JP2003055705A - Physical distribution plan preparing method, and program thereof - Google Patents

Physical distribution plan preparing method, and program thereof

Info

Publication number
JP2003055705A
JP2003055705A JP2001244633A JP2001244633A JP2003055705A JP 2003055705 A JP2003055705 A JP 2003055705A JP 2001244633 A JP2001244633 A JP 2001244633A JP 2001244633 A JP2001244633 A JP 2001244633A JP 2003055705 A JP2003055705 A JP 2003055705A
Authority
JP
Japan
Prior art keywords
hot metal
plan
refining
steelmaking
route
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2001244633A
Other languages
Japanese (ja)
Inventor
Yuusuke Yoshinari
有介 吉成
Hiroshi Tanabiki
浩 田靡
Koichi Ozawa
宏一 小澤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
JFE Engineering Corp
Original Assignee
NKK Corp
Nippon Kokan Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by NKK Corp, Nippon Kokan Ltd filed Critical NKK Corp
Priority to JP2001244633A priority Critical patent/JP2003055705A/en
Publication of JP2003055705A publication Critical patent/JP2003055705A/en
Pending legal-status Critical Current

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/30Computing systems specially adapted for manufacturing

Landscapes

  • Refinement Of Pig-Iron, Manufacture Of Cast Iron, And Steel Manufacture Other Than In Revolving Furnaces (AREA)
  • Carbon Steel Or Casting Steel Manufacturing (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

PROBLEM TO BE SOLVED: To provide a physical distribution plan preparing method and a program thereof by which a new physical distribution plan can be prepared by adjusting the influence to a minimum even when the physical distribution plan of a hot metal is varied. SOLUTION: The physical distribution plan preparing method comprises a selecting step (S3) of selecting a steel-making refining plan to be refined at the time closest to the present time in the steel-making refining plan which is not used in the physical distribution plan for each steel-making step, a route preparing step (S4) of preparing a plurality of carrying routes for the hot metal to be carried from a blast furnace step based on the selected steel-making refining plan, a determining step (S5) of determining an optimum carrying route based on the waiting time from the arrival in the steel-making step out of a plurality of prepared carrying routes to the start of the refining, and a plan preparing step (S6) of preparing the physical distribution plan with the determined carrying route incorporated therewith.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【発明の属する技術分野】本発明は、高炉工程と溶銑予
備処理工程と製鋼工程とを備えた製鉄所での溶銑需給の
ための物流計画を作成する方法に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a method for preparing a distribution plan for supply and demand of hot metal in an iron mill having a blast furnace process, a hot metal pretreatment process and a steelmaking process.

【0002】[0002]

【従来の技術】製鉄所においては、高炉工場で生産され
た溶銑は溶銑鍋あるいはトーピード等の溶銑運搬手段を
用いて製鋼工場まで運搬されている。
2. Description of the Related Art In a steelworks, hot metal produced in a blast furnace factory is transported to a steelmaking factory by means of hot metal transportation means such as a hot metal ladle or torpedo.

【0003】図7は溶銑の物流を説明する図である。FIG. 7 is a diagram for explaining the distribution of hot metal.

【0004】高炉工場1で出銑された溶銑は溶銑鍋2に
受銑される。この溶銑が満たされた溶銑鍋2は複数台が
機関車3によって牽引されて軌道上を運搬され、途中溶
銑予備処理設備4において溶銑の成分調整等の処理を受
けた後、製鋼工場5に運搬される。
The hot metal tapped at the blast furnace factory 1 is received by the hot metal ladle 2. A plurality of the hot metal ladles 2 filled with the hot metal are towed by a locomotive 3 and transported on an orbit. After being subjected to processing such as adjusting the components of the hot metal in a hot metal pretreatment facility 4, they are transported to a steel factory 5. To be done.

【0005】製鋼工場5では、溶銑鍋2は一旦待機状態
に置かれた後、例えば転炉を用いて鋼に精錬される。溶
銑を排出した溶銑鍋2は、再度高炉工場1での受銑に使
用するため、複数台が機関車3によって牽引され、所定
の高炉工場1にまで回送される。
In the steelmaking plant 5, the hot metal ladle 2 is once put in a standby state and then refined into steel by using, for example, a converter. Since the hot metal ladle 2 from which the hot metal has been discharged is used again for receiving hot metal in the blast furnace factory 1, a plurality of locomotives 3 are pulled by the locomotive 3 and sent to a predetermined blast furnace factory 1.

【0006】一般には、製鉄所では複数の高炉工場1、
溶銑予備処理設備4、製鋼工場5が備えられており、溶
銑鍋2も数十から数百の台数が使用されているため、各
工場での操業に対応して前述の溶銑の物流計画を作成し
運用することは熟練を要する業務となっている。
[0006] Generally, a steel mill has a plurality of blast furnace plants 1,
Preliminary hot metal pretreatment facility 4 and steel manufacturing plant 5 are provided, and several tens to several hundreds of hot metal ladle 2 are used. Therefore, the above-mentioned hot metal distribution plan is prepared in response to the operation at each factory. It is a task that requires skill.

【0007】従来の、高炉工場1と製鋼工場5間の溶銑
の物流に関する計画作成に関しては、特開平9−249
903号公報に開示された技術が知られている。
Japanese Patent Laid-Open No. Hei 9-249 discloses a conventional method for planning the distribution of hot metal between the blast furnace factory 1 and the steelmaking factory 5.
The technology disclosed in Japanese Patent No. 903 is known.

【0008】この技術では、通常の溶銑処理ルートと逆
の方向に処理を行い、下工程である製鋼工場5の精錬計
画から高炉工場1に遡って処理手順を作成することによ
り、溶銑の物流を合理的に運用できる計画を作成するも
のである。
According to this technique, the hot metal is processed in the direction opposite to the normal hot metal processing route, and the processing procedure is created by going back to the blast furnace factory 1 from the refining plan of the steelmaking factory 5, which is the lower process, to make the distribution of hot metal distribution. It creates a plan that can be operated reasonably.

【0009】[0009]

【発明が解決しようとする課題】しかしながら、従来技
術に基づいて溶銑の物流計画を作成しても、現実にはそ
の計画通りに実施することには困難が伴うことが多い。
However, even if a hot metal distribution plan is prepared based on the prior art, it is often difficult to actually carry out the hot metal distribution plan as planned.

