JP7221073B2 - Main rope installation method and main rope with storage part - Google Patents

Main rope installation method and main rope with storage part Download PDF

Info

Publication number
JP7221073B2
JP7221073B2 JP2019022863A JP2019022863A JP7221073B2 JP 7221073 B2 JP7221073 B2 JP 7221073B2 JP 2019022863 A JP2019022863 A JP 2019022863A JP 2019022863 A JP2019022863 A JP 2019022863A JP 7221073 B2 JP7221073 B2 JP 7221073B2
Authority
JP
Japan
Prior art keywords
rope
master
roof
portions
ropes
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2019022863A
Other languages
Japanese (ja)
Other versions
JP2020133100A (en
Inventor
英貴 植月
和広 安部
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Toyota Housing Corp
Original Assignee
Toyota Housing Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Toyota Housing Corp filed Critical Toyota Housing Corp
Priority to JP2019022863A priority Critical patent/JP7221073B2/en
Publication of JP2020133100A publication Critical patent/JP2020133100A/en
Application granted granted Critical
Publication of JP7221073B2 publication Critical patent/JP7221073B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Emergency Lowering Means (AREA)

Description

本発明は、建物の屋根に親綱を設置する親綱設置方法と、屋根への設置に用いる親綱とに関するものである。 TECHNICAL FIELD The present invention relates to a method of installing a main rope on the roof of a building, and a main rope used for installation on the roof.

住宅等の建物を新築する際や、既存の建物についてメンテナンス作業を行う際に、作業者が屋根の上に登る場合がある。この場合、あらかじめ屋根に親綱を張っておき、作業者は、自身に装着した安全帯などを親綱に連結することで、梯子の昇降や屋根の上での作業について安全性を確保することができる。 When constructing a new building such as a house or performing maintenance work on an existing building, workers may climb onto the roof. In this case, a main rope should be stretched on the roof in advance, and the worker should secure the safety of climbing the ladder and working on the roof by connecting the safety belt he/she wears to the main rope. can be done.

屋根に親綱を設置する方法として、特許文献1には、屋根に2本の親綱を十字に張って設置する方法が開示されている。この方法では、まず先に一の親綱を屋根上に設置し、その後、その親綱に安全帯を接続して他の親綱を設置する作業を行う。この場合、他の親綱の設置に際しては、当該他の親綱を一の親綱に結ぶことにより接続する。この特許文献1の方法によれば、屋根に2本の親綱が交差して配置されるため、それら交差する各方向のいずれの方向に力が加わっても親綱がずれるのを抑制することができる。 As a method of installing a main rope on a roof, Patent Literature 1 discloses a method of installing two main ropes on the roof by stretching them crosswise. In this method, first, one main rope is installed on the roof, and then a safety belt is connected to the main rope and another main rope is installed. In this case, when installing another master rope, the other master rope is connected by tying it to one master rope. According to the method of Patent Document 1, since two master ropes are arranged to cross each other on the roof, it is possible to suppress the deviation of the master ropes even if a force is applied in any of the directions in which they intersect. can be done.

特開2002-013294号公報JP 2002-013294 A

ところで、上記特許文献1の方法では、他の親綱を一の親綱に接続する作業を屋根上に行わなければならないため、作業者は落下しないよう十分注意を払いながら接続作業を行う必要がある。そのため、設置作業が大変になると考えられる。 By the way, in the method of Patent Document 1, the work of connecting other master ropes to one master rope must be performed on the roof, so the worker must be careful not to fall when performing the connection work. be. Therefore, it is considered that the installation work becomes difficult.

そこで、2本の親綱をあらかじめ接続しておき、その接続された2本の親綱を屋根上に設置するようにすることが考えられる。この場合、2本の親綱を屋根に設置した後、2本の親綱が所定角度で交差して配置されるよう、いずれか一方の親綱を他方の親綱に対して移動させる作業が発生する。すなわち、一方の親綱において屋根から垂れ下がった部分を持って、当該一方の親綱を他方の親綱に対して移動させる作業が発生する。しかしながら、親綱は重量が大きいため、その移動作業には大きな困難を伴うことが考えられる。 Therefore, it is conceivable to connect two main ropes in advance and install the connected two main ropes on the roof. In this case, after installing the two main ropes on the roof, it is necessary to move one of the main ropes relative to the other so that the two main ropes are arranged to intersect at a predetermined angle. Occur. In other words, there is a need to hold a portion of one of the main ropes that hangs down from the roof and move the one main rope with respect to the other main rope. However, since the master rope is heavy, it is conceivable that the work of moving it would be accompanied by great difficulty.

本発明は、上記事情に鑑みてなされたものであり、複数の親綱を互いに交差する向きで屋根上に設置するに際し、その設置作業を好適に行うことを主たる目的とするものである。 SUMMARY OF THE INVENTION The present invention has been made in view of the above circumstances, and its main object is to facilitate the installation work when installing a plurality of master ropes on a roof in a direction that intersects each other.

上記課題を解決すべく、第1の発明の親綱設置方法は、複数本の親綱を有し、それら各親綱が接続されて接続部が形成されることにより、前記接続部を基端部とする少なくとも3本の綱部が形成された親綱複合体を建物の屋根の上に設置する親綱設置方法であって、前記各綱部のうち第1綱部については、その少なくとも一部がまとめ手段によりまとめられることで綱まとめ部とされており、前記親綱複合体について、前記接続部と前記綱まとめ部とを含む一部を前記屋根よりも低い位置から前記屋根の上に引き上げる親綱引き上げ工程と、前記綱まとめ部を前記屋根上に載せた状態で、前記第1綱部を、前記各綱部のうち前記第1綱部以外の第2綱部に対し所定角度をなす位置まで移動させる綱移動工程と、前記綱移動工程の後、前記第1綱部を前記接続部とは反対側に引っ張ることで前記綱まとめ部を展開させる綱展開工程と、を備えることを特徴とする。 In order to solve the above-mentioned problems, a first invention provides a master rope installation method, which has a plurality of master ropes and connects the respective master ropes to form a connecting portion, whereby the connecting portion is placed at the base end. A master rope installation method for installing on the roof of a building a master rope complex having at least three ropes formed as parts, wherein at least one of the first ropes among the ropes is A rope binding part is formed by binding parts together by binding means, and a part of the parent rope complex including the connection part and the rope binding part is placed on the roof from a position lower than the roof. a step of pulling up the main rope, and in a state where the rope binding portion is placed on the roof, the first rope portion is set at a predetermined angle with respect to the second rope portion other than the first rope portion among the respective rope portions. and a rope unfolding step of unfolding the rope tying portion by pulling the first rope portion to the side opposite to the connection portion after the rope moving step. Characterized by

本発明によれば、親綱同士が接続された親綱複合体について、その接続部を含む一部が屋根上に引き上げられるため、親綱同士の接続作業を屋根上で行う必要がない。また、親綱複合体の各綱部のうち第1綱部については、その少なくとも一部がまとめ手段によりまとめられることで綱まとめ部とされている。そして、親綱複合体の屋根上への引き上げに際しては、その綱まとめ部も屋根上に引き上げられる。この引き上げの後、綱まとめ部が屋根上に載せられた状態で、第1綱部がそれ以外の綱部(第2綱部)に対して所定角度をなす位置まで移動される。この場合、第1綱部の大部分を屋根上に載せたまま、第1綱部を移動させることができるため、第1綱部の自重により第1綱部の移動作業が困難になるのを抑制することができる。また、第1綱部の移動後は、第1綱部が接続部とは反対側に引っ張られることで綱まとめ部が展開される。これにより、第1綱部が接続部から延びた状態で、第2綱部に対して所定角度をなして設置される。よって、以上より、複数の親綱を互いに交差する向きで屋根上に設置するに際し、その設置作業を好適に行うことが可能となる。 According to the present invention, a part of the master rope complex, in which the master ropes are connected to each other, including the connecting portion, is pulled up on the roof, so there is no need to perform the work of connecting the master ropes to each other on the roof. Further, at least a part of the first rope among the ropes of the parent rope complex is put together by the binding means to form a rope binding portion. When the parent rope complex is pulled up onto the roof, the rope binding portion is also pulled up onto the roof. After this pulling up, the first rope portion is moved to a position forming a predetermined angle with respect to the other rope portions (second rope portion) while the rope binding portion is placed on the roof. In this case, the first rope can be moved while most of the first rope remains on the roof. can be suppressed. After the movement of the first rope portion, the rope binding portion is unfolded by pulling the first rope portion in the opposite direction to the connecting portion. As a result, the first rope extends from the connecting portion and is installed at a predetermined angle with respect to the second rope. Therefore, as described above, when a plurality of main ropes are installed on the roof in directions that intersect each other, it is possible to perform the installation work favorably.

