JP6428435B2 - Transportation plan creation device and transportation plan creation method - Google Patents

Transportation plan creation device and transportation plan creation method Download PDF

Info

Publication number
JP6428435B2
JP6428435B2 JP2015070115A JP2015070115A JP6428435B2 JP 6428435 B2 JP6428435 B2 JP 6428435B2 JP 2015070115 A JP2015070115 A JP 2015070115A JP 2015070115 A JP2015070115 A JP 2015070115A JP 6428435 B2 JP6428435 B2 JP 6428435B2
Authority
JP
Japan
Prior art keywords
hot metal
plan
transport
transportation
plan creation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2015070115A
Other languages
Japanese (ja)
Other versions
JP2016191974A (en
Inventor
吉成 有介
有介 吉成
佳也 橋本
佳也 橋本
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
JFE Steel Corp
Original Assignee
JFE Steel Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by JFE Steel Corp filed Critical JFE Steel Corp
Priority to JP2015070115A priority Critical patent/JP6428435B2/en
Publication of JP2016191974A publication Critical patent/JP2016191974A/en
Application granted granted Critical
Publication of JP6428435B2 publication Critical patent/JP6428435B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/02Total factory control, e.g. smart factories, flexible manufacturing systems [FMS] or integrated manufacturing systems [IMS]

Landscapes

  • General Factory Administration (AREA)
  • Refinement Of Pig-Iron, Manufacture Of Cast Iron, And Steel Manufacture Other Than In Revolving Furnaces (AREA)

Description

本発明は、輸送計画作成装置及び輸送計画作成方法に関し、特に、高炉、溶銑予備処理等を行うための中間処理設備、及び製鋼工場を備える一貫製鉄所における、溶銑の輸送計画作成装置及び輸送計画作成方法に関するものである。   TECHNICAL FIELD The present invention relates to a transportation plan creation device and a transportation plan creation method, and in particular, a hot metal transportation plan creation device and a transportation plan in an integrated steelworks equipped with a blast furnace, intermediate treatment equipment for performing hot metal preliminary treatment, and a steelmaking factory. It relates to the creation method.

高炉、中間処理設備及び製鋼工場を備える一貫製鉄所において、溶銑の輸送は、いわゆるトピードカーと呼ばれる溶銑輸送用の台車(以下「輸送台車」という)によって行われている。高炉から出銑された溶銑は、輸送台車で受銑され、ディーゼル機関車等の車両に牽引されて、直接又は1つ以上の中間処理設備を経由して、製鋼工場に輸送される。そして、溶銑は、製鋼工場内で輸送台車から払い出される。溶銑を払い出して空になった輸送台車は、直接又は台車のクリーニング等を行う中間処理設備を経由して、高炉に回送される。   In an integrated steelworks equipped with a blast furnace, an intermediate treatment facility, and a steelmaking factory, the hot metal is transported by means of a hot metal transport cart (hereinafter referred to as “transport cart”) called a so-called topped car. The hot metal discharged from the blast furnace is received by a transport cart, pulled by a vehicle such as a diesel locomotive, and transported directly or via one or more intermediate processing facilities to a steel mill. The hot metal is then dispensed from the transport cart within the steelmaking factory. The transport cart, which has been emptied after the hot metal is dispensed, is forwarded to the blast furnace directly or via an intermediate processing facility for cleaning the cart.

例えば、特許文献1及び特許文献2には、高炉から製鋼工場までの輸送を計画する際に適用可能な輸送計画作成方法が開示されている。   For example, Patent Literature 1 and Patent Literature 2 disclose a transportation plan creation method applicable when planning transportation from a blast furnace to a steelmaking factory.

特開2005−330508号公報JP 2005-330508 A 特開2007−018083号公報JP 2007-018083 A

ここで、高炉からは溶銑が切れ目なく出銑されているため、高炉には常に輸送台車が待機していることが必要である。また、各製鋼工場に対しては、加工後の製品及び出鋼量等の出鋼計画に応じて、要求される溶銑量及び成分等の条件を満たすように溶銑の処理を行った上で、溶銑を供給することが必要である。通常、製鉄所内における輸送台車及び車両等の使用可能なリソースは限られているため、限られたリソースの範囲内で、高炉の出銑予定(出銑量)及び製鋼工場の出鋼計画に合わせた溶銑の輸送計画を作成することが求められる。   Here, since the hot metal is continuously discharged from the blast furnace, it is necessary that the transport cart is always waiting for the blast furnace. Also, for each steelmaking factory, after processing the hot metal to satisfy the required hot metal amount and composition, etc., according to the steel production plan such as the processed product and the amount of steel produced, It is necessary to supply hot metal. Usually, the resources that can be used, such as transportation carts and vehicles, are limited within the steelworks, so within the limited resources, it is in line with the planned blast furnace output (the amount of output) and the steelworks production plan. It is required to prepare a hot metal transportation plan.

しかしながら、特許文献1及び特許文献2に開示された発明では、輸送台車の高炉への回送については考慮されていない。また、輸送計画作成にあたり、輸送台車及び車両が走行する経路、並びに各設備同士の干渉等について、十分に考慮されているとは言い難い。   However, in the inventions disclosed in Patent Document 1 and Patent Document 2, the transport carriage to the blast furnace is not considered. Moreover, it is difficult to say that in the preparation of a transportation plan, sufficient consideration has been given to the route along which the transportation carriage and the vehicle travel, interference between the facilities, and the like.

本発明は、上記に鑑みてなされたものであり、高炉の出銑予定及び製鋼工場の出鋼計画に合わせた輸送計画を作成可能な、溶銑の輸送計画作成装置及び輸送計画作成方法を提供することを目的とする。   The present invention has been made in view of the above, and provides a hot metal transport plan creation device and a transport plan creation method capable of creating a transport plan in accordance with a blast furnace plan and a steel mill plan. For the purpose.

上記課題を解決するために、本発明の一実施形態に係る輸送計画作成装置は、
1基以上の高炉と、1か所以上の溶銑の中間処理を行う中間処理設備と、1か所以上の製鋼工場を備える一貫製鉄所における複数の輸送台車による溶銑の輸送計画を作成する輸送計画作成装置であって、
前記輸送台車が前記高炉から出銑された前記溶銑を前記製鋼工場まで輸送する際に通過する輸送通過工程に関する溶銑輸送計画であって、前記製鋼工場の出鋼計画に基づいて要求される成分の溶銑を要求される時刻に前記輸送台車から前記製鋼工場に払い出し可能となる溶銑輸送計画を作成する溶銑輸送計画作成部と、
前記溶銑輸送計画作成部が作成した前記溶銑輸送計画に基づいて、前記輸送台車と、該輸送台車が前記溶銑を払い出す製鋼工場とを紐付ける溶銑払出計画を作成する溶銑払出計画作成部と、
前記溶銑輸送計画作成部が作成した前記溶銑輸送計画と、前記溶銑払出計画作成部が作成した前記溶銑払出計画とに基づき、前記輸送台車が前記溶銑を払い出して空車となる時刻を決定するとともに、前記空車となった前記輸送台車が前記高炉に回送される際に通過する回送通過工程に関する回送計画を含む全体計画であって、前記高炉の出銑予定に基づいて要求される時刻に前記空車となった前記輸送台車が受銑可能となる全体計画を作成して、該全体計画を前記輸送計画と決定する全体計画作成部とを備える。
In order to solve the above-mentioned problem, a transportation plan creation device according to an embodiment of the present invention,
Transportation plan to create a transportation plan for hot metal with multiple transport carts in an integrated steelworks with one or more blast furnaces, intermediate processing equipment for intermediate processing of one or more hot metal, and one or more steel mills A creation device,
It is a hot metal transport plan related to a transport passage process that passes when the transport cart transports the hot metal extracted from the blast furnace to the steelmaking factory, and includes components required based on the steelmaking plan of the steelmaking factory. A hot metal transport plan creation unit for creating a hot metal transport plan that can be paid out from the transport cart to the steelmaking factory at the time when hot metal is required;
Based on the hot metal transport plan created by the hot metal transport plan creating unit, a hot metal payout plan creating unit for creating a hot metal payout plan that links the transport cart and a steelmaking factory from which the transport cart delivers the hot metal,
Based on the hot metal transport plan created by the hot metal transport plan creation unit and the hot metal delivery plan created by the hot metal delivery plan creation unit, the transport cart pays out the hot metal and becomes empty. It is an overall plan including a forwarding plan relating to a forwarding passage process that passes when the transport carriage that has become the empty vehicle is forwarded to the blast furnace, and the empty vehicle and the empty vehicle at a time required based on the schedule of the blast furnace. An overall plan creation unit that creates an overall plan that can be received by the transport cart, and determines the overall plan as the transport plan.

また、本発明の一実施形態に係る輸送計画作成装置において、
前記溶銑輸送計画作成部は、制約条件付き最適化問題として定式化することにより、前記溶銑輸送計画を作成し、
前記溶銑払出計画作成部は、制約条件付き最適化問題として定式化することにより、前記溶銑払出計画を作成し、
前記全体計画作成部は、制約充足問題として定式化することにより、前記全体計画を作成する。
Moreover, in the transportation plan creation device according to an embodiment of the present invention,
The hot metal transport plan creation unit creates the hot metal transport plan by formulating as an optimization problem with constraints,
The hot metal payout plan creation unit prepares the hot metal payout plan by formulating it as an optimization problem with constraints,
The overall plan creation unit creates the overall plan by formulating it as a constraint satisfaction problem.

また、本発明の一実施形態に係る輸送計画作成装置において、
前記溶銑輸送計画作成部は、前記輸送台車が前記高炉から前記製鋼工場まで移動するに際して通過する前記輸送通過工程における各工程の干渉状態を、前記最適化問題の制約条件として使用し、
前記全体計画作成部は、前記輸送台車の前記回送に際して通過する前記回送通過工程における各工程の干渉状態を、前記制約充足問題の制約条件として使用する。
Moreover, in the transportation plan creation device according to an embodiment of the present invention,
The hot metal transport plan creation unit uses the interference state of each process in the transport passage process that passes when the transport cart moves from the blast furnace to the steelmaking factory as a constraint condition of the optimization problem,
The overall plan creation unit uses an interference state of each process in the forwarding passage process that passes during the forwarding of the transport carriage as a constraint condition of the constraint satisfaction problem.

また、本発明の一実施形態に係る輸送計画作成装置において、
前記全体計画作成部が前記制約充足問題の前記制約条件を満たす解が導出できない場合、作成した前記輸送計画に関する前記輸送通過工程及び前記回送通過工程とは異なる輸送通過工程及び回送通過工程について、前記輸送計画の作成処理を再度実行する。
Moreover, in the transportation plan creation device according to an embodiment of the present invention,
When the overall plan creation unit cannot derive a solution that satisfies the constraint condition of the constraint satisfaction problem, the transport passage step and the forwarding passage step different from the transportation passage step and the forwarding passage step related to the created transportation plan, Run the transportation plan creation process again.

また、本発明の一実施形態は、上述した装置に実質的に相当する方法としても実現し得るものであり、本発明の範囲にはこれらも包含されるものと理解されたい。   Further, it should be understood that one embodiment of the present invention can be realized as a method substantially corresponding to the above-described apparatus, and these are also included in the scope of the present invention.

例えば、本発明の一実施形態に係る輸送計画作成方法は、
1基以上の高炉と、1か所以上の溶銑の中間処理を行う中間処理設備と、1か所以上の製鋼工場を備える一貫製鉄所における複数の輸送台車による溶銑の輸送計画を作成する輸送計画作成方法であって、
前記輸送台車が前記高炉から出銑された前記溶銑を前記製鋼工場まで輸送する際に通過する輸送通過工程に関する溶銑輸送計画であって、前記製鋼工場の出鋼計画に基づいて要求される成分の溶銑を要求される時刻に前記輸送台車から前記製鋼工場に払い出し可能となる溶銑輸送計画を作成する溶銑輸送計画作成ステップと、
前記溶銑輸送計画作成ステップにおいて作成された前記溶銑輸送計画に基づいて、前記輸送台車と、該輸送台車が前記溶銑を払い出す製鋼工場とを紐付ける溶銑払出計画を作成する溶銑払出計画作成ステップと、
前記溶銑輸送計画作成ステップにおいて作成された前記溶銑輸送計画と、前記溶銑払出計画作成ステップにおいて作成された前記溶銑払出計画とに基づき、前記輸送台車が前記溶銑を払い出して空車となる時刻を決定するとともに、前記空車となった前記輸送台車が前記高炉に回送される際に通過する回送通過工程に関する回送計画を含む全体計画であって、前記高炉の出銑予定に基づいて要求される時刻に前記空車となった前記輸送台車が受銑可能となる全体計画を作成して、該全体計画を前記輸送計画と決定する全体計画作成ステップとを含む。
For example, a transportation plan creation method according to an embodiment of the present invention is:
Transportation plan to create a transportation plan for hot metal with multiple transport carts in an integrated steelworks with one or more blast furnaces, intermediate processing equipment for intermediate processing of one or more hot metal, and one or more steel mills A creation method,
It is a hot metal transport plan related to a transport passage process that passes when the transport cart transports the hot metal extracted from the blast furnace to the steelmaking factory, and includes components required based on the steelmaking plan of the steelmaking factory. A hot metal transport plan creating step for creating a hot metal transport plan that can be paid out from the transport cart to the steelmaking factory at a time when hot metal is required;
Based on the hot metal transport plan created in the hot metal transport plan creating step, a hot metal discharge plan creating step for creating a hot metal payout plan for associating the transport cart with a steelmaking factory from which the transport cart delivers the hot metal, and ,
Based on the hot metal transportation plan created in the hot metal transportation plan creation step and the hot metal delivery plan created in the hot metal delivery plan creation step, the time at which the transport carriage dispenses the hot metal and becomes empty is determined. And an overall plan including a forwarding plan related to a forwarding passage process that passes when the transport carriage that has become the empty vehicle is forwarded to the blast furnace, and at a time required based on a schedule of the blast furnace An overall plan creating step of creating an overall plan that allows the transport cart that has become empty to be accepted, and determining the overall plan as the transport plan.

本発明の一実施形態に係る輸送計画作成装置及び輸送計画作成方法によれば、高炉の出銑予定及び製鋼工場の出鋼計画に合わせた輸送計画を作成可能である。   According to the transportation plan creation device and the transportation plan creation method according to an embodiment of the present invention, it is possible to create a transportation plan that matches the blast furnace's tapping schedule and the steelmaking plant's tapping plan.

溶銑の輸送設備の一例を示す概念図である。It is a conceptual diagram which shows an example of the hot metal transport equipment. 本発明の一実施形態に係る輸送計画作成装置を含む輸送計画作成システムの概略構成を示す機能ブロック図である。It is a functional block diagram which shows schematic structure of the transportation plan preparation system containing the transportation plan preparation apparatus which concerns on one Embodiment of this invention. 輸送台車の高炉から製鋼工場までの輸送通過工程のパターンの例を示す図である。It is a figure which shows the example of the pattern of the transport passage process from the blast furnace of a transport trolley to a steelmaking factory. 1つの工程に複数の輸送台車が存在する場合を模式的に示す図である。It is a figure showing typically the case where a plurality of transportation carts exist in one process. 図2の全体計画作成部が作成する全体計画のパターンの例を示す図である。It is a figure which shows the example of the pattern of the whole plan which the whole plan preparation part of FIG. 2 produces. 図2の輸送計画作成装置による輸送計画の作成手順の一例を示すフローチャートである。It is a flowchart which shows an example of the preparation procedure of the transportation plan by the transportation plan preparation apparatus of FIG. 表示部に表示される輸送計画の一例を示す図である。It is a figure which shows an example of the transportation plan displayed on a display part.

