JP5203662B2 - Bridge main girder erection method and erection girder horizontal mechanism - Google Patents
Bridge main girder erection method and erection girder horizontal mechanism Download PDFInfo
- Publication number
- JP5203662B2 JP5203662B2 JP2007248482A JP2007248482A JP5203662B2 JP 5203662 B2 JP5203662 B2 JP 5203662B2 JP 2007248482 A JP2007248482 A JP 2007248482A JP 2007248482 A JP2007248482 A JP 2007248482A JP 5203662 B2 JP5203662 B2 JP 5203662B2
- Authority
- JP
- Japan
- Prior art keywords
- girder
- installation
- bridge
- pier
- erection
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Bridges Or Land Bridges (AREA)
Description
本発明は、PC桁などの橋梁主桁の架設を、架設桁(エレクションガーダー)により吊り下げて行なう架設方法および架設桁の横取り機構に関するものである。 The present invention relates to an erection method in which a bridge main girder such as a PC girder is suspended by an erection girder (erection girder) and a framing mechanism for the erection girder.
架設桁による橋梁主桁の架設方法としては、上路式架設法、抱込み式架設法、吊下げ式架設法などがあり、このうち吊下げ式架設法に関しては、例えば特許文献1〜4に記載された発明がある。 As a method of erection of the bridge main girder by the erection girder, there are an upper-pass erection method, a embedment erection method, a suspension erection method, and the like. There are inventions made.
吊下げ式架設法において、複数の橋梁主桁を橋脚間あるいは橋台と橋脚間(以下、簡単のため、橋脚間として説明する)に架設する際、並列する橋梁主桁を、順次、横方向に移動させる横取りの方法として、橋脚間に架設した架設桁を、橋脚上に設置したベントなどの上部に橋軸方向と直交する方向に敷設した横取りレールとレールに沿って移動する重量台車で支持し、橋梁主桁を吊り支持した架設桁ごと横移動させるようにすれば、橋梁主桁を仮置きしたり、他の支持装置に盛り替えることなく、架設を行なうことができる。 When suspending multiple bridge main girders between piers or between abutments and piers (hereinafter referred to as between piers for the sake of brevity) in the suspension-type installation method, the bridge main girders in parallel are sequentially placed in the horizontal direction. As a method of pre-moving, the installation girders installed between the piers are supported by pre-installed rails laid in the direction perpendicular to the bridge axis direction on the upper part of the vents installed on the piers and heavy trucks that move along the rails. If the bridge main girder is horizontally moved together with the bridge main girder suspended, the bridge main girder can be erected without being temporarily placed or replaced with another support device.
しかしながら、橋梁が拡幅する区間(図1参照)や曲線区間では、隣り合う橋脚の橋軸と直交する方向が平行でないため、並列する橋梁主桁の長さ、架設スパンおよび角度が異なっている。 However, in the section where the bridge is widened (see FIG. 1) and the curved section, the length, span and angle of the bridge main girder in parallel differ because the direction orthogonal to the bridge axis of the adjacent pier is not parallel.
その場合、拡幅や曲線の角度がわずかであればある程度ベント部分で対処させることも考えられるが、無理に横取りするとベントの負担が大きくなり、並列する橋梁主桁どうしの寸法差が大きいと、実質的に横取りが不可能となる。 In that case, if the width of the widening or the angle of the curve is small, it may be possible to cope with the vent part to some extent, but if it is forcibly seized, the burden of the vent will increase, and if the dimensional difference between the parallel bridge main beams is large, Preemption is impossible.
本発明は、このような課題の解決を図ったものであり、吊下げ式架設法において、橋梁が拡幅する場合や曲線区間がある場合でも、架設桁の横取りにより並列する橋梁主桁の架設を容易に行なうことができる橋梁主桁の架設方法および架設桁の横取り機構を提供することを目的としたものである。 The present invention is intended to solve such problems, and in the suspension-type installation method, even when the bridge is widened or there is a curved section, the bridge main girder can be installed in parallel by intercepting the installation girder. It is an object of the present invention to provide a bridge main girder erection method and a framing mechanism that can be easily performed.
