JP6953216B2 - Excavator - Google Patents

Excavator Download PDF

Info

Publication number
JP6953216B2
JP6953216B2 JP2017143522A JP2017143522A JP6953216B2 JP 6953216 B2 JP6953216 B2 JP 6953216B2 JP 2017143522 A JP2017143522 A JP 2017143522A JP 2017143522 A JP2017143522 A JP 2017143522A JP 6953216 B2 JP6953216 B2 JP 6953216B2
Authority
JP
Japan
Prior art keywords
pressure
arm
valve
boom
oil chamber
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2017143522A
Other languages
Japanese (ja)
Other versions
JP2019027009A (en
Inventor
圭二 本田
圭二 本田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sumitomo Heavy Industries Ltd
Original Assignee
Sumitomo Heavy Industries Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sumitomo Heavy Industries Ltd filed Critical Sumitomo Heavy Industries Ltd
Priority to JP2017143522A priority Critical patent/JP6953216B2/en
Priority to KR1020197032486A priority patent/KR102537157B1/en
Priority to CN201880030523.7A priority patent/CN110612371B/en
Priority to EP18821558.6A priority patent/EP3643842B1/en
Priority to PCT/JP2018/023151 priority patent/WO2018235779A1/en
Publication of JP2019027009A publication Critical patent/JP2019027009A/en
Priority to US16/716,743 priority patent/US11655611B2/en
Application granted granted Critical
Publication of JP6953216B2 publication Critical patent/JP6953216B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Operation Control Of Excavators (AREA)
  • Component Parts Of Construction Machinery (AREA)
  • Fluid-Pressure Circuits (AREA)

Description

本開示は、ショベルに関する。 This disclosure relates to excavators.

ショベルの機体の浮き上がりを防止しながら複合掘削作業を支援するショベルが知られている(特許文献1参照。)。このショベルは、ブーム切換弁とブーム操作レバーとの間のパイロットライン上に配置される電磁比例弁を備えている。ブーム切換弁は、ブームシリンダに流出入する作動油の流量を制御するスプール弁である。電磁比例弁は、コントローラからの制御電流に応じてブーム切換弁におけるブーム上げ操作用パイロットポートに作用するパイロット圧を制御する。具体的には、電磁比例弁は、コントローラからの制御電流が増大するにつれて、ブーム上げ操作用パイロットポートに作用する二次側圧が、ブーム操作レバーが出力する一次側圧よりも大きくなるように構成されている。 A shovel that supports combined excavation work while preventing the excavator's airframe from floating is known (see Patent Document 1). This excavator includes an electromagnetic proportional valve located on the pilot line between the boom switching valve and the boom operating lever. The boom switching valve is a spool valve that controls the flow rate of hydraulic oil flowing in and out of the boom cylinder. The electromagnetic proportional valve controls the pilot pressure acting on the boom raising operation pilot port in the boom switching valve according to the control current from the controller. Specifically, the electromagnetic proportional valve is configured so that the secondary side pressure acting on the boom raising operation pilot port becomes larger than the primary side pressure output by the boom operation lever as the control current from the controller increases. ing.

このショベルは、ブーム上げ操作とアーム閉じ操作の組み合わせである複合掘削操作中に、ブームシリンダのロッド側油室における作動油の圧力が閾値に達すると、電磁比例弁に制御電流を供給してブーム上げ操作用パイロットポートに作用するパイロット圧を増大させる。ブームシリンダのロッド側油室から作動油タンクに流出する作動油の量を増大させることによって、ロッド側油室における作動油の圧力を低減させるためである。その結果、ブームの上昇速度が増大して掘削反力の鉛直成分が減少し、ショベルの機体の浮き上がりが防止される。このショベルは、同様の制御により、掘削作業中に機体が掘削地点のほうに引き摺られるのを防止している。 This excavator supplies a control current to the electromagnetic proportional valve when the pressure of the hydraulic oil in the oil chamber on the rod side of the boom cylinder reaches the threshold value during the combined excavation operation, which is a combination of the boom raising operation and the arm closing operation. Increases the pilot pressure acting on the raising operation pilot port. This is to reduce the pressure of the hydraulic oil in the rod side oil chamber by increasing the amount of the hydraulic oil flowing out from the rod side oil chamber of the boom cylinder to the hydraulic oil tank. As a result, the ascending speed of the boom is increased, the vertical component of the excavation reaction force is reduced, and the excavator's body is prevented from rising. The excavator uses similar control to prevent the airframe from being dragged towards the excavation site during the excavation operation.

特開2014−122510号公報Japanese Unexamined Patent Publication No. 2014-122510

しかしながら、上述のショベルは、複合掘削操作中にブーム上げ操作用パイロットポートに作用するパイロット圧を増大させてブーム4の上昇速度を強制的に増大させることで、ショベルの機体の浮き上がりを防止する。そのため、ブーム4の上昇速度の大きさによっては、操作者が違和感を抱いてしまうおそれがある。 However, the above-mentioned excavator prevents the excavator's body from rising by increasing the pilot pressure acting on the boom raising operation pilot port during the combined excavation operation and forcibly increasing the rising speed of the boom 4. Therefore, depending on the magnitude of the ascending speed of the boom 4, the operator may feel uncomfortable.

上述に鑑み、パイロット圧に影響を与えることなく、掘削作業中に機体が浮き上がったり或いは引き摺られたりしてしまうのを防止できるショベルを提供することが望まれる。 In view of the above, it is desired to provide an excavator that can prevent the airframe from being lifted or dragged during the excavation work without affecting the pilot pressure.

本発明の実施例に係るショベルは、下部走行体と、前記下部走行体に旋回可能に搭載される上部旋回体と、前記上部旋回体に取り付けられるアタッチメントと、前記アタッチメントを構成する作業要素を駆動する油圧シリンダと、前記油圧シリンダのロッド側油室とボトム側油室とを接続する第1油路と、前記第1油路に配置される再生弁と、機体の安定度に関する所定の条件が満たされているか否かに基づいて前記再生弁の開口を制御する制御装置と、を有する。
The excavator according to the embodiment of the present invention drives a lower traveling body, an upper swivel body rotatably mounted on the lower traveling body, an attachment attached to the upper swivel body, and a working element constituting the attachment. The hydraulic cylinder, the first oil passage connecting the rod side oil chamber and the bottom side oil chamber of the hydraulic cylinder, the regeneration valve arranged in the first oil passage, and predetermined conditions regarding the stability of the machine body are satisfied. It has a control device that controls the opening of the regeneration valve based on whether or not it is satisfied.

上述の手段により、パイロット圧に影響を与えることなく、掘削作業中に機体が浮き上がったり或いは引き摺られたりしてしまうのを防止できるショベルが提供される。 By the means described above, an excavator capable of preventing the airframe from being lifted or dragged during the excavation work without affecting the pilot pressure is provided.

本発明の実施例に係るショベルの側面図である。It is a side view of the excavator which concerns on embodiment of this invention. 図1のショベルに搭載される駆動系の構成例を示す図である。It is a figure which shows the structural example of the drive system mounted on the excavator of FIG. 掘削が行われる際にショベルに作用する力の関係を示す図である。It is a figure which shows the relationship of the force acting on the excavator when excavation is performed. 図1のショベルに搭載される油圧回路の構成例を示す図である。It is a figure which shows the structural example of the hydraulic circuit mounted on the excavator of FIG. 第1支援処理の流れを示すフローチャートである。It is a flowchart which shows the flow of the 1st support process. アーム掘削作業中における各種物理量の時間的推移を示す図である。It is a figure which shows the time transition of various physical quantities during arm excavation work. 図1のショベルに搭載される油圧回路の別の構成例を示す図である。It is a figure which shows another structural example of the hydraulic circuit mounted on the excavator of FIG. 第2支援処理の流れを示すフローチャートである。It is a flowchart which shows the flow of the 2nd support process. 第3支援処理の流れを示すフローチャートである。It is a flowchart which shows the flow of the 3rd support process.

図1は、本発明の実施例に係る建設機械としてのショベル(掘削機)を示す側面図である。ショベルの下部走行体1には、旋回機構2を介して上部旋回体3が旋回可能に搭載されている。上部旋回体3にはブーム4が取り付けられている。ブーム4の先端にはアーム5が取り付けられ、アーム5の先端にはバケット6が取り付けられている。作業要素としてのブーム4、アーム5及びバケット6は、アタッチメントの一例である掘削アタッチメントを構成し、ブームシリンダ7、アームシリンダ8及びバケットシリンダ9によりそれぞれ油圧駆動される。上部旋回体3には、キャビン10が設けられ、且つ、エンジン11等の動力源が搭載されている。 FIG. 1 is a side view showing an excavator (excavator) as a construction machine according to an embodiment of the present invention. An upper swivel body 3 is mounted on the lower traveling body 1 of the shovel so as to be swivelable via a swivel mechanism 2. A boom 4 is attached to the upper swing body 3. An arm 5 is attached to the tip of the boom 4, and a bucket 6 is attached to the tip of the arm 5. The boom 4, arm 5, and bucket 6 as working elements constitute an excavation attachment, which is an example of the attachment, and are hydraulically driven by the boom cylinder 7, the arm cylinder 8, and the bucket cylinder 9, respectively. The upper swing body 3 is provided with a cabin 10 and is equipped with a power source such as an engine 11.

図2は、図1のショベルに搭載される駆動系の構成例を示す図である。図2において、機械的動力系は二重線、作動油ラインは太実線、パイロットラインは破線、電気制御系は一点鎖線でそれぞれ示されている。 FIG. 2 is a diagram showing a configuration example of a drive system mounted on the excavator of FIG. In FIG. 2, the mechanical power system is shown by a double line, the hydraulic oil line is shown by a thick solid line, the pilot line is shown by a broken line, and the electric control system is shown by a dashed line.

エンジン11の出力軸にはメインポンプ14及びパイロットポンプ15が接続されている。メインポンプ14は、1回転当たりの吐出量がレギュレータ14Aによって制御される可変容量型油圧ポンプである。パイロットポンプ15は固定容量型油圧ポンプである。メインポンプ14には作動油ライン16を介してコントロールバルブ17が接続されている。パイロットポンプ15にはパイロットライン25を介して操作装置26が接続されている。 A main pump 14 and a pilot pump 15 are connected to the output shaft of the engine 11. The main pump 14 is a variable displacement hydraulic pump in which the discharge amount per rotation is controlled by the regulator 14A. The pilot pump 15 is a fixed capacity hydraulic pump. A control valve 17 is connected to the main pump 14 via a hydraulic oil line 16. An operating device 26 is connected to the pilot pump 15 via a pilot line 25.

コントロールバルブ17は、複数のバルブを含むバルブセットであり、ショベルにおける油圧系を制御する。コントロールバルブ17は、作動油ラインを介して、左側走行用油圧モータ1L、右側走行用油圧モータ1R、ブームシリンダ7、アームシリンダ8、バケットシリンダ9、旋回用油圧モータ21等の油圧アクチュエータに接続されている。 The control valve 17 is a valve set including a plurality of valves, and controls the hydraulic system in the excavator. The control valve 17 is connected to a hydraulic actuator such as a left-side traveling hydraulic motor 1L, a right-side traveling hydraulic motor 1R, a boom cylinder 7, an arm cylinder 8, a bucket cylinder 9, and a turning hydraulic motor 21 via a hydraulic oil line. ing.

操作装置26は、油圧アクチュエータを操作するための装置であり、操作レバー及び操作ペダルを含む。操作装置26は、パイロットライン27を介してコントロールバルブ17に接続され、且つ、パイロットライン28を介して操作圧センサ29に接続されている。 The operation device 26 is a device for operating the hydraulic actuator, and includes an operation lever and an operation pedal. The operating device 26 is connected to the control valve 17 via the pilot line 27 and is connected to the operating pressure sensor 29 via the pilot line 28.

操作圧センサ29は、操作装置26が生成するパイロット圧を検出し、検出したパイロット圧に関する情報をコントローラ30に送信する。操作圧センサ29は、アーム操作レバーの操作状態を検出するアーム操作圧センサ、ブーム操作レバーの操作状態を検出するブーム操作圧センサ等を含む。 The operating pressure sensor 29 detects the pilot pressure generated by the operating device 26, and transmits information regarding the detected pilot pressure to the controller 30. The operating pressure sensor 29 includes an arm operating pressure sensor that detects the operating state of the arm operating lever, a boom operating pressure sensor that detects the operating state of the boom operating lever, and the like.

コントローラ30は、ショベルの駆動制御を行う主制御部としての制御装置である。本実施例では、コントローラ30は、CPU及び内部メモリを含む演算処理装置で構成され、内部メモリに格納された駆動制御用のプログラムをCPUに実行させて各種機能を実現する。 The controller 30 is a control device as a main control unit that controls the drive of the excavator. In this embodiment, the controller 30 is composed of a CPU and an arithmetic processing device including an internal memory, and causes the CPU to execute a drive control program stored in the internal memory to realize various functions.

シリンダ圧センサ31は、油圧シリンダの油室における作動油の圧力を検出するセンサであり、検出した値をコントローラ30に対して出力する。シリンダ圧センサ31は、アームロッド圧センサ、ブームロッド圧センサ、アームボトム圧センサ、ブームボトム圧センサ等を含む。アームロッド圧センサは、アームシリンダ8のロッド側油室8Rにおける作動油の圧力であるアームロッド圧を検出する。ブームロッド圧センサは、ブームシリンダ7のロッド側油室7Rにおける作動油の圧力であるブームロッド圧を検出する。アームボトム圧センサは、アームシリンダ8のボトム側油室8Bにおける作動油の圧力であるアームボトム圧を検出する。ブームボトム圧センサは、ブームシリンダ7のボトム側油室7Bにおける作動油の圧力であるブームボトム圧を検出する。 The cylinder pressure sensor 31 is a sensor that detects the pressure of hydraulic oil in the oil chamber of the hydraulic cylinder, and outputs the detected value to the controller 30. The cylinder pressure sensor 31 includes an arm rod pressure sensor, a boom rod pressure sensor, an arm bottom pressure sensor, a boom bottom pressure sensor, and the like. The arm rod pressure sensor detects the arm rod pressure, which is the pressure of the hydraulic oil in the rod side oil chamber 8R of the arm cylinder 8. The boom rod pressure sensor detects the boom rod pressure, which is the pressure of the hydraulic oil in the rod side oil chamber 7R of the boom cylinder 7. The arm bottom pressure sensor detects the arm bottom pressure, which is the pressure of the hydraulic oil in the bottom side oil chamber 8B of the arm cylinder 8. The boom bottom pressure sensor detects the boom bottom pressure, which is the pressure of the hydraulic oil in the bottom side oil chamber 7B of the boom cylinder 7.

姿勢センサ32は、ショベルの姿勢を検出するセンサであり、検出した値をコントローラ30に対して出力する。姿勢センサ32は、アーム角度センサ、ブーム角度センサ、バケット角度センサ、旋回角度センサ、傾斜角度センサ等を含む。アーム角度センサは、ブーム4に対するアーム5の開閉角度(以下、「アーム角度」とする。)を検出する。ブーム角度センサは、上部旋回体3に対するブーム4の俯仰角度(以下、「ブーム角度」とする。)を検出する。バケット角度センサは、アーム5に対するバケット6の開閉角度(以下、「バケット角度」とする。)を検出する。アーム角度センサ、ブーム角度センサ及びバケット角度センサのそれぞれは、例えば、加速度センサとジャイロセンサの組み合わせで構成される。ポテンショメータ、ストロークセンサ、ロータリエンコーダ等で構成されてもよい。旋回角度センサは、下部走行体1に対する上部旋回体3の旋回角度を検出する。傾斜角度センサは、水平面に対するショベルの接地面の角度である機体傾斜角度を検出する。 The posture sensor 32 is a sensor that detects the posture of the excavator, and outputs the detected value to the controller 30. The attitude sensor 32 includes an arm angle sensor, a boom angle sensor, a bucket angle sensor, a turning angle sensor, an inclination angle sensor, and the like. The arm angle sensor detects the opening / closing angle of the arm 5 with respect to the boom 4 (hereinafter, referred to as “arm angle”). The boom angle sensor detects the elevation angle (hereinafter referred to as “boom angle”) of the boom 4 with respect to the upper swing body 3. The bucket angle sensor detects the opening / closing angle of the bucket 6 with respect to the arm 5 (hereinafter, referred to as “bucket angle”). Each of the arm angle sensor, the boom angle sensor, and the bucket angle sensor is composed of, for example, a combination of an acceleration sensor and a gyro sensor. It may be composed of a potentiometer, a stroke sensor, a rotary encoder and the like. The turning angle sensor detects the turning angle of the upper turning body 3 with respect to the lower traveling body 1. The tilt angle sensor detects the tilt angle of the aircraft, which is the angle of the ground plane of the excavator with respect to the horizontal plane.

表示装置33は、各種情報を表示するための装置であり、例えば、ショベルの運転室に設置される液晶ディスプレイである。表示装置33は、コントローラ30からの制御信号に応じて各種情報を表示する。 The display device 33 is a device for displaying various types of information, and is, for example, a liquid crystal display installed in the driver's cab of a shovel. The display device 33 displays various information according to the control signal from the controller 30.

音声出力装置34は、各種情報を音声出力するための装置であり、例えば、ショベルの運転室に設置されるスピーカである。音声出力装置34は、コントローラ30からの制御信号に応じて各種情報を音声出力する。 The voice output device 34 is a device for outputting various information by voice, and is, for example, a speaker installed in the driver's cab of a shovel. The voice output device 34 outputs various information by voice according to the control signal from the controller 30.

