JP6529874B2 - Method of dismantling a concrete column, and articulated rod device - Google Patents

Method of dismantling a concrete column, and articulated rod device Download PDF

Info

Publication number
JP6529874B2
JP6529874B2 JP2015186241A JP2015186241A JP6529874B2 JP 6529874 B2 JP6529874 B2 JP 6529874B2 JP 2015186241 A JP2015186241 A JP 2015186241A JP 2015186241 A JP2015186241 A JP 2015186241A JP 6529874 B2 JP6529874 B2 JP 6529874B2
Authority
JP
Japan
Prior art keywords
rod
base
concrete column
pulley
cut
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2015186241A
Other languages
Japanese (ja)
Other versions
JP2017061774A (en
Inventor
昭人 稲垣
昭人 稲垣
Original Assignee
東海工営 株式会社
東海工営 株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 東海工営 株式会社, 東海工営 株式会社 filed Critical 東海工営 株式会社
Priority to JP2015186241A priority Critical patent/JP6529874B2/en
Publication of JP2017061774A publication Critical patent/JP2017061774A/en
Application granted granted Critical
Publication of JP6529874B2 publication Critical patent/JP6529874B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Working Measures On Existing Buildindgs (AREA)

Description

本発明は、コンクリート柱を上端部から所定長ずつ順次切断して、滑車、ワイヤロープ及び地上に設置したウインチを用いて、短柱状に切断された切断済短柱部を地上まで順次吊り降ろすことで、撤去対象の送配電用のコンクリート柱を解体する方法、及び連結式台棒装置に関するものである。 In the present invention, a concrete column is sequentially cut from an upper end by a predetermined length, and a cut short column portion cut into short columns is sequentially suspended to the ground using a pulley, a wire rope and a winch installed on the ground. The present invention relates to a method of disassembling a power transmission and distribution concrete column to be removed , and to a connecting type stick device.

架空送電線を支持する構造物であるコンクリート柱の解体には、移動式クレーン等の大型重機が多用されており、架空送電線が通過している地域は、市街地、山岳地、田畑等、様々である。大型重機の使用には、搬入道路や作業現場において広い設置スペースが必要となるため、大型重機を用いた解体が可能な場所には、一定の制限があり、一般には、建物が林立している市街地では難しい。   A large heavy machine such as a mobile crane is widely used for dismantling concrete columns, which are structures supporting overhead power transmission lines, and various areas where overhead power transmission lines pass include urban areas, mountains, fields, etc. It is. Large-sized heavy machinery requires a large installation space on the loading road and work site, so there is a certain restriction on places where disassembly using large-sized heavy machinery is possible, and in general, buildings are standing It is difficult in the city area.

そこで、大型重機による解体が困難な地域においては、「台棒」と称される棒(ロッド)状の部材をコンクリート柱に対して平行であって、しかも解除可能に固定して、当該台棒を順次下げて、コンクリート柱を解体する工法が採用されている。   Therefore, in an area where disassembly by a large heavy machine is difficult, a rod-like member called a "rod" is fixed in parallel with and releasably to the concrete column. The method of dismantling concrete pillars is adopted by lowering the

「台棒」を用いた解体工法は、コンクリート柱の切断予定短柱部の部分に沿って台棒を固定し、台棒の側に設けられた滑車に吊降し用ワイヤロープを掛装させて、当該吊降し用ワイヤロープの先端部を、コンクリート柱の切断予定短柱部における前記滑車よりも下方の部分に引っ掛けた状態で、コンクリート柱の上端部の切断予定短柱部を切断すると、切断済短柱部は、前記吊降し用ワイヤロープに吊り下げられる。なお、切断済短柱部の下端部には、振止め用ナイロンロープが引っ掛けられていて、吊下げ時において、残存コンクリート柱と衝突するのを防止している。   In the dismantling method using the “sticker rod”, the pillar rod is fixed along the portion of the short column part to be cut of the concrete column, and the wire rope for hanging is hooked on the pulley provided on the side of the rod. And cutting the short cross section of the upper end of the concrete column in a state in which the tip of the wire rope for lifting is hooked to a portion of the short cross section of the short cross section of the concrete column below the pulley. The cut short post portion is hung on the lifting wire rope. In addition, a nylon rope for anti-vibration is hooked on the lower end portion of the cut short column portion, and at the time of suspension, it is prevented from colliding with the remaining concrete column.

そして、コンクリート柱の二回目の切断を行なう前には、解体中の残存コンクリート柱に対する前記台棒の固定を解除して、当該台棒を、残存コンクリート柱の二番目の切断予定短柱部に対応する位置まで下降させて、再度、当該残存コンクリート柱に固定することで、二回目の切断を行なって、切断済短柱部を上記と同様にして、地上まで降ろす操作を繰り返すことで、コンクリート柱を解体している。   Then, before performing the second cutting of the concrete column, release the fixation of the base bar to the remaining concrete column being dismantled, and use the base bar as the second planned cut short section of the remaining concrete column. By lowering the position to the corresponding position and fixing to the remaining concrete column again, the second cutting is performed, and the operation of lowering the cut short column portion to the ground in the same manner as described above is repeated, and concrete is obtained. It is dismantling a pillar.

例えば、特許文献1には、鋼管製の台棒全体を2本のチェーンバンドを用いてコンクリート柱に対して所定間隔をおいて固定するコンクリート柱の解体方法が開示されているが、各切断を終了する毎に、前記チェーンバンドの取外し、及び締結により、台棒を順次降ろして、解体中のコンクリート柱に固定し直す高所作業は、多大の労力を要する危険な作業であった。また、台棒全体を滑車とワイヤロープを用いて、コンクリート柱の上端部まで吊り上げる必要があり、この作業も多くの労力を必要とする。   For example, Patent Document 1 discloses a method of disassembling a concrete column in which the entire steel rod base rod is fixed at a predetermined distance to the concrete column using two chain bands, but each cutting At the end of the work, the work at the high place where the support rod is sequentially lowered and fixed to the concrete column being disassembled by removing and fastening the chain band is a dangerous work requiring much labor. In addition, it is necessary to lift the entire support rod to the upper end of the concrete column using a pulley and a wire rope, which also requires much labor.

また、現実の作業現場では、荷締機に近いチェーンバンドを用いて、コンクリート柱に密着して固定される木製の台棒も使用されている。木製台棒の場合には、当該木製台棒の強度に対応した長さでもってコンクリート柱を切断する必要があるために、その切断長が短くなるため、切断回数が増加すると共に、コンクリート柱の切断時に、当該コンクリート柱に密着固定されている木製台棒までもが部分切断されてしまう恐れがあるという問題点があった。   In addition, in the actual work site, a wooden base rod which is closely fixed to a concrete column is also used by using a chain band close to a clamping machine. In the case of a wooden base rod, since it is necessary to cut the concrete column with a length corresponding to the strength of the wooden base rod, the cutting length becomes short, so the number of cuttings increases and At the time of cutting, there is a problem that even the wooden base rod closely fixed to the concrete column may be partially cut.

特開2004−204506号公報Unexamined-Japanese-Patent No. 2004-204506

本発明は、多数の台棒単体を分離可能に連結して連結式台棒を使用することで、台棒全体を地上からコンクリート柱の上端部まで吊り上げたり、コンクリート柱に対して台棒全体を着脱する必要をなくすと共に、コンクリート柱の解体時には、上方の台棒単体を取り外して連結式台棒を順次短くするか、或いは下方に向けて順次伸ばすことで、解体効率を高めることを課題としている。   The present invention lifts the whole base bar from the ground to the upper end of the concrete column or connects the whole base bar to the concrete column by using a connecting type base bar by connecting a large number of base bars in a detachable manner. In addition to eliminating the need to attach and detach, it is an issue to increase the efficiency of dismantling by disassembling the upper base bar alone and shortening the connected base bar sequentially or extending it downward sequentially when disassembling the concrete column .

上記の課題を解決するための請求項1の発明は、コンクリート柱を上端部から所定長ずつ順次切断して、滑車装置とワイヤロープを用いて、切断済短柱部を地上まで吊り降ろすことで、コンクリート柱を解体する方法であって、
短パイプ状の多数本の台棒単体の全て又は特定の台棒単体のみを連結固定金具を介して前記コンクリート柱に連結すると共に、相上下する各台棒単体を互いに分離可能に連結することで、当該コンクリート柱の側方に連結式台棒を一体に組み付けて、最上段の滑車取付け用の台棒単体の上端部に滑車を一体に取付け、
最上段の台棒単体に一体に取付けられた前記滑車に掛装した吊降し用ワイヤロープを、前記コンクリート柱の切断予定短柱部の上端部に巻き掛けた状態で、当該切断予定短柱部を切断して、前記滑車、吊降し用ワイヤロープ及び地上に設置したウインチを用いて、地上まで吊り降ろした後に、
滑車が取付けられた最上段の台棒単体の直下の1ないし複数の台棒単体を取り外して、滑車が取付けられた最上段の台棒単体を、新たに直下となった別の台棒単体に連結して、切断途中の残存コンクリート柱の上端部の切断予定短柱部を、上記と同様にして切断して、切断済短柱部を地上まで吊り降ろす操作を繰り返すことを特徴としている。
Invention of Claim 1 for solving the above-mentioned subject is by cutting a concrete pillar sequentially from an upper end part by predetermined length, and using a pulley apparatus and a wire rope, by suspending a cut short pillar part to the ground. , A method of dismantling concrete columns,
By connecting all of the short pipe-like multiple base rods alone or only a specific base rod alone to the concrete column via the connection fixing bracket, the base rods moving up and down are connected to each other in a detachable manner. , Attaching the link-type rod integrally to the side of the concrete column, and integrally attaching the pulley to the upper end of the single rod for attachment of the topmost pulley;
The wire rod for suspension hung on the above-mentioned pulley integrally attached to the base rod single-piece of the top step is wound on the upper end portion of the short rod portion to be cut of the concrete column. After being cut off and using the pulleys, wire ropes for lifting and a winch installed on the ground,
Remove one or more base bars directly under the top base bar on which the pulley is mounted and remove the top base bar on which the pulley is mounted into another base bar that is newly directly below In connection with this, it is characterized in that an operation to cut off the cut short pillar portion of the upper end portion of the remaining concrete pillar in the middle of cutting is cut in the same manner as described above and the cut short pillar portion is lowered to the ground.

