JP6247496B2 - Steel structure construction method - Google Patents

Steel structure construction method Download PDF

Info

Publication number
JP6247496B2
JP6247496B2 JP2013217111A JP2013217111A JP6247496B2 JP 6247496 B2 JP6247496 B2 JP 6247496B2 JP 2013217111 A JP2013217111 A JP 2013217111A JP 2013217111 A JP2013217111 A JP 2013217111A JP 6247496 B2 JP6247496 B2 JP 6247496B2
Authority
JP
Japan
Prior art keywords
block
steel structure
rail girder
girder
rail
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2013217111A
Other languages
Japanese (ja)
Other versions
JP2015078561A (en
Inventor
大介 石丸
大介 石丸
大輔 金島
大輔 金島
薫 江藤
薫 江藤
飯塚 誠
飯塚  誠
義彦 黒岩
義彦 黒岩
照政 藤野
照政 藤野
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
East Japan Railway Co
Original Assignee
East Japan Railway Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by East Japan Railway Co filed Critical East Japan Railway Co
Priority to JP2013217111A priority Critical patent/JP6247496B2/en
Publication of JP2015078561A publication Critical patent/JP2015078561A/en
Application granted granted Critical
Publication of JP6247496B2 publication Critical patent/JP6247496B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Description

本発明は、平面視で細長い既設施設、例えば鉄道駅のプラットホームや線路上空に新たに屋根等の鋼構造物を架設する建方工法に関するものである。   The present invention relates to a construction method in which a steel structure such as a roof is newly installed on an existing facility which is elongated in plan view, for example, on a platform of a railway station or on a railroad track.

従来、鉄道駅のホームや線路のように平面視で既設の細長い既設施設の上空に新たに屋根等の鋼構造物を架設する場合、安全性が高くかつ列車運行時間外の短時間に施工できる建方工法として、スライド工法が採用されることが多かった。   Conventionally, when a steel structure such as a roof is newly installed above a long and thin existing facility in plan view like a railway station platform or railway, it is highly safe and can be constructed in a short time outside the train operation time. As the construction method, the slide method was often adopted.

スライド工法は、屋根等の鋼構造物のブロックを組立てるための構台として、細長い既設施設の限定された場所(端部や中央)を確保し、この場所にて屋根等の鋼構造物のブロックを組立て、施設の長手方向に敷設した少なくとも2列のレール桁に沿って、前記ブロックを押し出し、もしくは引き出し、空いた構台において次の鋼構造物のブロックを組立て、前記のブロックと連結後、前記ブロックと同様に、レール桁に沿って押し出し、もしくは引き出す作業を繰り返す工法である。   The slide construction method secures a limited place (edge or center) of a long and narrow existing facility as a gantry for assembling blocks of steel structures such as roofs, and blocks steel structures such as roofs at this place. Assembling and extruding or pulling out the block along at least two rows of rail girders laid in the longitudinal direction of the facility, and assembling the block of the next steel structure on the vacant gantry, and connecting the block, the block In the same way as above, it is a construction method that repeats the work of pushing or pulling along the rail girder.

既設建物の上空に屋根等の鋼構造物を架設する場合、仮設する少なくとも2列のレール桁は、既設柱もしくは新設(本設又は仮設)の柱により支える必要があるが、これらの柱列が直線で平行に並んでいれば、2列のレール桁も平行な直線となり、そのレール桁上を滑る滑り支承部は屋根等の鋼構造物の下面に固定されていればよい。   When steel structures such as roofs are installed above existing buildings, at least two rows of rail girders need to be supported by existing columns or new (main or temporary) columns. As long as the rail girder is aligned in a straight line, the two rows of rail girders may be parallel straight lines, and the sliding support portion that slides on the rail girder may be fixed to the lower surface of a steel structure such as a roof.

しかし、2列のレール桁が平行でなく或いは直線でない場合には、レール桁上を滑る滑り支承部は屋根等の鋼構造物の下面に固定することができないという問題があった。この問題に対する対策として、例えば、特許文献1及び特許文献2がある。   However, when the two rows of rail girders are not parallel or straight, there is a problem in that the sliding support portion sliding on the rail girders cannot be fixed to the lower surface of a steel structure such as a roof. As countermeasures against this problem, there are, for example, Patent Document 1 and Patent Document 2.

特許文献1では、橋桁ブロックを順次1径間毎に架設ガーター上に載せて架設する架設ガーターの構造に関するもので、該架設ガーターを構成する2本の桁の先端部の所要区間について幅を細くし、曲線部で架設ガーターを送り出す際、橋脚とぶつかるのを回避しながら所定量押し出した後、架設ガーダーを横方向に移動し、更に桁方向に送り出して曲線部における架設ガーダーを架設することが開示されている。   Patent Document 1 relates to a structure of a construction garter in which bridge girder blocks are sequentially placed on a construction garter for each span, and the width of a required section at the tip of two girders constituting the construction garter is narrowed. However, when sending out the construction girder at the curved part, after pushing out a predetermined amount while avoiding hitting the pier, the construction girder can be moved in the lateral direction and further sent out in the girder direction to construct the construction girder at the curved part. It is disclosed.

特許文献2では、敷幅(梁間方向)が変化する建築物をトラベリング工法により建設する建設方法及びその装置に関するもので、敷幅の異なる鉄骨骨組を一位置で桁方向に順次連結し、敷幅方向の両端のそれぞれの桁行方向連結部材を、敷幅方向に移動自在に設けた複数の台車上の受ローラで支持しながら、該鉄骨骨組を桁行方向に順次移動させて建設することが開示されている。   Patent Document 2 relates to a construction method and apparatus for building a building with varying floor width (direction between beams) by a traveling method, and sequentially connects steel frames with different floor widths at one position in the beam direction. It is disclosed that the steel frames are sequentially moved in the row direction while the row direction connecting members at both ends in the direction are supported by receiving rollers on a plurality of carriages provided movably in the width direction. ing.

また、スライド工法に用いられる、屋根等の鋼構造物のブロックを押し出し、もしくは引き出す作業の効率化を図る方法に関する先行技術としては、特許文献3及び特許文献4がある。   Further, Patent Document 3 and Patent Document 4 are known as prior arts related to a method for improving the efficiency of the work of pushing out or pulling out a block of a steel structure such as a roof, which is used in the slide method.

特許文献3では、屋根架構を順次建物長手方向に押し出して形成する方法に関するもので、一方向に並列して数スパンに亘って柱を配置し、端部に位置する1スパンの柱間に仮設レールを跨設するとともに、その上に1スパン間を往復して鉄骨梁をスパン方向に移動させる押し出し装置を設置し、仮設レールに隣接する1スパンの頭部上に1スパン相当の鉄骨梁を架設するとともに、対向した鉄骨梁間に立体トラスを架設し、これに隣接して押し出し装置上に鉄骨梁を設置して相互に接続し、その対向した鉄骨梁間に立体トラスを架設した後、押し出し装置により、その鉄骨梁をスパン方向に柱頭部を滑らして押し出す、という操作を繰り返して屋根架構を形成する方法が開示されている。   Patent Document 3 relates to a method of forming a roof frame by sequentially extruding it in the longitudinal direction of the building. Columns are arranged over several spans in parallel in one direction, and are temporarily installed between columns of one span located at the end. An extrusion device is installed to straddle the rail and to move the steel beam in the span direction by reciprocating between the spans. A steel beam equivalent to one span is placed on the head of one span adjacent to the temporary rail. In addition to installing a solid truss between opposing steel beams, installing a steel beam on the extrusion device adjacent to it and connecting them together, constructing the solid truss between the opposed steel beams, then extruding device Thus, a method of forming the roof frame by repeating the operation of sliding the column head in the span direction and extruding the column head is disclosed.

特許文献4では、予め桁行方向に立設された複数本の柱間に架設される桁梁を利用し、単位架構を桁行方向に移動させて屋根架構を構築する方法に関するもので、予め柱列の一端側に複数個の単位架構分の幅を持つ作業ステージを組み立て、この一端上で単位架構を組み立てる毎にウィンチによるワイヤの巻き取りによって他端側へ移動させ、新たな単位架構を組み立てて移動済みの単位架構に接続する、という作業を繰り返して屋根架構を構築する方法が開示されている。   Patent Document 4 relates to a method of constructing a roof frame by moving a unit frame in the column direction using a girder beam erected between a plurality of columns erected in advance in the column direction. Assemble a work stage with multiple unit frame widths on one end of the unit and move it to the other end by winding the wire with a winch each time you assemble the unit frame on this one end, and assemble a new unit frame A method of constructing a roof frame by repeating the operation of connecting to a moved unit frame is disclosed.

なお、特許文献3及び4では、スライドさせる屋根架構の軌道は、平行で直線であることが前提の記述となっており、そうでない場合の対応についての示唆はない。   In Patent Documents 3 and 4, it is assumed that the track of the roof frame to be slid is a parallel and straight line, and there is no suggestion for a case where this is not the case.

特開平08−134843号公報(プレキャストブロック工法用架設ガーダー)Japanese Patent Application Laid-Open No. 08-134443 (Installation girder for precast block method) 特開平09−125701号公報(敷幅が変化する建築物の建設方法及びその装置)Japanese Patent Application Laid-Open No. 09-125701 (construction method and apparatus for building with varying floor width) 特開昭62−248734号公報(屋根架構の構築方法)JP-A-62-248734 (construction method of roof frame) 特開平06−200624号公報(屋根架構の構築方法)Japanese Patent Application Laid-Open No. 06-200624 (Roof frame construction method)

特許文献1の方法は、先端部の2本の架設ガーダーは橋脚を挟むようにして送り出されるので、先端部の架設ガーダーの内法寸法の範囲でしか柱列の非直線性に対応できないという限界がある。   The method of Patent Document 1 has a limit that it can cope with the non-linearity of the column row only within the range of the internal dimensions of the construction girder at the tip portion because the two construction girders at the tip portion are sent out so as to sandwich the pier. .

特許文献2の方法は、建築物の張間方向寸法が一定(平行)でなく或いは直線でなくてもスライド工法に対応できるが、鉄道駅プラットホーム等の既設施設の上に屋根等の鋼構造物を新設する場合では、屋根等の構造物を載せて走る台車を支える敷幅方向の軌道は、既設もしくは新設(本設又は仮設)の柱上に設置することになる。   The method of Patent Document 2 can cope with the sliding method even if the span dimension of the building is not constant (parallel) or not straight, but the steel structure such as the roof on the existing facilities such as the railway station platform. In the case of newly installing, the track in the floor width direction for supporting the carriage running on the structure such as the roof is installed on the existing or newly installed (mainly or temporary) pillar.

しかし、その軌道を固定する既設の柱は必要な位置にあるとは限らず、また新設(本設又は仮設)の柱も鉄道駅プラットホームや線路では任意位置に建てられないので、特許文献2の方法は前記課題の解決には適用できない。   However, the existing pillar that fixes the track is not necessarily in the required position, and the new (main or temporary) pillar is not built at any position on the railway station platform or track. The method cannot be applied to solve the above problem.

特許文献3及び4の方法は、屋根等の構造物を移動させる軌道は平行な直線であることを前提に記述されており、前記課題の解決を示唆するものはない。   The methods of Patent Documents 3 and 4 are described on the assumption that the trajectory for moving a structure such as a roof is a parallel straight line, and there is no suggestion of a solution to the above problem.

本発明は、以上のような従来技術では対応できない前記課題を解決するためになされたもので、立体トラス等で構成される屋根等の鋼構造物を鉄道駅の既設のプラットホームや線路上空に新たに構築する場合に、スライド工法を適用するに当たり、送り出す屋根等の鋼構造物のブロックの軌道が柱位置の制約により平行或いは直線とできない場合でも容易に実施できる建方工法を提供することを目的とするものである。   The present invention has been made in order to solve the above-described problems that cannot be dealt with by the prior art as described above, and a steel structure such as a roof constituted by a three-dimensional truss or the like is newly added to the existing platform or railway track of a railway station. The purpose of the present invention is to provide a construction method that can be easily implemented even when the track of the steel structure block such as the roof to be sent out cannot be parallel or straight due to the restriction of the column position when applying the slide construction method It is what.