再生弁V1は、油圧シリンダのロッド側油室とボトム側油室とを接続する第1油路C1に配置される。すなわち、再生弁V1は、油圧シリンダへの作動油の流量を調整する流量制御弁と油圧シリンダとの間に配置されている。再生弁V1は、例えば、電磁比例弁であり、コントローラ30からの制御電流に応じて第1油路C1の流路面積を制御する。再生弁V1は、ブーム再生弁、アーム再生弁等を含む。本実施例では、再生弁V1は、ブームシリンダ7のロッド側油室7Rとボトム側油室7Bとを接続する第1油路C1に配置されたブーム再生弁である。再生弁V1は、ロッド側油室7Rとボトム側油室7Bとの間の双方向の作動油の流れを許容する。すなわち、チェック弁を含んでいない。但し、再生弁V1は、ロッド側油室7Rからボトム側油室7Bへの作動油の流れのみを許容するチェック弁が配置された油路を含む第1弁位置と、ボトム側油室7Bからロッド側油室7Rへの作動油の流れのみを許容するチェック弁が配置された油路を含む第2弁位置と、ロッド側油室7Rとボトム側油室7Bとの間の作動油の流れを遮断する第3弁位置とを含んでいてもよい。或いは、再生弁V1は、第1弁位置に相当する弁位置と第3弁位置に相当する弁位置の2つの弁位置を含む第1の比例弁と、第2弁位置に相当する弁位置と第3弁位置に相当する弁位置の2つの弁位置を含む第2の比例弁とで構成されていてもよい。また、再生弁V1は、コントロールバルブ17の外部に配置されている。そのため、コントロールバルブ17内のスプール弁の動きとは独立して制御される。 The regeneration valve V1 is arranged in the first oil passage C1 that connects the rod side oil chamber and the bottom side oil chamber of the hydraulic cylinder. That is, the regeneration valve V1 is arranged between the flow control valve for adjusting the flow rate of the hydraulic oil to the hydraulic cylinder and the hydraulic cylinder. The regeneration valve V1 is, for example, an electromagnetic proportional valve, and controls the flow path area of the first oil passage C1 according to the control current from the controller 30. The regeneration valve V1 includes a boom regeneration valve, an arm regeneration valve, and the like. In this embodiment, the regeneration valve V1 is a boom regeneration valve arranged in the first oil passage C1 connecting the rod side oil chamber 7R and the bottom side oil chamber 7B of the boom cylinder 7. The regeneration valve V1 allows bidirectional flow of hydraulic oil between the rod side oil chamber 7R and the bottom side oil chamber 7B. That is, it does not include a check valve. However, the regeneration valve V1 is located from the first valve position including the oil passage in which the check valve that allows only the flow of hydraulic oil from the rod side oil chamber 7R to the bottom side oil chamber 7B is arranged, and from the bottom side oil chamber 7B. The flow of hydraulic oil between the rod side oil chamber 7R and the bottom side oil chamber 7B and the position of the second valve including the oil passage where the check valve that allows only the flow of hydraulic oil to the rod side oil chamber 7R is arranged. It may include a third valve position that shuts off the oil. Alternatively, the regenerative valve V1 has a first proportional valve including two valve positions, a valve position corresponding to the first valve position and a valve position corresponding to the third valve position, and a valve position corresponding to the second valve position. It may be composed of a second proportional valve including two valve positions of the valve position corresponding to the third valve position. Further, the regeneration valve V1 is arranged outside the control valve 17. Therefore, it is controlled independently of the movement of the spool valve in the control valve 17.

コントローラ30は、操作圧センサ29、シリンダ圧センサ31、姿勢センサ32等の出力を得て、各種機能要素による演算を実行する。各種機能要素は、掘削操作検出部300、姿勢検出部301、許容最大圧力算出部302、再生弁制御部303等を含む。各種機能要素は、ソフトウェアで構成されてもよくハードウェアで構成されてもよい。そして、コントローラ30は、その演算結果を表示装置33、音声出力装置34、再生弁V1等に対して出力する。 The controller 30 obtains outputs from the operation pressure sensor 29, the cylinder pressure sensor 31, the posture sensor 32, and the like, and executes calculations by various functional elements. Various functional elements include an excavation operation detection unit 300, an attitude detection unit 301, a maximum allowable pressure calculation unit 302, a regeneration valve control unit 303, and the like. The various functional elements may be composed of software or hardware. Then, the controller 30 outputs the calculation result to the display device 33, the audio output device 34, the regeneration valve V1, and the like.

掘削操作検出部300は、掘削操作が行われたことを検出する機能要素である。本実施例では、掘削操作検出部300は、アーム閉じ操作を含むアーム掘削操作が行われたことを検出する。具体的には、掘削操作検出部300は、アーム閉じ操作が検出され、ブームロッド圧が所定値以上であり、且つ、アームボトム圧とアームロッド圧の圧力差が所定値以上の場合に、アーム掘削操作が行われたことを検出する。なお、アーム掘削操作は、アーム閉じ操作のみの単独操作、アーム閉じ操作とブーム下げ操作との組み合わせである複合操作、アーム閉じ操作とバケット閉じ操作との組み合わせである複合操作を含む。 The excavation operation detection unit 300 is a functional element that detects that an excavation operation has been performed. In this embodiment, the excavation operation detection unit 300 detects that the arm excavation operation including the arm closing operation has been performed. Specifically, the excavation operation detection unit 300 detects an arm closing operation, and when the boom rod pressure is equal to or more than a predetermined value and the pressure difference between the arm bottom pressure and the arm rod pressure is equal to or more than a predetermined value, the arm Detects that an excavation operation has been performed. The arm excavation operation includes a single operation of only the arm closing operation, a combined operation which is a combination of the arm closing operation and the boom lowering operation, and a combined operation which is a combination of the arm closing operation and the bucket closing operation.

掘削操作検出部300は、ブーム上げ操作を含むブーム上げ複合掘削操作が行われたか否かを検出してもよい。具体的には、掘削操作検出部300は、ブーム上げ操作が検出され、ブームロッド圧が所定値以上であり、且つ、アームボトム圧とアームロッド圧の圧力差が所定値以上の場合に、ブーム上げ複合掘削操作が行われたことを検出する。また、掘削操作検出部300は、アーム閉じ操作が検出されたことを追加的な条件としてブーム上げ複合掘削操作が行われたことを検出してもよい。 The excavation operation detection unit 300 may detect whether or not a boom raising combined excavation operation including a boom raising operation has been performed. Specifically, the excavation operation detection unit 300 detects a boom raising operation, and when the boom rod pressure is equal to or more than a predetermined value and the pressure difference between the arm bottom pressure and the arm rod pressure is equal to or more than a predetermined value, the boom Detects that a lift compound excavation operation has been performed. Further, the excavation operation detection unit 300 may detect that the boom-raising combined excavation operation has been performed on the additional condition that the arm closing operation has been detected.

掘削操作検出部300は、操作圧センサ29、シリンダ圧センサ31の出力に加え、或いはそれらに代えて、姿勢センサ32等の他のセンサの出力を用いて掘削操作が行われたか否かを検出してもよい。 The excavation operation detection unit 300 detects whether or not the excavation operation has been performed by using the output of the operation pressure sensor 29 and the cylinder pressure sensor 31 or instead of the output of another sensor such as the posture sensor 32. You may.

姿勢検出部301は、ショベルの姿勢を検出する機能要素である。本実施例では、姿勢検出部301は、姿勢センサ32の出力に基づいてブーム角度、アーム角度、バケット角度、機体傾斜角度、及び、旋回角度をショベルの姿勢として検出する。 The posture detection unit 301 is a functional element that detects the posture of the excavator. In this embodiment, the posture detection unit 301 detects the boom angle, arm angle, bucket angle, body tilt angle, and turning angle as the posture of the excavator based on the output of the posture sensor 32.

許容最大圧力算出部302は、掘削作業中の油圧シリンダにおける作動油の許容最大圧力を算出する機能要素である。許容最大圧力は、ショベルの姿勢に応じて変化する。掘削作業中に油圧シリンダにおける作動油が許容最大圧力を超えると、ショベルの機体は意図しない動きをもたらす場合がある。意図しない動きは、機体の浮き上がり、機体の引き摺られ等を含む。本実施例では、許容最大圧力算出部302は、掘削作業中の許容最大ブームロッド圧を算出する。ブームロッド圧が許容最大ブームロッド圧を超えると、ショベルの機体は、浮き上がるおそれがある。許容最大圧力算出部302は、掘削作業中の許容最大アームボトム圧を算出してもよい。アームボトム圧が許容最大アームボトム圧を超えると、ショベルの機体は、掘削地点のほうに引き摺られるおそれがある。 The maximum allowable pressure calculation unit 302 is a functional element for calculating the maximum allowable pressure of hydraulic oil in the hydraulic cylinder during excavation work. The maximum allowable pressure changes depending on the posture of the excavator. If the hydraulic oil in the hydraulic cylinder exceeds the maximum allowable pressure during excavation work, the excavator's airframe may cause unintended movement. Unintended movements include lifting of the aircraft, dragging of the aircraft, and the like. In this embodiment, the allowable maximum pressure calculation unit 302 calculates the allowable maximum boom rod pressure during the excavation work. If the boom rod pressure exceeds the maximum permissible boom rod pressure, the excavator body may float. The maximum allowable pressure calculation unit 302 may calculate the maximum allowable arm bottom pressure during excavation work. If the arm bottom pressure exceeds the maximum permissible arm bottom pressure, the excavator body may be dragged toward the excavation point.

再生弁制御部303は、掘削作業中におけるショベルの機体の意図しない動きを防止するために再生弁V1を制御する機能要素である。本実施例では、再生弁制御部303は、ショベルの機体の浮き上がりを防止するために、再生弁V1の開口面積を調整してブームロッド圧を許容最大ブームロッド圧以下に制御する。具体的には、再生弁制御部303は、ショベルの機体の安定度に関する所定の条件(以下、「制御開始条件」とする。)が満たされていると判定した場合に再生弁V1を制御してショベルの機体の意図しない動きを防止する。 The regeneration valve control unit 303 is a functional element that controls the regeneration valve V1 in order to prevent unintended movement of the excavator body during excavation work. In this embodiment, the regeneration valve control unit 303 adjusts the opening area of the regeneration valve V1 to control the boom rod pressure to the allowable maximum boom rod pressure or less in order to prevent the excavator body from floating. Specifically, the regeneration valve control unit 303 controls the regeneration valve V1 when it is determined that a predetermined condition (hereinafter, referred to as “control start condition”) relating to the stability of the excavator body is satisfied. Prevents unintended movement of the excavator's body.

より具体的には、再生弁制御部303は、アーム閉じ操作のみの単独操作であるアーム掘削操作が行われている場合に、ブームロッド圧が上昇して許容最大ブームロッド圧以下の所定圧力に達すると、制御開始条件が満たされていると判定する。そして、再生弁V1を開いて再生弁V1の開口面積を大きくする。その結果、ロッド側油室7Rからボトム側油室7Bに作動油が流れ、ブームロッド圧は低下する。このとき、ボトム側油室7Bの容積は増大し、ブームシリンダ7は伸張する。このように、再生弁制御部303は、ブームロッド圧を低減させることで、ブームロッド圧が許容最大ブームロッド圧を超えてしまうのを防止し、ショベルの機体が浮き上がるのを防止する。 More specifically, when the arm excavation operation, which is an independent operation of only the arm closing operation, is performed, the regeneration valve control unit 303 raises the boom rod pressure to a predetermined pressure equal to or less than the allowable maximum boom rod pressure. When it reaches, it is determined that the control start condition is satisfied. Then, the regeneration valve V1 is opened to increase the opening area of the regeneration valve V1. As a result, hydraulic oil flows from the rod side oil chamber 7R to the bottom side oil chamber 7B, and the boom rod pressure drops. At this time, the volume of the bottom side oil chamber 7B increases, and the boom cylinder 7 expands. In this way, the regeneration valve control unit 303 prevents the boom rod pressure from exceeding the allowable maximum boom rod pressure by reducing the boom rod pressure, and prevents the excavator body from floating.

また、再生弁制御部303は、再生弁V1を開いた場合には、表示装置33及び音声出力装置34の少なくとも一方に制御信号を出力してもよい。再生弁V1を開いた旨を表すテキストメッセージを表示装置33に表示させるため、或いは、その旨を表す音声メッセージ、警報音等を音声出力装置34から出力させるためである。 Further, when the regeneration valve V1 is opened, the regeneration valve control unit 303 may output a control signal to at least one of the display device 33 and the voice output device 34. This is to display a text message indicating that the reproduction valve V1 has been opened on the display device 33, or to output a voice message, an alarm sound, or the like indicating that effect from the voice output device 34.

次に、図3を参照しながら、姿勢検出部301によるショベルの姿勢の検出、及び、許容最大圧力算出部302による許容最大圧力の算出について説明する。なお、図3は、掘削が行われる際にショベルに作用する力の関係を示す図である。 Next, with reference to FIG. 3, the posture detection unit 301 detects the posture of the excavator and the maximum allowable pressure calculation unit 302 calculates the maximum allowable pressure. Note that FIG. 3 is a diagram showing the relationship between the forces acting on the excavator when excavation is performed.

最初に、掘削作業中に機体が浮き上がるのを防止するための制御に関するパラメータについて説明する。 First, control parameters for preventing the airframe from floating during excavation work will be described.

図3において、点P1は、上部旋回体3とブーム4との連結点を示し、点P2は、上部旋回体3とブームシリンダ7のシリンダとの連結点を示す。また、点P3は、ブームシリンダ7のロッド7Cとブーム4との連結点を示し、点P4は、ブーム4とアームシリンダ8のシリンダとの連結点を示す。また、点P5は、アームシリンダ8のロッド8Cとアーム5との連結点を示し、点P6は、ブーム4とアーム5との連結点を示す。また、点P7は、アーム5とバケット6との連結点を示し、点P8は、バケット6の先端を示す。なお、図3は、説明の明瞭化のため、バケットシリンダ9の図示を省略している。 In FIG. 3, the point P1 indicates the connection point between the upper swing body 3 and the boom 4, and the point P2 indicates the connection point between the upper swing body 3 and the cylinder of the boom cylinder 7. Further, the point P3 indicates the connection point between the rod 7C of the boom cylinder 7 and the boom 4, and the point P4 indicates the connection point between the boom 4 and the cylinder of the arm cylinder 8. Further, the point P5 indicates the connection point between the rod 8C of the arm cylinder 8 and the arm 5, and the point P6 indicates the connection point between the boom 4 and the arm 5. Further, the point P7 indicates the connection point between the arm 5 and the bucket 6, and the point P8 indicates the tip of the bucket 6. Note that FIG. 3 omits the illustration of the bucket cylinder 9 for the sake of clarity.

また、図3は、点P1及び点P3を結ぶ直線と水平線との間の角度をブーム角度θ1とし、点P3及び点P6を結ぶ直線と点P6及び点P7を結ぶ直線との間の角度をアーム角度θ2とし、点P6及び点P7を結ぶ直線と点P7及び点P8を結ぶ直線との間の角度をバケット角度θ3として示す。 Further, in FIG. 3, the angle between the straight line connecting the points P1 and P3 and the horizontal line is defined as the boom angle θ1, and the angle between the straight line connecting the points P3 and P6 and the straight line connecting the points P6 and P7 is defined as the angle. The arm angle is θ2, and the angle between the straight line connecting the points P6 and P7 and the straight line connecting the points P7 and P8 is shown as the bucket angle θ3.

更に、図3において、距離D1は、機体の浮き上がりが発生するときの回転中心RCとショベルの重心GCとの間の水平距離、すなわち、ショベルの質量M及び重力加速度gの積である重力M・gの作用線と回転中心RCとの間の距離を示す。そして、距離D1と重力M・gの大きさとの積は、回転中心RC周りの第1の力のモーメントの大きさを表す。なお、記号「・」は「×」(乗算記号)を表す。 Further, in FIG. 3, the distance D1 is the horizontal distance between the center of rotation RC and the center of gravity GC of the excavator when the aircraft is lifted, that is, the gravity M. The distance between the line of action of g and the center of gravity RC is shown. The product of the distance D1 and the magnitude of gravity M · g represents the magnitude of the moment of the first force around the center of rotation RC. The symbol "・" represents "x" (multiplication symbol).

また、図3において、距離D2は、回転中心RCと点P8との間の水平距離、すなわち、掘削反力Fの鉛直成分FR1の作用線と回転中心RCとの間の距離を示す。そして、距離D2と鉛直成分FR1の大きさとの積は、回転中心RC周りの第2の力のモーメントの大きさを表す。なお、掘削反力Fは、鉛直軸に対して掘削角度θを形成し、掘削反力Fの鉛直成分FR1は、FR1=F・cosθで表される。また、掘削角度θは、ブーム角度θ1、アーム角度θ2、及びバケット角度θ3に基づいて算出される。 Further, in FIG. 3, the distance D2 is the horizontal distance between the rotational center RC and the point P8, that is, the distance between the line of action of the vertical component F R1 drilling reaction force F R and the rotation center RC. The product of the distance D2 and the magnitude of the vertical component FR1 represents the magnitude of the moment of the second force around the center of rotation RC. Incidentally, excavation reaction force F R is the drilling angle θ formed relative to a vertical axis, vertical component F R1 drilling reaction force F R is represented by F R1 = F R · cosθ. The excavation angle θ is calculated based on the boom angle θ1, the arm angle θ2, and the bucket angle θ3.

