JP4481272B2 - Pneumatic caisson construction method - Google Patents

Pneumatic caisson construction method Download PDF

Info

Publication number
JP4481272B2
JP4481272B2 JP2006141412A JP2006141412A JP4481272B2 JP 4481272 B2 JP4481272 B2 JP 4481272B2 JP 2006141412 A JP2006141412 A JP 2006141412A JP 2006141412 A JP2006141412 A JP 2006141412A JP 4481272 B2 JP4481272 B2 JP 4481272B2
Authority
JP
Japan
Prior art keywords
anchor
slab
caisson
ground
working chamber
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2006141412A
Other languages
Japanese (ja)
Other versions
JP2007309043A (en
Inventor
豊 加島
紀夫 近藤
直昭 上月
秀行 武内
良典 鈴井
Original Assignee
大豊建設株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 大豊建設株式会社 filed Critical 大豊建設株式会社
Priority to JP2006141412A priority Critical patent/JP4481272B2/en
Publication of JP2007309043A publication Critical patent/JP2007309043A/en
Application granted granted Critical
Publication of JP4481272B2 publication Critical patent/JP4481272B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Piles And Underground Anchors (AREA)

Description

本発明は、所定深さに沈設された浮き上がり防止装置付きのニューマチックケーソンの施工方法に関する。 The present invention relates to a method for the construction of pneumatic cable Seo down with prevention device lifting which is sinking to a predetermined depth.

一般に、作業室底部の地盤を掘削し、所定深さに沈設されたニューマチックケーソンの如きケーソンは、通常の状態では地下水の浮力に対して、ケーソンの自重と周辺摩擦力とにより浮き上がりが防止されている。   Generally, a caisson such as a pneumatic caisson that has been excavated in the ground at the bottom of the working room and submerged to a predetermined depth is prevented from lifting due to the weight of the caisson and the surrounding frictional force against the buoyancy of groundwater. ing.

しかし、近年、井戸水の使用制限等によって地下水が上昇してきており、ケーソンの沈設後に地下水の浮力が増大し、ケーソンが浮き上がることが考えられる。   However, in recent years, groundwater has been rising due to restrictions on the use of well water, etc., and after the caisson is set up, the buoyancy of the groundwater increases and the caisson can rise.

さらに、地震時には、地盤の液状化による周辺摩擦力の低下と、液状体(水+土)の比重の増加により浮力が増大し、ケーソンが浮き上がることがある。また、地震による水平力によってケーソンの片側が浮き上がり、傾くことがある。   In addition, during an earthquake, buoyancy may increase due to a decrease in the peripheral friction force due to liquefaction of the ground and an increase in the specific gravity of the liquid material (water + soil), and the caisson may rise. Also, the horizontal force from the earthquake can cause one side of the caisson to lift and tilt.

前述のごときケーソンの浮き上がりを防止するため、従来側壁やスラブを厚くし、ケーソンの自重を増大させたり、ケーソンに水荷重を加えたりする技術がある。   In order to prevent the caisson from being lifted as described above, there is a conventional technique of thickening the side wall or slab to increase the caisson's own weight or applying a water load to the caisson.

しかし、ケーソンの側壁やスラブを厚くする技術では、コンクリート材料、鉄筋などの補強材の使用量が多くなり、コスト高を招くという問題があった。また、この従来技術ではケーソンの有効内径に対して外径が大きくなり、その分ケーソンを沈下させるための作業室底部の地盤の掘削量が多くなり、工期が長くなるという問題もあった。さらに、この従来技術では外径を同じに構築した場合、有効内径が小さくなるため、構造物としてその内部を使用する、例えばトンネルの発進立坑や換気坑、洪水時の地下貯留施設などの用途には、不向きであった。   However, the technology for thickening the caisson side walls and slabs has a problem in that the amount of use of reinforcing materials such as concrete materials and reinforcing bars increases, resulting in high costs. In addition, this prior art has a problem that the outer diameter is larger than the effective inner diameter of the caisson, and the excavation amount of the ground at the bottom of the working chamber for sinking the caisson increases accordingly, resulting in a longer construction period. Furthermore, in this prior art, when the outer diameter is the same, the effective inner diameter is reduced, so that the inside is used as a structure, for example, for use in tunnel start shafts, ventilation shafts, underground storage facilities during floods, etc. Was unsuitable.

一方、ケーソンに水荷重を加える技術では、荷重水を除去すると、沈設したケーソンの浮き上がりを防止できないという問題があった。   On the other hand, the technique of applying a water load to the caisson has a problem that if the loaded water is removed, the caisson that has been laid cannot be prevented from lifting.

ところで、作業室底部の地盤を掘削し、ケーソンを沈下させる作業時に、ケーソンの浮き上がりを防止するための技術として、従来例えば特許第3439859号公報や特開2001−11867号公報に記載の技術がある。   By the way, as a technique for preventing the caisson from lifting when excavating the ground at the bottom of the working chamber and sinking the caisson, there are conventional techniques described in, for example, Japanese Patent No. 3439859 and Japanese Patent Application Laid-Open No. 2001-11867. .

前掲特許第3439859号公報に記載の技術では、ケーソンの作業室スラブに、互いに所定の間隔をおいて複数個のアンカ通し用の穴を設け、これらの穴と同数配置されかつ下端部を地盤に固定したアンカ材を、前記穴に貫通させ、各穴とアンカ材間の空隙部に充填材を注入してシールする密閉式アンカ通し装置を設け、前記作業室スラブ上に前記アンカ材に対応させて圧入用ジャッキを設置し、当該圧入用ジャッキにアンカ材を連結し、ケーソンの作業室底部の地盤を掘削しながら圧入用ジャッキによりアンカ材を反力としてケーソンを地盤に圧入し、沈設するようにしている。   In the technique described in the aforementioned Japanese Patent No. 3439859, a plurality of anchor passage holes are provided in the work room slab of the caisson at predetermined intervals, the same number of these holes are arranged, and the lower end portion is formed on the ground. A fixed anchor passage device is provided for passing a fixed anchor material through the hole and injecting a filler into a gap between each hole and the anchor material to seal the anchor material on the working chamber slab. Install the press-fit jack, connect the anchor material to the press-fit jack, drill the ground at the bottom of the caisson's work room, press the caisson into the ground using the anchor material as a reaction force, and then sink I have to.

しかしながら、前掲特許第3439859号公報に記載の技術では、作業室底部の地盤を掘削してケーソンを沈下させる作業時、既に作業室内にアンカ材が貫通しているため、作業室底部の掘削の邪魔になるという問題があった。特に、機械掘削の場合には掘削バケットの旋回に制約を受け、作業室底部の地盤掘削の能率の低下を招いていた。また、掘削バケットの旋回時に、アンカ材を引き抜いてしまったり、破損させたりするおそれがあった。したがって、アンカ材を設置した場合でも、アンカ材の耐力が低下し、ケーソンの浮き上がりを効果的に防止することができなかった。   However, in the technique described in the above-mentioned Japanese Patent No. 3439859, when excavating the ground at the bottom of the working chamber and sinking the caisson, the anchor material has already penetrated into the working chamber, so that the excavation of the bottom of the working chamber is obstructed. There was a problem of becoming. In particular, in the case of mechanical excavation, the excavation bucket swivels is restricted, and the efficiency of ground excavation at the bottom of the working chamber is reduced. In addition, the anchor material may be pulled out or damaged when the excavation bucket is turned. Therefore, even when the anchor material is installed, the proof stress of the anchor material is lowered, and the caisson cannot be effectively prevented from being lifted.

他方、前掲特開2001−11867号公報に記載の技術では、ケーソンを設定すべき地盤に、適当な間隔を隔てて複数個の縦孔を穿設し、各縦孔に下部アンカ部材を挿入し、各縦孔内における下部アンカ部材の周りにグラウトを注入し、このグラウトの固化により下部アンカ部材を、ケーソンを設定すべき地盤内に固定する。一方、ケーソンの作業室スラブに、前記下部アンカ部材の位置に対応させて複数本の上部アンカ部材を配置するとともに、作業室スラブに各上部アンカ部材の上端部を埋設し固定している。そして、相互に対応する上部アンカ部材の下端部と下部アンカ部材の上端部とを、それぞれ連結手段により結合するようにしている。   On the other hand, in the technique described in the aforementioned Japanese Patent Application Laid-Open No. 2001-11867, a plurality of vertical holes are formed at appropriate intervals in the ground where the caisson is to be set, and a lower anchor member is inserted into each vertical hole. The grout is injected around the lower anchor member in each vertical hole, and the lower anchor member is fixed in the ground where the caisson is to be set by solidifying the grout. On the other hand, a plurality of upper anchor members are arranged in the work chamber slab of the caisson so as to correspond to the positions of the lower anchor members, and the upper end portions of the upper anchor members are embedded and fixed in the work chamber slab. Then, the lower end portion of the upper anchor member and the upper end portion of the lower anchor member corresponding to each other are coupled by the connecting means.