【0010】これは、高炉工場1、溶銑予備処理設備
4、製鋼工場5では操業の遅延・計画の変更が多く発生
するためで、更にこれに伴って機関車などの搬送手段の
変更手配、空鍋と満鍋の運搬経路と時刻の再作成などが
必要になり更なる遅延につながるためである。
This is because many delays and changes in plans occur in the blast furnace plant 1, the hot metal pretreatment facility 4, and the steelmaking plant 5, and accordingly, arrangements for changing transportation means such as locomotives and emptying are made. This is because it will be necessary to recreate the transportation routes and times for the pots and pans, which will lead to further delays.

【0011】この結果、機会損失による溶銑予備処理設
備4での稼働率低下、製鋼工場5での溶銑不足あるいは
溶銑在庫過剰等の状態が生じる。特に、溶銑予備処理
は、成分規格に外れた溶銑を単に規格内に収めるだけで
なく、脱珪、脱硫、脱燐処理を通じて予め不純物を取り
除くことにより、製鋼工場における精錬反応の促進、ス
ラグレス化などの合理化に寄与するものであるため、溶
銑予備処理率の低下は大きな合理化効果の損失となるも
のである。
As a result, there is a situation such as a reduction in the operating rate of the hot metal pretreatment facility 4 due to an opportunity loss, a shortage of hot metal in the steelmaking plant 5, or an excess of hot metal inventory. In particular, the hot metal pretreatment not only keeps the hot metal that does not meet the component specifications within the standard, but also removes impurities in advance through desiliconization, desulfurization, and dephosphorization treatment to promote the smelting reaction in the steelmaking plant and to reduce slag. Therefore, the reduction of the hot metal pretreatment rate causes a large rationalization effect loss.

【0012】従って、溶銑物流計画を作成できるだけで
なく、計画の変動に対してもその影響を最小限に調整管
理できることが常に必要とされる。
Therefore, it is always necessary not only to be able to create a hot metal distribution plan, but also to be able to adjust and manage the influence of changes in the plan to a minimum.

【0013】本発明はかかる事情に鑑みてなされたもの
であり、溶銑物流計画に変動が生じた場合でもその影響
を最小限に調整して新たな物流計画を作成することので
きる物流計画作成方法及びそのプログラムを提供するこ
とにある。
The present invention has been made in view of the above circumstances, and even when there is a change in the hot metal distribution plan, a new distribution plan can be created by adjusting the effect to a minimum and creating a new distribution plan. And to provide the program.

【0014】[0014]

【課題を解決するための手段】上記課題を解決するため
の本発明は、まだ物流計画に使用されていない製鋼精錬
計画の内現在時刻に最も近く精錬が開始される予定の製
鋼精錬計画をそれぞれの製鋼工程毎に選択する選択段階
と、選択された製鋼精錬計画に基づいて、高炉工程から
運搬開始予定の溶銑について複数の運搬経路を作成する
経路作成段階と、作成された複数の運搬経路の内製鋼工
程に到着してから精錬が開始されるまでの待機時間に基
づいて最適な運搬経路を決定する決定段階と、決定され
た運搬経路を組み込んだ物流計画を作成する計画作成段
階とを備えた物流計画作成方法である。
According to the present invention for solving the above-mentioned problems, a steelmaking refining plan which is scheduled to start the refining closest to the current time among the steelmaking refining plans not yet used in the distribution plan is provided. Based on the selected steelmaking refining plan, a selection stage to select each steelmaking process, a route creation stage to create multiple transport routes for the hot metal scheduled to be transported from the blast furnace process, and a plurality of created transport routes. Equipped with a decision step to decide the optimal transportation route based on the waiting time from the arrival at the internal steelmaking process to the start of refining, and a planning stage to create a logistics plan incorporating the determined transportation route It is a method of creating a logistics plan.

【0015】また本発明は、まだ物流計画に使用されて
いない製鋼精錬計画の内現在時刻に最も近く精錬が開始
される予定の製鋼精錬計画をそれぞれの製鋼工程毎に選
択する選択段階と、選択された製鋼精錬計画に基づいて
既に決定された第1の運搬経路に従って運搬中の溶銑に
ついて複数の第2の運搬経路を作成する経路作成段階
と、第1と第2の運搬経路の内製鋼工程に到着してから
精錬が開始されるまでの待機時間に基づいて最適な運搬
経路を決定する決定段階と、第1の運搬経路に代えて決
定された最適な運搬経路を組み込んだ物流計画を作成す
る計画作成段階とを備えた物流計画作成方法である。
Further, according to the present invention, a selection step of selecting, for each steelmaking process, a steelmaking refining plan which is scheduled to start refining closest to the current time of the steelmaking refining plan which has not yet been used in the logistics plan, A step of creating a plurality of second transportation routes for the hot metal being transported in accordance with the first transportation route already determined based on the established steel refining plan, and an internal steel manufacturing process of the first and second transportation routes Create a logistics plan that incorporates the determination stage that determines the optimal transportation route based on the waiting time from the arrival at the factory to the start of refining and the optimal transportation route that is determined in place of the first transportation route And a method of creating a distribution plan including a planning stage.

【0016】また本発明は、コンピュータに、まだ物流
計画に使用されていない製鋼精錬計画の内現在時刻に最
も近く精錬が開始される予定の製鋼精錬計画をそれぞれ
の製鋼工程毎に選択する選択手順、選択された製鋼精錬
計画に基づいて高炉工程から運搬開始予定の溶銑につい
て複数の運搬経路を作成する経路作成手順、作成された
複数の運搬経路の内製鋼工程に到着してから精錬が開始
されるまでの待機時間に基づいて最適な運搬経路を決定
する決定手順、決定された運搬経路を組み込んだ物流計
画を作成する計画作成手順、を実行させるためのプログ
ラムである。
According to the present invention, a selection procedure for selecting, on a computer, for each steelmaking process, a steelmaking refining plan that is scheduled to start refining closest to the current time of the steelmaking refining plan that has not yet been used in the physical distribution plan. , A route creation procedure to create multiple transportation routes for hot metal scheduled to be transported from the blast furnace process based on the selected steel refining plan, refining is started after arriving at the internal steel manufacturing process of the created multiple transportation routes It is a program for executing a decision procedure for deciding an optimal transportation route based on the waiting time until the operation, and a planning procedure for producing a distribution plan incorporating the determined transportation route.

