JP2016008434A - Main rope installation method and operation bar for installing the main rope - Google Patents

Main rope installation method and operation bar for installing the main rope Download PDF

Info

Publication number
JP2016008434A
JP2016008434A JP2014129813A JP2014129813A JP2016008434A JP 2016008434 A JP2016008434 A JP 2016008434A JP 2014129813 A JP2014129813 A JP 2014129813A JP 2014129813 A JP2014129813 A JP 2014129813A JP 2016008434 A JP2016008434 A JP 2016008434A
Authority
JP
Japan
Prior art keywords
master rope
pilot line
roof
operation rod
rope
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2014129813A
Other languages
Japanese (ja)
Other versions
JP6163139B2 (en
Inventor
英貴 植月
Hidetaka Uetsuki
英貴 植月
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Toyota Housing Corp
Original Assignee
Toyota Housing Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Toyota Housing Corp filed Critical Toyota Housing Corp
Priority to JP2014129813A priority Critical patent/JP6163139B2/en
Publication of JP2016008434A publication Critical patent/JP2016008434A/en
Application granted granted Critical
Publication of JP6163139B2 publication Critical patent/JP6163139B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Emergency Lowering Means (AREA)

Abstract

PROBLEM TO BE SOLVED: To ensure safety and reduce costs when installing a main rope on a roof.SOLUTION: A first worker P1 places a first anchor 26 at a first position N1, and places a pilot line 31 and a main rope in a bag for the first anchor 26. The first worker then connects an end of the pilot line 31 to a tip of an operation rod 32, and moves from the first position N1 side to an opposite position on an opposite side of a building 10 while holding the operation rod 32 in such a state. Here, the operation rod 32 is provided with a hook part 33 at the tip, and the pilot line 31 is connected to the tip of the operation rod 32 by hooking its ring part to the hook part 33. The first worker P1 installs the main rope on a roof 13, by removing the pilot line 31 from the operation rod 32 after arriving at the opposite position, and then recovering the pilot line 31 to the opposite position side.

Description

本発明は、親綱の設置方法及び親綱設置用の操作棒に関するものである。   The present invention relates to a parent rope installation method and a parent rope installation operation rod.

住宅等の建物を新築する際や、既存の建物についてメンテナンス作業を行う際に、作業者が屋根の上に登る場合がある。この場合、あらかじめ屋根に親綱を設置しておき、作業者は、自身に装着した安全帯などを親綱に連結することで、梯子の昇降や屋根上での作業について安全性を確保することができる。   When a new building such as a house is built or maintenance work is performed on an existing building, an operator may climb on the roof. In this case, the master rope is installed on the roof in advance, and the operator secures safety on the ladder up and down and the work on the roof by connecting the safety belt attached to the master rope to the master rope. Can do.

屋根に親綱を設置する方法としては、2本の操作棒を用いる方法がある(例えば特許文献1参照)。この方法では、伸縮可能な2本の操作棒の各上端部にパイロットロープを架け渡した状態で、これら操作棒を屋根の高さを越えるまで伸ばし、パイロットロープの繰り出しが可能な一方の操作棒を地面に起立させた状態で保持する一方で、作業者が他方の操作棒を建物の反対側に移動させることで、パイロットロープを屋根の上に架け渡した状態にする。その後、パイロットロープの一端に親綱を接続し、パイロットロープを他端側に引き下ろしてパイロットロープと親綱とを置換することで、その親綱を屋根上に架け渡した状態で設置する。   As a method for installing the master rope on the roof, there is a method using two operation bars (see, for example, Patent Document 1). In this method, one of the two control rods that can extend the pilot rope and extend the pilot rope over the height of the roof in a state where the pilot rope is bridged over the upper ends of the two extendable control rods. While the operator is standing on the ground, the operator moves the other operating rod to the opposite side of the building, thereby bringing the pilot rope over the roof. Thereafter, the master rope is connected to one end of the pilot rope, and the pilot rope is pulled down to the other end side to replace the pilot rope and the master rope, so that the master rope is installed on the roof.

特開2002−155632号公報JP 2002-155632 A

しかしながら、2本の操作棒を用いる方法では、一方の操作棒を移動させた際に、パイロットロープを繰り出す方の操作棒が倒れることが懸念される。   However, in the method using two operating rods, there is a concern that when one operating rod is moved, the operating rod for extending the pilot rope falls down.

そこで、パイロットロープを繰り出す方の操作棒に倒れ防止機能を付与する方法が考えられるが、上記のように操作棒が大型であることからして倒れ防止機能が大袈裟なものになってしまう。また、パイロットロープを繰り出す方の操作棒を他の作業者が手で支えるという方法が考えられるが、これでは、親綱の設置作業を2人の作業者が専任で行うことになり、建築現場の作業人員が増加してしまう。   In view of this, a method of imparting a fall prevention function to the operation rod for feeding out the pilot rope is conceivable. However, since the operation rod is large as described above, the fall prevention function becomes serious. Another method is to support the operator's operating rod for unwinding the pilot rope by hand, but with this, two workers will be dedicated to installing the master rope, and the construction site The number of workers will increase.

なお、親綱を設置する方法としては、親綱を操作棒に直接接続し、パイロットロープを用いずに親綱を設置する方法がある。この方法においても、2本の操作棒を用いる場合には、上記のような懸念が生じる。   As a method of installing the master rope, there is a method in which the master rope is directly connected to the operation rod and the master rope is installed without using the pilot rope. Even in this method, the above-described concern arises when two operating bars are used.

本発明は、上記事情に鑑みてなされたものであり、親綱を屋根に設置する際に安全性を確保し、しかも、コスト負担を低減することを主たる目的とするものである。   The present invention has been made in view of the above circumstances, and has as its main purpose to ensure safety and reduce the cost burden when installing the master rope on the roof.

以下、上記課題を解決するのに有効な手段等につき、必要に応じて作用、効果等を示しつつ説明する。なお以下においては、理解の容易のため、発明の実施の形態において対応する構成を括弧書き等で適宜示すが、この括弧書き等で示した具体的構成に限定されるものではない。   Hereinafter, means and the like effective for solving the above-described problems will be described while showing functions and effects as necessary. In the following, for easy understanding, the corresponding configuration in the embodiment of the invention is appropriately shown in parentheses, but is not limited to the specific configuration shown in parentheses.

第1の発明の親綱の設置方法は、建物(建物10)の屋根(屋根13)に親綱(親綱25)を設置する親綱の設置方法であって、前記親綱及び該親綱を案内するためのパイロットライン(パイロットライン31)のうち一方を線状部材として操作棒(操作棒32)に接続する接続工程と、前記線状部材を、前記操作棒の操作に伴う繰り出しが可能な状態で、前記建物の側方において地面又は地面付近に設定された仮置き位置(第1位置N1)に仮置きする仮置き工程と、前記仮置き位置から引き出された前記線状部材が前記屋根の上に載るように前記操作棒を操作しながら、当該操作棒を前記建物を挟んで前記仮置き位置とは反対側の反対位置(反対位置M)に移動させる移動工程と、前記操作棒に対する前記線状部材の接続を解除する接続解除工程と、を備えていることを特徴とする。   The master rope installation method of the first invention is a master rope installation method for installing a master rope (master rope 25) on the roof (roof 13) of a building (building 10), the master rope and the master rope. A connecting step of connecting one of the pilot lines (pilot line 31) for guiding the operation rod to the operation rod (operation rod 32) as a linear member, and feeding out the linear member in accordance with the operation of the operation rod. The temporary placement step (first position N1) temporarily placed on the ground or near the ground on the side of the building, and the linear member drawn from the temporary placement position A movement step of moving the operation bar to an opposite position (opposite position M) opposite to the temporary placement position while operating the operation bar to be placed on a roof; Connection to release the connection of the linear member to Characterized in that it comprises a dividing step.

第1の発明によれば、親綱やパイロットラインといった線状部材を繰り出し前の状態で地面又は地面付近に仮置きするとともに、作業者が1本の操作棒を用いて線状部材を屋根上に敷設するようにしたため、2本の操作棒を用いる場合とは異なり、移動させない方の操作棒が倒れるということ自体が発生しないため、安全性の低下を防止できる。また、線状部材を繰り出す方の操作棒が倒れないように保持するという必要がないため、倒れ防止機能が付与された操作棒を準備する必要も、線状部材を繰り出す方の作業棒を他の作業者が手で支えるという必要もない。   According to the first invention, a linear member such as a master rope or a pilot line is temporarily placed on the ground or in the vicinity of the ground before being fed, and the operator uses the single operation rod to place the linear member on the roof. Unlike the case of using two operation rods, since it does not occur that the operation rod that is not moved falls down, it is possible to prevent a decrease in safety. In addition, since it is not necessary to hold the operating rod that pulls out the linear member so that it does not fall down, it is necessary to prepare an operating rod that is provided with a function to prevent falling down. There is no need for the worker to support it by hand.

さらに、操作棒を操作する作業者が建物の反対側に移動した後、線状部材の繰り出しが適正に行われている状況であれば、必ずしも他の作業者を線状部材の仮置き位置に対して配置する必要がない。このため、線状部材の敷設作業を作業者が1人で行うことが可能になる。   Furthermore, after the operator operating the operating rod moves to the opposite side of the building, if the linear member is properly fed out, the other operator is not necessarily placed at the temporary placement position of the linear member. There is no need to arrange them. For this reason, it becomes possible for the worker to perform the laying work of the linear member by one person.

以上により、親綱を屋根に設置する際に安全性を確保でき、しかも、コスト負担を低減できる。   As described above, safety can be ensured when the master rope is installed on the roof, and the cost burden can be reduced.

なお、操作棒は、移動工程において作業者が当該操作棒を保持した状態で、線状部材を屋根よりも高い位置に持ち上げることが可能な長さ寸法を有していることが好ましい。これにより、線状部材を屋根の上に敷設する作業を操作棒により容易に行うことができる。   In addition, it is preferable that the operation rod has a length dimension that allows the linear member to be lifted to a position higher than the roof in a state where the operator holds the operation rod in the moving process. Thereby, the operation | work which lays a linear member on a roof can be easily performed with an operation stick.

第2の発明では、第1の発明において、前記接続工程では、前記親綱及び前記パイロットラインのうち前記パイロットラインを前記線状部材として前記操作棒に接続し、前記仮置き工程では、前記パイロットラインを前記仮置き位置に仮置きし、前記移動工程では、前記パイロットラインが前記屋根の上に載るように前記操作棒を移動させ、前記接続解除工程では、前記操作棒に対する前記パイロットラインの接続を解除し、さらに、前記親綱に接続された状態の前記パイロットラインを前記仮置き位置側又は前記反対位置側に回収することで、該親綱を前記屋根の上を通って前記仮置き位置側と前記反対位置側とに掛け渡す回収工程を備えている。   In a second invention, in the first invention, in the connecting step, the pilot line of the master rope and the pilot line is connected to the operating rod as the linear member, and in the temporary placing step, the pilot A line is temporarily placed at the temporary placement position, and in the moving step, the operating rod is moved so that the pilot line is placed on the roof, and in the disconnecting step, the pilot line is connected to the operating rod. And the pilot line connected to the master rope is recovered to the temporary placement position side or the opposite position side, so that the master rope passes through the roof and the temporary placement position. A recovery step of crossing between the side and the opposite position side.

第2の発明によれば、パイロットラインが線状部材として操作棒に接続されているため、例えば親綱が操作棒に接続された場合に比べて、操作棒を操作して線状部材を屋根の上に載せる作業を容易化できる。   According to the second invention, since the pilot line is connected to the operation rod as a linear member, for example, compared to the case where the master rope is connected to the operation rod, the linear member is operated by operating the operation rod. The work to put on can be facilitated.