しかしながら、前掲特開2001−11867号公報に記載の技術では、ケーソンを設定すべき位置に、あらかじめ下部アンカ部材を地盤に固定した後、作業室スラブに固定された上部アンカ部材を有するケーソンを設置し、上・下部アンカ部材を連結手段により結合するようにしているため、上・下部アンカ部材の平面上の位置を互いに結合しやすい精度に合わせることがきわめて困難であり、上・下部アンカ部材の結合に多くの時間を要することが想定される。また、前述の上・下部アンカ部材の結合作業が、ニューマチックケーソンでは高気圧下での作業となるので、作業員に高気圧障害を与えるおそれがある。さらに、この特開2001−11867号公報に記載の技術においても、作業室底部の地盤を掘削しケーソンを沈下させる作業時に、作業室内にアンカ部材が貫通しているため、前述の特許第3439859号公報に記載された技術と同様の問題があった。
特許第3439859号公報 特開2001−11867号公報
However, in the technique described in the aforementioned Japanese Patent Application Laid-Open No. 2001-11867, a caisson having an upper anchor member fixed to a working chamber slab is installed at a position where a caisson should be set in advance after fixing the lower anchor member to the ground. In addition, since the upper and lower anchor members are coupled by the connecting means, it is extremely difficult to match the positions of the upper and lower anchor members on the plane to the accuracy with which the upper and lower anchor members are easily coupled to each other. It is assumed that a long time is required for the coupling. In addition, the above-described upper / lower anchor member joining operation is performed under high atmospheric pressure in the pneumatic caisson, and there is a risk of high atmospheric pressure damage to workers. Further, even in the technique described in Japanese Patent Application Laid-Open No. 2001-11867, since the anchor member penetrates into the working chamber when excavating the ground at the bottom of the working chamber and sinking the caisson, the aforementioned Japanese Patent No. 3439859 is disclosed. There was a problem similar to the technique described in the publication.
Japanese Patent No. 3439859 JP 2001-11867 A

本発明は、上記の事情に鑑みなされたもので、その目的とするところは、所定深さに沈設されたニューマチックケーソンの浮き上がりを、浮き上がり防止装置自体の機能により、将来に亘って確実に防止でき、かつ作業室スラブの上方で、すなわち大気圧下で構築し得る浮き上がり防止装置を有するニューマチックケーソンの施工方法を提供することにある。 The present invention has been made in view of the above circumstances, and its purpose is to reliably prevent the lifting of a pneumatic caisson set to a predetermined depth for the future by the function of the lifting prevention device itself. An object of the present invention is to provide a method for constructing a pneumatic caisson having a lifting prevention device that can be constructed and can be constructed above a work room slab, that is, under atmospheric pressure.

また、本発明の他の目的は前記浮き上がり防止装置を有するニューマチックケーソンを、作業室スラブの上部より的確に施工でき、しかもスラブアンカホールの削孔により作業室スラブの鉄筋を傷付けるなどのトラブルを未然に防止し得るニューマチックケーソンの施工方法を提供することにある。 In addition , another object of the present invention is that the pneumatic caisson having the above-mentioned lifting prevention device can be accurately constructed from the upper part of the work room slab, and troubles such as damaging the rebar of the work room slab by drilling the slab anchor hole. The object is to provide a pneumatic caisson construction method that can be prevented in advance.

さらに、本発明の他の目的は地震時の水圧力によるニューマチックケーソンの転倒をも、確実に防止し得る浮き上がり防止装置を有するニューマチックケーソンの施工方法を提供することにある。 Furthermore, another object of the present invention is water pressure also falls pneumatic caisson by earthquake, there is provided a method of constructing the pneumatic caisson having a prevention device lifting can reliably prevented.

さらにまた、本発明の他の目的は作業室底部の地盤を掘削してニューマチックケーソンを沈下させる作業から永久アンカを設置する作業に至るまで、より一層能率良くかつ安定的に推進し得るニューマチックケーソンの施工方法を提供することにある。   Furthermore, another object of the present invention is a pneumatic that can be more efficiently and stably propelled from the work of excavating the ground at the bottom of the working room to sink the pneumatic caisson to the work of installing a permanent anchor. It is to provide a caisson construction method.

求項記載の発明は刃口3と作業室スラブ4とに囲まれた作業室5の上方に、作業室スラブ4と側壁7と上スラブ6とに囲まれた上部作業室8を形成し、上部作業室8の上方に、上スラブ6と側壁2とに囲まれた空間を形成してなるケーソンであって、作業室スラブ4の構築時にアンカ材が挿入可能で密封されたスラブアンカホール29を設置しておき、前記ケーソンを、所定深さに沈設し、作業室5内に底詰めコンクリート33を充填し、上部作業室8から、密封手段が装着されたスラブアンカホール29の密封手段を除去して底詰めコンクリート33と地盤G内に、水平方向に互いに所要の間隔をおいて、複数のアンカホール37を削孔して貫通させ、当該スラブアンカホール29とアンカホール37に、下方向に伸びるアンカ材38を挿入し、各アンカ材38の下部を地盤G内に定着させ、各アンカ材38に所定の緊張力を導入し、各アンカ材38の頭部を作業室スラブ4に固着し、永久アンカとして設置するようにしている。 Motomeko 1 inventions described is above the working chamber 5 surrounded by the cutting edge 3 and the working chamber slab 4, the upper working chamber surrounded by the upper slab 6 and work chamber slab 4 and the side wall 7 8 The caisson is formed by forming a space surrounded by the upper slab 6 and the side wall 2 above the upper working chamber 8, and the anchor material can be inserted and sealed when the working chamber slab 4 is constructed. leave installing slabs anchor holes 29, the caisson, and sinking to a predetermined depth, filling the bottom filling concrete 33 into the working chamber 5, the slab anchor hole 29 from the upper working chamber 8, the sealing means is mounted A plurality of anchor holes 37 are drilled and penetrated into the bottom-filled concrete 33 and the ground G at predetermined intervals in the horizontal direction, and the slab anchor holes 29 and the anchor holes 37 are removed. Next, anchor material 3 that extends downward Is inserted, the lower part of each anchor member 38 is fixed in the ground G, a predetermined tension is introduced into each anchor member 38, and the head of each anchor member 38 is fixed to the working chamber slab 4 as a permanent anchor. I try to install it.

求項2記載の発明は請求項1記載のニューマチックケーソンの施工方法において、刃口3と作業室スラブ4とに囲まれた作業室5の上方に、側壁7と上スラブ6とに囲まれた上部作業室8を形成し、上部作業室8の上方に、上スラブ6と側壁2とに囲まれた空間を形成したニューマチックケーソンにおいて、作業室底部の地盤Gを掘削してニューマチックケーソンを所定深さに沈設する作業ないしアンカ材38の下部を地盤Gに定着させ、頭部を作業室スラブ4に固着する作業が終了するまで、前記上スラブ6と側壁2とに囲まれた空間に、荷重水Wを入れまたは外部荷重を設置し、荷重を加えておくようにしている。 Inventions of Motomeko 2 wherein, in the method of constructing the pneumatic caisson according to claim 1, above the working chamber 5 surrounded by the cutting edge 3 and the working chamber slab 4, a side wall 7 and the upper slab 6 In the pneumatic caisson in which the upper working chamber 8 surrounded by the upper slab 6 and the side wall 2 is formed above the upper working chamber 8, the ground G at the bottom of the working chamber is excavated. Surrounded by the upper slab 6 and the side wall 2 until the operation of sinking the pneumatic caisson to a predetermined depth or the operation of fixing the lower part of the anchor material 38 to the ground G and fixing the head to the work chamber slab 4 is completed. Loaded water W or an external load is placed in the space, and the load is applied.

