JP4136049B2 - Concrete pier construction method - Google Patents
Concrete pier construction method Download PDFInfo
- Publication number
- JP4136049B2 JP4136049B2 JP04041498A JP4041498A JP4136049B2 JP 4136049 B2 JP4136049 B2 JP 4136049B2 JP 04041498 A JP04041498 A JP 04041498A JP 4041498 A JP4041498 A JP 4041498A JP 4136049 B2 JP4136049 B2 JP 4136049B2
- Authority
- JP
- Japan
- Prior art keywords
- precast
- frame member
- reinforcing bar
- frame
- concrete pier
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Bridges Or Land Bridges (AREA)
Description
【0001】
【発明の属する技術分野】
本発明は、コンクリート橋脚の施工方法に関する。
【0002】
【従来の技術】
高速道路等の高架橋には、通常、コンクリート橋脚が使用されており、従来は次のような施工方法により構築されていた。即ち、従来は基礎から主鉄筋を多数立設し、この主鉄筋の周囲を取り囲むよう帯鉄筋を固定する。この帯鉄筋を固定するときには、バインド線等を用いて手作業により主鉄筋に固定する。
【0003】
このような、鉄筋の建て込みを完成した後、鉄筋の周囲に支保工を組みコンクリート型枠を設営する。そしてこの型枠の完成後、型枠内部にコンクリートを打設し、養生の後型枠と支保工を解体撤去する。このような工程からなる一連の作業を必要回数繰り返して施工する。
【0004】
【発明が解決しようとする課題】
しかし、上述した従来のコンクリート橋脚の施工方法では次のような問題があった。第一に、鉄筋部分の組み立ては熟練を要する上に多くの手間と労力が必要なので、工期が長期化する。第二に、コンクリート型枠の脱型及び支保工の解体が必要であり、このため多大な労力と型枠等の仮設置場所を要する。第三に、高所作業となるため作業性が低下する。特に、山間地では高い橋脚が必要とされる場合が多く、作業環境の改善が強く望まれる。
【0005】
本発明の目的は、このような問題点を解決することにあり、鉄筋の組立が容易であり、また、脱型を省略して工期を短縮することができ、更に、作業性を向上させることが可能なコンクリート橋脚の施工方法を提供することにある。
【0006】
【課題を解決するための手段】
本発明は、コンクリート橋脚の施工方法であり、前述の技術的課題を解決するために以下のように構成されている。すなわち、本発明のコンクリート橋脚の施工方法は、枠状で所定高さのプレキャスト型枠部材を形成する工程と、
前記プレキャスト型枠部材に鉄筋用フレームを介して鉄筋を取り付ける工程と、
橋脚を構築する所定位置に鉄骨を建て込む工程と、
前記鉄骨の周囲に所定数の前記プレキャスト型枠部材を積み上げる工程と、
前記積み上げられたプレキャス型枠部材の中にコンクリートを打設する工程とを含み、
前記鉄筋用フレームは、前記プレキャスト内枠部材に所定間隔をおいて複数取り付けられ、前記プレキャスト外枠部材及びプレキャスト内枠部材に対して垂直に配され、前記プレキャスト外枠部材及びプレキャスト内枠部材の高さ方向に延び、かつこれらの高さに対応した一対の長辺と、この長辺の両端を連結する一対の短辺とにより形成された枠状部材であり、
前記鉄筋用フレームには、建て込まれた鉄骨とプレキャスト外枠部材との間及び前記鉄骨とプレキャスト内枠部材との間に配筋可能なように、複数の鉄筋を前記一対の長辺上に、当該長辺と交わるように所定間隔で固定することを特徴とする。
【0007】