請求項1の発明は、短パイプ状の複数本の台棒単体を分離可能に連結した連結式台棒を使用することが特徴であって、多数本の台棒単体の全て又は特定の台棒単体のみを連結固定金具を介して前記コンクリート柱に連結すると共に、相上下する各台棒単体を互いに分離可能に連結することで、当該コンクリート柱の側方に連結式台棒が一体に組み付けられる。最上段の台棒単体には、滑車が一体又は取外し可能に取付けられる。   The invention according to claim 1 is characterized by using a connecting-type rod in which a plurality of short-pipe-like base rods are separably connected, wherein all of the plurality of base rods alone or a specific base rod By connecting only a single body to the concrete column via the connection fixing bracket, and connecting the base bars moving up and down one another in a separable manner, the connectable base bar is assembled integrally to the side of the concrete column. . A pulley is integrally or removably attached to the uppermost support rod alone.

最上段の台棒単体の上端部に一体又は取外し可能に取付けられた滑車に吊降し用ワイヤロープを掛装して、当該滑車よりも低い位置において、前記吊降し用ワイヤロープの先端部をコンクリート柱の最上部の切断予定短柱部に巻き掛けた状態で、当該切断予定短柱部を切断具により切断すると、当該切断済短柱部は、前記吊降し用ワイヤロープに吊り下げられる。この状態で、振止め用ナイロンロープにより切断済短柱部の振れを防止した状態で、地上に設置したウインチにより吊降し用ワイヤロープを繰り出すと、切断済短柱部は、徐々に地上まで下降される。   A lifting wire rope is hooked on a pulley integrally or removably attached to the upper end of the top row of stand bars alone, and at a position lower than the pulley, the tip of the lifting wire rope Is cut by the cutting tool with the cutting scheduled short column part being wound around the cutting planned short column part at the top of the concrete column, the cut short column part is suspended to the lifting wire rope Be In this state, when the swing wire rope is fed out by the winch installed on the ground in a state where the runout of the cut short column is prevented by the nylon rope for anti-vibration, the cut short column gradually extends to the ground It is lowered.

最初の切断を終えて、2回目の切断を行なうには、2回目の切断対象である切断予定短柱部の長さに対応させて、滑車が取付けられた最上段の台棒単体の直下の1ないし複数の別の台棒単体を取り外して、滑車が取付けられた最上段の台棒単体を、新たに直下となった別の台棒単体に連結することで、滑車が取付けられた最上段の台棒単体は、2回目の切断に係る切断予定短柱部の側方の最適位置に配置される。この状態で、最初の切断と同様にして、2回目の発生に係る切断予定短柱部が切断されて、滑車に掛装された吊降し用ワイヤロープにより、当該2回目の切断に係る切断済短柱部は、地上に降ろされる。以後、滑車が取付けられた最上段の台棒単体の直下の1ないし複数の台棒単体を取り外して、滑車が取付けられた最上段の台棒単体を、新たに直下となった別の台棒単体に連結することで、新たに発生した切断済短柱部を地上まで降ろす操作を順次繰り返すと、コンクリート柱が解体される。   After completing the first cutting and performing the second cutting, the position immediately below the uppermost supporting rod alone on which the sheave is attached is made to correspond to the length of the planned short cross section to be cut the second time. By removing one or more other base bars alone and connecting the uppermost base bar with the pulley installed to the other new base bar just below it, the uppermost stage with the pulley installed The base bar alone is placed at an optimum position on the side of the short cross section intended to be cut for the second cutting. In this state, in the same manner as the first cutting, the short pillar portion to be cut related to the second generation is cut, and the cutting related to the second cutting is performed by the hanging wire rope hung on the pulley. The column is dropped to the ground. Thereafter, one or more base bars directly below the uppermost base bar on which the pulley is mounted is removed, and the upper base bar on which the pulley is mounted is newly provided immediately under another base bar. By connecting to a single body, the concrete pillar is dismantled by sequentially repeating the operation of lowering the newly generated cut short pillar portion to the ground.

このように、請求項1の発明によれば、多数本の台棒単体を分離可能に連結した連結式台棒を使用しているため、台棒単体どうしを連結する前後において、各台棒単体を連結固定金具を介して側方のコンクリート柱に連結することで、コンクリート柱の側方に連結式台棒が一体に組み付けられ、解体時には、滑車が取付けられた最上段の台棒単体の直下の1ないし複数の台棒単体のみを取り外して、最上段の台棒単体を、新たに直下となった別の台棒単体に連結することで、解体途中の残存コンクリート柱の高さに対応した位置に連結式台棒が、その都度形成されて、従来の解体方法のように、台棒の全体を順次下方に下げて、コンクリート柱に再連結する構成ではないので、コンクリート柱の解体効率が高まって、工期が短縮される。また、予め、コンクリート柱の必要な部分に全ての台棒単体を配置することで、コンクリート柱の側方に一体に組み付けられた連結式台棒と、多数の台棒単体の全部又はその一部をコンクリート柱に連結固定している複数の連結固定金具とは、一種の足場としての機能を果すため、この点においても、解体作業が容易となる。   As described above, according to the invention of claim 1, since the connecting-type base rod is used in which a large number of base rods are connected in a separable manner, each base rod alone is connected before and after connecting the base rods alone. The connection type mounting rod is integrally assembled on the side of the concrete column by connecting it to the side concrete column via the connection fixing bracket, and at the time of dismantling, directly below the single top support rod on which the pulley is mounted. It corresponds to the height of the remaining concrete pillar in the middle of dismantling by removing only one or more base bars single-piece and connecting the top single base stick single body to another stand single base rod which became newly directly below Since the connecting rod is formed in each position and the whole rod is lowered downward sequentially and reconnected to the concrete column as in the conventional dismantling method, the concrete pillar dismantling efficiency is reduced. Construction period will be shortened. In addition, by arranging all base bars alone in the necessary part of the concrete column in advance, the connectable base bar integrally assembled on the side of the concrete column, and all or part of a large number of base bars alone Since a plurality of connection fixing brackets connecting and fixing to a concrete column serve as a kind of scaffolding, dismantling work becomes easy also in this point.

このため、請求項1の発明によれば、コンクリート柱の解体に要するスペースは、当該コンクリート柱を中心とする僅かな面積で済むので、周辺に建物、道路等が存在する市街地のみならず、山間地、狭隘な場所等のコンクリート柱の設置場所の制約がなくなると共に、上記したように、工期の短縮が図れるので、用地交渉費及び用地借地料の削減が図られると共に、近隣住民が被る迷惑を最少にして工事ができる。   For this reason, according to the invention of claim 1, the space required for dismantling the concrete column may be a small area centering on the concrete column, and therefore, it is possible not only in the urban area where buildings, roads, etc. exist in the periphery but also between mountains As there is no restriction on the installation location of concrete pillars such as land and narrow places, as mentioned above, the construction period can be shortened, so land negotiation costs and land lease costs can be reduced, and inconveniences to nearby residents will be incurred. Construction can be done with minimum.

請求項2の発明は、コンクリート柱を上端部から所定長ずつ順次切断して、滑車装置とワイヤロープを用いて、切断済短柱部を地上まで吊り降ろすことで、コンクリート柱を解体する方法であって、
短パイプ状の多数本の台棒単体の全て又は特定の台棒単体のみを連結固定金具を介して前記コンクリート柱に連結すると共に、相上下する各台棒単体を互いに分離可能に連結することで、当該コンクリート柱の側方に連結式台棒を一体に組み付けて、最上段の台棒単体に、滑車を取付けるための滑車取付け金具を着脱可能にして取付け、
最上段の台棒単体に滑車取付け金具を介して取付けられた前記滑車に掛装した吊降し用ワイヤロープを、前記コンクリート柱の切断予定短柱部の上端部に巻き掛けた状態で、当該切断予定短柱部を切断して、前記滑車、吊降し用ワイヤロープ及び地上に設置したウインチを用いて、地上まで吊り降ろした後に、
最上段の台棒単体に取付けられた滑車取付け金具を取り外すと共に、最上段の台棒単体を含む1ないし複数の台棒単体を取り外して、新たに最上段となった別の台棒単体に滑車取付け金具を介して滑車を取付けることで、切断途中の残存コンクリート柱の上端部の切断予定短柱部を、上記と同様にして切断して、切断済短柱部を地上まで吊り降ろす操作を繰り返すことを特徴としている。
The invention of claim 2 is a method of dismantling a concrete pillar by suspending the cut short pillar portion to the ground by sequentially cutting the concrete pillar from the upper end portion by a predetermined length sequentially and using the pulley apparatus and the wire rope. There,
By connecting all of the short pipe-like multiple base rods alone or only a specific base rod alone to the concrete column via the connection fixing bracket, the base rods moving up and down are connected to each other in a detachable manner. , Attaching the link-type base rod integrally to the side of the concrete column, and attaching the pulley mounting bracket for mounting the pulley to the single top-most base rod so as to be removable
The wire rope for suspension hung on the pulley and attached to the base rod alone at the uppermost stage via the pulley mounting bracket is wound on the upper end portion of the short cross section to be cut of the concrete column, After cutting off the short column to be cut and using the pulley, wire rope for lifting and a winch installed on the ground, and after lifting to the ground,
While removing the pulley mounting bracket attached to the top row single rod, removing one or more single row rods including the top row single rod, and taking the new top row single rod as a separate single row rod By attaching the pulley through the mounting bracket, the short pillar portion to be cut at the upper end of the remaining concrete column in the middle of cutting is cut in the same manner as described above, and the operation of suspending the cut short pillar portion to the ground is repeated. It is characterized by

請求項1の発明は、最初の切断で最上段となる台棒単体に対して滑車が取付けられたままであって、常に、最上段となる台棒単体は、一定していて、最上段の台棒単体の直下の1ないし複数の台棒単体を取り外して、滑車が取付けられた最上段の台棒単体を、新たに直下となった別の台棒単体に連結する「だるま落し取外し方式」である。これに対して、請求項2の発明は、切断の都度、変更される最上段の台棒単体に、滑車を取付けるための滑車取付け金具が着脱可能に取付けられて、切断の都度、最上段の台棒単体、又は最上段の台棒単体に連続する複数の台棒単体を取り外して、新たに最上段となった別の台棒単体に滑車取付け金具を装着する「順次取外し方式」である点が異なるのみで、切断途中の残存コンクリート柱の高さが低くなることに応じて、上部の台棒単体を順次、取り外す点は共通している。   According to the invention of claim 1, the pulley is attached to the single stand bar at the top in the first cutting, and the single stand at the top is always constant, and the top stand Remove the one or more base bars directly below the bar, and connect the top base bar with the pulleys to another base bar that has just been added. is there. On the other hand, according to the invention of claim 2, the pulley mounting bracket for attaching the pulley is detachably attached to the top base rod which is changed each time cutting, and each time cutting is performed The point is a "sequential removal method" in which a plurality of base bar singles which are continuous with the base bar alone or the top base single bar are removed, and the pulley mounting bracket is attached to another base bar single that has become the top new stage. It is common that the upper base bar single-pieces are removed one after another according to the height of the remaining concrete column in the middle of cutting being lowered.