【0017】また本発明は、コンピュータに、まだ物流
計画に使用されていない製鋼精錬計画の内現在時刻に最
も近く精錬が開始される予定の製鋼精錬計画をそれぞれ
の製鋼工程毎に選択する選択手順、選択された製鋼精錬
計画に基づいて既に決定された第1の運搬経路に従って
運搬中の溶銑について複数の第2の運搬経路を作成する
経路作成手順、第1と第2の運搬経路の内製鋼工程に到
着してから精錬が開始されるまでの待機時間に基づいて
最適な運搬経路を決定する決定手順、第1の運搬経路に
代えて決定された最適な運搬経路を組み込んだ物流計画
を作成する計画作成手順、を実行させるためのプログラ
ムである。
Further, according to the present invention, a selection procedure for selecting, on a computer basis, a steelmaking refining plan which is scheduled to start refining at the current time of the steelmaking refining plan which has not yet been used in the physical distribution plan by the computer. , A route creation procedure for creating a plurality of second transport routes for the hot metal being transported according to the first transport route already determined based on the selected steelmaking refining plan, in-steel manufacturing of the first and second transport routes Create a logistics plan that incorporates a decision procedure that determines the optimal transportation route based on the waiting time from the arrival at the process to the start of refining, and the optimal transportation route that was determined in place of the first transportation route This is a program for executing the planning procedure to be performed.

【0018】[0018]

【発明の実施の形態】図1は本発明が適用される物流計
画システムの構成を示す図である。
1 is a diagram showing the configuration of a physical distribution planning system to which the present invention is applied.

【0019】計画の対象となる溶銑の物流については、
図7に示す構成と同一なので、ここでは同一の部分には
同一符号を付してその説明を省略する。
Regarding the distribution of hot metal which is the target of the plan,
Since the configuration is the same as that shown in FIG. 7, the same portions are denoted by the same reference numerals and the description thereof will be omitted.

【0020】プロセスコンピュータ7は、高炉工場1、
機関車3、溶銑予備処理設備4、製鋼工場5との間で工
程の進捗などに関する情報授受を行い、それらの情報に
基づいて物流計画を作成するコンピュータである。
The process computer 7 includes a blast furnace factory 1,
It is a computer for exchanging information about the progress of the process with the locomotive 3, the hot metal pretreatment facility 4, and the steelmaking plant 5, and creating a physical distribution plan based on the information.

【0021】次に、このプロセスコンピュータ7が授受
を行う情報の内容について説明する。
Next, the contents of information exchanged by the process computer 7 will be described.

【0022】先ず、高炉工場1からは、溶銑を高炉から
取り出す出銑作業に関する情報として、高炉の現在の出
銑状態と出銑予定のデータが送信される。プロセスコン
ピュータ7は、これらの情報を参照することにより、そ
れぞれの高炉工場1毎にこれからの出銑予定時刻が把握
できるため、その出銑作業に併せて機関車3などの配送
計画を作成することができる。
First, from the blast furnace factory 1, as the information on the tapping work for taking out the hot metal from the blast furnace, the present tapped state of the blast furnace and the scheduled tapping data are transmitted. Since the process computer 7 can grasp the scheduled tapping time for each blast furnace factory 1 by referring to these pieces of information, the process computer 7 should prepare a delivery plan for the locomotive 3 and the like in accordance with the tapping work. You can

【0023】次に、機関車3からは、溶銑鍋2と機関車
3が現在高炉工場1と製鋼工場5間のどの位置にいるか
を示す位置情報と、その溶銑鍋2について溶銑予備処理
設備4で処理が開始されたことを示す情報を受取る。そ
して、この処理実績に基づいてプロセスコンピュータ7
は機関車3が次に向かうべき工程を指示する。ここで、
機関車3との情報授受は、実際は図示していない鍋運行
管理用コンピュータとの間で行われる。
Next, from the locomotive 3, positional information indicating where the hot metal ladle 2 and the locomotive 3 are currently located between the blast furnace factory 1 and the steelmaking factory 5, and the hot metal ladle 2 for the hot metal ladle 2, the hot metal pretreatment equipment 4 The information indicating that the processing has been started is received. Then, based on this processing result, the process computer 7
Indicates the process that the locomotive 3 should go to next. here,
Information exchange with the locomotive 3 is actually performed with a pan operation management computer (not shown).

【0024】溶銑予備処理設備4からは、溶銑予備処理
状況として現在予備処理中の溶銑鍋2についての開始時
刻と終了予定時刻が送信される。従って、この情報を参
照することにより、次に溶銑予備処理を受ける予定の溶
銑鍋2の予備処理開始時刻を把握することができ、また
その予備処理に要する標準時間とから予備処理終了予定
時刻を把握することができる。
From the hot metal pretreatment facility 4, the start time and the scheduled end time of the hot metal ladle 2 currently being pretreated are transmitted as the hot metal pretreatment status. Therefore, by referring to this information, the pretreatment start time of the hot metal ladle 2 to be subjected to the hot metal pretreatment next can be known, and the pretreatment end time can be calculated from the standard time required for the pretreatment. You can figure it out.

【0025】製鋼工場5からは、製鋼工程である精錬作
業の進捗状況が送信されるとともに、製鋼工場5におい
て待機状態にある溶銑鍋2毎に、精錬作業に使用される
予定時刻が記載されている。プロセスコンピュータ7
は、この情報と機関車3の到着予想時刻とを組み合わせ
ることで溶銑を使用された空となった溶銑鍋2を高炉に
向けて回送可能な時刻を把握することができる。
From the steelmaking factory 5, the progress of the refining work, which is a steelmaking process, is transmitted, and the scheduled time to be used for the refining work is described for each hot metal ladle 2 in the standby state in the steelmaking factory 5. There is. Process computer 7
By combining this information with the estimated arrival time of the locomotive 3, it is possible to know the time when the empty hot metal ladle 2 containing hot metal can be forwarded to the blast furnace.