また、図3において、距離D3は、点P2及び点P3を結ぶ直線と回転中心RCとの間の距離、すなわち、ブームシリンダ7のロッド7Cを引っ張り出そうとする力Fの作用線と回転中心RCとの間の距離を示す。そして、距離D3と力Fの大きさとの積は、回転中心RC周りの第3の力のモーメントの大きさを表す。 Further, in FIG. 3, the distance D3 is the distance between the straight line and the rotation center RC connecting the points P2 and the point P3, that is, the line of action of the force F B to be Daso pull rod 7C of the boom cylinder 7 rotates The distance to the central RC is shown. Then, the product of the magnitude of distance D3 and the force F B represents the magnitude of the moment of the third force around the rotation center RC.

また、図3において、距離D4は、掘削反力Fの作用線と点P6との間の距離を示す。そして、距離D4と掘削反力Fの大きさとの積は、点P6周りの第1の力のモーメントの大きさを表す。 Further, in FIG. 3, the distance D4 represents the distance between the action line and the point P6 of the excavation reaction force F R. Then, the product of the distance D4 between the size of the excavation reaction force F R represents the magnitude of the moment of the first force around the point P6.

また、図3において、距離D5は、点P4及び点P5を結ぶ直線と点P6との間の距離、すなわち、アーム5を閉じるアーム推力Fの作用線と点P6との間の距離を示す。そして、距離D5とアーム推力Fの大きさとの積は、点P6周りの第2の力のモーメントの大きさを表す。 Also, shown in FIG. 3, the distance D5 is the distance between the straight line and the point P6 connecting the point P4 and the point P5, i.e., the distance between the action line and the point P6 of the arm thrust F A closing arm 5 .. Then, the product of the magnitude of the distance D5 and arm thrust F A represents the magnitude of the moment of the second force around the point P6.

ここで、掘削反力Fの鉛直成分FR1が回転中心RC周りにショベルを浮き上がらせようとする力のモーメントの大きさと、ブームシリンダ7のロッド7Cを引っ張り出そうとする力Fが回転中心RC周りにショベルを浮き上がらせようとする力のモーメントの大きさとを置き換え可能であると仮定する。この場合、回転中心RC周りの第2の力のモーメントの大きさと回転中心RC周りの第3の力のモーメントの大きさとの関係は以下の(1)式で表される。
R1・D2=F・cosθ・D2=F・D3・・・(1)
また、アーム推力Fが点P6周りにアーム5を閉じようとする力のモーメントの大きさと、掘削反力Fが点P6周りにアーム5を開こうとする力のモーメントの大きさとはつり合うものと考えられる。この場合、点P6周りの第1の力のモーメントの大きさと点P6周りの第2の力のモーメントの大きさとの関係は以下の(2)式及び(2)'式で表される。なお、記号「/」は「÷」(除算記号)を表す。
・D5=F・D4・・・(2)
=F・D5/D4・・・(2)'
また、(1)式及び(2)式より、ブームシリンダ7のロッド7Cを引っ張り出そうとする力Fは、以下の(3)式で表される。
=F・D2・D5・cosθ/(D3・D4)・・・(3)
更に、図3のX−X断面図で示すように、ブームシリンダ7のロッド側油室7Rに面するピストンの環状受圧面積を面積Aとし、ロッド側油室7Rにおける作動油の圧力をブームロッド圧Pとし、ブームシリンダ7のボトム側油室7Bに面するピストンの円状受圧面積を面積AB2とし、ボトム側油室7Bにおける作動油の圧力をブームボトム圧PB2とすると、ブームシリンダ7のロッド7Cを引っ張り出そうとする力Fは、F=P・A−PB2・AB2で表される。但し、P≫PB2のため、Fは、F=P・Aで表される。従って、(3)式は、以下の(4)式及び(4)'式で表される。
=F・D2・D5・cosθ/(A・D3・D4)・・・(4)
=P・A・D3・D4/(D2・D5・cosθ)・・・(4)'
ここで、機体が浮き上がる際の、ブームシリンダ7のロッド7Cを引っ張り出そうとする力Fを力FBMAXとすると、重力M・gが機体を浮き上がらせないようにする回転中心RC周りの第1の力のモーメントの大きさと、力FBMAXが機体を浮き上がらせようとする回転中心RC周りの第3の力のモーメントの大きさとはつり合うものと考えられる。この場合、それら2つの力のモーメントの大きさの関係は以下の(5)式で表される。
M・g・D1=FBMAX・D3・・・(5)
また、このときのブームロッド圧Pを、機体の浮き上がりを防止するために用いる許容最大ブームロッド圧(以下、「第1許容最大圧力」とする。)PBMAXとすると、第1許容最大圧力PBMAXは、以下の(6)式で表される。
BMAX=M・g・D1/(A・D3)・・・(6)
また、距離D1は定数であり、距離D2〜D5は、掘削角度θと同様、掘削アタッチメントの姿勢、すなわち、ブーム角度θ1、アーム角度θ2、及びバケット角度θ3に応じて決まる値である。具体的には、距離D2は、ブーム角度θ1、アーム角度θ2、及びバケット角度θ3に応じて決まり、距離D3は、ブーム角度θ1に応じて決まり、距離D4は、バケット角度θ3に応じて決まり、距離D5は、アーム角度θ2に応じて決まる。
Here, the magnitude of the moment of force tending float the excavator vertical component F R1 is the rotation center RC about the excavation reaction force F R, the force F B to be Daso pull rod 7C of the boom cylinder 7 rotates It is assumed that it can be replaced with the magnitude of the moment of the force that tries to lift the excavator around the central RC. In this case, the relationship between the magnitude of the second force moment around the rotation center RC and the magnitude of the third force moment around the rotation center RC is expressed by the following equation (1).
F R1 · D2 = F R · cosθ · D2 = F B · D3 ··· (1)
Further, balances the the magnitude of the moment of force which the arm thrust F A is going to close the arm 5 around the point P6, the size of the excavation reaction force F R is the force to open the arm 5 around the point P6 moment It is considered to be. In this case, the relationship between the magnitude of the moment of the first force around the point P6 and the magnitude of the moment of the second force around the point P6 is expressed by the following equations (2) and (2)'. The symbol "/" represents "÷" (division sign).
F A · D5 = F R · D4 ··· (2)
F R = F A · D5 / D4 ··· (2) '
Also, equation (1) and (2), the force F B to be Daso pull rod 7C of the boom cylinder 7 is expressed by the following equation (3).
F B = F A · D2 · D5 · cosθ / (D3 · D4) ··· (3)
Further, as shown by the sectional view taken along line X-X in FIG. 3, the annular pressure receiving area of the piston facing the rod side oil chamber 7R of the boom cylinder 7 and the area A B, boom the pressure of the hydraulic oil in the rod side oil chamber 7R Assuming that the rod pressure is P B , the circular pressure receiving area of the piston facing the bottom oil chamber 7B of the boom cylinder 7 is the area AB2, and the hydraulic oil pressure in the bottom oil chamber 7B is the boom bottom pressure P B2 , the boom force F B to be Daso pull rod 7C of the cylinder 7 is represented by F B = P B · a B -P B2 · a B2. However, since the P B »P B2, F B is expressed by F B = P B · A B . Therefore, the equation (3) is represented by the following equations (4) and (4)'.
P B = F A · D2 · D5 · cosθ / (A B · D3 · D4) ··· (4)
F A = P B · A B · D3 · D4 / (D2 · D5 · cosθ) ··· (4) '
Here, if the force F B that tries to pull out the rod 7C of the boom cylinder 7 when the airframe is lifted is the force F BMAX , the gravity M · g is the first around the rotation center RC that prevents the airframe from being lifted. It is considered that the magnitude of the force moment of 1 and the magnitude of the third force moment around the rotation center RC where the force F BMAX tries to lift the aircraft are balanced. In this case, the relationship between the magnitudes of the moments of these two forces is expressed by the following equation (5).
M ・ g ・ D1 = F BMAX・ D3 ... (5)
Further, if the boom rod pressure P B at this time is the maximum permissible boom rod pressure (hereinafter referred to as "first permissible maximum pressure") P BMAX used to prevent the aircraft from floating, the first permissible maximum pressure. P BMAX is represented by the following equation (6).
P BMAX = M · g · D1 / (A B · D3) ··· (6)
Further, the distance D1 is a constant, and the distances D2 to D5 are values determined according to the posture of the excavation attachment, that is, the boom angle θ1, the arm angle θ2, and the bucket angle θ3, as in the excavation angle θ. Specifically, the distance D2 is determined according to the boom angle θ1, the arm angle θ2, and the bucket angle θ3, the distance D3 is determined according to the boom angle θ1, and the distance D4 is determined according to the bucket angle θ3. The distance D5 is determined according to the arm angle θ2.

その結果、許容最大圧力算出部302は、姿勢検出部301が検出するブーム角度θ1と(6)式とを用いて第1許容最大圧力PBMAXを算出することができる。 As a result, the allowable maximum pressure calculation unit 302 can calculate the first allowable maximum pressure P BMAX by using the boom angle θ1 detected by the posture detection unit 301 and the equation (6).

また、再生弁制御部303は、ブームロッド圧Pを第1許容最大圧力PBMAX以下の所定圧力に維持することによってショベルの機体の浮き上がりを防止することができる。具体的には、再生弁制御部303は、ブームロッド圧Pが所定圧力に達した場合に、ロッド側油室7Rからボトム側油室7Bに流出する作動油の流量を増大させ、ブームロッド圧Pを低下させる。ブームロッド圧Pの低下は、(4)'式が示すように、アーム推力Fの低下をもたらし、更には、(2)'式が示すように、掘削反力Fの低下、ひいてはその鉛直成分FR1の低下をもたらすためである。 Further, the regeneration valve control unit 303 can prevent the excavator body from rising by maintaining the boom rod pressure P B at a predetermined pressure equal to or lower than the first allowable maximum pressure P BMAX. Specifically, the regeneration valve control unit 303, when the boom rod pressure P B reaches a predetermined pressure, to increase the flow rate of the hydraulic fluid flowing out to the bottom-side oil chamber 7B of the rod side oil chamber 7R, boom rod Reduces pressure P B. Lowering the boom rod pressure P B is 'as shown by formula, result in decreased arm thrust F A, furthermore, (2)' (4) As shown expression, lowering of drilling reaction force F R, thus This is because the vertical component FR1 is lowered.

また、回転中心RCの位置は、旋回角度センサ32Dの出力に基づいて決定される。例えば、下部走行体1と上部旋回体3との間の旋回角度が0度の場合には、下部走行体1が接地面と接触する部分のうちの後端が回転中心RCとなり、下部走行体1と上部旋回体3との間の旋回角度が180度の場合には、下部走行体1が接地面と接触する部分のうちの前端が回転中心RCとなる。また、下部走行体1と上部旋回体3との間の旋回角度が90度又は270度の場合には、下部走行体1が接地面と接触する部分のうちの側端が回転中心RCとなる。 Further, the position of the rotation center RC is determined based on the output of the turning angle sensor 32D. For example, when the turning angle between the lower running body 1 and the upper turning body 3 is 0 degrees, the rear end of the portion where the lower running body 1 comes into contact with the ground contact surface becomes the rotation center RC, and the lower running body 1 becomes the lower running body. When the turning angle between 1 and the upper turning body 3 is 180 degrees, the front end of the portion where the lower traveling body 1 comes into contact with the ground contact surface becomes the rotation center RC. Further, when the turning angle between the lower traveling body 1 and the upper rotating body 3 is 90 degrees or 270 degrees, the side end of the portion where the lower traveling body 1 contacts the ground contact surface becomes the rotation center RC. ..

次に、掘削作業中に機体が掘削地点のほうに引き摺られるのを防止するための制御に関するパラメータについて説明する。 Next, the parameters related to the control for preventing the airframe from being dragged toward the excavation point during the excavation work will be described.

掘削作業中に機体を水平方向に動かそうとする力の関係は、以下の(7)式で表される。
μ・N≧FR2・・・(7)
なお、静止摩擦係数μは、ショベルの接地面の静止摩擦係数を表し、垂直抗力Nは、ショベルの重力M・gに対する垂直抗力を表し、力FR2は、ショベルを掘削地点のほうに引き摺ろうとする掘削反力Fの水平成分FR2を表す。また、摩擦力μ・Nは、ショベルを静止させようとする最大静止摩擦力を表し、掘削反力Fの水平成分FR2が最大静止摩擦力μ・Nを上回ると、ショベルは、掘削地点のほうに引き摺られる。なお、静止摩擦係数μは、ROM等に予め記憶される値であってもよく、各種情報に基づいて動的に算出されるものであってもよい。本実施例では、静止摩擦係数μは、入力装置(図示せず。)を介して操作者が選択する予め記憶された値である。操作者は、接地面の状態に応じて複数レベルの摩擦状態(静止摩擦係数)から所望の摩擦状態(静止摩擦係数)を選択する。
The relationship between the forces that try to move the airframe in the horizontal direction during excavation work is expressed by the following equation (7).
μ ・ N ≧ FR2・ ・ ・ (7)
Incidentally, the static friction coefficient mu, represents a static friction coefficient of the ground surface of the shovel, the normal force N, represents a normal force against the gravity M · g of the shovel, the force F R2 is Hikizu shovel towards the drilling site It represents a horizontal component F R2 of the excavation reaction force F R to wax. Further, the frictional force mu · N represents the maximum static frictional force to try to stationary excavator, the horizontal component F R2 of the excavation reaction force F R is greater than the maximum static frictional force mu · N, shovel, drilling site It is dragged toward. The coefficient of static friction μ may be a value stored in advance in a ROM or the like, or may be dynamically calculated based on various information. In this embodiment, the coefficient of static friction μ is a pre-stored value selected by the operator via an input device (not shown). The operator selects a desired friction state (static friction coefficient) from a plurality of levels of friction state (static friction coefficient) according to the state of the ground contact surface.

ここで、掘削反力Fの水平成分FR2は、FR2=F・sinθで表され、また、(2)'式より、掘削反力Fは、F=F・D5/D4で表されるため、(7)式は、以下の(8)式で表される。
μ・M・g≧F・D5・sinθ/D4・・・(8)
また、図3のY−Y断面図で示すように、アームシリンダ8のボトム側油室8Bに面するピストンの円状受圧面積を面積Aとし、ボトム側油室8Bにおける作動油の圧力をアームボトム圧Pとし、アームシリンダ8のロッド側油室8Rに面するピストンの円状受圧面積を面積AA2とし、ロッド側油室8Rにおける作動油の圧力をアームロッド圧PA2とすると、アーム推力Fは、F=P・A−PA2・AA2で表される。但し、P≫PA2のため、アーム推力Fは、F=P・Aで表される。そのため、(8)式は、以下の(9)式で表される。
≦μ・M・g・D4/(A・D5・sinθ)・・・(9)
ここで、(9)式の右辺と左辺が等しいときのアームボトム圧Pは、機体が掘削地点のほうに引き摺られるのを回避可能な許容最大アームボトム圧、すなわち、機体が掘削地点のほうに引き摺られるのを防止するために用いる許容最大アームボトム圧(以下、「第2許容最大圧力」とする。)PAMAXに相当する。
Here, the drilling reaction force F horizontal component of the R F R2 is, F R2 = F is represented by R · sin [theta, also from (2) 'formula, drilling reaction force F R is, F R = F A · D5 / Since it is represented by D4, the equation (7) is represented by the following equation (8).
μ · M · g ≧ F A · D5 · sinθ / D4 ··· (8)
Further, as shown in the YY cross-sectional view of FIG. 3, the circular pressure receiving area of the piston facing the bottom side oil chamber 8B of the arm cylinder 8 is defined as the area AA, and the pressure of the hydraulic oil in the bottom side oil chamber 8B is defined as the area AA. and the arm bottom pressure P a, the circular pressure-receiving area of the piston facing the rod side oil chamber 8R of the arm cylinder 8 and the area a A2, when the pressure of the hydraulic oil in the rod side oil chamber 8R and arm rod pressure P A2, arm thrust F A is represented by F A = P A · A A -P A2 · A A2. However, since the P A »P A2, arm thrust F A is represented by F A = P A · A A . Therefore, the equation (8) is represented by the following equation (9).
P A ≦ μ · M · g · D4 / (A A · D5 · sinθ) ··· (9)
Here, (9) the arm bottom pressure P A of when the left and right sides are equal, aircraft avoidable allowable maximum arm bottom pressure from being dragged towards the drilling site, i.e., more aircraft of drilling site Maximum permissible arm bottom pressure used to prevent dragging (hereinafter referred to as "second permissible maximum pressure") corresponds to PAMAX.

以上の関係より、許容最大圧力算出部302は、姿勢検出部301が検出するブーム角度θ1、アーム角度θ2、及びバケット角度θ3と、(9)式とを用いて第2許容最大圧力PAMAXを算出することができる。 Based on the above relationship, the allowable maximum pressure calculation unit 302 uses the boom angle θ1, the arm angle θ2, and the bucket angle θ3 detected by the attitude detection unit 301, and the second allowable maximum pressure PAMAX using the equation (9). Can be calculated.

