JP6349939B2 - Coating method - Google Patents

Coating method Download PDF

Info

Publication number
JP6349939B2
JP6349939B2 JP2014098303A JP2014098303A JP6349939B2 JP 6349939 B2 JP6349939 B2 JP 6349939B2 JP 2014098303 A JP2014098303 A JP 2014098303A JP 2014098303 A JP2014098303 A JP 2014098303A JP 6349939 B2 JP6349939 B2 JP 6349939B2
Authority
JP
Japan
Prior art keywords
coating
roll
electrode paste
coating roll
main
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP2014098303A
Other languages
Japanese (ja)
Other versions
JP2015213876A (en
Inventor
昌人 小島
昌人 小島
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Toyota Industries Corp
Original Assignee
Toyota Industries Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Toyota Industries Corp filed Critical Toyota Industries Corp
Priority to JP2014098303A priority Critical patent/JP6349939B2/en
Publication of JP2015213876A publication Critical patent/JP2015213876A/en
Application granted granted Critical
Publication of JP6349939B2 publication Critical patent/JP6349939B2/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E60/00Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
    • Y02E60/10Energy storage using batteries

Description

本発明は、基材に電極ペーストを塗工する塗工方法に関する。   The present invention relates to a coating method for coating an electrode paste on a substrate.

従来、例えば蓄電装置に用いる電極の製造方法には、金属箔などの基材に電極ペーストを塗工する塗工工程が含まれている。塗工工程で用いられる塗工装置は、例えば電極ペーストを貯留するダムと、ダムから電極ペーストの供給を受けながら回転するコーティングロールと、コーティングロールとの間で形成される吐出口から吐出される電極ペーストの厚さを調整するコンマロールと、基材を送りながらコーティングロール上の電極ペーストに接触させるバックロールと、を備えて構成される(例えば特許文献1参照)。   Conventionally, for example, a method for manufacturing an electrode used in a power storage device includes a coating process in which an electrode paste is applied to a base material such as a metal foil. The coating apparatus used in the coating process is discharged from a discharge port formed between, for example, a dam that stores an electrode paste, a coating roll that rotates while receiving supply of the electrode paste from the dam, and a coating roll. A comma roll that adjusts the thickness of the electrode paste and a back roll that is brought into contact with the electrode paste on the coating roll while feeding the substrate (see, for example, Patent Document 1).

特開平9−99269号公報JP-A-9-99269

塗工装置を運転させる際には、例えば吐出口のギャップ調整やバックロールで送られる基材の張力調整といった運転準備が必要となる。一般に、運転準備の段階ではコーティングロールが停止しているため、自重などの影響によってコーティングロール上に留まっていた電極ペーストに盛り上がり部分が生じることがある。このような電極ペーストの盛り上がり部分が生じた状態で塗工装置の運転を開始すると、盛り上がり部分も含めて基材への電極ペーストの転写がなされ、その後の乾燥工程において盛り上がり部分の乾燥不良が発生してしまうおそれがある。   When operating the coating apparatus, it is necessary to prepare for operation such as adjusting the gap of the discharge port and adjusting the tension of the base material fed by the back roll. In general, since the coating roll is stopped at the stage of operation preparation, a swelled portion may occur in the electrode paste that has remained on the coating roll due to the influence of its own weight or the like. When the operation of the coating device is started with such a raised portion of the electrode paste, the electrode paste is transferred to the base material including the raised portion, and in the subsequent drying process, defective drying of the raised portion occurs. There is a risk of it.

本発明は、上記課題の解決のためになされたものであり、基材に電極ペーストを塗工する際の電極ペーストの厚さを安定化できる塗工方法を提供することを目的とする。   The present invention has been made to solve the above problems, and an object of the present invention is to provide a coating method capable of stabilizing the thickness of the electrode paste when the electrode paste is applied to a substrate.

上記課題の解決のため、本発明に係る塗工方法は、基材に電極ペーストを塗工する塗工工程を備えた塗工方法であって、塗工工程は、コーティングロール上に供給した電極ペーストを基材に塗工する本塗工工程と、本塗工工程の実施に先立って、電極ペーストを基材に塗工する際の条件の調整を行う本塗工準備工程と、を有し、本塗工準備工程においてコーティングロールを回転させると共に、当該コーティングロールの回転を本塗工工程の開始に至るまで継続させる。   In order to solve the above problems, a coating method according to the present invention is a coating method including a coating process for coating an electrode paste on a base material, and the coating process is an electrode supplied on a coating roll. A main coating process for applying the paste to the base material, and a main coating preparation process for adjusting the conditions for applying the electrode paste to the base material prior to the implementation of the main coating process. The coating roll is rotated in the main coating preparation process, and the rotation of the coating roll is continued until the start of the main coating process.

この塗工方法では、本塗工準備工程においてコーティングロールを回転させると共に、当該コーティングロールの回転を本塗工工程の開始に至るまで継続させる。コーティングロールの回転を継続させることで、コーティングロール上の電極ペーストに厚さの盛り上がり部分が生じることを防止できると共に、本塗工工程を実施する際の電極ペーストの厚さを安定化できる。   In this coating method, the coating roll is rotated in the main coating preparation process, and the rotation of the coating roll is continued until the start of the main coating process. By continuing the rotation of the coating roll, it is possible to prevent the thickness of the electrode paste on the coating roll from being raised, and to stabilize the thickness of the electrode paste when this coating process is performed.