【0026】また、製鋼工場5では、中央コンピュータ
(図示していない)からの指示に基づいて、所定の成分
をもつ鋼を製造するためのスケジュールである製鋼精錬
計画9を保有しており、更に溶銑予備処理設備4の操業
スケジュールである溶銑予備処理計画8も管理してい
る。従って、プロセスコンピュータ7はこれらの計画を
適宜参照することができ、またこれらの計画を自らのデ
ータベース10内に取り込むことが可能である。
Further, the steelmaking factory 5 has a steelmaking refining plan 9 which is a schedule for producing steel having predetermined components based on an instruction from a central computer (not shown). It also manages the hot metal pretreatment plan 8, which is the operating schedule of the hot metal pretreatment facility 4. Therefore, the process computer 7 can refer to these plans as appropriate, and can incorporate these plans into its own database 10.

【0027】尚、データベース10には、それぞれの工
場等から送信された前述の情報の他に、各工程間の移動
時間、溶銑予備処理時間、適切溶銑在庫数等の操業基準
値、及び溶銑物流計画作成に用いられるルールベース、
パラメータ等が格納されている。
The database 10 includes, in addition to the above-mentioned information transmitted from each factory, operating standard values such as a moving time between each process, a hot metal pretreatment time, an appropriate hot metal inventory number, and a hot metal distribution. The rule base used for planning,
Stores parameters, etc.

【0028】続いて、プロセスコンピュータ7に格納さ
れているプログラムである溶銑物流計画作成処理を用い
て溶銑物流計画を作成する方法について説明する。
Next, a method of creating a hot metal distribution plan by using a hot metal distribution plan creation process which is a program stored in the process computer 7 will be described.

【0029】図2は溶銑物流計画作成処理の概略の手順
を示すフロー図である。
FIG. 2 is a flow chart showing the general procedure of the hot metal distribution planning process.

【0030】溶銑物流計画作成処理は、各工場などの処
理実績が進捗したそれぞれのタイミングで起動されて物
流計画の作成と修正を行う。
The hot metal physical distribution plan preparation processing is started at each timing when the processing results of each factory or the like have progressed to prepare and modify the physical distribution plan.

【0031】先ず、計画を作成するための初期処理とし
て、必要なデータを読込む(S1)。読込まれるデータ
は製鋼精錬計画9、溶銑予備処理計画8、溶銑物流計画
作成処理が起動された時点での各高炉工場1での出銑状
況、溶銑鍋2と機関車3の位置情報、各溶銑予備処理設
備4の稼動情報、各製鋼工場5の稼動情報、各工程間の
移動時間や溶銑予備処理時間等の操業基準値、及び溶銑
物流計画作成に用いられるルールベースや各種パラメー
タ等である。
First, as an initial process for creating a plan, necessary data is read (S1). The data to be read are the steel refining plan 9, the hot metal pretreatment plan 8, the hot metal distribution at each blast furnace factory 1 at the time when the hot metal distribution plan creation process is started, the position information of the hot metal ladle 2 and the locomotive 3, It is operation information of the hot metal pretreatment equipment 4, operation information of each steelmaking plant 5, operation reference values such as moving time between each process and hot metal pretreatment time, and rule bases and various parameters used for hot metal distribution planning. .

【0032】次に、起動タイミングを調べる。溶銑鍋2
と機関車3が高炉工場1から搬出可能となったタイミン
グで起動された場合(S2)は、溶銑物流計画の新規作
成処理を開始する。
Next, the start timing is examined. Hot metal pot 2
When the locomotive 3 is started at a timing when it can be carried out of the blast furnace factory 1 (S2), a new hot metal distribution plan creation process is started.

【0033】先ず、製鋼精錬計画9を参照して、未だ溶
銑物流計画と対応付けがされていない精錬計画の内で最
も現在時刻に近いものを選択する(S3)が、製鋼工場
5が複数存在する場合は、それぞれの製鋼工場5毎に精
錬計画を選択する。
First, referring to the steel refining plan 9, a refining plan which is not yet associated with the hot metal distribution plan is selected (S3), but a plurality of steel mills 5 exist. When doing so, a refining plan is selected for each steel factory 5.

【0034】続いて、選択された精錬計画に従って当該
溶銑鍋2を処理する溶銑予備処理設備4とその処理順序
を決定する。そして現時点での溶銑予備処理設備4の稼
動状況と溶銑予備処理計画8とを参照して、当該溶銑鍋
2についての複数の処理経路を作成する(S4)。
Subsequently, the hot metal pretreatment equipment 4 for processing the hot metal ladle 2 and the processing sequence thereof are determined according to the selected refining plan. Then, a plurality of processing paths for the hot metal ladle 2 are created with reference to the current operating status of the hot metal pretreatment equipment 4 and the hot metal pretreatment plan 8 (S4).

【0035】図3は作成された溶銑鍋の複数の処理経路
を示す図である。
FIG. 3 is a diagram showing a plurality of processing paths of the hot metal ladle thus prepared.

【0036】本図において、縦軸は処理プロセスの単位
を表し、横軸は時間経過を表している。そして図中、丸
印は処理経路の開始点であって、それに続く実線で示す
経路11と経路12は計画作成済みの経路を示し、点線
で示す経路13と経路14は未確定の予定経路を示して
いる。
In the figure, the vertical axis represents the unit of the processing process, and the horizontal axis represents the passage of time. Further, in the figure, the circle mark is the starting point of the processing route, the routes 11 and 12 shown by the solid lines following the route show the planned routes, and the routes 13 and 14 shown by the dotted lines show the undetermined planned routes. Shows.

【0037】本図に記載された処理経路の内容を経路1
2を例にして説明する。
The contents of the processing route described in this figure are route 1
2 will be described as an example.

【0038】第2高炉からの出銑によって溶銑が満たさ
れた溶銑鍋2は、先ず第1予備処理設備に運搬される。
図においては、この溶銑鍋2は予備処理中であることが
示されている。
The hot metal ladle 2 filled with hot metal by tapping from the second blast furnace is first transported to the first pretreatment facility.
In the figure, this hot metal ladle 2 is shown to be undergoing pretreatment.