第2の発明の親綱設置方法は、第1の発明において、前記親綱複合体は、前記親綱として、第1親綱と、その第1親綱の中間部に一端部が接続された第2親綱とを含んで構成されることで、前記第1親綱には2つの前記綱部が形成され、前記第2親綱には1つの前記綱部が形成されており、前記第1親綱の前記2つの綱部はそれぞれ前記第2綱部とされ、前記第2親綱の前記1つの綱部は前記第1綱部とされ、前記親綱引き上げ工程では、前記第1親綱が前記建物を挟んだ両側のうち一方側から他方側に至るように、前記親綱複合体の一部を前記屋根上に引き上げ、前記綱移動工程では、前記第2親綱を、前記第1親綱に対して所定角度をなす位置まで移動させることを特徴とする。 A method for installing a master rope according to a second invention is the method according to the first invention, wherein the master rope composite includes a first master rope as the master rope, and one end connected to an intermediate portion of the first master rope. Two rope parts are formed in the first parent rope, one rope part is formed in the second parent rope, and the second parent rope is configured to include the second parent rope. The two rope portions of one master rope are respectively defined as the second rope portion, the one rope portion of the second master rope is defined as the first rope portion, and in the step of pulling up the master rope, the first parent rope A part of the master rope complex is pulled up on the roof so that the rope extends from one side to the other side of both sides of the building, and in the rope moving step, the second master rope is moved to the second 1 It is characterized by moving to a position forming a predetermined angle with respect to the master rope.

本発明によれば、第1親綱が建物を挟んだ両側に跨がるよう屋根上において直線状に設置される。そして、その第1親綱に対して第2親綱(第1綱部)が所定角度をなすように移動され展開される。この場合、複数の親綱を互いに交差する向きで屋根上に設置するに際し、その設置作業をシンプルに実施することができる。 According to the present invention, the first master rope is installed linearly on the roof so as to straddle both sides of the building. Then, the second master rope (first rope portion) is moved and deployed so as to form a predetermined angle with respect to the first master rope. In this case, when installing a plurality of master ropes on the roof in directions that intersect each other, the installation work can be carried out simply.

第3の発明の親綱設置方法は、第1又は第2の発明において、前記綱移動工程では、前記第1綱部の先端部にパイロットラインの一端部を接続し、かつそのパイロットラインの他端側に操作棒を接続した状態で、当該操作棒を操作することで、前記第1綱部を前記第2綱部に対して所定角度をなす位置まで移動させることを特徴とする。 A third aspect of the invention provides a master rope installation method according to the first or second invention, wherein in the step of moving the rope, one end of a pilot line is connected to the tip of the first rope, and the other end of the pilot line It is characterized in that the first rope is moved to a position forming a predetermined angle with respect to the second rope by operating the operation rod with the operation rod connected to the end side.

本発明によれば、綱まとめ部を屋根上に載せたまま第1綱部を移動させる際、その第1綱部の先端部にパイロットラインを介して接続された操作棒を用いて移動させることができる。この場合、第1綱部の全体を屋根上に載せた状態で第1綱部を移動させることができるため、第1綱部の移動作業をし易くすることができる。 According to the present invention, when the first rope is moved while the rope binding portion is placed on the roof, the operation rod connected to the tip of the first rope through the pilot line is used to move the first rope. can be done. In this case, since the first rope can be moved while the entire first rope is placed on the roof, the work of moving the first rope can be facilitated.

また、第1綱部を持って当該第1綱部を移動させる際には、第1綱部が屋根の軒先等に引っ掛かって移動が困難になるおそれがあるが、上記の構成では、操作棒を用いてパイロットラインを軒先等から上方に離した状態で第1綱部を移動させることができる。そのため、その点においても、第1綱部の移動作業をし易くすることができる。 In addition, when moving the first rope while holding the first rope, there is a risk that the first rope may get caught on the eaves of the roof or the like, making it difficult to move. can be used to move the first rope with the pilot line separated upward from the eaves or the like. Therefore, in this respect as well, the work of moving the first rope can be facilitated.

第4の発明の親綱設置方法は、第1乃至第3のいずれかの発明において、前記まとめ手段は、前記第1綱部の少なくとも一部をまとめて前記綱まとめ部として収容する収容部であることを特徴とする。 A fourth aspect of the present invention is a master rope installation method according to any one of the first to third aspects, wherein the tying means is an accommodating portion that assembles at least a part of the first rope portion and accommodates it as the rope tying portion. characterized by being

本発明によれば、綱まとめ部が収容部に収容されるため、綱まとめ部を屋根上に引き上げる際、綱まとめ部が屋根の軒先等に引っ掛かって引き上げが困難になるのを抑制できる。 According to the present invention, since the rope tying portion is housed in the housing portion, when the tying portion is lifted onto the roof, it is possible to prevent the rope tying portion from being caught on the eaves of the roof and difficult to pull up.

第5の発明の親綱設置方法は、第4の発明において、前記収容部は、前記綱まとめ部を包む包み部を有しており、前記綱展開工程では、前記第1綱部を引っ張ることにより、前記包み部を開いて前記綱まとめ部を展開させることを特徴とする。 A method for installing a main rope according to a fifth aspect of the present invention is the method according to the fourth aspect, wherein the accommodating portion has a wrapping portion that wraps the rope binding portion, and in the step of unfolding the rope, the first rope portion is pulled. is characterized in that the wrapping part is opened and the rope binding part is deployed.

本発明によれば、綱まとめ部を包み部により包むことで収容部に収容することができる。これにより、綱まとめ部の収容作業を容易に行うことが可能となる。また、綱まとめ部を展開させる際には、第1綱部を引っ張ることで包み部を開き展開させることができる。これにより、綱まとめ部を包み部により包む構成にあって、綱まとめ部を展開させ易くすることができる。 According to the present invention, the tying portion can be accommodated in the accommodation portion by wrapping it with the wrapping portion. As a result, it becomes possible to easily perform the operation of accommodating the rope binding portion. Further, when deploying the rope bundling portion, the wrapping portion can be opened and deployed by pulling the first rope portion. Thus, in the configuration in which the rope binding portion is wrapped by the wrapping portion, the rope binding portion can be easily unfolded.

第6の発明の収容部付き親綱は、建物の屋根の上に設置されて用いられる親綱と、その親綱が前記屋根に設置される際に、当該親綱の少なくとも一部をまとめた状態で収容するための収容部と、を備えることを特徴とする。 The main rope with a storage section of the sixth invention is a main rope that is installed on the roof of a building and used, and at least a part of the main rope when the main rope is installed on the roof. and an accommodating portion for accommodating the state.

本発明の収容部付き親綱を用いて親綱複合体を構成すれば、上記第4の発明を実現することができる。 The fourth aspect of the present invention can be realized by constructing a master rope complex using the master rope with housing portion of the present invention.

第7の発明の親綱設置方法は、第6の発明において、前記収容部は、前記綱まとめ部を包む包み部を有し、前記包み部は、前記綱まとめ部を包んだ状態で、前記親綱が引っ張られることに基づき展開可能とされていることを特徴とする。 A main rope installation method of a seventh invention is, in the sixth invention, wherein the accommodation part has a wrapping part that wraps the rope binding part, and the wrapping part wraps the rope binding part, It is characterized in that it can be deployed based on the pulling of the main rope.

本発明の収容部付き親綱を用いて親綱複合体を構成すれば、上記第5の発明を実現することができる。 The fifth aspect of the present invention can be realized by constructing a master rope complex using the master rope with housing portion of the present invention.

(a)が親綱を設置した状態の建物を示す斜視図であり、(b)が平面図である。(a) is a perspective view showing a building with a main rope installed, and (b) is a plan view. パイロットライン設置工程を示す斜視図。The perspective view which shows a pilot line installation process. パイロットライン設置工程を示す斜視図。The perspective view which shows a pilot line installation process. 親綱接続工程を示す斜視図。The perspective view which shows a master rope connection process. 綱収容工程を示す斜視図。The perspective view which shows a rope accommodation process. (a)が収容部を示す正面図であり、(b)が収容部を展開した状態で示す展開図である。(a) is a front view showing an accommodating portion, and (b) is an exploded view showing an unfolded state of the accommodating portion. 親綱引き上げ工程を示す斜視図。The perspective view which shows a master rope pulling-up process. 綱移動工程を示す斜視図。The perspective view which shows a rope moving process. 綱展開工程を示す斜視図。The perspective view which shows a rope deployment process. アンカー接続工程を示す斜視図。The perspective view which shows an anchor connection process.

以下に、本発明を具体化した一実施の形態について図面を参照しつつ説明する。図1は、(a)が親綱を設置した状態の建物を示す斜視図であり、(b)が平面図である。 An embodiment embodying the present invention will be described below with reference to the drawings. FIG. 1 : (a) is a perspective view showing a building with a main rope installed, and (b) is a plan view.

図1(a)及び(b)に示すように、住宅等の建物10は、切り妻式の屋根11を備えている。屋根11は、平面視にて矩形形状をなしている。この屋根11の上には、複数の親綱21~23が接続されて構成される親綱複合体20が設置されている。親綱複合体20は、作業者が屋根11上で作業を行う際に用いられるものである。作業者が梯子15を昇ることで屋根11上に移動する場合、あらかじめ屋根11上に親綱複合体20を設置しておき、作業者は、自身に装着した安全帯等を親綱複合体20に連結した状態で梯子15の昇降作業や屋根11での作業を行う。 As shown in FIGS. 1(a) and 1(b), a building 10 such as a house has a gable roof 11. As shown in FIG. The roof 11 has a rectangular shape in plan view. On the roof 11 is installed a master rope complex 20 composed of a plurality of master ropes 21 to 23 connected together. The master rope complex 20 is used when a worker works on the roof 11 . When the worker moves onto the roof 11 by climbing the ladder 15, the master rope complex 20 is installed on the roof 11 in advance, and the worker wears a safety belt or the like on himself/herself and attaches it to the master rope complex 20. The work of ascending and descending the ladder 15 and the work on the roof 11 are performed in the state of being connected to the .