また、塗工工程の実施に先立って、電極ペーストを基材に塗工する際の条件出しを行う条件出し工程を更に備え、条件出し工程は、電極ペーストを基材に塗工する際の条件の調整を行う測定用準備工程と、測定用準備工程で設定された条件下で電極ペーストを基材に塗工する測定用塗工工程と、測定用塗工工程で基材に塗工された電極ペーストの塗工状態を測定する測定工程と、を有し、少なくとも測定工程においてコーティングロールを回転させると共に、当該コーティングロールの回転を本塗工準備工程の開始に至るまで継続させてもよい。   In addition, prior to performing the coating process, it further includes a condition setting process for determining the conditions when applying the electrode paste to the substrate, and the condition determining process is a condition for applying the electrode paste to the substrate. Was applied to the substrate in the measurement preparation step, the measurement coating step for applying the electrode paste to the substrate under the conditions set in the measurement preparation step, and the measurement coating step. A measurement process for measuring the coating state of the electrode paste, and at least in the measurement process, the coating roll may be rotated and the rotation of the coating roll may be continued until the start of the coating preparation process.

このように、条件出し工程において少なくとも測定工程においてコーティングロールを回転させると共に、当該コーティングロールの回転を本塗工準備工程の開始に至るまで継続させることで、本塗工工程を実施する際の電極ペーストの厚さの安定化に加え、電極ペーストの幅の安定化を実現できる。   In this way, at the measurement step in the condition setting step, the coating roll is rotated at least in the measurement step, and the rotation of the coating roll is continued until the start of the main coating preparation step. In addition to stabilizing the thickness of the paste, the width of the electrode paste can be stabilized.

また、測定用準備工程においてコーティングロールを回転させると共に、当該コーティングロールの回転を本塗工準備工程の開始に至るまで継続させてもよい。この場合、本塗工工程を実施する際の電極ペーストの厚さ及び幅を一層確実に安定化できる。   In addition, the coating roll may be rotated in the measurement preparation step, and the rotation of the coating roll may be continued until the start of the coating preparation step. In this case, the thickness and width of the electrode paste when performing the present coating process can be more reliably stabilized.

また、本塗工準備工程におけるコーティングロールの回転速度を、本塗工工程における前記コーティングロールの回転速度と等速にしてもよい。この場合、コーティングロールの制御を簡単化できる。   Moreover, you may make the rotational speed of the coating roll in this coating preparation process into the same speed as the rotational speed of the said coating roll in this coating process. In this case, the control of the coating roll can be simplified.

また、本塗工準備工程におけるコーティングロールの回転速度を、本塗工工程におけるコーティングロールの回転速度よりも速くしてもよい。この場合、電極ペーストの厚さが安定化するまでの時間を短縮できる。   Moreover, you may make the rotational speed of the coating roll in this coating preparation process faster than the rotational speed of the coating roll in this coating process. In this case, the time until the thickness of the electrode paste is stabilized can be shortened.

また、本塗工準備工程におけるコーティングロールの回転速度を、本塗工工程におけるコーティングロールの回転速度よりも遅くしてもよい。この場合、電極ペーストの厚さが安定化するまでの電極ペーストのロスを低減できる。   Moreover, you may make the rotational speed of the coating roll in this coating preparation process slower than the rotational speed of the coating roll in this coating process. In this case, the loss of the electrode paste until the thickness of the electrode paste is stabilized can be reduced.

本発明によれば、基材に電極ペーストを塗工する際の電極ペーストの厚さを安定化できる。   ADVANTAGE OF THE INVENTION According to this invention, the thickness of the electrode paste at the time of applying an electrode paste to a base material can be stabilized.

本発明の一実施形態に係る塗工方法を適用する塗工装置の概略を示す図である。It is a figure which shows the outline of the coating apparatus which applies the coating method which concerns on one Embodiment of this invention. 本発明の一実施形態に係る塗工方法のフローチャートである。It is a flowchart of the coating method which concerns on one Embodiment of this invention. 測定用準備工程及び本塗工準備工程における塗工装置の動作を示す図である。It is a figure which shows operation | movement of the coating apparatus in the measurement preparation process and this coating preparation process. 測定用塗工工程及び本塗工工程における塗工装置の動作を示す図である。It is a figure which shows operation | movement of the coating apparatus in the coating process for a measurement, and this coating process. 電極ペーストの厚さの盛り上がり部分を示す図である。It is a figure which shows the rising part of the thickness of an electrode paste. 電極ペーストの幅の変化の様子を示す図である。It is a figure which shows the mode of the change of the width | variety of electrode paste. コーティングロールの回転時間に対する電極ペーストの厚さの変化の様子を示す図である。It is a figure which shows the mode of the change of the thickness of the electrode paste with respect to the rotation time of a coating roll. コーティングロールの回転時間に対する電極ペーストの幅の変化の様子を示す図である。It is a figure which shows the mode of the change of the width | variety of the electrode paste with respect to the rotation time of a coating roll.

以下、図面を参照しながら、本発明に係る塗工方法の好適な実施形態について詳細に説明する。   Hereinafter, preferred embodiments of a coating method according to the present invention will be described in detail with reference to the drawings.

