JP4471142B2 JP2001193403A JP2001193403A JP4471142B2 JP 4471142 B2 JP4471142 B2 JP 4471142B2 JP 2001193403 A JP2001193403 A JP 2001193403A JP 2001193403 A JP2001193403 A JP 2001193403A JP 4471142 B2 JP4471142 B2 JP 4471142B2
Authority
JP
Japan
Prior art keywords
shield
water
earth
sediment
sand
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP2001193403A
Other languages
Japanese (ja)
Other versions
JP2003003503A (en
Inventor
広幸 伊藤
隆 中根
Original Assignee
ジャパントンネルシステムズ株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ジャパントンネルシステムズ株式会社 filed Critical ジャパントンネルシステムズ株式会社
Priority to JP2001193403A priority Critical patent/JP4471142B2/en
Publication of JP2003003503A publication Critical patent/JP2003003503A/en
Application granted granted Critical
Publication of JP4471142B2 publication Critical patent/JP4471142B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)
  • Excavating Of Shafts Or Tunnels (AREA)

Description

【0001】
【産業上の利用分野】
本発明は、水底にトンネルを建造する水底シールドに関するものである。
【0002】
【従来の技術】
シールド掘進機は、その先端のカッタの回転と、シールドジャッキによる推進力によって、地中を掘進するようになっている。
【0003】
ところで、海底や川底等の水底にトンネルを建造する場合、従来は水底面にシールド掘進機全体が埋没しており、カッタで水底土砂を掘削しながらその水底土砂をスクリュコンベヤによりシールドフレーム内に取り込んで排出して、掘進を行うようになっていた。
【0004】
【発明が解決しようとする課題】
しかしながら、上述のシールド掘進機では、水底や水底に近い場所を掘進するため、水底土砂を過剰に取り込んだ場合に、水底面からシールド掘進機前端のスクリュコンベヤの開口部に繋がる水みちができることがある。このようにスクリュコンベヤの開口部に水みちが一旦できると、スクリュコンベヤから水が吸い込まれて、シールド掘進機内への水の吹き上げが発生して掘進ができなくなってしまうといった問題があった。
【0005】
そこで、本発明は、上記課題を解決するために案出されたものであり、その目的は、シールド内部への水の吹き上げが発生しない水底シールドを提供することにある。
【0006】
【課題を解決するための手段】
上記目的を達成するために、本発明は、水底にトンネルを建造する水底シールドにおいて、シールドフレームの先端の下側に前面の土砂を幅方向両側の水底面へ掻き分けるべく後方が上側に傾斜したくさび状の掻き分け部を備え、上側が水内に位置し、下側が水底土砂内に埋没して水底土砂を押し退けながら掘進するものである。
【0007】
上記構成によれば、上側が水内に位置し、下側が水底土砂内に埋没して、その前方の水底土砂を掻き分け部でシールドフレームの幅方向両側の水底面へ押し退けながら掘進するので、シールド内に土砂を取り込まなくてよい。従って、水底土砂を過剰に取り込むことがなく、水みちもできないので、シールド内に水が浸入することはなく、水の吹き上げも発生しない。
【0008】
そして、上記掻き分け部に、水底土砂を撹拌するためのカッタを設けたものが好ましい。
【0009】
また、上記掻き分け部に水底土砂の取込口を形成し、この土砂取込口に土砂を取り込んでシールドフレームの側面から水底面上に排出する排土装置を接続したものが好ましい。
【0010】
【発明の実施の形態】
以下本発明の好適な実施の形態を添付図面に基づいて詳述する。
【0011】
図1は本発明に係る水底シールドの好適な実施の形態を示した断面図、図2は本発明に係る水底シールドの好適な実施の形態を示した平面図、図3は本発明に係る水底シールドの好適な実施の形態を示した正面図である。
【0012】
まず、本実施の形態に係る水底シールドの構成を説明する。
【0013】
係る水底シールド1は、水底にトンネルを建造するものであって、図示するように、シールドフレーム2の先端の下側(本実施の形態では下側半分)に前面の土砂3を幅方向両側へ掻き分けるべく後方が上側に傾斜したくさび状の掻き分け部4を設け、上側(本実施の形態では上側半分)が水内に位置し、下側(本実施の形態では下側半分)が水底土砂3内に埋没して水底土砂3を押し退けながら掘進することを特徴としている。
【0014】
掻き分け部4は、シールドフレーム2の先端のバルクヘッド5の下側半分を、その下部が前方に突出して傾斜すると共に、幅方向中央部が稜線となるくさび状に形成して構成されている。掻き分け部4はシールドフレーム2の高さ方向中間部まで形成されている。掻き分け部4の上部となるバルクヘッド5の上側半分は、垂直で且つ幅方向中央部が稜線となるくさび状に形成されている。
【0015】
本実施の形態では、掻き分け部4に、水底土砂3を撹拌するカッタ6が設けられている。カッタ6は、一般的な形状のものが用いられる。本実施の形態では、揺動式のスポーク型カッタが用いられている。
【0016】
カッタ6は、バルクヘッド5を貫通して設けられたカッタ回転軸7を有している。カッタ回転軸7の先端には、その径方向に延びるカッタスポーク8が設けられている。カッタ回転軸7の後部には、カッタ回転軸7を回転させるためのモータ9が設けられている。カッタ6は、幅方向左右に隣接して2機設けられており、カッタスポーク8の回転軌道が互いにラップするように配置されている。各カッタ6はそれぞれのカッタスポーク8が干渉しないように、同期して所定角度揺動する(図3中、破線にて示す)ようになっている。
【0017】
なお、カッタ6の形状は、上記形状に限られるものではなく、回転式のカッタ等、他の形状であってもよい。
【0018】
カッタ6の下部の掻き分け部4には、水底土砂3の取込口11が形成されている。この土砂取込口11には、水底土砂3を水底シールド1内に一旦取り込んで、シールドフレーム2の側面から水底面12上に排出する排土装置14が接続されている。
【0019】
排土装置14は、土砂取込口11に接続されるツインスクリュ15と、このツインスクリュ15からシールドフレーム2の側面に形成された土砂排出口16に繋がる排土用配管17とを備えている。ツインスクリュ15は、止水性とポンプ機能とを備えており、土砂取込口11から取り込んだ水底土砂3を排土用配管17に送り出すようになっている。土砂取込口11及びツインスクリュ15は、各カッタ6ごとに設けられている。土砂排出口16は、シールドフレーム2の左右両側面に形成されており、各ツインスクリュ15にて取り込まれた水底土砂3を、水底シールド1の左右の水底面12上に均等に排出して、水底面12の乱れを低減するようになっている。
【0020】
なお、図1中、18は、水底シールド1を推進させるためのシールドジャッキ、19は、セグメントをそれぞれ示す。シールドジャッキ18は、軸方向に延びて配置され、シールドフレーム2の内周面に周方向に所定ピッチで、複数設けられている。
【0021】
次に、上記構成に係る水底シールド1の作用を説明する。
【0022】
水底シールド1は、その上側半分が水内に位置し、下側半分が水底土砂内に埋没して掘進する。
【0023】
水底土砂3が比較的軟弱な場合には、排土装置14は作動させずに、カッタ6で、水底シールド1の前面の水底土砂3を撹拌しながら、シールドジャッキ18で水底シールド1を推進させる。このとき、水底土砂3は、ラッセル車に雪が掻き分けられるように、掻き分け部4に沿って、左右上方に案内され、シールドフレーム2の左右の水底面12へと押し流される。
【0024】
以上のように、水底シールド1の上側半分が水内に位置し、下側半分が水底土砂内に埋没して、その前方の水底土砂3を掻き分け部4でシールドフレームの左右両側へ押し退けながら掘進するので、水底シールド1内に土砂を取り込まなくてよい。従って、水底土砂を過剰に取り込むことがなく、水みちもできないので、シールド内に水が浸入することはなく、水の吹き上げも発生しない。
【0025】