請求項3の発明は、請求項1又は2の発明において、多数本の台棒単体は、その全て、又は特定の台棒単体のみを連結固定金具を介してコンクリート柱に連結固定しながら、下方から上方に向けて順次連結することを特徴としている。   According to the invention of claim 3, in the invention of claim 1 or 2, the plurality of base rods alone is fixed downward while connecting all or only the specific base rod alone to the concrete column via the connection fixing fitting. Are characterized in that they are sequentially connected upward.

請求項3の発明によれば、連結式台棒は、下方から上方に向けて多数本の台棒単体を、連結固定金具を介して側方のコンクリート柱に連結固定しながら、1本棒状に連結されるので、連結途中における台棒単体の落下を防止できて、台棒単体の連結を安全に、しかも容易に連結できる。   According to the invention of claim 3, the connection-type rod is formed into a single rod while connecting and fixing a large number of base rods singly from the bottom to the top to the side concrete column via the connection fixing bracket. Since the connection is achieved, it is possible to prevent the single rod from falling in the middle of the connection, and the connection of the single rod can be connected safely and easily.

請求項の発明は、請求項1又は2に記載のコンクリート柱の解体方法の実施に使用される連結式台棒装置であって、
短パイプ状の多数の台棒単体が長手方向に沿って分離可能に連結された連結式台棒と、
当該連結式台棒を構成する各台棒単体を前記コンクリート柱に解除可能に連結するための多数の連結固定金具と、
前記連結式台棒を構成する最上段の台棒単体に滑車を取付けるための滑車取付け金具と、
を備えていることを特徴としている。
The invention according to claim 4 relates to a connecting type stick device used for carrying out the method for dismantling a concrete column according to claim 1 or 2,
A connecting-type rod in which a plurality of short-pipe-like base rods are separably connected along the longitudinal direction;
A large number of connection fixing brackets for releasably connecting each base bar constituting the connecting type base bar to the concrete column;
A sheave mounting bracket for mounting a sheave on a single top bar alone constituting the articulated bar;
It is characterized by having.

請求項の発明は、請求項1又は2に記載のコンクリート柱の解体方法の実施に使用される連結式台棒装置であって、その特徴部は、連結構造に存在し、その作用は、請求項1の発明と同一である。 The invention of claim 4 relates to a connecting rod unit used for carrying out the method of disassembling a concrete column according to claim 1 or 2, wherein the features thereof exist in the connecting structure, and the function is It is the same as the invention of claim 1.

本発明によれば、短棒状の多数本の台棒単体を分離可能に連結した連結式台棒を使用しているため、台棒単体どうしを連結する前後において、各台棒単体を連結固定金具を介して側方のコンクリート柱に連結することで、コンクリート柱の側方に連結式台棒が一体に組み付けられ、コンクリート柱の解体時には、「だるま落し取外し方式」又は「順次取外し方式」により、連結式台棒の不要となった上部の1ないし複数の台棒単体のみを取り外すことで、解体途中の残存コンクリート柱の高さに対応した連結式台棒が、その都度形成されるため、従来の解体方法のように、台棒の全体を順次下方に下げて、コンクリート柱に再連結する構成ではないので、コンクリート柱の解体効率が高まって、工期が短縮される。   According to the present invention, since the connection-type base rod in which a large number of short rod-like base rods are separably connected is used, the connecting and fixing bracket for each base rod alone is used before and after connecting the base rods alone. By connecting to the concrete column through the side, the connecting rod is assembled integrally to the side of the concrete column, and when dismantling the concrete column, "Dropper removal method" or "sequential removal method", By removing only the upper one or more base bar single members that are no longer required for the connectable base bar, a connectable base bar corresponding to the height of the remaining concrete column in the process of being disassembled is formed each time. As in the case of the dismantling method of (1), since the whole of the base bar is lowered downward sequentially and rejoined to the concrete column, the dismantling efficiency of the concrete column is enhanced and the construction period is shortened.

コンクリート柱Pの側方に連結式台棒Aが組み付けられた状態の斜視図である。It is a perspective view in the state where connected type stick rod A was attached to the side of concrete pillar P. 第1回の切断予定短柱部P1'に吊降し用ワイヤロープR1 を巻き掛けた状態の斜視図である。Is a perspective view of a state in which the wound the hanging drop-off wire rope R 1 in 1st cut short pillar portion P 1 of the '. 第1回の切断に係る切断済短柱部P1 を吊降し用ワイヤロープR1 により吊り下げている状態の斜視図である。It is a perspective view of a state in which the suspended by a wire rope R 1 for drop-off suspended cut already short pillar portion P 1 of the cutting of the first time. 本発明に係るコンクリート柱Pの連結式台棒装置を構成する台棒単体As、連結固定金具D及び滑車取付け金具Eとコンクリート柱Pとの関係を示す分解斜視図である。It is a disassembled perspective view which shows the relationship between the base rod As which comprises the connection-type rod apparatus of concrete column P which concerns on this invention, the connection fixing bracket D, the pulley attachment bracket E, and the concrete column P. FIG. 連結式台棒A及びコンクリート柱Pとの関係において示した連結固定金具Dの分解斜視図である。It is a disassembled perspective view of the connection fixing bracket D shown in relation with the connection type rod A and the concrete pillar P. FIG. 連結固定金具Dとの干渉を回避する吊降し用ワイヤロープR1 の張設構造を示す図である。It is a diagram illustrating a stretched configuration of the hanging drop-off wire rope R 1 to avoid interference with the coupling fixing bracket D. (a)〜(c)は、「だるま落し取外し方式」による本発明のコンクリート柱Pの解体方法を説明するための図である。(A)-(c) is a figure for demonstrating the dismantling method of the concrete pillar P of this invention by "the dart drop removal method." (a),(b)は、それぞれ第2回の切断予定短柱部P2'に吊降し用ワイヤロープR1 を巻き掛けた状態、及び第2回の切断に係る切断済短柱部P2 を吊降し用ワイヤロープR1 により吊り下げている状態の斜視図である。(A), (b) shows a state in which the hanging wire rope R 1 is wound around the second planned short column P 2 ′ and a cut short column according to the second cutting is a perspective view of a hanging in that state by the wire rope R 1 for drop-off suspended the P 2. (a)〜(c)は、「順次取外し方式」による本発明のコンクリート柱Pの解体方法を説明するための図である。(A)-(c) is a figure for demonstrating the dismantling method of concrete pillar P of this invention by a "sequential removal method." 連結式台棒Aを構成する台棒単体As’の別の連結部の断面図である。It is sectional drawing of another connection part of base bar single-piece | unit As' which comprises the connection-type base bar A. FIG.

以下、実施例を挙げて、本発明について更に詳細に説明する。最初に、図1ないし図6、特に、図4及び図5を参照して、「だるま落し取外し方式」及び「順次取外し方式」の双方の本発明のコンクリート柱Pの解体方法の実施に使用される連結式台棒装置、即ち、連結式台棒A、当該連結式台棒Aを構成する各台棒単体As をコンクリート柱Pに連結固定するための連結固定金具D、及び連結式台棒Aの最上段の台棒単体As の上端部に取付けられる滑車取付け金具Eについて説明する。コンクリート柱Pは、送電線を架空するために使用されていたものであり、産業或いは社会の諸事情により使用されなくなったものであり、図1及び図7に示されるように、図示のコンクリート柱Pは、全体が空中に配置される上部柱Paと、当該上部柱Paの下端部に一体に接続されて、自身の下端部が地中埋設される下部柱Pbとが一体となったものである。上部柱Paは、下端から上端に向けて外径が漸次小さくなるようなテーパー形状(通常のテーパーは、1/75)になっているが、下部柱Pbは、全長に亘って同一外径である。なお、以下の説明において、単に「コンクリート柱」と称した場合には、「上部柱Pa」を指す。   Hereinafter, the present invention will be described in more detail by way of examples. First, referring to FIGS. 1 to 6, and in particular to FIGS. 4 and 5, it is used to carry out the method of disassembling the concrete column P of the present invention in both the “falling and removing method” and the “sequential removal method”. Connection type rod device, ie, connection type connection rod A, connection fixing bracket D for connecting and fixing each support rod unit As constituting the connection type connection rod A to a concrete column P, and connection type connection rod A The pulley mounting bracket E attached to the upper end portion of the top base rod unit As at the top of the figure will be described. The concrete column P is used to set up a power transmission line, and is not used due to industrial or social circumstances. As shown in FIGS. 1 and 7, the concrete column shown in the figure is used. P is a combination of an upper column Pa, which is entirely disposed in the air, and a lower column Pb, which is integrally connected to the lower end of the upper column Pa and whose lower end is embedded in the ground. is there. The upper pillar Pa has a tapered shape (normal taper is 1/75) in which the outer diameter gradually decreases from the lower end to the upper end, but the lower pillar Pb has the same outer diameter over the entire length is there. In the following description, the term “concrete column” refers to “upper column Pa”.