図1は、本発明の一実施形態に係る塗工方法を適用する塗工装置の概略を示す図である。同図に示すように、塗工装置1は、例えばダム2と、コーティングロール3と、バックロール4と、コンマロール5とを備えて構成されている。この塗工装置1は、例えばリチウムイオン二次電池といった非水電解質二次電池などの蓄電装置に用いられる電極の製造装置に組み込まれる装置である。塗工装置1は、例えばリバース型のコンマロール方式により、金属箔(基材)6の一面側に電極ペーストPを所定の塗工幅で塗工する。塗工方式は、連続塗工であっても、間欠塗工であってもよい。   FIG. 1 is a diagram showing an outline of a coating apparatus to which a coating method according to an embodiment of the present invention is applied. As shown in the figure, the coating apparatus 1 includes a dam 2, a coating roll 3, a back roll 4, and a comma roll 5, for example. The coating apparatus 1 is an apparatus that is incorporated in an electrode manufacturing apparatus used in a power storage device such as a non-aqueous electrolyte secondary battery such as a lithium ion secondary battery. The coating apparatus 1 coats the electrode paste P with a predetermined coating width on one surface side of the metal foil (base material) 6 by, for example, a reverse type comma roll method. The coating method may be continuous coating or intermittent coating.

ダム2は、電極ペーストPを貯留する部分である。ダム2には、不図示の供給管及びポンプ等が接続されており、外部からの電極ペーストPの供給を受け得るようになっている。ダム2に貯留される電極ペーストPは、例えば活物質、バインダ、及び溶剤を含むスラリー状のペーストである。電極ペーストPには、例えばアセチレンブラック等の導電助剤が更に含まれていてもよい。活物質は、正極活物質及び負極活物質のいずれであってもよい。   The dam 2 is a part for storing the electrode paste P. A supply pipe and a pump (not shown) are connected to the dam 2 so that the electrode paste P can be supplied from the outside. The electrode paste P stored in the dam 2 is a slurry-like paste containing, for example, an active material, a binder, and a solvent. The electrode paste P may further contain a conductive additive such as acetylene black. The active material may be either a positive electrode active material or a negative electrode active material.

正極活物質としては、例えば複合酸化物、金属リチウム、硫黄等が挙げられる。複合酸化物は、例えばマンガン、ニッケル、コバルト及びアルミニウムの少なくとも1つとリチウムとを含んで構成される。負極活物質としては、例えば黒鉛、高配向性グラファイト、メソカーボンマイクロビーズ、ハードカーボン、ソフトカーボン等のカーボン、リチウム、ナトリウム等のアルカリ金属、金属化合物、SiOx(0.5≦x≦1.5)等の金属酸化物、ホウ素添加炭素等が挙げられる。   Examples of the positive electrode active material include composite oxide, metallic lithium, and sulfur. The composite oxide includes, for example, at least one of manganese, nickel, cobalt, and aluminum and lithium. Examples of the negative electrode active material include carbon such as graphite, highly oriented graphite, mesocarbon microbeads, hard carbon, and soft carbon, alkali metals such as lithium and sodium, metal compounds, SiOx (0.5 ≦ x ≦ 1.5 ) And the like, and boron-added carbon.

コーティングロール3は、ダム2から電極ペーストPの供給を受けながら回転するロールである。コーティングロール3の回転により、ダム2から供給された電極ペーストPが所定の塗工幅Wで吐出口Kから吐出される。また、バックロール4は、コーティングロール3に隣接して配置され、金属箔6を所定の方向に送りながらコーティングロール3上の電極ペーストPに接触させるロールである。   The coating roll 3 is a roll that rotates while receiving supply of the electrode paste P from the dam 2. The electrode paste P supplied from the dam 2 is discharged from the discharge port K with a predetermined coating width W by the rotation of the coating roll 3. The back roll 4 is a roll that is disposed adjacent to the coating roll 3 and contacts the electrode paste P on the coating roll 3 while feeding the metal foil 6 in a predetermined direction.

コーティングロール3の駆動及びバックロール4の駆動は、不図示の制御手段によって制御される。制御手段により、バックロール4は、金属箔6をコーティングロール3の周面3aに接触させる進出位置と、金属箔6をコーティングロール3の周面3aから離間させる退避位置との間で駆動する。かかるコーティングロール3及びバックロール4の協働により、吐出口Kから吐出された電極ペーストPが金属箔6に塗工幅Wで転写される。   The driving of the coating roll 3 and the driving of the back roll 4 are controlled by control means (not shown). By the control means, the back roll 4 is driven between an advance position where the metal foil 6 is brought into contact with the peripheral surface 3 a of the coating roll 3 and a retracted position where the metal foil 6 is separated from the peripheral surface 3 a of the coating roll 3. With the cooperation of the coating roll 3 and the back roll 4, the electrode paste P discharged from the discharge port K is transferred to the metal foil 6 with the coating width W.

コンマロール5は、吐出口Kから吐出される電極ペーストPの厚さを調整するロールである。コンマロール5の周面5aには、軸方向に沿って段差部5bが形成されている。コンマロール5は、段差部5bの先端側がコーティングロール3側を向くようにコーティングロール3の上方に配置され、段差部5bとコーティングロール3の周面3aとによって電極ペーストPの吐出口Kが形成される。コーティングロール3に対するコンマロール5の上下位置を変え、段差部5bの先端とコーティングロール3の周面3aとの間隔を変更することで、吐出口Kのギャップ(すなわち、金属箔6に転写される電極ペーストPの厚さ)が調整される。   The comma roll 5 is a roll that adjusts the thickness of the electrode paste P discharged from the discharge port K. On the peripheral surface 5a of the comma roll 5, a step portion 5b is formed along the axial direction. The comma roll 5 is arranged above the coating roll 3 so that the tip end side of the step portion 5b faces the coating roll 3 side, and the discharge port K for the electrode paste P is formed by the step portion 5b and the peripheral surface 3a of the coating roll 3. Is done. By changing the vertical position of the comma roll 5 with respect to the coating roll 3 and changing the distance between the tip of the stepped portion 5 b and the peripheral surface 3 a of the coating roll 3, the gap of the discharge port K (that is, transferred to the metal foil 6). The thickness of the electrode paste P) is adjusted.