前記課題を解決するために、請求項1に係る発明は、平面視で任意の形状を有する既存施設の上空に掛け渡される鋼構造物のブロック組立てとブロック同士の接続、及びそれら接続されたブロックの略水平方向へのスライドとを繰り返して、立体トラス等で構成される屋根等の鋼構造物の建方工法であって、
1)前記鋼構造物の下方に、前記既存施設の状況に応じて、複数の柱を、複数の柱列相互が平行でなくかつ任意の柱間隔で配置し、該柱頭部の位置決めをする柱立設工程、
2)前記複数の柱頭部に、前記鋼構造物のブロックをスライドする時に支持するレール桁を受けるレール桁受ブラケットと、該レール桁受ブラケット上に滑り台座とを設置するレール桁受ブラケット設置工程、
3)前記既存施設の上空の一部に又は同施設に隣接して、前記レール桁又は鋼構造物のブロックの組立と該ブロック同士との接続、また前記レール桁を載置する滑り受梁及び前記ブロック同士をスライドさせるスライド装置を設置するための構台を、前記柱頭部とほぼ同レベルに構築する構台構築工程、
4)前記構台上で、構台から遠い方の最終柱間に架設される前記レール桁のブロックと、手延べ桁とを接続するレール桁のブロック・手延べ桁接続工程、
5)前記構台上に設置したスライド装置により、前記接続されたレール桁のブロックと手延べ桁とを前記構台から遠い方の最終柱頭部を目指し、平面視で直線上にスライドさせて送り出し、前記構台から近い方の柱間のレール桁受ブラケット上の滑り台座と前記構台上の滑り受梁とに載置させることにより、前記接続されたレール桁のブロックと手延べ桁とを前記レール桁受ブラケット上の柱頭部の滑り台座にスライドさせて載置するレール桁のブロック移動工程、
6)前記構台上で、前記スライドされたレール桁のブロックと次にスライドするレール桁のブロックとを接合部材を介してする接合と、前記レール桁のブロック移動工程とを必要分繰り返し、前記構台から遠い方のレール桁のブロックを最終柱のレール桁受ブラケット上の滑り台座に載置させるレール桁のブロック接続・移動工程、
7)該接続・移動工程において、前記レール桁受ブラケット上の滑り台座に載置した前記レール桁のブロック同士を接合した接合部材を撤去し、かつ前記レール桁のブロックを載置した前記レール桁受ブラケット上の滑り台座を撤去して、前記レール桁のブロックを前記レール桁受ブラケット上に盛り替えると共に、前記レール桁のブロックを、レール桁受ブラケットを支える柱の柱頭中心位置まで横移動させて前記レール桁受ブラケットと前記レール桁のブロックとを締結し、前記撤去された接合部材の間隙を新たな補完部材によりレール桁のブロック同士及び前記構台上のレール桁のブロックを接続し、前記レール桁のブロックの先端に接続された手延べ桁を撤去して、レール桁のブロック同士が連結されかつレール桁受ブラケットの柱頭部の中心位置でレール桁受ブラケットに接続させることを、前記複数の柱列ごとに繰り返すレール桁のブロック架設工程、
8)前記構台のレール桁上で、構台より遠い方の複数の柱列に跨り架設される鋼構造物のブロックを単位ブロックとして、その単位ブロック下面に前記レール桁方向とほぼ直交する方向に該レール桁を跨いで摺動梁を取付けて組立てる鋼構造物の単位ブロック組立工程、
9)前記構台上に設置したスライド装置により、前記組立てられた鋼構造物の単位ブロックを前記構台からレール桁上をスライドさせる鋼構造物の単位ブロック移動工程、
10)前記スライドされた鋼構造物の単位ブロックの次にスライドする構台上の鋼構造物の単位ブロックを、前記鋼構造物の単位ブロック組立工程と同様に組立て、これら単位ブロック同士の接続と前記鋼構造物の単位ブロックをスライドさせる移動工程とを必要分繰り返し、鋼構造物の単位ブロックを接続しながら最終柱位置まで移動させ、前記鋼構造物の支承部を前記柱頭部の直上に位置させる鋼構造物の単位ブロック接続・移動工程、
11)前記レール桁のブロック同士を接続した補完部材を撤去後、前記複数の柱頂部の直上に支承受台を接合すると共に、前記鋼構造物のブロックの下面の摺動梁を撤去して、前記支承受台上に前記鋼構造物の支承部を移動し固定する鋼構造物の支承部固定工程、
以上の1)〜11)の工程を有することを特徴とする鋼構造物の建方工法である。
In order to solve the above-mentioned problems, the invention according to claim 1 is directed to a steel structure block assembly and connection between blocks, and blocks connected to each other over an existing facility having an arbitrary shape in plan view. It is a construction method of a steel structure such as a roof composed of a three-dimensional truss, etc.
1) Below the steel structure, a plurality of pillars are arranged in parallel with each other, with a plurality of pillar rows not parallel to each other and at an arbitrary pillar interval, depending on the situation of the existing facility, and the pillar heads are positioned. Erecting process,
2) A rail girder bracket installation step for installing a rail girder bracket that receives a rail girder supported when the steel structure block is slid on the plurality of column heads, and a slide base on the rail girder bracket. ,
3) Assembling the rail girder or the block of steel structure and connecting the blocks to each other in a part of the sky above the existing facility or adjacent to the facility, and a sliding beam for mounting the rail girder, and A gantry construction process for constructing a gantry for installing a slide device that slides the blocks together at substantially the same level as the column head,
4) On the gantry, the rail girder block / hand girder connecting step for connecting the rail girder block constructed between the last columns far from the gantry and the hand girder,
5) With the slide device installed on the gantry, the block of the connected rail girder and the hand girder are aimed at the final column head far from the gantry, and are slid on a straight line in a plan view, and sent out. The rail girder block and the hand girder are connected to each other by placing the slide girder on the rail girder bracket between the columns closer to the gantry and the slide girder on the gantry. Block movement process of rail girder that is slid and placed on the slide base of the column head on the bracket,
6) On the gantry, the joining of the slide rail girder block and the next sliding rail girder block through a joining member and the rail girder block moving step are repeated as necessary, and the gantry is repeated. Rail girder block connection / movement process for placing the rail girder block far from the rail girder on the rail girder bracket of the final column,
7) In the connecting / moving step, the rail girder in which the joining member joining the rail girder blocks placed on the slide base on the rail girder bracket is removed and the rail girder block is placed. Remove the slide pedestal on the support bracket, replace the rail girder block on the rail girder bracket, and move the rail girder block to the center position of the pillar supporting the rail girder bracket. The rail girder bracket and the rail girder block are fastened, and the gap between the removed joining members is connected to each other by means of a new complementary member between the rail girder blocks and the rail girder block on the gantry. The hand girder connected to the end of the rail girder block is removed, the rail girder blocks are connected to each other, and the column of the rail girder bracket That is connected to the rail Keta受 bracket at the center parts, rail-digit block erection step of repeating for each of the plurality of tubular elements,
8) On the rail girder of the gantry, a block of a steel structure constructed across a plurality of column rows farther from the gantry is used as a unit block, and the unit block has a lower surface in a direction substantially perpendicular to the rail girder direction. Unit block assembly process of steel structure that assembles by attaching sliding beams across rail girders,
9) A unit block moving step of the steel structure in which the unit block of the assembled steel structure is slid on the rail girder from the gantry by a slide device installed on the gantry.
10) Assemble the unit block of the steel structure on the gantry that slides next to the unit block of the slid steel structure in the same manner as the unit block assembly process of the steel structure, and connect the unit blocks to each other. The moving step of sliding the unit block of the steel structure is repeated as necessary, the unit block of the steel structure is moved to the final column position while being connected, and the support portion of the steel structure is positioned directly above the column head. Unit block connection / movement process of steel structures,
11) After removing the complementary member connecting the blocks of the rail girders, joining the support base directly above the plurality of column tops, and removing the sliding beam on the lower surface of the block of the steel structure, A support part fixing step of the steel structure for moving and fixing the support part of the steel structure on the support base;
A steel structure construction method characterized by having the steps 1) to 11) above.

また、請求項2に係る発明は、前記レール桁のブロックが、平行に間隔を置いた2本の桁材と、該桁材とを所定の間隔で繋ぐ複数の繋ぎ材とで形成されていることを特徴とする、請求項1に記載の工程を有する鋼構造物の建方工法である。   In the invention according to claim 2, the rail girder block is formed of two girder members spaced in parallel and a plurality of tethers that join the girder members at a predetermined interval. It is the construction method of the steel structure which has the process of Claim 1 characterized by the above-mentioned.

また、請求項3に係る発明は、前記レール桁のブロック端部は下段が長く上段が短い階段状に形成され、ブロック同士を接続した接合部材は、前記レール桁のブロック移動工程においては、ブロック同士を直線になるように接合し、前記レール桁のブロック移動工程完了後に前記接合部材を撤去して、前記レール桁のブロックを柱の中心位置に移動後、再びブロック同士を接続するレール桁のブロック架設工程においては、新たに補完部材を現場実測により製作し、階段状になった前記ブロック端部の上段に接合することを特徴とする、請求項1又は2に記載の工程を有する鋼構造物の建方工法である。   According to a third aspect of the present invention, the block end portion of the rail girder is formed in a stepped shape having a long lower step and a short upper step, and the joining member connecting the blocks is a block in the block moving step of the rail girder. After joining the rail girder block movement process, remove the joining member, move the rail girder block to the center position of the pillar, and then connect the blocks again. A steel structure having a process according to claim 1 or 2, characterized in that, in the block laying process, a complementary member is newly manufactured by field measurement and is joined to the upper stage of the block end portion in a staircase shape. It is a construction method of things.

また、請求項4に係る発明は、前記レール桁のブロック同士を接続した接合部材を撤去後に、前記レール桁のブロックと前記ブラケットとの間にジャッキを配置し、該ジャッキによりジャッキアップ・ダウンさせて前記滑り台座を撤去し、前記レール桁のブロックを前記レール桁受ブラケット上に盛り替えることを特徴とする、請求項1乃至3の何れか一項に記載の工程を有する鋼構造物の建方工法である。   According to a fourth aspect of the present invention, a jack is disposed between the rail girder block and the bracket after the joining member connecting the rail girder blocks is removed, and the jack is jacked up / down. The construction of the steel structure having the process according to any one of claims 1 to 3, wherein the slide base is removed and the block of the rail girder is replaced on the rail girder bracket. It is a method of construction.

また、請求項5に係る発明は、前記レール桁のブロック端部と前記レール桁受ブラケットとの間に固定ピンを挿入し、該固定ピンを回転中心として前記レール桁のブロック端部を前記ブラケットの柱頭部の中心位置まで回転及び/又は横移動させることを特徴とする、請求項1乃至4の何れか一項に記載の工程を有する鋼構造物の建方工法である。   According to a fifth aspect of the present invention, a fixing pin is inserted between a block end portion of the rail girder and the rail girder bracket, and the block end portion of the rail girder is used as the rotation center around the fixing pin. It is a construction method of the steel structure which has a process as described in any one of Claims 1 thru | or 4 characterized by rotating and / or moving laterally to the center position of this pillar head.

また、請求項6に係る発明は、前記レール桁のブロック中央から下方にジャッキを組込んだ鉛直材と、該鉛直材の下端から前記レール桁のブロックのそれぞれの両端部との間にテンション部材を取付けてあり、これら鉛直材及びテンション部材は、スライド完了するまではレール桁の厚みの中に収納していることを特徴とする、請求項1乃至5の何れか一項に記載の工程を有する鋼構造物の建方工法である。   According to a sixth aspect of the present invention, there is provided a tension member between a vertical member incorporating a jack downward from the center of the rail girder block and each end portion of the rail girder block from a lower end of the vertical member. The vertical member and the tension member are accommodated in the thickness of the rail girder until the sliding is completed, and the process according to any one of claims 1 to 5 is performed. This is a construction method for steel structures.

また、請求項7に係る発明は、前記鋼構造物の単位ブロックの下面に取付けられた摺動梁と、該摺動梁を挟んで前記鋼構造物の単位ブロックのスライド方向の前後両方又はどちらか一方の鋼構造物の各節点位置との間に部材を取付けることを特徴とする、請求項1乃至6の何れか一項に記載の工程を有する鋼構造物の建方工法である。   According to a seventh aspect of the present invention, there is provided a sliding beam attached to the lower surface of the unit block of the steel structure and either or both of front and rear in the sliding direction of the unit block of the steel structure across the sliding beam. A construction method for a steel structure having a process according to any one of claims 1 to 6, wherein a member is attached between each of the nodal positions of the steel structure.