このコンクリート橋脚の施工方法は、プレキャスト型枠部材を使用するので型枠の解体作業が不要になると共に、プレキャスト型枠部材に予め鉄筋用フレームを介して鉄筋を取り付けてから積み上げるので、プレキャスト型枠部材に鉄筋を容易に取り付けることができると共に、現地における鉄筋の組立作業が不要になる。
【0008】
前記鉄筋は帯鉄筋であり、この帯鉄筋は、前記一対の長辺の両内側又は前記プレキャスト内枠部材側に配されている長辺の内側と前記プレキャスト外枠部材側の長辺の外側とに固定することができる。
また、前記一対の長辺の両内側又は前記プレキャスト内枠部材側に配されている長辺の内側と前記プレキャスト外枠部材側の長辺の外側とに固定されている帯鉄筋を連結している中間帯鉄筋をさらに有するようにしてもよい。
【0009】
前記鉄筋は帯鉄筋であり、この帯鉄筋は、前記一対の長辺の両内側又は前記プレキャスト内枠部材側に配されている長辺の内側と前記プレキャスト外枠部材側の長辺の外側とに固定することができる。また、前記一対の長辺の両内側又は前記プレキャスト内枠部材側に配されている長辺の内側と前記プレキャスト外枠部材側の長辺の外側とに固定されている帯鉄筋を連結している中間帯鉄筋をさらに有するようにしてもよい。
【0010】
【発明の実施の形態】
以下、本発明に係るコンクリート橋脚の施工方法の実施の形態を、図面を参照して詳細に説明する。
【0011】
図1は、本発明に係るコンクリート橋脚の施工方法を示すフローチャートである。このコンクリート橋脚の施工方法においては、まず、例えば組み立てヤードや製造工場などで枠状のプレキャスト型枠部材10(図2参照)を必要な数だけ形成する(ステップ1)。次に、これらのプレキャスト型枠部材10に鉄筋用フレーム14を介して帯鉄筋11を取り付ける(ステップ2)。
【0012】
次に、コンクリート橋脚1の施工現場において、H型鋼などの鉄骨12を建て込み(ステップ3)、この鉄骨12の周囲にプレキャスト型枠部材10を設置する(ステップ4)。この後、支保工(図示せず)を組み立てる(ステップ5)。以下、上述のステップ4のプレキャスト型枠部材10の設置、及びステップ5の志保工の組立を所定回数mだけ繰り返して行うことにより、プレキャスト型枠部材10を順次積み上げて所定の高さにする。次に、積み上げられたプレキャスト型枠部材10内にコンクリート13を打設する(ステップ6)。
【0013】
このようにして、コンクリート橋脚1(図2参照)の一部分を所定の高さまで施工した後、上述のステップ3の鉄骨12の建て込み〜ステップ6のコンクリート打設を所定回数nだけ繰り返して行うことにより、コンクリート橋脚1が完成する。なお、比較的低いコンクリート橋脚1の場合は、鉄骨12を一段とし、この鉄骨12の周囲に所定数のプレキャスト型枠部材10を積み上げてから、コンクリート13を打設することによりコンクリート橋脚1を完成することもできる。これは、上述のm、nを1とした場合である。
【0014】
図2は、上述のコンクリート橋脚の施工方法を適用して製造したコンクリート橋脚1の横断面を示す。このコンクリート橋脚1のプレキャスト型枠部材10は、枠状、本実施の形態では4角形のプレキャスト外枠部材10aと、このプレキャスト外枠部材10aの内側に配置されるプレキャスト内枠部材10bによって構成され、これらのプレキャスト外枠部材10aとプレキャスト内枠部材10bとの間に所定数の鉄骨12が配置されている。
【0015】
プレキャスト外枠部材10a及びプレキャスト内枠部材10bは、コンクリート橋脚1の外壁となるものであり、コンクリート又はモルタルによって4角形に形成されている。このプレキャスト外枠部材10a及びプレキャスト内枠部材10bは、上述のように組み立てヤードや製造工場等において予め複数に分割して製造し、これらの分割片を接続して一体の枠状体として形成することができる。
【0016】
そして、その断面形状は本実施の形態では4角形としたが、円形、楕円形、多角形など任意の形状にすることができる。また、本実施の形態では、プレキャスト内枠部材10bの外周側に鉄筋用フレーム14が適宜な間隔で複数設けられ、これらの鉄筋用フレーム14に帯鉄筋11が取り付けられている。鉄筋用フレーム14及び帯鉄筋11の取り付け方法については後述する。