【0039】第1予備処理設備における処理が終了した
後、この溶銑鍋2は続いて第2予備処理設備に運搬さ
れ、更に予備処理が施される。そしてその処理後、第1
製鋼に運搬され、精錬開始まで待機状態に置かれた後、
精錬計画に従って精錬が行われる。
After the treatment in the first pretreatment facility is completed, this hot metal ladle 2 is subsequently transported to the second pretreatment facility for further pretreatment. And after that processing, the first
After being transported to steelmaking and put on standby until the start of refining,
Refining is performed according to the refining plan.

【0040】次に新しく発生した溶銑鍋2(図中では該
当鍋として表示)の処理経路の決定方法について説明す
る。
Next, a method of determining the processing path of the newly generated hot metal ladle 2 (displayed as a corresponding ladle in the figure) will be described.

【0041】前述の手順によって、第1製鋼での精錬計
画Aに対応付けられる場合の経路14と、第2製鋼での
精錬計画Bに対応付けられる場合の経路13の2つの経
路がこの溶銑鍋2の予定経路として作成される。
According to the above-mentioned procedure, two routes, that is, the route 14 in the case of being associated with the refining plan A in the first steelmaking and the route 13 in being associated with the refining plan B in the second steelmaking are the hot metal ladle. It is created as 2 planned routes.

【0042】ここで、これらの経路の内いずれを採用す
るかを決定するため、溶銑鍋2が製鋼工場5に到着して
から精錬が開始されるまでの待機時間を評価関数として
採用する(S5)。
Here, in order to determine which of these routes is adopted, the waiting time from the arrival of the hot metal ladle 2 to the steelmaking plant 5 until the start of refining is adopted as an evaluation function (S5). ).

【0043】この待機時間は経路14ではΔT1、経路
13ではΔT2であり、ΔT1がΔT2よりも小さい値
となっている。そこで、経路14をこの溶銑鍋2の処理
経路として採用する。
The waiting time is ΔT1 on the route 14 and ΔT2 on the route 13, and ΔT1 is a value smaller than ΔT2. Therefore, the path 14 is adopted as a processing path for the hot metal ladle 2.

【0044】待機時間の短い経路を採用するのは、待機
時間が短いほど待機中における熱の放散によるエネルギ
ーロスが少なく、また溶銑鍋2の使用効率を高めること
ができるため溶銑鍋2の需給計画が立てやすくなるなど
の効果が期待できるからである。
The short waiting time route is adopted because the shorter the waiting time, the less energy loss due to heat dissipation during the waiting time, and the higher the usage efficiency of the hot metal ladle 2, so that the supply and demand plan of the hot metal ladle 2 is increased. This is because it can be expected to have the effect of making it easier to stand.

【0045】こうして採用した処理経路を計画済み経路
として登録する(S6)。
The processing route thus adopted is registered as a planned route (S6).

【0046】図4は確定した溶銑鍋2の処理経路を示す
図である。新しく登録された経路が従前の経路に加わっ
て表示されている。
FIG. 4 is a diagram showing the processing path of the hot metal ladle 2 that has been determined. The newly registered route is displayed in addition to the previous route.

【0047】尚、経路の選択に際しては、1つの溶銑鍋
2について選択するだけでなく、その溶銑鍋2を含む複
数の溶銑鍋2について経路を作成し、前述の評価値を比
較して最適な経路を確定するものであっても良い。
When selecting a route, not only one hot metal ladle 2 is selected, but also a route is created for a plurality of hot metal ladles 2 including the hot metal ladle 2 and the above-mentioned evaluation values are compared to make the optimum route. The route may be fixed.

【0048】そして、登録後は該当した溶銑鍋2を牽引
する機関車3に対して次に向かうべき処理設備を通知す
る(S7)。そして、当該高炉から搬出されたことを実
績として反映して(S8)、処理を終了する。
After the registration, the locomotive 3 which pulls the hot metal ladle 2 in question is notified of the next processing facility to go to (S7). Then, the fact that the product has been unloaded from the blast furnace is reflected as a result (S8), and the process ends.

【0049】次に、起動タイミングを調べ、溶銑鍋2と
機関車3が例えば高炉工場1と製鋼工場5の所定の区間
を通過したとき、溶銑予備処理設備4の所定の処理を終
了したとき、などの所定のタイミングで起動要求がされ
た場合には(S9)、溶銑物流計画の変更処理を開始す
る。
Next, the start-up timing is examined, and when the hot metal ladle 2 and the locomotive 3 have passed through a predetermined section of the blast furnace factory 1 and the steelmaking factory 5, for example, when the predetermined processing of the hot metal pretreatment equipment 4 is completed, If a start request is made at a predetermined timing such as (S9), the hot metal distribution plan change process is started.

【0050】この変更処理は、既に作成された溶銑物流
計画を、最新の製鋼精錬計画9、他の高炉工場1の出銑
状況、溶銑予備処理設備4の稼動状況などを参照して、
予備処理経路を変更する必要があるか否かを判断し、変
更が必要な場合は処理経路の変更を行なって、溶銑物流
計画に反映するものである。
This change process refers to the hot metal distribution plan already created, referring to the latest steel refining plan 9, the status of tapping of other blast furnace plants 1, the operating status of the hot metal pretreatment facility 4, etc.
It is judged whether or not the pretreatment route needs to be changed, and if the pretreatment route needs to be changed, the treatment route is changed and reflected in the hot metal distribution plan.

【0051】そこで、先ず当該溶銑鍋2の溶銑予備処理
計画を検索して抽出する(S10)。そして、製鋼精錬
計画9を参照して、未だ溶銑物流計画と対応付けがされ
ていない精錬計画の内で最も現在時刻に近いものを選択
する(S11)が、製鋼工場5が複数存在する場合は、
それぞれの製鋼工場5毎に精錬計画を選択する。
Therefore, first, the hot metal pretreatment plan of the hot metal ladle 2 is searched and extracted (S10). Then, referring to the steel refining plan 9, the refining plan which is not yet associated with the hot metal distribution plan is selected to be closest to the current time (S11). ,
A refining plan is selected for each steel factory 5.