また、請求項8に係る発明は、前記鋼構造物の単位ブロックのレール桁上のスライド時に、該レール桁を構成する繋ぎ材に、スライド方向にガイドするガイド材と、前記鋼構造物の単位ブロックの下面に取付けられた摺動梁に前記ガイド材を遊嵌して摺動するガイドピースとを取付けることを特徴とする、請求項1乃至7の何れか一項に記載の工程を有する鋼構造物の建方工法である。   Further, the invention according to claim 8 is a guide member that guides in a sliding direction to a connecting member constituting the rail girder when sliding on the rail girder of the unit block of the steel structure, and a unit of the steel structure. A steel having a process according to any one of claims 1 to 7, wherein a guide piece that slides by sliding the guide material on a sliding beam attached to a lower surface of the block is attached. This is a construction method for structures.

また、請求項9に係る発明は、前記レール桁がスライド方向と平行でない範囲のガイド材を、スライド方向と平行にかつレール桁の2本の桁材の内側に納まる長さとして必要本数を配置し、前記鋼構造物の単位ブロックの下面に取付けられた摺動梁に、それら複数のガイド材にそれぞれ対応して摺動する横ずれ防止ピースを、前記ガイドピースの他に、上下に回転可能な状態にて複数取付けたことを特徴とする、請求項8に記載の工程を有する鋼構造物の建方工法である。 Further, the invention according to claim 9 arranges the necessary number of guide members in a range in which the rail girders are not parallel to the sliding direction so as to be parallel to the sliding direction and inside the two girders of the rail girders. In addition to the guide piece, a lateral slip prevention piece that slides corresponding to each of the plurality of guide members can be rotated up and down on the sliding beam attached to the lower surface of the unit block of the steel structure. It is the construction method of the steel structure which has the process of Claim 8 characterized by the above-mentioned.

また、請求項10に係る発明は、前記鋼構造物の支承部にジャッキ受け部が設けてあり、その支承部と前記ブラケットとの間にジャッキを配置し、該ジャッキのジャッキアップにより鋼構造物の単位ブロックの下面の摺動梁を撤去し、前記ジャッキのジャッキダウンにより前記支承部を前記柱頭部の支承受台上に盛り替えることを特徴とする、請求項1乃至9の何れか一項に記載の工程を有する鋼構造物の建方工法である。   The invention according to claim 10 is characterized in that a jack receiving portion is provided at a support portion of the steel structure, a jack is disposed between the support portion and the bracket, and the jack structure is used to jack up the steel structure. The sliding beam on the lower surface of the unit block is removed, and the support portion is remounted on the support base of the column head by jacking down the jack. It is the construction method of the steel structure which has the process of description.

本発明は以上のような手段によるので、鉄道駅のプラットホームや線路のように、平面視で細長い既設施設の上空に新たに屋根等の構造物を架設するためにスライド工法を用いる場合、次のような効果がある。   Since the present invention is based on the above-described means, when a slide method is used to construct a new structure such as a roof above a long and slender existing facility in a plan view, such as a railway station platform or railroad, There is an effect like this.

(1)請求項1に記載の発明によれば、屋根等の構造物を載せるためのレール桁を送り出し完了後に、前後のレール桁のブロック同士を、レール桁受けブラケットの上で回転及び/又は横移動して接続するので、レール桁を支える柱列が直線上になくてもレール桁の送り出しは直線上でよく、送り出し作業が単純になる。   (1) According to the invention described in claim 1, after the completion of feeding out the rail girder for mounting a structure such as a roof, the front and rear rail girder blocks are rotated and / or rotated on the rail girder bracket. Since the connection is made by laterally moving, the rail girder can be sent out on a straight line even if the column row supporting the rail girder is not on a straight line, and the feeding operation is simplified.

(2)請求項2に記載の発明によれば、レール桁を繋ぐ繋ぎ材に上に、複数本のガイド材を並べることができる。   (2) According to the invention described in claim 2, a plurality of guide members can be arranged on the connecting member that connects the rail girders.

(3)請求項3に記載の発明によれば、レール桁のブロック端部が階段状に2段になっているので、レール桁架設工程において、補完部材をレール桁のブロック端部の下段上面に仮置きできるので、補完部材の取り付け作業が容易になる。   (3) According to the invention described in claim 3, since the block end of the rail girder has two steps, the upper surface of the lower end of the block end of the rail girder is used as the complementary member in the rail girder erection process. Since it can be temporarily placed, the attachment work of the complementary member becomes easy.

(4)請求項4に記載の発明によれば、レール桁とレール桁受ブラケットとの間に挟まれている滑り台座の撤去を、ジャッキによるアップとダウンを連続して容易かつ安全に行うことができる。   (4) According to the invention described in claim 4, the removal of the slide pedestal sandwiched between the rail girder and the rail girder bracket is performed easily and safely by continuously up and down with a jack. Can do.

(5)請求項5に記載の発明によれば、レール桁受ブラケット上面でのレール桁のブロックの横移動作業を実施する際に、レール桁のブロックとブラケットとの間にピン部材を挿入した上で行うので、レール桁のブロックの回転が安全に行える。   (5) According to the invention described in claim 5, when carrying out the lateral movement work of the rail girder block on the top surface of the rail girder bracket, the pin member is inserted between the rail girder block and the bracket. As it is done above, the rail girder block can be rotated safely.

(6)請求項6に記載の発明によれば、鉛直材がジャッキであり、テンション部材端部はピン止めなので、レール桁のブロックをスライド中には、テンション部材とジャッキとの接合を解除し、これらの部材をレール桁の厚みの中に容易に収納することができる。   (6) According to the invention described in claim 6, since the vertical member is a jack and the end of the tension member is pinned, the joint between the tension member and the jack is released while sliding the rail girder block. These members can be easily accommodated in the thickness of the rail beam.

(7)請求項7に記載の発明によれば、摺動梁のレール桁との接触面は、屋根構造物の部材芯から離れているため、そのままスライドさせれば摩擦抵抗力による偏芯曲げが構造物の部材に作用して好ましくないので、スライド方向に取付けられたテンション部材等により偏芯曲げを塞ぐことができる。   (7) According to the invention described in claim 7, since the contact surface of the sliding beam with the rail girder is separated from the member core of the roof structure, if it is slid as it is, it is eccentrically bent by frictional resistance. Acts on the members of the structure, which is not preferable, so that the eccentric bending can be blocked by a tension member or the like attached in the sliding direction.

(8)請求項8に記載の発明によれば、屋根等の構造物のブロック下面に取り付けられた摺動梁に固定されたガイドピースが、レール桁の繋ぎ材の上に設置されたガイド材に遊嵌して摺動するので、スライド方向が安定する。   (8) According to the invention described in claim 8, the guide piece fixed to the sliding beam attached to the lower surface of the block of the structure such as the roof is the guide member installed on the connecting member of the rail girder. Since it slides loosely into the sliding direction, the sliding direction is stabilized.

(9)請求項9に記載の発明によれば、前記の固定されたガイドピースだけでは十分ではないと思われる地震時の水平力に対して、摺動梁に上下に回転可能に設置された複数の横ずれ防止ピースも抵抗でき、また横ずれ防止ピースは回転可能のためスライド中の障害物(レール桁の桁材)を乗り越えられるので、固定式ピースの場合には必要な盛り替えが不要になる。   (9) According to the invention described in claim 9, the fixed guide piece alone is installed to be able to rotate up and down on the sliding beam against a horizontal force at the time of an earthquake that seems to be insufficient. Multiple lateral slip prevention pieces can be resisted, and the lateral slip prevention pieces can be rotated so that they can get over obstacles (spars for rail girders) that are slid. .

(10)請求項10に記載の発明によれば、構造物の支承部にジャッキ受け部があるため、摺動梁の撤去及び柱頭部の支承台座への据え置きが容易かつ安全に行える。   (10) According to the invention described in claim 10, since the support portion of the structure has the jack receiving portion, the sliding beam can be removed and the column head can be placed on the support base easily and safely.

(11)以上(1)乃至(10)のことにより、安全性が高くかつ工事時間の短縮が図れるので、夜間の短時間に限定される鉄道駅のプラットホームや線路上空の工事では極めて有効な工法である。   (11) Since (1) to (10) above are highly safe and the construction time can be shortened, the construction method is extremely effective for the railway station platform and the construction over the railway line, which is limited to a short time at night. It is.

(12)設置完了後のレール桁は、柱列に合わせて接続しているので直線でも平行でもないが、屋根等の構造物の下面に摺動梁を設けることで、屋根等の構造物のスライド方向が一定となるため、スライド装置が単純化でき、上記(11)の点も含め、工事費が安価で済む。   (12) Since the rail girder after installation is connected in line with the column, it is neither straight nor parallel, but by providing a sliding beam on the lower surface of the structure such as the roof, Since the sliding direction is constant, the sliding device can be simplified, and the construction cost including the point (11) can be reduced.