以下、本発明にかかる一実施形態について、図面を参照して詳細に説明する。   Hereinafter, an embodiment according to the present invention will be described in detail with reference to the drawings.

図1は、製鉄所内における溶銑の輸送設備の一例を示す概念図である。図1に示すように、溶銑輸送設備100は、高炉(高炉1から高炉N)110と、前除滓設備(前除滓設備1から前除滓設備K)120と、溶銑予備処理設備(溶銑予備処理設備1から溶銑予備処理設備M)130と、後除滓設備(後除滓設備1から後除滓設備L)140と、製鋼工場(製鋼工場1から製鋼工場O)150と、クリーニングセンタ(クリーニングセンタ1からクリーニングセンタP)160とを備える、一貫製鉄所内に設けられた設備である。溶銑輸送設備100は、例えば工場の規模及び生産能力等に応じて、高炉110、前除滓設備120、溶銑予備処理設備130、後除滓設備140、製鋼工場150及びクリーニングセンタ160等の各設備を、それぞれ複数備えていてもよく、図1は、これらの各設備を、全て複数備える溶銑輸送設備100を示している。なお、以下、本明細書において、前除滓設備120、溶銑予備処理設備130及び後除滓設備140をまとめて中間処理設備ともいい、中間処理設備が行う除滓処理及び溶銑予備処理等をまとめて中間処理ともいう。   FIG. 1 is a conceptual diagram showing an example of hot metal transport equipment in an ironworks. As shown in FIG. 1, the hot metal transport facility 100 includes a blast furnace (blast furnace 1 to blast furnace N) 110, a prior removal equipment (pre-treatment equipment 1 to pre-treatment equipment K) 120, and a hot metal preliminary treatment equipment (hot metal). Pretreatment equipment 1 to hot metal pretreatment equipment M) 130, post removal equipment (post removal equipment 1 to post removal equipment L) 140, steelmaking factory (steelmaking factory 1 to steelmaking factory O) 150, and cleaning center (Cleaning center 1 to cleaning center P) 160 and provided in the integrated steelworks. The hot metal transporting equipment 100 includes, for example, each equipment such as a blast furnace 110, a pre-metal removal equipment 120, a hot metal pretreatment equipment 130, a post-metal removal equipment 140, a steelmaking factory 150, a cleaning center 160, etc. according to the scale and production capacity of the factory. A plurality of these may be provided, and FIG. 1 shows a hot metal transport facility 100 including a plurality of these facilities. Hereinafter, in the present specification, the pre-metal removal equipment 120, the hot metal preliminary treatment equipment 130, and the post-metal removal equipment 140 are collectively referred to as an intermediate treatment equipment, and the steel removal treatment and the hot metal preliminary treatment performed by the intermediate treatment equipment are summarized. Also called intermediate processing.

溶銑輸送設備100は、溶銑を輸送するトピードカー等の輸送台車170と、輸送台車170を連結することによって牽引する機関車等の車両171とを備える。また、溶銑輸送設備100は、輸送台車170及び車両171が、高炉110、前除滓設備120、溶銑予備処理設備130、後除滓設備140、製鋼工場150及びクリーニングセンタ160等の各設備を、この順序で巡回できるように配設された線路を備える。各設備間をつなぐ線路は、複数設けられていてもよい。すなわち、輸送台車170及び車両171は、複数の線路(経路)のうち、いずれか1つの経路を通って、各設備間を移動する。溶銑輸送設備100は、輸送台車170及び車両171が、いずれかの設備を経由せずに巡回できるように配設された、迂回するための線路(迂回路)を備えていてもよい。図1では、高炉110から、中間処理設備を経由せずに、製鋼工場150へ直接移動可能な迂回路と、製鋼工場150から、クリーニングセンタ160を経由せずに、高炉110に直接移動可能な迂回路とが示されている。   The hot metal transport facility 100 includes a transport cart 170 such as a topped car that transports the hot metal, and a vehicle 171 such as a locomotive that is pulled by connecting the transport cart 170. In addition, the hot metal transport facility 100 includes a transport cart 170 and a vehicle 171 that are equipped with a blast furnace 110, a pre-heat removal equipment 120, a hot metal preliminary treatment equipment 130, a post-heat removal equipment 140, a steelmaking factory 150, a cleaning center 160, and the like. Lines are provided so that they can be visited in this order. A plurality of lines connecting the facilities may be provided. That is, the transport carriage 170 and the vehicle 171 move between the facilities through any one of the plurality of tracks (routes). The hot metal transport facility 100 may include a detour line (a detour) arranged so that the transport cart 170 and the vehicle 171 can circulate without going through any of the facilities. In FIG. 1, a detour that can be directly moved from the blast furnace 110 to the steelmaking factory 150 without going through an intermediate processing facility, and a moveable directly from the steelmaking factory 150 to the blast furnace 110 without going through the cleaning center 160. A detour is shown.

ここで、輸送台車170が迂回路を使用せずに全ての設備を経由する場合における溶銑の輸送の流れについて説明する。まず、輸送台車170は、高炉110において出銑される溶銑を受銑する。前除滓設備120では、輸送台車170に受銑された溶銑のスラグを除去する処理が行われる。次に、溶銑予備処理設備130において、溶銑の成分調整のために、溶銑に含まれるケイ素及びリン等の不純物を取り除く処理が行われる。そして、後除滓設備140において、成分調整後の溶銑のスラグを除去する処理が行われる。中間処理設備で除滓処理及び成分調整処理が行われた溶銑は、製鋼工場150へ輸送されて、製鋼工場150で払い出される。溶銑を払い出した輸送台車170は、その内部を清掃するクリーニングセンタ160を経由して、高炉110に戻る。輸送台車170は、この巡回を繰り返す。 Here, the flow of the hot metal transport in the case where the transport carriage 170 passes through all the facilities without using the detour will be described. First, the transport carriage 170 receives the hot metal output from the blast furnace 110. In the front removal equipment 120, the process which removes the slag of the hot metal received by the transport cart 170 is performed. Next, in the hot metal preliminary treatment facility 130, a process of removing impurities such as silicon and phosphorus contained in the hot metal is performed in order to adjust the components of the hot metal. And in the post removal equipment 140, the process which removes the slag of the hot metal after a component adjustment is performed. Pig iron skimming process and composition adjustment processing in the intermediate processing facility and transported to the steelmaking plant 150, it is paid out in steel mill 150. The transport cart 170 that has dispensed the hot metal returns to the blast furnace 110 via the cleaning center 160 that cleans the inside. The transport cart 170 repeats this patrol.

溶銑は、製鋼工場150の出鋼計画に基づいて製鋼工場150において要求される所定の成分に近いほど、製鋼工場150での処理負担が少なくなるため、効率的な製鋼工場150の操業が可能となる。そのため、溶銑は、各中間処理設備を経由して所定の処理を行うことにより、予め製鋼工場150が要求する成分となっていることが好ましい。   As the hot metal is closer to the predetermined components required in the steelmaking factory 150 based on the steel production plan of the steelmaking factory 150, the processing burden at the steelmaking factory 150 is reduced, and therefore the efficient operation of the steelmaking factory 150 is possible. Become. Therefore, it is preferable that the hot metal is a component required by the steelmaking factory 150 in advance by performing a predetermined process via each intermediate processing facility.

図2は、本発明の一実施形態に係る輸送計画作成装置を含む輸送計画作成システムの概略構成を示す機能ブロック図である。輸送計画作成システム200は、本実施形態に係る輸送計画作成装置300と、ビジネスコンピュータ410及びプロセスコンピュータ420を含む上位システム部400とを有する。   FIG. 2 is a functional block diagram showing a schematic configuration of a transportation plan creation system including a transportation plan creation device according to an embodiment of the present invention. The transportation plan creation system 200 includes a transportation plan creation apparatus 300 according to the present embodiment, and a host system unit 400 including a business computer 410 and a process computer 420.

輸送計画作成装置300は、 例えばコンピュータにより構成され、記憶部310と、入力部320と、前処理部330と、輸送計画作成部340と、表示部350と、制御部360と、通信部370とを備える。輸送計画作成装置300は、製鉄所内における輸送台車170による溶銑の輸送計画を作成する。輸送計画は、高炉110から製鋼工場150への溶銑の輸送と、製鋼工場150に溶銑を払い出して空車となった輸送台車170の高炉110への回送とを含む The transportation plan creation apparatus 300 is configured by, for example, a computer, and includes a storage unit 310, an input unit 320, a preprocessing unit 330, a transportation plan creation unit 340, a display unit 350, a control unit 360, and a communication unit 370. Is provided. The transportation plan creation device 300 creates a transportation plan for hot metal by the transportation carriage 170 in the steelworks. The transportation plan includes the transportation of hot metal from the blast furnace 110 to the steelmaking factory 150 and the transportation of the transporting carriage 170 that has become empty after the hot metal is discharged to the steelmaking factory 150 to the blast furnace 110 .

記憶部310は、例えばリレーショナルデータベース等で構成され、輸送計画作成装置300が輸送計画作成において使用するための各種データを記憶する。記憶部310が記憶するデータの一例については、後述する溶銑輸送計画作成部341、溶銑払出計画作成部342及び全体計画作成部343の説明において、適宜説明する。   The storage unit 310 is composed of, for example, a relational database, and stores various data that the transportation plan creation device 300 uses for transportation plan creation. An example of data stored in the storage unit 310 will be described as appropriate in the description of the hot metal transport plan creation unit 341, the hot metal discharge plan creation unit 342, and the overall plan creation unit 343, which will be described later.

入力部320は、輸送計画作成装置300に対する入力操作を受け付ける。入力部320は、例えばキーボード及びマウス等の入力手段により構成される。   The input unit 320 receives an input operation on the transportation plan creation device 300. The input unit 320 is configured by input means such as a keyboard and a mouse.

前処理部330は、輸送計画作成装置300が上位システム部400から取得した各種データ及び記憶部310に記憶されている各種データを読み込み、輸送計画作成部340が輸送計画を作成するに際して使用するデータの整理及びクリーニング等の前処理を実行する。   The pre-processing unit 330 reads various data acquired by the transportation plan creation device 300 from the host system unit 400 and various data stored in the storage unit 310, and data used when the transportation plan creation unit 340 creates the transportation plan. Pre-processing such as rearranging and cleaning.

輸送計画作成部340は、前処理部330で処理されたデータに基づいて、輸送計画を作成する。本明細書において、輸送計画は、輸送台車170が、高炉110で溶銑を受銑し、必要に応じて中間処理設備を経由し、溶銑を製鋼工場150で払い出し、必要に応じてクリーニングセンタ160を経由して、高炉110に戻るまでの一連の輸送のフローをいう。輸送計画作成部340は、溶銑輸送計画作成部341と、溶銑払出計画作成部342と、全体計画作成部343とを有する。輸送計画作成部340は、溶銑輸送計画作成部341、溶銑払出計画作成部342及び全体計画作成部343において、輸送計画を3つに区分した所定の範囲の計画を最適化問題として定式化し、順に演算処理を行うことにより、輸送計画を作成する。溶銑輸送計画作成部341、溶銑払出計画作成部342及び全体計画作成部343がそれぞれ行う処理の詳細については、後述する。   The transportation plan creation unit 340 creates a transportation plan based on the data processed by the preprocessing unit 330. In this specification, the transportation plan is that the transport carriage 170 receives hot metal in the blast furnace 110, passes through an intermediate treatment facility as necessary, pays out hot metal at the steelmaking factory 150, and sets the cleaning center 160 as necessary. The flow of a series of transportation until it returns to the blast furnace 110 via it. The transport plan creation unit 340 includes a hot metal transport plan creation unit 341, a hot metal discharge plan creation unit 342, and an overall plan creation unit 343. The transportation plan creation unit 340 formulates, as an optimization problem, a plan within a predetermined range obtained by dividing the transportation plan into three in the hot metal transportation plan creation unit 341, the hot metal discharge plan creation unit 342, and the overall plan creation unit 343. A transportation plan is created by performing arithmetic processing. Details of the processes performed by the hot metal transport plan creation unit 341, the hot metal discharge plan creation unit 342, and the overall plan creation unit 343 will be described later.

表示部350は、様々な情報の表示を行い、本実施形態では、特に輸送計画作成部340が作成した輸送計画に関する情報の表示を行う。表示部350は、例えばブラウン管(CRT:Cathode Ray Tube)、液晶パネル(LCD:Liquid Crystal Display)又は有機ELパネル(OELD:Organic Electroluminescence Display)等を用いて構成される。表示部350に表示される輸送計画の例については、後述する図7において説明する。   The display unit 350 displays various information. In this embodiment, the display unit 350 displays information on the transportation plan created by the transportation plan creation unit 340. The display unit 350 is configured using, for example, a cathode ray tube (CRT), a liquid crystal panel (LCD), an organic electroluminescence display (OELD), or the like. An example of the transportation plan displayed on the display unit 350 will be described later with reference to FIG.

制御部360は、輸送計画作成装置300の各機能ブロックをはじめとして、輸送計画作成装置300の全体を制御及び管理するプロセッサである。なお、本実施形態では、輸送計画作成部340が制御部360とは異なる独立した機能部であるとして説明するが、制御部360は、輸送計画作成部340の機能を有していてもよい。   The control unit 360 is a processor that controls and manages the entire transportation plan creation device 300 including each functional block of the transportation plan creation device 300. In the present embodiment, the transportation plan creation unit 340 is described as an independent functional unit different from the control unit 360, but the control unit 360 may have the function of the transportation plan creation unit 340.

通信部370は、無線又は有線の通信手段により、プロセスコンピュータ420が有する通信部と通信を行う。輸送計画作成装置300は、通信部370を介して、プロセスコンピュータ420から、輸送計画の作成に必要なデータを取得する。また、輸送計画作成装置300は、通信部370を介して、例えば作成した輸送計画をプロセスコンピュータ420に送信する。なお、通信部370は、ビジネスコンピュータ410に接続され、ビジネスコンピュータ410から各種データを取得できるように構成してもよい。   The communication unit 370 communicates with the communication unit included in the process computer 420 by wireless or wired communication means. The transportation plan creation apparatus 300 acquires data necessary for creating a transportation plan from the process computer 420 via the communication unit 370. Further, the transportation plan creation apparatus 300 transmits, for example, the created transportation plan to the process computer 420 via the communication unit 370. The communication unit 370 may be configured to be connected to the business computer 410 and acquire various data from the business computer 410.

ビジネスコンピュータ410は、各高炉110の出銑の予定及び各製鋼工場150の出鋼計画を作成及び管理する。ビジネスコンピュータ410は、プロセスコンピュータ420と通信可能に接続されており、作成した出銑予定及び出鋼計画をプロセスコンピュータ420に送信する。   The business computer 410 creates and manages the output schedule of each blast furnace 110 and the output plan of each steelmaking factory 150. The business computer 410 is communicably connected to the process computer 420, and transmits the created ironing schedule and steelmaking plan to the process computer 420.

プロセスコンピュータ420は、高炉110、前除滓設備120、溶銑予備処理設備130、後除滓設備140、製鋼工場150、クリーニングセンタ160、輸送台車170及び車両171等の各設備の動作の制御及び管理を行う。プロセスコンピュータ420は、例えば、ビジネスコンピュータ410から取得した出銑予定及び出鋼計画、並びに輸送計画作成装置300から取得した輸送計画に基づき、各設備の動作の制御及び管理を行う。   The process computer 420 controls and manages the operation of each equipment such as the blast furnace 110, the pre-cleaning equipment 120, the hot metal pretreatment equipment 130, the post-cleaning equipment 140, the steelmaking factory 150, the cleaning center 160, the transport cart 170, and the vehicle 171. I do. The process computer 420 controls and manages the operation of each facility based on, for example, the schedule of production and production of steel obtained from the business computer 410 and the transportation plan acquired from the transportation plan creation apparatus 300.