また、コーティングロール3の下部には、ブレード7が配置されている。ブレード7は、バックロール4によってコーティングロール3と金属箔6とが接する位置に対してコーティングロール3の回転方向の前方においてコーティングロール3の周面3aに当接し、金属箔6に転写されずにコーティングロール3の周面3aに残った電極ペーストPを除去する。   A blade 7 is disposed below the coating roll 3. The blade 7 is in contact with the peripheral surface 3a of the coating roll 3 in front of the rotation direction of the coating roll 3 with respect to the position where the coating roll 3 and the metal foil 6 are in contact with each other by the back roll 4, and is not transferred to the metal foil 6. The electrode paste P remaining on the peripheral surface 3a of the coating roll 3 is removed.

続いて、上述した塗工装置1を用いた電極ペーストPの塗工方法について説明する。図2に示すように、この塗工方法は、例えば電極ペーストPを金属箔6に塗工する塗工工程と、塗工工程に先立って電極ペーストPを金属箔6に塗工する際の条件出しを行う条件出し工程とを備えている。   Then, the coating method of the electrode paste P using the coating apparatus 1 mentioned above is demonstrated. As shown in FIG. 2, this coating method includes, for example, a coating process in which the electrode paste P is applied to the metal foil 6, and conditions for applying the electrode paste P to the metal foil 6 prior to the coating process. And a condition setting step for performing discharging.

条件出し工程は、例えば電極ペーストPを金属箔6に塗工する際の条件の調整を行う測定用準備工程(ステップS01)と、測定用準備工程で設定された条件下で電極ペーストPを金属箔6に塗工する測定用塗工工程(ステップS02)と、測定用塗工工程で金属箔6に塗工された電極ペーストPの塗工状態を測定する測定工程(ステップS03)とを有している。また、塗工工程は、本塗工工程の実施に先立って電極ペーストPを金属箔6に塗工する際の条件の調整を行う本塗工準備工程(ステップS04)と、本塗工準備工程で設定された条件下で電極ペーストPを金属箔6に塗工する本塗工工程(ステップS05)とを有している。   In the condition setting process, for example, the electrode preparation P is metalized under the conditions set in the measurement preparation process (step S01) for adjusting the conditions for applying the electrode paste P to the metal foil 6 and the measurement preparation process. A measurement coating step (step S02) for coating the foil 6 and a measurement step (step S03) for measuring the coating state of the electrode paste P coated on the metal foil 6 in the measurement coating step. doing. In addition, the coating process includes a main coating preparation process (step S04) for adjusting conditions for applying the electrode paste P to the metal foil 6 prior to the execution of the main coating process, and a main coating preparation process. And a main coating step (step S05) for coating the metal paste 6 with the electrode paste P under the conditions set in (1).

測定用準備工程では、電極ペーストPを金属箔6に塗工する際の条件として、例えば吐出口Kのギャップ調整、及びバックロール4で送られる金属箔6の張力調整を行う。測定用準備工程に要する時間は、例えば20秒〜30秒程度である。測定用準備工程では、図3に示すように、バックロール4を退避位置に位置させた状態で、コーティングロール3の回転を行う。コーティングロール3の回転に伴って吐出口Kから吐出される電極ペーストPは、金属箔6には転写されずにブレード7によって除去される。   In the measurement preparation process, as conditions for applying the electrode paste P to the metal foil 6, for example, the gap adjustment of the discharge port K and the tension adjustment of the metal foil 6 sent by the back roll 4 are performed. The time required for the measurement preparation step is, for example, about 20 seconds to 30 seconds. In the measurement preparation step, as shown in FIG. 3, the coating roll 3 is rotated in a state where the back roll 4 is positioned at the retracted position. The electrode paste P discharged from the discharge port K with the rotation of the coating roll 3 is removed by the blade 7 without being transferred to the metal foil 6.

測定用準備工程におけるコーティングロール3の回転は、測定用準備工程の全期間にわたって継続し、コーティングロール3を回転させたまま後続の測定用塗工工程に移行する。測定用準備工程におけるコーティングロール3の回転速度は、例えば測定用塗工工程におけるコーティングロール3の回転速度と等速に設定する。これにより、コーティングロール3の制御を簡単化できる。   The rotation of the coating roll 3 in the measurement preparation process is continued over the entire period of the measurement preparation process, and the process proceeds to the subsequent measurement coating process while the coating roll 3 is rotated. The rotation speed of the coating roll 3 in the measurement preparation process is set, for example, to be equal to the rotation speed of the coating roll 3 in the measurement coating process. Thereby, control of the coating roll 3 can be simplified.

測定用塗工工程では、図4に示すように、バックロール4を進出位置に位置させた状態で、コーティングロール3の回転を行う。これにより、コーティングロール3上の電極ペーストPが金属箔6に転写される。測定用塗工工程に後続する測定工程では、図3に示すように、バックロール4を再び退避位置に位置させ、電極ペーストPの塗工状態として、例えば金属箔6に転写された電極ペーストPの厚さ及び幅を測定する。   In the measurement coating process, as shown in FIG. 4, the coating roll 3 is rotated with the back roll 4 positioned at the advanced position. Thereby, the electrode paste P on the coating roll 3 is transferred to the metal foil 6. In the measurement process subsequent to the measurement coating process, as shown in FIG. 3, the back roll 4 is again positioned at the retracted position, and the electrode paste P transferred to, for example, the metal foil 6 is applied as the electrode paste P coating state. Measure the thickness and width.

