JP6651255B2 - Construction method of pile driver - Google Patents

Construction method of pile driver Download PDF

Info

Publication number
JP6651255B2
JP6651255B2 JP2016079353A JP2016079353A JP6651255B2 JP 6651255 B2 JP6651255 B2 JP 6651255B2 JP 2016079353 A JP2016079353 A JP 2016079353A JP 2016079353 A JP2016079353 A JP 2016079353A JP 6651255 B2 JP6651255 B2 JP 6651255B2
Authority
JP
Japan
Prior art keywords
pile
construction
data
position information
displayed
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2016079353A
Other languages
Japanese (ja)
Other versions
JP2017190579A (en
Inventor
昌巳 桐山
昌巳 桐山
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nippon Sharyo Ltd
Original Assignee
Nippon Sharyo Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nippon Sharyo Ltd filed Critical Nippon Sharyo Ltd
Priority to JP2016079353A priority Critical patent/JP6651255B2/en
Publication of JP2017190579A publication Critical patent/JP2017190579A/en
Application granted granted Critical
Publication of JP6651255B2 publication Critical patent/JP6651255B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)

Description

本発明は、杭打機の施工方法に関し、詳しくは、施工管理装置を備えた杭打機によって複数の施工位置に複数の杭を施工する杭打機の施工方法に関する。   The present invention relates to a method for constructing a pile driver, and more particularly, to a method for constructing a pile driver in which a plurality of piles are constructed at a plurality of construction positions by a pile driver having a construction management device.

複数の施工位置に、複数の鋼管杭を埋設する際の作業効率を向上させ、作業時間の短縮を図れる施工管理装置及び施工方法が知られている(例えば、特許文献1参照。)。   2. Description of the Related Art There is known a construction management device and a construction method capable of improving work efficiency when burying a plurality of steel pipe piles at a plurality of construction positions and shortening a work time (for example, see Patent Document 1).

特開2008−38394号公報JP 2008-38394 A

しかしながら、特許文献1記載の施工管理装置の場合、杭番号毎に施工目標値等の計画データが保存されているが、実際の施工ポイントで杭番号の入力を作業者が行うため、杭番号を間違って入力してしまうと、異なる杭番号に紐づいた施工目標値に従って施工してしまう虞があった。また、施工後に作成される報告書についても、杭位置を示すデータがなく、作業者の記録に頼らざるを得なかった。   However, in the case of the construction management device described in Patent Document 1, although plan data such as construction target values are stored for each pile number, since the worker inputs the pile number at an actual construction point, the pile number is If entered incorrectly, there is a risk that construction will be performed according to the construction target value associated with a different pile number. In addition, there was no data indicating the pile position in the report created after construction, so the operator had to rely on the records of the workers.

そこで本発明は、誤入力のようなヒューマンエラーを防ぎ、施工位置に合った杭番号に紐づいた計画データを確実に読み込むことができるとともに、杭位置情報、施工実績データを記憶できる杭打機の施工方法を提供することを目的としている。   Therefore, the present invention prevents a human error such as an erroneous input, and can reliably read plan data associated with a pile number that matches a construction position, and can store pile position information and construction result data. It is intended to provide a construction method.

上記目的を達成するため、本発明の杭打機の施工方法は、施工管理装置を備えた杭打機によって複数の施工位置に複数の杭を施工する杭打機の施工方法において、前記施工管理装置は、複数の杭に対応する杭番号と埋設深度の施工目標値を含むあらかじめ計画された計画データを記憶する記憶手段と、該計画データに基づく杭位置情報を表示する表示手段と、杭打機の位置情報を取得するGPS受信装置とを備え、前記GPS受信装置で取得された位置情報が前記表示手段に表示可能であり、第1の杭と第2の杭の施工については、施工現場の地面にあらかじめ示される第1の施工位置と第2の施工位置にしたがって埋設するとともに、前記表示手段に表示された計画データの杭番号1番と杭番号2番をそれぞれ選択して、埋設時の施工実績データと杭の位置情報を記憶し、第3の杭以降の施工については、位置情報を第1及び第2の施工位置からのオフセット量で算出し前記表示手段に表示し、前記表示された計画データの杭番号を選択した上で埋設し、埋設時の施工実績データを杭番号情報と杭の位置情報とともに記憶することを特徴としている。   In order to achieve the above object, a method for constructing a pile driver according to the present invention is a method for constructing a pile driver in which a plurality of piles are constructed at a plurality of construction positions by a pile driver equipped with a construction management device. The apparatus includes: storage means for storing previously planned plan data including a pile number corresponding to a plurality of piles and a construction target value of a burial depth; display means for displaying pile position information based on the plan data; A GPS receiver for acquiring the position information of the aircraft, wherein the position information acquired by the GPS receiver can be displayed on the display means. Burying according to the first construction position and the second construction position shown in advance on the ground, and selecting the pile number 1 and the pile number 2 of the plan data displayed on the display means, respectively. Construction results The position information of the data and the pile is stored, and for the construction after the third pile, the position information is calculated by the offset amount from the first and second construction positions and displayed on the display means, and the displayed information is displayed. It is characterized in that the pile number is selected and buried after selecting the plan data, and the construction result data at the time of burial is stored together with the pile number information and the pile position information.

また、前記記憶された施工実績データと杭番号情報と杭の位置情報を外部のサーバにアップロードさせたり、前記記憶された施工実績データと杭番号情報と杭の位置情報を外部の表示手段に表示させたり、前記記憶された施工実績データと杭番号情報と杭の位置情報をもとに報告書を生成させることが好ましい。   In addition, the stored construction result data, pile number information, and pile position information are uploaded to an external server, and the stored construction result data, pile number information, and pile position information are displayed on external display means. Preferably, a report is generated based on the stored construction result data, pile number information, and pile position information.

本発明の杭打機の施工方法によれば、GPS受信装置で取得された位置情報によって算出された位置情報に基づいて、計画データの杭番号に紐づかせるので誤入力が生じない。   According to the construction method of the pile driving machine of the present invention, an erroneous input does not occur because the pile data is linked to the pile number of the plan data based on the position information calculated by the position information acquired by the GPS receiver.

また、施工実績データを外部のサーバにアップロードしたり、表示させたり、報告書に作成したりすることができるので、業務の効率が向上するとともにデータの改ざん等を防ぐことができる。   In addition, since the construction result data can be uploaded to an external server, displayed, or created in a report, the efficiency of work can be improved, and data falsification can be prevented.