【0052】続いて、選択された精錬計画に従って当該
溶銑鍋2を処理する溶銑予備処理設備4と処理順序を決
定する。そして、現時点での溶銑予備処理設備4の稼動
状況と溶銑予備処理計画8とを参照して、当該溶銑鍋2
についての処理経路を作成する。
Then, the hot metal pretreatment equipment 4 for processing the hot metal ladle 2 and the processing sequence are determined according to the selected refining plan. Then, with reference to the current operating state of the hot metal pretreatment facility 4 and the hot metal pretreatment plan 8, the hot metal ladle 2
Create a processing path for.

【0053】以上の処理によって、この溶銑鍋2につい
ては当初の処理経路と、新しく作成した処理経路の複数
の予定経路が存在することになる。
By the above-mentioned processing, the hot metal ladle 2 has a plurality of planned paths including the original processing path and the newly created processing path.

【0054】図5は、溶銑鍋の複数の処理経路を示す図
である。
FIG. 5 is a diagram showing a plurality of processing paths for the hot metal ladle.

【0055】本図において、実線で示す経路16、経路
17、経路18は既に作成されて登録されている経路を
示している。
In this figure, the routes 16, 17, and 18 shown by the solid lines are the routes that have already been created and registered.

【0056】そして、経路17で処理される計画の溶銑
鍋2が第1予備処理設備の処理が終わったタイミングで
起動されたとすると、前述の変更処理によって新しく第
2製鋼の精錬計画に対応付けられた予定経路19が作成
される。図中ではこの予定経路19は点線で表してい
る。
If it is assumed that the hot metal ladle 2 which is planned to be processed through the route 17 is started at the timing when the processing of the first pretreatment equipment is finished, it is newly associated with the refining plan of the second steelmaking by the above-mentioned change processing. The planned route 19 is created. In the figure, the planned route 19 is indicated by a dotted line.

【0057】続いて、これらの経路17と経路19の内
いずれを採用するかを決定するため、溶銑鍋2が製鋼工
場5に到着してから精錬が開始されるまでの待機時間を
評価関数として評価する(S12)。
Then, in order to determine which of the routes 17 and 19 is to be adopted, the waiting time from the arrival of the hot metal ladle 2 to the steelmaking plant 5 until the start of refining is used as an evaluation function. Evaluate (S12).

【0058】経路17での溶銑鍋2の待機時間がΔT3
であるに対して、経路19での待機時間はΔT4であっ
て、ΔT4の方小さい値となっている。そこでこの溶銑
鍋2の処理経路が、経路17から経路19に変更され
る。
The waiting time of the hot metal ladle 2 on the route 17 is ΔT3
On the other hand, the waiting time on the route 19 is ΔT4, which is smaller than ΔT4. Therefore, the processing route of the hot metal ladle 2 is changed from the route 17 to the route 19.

【0059】こうして経路に変更が発生した場合は、従
来作成していた計画を修正して(S14)、変更した経
路を計画済み経路として登録する(S6)。
When the route is changed in this way, the conventionally created plan is corrected (S14), and the changed route is registered as the planned route (S6).

【0060】変更する必要がない場合は、従来とおりの
計画に基づいて機関車3に対して次に向かうべき処理工
程を通知する(S7)。
If there is no need to change, the locomotive 3 is notified of the next process step to be performed based on the conventional plan (S7).

【0061】図6は、変更後の溶銑鍋の処理経路を示す
図である。
FIG. 6 is a diagram showing the processing route of the hot metal ladle after the change.

【0062】本変更処理において、経路17が経路19
に置き換えられた結果、従来の経路17において対応付
けられていた第1製鋼精錬計画が未対応の精錬計画とな
ったが、別の溶銑鍋2による起動タイミングで動作する
変更処理によって、新たな対応付けがなされ、経路18
が経路20として変更されている。
In this change processing, the route 17 is the route 19
As a result, the No. 1 steelmaking refining plan associated with the conventional route 17 has become an unsupported refining plan, but a new process is performed by the change process that operates at the start timing by another hot metal ladle 2. Route 18
Has been changed as the route 20.

【0063】このように、所定のタイミングで溶銑物流
計画を見直して再作成することにより、物流計画に変更
が生じた場合であっても、常に最近の製鋼精錬計画に対
応付けられ、また溶銑予備処理設備4が効率的に稼動で
きるような最適な物流計画に修正することができる。
As described above, by reviewing and recreating the hot metal distribution plan at a predetermined timing, even if the distribution plan is changed, it is always associated with the latest steelmaking refining plan and the hot metal reserve is prepared. It is possible to modify the optimal physical distribution plan so that the processing equipment 4 can operate efficiently.

【0064】次に、起動タイミングが製鋼工場5に到着
した場合は、予備処理が完了して最終目的地に到着した
ことを実績として反映する(S15)。
Next, when the start timing arrives at the steelmaking factory 5, the fact that the preliminary processing is completed and the final destination is reached is reflected as a result (S15).

【0065】[0065]

【発明の効果】以上説明したように、本発明によれば、
物流の進行に伴った所定のタイミングで最適な物流計画
を作成し修正するため、溶銑物流計画に変動が生じた場
合でもその影響を最小限に調整して新たな物流計画を作
成することができる。
As described above, according to the present invention,
Since an optimal distribution plan is created and modified at a predetermined timing as the distribution progresses, even if there is a change in the hot metal distribution plan, the effect can be adjusted to a minimum and a new distribution plan can be created. .

【図面の簡単な説明】[Brief description of drawings]

【図1】本発明が適用される物流計画システムの構成を
示す図。
FIG. 1 is a diagram showing a configuration of a physical distribution planning system to which the present invention is applied.

【図2】溶銑物流計画作成処理の概略の手順を示すフロ
ー図。
FIG. 2 is a flowchart showing a schematic procedure of hot metal distribution plan creation processing.

【図3】作成された溶銑鍋の複数の処理経路を示す図。FIG. 3 is a diagram showing a plurality of processing paths of the created hot metal ladle.

【図4】確定した溶銑鍋の処理経路を示す図。FIG. 4 is a diagram showing a processing path of the confirmed hot metal ladle.

【図5】溶銑鍋の複数の処理経路を示す図。FIG. 5 is a view showing a plurality of processing paths of a hot metal ladle.

【図6】変更後の溶銑鍋の処理経路を示す図。FIG. 6 is a view showing a processing route of the hot metal ladle after the change.

【図7】溶銑の物流を説明する図。FIG. 7 is a diagram for explaining the distribution of hot metal.