測定工程においても、その全期間にわたってコーティングロール3の回転を継続し、コーティングロール3を回転させたまま後続の塗工工程に移行する。測定工程でコーティングロール3の回転を継続することで、電極ペーストPが乾燥してしまうことを防止できる。測定工程におけるコーティングロール3の回転速度は、例えば測定用塗工工程におけるコーティングロール3の回転速度と等速に設定する。測定用準備工程から測定工程までに要する時間は、例えば10分程度である。   Also in the measurement process, the rotation of the coating roll 3 is continued over the entire period, and the process proceeds to the subsequent coating process while the coating roll 3 is rotated. By continuing the rotation of the coating roll 3 in the measurement process, the electrode paste P can be prevented from drying. The rotation speed of the coating roll 3 in the measurement process is set to, for example, the same speed as the rotation speed of the coating roll 3 in the measurement coating process. The time required from the measurement preparation process to the measurement process is, for example, about 10 minutes.

本塗工準備工程は、測定工程での測定結果に基づいて、電極ペーストPを金属箔6に塗工する際の条件として、例えば吐出口Kのギャップ調整、及びバックロール4で送られる金属箔6の張力調整を行う。本塗工準備工程に要する時間は、例えば20秒〜30秒程度である。本塗工準備工程では、図3に示すように、バックロール4を退避位置に位置させた状態で、コーティングロール3の回転を行う。コーティングロール3の回転に伴って吐出口Kから吐出される電極ペーストPは、金属箔6には転写されずにブレード7によって除去される。   This coating preparation process is based on the measurement result in the measurement process. As conditions for coating the electrode paste P onto the metal foil 6, for example, the gap adjustment of the discharge port K and the metal foil fed by the back roll 4 are used. 6 Adjust the tension. The time required for this coating preparation process is, for example, about 20 seconds to 30 seconds. In the present coating preparation process, as shown in FIG. 3, the coating roll 3 is rotated in a state where the back roll 4 is positioned at the retracted position. The electrode paste P discharged from the discharge port K with the rotation of the coating roll 3 is removed by the blade 7 without being transferred to the metal foil 6.

本塗工準備工程におけるコーティングロール3の回転は、本塗工準備工程の全期間にわたって継続し、コーティングロール3を回転させたまま後続の本塗工工程に移行する。本塗工準備工程におけるコーティングロール3の回転速度は、例えば本塗工工程におけるコーティングロール3の回転速度と等速に設定する。これにより、コーティングロール3の制御を簡単化できる。   The rotation of the coating roll 3 in the main coating preparation process is continued over the entire period of the main coating preparation process, and the process proceeds to the subsequent main coating process while the coating roll 3 is rotated. The rotation speed of the coating roll 3 in the main coating preparation process is set to, for example, the same speed as the rotation speed of the coating roll 3 in the main coating process. Thereby, control of the coating roll 3 can be simplified.

本塗工工程では、図4に示すように、バックロール4を進出位置に位置させた状態で、コーティングロール3の回転を行う。これにより、コーティングロール3上の電極ペーストPが金属箔6に転写される。本塗工工程の後、電極ペーストPを乾燥させる乾燥工程を実施し、金属箔6の裏面側についても上述した塗工方法を実施することにより、蓄電装置に用いられる電極が得られる。   In this coating process, as shown in FIG. 4, the coating roll 3 is rotated with the back roll 4 positioned at the advanced position. Thereby, the electrode paste P on the coating roll 3 is transferred to the metal foil 6. The electrode used for an electrical storage apparatus is obtained by implementing the drying process which dries the electrode paste P after this coating process, and also implementing the coating method mentioned above also about the back surface side of the metal foil 6. FIG.

従来の塗工方法では、本塗工準備工程に相当する工程においてコーティングロールを停止させていたため、自重などの影響によってコーティングロール上に留まっていた電極ペーストに盛り上がり部分が生じることがあった。このような電極ペーストの盛り上がり部分が生じた状態で塗工装置の運転を開始すると、例えば図5に示すように、盛り上がり部分Paも含めて金属箔6への電極ペーストPの転写がなされ、その後の乾燥工程において盛り上がり部分Paの乾燥不良が発生してしまうおそれがある。この場合、金属箔6の裏面側に更に電極ペーストPを塗工する際、盛り上がり部分Paの未乾燥部分がバックロール4等に当たることで、ロールへの貼り付きなどが生じ、歩留まりが低下してしまうことが考えられる。   In the conventional coating method, since the coating roll is stopped in a process corresponding to the present coating preparation process, a swelled portion may occur in the electrode paste that has remained on the coating roll due to the influence of its own weight or the like. When the operation of the coating apparatus is started in a state where such a swelled portion of the electrode paste is generated, the electrode paste P is transferred to the metal foil 6 including the swelled portion Pa, for example, as shown in FIG. There is a risk that poor drying of the raised portion Pa may occur in the drying process. In this case, when the electrode paste P is further applied to the back side of the metal foil 6, the undried portion of the raised portion Pa hits the back roll 4, etc., causing sticking to the roll and the yield is reduced. It is possible to end up.

