JP4835929B2 - Installation method of steel tower scattering protection net - Google Patents

Installation method of steel tower scattering protection net Download PDF

Info

Publication number
JP4835929B2
JP4835929B2 JP2006227804A JP2006227804A JP4835929B2 JP 4835929 B2 JP4835929 B2 JP 4835929B2 JP 2006227804 A JP2006227804 A JP 2006227804A JP 2006227804 A JP2006227804 A JP 2006227804A JP 4835929 B2 JP4835929 B2 JP 4835929B2
Authority
JP
Japan
Prior art keywords
protection net
tower
scattering
steel tower
net
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2006227804A
Other languages
Japanese (ja)
Other versions
JP2008050838A (en
Inventor
和浩 高石
義夫 田村
昇 志村
則之 高田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tokyo Electric Power Co Inc
Original Assignee
Tokyo Electric Power Co Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tokyo Electric Power Co Inc filed Critical Tokyo Electric Power Co Inc
Priority to JP2006227804A priority Critical patent/JP4835929B2/en
Publication of JP2008050838A publication Critical patent/JP2008050838A/en
Application granted granted Critical
Publication of JP4835929B2 publication Critical patent/JP4835929B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Details Or Accessories Of Spraying Plant Or Apparatus (AREA)

Description

本発明は、高層構造物である、例えば、架空送電線等の既設の鉄塔の周囲に、飛散防護ネットを張設するための鉄塔用飛散防護ネットの取付工法に関するものである。   The present invention relates to a method for attaching a scatter protection net for a steel tower for installing a scatter protection net around an existing steel tower such as an overhead power transmission line, which is a high-rise structure.

従来より、架空送電線等の鉄塔は、防錆のために定期的に刷毛塗り作業等によって塗装されている。   Conventionally, steel towers such as overhead power transmission lines have been regularly painted by brushing or the like to prevent rust.

このような鉄塔の塗装作業を行うに際し、図18乃至図31の作業手順に示されるように、鉄塔の周囲・外方へ塗料・ケレンカス等が飛散するのを防止するために、飛散防護ネット1が使用される。   When performing such a painting operation of the steel tower, as shown in the work procedure of FIGS. 18 to 31, in order to prevent the paint, the kerenkas and the like from scattering around and outside the steel tower, the splash protection net 1 Is used.

この飛散防護ネット1は、1重メッシュシート、あるいは、1重メッシュシートを2枚重ね合わせた2重メッシュシート等によって形成され、一辺の長さが、例えば、約6m程度以下と小サイズのものが使用されている。   The splash protection net 1 is formed of a single mesh sheet or a double mesh sheet obtained by superimposing two single mesh sheets, and the length of one side is small, for example, about 6 m or less. Is used.

そして、複数の飛散防護ネット1を構成するメッシュ同士は、なまし鉄線により結束している。   And the meshes which comprise the some scattering protection net | network 1 are bound with the annealing iron wire.

また、飛散防護ネット1の鉄塔への設置においては、事前に丸太やFRP製のパイプ、単管パイプ等を鉄塔材に固定しておく等して、鉄塔に飛散防護ネット1を張設するための仮設作業を行い、その仮設部に飛散防護ネット1を設置する工法が一般的である。   In addition, when installing the scatter protection net 1 on the steel tower, in order to stretch the scatter protection net 1 on the steel tower by fixing logs, FRP pipes, single pipe pipes, etc. to the steel tower material in advance. In general, the temporary work is performed, and the scattering protection net 1 is installed in the temporary part.

すなわち、この工法では、先ず、図28に示すように、FRP製単管パイプ等の資材を専用資材袋に収納し、この専用資材袋を、鉄塔内において荷揚げロープを使って荷揚げする。そして、この資材を鉄塔アーム部材になまし鉄線を使って結束する。また、資材同士の結束は、なまし鉄線やキャッチクランプを使用する。これと同時にアルミ製の足場板8を中間ステージの位置まで荷揚げし、なまし鉄線にて結束する。図18・図19には、中間ステージの足場板8の構成と、足場板8にFRP製パイプ材5を配設した構成が示されている。   That is, in this construction method, first, as shown in FIG. 28, materials such as FRP single pipe pipes are housed in a dedicated material bag, and the dedicated material bag is unloaded in a steel tower using a lifting rope. Then, this material is bound to a steel tower arm member using an annealed iron wire. Moreover, an annealed iron wire or a catch clamp is used for binding materials. At the same time, the aluminum scaffolding plate 8 is unloaded to the position of the intermediate stage and bound with an annealed iron wire. 18 and 19 show a configuration of the intermediate stage scaffold plate 8 and a configuration in which the FRP pipe material 5 is disposed on the scaffold plate 8.

飛散防護ネット1は、予め丸く束ねておき、鉄塔内で荷揚げロープを使って荷揚げした後、図20・図29に示すように、中間ステージより転落防止用の水平ガイドロープを介して鉄塔外側に引き出し、さらに荷揚げロープ7を使って鉄塔頂上まで荷揚げする。   As shown in FIGS. 20 and 29, the scattering protection net 1 is previously bundled in a round shape and unloaded using a lifting rope inside the tower, and then on the outer side of the tower through a horizontal guide rope for preventing the fall from the intermediate stage. Pull it out and use the unloading rope 7 to unload it to the top of the tower.

そして、図21・図22・図27・図31に示すように、飛散防護ネット1を展開して鉄塔および腕金の周囲全体に取り巻くようにしてから、飛散防護ネット1を各資材になまし鉄線を使って固縛する。このとき、強風等の悪天候が予想される場合には、作業員を各鉄塔アーム毎に配置し、例えば、養生シート固縛間隔を2m以内として、この飛散防護ネット1を固縛する。   Then, as shown in FIGS. 21, 22, 27, and 31, the scattering protection net 1 is expanded so as to surround the entire periphery of the steel tower and the armature, and then the scattering protection net 1 is annealed to each material. Secure with iron wire. At this time, when bad weather such as a strong wind is expected, an operator is arranged for each tower arm, and the scattering protection net 1 is secured by setting the curing sheet securing interval within 2 m, for example.

また、図23乃至図26は、鉄塔下部周囲に飛散防護ネット1を仮設する手順を示している。このとき、飛散防護ネット1の上端を鉄塔の外側から荷揚げロープ7を使って中間ステージ位置まで荷揚げして吊り下げた状態にしておき(図24参照)、この状態で飛散防護ネット1を横方向に展開した後(図25参照)、飛散防護ネット1を各資材になまし鉄線を使って固縛するのである(図26参照)。   Moreover, FIG. 23 thru | or FIG. 26 has shown the procedure which installs the scattering protection net | network 1 around a steel tower lower part periphery. At this time, the upper end of the scattering protection net 1 is unloaded from the outside of the tower to the intermediate stage position using the lifting rope 7 and is suspended (see FIG. 24). (See FIG. 25), the splash protection net 1 is secured to each material using an annealed iron wire (see FIG. 26).

この他、従来工法の他の例としては、例えば、特許文献1に開示されているものがある。この工法では、鉄塔の上部位置に、4つの主材からそれぞれ外方に突出する上突出棒が取り付けられ、他方、鉄塔の下端付近には各上突出棒の直下位置にそれぞれ下突出棒が取り付けられ、上下一対の突出棒間にそれぞれガイドロープ(合計4本)が緊張状態で張設される。   In addition, another example of the conventional construction method is disclosed in Patent Document 1, for example. In this method, an upper protruding bar that protrudes outward from each of the four main members is attached to the upper position of the steel tower, and on the other hand, a lower protruding bar is attached to a position directly below each upper protruding bar near the lower end of the steel tower. Each of the guide ropes (total of four) is stretched between the pair of upper and lower protruding bars.