また、再生弁制御部303は、アームボトム圧Pを第2許容最大圧力PAMAX以下の所定圧力に維持することによってショベルの機体が掘削地点のほうに引き摺られるのを防止することができる。具体的には、再生弁制御部303は、アームボトム圧Pが所定圧力に達した場合に、第1ポンプ14Lからボトム側油室8Bに流入する作動油の流量を減少させ、アームボトム圧Pを低下させる。ロッド側油室8Rとボトム側油室8Bとを接続する油路に再生弁が配置されている場合には、再生弁制御部303は、アームボトム圧Pが所定圧力に達したときに、ボトム側油室8Bからロッド側油室8Rに流出する作動油の流量を増大させ、アームボトム圧Pを低下させてもよい。アームボトム圧Pの低下は、アーム推力Fの低下をもたらし、更には、掘削反力Fの水平成分FR2の低下をもたらすためである。 Further, the regeneration valve control unit 303, it is possible to prevent the excavator body is dragged towards the drilling site by maintaining the arm bottom pressure P A to the second maximum allowable pressure P AMAX following a predetermined pressure. Specifically, the regeneration valve control unit 303, when the arm bottom pressure P A reaches a predetermined pressure, reducing the flow rate of the working oil flowing from the first pump 14L to the bottom side oil chamber 8B, arm bottom pressure lowering the P a. When the oil passage to the regeneration valve that connects the rod side oil chamber 8R and the bottom side oil chamber 8B is disposed, regeneration valve control unit 303, when the arm bottom pressure P A reaches a predetermined pressure, increasing the flow rate of the hydraulic oil flowing out from the bottom side oil chamber 8B into the rod side oil chamber 8R, it may reduce the arm bottom pressure P a. Lowering of the arm bottom pressure P A leads to reduction of the arm thrust F A, furthermore, in order to result in a reduction of the horizontal component F R2 of the excavation reaction force F R.

次に、図4を参照し、図1のショベルに搭載される油圧回路の構成例について説明する。図4は、図1のショベルに搭載される油圧回路の構成例を示す図である。図4の例では、駆動系は、第1ポンプ14L、第2ポンプ14R、コントロールバルブ17、及び、油圧アクチュエータを含む。油圧アクチュエータは、ブームシリンダ7、アームシリンダ8、バケットシリンダ9、及び、旋回用油圧モータ21を含む。また、油圧アクチュエータは、左側走行用油圧モータ1L及び右側走行用油圧モータ1Rを含んでいてもよい。 Next, with reference to FIG. 4, a configuration example of the hydraulic circuit mounted on the excavator of FIG. 1 will be described. FIG. 4 is a diagram showing a configuration example of a hydraulic circuit mounted on the excavator of FIG. In the example of FIG. 4, the drive system includes a first pump 14L, a second pump 14R, a control valve 17, and a hydraulic actuator. The hydraulic actuator includes a boom cylinder 7, an arm cylinder 8, a bucket cylinder 9, and a swivel hydraulic motor 21. Further, the hydraulic actuator may include a left-side traveling hydraulic motor 1L and a right-side traveling hydraulic motor 1R.

旋回用油圧モータ21は、上部旋回体3を旋回させる油圧モータであり、ポート21L、21Rがそれぞれリリーフ弁22L、22Rを介して作動油タンクTに接続され、且つ、チェック弁23L、23Rを介して作動油タンクTに接続されている。 The swivel hydraulic motor 21 is a hydraulic motor that swivels the upper swivel body 3, and the ports 21L and 21R are connected to the hydraulic oil tank T via the relief valves 22L and 22R, respectively, and via the check valves 23L and 23R. Is connected to the hydraulic oil tank T.

第1ポンプ14Lは、作動油タンクTから作動油を吸い込んで吐出する。第1ポンプ14Lはレギュレータ14ALに接続される。レギュレータ14ALは、コントローラ30からの指令に応じて第1ポンプ14Lの斜板傾転角を変更して第1ポンプ14Lの押し退け容積(1回転当たりの吐出量)を制御する。第2ポンプ14Rに関するレギュレータ14ARについても同様である。第1ポンプ14L及び第2ポンプ14Rは図2のメインポンプ14に対応し、レギュレータ14AL、14ARは図2のレギュレータ14Aに対応する。 The first pump 14L sucks hydraulic oil from the hydraulic oil tank T and discharges it. The first pump 14L is connected to the regulator 14AL. The regulator 14AL changes the tilt angle of the swash plate of the first pump 14L in response to a command from the controller 30 to control the retreat volume (discharge amount per rotation) of the first pump 14L. The same applies to the regulator 14AR relating to the second pump 14R. The first pump 14L and the second pump 14R correspond to the main pump 14 of FIG. 2, and the regulators 14AL and 14AR correspond to the regulator 14A of FIG.

第1ポンプ14L、第2ポンプ14Rは、センターバイパス管路40L、40R、パラレル管路42L、42R、戻り管路43L、43R、43Cを経て作動油タンクTまで作動油を循環させる。 The first pump 14L and the second pump 14R circulate the hydraulic oil to the hydraulic oil tank T via the center bypass pipelines 40L and 40R, the parallel pipelines 42L and 42R, and the return pipelines 43L, 43R and 43C.

センターバイパス管路40Lは、コントロールバルブ17内に配置された流量制御弁170、172L、及び173Lを通る作動油ラインである。センターバイパス管路40Rは、コントロールバルブ17内に配置された流量制御弁171、172R、及び173Rを通る作動油ラインである。 The center bypass line 40L is a hydraulic oil line passing through the flow control valves 170, 172L, and 173L arranged in the control valve 17. The center bypass line 40R is a hydraulic oil line passing through the flow rate control valves 171 and 172R and 173R arranged in the control valve 17.

パラレル管路42Lは、センターバイパス管路40Lに並行する作動油ラインである。パラレル管路42Lは、流量制御弁170又は流量制御弁172Lによってセンターバイパス管路40Lを通る作動油の流れが制限或いは遮断された場合に、より下流の流量制御弁に作動油を供給する。パラレル管路42Rは、センターバイパス管路40Rに並行する作動油ラインである。パラレル管路42Rは、流量制御弁171又は流量制御弁172Rによってセンターバイパス管路40Rを通る作動油の流れが制限或いは遮断された場合に、より下流の流量制御弁に作動油を供給する。 The parallel pipeline 42L is a hydraulic oil line parallel to the center bypass pipeline 40L. The parallel pipeline 42L supplies hydraulic oil to the flow control valve further downstream when the flow of hydraulic oil through the center bypass pipeline 40L is restricted or blocked by the flow control valve 170 or the flow control valve 172L. The parallel pipeline 42R is a hydraulic oil line parallel to the center bypass pipeline 40R. The parallel pipeline 42R supplies hydraulic oil to the flow control valve further downstream when the flow of hydraulic oil through the center bypass pipeline 40R is restricted or blocked by the flow control valve 171 or the flow control valve 172R.

戻り管路43Lは、センターバイパス管路40Lに並行する作動油ラインである。戻り管路43Lは、油圧アクチュエータから流量制御弁170、172L、173Lを通って流れる作動油を戻り管路43Cに流通させる。戻り管路43Rは、センターバイパス管路40Rに並行する作動油ラインである。戻り管路43Rは、油圧アクチュエータから流量制御弁171、172R、173Rを通って流れる作動油を戻り管路43Cに流通させる。 The return line 43L is a hydraulic oil line parallel to the center bypass line 40L. The return pipe 43L circulates hydraulic oil flowing from the hydraulic actuator through the flow control valves 170, 172L, and 173L to the return pipe 43C. The return line 43R is a hydraulic oil line parallel to the center bypass line 40R. The return line 43R circulates hydraulic oil flowing from the hydraulic actuator through the flow control valves 171, 172R, and 173R to the return line 43C.

センターバイパス管路40L、40Rは、最も下流にある流量制御弁173L、173Rのそれぞれと作動油タンクTとの間にネガティブコントロール絞り18L、18R及びリリーフ弁19L、19Rを備える。第1ポンプ14L、第2ポンプ14Rが吐出した作動油の流れは、ネガティブコントロール絞り18L、18Rで制限される。そして、ネガティブコントロール絞り18L、18Rは、レギュレータ14AL、14ARを制御するための制御圧(ネガコン圧)を発生させる。リリーフ弁19L、19Rは、ネガコン圧が所定のリリーフ圧に達した場合に開き、センターバイパス管路40L、40Rの作動油を作動油タンクTに排出する。 The center bypass pipelines 40L and 40R are provided with negative control throttles 18L and 18R and relief valves 19L and 19R between the flow control valves 173L and 173R located at the most downstream and the hydraulic oil tank T, respectively. The flow of hydraulic oil discharged by the first pump 14L and the second pump 14R is limited by the negative control throttles 18L and 18R. Then, the negative control diaphragms 18L and 18R generate a control pressure (negative control pressure) for controlling the regulators 14AL and 14AR. The relief valves 19L and 19R open when the negative pressure reaches a predetermined relief pressure, and discharge the hydraulic oil of the center bypass pipelines 40L and 40R to the hydraulic oil tank T.

戻り管路43Cの最下流にはバネ付きチェック弁20が設置されている。バネ付きチェック弁20は、旋回用油圧モータ21と戻り管路43Cとを繋ぐ管路44内の作動油の圧力を高める機能を果たす。この構成により、旋回減速時における旋回用油圧モータ21の吸い込み側ポートに確実に作動油を補給してキャビテーションの発生を防止する。 A check valve 20 with a spring is installed at the most downstream of the return pipe 43C. The spring-loaded check valve 20 functions to increase the pressure of hydraulic oil in the pipeline 44 connecting the swivel hydraulic motor 21 and the return pipeline 43C. With this configuration, hydraulic oil is reliably supplied to the suction side port of the turning hydraulic motor 21 during turning deceleration to prevent the occurrence of cavitation.

コントロールバルブ17は、ショベルにおける油圧駆動系の制御を行う油圧制御装置である。本実施例では、コントロールバルブ17は、流量制御弁170、171、172L、172R、173L、173Rと、センターバイパス管路40L、40R、パラレル管路42L、42R、及び、戻り管路43L、43Rを含む鋳造部品である。 The control valve 17 is a hydraulic control device that controls the hydraulic drive system in the excavator. In this embodiment, the control valve 17 includes flow control valves 170, 171, 172L, 172R, 173L, 173R, center bypass pipes 40L, 40R, parallel pipes 42L, 42R, and return pipes 43L, 43R. It is a cast part including.

流量制御弁170、171、172L、172R、173L、及び173Rは、油圧アクチュエータに流出入する作動油の向き及び流量を制御する弁である。図4の例では、流量制御弁170、171、172L、172R、173L、及び173Rのそれぞれは、対応する操作装置26が生成するパイロット圧を左右何れかのパイロットポートで受けて動作する3ポート3位置のスプール弁である。操作装置26は、操作量(操作角度)に応じて生成したパイロット圧を、操作方向に対応する側のパイロットポートに作用させる。 The flow rate control valves 170, 171, 172L, 172R, 173L, and 173R are valves that control the direction and flow rate of the hydraulic oil flowing in and out of the hydraulic actuator. In the example of FIG. 4, each of the flow control valves 170, 171, 172L, 172R, 173L, and 173R receives the pilot pressure generated by the corresponding operating device 26 at either the left or right pilot port to operate the three ports 3. Position spool valve. The operation device 26 applies the pilot pressure generated according to the operation amount (operation angle) to the pilot port on the side corresponding to the operation direction.

具体的には、流量制御弁170は、旋回用油圧モータ21に流出入する作動油の向き及び流量を制御するスプール弁であり、流量制御弁171は、バケットシリンダ9に流出入する作動油の向き及び流量を制御するスプール弁である。 Specifically, the flow rate control valve 170 is a spool valve that controls the direction and flow rate of the hydraulic oil flowing in and out of the swivel hydraulic motor 21, and the flow rate control valve 171 is a spool valve that controls the hydraulic oil flowing in and out of the bucket cylinder 9. A spool valve that controls the direction and flow rate.

流量制御弁172L、172Rは、ブームシリンダ7に流出入する作動油の向き及び流量を制御するスプール弁であり、流量制御弁173L、173Rは、アームシリンダ8に流出入する作動油の向き及び流量を制御するスプール弁である。 The flow rate control valves 172L and 172R are spool valves that control the direction and flow rate of the hydraulic oil flowing in and out of the boom cylinder 7, and the flow rate control valves 173L and 173R are the direction and flow rate of the hydraulic oil flowing in and out of the arm cylinder 8. It is a spool valve that controls.

再生弁V1は、コントローラ30からの指令に応じて開口の大きさを調整して流量を制御する弁であり、第1油路C1に設けられている。第1油路C1は、第2油路C2と第3油路C3を接続している。第2油路C2は、ブームシリンダ7のロッド側油室7Rと流量制御弁172L、172Rとを接続している。第3油路C3は、ブームシリンダ7のボトム側油室7Bと流量制御弁172L、172Rとを接続している。図4の例では、再生弁V1は、コントロールバルブ17の外部に配置されたブーム再生弁であり、第2油路C2と第3油路C3との間の連通・遮断を切り替え可能な1ポート2位置の電磁比例弁である。具体的には、再生弁V1は、第1弁位置にある場合に第2油路C2と第3油路C3との間を最大開口で連通させ、第2弁位置にある場合にその連通を遮断できる。また、再生弁V1は、第1弁位置と第2弁位置の間の任意の弁位置に留まることができる。再生弁V1の開口面積は、第1弁位置に近いほど大きい。再生弁V1は、流量制御弁と同様に、コントロールバルブ17の内部に配置されていてもよい。この場合、第1油路C1もコントロールバルブ17の内部に配置される。 The regeneration valve V1 is a valve that controls the flow rate by adjusting the size of the opening in response to a command from the controller 30, and is provided in the first oil passage C1. The first oil passage C1 connects the second oil passage C2 and the third oil passage C3. The second oil passage C2 connects the rod-side oil chamber 7R of the boom cylinder 7 with the flow control valves 172L and 172R. The third oil passage C3 connects the bottom side oil chamber 7B of the boom cylinder 7 with the flow control valves 172L and 172R. In the example of FIG. 4, the regeneration valve V1 is a boom regeneration valve arranged outside the control valve 17, and is a port capable of switching communication / shutoff between the second oil passage C2 and the third oil passage C3. It is a two-position electromagnetic proportional valve. Specifically, the regeneration valve V1 communicates between the second oil passage C2 and the third oil passage C3 at the maximum opening when it is in the first valve position, and communicates with the second oil passage C2 when it is in the second valve position. Can be blocked. Further, the regeneration valve V1 can stay at an arbitrary valve position between the first valve position and the second valve position. The opening area of the regeneration valve V1 is larger as it is closer to the position of the first valve. The regeneration valve V1 may be arranged inside the control valve 17 in the same manner as the flow rate control valve. In this case, the first oil passage C1 is also arranged inside the control valve 17.

コントローラ30は、例えば、ブームロッド圧が所定圧力に達したことを検知すると、再生弁V1に指令を出力する。指令を受けた再生弁V1は第2弁位置から第1弁位置に向かって変位し、第2油路C2と第3油路C3との間を連通させる。 When the controller 30 detects that the boom rod pressure has reached a predetermined pressure, for example, it outputs a command to the regeneration valve V1. The regenerated valve V1 that receives the command is displaced from the second valve position toward the first valve position, and communicates between the second oil passage C2 and the third oil passage C3.

図4の例では、再生弁V1は、アーム再生弁V1aを更に含む。アーム再生弁V1aは、アームシリンダ8のロッド側油室8Rとボトム側油室8Bとを接続する第1油路C1aに配置される電磁比例弁である。アーム再生弁V1aは、例えば、コントローラ30からの制御電流に応じて第1油路C1aの流路面積を制御する。アーム再生弁V1aは、ロッド側油室8Rとボトム側油室8Bとの間の双方向の作動油の流れを許容する。すなわち、チェック弁を含んでいない。また、アーム再生弁V1aは、コントロールバルブ17の外部に配置されている。そのため、コントロールバルブ17内のスプール弁の動きとは独立して制御される。 In the example of FIG. 4, the regeneration valve V1 further includes an arm regeneration valve V1a. The arm regeneration valve V1a is an electromagnetic proportional valve arranged in the first oil passage C1a connecting the rod side oil chamber 8R and the bottom side oil chamber 8B of the arm cylinder 8. The arm regeneration valve V1a controls the flow path area of the first oil passage C1a according to, for example, the control current from the controller 30. The arm regeneration valve V1a allows a bidirectional flow of hydraulic oil between the rod side oil chamber 8R and the bottom side oil chamber 8B. That is, it does not include a check valve. Further, the arm regeneration valve V1a is arranged outside the control valve 17. Therefore, it is controlled independently of the movement of the spool valve in the control valve 17.