【0017】
図3〜図12は、上述のコンクリート橋脚1の施工手順を示す。なお、プレキャスト型枠部材10は予め製造されているものとする。ここでは、まず図3に示すように、コンクリート橋脚1の基礎段21にH型鋼などの鉄骨12の定着部分を建て込む。次に、図4に示すように基礎部22のコンクリートを打設する。続いて、図5に示すように基礎部22上に所定数、本実施の形態では2個のプレキャスト外枠部材10aを積み重ねて設置し、次に図6に示すようにこれらのプレキャスト外枠部材10a内にコンクリート13を打設する。これにより、コンクリート橋脚1の中実部分が完成する。
【0018】
次に、図7に示すように鉄骨12上に、次の鉄骨12を載せて例えばボルトで結合する。続いて、図8に示すように設置済みのプレキャスト外枠部材10a上に、所定数のプレキャスト外枠部材10aを上乗せしてから、図9に示すように、鉄骨12の内側にプレキャスト内枠部材10bを所定数だけ積み重ねて配置する。このプレキャスト内枠部材10bには、後述のように帯鉄筋11が取り付けられている。
【0019】
次に、図10に示すようにプレキャスト外枠部材10aとプレキャスト内枠部材10bとを、例えば棒状の連結部材24で連結する。この連結部材24は、棒状部材以外に等辺山型鋼、溝型鋼等の鋼材を使用できる。このように連結部材24で連結することにより、プレキャスト外枠部材10a及びプレキャスト内枠部材10bが、コンクリート13がもたらす側圧で孕むのを防止できる。次に、図11に示すように、プレキャスト外枠部材10aとプレキャスト内枠部材10bとの間に、コンクリート13を打設する。
【0020】
以下同様にして、鉄骨12の建て込み、プレキャスト外枠部材10a及びプレキャスト内枠部材10bの設置及びコンクリート13の打設を繰り返すことにより、図12に示すように、コンクリート橋脚1を完成することができる。
【0021】
図13〜図17は、プレキャスト内枠部材10bに上述の鉄筋用フレーム14及び鉄筋11を取り付ける手順を示す。ここでは、鉄筋用フレーム14を4角形とし、これを縦に2分割した場合について説明する。まず、図13に示すようにプレキャスト内枠部材10bの外周面に、適宜な方法で鉄筋用フレーム14の片方の内側フレーム14aを固定する。内側フレーム14aはコの字状であり、縦辺部分にメッシュ筋25が設けられている。このメッシュ筋25は、帯鉄筋11のピッチを正確に保つと共に、帯鉄筋11の組立を容易にするために取り付けられている。
【0022】
次に、図14に示すようにメッシュ筋25に複数の帯鉄筋11を取り付ける。続いて、図15に示すように内側フレーム14aに他方の外側フレーム14bを取り付ける。この外側フレーム14bにもメッシュ筋26が設けられている。次に、図16に示すように外側フレーム14bのメッシュ筋26に帯鉄筋11を取り付け、更に図17に示すように内側フレーム14aの帯鉄筋11と、外側フレーム14bの帯鉄筋11とを中間帯鉄筋27で連結する。これにより、鉄筋用フレーム14と、帯鉄筋11及び中間帯鉄筋27との取り付けが完了する。
【0023】
このように、本発明に係るコンクリート橋脚の施工方法は、プレキャスト型枠部材10のプレキャスト内枠部材10bに、予め鉄筋用フレーム14を介して鉄筋11を取り付けてから積み上げるので、鉄筋11の取り付けが容易になる。また、現地における鉄筋11の組立作業及び型枠の解体が不要なので、作業工数の低減及び工期の短縮が可能になる。更に、高所における鉄筋組立作業が省略できるので、作業性及び安全性が向上する。
【0024】
また、プレキャスト内枠部材10bに鉄筋用フレーム14を設け、この鉄筋用フレーム14の内側フレーム14aに帯鉄筋11を取り付けたので、帯鉄筋11の取り付けが容易になる。この鉄筋用フレーム14を設けたことにより、プレキャスト型枠10を吊り上げるときに形状が保持される。
【0025】