本発明を適用する既存施設と、構台及び柱の配置の一実施形態を示す平面図である。It is a top view which shows one Embodiment of the existing facility to which this invention is applied, arrangement | positioning of a gantry, and a pillar. 図1の実施形態におけるイ矢視を示す側面図である。It is a side view which shows the arrow I in embodiment of FIG. 本発明におけるレール桁が載置された状態のレール桁受ブラケットを示す断面図である。It is sectional drawing which shows the rail girder bracket in the state in which the rail girder in this invention was mounted. 本発明によるレール桁のブロック送り出し工程の初期段階を示す側面図である。It is a side view which shows the initial stage of the block delivery process of the rail girder by this invention. 本発明によるレール桁のブロック送り出し工程の中間段階を示す側面図である。It is a side view which shows the intermediate step of the block delivery process of the rail girder by this invention. 本発明によるレール桁のブロック送り出し工程の終盤段階を示す側面図である。It is a side view which shows the last stage stage of the block delivery process of the rail girder by this invention. 本発明によるレール桁の送り出しが完了し、手延べ桁が撤去された時点の平面図である。It is a top view at the time of the delivery of the rail girder according to the present invention being completed and the hand girder removed. 本発明によるレール桁の各ブロックを柱頭部に合わせて移動完了後の平面図である。It is a top view after the completion of a movement by making each block of the rail girder by this invention match a pillar head. 屋根等の構造物の最初の単位ブロックを構台上で組立てる状況を示す平面図である。It is a top view which shows the condition which assembles the first unit blocks of structures, such as a roof, on a gantry. 屋根等の構造物の単位ブロックをスライド装置により送り出す単位ブロック移動工程の中間段階を示す平面図である。It is a top view which shows the intermediate | middle stage of the unit block moving process which sends out the unit block of structures, such as a roof, with a slide apparatus. 屋根等の構造物の単位ブロックをスライド装置により送り出す単位ブロック移動工程の終盤段階を示す平面図である。It is a top view which shows the last stage stage of the unit block movement process which sends out the unit block of structures, such as a roof, with a slide apparatus. 屋根等の構造物の支承部を柱頂部の支承受台に固定する工程を示す説明図であり、(a)はレール桁のブロック同士を補完部材51で接続した状態で、屋根等の構造物をスライドしている途中、(b)は補完部材51を撤去した後、複数の柱頂部の直上に支承受台を接合すると共に、屋根等の鋼構造物のブロック下面に取り付けた摺動梁を撤去した状態、(c)(d)はジャッキを用いて支承受台上に屋根等の鋼構造物支承部をジャッキダウンし固定する様子を示したものである。It is explanatory drawing which shows the process of fixing the support part of structures, such as a roof, to the support stand of a pillar top part, (a) is a structure, such as a roof, in the state which connected the blocks of rail girder with the complementary member 51 (B) shows the sliding beam attached to the lower surface of the block of a steel structure such as a roof, and the support base is joined immediately above the plurality of column tops after removing the complementary member 51. In the removed state, (c) and (d) show a state in which a steel structure support portion such as a roof is jacked down and fixed on a support stand using a jack. レール桁の構成を示した説明図である。It is explanatory drawing which showed the structure of the rail girder. レール桁のブロック移動工程における接合部材の取付け状態の説明図である。It is explanatory drawing of the attachment state of the joining member in the block movement process of a rail girder. レール桁のブロック架設工程において、ブロック同士を再度接合する補完部材の取付け状態の説明図である。It is explanatory drawing of the attachment state of the complementary member which joins blocks again in the block construction process of a rail girder. レール桁のブロック移動工程からブロック架設工程への移行時に、レール桁受ブラケット上の滑り台座を撤去する方法を説明した断面図であり、(a)はレール桁のブロック同士を接合した接合部材を撤去し、かつレール桁のブロックを載置したレール桁受ブラケット上の滑り台座を、ジャッキを用いて撤去した状態、(b)は(a)における(ヘ)断面を示したものであり、(c)はレール桁のブロックをレール桁受ブラケット上に盛り替えて載置する様子を示したものである。It is sectional drawing explaining the method of removing the slide base on a rail girder bracket at the time of transfer from a block girder block moving process to a block erection process, (a) is a joining member that joins the blocks of the rail girder together A state where the slide base on the rail girder bracket on which the rail girder block has been removed is removed using a jack, (b) shows a cross-section in (a) (f), (c) shows a state in which the rail girder block is rearranged and placed on the rail girder bracket. レール桁のブロック架設工程において、レール桁ブロックをブラケット上で移動させる方法の説明図であり、(a)はレール桁のブロック片端部とそのブロックを受けているレール桁受ブラケットとを貫通する固定ピンを挿入した状態、(b)は固定ピンを回転中心としてレール桁のブロック他端部を、レール桁受ブラケットの柱頭部の中心位置まで回転及び/又は横移動させる様子を示したものである。It is explanatory drawing of the method of moving a rail girder block on a bracket in the block laying process of a rail girder, (a) is the fixing which penetrates the rail girder bracket which has received the block one end part of the rail girder, and the block (B) shows a state where the other end of the rail girder block is rotated and / or moved laterally to the center position of the column head of the rail girder bracket with the fixed pin as the rotation center. . レール桁のブロック下に設置するテンション部材の説明図である。It is explanatory drawing of the tension member installed under the block of a rail girder. 屋根等の鋼構造物の単位ブロック下面に取り付けられた摺動梁のスライド方向の動きを拘束する部材(例示としてテンション材)の取付け状態を示す説明図である。It is explanatory drawing which shows the attachment state of the member (example tension material) which restrains the motion of the sliding direction of the sliding beam attached to the unit block lower surface of steel structures, such as a roof. 屋根等の鋼構造物の単位ブロック下面に取り付けられた摺動梁に取付くガイドピースの説明図であり、(a)はレール桁を構成する繋ぎ材の上にスライド方向に軸を合わせたガイド材を、可能な最大長さで載置した状態を示す平面図、(b)は(a)における断面図で鋼構造物の単位ブロックの下面に取付けられた摺動梁に固定され、ガイド材を遊嵌して摺動するガイドピースを取付けた状態を示す断面図、(c)はレール桁の軸方向がスライド方向に一致する区間の断面図である。It is explanatory drawing of the guide piece attached to the sliding beam attached to the unit block lower surface of steel structures, such as a roof, (a) is the guide which adjusted the axis | shaft to the sliding direction on the connecting material which comprises a rail girder. The top view which shows the state which mounted the material by the maximum possible length, (b) is a sectional view in (a), and is fixed to the sliding beam attached to the lower surface of the unit block of a steel structure, and guide material Sectional drawing which shows the state which attached the guide piece which loosely fits and slides, (c) is sectional drawing of the area where the axial direction of a rail girder corresponds to a sliding direction. 屋根等の鋼構造物の単位ブロック下面に取り付けられた摺動梁に取付く横ずれ防止ピースの説明図である。It is explanatory drawing of the side slip prevention piece attached to the sliding beam attached to the unit block lower surface of steel structures, such as a roof. 屋根等の鋼構造物の支承部に予め設けられているジャッキ受部を利用して、ジャッキにより柱頭部の支承受台に支承部を設置し固定する方法を説明した断面図であり、(a)は鋼構造物の支承部にジャッキ受け部が設けてあり、そのジャッキ受け部とレール桁受ブラケットとの間にジャッキを配置し、ジャッキアップにより鋼構造物の単位ブロックの下面の摺動梁20を撤去した状態、(b)はジャッキダウンにより支承部を柱頭部の支承受台上に盛り替えた状態を示したものである。It is sectional drawing explaining the method of installing and fixing a support part to the support stand of a column head with a jack using the jack support part previously provided in the support part of steel structures, such as a roof, (a ) Is provided with a jack receiving part at the support part of the steel structure, and a jack is arranged between the jack receiving part and the rail girder bracket, and the sliding beam on the lower surface of the unit block of the steel structure is provided by jacking up. The state which removed 20 and (b) shows the state which changed the support part on the support stand of a pillar head by jackdown. レール桁用のスライド装置と鋼構造物用のスライド装置を示した概略斜視図であり、(a)はレール桁のブロックを送り出すスライド装置、(b)は屋根等の鋼構造物の単位ブロックを送り出すスライド装置である。It is the schematic perspective view which showed the slide apparatus for rail girders, and the slide apparatus for steel structures, (a) is the slide apparatus which sends out the block of rail girders, (b) is the unit block of steel structures, such as a roof. It is a slide device to send out. 本発明に係るスライド工法(工程)のフローチャートである。It is a flowchart of the slide construction method (process) which concerns on this invention.

以下、本発明を添付した図面に基づいて説明する。なお、本発明は以下に示される実施形態に限定されるものではない。   Hereinafter, the present invention will be described with reference to the accompanying drawings. In addition, this invention is not limited to embodiment shown below.

図1〜図12は本発明の一実施形態を示し、以下の1)〜11)の工程から成る。また、図24に本発明によるスライド工法のフローチャートを示す。   1 to 12 show an embodiment of the present invention, which includes the following steps 1) to 11). FIG. 24 shows a flowchart of the slide method according to the present invention.

1)平面視で任意の形状を有する鉄道駅の既存プラットホーム100の上空に掛け渡される鋼構造物200(図9〜図11に表示)を支える柱1、1、・・・を、前記既存プラットホーム100の設置可能位置に複数立設する工程である。それら複数の柱列(図1では2列)は平行でなくかつ任意の柱間隔で配置された状態で各柱頭部が位置決めされる(図1)。
柱1、1、・・・は新設を通常とし、本設の場合と仮設の場合がある。勿論、既設の柱を利用できる場合もあり得る。前記鋼構造物200は、立体トラスで形成される屋根の場合を図示(図9以降)しているが、一般的な鉄骨架構(例えば、複層ラーメン架構等)でも可能である。
1) The pillars 1, 1,... That support the steel structure 200 (shown in FIGS. 9 to 11) suspended over the existing platform 100 of the railway station having an arbitrary shape in plan view are connected to the existing platform. This is a step of standing a plurality at 100 possible installation positions. The column heads are positioned in a state where the plurality of column rows (two rows in FIG. 1) are not parallel and are arranged at an arbitrary column interval (FIG. 1).
The pillars 1, 1,... Are normally newly installed, and there are cases of permanent installation and temporary installation. Of course, there may be cases where an existing pillar can be used. The steel structure 200 is illustrated with a roof formed of a three-dimensional truss (FIG. 9 and subsequent figures), but it can also be a general steel frame (for example, a multi-layer rigid frame).

2)前記複数の柱頭部に、前記屋根等の鋼構造物200のブロックをスライドする時に支持するレール桁10を受けるためのレール桁受ブラケット2、2、・・・を取り付け、該レール桁受ブラケット2、2、・・・の上に滑り台座3、3、・・・を設置する工程である。
滑り台座3、3、・・・の上面には、スライドされるレール桁ブロック10の抵抗を減らすために、滑り材3aを取り付けてある。(図2、図3)
2) A rail girder bracket 2, 2,... For receiving a rail girder 10 to be supported when sliding a block of the steel structure 200 such as the roof is attached to the plurality of column heads. This is a step of installing the slide bases 3, 3,... On the brackets 2, 2,.
In order to reduce the resistance of the slidable rail girder block 10, a sliding material 3a is attached to the upper surface of the sliding bases 3, 3,. (Fig. 2, Fig. 3)

3)前記既存プラットホーム100の上空の一部を覆うようにして、一定の広さを有する構台110を設置する工程である。この構台110は、重機111a、111bを用いて、前記レール桁10又は屋根等の鋼構造物200のブロックの組立、それらブロック同士の接続、また前記レール桁10を載置する滑り受梁120、120、・・・及び前記ブロックをスライドして送り出すスライド装置310又は320(図23(a)又は図23(b)に図示)を設置するためのものであり、既存プラットホーム上家100aよりも高く、前記柱頭部とほぼ同レベルに構築する。(図1、図2)   3) A step of installing a gantry 110 having a certain size so as to cover a part of the sky above the existing platform 100. This gantry 110 uses heavy machinery 111a and 111b to assemble the rail girder 10 or a block of a steel structure 200 such as a roof, connect the blocks to each other, and slide receiving beam 120 on which the rail girder 10 is placed, 120,... And slide device 310 or 320 (shown in FIG. 23 (a) or FIG. 23 (b)) that slides out and feeds the block, and is higher than the existing platform upper house 100a. , Constructed at approximately the same level as the column head. (Fig. 1 and Fig. 2)

4)前記構台110上で、構台110から遠い方の最終柱間に架設される前記レール桁10の最初のブロックと、上向きに勾配が付いた先端部を有する手延べ桁11とを接続するレール桁10のブロック・手延べ桁接続工程である。
手延べ桁11はレール桁10のブロックに先行して送り出され、上向きに勾配が付いた先端部が、前記レール桁受ブラケット2上の滑り台座3に乗り上げることにより、後続のレール桁10のブロックがレール桁受ブラケット2上に確実に載置される。(図3、図4)
4) On the gantry 110, a rail connecting the first block of the rail girder 10 installed between the final columns far from the gantry 110 and the hand girder 11 having a tip portion with an upward slope. This is a block 10 hand / girder connection process.
The hand girder 11 is sent out prior to the block of the rail girder 10, and the tip portion having an upward slope runs on the slide base 3 on the rail girder bracket 2, whereby the block of the subsequent rail girder 10 is moved. Is securely placed on the rail girder bracket 2. (Fig. 3, Fig. 4)

5)前記構台110上に設置したレール桁10のブロックを送り出すスライド装置310(図23(a)参照。以下同じ)により、前記接続された最初のレール桁10のブロックと手延べ桁11とを前記構台110から遠い方の最終柱頭部を目指して、平面視で直線上にスライドさせて送り出し、前記構台110から最も近い柱1上のレール桁受ブラケット2上の滑り台座3と前記構台110上の滑り受梁120、120、・・・とに載置する、最初のレール桁10のブロック移動工程である(図4)。
レール桁10のブロックを送り出すスライド装置310は、例えば、図23(a)に示すように、構台110側の滑車311とレール桁10側の滑車312とに架け渡されたワイヤー313をウインチ314にて巻き取る方式が考えられる。或いは、図示しないが、オイルジャッキを水平に用いて、そのピストン運動の繰り返しによりレール桁10のブロックを送り出す方法も考えられる。レール桁10は同図中の矢印方向に送り出される。
5) By the slide device 310 (see FIG. 23 (a), the same applies hereinafter) for sending out the block of the rail girder 10 installed on the gantry 110, the block of the first rail girder 10 connected and the hand girder 11 are connected. Aiming at the final column head far from the gantry 110, it is slid in a straight line in plan view and sent out, and the slide base 3 on the rail girder bracket 2 on the column 1 closest to the gantry 110 and the gantry 110 This is a block moving process of the first rail girder 10 to be placed on the sliding receiving beams 120, 120,... (FIG. 4).
For example, as shown in FIG. 23A, the slide device 310 that sends out the block of the rail girder 10 has a wire 313 spanned between the pulley 311 on the gantry 110 side and the pulley 312 on the rail girder 10 side on the winch 314. Can be considered. Or although not shown in figure, the method of sending out the block of the rail girder 10 by using the oil jack horizontally and repeating the piston motion is also considered. The rail girder 10 is sent out in the direction of the arrow in FIG.