なお、パイロットラインは弾性変形可能な線状部材であることが好ましい。ここで、作業者が操作棒を操作することでパイロットラインを屋根の上に載せる際、そのパイロットラインは、地面近くの仮置き位置から上方に向けて延びた状態になることからして屋根の周縁部や上面に接触する可能性が高く、屋根の凹凸にパイロットラインが引っ掛かることが懸念される。これに対して、パイロットラインが弾性変形可能であれば、例えば弾性変形しないパイロットラインを屋根の上に載せる場合に比べて、作業者は、パイロットラインの弾性変形を利用してそのパイロットラインが屋根の凹凸を乗り越えるように操作棒を操作することが容易になる。
第3の発明では、第1の発明において、前記仮置き工程では、前記パイロットラインに加えて、該パイロットラインにおける前記操作棒とは反対側の端部に接続される前記親綱を、同パイロットラインに続いて引き出される状態で前記仮置き位置に仮置きし、前記回収工程では、前記パイロットラインを前記反対位置側に回収する。
The pilot line is preferably a linear member that can be elastically deformed. Here, when the operator places the pilot line on the roof by operating the operation rod, the pilot line extends upward from the temporary placement position near the ground. There is a high possibility of contact with the peripheral edge or the upper surface, and there is a concern that the pilot line may be caught on the unevenness of the roof. On the other hand, if the pilot line can be elastically deformed, for example, compared to a case where a pilot line that does not elastically deform is placed on the roof, the operator can use the elastic deformation of the pilot line to It becomes easy to operate the operating rod so as to get over the unevenness of the.
According to a third invention, in the first invention, in the temporary placing step, in addition to the pilot line, the master rope connected to the end of the pilot line on the side opposite to the operation rod is connected to the pilot line. In the state of being pulled out following the line, the temporary placement position is temporarily placed, and in the collection step, the pilot line is collected to the opposite position side.

第3の発明によれば、操作棒を保持した作業者が移動を開始するよりも前に、あらかじめパイロットラインと親綱とが接続されているため、作業者が操作棒を持って反対位置に移動した後、その反対位置側にパイロットラインを回収するだけで親綱を屋根の上に通すことができる。このため、パイロットラインを仮置き位置側に回収する場合とは異なり、親綱をパイロットラインとは異なる反対位置側に配置する必要がなく、親綱をパイロットラインと同じ仮置き位置に配置すればよいため、親綱を設置する際の準備作業が容易になる。また、作業者が親綱の設置作業を1人で行う場合に、反対位置に移動した後に再び仮置き位置側に戻ってパイロットラインに親綱を接続するという必要がないため、作業負担を低減できる。   According to the third invention, since the pilot line and the master rope are connected in advance before the worker holding the operation rod starts moving, the operator holds the operation rod in the opposite position. After moving, the master rope can be passed over the roof simply by collecting the pilot line on the opposite side. For this reason, unlike the case where the pilot line is recovered to the temporary placement position side, it is not necessary to arrange the master rope on the opposite side of the pilot line, and if the master rope is arranged at the same temporary placement position as the pilot line, Since it is good, the preparatory work when installing the master rope becomes easy. In addition, when an operator performs installation work of the master rope alone, it is not necessary to return to the temporary placement position side after moving to the opposite position and to connect the master rope to the pilot line, thus reducing the work burden. it can.

第4の発明では、第3の発明において、前記仮置き工程では、前記回収工程を行うことで前記親綱を前記仮置き位置側と前記反対位置側とに掛け渡した状態で該親綱を前記仮置き位置側において地面に対して固定するための固定手段(第1アンカー26)を、同親綱に接続された状態で設置し、前記回収工程では、前記固定手段との間で前記親綱に張力がかかるまで前記反対位置側に該親綱又は前記パイロットラインを引っ張る。   In a fourth invention, in the third invention, in the temporary placement step, the master rope is placed in a state where the master rope is stretched between the temporary placement position side and the opposite position side by performing the recovery step. A fixing means (first anchor 26) for fixing to the ground on the temporary placement position side is installed in a state of being connected to the same parent rope, and in the recovery step, the parent means is connected to the fixing means. Pull the master rope or the pilot line to the opposite position side until tension is applied to the rope.

第4の発明によれば、仮置き工程が行われた状態では既に親綱が固定手段に接続されているため、回収工程を行うことで親綱を仮置き位置側と反対位置側とに掛け渡した後に、親綱を固定手段との間で張力がかかるまで反対位置側に引っ張ることで、仮置き位置側において固定手段により親綱を地面に対して固定することができる。この場合、親綱を反対位置側に引っ張る際に、親綱の引っ張り量が多過ぎたり少な過ぎたりすることを回避できる。さらに、作業者が親綱の設置作業を1人で行う場合に、反対位置側にパイロットラインを回収した後に、再び仮置き位置に戻って親綱を地面に対して固定するという必要がないため、作業負担を低減できる。   According to the fourth invention, since the master rope is already connected to the fixing means in the state where the temporary placement process is performed, the master rope is hung between the temporary placement position side and the opposite position side by performing the recovery process. After passing, the master rope can be fixed to the ground by the fixing means on the temporary placement position side by pulling the master rope to the opposite position side until tension is applied to the fixing means. In this case, when the master rope is pulled to the opposite position side, it is possible to avoid that the master rope is pulled too much or too little. Furthermore, when the operator performs the installation work of the master rope alone, there is no need to return the pilot line to the opposite position side and then return to the temporary placement position to fix the master rope to the ground. , Work load can be reduced.

第5の発明では、第4の発明において、前記固定手段は、上方に向けて開放された複数の収納部(袋体41)を有しており、前記仮置き工程では、前記複数の収納部のうち少なくとも1つの収納部に水を入れることで、前記親綱を地面に対して固定する重り部(袋体41)を形成し、該重り部ではない少なくとも1つの収納部に前記パイロットライン及び前記親綱を収納することで、これらパイロットライン及び親綱を前記仮置き位置に仮置きする。   In 5th invention, in 4th invention, the said fixing means has several storage parts (bag body 41) open | released upwards, In the said temporary placement process, these storage parts Water is poured into at least one storage part to form a weight part (bag body 41) that fixes the master rope to the ground, and the pilot line and the at least one storage part that is not the weight part are formed. By storing the master rope, the pilot line and master rope are temporarily placed at the temporary placement position.

第5の発明によれば、固定手段が複数の収納部を有しているため、仮置き位置にパイロットライン及び親綱を仮置きする作業、及び固定手段を移動しないように地面に対して設置することが容易となる。しかも、複数の収納部のうち、回収工程が行われることでパイロットラインや親綱が引き出された収納部については、水を入れることで重り部を追加して形成することができる。仮置き位置側において、固定手段による親綱の固定強度が不足しているという事態を回避できる。   According to the fifth invention, since the fixing means has a plurality of storage portions, the temporary placement of the pilot line and the master rope at the temporary placement position, and the fixing means are installed on the ground so as not to move. Easy to do. Moreover, among the plurality of storage units, the storage unit from which the pilot line and the master rope are drawn out by performing the recovery process can be formed by adding a weight part by adding water. It is possible to avoid a situation where the fixing strength of the master rope by the fixing means is insufficient on the temporary placement position side.

第6の発明では、第1乃至5のいずれか1つの発明において、前記操作棒は、前記線状部材が着脱可能に接続される被接続部を有し、該被接続部が当該操作棒の一端に配置された状態のまま伸縮可能になっており、前記接続工程では、前記操作棒を伸ばす前の状態で前記被接続部に前記線状部材を接続し、前記移動工程では、伸ばした状態の前記操作棒を用いて前記線状部材を前記屋根の上に載せ、前記接続解除工程では、前記操作棒を縮めた状態で前記被接続部から前記線状部材を取り外す。   In a sixth invention, in any one of the first to fifth inventions, the operation rod has a connected portion to which the linear member is detachably connected, and the connected portion is connected to the operation rod. In the connecting step, the linear member is connected to the connected portion in a state before the operation rod is extended, and in the moving step, the extended state is extended. The linear member is placed on the roof using the operation rod, and in the connection release step, the linear member is removed from the connected portion in a state where the operation rod is contracted.

第6の発明によれば、操作棒が伸縮可能なため、接続工程及び接続解除工程のいずれにおいても、操作棒を保持している作業者が操作棒の被接続部に線状部材を着脱する作業を容易に行うことができる。このため、作業者が親綱の設置作業を1人で行う際に、例えば伸縮不可な操作棒を用いる場合とは異なり、操作棒を横倒しにして手で保持する側と被接続部側とを行き来するという手間を省くことができる。   According to the sixth invention, since the operation rod can be expanded and contracted, the operator holding the operation rod attaches and detaches the linear member to the connected portion of the operation rod in both the connection step and the connection release step. Work can be done easily. For this reason, when the operator performs the installation work of the master rope by one person, for example, unlike the case where an operation rod that cannot be extended and contracted is used, the side where the operation rod is laid down and held by hand and the connected portion side are The trouble of going back and forth can be saved.

第7の発明では、第1乃至6のいずれか1つの発明において、前記仮置き工程では、前記建物の側方のうち、前記屋根の上に登るために梯子(梯子23)が設置される側に前記仮置き位置を設定する。   In a seventh invention, in the invention according to any one of the first to sixth inventions, in the temporary placing step, a side on which a ladder (ladder 23) is installed to climb on the roof among the sides of the building. The temporary placement position is set in (1).

梯子の昇降作業や屋根上での作業のために親綱を屋根に設置する場合、親綱の設置作業を行う作業者と、梯子に昇降するための準備作業を行う作業者とが同時進行で作業を進めることで、建築現場における作業効率を高めることができる。ここで、親綱の設置作業を行っている作業者は、移動工程において仮置き位置から離れた後、仮置き位置において線状部材が適正に引き出されていることを視認できない状況になると考えられる。   When installing the master rope on the roof for raising and lowering the ladder and working on the roof, the operator who performs the master rope installation work and the worker who performs the preparation work for raising and lowering the ladder simultaneously By proceeding with the work, the work efficiency at the construction site can be increased. Here, it is considered that the worker performing the installation work of the master rope cannot visually recognize that the linear member is properly pulled out at the temporary placement position after leaving the temporary placement position in the moving process. .

これに対して、第7の発明によれば、梯子の設置位置の周辺に仮置き位置を設定しているため、親綱の設置作業を行っている作業者とは異なる作業者が、梯子に昇降するための準備作業を梯子の設置位置の近くで行っている場合に、その準備作業を行いながら線状部材が引き出されている状況を視認することができる。このため、昇降の準備作業を行っている作業者が、線状部材が適正に引き出されていない場合にだけ線状部材が適正に引き出されるように親綱の設置作業を補助するということが可能になる。したがって、親綱の設置と梯子に昇降するための準備とを同時進行で行うことで建築現場における作業効率を高めることができ、しかも、親綱の設置作業を適正に進めることができる。   On the other hand, according to the seventh invention, since the temporary placement position is set around the position where the ladder is installed, an operator different from the worker who is performing the installation work of the master rope is placed on the ladder. When the preparatory work for raising and lowering is performed near the position where the ladder is installed, it is possible to visually recognize the situation in which the linear member is pulled out while performing the preparatory work. For this reason, it is possible for an operator who is performing preparation work for raising and lowering to assist the installation work of the master rope so that the linear member is properly drawn only when the linear member is not drawn properly. become. Therefore, by performing the installation of the master rope and the preparation for ascending / descending on the ladder at the same time, the work efficiency at the construction site can be improved, and the master rope installation work can be appropriately advanced.

第8の発明の親綱設置用の操作棒は、親綱(親綱25)を建物(建物10)の屋根(屋根13)の上に設置するために操作される親綱設置用の操作棒(操作棒32)であって、前記親綱及び該親綱を案内するためのパイロットライン(パイロットライン31)のうち一方を線状部材として、該線状部材の端部に着脱可能に引っ掛けることが可能な引っ掛け部(引っ掛け部33)が、前記操作棒の先端部に設けられており、前記引っ掛け部は、当該引っ掛け部が前記線状部材の端部に引っ掛けられた状態を保持する保持状態と、同引っ掛け部を前記線状部材の端部から取り外すことが可能な非保持状態とに移行可能であることを特徴とする。   The operation rod for installing the master rope of the eighth invention is an operation rod for installing the master rope operated to install the master rope (master rope 25) on the roof (roof 13) of the building (building 10). (Operating bar 32) One of the master rope and the pilot line (pilot line 31) for guiding the master rope is a linear member, and is detachably hooked to the end of the linear member. A hooking portion (hanging portion 33) that can be attached is provided at the tip of the operation rod, and the hooking portion holds the state where the hooking portion is hooked on the end of the linear member. And the non-holding state in which the hook portion can be removed from the end portion of the linear member.

第8の発明によれば、引っ掛け部を非保持状態に移行させるという容易な作業を行うことで操作棒に対する線状部材の着脱が可能になるため、操作棒に線状部材を接続するという前作業、及び操作棒から線状部材を取り外すという後作業について、作業負担を低減できる。また、引っ掛け部を保持状態に移行させることで、操作棒から線状部材が意図せずに離脱することを防止できる。したがって、線状部材の落下について安全性を確保した上で、作業者が操作棒を操作して線状部材を屋根の上という高所に載せる作業を行うことができる。   According to the eighth invention, since the linear member can be attached to and detached from the operation rod by performing an easy operation of shifting the hook portion to the non-holding state, before the linear member is connected to the operation rod. The work burden can be reduced for the work and the subsequent work of removing the linear member from the operation rod. Moreover, it can prevent that a linear member detaches | leaves from an operating rod unintentionally by shifting a hook part to a holding state. Therefore, after ensuring safety about the fall of a linear member, an operator can perform the operation | work which mounts a linear member on the high place on a roof by operating an operating rod.