また、コーティングロール3の回転初期は、金属箔6に転写された電極ペーストPの塗工幅が安定し難いという問題もある。電極ペーストPの初期の塗工幅Wは、例えば図6に示すように、所望の塗工幅Wに比べて大きくなり、コーティングロール3の回転を開始してからの時間の経過と共に徐々に塗工幅Wに近づいていく傾向が見られる場合がある。塗工幅Wが安定するまでの時間(塗工幅がWからWに変化するまでの時間)は、電極ペーストPの粘度などに依存し、蓄電装置に用いる電極ペーストPでは少なくとも10分程度は要すると考えられる。 There is also a problem that the coating width of the electrode paste P transferred to the metal foil 6 is difficult to stabilize at the initial rotation of the coating roll 3. For example, as shown in FIG. 6, the initial coating width W 0 of the electrode paste P becomes larger than the desired coating width W, and gradually increases with the passage of time after the rotation of the coating roll 3 is started. There may be a tendency to approach the coating width W. The time until the coating width W is stabilized (the time until the coating width changes from W 0 to W) depends on the viscosity of the electrode paste P and the like, and at least about 10 minutes for the electrode paste P used in the power storage device. Is considered necessary.

このような問題に対し、この塗工方法では、本塗工準備工程においてコーティングロール3を回転させると共に、当該コーティングロール3の回転を本塗工工程の開始に至るまで継続させる。コーティングロール3の回転を継続させることで、コーティングロール3上の電極ペーストPに厚さの盛り上がり部分が生じることを防止できると共に、本塗工工程を実施する際の電極ペーストPの厚さを安定化できる。   In response to such a problem, in this coating method, the coating roll 3 is rotated in the main coating preparation process, and the rotation of the coating roll 3 is continued until the start of the main coating process. By continuing the rotation of the coating roll 3, it is possible to prevent the thickness of the electrode paste P on the coating roll 3 from being raised, and to stabilize the thickness of the electrode paste P when performing this coating process. Can be

また、この塗工方法では、塗工工程に先立つ条件出し工程において、少なくとも測定用工程でコーティングロール3を回転させると共に、当該コーティングロール3の回転を本塗工準備工程の開始に至るまで継続させる。このように、条件出し工程においてコーティングロール3を回転させると共に、当該コーティングロール3の回転を本塗工準備工程の開始に至るまで継続させることで、本塗工工程を実施する際の電極ペーストPの厚さの安定化に加え、電極ペーストPの幅の安定化を実現できる。   In this coating method, in the condition setting step prior to the coating step, the coating roll 3 is rotated at least in the measurement step, and the rotation of the coating roll 3 is continued until the start of the present coating preparation step. . Thus, while rotating the coating roll 3 in the condition setting process and continuing the rotation of the coating roll 3 until the start of the main coating preparation process, the electrode paste P when performing the main coating process In addition to the stabilization of the thickness, the width of the electrode paste P can be stabilized.

図7は、コーティングロールの回転時間に対する電極ペーストの厚さの変化の様子を示す図である。当該データは、例えば粘度が4000mPa・s〜12000mPa・sの電極ペーストPについて、コーティングロール3の回転時間に対するコーティングロール3上の電極ペーストPの厚さの変化をプロットしたものである。電極ペーストPの厚さは、安定化後の厚さを100%としている。   FIG. 7 is a diagram illustrating a change in the thickness of the electrode paste with respect to the rotation time of the coating roll. The data is a plot of changes in the thickness of the electrode paste P on the coating roll 3 with respect to the rotation time of the coating roll 3, for example, for the electrode paste P having a viscosity of 4000 mPa · s to 12000 mPa · s. The thickness of the electrode paste P is 100% after stabilization.

同図に示すように、コーティングロール3の回転初期では、電極ペーストPの厚さが約120%となっており、電極ペーストPに厚さの盛り上がり部分が生じていることが分かる。一方、電極ペーストPの厚さは、コーティングロール3の回転時間の経過と共に急速に減少し、回転時間0.25分では約110%となる。電極ペーストPの厚さは、回転時間0.5分以降では約100%で安定する。したがって、上述したように、本塗工準備工程においてコーティングロール3を回転させると共に、当該コーティングロール3の回転を本塗工工程の開始に至るまで継続させることで、電極ペーストPの厚さを十分に安定化できる。   As shown in the figure, at the initial rotation of the coating roll 3, the thickness of the electrode paste P is about 120%, and it can be seen that the electrode paste P has a raised portion. On the other hand, the thickness of the electrode paste P decreases rapidly with the lapse of the rotation time of the coating roll 3, and becomes about 110% at the rotation time of 0.25 minutes. The thickness of the electrode paste P stabilizes at about 100% after a rotation time of 0.5 minutes. Therefore, as described above, the thickness of the electrode paste P is sufficiently increased by rotating the coating roll 3 in the main coating preparation process and continuing the rotation of the coating roll 3 until the start of the main coating process. Can be stabilized.

また、図8は、電極ペーストの一例について、コーティングロールの回転時間に対する電極ペーストの幅の変化の様子を示す図である。電極ペーストPの幅は、安定化後の厚さを100%としている。電極ペーストPについて、溶媒が水にて粘度が4000mPa・s〜12000mPa・sの範囲にある場合、あるいは、溶媒がNMPにて粘度が4000mPa・s〜12000mPa・sの範囲にある場合は、値に多少の変動はあるが、同様の傾向を示す。   Moreover, FIG. 8 is a figure which shows the mode of the change of the width of the electrode paste with respect to the rotation time of a coating roll about an example of electrode paste. The width of the electrode paste P is 100% after stabilization. For the electrode paste P, when the solvent is water and the viscosity is in the range of 4000 mPa · s to 12000 mPa · s, or the solvent is NMP and the viscosity is in the range of 4000 mPa · s to 12000 mPa · s, the value is Although there are some fluctuations, the same tendency is shown.