6)前記構台110上で、前記スライドされたレール桁10のブロックの桁材10aと次にスライドするレール桁10のブロックの桁材10aとを接合部材50(図14に図示)を用いて接合し、前記レール桁10のブロック移動工程と同様にして送り出しを必要分繰り返し、前記構台110から最も遠い方のレール桁10のブロックを最終の柱1のレール桁受ブラケット2上の滑り台座3に載置させる、レール桁10のブロック接続・移動工程である(図6)。
前記構台110から最も遠い方のレール桁10のブロックを最終の柱1のレール桁受ブラケット2上の滑り台座3に載置した後、先端の手延べ桁11は解体される。
6) On the gantry 110, the girder material 10a of the block of the slide rail girder 10 and the girder material 10a of the block of the rail girder 10 to be slid next are joined using a joining member 50 (shown in FIG. 14). In the same manner as the block moving step of the rail girder 10, the feeding is repeated as necessary, and the block of the rail girder 10 farthest from the gantry 110 is placed on the slide base 3 on the rail girder bracket 2 of the final column 1. It is a block connection / movement process of the rail girder 10 to be placed (FIG. 6).
After the block of the rail girder 10 farthest from the gantry 110 is placed on the slide base 3 on the rail girder bracket 2 of the final column 1, the leading hand girder 11 is disassembled.

7)前記6)の接続・移動工程において、前記構台110から最も遠い方のレール桁10のブロックを最終の柱1のレール桁受ブラケット2上の滑り台座3に載置し、先端の手延べ桁11の解体が完了後(図7)、図16(a)〜図16(c)に図示したように、前記レール桁10のブロック同士を接合した接合部材50を撤去し、かつ前記レール桁10のブロックを載置した前記レール桁受ブラケット2上の滑り台座3を、ジャッキ60、60を用いて撤去し(図16(a)、図16(b))、前記レール桁10のブロックを前記レール桁受ブラケット2上に盛り替えて載置する(図16(c))と共に、前記レール桁10のブロックをレール桁受ブラケット2を支える柱1の柱頭中心位置まで横移動させて(図17(a)、図17(b)参照)、前記レール桁10のブロックを前記レール桁受ブラケット2に締結し、次に、前記撤去された接合部材50の間隙を新たな補完部材51(図15に図示)により、レール桁10のブロック同士及び前記構台110上のレール桁10のブロックを接続する。
従って、レール桁10全体は、直線状(図7参照)から柱1、1、・・・の位置に合わせて屈折した状態に変形される(図8)。このようにして、レール桁10のブロック同士が連結されかつレール桁受ブラケット2の柱頭部の中心位置でレール桁受ブラケット2に接続させることを、前記複数の柱列(図7、図8では2列)ごとに繰り返すレール桁10のブロック架設工程である。
なお、図7、図8の構台110上に設置されている滑り受梁120やスライド装置310等の表示は省略している。
7) In the connecting / moving step of 6), the block of the rail girder 10 farthest from the gantry 110 is placed on the slide base 3 on the rail girder bracket 2 of the final column 1, and the tip is extended. After disassembly of the girder 11 (FIG. 7), as shown in FIGS. 16 (a) to 16 (c), the joining member 50 joining the blocks of the rail girder 10 is removed, and the rail girder is removed. The slide base 3 on the rail girder bracket 2 on which the 10 blocks are placed is removed using jacks 60 and 60 (FIGS. 16A and 16B), and the block of the rail girder 10 is removed. The rail girder bracket 2 is rearranged and placed (FIG. 16 (c)), and the block of the rail girder 10 is moved laterally to the center position of the pillar 1 supporting the rail girder bracket 2 (see FIG. 16). 17 (a), FIG. 17 (b) The block of the rail girder 10 is fastened to the rail girder bracket 2, and then the gap of the removed joining member 50 is removed by a new complementary member 51 (shown in FIG. 15) of the rail girder 10. The blocks and the blocks of the rail beam 10 on the gantry 110 are connected.
Therefore, the entire rail girder 10 is deformed from a straight shape (see FIG. 7) to a state of being refracted in accordance with the positions of the pillars 1, 1,... (FIG. 8). In this way, the blocks of the rail beam 10 are connected to each other and connected to the rail beam bracket 2 at the center position of the column head of the rail beam bracket 2. This is a block laying process of the rail girder 10 repeated every two rows).
In addition, the display of the slide receiving beam 120, the slide apparatus 310, etc. which are installed on the gantry 110 of FIG. 7, FIG. 8 is abbreviate | omitted.

8)前記構台110のレール桁10上で、構台110より遠い方の複数の柱列に跨り架設される屋根等の鋼構造物200の最初のブロックを単位ブロック201として組立て、次に、その単位ブロック201の下面に、前記レール桁10方向とほぼ直行する方向に、該レール桁10を跨いで摺動梁20、20、・・・を複数列取付ける。
以上のようにして形成される屋根等の鋼構造物200の単位ブロック組立工程である。(図9)
8) On the rail girder 10 of the gantry 110, the first block of the steel structure 200 such as a roof constructed over a plurality of column rows farther from the gantry 110 is assembled as a unit block 201, and then the unit A plurality of rows of sliding beams 20, 20,... Are attached to the lower surface of the block 201 across the rail girder 10 in a direction substantially perpendicular to the rail girder 10 direction.
This is a unit block assembling process of the steel structure 200 such as a roof formed as described above. (Fig. 9)

9)前記構台110上に設置したスライド装置320(図23(b)参照)により、前記8)の工程で組立てられた屋根等の鋼構造物200の単位ブロック201(その次に202、・・・)を、前記構台110からレール桁10上をスライドさせる、鋼構造物200の単位ブロックをスライドさせる移動工程である(図10)。
屋根等の鋼構造物200の単位ブロック201、202、・・・を送り出すスライド装置320は、例えば、図23(b)に示すように、構台110側の滑車321と立体トラス等の屋根側の滑車322とに架け渡されたワイヤー323をウインチ324にて巻き取る方式が考えられる。或いは、図示しないが、オイルジャッキを水平に用いて、その伸縮のピストン運動の繰り返しにより屋根等の鋼構造物200の単位ブロック201、202、・・・を送り出す方法も考えられる。各単位ブロックは同図中の矢印方向に送り出される。
9) The unit block 201 of the steel structure 200 such as a roof assembled in the step 8) by the slide device 320 (see FIG. 23 (b)) installed on the gantry 110 (then 202,. (4) is a moving step of sliding the unit block of the steel structure 200, which slides on the rail beam 10 from the gantry 110 (FIG. 10).
The slide device 320 that sends out the unit blocks 201, 202,... Of the steel structure 200 such as a roof includes, for example, a pulley 321 on the gantry 110 side and a roof side such as a three-dimensional truss as shown in FIG. A method of winding the wire 323 laid over the pulley 322 with the winch 324 is conceivable. Or although not shown in figure, the method of sending out the unit blocks 201, 202, ... of the steel structures 200, such as a roof, by repeating the piston movement of the expansion-contraction using an oil jack horizontally is also considered. Each unit block is sent out in the direction of the arrow in the figure.

10)前記9)の工程でスライドされた屋根等の鋼構造物200の単位ブロック201、202の次にスライドする単位ブロック203(その次に204、・・・)を、構台上にて前記8)屋根等の鋼構造物200の単位ブロック組立工程と同様にして組立て、これら単位ブロック同士の接続と前記9)鋼構造物200の単位ブロックをスライドさせる移動工程とを必要分繰り返し、屋根等の鋼構造物200を最終の柱1の位置まで移動させ、前記屋根等の鋼構造物200の支承部210(図12(b)〜図12(d)に図示)を前記柱頭部の直上に位置させる、屋根等の鋼構造物200の単位ブロック接続及び移動工程である。(図11)   10) The unit blocks 203 (204,...) That slide next to the unit blocks 201, 202 of the steel structure 200 such as a roof that has been slid in the step 9) are placed on the gantry. ) Assembling in the same manner as the unit block assembling process of the steel structure 200 such as the roof, repeating the connection of these unit blocks and the above 9) moving process of sliding the unit block of the steel structure 200 as necessary, The steel structure 200 is moved to the position of the final pillar 1, and the support portion 210 (illustrated in FIGS. 12 (b) to 12 (d)) of the steel structure 200 such as the roof is positioned immediately above the head of the pillar. It is a unit block connection and movement process of steel structures 200, such as a roof. (Fig. 11)

11)前記10)の工程の次に、前記レール桁10のブロック同士を接続していた補完部材51(図12(a)に図示)を撤去した後、前記複数の柱頂部の直上に支承受台52、52aを接合すると共に、前記屋根等の鋼構造物200のブロック下面に取り付けた摺動梁20、20、・・・を撤去して(図12(b))、ジャッキ60,60を用いて前記支承受台52a上に前記屋根等の鋼構造物200の支承部210をジャッキダウンし固定する(図12(c)〜図12(d))、屋根等の鋼構造物200の支承部固定工程である。   11) After the step of 10), after removing the complementary member 51 (shown in FIG. 12A) that connected the blocks of the rail girder 10, the bearings are received directly above the plurality of column tops. While joining the bases 52 and 52a, the sliding beams 20, 20,... Attached to the lower surface of the block of the steel structure 200 such as the roof are removed (FIG. 12B), and the jacks 60 and 60 are removed. The support portion 210 of the steel structure 200 such as the roof is jacked down and fixed on the support receiving base 52a (FIGS. 12 (c) to 12 (d)) to support the steel structure 200 such as the roof. It is a part fixing process.

以上、1)〜11)の工程により、鉄道駅の既存プラットホーム等の既設施設の上空を覆う立体トラス等で形成された屋根等の鋼構造物200の建方を完了する。   As described above, through the steps 1) to 11), the construction of the steel structure 200 such as a roof formed with a solid truss or the like covering the existing facilities such as the existing platform of the railway station is completed.

図13は図1〜12に示した実施形態において、前記レール桁10のブロックを、平行に間隔を置いた2本の桁材10a、10aと、該桁材10a、10aとを所定の間隔で繋ぐ複数の繋ぎ材10b、10b、・・・とで形成した場合である。   In the embodiment shown in FIGS. 1 to 12, the block of the rail girder 10 is divided into two girder members 10a and 10a spaced apart in parallel and the girder members 10a and 10a at a predetermined interval. This is a case where a plurality of connecting materials 10b, 10b,.

2本の桁材10a、10aの間に繋ぎ材10b、10b、・・・があるため、屋根等の鋼構造物200をスライドする時に移動方向を安定させるためのガイド材21を、前記繋ぎ材10b、10b、・・・の上に配置することが可能となる。(図20(a)及び図20(b)参照)   Since there are connecting members 10b, 10b,... Between the two girders 10a, 10a, the guide member 21 for stabilizing the moving direction when the steel structure 200 such as a roof is slid is used as the connecting member. It becomes possible to arrange | position on 10b, 10b, .... (See FIG. 20 (a) and FIG. 20 (b))

図14、図15は1〜12に示した実施形態において、前記レール桁10のブロックの桁材10a端部は下段が長く上段が短い階段状に形成され、ブロック同士を接続した接合部材50(図14参照)は、前記レール桁10のブロック移動工程においては、ブロック同士を直線になるように接合する。   14 and 15, in the embodiment shown in 1 to 12, the end portion of the beam member 10 a of the block of the rail beam 10 is formed in a step shape having a long lower step and a short upper step, and a joining member 50 ( 14), in the block moving process of the rail girder 10, the blocks are joined to form a straight line.

前記レール桁10のブロック移動工程完了後に前記接合部材50を撤去してそれらブロックを分離し、レール桁10とレール桁受ブラケット2との間にある滑り台座3を撤去後、レール桁受ブラケット2の上で、前記レール桁10のブロックを柱1の中心位置に移動後、隣接したレール桁10のブロック同士の空隙を充填するために、新たに補完部材51(図15参照)を現場実測により製作し、階段状になった前記ブロック端部の上段に設置して、隣接したレール桁10のブロック同士を再度接続するものである。   After the block moving process of the rail girder 10 is completed, the joining member 50 is removed to separate the blocks, and after the slide base 3 between the rail girder 10 and the rail girder bracket 2 is removed, the rail girder bracket 2 After moving the block of the rail girder 10 to the center position of the pillar 1, a new complementary member 51 (see FIG. 15) is newly measured on site to fill the gap between the blocks of the adjacent rail girder 10 The block of the block girder 10 adjacent to each other is installed again on the upper end of the block end portion that is manufactured and stepped.