請求項3の発明は、請求項1記載のニューマチックケーソンの施工方法において、作業室スラブ4に鉛直方向および斜め方向にアンカ材を挿入可能としたスラブアンカホール29、29’を設け、該スラブアンカホール29、29’を通して各アンカ材38、38’の頭部を作業室スラブ4に固着し、永久アンカとして設置するようにしている。According to a third aspect of the present invention, in the pneumatic caisson construction method according to the first aspect, slab anchor holes 29 and 29 'are provided in the work chamber slab 4 so that anchor materials can be inserted in a vertical direction and an oblique direction. The heads of the anchor members 38, 38 'are fixed to the working chamber slab 4 through the anchor holes 29, 29', and are installed as permanent anchors.

本発明の請求項1記載の発明によれば、所定深さに沈設されたニューマチックケーソンにおいて、作業室スラブ4にあらかじめ設けられた複数個のスラブアンカホール29と、当該スラブアンカホール29から底詰めコンクリート33を通って地盤G内に削孔されたアンカホール37の組に、それぞれアンカ材38を挿入し、各アンカ材38の下部を地盤G内に定着させ、各アンカ材38に所定の緊張力を与え、各アンカ材38の頭部を作業室スラブ4に固着しているので、所定深さに沈設した後のニューマチックケーソンの浮き上がりを、浮き上がり防止装置自体の機能のみにより確実に防止し得る効果がある。また、この発明によれば複数本のアンカ材38の下部を地盤G内に定着させ、頭部を作業室スラブ4に固着し、永久アンカとして設置しているので、将来に亘ってニューマチックケーソンの浮き上がりを確実に防止し得る効果がある。さらに、この発明によれば作業室スラブ4の上部から施工できるので、作業員を高気圧下での苦渋作業から解放し得る効果がある。しかも、この発明では複数本のアンカ材38からなる永久アンカを、ニューマチックケーソンを所定深さに沈設した後に施工するので、これら複数本のアンカ材38が作業室底部の地盤Gの掘削の邪魔になる不具合を解消することができる。   According to the first aspect of the present invention, in the pneumatic caisson submerged to a predetermined depth, a plurality of slab anchor holes 29 provided in advance in the work chamber slab 4 and the bottom from the slab anchor hole 29 are provided. Anchor members 38 are inserted into sets of anchor holes 37 drilled in the ground G through the stuffed concrete 33, and the lower portions of the anchor members 38 are fixed in the ground G. Tension is applied, and the head of each anchor member 38 is fixed to the working chamber slab 4, so that the pneumatic caisson can be reliably prevented from rising after being set to a predetermined depth only by the function of the lifting prevention device itself. There is a possible effect. Further, according to the present invention, the lower part of the plurality of anchor members 38 is fixed in the ground G, the head is fixed to the work chamber slab 4, and is installed as a permanent anchor. There is an effect that can surely prevent the lifting of. Furthermore, according to this invention, since it can construct from the upper part of the working room slab 4, there exists an effect which can release an operator from the hard work under high atmospheric pressure. In addition, in the present invention, the permanent anchor made of a plurality of anchor materials 38 is constructed after the pneumatic caisson is set to a predetermined depth, so that the plurality of anchor materials 38 obstruct the excavation of the ground G at the bottom of the working chamber. Can be solved.

求項記載の発明では、作業室スラブ4の構築時に、水平方向に所要の間隔をおいてあらかじめスラブアンカホール29を設けておき、アンカホールを削孔するまでは、各スラブアンカホール29を密閉しておく。この状態で、ニューマチックケーソンを所定深さに沈設し、作業室5内に底詰めコンクリート33を充填する。ついで、各スラブアンカホール29から密封手段を除去して底詰めコンクリート33を通って地盤G内にアンカホール37を削孔する。そして、各スラブアンカホール29とアンカホール37の組にアンカ材38を挿入し、各アンカ材38の下部を地盤Gに定着させ、各アンカ材38に所定の緊張力を与え、各アンカ材38の頭部を作業室スラブ4に固着し、永久アンカとして設置する。したがって、この発明によればニューマチックケーソンの浮き上がり装置を、作業室スラブ4の上部より的確に施工し得る効果がある。また、この発明によれば作業室スラブ4にあらかじめスラブアンカホール29を設けているので、削孔による作業室スラブ4の鉄筋を傷付けるなどのトラブルを未然に防止できるし、作業能率の向上を図り得る効果もある。さらに、この発明によれば作業室スラブ4の上部から施工できるので、作業員を高気圧下での苦渋作業から開放し得る効果がある。しかも、この発明では複数本のアンカ材38からなる永久アンカを、ニューマチックケーソンを所定深さに沈設した後に施工するので、これら複数本のアンカ材38が作業室底部の地盤Gの掘削の邪魔になる不具合を解消することができる。 In the invention Motomeko 1 wherein, during construction of the working chamber slab 4, may be provided a slab anchor holes 29 in advance at a required interval in the horizontal direction, until the drilling anchor holes, each slab anchor hole 29 Keep sealed. In this state, a pneumatic caisson is set to a predetermined depth, and the bottomed concrete 33 is filled into the working chamber 5. Next, the sealing means is removed from each slab anchor hole 29 and the anchor hole 37 is drilled in the ground G through the bottomed concrete 33. Then, an anchor material 38 is inserted into each slab anchor hole 29 and anchor hole 37, the lower portion of each anchor material 38 is fixed to the ground G, a predetermined tension is applied to each anchor material 38, and each anchor material 38 is fixed. Is fixed to the working room slab 4 and installed as a permanent anchor. Therefore, according to the present invention, there is an effect that the lifting device for the pneumatic caisson can be accurately constructed from the upper part of the working chamber slab 4. Further, according to the present invention, since the slab anchor hole 29 is provided in the work chamber slab 4 in advance, troubles such as damaging the reinforcing bars of the work chamber slab 4 due to drilling can be prevented and work efficiency can be improved. There is also an effect to obtain. Furthermore, according to this invention, since it can construct from the upper part of the working room slab 4, there exists an effect which can open | release a worker from the hard work under high atmospheric pressure. In addition, in the present invention, the permanent anchor made of a plurality of anchor materials 38 is constructed after the pneumatic caisson is set to a predetermined depth, so that the plurality of anchor materials 38 obstruct the excavation of the ground G at the bottom of the working chamber. Can be solved.

求項記載の発明では、作業室底部の地盤Gを掘削してニューマチックケーソンを所定深さに沈設する作業ないしアンカ材38の下部を地盤Gに定着させ、頭部を作業室スラブ4に固着する作業が終了するまで、上スラブ6と側壁2とに囲まれた空間に、荷重水Wを入れまたは外部荷重を設置し、荷重を加えるようにしている。したがって、この発明によれば作業室底部の地盤Gを掘削してニューマチックケーソンを沈下させる作業から永久アンカを設置する作業に至るまで、より一層能率良くかつ安定的に推進し得る効果がある。 Motomeko In the invention of the second aspect, the working chamber bottom the lower part of the work to anchor member 38 to the ground G and drilled to sinking the pneumatic caisson to a predetermined depth is fixed on the ground G of the working chamber slabs 4 the head Until the work of fixing to is finished, the load water W is put in the space surrounded by the upper slab 6 and the side wall 2 or an external load is applied to apply the load. Therefore, according to the present invention, there is an effect that it can be promoted more efficiently and stably from the operation of excavating the ground G at the bottom of the working chamber to sink the pneumatic caisson to the operation of installing the permanent anchor.