親綱複合体20は、複数本(具体的には3本)の親綱21~23を有し、それら各親綱21~23が互いに接続されることにより構成されている。各親綱21~23は、合成樹脂材料や金属材料などにより形成されたロープ等の線状部材であり、柔軟性を有している。各親綱21~23のうち、親綱21は、建物10を挟んだ両側のうち一方側から他方側へと屋根11の上を通ってかけられている。また、各親綱22,23は、その一端部が親綱21の中間部に接続されている。これら各親綱22,23はいずれも、親綱21に結ばれることで当該親綱21に接続されている。この場合、各親綱22,23は、親綱21に対して同じ位置で結ばれている。詳しくは、各親綱21~23はまとめて結ばれており、それによりそれら各親綱21~23が互いに接続された状態となっている。なお、各親綱21~23のうち、親綱21が第1親綱に相当し、親綱22,23が第2親綱に相当する。 The parent rope complex 20 has a plurality of (specifically, three) parent ropes 21 to 23, and is configured by connecting the parent ropes 21 to 23 with each other. Each of the master ropes 21 to 23 is a linear member such as a rope made of synthetic resin material, metal material, or the like, and has flexibility. Among the main ropes 21 to 23, the main rope 21 is hung over the roof 11 from one side to the other side of both sides of the building 10. - 特許庁One end of each of the master ropes 22 and 23 is connected to the intermediate portion of the master rope 21 . Both of these master ropes 22 and 23 are connected to the master rope 21 by being tied to the master rope 21 . In this case, the master ropes 22 and 23 are tied to the master rope 21 at the same position. Specifically, the master ropes 21 to 23 are tied together, thereby connecting the master ropes 21 to 23 to each other. Of the master ropes 21 to 23, the master rope 21 corresponds to the first master rope, and the master ropes 22 and 23 correspond to the second master ropes.

親綱複合体20では、各親綱21~23が接続されることにより接続部24が形成されているとともに、その接続部24を基端部とする複数の綱部25~28が形成されている。これら各綱部25~28のうち、綱部25は親綱21において接続部24から一端までの部分となっており、綱部26は親綱21において接続部24から他端までの部分となっている。また、綱部27は親綱22において接続部24から先端までの部分となっており、綱部28は親綱23において接続部から先端までの部分となっている。つまり、綱部27は親綱22全体により形成され、綱部28は親綱23全体により形成されている。なお、これら各綱部27,28にはそれぞれ綱部27,28を収容可能な収容部40が取り付けられているが、これら収容部40については後述することとする。 In the master rope complex 20, a connecting portion 24 is formed by connecting the respective master ropes 21 to 23, and a plurality of rope portions 25 to 28 having the connecting portion 24 as a base end are formed. there is Of these rope portions 25 to 28, the rope portion 25 is a portion from the connecting portion 24 to one end of the master rope 21, and the rope portion 26 is a portion from the connecting portion 24 to the other end of the master rope 21. ing. The rope portion 27 is a portion of the master rope 22 from the connection portion 24 to the tip, and the rope portion 28 is a portion of the master rope 23 from the connection portion to the tip. That is, the rope portion 27 is formed by the main rope 22 as a whole, and the rope portion 28 is formed by the main rope 23 as a whole. Each of the ropes 27 and 28 is provided with a housing 40 capable of housing the ropes 27 and 28, but the housing 40 will be described later.

接続部24は屋根11上に配置され、その接続部24からは各綱部25~28がそれぞれ屋根11よりも下方へ延びている。各綱部25~28はそれぞれ建物10の四方において屋根11下に垂れ下がっており、それら垂れ下がった各綱部25~28の先端部はそれぞれアンカー29に固定されている。アンカー29は、建物10の四方においてそれぞれ地面の上に設置されている。アンカー29は複数のタンク29aを有し、それら各タンク29aに水が充填されることで重量が増して地面等に固定されるようになっている。各アンカー29に対して各綱部25~28の先端部が接続されることで、各綱部25~28(換言すると各親綱21~23)がそれぞれ張った状態で親綱複合体20が屋根11上に設置されるようになっている。この場合、各綱部25~28が平面視にて接続部24から放射状に延びて90°間隔で配置されるようになっている。 The connecting portion 24 is arranged on the roof 11 , and each rope portion 25 to 28 extends downward from the roof 11 from the connecting portion 24 . Each of the ropes 25 to 28 hangs below the roof 11 in four directions of the building 10, and the ends of the hanging ropes 25 to 28 are fixed to anchors 29, respectively. Anchors 29 are installed on the ground in four directions of the building 10 respectively. The anchor 29 has a plurality of tanks 29a, and when each tank 29a is filled with water, the weight increases and the anchor 29 is fixed to the ground or the like. By connecting the tips of the ropes 25 to 28 to the anchors 29, the master rope complex 20 is formed while the ropes 25 to 28 (in other words, the master ropes 21 to 23) are stretched. It is designed to be installed on the roof 11 . In this case, the ropes 25 to 28 extend radially from the connecting portion 24 in plan view and are arranged at intervals of 90°.

次に、親綱複合体20を屋根11上に設置する親綱設置方法について説明する。 Next, a method of installing a master rope for installing the master rope complex 20 on the roof 11 will be described.

親綱複合体20を屋根11上に設置するに際しては、まず、パイロットライン設置工程を行う。図2及び図3は、パイロットライン設置工程を示す斜視図である。パイロット設置工程では、まず図2(a)に示すように、操作棒31の先端部にパイロットライン32の一端部を接続する作業を行う。 When installing the master rope complex 20 on the roof 11, first, a pilot line installation step is performed. FIG.2 and FIG.3 is a perspective view which shows a pilot line installation process. In the pilot installation step, first, as shown in FIG. 2(a), an operation of connecting one end of the pilot line 32 to the tip of the operating rod 31 is performed.

操作棒31は伸縮可能とされており、例えば筒状の棒本体を複数有して構成されている。この場合、操作棒31は、隣り合う棒本体のうち一方が他方の内部に収容されることで縮み、一方が他方の内部から引き出されることで伸びるようになっている。操作棒31は、最も伸ばした状態における長さが例えば7~15mとされており、これにより、操作棒31が地上にいる作業者により保持された状態で、操作棒31の先端部が屋根11において最も高い位置(本実施形態では棟)に届くようになっている。 The operating rod 31 is extendable, and is composed of, for example, a plurality of cylindrical rod bodies. In this case, the operating rod 31 contracts when one of the adjacent rod bodies is housed inside the other, and extends when one is pulled out from the other. The operating rod 31 has a length of, for example, 7 to 15 m in the most extended state, so that when the operating rod 31 is held by a worker on the ground, the tip of the operating rod 31 reaches the roof 11. , it reaches the highest position (ridge in this embodiment).

パイロットライン32は、合成樹脂材料や金属材料により形成されたワイヤ等の線状部材であり、柔軟性及び弾力性を有している。パイロットライン32は、親綱21~23に比べて軽量に形成されており、単位長さ当たりの重量が親綱21~23よりも小さくなっている。パイロットライン32は、建物10の側方において地面の上にトグロを巻いた状態で置かれている。また、パイロットライン32の他端部には、親綱21の一端部が粘着テープ等の接続材34により接続されている。但し、パイロットライン32及び親綱21を、地面上に設けた容器内に繰り出し可能な状態で収容するようにしてもよい。 The pilot line 32 is a linear member such as a wire made of synthetic resin material or metal material, and has flexibility and elasticity. The pilot line 32 is formed to be lighter than the master ropes 21-23, and has a smaller weight per unit length than the master ropes 21-23. The pilot line 32 is placed on the ground on the side of the building 10 in a coiled state. One end of the main rope 21 is connected to the other end of the pilot line 32 by a connecting material 34 such as an adhesive tape. However, the pilot line 32 and the master rope 21 may be accommodated in a container provided on the ground in a state in which they can be drawn out.

操作棒31の先端部にパイロットライン32の一端部を接続する際には、操作棒31を縮めた状態で作業を行う。具体的には、操作棒31の先端部にはフック31aが取り付けられており、そのフック31aにパイロットライン32の先端部に設けられたリング32aを引っ掛けることで接続を行う。パイロットライン32の接続後は、操作棒31を伸ばして伸長状態とする。 When connecting one end of the pilot line 32 to the tip of the operating rod 31, the operation is performed with the operating rod 31 contracted. Specifically, a hook 31a is attached to the tip of the operating rod 31, and a ring 32a provided at the tip of the pilot line 32 is hooked on the hook 31a to perform connection. After connecting the pilot line 32, the operating rod 31 is extended to be in an extended state.

続いて、図2(b)に示すように、操作棒31を操作することにより、パイロットライン32を建物10を挟んだ両側のうちの一方側(詳しくはパイロットライン32が置かれているライン設置側)から他方側に屋根11上を通して掛け渡す作業を行う。この作業では、作業者Hが操作棒31の基端側を持って建物10の上記一方側から上記他方側に建物10の周囲を通って移動しながら、パイロットライン32を屋根11上にかける作業を行う。 Subsequently, as shown in FIG. 2(b), by operating the operating rod 31, the pilot line 32 is placed on one side of the two sides of the building 10 (more specifically, the line installation on which the pilot line 32 is placed). side) to the other side through the roof 11. In this work, the operator H holds the base end side of the operating rod 31 and moves from the one side of the building 10 to the other side through the periphery of the building 10 while hanging the pilot line 32 on the roof 11. I do.