連結式台棒Aは、図1及び図7に示されるように、コンクリート柱Pの高さに対応した複数本の台棒単体As をボルト連結して構成される。台棒単体As は、図4及び図5に示されるように、断面円形の鋼管本体1の両端部に、溶接等により円形の連結フランジ部2が同心を保持して一体化され、連結フランジ部2には、連結用のボルトB1 を挿通するための4本のボルト孔3が周方向に沿って等間隔をおいて形成され、鋼管本体1の端部の外周面と、当該外周面に接続する連結フランジ部2の裏面とには、周方向に沿って等間隔をおいて複数の補強リブ4が溶接されて補強されている。 As shown in FIG. 1 and FIG. 7, the connection type base bar A is configured by bolting a plurality of base bar units As corresponding to the height of the concrete column P. As shown in FIG. 4 and FIG. 5, the base rod single body As is shown in FIGS. 4 and 5, the circular connection flange portion 2 is integrally held by welding or the like at both ends of the steel pipe main body 1 having a circular cross section. 4, four bolt holes 3 for inserting the connecting bolt B 1 are formed at equal intervals along the circumferential direction, and the outer peripheral surface of the end of the steel pipe main body 1 and the outer peripheral surface A plurality of reinforcing ribs 4 are welded and reinforced at equal intervals along the circumferential direction with the rear surface of the connecting flange portion 2 to be connected.

台棒単体As の長さL1 は、コンクリート柱Pの一回の切断長、及び作業者が手で持ち運び可能であることを主体に定められ、例えば、コンクリート柱Pの一回の切断長が2.5mの場合には、台棒単体As の基準長は、1.2〜1.4mである。なお、(長さ×外径×肉厚)が、(1,300×140×3.5)mmの鋼管から成る台棒単体As の重量は、23kgであり、一人の作業者が手で持ち上げて、取り扱うことのできる重量である。後述のように、コンクリート柱Pの側方に一体に組み付けられた連結式台棒Aの最上段の台棒単体As の上端部に取付けられた滑車Kに掛装される吊降し用ワイヤロープR1 の先端部は、玉掛けワイヤ51及びUクレビス52(図2及び図3参照)を介してコンクリート柱Pの切断予定短柱部P1'P2'・・に巻き掛けられ、コンクリート柱Pの切断を重ねる毎に、コンクリート柱Pの上端位置と連結式台棒Aの上端位置とに差異が生じ、この差異を適正に是正するために、台棒単体As には、コンクリート柱Pの切断により徐々に短くなる連結式台棒Aの上端部の位置を調整すべく、前記基準長よりも短い別の台棒単体を用意しておくことが望ましい。 The length L 1 of the base rod simple substance As is mainly determined on the basis of one cutting length of the concrete column P and that the operator can carry it by hand. For example, one cutting length of the concrete column P is In the case of 2.5 m, the standard length of the single support rod As is 1.2 to 1.4 m. In addition, the weight of a single base rod As consisting of a steel pipe of (1,300 × 140 × 3.5) mm (length × outer diameter × thickness) is 23 kg, and it is manually lifted by one worker. Weight that can be handled. As described later, a lifting wire rope is hooked on a pulley K attached to the upper end of a single base rod As of the uppermost stage of the connection type base rod A integrally assembled on the side of the concrete column P The tip end portion of R 1 is wound around a short pillar P 1 'P 2 ', ··· which is to be cut of the concrete pillar P via the hooking wire 51 and the U clevis 52 (see FIG. 2 and FIG. 3). Each time cutting is repeated, a difference occurs between the upper end position of the concrete column P and the upper end position of the connection type rod A. In order to correct this difference appropriately, the base rod As is cut off of the concrete column P. In order to adjust the position of the upper end portion of the connection-type support rod A which becomes gradually shorter, it is desirable to prepare another support rod single body shorter than the reference length.

連結式台棒Aを構成する複数本の台棒単体As は、図4及び図5に示されるように、連結固定金具Dによって側方のコンクリート柱Pに連結固定される。実施例では、複数本の台棒単体As は、1本おきにコンクリート柱Pに連結固定されており、コンクリート柱Pに対する連結式台棒Aの連結固定箇所の数は、コンクリート柱Pに対する連結式台棒Aの全体の連結強度との関係により定められ、解体効率を高める観点からは、全ての台棒単体As を、側方のコンクリート柱Pに連結固定する必要はない。   A plurality of base bar single members As constituting the connectable base bar A are connected and fixed to the concrete pillar P on the side by the connection fixing bracket D as shown in FIGS. 4 and 5. In the embodiment, the plurality of base bars As are connected and fixed to the concrete column P every other column, and the number of connection fixing places of the connection type base bar A to the concrete column P is the connection type to the concrete column P It is determined by the relationship with the overall connection strength of the support rods A, and it is not necessary to connect and fix all support rod single members As to the side concrete columns P from the viewpoint of enhancing the dismantling efficiency.

連結固定金具Dは、図4及び図5に示されるように、コンクリート柱Pに固定される二分割構造の第1金具11と、台棒単体As に固定される第2金具12と、第1及び第2の各金具11,12を連結する連結具13とで構成される。第1金具11は、中心角が180°よりも小さな半割短円筒状をした一対の金具本体14,14’で構成され、各金具本体14,14’の横断面視の両端には、それぞれ連結板部14a,14'aが外方に向けて互いに平行となって上下方向に沿って一体に取付けられ、台棒単体As の側に配置される金具本体14の上端部の外側には、平板部14bが水平となって一体に設けられ、当該金具本体14の外側であって、周方向の中央部には、連結板部14cが前記平板部14bの下方に位置して上下方向に設けられている。台棒単体As に固定される第2金具12の全体構成は、前記第1金具11と同様に、二分割構造の一対の金具本体15,15’で構成され、第1金具11と同様の連結板部15a,15'a、平板部15b及び連結板部15cを備えている。   As shown in FIGS. 4 and 5, the connection fixing bracket D includes a first bracket 11 of a two-part structure fixed to the concrete column P, a second bracket 12 fixed to the base rod As, and And a connector 13 for connecting the second metal fittings 11 and 12. The first metal fitting 11 is composed of a pair of metal fitting bodies 14 and 14 'each having a short half cylindrical shape with a central angle smaller than 180 °, and each end of the metal fitting bodies 14 and 14' in the cross sectional view The connecting plate portions 14a and 14'a are integrally and outwardly installed in parallel along the vertical direction parallel to each other, and outside the upper end portion of the metal fitting main body 14 disposed on the side of the base rod unit As, The flat plate portion 14b is horizontally provided integrally, and is provided on the outer side of the metal fitting main body 14 at the central portion in the circumferential direction with the connecting plate portion 14c located vertically below the flat plate portion 14b. It is done. The entire configuration of the second metal fitting 12 fixed to the base rod single body As is constituted by a pair of metal fitting bodies 15 and 15 'of a two-divided structure similarly to the first metal fitting 11, and the same connection as the first metal fitting 11. It is provided with board part 15a, 15'a, flat part 15b, and connection board part 15c.

ここで、連結式台棒Aを構成する各台棒単体As の外径は、同一であるが、コンクリート柱Pの上部柱Paは、下端から上端に向けて漸次僅かに外径が大きくなるようなテーパー状になっているために、第1金具11に関してのみ、コンクリート柱Pの固定高さ位置によって、金具本体14の内径サイズが僅かに変化しているが、全ての第1金具の符号としては、統一して、「11」を使用する。また、第1金具11に関しては、コンクリート柱Pが上記したテーパー状をなしている関係からして、一対の金具本体14,14' で構成される第1金具11の上端の内径は、下端の内径よりも僅かに小さくなっており、この寸法構造によって、第1金具11を構成する一対の金具本体14,14’のボルトにより締結力のみに依存することなく、コンクリート柱Pの解体時において、第1金具11に垂直下方への荷重、又は曲げ力が作用しても、当該第1金具11は、コンクリート柱Pに対して下方に滑り落ちない構造になっている。   Here, although the outer diameter of each base rod As constituting the connectable base rod A is the same, the upper pillar Pa of the concrete column P is such that the outer diameter gradually increases from the lower end toward the upper end The inner diameter size of the metal fitting main body 14 slightly changes depending on the fixed height position of the concrete column P only with respect to the first metal fitting 11 because of the tapered shape, but as the signs of all the first metal fittings Unify and use “11”. Further, regarding the first metal fitting 11, the inner diameter of the upper end of the first metal fitting 11 formed of the pair of metal fitting bodies 14 and 14 'is lower than that of the lower end because the concrete column P has the above-described tapered shape. The size is slightly smaller than the inner diameter, and by this dimensional structure, when disassembling the concrete column P, without depending only on the fastening force by the bolts of the pair of metal fitting bodies 14 and 14 'constituting the first metal fitting 11, The first metal fitting 11 is structured so as not to slide downward with respect to the concrete column P even if a load or bending force acts vertically downward on the first metal fitting 11.