本願の請求項1に係る架設桁による橋梁主桁の架設方法は、橋梁が拡幅する区間においても、長さ、架設スパンおよび角度が異なる隣り合う複数本の主桁を橋脚上に設けた横取り機構を用いて、吊下げ方式架設法で架設できるようにするための橋梁主桁の架設方法であって、前記橋脚上に複数並列配置した複数のベントと、前記複数のベントの頂部間に架け渡した形鋼からなる仮設横梁と、前記仮設横梁上に設置した横取りレールと、橋脚または橋台間に架け渡される架設桁を支持した状態で前記横取りレールに沿って車輪で走行する台車と、前記台車の上面と前記架設桁の下面との間に設置され、前記架設桁を載置した状態で、架設桁の支持点を架設桁軸方向および該架設桁の他端の支持点を中心とする回転方向にスライド可能とするすべり支承とを備える架設桁の横取り機構を、隣り合う橋脚上に設け、前記橋脚または橋台間に架け渡した架設桁によって主桁を吊支持した状態で、前記台車を前記横取りレールに沿って走行させ、橋梁の拡幅する区間においても、長さ、架設スパンおよび角度が異なる複数本の主桁を並列させて架設できるようにしたことを特徴とするものである。
The bridge main girder erection method using the erection girder according to
本発明は、吊下げ式架設法において、橋梁が拡幅する場合や曲線区間がある場合など、並列する複数本の橋梁主桁について、その長さや架設スパン、角度が異なる場合でも、架設桁を支持するベント等に負担をかけることなく、橋梁主桁を吊り支持したままの状態で架設桁を横取り移動させ、橋梁主桁を安価に、かつ安全、迅速に橋脚間に架設できるようにしたものである。 The present invention supports suspension girder even when the length, span, and angle of multiple bridge main girders are different in parallel, such as when the bridge is widened or there is a curved section in the suspension construction method. The bridge girder can be installed between bridge piers at low cost, safely and quickly, without any burden on the vents, etc. is there.
すべり支承は、従来、橋脚や橋台の橋梁主桁を受けるシュー(沓)部分などに用いられているが、本発明では横取りの際、台車が橋桁の主軸に対し斜めに移動するのに対し、架設桁とそれを支持するベント等との間に生ずる水平力を低減する目的で使用する。構造的には橋梁のシューに用いられるすべり支承と同様のものを利用することができる。 Conventionally, the sliding bearing is used for the shoe (沓) part that receives the bridge main girder of the bridge pier or abutment, but in the present invention, the carriage moves obliquely with respect to the main axis of the bridge girder, It is used for the purpose of reducing the horizontal force generated between the erection girder and the vent that supports it. Structurally, the same sliding bearing used for the shoe of the bridge can be used.
すべり支承としては、すべり面をステンレス面とフッ素樹脂面で形成したものなどを用いることができる。 The to slip bearing, or the like can be used a sliding surface which is formed of stainless surface and a fluororesin surface.
ステンレス板の表面とフッ素樹脂コーティング面との間の低摩擦係数を利用したすべり支承は、その性能が従来から確認されており、比較的容易に利用することができる。 The performance of the sliding bearing using the low friction coefficient between the surface of the stainless steel plate and the fluororesin coating surface has been confirmed so far and can be used relatively easily.
本願の請求項2に係る発明は、上記請求項1に係る架設方法に適した架設桁の横取り機構に関するものであり、橋梁が拡幅する区間においても、長さ、架設スパンおよび角度が異なる隣り合う複数本の主桁を、吊下げ方式架設法で架設できるようにするための架設桁の横取り機構であって、橋脚上に複数並列配置した複数のベントと、前記複数のベントの頂部間に架け渡した形鋼からなる仮設横梁と、前記仮設横梁上に設置した横取りレールと、橋脚または橋台間に架け渡される架設桁を支持した状態で前記横取りレールに沿って車輪で走行する台車と、前記台車の上面と前記架設桁の下面との間に設置され、前記架設桁を載置した状態で、架設桁の支持点を架設桁軸方向および該架設桁の他端の支持点を中心とする回転方向にスライド可能とするすべり支承とを備えることを特徴とするものである。
The invention according to
横取りレール、台車、すべり支承等は、架設方法に関して説明した通りである。 The horizontal rail, carriage, slide support, etc. are as described for the construction method.