続いて、図3(a)に示すように、操作棒31を縮めて、その操作棒31の先端部からパイロットライン32を取り外す。つまり、操作棒31のフック31aからパイロットライン32のリング32aを取り外す。その後、図3(b)に示すように、建物10の上記他方側(ライン設置側とは反対側)にパイロットライン32を引き寄せる。これにより、パイロットライン32が屋根11上を通って建物10の上記一方側から上記他方側に至るよう屋根11上にかけられた状態となる。 Subsequently, as shown in FIG. 3( a ), the operating rod 31 is contracted and the pilot line 32 is removed from the tip of the operating rod 31 . That is, the ring 32 a of the pilot line 32 is removed from the hook 31 a of the operating rod 31 . After that, as shown in FIG. 3B, the pilot line 32 is drawn to the other side of the building 10 (the side opposite to the line installation side). As a result, the pilot line 32 is put on the roof 11 so as to pass over the roof 11 and extend from the one side of the building 10 to the other side.

次に、親綱接続工程を行う。図4は、親綱接続工程を示す斜視図である。 Next, a master rope connecting step is performed. FIG. 4 is a perspective view showing a master rope connecting step.

図4に示すように、親綱接続工程では、親綱21に各親綱22,23を結んで接続することで親綱複合体20を形成する。この場合、親綱21の中間部に各親綱22,23の一端部を接続する。これにより、それら各親綱21~23が接続された接続部24(結び目)が形成されるとともに、その接続部24を基端部とする各綱部25~28が形成される。また、それら各綱部25~28のうち、綱部26(親綱21)がパイロットライン32と接続された状態とされる。 As shown in FIG. 4 , in the master rope connecting step, the master rope complex 20 is formed by tying and connecting the master ropes 22 and 23 to the master rope 21 . In this case, one end of each of the master ropes 22 and 23 is connected to the intermediate portion of the master rope 21 . As a result, a connecting portion 24 (knot) is formed to which the master ropes 21 to 23 are connected, and rope portions 25 to 28 having the connecting portion 24 as a base end are formed. Of the ropes 25 to 28 , the rope 26 (master rope 21 ) is connected to the pilot line 32 .

なお、親綱接続工程は、必ずしも現場で行う必要はなく、例えば工場等であらかじめ行うようにしてもよい。つまり、工場等であらかじめ親綱複合体20を形成し、その親綱複合体20を現場に持ち込むようにしてもよい。 Note that the master rope connecting step does not necessarily have to be performed on site, and may be performed in advance at a factory or the like, for example. That is, the master rope complex 20 may be formed in advance in a factory or the like, and the master rope complex 20 may be brought to the site.

親綱複合体20の各綱部27,28(つまり各親綱22,23)にはそれぞれ綱部27,28の一部を収容可能な収容部40が取り付けられている。収容部40は、各綱部27,28において接続部24付近に取り付けられている。親綱接続工程を行った後は、これら各綱部27,28の一部をそれぞれ収容部40に収容する綱収容工程を行う。以下、この綱収容工程について図5及び図6を用いながら説明する。図5は、綱収容工程を示す斜視図である。図6は、(a)が収容部40を示す正面図であり、(b)が収容部40を展開した状態で示す展開図である。なお、図6(a)及び(b)では、便宜上、親綱22,23と、その親綱22,23に接続されるパイロットライン35,36とを二点鎖線で示している。また、綱部27を収容部40に収容する構成と綱部28を収容部40に収容する構成とはいずれも同じとなっているため、以下の説明では、それらの構成をまとめて説明する。 Each rope portion 27, 28 of the master rope complex 20 (that is, each master rope 22, 23) is attached with a housing portion 40 capable of housing a part of the rope portions 27, 28, respectively. The accommodation portion 40 is attached near the connection portion 24 on each of the rope portions 27 and 28 . After performing the master rope connecting step, a rope accommodating step of accommodating a part of each of the rope portions 27 and 28 in the accommodating portion 40 is performed. The rope accommodation process will be described below with reference to FIGS. 5 and 6. FIG. FIG. 5 is a perspective view showing the rope accommodation process. 6A is a front view showing the housing portion 40, and FIG. 6B is a developed view showing the housing portion 40 in a developed state. In FIGS. 6A and 6B, for the sake of convenience, the master ropes 22, 23 and the pilot lines 35, 36 connected to the master ropes 22, 23 are indicated by two-dot chain lines. In addition, since the configuration for accommodating the rope portion 27 in the accommodation portion 40 and the configuration for accommodating the rope portion 28 in the accommodation portion 40 are both the same, in the following description, these configurations will be collectively described.

図5に示すように、綱収容工程では、親綱複合体20の各綱部27,28について、その綱部27,28の一部、詳しくは綱部27,28の大部分をまとめた状態で収容部40に収容する作業を行う。この場合、綱部27,28において収容部40にまとめられた(収容された)部分は綱まとめ部27a,28aとされる。なお、収容部40がまとめ手段に相当する。また、各綱部25~28のうち、綱部27,28が第1綱部に相当し、綱部25,26が第2綱部に相当する。 As shown in FIG. 5, in the rope housing step, a part of the rope portions 27 and 28 of the parent rope complex 20, more specifically, most of the rope portions 27 and 28 are put together. , the work of storing in the storage unit 40 is performed. In this case, the portions of the rope portions 27 and 28 that are bundled (stored) in the housing portion 40 are rope binding portions 27a and 28a. In addition, the accommodating part 40 corresponds to a grouping means. Further, among the rope portions 25 to 28, the rope portions 27 and 28 correspond to the first rope portion, and the rope portions 25 and 26 correspond to the second rope portion.

収容部40は、図6(a)及び(b)に示すように、綱まとめ部27a,28aを包む包み部41と、綱部27,28に取り付けられた取付部42とを有する。包み部41は、布製又は樹脂製のシート材により形成されている。包み部41は、綱まとめ部27a,28aを囲む囲み部43と、その囲み部43の一方の開口を塞ぐ蓋部44とを有している。それら囲み部43及び蓋部44(つまり包み部41)は展開可能とされている。また、包み部41は、全体として有底の筒状をなしており、その軸線方向に延びている。 As shown in FIGS. 6A and 6B, the housing portion 40 has a wrapping portion 41 that wraps the rope binding portions 27a and 28a, and an attachment portion 42 that is attached to the rope portions 27 and 28. As shown in FIGS. The wrapping part 41 is formed of a sheet material made of cloth or resin. The wrapping portion 41 has an enclosing portion 43 surrounding the rope binding portions 27a and 28a, and a lid portion 44 closing one opening of the enclosing portion 43. As shown in FIG. The enclosing part 43 and the lid part 44 (that is, the wrapping part 41) are expandable. The wrapping portion 41 has a bottomed tubular shape as a whole and extends in the axial direction thereof.

囲み部43は、その囲み方向の両端側が面ファスナ47を用いて接合されている。面ファスナ47は、互いに接合可能な一対のファスナ部47a,47bを有し、それら各ファスナ部47a,47bが囲み部43における上記両端側にそれぞれ取り付けられている。これにより、それら各ファスナ部47a,47bの接合により、囲み部43の上記両端側が離着可能に接合されている。 The enclosing part 43 is joined using hook-and-loop fasteners 47 at both ends in the enclosing direction. The hook-and-loop fastener 47 has a pair of fastener portions 47a and 47b that can be joined to each other, and the fastener portions 47a and 47b are attached to the both ends of the surrounding portion 43, respectively. As a result, the both end sides of the surrounding portion 43 are joined detachably by joining the fastener portions 47a and 47b.

蓋部44は、囲み部43に面ファスナ48を用いて接合されている。蓋部44は、囲み部43の外面に重ねられる重ね部44aを有し、その重ね部44aが面ファスナ48を用いて囲み部43に接合されている。面ファスナ48は、互いに接合可能な一対のファスナ部48a,48bを有し、それら各ファスナ部48a,48bが蓋部44(重ね部44a)及び囲み部43にそれぞれ取り付けられている。これにより、それら各ファスナ部48a,48bの接合により、蓋部44(重ね部44a)が囲み部43に離着可能に接合されている。 The lid portion 44 is joined to the surrounding portion 43 using hook-and-loop fasteners 48 . The lid portion 44 has an overlapping portion 44 a that overlaps the outer surface of the enclosing portion 43 , and the overlapping portion 44 a is joined to the enclosing portion 43 using hook-and-loop fasteners 48 . The hook-and-loop fastener 48 has a pair of fastener portions 48a and 48b that can be joined together, and the fastener portions 48a and 48b are attached to the lid portion 44 (overlapping portion 44a) and the surrounding portion 43, respectively. As a result, the lid portion 44 (overlapping portion 44a) is detachably joined to the enclosing portion 43 by joining the fastener portions 48a and 48b.

取付部42は、囲み部43を挟んで蓋部44とは反対側に設けられ、囲み部43の他方の開口を塞ぐように配置されている。取付部42は、囲み部43とは反対側に延びる円錐状をなしており、囲み部43に対して取り付けられている。この場合、取付部42は、上記反対側に先細りした先細部とされている。また、取付部42は、例えば硬質樹脂等の滑り性の高い材料により形成されている。 The mounting portion 42 is provided on the opposite side of the lid portion 44 with the enclosing portion 43 interposed therebetween, and is arranged so as to close the other opening of the enclosing portion 43 . The attachment portion 42 has a conical shape extending in the opposite direction to the enclosing portion 43 and is attached to the enclosing portion 43 . In this case, the mounting portion 42 is tapered to the opposite side. Also, the mounting portion 42 is formed of a highly slippery material such as hard resin.