一方、水底土砂3が比較的硬く、撹拌された土砂が水底シールド1の推進の抵抗となる場合には、排土装置14を作動させながら、掘進を行う。このとき、撹拌された水底土砂3の一部は、土砂取込口11からツインスクリュ15にて取り込まれ、土砂排出口16からシールドフレーム2の左右の水底面12上に排出される。これによって、バルクヘッド2の前面の水底土砂3が減少して、残りの水底土砂3が、掻き分け部4を介して、スムーズにシールドフレーム2の左右の水底面12へと適宜押し流される。
【0026】
この場合、水底土砂3は、水底シールド1内に一旦取り込まれるが、止水性を備えたスクリュ(本実施の形態ではツインスクリュ)15及び排土用配管17を通して、土砂排出口16から機外に排出されるので、土砂取込口11に繋がる水みちができても、水が水底土砂3と共に、機外に排出されるので、機内へ水が浸入することはなく、水の吹き上げも発生しない。
【0027】
また、取り込んだ水底土砂3は、シールドフレーム2の左右の水底面12上に排土されるので、掘進により凸凹になった水底面12を平滑な状態に戻す役目を果たすこともできると共に、産業廃棄物となる掘削土砂が発生しないので、コスト的にも有利になる。
【0028】
なお、上記実施の形態の水底シールド1は、カッタ6や排土装置14を備えているが、水底土砂3の状態によっては、カッタ6や排土装置14を設けない水底シールド1であってもよい。
【0029】
また、上記実施の形態では、掻き分け部4はバルクヘッド5の高さ方向中央まで形成されているが、もっと上方まで形成するようにしてもよい。これによれば、水底土砂3が、組み立てられたセグメント19の上端近傍まで被さることとなり、トンネルが浮き上がろうとする力に対して有効となる。
【0030】
【発明の効果】
以上要するに本発明によれば、シールド内に水が浸入することはなく、水の吹き上げも発生しないといった優れた効果を発揮する。
【図面の簡単な説明】
【図1】本発明に係る水底シールドの好適な実施の形態を示した断面図である。
【図2】本発明に係る水底シールドの好適な実施の形態を示した平面図である。
【図3】本発明に係る水底シールドの好適な実施の形態を示した正面図である。
【符号の説明】
1 水底シールド
2 シールドフレーム
3 (水底)土砂
4 掻き分け部
6 カッタ
11 (土砂)取込口
12 水底面
14 排土装置
[0001]
[Industrial application fields]
The present invention relates to a bottom shield for building a tunnel in the bottom.
[0002]
[Prior art]
The shield machine digs through the ground by the rotation of the cutter at its tip and the propulsive force of the shield jack.
[0003]
By the way, when constructing a tunnel on the bottom of the sea, riverbed, etc., the entire shield excavator has been buried on the bottom of the water. It was supposed to be excavated and excavated.
[0004]
[Problems to be solved by the invention]
However, in the above-described shield machine, the water bottom or a place close to the water bottom is dug. is there. As described above, once a water channel is formed in the opening of the screw conveyor, water is sucked in from the screw conveyor, and there is a problem in that the water is blown into the shield machine and the excavation cannot be performed.
[0005]
Therefore, the present invention has been devised to solve the above problems, and an object of the present invention is to provide a bottom shield that does not cause water to blow into the shield.
[0006]
[Means for Solving the Problems]
To achieve the above object, according to the present invention, in a bottom shield for constructing a tunnel at the bottom of the water, the rear side is inclined upward to scrape the front earth and sand to the bottom of the water on both sides in the width direction below the tip of the shield frame. A wedge-shaped scraping section is provided, the upper side is located in the water, and the lower side is buried in the bottom sediment and digs while pushing the bottom sediment.
[0007]
According to the above configuration, the upper side is located in the water, the lower side is buried in the bottom sediment, and the front bottom sediment is dug while pushing away to the bottom surface on both sides in the width direction of the shield frame at the scraping part. It is not necessary to take earth and sand inside. Accordingly, the bottom sediment cannot be taken in excessively and no water can be drawn, so that water does not enter the shield and water does not blow up.
[0008]
And what provided the cutter for stirring water bottom earth and sand in the said scraping part is preferable.
[0009]
Moreover, it is preferable to form a bottom sediment intake in the scraping section, and to connect a soil removal device that takes the sediment into the sediment intake and discharges it from the side surface of the shield frame onto the bottom surface.
[0010]
DETAILED DESCRIPTION OF THE INVENTION
Preferred embodiments of the present invention will be described below in detail with reference to the accompanying drawings.
[0011]
FIG. 1 is a sectional view showing a preferred embodiment of a bottom shield according to the present invention, FIG. 2 is a plan view showing a preferred embodiment of the bottom shield according to the present invention, and FIG. 3 is a bottom view according to the present invention. It is the front view which showed suitable embodiment of the shield.