第9の発明では、第8の発明において、長尺状の棒本体(棒本体36)と、前記引っ掛け部を有し、前記棒本体の先端部に取り付けられた引っ掛け部材(引っ掛け部材37)と、を備えている。   According to a ninth invention, in the eighth invention, a long rod main body (bar main body 36), a hooking member (hooking member 37) having the hooking portion and attached to the tip of the bar main body, It is equipped with.

第9の発明によれば、引っ掛け部材が棒本体に取り付けられているため、引っ掛け部材を専用品として製造する必要が生じたとしても、棒本体として汎用品を使用することができる。ここで、棒本体は、建物の屋根に届くほどの長さを有する大型の棒状部材であるため、専用品として製造するとコスト負担が大きくなることが懸念されるが、汎用品を使用することでコスト負担を低減できる。   According to the ninth aspect, since the hook member is attached to the rod main body, even if it becomes necessary to manufacture the hook member as a dedicated product, a general-purpose product can be used as the rod main body. Here, since the bar body is a large bar-shaped member having a length that can reach the roof of the building, there is a concern that the cost burden will increase if manufactured as a dedicated product, but by using a general-purpose product Cost burden can be reduced.

第10の発明では、第9の発明において、前記引っ掛け部材は、前記引っ掛け部に加えて、前記棒本体に交差する方向に延びているアーム部(アーム部51)を有しており、前記引っ掛け部は、前記アーム部の自由端側に配置されている。   According to a tenth aspect, in the ninth aspect, the hook member includes an arm portion (arm portion 51) extending in a direction intersecting the rod main body in addition to the hook portion. The part is disposed on the free end side of the arm part.

第10の発明によれば、引っ掛け部材がアーム部を有していることで、棒本体の延長線上から側方にずれた位置に引っ掛け部が配置されているため、建物の側方において地面の上にいる作業者が、アーム部を屋根の上方に配置させるように操作棒を操作することで、線状部材を屋根の上に載せる作業を容易に行うことができる。しかも、この場合、作業者は建物に近い位置にいても線状部材を屋根の上に敷設することが可能になるため、例えば狭小地に構築された建物についても、その敷地内から線状部材の敷設作業を容易に行うことができる。   According to the tenth invention, since the hooking member has the arm portion, the hooking portion is arranged at a position shifted laterally from the extension line of the rod main body. The operator on the top can easily perform the operation of placing the linear member on the roof by operating the operation rod so that the arm portion is disposed above the roof. In addition, in this case, since the operator can lay the linear member on the roof even at a position close to the building, for example, the linear member from the premises of a building constructed in a narrow area is also available. Can be easily laid.

これに対して、例えば棒本体の延長線上に引っ掛け部が配置された操作棒では、作業者が建物からある程度離れなければ引っ掛け部を屋根の上方に配置させることができないため、狭小地に構築された建物について、その敷地内から線状部材の敷設作業を行うことが困難になってしまう。   On the other hand, for example, with an operation bar in which the hook part is arranged on the extension line of the bar body, the hook part cannot be arranged above the roof unless the operator is separated from the building to some extent, so it is constructed in a narrow area. It becomes difficult to lay a linear member from the site of the building.

親綱を設置した状態の建物の斜視図Perspective view of building with parent rope installed パイロットラインの設置作業について説明するための建物の斜視図A perspective view of the building for explaining the installation work of the pilot line 第1アンカー及び操作棒の構成を示す図The figure which shows the structure of a 1st anchor and an operating rod パイロットライン及び親綱の設置手順を示す図The figure which shows the installation procedure of the pilot line and the master rope パイロットライン及び親綱の設置手順を示す図The figure which shows the installation procedure of the pilot line and the master rope 別の操作棒の構成を示す図The figure which shows composition of another operation stick

以下、本発明を具体化した一実施形態について図面を参照しつつ説明する。本実施形態では、本発明の親綱の設置方法を二階建ての住宅に適用して具体化している。図1は親綱25を設置した状態の建物10の斜視図である。   Hereinafter, an embodiment embodying the present invention will be described with reference to the drawings. In the present embodiment, the parent rope installation method of the present invention is applied to a two-story house and embodied. FIG. 1 is a perspective view of the building 10 with the master rope 25 installed.

図1に示すように、住宅等の建物10は、基礎11の上に設けられた建物本体12と、建物本体12の上に設けられた屋根13とを有している。建物本体12は、一階部分14及び二階部分15を有しており、平面視で長方形状とされている。   As shown in FIG. 1, a building 10 such as a house has a building body 12 provided on a foundation 11 and a roof 13 provided on the building body 12. The building body 12 has a first floor portion 14 and a second floor portion 15 and has a rectangular shape in plan view.

屋根13は、切妻屋根とされており、その棟が建物本体12の長手方向に延びる向きで配置されている。屋根13は、傾斜した一対の屋根部13a,13bを有しており、これら屋根部13a,13bの接続部分により棟が形成されている。屋根部13a,13bは、建物本体12の短手方向に並べられており、それぞれ建物本体12の長手方向に延びている。屋根部13a,13bは、建物本体12の短手方向及び長手方向のそれぞれにおいて建物本体12の側方に突出しており、軒先及びけらばを形成している。この場合、軒先は、建物本体12の長手方向において棟に平行に延びている。   The roof 13 is a gable roof, and the ridge is arranged in a direction extending in the longitudinal direction of the building body 12. The roof 13 has a pair of inclined roof portions 13a and 13b, and a ridge is formed by a connecting portion of the roof portions 13a and 13b. The roof portions 13 a and 13 b are arranged in the short direction of the building body 12 and extend in the longitudinal direction of the building body 12. The roof portions 13a and 13b protrude to the side of the building body 12 in the short direction and the long direction of the building body 12, and form eaves and ribs. In this case, the eaves end extends in parallel with the ridge in the longitudinal direction of the building body 12.

なお、屋根13は、野地板等の屋根下地材と、この屋根下地材の上に設けられた瓦や折板材等の屋根仕上材(屋根葺き材)とを有している。   Note that the roof 13 includes a roof base material such as a base plate and a roof finishing material (roofing material) such as a tile or a folded plate provided on the roof base material.

本実施形態では、建物10に太陽光発電装置を新規で設置する際の作業について説明する。太陽光発電装置は、複数の太陽光パネル21を有しており、これら太陽光パネル21は屋根13の上に設置される。太陽光パネル21は、屋根部13a、13bのそれぞれの上に設置されるものであり、作業者は、太陽光パネル21の設置作業を行う際に屋根13の上に登ることになる。   In the present embodiment, a description will be given of work when a solar power generation device is newly installed in the building 10. The solar power generation device has a plurality of solar panels 21, and these solar panels 21 are installed on the roof 13. The solar panel 21 is installed on each of the roof portions 13a and 13b, and the worker climbs on the roof 13 when performing the installation work of the solar panel 21.

作業者が梯子23を登ることで屋根13上に移動する場合、あらかじめ屋根13に対して親綱25を設置しておき、作業者は、自身に装着した安全帯等を親綱25に連結した状態で梯子23の昇降作業や屋根13上での太陽光パネル21の設置作業を行う。梯子23は、一方の端部が下端として地面の上に置かれた状態で、屋根13の軒先に立て掛けられている。梯子23においては、その上端寄りの部分が、屋根部13a,13bのうち第1屋根部13aの軒先部分に接触した状態になっている。   When an operator moves on the roof 13 by climbing the ladder 23, the master rope 25 is installed in advance on the roof 13, and the worker connects the safety belt attached to the master rope 25 to the master rope 25. In this state, the ladder 23 is moved up and down and the solar panel 21 is installed on the roof 13. The ladder 23 is leaned against the eaves of the roof 13 in a state where one end is placed on the ground as a lower end. In the ladder 23, the part near the upper end is in the state which contacted the eaves part of the 1st roof part 13a among the roof parts 13a and 13b.

親綱25は、合成樹脂材料や金属材料などにより形成されたロープ等の線状部材であり、柔軟性を有している。屋根部13a,13bの並び方向(建物本体12の短手方向)に延びており、屋根13の棟を跨いで屋根部13a,13bの各軒先に掛け渡された状態で設置されている。親綱25においては、その中間部分が屋根13の上に配置されている一方で、一端側が第1屋根部13aの軒先から下方に向けて延び、他端側が第2屋根部13bの軒先から下方に向けて延びている。   The master rope 25 is a linear member such as a rope formed of a synthetic resin material or a metal material, and has flexibility. It extends in the direction in which the roof portions 13a and 13b are arranged (the short direction of the building body 12), and is installed across the ridges of the roof 13 and spanned over the eaves of the roof portions 13a and 13b. In the master rope 25, the middle portion is arranged on the roof 13, while one end side extends downward from the eaves of the first roof portion 13a, and the other end side extends downward from the eaves of the second roof portion 13b. It extends toward.

屋根部13a,13bの各軒先の下方位置には固定手段としてのアンカー26,27が設置されており、親綱25は、これらアンカー26,27に接続されていることで地面に対して固定されている。アンカー26,27のうち第1アンカー26は、第1屋根部13a側に配置されており、親綱25において第1屋根部13aから下方に延びた部分が第1アンカー26に接続されている。第1アンカー26は、棟が延びている方向において屋根13の一方の側端部(けらば)から所定距離(例えば1m)だけ他方の側端部に近づいた位置に配置されている。   Anchors 26 and 27 as fixing means are installed below the eaves of the roof portions 13a and 13b, and the master rope 25 is fixed to the ground by being connected to the anchors 26 and 27. ing. Of the anchors 26 and 27, the first anchor 26 is disposed on the first roof portion 13 a side, and a portion of the master rope 25 that extends downward from the first roof portion 13 a is connected to the first anchor 26. The first anchor 26 is disposed at a position approaching the other side end portion by a predetermined distance (for example, 1 m) from one side end portion (slab) of the roof 13 in the direction in which the ridge extends.

第2アンカー27は、第2屋根部13b側に配置されており、親綱25において第2屋根部13bから下方に延びた部分が第2アンカー27に接続されている。この場合、親綱25は、屋根13の上を通って第1アンカー26と第2アンカー27とに掛け渡されており、これらアンカー26,27により張力が加えられた状態になっている。   The second anchor 27 is disposed on the second roof portion 13 b side, and a portion of the master rope 25 that extends downward from the second roof portion 13 b is connected to the second anchor 27. In this case, the master rope 25 passes over the first anchor 26 and the second anchor 27 through the roof 13, and tension is applied by the anchors 26 and 27.

アンカー26,27は、いずれも建物10の側方において地面の上に載置されている。第1アンカー26は、地面に対して設定された第1位置N1に配置されており、第2アンカー27は、第1位置N1とは建物10を挟んで反対側において、地面に対して設定された第2位置N2に配置されている。   The anchors 26 and 27 are both placed on the ground on the side of the building 10. The first anchor 26 is disposed at a first position N1 set with respect to the ground, and the second anchor 27 is set with respect to the ground on the opposite side of the building 10 from the first position N1. It is arranged at the second position N2.

ちなみに、親綱25は、太陽光パネル21の設置作業を行う上で支障にならない位置に配置されている。具体的には、棟が延びている方向において、太陽光パネル21を設置する設置領域の側方位置に親綱25が配置されている。なお、太陽光パネル21を親綱25の上に設置しても、太陽光パネル21の設置後に親綱25の撤去が可能であれば、親綱25が太陽光パネル21の設置領域に配置されていてもよい。   Incidentally, the master rope 25 is arranged at a position that does not hinder the installation work of the solar panel 21. Specifically, the master rope 25 is arranged at a lateral position of the installation area where the solar panels 21 are installed in the direction in which the ridge extends. Even if the solar panel 21 is installed on the master rope 25, if the master rope 25 can be removed after the solar panel 21 is installed, the master rope 25 is arranged in the installation area of the solar panel 21. It may be.

親綱25の設置作業について、図2〜図5を参照しつつ説明する。図2はパイロットライン31の設置作業について説明するための建物の斜視図、図3は第1アンカー26及び操作棒32の構成を示す図、図4、図5はパイロットライン31及び親綱25の設置手順を示す図である。なお、図4には建物10の概略側面図を示し、図5においては、(a)〜(c)に建物10の概略平面図を示し、(d)に建物10の概略正面図を示す。   The installation work of the master rope 25 will be described with reference to FIGS. 2 is a perspective view of the building for explaining the installation work of the pilot line 31, FIG. 3 is a diagram showing the configuration of the first anchor 26 and the operating rod 32, and FIGS. 4 and 5 are diagrams of the pilot line 31 and the master rope 25. It is a figure which shows an installation procedure. 4 shows a schematic side view of the building 10, FIG. 5 shows a schematic plan view of the building 10 in (a) to (c), and FIG. 4 (d) shows a schematic front view of the building 10.