具体的には、第1油路C1aは、第2油路C2aと第3油路C3aを接続している。第2油路C2aは、アームシリンダ8のロッド側油室8Rと流量制御弁173L、173Rとを接続している。第3油路C3aは、アームシリンダ8のボトム側油室8Bと流量制御弁173L、173Rとを接続している。図4の例では、アーム再生弁V1aは、第2油路C2aと第3油路C3aとの間の連通・遮断を切り替え可能な1ポート2位置の電磁比例弁である。具体的には、アーム再生弁V1aは、第1弁位置にある場合に第2油路C2aと第3油路C3aとの間を最大開口で連通させ、第2弁位置にある場合にその連通を遮断できる。また、アーム再生弁V1aは、第1弁位置と第2弁位置の間の任意の弁位置に留まることができる。アーム再生弁V1aの開口面積は、第1弁位置に近いほど大きい。アーム再生弁V1aは、流量制御弁と同様に、コントロールバルブ17の内部に配置されていてもよい。この場合、第1油路C1aもコントロールバルブ17の内部に配置される。 Specifically, the first oil passage C1a connects the second oil passage C2a and the third oil passage C3a. The second oil passage C2a connects the rod-side oil chamber 8R of the arm cylinder 8 with the flow control valves 173L and 173R. The third oil passage C3a connects the bottom side oil chamber 8B of the arm cylinder 8 and the flow control valves 173L and 173R. In the example of FIG. 4, the arm regeneration valve V1a is a 1-port 2-position electromagnetic proportional valve capable of switching communication / shutoff between the second oil passage C2a and the third oil passage C3a. Specifically, the arm regeneration valve V1a communicates between the second oil passage C2a and the third oil passage C3a at the maximum opening when it is in the first valve position, and when it is in the second valve position, it communicates with the second oil passage C2a. Can be blocked. Further, the arm regeneration valve V1a can stay at an arbitrary valve position between the first valve position and the second valve position. The opening area of the arm regeneration valve V1a is larger as it is closer to the position of the first valve. The arm regeneration valve V1a may be arranged inside the control valve 17 as well as the flow rate control valve. In this case, the first oil passage C1a is also arranged inside the control valve 17.

次に、図5を参照して、コントローラ30がショベルの機体の浮き上がりを防止しながら掘削作業を支援する処理(以下、「第1支援処理」とする。)について説明する。なお、図5は、第1支援処理の流れを示すフローチャートであり、コントローラ30は、所定周期で繰り返しこの第1支援処理を実行する。 Next, with reference to FIG. 5, a process in which the controller 30 supports the excavation work while preventing the excavator body from rising (hereinafter, referred to as “first support process”) will be described. Note that FIG. 5 is a flowchart showing the flow of the first support process, and the controller 30 repeatedly executes the first support process at a predetermined cycle.

最初に、コントローラ30の掘削操作検出部300は、掘削操作中であるか否かを判定する(ステップS1)。 First, the excavation operation detection unit 300 of the controller 30 determines whether or not the excavation operation is in progress (step S1).

コントローラ30は、例えば、操作圧センサ29の出力に基づいてアーム閉じ操作中であることを検出する。そして、アーム閉じ操作中であることを検出した場合、掘削操作検出部300は、アームボトム圧とアームロッド圧の圧力差を算出する。そして、掘削操作検出部300は、算出した圧力差が所定値以上の場合に、掘削操作中(アーム掘削操作中)であると判定する。 The controller 30 detects, for example, that the arm closing operation is in progress based on the output of the operating pressure sensor 29. Then, when it is detected that the arm closing operation is in progress, the excavation operation detection unit 300 calculates the pressure difference between the arm bottom pressure and the arm rod pressure. Then, when the calculated pressure difference is equal to or greater than a predetermined value, the excavation operation detection unit 300 determines that the excavation operation is in progress (arm excavation operation is in progress).

或いは、コントローラ30は、操作圧センサ29の出力に基づいてブーム上げ操作中であることを検出する。そして、ブーム上げ操作中であることを検出した場合、掘削操作検出部300は、ブームロッド圧を取得する。また、掘削操作検出部300は、アームボトム圧とアームロッド圧の圧力差を算出する。そして、掘削操作検出部300は、ブームロッド圧が所定値以上であり、且つ、算出した圧力差が所定値以上の場合に、掘削操作中(ブーム上げ複合掘削操作中)であると判定する。 Alternatively, the controller 30 detects that the boom raising operation is in progress based on the output of the operating pressure sensor 29. Then, when it is detected that the boom raising operation is in progress, the excavation operation detection unit 300 acquires the boom rod pressure. Further, the excavation operation detection unit 300 calculates the pressure difference between the arm bottom pressure and the arm rod pressure. Then, when the boom rod pressure is equal to or greater than a predetermined value and the calculated pressure difference is equal to or greater than a predetermined value, the excavation operation detection unit 300 determines that the excavation operation is in progress (during the boom raising combined excavation operation).

掘削操作中でないと判定した場合(ステップS1のNO)、掘削操作検出部300は、今回の第1支援処理を終了させる。 When it is determined that the excavation operation is not in progress (NO in step S1), the excavation operation detection unit 300 ends the first support process this time.

一方、掘削操作検出部300が掘削操作中であると判定した場合(ステップS1のYES)、姿勢検出部301は、ショベルの姿勢を検出する(ステップS2)。具体的には、姿勢検出部301は、アーム角度センサ、ブーム角度センサ及びバケット角度センサの出力に基づいて、ブーム角度θ1、アーム角度θ2、及びバケット角度θ3を検出する。掘削アタッチメントに作用する力の作用線と所定の回転中心との間の距離をコントローラ30の許容最大圧力算出部302が導出できるようにするためである。 On the other hand, when the excavation operation detection unit 300 determines that the excavation operation is in progress (YES in step S1), the posture detection unit 301 detects the posture of the excavator (step S2). Specifically, the posture detection unit 301 detects the boom angle θ1, the arm angle θ2, and the bucket angle θ3 based on the outputs of the arm angle sensor, the boom angle sensor, and the bucket angle sensor. This is so that the maximum allowable pressure calculation unit 302 of the controller 30 can derive the distance between the line of action of the force acting on the excavation attachment and the predetermined center of rotation.

その後、許容最大圧力算出部302は、姿勢検出部301の検出値に基づいて、第1許容最大圧力PBMAXを算出する(ステップS3)。具体的には、許容最大圧力算出部302は、上述の(6)式を用いて第1許容最大圧力PBMAXを算出する。 After that, the allowable maximum pressure calculation unit 302 calculates the first allowable maximum pressure P BMAX based on the detection value of the posture detection unit 301 (step S3). Specifically, the allowable maximum pressure calculation unit 302 calculates the first allowable maximum pressure P BMAX using the above equation (6).

その後、許容最大圧力算出部302は、算出した第1許容最大圧力PBMAX以下の所定圧力を目標ブームロッド圧PBTとして設定する(ステップS4)。具体的には、許容最大圧力算出部302は、第1許容最大圧力PBMAXから所定値を差し引いた後の値を目標ブームロッド圧PBTとして設定する。 After that, the allowable maximum pressure calculation unit 302 sets a predetermined pressure equal to or lower than the calculated first allowable maximum pressure P BMAX as the target boom rod pressure P BT (step S4). Specifically, the allowable maximum pressure calculation unit 302 sets the value after subtracting a predetermined value from the first allowable maximum pressure P BMAX as the target boom rod pressure P BT .

その後、コントローラ30の再生弁制御部303は、ショベルの機体の安定度に関する所定の条件である制御開始条件が満たされているか否かを判定する(ステップS5)。例えば、再生弁制御部303は、ブームロッド圧Pが目標ブームロッド圧PBTに達した場合に制御開始条件が満たされたと判定する。ブームロッド圧Pがこのまま上昇し続ければショベルの機体が浮き上がるおそれがあると判断できるためである。 After that, the regeneration valve control unit 303 of the controller 30 determines whether or not the control start condition, which is a predetermined condition regarding the stability of the shovel body, is satisfied (step S5). For example, the regeneration valve control unit 303 determines that the control start condition is satisfied when the boom rod pressure P B reaches the target boom rod pressure P BT. This is because it can be judged that the excavator body may be lifted if the boom rod pressure P B continues to rise as it is.

制御開始条件が満たされていると判定した場合(ステップS5のYES)、例えば、ブームロッド圧Pが目標ブームロッド圧PBTに達した場合、再生弁制御部303は、再生弁V1(ブーム再生弁)を制御してブームロッド圧Pを低減させる(ステップS6)。具体的には、再生弁制御部303は、再生弁V1に対して制御電流を供給し、再生弁V1の開口面積を増大させる。第1油路C1の流路面積を増大させるためである。そして、再生弁制御部303は、ロッド側油室7Rからボトム側油室7Bに作動油を流すことによって、ブームロッド圧Pを低減させる。このとき、ブームロッド圧センサの出力に基づいてブームロッド圧Pをフィードバック制御してもよい。その結果、ブームシリンダ7が伸張することで掘削反力Fの鉛直成分FR1が減少し、ショベルの機体の浮き上がりが防止される。 When it is determined that the control start condition is satisfied (YES in step S5), for example, when the boom rod pressure P B reaches the target boom rod pressure P BT , the regeneration valve control unit 303 receives the regeneration valve V1 (boom). The regeneration valve) is controlled to reduce the boom rod pressure P B (step S6). Specifically, the regeneration valve control unit 303 supplies a control current to the regeneration valve V1 to increase the opening area of the regeneration valve V1. This is to increase the flow path area of the first oil passage C1. The regeneration valve control unit 303, by flowing a working fluid to the bottom side oil chamber 7B of the rod side oil chamber 7R, reducing the boom rod pressure P B. At this time, the boom rod pressure P B may be feedback-controlled based on the output of the boom rod pressure sensor. As a result, the boom cylinder 7 is vertical component F R1 decreases excavation reaction force F R by stretching, lifting of the shovel of the aircraft is prevented.

なお、ステップS5において、制御開始条件が満たされていないと判定した場合(ステップS5のNO)、例えば、ブームロッド圧Pが目標ブームロッド圧PBT未満に留まる場合、再生弁制御部303は、ブームロッド圧Pを低減させることなく、今回の第1支援処理を終了させる。ショベルの機体が浮き上がるおそれがないためである。 When it is determined in step S5 that the control start condition is not satisfied (NO in step S5), for example, when the boom rod pressure P B remains less than the target boom rod pressure P BT , the regeneration valve control unit 303 , without reducing the boom rod pressure P B, to terminate the first support processing time. This is because there is no risk that the excavator's body will rise.

以上の構成により、コントローラ30は、パイロット圧に影響を与えることなく、掘削作業中にショベルの機体が浮き上がるのを防止できる。そのため、ショベルの機体が浮き上がる寸前のところでの、機体重量を効率的に利用した掘削作業を実現できる。また、浮き上がったショベルの姿勢を元に戻すための操作を不要にする等、作業効率を向上させることができ、ひいては、燃費の低減、機体故障の防止、操作者の操作負担の軽減を実現できる。 With the above configuration, the controller 30 can prevent the excavator body from floating during the excavation work without affecting the pilot pressure. Therefore, it is possible to realize excavation work that efficiently utilizes the weight of the excavator just before the excavator's body floats. In addition, work efficiency can be improved by eliminating the need for operations to restore the raised excavator's posture, which in turn can reduce fuel consumption, prevent aircraft breakdowns, and reduce the operational burden on the operator. ..

また、コントローラ30は、再生弁V1の開口面積を自動的に制御してブームロッド圧Pを低減させる。すなわち、操作者によるブーム操作レバーの操作とは無関係にブームロッド圧Pを低減させる。そのため、操作者は、ブーム操作レバーを微操作して機体の浮き上がりを防止する必要はない。 Further, the controller 30 automatically controls the opening area of the regeneration valve V1 to reduce the boom rod pressure P B. That is, the boom rod pressure P B is reduced regardless of the operation of the boom operating lever by the operator. Therefore, the operator does not need to finely operate the boom operating lever to prevent the airframe from floating.

また、コントローラ30は、ロッド側油室7Rとボトム側油室7Bとの間で作動油を移動させるため、ロッド側油室7Rからリリーフ弁等を通じて作動油タンクTに作動油を排出する構成に比べ、無駄に作動油タンクTに排出されてしまう作動油の量を減らすことできる。 Further, in order to move the hydraulic oil between the rod side oil chamber 7R and the bottom side oil chamber 7B, the controller 30 is configured to discharge the hydraulic oil from the rod side oil chamber 7R to the hydraulic oil tank T through a relief valve or the like. In comparison, the amount of hydraulic oil that is wasted discharged into the hydraulic oil tank T can be reduced.

また、例えばショベルの非操作時に異常な制御電流等に起因して再生弁V1が開いたままになってしまったとしても、アタッチメントの自重等によるブームシリンダ7の収縮は、ブームシリンダ7を伸張させようとする力と収縮させようとする力がつり合った時点で止まる。ロッド側油室7R及びボトム側油室7B以外に作動油が流出しないためである。そのため、ボトム側油室7Bと作動油タンクTとを繋ぐ油路に電磁リリーフ弁が配置されている構成においてその電磁リリーフ弁が開いたままになってしまったときのようにブームシリンダ7を過度に収縮させてしまうこともない。 Further, for example, even if the regeneration valve V1 remains open due to an abnormal control current or the like when the excavator is not operated, the contraction of the boom cylinder 7 due to the weight of the attachment or the like causes the boom cylinder 7 to expand. It stops when the force to try and the force to contract are balanced. This is because the hydraulic oil does not flow out to other than the rod side oil chamber 7R and the bottom side oil chamber 7B. Therefore, in a configuration in which the electromagnetic relief valve is arranged in the oil passage connecting the bottom side oil chamber 7B and the hydraulic oil tank T, the boom cylinder 7 is excessively increased as in the case where the electromagnetic relief valve is left open. It does not shrink.

次に、図6を参照し、アーム掘削作業中における各種物理量の時間的推移について説明する。図6は、アーム掘削作業中におけるアームボトム圧P、ブームロッド圧P、機体傾斜角度、及び、ブームシリンダストローク量のそれぞれの時間的推移を示す図である。図6の実線は第1支援処理が実行されるときの推移を表し、図6の点線は第1支援処理が実行されないときの推移を表す。図6の例では、操作者は、アーム閉じ操作のみによってアーム掘削作業を行っている。 Next, with reference to FIG. 6, the temporal transition of various physical quantities during the arm excavation work will be described. 6, the arm bottom pressure P A in the arm drilling operations, the boom rod pressure P B, body tilt angle, and a diagram showing the respective time course of the boom cylinder stroke. The solid line in FIG. 6 represents the transition when the first support process is executed, and the dotted line in FIG. 6 represents the transition when the first support process is not executed. In the example of FIG. 6, the operator performs the arm excavation work only by the arm closing operation.

時刻t1においてバケット6が地面と接触した後の時刻t2において、アームボトム圧Pは比較的急激に増大する。アーム掘削作業が進むにつれて掘削負荷が急増するためである。 At a time t2 after the bucket 6 is in contact with the ground at time t1, the arm bottom pressure P A is increased relatively sharply. This is because the excavation load increases rapidly as the arm excavation work progresses.

その後、時刻t3において、ブームロッド圧Pは、アームボトム圧Pの急激な増大に僅かに遅れ、アームボトム圧Pと同様に、比較的急激に増大する。 Thereafter, at time t3, the boom rod pressure P B, delayed slightly in rapid increase in the arm bottom pressure P A, similarly to the arm bottom pressure P A, increases relatively rapidly.

その後、時刻t4において、ブームロッド圧Pが目標ブームロッド圧PBTに達すると、第1支援処理を利用できる場合には、コントローラ30は、再生弁V1に対して制御電流を供給し、再生弁V1の開口面積を増大させる。その結果、ブームロッド圧Pは、実線で示すように、目標ブームロッド圧PBTを維持するように推移する。このとき、コントローラ30は、ブームロッド圧Pの変動に応じて再生弁V1の開口面積を増減させることでブームロッド圧Pが目標ブームロッド圧PBTで維持されるようにする。具体的には、コントローラ30は、ブームロッド圧Pが目標ブームロッド圧PBTを上回ったときに再生弁V1の開口面積を増大させ、ブームロッド圧Pが目標ブームロッド圧PBTを下回ったときに再生弁V1の開口面積を低減させる。 After that, when the boom rod pressure P B reaches the target boom rod pressure P BT at time t4, if the first support process can be used, the controller 30 supplies a control current to the regeneration valve V1 to regenerate the valve V1. Increase the opening area of valve V1. As a result, the boom rod pressure P B, as shown by the solid line, to remain so as to maintain the target boom rod pressure P BT. At this time, the controller 30, so that the boom rod pressure P B is maintained at the target boom rod pressure P BT by increasing or decreasing the opening area of the regeneration valve V1 according to variation of the boom rod pressure P B. Specifically, the controller 30 increases the opening area of the regeneration valve V1 when the boom rod pressure P B exceeds the target boom rod pressure P BT, below target boom rod pressure P BT boom rod pressure P B At that time, the opening area of the regeneration valve V1 is reduced.

そのため、ブームシリンダストローク量は、時刻t4において増大し始め、その後も比較的緩やかに増大していく。すなわち、ブーム4が緩やかに上昇していく。アーム5を閉じる際に掘削反力が増大してブームロッド圧Pが目標ブームロッド圧PBTを上回る度に再生弁V1の開口面積が大きくなりロッド側油室7Rからボトム側油室7Bに作動油が流れるためである。 Therefore, the boom cylinder stroke amount starts to increase at time t4, and then increases relatively slowly thereafter. That is, the boom 4 gradually rises. Every time the excavation reaction force increases when the arm 5 is closed and the boom rod pressure P B exceeds the target boom rod pressure P BT , the opening area of the regeneration valve V1 increases and the rod side oil chamber 7R changes to the bottom side oil chamber 7B. This is because the hydraulic oil flows.

その結果、機体傾斜角度は大きく変動することなくそのままの状態で推移する。すなわち、ショベルの機体が浮き上がることはない。 As a result, the tilt angle of the airframe does not fluctuate significantly and remains as it is. That is, the excavator's body does not float.