具体的には、プロセスコンピュータ420は、例えば、各高炉110の出銑状況、各中間処理設備の稼働状況、各中間処理設備が処理の完了までに要する時間、各輸送台車170の現在位置、各輸送台車170が溶銑を輸送しているか否か等に関する情報を取得し、各設備の動作を制御する。   Specifically, the process computer 420 includes, for example, the output status of each blast furnace 110, the operating status of each intermediate processing facility, the time required for each intermediate processing facility to complete processing, the current location of each transport carriage 170, Information on whether or not the transport carriage 170 is transporting hot metal is acquired, and the operation of each facility is controlled.

また、プロセスコンピュータ420は、例えば各設備の稼働状況及び溶銑の輸送状況等に基づいて、輸送計画作成装置300に、輸送計画の作成を開始するように指示するための輸送計画作成指示を送信する。プロセスコンピュータ420は、例えば、高炉の出銑状況等の各設備の稼働状況が、実行中の輸送計画と一定程度乖離した場合に輸送計画作成指示を送信する。   In addition, the process computer 420 transmits a transportation plan creation instruction for instructing the transportation plan creation apparatus 300 to start creating a transportation plan based on, for example, the operating state of each facility and the transportation state of molten iron. . For example, the process computer 420 transmits a transport plan creation instruction when the operating status of each facility such as the blast furnace output status deviates to some extent from the currently executed transport plan.

次に、輸送計画作成部340における輸送計画の作成の詳細について説明する。輸送計画作成装置300は、例えば上位システム部400のプロセスコンピュータ420が送信した輸送計画作成指示に基づき、輸送計画の作成を行う。
Next, details of creation of a transportation plan in the transportation plan creation unit 340 will be described. The transportation plan creation device 300 creates a transportation plan based on, for example, a transportation plan creation instruction transmitted by the process computer 420 of the host system unit 400.

まず、溶銑輸送計画作成部341における演算について説明する。溶銑輸送計画作成部341は、各輸送台車170が各高炉110から出銑された溶銑を各製鋼工場150まで輸送する輸送通過工程に関する計画(以下、「溶銑輸送計画」ともいう)を作成する。つまり、溶銑輸送計画作成部341は、各輸送台車170が、どの線路を通って、どの中間処理設備を経由して、又はいずれの中間処理設備も経由せずに、高炉110から製鋼工場150まで移動するかに関する計画を作成する。   First, the calculation in the hot metal transport plan creation unit 341 will be described. The hot metal transport plan creation unit 341 creates a plan (hereinafter also referred to as “hot metal transport plan”) related to a transport passage process in which each transport cart 170 transports the hot metal discharged from each blast furnace 110 to each steelmaking factory 150. In other words, the hot metal transportation plan creation unit 341 allows each transportation vehicle 170 to pass from which blast furnace 110 to the steelmaking factory 150 through which line, through which intermediate processing equipment, or without any intermediate processing equipment. Create a plan for what to move.

なお、以下の溶銑輸送計画作成部341に関する説明において、工程とは、高炉110における受銑、各中間処理設備で行われる処理、及び各設備間の経路の移動のそれぞれを意味するものとする。つまり、工程開始は、例えば高炉110における受銑開始、各中間処理設備における処理開始、又は移動開始を意味し、工程終了は、例えば高炉110における受銑終了、各中間処理設備における処理終了、又は移動完了(次の工程が行われる設備への到着)を意味する。   In the following description of the hot metal transport plan creating unit 341, the process means receiving in the blast furnace 110, processing performed in each intermediate processing facility, and movement of a route between the facilities. That is, the process start means, for example, the start of receiving in the blast furnace 110, the start of processing in each intermediate processing facility, or the start of movement, and the end of the process is, for example, the end of receiving in the blast furnace 110, the end of processing in each intermediate processing facility, or It means the completion of movement (arrival at the facility where the next process is performed).

溶銑輸送計画作成部341は、溶銑輸送計画を目的関数に基づく制約条件付き最適化問題として定式化し、定式化された変数の解を算出することにより、溶銑輸送計画を作成する。本実施形態では、溶銑輸送計画作成部341は、輸送台車170が通過する工程(設備及び経路)と、その通過に関する時刻とを、決定すべき変数(決定変数)として定義する。溶銑輸送計画作成部341は、溶銑の輸送に際して生じる種々の制約条件を考慮して、目的関数を使用して、決定変数の解を算出する。溶銑輸送計画作成部341は、輸送台車170が高炉110から製鋼工場150まで移動するに際して通過する各工程において満たされるべき各工程の状態(干渉状態)を、最適化問題の制約条件として使用する。各工程の干渉状態は、輸送台車170の輸送に伴う経路の取り合い状態、及び輸送台車170による中間処理設備の占有に関する状態を含む。   The hot metal transport plan creating unit 341 formulates the hot metal transport plan as a constrained optimization problem based on an objective function, and creates a hot metal transport plan by calculating a solution of the formulated variables. In the present embodiment, the hot metal transport plan creation unit 341 defines the process (equipment and route) through which the transport carriage 170 passes and the time related to the passage as variables to be determined (decision variables). The hot metal transport plan creation unit 341 calculates the solution of the decision variable using the objective function in consideration of various constraint conditions that occur during the transport of the hot metal. The hot metal transport plan creation unit 341 uses the state (interference state) of each process to be satisfied in each process that passes when the transport carriage 170 moves from the blast furnace 110 to the steelmaking factory 150 as a constraint condition of the optimization problem. The interference state of each process includes a state of a route associated with the transportation of the transportation carriage 170 and a state regarding occupation of the intermediate processing facility by the transportation carriage 170.

まず、決定変数について説明する。溶銑輸送計画作成部341は、決定変数として、各工程の開始時刻に関する決定変数1−1、各工程での所要時間(つまり、処理時間又は移動時間)に関する決定変数1−2、及び通過する工程(輸送通過工程)に関する決定変数1−3を定義する。   First, the decision variable will be described. The hot metal transport plan creation unit 341 includes, as decision variables, a decision variable 1-1 regarding the start time of each process, a decision variable 1-2 regarding a required time (that is, a processing time or a movement time) in each process, and a process to pass through. Define the decision variable 1-3 for (Transport Passing Step).

下記数式(1)は、溶銑輸送計画作成部341が定義する、各工程の開始時刻vStartTime[i][pc]に関する決定変数1−1である。   The following mathematical formula (1) is a decision variable 1-1 related to the start time vStartTime [i] [pc] of each process defined by the hot metal transport plan creation unit 341.

Figure 0006428435
Figure 0006428435

数式(1)において、i、pc、C及びPRCは、それぞれ以下の意味で使用され、本明細書において、以後同様の意味で使用される。
i:溶銑輸送計画の作成対象となっている輸送台車170
C:溶銑輸送計画の作成対象となっている輸送台車170の集合
pc:輸送台車170が通過する設備及び経路
PRC:輸送台車170が通過する設備及び経路の順序を示す集合
In the formula (1), i, pc, C and PRC are respectively used in the following meanings, and in the present specification, are used in the same meaning hereinafter.
i: Transportation cart 170 for which hot metal transportation plan is prepared
C: Set of transport carts 170 for which the hot metal transport plan is prepared
pc: Equipment and route through which transport cart 170 passes
PRC: A set indicating the order of equipment and routes that the transport cart 170 passes through

また、下記数式(2)は、溶銑輸送計画作成部341が定義する、各工程での所要時間vProcTime[i][pc]に関する決定変数1−2である。   Also, the following mathematical formula (2) is a decision variable 1-2 regarding the required time vProcTime [i] [pc] in each process, which is defined by the hot metal transport plan creation unit 341.

Figure 0006428435
Figure 0006428435

また、下記数式(3)は、溶銑輸送計画作成部341が定義する、通過工程vCar1[i][pt]に関する決定変数1−3である。   Also, the following mathematical formula (3) is a decision variable 1-3 related to the passage process vCar1 [i] [pt] defined by the hot metal transport plan creation unit 341.

Figure 0006428435
Figure 0006428435

数式(3)は、複数の通過工程のパターンのうち、溶銑輸送計画作成部341により演算において選択されたパターンを「1」、選択されていないパターンを「0」とするものである。つまり、輸送台車170が取りうる通過工程パターンは、図3にその一部を示すように、複数存在するが、数式(3)は、通過工程パターンのうち選択された1つの通過工程パターンのみを「1」とするものである。   In Formula (3), among the plurality of passage process patterns, the pattern selected in the calculation by the hot metal transport plan creation unit 341 is “1”, and the unselected pattern is “0”. That is, there are a plurality of passage process patterns that the transport carriage 170 can take, as shown in part of FIG. 3, but Equation (3) shows only one passage process pattern selected from the passage process patterns. “1”.

なお、数式(3)において、pt及びPTNは、それぞれ以下の意味で使用され、本明細書において、以後同様の意味で使用される。
pt:輸送台車170が選択可能な通過工程パターン
PTN:輸送台車170が選択可能な通過工程パターンの集合
In Equation (3), pt and PTN are respectively used with the following meanings, and are used with the same meaning hereinafter in this specification.
pt: Passing process pattern that can be selected by transport cart 170
PTN: A set of transit process patterns that can be selected by the transport cart 170

決定変数1−3の演算処理に当たっては、選択不可能な通過工程パターンを排除するための数式(4)に示す変数vCar[i][pt]が用いられる。   In the calculation process of the decision variable 1-3, a variable vCar [i] [pt] shown in Formula (4) for eliminating a non-selectable passing process pattern is used.

Figure 0006428435
Figure 0006428435

数式(4)において、cImps[i][pt]は選択可能又は選択不可能な通過工程パターンを定義する重み係数であり、輸送台車iが選択可能な通過工程パターンではcImps[i][pt]=1となり、輸送台車iが選択不可能な通過工程パターンではcImps[i][pt]=0となる定数である。例えば、輸送台車170は、仕様によっては溶銑予備処理を行うことができない場合がある。このような輸送台車170が溶銑予備処理設備130を経由する通過工程パターンについては、重み係数cImps[i][pt]は、cImps[i][pt]=0となる。このように重み係数cImps[i][pt]を定義することにより、溶銑輸送計画作成部341は、選択可能な通過工程パターンについて、溶銑輸送計画を作成できる。重み係数cImps[i][pt]は、例えば記憶部310に記憶されている。   In Equation (4), cImps [i] [pt] is a weighting factor that defines a selectable or nonselectable passing process pattern, and cImps [i] [pt] in the passing process pattern that the transport carriage i can select. = 1, and the constant is cImps [i] [pt] = 0 in the passing process pattern in which the transport cart i cannot be selected. For example, the transport cart 170 may not be able to perform hot metal preliminary processing depending on the specifications. For such a passing process pattern in which the transport carriage 170 passes through the hot metal pretreatment facility 130, the weight coefficient cImps [i] [pt] is cImps [i] [pt] = 0. By defining the weight coefficient cImps [i] [pt] in this way, the hot metal transport plan creating unit 341 can create a hot metal transport plan for selectable passing process patterns. The weighting coefficient cImps [i] [pt] is stored in the storage unit 310, for example.

なお、輸送計画作成部340は、詳細については後述するが、作成した輸送計画が実行可能な解でないと判断した場合、作成した輸送計画の通過工程パターンについて、記憶部310に記憶された重み係数cImps[i][pt]を、cImps[i][pt]=1からcImps[i][pt]=0に変更する。輸送台車iは実行不可能な輸送計画の通過工程パターンを選択して溶銑を輸送することができないため、このように実行不可能な輸送計画が作成された場合に、制御部360が重み係数cImps[i][pt]を変更することによって、溶銑輸送計画作成部341は、選択不可能な通過工程パターンを排除しながら、選択可能な通過工程パターンについて溶銑輸送計画を作成できる。   Although the details will be described later, when the transportation plan creation unit 340 determines that the created transportation plan is not an executable solution, the weighting factor stored in the storage unit 310 for the passing process pattern of the created transportation plan is described. cImps [i] [pt] is changed from cImps [i] [pt] = 1 to cImps [i] [pt] = 0. Since the transport carriage i cannot select the passing process pattern of the infeasible transportation plan and transport the hot metal, when the infeasible transportation plan is created in this way, the control unit 360 uses the weight coefficient cImps. By changing [i] [pt], the hot metal transport plan creation unit 341 can create a hot metal transport plan for selectable passing process patterns while excluding unselectable passing process patterns.

次に、溶銑輸送計画の作成における制約条件について説明する。本実施形態において、溶銑輸送計画作成部341は、下記制約条件1−1から制約条件1−7を使用して、溶銑輸送計画を作成する。   Next, the constraint conditions in preparing the hot metal transport plan will be described. In this embodiment, the hot metal transport plan creating unit 341 creates a hot metal transport plan using the following constraint conditions 1-1 to 1-7.

数式(5)は、輸送台車iが選択可能な通過工程パターンが、1つに限定されることを定めた制約条件1−1を示す。制約条件1−1により、通過工程パターンが1つに定まる。   Formula (5) shows a constraint condition 1-1 that defines that the passing process pattern that can be selected by the transport carriage i is limited to one. The passing process pattern is determined to be one by the constraint condition 1-1.

Figure 0006428435
Figure 0006428435

数式(6)は、輸送台車iが高炉nで受銑を開始する時刻に関する制約条件1−2である。制約条件1−2により、輸送台車iの受銑開始時刻が定められる。   Formula (6) is a constraint condition 1-2 regarding the time when the transport cart i starts receiving in the blast furnace n. Due to the constraint condition 1-2, the reception start time of the transport carriage i is determined.

Figure 0006428435
Figure 0006428435

ここで、BFnは、輸送台車iが通過する工程が高炉nであることを示す値である。具体的な受銑開始時刻は、例えば、高炉nに待機している、溶銑が入っていない空車状態の輸送台車170の数量と、上位システム部400から取得した高炉nの出銑予定に基づき、前処理部330が予め算出する。   Here, BFn is a value indicating that the process through which the transport carriage i passes is the blast furnace n. The specific reception start time is based on, for example, the number of empty transport carts 170 that are waiting in the blast furnace n and do not contain molten iron, and the blast furnace n extraction schedule acquired from the host system unit 400. The preprocessing unit 330 calculates in advance.

数式(7)及び(8)は、各工程における所要時間の範囲に関する制約条件1−3である。制約条件1−3により、各工程での所要時間の範囲が定められる。   Equations (7) and (8) are the constraint conditions 1-3 regarding the range of required time in each process. The range of required time in each process is determined by the constraint condition 1-3.

Figure 0006428435
Figure 0006428435

Figure 0006428435
Figure 0006428435

数式(7)におけるcProcMin[pt][pc]は、通過工程pcにおける所要時間の下限値であり、例えば、高炉110での受銑にかかる最小時間、中間設備での処理にかかる最小時間、又は経路の移動にかかる最小時間等である。所要時間の下限値cProcMin[pt][pc]に係るデータは、例えば予め記憶部310に記憶されており、前処理部330において処理されて、溶銑輸送計画作成部341において使用される。数式(7)で示される制約条件1−3により、各工程における最低限の所要時間が確保される。   CProcMin [pt] [pc] in Equation (7) is a lower limit value of the required time in the passage process pc, for example, the minimum time required for receiving in the blast furnace 110, the minimum time required for processing in the intermediate facility, or This is the minimum time required for moving the route. Data relating to the lower limit value cProcMin [pt] [pc] of the required time is stored in advance in the storage unit 310, for example, processed in the preprocessing unit 330, and used in the hot metal transport plan creation unit 341. The minimum required time in each process is ensured by the constraint condition 1-3 expressed by Equation (7).