同図に示すように、コーティングロール3の回転初期では、電極ペーストPの幅は約130%となっており、回転時間0.25分では約124%、回転時間0.5分では約120%となっている。その後、回転時間の経過と共に電極ペーストPの幅が緩やかに減少し、回転時間10分以降では約100%で安定する。したがって、上述したように、測定用準備工程においてコーティングロール3を回転させると共に、当該コーティングロール3の回転を本塗工準備工程の開始に至るまで継続させることで、電極ペーストPの幅を十分に安定化できる。   As shown in the figure, at the initial stage of rotation of the coating roll 3, the width of the electrode paste P is about 130%, about 124% when the rotation time is 0.25 minutes, and about 120% when the rotation time is 0.5 minutes. It has become. Thereafter, the width of the electrode paste P gradually decreases with the passage of the rotation time, and stabilizes at about 100% after the rotation time of 10 minutes. Therefore, as described above, the width of the electrode paste P is sufficiently increased by rotating the coating roll 3 in the measurement preparation process and continuing the rotation of the coating roll 3 until the start of the coating preparation process. Can be stabilized.

本発明は上記実施形態に限られるものではない。例えば上述した実施形態では、本塗工準備工程におけるコーティングロール3の回転速度を、本塗工工程におけるコーティングロール3の回転速度と等速に設定しているが、本塗工準備工程におけるコーティングロール3の回転速度を、本塗工工程におけるコーティングロール3の回転速度よりも速くしてもよい。この場合、電極ペーストPの厚さ及び幅が安定化するまでの時間を短縮できる。また、本塗工準備工程におけるコーティングロール3の回転速度を、本塗工工程におけるコーティングロール3の回転速度よりも遅くしてもよい。この場合、電極ペーストPの厚さ及び幅が安定化するまでの電極ペーストPのロスを低減できる。   The present invention is not limited to the above embodiment. For example, in the above-described embodiment, the rotation speed of the coating roll 3 in the main coating preparation process is set to be equal to the rotation speed of the coating roll 3 in the main coating process. The rotational speed of 3 may be faster than the rotational speed of the coating roll 3 in the main coating process. In this case, the time until the thickness and width of the electrode paste P are stabilized can be shortened. Moreover, you may make the rotational speed of the coating roll 3 in this coating preparation process slower than the rotational speed of the coating roll 3 in this coating process. In this case, the loss of the electrode paste P until the thickness and width of the electrode paste P are stabilized can be reduced.

また、この塗工方法では、条件出し工程(ステップS01〜ステップS03)を複数回実施してもよい。この場合、電極ペーストPの厚さ及び幅を一層確実に安定化できる。条件出し工程を複数回実施する場合には、最終回の条件出し工程のみで測定用準備工程からのコーティングロール3の回転の継続を実施するようにしてもよい。   In this coating method, the condition setting step (step S01 to step S03) may be performed a plurality of times. In this case, the thickness and width of the electrode paste P can be more reliably stabilized. When the condition setting process is performed a plurality of times, the rotation of the coating roll 3 from the measurement preparation process may be continued only in the final condition setting process.

3…コーティングロール、6…金属箔(基材)、P…電極ペースト。   3 ... coating roll, 6 ... metal foil (base material), P ... electrode paste.

Claims (6)