[0012]
First, the configuration of the bottom shield according to the present embodiment will be described.
[0013]
Such a bottom shield 1 is for constructing a tunnel in the bottom of the water. As shown in the drawing, the earth and sand 3 on the front side is placed on both sides in the width direction on the lower side (lower half in the present embodiment) of the tip of the shield frame 2. A wedge-shaped scraping portion 4 whose rear side is inclined upward is provided for scraping, and the upper side (the upper half in the present embodiment) is located in the water, and the lower side (the lower half in the present embodiment) is the bottom sediment. It is buried in 3 and digging while pushing away the bottom sediment 3.
[0014]
The scraping portion 4 is configured such that the lower half of the bulkhead 5 at the tip of the shield frame 2 is formed in a wedge shape in which the lower portion protrudes forward and the central portion in the width direction becomes a ridgeline. The scraping portion 4 is formed up to an intermediate portion in the height direction of the shield frame 2. The upper half of the bulkhead 5 that is the upper portion of the scraping portion 4 is formed in a wedge shape that is vertical and has a central portion in the width direction as a ridgeline.
[0015]
In the present embodiment, the scraping unit 4 is provided with a cutter 6 for stirring the bottom sediment 3. The cutter 6 has a general shape. In the present embodiment, a swing type spoke cutter is used.
[0016]
The cutter 6 has a cutter rotating shaft 7 provided through the bulkhead 5. A cutter spoke 8 extending in the radial direction is provided at the tip of the cutter rotating shaft 7. A motor 9 for rotating the cutter rotation shaft 7 is provided at the rear portion of the cutter rotation shaft 7. Two cutters 6 are provided adjacent to the left and right in the width direction, and are arranged so that the rotation tracks of the cutter spokes 8 wrap around each other. Each cutter 6 swings by a predetermined angle synchronously (indicated by a broken line in FIG. 3) so that the respective cutter spokes 8 do not interfere with each other.
[0017]
The shape of the cutter 6 is not limited to the above shape, and may be other shapes such as a rotary cutter.
[0018]
An intake 11 for the bottom sediment 3 is formed in the scraping portion 4 at the lower part of the cutter 6. The earth and sand intake 11 is connected to a soil discharging device 14 that once takes the bottom sediment 3 into the bottom shield 1 and discharges it from the side surface of the shield frame 2 onto the bottom surface 12.
[0019]
The earth discharging device 14 includes a twin screw 15 connected to the earth and sand intake port 11 and a pipe 17 for earth discharging connected from the twin screw 15 to an earth and sand outlet 16 formed on the side surface of the shield frame 2. . The twin screw 15 has a water-stopping function and a pump function, and sends out the bottom sediment 3 taken in from the earth-and-sand intake 11 to the soil discharge pipe 17. The earth and sand intake port 11 and the twin screw 15 are provided for each cutter 6. The earth and sand discharge ports 16 are formed on both the left and right side surfaces of the shield frame 2, and the bottom sediment 3 taken in by each twin screw 15 is uniformly discharged onto the left and right bottom surfaces 12 of the bottom shield 1. The disturbance of the water bottom surface 12 is reduced.
[0020]
In FIG. 1, 18 is a shield jack for propelling the bottom shield 1 and 19 is a segment. The shield jacks 18 are arranged extending in the axial direction, and a plurality of shield jacks 18 are provided on the inner peripheral surface of the shield frame 2 at a predetermined pitch in the circumferential direction.
[0021]
Next, the operation of the bottom shield 1 according to the above configuration will be described.
[0022]
The bottom shield 1 has its upper half located in the water and its lower half buried in the bottom soil and dug.