前記ブロック端部が2段になっているのは、補完部材51下面と前記下段の上面とをボルト接合する時、ナット締付けをし易くするためボルトを上向きに差し込むが、そのボルトを挿入する空間を確保するためである。即ち、前記ブロック端部を2段にすることにより、補完部材51の接合作業が容易になる。   The block end portion has two stages. When the lower surface of the complementary member 51 and the upper surface of the lower stage are bolted together, the bolt is inserted upward to facilitate tightening of the nut. This is to ensure That is, by making the block end portion two stages, the joining work of the complementary member 51 is facilitated.

図16(a)〜図16(c)は図1〜12に示した実施形態において、前記レール桁10のブロック同士を接続した接合部材50を撤去後に、前記レール桁10のブロックと前記レール桁受ブラケット2との間にジャッキ60、60と2本の桁材10a、10aを繋ぐ仮設梁61を配置し(図16(a)、図16(b))、該ジャッキ60、60によりジャッキアップ・ダウンさせて前記滑り台座3を撤去し、前記レール桁10のブロックを前記レール桁受ブラケット2上に盛り替える(図16(c))ものである。   16 (a) to 16 (c) show the blocks of the rail girder 10 and the rail girder after removing the joining member 50 connecting the blocks of the rail girder 10 in the embodiment shown in FIGS. Temporary beams 61 connecting the jacks 60, 60 and the two beam members 10a, 10a are arranged between the receiving bracket 2 (FIGS. 16A and 16B), and the jacks 60, 60 are used to jack up. -The slide base 3 is removed and the block of the rail girder 10 is replaced on the rail girder bracket 2 (FIG. 16 (c)).

レール桁10のブロックが前記レール桁受ブラケット2から脱落することを防止する固定ピン2a(図17(a)、図17(b)参照)を挿入するための大き目の孔(図示せず)が、レール桁受ブラケット2に開けられている。   A large hole (not shown) for inserting a fixing pin 2a (see FIGS. 17 (a) and 17 (b)) for preventing the block of the rail beam 10 from falling off the rail beam receiving bracket 2 is provided. The rail girder bracket 2 is opened.

図17(a)、図17(b)は図1〜12に示した実施形態において、前記レール桁10のブロック片端部とそのブロックを受けているレール桁受ブラケット2とを貫通する固定ピン2aを1本挿入し、該固定ピン2aを回転中心として前記レール桁10のブロック他端部を、前記レール桁受ブラケット2の柱頭部の中心位置まで回転及び/又は横移動させるものである。回転及び/又は横移動は、人力もしくはチェーンブロック等の道具を用いて行う。   17 (a) and 17 (b) show a fixing pin 2a penetrating through one end of the block of the rail beam 10 and the rail beam receiving bracket 2 receiving the block in the embodiment shown in FIGS. Is inserted, and the other end of the block of the rail girder 10 is rotated and / or moved laterally to the center position of the column head of the rail girder bracket 2 with the fixing pin 2a as the center of rotation. The rotation and / or lateral movement is performed using tools such as human power or a chain block.

レール桁10のブロックの一端は固定ピン2aが挿入されており、又、回転及び/又は横移動する側のレール桁受ブラケット2の端部には、オーバーランさせないためのストッパー2b(図17(a)、図17(b)に位置のみを示す)を設けて安全に配慮している。   A fixing pin 2a is inserted into one end of the block of the rail girder 10, and a stopper 2b (FIG. 17 (FIG. 17) for preventing overrun at the end of the rail girder bracket 2 on the side that rotates and / or moves laterally. a) and FIG. 17 (b) show only the position) for safety.

図18は図1〜12に示した実施形態において、前記レール桁10のブロック中央から下方にジャッキを組込んだ鉛直材70と、該鉛直材70の下端から前記レール桁10のブロックのそれぞれの両端部との間にテンション部材71を取付けたものである。   18 shows a vertical member 70 incorporating a jack downward from the center of the block of the rail girder 10 and a block of the rail girder 10 from the lower end of the vertical member 70 in the embodiment shown in FIGS. A tension member 71 is attached between both ends.

テンション部材71を設けたレール桁10のブロックは、いわゆる張弦梁となるので、柱1、1、・・・の間隔が広い部分でも、上下方向のたわみ剛性が高くなる。よって、レール桁10の上を屋根等の鋼構造部200のブロックが通過してもたわみが抑制されるので、スライドがスムースに行える。なお、鉛直材70とテンション部材71は、スライドが完了した後、撤去される。   Since the block of the rail girder 10 provided with the tension member 71 is a so-called stringed beam, even in a portion where the interval between the pillars 1, 1,. Therefore, even if the block of the steel structure part 200 such as a roof passes over the rail girder 10, the deflection is suppressed, so that the slide can be performed smoothly. The vertical member 70 and the tension member 71 are removed after the slide is completed.

これら鉛直材70及びテンション部材71は、取付けボルト(図示せず)の一部を外すことにより、レール桁10の厚みの中に収納した状態で、スライドを行う建方工法である。レール桁10は、平行に間隔を置いた2本の桁材10a、10aと、該桁材10a、10aとを所定の間隔で繋ぐ複数の繋ぎ材10b、10b・・・とで形成しているため、2本の桁材10a、10aの間にできた空間に、前記鉛直材70及びテンション部材71を収納することができる。   The vertical member 70 and the tension member 71 are a construction method that slides in a state in which the vertical member 70 and the tension member 71 are accommodated in the thickness of the rail girder 10 by removing a part of a mounting bolt (not shown). The rail girder 10 is formed by two girder members 10a, 10a spaced apart in parallel and a plurality of connecting members 10b, 10b,... That join the girder members 10a, 10a at a predetermined interval. Therefore, the vertical member 70 and the tension member 71 can be accommodated in a space formed between the two beam members 10a and 10a.

図19は図1〜12に示した実施形態において、立体トラスの屋根等の鋼構造物200の単位ブロック201、202、・・・の下面に取付けられた摺動梁20、20・・・と、該摺動梁20、20・・・を挟んで、その単位ブロック201、202、・・・のスライド方向の前後の鋼構造物200の下面各節点位置(図19では、立体トラスの下弦節点211)との間にテンション部材22、22・・・を取付けた状態にてスライドを行うものである。   19 is a sliding beam 20, 20 attached to the lower surface of unit blocks 201, 202,... Of a steel structure 200 such as a roof of a three-dimensional truss in the embodiment shown in FIGS. , Sandwiching the sliding beams 20, 20..., Each node position on the lower surface of the steel structure 200 before and after the sliding direction of the unit blocks 201, 202,. 211) and the tension members 22, 22...

あるいは、テンション部材22、22・・・に替えて、圧縮軸力に抵抗できる太い部材(図示せず)を、前記摺動梁20、20・・・の前又は後の一方のみに取付けてもよく、この場合、取付け部材数が減り、取付け手間が省略できる。また、片側に障害物があって取付けられない場合、この方法で対応できる。   Alternatively, instead of the tension members 22, 22..., A thick member (not shown) that can resist the compression axial force may be attached only to one of the front or rear of the sliding beams 20, 20. In this case, the number of mounting members is reduced and the mounting effort can be omitted. This method can also be used when there is an obstacle on one side and it cannot be attached.

前記鋼構造物200の下面各節点位置(図19では、立体トラスの下弦節点211)と、摺動梁20下面の滑り面との間に距離があるため、スライド中に摺動梁20の下面とレール桁10の上面との間の摩擦力により摺動梁20が回転を起し、前記鋼構造物200の摺動梁20が取り付く立体トラスの下弦節点211に曲げモーメントが作用して、構造物200に損傷を与える可能性がある。   Since there is a distance between each node position of the lower surface of the steel structure 200 (the lower chord node 211 of the three-dimensional truss in FIG. 19) and the sliding surface of the lower surface of the sliding beam 20, the lower surface of the sliding beam 20 during the slide. The sliding beam 20 rotates due to the frictional force between the rail girder 10 and the upper surface of the rail girder 10, and a bending moment acts on the lower chord node 211 of the solid truss to which the sliding beam 20 of the steel structure 200 is attached. The object 200 may be damaged.

そのため摺動梁20下面の摩擦力によって摺動梁20が回転を起さないように、テンション部材22、22を、摺動梁20を挟んでスライド方向の前後に設けることによって損傷を防止するものである。   Therefore, damage members are prevented by providing tension members 22 and 22 before and after the sliding beam 20 so that the sliding beam 20 does not rotate due to the frictional force of the lower surface of the sliding beam 20. It is.

図20(a)〜図20(c)は図1〜12に示した実施形態において、図20(b)に図示のように、前記レール桁10を構成する繋ぎ材10bの上にスライド方向に軸を合わせたガイド材21を、可能な最大長さで載置し(図20(a))、前記屋根等の鋼構造物200の単位ブロック201、202、・・・の下面に取付けられた摺動梁20に固定され、前記ガイド材21を遊嵌して摺動するガイドピース21aを取付けたものである。   20 (a) to 20 (c) show the embodiment shown in FIGS. 1 to 12 in the sliding direction on the connecting member 10b constituting the rail girder 10 as shown in FIG. 20 (b). The guide material 21 with the shaft aligned is placed at the maximum possible length (FIG. 20A) and attached to the lower surface of the unit blocks 201, 202,... Of the steel structure 200 such as the roof. A guide piece 21a that is fixed to the sliding beam 20 and slides by loosely fitting the guide material 21 is attached.

但し、図20(c)に図示のように、レール桁10の軸方向がスライド方向に一致する区間は、ガイド材21の役目はレール桁10の桁材10a、10aが果たすので、ガイド材21は不要である。   However, as illustrated in FIG. 20C, in the section where the axial direction of the rail beam 10 coincides with the sliding direction, the role of the guide material 21 is played by the beam materials 10 a and 10 a of the rail beam 10. Is unnecessary.

前記屋根等の鋼構造物200の単位ブロック201、202、・・・をレール桁10上でスライドさせる時に、スライド方向に軸を合わせたガイド材21に嵌合したガイドピース21aは、前記ガイド材21から外れることなく摺動するので、前記屋根等の鋼構造物200の単位ブロック201、202、・・・のスライド方向が安定する。   When the unit blocks 201, 202,... Of the steel structure 200 such as the roof are slid on the rail beam 10, the guide piece 21a fitted to the guide material 21 whose axis is aligned in the sliding direction is the guide material 21a. Since it slides without deviating from 21, the sliding direction of the unit blocks 201, 202,... Of the steel structure 200 such as the roof is stabilized.

図21は図1〜12に示した実施形態において、スライド方向と平行でない前記レール桁10のブロックに設置されたガイド材21を、スライド方向と平行にかつレール桁10の2本の桁材10a、10aの内側に納まる最大長さとして必要本数を配置し、前記屋根等の鋼構造物200の単位ブロック201、202、・・・の下面に取付けられた摺動梁20、20、・・・に、前記複数のガイド材21、21、・・・にそれぞれ対応して摺動する複数の横ずれ防止ピース21b、21b、・・・を、前記ガイドピース21aの他に取り付けたものである。   21 shows a guide member 21 installed in a block of the rail girder 10 that is not parallel to the sliding direction in the embodiment shown in FIGS. 1 to 12, and the two girder members 10a of the rail girder 10 are parallel to the sliding direction. 10a, the required number is arranged as the maximum length that fits inside, and the sliding beams 20, 20,... Attached to the lower surfaces of the unit blocks 201, 202,. In addition to the guide piece 21a, a plurality of lateral slip prevention pieces 21b, 21b,... That slide in correspondence with the plurality of guide members 21, 21,.

前記横ずれ防止ピース21b、21b、・・・は、上下に回転可能な状態に取り付けているので(図21のト断面参照)、ガイド材21の端部から外れた状態でスライドを続行して横ずれ防止ピース21bがレール桁10の桁材10aに接触しても、前記横ずれ防止ピース21b、21b、・・・は上方向に回転して、そのレール桁10の桁材10aを乗り越えることができる。   Since the lateral slip prevention pieces 21b, 21b,... Are attached so as to be rotatable up and down (refer to the cross section of FIG. 21), the lateral slippage is continued by detaching from the end of the guide member 21. Even if the prevention piece 21b comes into contact with the beam member 10a of the rail beam 10, the lateral displacement prevention pieces 21b, 21b,... Can rotate upward to get over the beam member 10a of the rail beam 10.