基材に電極ペーストを塗工する塗工工程と、
前記塗工工程の実施に先立って、前記電極ペーストを前記基材に塗工する際の条件出しを行う条件出し工程と、を備え
前記塗工工程は、
コーティングロール上に供給した前記電極ペーストをバックロールで送られる前記基材に塗工する本塗工工程と、
前記本塗工工程の実施に先立って、前記条件出し工程での条件出しの結果に基づいて、前記電極ペーストを前記基材に塗工する際の条件の調整を行う本塗工準備工程と、を有し、
前記本塗工準備工程では、前記バックロールを前記基材が前記コーティングロールの周面から離間する退避位置に位置させた状態で前記コーティングロールを回転させると共に、前記コーティングロールの回転を前記本塗工工程の開始に至るまで継続させ、前記コーティングロールの回転によって吐出される前記電極ペーストをブレードによって前記コーティングロールの周面から除去する塗工方法。
A coating process for coating the substrate with electrode paste ;
Prior to performing the coating step, comprising a condition setting step for performing a condition setting when the electrode paste is applied to the substrate ,
The coating process includes
A main coating step of applying the electrode paste supplied on the coating roll to the substrate fed by a back roll ;
Prior to the implementation of the main coating step , based on the result of the condition setting in the condition setting step, a main coating preparation step of adjusting the conditions for applying the electrode paste to the substrate, Have
And in the present coating preparing step, with rotating the coating roll in a state where the back roll the substrate was positioned at the retracted position separated from the peripheral surface of the coating roll, the present coating rotation of the coating roll A coating method in which the electrode paste discharged by the rotation of the coating roll is removed from the peripheral surface of the coating roll by a blade, which is continued until the start of the construction process.
記条件出し工程は、
前記電極ペーストを前記基材に塗工する際の条件の調整を行う測定用準備工程と、
前記測定用準備工程で設定された条件下で前記電極ペーストを前記基材に塗工する測定用塗工工程と、
前記測定用塗工工程で前記基材に塗工された前記電極ペーストの塗工状態を測定する測定工程と、を有し、
少なくとも前記測定工程において前記コーティングロールを回転させると共に、当該コーティングロールの回転を前記本塗工準備工程の開始に至るまで継続させる請求項1記載の塗工方法。
Before Symbol conditions out process,
Preparation step for measurement for adjusting the conditions when applying the electrode paste to the substrate;
A measurement coating step of coating the substrate with the electrode paste under the conditions set in the measurement preparation step;
Measuring step of measuring the coating state of the electrode paste applied to the substrate in the measurement coating step,
The coating method according to claim 1, wherein the coating roll is rotated at least in the measurement step and the rotation of the coating roll is continued until the start of the main coating preparation step.
前記測定用準備工程において前記コーティングロールを回転させると共に、当該コーティングロールの回転を前記本塗工準備工程の開始に至るまで継続させる請求項2記載の塗工方法。   The coating method according to claim 2, wherein the coating roll is rotated in the measurement preparation step and the rotation of the coating roll is continued until the start of the main coating preparation step. 前記本塗工準備工程における前記コーティングロールの回転速度を、前記本塗工工程における前記コーティングロールの回転速度と等速にする請求項1〜3のいずれか一項記載の塗工方法。   The coating method as described in any one of Claims 1-3 which makes the rotational speed of the said coating roll in the said main coating preparation process the same speed as the rotational speed of the said coating roll in the said main coating process. 前記本塗工準備工程における前記コーティングロールの回転速度を、前記本塗工工程における前記コーティングロールの回転速度よりも速くする請求項1〜3のいずれか一項記載の塗工方法。   The coating method as described in any one of Claims 1-3 which makes the rotational speed of the said coating roll in the said main coating preparation process faster than the rotational speed of the said coating roll in the said main coating process. 前記本塗工準備工程における前記コーティングロールの回転速度を、前記本塗工工程における前記コーティングロールの回転速度よりも遅くする請求項1〜3のいずれか一項記載の塗工方法。   The coating method as described in any one of Claims 1-3 which makes the rotational speed of the said coating roll in the said main coating preparation process slower than the rotational speed of the said coating roll in the said main coating process.
JP2014098303A 2014-05-12 2014-05-12 Coating method Expired - Fee Related JP6349939B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2014098303A JP6349939B2 (en) 2014-05-12 2014-05-12 Coating method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2014098303A JP6349939B2 (en) 2014-05-12 2014-05-12 Coating method

Publications (2)

Publication Number Publication Date
JP2015213876A JP2015213876A (en) 2015-12-03
JP6349939B2 true JP6349939B2 (en) 2018-07-04

Family

ID=54751315

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2014098303A Expired - Fee Related JP6349939B2 (en) 2014-05-12 2014-05-12 Coating method

Country Status (1)

Country Link
JP (1) JP6349939B2 (en)

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0876683B1 (en) * 1996-01-25 2002-09-25 Danionics A/S Electrode/current collector, laminates for an electrochemical device
JP2000051778A (en) * 1998-08-13 2000-02-22 Sony Corp Coating method and coating device
JP3680985B2 (en) * 1999-06-11 2005-08-10 トヨタ自動車株式会社 Method for manufacturing battery sheet electrode
JP3471747B2 (en) * 2000-11-17 2003-12-02 鹿児島日本電気株式会社 Comma coater and method for applying paste on substrate using the same
JP2004148168A (en) * 2002-10-29 2004-05-27 Nec Plasma Display Corp Comma coater and method for applying paste by using the same

Also Published As

Publication number Publication date
JP2015213876A (en) 2015-12-03

Similar Documents

Publication Publication Date Title
JP6424608B2 (en) Electrode manufacturing method and electrode manufacturing apparatus
US10500605B2 (en) Apparatus and method for coating electrode active material slurry
JP6880689B2 (en) Die
CN103250281A (en) Process for manufacture of lithium ion secondary battery
JP2006012788A (en) Lithium ion secondary battery and its manufacturing method
JP2012216375A (en) Coating device and coating film formation system
JP2014096302A (en) Electrode paste coating device and electrode paste coating method
JP2012179540A (en) Coating apparatus and coating film formation system
JP6349939B2 (en) Coating method
JP6212002B2 (en) Method for producing electrode for lithium ion secondary battery
WO2009113246A1 (en) Coating device and lithium ion secondary battery manufactured using same
JP2015100786A (en) Coating device
JP4852846B2 (en) Press roll device and press method
US20070231465A1 (en) Method and apparatus for forming electrode for battery
JPH09298058A (en) Manufacture of electrode plate for nonaqueous electrolyte secondary battery
US9825298B2 (en) Apparatus and method for manufacturing an electricity storage material
JP4760014B2 (en) Press roll device and press method
EP3657578A1 (en) Method and device for producing cathode slurry for non-aqueous electrolyte secondary battery
JPH11185734A (en) Electrode plate for nonaqueous electrolyte and manufacture thereof
JP6237445B2 (en) Coating equipment
US20180294482A1 (en) Mixed binders
JP6372334B2 (en) Electrode manufacturing apparatus and electrode manufacturing method
JP2009277598A (en) Coating method, overlay film forming device, overlay film, and nonaqueous electrolyte secondary battery
JP2014120293A (en) Method of manufacturing electrode
JP5545088B2 (en) Method for forming solid electrolyte-containing film

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20170208

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20171005

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20171017

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20171120

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20180508

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20180521

R151 Written notification of patent or utility model registration

Ref document number: 6349939

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R151

LAPS Cancellation because of no payment of annual fees