また、防護ネットには、各ガイドロープに対応する4つの角部のそれぞれ上下2位置(合計8位置)にそれぞれガイド環を取り付け、この上下一対で4組のガイド環には、それぞれガイドロープを挿通させ、防護ネットは各ガイドロープに沿って上下動し得るようになっている。   In addition, a guide ring is attached to each of the four corners corresponding to each guide rope in the upper and lower positions (total 8 positions) on the protective net, and guide ropes are attached to the four guide rings in the upper and lower pairs. The protective net can be moved up and down along each guide rope.

昇降装置は、防護ネットを吊下げている吊下げロープと、該吊下げロープを巻取るウインチを使用している。各吊下げロープは、対向位置にある2本の上突出棒の先端部付近に取り付けた滑車に巻掛けし、その各一端を防護ネットの上部枠に固定すると共に、各他端側を地上まで垂下させてそれぞれウインチに巻取らせている。   The lifting device uses a suspension rope that suspends a protective net and a winch that winds the suspension rope. Each hanging rope is wrapped around a pulley attached near the tip of the two upper protruding rods at the opposite positions, and one end of each is fixed to the upper frame of the protective net, and the other end is extended to the ground. It is made to hang down and is wound around each winch.

こうして、鉄塔の最大外形部の外側を囲繞し得る大きさの筒状で、所定の高さ幅の単一の防護ネットで鉄塔の外側を囲繞した状態で、該防護ネットを塗装すべき高さに対応して上下動させながら順次塗装を行うものである。
特開2001−347203号公報
In this way, in a cylindrical shape of a size that can surround the outside of the maximum outer shape of the tower, the height of the protection net to be painted in a state where the outside of the tower is surrounded by a single protection net of a predetermined height and width. The coating is performed sequentially while moving up and down correspondingly.
JP 2001-347203 A

しかしながら、従来においては、飛散防護ネットは、1重メッシュシート、あるいは、メッシュシートを2枚重ね合わせた2重メッシュシート等を複数使用しており、複数のメッシュ同士の結束は、双方のメッシュ端部を丸めて絞りながら番線ロープ等で結束して接合しているため、鉄塔の最大外形部の外側を囲繞し得る大きさの飛散防護ネットを作るのに、1基当たり20人程度の作業員による労力が必要であった。   However, conventionally, the scattering protection net uses a single mesh sheet or a plurality of double mesh sheets in which two mesh sheets are overlapped. Because it is bound and joined with a wire rope etc. while rounding and narrowing the part, about 20 workers per unit to make a scattering protection net that can surround the outside of the maximum outer shape of the tower The effort by was needed.

また、架空送電線の鉄塔の場合、片側の回線においては電気を充電しての作業が求められていることから、従来においては、飛散防護ネットを鉄塔に固定する資材として電気絶縁性の高いFRP製によるパイプ材が多く使用されている。   Moreover, in the case of a steel tower of an overhead power transmission line, since work for charging electricity on one side of the line is required, conventionally, an FRP having high electrical insulation as a material for fixing the scattering protection net to the steel tower. Many pipe materials are used.

しかし、パイプ材の強度は決して強いものではなく、飛散防護ネットの自重と飛散防護ネットにかかる風圧による荷重を受け止めるために、大量のパイプ材を鉄塔上に設置する必要がある。   However, the strength of the pipe material is never strong, and it is necessary to install a large amount of pipe material on the steel tower in order to receive the load due to the weight of the scattering protection net and the wind pressure applied to the scattering protection net.

さらに、飛散防護ネット自体の強度、パイプ材、足場材等の強度の関係から、強風等の荒天時には一度設置した飛散防護ネットを毎日撤去しなければならないのが実状である。   In addition, due to the strength of the scattering protection net itself, the strength of the pipe material, scaffolding material, etc., the actual situation is that the scattering protection net once installed must be removed every day during stormy weather such as strong winds.

特に、飛散防護ネットは、FRP製によるパイプ材のみによって吊持されているため、パイプ材に荷重が集中してしまう。そして、パイプ材自体は、約140kg以上の曲げ荷重によって容易に破断してしまうのである。   In particular, since the splash protection net is suspended only by the pipe material made of FRP, the load is concentrated on the pipe material. And the pipe material itself is easily broken by a bending load of about 140 kg or more.

これは、パイプ材の下面が、略L字形に形成したアングル材の上端部による一点で支持されていることから、パイプ材の端部に荷重がかかると、パイプ材とアングル材が接している一点部分に荷重が集中してしまうため、パイプ材が容易に破断してしまうのである。   This is because the lower surface of the pipe material is supported at one point by the upper end portion of the angle material formed in a substantially L shape, so that when a load is applied to the end portion of the pipe material, the pipe material and the angle material are in contact with each other. Since the load is concentrated at one point, the pipe material is easily broken.

一方、特許文献1に示す工法においては、防護ネットは、各ガイドロープに対応する4つの角部のそれぞれ上下2位置(合計8位置)に取り付けられた4組のガイド環にそれぞれガイドロープを挿通させて、該防護ネットを昇降装置により各ガイドロープに沿って上下動し得るようになっているため、飛散防護ネットの事前準備作業が非常に面倒である。   On the other hand, in the construction method shown in Patent Document 1, the protection net is inserted into the four guide rings attached to the upper and lower two positions (eight positions in total) of the four corners corresponding to each guide rope. Thus, since the protective net can be moved up and down along the guide ropes by the lifting device, the preparatory work for the scattering protective net is very troublesome.

また、各吊下げロープは、対向位置にある2本の上突出棒の先端部付近に取り付けた滑車に巻掛けし、その各一端を防護ネットの上部枠に固定すると共に、各他端側を地上まで垂下させてそれぞれウインチに巻取らせているため、その強度は決して強いものではなく、飛散防護ネットにかかる風圧による荷重を充分に受け止めることが困難である。   In addition, each hanging rope is wound around a pulley attached near the tip of the two upper projecting rods at the opposite positions, and one end thereof is fixed to the upper frame of the protective net, and the other end side is Since it hangs down to the ground and is wound on each winch, its strength is never strong, and it is difficult to sufficiently receive the load due to wind pressure applied to the scattering protection net.

そこで、本発明は如上のような従来存した諸事情に鑑み創出されたもので、飛散防護ネットの設置・撤去作業の手間を削減し、また、FRP製パイプ材、FRP製足場等の鉄塔への設置数量を半減させることができ、一度鉄塔に張設した飛散防護ネットを下部に降ろすことなく施工することができると共に、飛散防護ネットにかかる風圧による荷重を充分に受け止めることができる鉄塔用飛散防護ネットの取付工法を提供することを目的とする。   Therefore, the present invention was created in view of the existing circumstances as described above, and reduces the labor of installation / removal work of the splash protection net, and also to steel towers such as FRP pipe materials and FRP scaffolds. The number of installations can be reduced by half, and the scattering protection net once stretched on the steel tower can be installed without lowering it, and it is possible to receive the load due to the wind pressure on the scattering protection net sufficiently. The purpose is to provide a method for mounting a protective net.