[0023]
When the bottom sediment 3 is relatively soft, the earth removal device 14 is not operated, and the bottom shield 1 is propelled by the shield jack 18 while stirring the bottom sediment 3 in front of the bottom shield 1 with the cutter 6. . At this time, the submarine earth and sand 3 is guided to the left and right upward along the scraping portion 4 so as to scrape snow into the Russell vehicle, and is pushed to the left and right bottom surfaces 12 of the shield frame 2.
[0024]
As described above, the upper half of the bottom shield 1 is located in the water and the lower half is buried in the bottom sediment, and the bottom sediment 3 in front of the bottom shield 1 is pushed away to the left and right sides of the shield frame by the scraping portion 4. Therefore, it is not necessary to take earth and sand into the bottom shield 1. Accordingly, the bottom sediment cannot be taken in excessively and no water can be drawn, so that water does not enter the shield and water does not blow up.
[0025]
On the other hand, when the bottom sediment 3 is relatively hard and the agitated sediment becomes resistance to propulsion of the bottom shield 1, excavation is performed while the soil removal device 14 is operated. At this time, a part of the agitated bottom sediment 3 is taken in by the twin screw 15 from the sediment intake 11 and discharged from the sediment outlet 16 onto the left and right bottom surfaces 12 of the shield frame 2. As a result, the bottom sediment 3 on the front surface of the bulkhead 2 is reduced, and the remaining bottom sediment 3 is smoothly pushed to the left and right bottom surfaces 12 of the shield frame 2 through the scraping portion 4 as appropriate.
[0026]
In this case, although the bottom sediment 3 is once taken into the bottom shield 1, it passes through a screw (in this embodiment, a twin screw) 15 having water-stopping properties and a soil discharge pipe 17 from the sediment discharge port 16 to the outside. Since it is discharged, even if there is a water channel connected to the earth and sand intake 11, water is discharged together with the bottom sediment 3 to the outside of the machine, so that water does not enter the machine and water does not blow up. .
[0027]
Moreover, since the taken-in bottom sediment 3 is discharged on the left and right bottom surfaces 12 of the shield frame 2, the bottom surface 12 that has become uneven due to the excavation can be returned to a smooth state. Since no excavated sediment is generated as waste, it is advantageous in terms of cost.
[0028]
In addition, although the bottom shield 1 of the said embodiment is equipped with the cutter 6 and the earth removal apparatus 14, even if it is the bottom shield 1 which does not provide the cutter 6 and the earth removal apparatus 14 depending on the state of the bottom earth sand 3 Good.
[0029]
In the above embodiment, the scraping portion 4 is formed up to the center in the height direction of the bulkhead 5, but it may be formed further up. According to this, the submarine earth and sand 3 covers the vicinity of the upper end of the assembled segment 19, which is effective against the force of the tunnel trying to lift up.
[0030]
【The invention's effect】
In short, according to the present invention, there is an excellent effect that water does not enter the shield and water does not blow up.
[Brief description of the drawings]
FIG. 1 is a cross-sectional view showing a preferred embodiment of a bottom shield according to the present invention.
FIG. 2 is a plan view showing a preferred embodiment of a bottom shield according to the present invention.
FIG. 3 is a front view showing a preferred embodiment of a water bottom shield according to the present invention.
[Explanation of symbols]
DESCRIPTION OF SYMBOLS 1 Water bottom shield 2 Shield frame 3 (Water bottom) Earth and sand 4 Scraping part 6 Cutter 11 (Earth and sand) Intake port 12 Water bottom 14 Earth removal device