第1金具11を構成している一対の金具本体14,14' は、コンクリート柱Pの所定高さ位置において、当該コンクリート柱Pを挟むように対向配置させた状態で、互いに近接させて、当該コンクリート柱Pに密着させた状態で、各連結板部14a, 14' aが複数本のボルトB2 及びナットN2 を介して連結されることで、第1金具11は、コンクリート柱Pに固定される。同様にして、第2金具12を構成する一対の金具本体15,15' は、台棒単体As を挟んだ状態で、各連結板部15a, 15' aが複数本のボルトB3 及びナットN3 を介して連結されることで、第2金具12は、台棒単体As に固定される。第1及び第2の各金具11,12の各連結板部14c,15cと、横断面L字状をした一対の連結具13の垂直板部13aとがボルトB4 及びナットN4 を介して互いに連結されることで、台棒単体As は、コンクリート柱Pに対して平行を保持した状態で、当該コンクリート柱Pの側方に垂直に配置されて、連結固定金具Dを介してコンクリート柱Pに連結固定される。なお、現実の施工においては、図4に示されるように、コンクリート柱Pと台棒単体As との間に配置される第1及び第2の各金具11,12の一方の金具本体14,15を連結具13を介して連結して仮連結体を形成した後に、当該仮連結体と残りの金具本体14,15とでコンクリート柱P及び台棒単体As を挟んで、第1及び第2の各金具11,12を構成する一対の金具本体14及び同15を互いに連結することで、連結固定金具Dを介してコンクリート柱Pに対して台棒単体As を連結固定している。この状態では、第1及び第2の各金具11,12の各平板部14b,15bとは、段差を介して連続していて、コンクリート柱Pの解体作業を行なう作業者の足場として機能する。 The pair of metal fitting bodies 14 and 14 'constituting the first metal fitting 11 are made to be close to each other in a state in which they are disposed opposite to each other so as to sandwich the concrete pillar P at a predetermined height position of the concrete pillar P. in a state of being in close contact with the concrete column P, that each connecting plate portion 14a, 14 'a is connected via a plurality of bolts B 2 and the nut N 2, the first bracket 11 is fixed to the concrete pole P Be done. Similarly, a pair of fitting body 15, 15 constituting the second member 12 'is in a state of sandwiching the Taibo alone As, the connecting plate 15a, 15' a plurality of bolts B 3 and a nut N By being connected via 3 , the second metal fitting 12 is fixed to the base bar As. Each connecting plate portion 14c of each of the first and second brackets 11, 12, 15c and a vertical plate portion 13a of the pair of connector 13 in which the cross-sectional L-shape with bolts B 4 and the nut N 4 By being connected to each other, the single support rod As is held vertically to the side of the concrete column P while being held parallel to the concrete column P, and the concrete column P is held via the connection fixing bracket D. It is fixed to In actual construction, as shown in FIG. 4, one of the metal fitting bodies 14 and 15 of the first and second metal fittings 11 and 12 disposed between the concrete column P and the base rod single body As. Are connected via the connector 13 to form a temporary connection body, and then the first and second holding members A and B are interposed between the temporary connection body and the remaining metal fitting bodies 14 and 15 to form the first and second By connecting the pair of metal fitting bodies 14 and 15 constituting the metal fittings 11 and 12 to each other, the base bar As is connected and fixed to the concrete column P via the connection fixing metal fitting D. In this state, the flat plate portions 14b and 15b of the first and second metal fittings 11 and 12 are continuous with steps and function as a foothold of a worker who performs dismantling work of the concrete pillar P.

また、図4に示されるように、連結式台棒Aを構成する最上段の台棒単体As の連結フランジ部2には、滑車Kを取付けるための滑車取付け金具Eが複数本のボルトB5 及びナットN5 を用いて取付けられる。滑車取付け金具Eは、横断面L字形をした一対の金具板21の垂直板部21aの間に、左右一対の滑車吊下げ板22を挟んだ状態で、計3枚の板材を複数本のボルト(図示せず)を介して一体に連結した構成であって、各金具板21の水平板部21bには、台棒単体As の連結フランジ部2に形成されたボルト孔3に対応する位置に計4個のボルト孔23が形成されている。よって、図4に示されるように、最上段の台棒単体As の連結フランジ部2に滑車取付け金具Eの各水平板部21bを載せて、最上段の台棒単体As の連結フランジ部2の各ボルト孔3と、滑車取付け金具Eの各水平板部21bのボルト孔23とに挿通されたボルトB5 とナットN5 を螺合させることで、最上段の台棒単体As の上端部に滑車取付け金具Eが取付けられる。滑車Kは、滑車取付け金具Eの滑車吊下げ板22にUクレビス24を介して吊り下げられる。 In addition, as shown in FIG. 4, in the connection flange portion 2 of the top base rod single member As that constitutes the connection type base rod A, a plurality of pulley mounting brackets E for mounting the pulley K are bolts B 5 and it is mounted with a nut N 5. The pulley attachment bracket E has a total of three plate members as bolts with a pair of left and right pulley suspension plates 22 sandwiched between the vertical plate portions 21a of the pair of bracket plates 21 having a L-shaped cross section. (Not shown) is integrally connected through the horizontal plate portion 21b of each metal fitting plate 21 at a position corresponding to the bolt hole 3 formed in the connecting flange portion 2 of the base rod As alone. A total of four bolt holes 23 are formed. Therefore, as shown in FIG. 4, the horizontal plate portions 21b of the pulley mounting bracket E are placed on the connection flange portion 2 of the uppermost stand rod single member As, and the connection flange portion 2 of the uppermost stand rod single member As is each bolt hole 3, by screwing the bolt B 5 and the nut N 5 that is inserted into the bolt holes 23 of the horizontal plate portion 21b of the pulley mounting brackets E, the upper end portion of the uppermost Taibo alone as Pulley mounting bracket E is mounted. The pulley K is suspended from the pulley suspension plate 22 of the pulley mounting bracket E via the U clevis 24.

コンクリート柱Pの側方に連結式台棒Aを組み付けるには、当該コンクリート柱Pの周囲に足場枠(図示せず)を組んでおき、当該足場枠によって、コンクリート柱Pの上部柱Paの下端部から上端部に向けて、連結固定金具Dを介して台棒単体Asをコンクリート柱Pに連結固定した後に、当該コンクリート柱Pに連結固定された台棒単体Asの上方に別の台棒単体Asを連結する操作を順次繰り返すことで、コンクリート柱Pの側方に連結式台棒Aが所定間隔をおいて組み付けられる。図示の例では、コンクリート柱Pの地上部の長さは、20mであり、台棒単体Asとしては、作業者が一人で取扱うことが可能とすべく、(長さ×外径×肉厚)=(1,300×140×3.5)mmであって、1本当りの重量が23Kgのものを使用した。コンクリート柱Pに対する台棒単体Asの連結固定は、1本おきである。   In order to assemble the connection-type rod A to the side of the concrete column P, a scaffolding frame (not shown) is assembled around the concrete column P, and the lower end of the upper pillar Pa of the concrete column P is assembled by the scaffolding frame. The base rod As is connected and fixed to the concrete column P through the connection fixing bracket D from the head to the upper end, and another base rod alone is fixed above the base rod As connected and fixed to the concrete column P By sequentially repeating the operation of connecting As, the connecting rod A is attached to the side of the concrete column P at a predetermined interval. In the illustrated example, the length of the above-ground part of the concrete column P is 20 m, and the base bar As can be handled by a single worker (length x outer diameter x thickness) = (1, 300 x 140 x 3.5) mm, and a weight of 23 kg per piece was used. The connection fixation of the base bar As to the concrete pillar P is alternately every other.

コンクリート柱Pと連結式台棒Aとの間には、複数の連結固定金具Dが存在していて、ウインチGに連結される吊降し用ワイヤロープR1 は、連結固定金具D(正確には、連結具13)との干渉を回避して配置する必要がある。このため、図2及び図6に示されるように、コンクリート柱Pと連結式台棒Aの各台棒単体Asを結ぶ方向を「X」とした場合に、X方向と直交するY方向に沿って吊降し用ワイヤロープR1 をずらすことで、上記干渉を回避している。即ち、コンクリート柱Pの下部柱Pbにワイヤ61によって当該下部柱PbからY方向に沿って離れた位置に飛滑車62を配置し、吊降し用ワイヤロープR1 を当該飛滑車62に掛装させることで、ウインチGのドラム63との間の吊降し用ワイヤロープR1 を水平に繰り出したり、巻き取る構成にしてある。 A plurality of connection fixing brackets D are present between the concrete column P and the connection type support rod A, and the lifting wire rope R 1 connected to the winch G is a connection fixing bracket D (correctly Should be placed to avoid interference with the connector 13). For this reason, as shown in FIG. 2 and FIG. 6, when the direction connecting the concrete rod P and each base bar As of the connection type base bar A is “X”, it is along the Y direction orthogonal to the X direction. shifting the hanging drop-off wire rope R 1 Te is, thereby avoiding the interference. That is, the wire 61 in the bottom post Pb concrete column P to place the flying sheave 62 at a position apart along the said bottom post Pb in the Y direction, hung the hanging drop-off wire rope R 1 in the flying sheave 62 be to, the hanging drop-off wire rope R 1 or feeding horizontally between the drum 63 of the winch G, are the construction of winding.

コンクリート柱Pの解体前の準備作業として、コンクリート柱Pの周囲に足場枠(図示せず)を組んで、当該足場枠を利用して、図1及び図7(a)に示されるように、コンクリート柱Pの上部柱Paの下端部から上端部に向けて、連結固定金具Dを使用して台棒単体Asをコンクリート柱Pに連結固定した後に、コンクリート柱Pに連結固定された台棒単体Asに別の台棒単体Asを連結する作業を繰り返して、コンクリート柱Pの側方に連結式台棒Aを一体に組付ける。連続した1本棒状に連結された連結式台棒Aを構成する台棒単体Asは、1本おきにコンクリート柱Pに連結固定されている。ここで、図7においては、連結式台棒Aを構成する多数本の台棒単体Asは、最上段から最下段に向けて、符号(As)の後に番号(1) 〜(12)を付して、高さ方向に沿った配置位置に対応した特定の台棒単体Asを識別可能にしてある。最上段の台棒単体As(1) には、滑車取付け金具Eが取付けられ、当該滑車取付け金具Eの一方の滑車吊下げ板22には、Uクレビス24を介して滑車Kが吊り下げられている。   As preparation work before dismantling of the concrete pillar P, a scaffolding frame (not shown) is assembled around the concrete pillar P, and as shown in FIG. 1 and FIG. 7A, using the scaffolding frame, Base rod single body connected and fixed to concrete column P after connecting and fixing base rod As to concrete column P from lower end to upper end of upper column Pa of concrete column P using connecting fixing bracket D Repeat the work of connecting another base bar As to As and assemble the connectable base bar A integrally to the side of the concrete column P. Base rod single members As constituting the continuous rod-like connected connected base rod A are connected and fixed to the concrete pillar P every other rod. Here, in FIG. 7, a large number of base bar single members As that constitute the connectable base bar A are numbered (1) to (12) after the code (As) from the top to the bottom. Thus, it is possible to identify a specific base bar As corresponding to the arrangement position along the height direction. A pulley mounting bracket E is attached to the uppermost stand bar single member As (1), and a pulley K is suspended to one pulley suspension plate 22 of the pulley mounting bracket E via a U clevis 24. There is.