取付部42には、その先端部に綱部27,28を挿通させる挿通孔51が形成されている。取付部42は、この挿通孔51に綱部27,28を挿通した状態で当該綱部27,28に取り付けられている。この取付状態において、取付部42は、囲み部43に対して接続部24側に位置している。この場合、収容部40は、その先細部(取付部42)を接続部24に向けて綱部27,28に取り付けられている。 An insertion hole 51 through which the rope portions 27 and 28 are inserted is formed at the tip portion of the mounting portion 42 . The attachment portion 42 is attached to the rope portions 27 and 28 with the rope portions 27 and 28 inserted through the insertion hole 51 . In this attached state, the attachment portion 42 is located on the connection portion 24 side with respect to the enclosing portion 43 . In this case, the accommodation portion 40 is attached to the rope portions 27 and 28 with its tapered portion (attachment portion 42 ) directed toward the connection portion 24 .

綱収容工程では、綱部27,28において挿通孔51よりも先端側をまとめて綱まとめ部27a,28aとし、その綱まとめ部27a,28aを包み部41により包むことで当該綱まとめ部27a,28aを収容部40に収容する。包み部41により綱まとめ部27a,28aを包む際には、包み部41において囲み部43の両端側を面ファスナ47を用いて接合し、蓋部44を囲み部43に面ファスナ48を用いて接合する。また、綱まとめ部27a,28aを形成するに際し、本実施形態では、綱部27,28を収容部40の長手方向の両側で交互に折り返すことにより綱まとめ部27a,28aを形成する。 In the rope accommodating step, the rope tying portions 27a and 28a are formed by collectively forming the rope tying portions 27a and 28a on the tip end side of the insertion hole 51 in the rope portions 27 and 28, and the wrapping portion 41 wraps the rope tying portions 27a and 28a. 28 a is accommodated in the accommodation portion 40 . When the rope binding portions 27a and 28a are wrapped by the wrapping portion 41, both ends of the enclosing portion 43 are joined using the hook-and-loop fasteners 47 in the wrapping portion 41, and the lid portion 44 is attached to the enclosing portion 43 using the hook-and-loop fasteners 48. Join. In forming the rope binding portions 27a and 28a, in the present embodiment, the rope binding portions 27a and 28a are formed by alternately folding back the rope portions 27 and 28 on both sides of the housing portion 40 in the longitudinal direction.

なお、綱部27,28において綱まとめ部27a,28aよりも先端側の部分については蓋部44と囲み部43との隙間を通じて収容部40の外部に引き出す。また、綱収容工程は、必ずしも現場で行う必要はなく、例えば工場等であらかじめ行うようにしてもよい。 It should be noted that portions of the rope portions 27 and 28 closer to the leading end than the rope binding portions 27a and 28a are pulled out of the accommodation portion 40 through the gap between the lid portion 44 and the enclosing portion 43. As shown in FIG. Further, the rope accommodation process does not necessarily have to be carried out on site, and may be carried out in advance, for example, at a factory or the like.

綱収容工程の後、各綱部27,28の先端部にそれぞれパイロットライン35,36を粘着テープ等の接続材34を用いて接続する。これらのパイロットライン35,36は、先述したパイロットライン32と同じ構成であるためその説明を割愛する。 After the rope housing step, the pilot lines 35 and 36 are connected to the ends of the ropes 27 and 28, respectively, using a connecting material 34 such as an adhesive tape. Since these pilot lines 35 and 36 have the same configuration as the pilot line 32 described above, the description thereof is omitted.

次に、親綱引き上げ工程を行う。図7は、親綱引き上げ工程を示す斜視図である。 Next, the parent rope pulling process is performed. FIG. 7 is a perspective view showing the process of pulling up the master rope.

図7に示すように、親綱引き上げ工程では、屋根11にかけられているパイロットライン32について、親綱複合体20(詳しくは親綱21の綱部26)が接続されている側とは反対側となる先端側から基端側を手繰り寄せることで、親綱複合体20を屋根11上に引き上げる作業を行う。この工程では、親綱21が建物10を挟んだ両側のうち一方側から他方側に至るよう、親綱複合体20の一部を屋根11上に引き上げる。これにより、親綱21が屋根11上において平面視にて直線状に設置される。 As shown in FIG. 7, in the master rope pulling process, the pilot line 32 hung on the roof 11 is placed on the side opposite to the side to which the master rope complex 20 (specifically, the rope portion 26 of the master rope 21) is connected. The operation of pulling up the master rope complex 20 onto the roof 11 is performed by pulling the base end side from the leading end side. In this step, a part of the main rope complex 20 is pulled up on the roof 11 so that the main rope 21 extends from one side to the other of the two sides of the building 10 . As a result, the main rope 21 is installed linearly on the roof 11 in plan view.

また、親綱引き上げ工程では、親綱複合体20について、接続部24と、各収容部40に収容された綱まとめ部27a,28aとを含む一部が屋根11上に引き上げられる。この場合、親綱複合体20の各綱部27,28については、その全体が屋根11上に引き上げられる。そして、それら各綱部27,28に接続されたパイロットライン35,36が屋根11から垂れ下がった状態とされる。 In the master rope pulling step, a part of the master rope complex 20 including the connection portion 24 and the rope binding portions 27a and 28a housed in the respective housing portions 40 is pulled up onto the roof 11 . In this case, the entire rope portions 27 and 28 of the master rope complex 20 are pulled up onto the roof 11 . Pilot lines 35 and 36 connected to the ropes 27 and 28 hang down from the roof 11 .

次に、綱移動工程を行う。図8は、綱移動工程を示す斜視図である。 Next, a rope movement process is performed. FIG. 8 is a perspective view showing the rope moving process.

図8に示すように、綱移動工程では、綱まとめ部27a,28a(換言すると収容部40)を屋根11上に載せた状態で、綱部27,28を親綱21(綱部25,26)に対して平面視で所定角度をなす位置まで移動させる作業を行う。この作業は、各綱部27,28ごとに行われる。これら各綱部27,28の移動作業は基本的に同じ作業であるため、以下においては、綱部27の移動作業のみ説明する。 As shown in FIG. 8, in the rope moving process, the rope binding portions 27a and 28a (in other words, the housing portion 40) are placed on the roof 11, and the rope portions 27 and 28 are moved to the main rope 21 (rope portions 25 and 26). ) to a position forming a predetermined angle in plan view. This work is performed for each of the ropes 27 and 28 . Since the work for moving the ropes 27 and 28 is basically the same work, only the work for moving the rope 27 will be described below.

綱部27を移動させる際にはまず、綱部27に接続されたパイロットライン35の先端部に操作棒31を接続する。この接続は、操作棒31の先端部に設けられたフック31aにパイロットライン35のリング35aを引っ掛けることで行う。これにより、操作棒31に綱部27がパイロットライン35を介して接続される。 When moving the rope portion 27 , first, the operating rod 31 is connected to the tip of the pilot line 35 connected to the rope portion 27 . This connection is made by hooking the ring 35 a of the pilot line 35 on the hook 31 a provided at the tip of the operating rod 31 . Thereby, the rope portion 27 is connected to the operating rod 31 via the pilot line 35 .

次に、操作棒31を操作することで、綱部27を親綱21に対して所定角度(例えば約90°)をなす位置まで移動させる。この場合、作業者Hが操作棒31の基端側を持って建物10の周囲を通って移動しながら綱部27を移動させる。また、この際、作業者Hは建物10の出隅外側を経由して移動する。また、綱部27を移動させるに際しては、操作棒31によりパイロットライン35を屋根11から上方に持ち上げた(離した)状態で移動させる。 Next, by operating the operating rod 31 , the rope portion 27 is moved to a position forming a predetermined angle (for example, approximately 90°) with respect to the main rope 21 . In this case, the worker H moves the rope portion 27 while holding the base end side of the operating rod 31 and moving around the building 10 . Also, at this time, the worker H moves through the exterior corner of the building 10 . When moving the rope 27 , the pilot line 35 is lifted (separated) from the roof 11 by the operating rod 31 .

綱部27の移動作業が終了した後、同様の手順で、綱部28を親綱21に対し所定角度(例えば約90°)をなす位置まで移動させる。 After the work of moving the rope 27 is completed, the rope 28 is moved to a position forming a predetermined angle (for example, about 90°) with respect to the master rope 21 in the same procedure.

次に、綱展開工程を行う。図9は、綱展開工程を示す斜視図である。 Next, a rope development process is performed. FIG. 9 is a perspective view showing the rope unfolding process.

図9に示すように、綱展開工程では、綱部27,28を接続部24と反対側に引っ張ることで綱まとめ部27a,28aを展開させる作業を行う。この作業は、各綱部27,28ごとに行われる。これら各綱部27,28の展開作業は基本的に同じ作業であるため、以下においては、綱部27の展開作業のみ説明する。 As shown in FIG. 9, in the rope unfolding process, the rope tying parts 27a and 28a are unfolded by pulling the rope parts 27 and 28 to the opposite side of the connecting part 24. As shown in FIG. This work is performed for each of the ropes 27 and 28 . Since the operation of unfolding the ropes 27 and 28 is basically the same operation, only the operation of unfolding the rope 27 will be described below.