【符号の説明】[Explanation of symbols]

1…高炉工場 2…溶銑鍋 3…機関車 4…溶銑予備処理設備 5…製鋼工場 7…プロセスコンピュータ 8…溶銑予備処理計画 9…製鋼精錬計画 13…経路 14…経路 17…経路 19…経路 1 ... Blast furnace factory 2 ... Hot metal pot 3 ... locomotive 4 ... Hot metal pretreatment equipment 5 ... Steelmaking factory 7 ... Process computer 8 ... Hot metal pretreatment plan 9 ... Steelmaking refining plan 13 ... Route 14 ... Route 17 ... Route 19 ... Route

フロントページの続き (72)発明者 小澤 宏一 東京都千代田区丸の内一丁目1番2号 日 本鋼管株式会社内 Fターム(参考) 4K014 AE00 4K070 DA00 DA04 DA10 Continued front page    (72) Inventor Koichi Ozawa             1-2-1, Marunouchi, Chiyoda-ku, Tokyo             Main Steel Pipe Co., Ltd. F-term (reference) 4K014 AE00                 4K070 DA00 DA04 DA10

Claims (4)

【特許請求の範囲】[Claims] 【請求項1】 少なくとも1の高炉工程と、少なくとも
1の溶銑予備処理工程と、少なくとも1の製鋼工程とを
備えた製鉄所での高炉工程から溶銑予備処理工程を経由
して製鋼工程まで溶銑を運搬するための運搬経路を含む
物流計画を作成する方法において、 まだ前記物流計画に使用されていない製鋼精錬計画の
内、現在時刻に最も近く精錬が開始される予定の前記製
鋼精錬計画を、それぞれの製鋼工程毎に選択する選択段
階と、 前記選択された前記製鋼精錬計画に基づいて、前記高炉
工程から運搬開始予定の溶銑について複数の運搬経路を
作成する経路作成段階と、 前記作成された複数の運搬経路の内、製鋼工程に到着し
てから精錬が開始されるまでの待機時間に基づいて最適
な運搬経路を決定する決定段階と、 前記決定された運搬経路を組み込んだ物流計画を作成す
る計画作成段階とを備えたことを特徴とする物流計画作
成方法。
1. Hot metal is supplied from a blast furnace process at a steel mill equipped with at least one blast furnace process, at least one hot metal pretreatment process, and at least one steelmaking process to the steelmaking process via the hot metal pretreatment process. In the method of creating a logistics plan including a transportation route for transportation, among the steelmaking refining plans not yet used in the logistics plan, the steelmaking refining plan scheduled to start refining closest to the current time, respectively, A selection step of selecting for each steel making process, based on the selected steel refining plan, a route creation step of creating a plurality of transport routes for the hot metal scheduled to be transported from the blast furnace process, and the created multiple Determination step of determining an optimal transportation route based on the waiting time from the arrival at the steelmaking process to the start of refining among the transportation routes of Logistics planning method which is characterized in that a planning stage to create a logistics plan that incorporates.
【請求項2】 少なくとも1の高炉工程と、少なくとも
1の溶銑予備処理工程と、少なくとも1の製鋼工程とを
備えた製鉄所での高炉工程から溶銑予備処理工程を経由
して製鋼工程まで溶銑を運搬するための運搬経路を含む
物流計画を作成する方法において、 まだ前記物流計画に使用されていない製鋼精錬計画の
内、現在時刻に最も近く精錬が開始される予定の前記製
鋼精錬計画を、それぞれの製鋼工程毎に選択する選択段
階と、 前記選択された前記製鋼精錬計画に基づいて、既に決定
された第1の運搬経路に従って運搬中の溶銑について複
数の第2の運搬経路を作成する経路作成段階と、 前記第1と第2の運搬経路の内、製鋼工程に到着してか
ら精錬が開始されるまでの待機時間に基づいて最適な運
搬経路を決定する決定段階と、 前記第1の運搬経路に代えて、前記決定された最適な運
搬経路を組み込んだ物流計画を作成する計画作成段階と
を備えたことを特徴とする物流計画作成方法。
2. Hot metal is supplied from a blast furnace process at a steel mill equipped with at least one blast furnace process, at least one hot metal pretreatment process, and at least one steelmaking process to the steelmaking process via the hot metal pretreatment process. In the method of creating a logistics plan including a transportation route for transportation, among the steelmaking refining plans not yet used in the logistics plan, the steelmaking refining plan scheduled to start refining closest to the current time, respectively, Selection step for each of the steel making processes, and route creation for creating a plurality of second transport routes for the hot metal being transported in accordance with the first transport route that has already been determined based on the selected steel refining plan A step of deciding an optimal transportation route based on a waiting time from the arrival at the steelmaking process to the start of refining among the first and second transportation routes; Instead of the conveying path, the planning phase and logistics planning method characterized by comprising a creating logistics plan that incorporates an optimum delivery route the determined.
【請求項3】 少なくとも1の高炉工程と、少なくとも
1の溶銑予備処理工程と、少なくとも1の製鋼工程とを
備えた製鉄所での高炉工程から溶銑予備処理工程を経由
して製鋼工程まで溶銑を運搬するための運搬経路を含む
物流計画を作成するプログラムにおいて、 コンピュータに、 まだ前記物流計画に使用されていない製鋼精錬計画の
内、現在時刻に最も近く精錬が開始される予定の前記製
鋼精錬計画を、それぞれの製鋼工程毎に選択する選択手
順、 前記選択された前記製鋼精錬計画に基づいて、前記高炉
工程から運搬開始予定の溶銑について複数の運搬経路を
作成する経路作成手順、 前記作成された複数の運搬経路の内、製鋼工程に到着し
てから精錬が開始されるまでの待機時間に基づいて最適
な運搬経路を決定する決定手順、 前記決定された運搬経路を組み込んだ物流計画を作成す
る計画作成手順、を実行させるためのプログラム。
3. Hot metal is supplied from a blast furnace process at a steel mill equipped with at least one blast furnace process, at least one hot metal pretreatment process, and at least one steelmaking process to the steelmaking process via the hot metal pretreatment process. In a program for creating a distribution plan including a transportation route for transportation, among the steel refining plans that are not yet used in the distribution plan, the steelmaking refining plan scheduled to start refining closest to the current time on the computer. , A selection procedure for selecting each steelmaking process, based on the selected steelmaking refining plan, a route creation procedure for creating a plurality of transportation routes for the hot metal scheduled to be transported from the blast furnace process, the created Of the plurality of transportation routes, a determination procedure for determining an optimal transportation route based on the waiting time from the arrival at the steelmaking process until the start of refining, Planning procedure program for executing, to create a logistics plan that incorporates the difference between the transport route.
【請求項4】 少なくとも1の高炉工程と、少なくとも
1の溶銑予備処理工程と、少なくとも1の製鋼工程とを
備えた製鉄所での高炉工程から溶銑予備処理工程を経由
して製鋼工程まで溶銑を運搬するための運搬経路を含む
物流計画を作成するプログラムにおいて、 コンピュータに、 まだ前記物流計画に使用されていない製鋼精錬計画の
内、現在時刻に最も近く精錬が開始される予定の前記製
鋼精錬計画を、それぞれの製鋼工程毎に選択する選択手
順、 前記選択された前記製鋼精錬計画に基づいて、既に決定
された第1の運搬経路に従って運搬中の溶銑について複
数の第2の運搬経路を作成する経路作成手順、 前記第1と第2の運搬経路の内、製鋼工程に到着してか
ら精錬が開始されるまでの待機時間に基づいて最適な運
搬経路を決定する決定手順、 前記第1の運搬経路に代えて、前記決定された最適な運
搬経路を組み込んだ物流計画を作成する計画作成手順、
を実行させるためのプログラム。
4. Hot metal is supplied from a blast furnace process at a steel mill equipped with at least one blast furnace process, at least one hot metal pretreatment process, and at least one steelmaking process to the steelmaking process via the hot metal pretreatment process. In a program for creating a distribution plan including a transportation route for transportation, among the steel refining plans that are not yet used in the distribution plan, the steelmaking refining plan scheduled to start refining closest to the current time on the computer. A selection procedure for selecting each of the steelmaking processes, and based on the selected steelmaking refining plan, create a plurality of second transportation routes for the hot metal being transported according to the first transportation route that has already been determined. A route creation procedure, of the first and second transportation routes, the optimal transportation route is determined based on the waiting time from the arrival of the steelmaking process until the start of refining. Constant procedure, the first place in the transport path, planning steps to create a logistics plan that incorporates an optimum delivery route the determined,
A program to execute.
JP2001244633A 2001-08-10 2001-08-10 Physical distribution plan preparing method, and program thereof Pending JP2003055705A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2001244633A JP2003055705A (en) 2001-08-10 2001-08-10 Physical distribution plan preparing method, and program thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2001244633A JP2003055705A (en) 2001-08-10 2001-08-10 Physical distribution plan preparing method, and program thereof