また、数式(8)におけるcProcMax[pt][pc]は、通過工程pcに輸送台車iが停留可能な最大時間であり、例えば、予め入力部320から入力された時間が記憶部310に記憶されている。溶銑輸送計画作成部341は、記憶部310に記憶されており、前処理部330において処理されたデータを使用する。数式(8)で示される制約条件1−3により、輸送台車iが各工程において所定時間以上停留することを防ぐことができる。   Further, cProcMax [pt] [pc] in Equation (8) is the maximum time during which the transport carriage i can stop in the passing process pc. For example, the time previously input from the input unit 320 is stored in the storage unit 310. ing. The hot metal transport plan creating unit 341 is stored in the storage unit 310 and uses the data processed in the preprocessing unit 330. According to the constraint condition 1-3 represented by the mathematical formula (8), it is possible to prevent the transport carriage i from stopping for a predetermined time or more in each step.

数式(9)は、通過工程の順序と、次の工程の開始時刻に関する制約条件1−4である。つまり、数式(9)で示す制約条件1−4は、ある工程の終了時刻と、その次の工程の開始時刻とが同じであることを示し、さらに言い換えれば、現工程の終了と同時に次工程が開始されることを意味する。   Formula (9) is a constraint condition 1-4 regarding the order of the passing process and the start time of the next process. That is, the constraint condition 1-4 represented by Equation (9) indicates that the end time of a certain process is the same as the start time of the next process. In other words, the next process is completed simultaneously with the end of the current process. Means that will start.

Figure 0006428435
Figure 0006428435

数式(10)は、各工程において停留させることができる輸送台車iの最大台数に関する制約条件1−5である。つまり、数式(10)で示される制約条件1−5は、各工程において重複して停留させることが可能な輸送台車iの台数を定めたものである。   Formula (10) is a constraint condition 1-5 regarding the maximum number of transport carts i that can be stopped in each step. That is, the constraint condition 1-5 shown by the mathematical formula (10) defines the number of transport carriages i that can be stopped repeatedly in each process.

Figure 0006428435
Figure 0006428435

数式(10)において、vmOverlapNum[i][pc]は、数式(11)を満たす中間変数である。   In Equation (10), vmOverlapNum [i] [pc] is an intermediate variable that satisfies Equation (11).

Figure 0006428435
Figure 0006428435

つまり、vmOverlapNum[i][pc]は、輸送台車iが、ある工程に存在する場合に、他の輸送台車が同一の工程に存在する場合に「1」となる中間変数である。具体的には、vmOverlapNum[i][pc]=1となるのは、次の数式(12)又は(13)のいずれかの場合である。   That is, vmOverlapNum [i] [pc] is an intermediate variable that is “1” when the transport carriage i exists in a certain process and another transport carriage exists in the same process. Specifically, vmOverlapNum [i] [pc] = 1 is the case of either of the following formulas (12) or (13).

Figure 0006428435
Figure 0006428435

Figure 0006428435
Figure 0006428435

Figure 0006428435
Figure 0006428435

Figure 0006428435
Figure 0006428435

Figure 0006428435
Figure 0006428435

数式(12)及び(13)がそれぞれ示す、1つの工程に複数の輸送台車が存在するケースについて、図4を参照して説明する。図4(a)は、数式(12)によって表現されるケースを示しており、輸送台車iがある工程を開始した後であって輸送台車iが当該工程を終了する前に、輸送台車i'が当該工程を開始するケースを示している。数式(12)により表現されるケースは、輸送台車i'の当該工程の終了時刻が、図4(a)(i)に示すように輸送台車iの当該工程の終了時刻よりも後に終了する場合と、図4(a)(ii)に示すように輸送台車iの当該工程の終了時刻よりも前に終了する場合とが含まれる。また、数式(12)により表現されるケースは、輸送台車iと輸送台車i'との当該工程の終了時刻が同時刻であってもよい。   A case where there are a plurality of transport carts in one process shown by the mathematical expressions (12) and (13) will be described with reference to FIG. FIG. 4 (a) shows a case expressed by the mathematical expression (12), and after the transportation carriage i starts a certain process and before the transportation carriage i finishes the process, the transportation carriage i ′. Indicates a case of starting the process. In the case expressed by Equation (12), the end time of the process of the transport carriage i ′ ends after the end time of the process of the transport carriage i as shown in FIGS. And the case where it complete | finishes before the end time of the said process of the transport cart i as shown to Fig.4 (a) (ii) is included. Further, in the case expressed by Expression (12), the end time of the process of the transport cart i and the transport cart i ′ may be the same time.

図4(b)は、数式(13)によって表現されるケースを示しており、輸送台車i'がある工程を開始した後であって輸送台車i'が当該工程を終了する前に、輸送台車iが当該工程を開始するケースを示している。数式(13)により表現されるケースは、輸送台車iの当該工程の終了時刻が、図4(b)(i)に示すように輸送台車i'の当該工程の終了時刻よりも後に終了する場合と、図4(b)(ii)に示すように輸送台車i'の当該工程の終了時刻よりも前に終了する場合とが含まれる。また、数式(12)により表現されるケースは、輸送台車iと輸送台車i'との当該工程の終了時刻が同時刻であってもよい。   FIG. 4B shows a case expressed by the mathematical formula (13), and after the transportation carriage i ′ starts a certain process and before the transportation carriage i ′ finishes the process, the transportation carriage i indicates the case of starting the process. In the case expressed by Equation (13), the end time of the process of the transport carriage i ends after the end time of the process of the transport carriage i ′ as shown in FIGS. And the case where it complete | finishes before the end time of the said process of transport cart i 'as shown in FIG.4 (b) (ii) is included. Further, in the case expressed by Expression (12), the end time of the process of the transport cart i and the transport cart i ′ may be the same time.

なお、cOverlapMax[pc]は、通過工程pcにおいて停留させることができる輸送台車iの最大台数が定義された定数であり、記憶部310に記憶されているデータを、前処理部330が取り出して作成した定数である。制約条件1−5により、1つの工程に過剰に輸送台車iが停留することを防止しやすくなる。   Note that cOverlapMax [pc] is a constant in which the maximum number of transport carts i that can be stopped in the passing process pc is defined, and is created by the preprocessing unit 330 taking out the data stored in the storage unit 310. Constant. The constraint condition 1-5 makes it easy to prevent the transport carriage i from stopping excessively in one process.

数式(16)は、製鋼工場150において輸送台車170から払い出される溶銑の量(払出チャージ)に関する制約条件1−6である。制約条件1−6は、製鋼工場150が出鋼計画に基づく出鋼を行うために必要な溶銑量(重量)を満たすべきことを定めた条件である。   Expression (16) is a constraint condition 1-6 regarding the amount of hot metal (payout charge) to be paid out from the transport carriage 170 in the steelmaking factory 150. The constraint condition 1-6 is a condition that stipulates that the steelmaking factory 150 should satisfy the amount (weight) of hot metal necessary for performing steel production based on the steel production plan.

Figure 0006428435
Figure 0006428435

数式(16)において、sm、SMS、ch及びCHは、それぞれ以下の意味で使用され、本明細書において、以後同様の意味で使用される。
sm:溶銑輸送計画の作成対象となっている製鋼工場150
SMS:溶銑輸送計画の作成対象となっている製鋼工場150の集合
ch:輸送台車170による製鋼工場150への払出チャージ
CH:輸送台車170による製鋼工場150への払出チャージの集合
In the formula (16), sm, SMS, ch, and CH are respectively used in the following meanings and are used in the same meaning in the present specification.
sm: Steelmaking plant 150 for which the hot metal transportation plan has been created
SMS: Aggregation of 150 steelmaking factories for which hot metal transportation plans are being prepared
ch: Discharge charge to steelmaking factory 150 by transport cart 170
CH: Collection of payout charges to steel mill 150 by transport cart 170

また、数式(16)において、vmSumPigWt[sm][ch]は、次の数式(17)を満たす中間変数である。   In the equation (16), vmSumPigWt [sm] [ch] is an intermediate variable that satisfies the following equation (17).

Figure 0006428435
Figure 0006428435

中間変数vmSumPigWt[sm][ch]は、製鋼工場smにおいて払出しを行うまでに、輸送台車170が高炉110から製鋼工場smまで輸送してきた溶銑量の総和であり、次の数式(18)で表現される。   The intermediate variable vmSumPigWt [sm] [ch] is the total amount of hot metal that the transport cart 170 has transported from the blast furnace 110 to the steelmaking plant sm before delivery at the steelmaking plant sm, and is expressed by the following equation (18). Is done.

Figure 0006428435
Figure 0006428435

中間変数vmSumPigWt[sm][ch]は、次の数式(19)が満たされる場合に算出される。   The intermediate variable vmSumPigWt [sm] [ch] is calculated when the following equation (19) is satisfied.

Figure 0006428435
Figure 0006428435

ここで、数式(18)において、cSMS[sm][pt]は、通過工程パターンptにおける仕向け先(つまり到着する製鋼工場)が製鋼工場smである場合「1」となり、仕向け先が製鋼工場smでない場合「0」となる定数である。また、cWt[i]は、輸送台車iが高炉110から製鋼工場smまで輸送した溶銑量であり、cSmsUnloadTime[sm][ch]は、製鋼工場smにおける払出しの開始時刻を表す定数である。数式(19)は、製鋼工場smでの払出しの開始時刻において、輸送台車iが製鋼工場smに到着していなければならないことを示している。   Here, in Equation (18), cSMS [sm] [pt] is “1” when the destination (that is, the arriving steel factory) in the passing process pattern pt is a steel factory sm, and the destination is the steel factory sm. Otherwise, it is a constant that is “0”. CWt [i] is the amount of hot metal transported by the transport cart i from the blast furnace 110 to the steelmaking factory sm, and cSmsUnloadTime [sm] [ch] is a constant representing the start time of dispensing at the steelmaking factory sm. Formula (19) indicates that the transport cart i must arrive at the steelmaking factory sm at the start time of payout at the steelmaking factory sm.

また、数式(16)において、cSmsStockCap[sm][ch]は、製鋼工場smにおける払出しの際に、製鋼工場smが有していることが必要な在庫の溶銑量(必要在庫溶銑量)である。必要在庫溶銑量cSmsStockCap[sm][ch]は、上位システム部400から取得した製鋼工場smの出鋼計画に基づき、前処理部330が算出する。   Moreover, in Formula (16), cSmsStockCap [sm] [ch] is the amount of hot metal in stock (necessary stock hot metal amount) that the steelmaking factory sm needs to have when paying out at the steelmaking factory sm. . The required stock hot metal amount cSmsStockCap [sm] [ch] is calculated by the pre-processing unit 330 based on the steel production plan of the steelmaking factory sm acquired from the host system unit 400.

制約条件1−6により、製鋼工場smにおいて、出鋼計画に基づいて加工を行うに際し、原料となる溶銑が不足することを防ぐことができる。   With the constraint condition 1-6, it is possible to prevent the hot metal serving as a raw material from being insufficient when performing processing based on the steel production plan in the steelmaking factory sm.

数式(20)は、輸送台車iが高炉110において受銑を終了してから製鋼工場150に到着するまでにかかる時間(以下、「溶銑輸送リードタイム」ともいう)の上限に関する制約条件1−7である。   Equation (20) is a constraint condition 1-7 regarding the upper limit of the time required for the transport cart i to arrive at the steelmaking factory 150 after finishing receiving in the blast furnace 110 (hereinafter also referred to as “hot metal transport lead time”) 1-7 It is.

Figure 0006428435
Figure 0006428435

溶銑輸送リードタイムが所定の時間より長くなると、輸送の間に溶銑の温度が低下し、製鋼工場150において溶銑を昇温する必要が生じうる。これを防ぐために、制約条件1−7が設けられる。溶銑輸送リードタイムの上限を示すcMaxLeadTimeは、例えば入力部320への入力に基づいて予め記憶部310に記憶されており、前処理部330が記憶部310に記憶されたデータを読み込んで、溶銑輸送計画作成部341で使用される。   When the hot metal transport lead time becomes longer than a predetermined time, the temperature of the hot metal decreases during transport, and it may be necessary to raise the temperature of the hot metal in the steelmaking factory 150. In order to prevent this, constraint conditions 1-7 are provided. The cMaxLeadTime indicating the upper limit of the hot metal transport lead time is stored in advance in the storage unit 310 based on, for example, the input to the input unit 320, and the preprocessing unit 330 reads the data stored in the storage unit 310 to transport the hot metal transport. Used by the plan creation unit 341.

次に、溶銑輸送計画の作成にあたり溶銑輸送計画作成部341が使用する目的関数J1について説明する。本実施形態において、溶銑輸送計画作成部341は、下記数式(21)で示される目的関数J1を使用して所定の演算を行い、決定変数の解を算出することによって、溶銑輸送計画を作成する。本実施形態では、溶銑輸送計画作成部341は、目的関数J1が最小となるように、決定変数1−1から1−3を算出する。   Next, the objective function J1 used by the hot metal transport plan creating unit 341 when creating the hot metal transport plan will be described. In the present embodiment, the hot metal transport plan creating unit 341 creates a hot metal transport plan by performing a predetermined calculation using the objective function J1 represented by the following mathematical formula (21) and calculating a solution of the decision variable. . In the present embodiment, the hot metal transport plan creating unit 341 calculates the decision variables 1-1 to 1-3 so that the objective function J1 is minimized.

Figure 0006428435
Figure 0006428435

数式(21)において、vmSumSeibunWt[sm][ch]は、輸送台車170が高炉110から製鋼工場smに輸送した溶銑の成分を示す中間変数であり、例えば溶銑の不純物の含有量に関する情報を示す中間変数である。中間変数vmSumSeibunWt[sm][ch]は、次の数式(22)で表現される。   In Equation (21), vmSumSeibunWt [sm] [ch] is an intermediate variable indicating the component of the hot metal transported by the transport cart 170 from the blast furnace 110 to the steelmaking factory sm, and is an intermediate variable indicating information on the content of impurities in the hot metal, for example. Is a variable. The intermediate variable vmSumSeibunWt [sm] [ch] is expressed by the following equation (22).

Figure 0006428435
Figure 0006428435

Figure 0006428435
Figure 0006428435

数式(22)において、cAjust[pt]は、通過工程パターンptごとに製鋼工場smに輸送される溶銑の成分に関する情報(溶銑成分値)を示し、例えば、溶銑の単位重量当たりの不純物の含有量に関する情報を示す。   In Equation (22), cAjust [pt] indicates information (hot metal component value) on the hot metal component transported to the steel mill sm for each passing process pattern pt, for example, the content of impurities per unit weight of hot metal Indicates information about.

また、数式(21)で示す目的関数J1において、cSmsStockMaxSeibun[sm][ch]は、製鋼工場smへの払出チャージchにおいて許容される溶銑成分値の最大値を示す。cSmsStockMaxSeibun[sm][ch]は、例えば上位システム部400から取得した取得した製鋼工場smの出鋼計画に基づき、前処理部330が製鋼工場smごとに予め算出する。   Further, in the objective function J1 represented by the mathematical formula (21), cSmsStockMaxSeibun [sm] [ch] represents the maximum value of the hot metal component value allowed in the discharge ch ch to the steelmaking factory sm. cSmsStockMaxSeibun [sm] [ch] is calculated in advance by the preprocessing unit 330 for each steelmaking factory sm based on the steel production plan of the steelmaking factory sm acquired from the host system unit 400, for example.

溶銑輸送計画作成部341は、制約条件1−1から1−7を満たし、かつ、目的関数J1が最小となるように、決定変数1−1から1−3を算出する。溶銑輸送計画作成部341は、決定変数の算出により導出された、時間及び通過工程を溶銑輸送計画として決定する。   The hot metal transport plan creation unit 341 calculates the decision variables 1-1 to 1-3 so that the constraint conditions 1-1 to 1-7 are satisfied and the objective function J1 is minimized. The hot metal transport plan creation unit 341 determines the time and passage process derived by calculating the decision variable as the hot metal transport plan.