綱部27(綱まとめ部27a)を展開させる際には、操作棒31を操作して、綱部27をパイロットライン35を介して反接続部24側に引っ張る。この場合、綱部27を引っ張ることで、収容部40の包み部41が開き、当該収容部40から綱まとめ部27aが引き出され展開される。これにより、綱部27が全体として延びた状態となり、綱部27の一部が屋根11から垂れ下がった状態とされる。その後、綱部27からパイロットライン35及び操作棒31を取り外す。 When deploying the rope portion 27 (rope binding portion 27 a ), the operating rod 31 is operated to pull the rope portion 27 through the pilot line 35 to the side opposite to the connecting portion 24 . In this case, by pulling the rope portion 27, the wrapping portion 41 of the accommodation portion 40 is opened, and the rope binding portion 27a is pulled out from the accommodation portion 40 and deployed. As a result, the rope portion 27 is extended as a whole, and a portion of the rope portion 27 hangs down from the roof 11 . After that, the pilot line 35 and the operating rod 31 are removed from the rope portion 27 .

綱部27の展開作業が終了した後、同様の手順で、綱部28を展開させる。 After the operation of unfolding the rope portion 27 is completed, the rope portion 28 is unfolded in the same procedure.

なお、上述した綱移動工程では、各綱部27,28をそれぞれ移動させ、それから綱展開工程において各綱部27,28をそれぞれ展開させるようにしたが、これを変更して、例えばまず綱部27について綱移動工程及び綱展開工程を行い、その後、綱部28について綱移動工程及び綱展開工程を行うようにしてもよい。 In the above-described rope moving step, the ropes 27 and 28 are respectively moved, and then in the rope unfolding step, the ropes 27 and 28 are respectively deployed. 27 may be subjected to the rope moving process and the rope unfolding process, and then the rope part 28 may be subjected to the rope moving process and the rope unfolding process.

次に、アンカー接続工程を行う。図10は、アンカー接続工程を示す斜視図である。 Next, an anchor connection process is performed. FIG. 10 is a perspective view showing the anchor connection process.

図10に示すように、アンカー接続工程では、建物10の4方にアンカー29を設置し、それら各アンカー29に親綱複合体20の各綱部25~28を接続する作業を行う。これにより、親綱複合体20が各アンカー29に固定された状態で屋根11上に設置される。以上により、親綱複合体20の設置作業が終了する。 As shown in FIG. 10, in the anchor connection step, anchors 29 are installed on four sides of the building 10, and the ropes 25 to 28 of the master rope complex 20 are connected to each of the anchors 29. As shown in FIG. As a result, the master rope complex 20 is installed on the roof 11 while being fixed to each anchor 29 . By the above, the installation work of the master rope complex 20 is completed.

以上、詳述した本実施形態の構成によれば、以下の優れた効果が得られる。 According to the configuration of the present embodiment described in detail above, the following excellent effects are obtained.

親綱21~23同士が接続された親綱複合体20について、その接続部24を含む一部が屋根11上に引き上げられるため、親綱21~23同士の接続作業を屋根11上で行う必要がない。また、親綱複合体20の各綱部25~28のうち綱部27,28については、その一部が収容部40によりまとめられることで綱まとめ部27a,28aとされている。親綱複合体20の屋根11上への引き上げに際しては、それら綱まとめ部27a,28aも屋根11上に引き上げられる。この引き上げの後、綱まとめ部27a,28aが屋根11上に載せられた状態で、綱部27,28がそれ以外の綱部25,26(親綱21)に対して所定角度をなす位置まで移動される。この場合、綱部27,28の大部分を屋根11上に載せたまま、綱部27,28を移動させることができるため、綱部27,28の自重により綱部27,28の移動作業が困難になるのを抑制することができる。また、綱部27,28の移動後は、綱部27,28が接続部24とは反対側に引っ張られることで綱まとめ部27a,28aが展開される。これにより、綱部27,28が接続部24から延びた状態で、綱部25,26に対して所定角度をなして設置される。よって、以上より、複数の親綱21~23を互いに交差する向きで屋根11上に設置するに際し、その設置作業を好適に行うことが可能となる。 Part of the master rope complex 20, in which the master ropes 21 to 23 are connected to each other, including the connecting part 24 is pulled up on the roof 11, so it is necessary to perform the work of connecting the master ropes 21 to 23 on the roof 11. There is no Of the rope portions 25 to 28 of the parent rope complex 20, the rope portions 27 and 28 are partly put together by the storage portion 40 to form rope binding portions 27a and 28a. When the master rope complex 20 is pulled up onto the roof 11 , the rope binding portions 27 a and 28 a are also pulled up onto the roof 11 . After this lifting, with the rope binding portions 27a and 28a placed on the roof 11, the rope portions 27 and 28 form a predetermined angle with respect to the other rope portions 25 and 26 (main rope 21). be moved. In this case, since the ropes 27, 28 can be moved while most of the ropes 27, 28 are placed on the roof 11, the weight of the ropes 27, 28 makes it difficult to move the ropes 27, 28. You can prevent it from becoming difficult. After the rope portions 27 and 28 are moved, the rope binding portions 27a and 28a are unfolded by pulling the rope portions 27 and 28 to the opposite side of the connecting portion 24. As shown in FIG. As a result, the rope portions 27 and 28 are installed at a predetermined angle with respect to the rope portions 25 and 26 while extending from the connection portion 24 . Therefore, as described above, when installing the plurality of master ropes 21 to 23 on the roof 11 so as to intersect each other, the installation work can be performed favorably.

また、親綱引き上げ工程に際して、親綱21が建物10を挟んだ両側のうち一方側から他方側に至るよう、親綱複合体20の一部が屋根11上に引き上げられるため、親綱21が屋根11上において平面視にて直線状に設置される。そして、その親綱21に対して親綱22,23(綱部27,28)が所定角度をなすように移動され展開される。これにより、複数の親綱21~23を互いに交差する向きで屋根11上に設置するに際し、その設置作業をシンプルに実施することができる。 In addition, in the process of pulling up the main rope, a part of the main rope complex 20 is pulled up on the roof 11 so that the main rope 21 extends from one side to the other side of both sides of the building 10, so that the main rope 21 is It is installed linearly on the roof 11 in plan view. Then, the master ropes 22 and 23 (rope portions 27 and 28) are moved and unfolded so as to form a predetermined angle with respect to the master rope 21.例文帳に追加As a result, when the plurality of master ropes 21 to 23 are installed on the roof 11 so as to intersect each other, the installation work can be carried out simply.

綱移動工程に際しては、綱部27,28が、その先端部にパイロットライン35,36を介して接続された操作棒31の操作によって移動される。この場合、綱部27,28の全体を屋根11上に載せた状態で綱部27,28を移動させることができるため、綱部27,28の移動作業をし易くすることができる。 In the rope moving step, the ropes 27 and 28 are moved by operating the operating rod 31 connected to the tip thereof via pilot lines 35 and 36 . In this case, since the ropes 27 and 28 can be moved while the whole ropes 27 and 28 are placed on the roof 11, the work of moving the ropes 27 and 28 can be facilitated.

また、綱部27,28を持って当該綱部27,28を移動させる際には、綱部27,28が屋根11の軒先等に引っ掛かって移動が困難になるおそれがあるが、上記の構成によれば、操作棒31を用いてパイロットライン35,36を屋根11の軒先等から上方に離した状態で綱部27,28を移動させることができる。そのため、その点においても、綱部27,28の移動作業をし易くすることができる。 Also, when moving the ropes 27, 28 by holding the ropes 27, 28, the ropes 27, 28 may get caught on the eaves of the roof 11 or the like, making it difficult to move. , the ropes 27 and 28 can be moved in a state where the pilot lines 35 and 36 are separated from the eaves of the roof 11 or the like using the operating rod 31 . Therefore, in this respect as well, the work of moving the ropes 27 and 28 can be facilitated.

綱収容工程により、綱まとめ部27a,28aが収容部40に収容されるため、綱まとめ部27a,28aを屋根11上に引き上げる際、綱まとめ部27a,28aが屋根11の軒先等に引っ掛かって引き上げが困難になるのを抑制できる。 Since the rope tying portions 27a and 28a are housed in the housing portion 40 by the rope housing step, when the rope tying portions 27a and 28a are pulled up onto the roof 11, the rope tying portions 27a and 28a are caught by the eaves of the roof 11 and the like. Difficulty in lifting can be suppressed.

また、収容部40は、包み部41の軸線方向に長い形状を有しており、換言すると、収容部40を屋根11上に引き上げる際の引き上げ方向に長い形状を有している。この場合、収容部40(つまり綱まとめ部27a,28a)を屋根11に引き上げる際、収容部40が軒先等に引っ掛かるのを抑制することが可能となる。また、収容部40を上記引き上げ方向に長い形状とすることで、収容部40に柔軟性を持たせることができるため、その点でも収容部40の軒先等に対する引っ掛かりを抑制することが可能となる。 In addition, the accommodation portion 40 has a shape that is long in the axial direction of the wrapping portion 41 , in other words, it has a shape that is long in the lifting direction when the accommodation portion 40 is lifted onto the roof 11 . In this case, when the accommodation portion 40 (that is, the rope binding portions 27a and 28a) is pulled up to the roof 11, it is possible to prevent the accommodation portion 40 from being caught by the edge of the eaves or the like. In addition, by making the accommodating portion 40 long in the lifting direction, the accommodating portion 40 can be made flexible. .