屋根13に親綱25を設置する場合、親綱25に先行してパイロットライン31を屋根13の上に敷設し、そのパイロットライン31を利用して親綱25を屋根13の上に引き上げる。パイロットライン31は、合成樹脂材料や金属材料により形成されたワイヤ等の線状部材であり、弾性変形が可能になっている。パイロットライン31は、親綱25に比べて軽量に形成されており、単位長さ当たりの重量が親綱25よりも小さくなっている。また、パイロットライン31を、呼び線やパイロットロープと称することもできる。   When the master rope 25 is installed on the roof 13, the pilot line 31 is laid on the roof 13 prior to the master rope 25, and the master rope 25 is pulled up on the roof 13 using the pilot line 31. The pilot line 31 is a linear member such as a wire formed of a synthetic resin material or a metal material, and can be elastically deformed. The pilot line 31 is formed to be lighter than the parent rope 25, and the weight per unit length is smaller than that of the parent rope 25. Moreover, the pilot line 31 can also be called a call line or a pilot rope.

図2に示すように、作業者は、操作棒32を用いることでパイロットライン31を屋根13の上に敷設する。操作棒32は、作業者に保持された状態で屋根13において最も高い位置にある棟に届く程度の長さ寸法(例えば7〜8m)を有しており、その先端部にパイロットライン31が接続された状態で作業者により操作される。   As shown in FIG. 2, the operator lays the pilot line 31 on the roof 13 by using the operation rod 32. The operation bar 32 has a length dimension (for example, 7 to 8 m) that can reach the highest ridge on the roof 13 while being held by an operator, and the pilot line 31 is connected to the tip thereof. In this state, it is operated by the operator.

なお、操作棒32は、作業者に保持された状態で屋根13において最も低い位置にある軒先に届く程度の長さ寸法を有していてもよい。この場合でも、作業者は、操作棒32を操作することでパイロットライン31を軒先の上に載せ、その状態からパイロットライン31を棟に向けて移動させることが可能になる。   The operation bar 32 may have a length dimension that reaches the eaves at the lowest position on the roof 13 while being held by the operator. Even in this case, the operator can place the pilot line 31 on the eaves by operating the operation rod 32, and can move the pilot line 31 from the state toward the building.

図3に示すように、操作棒32は、その先端部に設けられた引っ掛け部33を有し、パイロットライン31の一端には、貫通孔を有するリング部34が設けられており、引っ掛け部33がリング部34に引っ掛け可能になっている。引っ掛け部33は、リング部34に引っ掛けられた場合にその引っ掛けられた状態を保持する保持状態と、リング部34に対する引っ掛け及び取り外しが可能な非保持状態とに移行可能になっている。これにより、リング部34に対する引っ掛け部33の着脱を容易に行うことができる一方で、引っ掛け部33がリング部34から意図せずに外れるということを防止できる。   As shown in FIG. 3, the operation rod 32 has a hook portion 33 provided at the tip thereof, and a ring portion 34 having a through hole is provided at one end of the pilot line 31. Can be hooked on the ring portion 34. The hook part 33 can be shifted to a holding state that holds the hooked state when it is hooked on the ring part 34 and a non-holding state that allows the ring part 34 to be hooked and removed. Thus, the hook portion 33 can be easily attached to and detached from the ring portion 34, while the hook portion 33 can be prevented from being unintentionally detached from the ring portion 34.

引っ掛け部33は、開放部分を有するフック体33aと、フック体33aの開放部分を閉鎖可能な開閉体33bとを有しており、開閉体33bはフック体33aに対して開閉可能に軸支されている。開閉体33bは、フック体33aの内側に向けて回動することで開状態に移行し、外側に向けて回動することで閉状態に移行する。開閉体33bは、閉状態に保持されるようにバネ等の付勢手段により付勢されており、その付勢力に抗する外力が加えられることで開状態に移行する。引っ掛け部33は、開閉体33bが閉状態にある場合に保持状態になっており、開閉体33bが開状態にある場合に非保持状態になっている。   The hook 33 includes a hook body 33a having an open portion and an opening / closing body 33b capable of closing the open portion of the hook body 33a. The opening / closing body 33b is pivotally supported so as to be openable / closable with respect to the hook body 33a. ing. The opening / closing body 33b shifts to the open state by rotating toward the inside of the hook body 33a, and shifts to the closed state by rotating toward the outside. The opening / closing body 33b is urged by an urging means such as a spring so as to be held in a closed state, and shifts to an open state by applying an external force against the urging force. The hook 33 is in a holding state when the opening / closing body 33b is in a closed state, and is in a non-holding state when the opening / closing body 33b is in an open state.

なお、引っ掛け部33は、パイロットライン31が着脱可能に接続される被接続部に相当する。   The hook portion 33 corresponds to a connected portion to which the pilot line 31 is detachably connected.

操作棒32は、長尺状の棒本体36と、引っ掛け部33が形成された引っ掛け部材37とを有している。引っ掛け部材37は、棒本体36の一端に取り付けられている。引っ掛け部材37は、引っ掛け部33に加えて、棒本体36の一端に着脱可能に装着された装着部38を有している。装着部38は、引っ掛け部33とは反対側に向けて開放された中空部を有しており、この中空部に棒本体36の一端が挿入されることでその棒本体36に装着されている。装着部38は、ゴム等の弾性変形可能な材料により形成されており、その中空部に棒本体36が挿入されることで弾性変形し、棒本体36を中空部から離脱させないようになっている。   The operation rod 32 has a long rod main body 36 and a hook member 37 in which a hook portion 33 is formed. The hook member 37 is attached to one end of the rod body 36. In addition to the hook portion 33, the hook member 37 has a mounting portion 38 that is detachably mounted on one end of the rod body 36. The mounting portion 38 has a hollow portion that opens toward the opposite side of the hook portion 33, and is attached to the rod body 36 by inserting one end of the rod body 36 into the hollow portion. . The mounting portion 38 is formed of an elastically deformable material such as rubber, and is elastically deformed by inserting the rod main body 36 into the hollow portion, so that the rod main body 36 is not detached from the hollow portion. .

棒本体36は、引っ掛け部33を操作棒32の一端に配置した状態のまま伸縮することが可能になっている。棒本体36は、筒状の本体部を複数有しており、隣り合う本体部のうち一方が他方の内部に収納されることで縮み、一方が他方の内部から引き出されることで伸びるようになっている。棒本体36において、複数の本体部には、他の本体部をすべて収納可能な外側本体部と、棒本体36が収縮しても他の本体部を内部に収納しない内側本体部36aとが含まれている。引っ掛け部材37は、内側本体部36aの端部に取り付けられていることで、棒本体36が収縮しても操作棒32の一端に配置された状態が保持されるようになっている。各本体部は、FRP等の合成樹脂材料により形成されている。   The rod main body 36 can be expanded and contracted with the hook 33 disposed at one end of the operation rod 32. The rod main body 36 has a plurality of cylindrical main body portions. One of the adjacent main body portions is contracted by being accommodated in the other, and the other is extended by being pulled out from the other. ing. In the rod main body 36, the plurality of main body portions include an outer main body portion that can store all other main body portions, and an inner main body portion 36a that does not store other main body portions therein even when the rod main body 36 contracts. It is. The hook member 37 is attached to the end portion of the inner main body portion 36a, so that the state of being disposed at one end of the operation rod 32 is maintained even when the rod main body 36 contracts. Each main body is formed of a synthetic resin material such as FRP.

なお、作業者が操作棒32を保持する場合、棒本体36の外側本体部を手で持つことになる。   When the operator holds the operation rod 32, the outer body portion of the rod body 36 is held by hand.

アンカー26,27は、それぞれ袋体41を複数(例えば4個)有している。袋体41は、上方に向けて開放された内部空間を有しており、その内部空間には物品を収納することが可能になっている。袋体41は、布材料や合成樹脂材料等の防水性を有する材料により形成されており、物品に加えて、水等の液体を貯留することが可能になっている。袋体41は、所定の収納容量(例えば20〜30L)を有しており、液体等が入れられることで重り部としての役割を果たすことが可能になっている。袋体41は、底部と側面部とを有しており、液体や物品が地面の上に置かれた場合に自立することができるようになっている。袋体41は収納部に相当する。   Each of the anchors 26 and 27 has a plurality of (for example, four) bag bodies 41. The bag body 41 has an internal space opened upward, and an article can be stored in the internal space. The bag body 41 is formed of a waterproof material such as a cloth material or a synthetic resin material, and can store liquid such as water in addition to articles. The bag body 41 has a predetermined storage capacity (for example, 20 to 30 L), and can serve as a weight portion when a liquid or the like is placed therein. The bag body 41 has a bottom part and a side part, and can stand by itself when a liquid or an article is placed on the ground. The bag body 41 corresponds to a storage unit.

なお、袋体41は、持ち手を有しており、この持ち手は、開口部を跨いで側面部の上部に掛け渡した状態で取り付けられている。また、図3には、第1アンカー26を図示している。   In addition, the bag body 41 has a handle, and the handle is attached in a state where the bag is spanned over the opening and over the upper portion of the side surface. FIG. 3 shows the first anchor 26.

次に、親綱25を設置する際の作業手順について説明する。   Next, the work procedure when installing the master rope 25 will be described.

まず、アンカー26,27を設置する(図1参照)。ここでは、第1アンカー26及び第2アンカー27を第1位置N1及び第2位置N2において地面の上に置き、これらアンカー26,27の各袋体41に水を入れる。   First, the anchors 26 and 27 are installed (see FIG. 1). Here, the 1st anchor 26 and the 2nd anchor 27 are set | placed on the ground in the 1st position N1 and the 2nd position N2, and water is put into each bag body 41 of these anchors 26 and 27. FIG.

ただし、第1アンカー26においては、全ての袋体41に水を入れるのではなく、いくつかの袋体41には親綱25やパイロットライン31を入れておく。複数の袋体41のうち、袋体41aには親綱25を入れ、袋体41bにはパイロットライン31を入れ、さらに、その他の袋体41に水を入れておく。パイロットライン31は、その先端部(リング部34側の端部)が引っ張られることで引き出される状態で袋体41bに収納されている。また、パイロットライン31の終端部(リング部34とは反対側の端部)は、粘着テープ等の接続部材42により親綱25の一端に接続されている。   However, in the first anchor 26, water is not put into all the bag bodies 41, but the master rope 25 and the pilot line 31 are put into some bag bodies 41. Among the plurality of bag bodies 41, the master rope 25 is put in the bag body 41 a, the pilot line 31 is put in the bag body 41 b, and water is put in the other bag bodies 41. The pilot line 31 is stored in the bag body 41b in a state where the pilot line 31 is pulled out by being pulled. Moreover, the terminal part (end part on the opposite side to the ring part 34) of the pilot line 31 is connected to one end of the master rope 25 by a connection member 42 such as an adhesive tape.

また、第2アンカー27においても、全ての袋体41に水を入れるのではなく、1つの袋体41は水を入れずに空の状態にしておく。   Also in the second anchor 27, not all the bags 41 are filled with water, but one bag 41 is left empty without water.

親綱25は、その先端部(パイロットライン31に接続された方の端部)が引っ張られることで引き出される状態で袋体41aに収納されている。親綱25の終端部(パイロットライン31とは反対側の端部)は、接続金具等の接続具により第1アンカー26の全ての袋体41に接続されている。例えば、接続具は、各袋体41の持ち手に対して親綱25の終端部を接続している。なお、親綱25及びパイロットライン31が、それぞれの先端部が引っ張られることで引き出される状態としては、巻回して束にされた状態が挙げられる。また、接続具は、袋体41に対して持ち手とは異なる部分に対して接続されていてもよい。   The master rope 25 is accommodated in the bag body 41a in a state where the distal end portion (the end portion connected to the pilot line 31) is pulled out. The terminal portion of the master rope 25 (the end portion opposite to the pilot line 31) is connected to all the bag bodies 41 of the first anchor 26 by connecting tools such as connecting fittings. For example, the connection tool connects the terminal portion of the master rope 25 to the handle of each bag body 41. In addition, as the state where the master rope 25 and the pilot line 31 are pulled out by pulling the respective distal end portions, a state where the master rope 25 and the pilot line 31 are wound and bundled is mentioned. Further, the connection tool may be connected to the bag body 41 with respect to a portion different from the handle.