本発明は、鉄塔の塗装工事施工時に、該鉄塔を覆って外部への塗料・ケレンカス等の飛散を防止するための鉄塔用飛散防護ネットの取付工法であって、FRP製パイプ材を荷揚げし、中間ステージにおいて鉄塔の部材に対して略放射状、中間ステージより下段のステージにおいては角部におけるFRP製パイプ材同士を交差させるように配置して結束する工程と、鉄塔サイズに合わせて複数のメッシュシートの連結数を決定して組み合わせ、これらのメッシュシート同士を連結ロープで結束して飛散防護ネットを形成する工程と、この鉄塔サイズに調整されている飛散防護ネットを予め丸く束ねておき、鉄塔内において、荷揚げロープを使って飛散防護ネットを地上から鉄塔の中間ステージまで荷揚げした後、飛散防護ネットを中間ステージより鉄塔の外側に引き出し、さらに荷揚げロープを使って鉄塔の頂上まで荷揚げする工程と、鉄塔を囲繞するように飛散防護ネットを展開してから、飛散防護ネットの四方から外部に延出させた連結ロープを、前記FRP製パイプ材の上方において、所定の距離を保持して、鉄塔部材に直接固縛することにより、飛散防護ネットを塔体側に固縛する工程とを備え、前記飛散防護ネットによる荷重を鉄塔部材で受け止め、前記FRP製パイプ材の先端部で飛散防護ネットを鉄塔の外側に押し付けることにより飛散防護ネットと鉄塔との間の所定の距離を保持することで、上述した課題を解決した。 The present invention is a method of mounting a steel tower protection net for covering a steel tower and preventing the paint, kerenkas, etc. from scattering to the outside during the construction work of the steel tower , unloading the FRP pipe material, It is substantially radial to the steel tower members in the intermediate stage, and in the stage lower than the intermediate stage, the step of arranging and binding the FRP pipe materials at the corners to cross each other, and a plurality of mesh sheets according to the steel tower size Determine the number of connections and combine these mesh sheets together with a connecting rope to form a scattering protection net, and the scattering protection net adjusted to the size of this tower is previously bundled in a round shape. , After unloading the splash protection net from the ground to the intermediate stage of the tower using the unloading rope, The process of drawing out to the outside of the tower and then unloading it to the top of the tower using the unloading rope, and connecting the extension of the splash protection net to the outside after expanding the splash protection net to surround the tower Securing the scattering protection net to the tower body side by directly tying the rope to the steel tower member while maintaining a predetermined distance above the pipe material made of FRP, and by the scattering protection net a load received by the tower member, the scattering guard net at the distal end of the FRP pipe material by holding a predetermined distance between the scattering guard net and tower by pressing on the outside of the tower, the problems above mentioned Settled.

また、飛散防護ネットを作成する工程は、鉄塔サイズに略対応するように、縦幅が10mおよび横幅が約1.8mの第1シートと、縦幅が10mおよび横幅が3.6mの第2シートの2種類の飛散防護ネットを組み合わせるものであることで、同じく上述した課題を解決した。   In addition, the step of creating the splash protection net includes a first sheet having a vertical width of 10 m and a horizontal width of approximately 1.8 m, and a second sheet having a vertical width of 10 m and a horizontal width of 3.6 m so as to substantially correspond to the tower size. By combining two types of scattering protection nets for the sheet, the above-mentioned problem was solved.

加えて、荷揚げロープを使って鉄塔の腕金付近(中間ステージ)まで飛散防護ネットを荷揚げする工程と、腕金の上側においてFRP製パイプ材の先端に連繋した通し綱に、飛散防護ネットの端部から延出されている連結ロープを輪状に縛結した後、飛散防護ネットを通し綱に沿って塔体側から腕金の先端側に展開してからFRP製パイプ材に固縛する工程を含むことで、同じく上述した課題を解決した。 In addition, the steps of offloading a scattering guard net to near arm-pylons (intermediate stage) with the offloading rope, the through rope that tandem to the tip of Oite FRP pipe material on the upper side of the arm-scattering guard net After tying the connecting rope extending from the end of the ring in a ring shape, deploying it from the tower body side to the tip side of the brace along the rope through the splash protection net, and then securing to the FRP pipe material The problem mentioned above was solved by including.

また、鉄塔サイズに調整されている飛散防護ネットを予め丸く束ねておき、鉄塔外において、荷揚げロープを使って飛散防護ネットを地上から鉄塔の中間ステージまで荷揚げする工程と、塔体の周囲を囲繞するように飛散防護ネットを一面づつ展開してから、飛散防護ネットをFRP製単管パイプを介して固縛する工程を含むことで、同じく上述した課題を解決した。   In addition, the scattering protection net that has been adjusted to the size of the steel tower is bundled in advance, and the outside of the tower uses a lifting rope to unload the scattering protection net from the ground to the intermediate stage of the tower, and surrounds the tower body. The problem mentioned above was also solved by including the step of securing the scattering protection net through a single pipe pipe made of FRP after deploying the scattering protection net one by one.

本発明は、鉄塔の塗装工事施工時に、該鉄塔を覆って外部への塗料・ケレンカス等の飛散を防止するための鉄塔用飛散防護ネットの取付工法であって、飛散防護ネットの四方から外部に延出させた連結ロープを、鉄塔部材に直接固縛することから、飛散防護ネットの自重と、飛散防護ネットにかかる風圧による荷重を、鉄塔部材により充分に受け止めることができる。   The present invention is an installation method of a steel tower protection net for covering the steel tower and preventing the paint, kerenkas, etc. from scattering to the outside during the construction work of the steel tower. Since the extended connecting rope is directly secured to the steel tower member, the weight of the scattering protection net and the load due to the wind pressure applied to the scattering protection net can be sufficiently received by the steel tower member.

すなわち、本発明は、FRP製によるパイプ材を介して飛散防護ネットを鉄塔に固定するものではなく、飛散防護ネットの四方から外部に延出させた連結ロープを、鉄塔部材に直接固縛することから、飛散防護ネットにかかる種々の荷重を、鉄塔部材が充分に受け止めるのである。   That is, the present invention does not fix the scattering protection net to the steel tower via the pipe material made of FRP, but directly ties the connecting rope extending from the four sides of the scattering protection net to the steel tower member. Therefore, the steel tower member sufficiently receives various loads applied to the scattering protection net.

このように、本発明によれば、パイプ材のみにより飛散防護ネットを吊持する従来の手法において生じていた、パイプ材とアングル材が接している一点部分に荷重が集中してしまう事態を回避し、パイプ材の破断も防いでいるのである。   As described above, according to the present invention, the situation in which the load is concentrated on one point where the pipe material and the angle material are in contact with each other, which has occurred in the conventional method of suspending the scattering protection net only by the pipe material, is avoided. In addition, the pipe material is prevented from breaking.

一方、本発明は、鉄塔の塗装工事施工時に、該鉄塔を覆って外部への塗料・ケレンカス等の飛散を防止する鉄塔用飛散防護ネットの取付工法であって、鉄塔サイズに合わせて複数のメッシュシートの連結数を決定して組み合わせ、これらのメッシュシート同士を連結ロープで結束して飛散防護ネットを形成する工程と、この鉄塔サイズに調整されている飛散防護ネットを予め丸く束ねておき、鉄塔内において、荷揚げロープを使って飛散防護ネットを地上から鉄塔の中間ステージまで荷揚げした後、飛散防護ネットを中間ステージより鉄塔の外側に引き出し、さらに荷揚げロープを使って鉄塔の頂上まで荷揚げする工程と、鉄塔を囲繞するように飛散防護ネットを展開してから、飛散防護ネットを塔体側に固縛する工程と、から成ることから、鉄塔への飛散防護ネットの設置・取り外しを迅速に行うことができる。   On the other hand, the present invention is an installation method of a spill protection net for a steel tower that covers the steel tower and prevents the paint, kerenkas, etc. from scattering to the outside during the construction work of the steel tower, and includes a plurality of meshes according to the size of the steel tower. The number of sheets connected is determined and combined, and the mesh sheets are bound together with a connecting rope to form a splash protection net, and the splash protection net adjusted to this tower size is bundled in advance in a round shape. In the process, after unloading the splash protection net from the ground to the intermediate stage of the tower using the unloading rope, pulling the splash protection net from the intermediate stage to the outside of the tower, and then unloading to the top of the tower using the unloading rope; The process consists of the steps of deploying the scattering protection net so as to surround the steel tower and then securing the scattering protection net to the tower body side. The installation and removal of the scattering protection net to the tower can be performed quickly.

また、飛散防護ネットを塔体側に固縛する工程は、飛散防護ネットの四方から外部に延出させた連結ロープを、鉄塔部材に直接固縛するものであることから、飛散防護ネットの自重と、飛散防護ネットにかかる風圧による荷重を、鉄塔部材により充分に受け止めることができる。   In addition, the process of securing the scattering protection net to the tower side is to directly tie the connecting rope extended from the four sides of the scattering protection net to the steel tower member. The load due to the wind pressure applied to the scattering protection net can be sufficiently received by the steel tower member.