目的関数J1が溶銑の成分に関する項を含むことにより、溶銑輸送計画作成部341は、溶銑の成分が所望の成分になるように中間処理設備を経由する輸送計画を作成しやすくなるため、製鋼工場smの出鋼計画に基づく出鋼(生産)をより効率的に行うことができる成分となるような溶銑輸送計画を作成しやすくなる。また、目的関数J1が各工程pcでかかる時間に関する項を含むことにより、溶銑輸送計画作成部341は、溶銑輸送リードタイムがより短い溶銑輸送計画を作成しやすくなる。このように、溶銑輸送計画作成部341は、目的関数J1を用いて、溶銑の成分及び溶銑輸送リードタイムを考慮した溶銑輸送計画を作成する。   Since the objective function J1 includes a term relating to the hot metal component, the hot metal transport plan creation unit 341 makes it easier to create a transport plan via the intermediate processing equipment so that the hot metal component becomes a desired component. It is easy to create a hot metal transport plan that is a component that enables more efficient steel production (production) based on the sm steel production plan. In addition, since the objective function J1 includes a term related to the time taken for each process pc, the hot metal transport plan creation unit 341 can easily create a hot metal transport plan with a shorter hot metal transport lead time. In this way, the hot metal transport plan creating unit 341 creates a hot metal transport plan that takes into account the hot metal components and the hot metal transport lead time using the objective function J1.

次に、溶銑払出計画作成部342における演算について説明する。溶銑払出計画作成部342は、溶銑輸送計画作成部341で作成された溶銑輸送計画に基づき、製鋼工場150まで溶銑を輸送した1台以上の輸送台車170と、輸送台車170が溶銑を払い出す1つ以上の製鋼工場150とを紐付ける計画(以下、「溶銑払出計画」ともいう)を作成する。輸送台車170は、高炉110から輸送した溶銑を、1つ以上の製鋼工場150に分配して払い出すことができる。つまり、輸送台車170は、溶銑の払出チャージを分配することができる。溶銑払出計画作成部342は、各輸送台車170が、どの製鋼工場150に、どれくらいの量の溶銑の払出チャージを分配するかに関する計画を作成する。   Next, calculation in the hot metal dispensing plan creation unit 342 will be described. The hot metal delivery plan creation unit 342 is based on the hot metal transport plan created by the hot metal transport plan creation unit 341, and one or more transport carts 170 that transport the hot metal to the steelmaking factory 150, and the transport cart 170 delivers hot metal 1 A plan (hereinafter also referred to as a “hot metal discharge plan”) for linking two or more steelmaking plants 150 is created. The transport carriage 170 can distribute and discharge the hot metal transported from the blast furnace 110 to one or more steel mills 150. That is, the transport cart 170 can distribute the hot metal payout charge. The hot metal dispensing plan creation unit 342 creates a plan relating to how much hot metal dispensing charge is distributed to which steelmaking factory 150 by each transport carriage 170.

溶銑払出計画作成部342は、溶銑払出計画を目的関数に基づく制約条件付き最適化問題として定式化し、定式化された変数の解を算出することにより、溶銑払出計画を作成する。本実施形態では、溶銑払出計画作成部342は、輸送台車170が各製鋼工場150に払い出す溶銑量を、決定すべき変数(決定変数)として定義する。溶銑払出計画作成部342は、溶銑の払出しにおける種々の制約条件を考慮して、目的関数を使用して、決定変数の解を算出する。   The hot metal payout plan creation unit 342 formulates the hot metal payout plan as an optimization problem with constraints based on an objective function, and creates a hot metal payout plan by calculating a solution of the formulated variables. In the present embodiment, the hot metal dispensing plan creation unit 342 defines the amount of molten iron to be determined by the transport carriage 170 to each steelmaking factory 150 as a variable (decision variable) to be determined. The hot metal payout plan creation unit 342 calculates the solution of the decision variable using the objective function in consideration of various constraints on the hot metal payout.

下記数式(23)は、溶銑払出計画作成部342が定義する、輸送台車iから製鋼工場smへの溶銑の払出チャージchの分配vDivCarWt[sm][i][ch]に関する決定変数2−1である。すなわち、決定変数2−1は、輸送台車iで輸送された溶銑を製鋼工場smの払出チャージchとして、どれくらいの重量の紐付けをするかを決定するための変数である。   The following equation (23) is a decision variable 2-1 related to the distribution vDivCarWt [sm] [i] [ch] of the hot metal discharge charge ch from the transport cart i to the steelmaking factory sm defined by the hot metal discharge plan creation unit 342. is there. That is, the decision variable 2-1 is a variable for deciding how much weight is to be linked using the hot metal transported by the transport carriage i as the payout charge ch of the steel mill sm.

Figure 0006428435
Figure 0006428435

次に、溶銑払出計画の作成における制約条件について説明する。本実施形態において、溶銑払出計画作成部342は、下記制約条件2−1から制約条件2−5を使用して、溶銑輸送計画を作成する。   Next, the constraint conditions in creating the hot metal dispensing plan will be described. In the present embodiment, the hot metal discharge plan creating unit 342 creates a hot metal transport plan using the following constraint conditions 2-1 to 2-5.

数式(24)は、製鋼工場smの払出チャージchに分配された輸送台車iの溶銑の総量に関する制約条件2−1である。すなわち、制約条件2−1では、輸送台車iが各製鋼工場smで払い出す払出チャージchの総和が、輸送台車iが高炉110から輸送した溶銑量以下となることを定めている。   Formula (24) is a constraint condition 2-1 regarding the total amount of hot metal of the transport carriage i distributed to the payout charge ch of the steelmaking factory sm. That is, the constraint condition 2-1 stipulates that the sum of the payout charges ch that the transport cart i pays out at each steelmaking factory sm is equal to or less than the hot metal amount transported from the blast furnace 110 by the transport cart i.

Figure 0006428435
Figure 0006428435

数式(24)で示される制約条件2−1において、cCarWt[sm][i]は、仕向け先(つまり到着する製鋼工場)が製鋼工場smである輸送台車iが輸送する溶銑量を示す定数である。溶銑払出計画作成部342は、溶銑輸送計画作成部341が作成した溶銑輸送計画を参照することにより得られる、輸送台車iの仕向け先の製鋼工場smと、輸送台車iが輸送する溶銑量とに基づいて、定数cCarWt[sm][i]を決定できる。   In the constraint condition 2-1 expressed by the mathematical formula (24), cCarWt [sm] [i] is a constant indicating the amount of hot metal transported by the transport cart i whose destination (that is, the arriving steel mill) is the steel mill sm. is there. The hot metal discharge plan creation unit 342 obtains the steelmaking factory sm of the destination of the transport cart i and the amount of hot metal transported by the transport cart i obtained by referring to the hot metal transport plan created by the hot metal transport plan creation unit 341. Based on this, the constant cCarWt [sm] [i] can be determined.

数式(25)は、複数の輸送台車iから製鋼工場smの払出チャージchとして分配された溶銑量の総和に関する制約条件2−2である。すなわち、制約条件2−2では、複数の輸送台車iから製鋼工場smに払い出される払出チャージchが、製鋼工場smが出鋼計画に基づいて出鋼を行うために必要な溶銑量を満たすべきことを定めている。   Equation (25) is a constraint condition 2-2 regarding the sum total of the amount of hot metal distributed from the plurality of transport carts i as the payout charge ch of the steelmaking factory sm. That is, in the constraint condition 2-2, the payout charge ch paid out from the plurality of transport carts i to the steelmaking factory sm should satisfy the amount of hot metal necessary for the steelmaking factory sm to perform steelmaking based on the steelmaking plan. Is stipulated.

Figure 0006428435
Figure 0006428435

数式(25)において、cSMSChWt[sm][ch]は、製鋼工場smが出鋼計画に基づいて出鋼を行うために必要とする溶銑量を示す定数である。定数cSMSChWt[sm][ch]は、上位システム部400から取得した製鋼工場smの出鋼計画に基づき、前処理部330が予め算出する。   In Equation (25), cSMSChWt [sm] [ch] is a constant indicating the amount of hot metal required for the steelmaking factory sm to produce steel based on the steel production plan. The constant cSMSChWt [sm] [ch] is calculated in advance by the preprocessing unit 330 based on the steel production plan of the steelmaking factory sm acquired from the host system unit 400.

数式(26)は、各製鋼工場smに対する輸送台車iの溶銑の払出チャージchへの分配回数の上限に関する制約条件2−3である。すなわち、制約条件2−3は、払出チャージchへの分配回数の上限を定める。   Formula (26) is a constraint condition 2-3 regarding the upper limit of the number of times of distribution of the hot metal of the transport cart i to the discharge charge ch of each steelmaking factory sm. That is, the constraint condition 2-3 determines the upper limit of the number of times of distribution to the payout charge ch.

Figure 0006428435
Figure 0006428435

数式(26)において、vmDivCar[sm][i][ch]は、次の数式(27)により表される中間変数である。   In Expression (26), vmDivCar [sm] [i] [ch] is an intermediate variable represented by the following Expression (27).

Figure 0006428435
Figure 0006428435

Figure 0006428435
Figure 0006428435

Figure 0006428435
Figure 0006428435

つまり、中間変数vmDivCar[sm][i][ch]は、輸送台車iから製鋼工場smに払出チャージchが分配される場合に「1」となる。   That is, the intermediate variable vmDivCar [sm] [i] [ch] is “1” when the payout charge ch is distributed from the transport carriage i to the steelmaking factory sm.

また、数式(26)において、cMaxSMSChNum[sm][i]は、輸送台車iから製鋼工場smへの払出チャージchの分配回数の上限値を示す定数である。定数cMaxSMSChNum[sm][i]は、例えば入力部320への入力に基づいて予め記憶部310に記憶されており、前処理部330が記憶部310に記憶されたデータを読み込んで、溶銑払出計画作成部342で使用される。   Further, in Expression (26), cMaxSMSChNum [sm] [i] is a constant indicating the upper limit value of the distribution frequency of the payout charge ch from the transport carriage i to the steelmaking factory sm. The constant cMaxSMSChNum [sm] [i] is stored in advance in the storage unit 310 based on, for example, an input to the input unit 320, and the preprocessing unit 330 reads the data stored in the storage unit 310, and the hot metal dispensing plan Used by the creation unit 342.

制約条件2−3により、輸送台車iから製鋼工場smへの払出チャージchの分配回数が所定の回数以下に定められる。そのため、所定の回数より多くの回数払出チャージchが分配されて輸送台車iが輸送した溶銑の温度が低下しすぎることを防ぎやすくなる。   According to the constraint condition 2-3, the number of distributions of the payout charge ch from the transport carriage i to the steelmaking factory sm is set to a predetermined number or less. Therefore, it is easy to prevent the temperature of the hot metal transported by the transport cart i from being distributed more than the predetermined number of times and the temperature of the hot metal transported by the transport cart i from being excessively lowered.

数式(29)は、製鋼工場smに対して溶銑の払出しを行うことが可能な輸送台車iの台数に関する制約条件2−4である。すなわち、制約条件2−4は、製鋼工場smが最大で何台の輸送台車iから払出チャージchを受けることができるかについての上限を定める。   Formula (29) is a constraint condition 2-4 regarding the number of transport carts i that can dispense hot metal to the steelmaking factory sm. That is, the constraint condition 2-4 defines an upper limit as to how many transport carts i the steelmaking factory sm can receive the payout charge ch.

Figure 0006428435
Figure 0006428435

数式(29)において、cCarDivNum[sm][ch]は、製鋼工場smに対して払出チャージchを払い出す輸送台車iの上限数を示す定数である。定数cCarDivNum[sm][ch]は、例えば、製鋼工場smが輸送台車iから払出しを受けるスペースや輸送台車iを受け入れる線路の本数等、製鋼工場smが備える設備の状況等に基づいて、予め入力部320から入力されて、記憶部310に記憶されている。そして、前処理部330が記憶部310に記憶された定数cCarDivNum[sm][ch]に関するデータを読み込むことにより、定数cCarDivNum[sm][ch]は、溶銑払出計画作成部342において溶銑払出計画の作成の際に使用される。   In Equation (29), cCarDivNum [sm] [ch] is a constant indicating the upper limit number of transport carts i that pay out the payout charge ch to the steelmaking factory sm. The constant cCarDivNum [sm] [ch] is input in advance based on, for example, the status of the facilities provided by the steelmaking factory sm, such as the space where the steelmaking factory sm is paid out from the transportation carriage i, the number of tracks that receive the transportation carriage i, etc. Input from the unit 320 and stored in the storage unit 310. Then, the preprocessing unit 330 reads the data related to the constant cCarDivNum [sm] [ch] stored in the storage unit 310, so that the constant cCarDivNum [sm] [ch] is stored in the hot metal discharge plan creating unit 342. Used when creating.

数式(30)は、製鋼工場smに対して溶銑の払出しを行う輸送台車iの製鋼工場smへの到着時刻に関する制約条件2−5である。すなわち、制約条件2−5は、製鋼工場smへの払出しを行う輸送台車iが、製鋼工場smへの払出の開始時刻までに製鋼工場smに到着していなければならないことについて定めている。   Formula (30) is a constraint condition 2-5 regarding the arrival time of the transport carriage i that delivers hot metal to the steelmaking factory sm at the steelmaking factory sm. That is, the constraint condition 2-5 stipulates that the transport carriage i that pays out to the steelmaking factory sm must arrive at the steelmaking factory sm by the start time of paying out to the steelmaking factory sm.

Figure 0006428435
Figure 0006428435

数式(30)において、cCarArrTime[i]は、輸送台車iが製鋼工場smに到着する時刻を示す定数である。溶銑払出計画作成部342は、溶銑輸送計画作成部341が作成した溶銑輸送計画を参照して得られる輸送台車iの製鋼工場smへの到着時刻に基づいて、定数cCarArrTime[i]を算出できる。   In Equation (30), cCarArrTime [i] is a constant indicating the time when the transport carriage i arrives at the steelmaking factory sm. The hot metal discharge plan creation unit 342 can calculate the constant cCarArrTime [i] based on the arrival time of the transport carriage i obtained at the steelmaking factory sm by referring to the hot metal transport plan created by the hot metal transport plan creation unit 341.

次に、溶銑払出計画の作成にあたり溶銑払出計画作成部342が使用する目的関数J2について説明する。本実施形態において、溶銑払出計画作成部342は、下記数式(31)で示される目的関数J2を使用して所定の演算を行い、決定変数の解を算出することによって、溶銑払出計画を作成する。本実施形態では、溶銑払出計画作成部342は、目的関数J2が最小となるように、決定変数2−1を算出する。   Next, the objective function J2 used by the hot metal dispensing plan creation unit 342 in creating the hot metal dispensing plan will be described. In the present embodiment, the hot metal payout plan creating unit 342 performs a predetermined calculation using an objective function J2 represented by the following mathematical formula (31), and creates a hot metal payout plan by calculating a solution of the decision variable. . In the present embodiment, the hot metal dispensing plan creation unit 342 calculates the decision variable 2-1 so that the objective function J2 is minimized.

Figure 0006428435
Figure 0006428435

数式(31)において、cCarSeibunRatio[sm][i]は、製鋼工場smで払出しを行う輸送台車iの溶銑の成分比を示す定数である。溶銑払出計画作成部342は、溶銑輸送計画作成部341が作成した溶銑輸送計画を参照して得られる輸送台車iの溶銑量(重量)と、輸送台車iの通過工程とに基づいて、定数cCarSeibunRatio[sm][i]を算出できる。   In Equation (31), cCarSeibunRatio [sm] [i] is a constant indicating the component ratio of the hot metal of the transport carriage i that is discharged at the steelmaking factory sm. The hot metal discharge plan creation unit 342 determines the constant cCarSeibunRatio based on the hot metal amount (weight) of the transport carriage i obtained by referring to the hot metal transport plan created by the hot metal transport plan creation unit 341 and the passing process of the transport cart i. [sm] [i] can be calculated.