親綱25及びパイロットライン31を収納した袋体41a,41bを第1位置N1に設置することは、親綱25及びパイロットライン31を第1位置N1に引き出し可能な状態で仮置きすることになる。この場合、第1位置N1は、親綱25及びパイロットライン31にとっての仮置き位置に相当し、袋体41a,41bを用いて親綱25やパイロットライン31を第1位置N1に仮置きする作業が仮置き工程に相当する。   Installing the bags 41a and 41b containing the master rope 25 and the pilot line 31 in the first position N1 temporarily places the master rope 25 and the pilot line 31 in a state where they can be pulled out to the first position N1. . In this case, the first position N1 corresponds to a temporary placement position for the master rope 25 and the pilot line 31, and work for temporarily placing the master rope 25 and the pilot line 31 at the first position N1 using the bag bodies 41a and 41b. Corresponds to the temporary placement step.

親綱25及びパイロットライン31を第1位置N1に仮置きした後、図4(a)に示すように、操作棒32の引っ掛け部33にパイロットライン31の先端部(リング部34)を接続する接続工程を行う。この工程では、操作棒32を伸ばしていない非伸長状態としたまま、操作棒32に対するパイロットライン31の接続作業を行うことで、第1作業者P1は、その接続作業が終了した後に大きく移動することなく操作棒32の外側本体部を手で持つことが可能になる。   After temporarily placing the master rope 25 and the pilot line 31 at the first position N1, as shown in FIG. 4A, the tip part (ring part 34) of the pilot line 31 is connected to the hook part 33 of the operating rod 32. A connection process is performed. In this step, the first operator P1 moves greatly after the connection work is completed by performing the connection work of the pilot line 31 to the operation stick 32 while the operation stick 32 is not stretched. It is possible to hold the outer body portion of the operation rod 32 without hand.

そして、図4(b)に示すように、第1作業者P1は、建物10の長辺部の側方位置において、操作棒32を保持した状態でその操作棒32を伸ばす、という伸長工程を行う。第1作業者P1は、操作棒32を上下方向に立てた状態で、その先端部が屋根13の最も高い部分(棟)よりも高い位置に配置できる程度の長さまで伸す。この場合、操作棒32の伸長に伴ってパイロットライン31が第1アンカー26の袋体41bから引き出されるため、操作棒32を伸ばす際の作業負担を低減できる。また、この場合、図5(a)にも示すように、第1作業者P1は、建物10よりも第1アンカー26側の位置にいることになる。   And as shown in FIG.4 (b), the 1st worker P1 extends the operation bar 32 in the state which hold | maintained the operation bar 32 in the side position of the long side part of the building 10, and extends. Do. The first worker P <b> 1 extends to a length that allows the tip of the operation rod 32 to be disposed at a position higher than the highest portion (ridge) of the roof 13 in a state where the operation rod 32 is vertically erected. In this case, since the pilot line 31 is pulled out from the bag body 41b of the first anchor 26 along with the extension of the operation rod 32, the work load when the operation rod 32 is extended can be reduced. Further, in this case, as shown in FIG. 5A, the first worker P <b> 1 is at a position closer to the first anchor 26 than the building 10.

その後、第1作業者P1は、第1位置N1側から建物10の外周を回り込んで第2位置N2側に移動する移動工程を行う。この移動工程において第1作業者P1は、図4(c)、図5(b),(d)に示すように、まず、パイロットライン31が屋根13の上に載るように操作棒32を操作しながら、建物10における第1位置N1側の出隅部分の外側を回り込むことで、建物10の長辺部の側方位置(第1屋根部13aの軒先の下方位置)から建物10の短辺部の側方位置(「けらば」の下方位置)に移動する。   Thereafter, the first worker P1 performs a moving process of moving around the outer periphery of the building 10 from the first position N1 side and moving to the second position N2 side. In this moving process, the first worker P1 first operates the operating rod 32 so that the pilot line 31 is placed on the roof 13, as shown in FIGS. 4C, 5B, and 5D. However, the short side of the building 10 from the side position of the long side of the building 10 (the lower position of the eaves of the first roof portion 13a) by wrapping around the outside of the protruding corner portion on the first position N1 side in the building 10 It moves to the side position of the part (the position below “Keraba”).

第1作業者P1は、建物10から側方にある程度離れた位置を通り、操作棒32をその先端部(引っ掛け部33)が屋根13の上側に存在するように斜めに傾け、それによって、建物10の出隅部分の外側を回り込む際にパイロットライン31を屋根13の角部分の上に載せる。この場合、パイロットライン31を第1屋根部13aの軒先の側端部に上から引っ掛けるとともに、パイロットライン31が第1屋根部13a側から棟を越えて第2屋根部13b側に掛け渡されるように操作棒32を操作する。なお、第1作業者P1が第1アンカー26から遠ざかる向きに移動するだけでパイロットライン31は袋体41bから引き出されることになる。   The first worker P1 passes through a position somewhat away from the building 10 to the side, and tilts the operation rod 32 so that the tip (hook portion 33) is on the upper side of the roof 13, thereby The pilot line 31 is placed on the corner portion of the roof 13 when going around the outside of the ten corner portions. In this case, the pilot line 31 is hooked on the side edge of the eaves of the first roof portion 13a from above, and the pilot line 31 is extended from the first roof portion 13a side to the second roof portion 13b side over the ridge. The operating rod 32 is operated. The pilot line 31 is pulled out from the bag body 41b only by moving the first worker P1 away from the first anchor 26.

ここで、第1作業者P1が第2位置N2側への移動を開始するよりも前のタイミングで、第1作業者P1とは異なる第2作業者P2が、第1位置N1側において梯子23に昇降するための準備作業を開始する。例えば、第2作業者P2は、既に梯子23を第1位置N1の近くに運んでおき、その状態で自身への安全帯の装着を開始する。この場合、第2作業者P2は、昇降の準備作業を行いながら、袋体41a,41bからパイロットライン31や親綱25が繰り出される状態を視認することが可能になっている。このため、パイロットライン31や親綱25が絡まるなど繰り出し状態が不適になった場合には、第1作業者P1に知らせることや、その繰り出し状態を適正に戻すための作業を行うことができる。   Here, at a timing before the first worker P1 starts moving to the second position N2, the second worker P2 different from the first worker P1 has the ladder 23 on the first position N1 side. Start preparations for moving up and down. For example, the second worker P2 has already carried the ladder 23 near the first position N1, and in that state, starts to attach the safety belt to the second worker P2. In this case, the second worker P2 can visually recognize the state in which the pilot line 31 and the master rope 25 are drawn out from the bag bodies 41a and 41b while performing preparation work for raising and lowering. For this reason, when the extended state becomes unsuitable, such as the pilot line 31 and the master rope 25 are entangled, it is possible to notify the first worker P1 and to perform an operation for properly returning the extended state.

第1作業者P1は、建物10の「けらば」の下方位置に移動した後、図4(d)、図5(c)に示すように、建物10における第2位置N2側の出隅部分の外側を回り込むことで、建物10を挟んで第1位置N1とは反対側の反対位置Mに移動する。反対位置Mは、第2屋根部13bの軒先の下方位置であって第2位置N2に近い位置であり、第1作業者P1が第2アンカー27に対して所定作業を行うことが可能になっている。   After the first worker P1 moves to a position below the “Karaba” of the building 10, as shown in FIGS. 4 (d) and 5 (c), the projected corner portion on the second position N2 side in the building 10 Is moved to the opposite position M opposite to the first position N1 across the building 10. The opposite position M is a position below the eaves of the second roof portion 13b and close to the second position N2, and the first worker P1 can perform a predetermined work on the second anchor 27. ing.

第1作業者P1は、反対位置Mに移動した後、図4(e)に示すように、操作棒32を保持した状態でその操作棒32を縮めるという収縮工程を行う。第1作業者P1は、伸長工程と同様に、操作棒32を上下方向に立てた状態で非伸長状態になるまで縮める。   After the first worker P1 moves to the opposite position M, as shown in FIG. 4 (e), the first worker P1 performs a contraction process of contracting the operation bar 32 while holding the operation bar 32. Similar to the extension step, the first worker P1 contracts the operating rod 32 in the up-down direction until it reaches a non-extended state.

その後、図4(f)に示すように、第1作業者P1は、操作棒32に対するパイロットライン31の接続を解除する接続解除工程を行う。この接続解除工程では、操作棒32の引っ掛け部33からパイロットライン31のリング部34を取り外す。そして、パイロットライン31を第2位置N2側に引き寄せる。ここで、パイロットライン31において引き寄せた部分は、第2アンカー27の各袋体41のうち水を入れずに空にしてある袋体41に入れていく。これにより、第2アンカー27の袋体41の1つをパイロットライン31の収納部として利用することができる。   Thereafter, as shown in FIG. 4 (f), the first worker P 1 performs a connection releasing step for releasing the connection of the pilot line 31 to the operation rod 32. In this connection release step, the ring portion 34 of the pilot line 31 is removed from the hook portion 33 of the operation rod 32. Then, the pilot line 31 is drawn toward the second position N2. Here, the portion drawn in the pilot line 31 is put into the bag body 41 that is empty without putting water in each bag body 41 of the second anchor 27. Thereby, one of the bag bodies 41 of the second anchor 27 can be used as a storage part of the pilot line 31.

第1作業者P1は、第2位置N2側にパイロットライン31の全てを回収した後、接続部材42を取り外すことでパイロットライン31と親綱25との接続を解消する。また、第1作業者P1は、親綱25の終端部が第1アンカー26の袋体41aから引き上げられ、それ以上の引き上げが第1アンカー26の重さにより規制された状態になるまで、第2位置N2側に向けて親綱25を引き寄せる。この場合、第1位置N1を視認している第2作業者P2が、親綱25の引き寄せを終了するように第1作業者P1に指示を出すことが好ましい。これにより、第1作業者P1による親綱25の引き寄せが多過ぎたり少な過ぎたりすることを防止できる。   The first worker P1 removes the connection member 42 and then removes the connection between the pilot line 31 and the master rope 25 after collecting all of the pilot line 31 on the second position N2 side. In addition, the first worker P1 is in a state where the terminal portion of the master rope 25 is lifted from the bag body 41a of the first anchor 26, and further lifting is restricted by the weight of the first anchor 26. The master rope 25 is drawn toward the second position N2. In this case, it is preferable that the second worker P2 viewing the first position N1 issues an instruction to the first worker P1 so as to end the drawing of the master rope 25. Thereby, it is possible to prevent the parent rope 25 from being pulled too much or too little by the first worker P1.

第1作業者P1は、親綱25の引き寄せ作業を終了した後、その親綱25の先端側の部分を第2アンカー27に接続する。これにより、図1に示すように、親綱25を弛みがない状態で屋根13に設置することができる。その後、第2作業者P2は、梯子23を第1アンカー26の近くにおいて第1屋根部13aの軒先に立て掛け、親綱25に安全帯を連結して梯子23の昇降を開始する。親綱25を設置した後に梯子23の設置作業を行うことで、梯子23の設置作業を先に行った場合とは異なり、パイロットライン31や親綱25が梯子23に引っ掛かってしまうということを防止できる。   The first worker P <b> 1 connects the distal end portion of the master rope 25 to the second anchor 27 after finishing the pulling work of the master rope 25. Thereby, as shown in FIG. 1, the master rope 25 can be installed in the roof 13 in a state without slack. Thereafter, the second worker P2 leans the ladder 23 against the eaves of the first roof portion 13a near the first anchor 26, connects the safety belt to the master rope 25, and starts raising and lowering the ladder 23. By installing the ladder 23 after installing the master rope 25, unlike the case where the ladder 23 is installed first, the pilot line 31 and the master rope 25 are prevented from being caught by the ladder 23. it can.

なお、親綱25の設置作業が終了した後、第1アンカー26の袋体41a,41bは、親綱25やパイロットライン31が引き出されたことで空になっている。そこで、袋体41a,41bに水を入れることで、第1アンカー26の重量を増加させる。これにより、第1アンカー26による親綱25の固定強度を高めることができる。   In addition, after the installation work of the master rope 25 is complete | finished, the bag bodies 41a and 41b of the 1st anchor 26 are empty because the master rope 25 and the pilot line 31 were pulled out. Then, the weight of the 1st anchor 26 is increased by putting water in the bag bodies 41a and 41b. Thereby, the fixed strength of the master rope 25 by the first anchor 26 can be increased.