さらに、飛散防護ネットを作成する工程は、鉄塔サイズに略対応するように、縦幅が10mおよび横幅が約1.8mの第1シートと、縦幅が10mおよび横幅が3.6mの第2シートの2種類の飛散防護ネットを容易に作成できる。   Further, the step of creating the splash protection net includes a first sheet having a vertical width of 10 m and a horizontal width of approximately 1.8 m, and a second sheet having a vertical width of 10 m and a horizontal width of 3.6 m so as to substantially correspond to the tower size. Two types of splash protection nets can be easily created.

また、荷揚げロープを使って鉄塔の腕金付近(中間ステージ)まで飛散防護ネットを荷揚げする工程と、腕金の上側においてFRP製パイプ材の先端に連繋した通し綱に、飛散防護ネットの端部から延出されている連結ロープを輪状に縛結した後、飛散防護ネットを通し綱に沿って塔体側から腕金の先端側に展開してからFRP製パイプ材に固縛する工程を含むことから、鉄塔の腕金にも迅速に飛散防護ネットを設置できる。 Further, a step of unloading the scattering guard net to near arm-pylons (intermediate stage) with the offloading rope, the through rope that tandem to the tip of Oite FRP pipe material in the upper arm-, scattering guard net After the connecting rope extending from the end is tied in a ring shape, the process of unfolding from the tower body side to the tip side of the brace along the rope through the splash protection net and then securing to the FRP pipe material Because of this, a splash protection net can be quickly installed on the armature of the steel tower.

加えて、鉄塔サイズに調整されている飛散防護ネットを予め丸く束ねておき、鉄塔外において、荷揚げロープを使って飛散防護ネットを地上から鉄塔の中間ステージまで荷揚げする工程と、塔体の周囲を囲繞するように飛散防護ネットを一面づつ展開してから、飛散防護ネットをFRP製単管パイプを介して固縛する工程を含むことから、飛散防護ネットの連結ロープを鉄塔部材に直接固縛することと合わせて、より強固に飛散防護ネットを鉄塔に設置できる。   In addition, the scattering protection net that has been adjusted to the size of the steel tower is bundled in advance, and the process of unloading the scattering protection net from the ground to the intermediate stage of the steel tower using a lifting rope outside the tower, and around the tower body Since it includes the steps of deploying the splash protection net one side at a time and then securing the splash protection net through a single pipe made of FRP, the connection rope of the splash protection net is directly secured to the steel tower member. At the same time, the splash protection net can be installed more firmly on the steel tower.

このように、本発明によれば、飛散防護ネットの設置・撤去の手間を大幅に削減できる。   Thus, according to this invention, the effort of installation / removal of a scattering protection net | network can be reduced significantly.

また、基本的には、飛散防護ネットの四方から外部に延出させた連結ロープを、鉄塔部材に直接固縛し、飛散防護ネットにかかる種々の荷重を、鉄塔部材が充分に受け止めるので、FRP製パイプ材、FRP製足場等の鉄塔への設置数量を半減させることができる。   Basically, the connecting rope extended outside from the four sides of the splash protection net is directly secured to the steel tower member, and the steel tower member sufficiently receives various loads applied to the splash protection net. The number of pipes and FRP scaffolds installed on steel towers can be halved.

さらに、飛散防護ネットにかかる種々の荷重を、鉄塔部材が充分に受け止めるので、一度鉄塔に張設した飛散防護ネットを下部に降ろすことなく施工することが可能となる。   Furthermore, since the steel tower member sufficiently receives various loads applied to the scattering protection net, it is possible to perform the construction without lowering the scattering protection net once stretched on the steel tower.

以下に、本発明を実施するための最良の形態を、図面を参照して説明する。   The best mode for carrying out the present invention will be described below with reference to the drawings.

本発明に係る鉄塔用飛散防護ネット取付工法は、2重メッシュシートによって形成された飛散防護ネット1を使用している。この飛散防護ネット1は、塗料・ケレンカス等が通過しないように、メッシュの細かいものが採用されている。   The steel tower scattering protection net mounting method according to the present invention uses a scattering protection net 1 formed of a double mesh sheet. The scattering protection net 1 is made of a fine mesh so that paints, kerenkas and the like do not pass through.

そして、この飛散防護ネット1は、図1に示すように、鉄塔Pのサイズに略対応するように、縦幅が10mおよび横幅が約1.8mの矩形型の第1シート1a(図1(a)参照)と、高さ幅が10mおよび底辺幅が約1.8mの直角三角形型の第1シート1c(図1(b)参照)と、第1シート1aを2枚連設した縦幅が10mおよび横幅が3.6mの矩形型の第2シート1b(図1(c)参照)と、高さ幅が10mおよび底辺幅が3.6mの直角三角形型の第2シート1d(図1(d)参照)の大サイズによる4種類が用意されている。   As shown in FIG. 1, the scattering protection net 1 is a rectangular first sheet 1 a having a vertical width of 10 m and a horizontal width of approximately 1.8 m so as to substantially correspond to the size of the steel tower P (FIG. 1 ( a)), a vertical triangular first sheet 1c (see FIG. 1 (b)) having a height width of 10 m and a base width of about 1.8 m, and two first sheets 1a connected in series. Is a rectangular second sheet 1b (see FIG. 1C) having a width of 10 m and a lateral width of 3.6 m, and a right triangle type second sheet 1d having a height width of 10 m and a base width of 3.6 m (FIG. 1). Four types of large sizes (see (d)) are prepared.

このとき、直角三角形型の第1シート1c、第2シート1dのそれぞれは、略縦長台形状の鉄塔P下部における両サイドの傾斜形状に合わせるようにして形成されている。そして、鉄塔Pサイズ・形状に合わせて、養生ネットの連結数を決定し、これら4種類の2重メッシュシート同士を連結ロープ2(図3参照)で結束することで、飛散防護ネット1が形成される。   At this time, each of the first sheet 1c and the second sheet 1d having a right triangle shape is formed so as to match the inclined shapes on both sides in the lower part of the substantially tower-shaped steel tower P. Then, the number of curing nets is determined in accordance with the size and shape of the steel tower P, and these four types of double mesh sheets are bound together with a connecting rope 2 (see FIG. 3), thereby forming a scattering protection net 1. Is done.

具体的には、図2(a)に示すように、1枚の第1シート1aに対し3枚の第2シート1bを隣接するように配置して互いを連結ロープ2で連結したり、図2(b)に示すように、1枚の第1シート1aの隣に第2シート1bを配置したものを縦に並べて、これらを連結ロープ2で連結したりすることで、飛散防護ネット1全体が鉄塔Pのサイズに略対応するようにしている。このように飛散防護ネット1自体は、もとから大サイズに作製されているため、鉄塔上での連結作業において、作業員による労力が少なくて済むのである。   Specifically, as shown in FIG. 2A, three second sheets 1b are arranged adjacent to one first sheet 1a and connected to each other with a connecting rope 2, As shown in FIG. 2 (b), by arranging the second sheet 1b next to the first sheet 1a vertically and connecting them with the connecting rope 2, the entire scattering protection net 1 is arranged. Substantially corresponds to the size of the steel tower P. In this way, the scattering protection net 1 itself is manufactured in a large size from the beginning, and therefore, the labor by the worker can be reduced in the connecting work on the steel tower.

飛散防護ネット1における複数の2重メッシュシート同士の結束は、図3(a)・(b)に示すように、双方のシート端縁部に沿って設けた筒状の連結耳輪部3,4を介して行う。   As shown in FIGS. 3 (a) and 3 (b), the plurality of double mesh sheets in the scattering protection net 1 are bound together by cylindrical connecting ear rings 3 and 4 provided along both edge portions of the sheets. Do through.