求項記載の発明によれば、作業室スラブ4に鉛直方向のスラブアンカホールと斜め方向のスラブアンカホール29とを設け、当該スラブアンカホール29、29’から底詰めコンクリート33を通って地盤G内にアンカホール37、37’を削孔し、鉛直方向のスラブアンカホール29とアンカホール37の組にはアンカ材38を、斜め方向のスラブアンカホール29’とアンカホール37’の組にはアンカ材38’をそれぞれ挿入し、各アンカ材38、38’の下部を地盤Gに定着させ、各アンカ材38、38’に緊張力を与え、各アンカ材38、38’の頭部を作業室スラブ4に固着し、永久アンカとして設置しているので、地震時の水圧力によるニューマチックケーソンの転倒をも、確実に防止する効果がある。 According to the invention Motomeko 3 wherein, through the working chamber slab 4 is provided a vertical slab anchor holes and the oblique direction of the slab anchor hole 29, bottom filling concrete 33 from the slab anchor holes 29, 29 ' Anchor holes 37 and 37 ′ are drilled in the ground G, the anchor slab anchor hole 29 ′ and the anchor hole 37 ′ in the diagonal direction are paired with the anchor material 38 in the pair of the slab anchor hole 29 and anchor hole 37 in the vertical direction Are inserted with anchor materials 38 ', the lower portions of the anchor materials 38, 38' are fixed to the ground G, tension is applied to the anchor materials 38, 38 ', and the heads of the anchor materials 38, 38' are provided. Is fixed to the working chamber slab 4 and installed as a permanent anchor, so that it is possible to reliably prevent the pneumatic caisson from overturning due to water pressure during an earthquake.

以下、本発明の実施例を図面に基づいて説明する。   Embodiments of the present invention will be described below with reference to the drawings.

図1〜図5は本発明の実施例1を示すもので、図1はニューマチックケーソンを所定の深さに沈設した状態における縦断正面図、図2は図1のA部分の拡大図、図3は作業室に底詰めコンクリートを充填した後、削孔機によりアンカホールを削孔している状態の一部縦断正面図、図4はニューマチックケーソンの浮き上がり防止装置を構築した状態の一部縦断正面図、図5は図4のB−B線横断平面図である。   1 to 5 show a first embodiment of the present invention. FIG. 1 is a longitudinal front view of a pneumatic caisson set to a predetermined depth. FIG. 2 is an enlarged view of a portion A in FIG. 3 is a partial front view of a state where an anchor hole is drilled by a drilling machine after filling the bottom-filled concrete into the working room, and FIG. 4 is a part of a state in which a pneumatic caisson lifting prevention device is constructed. FIG. 5 is a cross-sectional plan view taken along the line BB of FIG.

これら図1〜図5に示す実施例1では、ニューマチックケーソン1は側壁2の下部に刃口3と作業室スラブ4とに囲まれた作業室5が形成されている。   In the first embodiment shown in FIGS. 1 to 5, the pneumatic caisson 1 has a work chamber 5 surrounded by a blade edge 3 and a work chamber slab 4 at a lower portion of a side wall 2.

前記作業室5の上方には、図1に示すように、上スラブ6と側壁7とに囲まれた気閘室としての上部作業室8が形成されている。   An upper working chamber 8 is formed above the working chamber 5 as an air chamber surrounded by an upper slab 6 and a side wall 7 as shown in FIG.

上部作業室8は、図5に示すように、側壁7と隔壁9,10,11,12により、エレベータ室13とメンテナンスロック14とマンロック15とに区画されている。   As shown in FIG. 5, the upper working chamber 8 is divided into an elevator chamber 13, a maintenance lock 14, and a manlock 15 by a side wall 7 and partition walls 9, 10, 11, and 12.

前記作業室スラブ4における作業室5とメンテナンスロック14間には、図1,図3および図4に示すように、掘削土を排出するための排土バケットや、メンテナンスを行うための掘削機を通すためのハッチ17を有する通過口16が設けられている。   Between the working chamber 5 and the maintenance lock 14 in the working chamber slab 4, as shown in FIGS. 1, 3 and 4, there is a soil discharging bucket for discharging the excavated soil and an excavator for performing maintenance. A passage port 16 having a hatch 17 for passing therethrough is provided.

前記エレベータ室13とメンテナンスロック14間の隔壁10には、図5に示すように、ハッチ19を有する出入り口18が設けられている。   As shown in FIG. 5, the partition wall 10 between the elevator chamber 13 and the maintenance lock 14 is provided with an entrance 18 having a hatch 19.

前記エレベータ室13とマンロック15間には、図5に示すように、ハッチ21を有する出入り口20が設けられている。   As shown in FIG. 5, an entrance / exit 20 having a hatch 21 is provided between the elevator chamber 13 and the manlock 15.

上スラブ6におけるエレベータ室13の位置には、図1に示すように、エレベータシャフト22が立設されている。このエレベータシャフト22の上端部側には、出入り口23が設けられており、エレベータ室13内の下端部側には、出入り口24が設けられている。   As shown in FIG. 1, an elevator shaft 22 is erected at the position of the elevator chamber 13 in the upper slab 6. An entrance / exit 23 is provided on the upper end side of the elevator shaft 22, and an entrance / exit 24 is provided on the lower end side in the elevator chamber 13.

上スラブ6における前記出入り口16の中心線上には、図1および図5に示すように、マテリアルシャフト25が立設されている。このマテリアルシャフト25の上端部には、マテリアルロック26が取り付けられている。また、マテリアルシャフト25の下端部はメンテナンスロック14に開口している。   As shown in FIGS. 1 and 5, a material shaft 25 is erected on the center line of the doorway 16 in the upper slab 6. A material lock 26 is attached to the upper end portion of the material shaft 25. Further, the lower end portion of the material shaft 25 is open to the maintenance lock 14.

さらに、上スラブ6におけるマンロック15の位置には、図5に示すように、人がマンロックから作業室5へ出入するためのハッチを備えた出入り口27が設けられている。   Further, as shown in FIG. 5, an entrance 27 having a hatch for a person to enter and exit the work chamber 5 from the manlock is provided at the position of the manlock 15 in the upper slab 6.

前記作業室スラブ4を構築する過程で、図1,図3および図4に示すように、水平方向に所要の間隔をおいてアンカパイプ28を複数個組み込んだ後、作業室スラブ4を構築している。   In the process of constructing the working chamber slab 4, as shown in FIGS. 1, 3, and 4, after incorporating a plurality of anchor pipes 28 at a required interval in the horizontal direction, the working chamber slab 4 is constructed. ing.

各アンカパイプ28の内部は、図2に示すように、スラブアンカホール29として用いられるようになっている。   The inside of each anchor pipe 28 is used as a slab anchor hole 29 as shown in FIG.

各スラブアンカホール29には、図2に示すように、めねじ30が形成されている。また、各スラブアンカホール29には上蓋31が装着されている。各上蓋31には、おねじ32が設けられている。しかして、各上蓋31は図2から分かるように、前記めねじ30とおねじ32の螺合を介して当該アンカパイプ28に着脱自在に装着され、かつ当該アンカパイプ28に装着された状態において当該スラブアンカホール29を密封し得るようになっている。   Each slab anchor hole 29 is formed with a female screw 30 as shown in FIG. Each slab anchor hole 29 is provided with an upper lid 31. Each upper lid 31 is provided with a male screw 32. As can be seen from FIG. 2, each upper lid 31 is detachably attached to the anchor pipe 28 through the threaded engagement of the female screw 30 and the male screw 32, and the upper lid 31 is attached to the anchor pipe 28. The slab anchor hole 29 can be sealed.

ところで、この実施例1ではニューマチックケーソン1としてニューマチックケーソンを対象としている。   By the way, in the first embodiment, the pneumatic caisson 1 is a pneumatic caisson.

そして、作業室5内に底詰めコンクリートを充填後、この底詰めコンクリートを貫いて地盤内にアンカホールを削孔する作業を開始するまで、各スラブアンカホール29を当該上蓋31により密封しておく。   Then, after filling the bottom-filled concrete into the working chamber 5, each slab anchor hole 29 is sealed with the upper lid 31 until an operation of drilling the anchor hole in the ground through the bottom-filled concrete is started. .

前述のごとく、ニューマチックケーソン1を所定の位置に設置し、各スラブアンカホール29を密封した状態で、通常の工法により作業室5の底部の地盤Gを掘削し、ニューマチックケーソン1の自重と荷重水Wの水荷重とにより、図1に示すように、ニューマチックケーソン1を所定の深さ位置Sに沈設する。   As described above, the pneumatic caisson 1 is installed at a predetermined position, and each ground slab anchor hole 29 is sealed, and the ground G at the bottom of the working chamber 5 is excavated by a normal construction method. As shown in FIG. 1, the pneumatic caisson 1 is sunk at a predetermined depth position S by the water load of the load water W.

次に、作業室5内に図3に示すごとく、底詰めコンクリート33を充填し、断気(高圧空気の使用を終了)する。   Next, as shown in FIG. 3, the bottom-filled concrete 33 is filled in the working chamber 5 and the air is cut off (use of high-pressure air is terminated).