本発明の一形態例に用いられる施工管理装置を含む施工管理システムの構成の説明図である。FIG. 1 is an explanatory diagram of a configuration of a construction management system including a construction management device used in an embodiment of the present invention. 同じく施工管理装置の構成の説明図である。It is explanatory drawing of the structure of a construction management apparatus similarly. FLASH ROMに初期状態で保存されるプログラムの説明図である。FIG. 4 is an explanatory diagram of a program stored in an initial state in a FLASH ROM. FLASH ROMに保存されたプログラムの起動実行を示すフローチャートである。6 is a flowchart showing the execution of a program stored in a FLASH ROM. 施工管理プログラムのダウンロードの手順を示すフローチャートである。It is a flowchart which shows the download procedure of a construction management program. 施工管理プログラム及び設定パラメータのFLASH ROMへの書き込みの説明図である。It is explanatory drawing of writing in a FLASH ROM of a construction management program and a setting parameter. 計画データのダウンロードの手順を示すフローチャートである。It is a flowchart which shows the procedure of download of plan data. 計画データのFLASH ROMへの書き込みの説明図である。It is explanatory drawing of writing of plan data to FLASH ROM. 施工管理プログラムの動作を説明するフローチャートである。It is a flowchart explaining operation | movement of a construction management program. ディスプレイに表示される杭選択画面の一例である。It is an example of a pile selection screen displayed on a display. ディスプレイに表示される施工画面の一例である。It is an example of a construction screen displayed on a display. 施工データモニタプログラムの動作を説明するフローチャートである。It is a flowchart explaining operation | movement of a construction data monitor program. 報告書作成データプログラムの動作を説明するフローチャートである。It is a flowchart explaining operation | movement of a report preparation data program. 計画データの作成画面を示す説明図である。It is explanatory drawing which shows the preparation screen of plan data.

以下、本発明の杭打機の施工方法について、施工管理システムを用いて複数の鋼管杭を埋設する杭打機に適用した実施の形態について説明する。図1は、本発明の杭打機の施工法方法に用いられる施工管理システム全体の構成を概略的に示した説明図である。図2は、杭打機に実装された施工管理装置の説明図である。   Hereinafter, an embodiment in which a pile driving machine of the present invention is applied to a pile driving machine for burying a plurality of steel pipe piles using a construction management system will be described. FIG. 1 is an explanatory diagram schematically showing the configuration of the entire construction management system used in the method of constructing a pile driver according to the present invention. FIG. 2 is an explanatory diagram of the construction management device mounted on the pile driver.

施工管理装置10は杭打機1に実装され、制御装置20と、杭打機1のリーダに昇降可能に設けられた駆動装置の駆動トルク,回転数,圧入力等を検出する各種センサ30と、データサーバ3とインターネットや直通の携帯通信網等を介して情報を送受信する通信機40と、杭打機1の位置情報を取得するGPS受信装置50と、センサ30からの検知情報を演算処理した施工実績データや杭選択画面等を表示するディスプレイ60(図10及び図11)と、施工実績データ等を印字するプリンタ70とから構成されている。   The construction management device 10 is mounted on the pile driving machine 1, and includes a control device 20 and various sensors 30 for detecting a driving torque, a rotation speed, a press input, and the like of a driving device provided to be able to move up and down on a reader of the pile driving machine 1. , A communication device 40 for transmitting and receiving information to and from the data server 3 via the Internet or a direct portable communication network, a GPS receiving device 50 for obtaining position information of the pile driver 1, and arithmetically processing detection information from the sensor 30. A display 60 (FIGS. 10 and 11) that displays the actual construction data and the pile selection screen, etc., and a printer 70 that prints the actual construction data and the like.

制御装置20は、各種演算処理を行うCPU21と、各種データやプログラムを記憶するRAM22及びFLASH ROM23(本発明の記憶手段)と、センサ30からの検知情報を取り込む入出力インターフェース(I/O)24及びAD変換器(A/D)25と、通信機40等と接続するためのシリアルインターフェース(SIO)26やLAN27とが備わっている。また、施工実績データ等を記憶するためのUSBメモリ80を接続するためのUSBインターフェース28も有している。   The control device 20 includes a CPU 21 for performing various arithmetic processes, a RAM 22 and a FLASH ROM 23 (storage means of the present invention) for storing various data and programs, and an input / output interface (I / O) 24 for receiving detection information from the sensor 30. An A / D converter (A / D) 25, a serial interface (SIO) 26 and a LAN 27 for connecting to a communication device 40 and the like are provided. Further, it has a USB interface 28 for connecting a USB memory 80 for storing construction result data and the like.

なお、GPS受信装置50は、杭芯の位置が検出できるように設けられている。また、FLASH ROM23には、図3に示されるように、基本プログラム、施工管理プログラムダウンロード用プログラム、計画データダウンロード用プログラム及び前回の施工時にダウンロードした施工管理プログラムがあらかじめ保存されている。これらは独立したプログラムであり、電源投入後には、図4に示されるように、基本プログラム、施工管理プログラムダウンロード用プログラム、計画データダウンロード用プログラム、施工管理プログラムの順に起動して実行される。   The GPS receiver 50 is provided so that the position of the core of the pile can be detected. Further, as shown in FIG. 3, a basic program, a construction management program download program, a plan data download program, and a construction management program downloaded during the previous construction are stored in the FLASH ROM 23 in advance. These are independent programs. After the power is turned on, as shown in FIG. 4, the basic program, the construction management program download program, the plan data download program, and the construction management program are started and executed in this order.

まず、あらかじめ、管理事務所2において、施工現場の位置と土質等を調べ施工計画書を作成し、杭番号と杭番号に紐づけされた深度,フィード速度、攪拌ヘッドの回転数やセメントミルク流量等の施工目標値を設定した計画データを作成し、データサーバ3へアップロードする。アップロードするデータには、施工現場の住所等を示す位置データと施工する杭打機の号機データも含まれる。   First, the management office 2 checks the construction site location and soil properties, etc. in advance and prepares a construction plan. The pile number and the depth, feed speed, rotation speed of the stirring head, and cement milk flow rate linked to the pile number are prepared. The plan data in which the construction target values such as are set are created and uploaded to the data server 3. The data to be uploaded include position data indicating the address of the construction site and the like, and data on the number of the pile driver to be constructed.