すなわち、双方のシートにおいて、一方のシート端部の連結耳輪部3の間に、他方のシート端部の連結耳輪部4を嵌め合わせるようにして、連結耳輪部3,4を互い違いに配置する。そして、双方の連結耳輪部3,4に連結ロープ2を挿通して、双方のシートを結束している。   That is, in both the seats, the connecting ear ring portions 3 and 4 are alternately arranged so that the connecting ear ring portion 4 at the other sheet end portion is fitted between the connecting ear ring portions 3 at one sheet end portion. And the connection rope 2 is penetrated to both the connection ear ring parts 3 and 4, and both the sheets are bound.

また、相手方のシート端部が連結されない飛散防護ネット1の端部においては、連結耳輪部3(または4)に連結ロープ2を単に挿通させるだけである。   Further, the connecting rope 2 is simply inserted through the connecting ear ring 3 (or 4) at the end of the anti-scattering net 1 to which the other sheet end is not connected.

飛散防護ネット1を鉄塔Pの周囲に張設する、例えば、下部塔体養生に際し、図4に示すように、飛散防護ネット1上端から外部に延出させた連結ロープ2を、鉄塔Pの部材に直接固縛する。   The scattering protection net 1 is stretched around the steel tower P. For example, when the lower tower is cured, as shown in FIG. 4, the connecting rope 2 extended to the outside from the upper end of the scattering protection net 1 is connected to the steel tower P member. Secure directly to.

すなわち、飛散防護ネット1をFRP製パイプ材5により吊り下げて飛散防護ネット1を鉄塔Pに固定するのではなく、飛散防護ネット1の四方から延出している連結ロープ2を鉄塔P部材に直接固縛することから、飛散防護ネット1にかかる種々の荷重を、鉄塔P部材が充分に受け止めるのである。   That is, the scattering protection net 1 is not suspended by the FRP pipe material 5 and the scattering protection net 1 is fixed to the steel tower P, but the connecting rope 2 extending from the four sides of the scattering protection net 1 is directly attached to the steel tower P member. The steel tower P member sufficiently receives various loads applied to the scattering protection net 1 because it is secured.

その結果、飛散防護ネット1を吊り下げて保持するための連結ロープ2や、他のワイヤー部材等に加わる荷重を分散させ、FRP製パイプ材5等の資材にかかる荷重を軽減させている。   As a result, the load applied to the connecting rope 2 for suspending and holding the scattering protection net 1 and other wire members and the like are dispersed, and the load applied to the material such as the FRP pipe material 5 is reduced.

尚、図4に示す飛散防護ネット1の吊り下げ状態において、飛散防護ネット1にかかる種々の荷重は、鉄塔P部材が直接受け止めていることから、FRP製パイプ材5の先端部には、飛散防護ネット1を吊り下げるための荷重は何等作用していない。FRP製パイプ材5の先端部にかかる荷重は、飛散防護ネット1と鉄塔Pとの間の所定の距離を保持するために、飛散防護ネット1を鉄塔Pの外側に押し付けるだけのものである。   In the suspended state of the scattering protection net 1 shown in FIG. 4, various loads applied to the scattering protection net 1 are directly received by the steel tower P member. No load is applied to suspend the protective net 1. The load applied to the tip of the FRP pipe material 5 is only to press the scattering protection net 1 against the outside of the tower P in order to maintain a predetermined distance between the scattering protection net 1 and the tower P.

そして、図4に示す飛散防護ネット1の吊り下げ状態において、最も上に位置しているFRP製パイプ材5の先端部にかかる荷重を軽減するには、FRP製パイプ材5の上方において、所定の距離を保持して、飛散防護ネット1の連結ロープ2を鉄塔P部材に固縛するのが好ましいものとなる。   In order to reduce the load applied to the tip of the FRP pipe material 5 located at the top in the suspended state of the scattering protection net 1 shown in FIG. It is preferable that the connecting rope 2 of the scattering protection net 1 is secured to the steel tower P member while maintaining the above distance.

また、飛散防護ネット1の腕金Q部分の養生に際しては、図5に示すように、腕金Q上側の周囲毎に斜め外方に向けて固縛したFRP製パイプ材5の先端に連繋した通し綱(連結ロープ)6に、飛散防護ネット1の端部から延出されている連結ロープ2を連結する。そして、飛散防護ネット1自体は、腕金Qに対して上方が開口した袋状に張設配置される。   Further, when the armor Q portion of the splash protection net 1 is cured, as shown in FIG. 5, it is connected to the tip of the FRP pipe material 5 that is secured to the outer periphery of the armor Q on the upper side obliquely outward. The connecting rope 2 that extends from the end of the splash protection net 1 is connected to the thread rope (connecting rope) 6. The splash protection net 1 itself is stretched and arranged in a bag shape with the upper part opened with respect to the arm metal Q.

次に、以上のように構成された飛散防護ネット1の具体的な取付工法について説明する。    Next, a specific method of attaching the scattering protection net 1 configured as described above will be described.

先ず、FRP製単管パイプ材5を専用資材袋に収納し、この専用資材袋を、荷揚げロープ7を使って鉄塔P内で荷揚げする。このFRP製単管パイプ材5は、図6に示すように、中間ステージにおいては鉄塔Pの部材に対し略放射状に配置し、なまし鉄線やキャッチクランプを用いて結束する。   First, the FRP single-pipe pipe material 5 is stored in a dedicated material bag, and this dedicated material bag is unloaded in the steel tower P using the unloading rope 7. As shown in FIG. 6, the FRP single-pipe pipe material 5 is arranged substantially radially with respect to the members of the steel tower P in the intermediate stage, and is bound using an annealed iron wire or a catch clamp.

また、中間ステージより下段のステージにおいては、角部におけるFRP製単管パイプ材5同士を交差させるようにして配置し、なまし鉄線を用いて結束する。さらに、FRP製単管パイプ材5同士の結束も、なまし鉄線を用いる。   Further, in the stage below the intermediate stage, the FRP single-pipe pipe members 5 at the corners are arranged so as to intersect with each other and bundled using an annealed iron wire. Further, annealed iron wires are also used to bind the FRP single pipe materials 5 together.

これと同時に、アルミ製等の足場板8を中間ステージ位置まで荷揚げし、なまし鉄線を用いて結束する。また、鉄塔P上部における腕金(アーム)Qの上側前後箇所には、FRP製単管パイプ材5を配置し、なまし鉄線を用いて結束する。このFRP製単管パイプ材5同士には、四端から出たロープを固縛しておく。   At the same time, the scaffolding plate 8 made of aluminum or the like is unloaded to the intermediate stage position and bound using an annealed iron wire. Moreover, the FRP single-pipe pipe material 5 is arrange | positioned in the upper front and back location of the arm bracket (arm) Q in the steel tower P upper part, and it binds using an annealed iron wire. The ropes from the four ends are secured to the FRP single pipe materials 5.

(飛散防護ネットの作成)
飛散防護ネット1の作成に際しては、縦幅が10mおよび横幅が約1.8mの矩形型の第1シート1a(図1(a)参照)と、高さ幅が10mおよび底辺幅が約1.8mの直角三角形型の第1シート1c(図1(b)参照)と、縦幅が10mおよび横幅が3.6mの矩形型の第2シート1b(図1(c)参照)と、高さ幅が10mおよび底辺幅が3.6mの直角三角形型の第2シート1d(図1(d)参照)の大サイズによる4種類が用意されていることから、鉄塔Pのサイズ・形状に合わせて養生ネットの連結数を決定する。そして、これら4種類の2重メッシュシート同士を連結ロープ2で結束することで、飛散防護ネット1を形成しておく。
(Creation of splash protection net)
In creating the splash protection net 1, a rectangular first sheet 1a (see FIG. 1 (a)) having a vertical width of 10 m and a horizontal width of about 1.8 m, a height width of 10 m, and a base width of about 1.m. A first sheet 1c having a right triangle shape of 8 m (see FIG. 1B), a rectangular second sheet 1b having a length of 10 m and a width of 3.6 m (see FIG. 1C), and a height Four types of large-sized right triangle-shaped second sheet 1d (see FIG. 1 (d)) having a width of 10 m and a base width of 3.6 m are prepared, so that it matches the size and shape of the steel tower P. Determine the number of links in the curing net. Then, the scattering protection net 1 is formed by bundling these four types of double mesh sheets with the connecting rope 2.