Publications (1)

Publication Number Publication Date
JP2003055705A true JP2003055705A (en) 2003-02-26

Family

ID=19074536

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2001244633A Pending JP2003055705A (en) 2001-08-10 2001-08-10 Physical distribution plan preparing method, and program thereof

Country Status (1)

Country Link
JP (1) JP2003055705A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2005330508A (en) * 2004-05-18 2005-12-02 Kobe Steel Ltd Apparatus and method for controlling delivering plan, and program thereof
JP2016130331A (en) * 2015-01-13 2016-07-21 Jfeスチール株式会社 Molten iron physical distribution planning method and apparatus
JP2016191974A (en) * 2015-03-30 2016-11-10 Jfeスチール株式会社 Transportation plan creation device and transportation plan creation method

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2005330508A (en) * 2004-05-18 2005-12-02 Kobe Steel Ltd Apparatus and method for controlling delivering plan, and program thereof
JP2016130331A (en) * 2015-01-13 2016-07-21 Jfeスチール株式会社 Molten iron physical distribution planning method and apparatus
JP2016191974A (en) * 2015-03-30 2016-11-10 Jfeスチール株式会社 Transportation plan creation device and transportation plan creation method

Similar Documents

Publication Publication Date Title
CN101520656B (en) On-line multi-mode time optimization scheduling method for steelmaking and continuous casting production
CN102323755B (en) Method for controlling molten steel processing of steelmaking workshop
JP4407543B2 (en) Steelmaking process operation schedule creation system, steelmaking process operation schedule creation method, and computer program
JP6428435B2 (en) Transportation plan creation device and transportation plan creation method
CN105303320A (en) Intelligent scheduling algorithm for steelmaking
Urban et al. De-Phosphorization Strategies and Modelling in Oxygen Steelmaking
JP2003055705A (en) Physical distribution plan preparing method, and program thereof
JP4501740B2 (en) Steelmaking process operation schedule creation system, steelmaking process operation schedule creation method, and computer program
JP3166822B2 (en) Operation schedule creation system for steelmaking process
CN108022010A (en) The optimization method of ladle scheduling problem
CN113084148A (en) Method and system for controlling molten iron transportation
Tamura et al. Synchronized scheduling method in manufacturing steel sheets
JP2018190312A (en) Conveyance container allocating plan creating method, conveyance container allocating plan creating device, and operation method for steel plant
CN114559027B (en) Molten iron scheduling method and system based on steelmaking molten iron quality requirements
Yang et al. Quantitative evaluation of multi-process collaborative operation in steelmaking-continuous casting sections
JP2002332510A (en) Method for preparing physical distribution plan, and program therefor
JP2003082407A (en) Method and device for verifying balance in hot metal storage between blast furnace and steel-making shop
Shukla et al. Lean operations strategy to combat uncertainties in temperture at bof end point, tapping, deoxidation, alloy addition and thermal history
JP5672041B2 (en) Method for allocating steel out of ladle and apparatus for allocating steel out of ladle
JP3154397B2 (en) Hot metal supply and demand management scheduling method
JP2005330508A (en) Apparatus and method for controlling delivering plan, and program thereof
JP2008156740A (en) Method for allotting molten iron and apparatus therefor
US20080172277A1 (en) Algorithmic framework for scheduling steelmaking production optimizing the flow of molten iron subject to inventory constraints
JPS6296611A (en) Method for making refining plan
JP3360638B2 (en) Casting operation plan formulation method