具体的に、この計画データの作業を図14を用いて説明する。この計画データの作成時には、施工図面と対比して位置データを入力する。なお、位置データの入力は、原点からの相対的位置(距離)を二次元座標で指定することになる。   Specifically, the operation of the plan data will be described with reference to FIG. When creating the plan data, the position data is input in comparison with the construction drawing. The input of the position data specifies the relative position (distance) from the origin in two-dimensional coordinates.

まず、管理事務所2のPCのモニタ上には図14(a)のような格子状の画面が表示される。格子は10cmピッチで表示されるが、50cm、25cm等の計画予定の杭位置に対応して拡大縮小が可能である。   First, a lattice screen as shown in FIG. 14A is displayed on the monitor of the PC of the management office 2. The grid is displayed at a pitch of 10 cm, but can be enlarged or reduced in accordance with a planned pile position such as 50 cm or 25 cm.

画面上で、杭番号1番と入力し、PCのマウスで矢印のカーソルを動かし、原点として杭の位置を決め、任意の点をマウスでクリックし、クリックした点を施工位置として設定する(この点を原点(0,0)として設定する。)。なお、キーボードにより原点位置を入力することも可能である。次に、杭番号1番に対応した、深度,フィード速度、攪拌ヘッドの回転数やセメントミルク流量等の施工目標値を入力して、杭番号1番に紐づく計画データの入力が完了する。   Enter the pile number 1 on the screen, move the arrow cursor with the PC mouse, determine the position of the pile as the origin, click an arbitrary point with the mouse, and set the clicked point as the construction position (this Set the point as the origin (0,0).) In addition, it is also possible to input the origin position using a keyboard. Next, the construction target values such as the depth, the feed speed, the rotation speed of the stirring head, the cement milk flow rate, and the like corresponding to the pile number 1 are input, and the input of the plan data associated with the pile number 1 is completed.

次に、杭番号2番と入力し、図14(b)のような画面を表示させる。入力済みの杭番号1番については、白丸で表示されている。原点との相対位置で杭の位置を決め、マウスによりカーソルを動かし、クリックした点を施工位置として設定する(この場合は(20,20)として設定される。原点からX方向へ20cm、Y方向へ20cmの位置を示すものである。)。さらに、杭番号2番に対応した、深度,フィード速度、攪拌ヘッドの回転数やセメントミルク流量等の施工目標値を入力して、杭番号2番に紐づく計画データの入力が完了する。   Next, the stake number 2 is input, and a screen as shown in FIG. 14B is displayed. The already entered pile number 1 is indicated by a white circle. Determine the position of the pile relative to the origin, move the cursor with the mouse, and set the clicked point as the construction position (in this case, set as (20, 20). 20 cm from the origin in the X direction, Y direction) 20 cm). Further, the construction target values such as the depth, the feed speed, the rotation speed of the stirring head, the cement milk flow rate, etc., corresponding to the pile number 2 are input, and the input of the plan data associated with the pile number 2 is completed.

さらに、杭番号3番と入力し、図14(c)のような画面を表示させ、同様の作業により計画データを入力していき、順次繰り返していく。その結果、杭番号と杭番号に紐づけされた各種の施工目標値を設定した計画データが完成し、データサーバ3へアップロードされる。   Further, the stake number 3 is input, a screen as shown in FIG. 14C is displayed, and the plan data is input by the same operation, and the operation is sequentially repeated. As a result, the plan data in which the pile numbers and various construction target values associated with the pile numbers are set is completed, and uploaded to the data server 3.

また、計画データにしたがって実施される工法の種類と建設機械に対応した施工管理プログラムと施工管理プログラムの設定パラメータデータも作成し、同様にデータサーバ3へアップロードする。アップロードするデータには、施工現場の住所等を示す位置データと施工する杭打機の号機データも含まれる。   In addition, a construction management program corresponding to the type of construction method to be implemented according to the plan data and the construction machine and setting parameter data of the construction management program are also created and uploaded to the data server 3 in the same manner. The data to be uploaded include position data indicating the address of the construction site and the like, and data on the number of the pile driver to be constructed.

次に、杭打機1が施工現場に到着し、エンジンをかけ、施工管理装置10の電源を投入すると、上述のように基本プログラムの起動実行後に、施工管理プログラムダウンロード用プログラムが起動実行され、施工現場に応じた施工管理プログラムと施工管理プログラムの設定パラメータが自動的にダウンロードされることになる。   Next, when the pile driver 1 arrives at the construction site, starts the engine, and turns on the power of the construction management device 10, the execution program of the construction management program is started and executed after the execution of the basic program as described above, The construction management program corresponding to the construction site and the setting parameters of the construction management program are automatically downloaded.

この手順の流れを図5にしたがって説明する。ステップS501において、GPS受信装置50により杭打機1の位置情報を検出する。次に、ステップS502に進み、ステップS501で得られた位置情報と前回の施工時に記憶した位置情報とを対比して、あらかじめ定められた範囲内にあるかどうかを判定する。同じ現場内であると判断した場合には、前回の続きの施工になるため、前回保存されている施工管理プログラムと施工管理プログラムの設定パラメータ及び計画データを使用するものと判断し、施工管理プログラムダウンロード用プログラムは終了する。   The flow of this procedure will be described with reference to FIG. In step S501, the GPS receiver 50 detects the position information of the pile driver 1. Next, the process proceeds to step S502, in which the position information obtained in step S501 is compared with the position information stored at the time of the previous construction to determine whether the position information is within a predetermined range. If it is determined that the work is within the same site, the construction will be continued from the previous work. Therefore, it is determined that the previously saved construction management program and the setting parameters and plan data of the construction management program will be used. The download program ends.

ステップS502で違う現場と判断された場合には、ステップS503に進み、通信機40を介してデータサーバ3に対して、位置情報と杭打機の号機データを送信し、該当する施工管理プログラム及び設定パラメータのデータのダウンロードを要求する。なお、杭打機の号機データを送信するのは、同じ施工現場に複数の杭打機が存在する場合に区別するためである。該要求に対して、ステップS504において、データサーバ3が応答チェックをし、該当する施工管理プログラムがデータサーバ3内に保存されているかどうかをステップS505にて判断する。ここで、データサーバ3内に該当する施工管理プログラムが無い場合には、「プログラムなし」というメッセージがディスプレイ60に表示される(ステップS506)。このような場合には、作業者は管理事務所等に、施工管理プログラムをデータサーバ3内にアップロードするように問い合わせをすればよい。   If it is determined in step S502 that the site is different, the process proceeds to step S503, where the location information and the pile driving machine data are transmitted to the data server 3 via the communication device 40, and the corresponding construction management program and Request download of setting parameter data. It should be noted that the reason why the pile driver data is transmitted is to distinguish the case where a plurality of pile drivers exist at the same construction site. In step S504, the data server 3 checks a response to the request, and determines in step S505 whether the corresponding construction management program is stored in the data server 3. Here, when there is no corresponding construction management program in the data server 3, a message of "no program" is displayed on the display 60 (step S506). In such a case, the worker may inquire the management office or the like to upload the construction management program into the data server 3.