また、収容部40に綱まとめ部27a,28aを収容するに際しては、綱部27,28の一部を収容部40の長手方向(換言すると収容部40の引き上げ方向)の両側で折り返すことで綱まとめ部27a,28aを形成した。この場合、収容部40に綱まとめ部27a,28aが収容された状態において、収容部40(及び綱まとめ部27a,28a)に柔軟性を持たせることができる。そのため、これによっても、収容部40の軒先等に対する引っ掛かりを抑制することが可能となる。 When the rope binding portions 27a and 28a are accommodated in the accommodation portion 40, part of the rope portions 27 and 28 are folded back on both sides in the longitudinal direction of the accommodation portion 40 (in other words, the direction in which the accommodation portion 40 is pulled up). Combined portions 27a and 28a are formed. In this case, when the rope binding portions 27a and 28a are accommodated in the holding portion 40, the holding portion 40 (and the rope binding portions 27a and 28a) can be made flexible. Therefore, this also makes it possible to prevent the accommodation portion 40 from being caught on the edge of the eaves or the like.

収容部40は綱まとめ部27a,28aを包む包み部41を有している。この場合、綱まとめ部27a,28aを包み部41により包むことで収容部40に収容することができる。これにより、綱まとめ部27a,28aの収容作業を容易に行うことが可能となる。また、綱まとめ部27a,28aを展開させる際には、綱部27,28を引っ張ることで包み部41を開き展開させることができる。これにより、綱まとめ部27a,28aを包み部41により包む構成にあって、綱まとめ部27a,28aを展開させ易くすることができる。 The housing portion 40 has a wrapping portion 41 that wraps the rope binding portions 27a and 28a. In this case, the rope binding portions 27 a and 28 a can be accommodated in the accommodating portion 40 by wrapping the wrapping portion 41 . This makes it possible to easily perform the work of accommodating the rope binding portions 27a and 28a. Further, when the rope binding portions 27a and 28a are deployed, the wrapping portion 41 can be opened and deployed by pulling the rope portions 27 and 28.例文帳に追加As a result, the rope binding portions 27a and 28a are wrapped by the wrapping portion 41, and the rope binding portions 27a and 28a can be easily deployed.

収容部40は、その接続部24側に、換言すると収容部40の引き上げ方向の先端側に、先細部としての取付部42を有している。このため、収容部40を屋根11に引き上げる際、収容部40の先端側が軒先等に引っ掛かりにくくなっている。 The accommodating portion 40 has a mounting portion 42 as a tapered portion on the connecting portion 24 side, in other words, on the tip end side of the accommodating portion 40 in the pulling direction. Therefore, when the accommodation portion 40 is pulled up to the roof 11, the tip side of the accommodation portion 40 is less likely to be caught by the edge of the eaves or the like.

本発明は上記実施形態に限らず、例えば次のように実施されてもよい。 The present invention is not limited to the above embodiments, and may be implemented as follows, for example.

・上記実施形態では、綱展開工程に際し、綱部27,28を引っ張ることで包み部41の囲み部43及び蓋部44がそれぞれ開くようにしたが、これに代えて、蓋部44のみ開くようにしてもよい。この場合にも、蓋部44が開くことで開口した開口部を通じて綱まとめ部27a,28aを引き出し展開させることが可能である。但し、綱まとめ部27a,28aをスムーズに展開させる上では、囲み部43及び蓋部44の両方が開くようにするのが望ましい。 - In the above-described embodiment, the enclosing portion 43 and the lid portion 44 of the wrapping portion 41 are opened by pulling the rope portions 27 and 28 in the step of unfolding the rope. can be In this case also, it is possible to pull out and deploy the rope binding portions 27a and 28a through the openings opened by opening the lid portion 44. As shown in FIG. However, it is desirable to open both the enclosing portion 43 and the lid portion 44 in order to smoothly unfold the rope binding portions 27a and 28a.

・上記実施形態では、綱移動工程に際し、綱部27,28の先端部にパイロットライン35,36を介して操作棒31を接続し、その操作棒31を用いて綱部27,28を移動させるようにしたが、これを変更してもよい。例えば、綱部27,28において収容部40よりも先端側を長くし、その長くした先端側の一部を屋根11から下方に垂れ下がるようにする。そして、その垂れ下がった綱部27,28の先端側を持って綱部27,28を移動させるようにすることが考えられる。この場合にも、綱まとめ部27a,28aを屋根11上に載せたまま綱部27,28を移動させることができるため、綱部27,28の自重により綱部27,28の移動作業が困難になるのを抑制することができる。 In the above embodiment, during the rope moving step, the operating rod 31 is connected to the tip of the ropes 27, 28 via the pilot lines 35, 36, and the ropes 27, 28 are moved using the operating rod 31. but you can change this. For example, the rope portions 27 and 28 are made longer than the accommodation portion 40 on the tip side, and a portion of the lengthened tip side hangs downward from the roof 11 . Then, it is conceivable to move the hanging rope portions 27 and 28 by holding the tip side of the hanging rope portions 27 and 28 . In this case as well, since the ropes 27, 28 can be moved while the rope binding portions 27a, 28a are placed on the roof 11, it is difficult to move the ropes 27, 28 due to the weight of the ropes 27, 28. can be prevented from becoming

・上記実施形態では、綱部27,28の一部をまとめるまとめ手段として収容部40を用いたが、まとめ手段としては必ずしも収容部40を用いる必要はない。例えば、まとめ手段として、綱部を巻き付け可能な巻付棒を用いてもよい、この場合、その巻付棒に綱部の一部を巻き付けることで綱まとめ部を形成することができる。また、まとめ手段として、綱部の一部を束ねる紐等の線状部材を用いてもよい。 - In the above-described embodiment, the accommodating portion 40 is used as the bundling means for assembling a part of the rope portions 27 and 28, but it is not always necessary to use the accommodating portion 40 as the bundling means. For example, a winding rod around which the rope can be wound may be used as the tying means. In this case, the rope tying portion can be formed by winding a part of the rope around the winding rod. Also, as the bundling means, a linear member such as a cord for bundling a part of the rope may be used.

・上記実施形態では、綱部27,28の一部を収容部40にまとめて収容して綱まとめ部27a,28aとしたが、綱部27,28の全部を収容部40に収容して綱まとめ部27a,28aとしてもよい。 In the above embodiment, part of the rope portions 27 and 28 are housed in the housing portion 40 to form the rope bundling portions 27a and 28a. The grouping portions 27a and 28a may be used.

・上記実施形態では、パイロットライン設置工程において、操作棒31を操作することによりパイロットライン32を屋根11にかけるようにしたが、例えばドローンやラジコンヘリコプタ等の飛行装置を用いてパイロットライン32を屋根11にかけるようにしてもよい。この場合、飛行装置にフックを設け、そのフックにパイロットライン32のリング32aを引っ掛けることで、パイロットライン32を飛行装置に接続する。そして、その接続状態で、作業者がコントローラを用いて飛行装置を操作することで、パイロットライン32を屋根11にかけるようにする。 In the above embodiment, the pilot line 32 is hung on the roof 11 by operating the operation rod 31 in the pilot line installation process. 11 may be applied. In this case, the pilot line 32 is connected to the flight device by providing a hook on the flight device and hooking the ring 32a of the pilot line 32 on the hook. In this connected state, the pilot line 32 is hung on the roof 11 by operating the flight device using the controller.

・上記実施形態では、親綱21の中間部に2本の親綱22,23の一端部を接続することで親綱複合体20を形成したが、親綱21(第1親綱に相当)の中間部に各親綱22,23のうちいずれか一の親綱(第2親綱に相当)の一端部を接続することで親綱複合体を形成してもよい。この場合、親綱複合体には、接続部を基端部とする3本の綱部が形成される。また、親綱21の中間部に3本以上の親綱(第2親綱に相当)の一端部を接続して親綱複合体を形成してもよい。この場合、親綱複合体に、接続部を基端部とする5本以上の綱部が形成される。 ・In the above embodiment, the master rope complex 20 is formed by connecting one end of the two master ropes 22 and 23 to the intermediate portion of the master rope 21, but the master rope 21 (corresponding to the first master rope) A master rope complex may be formed by connecting one end of one of the master ropes 22 and 23 (corresponding to the second master rope) to the intermediate part of the . In this case, the parent rope complex is formed with three rope portions having the connection portion as the base end. Also, one end of three or more master ropes (corresponding to the second master rope) may be connected to the intermediate portion of the master rope 21 to form a master rope complex. In this case, five or more ropes are formed in the parental rope complex, with the connection portion as the proximal end.

・例えば、2本の親綱を互いの中間部で接続することにより親綱複合体を形成するようにしてもよい。また、4本の親綱の一端部同士を接続することで親綱複合体を形成するようにしてもよい。これらの場合にも、上記実施形態の親綱複合体20と同様、親綱複合体には、接続部を基端部とする4本の綱部が形成される。 - For example, a parent rope complex may be formed by connecting two parent ropes at their intermediate portions. Alternatively, a parent rope complex may be formed by connecting one end portions of four parent ropes. In these cases, as in the parent rope complex 20 of the above-described embodiment, the parent rope complex is formed with four rope portions having the connecting portions as base ends.

・上記実施形態では、親綱22,23(綱部27,28)と親綱21(綱部25,26)とがなす角度は必ずしも90°である必要はなく、70°や80°等、他の角度としてもよい。また、親綱22と親綱21とがなす角度と、親綱23と親綱21とがなす角度とを異ならせてもよい。 ・In the above embodiment, the angle formed by the master ropes 22, 23 (rope portions 27, 28) and the master rope 21 (rope portions 25, 26) does not necessarily have to be 90°, Other angles are possible. Also, the angle formed by the master ropes 22 and 21 may be different from the angle formed by the master ropes 23 and 21 .