この飛散防護ネット1における複数の2重メッシュシート同士の結束に際し、図3(a)・(b)に示すように、双方のシート端縁部に沿って設けた筒状の連結耳輪部3,4を介して行う。   When bundling a plurality of double mesh sheets in the scattering protection net 1, as shown in FIGS. 3 (a) and 3 (b), a cylindrical connecting ear ring part 3, provided along both edge parts of the sheet, 4 through.

すなわち、双方のシートにおいて、一方のシート端部の連結耳輪部3の間に、他方のシート端部の連結耳輪部4を嵌め合わせるようにして、連結耳輪部3,4を互い違いに配置する。そして、双方の連結耳輪部3,4に連結ロープ2を挿通して、双方のシートを結束する。このようにして、飛散防護ネット1全体は、鉄塔Pのサイズに略対応する大きさとなるように調整される。   That is, in both the seats, the connecting ear ring portions 3 and 4 are alternately arranged so that the connecting ear ring portion 4 at the other sheet end portion is fitted between the connecting ear ring portions 3 at one sheet end portion. Then, the connecting rope 2 is inserted into both the connecting ear ring portions 3 and 4 to bind both the sheets. In this way, the entire scattering protection net 1 is adjusted to have a size substantially corresponding to the size of the steel tower P.

(鉄塔の上部への仮設手順)
飛散防護ネット1の鉄塔Pの上部への仮設に際し、図7に示すように、飛散防護ネット1を予め丸く束ねておき、地上より鉄塔P内で荷揚げロープ7を使って中間ステージまで荷揚げする。その後、中間ステージより転落防止用の水平ガイドロープを介して鉄塔Pの外側に引き出し、さらに荷揚げロープ7を使って鉄塔Pの頂上まで荷揚げする。
(Temporary procedure at the top of the tower)
When the scattering protection net 1 is temporarily installed on the upper part of the steel tower P, as shown in FIG. 7, the scattering protection net 1 is previously bundled in a round shape and unloaded from the ground to the intermediate stage using the unloading rope 7 in the steel tower P. Thereafter, the steel sheet is pulled out from the intermediate stage to the outside of the steel tower P through a horizontal guide rope for preventing falling, and further unloaded to the top of the steel tower P using the unloading rope 7.

そして、図8・図9に示すように、塔体Pの周囲を囲繞するように飛散防護ネット1を展開してから、飛散防護ネット1をFRP製単管パイプ材5になまし鉄線を用いて固縛する。   Then, as shown in FIG. 8 and FIG. 9, after the scattering protection net 1 is expanded so as to surround the tower P, the scattering protection net 1 is used for the FRP single pipe material 5 using an annealed iron wire. And tie up.

(鉄塔の腕金への仮設手順)
飛散防護ネット1の鉄塔Pの上側における腕金Qへの仮設に際し、図10に示すように、荷揚げロープ7を使って腕金Q付近まで飛散防護ネット1を荷揚げする。
(Temporary procedure for tower metallurgy)
At the time of temporary installation to the arm metal Q on the upper side of the steel tower P of the anti-scattering net 1, the anti-scattering net 1 is unloaded to the vicinity of the arm metal Q using the unloading rope 7, as shown in FIG.

その後、図11に示すように、腕金Q上側の周囲毎に斜め外方に向けて固縛したFRP製パイプ材5の先端に連繋した通し綱6に、飛散防護ネット1の端部から延出されている連結ロープ2を輪状に連結する。そして、飛散防護ネット1を通し綱6に沿って塔体側から腕金Qの先端側に展開してから、FRP製パイプ材5になまし鉄線を用いて固縛する。こうして、図12示すように、飛散防護ネット1自体は、腕金Qに対して上方が開口した袋状に張設配置される。   After that, as shown in FIG. 11, it extends from the end of the scattering protection net 1 to the threading rope 6 connected to the tip of the FRP pipe material 5 that is slanted outwardly around the upper side of the arm metal Q. The connected connecting rope 2 is connected in a ring shape. Then, after spreading from the tower body side to the tip end side of the arm metal Q along the rope 6 through the splash protection net 1, the FRP pipe material 5 is secured with an annealed iron wire. In this way, as shown in FIG. 12, the scattering protection net 1 itself is stretched and arranged in a bag shape whose upper side is open with respect to the arm metal Q.

(鉄塔の下部への仮設手順)
飛散防護ネット1の鉄塔Pの下部への仮設に際し、図13示すように、鉄塔Pのサイズに調整されている飛散防護ネット1を予め丸く束ねておき、鉄塔Pの外側で荷揚げロープ7を使って地上から中間ステージまで荷揚げする。
(Temporary procedure at the bottom of the tower)
At the time of temporary installation of the scattering protection net 1 to the lower part of the steel tower P, as shown in FIG. 13, the scattering protection net 1 adjusted to the size of the steel tower P is preliminarily bundled, and the unloading rope 7 is used outside the steel tower P. Unload from the ground to the intermediate stage.

その後、図14示すように、鉄塔Pの周囲を囲繞するように飛散防護ネット1を一面づつ展開してから、飛散防護ネット1をFRP製単管パイプ材5になまし鉄線を用いて固縛する。このとき、図4に示すように、飛散防護ネット1の四端から外部に延出させた連結ロープ2を、鉄塔Pの部材に直接固縛する。   Thereafter, as shown in FIG. 14, the scattering protection net 1 is developed one by one so as to surround the periphery of the steel tower P, and then the scattering protection net 1 is secured to the FRP single-pipe pipe material 5 using an annealed iron wire. To do. At this time, as shown in FIG. 4, the connecting rope 2 extended outward from the four ends of the scattering protection net 1 is directly secured to the member of the steel tower P.

この鉄塔Pの下部への仮設および腕金を含む鉄塔Pの上部においては、塔体自体の横幅および周囲の長さが大きいため、図15乃至図17に示すように、鉄塔Pに合わせて飛散防護ネット1を何回かに分けて揚げてから、面毎に養生すれば良い。   In the upper part of the steel tower P including the temporary structure at the lower part of the steel tower P and the armature, the horizontal width and the peripheral length of the tower body itself are large, so that they are scattered in accordance with the steel tower P as shown in FIGS. The protective net 1 may be fried in several times and then cured for each surface.

本実施の形態における鉄塔用飛散防護ネットの取付工法は、架空送電線等の既設の鉄塔Pの周囲に飛散防護ネット1を張設する他に、鉄塔P以外の種々の高層建造物に対しても幅広く利用できるものである。   The method of attaching the steel tower scattering protection net in this embodiment is not limited to the construction of the scattering protection net 1 around the existing steel tower P such as an overhead power transmission line, but also to various high-rise buildings other than the steel tower P. Can also be used widely.