該当する施工管理プログラムがデータサーバ3内にある場合には、設定パラメータのデータとともに、RAM22内にダウンロードされ保存される(ステップS507)。正常に保存されたかどうかデータチェックをし(ステップS508)、正常な場合には施工管理プログラムと設定パラメータをFLASH ROM23へ書き込む(ステップS509)(図6参照。)。   If the corresponding construction management program is in the data server 3, it is downloaded and stored in the RAM 22 together with the data of the setting parameters (step S507). A data check is performed to determine whether the data has been stored normally (step S508). If the data is normal, the construction management program and setting parameters are written to the FLASH ROM 23 (step S509) (see FIG. 6).

書き込みが完了したら、施工管理プログラムが無事にダウンロードされた受信応答をデータサーバ3へ送信する(ステップS510)とともに、前回の稼働時の位置情報を、現在の位置情報に上書きして記憶し(ステップS511)、施工管理プログラムダウンロード用プログラムは終了する。   When the writing is completed, the construction management program transmits the successfully downloaded reception response to the data server 3 (step S510), and stores the previous operation-time position information over the current position information (step S510). S511), the construction management program download program ends.

なお、ステップS508において、正常に保存されないような場合にはデータエラーメッセージが表示される(ステップS512)。   If it is determined in step S508 that the data is not stored normally, a data error message is displayed (step S512).

図4に示されるように、施工管理プログラムダウンロード用プログラムの終了後には、計画データダウンロード用プログラムが起動実行され、施工管理プログラムと同様に、施工現場の位置に応じた計画データが自動的にダウンロードされる。   As shown in FIG. 4, after the completion of the construction management program download program, the plan data download program is started and executed, and, similarly to the construction management program, the plan data corresponding to the position of the construction site is automatically downloaded. Is done.

この手順の流れを図7にしたがって説明する。ステップS701において、GPS受信装置50により杭打機1の位置情報を検出する。次に、ステップS702に進み、ステップS501で得られた位置情報に対応した現場の計画データが保存されているかどうかを判定する。すでに計画データを有している場合には、計画データダウンロード用プログラムは終了する。   The flow of this procedure will be described with reference to FIG. In step S701, the GPS receiver 50 detects the position information of the pile driver 1. Next, the process proceeds to step S702, and it is determined whether or not site plan data corresponding to the position information obtained in step S501 is stored. If the plan data already exists, the plan data download program ends.

ステップS702で計画データが保存されていない場合には、ステップS703に進み、通信機40を介してデータサーバ3に対して、位置情報と杭打機の号機データを送信し、該当する計画データのダウンロードを要求する。なお、杭打機の号機データを送信するのは、同じ施工現場に複数の杭打機が存在する場合に区別するためである。該要求に対して、ステップS704において、データサーバ3が応答チェックをし、該当する計画データがデータサーバ3内に保存されているかどうかをステップS705にて判断する。ここで、データサーバ3内に該当する計画データが無い場合には、「計画データなし」というメッセージがディスプレイ60に表示される(ステップS706)。このような場合にも、施工管理プログラムと同様に、作業者は管理事務所等に問い合わせをすればよい。   If the plan data is not stored in step S702, the process proceeds to step S703, where the position information and the pile driving machine number data are transmitted to the data server 3 via the communication device 40, and the corresponding planning data Request download. It should be noted that the reason why the pile driver data is transmitted is to distinguish the case where a plurality of pile drivers exist at the same construction site. In step S704, the data server 3 checks the response to the request, and determines in step S705 whether the corresponding plan data is stored in the data server 3. Here, when there is no corresponding plan data in the data server 3, a message "No plan data" is displayed on the display 60 (step S706). In such a case as well, the operator may inquire of the management office or the like as in the construction management program.

該当する計画データがデータサーバ3内にある場合には、RAM22内にダウンロードされ保存される(ステップS707)。正常に保存されたかどうかデータチェックをし(ステップS708)、正常な場合には計画データをFLASH ROM23へ書き込む(ステップS709)(図8参照。)。   If the corresponding plan data exists in the data server 3, it is downloaded and stored in the RAM 22 (step S707). A data check is performed to determine whether the data has been stored normally (step S708). If the data has been stored normally, the plan data is written to the FLASH ROM 23 (step S709) (see FIG. 8).

書き込みが完了したら、計画データが無事にダウンロードされた受信応答をデータサーバ3へ送信する(ステップS710)とともに、前回の稼働時の位置情報を、現在の位置情報に上書きして記憶し(ステップS711)、計画データダウンロード用プログラムは終了する。   When the writing is completed, the reception response that the plan data has been successfully downloaded is transmitted to the data server 3 (step S710), and the position information at the time of the previous operation is overwritten on the current position information and stored (step S711). ), The plan data download program ends.

なお、ステップS708において、正常に保存されないような場合にはデータエラーメッセージが表示される(ステップS712)。   If it is determined in step S708 that the data is not stored normally, a data error message is displayed (step S712).

上述のように、施工現場に応じた施工管理プログラム及び計画データのダウンロードが完了したら、施工管理プログラムを起動して、鋼管杭の埋設を開始する。このように、GPS受信装置50で得た位置情報と杭打機の号機データをデータサーバに送信し、位置情報と杭打機の号機データに基づいて適切な計画データや施工管理プログラムと施工管理プログラムの設定パラメータを施工管理装置に送信することができるため、作業者に負担をかけることなく、施工前に施工管理装置の設定をすることができる。   As described above, when the download of the construction management program and the plan data according to the construction site is completed, the construction management program is activated to start burying the steel pipe pile. As described above, the position information and the pile driving machine data obtained by the GPS receiver 50 are transmitted to the data server, and the appropriate planning data, the construction management program, and the construction management are performed based on the position information and the pile driving machine data. Since the setting parameters of the program can be transmitted to the construction management device, the construction management device can be set before the construction without burdening the operator.