なお、上述の実施の形態では、コンクリート橋脚1を中空断面とした場合について説明したが、本発明は中実断面のコンクリート橋脚に適用することもできる。また、ここでは鉄筋用フレーム14及び帯鉄筋11をプレキャスト内枠部材10bに取り付けたが、これをプレキャスト外枠部材10aに取り付けることもできる。更に、プレキャスト型枠部材10の設置工程、鉄骨12の建て込み工程は、適宜入れ替えて行うことができる。
【0026】
【発明の効果】
以上説明したように、本発明に係るコンクリート橋脚の施工方法によれば、プレキャスト型枠部材を使用するので、現地における型枠の解体作業が不要になると共に、プレキャスト型枠部材に予め鉄筋用フレームを介して鉄筋を取り付けてから積み上げるので、鉄筋の取り付けが容易になると共に、現地において鉄筋の組立作業が不要になる。したがって、作業工数の低減及び工期の短縮が可能になる。更に高所における鉄筋組立作業が不要になるので、作業性及び安全性が向上する。
【0027】
また、鉄筋を帯鉄筋及び中間帯鉄筋とした場合は、帯鉄筋及び中間帯鉄筋の組立が容易になる。
【図面の簡単な説明】
【図1】本発明に係るコンクリート橋脚の施工方法を説明するフローチャートである。
【図2】本発明に係るコンクリート橋脚を示す断面図である。
【図3】本発明に係るコンクリート橋脚の施工手順を示す図である。
【図4】本発明に係るコンクリート橋脚の施工手順を示す図である。
【図5】本発明に係るコンクリート橋脚の施工手順を示す図である。
【図6】本発明に係るコンクリート橋脚の施工手順を示す図である。
【図7】本発明に係るコンクリート橋脚の施工手順を示す図である。
【図8】本発明に係るコンクリート橋脚の施工手順を示す図である。
【図9】本発明に係るコンクリート橋脚の施工手順を示す図である。
【図10】本発明に係るコンクリート橋脚の施工手順を示す図である。
【図11】本発明に係るコンクリート橋脚の施工手順を示す図である。
【図12】本発明に係るコンクリート橋脚の施工手順を示す図である。
【図13】本発明に係るプレキャスト型枠部材の鉄筋用フレーム及び鉄筋の取り付け手順を示す図である。
【図14】本発明に係るプレキャスト型枠部材の鉄筋用フレーム及び鉄筋の取り付け手順を示す図である。
【図15】本発明に係るプレキャスト型枠部材の鉄筋用フレーム及び鉄筋の取り付け手順を示す図である。
【図16】本発明に係るプレキャスト型枠部材の鉄筋用フレーム及び鉄筋の取り付け手順を示す図である。
【図17】本発明に係るプレキャスト型枠部材の鉄筋用フレーム及び鉄筋の取り付け手順を示す図である。
【符号の説明】
1 コンクリート橋脚
10 プレキャスト型枠部材
10a プレキャスト外枠部材
10b プレキャスト内枠部材
11 帯鉄筋
12 鉄骨
13 コンクリート
14 鉄筋用フレーム
27 中間帯鉄筋[0001]
BACKGROUND OF THE INVENTION
The present invention relates to a concrete pier construction method.
[0002]
[Prior art]
Concrete bridge piers are usually used for viaducts such as expressways, and conventionally constructed by the following construction method. That is, conventionally, a number of main reinforcing bars are erected from the foundation, and the belt reinforcing bars are fixed so as to surround the main reinforcing bars. When fixing the rebar, it is fixed to the main rebar manually by using a bind wire or the like.