Claims (3)

水底にトンネルを建造する水底シールドにおいて、シールドフレームの先端の下側に前面の土砂を幅方向両側の水底面へ掻き分けるべく後方が上側に傾斜したくさび状の掻き分け部を備え、上側が水内に位置し、下側が水底土砂内に埋没して水底土砂を押し退けながら掘進することを特徴とする水底シールド。In the bottom shield that builds a tunnel on the bottom of the water, a wedge-shaped scraping section with the rear sloped upward is provided below the tip of the shield frame to scrape the soil on the front to the bottom of the water on both sides in the width direction. A bottom shield that is located at the bottom and is buried in the bottom sediment and digs while pushing away the bottom sediment. 上記掻き分け部に、水底土砂を撹拌するためのカッタを設けた請求項1記載の水底シールド。The bottom shield according to claim 1, wherein a cutter for stirring the bottom sediment is provided in the scraping portion. 上記掻き分け部に水底土砂の取込口を形成し、この土砂取込口に土砂を取り込んでシールドフレームの側面から水底面上に排出する排土装置を接続した請求項1または2いずれかに記載の水底シールド。3. The bottom of the earth and sand is formed in the scraping section, and the earth removing device for connecting the earth and sand to the earth and sand intake and discharging it from the side of the shield frame onto the bottom of the water is connected. Underwater shield.
JP2001193403A 2001-06-26 2001-06-26 Underwater shield Expired - Lifetime JP4471142B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2001193403A JP4471142B2 (en) 2001-06-26 2001-06-26 Underwater shield