図9は、施工管理プログラムを用いて、複数の鋼管杭を埋設する際の動作を説明するフローチャートである。まずは、杭打機1を移動して、1本目の杭(杭番号1番)の杭芯位置にセットする。なお、施工現場の地面には、施工図面に従って、杭位置と杭番号があらかじめ示されている。施工管理プログラム起動後、1本目の杭かどうかを判断し(ステップS901)、GPS受信装置50により位置情報(x0,y0)を検出する(ステップS902)。ディスプレイ60には、図10に示す杭選択画面が表示されている。(ステップS903)。   FIG. 9 is a flowchart illustrating an operation when burying a plurality of steel pipe piles using the construction management program. First, the pile driver 1 is moved and set to the pile center position of the first pile (pile number 1). The pile position and the pile number are indicated in advance on the ground of the construction site according to the construction drawing. After the execution of the construction management program, it is determined whether the pile is the first pile (step S901), and the GPS receiver 50 detects the position information (x0, y0) (step S902). On the display 60, a pile selection screen shown in FIG. 10 is displayed. (Step S903).

ディスプレイ60に表示される杭選択画面には、計画データで設定された杭番号と施工ポイントが格子上に表示され、未施工の杭番号については白丸で表示される。なお、杭選択画面は、施工現場全体の杭の配置が確認できるように上下左右へのスクロールや拡大縮小が可能となっている。   On the pile selection screen displayed on the display 60, pile numbers and construction points set in the plan data are displayed on a lattice, and unconstructed pile numbers are displayed as white circles. It should be noted that the pile selection screen can be scrolled up, down, left, and right and enlarged and reduced so that the arrangement of the piles at the entire construction site can be confirmed.

ディスプレイ上の座標位置(X0,Y0)にある杭番号1番を示す白色の丸印をタッチして選択する(ステップS904)。この際、GPS受信装置50により検出された位置情報(x0,y0)については、杭番号1番の杭の位置情報として記憶され、杭番号に紐づけられる。   Touch and select the white circle indicating the stake number 1 at the coordinate position (X0, Y0) on the display (step S904). At this time, the position information (x0, y0) detected by the GPS receiver 50 is stored as the position information of the stake of the stake number 1, and is linked to the stake number.

次に、計画データにしたがって、杭番号1番の目標深度等の施工目標値を読み込みセットされ(ステップS905)、ディスプレイ60の画面が図11に示す施工画面に切り替わる(ステップS906)。   Next, according to the plan data, the construction target values such as the target depth of the pile number 1 are read and set (step S905), and the screen of the display 60 is switched to the construction screen shown in FIG. 11 (step S906).

施工画面では深度や速度などが時々刻々と表示され、施工目標値と比較しながら、各種調整をして鋼管杭の埋設を進める。鋼管杭の目標深度に達すると1本目の杭の施工を終了する。埋設の施工作業と同時に、通信機40を介して、データサーバ3へ、杭番号情報、施工日、時刻及び深度等の施工実績データを送信し、データサーバ3は施工実績データとして記憶する(ステップS906)。なお、施工実積データには、杭打機の号機データも含まれる。   On the construction screen, the depth, speed, etc. are displayed every moment, and while making comparisons with the construction target values, various adjustments are made and the burial of steel pipe piles is advanced. When the target depth of the steel pipe pile is reached, the construction of the first pile is completed. Simultaneously with the burying construction work, the construction server transmits stake number information, construction date, construction time, time and depth, etc., to the data server 3 via the communication device 40, and the data server 3 stores the construction result data (step). S906). It should be noted that the actual construction data includes the data of the pile driving machine.

また、データサーバ3への情報送信と並行して、USBメモリ80へバックアップデータとして同様に記憶したり、プリンタ70で施工実績データを印字することもできる。   Also, in parallel with the information transmission to the data server 3, the USB memory 80 can similarly store the data as backup data, or the printer 70 can print the construction result data.

杭番号1番の杭の埋設が終了し、計画データに次の杭の埋設予定があるかどうかを判断し(ステップS907)、2本目以降の予定がある場合には、ステップS901に戻る。   The embedding of the pile No. 1 is completed, and it is determined whether there is a plan for embedding the next pile in the plan data (step S907), and if there is a second or later plan, the process returns to step S901.

ステップS901で2本目以降の杭と判断され、次のステップS908へ進み、2本目の杭かどうかを判断される。2本目の杭と判断されると、1本目の杭と同様にGPS受信装置50により位置情報(x1,y1)を検出する(ステップS909)。また、同様にディスプレイ60には、図10に示す杭選択画面が表示されている。(ステップS910)。なお、杭番号1番の丸印については施工が終了したことを示す青色に替わっている。   In step S901, it is determined that the pile is the second pile, and the process proceeds to the next step S908, where it is determined whether the pile is the second pile. If it is determined that the pile is the second pile, the GPS receiver 50 detects the position information (x1, y1) as in the case of the first pile (step S909). Similarly, a stake selection screen shown in FIG. 10 is displayed on the display 60. (Step S910). It should be noted that the circle number of the pile number 1 has been changed to blue indicating that the construction has been completed.

ここで、施工現場の地面に記載された杭番号2番の位置に杭打機1を移動し、杭芯位置にセットする。そして、座標位置(X1,Y1)にあるディスプレイ上の杭番号2番の白色の丸印をタッチして選択する(ステップS911)。杭番号1番と同様に、GPS受信装置50により検出された杭芯情報(x1,y1)については、杭番号2番の杭の位置情報として記憶され、杭番号に紐づけられる。   Here, the pile driver 1 is moved to the position of the pile number 2 described on the ground of the construction site, and set to the pile center position. Then, the user selects and touches the white circle of the pile number 2 on the display at the coordinate position (X1, Y1) (step S911). Similarly to the pile number 1, the pile center information (x1, y1) detected by the GPS receiver 50 is stored as the pile position information of the pile number 2 and linked to the pile number.

次に、計画データにしたがって、杭番号2番の目標深度等の施工目標値を読み込みセットされ(ステップS912)、ディスプレイ60の画面が図11に示す施工画面に切り替わる(ステップS913)。   Next, according to the plan data, the construction target values such as the target depth of the pile number 2 are read and set (step S912), and the screen of the display 60 is switched to the construction screen shown in FIG. 11 (step S913).