また、数式(31)において、cSMSMaxSeibun[sm][ch]は、製鋼工場smが出鋼計画に基づいて要求する溶銑成分値の最大値を示す定数である。定数cSMSMaxSeibun[sm][ch]は、上位システム部400から取得した製鋼工場smの出鋼計画に基づき、製鋼工場smごとに前処理部330が予め算出する。   In Equation (31), cSMSMaxSeibun [sm] [ch] is a constant indicating the maximum value of the hot metal component value requested by the steelmaking factory sm based on the steel production plan. The constant cSMSMaxSeibun [sm] [ch] is calculated in advance by the preprocessing unit 330 for each steelmaking factory sm based on the steelmaking plan of the steelmaking factory sm acquired from the host system unit 400.

溶銑払出計画作成部342は、制約条件2−1から2−5を満たし、かつ、目的関数J2が最小となるように、決定変数2−1を算出する。溶銑払出計画作成部342は、決定変数の算出により導出された、分配を溶銑払出計画として決定する。   The hot metal payout plan creation unit 342 calculates the decision variable 2-1 so that the constraint conditions 2-1 to 2-5 are satisfied and the objective function J2 is minimized. The hot metal payout plan creation unit 342 determines the distribution derived by calculating the decision variable as the hot metal payout plan.

目的関数J2が溶銑の成分に関する項を含むことにより、溶銑払出計画作成部342は、溶銑の成分が所望の成分になるように中間処理設備を経由する輸送計画を作成しやすくなるため、製鋼工場smの出鋼計画に基づく出鋼(生産)をより効率的に行うことができる成分となるような溶銑払出計画を作成しやすくなる。また、目的関数J2が輸送台車iの製鋼工場smへの到着時刻及び製鋼工場smにおける払出開始時刻に関する項を含むことにより、溶銑払出計画作成部342は、各輸送台車iが製鋼工場smに到着してから払出しを開始するまでの時刻がより短くなる溶銑払出計画を作成しやすくなる。このように、溶銑払出計画作成部342は、目的関数J2を用いて、溶銑の成分及び払出誌に関する時刻を考慮した溶銑払出計画を作成する。   Since the objective function J2 includes a term relating to the hot metal component, the hot metal discharge plan creation unit 342 makes it easier to create a transportation plan via the intermediate processing equipment so that the hot metal component becomes a desired component. It becomes easy to create a hot metal discharge plan that is a component that enables more efficient steel production (production) based on the sm steel production plan. In addition, since the objective function J2 includes terms relating to the arrival time of the transportation cart i at the steelmaking factory sm and the dispensing start time at the steelmaking plant sm, the hot metal dispensing plan creation unit 342 allows each transportation vehicle i to arrive at the steelmaking plant sm. Then, it becomes easier to create a hot metal dispensing plan that shortens the time from when the dispensing starts. As described above, the hot metal discharge plan creating unit 342 uses the objective function J2 to create a hot metal payout plan in consideration of the hot metal components and the time related to the payout magazine.

次に、全体計画作成部343における演算について説明する。溶銑輸送計画作成部341が作成した溶銑輸送計画により、輸送台車170の製鋼工場150への到着時刻が決定されており、溶銑払出計画作成部342が作成した溶銑払出計画により、輸送台車170から溶銑の払出しが開始される時刻が決定されている。全体計画作成部343は、溶銑輸送計画作成部341が作成した溶銑輸送計画と、溶銑払出計画作成部342が作成した溶銑払出計画とに基づいて、溶銑を払い出して空車となった輸送台車170の高炉110への回送の通過工程(回送通過工程)を含む輸送計画の全体(以下、「全体計画」ともいう)を作成する。   Next, calculation in the overall plan creation unit 343 will be described. The arrival time of the transport cart 170 at the steelmaking factory 150 is determined by the hot metal transport plan created by the hot metal transport plan creation unit 341, and the hot metal delivery plan created by the hot metal discharge plan creation unit 342 determines the arrival time from the transport cart 170. The time at which the payout is started is determined. Based on the hot metal transport plan created by the hot metal transport plan creating unit 341 and the hot metal payout plan created by the hot metal discharge plan creating unit 342, the overall plan creating unit 343 generates the empty transport carriage 170 of the hot metal. The entire transportation plan (hereinafter, also referred to as “overall plan”) including the forward passage process (forward passage process) to the blast furnace 110 is created.

なお、以下の全体計画作成部343に関する説明において、工程とは、溶銑輸送計画作成部341に関する説明で説明した各工程に加え、各クリーニングセンタ160で行われる清掃処理を含むものとする。つまり、工程開始は、例えばクリーニングセンタ160における清掃開始を含み、工程終了は、例えばクリーニングセンタ160における清掃終了を含む。   In the following description of the overall plan creation unit 343, the process includes a cleaning process performed at each cleaning center 160 in addition to the steps described in the description of the hot metal transport plan creation unit 341. That is, the process start includes, for example, the cleaning start in the cleaning center 160, and the process end includes, for example, the cleaning end in the cleaning center 160.

図5は、全体計画作成部343が作成する全体計画のパターンの例を示す図である。図5に示すように、高炉から製鋼工場までの工程は作成された状態であり、全体計画作成部343は、溶銑輸送計画により決定された輸送通過工程、及び輸送台車170が溶銑を払い出して空車となった時刻を考慮して、全体計画を作成する。   FIG. 5 is a diagram illustrating an example of a pattern of the overall plan created by the overall plan creation unit 343. As shown in FIG. 5, the process from the blast furnace to the steelmaking factory is in a prepared state, and the overall plan creation unit 343 performs the transport passing process determined by the hot metal transport plan, and the transport carriage 170 delivers hot metal and is empty. The overall plan is created taking into account the time of day.

全体計画作成部343は、全体計画を制約充足問題として定式化することにより、全体計画を作成する。そして、全体計画作成部343は、定式化した全体計画を満たす解が存在するか否かを判断する。定式化した全体計画を満たす解が存在し、全体計画が成立する場合、全体計画作成部343は、その解としての全体計画を、輸送計画として決定する。   The overall plan creation unit 343 creates the overall plan by formulating the overall plan as a constraint satisfaction problem. Then, the overall plan creation unit 343 determines whether there is a solution that satisfies the formulated overall plan. When a solution that satisfies the formulated overall plan exists and the overall plan is established, the overall plan creation unit 343 determines the overall plan as the solution as a transportation plan.

全体計画作成部343における定式化は、溶銑輸送計画作成部341における定式化と類似するが、溶銑輸送計画作成部341における定式化の場合と比較して、輸送台車が通過する工程の集合が、払出し後の空車となった輸送台車の工程まで拡張される点、及び回送先の高炉に関する制約条件が付加される点が異なる。以下、全体計画作成部343における全体計画の定式化について、溶銑輸送計画作成部341の作成要領と類似する点については、適宜説明を省略しながら、説明を行う。なお、全体計画作成部343は、輸送台車170の回送に際して通過する回送通過工程において満たされるべき各工程の状態(干渉状態)を、制約充足問題の制約条件として使用する。各工程の干渉状態は、輸送台車170の輸送に伴う経路の取り合い状態、及び輸送台車170によるクリーニングセンタ160の占有に関する状態を含む。   The formulation in the overall plan creation unit 343 is similar to the formulation in the hot metal transport plan creation unit 341, but compared to the formulation in the hot metal transport plan creation unit 341, the set of processes through which the transport carriage passes is The difference is that the process is extended to the process of a transport carriage that has become an empty vehicle after payout, and a restriction condition regarding the blast furnace at the forwarding destination is added. Hereinafter, the formulation of the overall plan in the overall plan creation unit 343 will be described while omitting a description as appropriate with respect to the points similar to the preparation procedure of the hot metal transport plan creation unit 341. Note that the overall plan creation unit 343 uses the state (interference state) of each process to be satisfied in the forward passing process that passes when the transport carriage 170 is forwarded as a constraint condition for the constraint satisfaction problem. The interference state of each process includes a state of connection of routes associated with the transportation of the transportation carriage 170 and a state relating to the occupation of the cleaning center 160 by the transportation carriage 170.

全体計画作成部343が行う全体計画の定式化の説明において、空車の輸送台車170の高炉110への回送までの設備及び経路を含む、輸送台車170が通過する設備及び経路の順序を示す集合をPRC'とし、空車の輸送台車170の高炉110への回送までの工程を含む、輸送台車170が選択可能な通過工程パターンの集合をPTN'とする。また、溶銑輸送計画作成部341における決定変数1−1から1−3に対応する、全体計画作成部343における決定変数3−1から3−3については、それぞれ変数名「'」を付して記載することにより、溶銑輸送計画作成部341における決定変数1−1から1−3と区別する。   In the description of the formulation of the overall plan performed by the overall plan creation unit 343, a set indicating the order of the equipment and the route through which the transport cart 170 passes, including the equipment and the route until the empty transport cart 170 is forwarded to the blast furnace 110, Let PRC ′ be a set of passing process patterns that can be selected by the transport cart 170, including the steps up to forwarding the empty transport cart 170 to the blast furnace 110. In addition, variable names “′” are attached to the decision variables 3-1 to 3-3 in the overall plan creation unit 343 corresponding to the decision variables 1-1 to 1-3 in the hot metal transport plan creation unit 341, respectively. By describing, it distinguishes from the decision variables 1-1 to 1-3 in the hot metal transport plan preparation part 341.

まず、全体計画の作成における決定変数について説明する。数式(32)は、全体計画作成部343が定義する、各工程の開始時刻vStartTime'[i][pc]に関する決定変数3−1である。   First, the decision variables in creating the overall plan will be described. Formula (32) is a decision variable 3-1 related to the start time vStartTime ′ [i] [pc] of each process defined by the overall plan creation unit 343.

Figure 0006428435
Figure 0006428435

数式(33)は、全体計画作成部343が定義する、各工程での所要時間vProcTime'[i][pc]に関する決定変数3−2である。   Formula (33) is a decision variable 3-2 for the required time vProcTime ′ [i] [pc] in each process defined by the overall plan creation unit 343.

Figure 0006428435
Figure 0006428435

また、下記数式(34)は、全体計画作成部343が定義する、通過工程vCar1'[i][pt]に関する決定変数3−3である。   Also, the following mathematical formula (34) is a decision variable 3-3 related to the passing process vCar1 ′ [i] [pt] defined by the overall plan creation unit 343.

Figure 0006428435
Figure 0006428435

全体計画作成部343は、決定変数3−3について、高炉110から製鋼工場150までの通過工程は溶銑輸送計画作成部341において既に決定されているため、特に製鋼工場150から高炉110までの回送に関する通過工程を算出する。   Since the passing process from the blast furnace 110 to the steelmaking factory 150 has already been determined in the hot metal transport plan preparation part 341 for the decision variable 3-3, the overall plan creation part 343 particularly relates to the forwarding from the steelmaking factory 150 to the blast furnace 110 Calculate the passing process.

次に、全体計画の作成における制約条件について説明する。数式(35)は、輸送台車iが選択可能な通過工程パターンが、1つに限定されることを定めた制約条件3−1を示す。制約条件3−1により、通過工程パターンが1つに定まる。   Next, the constraint conditions in creating the overall plan will be described. Formula (35) shows a constraint condition 3-1 that defines that the passing process pattern that can be selected by the transport carriage i is limited to one. The passing process pattern is determined to be one by the constraint condition 3-1.

Figure 0006428435
Figure 0006428435

溶銑輸送計画作成部341が作成した溶銑輸送計画により、高炉110での輸送台車iの受銑開始時刻、製鋼工場150への到着時刻が既に確定している。そのため、全体計画作成部343では、溶銑輸送計画に基づいて定められる数式(36)及び数式(37)が、それぞれ制約条件3−2及び3−3として使用される。   By the hot metal transport plan created by the hot metal transport plan creating unit 341, the time at which the transport cart i is received in the blast furnace 110 and the arrival time at the steelmaking factory 150 are already determined. Therefore, in the overall plan creation unit 343, Expressions (36) and (37) determined based on the hot metal transportation plan are used as the constraint conditions 3-2 and 3-3, respectively.

Figure 0006428435
Figure 0006428435

Figure 0006428435
Figure 0006428435

数式(36)は、輸送台車iが高炉nで受銑を開始する時刻に関する制約条件3−2である。ここで、BFnは、輸送台車iが通過する工程が高炉nであることを示す値である。   Formula (36) is a constraint condition 3-2 regarding the time when the transport cart i starts receiving in the blast furnace n. Here, BFn is a value indicating that the process through which the transport carriage i passes is the blast furnace n.

数式(37)は、輸送台車iが製鋼工場smmに到着する時刻に関する制約条件3−3である。ここで、smmは、輸送台車iが到着する製鋼工場を示す値である。   Formula (37) is a constraint condition 3-3 regarding the time at which the transport carriage i arrives at the steelmaking factory smm. Here, smm is a value indicating the steelmaking factory where the transport carriage i arrives.

また、全体計画作成部343は、溶銑払出計画作成部342が作成した溶銑払出計画に基づき、輸送台車iが溶銑を払い出して空車となる時刻を決定できる。具体的には、全体計画作成部343は、溶銑払出計画に基づき、製鋼工場smmで払出しが開始される時刻に、製鋼工場smmへ払出チャージchを分配する輸送台車iのうち払出しに最も時間を要する輸送台車iの払出しにかかる所要時間を加算した時刻を、空車となる時刻として決定する。全体計画作成部343は、巡回計画の作成において、輸送台車iが空車となる時刻に基づいて下記数式(38)により定められる制約条件3−4を使用する。数式(38)は、製鋼工場smmにおける工程の所要時間に関する制約条件3−4である。   Further, the overall plan creation unit 343 can determine the time when the transport carriage i pays out the hot metal and becomes empty based on the hot metal delivery plan created by the hot metal delivery plan creation unit 342. Specifically, based on the hot metal payout plan, the overall plan creation unit 343 takes the most time for paying out of the transport cart i that distributes the payout charge ch to the steelmaking factory smm at the time when the payout starts at the steelmaking factory smm. The time obtained by adding the time required for paying out the required transport carriage i is determined as the time when the vehicle is empty. The overall plan creation unit 343 uses the constraint condition 3-4 defined by the following mathematical formula (38) based on the time when the transport carriage i becomes empty in creating the tour plan. Formula (38) is the constraint condition 3-4 regarding the time required for the process in the steel factory smm.

Figure 0006428435
Figure 0006428435

数式(39)及び(40)は、各工程における所要時間の範囲に関する制約条件3−5である。制約条件3−5により、各工程での所要時間の範囲が定められる。   Expressions (39) and (40) are the constraint conditions 3-5 regarding the range of the required time in each process. The range of required time in each process is determined by the constraint condition 3-5.

Figure 0006428435
Figure 0006428435

Figure 0006428435
Figure 0006428435

数式(39)におけるcProcMin[pt][pc]は、通過工程pcにおける所要時間の下限値であり、数式(39)で示される制約条件3−5により、各工程における最低限の所要時間が確保される。また、数式(40)におけるcProcMax[pt][pc]は、通過工程pcに輸送台車iが停留可能な最大時間であり、数式(40)で示される制約条件3−5により、輸送台車iが各工程において所定時間以上停留することを防ぐことができる。   CProcMin [pt] [pc] in Equation (39) is the lower limit value of the required time in the passage process pc, and the minimum required time in each step is secured by the constraint 3-5 shown in Equation (39). Is done. In addition, cProcMax [pt] [pc] in Expression (40) is the maximum time that the transportation carriage i can stop in the passing process pc, and the transportation carriage i is determined by the constraint condition 3-5 shown in Expression (40). It is possible to prevent stopping for a predetermined time or longer in each step.