そして、マテリアルシャフト25から図1に示すマテリアルロック26を撤去する。ついで、分割した状態で削孔機34をマテリアルシャフト25から上部作業室8内に投入する。この削孔機34は、ロッド用の回転駆動部(図示省略)と、これに連結されたロッド35と、このロッド35の下端部に設けられたビット36等を有している。かかる削孔機34を、上部作業室8内で組み立てる。   Then, the material lock 26 shown in FIG. 1 is removed from the material shaft 25. Next, the hole drilling machine 34 is put into the upper working chamber 8 from the material shaft 25 in a divided state. The drilling machine 34 includes a rod rotation driving unit (not shown), a rod 35 connected thereto, a bit 36 provided at the lower end of the rod 35, and the like. Such a drilling machine 34 is assembled in the upper working chamber 8.

ついで、前記削孔機34を作業室スラブ4上における所定の削孔位置のスラブアンカホール29上に設置する。   Next, the drilling machine 34 is installed on the slab anchor hole 29 at a predetermined drilling position on the work chamber slab 4.

そして、削孔位置のスラブアンカホール29を密封している上蓋31を撤去する。   Then, the upper lid 31 sealing the slab anchor hole 29 at the drilling position is removed.

ついで、図3に示すように、削孔機34により作業室スラブ4上から当該スラブアンカホール29よりロッド35を導入し、ビット36により底詰めコンクリート33を貫いて地盤G内に下方向に所定深さのアンカホール37を削孔する。掘削機34は自走式であると掘削作業が効率的に行うことができるので好適である。   Next, as shown in FIG. 3, the rod 35 is introduced from the slab anchor hole 29 from above the work chamber slab 4 by the hole drilling machine 34, and penetrated into the bottom-filled concrete 33 by the bit 36 and predetermined downward in the ground G. A depth anchor hole 37 is drilled. The excavator 34 is preferably self-propelled because excavation work can be performed efficiently.

このようにして、当該スラブアンカホール29に貫通する図5にアンカ材38で示す位置の全部のアンカホール37を削孔後、削孔機34を分割し、上部作業室8からマテリアルシャフト25を通じて撤去する。   In this way, after drilling all the anchor holes 37 at the positions indicated by the anchor material 38 in FIG. 5 that penetrates the slab anchor hole 29, the hole drill 34 is divided, and the upper working chamber 8 passes through the material shaft 25. Remove.

ついで、グラウト注入機(図示省略)により作業室スラブ4上から当該スラブアンカホール29を経てアンカホール37にグラウトモルタルを注入する。   Next, grout mortar is injected into the anchor hole 37 from the work chamber slab 4 through the slab anchor hole 29 by a grout injection machine (not shown).

アンカホール37にグラウトモルタルを注入後、押し込み装置等(図示省略)により作業室スラブ4上から当該スラブアンカホール29とアンカホール37で形成されたグランドアンカホールに、下方向にアンカ材38を挿入する。アンカ材38の挿入は掘削機34の駆動装置を使用することもできる。   After injecting grout mortar into the anchor hole 37, an anchor material 38 is inserted downward from the work chamber slab 4 into the ground anchor hole formed by the slab anchor hole 29 and the anchor hole 37 by a pushing device or the like (not shown). To do. The anchor member 38 can be inserted by using a driving device of the excavator 34.

前記アンカ材38には、PC鋼線、PC鋼棒、炭素繊維またはアラミド繊維などの線状体または棒状体を用いる。   As the anchor material 38, a linear body or a rod-shaped body such as a PC steel wire, a PC steel rod, carbon fiber or aramid fiber is used.

前述のごとく、スラブアンカホール29とアンカホール37で形成されたグランドアンカホールにアンカ材38を挿入し、各アンカ材38の下部をグラウトモルタルによりアンカホール37における地盤G内の部分に定着させる。かかるアンカ材38の定着部を、図4に符号39で示す。   As described above, the anchor material 38 is inserted into the ground anchor hole formed by the slab anchor hole 29 and the anchor hole 37, and the lower portion of each anchor material 38 is fixed to a portion of the ground hole G in the anchor hole 37 by the grout mortar. The fixing portion of the anchor material 38 is indicated by reference numeral 39 in FIG.

アンカホール37の地盤G内の部分にアンカ材38の下部のアンカ体39を定着させた後、アンカ材38を緊張用ジャッキ(図示省略)によりアンカ材38を引っ張り、各アンカ材38に所定の緊張力を付与する。   After the anchor body 39 below the anchor material 38 is fixed to a portion of the ground hole G in the anchor hole 37, the anchor material 38 is pulled by a tension jack (not shown), and each anchor material 38 has a predetermined predetermined width. Give tension.

各アンカ材38に所定の緊張力を与えた後、図4および図5に示すように、各アンカ材38の上端部にアンカプレート40を装着する。そして、各アンカ材38の上端部に形成されているおねじに、固着具としてのナット41を締結し、各アンカ材38の頭部を作業室スラブ4に固着し、各アンカ材38を永久アンカとして設置する。   After applying a predetermined tension to each anchor member 38, an anchor plate 40 is attached to the upper end portion of each anchor member 38 as shown in FIGS. 4 and 5. Then, a nut 41 as a fixing tool is fastened to the male screw formed at the upper end portion of each anchor member 38, and the head of each anchor member 38 is fixed to the working chamber slab 4, so that each anchor member 38 is permanently attached. Install as an anchor.

なお、上述の[0046]から[0053]までの記載のアンカホールの削孔からアンカ材の挿入・着定に至るまでの作業手順は、周知の各種グランドアンカ工法によってそれぞれ差異があり、技術の主要素のみを述べた。   The work procedure from the anchor hole drilling described in the above [0046] to [0053] to the insertion / fixing of the anchor material is different depending on the various known ground anchor methods. Only the main elements are mentioned.

そして、使用した機材や資材の残り等を、メンテナンスロック14からマテリアルシャフト25を通じてケーソン1の外部に搬出する。また、ケーソンを沈下させるために補った荷重水Wを排出し、用途に応じたケーソン1を構築する。   Then, the remaining equipment and materials used are carried out from the maintenance lock 14 to the outside of the caisson 1 through the material shaft 25. Moreover, the load water W supplemented in order to sink a caisson is discharged | emitted, and the caisson 1 according to a use is constructed | assembled.

以上のように構築した実施例1のケーソンによれば、水平方向に所要の間隔をおいて作業室スラブ4に設けられた複数個のスラブアンカホール29を通じて、底詰めコンクリート33と地盤G内にアンカホール37を削孔し、各アンカホール37にアンカ材38を挿入し、各アンカ材38の下部のアンカ体39を地盤Gに定着させ、各アンカ材38に所定の緊張力を付与し、各アンカ材38の頭部を作業室スラブ4に固着し、各アンカ材38を永久アンカとして設置し、ケーソンの浮き上がり防止装置としているので、この浮き上がり防止装置自体の持つ引き抜き抵抗力により、ケーソン1の浮き上がりを確実に防止することができる。したがって、ケーソンの側壁を厚くして、ケーソンの自重を増大させる必要がないため、材料の使用量を節減することができし、ケーソンを沈下させるときの、作業室底部の地盤の掘削量を相対的に少なくなし得るので、エネルギーの消費量をも節減できるし、工期を短縮することもできる。さらに、ケーソンの外径を同一に構築したときは、ケーソン内部の有効面積を広く取ることができる。   According to the caisson of the first embodiment constructed as described above, the bottom-filled concrete 33 and the ground G are passed through the plurality of slab anchor holes 29 provided in the work chamber slab 4 at a predetermined interval in the horizontal direction. The anchor holes 37 are drilled, the anchor material 38 is inserted into each anchor hole 37, the anchor body 39 below each anchor material 38 is fixed to the ground G, and a predetermined tension is applied to each anchor material 38. Since the heads of the anchor members 38 are fixed to the work chamber slab 4 and the anchor members 38 are installed as permanent anchors to serve as a caisson lift prevention device, the pull-out resistance of the lift prevention device itself causes the caisson 1 Can be reliably prevented. Therefore, it is not necessary to increase the caisson's own weight by increasing the thickness of the caisson's side wall, so that the amount of material used can be saved, and the excavation amount of the ground at the bottom of the work room when the caisson sinks is relatively As a result, energy consumption can be reduced and the construction period can be shortened. Furthermore, when the caisson has the same outer diameter, the effective area inside the caisson can be increased.