一方、第1支援処理を利用しない場合には、コントローラ30は、ブームロッド圧Pが目標ブームロッド圧PBTに達しても、再生弁V1の開口面積を増大させることはない。その結果、ブームロッド圧Pは、点線で示すように、時刻t5においてショベルの機体が浮き上がるまで目標ブームロッド圧PBTを超えて増大し続ける。ショベルの機体が浮き上がると、ブームロッド圧Pの更なる増大が抑制される。機体の浮き上がりによって掘削負荷の更なる増大が抑制されるためである。 On the other hand, when the first support process is not used, the controller 30 does not increase the opening area of the regeneration valve V1 even if the boom rod pressure P B reaches the target boom rod pressure P BT. As a result, the boom rod pressure P B, as indicated by the dotted line, continues to increase beyond the target boom rod pressure P BT at time t5 to excavator body floats. When excavator body floats, a further increase in the boom rod pressure P B can be suppressed. This is because the lift of the airframe suppresses a further increase in the excavation load.

ブームシリンダストローク量は、点線で示すように、時刻t4以降もそのままの状態で維持される。すなわち、ブームシリンダ7は伸張しない。一方、機体傾斜角度は、点線で示すように、時刻t5において増大し始め、その後も比較的緩やかに増大していく。ショベルの機体が浮き上がるためである。 As shown by the dotted line, the boom cylinder stroke amount is maintained as it is after the time t4. That is, the boom cylinder 7 does not extend. On the other hand, as shown by the dotted line, the airframe tilt angle starts to increase at time t5 and then increases relatively slowly thereafter. This is because the excavator's body floats up.

このように、コントローラ30は、ブームロッド圧Pが目標ブームロッド圧PBTに達したときに再生弁V1を開くことで、ショベルの機体が浮き上がるのを防止できる。 In this way, the controller 30 can prevent the excavator body from floating by opening the regeneration valve V1 when the boom rod pressure P B reaches the target boom rod pressure P BT.

また、コントローラ30は、ブームシリンダ7に関する操作とは無関係に再生弁V1を制御できる。具体的には、アーム掘削作業中において、操作者がブーム操作レバーを操作していない場合であっても、必要に応じて再生弁V1を開くことでブームシリンダ7の伸張を許容し、ブームロッド圧を下げてショベルの機体が浮き上がるのを防止できる。 Further, the controller 30 can control the regeneration valve V1 regardless of the operation related to the boom cylinder 7. Specifically, even when the operator is not operating the boom operating lever during the arm excavation work, the regenerating valve V1 is opened as necessary to allow the boom cylinder 7 to expand and the boom rod. It is possible to reduce the pressure and prevent the excavator's body from floating.

次に図7を参照し、図1のショベルに搭載される油圧回路の別の構成例について説明する。図7は、図1のショベルに搭載される油圧回路の別の構成例を示す図である。図7の油圧回路は、主に、コントロールバルブ17が可変ロードチェック弁51〜53、合流弁55、及び、統一ブリードオフ弁56L、56Rを含む点で図4の油圧回路と異なるが、その他の点で共通する。そのため、共通部分の説明を省略し、相違部分を詳細に説明する。 Next, with reference to FIG. 7, another configuration example of the hydraulic circuit mounted on the excavator of FIG. 1 will be described. FIG. 7 is a diagram showing another configuration example of the hydraulic circuit mounted on the excavator of FIG. The hydraulic circuit of FIG. 7 is different from the hydraulic circuit of FIG. 4 in that the control valve 17 mainly includes the variable load check valves 51 to 53, the merging valve 55, and the unified bleed-off valves 56L and 56R. It is common in that. Therefore, the description of the common part will be omitted, and the difference part will be described in detail.

可変ロードチェック弁51〜53は、コントローラ30からの指令に応じて動作する。図7の例では、可変ロードチェック弁51〜53は、流量制御弁171〜173のそれぞれと第1ポンプ14L及び第2ポンプ14Rのうちの少なくとも一方との間の連通・遮断を切り替え可能な1ポート2位置の電磁弁である。なお、可変ロードチェック弁51〜53は、第1位置において、ポンプ側に戻る作動油の流れを遮断するチェック弁を有する。具体的には、可変ロードチェック弁51は、第1位置にある場合に流量制御弁171と第1ポンプ14L及び第2ポンプ14Rのうちの少なくとも一方との間を連通させ、第2位置にある場合にその連通を遮断する。可変ロードチェック弁52及び可変ロードチェック弁53についても同様である。 The variable load check valves 51 to 53 operate in response to a command from the controller 30. In the example of FIG. 7, the variable load check valves 51 to 53 can switch communication / shutoff between each of the flow control valves 171 to 173 and at least one of the first pump 14L and the second pump 14R1. It is a solenoid valve at the port 2 position. The variable load check valves 51 to 53 have a check valve that shuts off the flow of hydraulic oil returning to the pump side at the first position. Specifically, the variable load check valve 51 communicates with the flow control valve 171 and at least one of the first pump 14L and the second pump 14R when it is in the first position, and is in the second position. In some cases, the communication is cut off. The same applies to the variable load check valve 52 and the variable load check valve 53.

合流弁55は、第1ポンプ14Lが吐出する作動油(以下、「第1作動油」とする。)と第2ポンプ14Rが吐出する作動油(以下、「第2作動油」とする。)とを合流させるか否かを切り替える。図7の例では、合流弁55は、1ポート2位置の電磁弁であり、コントローラ30からの指令に応じて動作する。具体的には、合流弁55は、第1位置にある場合に第1作動油と第2作動油とを合流させ、第2位置にある場合に第1作動油と第2作動油とを合流させないようにする。 The merging valve 55 is a hydraulic oil discharged from the first pump 14L (hereinafter referred to as "first hydraulic oil") and a hydraulic oil discharged from the second pump 14R (hereinafter referred to as "second hydraulic oil"). Switch whether or not to merge with. In the example of FIG. 7, the confluence valve 55 is a solenoid valve at one port and two positions, and operates in response to a command from the controller 30. Specifically, the merging valve 55 merges the first hydraulic oil and the second hydraulic oil when it is in the first position, and merges the first hydraulic oil and the second hydraulic oil when it is in the second position. Do not let it.

統一ブリードオフ弁56L、56Rは、コントローラ30からの指令に応じて動作する。図7の例では、統一ブリードオフ弁56Lは、第1作動油の作動油タンクTへの排出量を制御可能な1ポート2位置の電磁弁である。統一ブリードオフ弁56Rについても同様である。この構成により、統一ブリードオフ弁56L、56Rは、流量制御弁170〜173のうちの関連する流量制御弁の合成開口を実現できる。具体的には、合流弁55が第2位置にある場合に、統一ブリードオフ弁56Lは流量制御弁170及び流量制御弁173の合成開口を実現でき、統一ブリードオフ弁56Rは流量制御弁171及び流量制御弁172の合成開口を実現できる。統一ブリードオフ弁56Lは、第1位置にある場合にコントローラ30からの指令に応じてその合成開口の開口面積を調整する可変絞りとして機能し、第2位置にある場合にその合成開口を遮断する。統一ブリードオフ弁56Rについても同様である。 The unified bleed-off valves 56L and 56R operate in response to a command from the controller 30. In the example of FIG. 7, the unified bleed-off valve 56L is a 1-port 2-position solenoid valve capable of controlling the discharge amount of the first hydraulic oil to the hydraulic oil tank T. The same applies to the unified bleed-off valve 56R. With this configuration, the unified bleed-off valves 56L, 56R can realize the combined opening of the related flow control valves of the flow control valves 170 to 173. Specifically, when the merging valve 55 is in the second position, the unified bleed-off valve 56L can realize the combined opening of the flow control valve 170 and the flow control valve 173, and the unified bleed-off valve 56R is the flow control valve 171 and A combined opening of the flow control valve 172 can be realized. The unified bleed-off valve 56L functions as a variable diaphragm that adjusts the opening area of the combined opening in response to a command from the controller 30 when it is in the first position, and shuts off the combined opening when it is in the second position. .. The same applies to the unified bleed-off valve 56R.

可変ロードチェック弁51〜53、合流弁55、及び、統一ブリードオフ弁56L、56Rのそれぞれは、パイロット圧駆動のスプール弁であってもよい。 Each of the variable load check valves 51 to 53, the merging valve 55, and the unified bleed-off valves 56L and 56R may be pilot pressure driven spool valves.

次に、図8を参照して、図7の油圧回路を搭載するショベルのコントローラ30が、ショベルの機体が掘削地点のほうに引き摺られるのを防止しながらアーム掘削作業を支援する処理(以下、「第2支援処理」とする。)について説明する。なお、図8は、第2支援処理の流れを示すフローチャートであり、コントローラ30は、所定周期で繰り返しこの第2支援処理を実行する。 Next, referring to FIG. 8, a process in which the controller 30 of the excavator equipped with the hydraulic circuit of FIG. 7 supports the arm excavation work while preventing the excavator's body from being dragged toward the excavation point (hereinafter, “Second support processing”) will be described. Note that FIG. 8 is a flowchart showing the flow of the second support process, and the controller 30 repeatedly executes the second support process at a predetermined cycle.

最初に、コントローラ30の掘削操作検出部300は、アーム閉じ操作を含むアーム掘削操作中であるか否かを判定する(ステップS11)。具体的には、掘削操作検出部300は、操作圧センサ29の出力に基づいてアーム閉じ操作中であることを検出する。そして、アーム閉じ操作中であることを検出した場合、掘削操作検出部300は、アームボトム圧とアームロッド圧の圧力差を算出する。そして、掘削操作検出部300は、算出した圧力差が所定値以上の場合にアーム掘削操作中であると判定する。 First, the excavation operation detection unit 300 of the controller 30 determines whether or not the arm excavation operation including the arm closing operation is in progress (step S11). Specifically, the excavation operation detection unit 300 detects that the arm closing operation is in progress based on the output of the operation pressure sensor 29. Then, when it is detected that the arm closing operation is in progress, the excavation operation detection unit 300 calculates the pressure difference between the arm bottom pressure and the arm rod pressure. Then, the excavation operation detection unit 300 determines that the arm excavation operation is in progress when the calculated pressure difference is equal to or greater than a predetermined value.

アーム掘削操作中でないと判定した場合(ステップS11のNO)、掘削操作検出部300は、今回の第2支援処理を終了させる。 When it is determined that the arm excavation operation is not in progress (NO in step S11), the excavation operation detection unit 300 ends the second support process this time.

一方、掘削操作検出部300がアーム掘削操作中であると判定した場合(ステップS11のYES)、姿勢検出部301は、ショベルの姿勢を検出する(ステップS12)。 On the other hand, when the excavation operation detection unit 300 determines that the arm excavation operation is in progress (YES in step S11), the posture detection unit 301 detects the posture of the excavator (step S12).

その後、許容最大圧力算出部302は、姿勢検出部301の出力に基づいて、第2許容最大圧力を算出する(ステップS13)。具体的には、許容最大圧力算出部302は、上述の(9)式を用いて第2許容最大圧力PAMAXを算出する。 After that, the allowable maximum pressure calculation unit 302 calculates the second allowable maximum pressure based on the output of the posture detection unit 301 (step S13). Specifically, the allowable maximum pressure calculation unit 302 calculates the second allowable maximum pressure PAMAX using the above equation (9).

その後、許容最大圧力算出部302は、算出した第2許容最大圧力PAMAX以下の所定圧力を目標アームボトム圧PATとして設定する(ステップS14)。本実施例では、許容最大圧力算出部302は、第2許容最大圧力PAMAXを目標アームボトム圧PATとして設定する。 Then, the allowable maximum pressure calculating unit 302 sets the second allowable maximum pressure P AMAX following predetermined pressure which is calculated as the target arm bottom pressure P AT (step S14). In this embodiment, the allowable maximum pressure calculating unit 302 sets the second allowable maximum pressure P AMAX as the target arm bottom pressure P AT.

その後、コントローラ30の再生弁制御部303は、ショベルの機体の安定度に関する所定の条件である制御開始条件が満たされているか否かを判定する(ステップS15)。例えば、再生弁制御部303は、アームボトム圧Pが目標アームボトム圧PATに達した場合に制御開始条件が満たされたと判定する。アームボトム圧Pがこのまま上昇し続ければショベルの機体が掘削地点のほうに引き摺られるおそれがあると判断できるためである。 After that, the regeneration valve control unit 303 of the controller 30 determines whether or not the control start condition, which is a predetermined condition regarding the stability of the excavator body, is satisfied (step S15). For example, the regeneration valve control unit 303 determines that the control start condition when the arm bottom pressure P A has reached the target arm bottom pressure P AT is satisfied. Arm bottom pressure P A is it can be determined that the body of the shovel it continues to rise in this state is likely to be dragged towards the drilling site.

制御開始条件が満たされていると判定した場合(ステップS15のYES)、例えば、アームボトム圧Pが目標アームボトム圧PATに達した場合、再生弁制御部303は、アーム再生弁V1aを制御してアームボトム圧Pとアームロッド圧PA2との差圧を低減させることでアーム推力Fを低減させる(ステップS16)。具体的には、再生弁制御部303は、アーム再生弁V1aに対して制御電流を供給し、アーム再生弁V1aを開いてその開口面積を増大させる。第1油路C1aの流路面積を増大させるためである。そして、流量制御弁173のCTポート(シリンダ・タンクポート)の開口が大きい場合には、再生弁制御部303は、ボトム側油室8Bから作動油を流出させることによって、アームボトム圧Pを低減させる。その結果、アームシリンダ8の伸張が抑制され或いは停止されることで掘削反力Fの水平成分FR2が減少し或いは消失し、ショベルの機体が掘削地点のほうに引き摺られるのが防止される。 If the control start condition is determined to have been met (YES in step S15), and for example, if the arm bottom pressure P A has reached the target arm bottom pressure P AT, regeneration valve control unit 303, the arm regeneration valve V1a controlled to reduce arm thrust F a by reducing the differential pressure between the arm bottom pressure P a and the arm rod pressure P A2 (step S16). Specifically, the regeneration valve control unit 303 supplies a control current to the arm regeneration valve V1a to open the arm regeneration valve V1a to increase the opening area thereof. This is to increase the flow path area of the first oil passage C1a. When the opening of the CT ports of the flow control valve 173 (cylinder tank port) is large, the regeneration valve control unit 303, by discharging the hydraulic oil from the bottom side oil chamber 8B, the arm bottom pressure P A Reduce. As a result, extension of the arm cylinder 8 is reduced horizontal component F R2 of the excavation reaction force F R by being suppressed or stopped, or lost, thereby preventing the excavator body is dragged towards the drilling site ..

また、流量制御弁173のCTポートの開口が小さい場合であっても、再生弁制御部303は、ロッド側油室8Rへ作動油を流入させることによって、アームロッド圧PA2を上昇させ、アームボトム圧Pとアームロッド圧PA2との差圧を低減させる。その結果、アームシリンダ8の伸張が抑制され或いは停止されることで掘削反力Fの水平成分FR2が減少し或いは消失し、ショベルの機体が掘削地点のほうに引き摺られるのが防止される。 Further, even when the opening of the CT port of the flow rate control valve 173 is small, the regeneration valve control unit 303 raises the arm rod pressure PA2 by flowing hydraulic oil into the rod side oil chamber 8R, and the arm. reducing the pressure difference between the bottom pressure P a and the arm rod pressure P A2. As a result, extension of the arm cylinder 8 is reduced horizontal component F R2 of the excavation reaction force F R by being suppressed or stopped, or lost, thereby preventing the excavator body is dragged towards the drilling site ..

このように、アームシリンダ8から排出される作動油は、流量制御弁173のシリンダ・タンクポートの開口の大きさに応じて、排出される側の油室とは反対側の油室へ供給され、若しくは、タンクへ排出される。その結果、アームシリンダ8の伸張が抑制され或いは停止されることでショベルの機体が掘削地点のほうに引き摺られるのが防止される。 In this way, the hydraulic oil discharged from the arm cylinder 8 is supplied to the oil chamber on the side opposite to the oil chamber on the discharge side according to the size of the opening of the cylinder tank port of the flow control valve 173. Or, it is discharged to the tank. As a result, the extension of the arm cylinder 8 is suppressed or stopped, so that the excavator body is prevented from being dragged toward the excavation point.

ステップS15において、制御開始条件が満たされていないと判定した場合(ステップS15のNO)、例えば、アームボトム圧Pが目標アームボトム圧PAT未満に留まる場合、再生弁制御部303は、アームボトム圧Pを低減させることなく、今回の第2支援処理を終了させる。ショベルの機体が引き摺られるおそれがないためである。 In step S15, when the control start condition is found not satisfied (NO in step S15), and for example, if the arm bottom pressure P A remains below the target arm bottom pressure P AT, regeneration valve control unit 303, the arm without reducing the bottom pressure P a, and ends the second support processing time. This is because there is no risk of the excavator's body being dragged.

以上の構成により、コントローラ30は、パイロット圧に影響を与えることなく、アーム掘削作業中にショベルの機体が掘削地点のほうに引き摺られるのを防止することができる。そのため、ショベルの機体が引き摺られる寸前のところでの、機体重量を効率的に利用したアーム掘削作業を実現できる。また、引き摺られたショベルの姿勢を元に戻すための操作を不要にする等、作業効率を向上させることができ、ひいては、燃費の低減、機体故障の防止、操作者の操作負担の軽減を実現できる。 With the above configuration, the controller 30 can prevent the excavator body from being dragged toward the excavation point during the arm excavation work without affecting the pilot pressure. Therefore, it is possible to realize arm excavation work that efficiently utilizes the weight of the excavator just before the excavator's body is dragged. In addition, work efficiency can be improved by eliminating the need for operations to restore the posture of the dragged excavator, which in turn reduces fuel consumption, prevents aircraft breakdowns, and reduces the operational burden on the operator. can.

