcement of new column and section enlargement reinforced column
KR1020210052487A KR102402442B1 (en) 2019-06-10 2021-04-22 Reinforced pre-assembly continuous v-tie construction method for reinforcement of new column and section enlargement reinforced column

Related Parent Applications (1)

Application Number Title Priority Date Filing Date
KR1020190068015A Division KR20200141567A (en) 2019-06-10 2019-06-10 Reinforced pre-assembly continuous v-tie construction method for reinforcement of new column and section enlargement reinforced column

Publications (2)

Publication Number Publication Date
KR20210047292A KR20210047292A (en) 2021-04-29
KR102402442B1 true KR102402442B1 (en) 2022-06-09

Family

ID=81985637

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020210052487A KR102402442B1 (en) 2019-06-10 2021-04-22 Reinforced pre-assembly continuous v-tie construction method for reinforcement of new column and section enlargement reinforced column

Country Status (1)

Country Link
KR (1) KR102402442B1 (en)

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100946274B1 (en) * 2009-06-19 2010-03-09 공주대학교 산학협력단 Structural frame for intensity reinforcement of concrete structure

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR102004419B1 (en) * 2017-11-08 2019-07-26 포엠 주식회사 Structure for reinforcing column using V-shaped ties

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100946274B1 (en) * 2009-06-19 2010-03-09 공주대학교 산학협력단 Structural frame for intensity reinforcement of concrete structure

Also Published As

Publication number Publication date
KR20210047292A (en) 2021-04-29

Similar Documents

Publication Publication Date Title
KR100971736B1 (en) Shear reinforcement with dual anchorage function each up and down
CN103422677B (en) Reinforced concrete composite structure reinforcing bar binding construction method
CN108867859A (en) Prestressing force assembled beam-column node beam-ends latch closure stirrup construction and installation method
KR102402442B1 (en) Reinforced pre-assembly continuous v-tie construction method for reinforcement of new column and section enlargement reinforced column
CN113638487B (en) Staggered connection structure of local superposed beam and prefabricated column node steel bar and construction method thereof
KR101036915B1 (en) Structure for jointing reinforced concrete column and steel beam
KR20160057747A (en) Prestressed wale for temporary facility
KR20180101678A (en) Anchor bolt for wall form supporter
KR20200141567A (en) Reinforced pre-assembly continuous v-tie construction method for reinforcement of new column and section enlargement reinforced column
KR101428752B1 (en) Rebar details in RC Coupling Beam
JP3653691B2 (en) Seismic reinforcement method and structure for existing buildings
JP2019065462A (en) Reinforcement unit and reinforced concrete beam
KR102340570B1 (en) Reinforced pre-assembly unit method for enlarging and strengthening cross-section of column
JP3726665B2 (en) Lateral restraint bars for columnar concrete members and concrete members using the same
KR20060038665A (en) Shear reinforcement device arranged in the slab-column connection and the shear reinforcement structure using the device
JPH0747544Y2 (en) Shear reinforcement structure of reinforced concrete or steel reinforced concrete beams
JP7132767B2 (en) Beam reinforcement and its reinforcement method
JP5939707B2 (en) Reinforcement structure for beam-column joints
JP7506480B2 (en) Beam reinforcement and its arrangement method
KR101738556B1 (en) Construction method of foundation structure comprising cross bar
KR101039041B1 (en) Binding wire for fixing position of steel rod
JP2009144500A (en) Shearing reinforcement structure for column-beam joint part of uppermost story
KR102203621B1 (en) Hoop bar locking device
JP5095967B2 (en) Joint structure of column beam joint
JP2021085161A (en) Beam reinforcement and reinforcement arrangement method

Legal Events

Date Code Title Description
A107 Divisional application of patent
E902 Notification of reason for refusal
AMND Amendment
E601 Decision to refuse application
X091 Application refused [patent]
AMND Amendment
X701 Decision to grant (after re-examination)