そして、「だるま落し取外し方式」によりコンクリート柱Pの解体を行なうには、図2及び図7(a)に示されるように、最上段の所定長の切断予定短柱部P1'に、チェーンブロック53を締付機54によって強固に締め付けておき、吊降し用ワイヤロープR1 の先端部にUクレビス52を介して連結された玉掛けワイヤ51を前記チェーンブロック53の下方に配置して、当該チェーンブロック53に引っ掛けて、吊下げ可能にしておくと共に、コンクリート柱Pの第1回の切断予定部C1 の直上の部分に振止め用ナイロンロープR2 を引っ掛けておく。この状態で、ウインチGにより、吊降し用ワイヤロープR1 に張力を付与した状態で、エンジン式のコンクリートカッター(図示せず)により、コンクリート柱Pの第1回の切断予定部C1 を切断する。最上段の切断予定短柱部P1'が切断されると、図3に示されるように、第1回の切断済短柱部P1 は、ウインチGによる吊降し用ワイヤロープR1 の繰り出しによって、徐々に下降されて、地上まで吊り降ろされる。 Then, in order to perform the dismantling of the concrete column P by 'potbelly drop removal method ", as shown in FIGS. 2 and FIG. 7 (a), the cut of a predetermined length of the uppermost short bar portion P 1', the chain the block 53 keep firmly clamped by tightening machine 54, and the rigging wire 51 connected via a U clevis 52 to the distal end of the wire rope R 1 for hanging drop-off arranged below the chain block 53, hook on the chain block 53, with advance to allow hanging, previously hooking the Futome nylon ropes R 2 in the 1st part just above the cut portion C 1 of the concrete column P. In this state, the winch G, while applying a tension to the hanging drop-off wire rope R 1, the engine type of the concrete cutter (not shown), the cut portion C 1 of the first part of the concrete column P Disconnect. When the uppermost cutting scheduled short column P 1 ′ is cut, as shown in FIG. 3, the first cut short column P 1 is a wire rope R 1 for lifting with a winch G. It is gradually lowered by the delivery and is lowered to the ground.

次に、図7(a),(b)に示されるように、最上段の台棒単体As(1) に装着されている滑車取付け金具Eを取り外すことなく、そのままにして、最上段の台棒単体As(1) の直下の二段目の台棒単体As(2) を取り外して、最上段の台棒単体As(1) を、新たに最上段の台棒単体As(1) の直下となった三番目の台棒単体As(3) に連結する。これの実現には、足場枠を使用して、最上段及び二段目の各台棒単体As(1) 、As(2) を、それぞれ1本棒状となるように分離させた後に、最上段の台棒単体As(1) と三番目の台棒単体As(3) とを連結して、不要となった二段目の台棒単体As(2) を吊降し用ワイヤロープR1 を使用して地上まで降ろす。なお、連結固定金具Dは、第1及び第2の各金具11,12と連結具13との計3つの部材で構成されているため、台棒単体As(2) と、コンクリート柱Pの連結固定の解除には、第1金具11を構成する一対の金具本体14,14’を分離させるのみで足り、第2金具12、連結具13及び金具本体15は、台棒単体As(2) に連結されたままで、当該台棒単体As(2) を吊り降ろせばよい。 Next, as shown in FIGS. 7 (a) and 7 (b), without removing the pulley attachment bracket E mounted on the uppermost base rod single-piece As (1), the base for the uppermost stage Remove the second-row base rod As (2) directly below the rod single-piece As (1), and place the top-most base rod As (1) just below the top-most base rod As (1) Connect to the third single rod As (3). In order to realize this, using the scaffolding frame, after separating each single base rod As (1) and As (2) of the uppermost row and the second row into a single rod shape, the uppermost row is obtained. Connect the 3rd base rod As (1) and the 3rd base rod As (3) to make the second stage base rod As (2), which is no longer needed, a hanging wire rope R 1 Use it to the ground. In addition, since the connection fixing bracket D is constituted by a total of three members of the first and second brackets 11 and 12 and the connecting tool 13, the connection between the base rod As (2) and the concrete pillar P is performed. In order to release the fixation, it is sufficient to separate the pair of metal fitting bodies 14 and 14 'constituting the first metal fitting 11, and the second metal fitting 12, the connector 13 and the metal fitting body 15 can be mounted on the base rod As (2). While being connected, the base bar As (2) may be suspended.

次に、二段目の切断予定短柱部P2'を切断して吊り降ろすには、図7(b),(c)及び図8(a),(b)に示されるように、上記と同様にして、切断予定短柱部P2'の上端部及び下端部に、それぞれに吊降し用ワイヤロープR1 及び振止め用ナイロンロープR2 を引っ掛けて、吊降し用ワイヤロープR1 に張力が加えられた状態で、二番目の切断予定部C2 の部分で残存コンクリート柱Pを切断した後に、切断済短柱部P2 を地上まで吊り降ろす。ここで、二番目及びこれ以降の切断予定部で切断された切断済短柱部P2 ,P3 ・・の長さ(L12)は、最上段の切断済短柱部P1 の長さ(L11)よりも長くなっているため、二段目の切断済短柱部P2 を地上に吊り降ろした後においては、図7(b)において、最上段の台棒単体As(1) と二段目の台棒単体As(3) との連結を解除すると共に三段目と四段目の各台棒単体As(4) 、As(5) の連結を解除して、吊降し用ワイヤロープR1 を用いて、互いに連結されている各台棒単体As(3),As(4) を纏めて地上に吊り降ろす。なお、図7において、C3 は、残存コンクリート柱Pの三回目の切断予定部を示す。 Next, in order to cut and suspend the second column of the scheduled cutting short column portion P 2 ′, as shown in FIGS. 7 (b), (c) and FIGS. 8 (a), (b), in the same manner as, the upper and lower ends of the cut short pillar portion P 2 ', by hooking the drop-off wire rope R 1 and Futome nylon ropes R 2 hanging in each hanging drop-off wire rope R in a state where tension is applied to 1, after cutting the remaining concrete column P at the portion of the second cut portion C 2, down hanging cut already short pillar portion P 2 to the ground. Here, the length (L 12 ) of the cut short pillars P 2 , P 3 .. cut at the second and subsequent cut scheduled portions is the length of the cut short pillar P 1 of the uppermost row Since it is longer than (L 11 ), after the second cut truncated column portion P 2 is suspended to the ground, in FIG. And release the connection between the second and third base bars As (3) and the third and fourth base bars As (4) and As (5) for suspension. with use wire rope R 1, each base bar alone As (3) which are connected to each other, down hanging on the ground together with As (4). Incidentally, in FIG. 7, C 3 shows the cutting portion of the third time the remaining concrete column P.

以後、上記した操作を反復させて、残存コンクリート柱Pの上部柱Paを所定長ずつ切断することで、その解体を行う。その後に、コンクリート柱Pの下部柱Pbの部分も、上部柱Paと同様にして、側方に連結式台棒Aを組み付けることで、下部柱Paを所定長ずつ切断し、その解体を行う。   Thereafter, the above-described operation is repeated, and the upper column Pa of the remaining concrete column P is cut by a predetermined length to perform dismantling. After that, the lower pillar Pb of the concrete pillar P is also assembled in the same manner as the upper pillar Pa, and the lower pillar Pa is cut by a predetermined length and disassembled by assembling the connecting rod A to the side.

上記した「だるま落し取外し方式」によるコンクリート柱の解体方法は、常に最上段となる特定の台棒単体Asの上端部に滑車取付け金具Eを介して滑車Kが取付けられた状態において、滑車取付け金具Eが取付けられた当該特定の台棒単体Asと、新たに直下となった別の台棒単体Asとを連結するため、台棒単体Asに対する滑車取付け金具Eの着脱操作が不要となって、連結式台棒Aを構成する上部の1ないし複数の台棒単体Asの取外し操作が容易となる。   The dismantling method of the concrete column by the above-mentioned “Daruma dropping and removing method” is the pulley mounting bracket in a state where the pulley K is attached via the pulley mounting bracket E to the upper end of the specific base bar single member As always at the top. In order to connect the specific base bar As attached with E and another base bar As that is newly directly below, the attaching and detaching operation of the pulley mounting bracket E with respect to the base bar As is unnecessary. The removal operation of the upper one or a plurality of base bars As constituting the connectable base bar A becomes easy.

なお、上記した「だるま落し取外し方式」による本発明のコンクリート柱の解体方法の実施例では、全ての切断時に最上段となる台棒単体As(1) には、「順次取外し方式」による本発明のコンクリート柱の解体方法の実施も可能なように、滑車取付け金具Eが着脱可能に取付けられているが、台棒単体As(1) には、滑車取付け金具Eを溶接等により一体に取付けておいて、当該台棒単体As(1) を常時使用するようにしてもよい。   In the embodiment of the dismantling method of the concrete column according to the present invention by the above-mentioned "Daruma dropping and removing method", the base rod As (1) which becomes the uppermost stage at all cutting is the present invention by "sequential removing method". Although the pulley mounting bracket E is detachably mounted so that the method of disassembling the concrete column can be carried out, the pulley mounting bracket E is integrally attached to the base bar As (1) by welding or the like. In addition, the base bar alone As (1) may be used at all times.

また、コンクリート柱Pの解体には、上記した「だるま落し取外し方式」に限られず、連結式台棒Aを構成する台棒単体As(1) 〜As(12)を、最上段から順次取り外す「順次取外し方式」によることも可能である。「順次取外し方式」は、図9に示されるように、コンクリート柱Pの切断毎に、最上段の台棒単体Asに取付けられている滑車取付け金具Eを取り外すと共に、最上段の台棒単体のみ、又は最上段の台棒単体を含む連続する複数の台棒単体を取り外した後に、新たに最上段となった別の台棒単体Asに対して滑車取付け金具Eを装着する方式であり、コンクリート柱Pを切断する毎に、連結式台棒Aを構成する上部の台棒単体Asを取り外す点は同一であるが、取外し対象となる上部の台棒単体Asが異なるのみである。   In addition, the dismantling of the concrete column P is not limited to the above-mentioned "Daruma dropping and removing method", and the base rods As (1) to As (12) constituting the connectable base rod A are sequentially removed from the top It is also possible to use a sequential removal method. In the “sequential removal method”, as shown in FIG. 9, every time the concrete column P is cut, the pulley mounting bracket E attached to the top row single stand rod As is removed, and only the top row single stand rod , Or after removing a plurality of continuous base bars alone including the top base single bar, mounting the pulley mounting bracket E on another base bar As that has become the top new, concrete Every time the pillar P is cut, the upper stand bar single member As constituting the connectable base bar A is removed at the same point, but only the upper stand bar single unit As to be removed is different.