飛散防護ネットの一例を示すもので、(a)は幅狭矩形型の第1シートの平面図、(b)は幅狭三角型の第1シートの平面図、(c)は幅広矩形型の第2シートの平面図、(d)は幅広三角型の第2シートの平面図である。It shows an example of a splash protection net, (a) is a plan view of a first sheet of a narrow rectangular type, (b) is a plan view of a first sheet of a narrow triangular type, (c) is a wide rectangular type The top view of a 2nd sheet | seat, (d) is a top view of the 2nd sheet | seat of a wide triangle type. 矩形型の養生ネットの連結数の具体例を示し、(a)は1つの第1シートと3つの第2シートを横に連結した構成の平面図、(b)は第1シートと第2シートを横に連結した2つを縦方向に連結した構成の平面図である。The specific example of the connection number of a rectangular-shaped curing net is shown, (a) is a top view of the structure which connected one 1st sheet | seat and three 2nd sheet | seats horizontally, (b) is a 1st sheet | seat and a 2nd sheet | seat. It is a top view of the structure which connected two which connected horizontally to the vertical direction. 飛散防護ネットの各シート同士の連結状態の一例を示すもので、(a)は連結部分の平面図、(b)は連結部分を拡大した斜視図である。An example of the connection state of each sheet | seat of a scattering protection net | network is shown, (a) is a top view of a connection part, (b) is the perspective view which expanded the connection part. 飛散防護ネットの塔体の固定方法の一例を示す正面図である。It is a front view which shows an example of the fixing method of the tower body of a scattering protection net | network. 飛散防護ネットの腕金養生の一例を示すもので、(a)は腕金に連結ロープを配した状態の斜視図、(b)は連結ロープを介して飛散防護ネットを配した状態の斜視図である。It shows an example of the armature curing of the splash protection net, (a) is a perspective view of a state in which a connection rope is arranged on the armrest, (b) is a perspective view of a state in which the splash protection net is arranged through the connection rope It is. 鉄塔に中間ステージ等を仮設した状態を示す正面図である。It is a front view which shows the state which temporarily installed the intermediate stage etc. in the steel tower. 飛散防護ネットの鉄塔の上部への仮設手順を示す正面図である。It is a front view which shows the temporary procedure to the upper part of the steel tower of a scattering protection net | network. 同じく鉄塔の上部への仮設手順を示す正面図である。It is a front view which similarly shows the temporary procedure to the upper part of a steel tower. 同じく鉄塔の上部への仮設手順を示す正面図である。It is a front view which similarly shows the temporary procedure to the upper part of a steel tower. 飛散防護ネットの鉄塔の腕金への仮設手順を示す正面図である。It is a front view which shows the temporary procedure to the armrest of the steel tower of a scattering protection net | network. 同じく鉄塔の腕金への仮設手順を示す正面図である。It is a front view which similarly shows the temporary procedure to the armrest of a steel tower. 同じく鉄塔の腕金への仮設手順を示す正面図である。It is a front view which similarly shows the temporary procedure to the armrest of a steel tower. 飛散防護ネットの鉄塔の下部への仮設手順を示す正面図である。It is a front view which shows the temporary procedure to the lower part of the steel tower of a scattering protection net | network. 同じく鉄塔の下部への仮設手順を示す正面図である。It is a front view which similarly shows the temporary procedure to the lower part of a steel tower. 同じく鉄塔の下部への仮設手順を示す正面図である。It is a front view which similarly shows the temporary procedure to the lower part of a steel tower. 同じく鉄塔の下部への仮設手順を示す正面図である。It is a front view which similarly shows the temporary procedure to the lower part of a steel tower. 飛散防護ネットを、鉄塔の上部および鉄塔の腕金の横半分、鉄塔の下部の全周囲に張設した状態の正面図である。It is a front view of the state which spread | stretched the scattering protection net | network over the perimeter of the upper part of a steel tower, the horizontal half of the armature of a steel tower, and the lower part of a steel tower. 従来例において、FRP製単管パイプ・足場等の資材を鉄塔に配置させた状態の正面図である。In a prior art example, it is a front view of the state which has arrange | positioned materials, such as a FRP single pipe pipe and scaffolding, to the steel tower. 同じく中間ステージにおける足場周辺の構成を示す正面図である。It is a front view which similarly shows the structure around the scaffolding in an intermediate stage. 従来例における飛散防護ネットの鉄塔の上部への仮設手順を示す正面図である。It is a front view which shows the temporary procedure to the upper part of the steel tower of the scattering protection net | network in a prior art example. 同じく従来例における飛散防護ネットの鉄塔の上部への仮設手順を示す正面図である。It is a front view which shows the temporary procedure similarly to the upper part of the steel tower of the scattering protection net in a conventional example. 同じく従来例における飛散防護ネットの鉄塔の上部への仮設手順を示す正面図である。It is a front view which shows the temporary procedure similarly to the upper part of the steel tower of the scattering protection net in a conventional example. 従来例における飛散防護ネットの鉄塔の下部への仮設手順を示す正面図である。It is a front view which shows the temporary procedure to the lower part of the steel tower of the scattering protection net | network in a prior art example. 同じく従来例における飛散防護ネットの鉄塔の下部への仮設手順を示す正面図である。It is a front view which shows the temporary procedure to the lower part of the steel tower of the scattering protection net in a conventional example. 同じく従来例における飛散防護ネットの鉄塔の下部への仮設手順を示す正面図である。It is a front view which shows the temporary procedure to the lower part of the steel tower of the scattering protection net in a conventional example. 同じく従来例における飛散防護ネットの鉄塔の下部への仮設手順を示す正面図である。It is a front view which shows the temporary procedure to the lower part of the steel tower of the scattering protection net in a conventional example. 従来例における飛散防護ネットの鉄塔の上部における略半分と鉄塔の下部全体の仮設状態を示す正面図である。It is a front view which shows the temporary state of the substantially half in the upper part of the steel tower of the scattering protection net | network in a prior art example, and the whole lower part of a steel tower. 従来例における鉄塔上に資材を荷揚げする状態の正面図である。It is a front view of the state which unloads material on the steel tower in a prior art example. 従来例における飛散防護ネットを、中間ステージより転落防止用の水平ガイドロープを介して鉄塔外側に引き出し、荷揚げロープを使って鉄塔頂上まで荷揚げする状態の正面図である。It is a front view of the state which pulls out the scattering protection net in a prior art example from a middle stage via a horizontal guide rope for fall prevention to the outside of a steel tower, and unloads it to the top of a steel tower using a lifting rope. 従来例における飛散防護ネットを鉄塔の上部および腕金周囲全体と鉄塔の下部全体に仮設するために飛散防護ネットを鉄塔外側から荷揚げした状態を示す正面図である。It is a front view which shows the state which unloaded the scattering protection net | network from the steel tower outer side in order to temporarily install the scattering protection net | network in a prior art example on the upper part of a steel tower, the whole armor circumference | surroundings, and the whole lower part of a steel tower. 従来例における飛散防護ネットを展開して鉄塔および腕金の周囲全体に取り巻くようにしてから飛散防護ネットを固縛する作業を示す正面図である。It is a front view which shows the operation | work which secures a scattering protection net | network after expanding the scattering protection net | network in a prior art example, and encircling the whole circumference | surroundings of a steel tower and a brace.

符号の説明Explanation of symbols

P…鉄塔
Q…腕金(アーム)
1…飛散防護ネット
1a…第1シート
1b…第2シート
1c…第1シート
1d…第2シート
2…連結ロープ
3,4…連結耳輪部
5…パイプ材
6…通し綱(連結ロープ)
7…荷揚げロープ
8…足場板
P ... Steel tower Q ... Arm (arm)
DESCRIPTION OF SYMBOLS 1 ... Scatter protection net 1a ... 1st sheet | seat 1b ... 2nd sheet | seat 1c ... 1st sheet | seat 1d ... 2nd sheet | seat 2 ... Connection rope 3, 4 ... Connection ear ring part 5 ... Pipe material 6 ... Through rope (connection rope)
7 ... Unloading rope 8 ... Scaffolding board

Claims (4)