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2001193403A JP4471142B2 (en) 2001-06-26 2001-06-26 Underwater shield

Publications (2)

Publication Number Publication Date
JP2003003503A JP2003003503A (en) 2003-01-08
JP4471142B2 true JP4471142B2 (en) 2010-06-02

Family

ID=19031697

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2001193403A Expired - Lifetime JP4471142B2 (en) 2001-06-26 2001-06-26 Underwater shield

Country Status (1)

Country Link
JP (1) JP4471142B2 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110409497A (en) * 2019-06-21 2019-11-05 中交第二航务工程局有限公司 Construction method suitable for water-bed shallow embedding prefabrication and assembly construction tunnel

Also Published As

Publication number Publication date
JP2003003503A (en) 2003-01-08

Similar Documents

Publication Publication Date Title
JP4471142B2 (en) Underwater shield
US9745715B2 (en) Dredge with water-jet cutterhead
CN109208675B (en) Dredger and drag head structure thereof
CN114775718A (en) Dredging device that prevents blockking up in harbour channel
JP3934984B2 (en) Bullet culvert forming apparatus and method
JP4562662B2 (en) Rectangular cross-section machine
JPH04213694A (en) Jacking method of buried pipe without earth removal
JP3940681B2 (en) Rectangular cross-section excavator
JP3776815B2 (en) Shield machine
JPH0327081Y2 (en)
JP3047964B2 (en) Semi-shield machine and semi-shield method
JP3335535B2 (en) Shield excavator and muddy shield construction method
JP2808520B2 (en) Multiple tunnel excavator
JP3286200B2 (en) Shaft excavator
JP3306709B2 (en) Side hole construction machine
JP4531298B2 (en) Underwater shield shield machine
JPH0513808Y2 (en)
JP2005083007A (en) Method for laying square pipe
JPH07207746A (en) Sediment dredging device
JP3849201B2 (en) Shield machine
JPS5810761Y2 (en) trench excavator wheel
JP2808519B2 (en) Multiple tunnel excavator
JPH0652037B2 (en) Pipe dock replacement method
JP3773625B2 (en) Underground excavator
JP2722588B2 (en) Rectangular section shield machine

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20080424

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20100128

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20100202

A711 Notification of change in applicant

Free format text: JAPANESE INTERMEDIATE CODE: A712

Effective date: 20100203

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20100224

A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130312

Year of fee payment: 3

R150 Certificate of patent or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150