ここで、吊降し中の切断済短柱部P1 ,P2 ・・の荷重は、滑車Kを介して連結式台棒Aに対して軸力又は曲げ力として作用すると共に、コンクリート柱Pに対して連結固定金具Dを介して曲げ力として作用する。コンクリート柱Pに対して連結固定金具Dを構成する第1金具11が滑り落下しないことは、上記した通りであるが、連結式台棒Aを構成する各台棒単体Asに対する連結固定金具Dを構成する第2金具12の固定は、複数本のボルトB3 による台棒単体Asに対する当該第2金具12を構成する一対の金具本体15の締付力に依存しており、万が一、第2金具12に対して台棒単体Asが滑ったとしても、台棒単体Asどうし連結している各連結フランジ部2が、前記第2金具12に当接して止まるので、安全が図られる。 Here, the load of the cut short pillars P 1 , P 2 ... During suspension acts as an axial force or a bending force on the connection type base bar A via the pulley K, and the concrete pillar P Acts as a bending force via the connection fixing bracket D. As described above, the first metal fitting 11 constituting the connecting and fixing bracket D does not slide relative to the concrete column P, but as described above, the connecting and fixing bracket D for each base bar As constituting the connecting type base bar A is used. fixing the second member 12 constituting, depends on the tightening force of the pair of fitting body 15 constituting the second member 12 by a plurality of bolts B 3 for base rod itself As, by any chance, the second fitting Even if the base bar As is slipped with respect to 12, each connecting flange portion 2 connecting the base bar As alone is in contact with the second metal fitting 12 and stops, so safety can be achieved.

また、上記した解体方法では、切断済短柱部P1 ,P2 を地上まで吊り降ろした後において、最上段の台棒単体As(1) の直下の1又は2本の別の台棒単体As(2) 又はAs(3) 及びAs(4) は、取り外して、吊降し用ワイヤロープR1 により地上まで吊り降ろす工法であるが、当該台棒単体As(2) 又はAs(3) 及びAs(4) は、連結式台棒Aを構成する最下段の台棒単体Asに連結して、連結式台棒Aの全長を保持して、コンクリート柱Pの切断毎に、下方に伸ばす工法も可能である。 Further, in the disassembling method described above, after suspending the cut short column portions P 1 and P 2 to the ground, one or two other base bars alone immediately below the base bar single As (1) at the uppermost stage as (2) or as (3) and as (4) is removed and, is a method to unload hanging by a hanger drop-off wire rope R 1 to the ground, the stand rod alone as (2) or as (3) And As (4) are connected to the lowermost support rod As forming the lower end of the connectable support rod A, hold the full length of the connectable support rod A, and extend downward each time the concrete column P is cut. A construction method is also possible.

連結式台棒Aは、複数の台棒単体Asを解除可能に連結した構成であるので、解体対象のコンクリート柱の高さに応じて、最適な長さの台棒を自在に形成できる。また、解体現場への搬入出は、台棒単体Asの状態で行なえるので、その取り扱い、及び保管も容易となる。   Since the connection type rod A is configured to be releasably connected to a plurality of base rod single members As, it is possible to freely form a rod of optimum length according to the height of the concrete column to be disassembled. Moreover, since the loading and unloading to and from the dismantling site can be performed in the state of the single rod As, the handling and storage become easy.

また、本発明の連結式台棒装置の連結式台棒Aを構成する各台棒単体As’の連結は、鋼管本体1の長手方向の両端部に一体に設けられた前記連結フランジ部2によるものに限定されない。例えば、図9に示されるように、連結状態で下方に配置される鋼管本体1’の長手方向の一端部のみに、直下に配置される別の鋼管本体1’の貫通孔部5に、連結フランジ部2’と嵌合筒部6とが一体化されたフランジ付嵌合筒体7の当該嵌合筒部6を嵌合させることで、台棒単体As’どうしをボルト連結することなく、嵌合筒部6の嵌合のみによることも可能であり、これにより、台棒単体As’の連結及びその解除を迅速に行なえる。但し、最上段の滑車Kが取付けられる台棒単体As(1) と、直下の別の台棒単体Asとの各連結フランジ部2のみは、最上段の台棒単体As(1) の回動を防止するために、互いにボルト連結する必要がある。また、台棒単体As’の外径を、配置状態で上端側となる連結フランジ部2のみの部分から、下端側となるフランジ付嵌合筒体7の部分に向けて、外径が漸次大きくなるようなテーパー状にしておくと、台棒単体As’に対して連結固定金具Dを構成する第2金具12が下方にずれなくなって、安全が図られる。   Further, the connection of the base bars As ′ constituting the connectable base bar A of the connectable base bar device of the present invention is achieved by the connecting flange portion 2 integrally provided at both ends of the steel pipe main body 1 in the longitudinal direction. It is not limited to things. For example, as shown in FIG. 9, only one end in the longitudinal direction of the steel pipe body 1 'disposed downward in the connected state is connected to the through hole 5 of another steel pipe body 1' disposed immediately below By fitting the fitting cylindrical portion 6 of the flanged fitting cylindrical body 7 in which the flange portion 2 ′ and the fitting cylindrical portion 6 are integrated, the base bars As ′ are not bolted to each other. It is also possible to use only the fitting of the fitting cylindrical portion 6, whereby the connection and release of the base bar As' can be performed quickly. However, only the connecting flange portion 2 between the base bar As (1) to which the uppermost pulley K is attached and another base bar As immediately below is the pivoting of the base rod As (1) on the uppermost stage. In order to prevent this, it is necessary to bolt together. In addition, the outer diameter of the base rod simple substance As' is gradually increased from the portion of the connection flange portion 2 which is the upper end side in the arrangement state toward the portion of the flanged fitting cylinder 7 which is the lower end side. With such a tapered shape, the second metal fitting 12 constituting the connecting and fixing metal fitting D does not shift downward with respect to the base rod single body As ′, and safety can be achieved.

また、コンクリート柱Pと、その側方に垂直に配置される連結式台棒Aを構成する各台棒単体Asとを連結する連結固定具金具Dに関しても、コンクリート柱Pと各台棒単体Asとが解除可能に連結固定されれば足り、当然に上記構造のものに限定されない。例えば、連結固定金具Dを構成する二分割構造の第1及び第2の各金具11,12に関しては、一対の金具本体14,14’(15,15’)の周方向の一端部をヒンジ連結して、他端部を、締結した直前に最大締付力が発生する「トグル機構」を使用した「締付機」が解除可能に連結する構造であってもよく、この構造により、コンクリート柱P及び台棒単体Asに対する第1及び第2の各金具11,12の着脱を迅速に行なえる利点がある。   In addition, with regard to the connection fixture fitting D for connecting the concrete column P and each base rod As constituting the joint type rod A vertically disposed on the side, the concrete column P and each base rod As is also used. It is sufficient if and is releasably connected and fixed, and naturally, it is not limited to the above structure. For example, with regard to the first and second brackets 11 and 12 of the two-part structure constituting the connection fixing bracket D, the one end portion in the circumferential direction of the pair of bracket main bodies 14 and 14 '(15 and 15') is hinged The other end may be configured to releasably connect a "clamping machine" using a "toggle mechanism" that generates a maximum clamping force immediately before fastening the other end. There is an advantage that the first and second brackets 11 and 12 can be quickly attached to and detached from P and the base bar As alone.

なお、上記したコンクリート柱Pは、地上部の高さが15〜20mの送電用のものであるが、本発明は、地上部の高さが、これよりも低い配電用のコンクリート柱の解体にも実施可能である。   In addition, although the above-mentioned concrete pillar P is for power transmission of 15-20 m in height of the ground part, this invention is for the dismantling of the concrete pillar for power distribution whose height of the ground part is lower than this. Is also feasible.

A:連結式台棒
As,As’:台棒単体
1 〜C3 :コンクリート柱の切断予定部
D:連結固定金具
E:滑車取付け金具
G:ウインチ
P:コンクリート柱
1 〜P3 :コンクリート柱の切断済短柱部
1'〜P3':コンクリート柱の切断予定短柱部
Pa:コンクリート柱の上部柱
Pb:コンクリート柱の下部柱
1 :吊降し用ワイヤロープ
2 :振止め用ナイロンロープ
1,1’:鋼管本体
2:連結フランジ部
11:連結固定金具の第1金具
12:連結固定金具の第2金具
13:連結固定金具の連結具
14,14’:第1金具の金具本体
15,15’:第2金具の金具本体
21:滑車取付け金具の金具板
22:滑車取付け金具の滑車吊下げ板
A: articulated rod As, As': single rod C 1 to C 3 : cut intended part of concrete column
D: Coupling bracket
E: Pulley mounting bracket
G: winch
P: concrete column P 1 to P 3 : cut short column part of concrete column P 1 'to P 3 ': short column part to be cut of concrete column
Pa: upper column of concrete column
Pb: Lower column of concrete column
R 1 : Wire rope for lifting
R 2 : Nylon rope for anti-vibration
1, 1 ': steel pipe body
2: Connection flange
11: The first fitting of the connection fixing bracket
12: Second fitting of connection fixing bracket
13: Connecting tool of connection fixing bracket 14, 14 ': Bracket body of first bracket 15, 15': Bracket body of second bracket
21: Bracket plate for pulley mounting bracket
22: Pulley suspension plate of pulley mounting bracket

Claims (4)