鉄塔の塗装工事施工時に、該鉄塔を覆って外部への塗料・ケレンカス等の飛散を防止するための鉄塔用飛散防護ネットの取付工法であって、FRP製パイプ材を荷揚げし、中間ステージにおいて鉄塔の部材に対して略放射状、中間ステージより下段のステージにおいては角部におけるFRP製パイプ材同士を交差させるように配置して結束する工程と、鉄塔サイズに合わせて複数のメッシュシートの連結数を決定して組み合わせ、これらのメッシュシート同士を連結ロープで結束して飛散防護ネットを形成する工程と、この鉄塔サイズに調整されている飛散防護ネットを予め丸く束ねておき、鉄塔内において、荷揚げロープを使って飛散防護ネットを地上から鉄塔の中間ステージまで荷揚げした後、飛散防護ネットを中間ステージより鉄塔の外側に引き出し、さらに荷揚げロープを使って鉄塔の頂上まで荷揚げする工程と、鉄塔を囲繞するように飛散防護ネットを展開してから、飛散防護ネットの四方から外部に延出させた連結ロープを、前記FRP製パイプ材の上方において、所定の距離を保持して、鉄塔部材に直接固縛することにより、飛散防護ネットを塔体側に固縛する工程とを備え、
前記飛散防護ネットによる荷重を鉄塔部材で受け止め、前記FRP製パイプ材の先端部で飛散防護ネットを鉄塔の外側に押し付けることにより飛散防護ネットと鉄塔との間の所定の距離を保持することを特徴とした鉄塔用飛散防護ネットの取付工法。
An installation method of a steel tower anti-scattering net that covers the steel tower and prevents the paint, kerenkas, etc. from scattering to the outside during the construction work of the steel tower , unloading the FRP pipe material, and in the intermediate stage In the stage lower than the intermediate stage, the step of arranging and binding the FRP pipe materials at the corners so as to cross each other, and the number of connected mesh sheets according to the tower size Decide and combine, bind these mesh sheets together with a connecting rope to form a splash protection net, and scatter the net that is adjusted to the size of the tower in advance and bundle it in the tower. After unloading the scattering protection net from the ground to the intermediate stage of the tower, use the Pull out to the outside, further unloading to the top of the tower using the unloading rope, and after expanding the scattering protection net so as to surround the tower, the connecting rope extended to the outside from the four sides of the scattering protection net, Above the FRP pipe material, with a predetermined distance, and by directly tying to the steel tower member, the step of securing the splash protection net to the tower body side,
The load from the scattering protection net is received by a steel tower member, and a predetermined distance between the scattering protection net and the steel tower is maintained by pressing the scattering protection net to the outside of the steel tower at the tip of the FRP pipe material. The installation method of the scattering protection net for steel towers.
飛散防護ネットを形成する工程は、鉄塔サイズに略対応するように、縦幅が10mおよび横幅が約1.8mの第1シートと、縦幅が10mおよび横幅が3.6mの第2シートの2種類の飛散防護ネットを組み合わせるものである請求項1に記載の鉄塔用飛散防護ネットの取付工法。 The step of forming the splash protection net includes a first sheet having a vertical width of 10 m and a horizontal width of approximately 1.8 m, and a second sheet having a vertical width of 10 m and a horizontal width of 3.6 m so as to substantially correspond to the tower size. The method for attaching a steel tower scattering protection net according to claim 1 , wherein two types of scattering protection nets are combined . 荷揚げロープを使って鉄塔の腕金付近(中間ステージ)まで飛散防護ネットを荷揚げする工程と、腕金の上側においてFRP製パイプ材の先端に連繋した通し綱に、飛散防護ネットの端部から延出されている連結ロープを輪状に縛結した後、飛散防護ネットを通し綱に沿って塔体側から腕金の先端側に展開してからFRP製パイプ材に固縛する工程とを更に含む請求項1または2に記載の鉄塔用飛散防護ネットの取付工法。 From the end of the anti-scattering net, a process of unloading the anti-scattering net to the vicinity of the armature (intermediate stage) of the tower using the unloading rope and a thread that is connected to the tip of the FRP pipe material on the upper side of the metal arm. Further comprising a step of binding the connected connecting rope in a ring shape, and then expanding the connecting rope along the rope from the tower body side to the tip side of the arm metal, and then securing the connecting rope to the FRP pipe material. Item 3. A method for mounting a steel tower scattering protection net according to item 1 or 2. 鉄塔サイズに調整されている飛散防護ネットを予め丸く束ねておき、鉄塔外において、荷揚げロープを使って飛散防護ネットを地上から鉄塔の中間ステージまで荷揚げする工程と、塔体の周囲を囲繞するように飛散防護ネットを一面づつ展開してから、飛散防護ネットをFRP製パイプ材を介して固縛する工程とを更に含む請求項1乃至3のいずれか1項に記載の鉄塔用飛散防護ネットの取付工法。 The process of unloading the anti-scattering net from the ground to the intermediate stage of the tower using the unloading rope and surrounding the tower body is done by bundling the anti-scattering net adjusted to the size of the tower beforehand. 4. The steel tower according to claim 1, further comprising a step of deploying the anti-scattering net one by one and then securing the anti-scattering net via an FRP pipe material . 5. Installation method.
JP2006227804A 2006-08-24 2006-08-24 Installation method of steel tower scattering protection net Active JP4835929B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2006227804A JP4835929B2 (en) 2006-08-24 2006-08-24 Installation method of steel tower scattering protection net

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2006227804A JP4835929B2 (en) 2006-08-24 2006-08-24 Installation method of steel tower scattering protection net

Publications (2)

Publication Number Publication Date
JP2008050838A JP2008050838A (en) 2008-03-06
JP4835929B2 true JP4835929B2 (en) 2011-12-14

Family

ID=39235156

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2006227804A Active JP4835929B2 (en) 2006-08-24 2006-08-24 Installation method of steel tower scattering protection net

Country Status (1)

Country Link
JP (1) JP4835929B2 (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP5858531B2 (en) * 2012-03-09 2016-02-10 住澤塗装工業株式会社 Curing equipment for painting work
JP6300566B2 (en) * 2014-02-19 2018-03-28 株式会社シーテック Method for adjusting base of power transmission tower, scattering prevention method and scattering prevention device
KR101897766B1 (en) * 2017-02-07 2018-09-13 주식회사 제이케이시스 Fall and fallen object prevention devices for steel pipe type transmission tower

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0675530A (en) * 1992-05-07 1994-03-18 Aiyou Sangyo:Kk Production of signal net
JP3976308B2 (en) * 2001-12-26 2007-09-19 岳南建設株式会社 Method of electrostatic coating of steel tower
JP4767612B2 (en) * 2004-08-24 2011-09-07 東京電力株式会社 Protection sheet structure

Also Published As

Publication number Publication date
JP2008050838A (en) 2008-03-06

Similar Documents

Publication Publication Date Title
JP4102372B2 (en) Attaching the protective net to the steel tower
JP2010126959A (en) Retractable scaffold for steel tower for communication antenna
JP6312109B1 (en) Safety device for temporary scaffold
JP4835929B2 (en) Installation method of steel tower scattering protection net
WO2017151990A1 (en) Containment shroud system
JP5589183B2 (en) Cylindrical structure scaffolding apparatus and moving method thereof
JP2011241633A (en) Construction method of pc structure and fitting for pc structure construction
JP4714203B2 (en) Protective net construction method
JP3164853U (en) Falling object protection net installation device
JP5339826B2 (en) Scaffolding for transmission tower
KR200417314Y1 (en) Apparatus for supporting falling objects
JP2009112511A (en) Protective net
JPH11264252A (en) Curing sheet fitting structure
JP5377361B2 (en) Net extension device for steel pipe support
JP7124487B2 (en) Anti-scattering device and lift-up construction method
US7726634B2 (en) System and method for tensioning and locking a safety strand
JP5977097B2 (en) Simple protective fence
GB2518514A (en) A clamp for use in the raising and lowering of at least one corrugated sheet
JP5502405B2 (en) Auxiliary working tool and work method using the auxiliary tool
CN219605468U (en) Concrete tower section of thick bamboo protection network platform structure
CN221070642U (en) Vertical hoist device of reinforcing bar
JP4352404B2 (en) Paint scattering prevention device for painting power transmission tower and painting method for power transmission tower
JP7274378B2 (en) Steel tower work scaffolding
JP3035741U (en) Belt for construction work
JP4181507B2 (en) Fiber cable laying structure, laying method and maintenance method

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20090205

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20110408

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20110412

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20110527

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20110901

A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20110914

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20141007

Year of fee payment: 3

R150 Certificate of patent or registration of utility model

Ref document number: 4835929

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

Free format text: JAPANESE INTERMEDIATE CODE: R150

S533 Written request for registration of change of name

Free format text: JAPANESE INTERMEDIATE CODE: R313533

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350