また、コントローラ30は、ロッド側油室8Rとボトム側油室8Bとの間で作動油を移動させるため、ボトム側油室8Bからリリーフ弁等を通じて作動油タンクTに作動油を排出する構成に比べ、管路等における圧力損失を抑制できる。また、アーム再生弁V1aが開いたままになってしまったとしても、アームシリンダ8を伸張させようとする力と収縮させようとする力がつり合った時点でアームシリンダ8の伸縮が止まるため、リリーフ弁が開いたままになってしまったときのようにアームシリンダ8を過度に伸縮させることもない。 Further, in order to move the hydraulic oil between the rod side oil chamber 8R and the bottom side oil chamber 8B, the controller 30 is configured to discharge the hydraulic oil from the bottom side oil chamber 8B to the hydraulic oil tank T through a relief valve or the like. In comparison, pressure loss in pipelines and the like can be suppressed. Further, even if the arm reliever valve V1a remains open, the expansion and contraction of the arm cylinder 8 stops when the force for extending the arm cylinder 8 and the force for contracting the arm cylinder 8 are balanced. The arm cylinder 8 is not excessively expanded and contracted as when the relief valve is left open.

次に、図9を参照して、図7の油圧回路を搭載するショベルのコントローラ30が、ショベルの機体が浮き上がること、及び、ショベルの機体が掘削地点のほうに引き摺られることを防止しながら掘削作業を支援する処理(以下、「第3支援処理」とする。)について説明する。図9は、第3支援処理の流れを示すフローチャートであり、コントローラ30は、所定周期で繰り返しこの第3支援処理を実行する。 Next, referring to FIG. 9, the excavator controller 30 equipped with the hydraulic circuit of FIG. 7 excavates while preventing the excavator body from floating and the excavator body from being dragged toward the excavation point. The process of supporting the work (hereinafter referred to as "third support process") will be described. FIG. 9 is a flowchart showing the flow of the third support process, and the controller 30 repeatedly executes the third support process at a predetermined cycle.

最初に、コントローラ30の掘削操作検出部300は、ブーム上げ操作及びアーム閉じ操作を含む複合掘削操作中であるか否かを判定する(ステップS21)。具体的には、掘削操作検出部300は、操作圧センサ29の出力に基づいてブーム上げ操作中であることを検出する。そして、ブーム上げ操作中であることを検出した場合、掘削操作検出部300は、ブームロッド圧を取得する。また、掘削操作検出部300は、アームボトム圧とアームロッド圧の圧力差を算出する。そして、掘削操作検出部300は、ブームロッド圧が所定値以上であり、且つ、算出した圧力差が所定値以上の場合に、複合掘削操作中であると判定する。 First, the excavation operation detection unit 300 of the controller 30 determines whether or not a combined excavation operation including a boom raising operation and an arm closing operation is in progress (step S21). Specifically, the excavation operation detection unit 300 detects that the boom raising operation is in progress based on the output of the operation pressure sensor 29. Then, when it is detected that the boom raising operation is in progress, the excavation operation detection unit 300 acquires the boom rod pressure. Further, the excavation operation detection unit 300 calculates the pressure difference between the arm bottom pressure and the arm rod pressure. Then, the excavation operation detection unit 300 determines that the combined excavation operation is in progress when the boom rod pressure is equal to or greater than a predetermined value and the calculated pressure difference is equal to or greater than a predetermined value.

複合掘削操作中でないと判定した場合(ステップS21のNO)、掘削操作検出部300は、今回の第3支援処理を終了させる。 When it is determined that the combined excavation operation is not in progress (NO in step S21), the excavation operation detection unit 300 ends the third support process this time.

一方、掘削操作検出部300が複合掘削操作中であると判定した場合(ステップS21のYES)、姿勢検出部301は、ショベルの姿勢を検出する(ステップS22)。 On the other hand, when the excavation operation detection unit 300 determines that the combined excavation operation is in progress (YES in step S21), the posture detection unit 301 detects the posture of the excavator (step S22).

その後、許容最大圧力算出部302は、姿勢検出部301の検出値に基づいて、第1許容最大圧力及び第2許容最大圧力を算出する(ステップS23)。具体的には、許容最大圧力算出部302は、上述の(6)式を用いて第1許容最大圧力PBMAXを算出し、且つ、上述の(9)式を用いて第2許容最大圧力PAMAXを算出する。 After that, the allowable maximum pressure calculation unit 302 calculates the first allowable maximum pressure and the second allowable maximum pressure based on the detected values of the posture detection unit 301 (step S23). Specifically, the allowable maximum pressure calculation unit 302 calculates the first allowable maximum pressure P BMAX using the above equation (6), and the second allowable maximum pressure P using the above equation (9). Calculate AMAX .

その後、許容最大圧力算出部302は、算出した第1許容最大圧力PBMAX以下の所定圧力を目標ブームロッド圧PBTとして設定する(ステップS24)。 After that, the allowable maximum pressure calculation unit 302 sets a predetermined pressure equal to or lower than the calculated first allowable maximum pressure P BMAX as the target boom rod pressure P BT (step S24).

その後、コントローラ30の再生弁制御部303は、ショベルの機体の安定度に関する所定の条件である制御開始条件が満たされているか否かを判定する(ステップS25)。例えば、再生弁制御部303は、ブームロッド圧Pが目標ブームロッド圧PBTに達した場合に制御開始条件が満たされたと判定する。ここでは、制御開始条件である所定の条件が満たされたか否かは、ブームロッド圧Pを用いて判定されているが、掘削反力の鉛直成分の大きさが予め定められた条件を満たしたか否かに基づいて判定されてもよい。このように、鉛直成分に寄与するパラメータに基づいて浮き上がりの防止に関する判定が行われてもよい。 After that, the regeneration valve control unit 303 of the controller 30 determines whether or not the control start condition, which is a predetermined condition regarding the stability of the shovel body, is satisfied (step S25). For example, the regeneration valve control unit 303 determines that the control start condition is satisfied when the boom rod pressure P B reaches the target boom rod pressure P BT. Here, whether or not a predetermined condition is satisfied is control start condition, has been determined using the boom rod pressure P B, satisfies the condition magnitude of the vertical component of the excavation reaction force reaches a predetermined It may be determined based on whether or not it is. In this way, the determination regarding the prevention of floating may be made based on the parameters that contribute to the vertical component.

制御開始条件が満たされていると判定した場合(ステップS25のYES)、例えば、ブームロッド圧Pが目標ブームロッド圧PBTに達した場合、再生弁制御部303は、再生弁V1(ブーム再生弁)を制御してブームロッド圧Pを低減させる(ステップS26)。具体的には、再生弁制御部303は、再生弁V1に対して制御電流を供給し、再生弁V1を開いてその開口面積を増大させる。第1油路C1の流路面積を増大させるためである。そして、再生弁制御部303は、ロッド側油室7Rから作動油を流出させることによって、ブームロッド圧Pを低減させる。その結果、ブームシリンダ7が伸張することで掘削反力Fの鉛直成分FR1が減少し、ショベルの機体の浮き上がりが防止される。 When it is determined that the control start condition is satisfied (YES in step S25), for example, when the boom rod pressure P B reaches the target boom rod pressure P BT , the regeneration valve control unit 303 receives the regeneration valve V1 (boom). The regeneration valve) is controlled to reduce the boom rod pressure P B (step S26). Specifically, the regeneration valve control unit 303 supplies a control current to the regeneration valve V1 to open the regeneration valve V1 to increase the opening area thereof. This is to increase the flow path area of the first oil passage C1. Then, the regeneration valve control unit 303 reduces the boom rod pressure P B by causing the hydraulic oil to flow out from the rod side oil chamber 7R. As a result, the boom cylinder 7 is vertical component F R1 decreases excavation reaction force F R by stretching, lifting of the shovel of the aircraft is prevented.

その後、コントローラ30の再生弁制御部303は、ブームロッド圧Pの監視を継続する。そして、再生弁V1の開口面積を増大させたにもかかわらずブームロッド圧Pが更に上昇して第1許容最大圧力PBMAXに達した場合(ステップS27のYES)、再生弁制御部303は、アーム再生弁V1aを制御してアームボトム圧Pを低減させる(ステップS28)。具体的には、再生弁制御部303は、アーム再生弁V1aに対して制御電流を供給し、アーム再生弁V1aを開いてその開口面積を増大させる。第1油路C1aの流路面積を増大させるためである。そして、再生弁制御部303は、ボトム側油室8Bから作動油を流出させることによって、アームボトム圧Pを低減させる。その結果、アームシリンダ8の伸張が抑制され或いは停止されることで掘削反力Fの鉛直成分FR1が減少し或いは消失し、ショベルの機体の浮き上がりが防止される。 Thereafter, the regeneration valve control unit 303 of the controller 30 continues to monitor the boom rod pressure P B. Then, when the boom rod pressure P B further rises and reaches the first allowable maximum pressure P BMAX even though the opening area of the regenerating valve V1 is increased (YES in step S27), the regenerating valve control unit 303 controls the arm regeneration valves V1a reduce arm bottom pressure P a (step S28). Specifically, the regeneration valve control unit 303 supplies a control current to the arm regeneration valve V1a to open the arm regeneration valve V1a to increase the opening area thereof. This is to increase the flow path area of the first oil passage C1a. The regeneration valve control unit 303, by discharging the hydraulic oil from the bottom side oil chamber 8B, reducing the arm bottom pressure P A. As a result, the vertical component F R1 drilling reaction force F R by extension of the arm cylinder 8 is inhibited or stopped is or disappears decreased, floating of shovel of the aircraft is prevented.

ステップS25において、制御開始条件が満たされていないと判定した場合(ステップS25のNO)、例えば、ブームロッド圧Pが目標ブームロッド圧PBT未満に留まる場合、コントローラ30は、ブームロッド圧Pを低減させることなく、処理をステップS29に進める。ショベルの機体を浮き上がらせるおそれがないためである。 When it is determined in step S25 that the control start condition is not satisfied (NO in step S25), for example, when the boom rod pressure P B remains less than the target boom rod pressure P BT , the controller 30 causes the boom rod pressure P. The process proceeds to step S29 without reducing B. This is because there is no risk of raising the excavator's body.

同様に、ステップS27において、ブームロッド圧Pが第1許容最大圧力PBMAX未満に留まる場合(ステップS27のNO)、コントローラ30は、アームボトム圧Pを低減させることなく、処理をステップS29に進める。ショベルの機体を浮き上がらせるおそれがないためである。 Similarly, in step S27, if the boom rod pressure P B remains below the first allowable maximum pressure P BMAX (NO in step S27), the controller 30, without reducing the arm bottom pressure P A, step S29 the process Proceed to. This is because there is no risk of raising the excavator's body.

その後、ステップS29において、許容最大圧力算出部302は、算出した第2許容最大圧力PAMAX以下の所定圧力を目標アームボトム圧PATとして設定する。具体的には、許容最大圧力算出部302は、第2許容最大圧力PAMAXを目標アームボトム圧PATとして設定する。 Thereafter, in step S29, the allowable maximum pressure calculating unit 302 sets the second allowable maximum pressure P AMAX following predetermined pressure which is calculated as the target arm bottom pressure P AT. Specifically, the allowable maximum pressure calculating unit 302 sets the second allowable maximum pressure P AMAX as the target arm bottom pressure P AT.

その後、コントローラ30の再生弁制御部303は、別の制御開始条件が満たされているか否かを判定する(ステップS30)。例えば、再生弁制御部303は、アームボトム圧Pが目標アームボトム圧PATに達した場合に別の制御開始条件が満たされたと判定する。 After that, the regeneration valve control unit 303 of the controller 30 determines whether or not another control start condition is satisfied (step S30). For example, the regeneration valve control unit 303 determines that another control start condition is satisfied when the arm bottom pressure P A has reached the target arm bottom pressure P AT.

別の制御開始条件が満たされていると判定した場合(ステップS30のYES)、例えば、アームボトム圧Pが目標アームボトム圧PATに達した場合、再生弁制御部303は、アーム再生弁V1aを制御してアームボトム圧Pとアームロッド圧PA2との差圧を低減させることでアーム推力FAを低減させる(ステップS31)。具体的には、再生弁制御部303は、アーム再生弁V1aに対して制御電流を供給し、アーム再生弁V1aを開いてその開口面積を増大させる。第1油路C1aの流路面積を増大させるためである。そして、再生弁制御部303は、ボトム側油室8Bから作動油を流出させることによって、アームボトム圧Pを低減させる。その結果、アームシリンダ8の伸張が抑制され或いは停止されることで掘削反力Fの水平成分FR2が減少し或いは消失し、ショベルの機体が掘削地点のほうに引き摺られるのが防止される。 If another control start condition is determined to have been met (YES in step S30), for example, if the arm bottom pressure P A has reached the target arm bottom pressure P AT, regeneration valve control unit 303, arm regeneration valve controls V1a reduce arm thrust FA by reducing the differential pressure between the arm bottom pressure P a and the arm rod pressure P A2 (step S31). Specifically, the regeneration valve control unit 303 supplies a control current to the arm regeneration valve V1a to open the arm regeneration valve V1a to increase the opening area thereof. This is to increase the flow path area of the first oil passage C1a. The regeneration valve control unit 303, by discharging the hydraulic oil from the bottom side oil chamber 8B, reducing the arm bottom pressure P A. As a result, extension of the arm cylinder 8 is reduced horizontal component F R2 of the excavation reaction force F R by being suppressed or stopped, or lost, thereby preventing the excavator body is dragged towards the drilling site ..

また、アームシリンダ8が収縮する際にも、例えば、アームロッド圧PA2が目標アームロッド圧PA2Tに達した場合、再生弁制御部303は、アーム再生弁V1aを制御してアームボトム圧Pとアームロッド圧PA2との差圧を低減させることでアーム推力Fを低減させることができる。この場合、アーム5が開き方向に回動する場合でも、ショベルが引き摺られるのを防止できる。ここでは、制御開始条件である所定の条件が満たされたか否かは、アームロッド圧PA2又はアームボトム圧を用いて判定されているが、掘削反力の水平成分の大きさが予め定められた条件を満たしたか否かに基づいて判定されてもよい。このように、水平成分に寄与するパラメータに基づいて引き摺られの防止に関する判定が行われてもよい。 Further, even when the arm cylinder 8 is contracted, for example, if the arm rod pressure P A2 has reached the target arm rod pressure P A2T, regeneration valve control unit 303, the arm bottom pressure P by controlling the arm regeneration valve V1a it is possible to reduce the arm thrust F a by reducing the differential pressure between a and the arm rod pressure P A2. In this case, it is possible to prevent the shovel from being dragged even when the arm 5 rotates in the opening direction. Here, whether or not the predetermined condition, which is the control start condition, is satisfied is determined by using the arm rod pressure PA2 or the arm bottom pressure A , but the magnitude of the horizontal component of the excavation reaction force is predetermined. The determination may be made based on whether or not the specified conditions are satisfied. In this way, the determination regarding the prevention of dragging may be made based on the parameters that contribute to the horizontal component.

ステップS30において、別の制御開始条件が満たされていないと判定した場合(ステップS30のNO)、例えば、アームボトム圧Pが目標アームボトム圧PAT未満に留まる場合、再生弁制御部303は、アームボトム圧Pを低減させることなく、今回の第3支援処理を終了させる。ショベルの機体が引き摺られるおそれがないためである。 In step S30, when it is determined that another control start condition is not satisfied (NO in step S30), for example, if the arm bottom pressure P A remains below the target arm bottom pressure P AT, regeneration valve control unit 303 , without reducing the arm bottom pressure P a, and ends the third support processing time. This is because there is no risk of the excavator's body being dragged.

また、ステップS24〜ステップS28におけるショベルの浮き上がりを防止するための一連の処理、及び、ステップS29〜ステップS31におけるショベルが引き摺られるのを防止するための一連の処理は順不同である。従って、2つの一連の処理は、同時並行で実行されてもよく、ショベルが引き摺られるのを防止するための一連の処理が、ショベルの浮き上がりを防止するための一連の処理に先行して実行されてもよい。 Further, the series of processes for preventing the excavator from rising in steps S24 to S28 and the series of processes for preventing the excavator from being dragged in steps S29 to S31 are in no particular order. Therefore, the two series of processes may be executed in parallel, and the series of processes for preventing the excavator from being dragged is executed prior to the series of processes for preventing the excavator from rising. You may.

以上の構成により、コントローラ30は、パイロット圧に影響を与えることなく、掘削作業中にショベルの機体が浮き上がり或いは掘削地点のほうに引き摺られるのを防止できる。そのため、ショベルの機体が浮き上がり或いは引き摺られる寸前のところでの、機体重量を効率的に利用した複合掘削作業を実現できる。また、浮き上がった或いは引き摺られたショベルの姿勢を元に戻すための操作を不要にする等、作業効率を向上させることができ、ひいては、燃費の低減、機体故障の防止、操作者の操作負担の軽減を実現できる。 With the above configuration, the controller 30 can prevent the excavator body from being lifted or dragged toward the excavation point during the excavation work without affecting the pilot pressure. Therefore, it is possible to realize a combined excavation work that efficiently utilizes the weight of the excavator just before the excavator's body is lifted or dragged. In addition, work efficiency can be improved by eliminating the need for operations to restore the posture of the excavator that has been lifted or dragged, which in turn reduces fuel consumption, prevents aircraft failure, and imposes an operator's operational burden. Reduction can be achieved.