しかも、この実施例1ではケーソン1を所定深さに沈設した後に、浮き上がり防止装置を施工するようにしているので、アンカ材38が作業室底部の地盤Gの掘削時に邪魔になることがないし、アンカ材38が掘削バケットにより引き抜かれたり、破断や損傷を受けるなどのトラブルを回避することができる。   Moreover, in this embodiment 1, since the caliper 1 is set to a predetermined depth and then the lifting prevention device is constructed, the anchor material 38 does not become an obstacle when excavating the ground G at the bottom of the working chamber, Troubles such as the anchor material 38 being pulled out by the excavation bucket or being broken or damaged can be avoided.

また、ケーソン1を所定深さに沈設した後、作業室スラブ4の上部で浮き上がり防止装置を施工するようにしているので、ニューマチックケーソンにおいても、作業員を高気圧下での苦渋作業から解放することができる。   Moreover, since the anti-lifting device is installed on the upper part of the work room slab 4 after the caisson 1 is sunk to a predetermined depth, even in the pneumatic caisson, the worker is released from the troublesome work under high pressure. be able to.

通常、作業室スラブは圧気圧力に耐えられるようにするため、多くの鉄筋が配置され、かつ2m近くの厚さに構築されている。したがって、作業室スラブの構築後にアンカホールを削孔すると、削孔に多くの時間を要するばかりでなく、削孔機により鉄筋を傷めたり、反対に鉄筋により削孔機を傷めたりすることがある。   Usually, in order to be able to withstand the pressure pressure, the work room slab is provided with many rebars and is constructed with a thickness of about 2 m. Therefore, if the anchor hole is drilled after the construction of the working room slab, not only does it take a long time to drill, but the rebar may be damaged by the drilling machine, and conversely, the drilling machine may be damaged by the rebar. .

これに対して、この実施例1では作業室スラブ4の構築時に、水平方向に所要の間隔をおいて複数個のアンカパイプ28を組み込んでおき、各アンカパイプ28の内部をスラブアンカホール29として用いるようにしているので、作業室スラブ4への削孔を省略することができる。したがって、工期を短縮することができるし、削孔機により作業室スラブ4の鉄筋を傷めたり、鉄筋により削孔機を傷めたりするトラブルをすべて解消することができる。   On the other hand, in the first embodiment, when the work chamber slab 4 is constructed, a plurality of anchor pipes 28 are incorporated at a predetermined interval in the horizontal direction, and the inside of each anchor pipe 28 is used as a slab anchor hole 29. Since it uses, the drilling to the working chamber slab 4 can be omitted. Therefore, the construction period can be shortened, and all the troubles of damaging the reinforcing bar of the working chamber slab 4 with the hole drilling machine and damaging the hole drilling machine with the reinforcing bar can be solved.

次に、図6〜図9は本発明の実施例2を示すもので、図6はケーソンを所定の深さに沈設した状態における一部縦断正面図、図7は図6のC部分の拡大図、図8は作業室に底詰めコンクリートを充填後、削孔機によりアンカホールを削孔している状態の一部縦断正面図、図9はケーソンの浮き上がり防止装置を構築した状態の一部縦断正面図である。   Next, FIGS. 6 to 9 show a second embodiment of the present invention. FIG. 6 is a partially longitudinal front view of a caisson set to a predetermined depth, and FIG. 7 is an enlarged view of a portion C in FIG. Fig. 8, Fig. 8 is a partially longitudinal front view of a state where an anchor hole is drilled by a drilling machine after filling the bottom-filled concrete into the working room, and Fig. 9 is a part of a state in which a caisson lift prevention device is constructed. It is a vertical front view.

これら図6〜図9に示す実施例2では、作業室スラブ4を構築する過程で、作業室スラブ4のほぼ全域に、水平方向に所要の間隔をおいて、あらかじめ複数個のアンカパイプ28を組み込み、このアンカパイプ28を介してほぼ鉛直方向に貫通するスラブアンカホール29を設けている。そして、前記アンカパイプ28の群の周りには、互いに所要の間隔をおいて、あらかじめ複数個のアンカパイプ28’を、外側に向かって斜め方向に組み込み、このアンカパイプ28’を介して斜め方向に貫通するスラブアンカホール29’を設けている。すなわち、斜め方向のスラブアンカホール29’の列は、末広がりに設けられている。   In the second embodiment shown in FIGS. 6 to 9, in the process of constructing the work chamber slab 4, a plurality of anchor pipes 28 are preliminarily provided in the entire region of the work chamber slab 4 at a predetermined interval in the horizontal direction. A built-in slab anchor hole 29 is provided through the anchor pipe 28 in a substantially vertical direction. Around the group of anchor pipes 28, a plurality of anchor pipes 28 'are preliminarily assembled obliquely toward the outside at predetermined intervals, and oblique directions are formed via the anchor pipes 28'. Is provided with a slab anchor hole 29 'penetrating therethrough. That is, the row of slab anchor holes 29 'in the oblique direction is provided so as to widen toward the end.

前記ほぼ鉛直方向に組み込んだ各アンカパイプ28には、めねじ30とおねじ32の螺合を介して上蓋31を装着し、この上蓋31により各スラブアンカホール29を密閉している(図2参照)。また、前記斜め方向に組み込んだ各アンカパイプ28’には、図7に示すごとく、めねじ30’とおねじ32’の螺合を介して上蓋31’を装着し、この上蓋31’により各スラブアンカホール29’を密閉している。   Each anchor pipe 28 incorporated in the substantially vertical direction is fitted with an upper lid 31 through screwing of a female screw 30 and a male screw 32, and each slab anchor hole 29 is sealed by the upper lid 31 (see FIG. 2). ). Further, as shown in FIG. 7, an upper cover 31 ′ is attached to each anchor pipe 28 ′ incorporated in the oblique direction via a threaded engagement of a female screw 30 ′ and a male screw 32 ′, and each slab is attached by the upper cover 31 ′. The anchor hole 29 'is sealed.

この状態で、作業室スラブ4を構築するとともに、ケーソン1を構築する。   In this state, the work room slab 4 is constructed, and the caisson 1 is constructed.

前述のごとく構築したケーソン1を所定の位置に設置し、前記実施例1と同様の掘削作業によりケーソン1を所定の深さ位置Sに沈設する。   The caisson 1 constructed as described above is set at a predetermined position, and the caisson 1 is set at a predetermined depth position S by excavation work similar to the first embodiment.

ケーソン1を所定の深さに沈設した後、作業室5内に底詰めコンクリート33を充填する。   After the caisson 1 is sunk to a predetermined depth, the work chamber 5 is filled with bottom-filled concrete 33.

作業室5内に底詰めコンクリート33を充填した後、実施例1と同様、図1に示すマテリアルロック26を撤去し、削孔機を分割した状態でマテリアルシャフト25を通じて上部作業室8内に投入し、削孔機34を組み立てる。そして、削孔機34を作業室スラブ4上における所定のスラブアンカホール29または29’の位置に設置する。ついで、当該スラブアンカホール29または29’の上蓋31または31’を撤去する。   After filling the bottom filled concrete 33 into the working chamber 5, the material lock 26 shown in FIG. 1 is removed and the hole drilling machine is divided into the upper working chamber 8 through the material shaft 25 in the same manner as in the first embodiment. Then, the hole drilling machine 34 is assembled. Then, the drilling machine 34 is installed at a predetermined slab anchor hole 29 or 29 ′ on the work chamber slab 4. Next, the upper lid 31 or 31 'of the slab anchor hole 29 or 29' is removed.

ついで、図8に示すごとく、削孔機34により作業室スラブ4上から当該スラブアンカホール29または29’を通し、底詰めコンクリート33を貫いて地盤G内にほぼ鉛直方向に伸びるアンカホール37と、斜め方向に伸びるアンカホール37’とを削孔する。   Next, as shown in FIG. 8, an anchor hole 37 that passes through the bottom slab 33 through the slab anchor hole 29 or 29 ′ from the work chamber slab 4 by the hole drilling machine 34 and extends into the ground G substantially vertically. An anchor hole 37 ′ extending in an oblique direction is drilled.