また、第2アンカー27においては、回収したパイロットライン31を袋体41から取り出して片付けることで、その袋体41が再び空になる。そこで、その袋体41に水を入れて第2アンカー27の重量を増加させる。これにより、第2アンカー27による親綱25の固定強度を高めることができる。   Further, in the second anchor 27, the collected pilot line 31 is taken out from the bag body 41 and cleaned up so that the bag body 41 becomes empty again. Therefore, water is put into the bag body 41 to increase the weight of the second anchor 27. Thereby, the fixed strength of the master rope 25 by the second anchor 27 can be increased.

以上詳述した本実施形態によれば、以下の優れた効果が得られる。   According to the embodiment described in detail above, the following excellent effects can be obtained.

第1位置N1においては、地面に置かれた袋体41bにパイロットライン31が収納されているため、第1作業者P1が操作棒32を持って第1位置N1から第2位置N2に移動する際に、別の作業者(例えば第2作業者P2)が第1位置N1からのパイロットライン31の繰り出し作業を行うという必要がない。このため、パイロットライン31の敷設作業を第1作業者P1が1人で行うことができる。   At the first position N1, since the pilot line 31 is stored in the bag body 41b placed on the ground, the first operator P1 moves from the first position N1 to the second position N2 with the operation rod 32. In this case, it is not necessary for another worker (for example, the second worker P2) to perform the operation of extending the pilot line 31 from the first position N1. For this reason, the first worker P1 can perform the installation work of the pilot line 31 by one person.

例えば、第1位置N1に棒部材が立設され、その棒部材の上端からパイロットライン31が繰り出されるという構成では、その棒部材を別の作業者が手で支えている必要がある。また、棒部材が屋根13に届くほどの長さを有していれば、この棒部材が倒れた場合に、建物10や人に接触する可能性が高くなってしまう。これに対して、本実施形態では、棒部材を用いずにパイロットライン31の繰り出しが行われているため、パイロットライン31の敷設に際して安全性が低下することを抑制できる。   For example, in a configuration in which a rod member is erected at the first position N1 and the pilot line 31 is fed out from the upper end of the rod member, it is necessary that another worker supports the rod member by hand. Further, if the bar member has such a length that it can reach the roof 13, when the bar member falls down, the possibility of coming into contact with the building 10 or a person is increased. On the other hand, in this embodiment, since the pilot line 31 is drawn out without using a bar member, it is possible to suppress a decrease in safety when the pilot line 31 is laid.

したがって、親綱25を屋根13に設置する際に安全性を確保でき、しかも、コスト負担を低減できる。   Therefore, safety can be secured when the master rope 25 is installed on the roof 13, and the cost burden can be reduced.

パイロットライン31の終端部と親綱25の先端部とが接続された状態でパイロットライン31の敷設作業が行われるため、第1作業者P1は、第1位置N1から反対位置Mに移動した後、パイロットライン31を第2位置N2側(反対位置M側)に回収することで、第1位置N1側に戻らなくても親綱25を屋根13の上に設置できる。このため、パイロットライン31を敷設した後に、第1作業者P1が第1位置N1側と第2位置N2側とを往復するという手間を省くことができる。   Since the laying operation of the pilot line 31 is performed in a state in which the end portion of the pilot line 31 and the distal end portion of the master rope 25 are connected, the first worker P1 moves from the first position N1 to the opposite position M. By collecting the pilot line 31 to the second position N2 side (opposite position M side), the master rope 25 can be installed on the roof 13 without returning to the first position N1 side. For this reason, after laying the pilot line 31, it is possible to save the trouble of the first worker P1 reciprocating between the first position N1 side and the second position N2 side.

親綱25の終端部が第1アンカー26に接続された状態でパイロットライン31の敷設作業及び回収作業が行われるため、第1作業者P1は、親綱25を弛みがない状態になるまで第2位置N2側に引っ張るという容易な作業を行うことで、親綱25の終端部を第1アンカー26により固定することができる。このため、第1作業者P1は、親綱25を屋根13の上に敷設した後に、再び第1位置N1側に戻って親綱25を第1アンカー26に固定するという作業を行う必要がない。   Since the laying operation and the recovery operation of the pilot line 31 are performed in a state in which the terminal portion of the master rope 25 is connected to the first anchor 26, the first operator P1 does not loosen the master rope 25 until the master rope 25 becomes loose. By performing an easy operation of pulling to the second position N2 side, the terminal portion of the master rope 25 can be fixed by the first anchor 26. For this reason, after laying the master rope 25 on the roof 13, the first worker P1 does not need to perform the work of returning to the first position N1 side and fixing the master rope 25 to the first anchor 26 again. .

アンカー26,27が複数の袋体41を有しているため、これら袋体41を、水を入れることで重り部として利用すること、及びパイロットライン31や親綱25を入れておく収納部として利用することの両方が可能になる。したがって、重り部と収納部とを別々の専用部材として準備する必要がないため、作業負担及びコスト負担の両方を低減できる。   Since the anchors 26 and 27 have a plurality of bag bodies 41, these bag bodies 41 can be used as weight parts by putting water, and as a storage part in which the pilot line 31 and the master rope 25 are put. Both can be used. Therefore, since it is not necessary to prepare the weight part and the storage part as separate dedicated members, both the work burden and the cost burden can be reduced.

操作棒32が伸縮可能になっているため、伸縮させることができない操作棒を使用する場合とは異なり、操作棒32に対するパイロットライン31の着脱作業を第1作業者P1が1人で行う際に、操作棒32を地面に横倒しの状態で置いて操作棒32の根元側と先端側とを行き来するという手間を省くことができる。   Since the operation rod 32 is extendable and retractable, unlike the case of using an operation rod that cannot be expanded and contracted, when the first operator P1 performs the attaching / detaching operation of the pilot line 31 with respect to the operation rod 32 by one person. Thus, it is possible to save the trouble of placing the operating rod 32 on the ground while lying on the ground and moving back and forth between the base side and the distal end side of the operating rod 32.

操作棒32の先端部に引っ掛け部33が設けられているため、その引っ掛け部33にパイロットライン31のリング部34を引っ掛けるという容易な作業を行うことで、操作棒32に対するパイロットライン31の接続作業を行うことができる。また、引っ掛け部33は保持状態にあることで、パイロットライン31が引っ掛かった状態を保持するため、パイロットライン31の敷設作業を行っている最中にパイロットライン31が意図せずに操作棒32の先端部から外れるということを防止できる。   Since the hook 33 is provided at the tip of the operation rod 32, the pilot line 31 is connected to the operation rod 32 by performing an easy operation of hooking the ring 34 of the pilot line 31 to the hook 33. It can be performed. In addition, since the hook portion 33 is in the holding state, the pilot line 31 is not intended to be used while the pilot line 31 is being laid, so that the pilot line 31 is held. It can prevent coming off from the tip.

操作棒32においては、棒本体36の先端部に引っ掛け部材37が取り付けられているため、引っ掛け部材37を専用品として製造する必要が生じたとしても、棒本体36は専用品ではなく汎用品を使用することができる。これにより、操作棒32についてコスト負担の低減を実現できる。   In the operation rod 32, the hook member 37 is attached to the tip of the rod body 36. Therefore, even if the hook member 37 needs to be manufactured as a dedicated product, the rod body 36 is not a dedicated product but a general-purpose product. Can be used. Thereby, the cost burden can be reduced for the operation rod 32.

[他の実施形態]
本発明は上記実施形態の記載内容に限定されず、例えば次のように実施されてもよい。
[Other Embodiments]
The present invention is not limited to the description of the above embodiment, and may be implemented as follows, for example.

(1)操作棒32が、その長手方向に交差する方向に延びたアーム部を有していてもよい。例えば、図6(a),(b)に示すように、操作棒32の引っ掛け部材37がアーム部51を備えた構成とする。この構成では、アーム部51が装着部38の先端部から棒本体36に直交する方向に延びている。アーム部51は、所定の長さ寸法(例えば30〜50cm)を有しており、その先端部(自由端側)に引っ掛け部33が配置されている。このため、第1作業者P1がこの操作棒32を用いてパイロットライン31の敷設作業を行う場合に、第1作業者P1は、操作棒32と屋根13との離間距離がアーム部51の長さ寸法より小さくなる位置を通ることで、操作棒32を斜めに傾けなくてもアーム部51の先端部(引っ掛け部33)を屋根13の上側に存在させることができる。これにより、パイロットライン31の敷設作業を容易化することができる。   (1) The operation rod 32 may have an arm portion extending in a direction intersecting the longitudinal direction. For example, as shown in FIGS. 6A and 6B, the hook member 37 of the operation rod 32 includes an arm portion 51. In this configuration, the arm portion 51 extends from the distal end portion of the mounting portion 38 in a direction orthogonal to the rod body 36. The arm part 51 has a predetermined length dimension (for example, 30 to 50 cm), and the hook part 33 is disposed at the tip part (free end side) thereof. For this reason, when the first worker P1 performs the laying operation of the pilot line 31 using the operation rod 32, the first worker P1 has a distance between the operation rod 32 and the roof 13 that is the length of the arm portion 51. By passing through a position smaller than the size, the tip end portion (the hook portion 33) of the arm portion 51 can be present on the upper side of the roof 13 without tilting the operation bar 32 obliquely. Thereby, the installation work of the pilot line 31 can be facilitated.

また、操作棒32を斜めに傾けなくてもパイロットライン31を屋根13の上に載せることができるため、第1作業者P1は、建物10から側方にある程度離れるという必要がない。このため、仮に建物10が狭小地に構築されていることなどに起因して、敷地境界線と建物10との離間距離が操作棒32を斜めに傾けることができないほどに小さくても、第1作業者P1が敷地内にいながらにして操作棒32を用いてパイロットライン31を屋根13の上に敷設することができる。   In addition, since the pilot line 31 can be placed on the roof 13 without tilting the operation bar 32, the first worker P1 does not have to move away from the building 10 to some extent on the side. For this reason, even if the distance between the site boundary line and the building 10 is so small that the operation rod 32 cannot be tilted obliquely due to the building 10 being constructed in a narrow area, the first The pilot line 31 can be laid on the roof 13 using the operation rod 32 while the worker P1 is in the site.

(2)上記実施形態では、操作棒32の引っ掛け部33において、開閉体33bが付勢手段により付勢されていたが、引っ掛け部33が保持状態と非保持状態とに移行可能であれば、開閉体33bは付勢されていなくてもよい。例えば、開閉体33bが雌ネジを有し、フック体33aの端部が雄ネジを有しており、フック体33aに対する開閉体33bのねじ込みの状態に応じて保持状態と非保持状態とが切り替えられる構成とする。また、引っ掛け部33が保持状態と非保持状態とに切り替えられるのであれば、引っ掛け部33はフック体33aや開閉体33bを含まずに形成されていてもよい。   (2) In the above-described embodiment, the opening / closing body 33b is urged by the urging means in the hook portion 33 of the operation rod 32, but if the hook portion 33 can be shifted between the holding state and the non-holding state The opening / closing body 33b may not be biased. For example, the opening / closing body 33b has a female thread and the end of the hook body 33a has a male thread, and the holding state and the non-holding state are switched depending on the screwed state of the opening / closing body 33b with respect to the hook body 33a. It is set as the structure. Further, as long as the hook portion 33 can be switched between the holding state and the non-holding state, the hook portion 33 may be formed without including the hook body 33a and the opening / closing body 33b.

(3)上記実施形態では、操作棒32において、装着部38が弾性変形することで引っ掛け部材37が棒本体36に装着されていたが、引っ掛け部材37が棒本体36に着脱可能であれば、引っ掛け部材37は棒本体36に対して螺着されていてもよく、ビス等の固定具により固定されていてもよい。   (3) In the above-described embodiment, the hook member 37 is attached to the rod main body 36 due to the elastic deformation of the attachment portion 38 in the operation rod 32, but if the hook member 37 is detachable from the rod main body 36, The hook member 37 may be screwed to the rod main body 36 or may be fixed by a fixing tool such as a screw.

また、引っ掛け部材37は、棒本体36に対して着脱できない状態で設けられていてもよい。例えば、内側本体部36aと引っ掛け部材37とが一体成型された構成とする。   Further, the hook member 37 may be provided in a state where it cannot be attached to and detached from the rod body 36. For example, the inner main body 36a and the hook member 37 are integrally formed.

(4)上記実施形態では、パイロットライン31が弾性変形可能であり、親綱25が柔軟性を有していたが、パイロットライン31及び親綱25の両方が弾性変形可能としてもよく、これら両方が柔軟性を有していてもよい。   (4) In the above embodiment, the pilot line 31 can be elastically deformed and the master rope 25 has flexibility. However, both the pilot line 31 and the master rope 25 may be elastically deformable, both of these. May have flexibility.