数式(41)は、通過工程の順序と、次の工程の開始時刻に関する制約条件3−6である。つまり、数式(41)で示す制約条件3−6は、ある工程の終了時刻と、その次の工程の開始時刻とが同じであることを示し、さらに言い換えれば、現工程の終了と同時に次工程が開始されることを意味する。   Formula (41) is a constraint condition 3-6 regarding the order of the passing process and the start time of the next process. That is, the constraint condition 3-6 represented by the mathematical formula (41) indicates that the end time of a certain process is the same as the start time of the next process. In other words, the next process is completed simultaneously with the end of the current process. Means that will start.

Figure 0006428435
Figure 0006428435

数式(42)は、各工程において停留させることができる輸送台車iの最大台数に関する制約条件3−7である。つまり、数式(42)で示される制約条件3−7は、各工程において重複して停留させることが可能な輸送台車iの台数を定めたものである。   Formula (42) is the constraint condition 3-7 regarding the maximum number of transport carts i that can be stopped in each step. That is, the constraint condition 3-7 shown by the mathematical formula (42) defines the number of transport carriages i that can be stopped redundantly in each process.

Figure 0006428435
Figure 0006428435

数式(42)において、vmOverlapNum'[i][pc]は、数式(43)を満たす中間変数である。   In Equation (42), vmOverlapNum ′ [i] [pc] is an intermediate variable that satisfies Equation (43).

Figure 0006428435
Figure 0006428435

つまり、vmOverlapNum[i][pc]は、輸送台車iが、ある工程に存在する場合に、他の輸送台車が同一の工程に存在する場合に「1」となる中間変数である。具体的には、vmOverlapNum[i][pc]=1となるのは、次の数式(44)又は(45)のいずれかの場合である。   That is, vmOverlapNum [i] [pc] is an intermediate variable that is “1” when the transport carriage i exists in a certain process and another transport carriage exists in the same process. Specifically, vmOverlapNum [i] [pc] = 1 is the case of either of the following formulas (44) or (45).

Figure 0006428435
Figure 0006428435

Figure 0006428435
Figure 0006428435

Figure 0006428435
Figure 0006428435

Figure 0006428435
Figure 0006428435

Figure 0006428435
Figure 0006428435

数式(48)は、高炉から出銑される溶銑を受銑するために必要な空車状態の輸送台車の台数に関する制約条件3−8である。   Formula (48) is a constraint condition 3-8 regarding the number of empty transport carriages necessary for receiving the hot metal output from the blast furnace.

Figure 0006428435
Figure 0006428435

数式(48)において、bf、BF、pg及びPIGは、それぞれ以下の意味で使用され、本明細書において、以後同様の意味で使用される。
bf:全体計画作成の対象となっている高炉110
BF:全体計画作成の対象となっている高炉110の集合
pg:高炉110における出銑
PIG:高炉110における出銑の集合
In Formula (48), bf, BF, pg, and PIG are used in the following meanings, and are used in the same meaning in the present specification.
bf: Blast furnace 110 that is the target of the overall plan
BF: Set of blast furnaces 110 that are the targets of the overall plan
pg: Output at blast furnace 110
PIG: Collection of tapping in the blast furnace 110

数式(48)において、vmSumCarNum[bf][pg]は、次の数式(49)により表される中間変数である。   In Equation (48), vmSumCarNum [bf] [pg] is an intermediate variable represented by the following Equation (49).

Figure 0006428435
Figure 0006428435

中間変数vmSumCarNum[bf][pg]は、次の数式(50)が満たされる場合に算出される。   The intermediate variable vmSumCarNum [bf] [pg] is calculated when the following formula (50) is satisfied.

Figure 0006428435
Figure 0006428435

ここで、数式(50)において、cBF[bf][pt]は、通過工程パターンptにおける回送先の高炉が高炉bfである場合「1」となり、回送先の高炉が高炉bfでない場合「0」となる定数である。また、cPigTime[bf][pg]は、高炉bfにおける出銑開始時刻を示す定数である。数式(50)は、高炉bfにおける出銑pgの開始時刻において、空車状態の輸送台車iが高炉bfに到着していなければならないことを示している。   Here, in Formula (50), cBF [bf] [pt] is “1” when the forwarding blast furnace in the passage process pattern pt is the blast furnace bf, and “0” when the forwarding blast furnace is not the blast furnace bf. Is a constant. Further, cPigTime [bf] [pg] is a constant indicating the start time of tapping in the blast furnace bf. Formula (50) indicates that the empty transport carriage i must arrive at the blast furnace bf at the start time of the output pg in the blast furnace bf.

また、数式(48)において、cSumCarNumBF[bf][pg]は、高炉bfでの出銑pgにおいて必要な輸送台車iの台数である。必要輸送台車数cSumCarNumBF[bf][pg]は、上位システム部400から取得した高炉bfの出銑予定に基づき、前処理部330が算出する。   Moreover, in Formula (48), cSumCarNumBF [bf] [pg] is the number of transport carts i necessary for the output pg at the blast furnace bf. The necessary number of transport carts cSumCarNumBF [bf] [pg] is calculated by the preprocessing unit 330 based on the blast furnace bf extraction schedule obtained from the host system unit 400.

制約条件3−8により、高炉bfでの出銑pgにおいて、出銑される溶銑量に対して、輸送台車iが不足することを防止できる。   With restriction condition 3-8, it is possible to prevent the transport cart i from being insufficient with respect to the amount of molten iron discharged in the output pg at the blast furnace bf.

全体計画作成部343は、以上の制約条件3−1から3−8を満たす決定変数3−1から3−3の解が存在するか否かを、演算を行うことにより判断する。全体計画作成部343は、解が存在しないと判断した場合、当該演算に使用された通過工程パターンptでは、全体計画が成立しないと判断し、記憶部310に記憶された当該演算に使用された通過工程パターンptに対応する重み係数cImps[i][pt]を、cImps[i][pt]=1からcImps[i][pt]=0に変更する。かかる重み係数cImps[i][pt]の変更により、輸送計画作成において、この通過工程パターンptは選択不可能となる。そして、輸送計画作成部340は、他の通過工程パターンptについて、解が存在するか否か、再び溶銑輸送計画作成部341における溶銑輸送計画の作成から演算を実行する。輸送計画作成部340は、全体計画作成部343が、決定変数3−1から3−3の解が存在すると判断するまで、演算を繰り返す。   The overall plan creation unit 343 determines whether there is a solution of the decision variables 3-1 to 3-3 satisfying the above constraint conditions 3-1 to 3-8 by performing an operation. When it is determined that there is no solution, the overall plan creation unit 343 determines that the overall plan is not established in the passing process pattern pt used for the calculation, and is used for the calculation stored in the storage unit 310. The weighting coefficient cImps [i] [pt] corresponding to the passing process pattern pt is changed from cImps [i] [pt] = 1 to cImps [i] [pt] = 0. By changing the weighting factor cImps [i] [pt], the passage process pattern pt cannot be selected in the transportation plan creation. Then, the transportation plan creation unit 340 executes the calculation again from the creation of the hot metal transportation plan in the hot metal transportation plan creation unit 341 whether or not there is a solution for the other passage process pattern pt. The transportation plan creation unit 340 repeats the calculation until the overall plan creation unit 343 determines that the solutions of the decision variables 3-1 to 3-3 exist.

一方、全体計画作成部343は、解が存在すると判断した場合、全体計画が成立すると判断し、解として成立した全体計画を輸送計画として決定する。そして、全体計画作成部343は、演算した結果得られた輸送計画を、表示部350に表示する。表示部350における表示例については、後述する。また、全体計画作成部343は、演算した結果得られた輸送計画を上位システム部400に送信する。上位システム部400は、取得した輸送計画に基づいて、各設備を制御し、輸送計画を実行する。   On the other hand, when it is determined that a solution exists, the overall plan creation unit 343 determines that the overall plan is established, and determines the overall plan established as a solution as a transportation plan. Then, the overall plan creation unit 343 displays the transportation plan obtained as a result of the calculation on the display unit 350. A display example on the display unit 350 will be described later. In addition, the overall plan creation unit 343 transmits the transportation plan obtained as a result of the calculation to the upper system unit 400. The host system unit 400 controls each facility based on the acquired transportation plan and executes the transportation plan.

なお、溶銑輸送計画作成部341、溶銑払出計画作成部342、及び全体計画作成部343は、制約条件付き最適化問題又は制約充足問題として定式化した問題を、周知の数理ソルバ又はメタヒューリスティックス手法を用いて、決定変数及び中間変数の解を導出する。   The hot metal transport plan creation unit 341, the hot metal discharge plan creation unit 342, and the overall plan creation unit 343 apply a well-known mathematical solver or metaheuristics method to a problem formulated as a constrained optimization problem or a constraint satisfaction problem. To derive solutions for the decision variables and intermediate variables.

次に、輸送計画作成装置300による輸送計画の作成手順の一例を、図6のフローチャートを参照して説明する。   Next, an example of a transportation plan creation procedure by the transportation plan creation apparatus 300 will be described with reference to the flowchart of FIG.

輸送計画作成装置300は、まず、溶銑輸送計画作成部341において、溶銑輸送計画を制約条件付き最適化問題として定式化し、定式化した最適化問題の解を導出することにより、溶銑輸送計画を作成する(ステップS101)。   The transport plan creation device 300 first creates a hot metal transport plan by formulating the hot metal transport plan as a constrained optimization problem in the hot metal transport plan creation unit 341 and deriving a solution of the formulated optimization problem. (Step S101).

次に、輸送計画作成装置300は、溶銑払出計画作成部342において、溶銑払出計画を制約条件付き最適化問題として定式化し、定式化した最適化問題の解を導出することにより、溶銑払出計画を作成する(ステップS102)。   Next, the transportation plan creation device 300 formulates the hot metal delivery plan as a constrained optimization problem in the hot metal delivery plan creation unit 342 and derives a solution of the formulated optimization problem, thereby generating the hot metal delivery plan. Create (step S102).

そして、輸送計画作成装置300は、全体計画作成部343において、全体計画を制約充足問題として定式化することにより、全体計画を作成する(ステップS103)。   Then, the transportation plan creation device 300 creates the overall plan by formulating the overall plan as a constraint satisfaction problem in the overall plan creation unit 343 (step S103).

輸送計画作成装置300は、全体計画作成部343において、定式化した全体計画を満たす解が存在するか否かを判断することにより、全体計画が成立するか否かを判断する(ステップS104)。   The transportation plan creation device 300 determines whether or not the overall plan is established by determining whether or not there is a solution that satisfies the formulated overall plan in the overall plan creation unit 343 (step S104).

輸送計画作成装置300は、全体計画作成部343において、定式化した全体計画を満たす解が存在しないために全体計画が成立しないと判断した場合(ステップS104のNo)、ステップS101からステップS103の全体を通して行った輸送計画作成において選択した通過工程パターンを、例えば重み係数を変更することにより選択不可能にする(ステップS107)。そして、輸送計画作成装置300は、このフローのステップS101に戻り、ステップS104において全体計画が成立すると判断されるまで、選択可能な通過工程パターンについて、ステップS101からステップS104までの同様の処理を繰り返す。   When the overall plan creation unit 343 determines that the overall plan is not established because there is no solution that satisfies the formulated overall plan (No in step S104), the transportation plan creation apparatus 300 performs the entire process from step S101 to step S103. The passage process pattern selected in the transportation plan creation made through the process is made unselectable, for example, by changing the weighting factor (step S107). Then, the transportation plan creation apparatus 300 returns to step S101 of this flow, and repeats the same processing from step S101 to step S104 for the selectable passing process pattern until it is determined that the overall plan is established in step S104. .

輸送計画作成装置300は、全体計画作成部343において、定式化した全体計画を満たす解が存在するために全体計画が成立すると判断した場合(ステップS104のYes)、全体計画を輸送計画として決定する(ステップS105)。   If the overall plan creation unit 343 determines that the overall plan is established because there is a solution that satisfies the formulated overall plan (Yes in step S104), the transportation plan creation device 300 determines the overall plan as a transportation plan. (Step S105).

そして、輸送計画作成装置300は、ステップS105において決定した輸送計画を、表示部350に表示する。   Then, the transportation plan creation apparatus 300 displays the transportation plan determined in step S105 on the display unit 350.

次に、図7を参照して、表示部350に表示される輸送計画について説明する。輸送計画作成部340において作成された輸送計画は、CRT等の表示部350に、例えば図7に示すように、ガントチャートとして表示される。図7は、溶銑輸送設備100が、高炉110、前除滓設備120、溶銑予備処理設備130、後除滓設備140、製鋼工場150及びクリーニングセンタ160を、それぞれ2つずつ有する場合の例を示している。   Next, the transportation plan displayed on the display unit 350 will be described with reference to FIG. The transportation plan created in the transportation plan creation unit 340 is displayed on a display unit 350 such as a CRT as a Gantt chart as shown in FIG. FIG. 7 shows an example in which the hot metal transporting facility 100 has two blast furnaces 110, a pre-metal removal equipment 120, a hot metal pretreatment equipment 130, a post-metal removal equipment 140, a steelmaking factory 150, and two cleaning centers 160, respectively. ing.

図7に示すように、本実施形態において、高炉1及び高炉2は、それぞれ溶銑の出銑口を2つずつ有する。すなわち、高炉1及び高炉2は、それぞれ2つの出銑口のいずれかから、輸送台車170に溶銑を出銑することができる。また、製鉄工場1及び製鉄工場2は、輸送台車170からの溶銑の払出し位置を、それぞれ2つ有する。   As shown in FIG. 7, in this embodiment, the blast furnace 1 and the blast furnace 2 each have two hot metal outlets. That is, each of the blast furnace 1 and the blast furnace 2 can feed hot metal to the transport carriage 170 from either of the two tap outlets. Further, each of the steel factory 1 and the steel factory 2 has two hot metal discharge positions from the transport carriage 170.

輸送計画作成装置300は、適宜のタイミングで輸送計画を作成する。輸送計画作成装置300は、輸送計画を作成した後、例えば、高炉の出銑予定、各中間処理設備での処理状況、及び製鋼工場での出鋼状況等が、変化したことにより作成した輸送計画の実行が困難になった場合、その時点において、その時点からの輸送計画を作成してもよい。   The transportation plan creation device 300 creates a transportation plan at an appropriate timing. After creating the transportation plan, the transportation plan creation apparatus 300 is created by, for example, changing the blast furnace schedule, the processing status at each intermediate processing facility, and the steel production status at the steelmaking factory. If it becomes difficult to execute, a transportation plan from that point may be created.

このように、本実施形態に係る輸送計画作成装置300によれば、切れ目なく高炉110から出銑される溶銑を、輸送台車170及び車両171等の限られたリソースを用いて、製鋼工場150に供給可能な輸送計画を作成可能である。また、輸送計画作成装置300は、各工程の干渉状態を考慮しながら、輸送台車170が、各製鋼工場150が要求する溶銑量及び溶銑成分等を満たすように中間処理設備を通過するように、輸送計画を作成可能である。さらに、輸送計画作成装置300は、輸送台車170の回送についても考慮するため、常時、高炉110に空車状態の輸送台車170を待機させることが可能な輸送計画を作成可能である。このように、本実施形態に係る輸送計画作成装置300によれば、高炉の出銑予定及び製鋼工場の出鋼計画に合わせた輸送計画を作成可能である。また、本実施形態に係る輸送計画作成装置300が作成した輸送計画を実行することにより、高炉110から製鋼工場150に安定して溶銑を供給可能となる。特に、輸送計画作成装置300が作成した輸送計画によれば、安定して、製鋼工場において効率的な出鋼を行うことができる。   Thus, according to the transportation plan creation apparatus 300 according to the present embodiment, the hot metal discharged from the blast furnace 110 without breaks is transferred to the steelmaking factory 150 using limited resources such as the transportation carriage 170 and the vehicle 171. A transport plan that can be supplied can be created. In addition, the transportation plan creation device 300, while taking into account the interference state of each process, so that the transportation carriage 170 passes through the intermediate processing equipment so as to satisfy the hot metal amount and the hot metal component required by each steelmaking factory 150, A transportation plan can be created. Furthermore, since the transport plan creation apparatus 300 also considers the forwarding of the transport carriage 170, it is possible to create a transport plan that allows the blast furnace 110 to always keep the empty transport carriage 170 on standby. As described above, according to the transportation plan creation apparatus 300 according to the present embodiment, it is possible to create a transportation plan in accordance with the blast furnace schedule and the steelmaking plan. Further, by executing the transportation plan created by the transportation plan creation device 300 according to the present embodiment, the hot metal can be stably supplied from the blast furnace 110 to the steelmaking factory 150. In particular, according to the transportation plan created by the transportation plan creation device 300, it is possible to stably and efficiently produce steel in a steelmaking factory.