本発明によれば、吊下げ式架設法において、橋梁が拡幅する場合や曲線区間がある場合など、並列する複数本の橋梁主桁について、その長さや架設スパン、角度が異なる場合でも、架設桁を支持するベント等に負担をかけることなく、橋梁主桁を吊り支持したままの状態で架設桁を横取り移動させ、橋梁主桁を橋脚間に架設することができる。 According to the present invention, in the suspension-type erection method, even when the length, erection span, and angle of the bridge main girder in parallel are different, such as when the bridge is widened or there is a curved section, the erection girder is different. The bridge girder can be bridged between the piers by placing the bridge girder in a state where the bridge main girder is suspended and supported without placing a burden on the vents that support the bridge.
橋梁主桁を吊り支持したままの状態で架設桁を横取り移動させるので、主桁支持の盛り替えを必要とせず、安価に、かつ安全、迅速に施工を行うことができる。 Since the construction girder is moved sideways while the bridge main girder is suspended and supported, the main girder support is not required to be replaced, and the construction can be performed inexpensively, safely, and quickly.
以下、本発明の最良の実施形態を、添付図面に基づいて説明する。 DESCRIPTION OF EXEMPLARY EMBODIMENTS Hereinafter, preferred embodiments of the invention will be described with reference to the accompanying drawings.
図1〜図5は、本発明を道路橋の拡幅区間(橋脚P4−P6)に適用した場合の実施形態を示したもので、この例では上り線と下り線が並列する別々の橋脚P上に架設されている。なお、P4〜P6における数字は多径間の橋梁の何番目の橋脚であるかを示し、並列する橋脚には同じ数字を用いている。 1 to 5 show an embodiment in the case where the present invention is applied to a widening section (pier P4-P6) of a road bridge. It is built in. Note that the numbers in P4 to P6 indicate the number of piers of the multi-span bridge, and the same numbers are used for the parallel piers.
図1は架設桁9を支持するベント3の配置例を示しており、図2は図1の拡幅区間について、架設桁9が橋脚P5、P6間で支持され、橋梁主桁11を橋脚P5、P6間に架設する様子を示している。図2において、符号1は橋脚の基礎部、符号2は側方に張り出す橋脚頂部を示している。
FIG. 1 shows an example of the arrangement of the
図1に示すように、橋脚P4−P6にかけて拡幅しているため、この区間に架設される隣り合う橋梁主桁11どうしは平行ではなく、長さも中央の橋梁主桁11が短く、両側の橋梁主桁11が長くなっている。
As shown in FIG. 1, since it is widened over the bridge piers P4 to P6, the adjacent bridge
図3は、本実施形態における架設桁9の横取り機構の詳細を示したものであり、橋脚P上のベント3の頂部に、橋軸直交方向に延びる形鋼からなる仮設横梁4を設置し、その上に仮設横梁4に沿って横取りレール5が設けられている。
FIG. 3 shows the details of the horizontal arrangement mechanism of the
この横取りレール5に沿って、車輪7で走行する重量台車6が設けられ、台車6上に架設桁9を載置する構成としている。
A
台車6の上面と架設桁9の下面との間には、すべり支承8を介在させてあり、台車6が横取りレール5に沿って移動する際に、架設桁9の支持点を橋軸方向にスライドさせることができるようになっている。
A sliding
このような構成において、図2の橋脚P5、P6間に架け渡した架設桁9から、桁吊装置10の吊り材で橋梁主桁11を吊り下げ、その状態で、架設桁9を支持する台車6を横取りレール5に沿って移動させることで、長さの異なる主桁11を、順次、橋脚P5、P6間に並列させて架設して行くことができる。
In such a configuration, the bridge
図4は、橋脚P5上への橋梁主桁11の架設の様子を示したもので、2段のベント3上に仮設梁4が架設され(図2の橋脚P6位置の状態)、その上面に設けられた横取りレール5上を、架設桁9を支持する重量台車6が走行する。架設桁9から桁吊装置10の吊り材で吊った橋梁主桁11を、橋脚頂部2の所定位置に吊り降ろし、架設する。
FIG. 4 shows the construction of the bridge
図5は、橋脚P5上への橋梁主桁11の架設が完了し、架設した橋梁主桁11の上にベント3を1段載置し(図2の橋脚P5位置の状態)、次工程へ進む際の様子を示したものである。
FIG. 5 shows that the bridge
P(P4,P5,P6)…橋脚、
1…橋脚基礎部、2…橋脚頂部、3…ベント、4…仮設横梁、5…横取りレール、6…台車、7…車輪、8…すべり支承、9…架設桁、10…桁吊装置、11…橋梁主桁
P (P4, P5, P6) ... pier,
DESCRIPTION OF
Claims (2)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2007248482A JP5203662B2 (en) | 2007-09-26 | 2007-09-26 | Bridge main girder erection method and erection girder horizontal mechanism |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2007248482A JP5203662B2 (en) | 2007-09-26 | 2007-09-26 | Bridge main girder erection method and erection girder horizontal mechanism |
Publications (2)
Publication Number | Publication Date |
---|---|
JP2009079395A JP2009079395A (en) | 2009-04-16 |
JP5203662B2 true JP5203662B2 (en) | 2013-06-05 |
Family
ID=40654353
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP2007248482A Expired - Fee Related JP5203662B2 (en) | 2007-09-26 | 2007-09-26 | Bridge main girder erection method and erection girder horizontal mechanism |