[0003]
After completing the building of the reinforcing bar, a support work is built around the reinforcing bar and a concrete formwork is set up. And after completion of this formwork, concrete is cast inside the formwork, and after curing, the formwork and support work are dismantled and removed. A series of operations consisting of these processes are repeated as many times as necessary.
[0004]
[Problems to be solved by the invention]
However, the conventional concrete pier construction method described above has the following problems. First, the assembly of the reinforcing bars requires skill and a lot of labor and labor, so the construction period is prolonged. Secondly, it is necessary to remove the concrete formwork and dismantle the support work, which requires a lot of labor and a temporary installation place for the formwork. Thirdly, workability is reduced due to work at high places. In particular, high piers are often required in mountainous areas, and improvement of the working environment is strongly desired.
[0005]
An object of the present invention is to solve such problems, and it is easy to assemble a reinforcing bar, and it is possible to shorten the work period by omitting demolding, and to further improve workability. It is to provide a concrete pier construction method that can be used.
[0006]
[Means for Solving the Problems]
The present invention is a concrete pier construction method and is configured as follows in order to solve the above-described technical problems. That is, the concrete pier construction method of the present invention is a frame-shaped step of forming a precast formwork member of a predetermined height ,
Attaching a reinforcing bar to the precast formwork member via a reinforcing bar frame;
Building a steel frame at a predetermined position for building a pier;
Stacking a predetermined number of the precast formwork members around the steel frame;
Placing concrete in the stacked precast formwork members,
A plurality of the reinforcing bar frames are attached to the precast inner frame member at a predetermined interval, and are arranged perpendicular to the precast outer frame member and the precast inner frame member, and the precast outer frame member and the precast inner frame member A frame-like member formed by a pair of long sides extending in the height direction and corresponding to these heights, and a pair of short sides connecting both ends of the long sides,
The reinforcing bar frame has a plurality of reinforcing bars on the pair of long sides so that reinforcement can be arranged between the built steel frame and the precast outer frame member and between the steel frame and the precast inner frame member. , And fixed at a predetermined interval so as to cross the long side.
[0007]
Since this concrete pier construction method uses precast formwork members, the work of disassembling the formwork is unnecessary, and the precast formwork members are stacked after the reinforcing bars are attached to the precast formwork members in advance through the rebar frames. Reinforcing bars can be easily attached to the members, and assembly work of the reinforcing bars in the field becomes unnecessary.
[0008]
The reinforcing bars are band reinforcing bars, and the reinforcing bars are arranged on both inner sides of the pair of long sides or on the inner side of the longer side arranged on the precast inner frame member side and on the outer side of the longer side on the precast outer frame member side. Can be fixed to.
In addition, the rebars fixed to both inner sides of the pair of long sides or the inner side of the long side arranged on the precast inner frame member side and the outer side of the long side on the precast outer frame member side are connected. You may make it further have the intermediate strip rebar which is.
[0009]
The reinforcing bars are band reinforcing bars, and the reinforcing bars are arranged on both inner sides of the pair of long sides or on the inner side of the longer side arranged on the precast inner frame member side and on the outer side of the longer side on the precast outer frame member side. Can be fixed to. In addition, the rebars fixed to both inner sides of the pair of long sides or the inner side of the long side arranged on the precast inner frame member side and the outer side of the long side on the precast outer frame member side are connected. You may make it further have the intermediate strip rebar which is.
[0010]
DETAILED DESCRIPTION OF THE INVENTION
DESCRIPTION OF EMBODIMENTS Hereinafter, embodiments of a concrete pier construction method according to the present invention will be described in detail with reference to the drawings.