1本目の杭と同様に施工画面を確認しながら埋設し、施工が終了すると、通信機40を介して、データサーバ3へ、杭番号情報、杭の位置情報、施工日、時刻及び深度等の施工実績データを送信し、記憶する(ステップS913)。   When the construction is completed, while confirming the construction screen as in the case of the first pile, and the construction is completed, the pile number information, the pile position information, the construction date, the time, the depth and the like are transmitted to the data server 3 via the communication device 40. The construction result data is transmitted and stored (step S913).

さらに、計画データに次の杭の埋設予定があるかどうかを判断し(ステップS907)、3本目以降の予定がある場合には、ステップS901に戻り、ステップS908を経て、ステップS914において、GPS受信装置50による位置情報(x,y)を検出し、1本目及び2本目の杭の位置情報とのオフセット量から、次式を用いて現在の杭打機1の位置(X、Y)を算出する(ステップS915)。   Furthermore, it is determined whether or not the next pile is to be buried in the plan data (step S907). The position information (x, y) detected by the device 50 is detected, and the current position (X, Y) of the pile driver 1 is calculated from the offset amount with the position information of the first and second piles using the following equation. (Step S915).

X=(x−x0)cos(α)−(y−y0)sin(α)
Y=(x−x0)sin(α)+(y−y0)cos(α)
cos(α)=[X1・(x1−x0)+Y1・(y1−y0)]/[(x1−x0)+(y1−y0)
sin(α)=[Y1・(x1−x0)+X1・(y1−y0)]/[(x1−x0)+(y1−y0)
施工現場の地面に記載された杭番号3の位置に杭打機1を移動し、杭芯位置にセットする。ディスプレイ上には、上記の式によって算出された杭打機1の現在位置に一番近い位置に対応した杭番号の丸印が赤色で表示される(ステップS916)。
X = (x−x0) cos (α) − (y−y0) sin (α)
Y = (x−x0) sin (α) + (y−y0) cos (α)
cos (α) = [X1 · (x1-x0) + Y1 · (y1-y0)] / [(x1-x0) 2 + (y1-y0) 2 ]
sin (α) = [Y1 · (x1-x0) + X1 · (y1-y0)] / [(x1-x0) 2 + (y1-y0) 2 ]
The pile driver 1 is moved to the position of the pile number 3 described on the ground of the construction site, and set to the pile center position. The circle of the pile number corresponding to the position closest to the current position of the pile driver 1 calculated by the above equation is displayed in red on the display (step S916).

杭選択画面において、赤丸印をタッチすると、杭番号とともに、計画データにしたがった施工目標値が読み込まれ(ステップS917)、ディスプレイ60の画面が図11に示す施工画面に切り替わる(ステップS918)。   When the red circle is touched on the pile selection screen, the construction target value according to the plan data is read together with the pile number (step S917), and the screen of the display 60 is switched to the construction screen shown in FIG. 11 (step S918).

1本目及び2本目の杭と同様に施工画面を確認しながら埋設し、施工が終了すると、通信機40を介して、データサーバ3へ、杭番号情報、杭の位置情報、施工日、時刻及び深度等の施工実績データを送信し、記憶する(ステップS913)。以後、4本目以降の杭について施工する場合も同様に繰り返す。   When the construction is completed while confirming the construction screen in the same manner as the first and second piles and the construction is completed, the pile number information, the pile position information, the construction date, the time and The construction result data such as the depth is transmitted and stored (step S913). Thereafter, the same is repeated when constructing the fourth and subsequent piles.

このように位置情報に基づいて杭番号を選択するので、3本目以降の杭の施工については杭番号の誤入力等によるヒューマンエラーは発生しない。   As described above, since the pile number is selected based on the position information, no human error occurs due to erroneous input of the pile number or the like in the construction of the third and subsequent piles.

また、管理事務所2のPCには、施工現場よりデータサーバ3に送られた杭の位置情報と施工実績データをリアルタイムで表示させるための施工データモニタプログラムが記憶されている。施工データモニタプログラムの動作手順について、図12にフローチャートで示す。   The PC of the management office 2 stores a construction data monitoring program for displaying the pile position information and construction result data sent from the construction site to the data server 3 in real time. FIG. 12 is a flowchart showing the operation procedure of the construction data monitor program.

施工データモニタプログラムを起動すると、管理事務所2の管轄内の地図が表示される (ステップS1201)。地図上には稼働中の建設機械の場所が丸印等で表示される。なお、別画面にて、施工現場名の一覧表を表示することも可能である。同じ施工現場で複数の杭打機が稼働している場合には、杭打機の号機データで区別できるようにしている。   When the construction data monitor program is started, a map within the jurisdiction of the management office 2 is displayed (step S1201). The location of the active construction machine is indicated by a circle or the like on the map. It is also possible to display a list of construction site names on another screen. If multiple pile driving machines are operating at the same construction site, it can be distinguished by the pile driving machine data.

地図上の丸印をクリックするか、一覧表から選択することでモニタすべき施工現場を選択し(ステップS1202)、該当する施工現場の計画データを読み込み、図10に示す杭選択画面と同様の画面を表示させる(ステップS1203)。   The construction site to be monitored is selected by clicking a circle on the map or selecting from the list (step S1202), the plan data of the construction site concerned is read, and a screen similar to the pile selection screen shown in FIG. 10 is displayed. It is displayed (step S1203).

施工管理装置10の杭選択画面と同様に、杭位置(施工ポイント)が丸印で表示され、未施工のものは白丸、施工済みのものは青丸、施工中のものは赤丸といったように色分けされるとともに、杭番号が示される。モニタしたい杭番号を選択すると(ステップS1204)、図11に示すような施工画面に切り替わり、施工実績データを表示させながら、施工の様子が遠隔地でも把握することができる。施工画面から他の杭を選択したり(ステップS1206)、他の現場を選択する(ステップS1207)ことも可能である。   Similar to the pile selection screen of the construction management device 10, the pile position (construction point) is indicated by a circle, a non-constructed one is a white circle, a constructed one is a blue circle, and a constructed one is a red circle. And the pile number is indicated. When a pile number to be monitored is selected (step S1204), the screen is switched to a construction screen as shown in FIG. 11, and the state of construction can be grasped even in a remote place while displaying construction result data. It is also possible to select another pile from the construction screen (step S1206) or select another site (step S1207).

このような施工データモニタプログラムをタブレット4に実装すれば、管理事務所にいなくとも遠隔地から施工の様子を監視することが可能である。   If such a construction data monitoring program is implemented in the tablet 4, it is possible to monitor the construction from a remote place without being in the management office.