アンカホール37,37’を削孔した後、各アンカホール37,37’にグラウトモルタルを注入する。   After drilling the anchor holes 37, 37 ', grout mortar is injected into each anchor hole 37, 37'.

各アンカホール37,37’にグラウトモルタルを注入後、作業室スラブ4上から当該スラブアンカホール29とアンカホール37によって形成されたグランドアンカホールにはアンカ材38を挿入し、当該スラブアンカホール29’とアンカホール37’にはアンカ材38’を挿入し、各アンカ材38,38’の下部のアンカ体39、39’をグラウトモルタルにより地盤G内のアンカホール37,37’に定着させる。   After injecting grout mortar into each anchor hole 37, 37 ′, an anchor material 38 is inserted into the ground anchor hole formed by the slab anchor hole 29 and the anchor hole 37 from above the work chamber slab 4, and the slab anchor hole 29 Anchor materials 38 'are inserted into' and anchor holes 37 ', and anchor bodies 39, 39' below the anchor materials 38, 38 'are fixed to the anchor holes 37, 37' in the ground G by grout mortar.

各アンカ材38,38’の下部を地盤G内の当該アンカホール37,37’に定着させた後、各アンカ材38,38’を引っ張り、所要の緊張力を付与する。   After the lower portions of the anchor members 38 and 38 'are fixed to the anchor holes 37 and 37' in the ground G, the anchor members 38 and 38 'are pulled to give a required tension.

ついで、各アンカ材38,38’の頭部を、アンカ材38,38’に形成されたおねじとナット41との螺合を介して作業室スラブ4に固着し、前記アンカ材38,38’を永久アンカとして設置し、ケーソンの浮き上がり防止装置を構築する。   Next, the heads of the anchor members 38, 38 ′ are fixed to the working chamber slab 4 through screwing of the male screw formed on the anchor members 38, 38 ′ and the nut 41, and the anchor members 38, 38 are fixed. 'Is installed as a permanent anchor and a caisson lift prevention device is constructed.

以上のように構築したケーソンの浮き上がり防止装置によれば、ほぼ鉛直方向に挿入し,定着させた複数本のアンカ材38のほかに、斜め方向に挿入して末広がりに配置し,定着させた複数本のアンカ材38’を設置しているので、地震時の水平力によるケーソンの転倒を、より効果的に防止することができる。さらに、永久アンカとして引き抜き抵抗力が大きいため、荷重水W等の荷重を取り除いても、地下水による浮力や地震時の地盤液状化に伴う浮力の増大に打ち勝って、ケーソンの浮き上がりを確実に防止できるし、将来に亘ってケーソンの浮き上がりを効果的に防止することができる。   According to the caisson lifting prevention device constructed as described above, in addition to the plurality of anchor members 38 inserted and fixed substantially vertically, the plurality of anchor members 38 inserted in an oblique direction and arranged in a divergent manner are fixed. Since the anchor material 38 'is installed, the fall of the caisson due to the horizontal force at the time of an earthquake can be prevented more effectively. Furthermore, since the pulling resistance is large as a permanent anchor, even if the load such as the load water W is removed, it is possible to overcome the increase in buoyancy due to groundwater or liquefaction due to ground liquefaction during an earthquake, and to prevent the caisson from rising. In the future, the caisson can be effectively prevented from rising.

なお、この実施例2の他の構成,作用および効果については、前記実施例1と同様である。   Other configurations, operations, and effects of the second embodiment are the same as those of the first embodiment.

[その他の実施例]
本発明では、作業室スラブ4に設けられたスラブアンカホール29,29’を一時的に密封する手段は、上蓋31,31’を装着するものに限らず、作業室の圧気圧力に耐えられる強度と付着力を持つモルタルやセメントペーストを詰め込んでもよい。
[Other Examples]
In the present invention, the means for temporarily sealing the slab anchor holes 29, 29 ′ provided in the work chamber slab 4 is not limited to the one provided with the upper lids 31, 31 ′, but is strong enough to withstand the pressure pressure in the work chamber. Or mortar or cement paste with adhesive strength may be packed.

また、上スラブ6と側壁2とに囲まれた空間には、荷重水Wに替えて外部荷重を加えるようにしてもよい。外部荷重としては、例えば消波ブロックのごときコンクリート塊や、金属塊を用いる。また、外部荷重としては、仮設備用のケーソン外部アンカ材による圧入工法を用いることもできる。   Further, an external load may be applied to the space surrounded by the upper slab 6 and the side wall 2 instead of the load water W. As the external load, for example, a concrete block such as a wave-dissipating block or a metal block is used. Moreover, as an external load, the press-fitting method by the caisson external anchor material for temporary facilities can also be used.

さらには、アンカ材38,38’を固着する手段はアンカ材38,38’に設けられたおねじとナット41の螺合に限らず、例えば溶接により固着してもよい。   Further, the means for fixing the anchor members 38, 38 'is not limited to the male screw provided on the anchor members 38, 38' and the nut 41, and may be fixed by welding, for example.

実施例1において、ケーソンを所定の深さに沈設した状態における縦断正面図である。In Example 1, it is a longitudinal front view in the state where the caisson was sunk to a predetermined depth. 図1のA部分の拡大図である。It is an enlarged view of the A part of FIG. 実施例1において、作業室に底詰めコンクリートを充填した後、削孔機によりアンカホールを削孔している状態の一部縦断正面図である。In Example 1, it is a partially longitudinal front view of a state where an anchor hole is drilled by a drilling machine after filling the bottom filled concrete into the working chamber. 実施例1において、ケーソンの浮き上がり防止装置を構築した状態の一部縦断正面図である。In Example 1, it is a partial longitudinal cross-sectional front view of the state which constructed | assembled the caisson floating prevention apparatus. 図4のB−B線横断平面図である。It is a BB line crossing top view of FIG. 実施例2において、ケーソンを所定の深さに沈設した状態における一部縦断正面図である。In Example 2, it is a partial longitudinal cross-sectional front view in the state where the caisson was sunk to a predetermined depth. 図6のC部分の拡大図である。FIG. 7 is an enlarged view of a portion C in FIG. 6. 実施例2において、作業室に底詰めコンクリートを充填した後、削孔機によりアンカホールを削孔している状態の一部縦断正面図である。In Example 2, it is a partially longitudinal front view of the state where the anchor hole is drilled by the drilling machine after filling the bottom filled concrete into the working chamber. 同実施例2において、ケーソンの浮き上がり防止装置を構築した状態の一部縦断正面図である。In the Example 2, it is a partial longitudinal cross-sectional front view of the state which constructed | assembled the caisson raising prevention apparatus.

1 ケーソン
2 側壁
3 刃口
4 作業室スラブ
5 作業室
6 上スラブ
7 側壁
8 上部作業室
G 地盤
S ケーソンを沈設すべき所定の深さ位置
W 荷重水
28 ほぼ鉛直方向のアンカパイプ
28’ 斜め方向のアンカパイプ
29 ほぼ鉛直方向のスラブアンカホール
29’ 斜め方向のスラブアンカホール
31 スラブアンカホール29の密封用の上蓋
31’ スラブアンカホール29’の密封用の上蓋
33 底詰めコンクリート
37 ほぼ鉛直方向のアンカホール
37’ 斜め方向のアンカホール
38 アンカ材
38’ 斜め方向に挿入されたアンカ材
39 アンカ体(アンカ材の下部の定着部)
39’ アンカ体(アンカ材の下部の定着部)
41 アンカ材の頭部の固着具であるナット
DESCRIPTION OF SYMBOLS 1 Caisson 2 Side wall 3 Cutting edge 4 Working room slab 5 Working room 6 Upper slab 7 Side wall 8 Upper working room G Ground S Predetermined depth position where caisson should be laid W Load water 28 An almost vertical anchor pipe 28 'Diagonal direction Anchor pipe 29 of almost vertical slab anchor hole 29 'diagonal slab anchor hole 31 upper cover for sealing slab anchor hole 29' upper cover for sealing of slab anchor hole 29 '33 bottom-filled concrete 37 substantially vertical Anchor hole 37 'Anchor hole in an oblique direction 38 Anchor material 38' Anchor material inserted in an oblique direction 39 Anchor body (fixing portion under the anchor material)
39 'anchor body (fixing part under anchor material)
41 Nuts that are anchors for anchor heads

Claims (3)