[0011]
FIG. 1 is a flowchart showing a concrete pier construction method according to the present invention. In this concrete pier construction method, first, a necessary number of frame-shaped precast mold members 10 (see FIG. 2) are formed in, for example, an assembly yard or a manufacturing factory (step 1). Next, the
[0012]
Next, at the construction site of the concrete pier 1, a
[0013]
In this way, after a part of the concrete pier 1 (see FIG. 2) is constructed to a predetermined height, the above-described construction of the
[0014]
FIG. 2 shows a cross section of a concrete pier 1 manufactured by applying the concrete pier construction method described above. The
[0015]
The precast
[0016]
The cross-sectional shape is a quadrangular shape in the present embodiment, but can be any shape such as a circle, an ellipse, or a polygon. Further, in the present embodiment, a plurality of reinforcing bar frames 14 are provided at appropriate intervals on the outer peripheral side of the precast
[0017]
3-12 shows the construction procedure of the above-mentioned concrete pier 1. In addition, the
[0018]
Next, as shown in FIG. 7, the
[0019]
Next, as shown in FIG. 10, the precast
[0020]
In the same manner, the concrete pier 1 can be completed as shown in FIG. 12 by repeating the construction of the
[0021]
13 to 17 show a procedure for attaching the above-described reinforcing
[0022]
Next, as shown in FIG. 14, the plurality of rebar bars 11 are attached to the mesh bars 25. Subsequently, as shown in FIG. 15, the other
[0023]
Thus, since the construction method of the concrete pier concerning this invention attaches the reinforcing
[0024]
Further, since the reinforcing
[0025]
In addition, although the above-mentioned embodiment demonstrated the case where the concrete pier 1 was made into the hollow cross section, this invention can also be applied to the concrete pier of a solid cross section. In addition, here, the reinforcing
[0026]
【The invention's effect】
As described above, according to the concrete pier construction method according to the present invention, since the precast formwork member is used, the work of disassembling the formwork in the field is not required, and the precast formwork member is previously provided with the frame for the reinforcing bar. Since the reinforcing bars are piled up after being attached via the brackets, the reinforcing bars can be easily attached and the assembling work of the reinforcing bars becomes unnecessary on site. Therefore, it is possible to reduce the work man-hours and the work period. Furthermore, since the rebar assembly work at a high place becomes unnecessary, workability and safety are improved.
[0027]
Further, when the reinforcing bar is a band reinforcing bar and an intermediate band reinforcing bar, the assembling of the band reinforcing bar and the intermediate band reinforcing bar becomes easy.
[Brief description of the drawings]
FIG. 1 is a flowchart for explaining a concrete pier construction method according to the present invention.
FIG. 2 is a sectional view showing a concrete pier according to the present invention.
FIG. 3 is a diagram showing a construction procedure of a concrete pier according to the present invention.
FIG. 4 is a diagram showing a construction procedure of a concrete pier according to the present invention.
FIG. 5 is a diagram showing a construction procedure of a concrete pier according to the present invention.
FIG. 6 is a diagram showing a construction procedure of a concrete pier according to the present invention.
FIG. 7 is a diagram showing a construction procedure of a concrete pier according to the present invention.
FIG. 8 is a diagram showing a construction procedure of a concrete pier according to the present invention.
FIG. 9 is a diagram showing a construction procedure of a concrete pier according to the present invention.
FIG. 10 is a diagram showing a construction procedure of a concrete pier according to the present invention.
FIG. 11 is a diagram showing a construction procedure of a concrete pier according to the present invention.
FIG. 12 is a diagram showing a construction procedure of a concrete pier according to the present invention.
FIG. 13 is a view showing a reinforcing bar frame and a reinforcing bar attaching procedure of the precast mold member according to the present invention.
FIG. 14 is a view showing a reinforcing bar frame and a reinforcing bar attaching procedure of the precast mold member according to the present invention.
FIG. 15 is a diagram showing a reinforcing bar frame and a reinforcing bar attaching procedure of the precast mold member according to the present invention.
FIG. 16 is a view showing a reinforcing bar frame and a reinforcing bar attaching procedure of the precast mold member according to the present invention.