従って、何れかの横ずれ防止ピース21bがガイド材21の端部から外れても、レール桁10を自動的に乗り越えるため、盛り替えをする必要がない。よって、スライド作業に掛かる時間を節約できる。なお、前記ガイドピース21aは固定式なので、盛り替えが必要である。   Therefore, even if any one of the lateral slip prevention pieces 21b is detached from the end portion of the guide member 21, the rail girder 10 is automatically climbed, so there is no need to change the size. Therefore, it is possible to save time required for the slide operation. Since the guide piece 21a is a fixed type, it needs to be refilled.

また、ガイドピース21aと横ずれ防止ピース21bは、屋根等の鋼構造物200が地震時の水平力によりレール桁から脱落することも防止する。   Moreover, the guide piece 21a and the lateral slip prevention piece 21b prevent the steel structure 200 such as a roof from falling off the rail girder due to a horizontal force during an earthquake.

図22(a)、図22(b)は図1〜12に示した実施形態において、前記屋根等の鋼構造物200の支承部210にジャッキ受け部210aが設けてあり、そのジャッキ受210aと前記レール桁受ブラケット2との間にジャッキ60、60を配置し、該ジャッキ60、60のジャッキアップにより鋼構造物200の単位ブロックの下面の摺動梁20を撤去し、前記ジャッキ60、60のジャッキダウンにより前記支承部210を前記柱頭部の支承受台52a上に盛り替えるものである。   22 (a) and 22 (b), in the embodiment shown in FIGS. 1 to 12, a jack receiving part 210a is provided on the support part 210 of the steel structure 200 such as the roof, and the jack receiver 210a and Jacks 60, 60 are arranged between the rail girder bracket 2, the sliding beams 20 on the lower surface of the unit block of the steel structure 200 are removed by jacking up the jacks 60, 60, and the jacks 60, 60 are removed. The support portion 210 is replaced on the support portion 52a of the column head by jacking down.

屋根等の鋼構造物200の支承部210に、予めジャッキ受け部210aが設けてあるので、屋根等の鋼構造物200のジャッキアップ、ジャッキダウンが容易に実施できる。前記ジャッキ受部210aは、支承部210と一体のものでも、着脱可能としたものでもよい。   Since the jack receiving part 210a is provided in advance in the support part 210 of the steel structure 200 such as a roof, jacking up and jacking down of the steel structure 200 such as the roof can be easily performed. The jack receiving portion 210a may be integral with the support portion 210 or detachable.

以上、立体トラスで形成された屋根等の鋼構造物200の場合を実施態様の例として説明したが、本発明は、屋根ではなく層を成す鋼構造物に対しても、該鋼構造物の下面に摺動梁20、20・・・を取り付けることができれば、適用できる。   As described above, the case of the steel structure 200 such as a roof formed of a three-dimensional truss has been described as an example of the embodiment. However, the present invention is not applied to a roof but a layered steel structure. If the sliding beams 20, 20... Can be attached to the lower surface, it can be applied.

又、説明中のレール桁、スライド装置、テンション材、ガイド材、ガイドピース、横ずれ防止ピース等は一例を示したものであり、特許請求範囲内で、他の既知の手段や形態を適宜採用可能であることはいうまでもない。   In addition, the rail girder, slide device, tension material, guide material, guide piece, lateral slip prevention piece, etc. in the description are examples, and other known means and forms can be appropriately employed within the scope of the claims. Needless to say.

本発明は、鉄道駅の既設のプラットホームや線路上空に新たに鋼構造物を構築する場合にスライド工法を適用するに当たり、送り出す鋼構造物のブロックを受けるレール桁が平行でも直線でもない場合でも、比較的短時間に実施できる建方工法であり、列車の運行が止まっている深夜の短い時間内に工事を安全かつ効率的に実施でき、極めて有用な鋼構造物の建方工法である。   In the case of applying the slide method when the steel structure is newly constructed on the existing platform or railroad of the railway station, even if the rail girder receiving the steel structure block to be sent is not parallel or straight, It is a construction method that can be carried out in a relatively short time, and can be carried out safely and efficiently within a short time of late at night when train operation is stopped. It is a very useful construction method for steel structures.

1 柱
2 レール受ブラケット
2a 固定ピン
2b ストッパー
3 滑り台座
3a 滑り材
10 レール桁
10a 桁材
10b 繋ぎ材
11 手延べ桁
20 摺動梁
21 ガイド材
21a ガイドピース
21b 横ずれ防止ピース
22 テンション部材
50 接合部材
51 補完部材
52、52a 支承受台
60 ジャッキ
61 仮設梁
70 鉛直材
71 テンション部材
100 既存プラットホーム
100a 既存プラットホーム上家
110 構台
111a、111b 重機
120 滑り受梁
200 鋼構造物
201、202、・・・ 単位ブロック
210 支承部
210a ジャッキ受け部
211 立体トラスの下弦節点
310 レール桁用のスライド装置
320 鋼構造物用のスライド装置
311、312、321、322 滑車
313、323 ワイヤー
314、324 ウインチ
DESCRIPTION OF SYMBOLS 1 Pillar 2 Rail receiving bracket 2a Fixing pin 2b Stopper 3 Sliding pedestal 3a Sliding material 10 Rail girder 10a Girder material 10b Connecting material 11 Hand girder 20 Sliding beam 21 Guide material 21a Guide piece 21b Side slip prevention piece 22 Tension member 50 Joining member 51 Complementary member 52, 52a Support pedestal 60 Jack 61 Temporary beam 70 Vertical member 71 Tension member 100 Existing platform 100a Existing platform upper house 110 Gantry 111a, 111b Heavy machine 120 Sliding beam 200 Steel structure 201, 202, ... Unit Block 210 Bearing portion 210a Jack receiving portion 211 Lower chord node of three-dimensional truss 310 Slide device for rail girder 320 Slide device for steel structure 311, 312, 321, 322 Pulley 313, 323 Wire 31 , 324 winch

Claims (10)