刃口(3)と作業室スラブ(4)とに囲まれた作業室(5)の上方に、作業室スラブ(4)と側壁(7)と上スラブ(6)とに囲まれた上部作業室(8)を形成し、上部作業室(8)の上方に、上スラブ(6)と側壁(2)とに囲まれた空間を形成してなるケーソンであって、
作業室スラブ(4)の構築時にアンカ材が挿入可能で密封されたスラブアンカホール(29)を設置しておき、
前記ケーソンを、所定深さに沈設し、
作業室(5)内に底詰めコンクリート(33)を充填し、
上部作業室(8)から、密封手段が装着されたスラブアンカホール(29)の密封手段を除去して底詰めコンクリート(33)と地盤(G)内に、水平方向に互いに所要の間隔をおいて、複数のアンカホール(37)を削孔して貫通させ、
当該スラブアンカホール(29)とアンカホール(37)に、下方向に伸びるアンカ材(38)を挿入し、
各アンカ材(38)の下部を地盤(G)内に定着させ、各アンカ材(38)に所定の緊張力を導入し、各アンカ材(38)の頭部を作業室スラブ(4)に固着し、永久アンカとして設置する、
ことを特徴とするニューマチックケーソンの施工方法。
Above the work chamber (5) surrounded by the blade edge (3) and the work chamber slab (4), the upper work surrounded by the work chamber slab (4), the side wall (7) and the upper slab (6). A caisson that forms a chamber (8) and forms a space surrounded by an upper slab (6) and a side wall (2) above the upper working chamber (8),
A slab anchor hole (29) in which an anchor material can be inserted and sealed when the work room slab (4) is constructed is installed,
The caisson is set to a predetermined depth,
Fill the working chamber (5) with bottom-filled concrete (33),
From the upper working chamber (8), the sealing means of the slab anchor hole (29) to which the sealing means is attached is removed, and the required distance between the bottom-filled concrete (33) and the ground (G) is set horizontally. And drill a plurality of anchor holes (37),
Insert the downwardly extending anchor material (38) into the slab anchor hole (29) and the anchor hole (37),
The lower part of each anchor material (38) is fixed in the ground (G), a predetermined tension is introduced into each anchor material (38), and the head of each anchor material (38) is placed on the working room slab (4). Fixed and installed as a permanent anchor,
Pneumatic caisson construction method characterized by this.
請求項1記載のニューマチックケーソンの施工方法において、
作業室底部の地盤(G)を掘削してニューマチックケーソンを所定深さに沈設する作業ないしアンカ材(38)の下部を地盤(G)に定着させ、頭部を作業室スラブ(4)に固着する作業が終了するまで、前記上スラブ(6)と側壁(2)とに囲まれた空間に、荷重水(W)を入れまたは外部荷重を設置し、荷重を加えておく、
ことを特徴とするニューマチックケーソンの施工方法。
In the construction method of the pneumatic caisson according to claim 1,
Excavation of the ground (G) at the bottom of the working chamber to sink the pneumatic caisson to a predetermined depth or fixing the lower part of the anchor material (38) to the ground (G), and the head to the working room slab (4) Until the work of fixing is completed, in the space surrounded by the upper slab (6) and the side wall (2), load water (W) is placed or an external load is installed, and the load is applied.
Features and be Runi-menu pneumatic method of constructing the caissons that.
請求項1記載のニューマチックケーソンの施工方法において、In the construction method of the pneumatic caisson according to claim 1,
作業室スラブ(4)に鉛直方向および斜め方向にアンカ材を挿入可能としたスラブアンカホール(29)、(29’)を設け、Slab anchor holes (29), (29 ') are provided in the work chamber slab (4) to enable anchor materials to be inserted vertically and obliquely.
該スラブアンカホール(29)、(29’)を通して各アンカ材(38)、(38’)の頭部を作業室スラブ(4)に固着し、永久アンカとして設置する、The heads of the anchor members (38), (38 ') are fixed to the working chamber slab (4) through the slab anchor holes (29), (29') and installed as permanent anchors.
ことを特徴とするニューマチックケーソンの施工方法。Pneumatic caisson construction method characterized by this.
JP2006141412A 2006-05-22 2006-05-22 Pneumatic caisson construction method Active JP4481272B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2006141412A JP4481272B2 (en) 2006-05-22 2006-05-22 Pneumatic caisson construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2006141412A JP4481272B2 (en) 2006-05-22 2006-05-22 Pneumatic caisson construction method

Publications (2)

Publication Number Publication Date
JP2007309043A JP2007309043A (en) 2007-11-29
JP4481272B2 true JP4481272B2 (en) 2010-06-16

Family

ID=38842153

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2006141412A Active JP4481272B2 (en) 2006-05-22 2006-05-22 Pneumatic caisson construction method

Country Status (1)

Country Link
JP (1) JP4481272B2 (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS6070647U (en) * 1984-08-16 1985-05-18 大豊建設株式会社 Caisson worker lifting device
JPS6095033A (en) * 1983-10-28 1985-05-28 Mitsuo Shibata Sinking method of open caisson
JPH02282522A (en) * 1989-04-24 1990-11-20 Taisei Corp Floating construction to be provided on soft ground
JPH08177055A (en) * 1994-12-26 1996-07-09 Daiho Constr Co Ltd Press-in caisson
JP2001011867A (en) * 1999-07-01 2001-01-16 Shiraishi Corp Anchor structure of caisson and construction method therefor

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS6095033A (en) * 1983-10-28 1985-05-28 Mitsuo Shibata Sinking method of open caisson
JPS6070647U (en) * 1984-08-16 1985-05-18 大豊建設株式会社 Caisson worker lifting device
JPH02282522A (en) * 1989-04-24 1990-11-20 Taisei Corp Floating construction to be provided on soft ground
JPH08177055A (en) * 1994-12-26 1996-07-09 Daiho Constr Co Ltd Press-in caisson
JP2001011867A (en) * 1999-07-01 2001-01-16 Shiraishi Corp Anchor structure of caisson and construction method therefor

Also Published As

Publication number Publication date
JP2007309043A (en) 2007-11-29

Similar Documents

Publication Publication Date Title
KR101410471B1 (en) Method for buttom-up removal of underground retaining wall by using h-piles remained in earth retaining work of existed building
JP2009084919A (en) Ground excavating method
JP5282541B2 (en) How to prevent lifting of the lining body
CN103510540A (en) Construction method for reinforcing mortar rubble retaining wall and structure of mortar rubble retaining wall
KR100914158B1 (en) Process of blocking water penetration and blocking earth collapsing by using impermeable wall without strut
JP4593577B2 (en) Pneumatic caisson and its construction method
JP5986429B2 (en) Caisson and manufacturing method thereof
JP6523064B2 (en) Pipe type surface collapse prevention facility and construction method of pipe type surface collapse prevention facility
JP4451553B2 (en) Buoyancy prevention structure and construction method thereof
JP5976373B2 (en) Pile foundation reinforcement structure and reinforcement method
JP3752560B2 (en) Basic structure for constructing a new building in an existing basement and its construction method
JP3889750B2 (en) Face stabilization method in underground structure construction method
JP4481272B2 (en) Pneumatic caisson construction method
JP2007308951A (en) Method of constructing outer peripheral column by inverted construction method
JP2010248714A (en) Method for protecting pile hole wall
KR100711054B1 (en) A construction method of concrete retaining wall using anchor
JP6940081B2 (en) Lock structure, how to build the lock structure, and how to remove the lock structure
KR200308379Y1 (en) Dismemberment removal type nail composition
JP2017197910A (en) Construction method of earth retaining wall structure, and earth retaining wall structure
JP2001303592A (en) Method for installing and fixing block
JP5528200B2 (en) Groundwater level lowering method using well points
KR20100136900A (en) Reinforcing method for structure base
JP4911242B2 (en) Reinforcement structure of existing gravity quay
JP7233829B2 (en) Steel pipe pile type landslide prevention facility and method for forming steel pipe pile type landslide prevention facility
JP4780004B2 (en) Reinforcing and reinforcing method for existing quay and its reinforcing structure

Legal Events

Date Code Title Description
A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20080902

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20080924

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20081110

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20090106

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20090304

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20100316

A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20100317

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130326

Year of fee payment: 3

R150 Certificate of patent or registration of utility model

Ref document number: 4481272

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20140326

Year of fee payment: 4