コンクリート柱を上端部から所定長ずつ順次切断して、滑車装置とワイヤロープを用いて、切断済短柱部を地上まで吊り降ろすことで、コンクリート柱を解体する方法であって、
短パイプ状の多数本の台棒単体の全て又は特定の台棒単体のみを連結固定金具を介して前記コンクリート柱に連結すると共に、相上下する各台棒単体を互いに分離可能に連結することで、当該コンクリート柱の側方に連結式台棒を一体に組み付けて、最上段の滑車取付け用の台棒単体の上端部に滑車を一体に取付け、
最上段の台棒単体に一体に取付けられた前記滑車に掛装した吊降し用ワイヤロープを、前記コンクリート柱の切断予定短柱部の上端部に巻き掛けた状態で、当該切断予定短柱部を切断して、前記滑車、吊降し用ワイヤロープ及び地上に設置したウインチを用いて、地上まで吊り降ろした後に、
滑車が取付けられた最上段の台棒単体の直下の1ないし複数の台棒単体を取り外して、滑車が取付けられた最上段の台棒単体を、新たに直下となった別の台棒単体に連結して、切断途中の残存コンクリート柱の上端部の切断予定短柱部を、上記と同様にして切断して、切断済短柱部を地上まで吊り降ろす操作を繰り返すことを特徴とするコンクリート柱の解体方法。
A concrete pillar is disassembled by cutting a concrete pillar sequentially from the upper end by a predetermined length and suspending the cut short pillar portion to the ground using a pulley apparatus and a wire rope.
By connecting all of the short pipe-like multiple base rods alone or only a specific base rod alone to the concrete column via the connection fixing bracket, the base rods moving up and down are connected to each other in a detachable manner. , Attaching the link-type rod integrally to the side of the concrete column, and integrally attaching the pulley to the upper end of the single rod for attachment of the topmost pulley;
The wire rod for suspension hung on the above-mentioned pulley integrally attached to the base rod single-piece of the top step is wound on the upper end portion of the short rod portion to be cut of the concrete column. After being cut off and using the pulleys, wire ropes for lifting and a winch installed on the ground,
Remove one or more base bars directly under the top base bar on which the pulley is mounted and remove the top base bar on which the pulley is mounted into another base bar that is newly directly below A concrete column characterized by repeating the operation of cutting and cutting the short cross section portion of the upper end portion of the remaining concrete column in the middle of cutting in the same manner as described above and suspending the cut short cross section to the ground. Dismantling method.
コンクリート柱を上端部から所定長ずつ順次切断して、滑車装置とワイヤロープを用いて、切断済短柱部を地上まで吊り降ろすことで、コンクリート柱を解体する方法であって、
短パイプ状の多数本の台棒単体の全て又は特定の台棒単体のみを連結固定金具を介して前記コンクリート柱に連結すると共に、相上下する各台棒単体を互いに分離可能に連結することで、当該コンクリート柱の側方に連結式台棒を一体に組み付けて、最上段の台棒単体に、滑車を取付けるための滑車取付け金具を着脱可能にして取付け、
最上段の台棒単体に滑車取付け金具を介して取付けられた前記滑車に掛装した吊降し用ワイヤロープを、前記コンクリート柱の切断予定短柱部の上端部に巻き掛けた状態で、当該切断予定短柱部を切断して、前記滑車、吊降し用ワイヤロープ及び地上に設置したウインチを用いて、地上まで吊り降ろした後に、
最上段の台棒単体に取付けられた滑車取付け金具を取り外すと共に、最上段の台棒単体を含む1ないし複数の台棒単体を取り外して、新たに最上段となった別の台棒単体に滑車取付け金具を介して滑車を取付けることで、切断途中の残存コンクリート柱の上端部の切断予定短柱部を、上記と同様にして切断して、切断済短柱部を地上まで吊り降ろす操作を繰り返すことを特徴とするコンクリート柱の解体方法。
A concrete pillar is disassembled by cutting a concrete pillar sequentially from the upper end by a predetermined length and suspending the cut short pillar portion to the ground using a pulley apparatus and a wire rope.
By connecting all of the short pipe-like multiple base rods alone or only a specific base rod alone to the concrete column via the connection fixing bracket, the base rods moving up and down are connected to each other in a detachable manner. , Attaching the link-type base rod integrally to the side of the concrete column, and attaching the pulley mounting bracket for mounting the pulley to the single top-most base rod so as to be removable
The wire rope for suspension hung on the pulley and attached to the base rod alone at the uppermost stage via the pulley mounting bracket is wound on the upper end portion of the short cross section to be cut of the concrete column, After cutting off the short column to be cut and using the pulley, wire rope for lifting and a winch installed on the ground, and after lifting to the ground,
While removing the pulley mounting bracket attached to the top row single rod, removing one or more single row rods including the top row single rod, and taking the new top row single rod as a separate single row rod By attaching the pulley through the mounting bracket, the short pillar portion to be cut at the upper end of the remaining concrete column in the middle of cutting is cut in the same manner as described above, and the operation of suspending the cut short pillar portion to the ground is repeated. How to dismantle a concrete column characterized by
多数本の台棒単体は、その全て、又は特定の台棒単体のみを連結固定金具を介してコンクリート柱に連結固定しながら、下方から上方に向けて順次連結することを特徴とする請求項1又は2に記載のコンクリート柱の解体方法。   A large number of base bars alone are connected sequentially from the bottom to the top while connecting and fixing all of them or only a specific base bar alone to a concrete column via a connection fixing bracket. Or the dismantling method of the concrete pillar as described in 2. 請求項1又は2に記載のコンクリート柱の解体方法の実施に使用される連結式台棒装置であって、
短パイプ状の多数の台棒単体が長手方向に沿って分離可能に連結された連結式台棒と、
当該連結式台棒を構成する各台棒単体を前記コンクリート柱に解除可能に連結するための多数の連結固定金具と、
前記連結式台棒を構成する最上段の台棒単体に滑車を取付けるための滑車取付け金具と、
を備えていることを特徴とする連結式台棒装置。
It is a connection type stick apparatus used for implementation of the dismantling method of the concrete pillar of Claim 1 or 2, Comprising:
A connecting-type rod in which a plurality of short-pipe-like base rods are separably connected along the longitudinal direction;
A large number of connection fixing brackets for releasably connecting each base bar constituting the connecting type base bar to the concrete column;
A sheave mounting bracket for mounting a sheave on a single top bar alone constituting the articulated bar;
An articulated-type stick device characterized in that it comprises:
JP2015186241A 2015-09-24 2015-09-24 Method of dismantling a concrete column, and articulated rod device Active JP6529874B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2015186241A JP6529874B2 (en) 2015-09-24 2015-09-24 Method of dismantling a concrete column, and articulated rod device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2015186241A JP6529874B2 (en) 2015-09-24 2015-09-24 Method of dismantling a concrete column, and articulated rod device

Publications (2)

Publication Number Publication Date
JP2017061774A JP2017061774A (en) 2017-03-30
JP6529874B2 true JP6529874B2 (en) 2019-06-12

Family

ID=58429373

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2015186241A Active JP6529874B2 (en) 2015-09-24 2015-09-24 Method of dismantling a concrete column, and articulated rod device

Country Status (1)

Country Link
JP (1) JP6529874B2 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114197942B (en) * 2020-09-18 2024-05-28 国网江苏省电力有限公司徐州供电分公司 Portable electric power concrete pole support

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4986687A (en) * 1989-05-18 1991-01-22 Ivey Don L AD-IV breakaway system for timber utility poles
JPH09256583A (en) * 1996-03-19 1997-09-30 Astec:Kk Jointing method of louver in extension type spiral stair
JP2002061420A (en) * 2000-08-14 2002-02-28 Saito Denki:Kk Device for erecting and recovering temporary utility pole
JP3889357B2 (en) * 2002-12-25 2007-03-07 関西電力株式会社 Concrete pole lifting base device and concrete column cutting and recovery method using the same
JP6080361B2 (en) * 2012-01-23 2017-02-15 株式会社永島製作所 Junction structure

Also Published As

Publication number Publication date
JP2017061774A (en) 2017-03-30

Similar Documents

Publication Publication Date Title
JP2014074304A (en) Hanger device, top end positioning tool for reinforcement cage, hanging method for reinforcement cage, and erecting method for reinforcement cage
CN103470093B (en) Concrete chimney dismantling method
KR101457114B1 (en) Pre-fabrication method for steel reinforcement
KR20120046667A (en) Device for sling pile
JP2018003509A (en) Floor slab unit, floor slab basic assembly method and construction method of floor
CN110902549A (en) Self-balancing tool system and PC component hoisting method applying same
JP3181041U (en) Mounting member for scaffolding for bridge
JP2009108473A (en) Hanging scaffold erection method for elevated structure
JP6529874B2 (en) Method of dismantling a concrete column, and articulated rod device
JP2018204194A (en) Method of reinforcement construction for caisson type pile and its lifting jig
JP3144708U (en) Reinforcing bar temporary fixing device
JP2012219551A (en) Scaffold device for cylindrical structure and movement method of the same
JP5339826B2 (en) Scaffolding for transmission tower
JP5075398B2 (en) Construction method of tower-like PC structure and tension system device
CN209815482U (en) Overhead hoist of aerated block
JP4001332B2 (en) Chimney demolition scaffold device and chimney demolition method using the device
JP2009221763A (en) Reinforcement assembling apparatus and reinforcement assembling method
JP5948828B2 (en) Lifting device used for assembling cargo lift for building demolition work, cargo lift for building demolition work, and assembling method thereof
JP4695475B2 (en) Work jig for steel tower dismantling
JP6309153B1 (en) Connecting suspension bracket
JP2018123608A (en) Hanging-down removal device of tunnel ceiling part concrete matter
JP4017143B2 (en) Shaft rebar assembly method and assembly apparatus
JP4372674B2 (en) Dismantling method of ultra-high cylindrical structure
JP2004076256A6 (en) Chimney demolition scaffold device and chimney demolition method using the device
JP7152045B2 (en) How to dismantle suspended structures

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20180305

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20181226

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20190115

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20190123

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20190514

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20190515

R150 Certificate of patent or registration of utility model

Ref document number: 6529874

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250