Country Status (1)
Country | Link |
---|---|
JP (1) | JP5203662B2 (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106087775A (en) * | 2016-08-08 | 2016-11-09 | 郑州新大方重工科技有限公司 | For setting up intercity track and subway U beam self-balancing via hole type Bridge Erector |
CN110029588A (en) * | 2019-05-05 | 2019-07-19 | 中建钢构有限公司 | Piston shoes |
CN110644377A (en) * | 2019-09-30 | 2020-01-03 | 中铁二院工程集团有限责任公司 | Roller type beam body pushing construction device |
CN111074792A (en) * | 2020-01-03 | 2020-04-28 | 北京中铁建北方路桥工程有限公司 | Large-span bridge fabrication machine and sliding device thereof |
Families Citing this family (13)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP5152102B2 (en) | 2009-03-27 | 2013-02-27 | 富士電機機器制御株式会社 | Thermal overload relay |
CN102286931B (en) * | 2011-06-20 | 2013-05-08 | 江苏恩纳斯重工机械有限公司 | Deck moving support system (MSS) bridge fabrication machine specially for construction of double-T-shaped bridge |
CN102304896A (en) * | 2011-07-08 | 2012-01-04 | 温州合力建设机械有限公司 | Section assembling bridge girder erection machine |
CN102330412B (en) * | 2011-07-08 | 2014-08-13 | 芜湖合建路桥机械有限公司 | Bridge-deck portal bridge girder erection machine |
CN102733316B (en) * | 2012-07-13 | 2014-07-23 | 中铁大桥局股份有限公司 | Integral synchronous rotary jacking construction method for small radius horizontal curved bridge |
CN107100086B (en) * | 2017-06-20 | 2023-05-30 | 山东交通学院 | Method and device for passing holes in ultra-wide pier through movable die frame |
CN110158486B (en) * | 2019-05-05 | 2021-02-26 | 郑州新大方重工科技有限公司 | Bridge girder erection machine for erecting spliced wide beams and construction method |
CN110952459A (en) * | 2019-12-17 | 2020-04-03 | 中交路桥建设有限公司 | T-beam hanging basket system |
CN113756190B (en) * | 2021-08-04 | 2023-01-24 | 中铁上海工程局集团有限公司 | Small-spacing multi-bridge parallel section box girder synchronous frame transporting construction method |
CN114277688B (en) * | 2021-12-28 | 2024-02-02 | 中交路桥华南工程有限公司 | Bridge girder erection machine |
CN114606863B (en) * | 2022-03-11 | 2023-10-03 | 中铁二十四局集团有限公司 | Integrated lifting device for bent cap template |
CN116591173A (en) * | 2023-05-29 | 2023-08-15 | 中交第四航务工程局有限公司 | Construction method for DCM pile mixed foundation reinforcement for shoal silt geology |
CN117286807B (en) * | 2023-11-01 | 2024-04-30 | 保利长大工程有限公司 | Bridge sliding equipment and bridge construction system |
Family Cites Families (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH0814092B2 (en) * | 1991-09-18 | 1996-02-14 | 株式会社ピー・エス | Bridge girder erection device |
JP2809990B2 (en) * | 1994-08-01 | 1998-10-15 | 株式会社ピー・エス | Bridge girder erection equipment |
JPH09256323A (en) * | 1996-03-22 | 1997-09-30 | Mitsui Miike Mach Co Ltd | Bridge girder installing apparatus |
JP2006348647A (en) * | 2005-06-17 | 2006-12-28 | Oriental Construction Co Ltd | Extrusion method for bridge girder |
-
2007
- 2007-09-26 JP JP2007248482A patent/JP5203662B2/en not_active Expired - Fee Related
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106087775A (en) * | 2016-08-08 | 2016-11-09 | 郑州新大方重工科技有限公司 | For setting up intercity track and subway U beam self-balancing via hole type Bridge Erector |
CN106087775B (en) * | 2016-08-08 | 2017-08-08 | 郑州新大方重工科技有限公司 | For setting up intercity track and subway U beam self-balancing via hole type Bridge Erectors |
CN110029588A (en) * | 2019-05-05 | 2019-07-19 | 中建钢构有限公司 | Piston shoes |
CN110029588B (en) * | 2019-05-05 | 2021-06-15 | 中建钢构有限公司 | Sliding boot |
CN110644377A (en) * | 2019-09-30 | 2020-01-03 | 中铁二院工程集团有限责任公司 | Roller type beam body pushing construction device |