以上、本発明を諸図面や実施例に基づき説明してきたが、当業者であれば本開示に基づき種々の変形や修正を行うことが容易であることに注意されたい。したがって、これらの変形や修正は本発明の範囲に含まれることに留意されたい。例えば、各手段、各ステップ等に含まれる機能等は論理的に矛盾しないように再配置可能であり、複数の手段やステップ等を1つに組み合わせたり、或いは分割したりすることが可能である。   Although the present invention has been described based on the drawings and examples, it should be noted that those skilled in the art can easily make various modifications and corrections based on the present disclosure. Therefore, it should be noted that these variations and modifications are included in the scope of the present invention. For example, the functions included in each means, each step, etc. can be rearranged so that there is no logical contradiction, and a plurality of means, steps, etc. can be combined or divided into one. .

100 溶銑輸送設備
110 高炉
120 前除滓設備
130 溶銑予備処理設備
140 後除滓設備
150 製鋼工場
160 クリーニングセンタ
170 輸送台車
171 車両
200 輸送計画作成システム
300 輸送計画作成装置
310 記憶部
320 入力部
330 前処理部
340 輸送計画作成部
341 溶銑輸送計画作成部
342 溶銑払出計画作成部
343 全体計画作成部
350 表示部
360 制御部
370 通信部
400 上位システム部
410 ビジネスコンピュータ
420 プロセスコンピュータ
DESCRIPTION OF SYMBOLS 100 Hot metal transport equipment 110 Blast furnace 120 Pre-treatment equipment 130 Hot metal pretreatment equipment 140 Post-treatment equipment 150 Steelmaking factory 160 Cleaning center 170 Transport cart 171 Vehicle 200 Transport plan creation system 300 Transport plan creation device 310 Storage section 320 Input section 330 Front Processing unit 340 Transport plan creation unit 341 Hot metal transport plan creation unit 342 Hot metal delivery plan creation unit 343 Overall plan creation unit 350 Display unit 360 Control unit 370 Communication unit 400 Host system unit 410 Business computer 420 Process computer

Claims (5)

1基以上の高炉と、1か所以上の溶銑の中間処理を行う中間処理設備と、1か所以上の製鋼工場を備える一貫製鉄所における複数の輸送台車による溶銑の輸送計画を作成する輸送計画作成装置であって、
前記輸送台車が前記高炉から出銑された前記溶銑を前記製鋼工場まで輸送する際に通過する輸送通過工程に関する溶銑輸送計画であって、前記製鋼工場の出鋼計画に基づいて要求される成分の溶銑を要求される時刻に前記輸送台車から前記製鋼工場に払い出し可能となる溶銑輸送計画を作成する溶銑輸送計画作成部と、
前記溶銑輸送計画作成部が作成した前記溶銑輸送計画に基づいて、前記輸送台車と、該輸送台車が前記溶銑を払い出す製鋼工場とを紐付ける溶銑払出計画を作成する溶銑払出計画作成部と、
前記溶銑輸送計画作成部が作成した前記溶銑輸送計画と、前記溶銑払出計画作成部が作成した前記溶銑払出計画とに基づき、前記輸送台車が前記溶銑を払い出して空車となる時刻を決定するとともに、前記空車となった前記輸送台車が前記高炉に回送される際に通過する回送通過工程に関する回送計画を含む全体計画であって、前記高炉の出銑予定に基づいて要求される時刻に前記空車となった前記輸送台車が受銑可能となる全体計画を作成して、該全体計画を前記輸送計画と決定する全体計画作成部と
を備える、輸送計画作成装置。
Transportation plan to create a transportation plan for hot metal with multiple transport carts in an integrated steelworks with one or more blast furnaces, intermediate processing equipment for intermediate processing of one or more hot metal, and one or more steel mills A creation device,
It is a hot metal transport plan related to a transport passage process that passes when the transport cart transports the hot metal extracted from the blast furnace to the steelmaking factory, and includes components required based on the steelmaking plan of the steelmaking factory. A hot metal transport plan creation unit for creating a hot metal transport plan that can be paid out from the transport cart to the steelmaking factory at the time when hot metal is required;
Based on the hot metal transport plan created by the hot metal transport plan creating unit, a hot metal payout plan creating unit for creating a hot metal payout plan that links the transport cart and a steelmaking factory from which the transport cart delivers the hot metal,
Based on the hot metal transport plan created by the hot metal transport plan creation unit and the hot metal delivery plan created by the hot metal delivery plan creation unit, the transport cart pays out the hot metal and becomes empty. It is an overall plan including a forwarding plan relating to a forwarding passage process that passes when the transport carriage that has become the empty vehicle is forwarded to the blast furnace, and the empty vehicle and the empty vehicle at a time required based on the schedule of the blast furnace. A transportation plan creation device comprising: an overall plan creation unit that creates an overall plan that can be received by the transport cart, and determines the overall plan as the transportation plan.
前記溶銑輸送計画作成部は、制約条件付き最適化問題として定式化することにより、前記溶銑輸送計画を作成し、
前記溶銑払出計画作成部は、制約条件付き最適化問題として定式化することにより、前記溶銑払出計画を作成し、
前記全体計画作成部は、制約充足問題として定式化することにより、前記全体計画を作成する、請求項1に記載の輸送計画作成装置。
The hot metal transport plan creation unit creates the hot metal transport plan by formulating as an optimization problem with constraints,
The hot metal payout plan creation unit prepares the hot metal payout plan by formulating as an optimization problem with constraints,
The transportation plan creation device according to claim 1, wherein the overall plan creation unit creates the overall plan by formulating as a constraint satisfaction problem.
前記溶銑輸送計画作成部は、前記輸送台車が前記高炉から前記製鋼工場まで移動するに際して通過する前記輸送通過工程における各工程の干渉状態を、前記最適化問題の制約条件として使用し、
前記全体計画作成部は、前記輸送台車の前記回送に際して通過する前記回送通過工程における各工程の干渉状態を、前記制約充足問題の制約条件として使用する、
請求項2に記載の輸送計画作成装置。
The hot metal transport plan creation unit uses the interference state of each process in the transport passage process that passes when the transport cart moves from the blast furnace to the steelmaking factory as a constraint condition of the optimization problem,
The overall plan creation unit uses the interference state of each process in the forwarding passage process that passes during the forwarding of the transport carriage as a constraint condition of the constraint satisfaction problem.
The transportation plan creation device according to claim 2.
前記全体計画作成部が前記制約充足問題の前記制約条件を満たす解が導出できない場合、作成した前記輸送計画に関する前記輸送通過工程及び前記回送通過工程とは異なる輸送通過工程及び回送通過工程について、前記輸送計画の作成処理を再度実行する、請求項3に記載の輸送計画作成装置。   When the overall plan creation unit cannot derive a solution that satisfies the constraint condition of the constraint satisfaction problem, the transport passage step and the forwarding passage step different from the transportation passage step and the forwarding passage step related to the created transportation plan, The transportation plan creation device according to claim 3, wherein the transportation plan creation processing is executed again. 1基以上の高炉と、1か所以上の溶銑の中間処理を行う中間処理設備と、1か所以上の製鋼工場を備える一貫製鉄所における複数の輸送台車による溶銑の輸送計画を、コンピュータが作成する輸送計画作成方法であって、
前記輸送台車が前記高炉から出銑された前記溶銑を前記製鋼工場まで輸送する際に通過する輸送通過工程に関する溶銑輸送計画であって、前記製鋼工場の出鋼計画に基づいて要求される成分の溶銑を要求される時刻に前記輸送台車から前記製鋼工場に払い出し可能となる溶銑輸送計画を作成する溶銑輸送計画作成ステップと、
前記溶銑輸送計画作成ステップにおいて作成された前記溶銑輸送計画に基づいて、前記輸送台車と、該輸送台車が前記溶銑を払い出す製鋼工場とを紐付ける溶銑払出計画を作成する溶銑払出計画作成ステップと、
前記溶銑輸送計画作成ステップにおいて作成された前記溶銑輸送計画と、前記溶銑払出計画作成ステップにおいて作成された前記溶銑払出計画とに基づき、前記輸送台車が前記溶銑を払い出して空車となる時刻を決定するとともに、前記空車となった前記輸送台車が前記高炉に回送される際に通過する回送通過工程に関する回送計画を含む全体計画であって、前記高炉の出銑予定に基づいて要求される時刻に前記空車となった前記輸送台車が受銑可能となる全体計画を作成して、該全体計画を前記輸送計画と決定する全体計画作成ステップと
を含む、輸送計画作成方法。
Computer creates hot metal transport plan with multiple transport trolleys at integrated steelworks with one or more blast furnaces, intermediate processing equipment for intermediate processing of hot metal at one or more locations, and one or more steel mills A transportation plan creation method,
It is a hot metal transport plan related to a transport passage process that passes when the transport cart transports the hot metal extracted from the blast furnace to the steelmaking factory, and includes components required based on the steelmaking plan of the steelmaking factory. A hot metal transport plan creating step for creating a hot metal transport plan that can be paid out from the transport cart to the steelmaking factory at a time when hot metal is required;
Based on the hot metal transport plan created in the hot metal transport plan creating step, a hot metal discharge plan creating step for creating a hot metal payout plan for associating the transport cart with a steelmaking factory from which the transport cart delivers the hot metal, and ,
Based on the hot metal transportation plan created in the hot metal transportation plan creation step and the hot metal delivery plan created in the hot metal delivery plan creation step, the time at which the transport carriage dispenses the hot metal and becomes empty is determined. And an overall plan including a forwarding plan related to a forwarding passage process that passes when the transport carriage that has become the empty vehicle is forwarded to the blast furnace, and at a time required based on a schedule of the blast furnace A transportation plan creation method, comprising: creating an overall plan in which the transport carriage that has become an empty vehicle can be received and determining the overall plan as the transportation plan.
JP2015070115A 2015-03-30 2015-03-30 Transportation plan creation device and transportation plan creation method Active JP6428435B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2015070115A JP6428435B2 (en) 2015-03-30 2015-03-30 Transportation plan creation device and transportation plan creation method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2015070115A JP6428435B2 (en) 2015-03-30 2015-03-30 Transportation plan creation device and transportation plan creation method

Publications (2)

Publication Number Publication Date
JP2016191974A JP2016191974A (en) 2016-11-10
JP6428435B2 true JP6428435B2 (en) 2018-11-28

Family

ID=57245599

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2015070115A Active JP6428435B2 (en) 2015-03-30 2015-03-30 Transportation plan creation device and transportation plan creation method

Country Status (1)

Country Link
JP (1) JP6428435B2 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110961611A (en) * 2018-12-28 2020-04-07 合肥工大高科信息科技股份有限公司 Molten iron transportation control method, rear end and front end

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2019067293A (en) * 2017-10-04 2019-04-25 株式会社神戸製鋼所 Arrangement adjustment system of engine for traction of mixer car in steel-making process
CN110262439B (en) * 2019-07-22 2021-11-19 中冶赛迪工程技术股份有限公司 Steelmaking process quality control method and system
JP7294660B2 (en) * 2019-12-24 2023-06-20 株式会社未来シェア Route planning device, route planning method, and program
KR102308703B1 (en) * 2019-12-30 2021-10-01 주식회사 포스코아이씨티 System for Predicting Timing of Closing Hole of Blast Furnace
WO2022153716A1 (en) * 2021-01-12 2022-07-21 日本電気株式会社 Optimization device, optimization method, and non-transitory computer-readable medium

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002332510A (en) * 2001-05-07 2002-11-22 Nkk Corp Method for preparing physical distribution plan, and program therefor
JP2003055705A (en) * 2001-08-10 2003-02-26 Nkk Corp Physical distribution plan preparing method, and program thereof
JP4373275B2 (en) * 2004-05-18 2009-11-25 株式会社神戸製鋼所 Discharge plan management apparatus, payout plan management method, and program
JP5005194B2 (en) * 2005-07-05 2012-08-22 新日本製鐵株式会社 Transport vehicle operation plan creation method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110961611A (en) * 2018-12-28 2020-04-07 合肥工大高科信息科技股份有限公司 Molten iron transportation control method, rear end and front end
CN110961611B (en) * 2018-12-28 2021-11-09 合肥工大高科信息科技股份有限公司 Molten iron transportation control method, rear end and front end

Also Published As

Publication number Publication date
JP2016191974A (en) 2016-11-10

Similar Documents

Publication Publication Date Title
JP6428435B2 (en) Transportation plan creation device and transportation plan creation method
WO2017088674A1 (en) Steelmaking batch grouping and production scheduling method for whole process production
Tang et al. Integrated charge batching and casting width selection at Baosteel
JP4734024B2 (en) Hot rolling mill heating / rolling schedule creation apparatus, creation method, computer program, and computer-readable recording medium
CN106779220A (en) A kind of steel-making continuous casting hot rolling integrated scheduling method and system
JP6593080B2 (en) Steelmaking rolling planning device, steelmaking rolling planning method, and program
JP4407543B2 (en) Steelmaking process operation schedule creation system, steelmaking process operation schedule creation method, and computer program
CN106647674A (en) Knowledge representation-based steel production scheduling model matching method
CN108022010A (en) The optimization method of ladle scheduling problem
JP6724858B2 (en) Transportation container allocation plan creation method, transportation container allocation plan creation device, and steel mill operation method
JP2000176634A (en) Apparatus for settling on production plan of steel product
JP6191629B2 (en) Hot metal logistics planning method and hot metal logistics planning device
JP4373275B2 (en) Discharge plan management apparatus, payout plan management method, and program
JP2011204032A (en) Method and device for estimating operation load of molten steel ladle
JPS62164811A (en) Method for making operation plan for tapping and casting
JP4557473B2 (en) Method and apparatus for adjusting steelmaking schedule based on the amount of storage between blast furnace and steelmaking factory
JP7156024B2 (en) Plan creation device, plan creation method, and program
JP5494194B2 (en) Production target range setting device and production target range setting method
JP4994797B2 (en) Production / distribution plan creation apparatus and method for continuous or related processes, production / distribution control apparatus and method, computer program, and computer-readable recording medium
JP5672041B2 (en) Method for allocating steel out of ladle and apparatus for allocating steel out of ladle
JP4638824B2 (en) Production / distribution plan creation apparatus, production / distribution plan creation method, distribution control apparatus, distribution control method, program, and computer-readable recording medium
Pan et al. Application of extremal optimization approach to the integrated scheduling problem of continuous casting and hot rolling process
JPH11236116A (en) Material carry control system
JP5556028B2 (en) Hot metal allocating method and apparatus, and hot metal inventory transition estimating apparatus
JP2019067293A (en) Arrangement adjustment system of engine for traction of mixer car in steel-making process

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20161025

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20170726

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20170905

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20171016

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20180403

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20180418

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20181002

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20181015

R150 Certificate of patent or registration of utility model

Ref document number: 6428435

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250