また、管理事務所2のPCには、施工現場よりデータサーバ3に送られた杭の位置情報と施工実績データに基づいて、報告書を作成するための報告書作成プログラムが記憶されている。報告書作成プログラムの動作手順について、図13にフローチャートで示す。   The PC of the management office 2 stores a report creation program for creating a report based on the pile position information and construction result data sent from the construction site to the data server 3. FIG. 13 is a flowchart showing the operation procedure of the report creation program.

報告書作成プログラムを起動すると、施工データモニタプログラムと同様に、管理事務所2の管轄内の地図が表示され(ステップS1301)、報告書を作成する施工現場を選ぶ(ステップS1302)。なお、施工現場名の一覧表からも選択可能である。   When the report creation program is started, a map within the jurisdiction of the management office 2 is displayed as in the construction data monitoring program (step S1301), and a construction site for creating a report is selected (step S1302). In addition, it can also be selected from a list of construction site names.

選択された施工現場に基づいて、データサーバ3から計画データと杭の位置情報と施工実績データを読み込む。「杭一覧表」(ステップS1303)、「杭の詳細データ」(ステップS1304)、「杭のグラフデータ処理」(ステップS1305)をそれぞれ選択すると、各処理画面に進む。   Based on the selected construction site, plan data, pile position information, and construction result data are read from the data server 3. When the “pile list” (step S1303), the “detailed pile data” (step S1304), and the “pile graph data processing” (step S1305) are selected, the processing proceeds to each processing screen.

「杭一覧表」の処理画面では、杭毎の施工日時、深度等の一覧データが表示され、「杭の詳細データ」の処理画面では、杭番号毎の施工実績データを印字することが可能である。また、「杭のグラフデータ処理」の処理画面では、杭番号毎の施工実績データをグラフ化して印字することが可能である。「杭一覧表」「杭の詳細データ」「杭のグラフデータ」の印字では、他に杭の位置関係を示す図10のような杭配置図も印字できる。   On the “Pile List” processing screen, list data such as the construction date and depth for each pile is displayed, and on the “Pile Detail Data” processing screen, it is possible to print the actual construction data for each pile number. is there. Further, on the processing screen of “graph data processing of piles”, the construction result data for each pile number can be graphed and printed. In printing the “pile list”, “pile detailed data”, and “pile graph data”, a pile arrangement diagram as shown in FIG.

報告書作成が終了すれば(ステップS1306)、当該施工現場は報告書作成終了状態に変更され、次回からはステップS1302の現場選択には表示されないようにすることができる。   When the report creation is completed (step S1306), the construction site is changed to the report creation end state, and can be prevented from being displayed in the site selection in step S1302 from the next time.

このように、遠隔地で監視したり、遠隔地の施工実績データを報告書に作成することができるので、大幅に業務効率を向上させるとともに、データ偽造等を防ぐことができる。   As described above, since it is possible to monitor at a remote place and to create construction result data at a remote place in a report, it is possible to greatly improve work efficiency and prevent data forgery and the like.

なお、上述の形態例では、鋼管杭の埋設の例を示したが、本発明の杭の施工は地盤改良等の他の工法も含むものであり、杭打機等の建設機械の形式や構造も任意である。   In the above-described embodiment, the example of burying steel pipe piles is shown. However, the construction of the pile according to the present invention includes other construction methods such as ground improvement, and the type and structure of a construction machine such as a pile driver. Is also optional.

また、ステップS707では計画データをデータサーバ3からダウンロードしているが、計画データを記録したUSBメモリ80から読み込む方法も適用できる。管理事務所2のPCの報告書作成プログラムは、USBメモリ80に記録された杭の位置情報、施行実績データを読み込んで、報告書を作成することも可能である。   In step S707, the plan data is downloaded from the data server 3, but a method of reading the plan data from the USB memory 80 in which the plan data is recorded can be applied. The report creation program of the PC of the management office 2 can read the position information of the pile and the execution result data recorded in the USB memory 80 and create a report.

1…杭打機、2…管理事務所、3…データサーバ、4…タブレット、10…施工管理装置、20…制御装置、21…CPU、22…RAM、23…FLASH ROM、24…入出力インターフェース、25…AD変換器、26…シリアルインターフェース、27…LAN、28…USBインターフェース、30…センサ、40…通信機、50…GPS受信装置、60…ディスプレイ、70…プリンタ、80…USBメモリ REFERENCE SIGNS LIST 1 pile driver, 2 management office, 3 data server, 4 tablet, 10 construction management device, 20 control device, 21 CPU, 22 RAM, 23 flash ROM, 24 input / output interface , 25 AD converter, 26 serial interface, 27 LAN, 28 USB interface, 30 sensor, 40 communication device, 50 GPS receiver, 60 display, 70 printer, 80 USB memory

Claims (4)

施工管理装置を備えた杭打機によって複数の施工位置に複数の杭を施工する杭打機の施工方法において、
前記施工管理装置は、複数の杭に対応する杭番号と埋設深度の施工目標値を含むあらかじめ計画された計画データを記憶する記憶手段と、該計画データに基づく杭位置情報を表示する表示手段と、杭打機の位置情報を取得するGPS受信装置とを備え、前記GPS受信装置で取得された位置情報が前記表示手段に表示可能であり、
第1の杭と第2の杭の施工については、施工現場の地面にあらかじめ示される第1の施工位置と第2の施工位置にしたがって埋設するとともに、前記表示手段に表示された計画データの杭番号1番と杭番号2番をそれぞれ選択して、埋設時の施工実績データと杭の位置情報を記憶し、
第3の杭以降の施工については、位置情報を第1及び第2の施工位置からのオフセット量で算出し前記表示手段に表示し、前記表示された計画データの杭番号を選択した上で埋設し、埋設時の施工実績データを杭番号情報と杭の位置情報とともに記憶することを
特徴とする杭打機の施工方法。
In a pile driving machine construction method of constructing a plurality of piles at a plurality of construction positions by a pile driving machine equipped with a construction management device,
The construction management device, a storage means for storing previously planned plan data including a construction target value of the pile number and burial depth corresponding to a plurality of piles, and a display means for displaying pile position information based on the plan data A GPS receiver for acquiring position information of the pile driver, and the position information acquired by the GPS receiver can be displayed on the display means,
Regarding the construction of the first pile and the second pile, the pile is buried according to the first construction position and the second construction position previously indicated on the ground of the construction site, and the pile of the plan data displayed on the display means is displayed. Select No. 1 and Pile No. 2 respectively, and store the construction result data and pile position information at the time of burial,
For the construction after the third pile, the position information is calculated by the offset amount from the first and second construction positions, displayed on the display means, and the pile number is selected after selecting the pile number of the displayed plan data. A pile driving method, characterized in that the actual construction data at the time of burial is stored together with pile number information and pile position information.
前記記憶された施工実績データと杭番号情報と杭の位置情報を外部のサーバにアップロードさせる請求項1記載の杭打機の施工方法。   The method according to claim 1, wherein the stored construction result data, pile number information, and pile position information are uploaded to an external server. 前記記憶された施工実績データと杭番号情報と杭の位置情報を外部の表示手段に表示させる請求項1又は2記載の杭打機の施工方法。   3. The construction method for a pile driving machine according to claim 1, wherein the stored construction result data, pile number information, and pile position information are displayed on an external display means. 前記記憶された施工実績データと杭番号情報と杭の位置情報をもとに報告書を生成させる請求項1乃至3のいずれか1項記載の杭打機の施工方法。   4. The method according to claim 1, wherein a report is generated based on the stored construction result data, pile number information, and pile position information. 5.
JP2016079353A 2016-04-12 2016-04-12 Construction method of pile driver Active JP6651255B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2016079353A JP6651255B2 (en) 2016-04-12 2016-04-12 Construction method of pile driver