平面視で任意の形状を有する既存施設の上空に掛け渡される鋼構造物のブロック組立てとブロック同士の接続、及びそれら接続されたブロックの略水平方向へのスライドとを繰り返すことによる鋼構造物の建方工法であって、
前記鋼構造物の下方に、前記既存施設の状況に応じて、複数の柱を任意の柱間隔で配置させ、該柱頭部の位置決めをする柱立設工程と、
前記複数の柱頭部に、前記鋼構造物のブロックをスライドする時に支持するレール桁を受けるレール桁受ブラケットと、該レール桁受ブラケット上に滑り台座を設置するレール桁受ブラケット設置工程と、
前記既存施設の上空の一部に又は前記既存施設に隣接して、前記レール桁又は鋼構造物のブロックの組立と該ブロック同士との接続、また前記レール桁を載置する滑り受梁及び前記ブロック同士をスライドさせるスライド装置を設置するための構台を、前記柱頭部とほぼ同レベルに構築する構台構築工程と、
前記構台上で、構台から遠い方の最終柱間に架設される前記レール桁のブロックと、手延べ桁とを接続するガイドレール梁のブロック・手延べ桁接続工程と、
前記構台上に設置したスライド装置により、前記接続されたレール桁のブロックと手延べ桁とを前記構台から遠い方の最終柱頭部を目指して、平面視で直線上にスライドさせて送り出し、前記構台から近い方の柱間のレール桁受ブラケット上の滑り台座と前記構台上の滑り受梁とに載置させることにより、前記接続されたレール桁のブロックと手延べ桁とを前記レール桁受ブラケット上の柱頭部の滑り台座にスライドさせて載置するレール桁のブロック移動工程と、
前記構台上で、前記スライドされたレール桁のブロックと次にスライドするレール桁のブロックとを接合部材を介してする接合と、前記レール桁のブロック移動工程とを必要分繰り返し、前記構台から遠い方のレール桁のブロックを最終柱のレール桁受ブラケット上の滑り台座に載置させるレール桁のブロック接続・移動工程と、
該接続・移動工程において、前記レール桁受ブラケット上の滑り台座に載置した前記レール桁のブロック同士を接合した接合部材を撤去し、かつ前記レール桁のブロックを載置した前記レール桁受ブラケット上の滑り台座を撤去して、前記レール桁のブロックを前記レール桁受ブラケット上に盛り替えると共に、前記レール桁のブロックを、レール桁受ブラケットを支える柱の柱頭中心位置まで横移動させて前記レール桁受ブラケットと前記レール桁のブロックとを締結し、前記撤去された接合部材の間隙を補完部材によりレール桁のブロック同士及び前記構台上のレール桁のブロックを接続し、前記レール桁のブロックの先端に接続された手延べ桁を撤去して、レール桁のブロック同士が連結されかつレール桁受ブラケットの柱頭部の中心位置でレール桁受ブラケットに接続させることを、前記複数の柱列ごとに繰り返すレール桁のブロック架設工程と、
前記構台のレール桁上で、構台より遠い方の複数の柱列に跨り架設される鋼構造物のブロックを単位ブロックとして、その単位ブロック下面に前記レール桁方向とほぼ直交する方向に該レール桁を跨いで摺動梁を取付けて組立てる鋼構造物の単位ブロック組立工程と、
前記構台上に設置したスライド装置により、前記組立てられた鋼構造物の単位ブロックを前記構台からレール桁上をスライドさせる鋼構造物の単位ブロック移動工程と、
前記スライドされた鋼構造物の単位ブロックの次にスライドする構台上の鋼構造物の単位ブロックを、前記鋼構造物の単位ブロック組立工程と同様に組立て、これら単位ブロック同士の接続と前記鋼構造物の単位ブロックをスライドさせる移動工程とを必要分繰り返し、鋼構造物の単位ブロックを接続しながら最終柱位置まで移動させ、前記鋼構造物の支承部を前記柱頭部の直上に位置させる鋼構造物の単位ブロック接続・移動工程と、
前記レール桁のブロック同士を接続した補完部材を撤去後、前記複数の柱頂部の直上に支承受台を接合すると共に、前記鋼構造物のブロックの下面の摺動梁を撤去して、前記支承受台上に前記鋼構造物の支承部を移動し固定する鋼構造物の支承部固定工程と、
を有することを特徴とする鋼構造物の建方工法。
A steel structure is constructed by repeatedly assembling a block of steel structures spanned over an existing facility having an arbitrary shape in plan view, connecting the blocks together, and sliding the connected blocks in a substantially horizontal direction. The construction method,
Under the steel structure, depending on the situation of the existing facility, a plurality of columns are arranged at arbitrary column intervals, and a column standing step for positioning the column heads,
A rail girder bracket that receives a rail girder that is supported when sliding the steel structure block on the plurality of column heads, and a rail girder bracket installation step that installs a slide base on the rail girder bracket,
Assembling the rail girder or block of steel structure and connecting the blocks to each other in a part of the sky above the existing facility or adjacent to the existing facility, and a sliding bearing for placing the rail girder and A gantry construction process for constructing a gantry for installing a slide device that slides between the blocks at substantially the same level as the pillar head;
On the gantry, the rail girder block constructed between the last columns farther from the gantry and the guide rail beam block / hand girder connecting step for connecting the hand girder,
The slide device installed on the gantry slides the connected rail girder block and the hand girder toward the final column head far from the gantry and slides it straight out in plan view to send out the gantry. The rail girder bracket is connected to the block of the connected rail girder and the hand girder by being placed on a slide pedestal on the rail girder bracket between the columns closer to the side and a slide girder on the gantry. Block movement process of rail girder that is slid and placed on the slide base of the upper column head,
On the gantry, the joining of the slide rail girder block and the next sliding rail girder block via a joining member and the rail girder block moving step are repeated as necessary, and the farther from the gantry. The rail girder block connecting / moving process for placing the rail girder block on the slide base on the rail girder bracket of the final pillar,
In the connecting / moving step, the rail girder bracket in which the joint member joining the rail girder blocks placed on the slide base on the rail girder bracket is removed and the rail girder block is placed. The upper slide pedestal is removed, and the rail girder block is rearranged on the rail girder bracket, and the rail girder block is laterally moved to the center position of the column supporting the rail girder bracket. The rail girder bracket and the rail girder block are fastened, and the rail girder block on the gantry is connected to each other by connecting the rail girder blocks and the rail girder block with a complementary member through the gap of the removed joining member. The hand girder connected to the tip of the rail is removed, the rail girder blocks are connected to each other, and the center of the column head of the rail girder bracket And a rail-digit block erection step of repeating for each of the plurality of tubular elements be connected to the rail Keta受 bracket location,
On the rail girder of the gantry, a steel structure block constructed across a plurality of column rows farther from the gantry is used as a unit block, and the rail girder is arranged on the lower surface of the unit block in a direction substantially perpendicular to the rail girder direction. Unit block assembly process of steel structure that assembles by mounting sliding beams across
A unit block moving step of a steel structure in which a unit block of the assembled steel structure is slid on a rail girder from the gantry by a slide device installed on the gantry;
The unit block of the steel structure on the gantry that slides next to the unit block of the slid steel structure is assembled in the same manner as the unit block assembly process of the steel structure, and the connection between the unit blocks and the steel structure The steel structure in which the moving step of sliding the unit block of the object is repeated as necessary, the unit block of the steel structure is moved to the final column position while being connected, and the support portion of the steel structure is positioned directly above the column head Unit block connection / movement process of objects,
After removing the complementary member connecting the rail girder blocks, a support base is joined immediately above the plurality of column tops, and the sliding beam on the lower surface of the steel structure block is removed to remove the support. A support part fixing step of the steel structure for moving and fixing the support part of the steel structure on the cradle;
A construction method of a steel structure characterized by comprising:
前記レール桁のブロックが、平行に間隔を置いて2本の桁材と、該桁材とを所定の間隔で繋ぐ複数の繋ぎ材とで形成されていることを特徴とする、請求項1に記載の鋼構造物の建方工法。   The rail girder block is formed of two girder members spaced apart in parallel and a plurality of connecting members that join the girder members at a predetermined interval. Construction method of the steel structure described. 前記レール桁のブロック端部は下段が長く上段が短い階段状に形成され、ブロック同士を接続した接合部材は、前記レール桁のブロック移動工程においては、ブロック同士を直線になるように接合し、前記レール桁のブロック移動工程完了後に前記接合部材を撤去して、前記レール桁のブロックを柱の中心に移動後、再びブロック同士を接続するレール桁のブロック架設工程においては、新たに補完部材を現場実測により製作し、階段状になった前記ブロック端部の上段に設置することを特徴とする、請求項1又は2に記載の鋼構造物の建方工法   The rail girder block end is formed in a step shape with a long lower step and a short upper step, and the joining member connecting the blocks joins the blocks so that they are straight in the block moving step of the rail girder, After the rail girder block moving process is completed, the joining member is removed, and after the rail girder block is moved to the center of the column, a new complementary member is added in the rail girder block erection process for connecting the blocks again. The method for construction of a steel structure according to claim 1 or 2, characterized in that the steel structure is manufactured by on-site measurement and is installed on the upper end of the stepped block end. 前記レール桁のブロック同士を接続した接合部材を撤去後に、前記レール桁のブロックと前記ブラケットとの間にジャッキを配置し、該ジャッキによりジャッキアップ・ダウンさせて前記滑り台座を撤去し、前記レール桁のブロックを前記レール桁受ブラケット上に盛り替えることを特徴とする、請求項1乃至3の何れか一項に記載の鋼構造物の建方工法。   After removing the joint member connecting the rail girder blocks, a jack is disposed between the rail girder block and the bracket, and the slide base is removed by jacking up and down with the jack. The construction method for a steel structure according to any one of claims 1 to 3, wherein a girder block is rearranged on the rail girder bracket. 前記レール桁のブロック端部と前記レール桁受ブラケットとの間に固定ピンを挿入し、該固定ピン部材を回転中心として前記レール桁のブロック端部を前記ブラケットの柱頭部の中心位置まで回転及び/又は横移動させることを特徴とする、請求項1乃至4の何れか一項に記載の鋼構造物の建方工法。   A fixing pin is inserted between a block end portion of the rail girder and the rail girder bracket, and the block end portion of the rail girder is rotated to the center position of the column head of the bracket with the fixing pin member as a rotation center. The steel structure construction method according to any one of claims 1 to 4, wherein the steel structure is moved laterally. 前記レール桁のブロック中央から下方にジャッキを組込んだ鉛直材と、該鉛直材の下端から前記レール桁のブロックのそれぞれの両端部との間にテンション部材を取付けてあり、これら鉛直材及びテンション部材は、スライド完了するまでは、レール桁の厚みの中に収納していることを特徴とする、請求項1乃至5の何れか一項に記載の鋼構造物の建方工法。   A tension member is attached between a vertical member incorporating a jack downward from the center of the rail girder block and both ends of the rail girder block from the lower end of the vertical member. The steel structure construction method according to any one of claims 1 to 5, wherein the member is housed in the thickness of the rail girder until sliding is completed. 前記鋼構造物の単位ブロックの下面に取付けられた摺動梁と、該摺動梁を挟んで前記鋼構造物の単位ブロックのスライド方向の前後両方又はどちらか一方の鋼構造物の各節点位置との間に部材を取付けることを特徴とする、請求項1乃至6の何れか一項に記載の鋼構造物の建方工法。   The sliding beam attached to the lower surface of the unit block of the steel structure, and the position of each node of the steel structure both before and after the sliding direction of the unit block of the steel structure across the sliding beam A construction method for a steel structure according to any one of claims 1 to 6, wherein a member is attached between the steel structure and the steel structure. 前記鋼構造物の単位ブロックのレール桁上のスライド時に、該レール桁を構成する繋ぎ材にスライド方向にガイドするガイド材と、前記鋼構造物の単位ブロックの下面に取付けられた摺動梁に前記ガイド材を遊嵌して摺動するガイドピースとを取付けることを特徴とする、請求項1乃至7の何れか一項に記載の鋼構造物の建方工法。   When sliding on the rail girder of the unit block of the steel structure, a guide material that guides in a sliding direction to a connecting member constituting the rail girder, and a sliding beam attached to the lower surface of the unit block of the steel structure The steel structure construction method according to any one of claims 1 to 7, wherein a guide piece that slides by sliding the guide material loosely is attached. 前記レール桁がスライド方向と平行でない範囲のガイド材を、スライド方向と平行にかつレール桁の2本の桁材の内側に納まる長さとして必要本数を配置し、前記鋼構造物の単位ブロックの下面に取付けられた摺動梁に、それら複数のガイド材にそれぞれ対応して摺動する横ずれ防止ピースを、前記ガイドピースの他に、上下に回転可能な状態にて複数取付けたことを特徴とする、請求項8に記載の鋼構造物の建方工法。 A guide material in a range where the rail girder is not parallel to the sliding direction is arranged in a necessary number as a length that is parallel to the sliding direction and fits inside the two girder members of the rail girder, and the unit block of the steel structure In addition to the guide piece, a plurality of lateral slip prevention pieces that slide corresponding to the plurality of guide members are attached to the sliding beam attached to the lower surface in a state of being vertically rotatable. The construction method of the steel structure according to claim 8 . 前記鋼構造物の支承部にジャッキ受け部が設けてあり、その支承部と前記ブラケットとの間にジャッキを配置し、該ジャッキのジャッキアップにより鋼構造物の単位ブロックの下面の摺動梁を撤去し、前記ジャッキのジャッキダウンにより前記支承部を前記柱頭部の支承受台上に盛り替えることを特徴とする、請求項1乃至9の何れか一項に記載の鋼構造物の建方工法。   A jack receiving portion is provided on the support portion of the steel structure, and a jack is arranged between the support portion and the bracket, and the sliding beam on the lower surface of the unit block of the steel structure is provided by jacking up the jack. The steel structure construction method according to any one of claims 1 to 9, wherein the steel structure is removed and rearranged on the column head support base by jackdown of the jack. .
JP2013217111A 2013-10-18 2013-10-18 Steel structure construction method Active JP6247496B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2013217111A JP6247496B2 (en) 2013-10-18 2013-10-18 Steel structure construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2013217111A JP6247496B2 (en) 2013-10-18 2013-10-18 Steel structure construction method

Publications (2)

Publication Number Publication Date
JP2015078561A JP2015078561A (en) 2015-04-23
JP6247496B2 true JP6247496B2 (en) 2017-12-13

Family

ID=53010186

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2013217111A Active JP6247496B2 (en) 2013-10-18 2013-10-18 Steel structure construction method

Country Status (1)

Country Link
JP (1) JP6247496B2 (en)

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP7085462B2 (en) * 2018-11-22 2022-06-16 株式会社竹中工務店 How to install the beam frame
CN111155770B (en) * 2020-01-17 2023-11-03 中国二十二冶集团有限公司 Steel roof truss splicing device and steel roof truss splicing construction method
CN113404309B (en) * 2021-05-31 2022-05-17 中国南方电网有限责任公司超高压输电公司 Large-span dome structure spiral lifting system and method
CN113565325A (en) * 2021-07-29 2021-10-29 戴巍 Directional movable supporting platform for civil engineering
CN113914620A (en) * 2021-11-11 2022-01-11 防城港中一重工有限公司 Method for integrally landing silo sliding-form platform
CN115075587A (en) * 2022-07-28 2022-09-20 中铁上海工程局集团有限公司 Assembling equipment and construction method

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH11148179A (en) * 1997-11-17 1999-06-02 Fujita Corp Constructing method of roof
JP4188170B2 (en) * 2003-07-14 2008-11-26 東日本旅客鉄道株式会社 Construction method and apparatus for steel structure
GB2438023B (en) * 2006-05-11 2011-07-13 William Hare Ltd Improvements In And Relating To Construction
JP5184311B2 (en) * 2008-11-17 2013-04-17 鉄建建設株式会社 Steel structure construction method

Also Published As

Publication number Publication date
JP2015078561A (en) 2015-04-23

Similar Documents

Publication Publication Date Title
JP6247496B2 (en) Steel structure construction method
JP5807253B2 (en) Telescopic scaffold structure and suspension scaffold installation method using the same
JP4777319B2 (en) Bridge erection method
KR101214602B1 (en) Incremental launching apparatus for constructing rail-type concrete slab of composite bridge using shearing connector rail, and method for the same
CN103967285A (en) Method for net rack long-distance upper air synchronous sliding
AU2012226370A2 (en) Suspended scaffolding system
CN108385539B (en) Long-distance pushing construction method for steel-concrete combined beam span arch ring of deck arch bridge
CN109279480B (en) Steel structure elevator hoistway splicing device and method
CN107499453B (en) Ocean platform device mounting system
CN112144889A (en) Mounting construction method for sliding assembly type building steel structure
CN109629449B (en) Mounting and positioning support and alignment method for steel-concrete combined section of arch foot of steel box arch bridge
KR101230049B1 (en) Incremental launching apparatus for launching concrete slab for bridge using form and rail, and constructing method for the same
CN110805305A (en) Climbing and shifting method for high-rise building
JP6425779B2 (en) Roof structure
JP3991067B1 (en) Temporary bridge between railway platforms
JP4188170B2 (en) Construction method and apparatus for steel structure
CN104653194A (en) Multi-platform railway tunnel operation trolley
JP5693869B2 (en) Bridge girder construction method
CN103806374A (en) Assembled road steel bridge overall track erection and push system and process
JP6636091B2 (en) Slide method for ramen structures
CN110939071A (en) Non-buttress construction method for assembled steel-concrete I-shaped composite beam bridge
KR100472390B1 (en) Method for construction of linear steel bridge
CN104060809A (en) Roof lighting glass steel frame installation device and operation method thereof
KR101341618B1 (en) Concrete form apparatus
CN204532360U (en) Multi-platform railway tunnel Mobile workbench

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20160920

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20170620

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20170704

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20170821

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20171114

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20171117

R150 Certificate of patent or registration of utility model

Ref document number: 6247496

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

S531 Written request for registration of change of domicile

Free format text: JAPANESE INTERMEDIATE CODE: R313532

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

S111 Request for change of ownership or part of ownership

Free format text: JAPANESE INTERMEDIATE CODE: R313117

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

S531 Written request for registration of change of domicile

Free format text: JAPANESE INTERMEDIATE CODE: R313531

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350