・上記実施形態では、切り妻式の屋根11に本発明の親綱設置方法を適用したが、寄せ棟式の屋根や片流れ式の屋根等に本発明の親綱設置方法を適用してもよい。 ・In the above-described embodiment, the method of installing the main rope of the present invention is applied to the gable roof 11, but the method of installing the main rope of the present invention may be applied to a hipped roof, a one-sided roof, or the like. .

10…建物、11…屋根、20…親綱複合体、21…第1親綱としての親綱、22…第2親綱としての親綱、23…第2親綱としての親綱、25…第2綱部としての綱部、26…第2綱部としての綱部、27…第1綱部としての綱部、27a…綱まとめ部、28…第1綱部としての綱部、28a…綱まとめ部、31…操作部、40…まとめ手段としての収容部、41…包み部。 10... Building 11... Roof 20... Parent rope complex 21... Parent rope as first parent rope 22... Parent rope as second parent rope 23... Parent rope as second parent rope 25... Rope part as the second rope part 26... Rope part as the second rope part 27... Rope part as the first rope part 27a... Rope binding part 28... Rope part as the first rope part 28a... Rope binding section 31 Operation section 40 Receiving section as binding means 41 Wrapping section.

Claims (5)

複数本の親綱を有し、それら各親綱が接続されて接続部が形成されることにより、前記接続部を基端部とする少なくとも3本の綱部が形成された親綱複合体を建物の屋根の上に設置する親綱設置方法であって、
前記親綱複合体は、前記親綱として、第1親綱と、その第1親綱の中間部に一端部が接続された第2親綱とを含んで構成されることで、前記第1親綱には2つの前記綱部が形成され、前記第2親綱には1つの前記綱部が形成されており、
前記第1親綱の前記2つの綱部はそれぞれ第2綱部とされ、前記第2親綱の前記1つの綱部は第1綱部とされ、
記第1綱部については、その少なくとも一部がまとめ手段によりまとめられることで綱まとめ部とされており、
前記第1親綱が前記建物を挟んだ両側のうち一方側から他方側に至るように、前記親綱複合体について、前記接続部と前記綱まとめ部とを含む一部を前記屋根よりも低い位置から前記屋根の上に引き上げる親綱引き上げ工程と、
前記綱まとめ部を前記屋根上に載せた状態で、前記第2親綱を、前記第1親綱に対し所定角度をなす位置まで移動させる綱移動工程と、
前記綱移動工程の後、前記第1綱部を前記接続部とは反対側に引っ張ることで前記綱まとめ部を展開させる綱展開工程と、
を備えることを特徴とする親綱設置方法。
A parent rope complex having a plurality of parent ropes, each of which is connected to form a connecting portion, thereby forming at least three rope portions having the connecting portions as base ends. A parent rope installation method for installation on the roof of a building,
The parent rope complex includes, as the parent rope, a first parent rope and a second parent rope having one end connected to an intermediate portion of the first parent rope. Two said rope portions are formed in the master rope, and one said rope portion is formed in said second master rope,
The two rope portions of the first master rope are each designated as a second rope portion, and the one rope portion of the second master rope is designated as a first rope portion,
At least a part of the first rope portion is put together by a binding means to form a binding portion,
A portion of the main rope complex including the connecting portion and the rope binding portion is lower than the roof so that the first main rope extends from one side to the other side of both sides of the building. A master rope lifting step of lifting from a position onto the roof;
A rope moving step of moving the second master rope to a position forming a predetermined angle with respect to the first master rope while the rope binding portion is placed on the roof;
After the rope moving step, a rope unfolding step of unfolding the rope tying portion by pulling the first rope portion in a direction opposite to the connecting portion;
A method for installing a parent rope, comprising:
前記綱移動工程では、前記第1綱部の先端部にパイロットラインの一端部を接続し、かつそのパイロットラインの他端側に操作棒を接続した状態で、当該操作棒を操作することで、前記第1綱部としての前記第2親綱を前記第1親綱に対して所定角度をなす位置まで移動させることを特徴とする請求項1に記載の親綱設置方法。 In the rope moving step, one end of a pilot line is connected to the tip of the first rope and an operation rod is connected to the other end of the pilot line, and the operation rod is operated to 2. The method of installing a master rope according to claim 1, wherein said second master rope as said first rope is moved to a position forming a predetermined angle with respect to said first rope . 前記まとめ手段は、前記第1綱部の少なくとも一部をまとめて前記綱まとめ部として収容する収容部であることを特徴とする請求項1又は2に記載の親綱設置方法。 3. The method of installing a master rope according to claim 1 , wherein the tying means is a storage section that stores at least part of the first rope section together as the rope tying section. 前記収容部は、前記綱まとめ部を包む包み部を有しており、
前記綱展開工程では、前記第1綱部を引っ張ることにより、前記包み部を開いて前記綱まとめ部を展開させることを特徴とする請求項に記載の親綱設置方法。
The accommodation part has a wrapping part that wraps the rope binding part,
4. The master rope installation method according to claim 3 , wherein in the rope deployment step, the first rope is pulled to open the wrapping portion and deploy the rope binding portion.
建物の屋根の上に設置されて用いられる親綱と、
その親綱が前記屋根に設置される際に、当該親綱の少なくとも一部をまとめた綱まとめ部を収容するための収容部と、
を備え、
前記収容部は、前記綱まとめ部を包む包み部を有し、
前記包み部は、前記綱まとめ部を包んだ状態で、前記親綱が引っ張られることに基づき展開可能とされていることを特徴とする収容部付き親綱。
A main rope installed and used on the roof of a building,
an accommodation unit for accommodating a rope binding unit that bundles at least a part of the main rope when the main rope is installed on the roof;
with
The accommodation part has a wrapping part that wraps the rope binding part,
A master rope with a housing portion, wherein the wrapping portion can be deployed by pulling the master rope in a state in which the rope binding portion is wrapped.
JP2019022863A 2019-02-12 2019-02-12 Main rope installation method and main rope with storage part Active JP7221073B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2019022863A JP7221073B2 (en) 2019-02-12 2019-02-12 Main rope installation method and main rope with storage part

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2019022863A JP7221073B2 (en) 2019-02-12 2019-02-12 Main rope installation method and main rope with storage part

Publications (2)

Publication Number Publication Date
JP2020133100A JP2020133100A (en) 2020-08-31
JP7221073B2 true JP7221073B2 (en) 2023-02-13

Family

ID=72262610

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2019022863A Active JP7221073B2 (en) 2019-02-12 2019-02-12 Main rope installation method and main rope with storage part

Country Status (1)

Country Link
JP (1) JP7221073B2 (en)

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2012122328A (en) 2010-05-25 2012-06-28 Fujii Denko Co Ltd Multiple-ring member, 8-shaped ring member and four-hole member
JP2016008434A (en) 2014-06-25 2016-01-18 トヨタホーム株式会社 Main rope installation method and operation bar for installing the main rope

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0562271U (en) * 1992-01-30 1993-08-20 前田建設工業株式会社 Master rope device for work in high places
JPH09250237A (en) * 1996-03-18 1997-09-22 Sekisui Chem Co Ltd Scaffold device for rooftop work and assembling method for scaffold device

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2012122328A (en) 2010-05-25 2012-06-28 Fujii Denko Co Ltd Multiple-ring member, 8-shaped ring member and four-hole member
JP2016008434A (en) 2014-06-25 2016-01-18 トヨタホーム株式会社 Main rope installation method and operation bar for installing the main rope

Also Published As

Publication number Publication date
JP2020133100A (en) 2020-08-31

Similar Documents

Publication Publication Date Title
EP3366429B1 (en) Lanyard attachment assembly
US20120060278A1 (en) Rope and Fastener Assembly
US9874039B2 (en) Sheet material fastener device
CA2869419C (en) Method of applying suspension fabric in a fall protection system
US9750962B2 (en) Fire protection curtain
US5704669A (en) Portable tree swing system
JP7221073B2 (en) Main rope installation method and main rope with storage part
US20140014150A1 (en) Retractable tarpaulin
JP6163139B2 (en) Master rope installation method and parent rope installation control rod
JP2016047985A (en) Installation method of work sheet and device used for this method
JP6321938B2 (en) Installation method of construction sheet and equipment used for this method
JP6924101B2 (en) Crawling prevention device for climbing plants
JPH11264252A (en) Curing sheet fitting structure
JP7202135B2 (en) How to install the main rope
JP4835929B2 (en) Installation method of steel tower scattering protection net
JP2008172858A (en) Tool for preventing fall of material
KR102255412B1 (en) Device for cabel installation and method for cable installation using the same
JP7490169B1 (en) Flight system and tether used therein
JP6683317B2 (en) Fall prevention device
JP4140852B2 (en) Cable lashing device
JP7447057B2 (en) seat folding aid
US20140270964A1 (en) Self-Expanding Protective Covering Structure
JP6105380B2 (en) Safety device for roof work
JP2020006861A (en) Curing tool of on-vehicle product and its use method
JP6404519B1 (en) Pollution prevention fence device

Legal Events

Date Code Title Description
A711 Notification of change in applicant

Free format text: JAPANESE INTERMEDIATE CODE: A711

Effective date: 20211006

A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20211021

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A821

Effective date: 20211006

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20220902

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20220906

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20221026

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20221108

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20221205

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20230110

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20230201

R150 Certificate of patent or registration of utility model

Ref document number: 7221073

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150