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2016079353A JP6651255B2 (en) 2016-04-12 2016-04-12 Construction method of pile driver

Publications (2)

Publication Number Publication Date
JP2017190579A JP2017190579A (en) 2017-10-19
JP6651255B2 true JP6651255B2 (en) 2020-02-19

Family

ID=60085790

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2016079353A Active JP6651255B2 (en) 2016-04-12 2016-04-12 Construction method of pile driver

Country Status (1)

Country Link
JP (1) JP6651255B2 (en)

Families Citing this family (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR102201146B1 (en) * 2018-08-17 2021-01-11 대모 엔지니어링 주식회사 Equipment for ground working and method for ground working
JP7040810B2 (en) * 2020-01-08 2022-03-23 株式会社ワイビーエム Construction position guidance system for ground improvement machines
CN111832100B (en) * 2020-06-15 2022-05-27 中交疏浚技术装备国家工程研究中心有限公司 Intubation tube positioning system
CN111913194A (en) * 2020-08-07 2020-11-10 上海联适导航技术有限公司 Pile position guiding method, device, equipment and computer readable storage medium
JP7384769B2 (en) 2020-09-11 2023-11-21 あおみ建設株式会社 Heavy equipment construction management system
CN114320273B (en) * 2022-03-11 2022-05-24 江苏交水建智能装备研究院有限公司 Rotary excavating pile construction process monitoring system based on Internet of things technology
JP7401944B1 (en) 2023-02-01 2023-12-20 日邦電機株式会社 Pile construction information recording system and program

Family Cites Families (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS63210614A (en) * 1987-02-26 1988-09-01 Asakawagumi:Kk Method for correcting varticality of pile in driving of pile
US6301551B1 (en) * 1998-10-01 2001-10-09 Pile Dynamics, Inc. Remote pile driving analyzer
JP3156049B2 (en) * 1998-11-27 2001-04-16 株式会社竹中土木 Ground improvement device, ground improvement method, and improved soil column pile pile lap length management method
JP2002202357A (en) * 2000-12-28 2002-07-19 Oura Kosoku Kk Pile driving method and setting-out position checking system
JP2002256555A (en) * 2001-02-28 2002-09-11 Nippon Sharyo Seizo Kaisha Ltd Execution control device
JP4527904B2 (en) * 2001-05-29 2010-08-18 株式会社技研製作所 Civil engineering machine system
JP2008038394A (en) * 2006-08-03 2008-02-21 Nippon Sharyo Seizo Kaisha Ltd Work control apparatus for pile driver and work execution method
WO2012109192A2 (en) * 2011-02-08 2012-08-16 Pile Dynamics, Inc. Pile installation and monitoring system and method of using the same
JP2013028923A (en) * 2011-07-27 2013-02-07 Daiwa Kiko Kk Control device of ground improvement machine
JP5920931B2 (en) * 2013-03-25 2016-05-18 株式会社不動テトラ Construction management system for ground improvement work and pile foundation work

Also Published As

Publication number Publication date
JP2017190579A (en) 2017-10-19

Similar Documents

Publication Publication Date Title
JP6651255B2 (en) Construction method of pile driver
AU2015200280B2 (en) Three-dimensional object storage, customization, and distribution system
JP6765747B2 (en) Construction management system
WO2015042428A1 (en) Methods and systems for mapping and processing building information modeling (bim)- based data
US20190347746A1 (en) Building construction tracking device and methods
WO2012171138A1 (en) Camera registration and video integration in 3-d geometry model
GB2565101A (en) Method for integrating photographic images and BIM data
JP6987624B2 (en) Pile construction method and pile construction management system
JP6798064B1 (en) Systems and methods to support manufacturing control
KR20210075484A (en) Method for inspecting facility and user terminal performing the same
JP2017156139A (en) Survey position display device and survey position display program
JP6590905B2 (en) Content development device
JP7360107B2 (en) Ground investigation data transfer system and ground improvement construction data transfer system
KR101498877B1 (en) Program-producing device and image control system
JP2010193385A (en) Color adjusting apparatus and color adjusting method
US7876324B2 (en) Method and system for developing a strategy for use in a controller and storage medium for storing instructions which effectuate the method
JP4968275B2 (en) Map data editing device and server for map data editing device
JP6692554B1 (en) Ground survey data transfer system, wireless communication module, mobile information processing terminal, and ground improvement construction data transfer system
JP2022176523A (en) Bending drilling management device and management method
KR20140139721A (en) Method of preparing three-dimensional indoor map based on web
JP6459529B2 (en) Data logging software and data logging device
JP2006190199A (en) Cad progress managing system and its method and program
JP5183675B2 (en) Map image providing system, map image providing device, map image update determining method and program
JP7518370B2 (en) Information processing device, information processing program, and learning device
JP2021026705A (en) Information processing apparatus, control method, and program

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20190304

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20200117

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20200121

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20200121

R150 Certificate of patent or registration of utility model

Ref document number: 6651255

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150