以上、本発明の好ましい実施例について詳説した。しかしながら、本発明は、上述した実施例に制限されることはない。上述した実施例は、本発明の範囲を逸脱することなしに、種々の変形及び置換が適用され得る。また、上述の実施例を参照して説明された特徴のそれぞれは、技術的に矛盾しない限り、適宜に組み合わされてもよい。 The preferred embodiments of the present invention have been described in detail above. However, the present invention is not limited to the examples described above. Various modifications and substitutions can be applied to the above-mentioned examples without departing from the scope of the present invention. In addition, each of the features described with reference to the above-described embodiment may be appropriately combined as long as there is no technical contradiction.

例えば、上述の実施例では、許容最大圧力算出部302及び再生弁制御部303による演算は、ショベルの接地面が水平面であることを前提として行われる。しかしながら、本発明はこれに限定されるものではない。上述の実施例における各種演算は、ショベルの接地面が傾斜面であっても、傾斜角度センサの出力を追加的に考慮して適切に実行され得る。 For example, in the above embodiment, the calculation by the allowable maximum pressure calculation unit 302 and the regeneration valve control unit 303 is performed on the premise that the ground plane of the excavator is a horizontal plane. However, the present invention is not limited to this. Even if the ground plane of the excavator is an inclined surface, the various operations in the above-described embodiment can be appropriately executed in consideration of the output of the inclined angle sensor.

コントローラ30は、バケット閉じ操作中における機体の浮き上がりを防止するように構成されてもよい。この場合、コントローラ30は、ブームロッド圧が目標ブームロッド圧PBTを上回った場合に再生弁V1を開く。また、コントローラ30は、バケット閉じ操作及びブーム上げ操作を含む複合掘削操作中における機体の浮き上がりを防止するように構成されてもよい。この場合、コントローラ30は、ブームロッド圧が目標ブームロッド圧PBTを上回った場合に再生弁V1を開く。そして、コントローラ30は、ブームロッド圧が第1許容最大圧力PBMAXに達した場合に、バケットシリンダ9のロッド側油室とボトム側油室を接続する第1油路に配置されたバケット再生弁を開く。このようにして、コントローラ30は、バケット閉じ操作及びブーム上げ操作を含む複合掘削操作中における機体の浮き上がりを防止してもよい。同様に、バケット再生弁を利用してショベルの機体が引き摺られるのを防止してもよい。 The controller 30 may be configured to prevent the airframe from floating during the bucket closing operation. In this case, the controller 30 opens the regeneration valve V1 when the boom rod pressure exceeds the target boom rod pressure PBT. Further, the controller 30 may be configured to prevent the airframe from rising during the combined excavation operation including the bucket closing operation and the boom raising operation. In this case, the controller 30 opens the regeneration valve V1 when the boom rod pressure exceeds the target boom rod pressure PBT. Then, when the boom rod pressure reaches the first allowable maximum pressure P BMAX , the controller 30 is a bucket regeneration valve arranged in the first oil passage connecting the rod side oil chamber and the bottom side oil chamber of the bucket cylinder 9. open. In this way, the controller 30 may prevent the airframe from floating during the combined excavation operation including the bucket closing operation and the boom raising operation. Similarly, the bucket regeneration valve may be used to prevent the excavator from being dragged.

また、上述の実施例では、再生弁V1は、ロッド側油室7Rから作動油を流出させるために利用されているが、ボトム側油室7Bから作動油を流出させるために利用されてもよい。また、アーム再生弁V1aは、ボトム側油室8Bから作動油を流出させるために利用されているが、ロッド側油室8Rから作動油を流出させるために利用されてもよい。すなわち、コントローラ30は、アーム再生弁V1aを開いてアームシリンダ8のロッド側油室8Rからボトム側油室8Bに、若しくは、アームシリンダ8のボトム側油室8Bからロッド側油室8Rに、自重に応じて作動油が流れるようにしてもよい。バケット再生弁についても同様である。

また、上述の実施例では、ブームシリンダ7、アームシリンダ8等の油圧シリンダは、エンジン駆動のメインポンプ14が吐出する作動油によって動かされるが、電動モータ駆動の油圧ポンプが吐出する作動油によって動かされてもよい。
Further, in the above-described embodiment, the regeneration valve V1 is used to discharge the hydraulic oil from the rod side oil chamber 7R, but may be used to discharge the hydraulic oil from the bottom side oil chamber 7B. .. Further, although the arm regeneration valve V1a is used to let the hydraulic oil flow out from the bottom side oil chamber 8B, it may be used to let the hydraulic oil flow out from the rod side oil chamber 8R. That is, the controller 30 opens the arm regeneration valve V1a and shifts its own weight from the rod-side oil chamber 8R of the arm cylinder 8 to the bottom-side oil chamber 8B, or from the bottom-side oil chamber 8B of the arm cylinder 8 to the rod-side oil chamber 8R. The hydraulic oil may flow according to the situation. The same applies to the bucket regeneration valve.

Further, in the above-described embodiment, the hydraulic cylinders such as the boom cylinder 7 and the arm cylinder 8 are driven by the hydraulic oil discharged by the engine-driven main pump 14, but are driven by the hydraulic oil discharged by the electric motor-driven hydraulic pump. May be done.

また、上述の構成は、油圧シリンダにより上下運動を行うフォークリフト、ホイールローダ等の他の建設機械に搭載されてもよい。 Further, the above-described configuration may be mounted on other construction machines such as forklifts and wheel loaders that move up and down by a hydraulic cylinder.

1・・・下部走行体 1L・・・左側走行用油圧モータ 1R・・・右側走行用油圧モータ 2・・・旋回機構 3・・・上部旋回体 4・・・ブーム 5・・・アーム 6・・・バケット 7・・・ブームシリンダ 7B・・・ボトム側油室 7R・・・ロッド側油室 8・・・アームシリンダ 8B・・・ボトム側油室 8R・・・ロッド側油室 9・・・バケットシリンダ 10・・・キャビン 11・・・エンジン 13・・・変速機 14・・・メインポンプ 14L・・・第1ポンプ 14R・・・第2ポンプ 14A、14AL、14AR・・・レギュレータ 15・・・パイロットポンプ 16・・・作動油ライン 17・・・コントロールバルブ 18L、18R・・・ネガティブコントロール絞り 19L、19R・・・リリーフ弁 20・・・バネ付きチェック弁 21・・・旋回用油圧モータ 21L、21R・・・ポート 22L、22R・・・リリーフ弁 23L、23R・・・チェック弁 25・・・パイロットライン 26・・・操作装置 27、28・・・パイロットライン 29・・・操作圧センサ 30・・・コントローラ 31・・・シリンダ圧センサ 32・・・姿勢センサ 33・・・表示装置 34・・・音声出力装置 40L、40R・・・センターバイパス管路 42L、42R・・・パラレル管路 43C、43L、43R・・・戻り管路 44・・・管路 51、52、53・・・可変ロードチェック弁 55・・・合流弁 56L、56R・・・統一ブリードオフ弁 170、171、172、172L、172R、173、173L、173R・・・流量制御弁 300・・・掘削操作検出部 301・・・姿勢検出部 302・・・許容最大圧力算出部 303・・・再生弁制御部 C1、C1a・・・第1油路 C2、C2a・・・第2油路 C3、C3a・・・第3油路 V1・・・再生弁 V1a・・・アーム再生弁 T・・・作動油タンク 1 ・ ・ ・ Lower traveling body 1L ・ ・ ・ Hydraulic motor for left side traveling 1R ・ ・ ・ Hydraulic motor for right side traveling 2 ・ ・ ・ Swivel mechanism 3 ・ ・ ・ Upper swivel body 4 ・ ・ ・ Boom 5 ・ ・ ・ Arm 6 ・・ ・ Bucket 7 ・ ・ ・ Boom cylinder 7B ・ ・ ・ Bottom side oil chamber 7R ・ ・ ・ Rod side oil chamber 8 ・ ・ ・ Arm cylinder 8B ・ ・ ・ Bottom side oil chamber 8R ・ ・ ・ Rod side oil chamber 9 ・ ・・ Bucket cylinder 10 ・ ・ ・ Cabin 11 ・ ・ ・ Engine 13 ・ ・ ・ Transmission 14 ・ ・ ・ Main pump 14L ・ ・ ・ 1st pump 14R ・ ・ ・ 2nd pump 14A, 14AL, 14AR ・ ・ ・ Regulator 15 ・・ ・ Pilot pump 16 ・ ・ ・ Hydraulic oil line 17 ・ ・ ・ Control valve 18L, 18R ・ ・ ・ Negative control throttle 19L, 19R ・ ・ ・ Relief valve 20 ・ ・ ・ Spring check valve 21 ・ ・ ・ Flood control motor 21L, 21R ... Ports 22L, 22R ... Relief valve 23L, 23R ... Check valve 25 ... Pilot line 26 ... Operating device 27, 28 ... Pilot line 29 ... Operating pressure sensor 30 ... Controller 31 ... Cylinder pressure sensor 32 ... Attitude sensor 33 ... Display device 34 ... Voice output device 40L, 40R ... Center bypass pipeline 42L, 42R ... Parallel pipeline 43C, 43L, 43R ... Return line 44 ... Line 51, 52, 53 ... Variable load check valve 55 ... Merge valve 56L, 56R ... Unified bleed-off valve 170, 171, 172 , 172L, 172R, 173, 173L, 173R ... Flow control valve 300 ... Excavation operation detection unit 301 ... Attitude detection unit 302 ... Allowable maximum pressure calculation unit 303 ... Regeneration valve control unit C1, C1a ... 1st oil passage C2, C2a ... 2nd oil passage C3, C3a ... 3rd oil passage V1 ... Regeneration valve V1a ... Arm regeneration valve T ... Hydraulic oil tank

Claims (7)

下部走行体と、
前記下部走行体に旋回可能に搭載される上部旋回体と、
前記上部旋回体に取り付けられるアタッチメントと、
前記アタッチメントを構成する作業要素を駆動する油圧シリンダと、
前記油圧シリンダのロッド側油室とボトム側油室とを接続する第1油路と、
前記第1油路に配置される再生弁と、
機体の安定度に関する所定の条件が満たされているか否かに基づいて前記再生弁の開口を制御する制御装置と、を有する、
ショベル。
With the lower running body,
An upper swivel body that is mounted on the lower traveling body so as to be swivel
The attachment attached to the upper swing body and
A hydraulic cylinder that drives the work elements that make up the attachment,
A first oil passage connecting the rod side oil chamber and the bottom side oil chamber of the hydraulic cylinder, and
The regeneration valve arranged in the first oil passage and
It has a control device that controls the opening of the regeneration valve based on whether or not a predetermined condition regarding the stability of the airframe is satisfied.
Excavator.
前記油圧シリンダに流出入する作動油の流量を制御する流量制御弁と、
前記油圧シリンダのロッド側油室と前記流量制御弁とを接続する第2油路と、
前記油圧シリンダのボトム側油室と前記流量制御弁とを接続する第3油路と、を有し、
前記第1油路は、第2油路と第3油路を接続する、
請求項1に記載のショベル。
A flow rate control valve that controls the flow rate of hydraulic oil flowing into and out of the hydraulic cylinder,
A second oil passage connecting the rod-side oil chamber of the hydraulic cylinder and the flow control valve,
It has a third oil passage that connects the bottom side oil chamber of the hydraulic cylinder and the flow rate control valve.
The first oil passage connects the second oil passage and the third oil passage.
The excavator according to claim 1.
前記油圧シリンダは、ブームシリンダであり、
前記制御装置は、前記再生弁を開いて前記ブームシリンダのロッド側油室からボトム側油室に作動油が流れるようにする、
請求項1又は2に記載のショベル。
The hydraulic cylinder is a boom cylinder and
The control device opens the regeneration valve to allow hydraulic oil to flow from the rod-side oil chamber of the boom cylinder to the bottom-side oil chamber.
The excavator according to claim 1 or 2.
前記制御装置は、前記油圧シリンダに関する操作とは無関係に、前記再生弁を制御する、
請求項1乃至3の何れかに記載のショベル。
The control device controls the regeneration valve independently of the operation related to the hydraulic cylinder.
The excavator according to any one of claims 1 to 3.
前記油圧シリンダは、アームシリンダであり、
前記制御装置は、前記再生弁を開いて前記アームシリンダのロッド側油室からボトム側油室に、若しくは、前記アームシリンダのボトム側油室からロッド側油室に、自重に応じて作動油が流れるようにする、
請求項1又は2に記載のショベル。
The hydraulic cylinder is an arm cylinder and
In the control device, the regeneration valve is opened and hydraulic oil is discharged from the rod-side oil chamber of the arm cylinder to the bottom-side oil chamber, or from the bottom-side oil chamber of the arm cylinder to the rod-side oil chamber according to its own weight. Make it flow,
The excavator according to claim 1 or 2.
前記再生弁は、前記油圧シリンダへの作動油の流量を調整する流量制御弁と前記油圧シリンダとの間に配置されている、
請求項1に記載のショベル。
The regeneration valve is arranged between the flow control valve for adjusting the flow rate of hydraulic oil to the hydraulic cylinder and the hydraulic cylinder.
The excavator according to claim 1.
前記油圧シリンダから排出される作動油は、前記流量制御弁のシリンダ・タンクポートの開口の大きさに応じて、排出される側の油室とは反対側の油室へ供給され、若しくは、タンクへ排出される請求項2に記載のショベル。 The hydraulic oil discharged from the hydraulic cylinder is supplied to the oil chamber on the side opposite to the oil chamber on the discharge side, or the tank, depending on the size of the opening of the cylinder / tank port of the flow control valve. The excavator according to claim 2, which is discharged to.
JP2017143522A 2017-06-21 2017-07-25 Excavator Active JP6953216B2 (en)

Priority Applications (6)

Application Number Priority Date Filing Date Title
JP2017143522A JP6953216B2 (en) 2017-07-25 2017-07-25 Excavator
KR1020197032486A KR102537157B1 (en) 2017-06-21 2018-06-18 shovel
CN201880030523.7A CN110612371B (en) 2017-06-21 2018-06-18 Excavator
EP18821558.6A EP3643842B1 (en) 2017-06-21 2018-06-18 Excavator
PCT/JP2018/023151 WO2018235779A1 (en) 2017-06-21 2018-06-18 Excavator
US16/716,743 US11655611B2 (en) 2017-06-21 2019-12-17 Shovel

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2017143522A JP6953216B2 (en) 2017-07-25 2017-07-25 Excavator

Publications (2)

Publication Number Publication Date
JP2019027009A JP2019027009A (en) 2019-02-21
JP6953216B2 true JP6953216B2 (en) 2021-10-27

Family

ID=65477675

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2017143522A Active JP6953216B2 (en) 2017-06-21 2017-07-25 Excavator

Country Status (1)

Country Link
JP (1) JP6953216B2 (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPWO2022208694A1 (en) * 2021-03-30 2022-10-06
JP7501430B2 (en) 2021-03-31 2024-06-18 コベルコ建機株式会社 Swing-type hydraulic work machine

Family Cites Families (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003105795A (en) * 2001-09-28 2003-04-09 Hitachi Constr Mach Co Ltd Drilling control device of hydraulic shovel
JP2012012821A (en) * 2010-06-30 2012-01-19 Tadao Osuga Hydraulic circuit of hydraulic shovel
JP2013040641A (en) * 2011-08-12 2013-02-28 Komatsu Ltd Hydraulic circuit
JP5969379B2 (en) * 2012-12-21 2016-08-17 住友建機株式会社 Excavator and excavator control method
JP6157994B2 (en) * 2013-08-29 2017-07-05 住友建機株式会社 Hydraulic circuit of construction machine and construction machine
CN106795707B (en) * 2014-10-06 2020-05-19 住友重机械工业株式会社 Excavator
JP6521691B2 (en) * 2015-03-26 2019-05-29 住友重機械工業株式会社 Shovel
JP2016188544A (en) * 2015-03-30 2016-11-04 住友重機械工業株式会社 Shovel

Also Published As

Publication number Publication date
JP2019027009A (en) 2019-02-21

Similar Documents

Publication Publication Date Title
JP5969379B2 (en) Excavator and excavator control method
JP5969380B2 (en) Excavator and excavator control method
JP6134263B2 (en) Hydraulic drive system
EP3203089B1 (en) Workmachine comprising a hydraulic drive system
US11655611B2 (en) Shovel
EP2568181B1 (en) Work vehicle
JPWO2019182128A1 (en) Excavator
JP2010078035A (en) Hydraulic cylinder control circuit of utility machine
JPWO2018164263A1 (en) Excavator
JP6891079B2 (en) Hydraulic drive system for construction machinery
WO2017061220A1 (en) Construction machinery
JP6953216B2 (en) Excavator
JP6605316B2 (en) Drive device for work machine
JP6585012B2 (en) Excavator
KR20150140220A (en) Hybrid construction machine
JP2000104290A (en) Controller for construction machine
JP6585013B2 (en) Excavator
JP6974399B2 (en) Excavator
JP6629189B2 (en) Excavator and control method thereof
WO2020262073A1 (en) Hydraulic control device for work machine
JPH11140914A (en) Hydraulic pump control device for slewing construction machine
JP2021021199A (en) Shovel
JP2018159395A (en) Hydraulic transmission of construction equipment

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20200617

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20210629

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20210830

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20210928

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20210929

R150 Certificate of patent or registration of utility model

Ref document number: 6953216

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150