(5)上記実施形態では、操作棒32が伸縮可能な構成とされたが、操作棒32は伸縮させることができない構成としてもよい。この場合でも、接続工程や接続解除工程において、大型の操作棒32を地面に横倒しの状態で置き、第1作業者P1が操作棒32の先端部に移動することで、操作棒32に対するパイロットライン31の接続及び接続解除を行うことができる。   (5) In the above-described embodiment, the operation rod 32 is configured to be extendable / contracted. Even in this case, in the connection process and the connection release process, the large operation rod 32 is placed on the ground in a lying state, and the first operator P1 moves to the tip of the operation rod 32, whereby the pilot line for the operation rod 32 is obtained. 31 can be connected and disconnected.

(6)上記実施形態では、仮置き工程においてパイロットライン31と親綱25とを別々の袋体41a,41bに入れておいたが、これらパイロットライン31と親綱25とは1つの袋体41に入れておいてもよい。この場合でも、1つの袋体41の内部において、親綱25の上にパイロットライン31を配置することで、パイロットライン31に続いて親綱25が繰り出される状態をつくり出すことができる。   (6) In the above embodiment, the pilot line 31 and the master rope 25 are put in separate bag bodies 41a and 41b in the temporary placing step, but the pilot line 31 and the master rope 25 are one bag body 41. It may be put in. Even in this case, it is possible to create a state in which the master rope 25 is drawn out following the pilot line 31 by disposing the pilot line 31 on the master rope 25 inside one bag body 41.

また、パイロットライン31や親綱25は、操作棒32の操作に伴って繰り出し可能な状態で第1位置N1に仮置きされていれば、袋体41に入れられていなくてもよい。つまり、パイロットライン31や親綱25は、アンカー26,27に収納されているのではなく、専用の収納体に収納されていてもよい。   Further, the pilot line 31 and the master rope 25 may not be put in the bag body 41 as long as they are temporarily placed at the first position N1 in a state where the pilot line 31 and the master rope 25 can be paid out in accordance with the operation of the operation rod 32. That is, the pilot line 31 and the master rope 25 may not be stored in the anchors 26 and 27 but may be stored in a dedicated storage body.

(7)上記実施形態では、固定手段としてのアンカー26,27が水の入れられた袋体41とされていたが、アンカー26,27は、鋼材やコンクリートブロック等の重量物とされていてもよい。この場合、パイロットライン31や親綱25を収納する収納部は、アンカー26,27とは別に設けられていることが好ましい。また、親綱25は、基礎11や建物10の躯体の一部に対して固定されていてもよい。この場合は、基礎11や躯体が固定手段に相当する。   (7) In the above embodiment, the anchors 26 and 27 as the fixing means are the bags 41 containing water, but the anchors 26 and 27 may be heavy objects such as steel and concrete blocks. Good. In this case, it is preferable that the storage unit for storing the pilot line 31 and the master rope 25 is provided separately from the anchors 26 and 27. In addition, the master rope 25 may be fixed to a part of the foundation 11 or the housing of the building 10. In this case, the foundation 11 and the housing correspond to the fixing means.

(8)上記実施形態では、親綱25の設置作業について、仮置き工程の後に接続工程が行われていたが、接続工程は仮置き工程の前に行われてもよい。この場合、第1作業者P1等は、操作棒32の引っ掛け部33にパイロットライン31のリング部34を引っ掛けた状態で、これら操作棒32とパイロットライン31とをまとめて第1位置N1に運べばよい。   (8) In the above embodiment, the connection process is performed after the temporary placement process for the installation work of the master rope 25, but the connection process may be performed before the temporary placement process. In this case, the first worker P1 or the like can carry the operation rod 32 and the pilot line 31 together to the first position N1 in a state where the ring portion 34 of the pilot line 31 is hooked on the hook 33 of the operation rod 32. That's fine.

また、接続解除工程は、回収工程の前ではなく回収工程の後に行われてもよい。これは、第1作業者P1が、パイロットライン31を第2位置N2側に回収した後でも、そのパイロットライン31を操作棒32から取り外すことが可能なためである。   Further, the disconnection process may be performed after the recovery process, not before the recovery process. This is because the first operator P1 can remove the pilot line 31 from the operation rod 32 even after the pilot line 31 has been recovered to the second position N2.

(9)上記実施形態では、第1位置N1においてパイロットライン31及び親綱25の両方を仮置きしたが、第1位置N1にはパイロットライン31だけを仮置きし、親綱25は第2位置N2に仮置きしてもよい。この場合、第1作業者P1は、反対位置Mに移動することでパイロットライン31を敷設した後、そのパイロットライン31を操作棒32から取り外して親綱25の先端部に接続し、第1位置N1側に戻ってこの第1位置N1側にパイロットライン31を引き戻すことで回収する。この作業手順でも、屋根13の上に親綱25を設置することができる。   (9) In the above embodiment, both the pilot line 31 and the master rope 25 are temporarily placed at the first position N1, but only the pilot line 31 is temporarily placed at the first position N1, and the master rope 25 is at the second position. It may be temporarily placed on N2. In this case, after laying the pilot line 31 by moving to the opposite position M, the first operator P1 removes the pilot line 31 from the operating rod 32 and connects it to the tip of the master rope 25, and then the first position The pilot line 31 is recovered by returning to the N1 side and returning the pilot line 31 to the first position N1 side. Even in this work procedure, the master rope 25 can be installed on the roof 13.

(10)上記実施形態では、親綱25を屋根13の上に設置する際にパイロットライン31を使用したが、パイロットライン31を使用しなくてもよい。例えば、パイロットライン31ではなく親綱25を操作棒32に接続し、操作棒32を操作することで親綱25を屋根13の上に載せる方法とする。この方法では、接続工程において、親綱25の先端部にリング部を取り付けておき、そのリング部を操作棒32の引っ掛け部33に引っ掛ける。また、移動工程では、第1作業者P1が親綱25が屋根13の上に載るように操作棒32を操作しながら移動する。接続解除工程では、親綱25のリング部を引っ掛け部33から取り外すことで、操作棒32に対する親綱25の接続を解除する。   (10) In the above embodiment, the pilot line 31 is used when the master rope 25 is installed on the roof 13, but the pilot line 31 may not be used. For example, instead of the pilot line 31, the master rope 25 is connected to the operation rod 32, and the operation rod 32 is operated to place the master rope 25 on the roof 13. In this method, in the connecting step, a ring part is attached to the tip of the master rope 25 and the ring part is hooked on the hook part 33 of the operating rod 32. In the moving process, the first worker P1 moves while operating the operation bar 32 so that the master rope 25 is placed on the roof 13. In the connection release step, the connection of the master rope 25 to the operation rod 32 is released by removing the ring portion of the master rope 25 from the hook portion 33.

操作棒32にパイロットライン31及び親綱25のいずれを接続する場合でも、操作棒32に線状部材を接続することになり、第1作業者P1は、操作棒32を操作することで線状部材を屋根13の上に載せることになる。なお、操作棒32に親綱25を接続する場合には、親綱25が弾性変形可能な線状部材とされていることが好ましい。これにより、操作棒32を用いて親綱25を屋根13の上に載せる作業を容易化できる。   Regardless of whether the pilot line 31 or the master rope 25 is connected to the operation rod 32, a linear member is connected to the operation rod 32, and the first worker P 1 operates linearly by operating the operation rod 32. The member is placed on the roof 13. When the master rope 25 is connected to the operation bar 32, the master rope 25 is preferably a linear member that can be elastically deformed. Thereby, the operation | work which mounts the master rope 25 on the roof 13 using the operation stick | rod 32 can be made easy.

(11)上記実施形態では、第1位置N1は地面に対して設定されていたが、第1位置N1は地面から上方に離間した位置(地面付近)に設定されていてもよい。例えば、地面の上に仮置き台が載置され、その仮置き台の上に第1アンカー26が置かれてもよい。   (11) In the above embodiment, the first position N1 is set with respect to the ground. However, the first position N1 may be set at a position (near the ground) spaced upward from the ground. For example, a temporary table may be placed on the ground, and the first anchor 26 may be placed on the temporary table.

(12)上記実施形態では、親綱25を設置した後に梯子23を屋根13に立て掛けたが、梯子23を屋根13に立て掛けた状態で親綱25の設置作業を行ってもよい。   (12) In the above embodiment, the ladder 23 is leaned against the roof 13 after the parent rope 25 is installed. However, the installation work of the parent rope 25 may be performed with the ladder 23 leaning against the roof 13.

(13)上記実施形態では、新規の太陽光パネル21を建物10の屋根13に取り付ける際に親綱25が設置されたが、親綱25は、既設の太陽光パネル21のメンテナンスや、既設の屋根13のメンテナンス、建物10の新築工事に際して設置されてもよい。   (13) In the above embodiment, when the new solar panel 21 is attached to the roof 13 of the building 10, the master rope 25 is installed. However, the master rope 25 can be used for maintenance of the existing solar panel 21 or the existing solar panel 21. It may be installed at the time of maintenance of the roof 13 or new construction of the building 10.

(14)上記実施形態では、親綱25を棟に交差して延びるように設置したが、親綱25を棟に沿って延びるように設置してもよい。また、親綱25を設置する屋根13は、切妻屋根ではなく、寄棟屋根や片流れ屋根、陸屋根とされていてもよい。   (14) In the above embodiment, the master rope 25 is installed so as to extend across the ridge, but the master rope 25 may be installed so as to extend along the ridge. Moreover, the roof 13 on which the master rope 25 is installed may be a dormitory roof, a single-flow roof, or a flat roof instead of a gable roof.

10…建物、13…屋根、23…梯子、25…線状部材としての親綱、26…固定手段としての第1アンカー、31…線状部材としてのパイロットライン、32…操作棒、33…被接続部としての引っ掛け部、36…棒本体、37…引っ掛け部材、41…重り部を形成する収納部としての袋体、51…アーム部、N1…仮置き位置としての第1位置、M…反対位置、P1…作業者としての第1作業者。   DESCRIPTION OF SYMBOLS 10 ... Building, 13 ... Roof, 23 ... Ladder, 25 ... Master rope as linear member, 26 ... First anchor as fixing means, 31 ... Pilot line as linear member, 32 ... Operation rod, 33 ... Cover Hook part as connection part, 36 ... rod main body, 37 ... hook member, 41 ... bag as storage part forming weight part, 51 ... arm part, N1 ... first position as temporary placement position, M ... opposite Position, P1... First worker as an operator.

Claims (10)