CN111074792A (en) * | 2020-01-03 | 2020-04-28 | 北京中铁建北方路桥工程有限公司 | Large-span bridge fabrication machine and sliding device thereof |
Also Published As
Publication number | Publication date |
---|---|
JP2009079395A (en) | 2009-04-16 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JP5203662B2 (en) | Bridge main girder erection method and erection girder horizontal mechanism | |
JP4414906B2 (en) | Bridge girder construction and removal method and bridge girder construction equipment | |
JP2008088782A (en) | Cantilever overhang erection method of corrugated steel plate web bridge | |
JP2013174075A (en) | Reconstruction technique for bridge girder | |
CN109610327B (en) | Bridge girder erection machine cantilever assembling construction method | |
JP2018003526A (en) | Replacement method for main cable of suspension bridge | |
JP5865156B2 (en) | Bridge girder erection / removal device and bridge girder new / removal method using it | |
JP4405958B2 (en) | Bridge girder construction and removal method and bridge girder construction equipment | |
CN103821084B (en) | Operational method at the bottom of implement at the bottom of beam and beam | |
KR20150070578A (en) | Construction Method | |
JP5702640B2 (en) | Bridge crane, bridge erection method, and bridge removal method | |
JP5421143B2 (en) | Overhead crane installation equipment | |
JP4175718B2 (en) | Bridge erection device | |
JP6736387B2 (en) | How to replace the cushioning material in the soundproof wall | |
KR101819495B1 (en) | Rolling method of girder using the moving car | |
JP6012020B2 (en) | Installation method of overhead crane | |
JP5487031B2 (en) | Bridge erection method | |
JP6974233B2 (en) | Floor slab replacement method and floor slab replacement device | |
JP4424744B2 (en) | Bridge replacement method | |
JP2018009396A (en) | Floor slab replacement apparatus and floor slab replacement method | |
JP2019019477A (en) | Floor slab replacement method and portal crane | |
JP5769191B2 (en) | Construction work device | |
JP2020122359A (en) | Floor slab erection system, additional floor slab installation method, and floor slab removing method | |
JP2020133213A (en) | Floor slab lifting device | |
JPH0350841B2 (en) |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20100726 |
|
A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20120131 |
|
A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20120207 |
|
A521 | Written amendment |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20120409 |
|
TRDD | Decision of grant or rejection written | ||
A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20130205 |
|
A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20130214 |
|
R150 | Certificate of patent or registration of utility model |
Ref document number: 5203662 Country of ref document: JP Free format text: JAPANESE INTERMEDIATE CODE: R150 Free format text: JAPANESE INTERMEDIATE CODE: R150 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20160222 Year of fee payment: 3 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
S111 | Request for change of ownership or part of ownership |
Free format text: JAPANESE INTERMEDIATE CODE: R313113 |
|
R350 | Written notification of registration of transfer |
Free format text: JAPANESE INTERMEDIATE CODE: R350 |
|
S533 | Written request for registration of change of name |
Free format text: JAPANESE INTERMEDIATE CODE: R313533 |
|
R350 | Written notification of registration of transfer |
Free format text: JAPANESE INTERMEDIATE CODE: R350 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
LAPS | Cancellation because of no payment of annual fees |