建物の屋根に親綱を設置する親綱の設置方法であって、
前記親綱及び該親綱を案内するためのパイロットラインのうち一方を線状部材として操作棒に接続する接続工程と、
前記線状部材を、前記操作棒の操作に伴う繰り出しが可能な状態で、前記建物の側方において地面又は地面付近に設定された仮置き位置に仮置きする仮置き工程と、
前記仮置き位置から引き出された前記線状部材が前記屋根の上に載るように前記操作棒を操作しながら、当該操作棒を前記建物を挟んで前記仮置き位置とは反対側の反対位置に移動させる移動工程と、
前記操作棒に対する前記線状部材の接続を解除する接続解除工程と、
を備えていることを特徴とする親綱の設置方法。
A method for installing a master rope on a roof of a building,
A connecting step of connecting one of the master rope and a pilot line for guiding the master rope as a linear member to the operation rod;
Temporary placement step of temporarily placing the linear member in a temporary placement position set on the ground or in the vicinity of the ground on the side of the building in a state where the linear member can be extended with the operation of the operation rod;
While operating the operation bar so that the linear member drawn out from the temporary placement position is placed on the roof, the operation bar is placed on the opposite side of the temporary placement position across the building. A moving process to move;
A connection releasing step for releasing the connection of the linear member to the operation rod;
A parent rope installation method characterized by comprising:
前記接続工程では、前記親綱及び前記パイロットラインのうち前記パイロットラインを前記線状部材として前記操作棒に接続し、
前記仮置き工程では、前記パイロットラインを前記仮置き位置に仮置きし、
前記移動工程では、前記パイロットラインが前記屋根の上に載るように前記操作棒を移動させ、
前記接続解除工程では、前記操作棒に対する前記パイロットラインの接続を解除し、
さらに、前記親綱に接続された状態の前記パイロットラインを前記仮置き位置側又は前記反対位置側に回収することで、該親綱を前記屋根の上を通って前記仮置き位置側と前記反対位置側とに掛け渡す回収工程を備えていることを特徴とする請求項1に記載の親綱の設置方法。
In the connecting step, the pilot line of the master rope and the pilot line is connected to the operation rod as the linear member,
In the temporary placement step, the pilot line is temporarily placed at the temporary placement position,
In the moving step, the operation bar is moved so that the pilot line is placed on the roof,
In the connection release step, release the connection of the pilot line to the operation rod,
Further, by collecting the pilot line connected to the master rope to the temporary placement position side or the opposite position side, the master rope passes through the roof and is opposite to the temporary placement position side. The method for installing a master rope according to claim 1, further comprising a recovery step that spans the position side.
前記仮置き工程では、前記パイロットラインに加えて、該パイロットラインにおける前記操作棒とは反対側の端部に接続される前記親綱を、同パイロットラインに続いて引き出される状態で前記仮置き位置に仮置きし、
前記回収工程では、前記パイロットラインを前記反対位置側に回収することを特徴とする請求項2に記載の親綱の設置方法。
In the temporary placement step, in addition to the pilot line, the master rope connected to the end of the pilot line on the side opposite to the operation rod is placed in the temporary placement position in a state of being pulled out following the pilot line. Temporarily put in
3. The parent rope installation method according to claim 2, wherein in the recovery step, the pilot line is recovered to the opposite position side.
前記仮置き工程では、
前記回収工程を行うことで前記親綱を前記仮置き位置側と前記反対位置側とに掛け渡した状態で該親綱を前記仮置き位置側において地面に対して固定するための固定手段を、同親綱に接続された状態で設置し、
前記回収工程では、前記固定手段との間で前記親綱に張力がかかるまで前記反対位置側に該親綱又は前記パイロットラインを引っ張ることを特徴とする請求項3に記載の親綱の設置方法。
In the temporary placement step,
A fixing means for fixing the master rope to the ground at the temporary placement position side in a state where the master rope is spanned between the temporary placement position side and the opposite position side by performing the recovery step; Installed while connected to the parent rope,
The method of installing a master rope according to claim 3, wherein, in the recovery step, the master rope or the pilot line is pulled to the opposite position side until tension is applied to the master rope between the fixing means. .
前記固定手段は、上方に向けて開放された複数の収納部を有しており、
前記仮置き工程では、前記複数の収納部のうち少なくとも1つの収納部に水を入れることで、前記親綱を地面に対して固定する重り部を形成し、該重り部ではない少なくとも1つの収納部に前記パイロットライン及び前記親綱を収納することで、これらパイロットライン及び親綱を前記仮置き位置に仮置きすることを特徴とする請求項4に記載の親綱の設置方法。
The fixing means has a plurality of storage parts opened upward,
In the temporary placing step, by adding water to at least one of the plurality of storage portions, a weight portion that fixes the parent rope to the ground is formed, and at least one storage that is not the weight portion is formed. 5. The method of installing the master rope according to claim 4, wherein the pilot line and the master rope are temporarily stored in the temporary placement position by storing the pilot line and the master rope in a part.
前記操作棒は、前記線状部材が着脱可能に接続される被接続部を有し、該被接続部が当該操作棒の一端に配置された状態のまま伸縮可能になっており、
前記接続工程では、前記操作棒を伸ばす前の状態で前記被接続部に前記線状部材を接続し、
前記移動工程では、伸ばした状態の前記操作棒を用いて前記線状部材を前記屋根の上に載せ、
前記接続解除工程では、前記操作棒を縮めた状態で前記被接続部から前記線状部材を取り外すことを特徴とする請求項1乃至5のいずれか1項に記載の親綱の設置方法。
The operation rod has a connected portion to which the linear member is detachably connected, and the connected portion can be expanded and contracted while being disposed at one end of the operation rod.
In the connecting step, the linear member is connected to the connected portion in a state before the operation rod is extended,
In the moving step, the linear member is placed on the roof using the extended operation rod.
6. The parent rope installation method according to claim 1, wherein, in the connection release step, the linear member is removed from the connected portion in a state in which the operation rod is contracted.
前記仮置き工程では、前記建物の側方のうち、前記屋根の上に登るために梯子が設置される側に前記仮置き位置を設定することを特徴とする請求項1乃至6のいずれか1項に記載の親綱の設置方法。   7. The temporary placement step, wherein the temporary placement position is set on a side of the building where a ladder is installed to climb on the roof. How to install the master rope described in the section. 親綱を建物の屋根の上に設置するために操作される親綱設置用の操作棒であって、
前記親綱及び該親綱を案内するためのパイロットラインのうち一方を線状部材として、該線状部材の端部に着脱可能に引っ掛けることが可能な引っ掛け部が、前記操作棒の先端部に設けられており、
前記引っ掛け部は、当該引っ掛け部が前記線状部材の端部に引っ掛けられた状態を保持する保持状態と、同引っ掛け部を前記線状部材の端部から取り外すことが可能な非保持状態とに移行可能であることを特徴とする親綱設置用の操作棒。
An operating rod for installing a master rope, which is operated to install the master rope on the roof of the building,
One of the master rope and the pilot line for guiding the master rope is a linear member, and a hook portion that can be detachably hooked to the end portion of the linear member is attached to the tip of the operation rod. Provided,
The hook portion is in a holding state in which the hook portion is hooked on an end portion of the linear member and in a non-holding state in which the hook portion can be removed from the end portion of the linear member. An operation bar for setting a master rope, which is transferable.
長尺状の棒本体と、
前記引っ掛け部を有し、前記棒本体の先端部に取り付けられた引っ掛け部材と、
を備えていることを特徴とする請求項8に記載の親綱設置用の操作棒。
A long rod body,
A hook member having the hook and attached to the tip of the rod body;
The operation rod for installing the master rope according to claim 8.
前記引っ掛け部材は、前記引っ掛け部に加えて、前記棒本体に交差する方向に延びているアーム部を有しており、
前記引っ掛け部は、前記アーム部の自由端側に配置されていることを特徴とする請求項9に記載の親綱設置用の操作棒。
The hook member has an arm portion extending in a direction intersecting the rod body in addition to the hook portion,
The operating rod for installing the master rope according to claim 9, wherein the hooking portion is arranged on a free end side of the arm portion.
JP2014129813A 2014-06-25 2014-06-25 Master rope installation method and parent rope installation control rod Active JP6163139B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2014129813A JP6163139B2 (en) 2014-06-25 2014-06-25 Master rope installation method and parent rope installation control rod

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2014129813A JP6163139B2 (en) 2014-06-25 2014-06-25 Master rope installation method and parent rope installation control rod

Publications (2)

Publication Number Publication Date
JP2016008434A true JP2016008434A (en) 2016-01-18
JP6163139B2 JP6163139B2 (en) 2017-07-12

Family

ID=55226193

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2014129813A Active JP6163139B2 (en) 2014-06-25 2014-06-25 Master rope installation method and parent rope installation control rod

Country Status (1)

Country Link
JP (1) JP6163139B2 (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2020063553A (en) * 2018-10-15 2020-04-23 トヨタホーム株式会社 Main rope setting method
KR102118121B1 (en) * 2019-12-27 2020-06-12 양진문 Winding Machine for Instllation of Saftey Rope
JP2020133100A (en) * 2019-02-12 2020-08-31 トヨタホーム株式会社 Master rope installation method and master rope with accommodation part
JP2021173033A (en) * 2020-04-23 2021-11-01 トヨタホーム株式会社 Main rope installation method

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS6472760A (en) * 1987-09-14 1989-03-17 Fujii Denko Metal hook which can be hooked at elevated spot
JPH0639024U (en) * 1992-10-28 1994-05-24 藤井電工株式会社 Master rope lock
JP3002444U (en) * 1994-03-28 1994-09-27 藤井電工株式会社 Main rope hook
JP2002155632A (en) * 2000-11-22 2002-05-31 Midori Anzen Co Ltd Operating rod and method for stretching main rope
JP2005299112A (en) * 2004-04-07 2005-10-27 Ebaa Shokai:Kk Safety rod for roof work
JP2005325562A (en) * 2004-05-13 2005-11-24 Sankyo:Kk Method and device for mounting safety device
JP2011179241A (en) * 2010-03-02 2011-09-15 Fujii Denko Co Ltd Implement for stretching main rope, and working method using the same
JP2012219561A (en) * 2011-04-12 2012-11-12 Ever-Shoukai Co Ltd Safety rod for lifting onto roof
WO2013125945A1 (en) * 2012-01-23 2013-08-29 Hans Antonius Borra Installing a safety line on a pitched roof

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS6472760A (en) * 1987-09-14 1989-03-17 Fujii Denko Metal hook which can be hooked at elevated spot
JPH0639024U (en) * 1992-10-28 1994-05-24 藤井電工株式会社 Master rope lock
JP3002444U (en) * 1994-03-28 1994-09-27 藤井電工株式会社 Main rope hook
JP2002155632A (en) * 2000-11-22 2002-05-31 Midori Anzen Co Ltd Operating rod and method for stretching main rope
JP2005299112A (en) * 2004-04-07 2005-10-27 Ebaa Shokai:Kk Safety rod for roof work
JP2005325562A (en) * 2004-05-13 2005-11-24 Sankyo:Kk Method and device for mounting safety device
JP2011179241A (en) * 2010-03-02 2011-09-15 Fujii Denko Co Ltd Implement for stretching main rope, and working method using the same
JP2012219561A (en) * 2011-04-12 2012-11-12 Ever-Shoukai Co Ltd Safety rod for lifting onto roof
WO2013125945A1 (en) * 2012-01-23 2013-08-29 Hans Antonius Borra Installing a safety line on a pitched roof

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2020063553A (en) * 2018-10-15 2020-04-23 トヨタホーム株式会社 Main rope setting method
JP7202135B2 (en) 2018-10-15 2023-01-11 トヨタホーム株式会社 How to install the main rope
JP2020133100A (en) * 2019-02-12 2020-08-31 トヨタホーム株式会社 Master rope installation method and master rope with accommodation part
JP7221073B2 (en) 2019-02-12 2023-02-13 トヨタホーム株式会社 Main rope installation method and main rope with storage part
KR102118121B1 (en) * 2019-12-27 2020-06-12 양진문 Winding Machine for Instllation of Saftey Rope
JP2021173033A (en) * 2020-04-23 2021-11-01 トヨタホーム株式会社 Main rope installation method
JP7323488B2 (en) 2020-04-23 2023-08-08 トヨタホーム株式会社 How to install the main rope

Also Published As

Publication number Publication date
JP6163139B2 (en) 2017-07-12

Similar Documents

Publication Publication Date Title
JP6163139B2 (en) Master rope installation method and parent rope installation control rod
WO2016181899A1 (en) Work gondola
US20180055298A1 (en) Semi-automatic apparatus for washing a building
JP3158320U (en) crane
JP6452995B2 (en) Installation method of construction sheet and equipment used for this method
KR101332763B1 (en) Working rack of safety net for box type structure
US20150259931A1 (en) Construction Hoist Strap and Method
JP5984064B2 (en) Net body or sheet body for ballproof etc., and moving method of net body or sheet body for ballproof etc.
EP3447212A1 (en) Platform apparatus and collection means therefor
KR20140030888A (en) Bed carrier
JP6321938B2 (en) Installation method of construction sheet and equipment used for this method
CN209159947U (en) A kind of tubular pole cutting operation platform
CN109277728B (en) Umbrella-shaped fire-catching device and fire-catching method thereof
JP2012140811A (en) Fall prevention ladder
KR101853009B1 (en) Greenhouse safety ladder for high place
KR101191918B1 (en) Rotating-up building roof structure using keel truss and rotating-up building method using keel truss
JP2010193656A (en) Line hardware replacing device
JP2016192881A (en) Capture net
JP7443279B2 (en) A roof frame for curing external framework scaffolding and a rain protection device for external framework scaffolding using a roof frame for curing external framework scaffolding.
JP2016192881A5 (en)
CN205442450U (en) Long -range controlled tower crane device
JP5463434B1 (en) Snow fence cutting device
JP7323488B2 (en) How to install the main rope
CN215093420U (en) Electric drill support frame for drilling holes in top of house
CN112376497B (en) Automatic change open water conservancy slope protection structure

Legal Events

Date Code Title Description
A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20160825

A711 Notification of change in applicant

Free format text: JAPANESE INTERMEDIATE CODE: A711

Effective date: 20160825

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A821

Effective date: 20160825

A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20161226

A871 Explanation of circumstances concerning accelerated examination

Free format text: JAPANESE INTERMEDIATE CODE: A871

Effective date: 20161226

A975 Report on accelerated examination

Free format text: JAPANESE INTERMEDIATE CODE: A971005

Effective date: 20170310

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20170321

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20170519

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20170606

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20170616

R150 Certificate of patent or registration of utility model

Ref document number: 6163139

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250