FIG. 17 is a view showing a reinforcing bar frame and a reinforcing bar attaching procedure of the precast mold member according to the present invention.
[Explanation of symbols]
DESCRIPTION OF SYMBOLS 1
Claims (3)
前記プレキャスト型枠部材に鉄筋用フレームを介して鉄筋を取り付ける工程と、
橋脚を構築する所定位置に鉄骨を建て込む工程と、
前記鉄骨の周囲に所定数の前記プレキャスト型枠部材を積み上げる工程と、
前記積み上げられたプレキャス型枠部材の中にコンクリートを打設する工程とを含み、
前記鉄筋用フレームは、前記プレキャスト内枠部材に所定間隔をおいて複数取り付けられ、前記プレキャスト外枠部材及びプレキャスト内枠部材に対して垂直に配され、前記プレキャスト外枠部材及びプレキャスト内枠部材の高さ方向に延び、かつこれらの高さに対応した一対の長辺と、この長辺の両端を連結する一対の短辺とにより形成された枠状部材であり、
前記鉄筋用フレームには、建て込まれた鉄骨とプレキャスト外枠部材との間及び前記鉄骨とプレキャスト内枠部材との間に配筋可能なように、複数の鉄筋を前記一対の長辺上に、当該長辺と交わるように所定間隔で固定することを特徴とするコンクリート橋脚の施工方法。Forming a precast mold member of a predetermined height in a frame shape ;
Attaching a reinforcing bar to the precast formwork member via a reinforcing bar frame;
Building a steel frame at a predetermined position for building a pier;
Stacking a predetermined number of the precast formwork members around the steel frame;
Placing concrete in the stacked precast formwork members,
A plurality of the reinforcing bar frames are attached to the precast inner frame member at a predetermined interval, and are arranged perpendicular to the precast outer frame member and the precast inner frame member, and the precast outer frame member and the precast inner frame member A frame-like member formed by a pair of long sides extending in the height direction and corresponding to these heights, and a pair of short sides connecting both ends of the long sides,
The reinforcing bar frame has a plurality of reinforcing bars on the pair of long sides so as to be arranged between the built steel frame and the precast outer frame member and between the steel frame and the precast inner frame member. A concrete pier construction method characterized by fixing at predetermined intervals so as to cross the long side.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP04041498A JP4136049B2 (en) | 1998-02-23 | 1998-02-23 | Concrete pier construction method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP04041498A JP4136049B2 (en) | 1998-02-23 | 1998-02-23 | Concrete pier construction method |
Publications (2)
Publication Number | Publication Date |
---|---|
JPH11241311A JPH11241311A (en) | 1999-09-07 |
JP4136049B2 true JP4136049B2 (en) | 2008-08-20 |
Family
ID=12580014
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP04041498A Expired - Fee Related JP4136049B2 (en) | 1998-02-23 | 1998-02-23 | Concrete pier construction method |
Country Status (1)
Country | Link |
---|---|
JP (1) | JP4136049B2 (en) |
Families Citing this family (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2001020089A1 (en) * | 1999-09-10 | 2001-03-22 | Maeda Corporation | Concrete structure and method of constructing the same |
JP2003213698A (en) * | 2002-01-16 | 2003-07-30 | Maeda Corp | Bridge and construction method thereof |
JP3906742B2 (en) * | 2002-05-23 | 2007-04-18 | Jfeエンジニアリング株式会社 | Joint structure and joining method of main girder and reinforced concrete pier |
JP4347846B2 (en) * | 2005-12-27 | 2009-10-21 | 東日本旅客鉄道株式会社 | Bridge pier reinforcement method |
JP5620344B2 (en) * | 2011-06-21 | 2014-11-05 | 三井住友建設株式会社 | Construction method of pier |
CN104120647B (en) * | 2014-07-04 | 2016-09-14 | 上海应用技术学院 | It is suitable for section assembling concrete frame bridge pier system and the construction method of rapid construction |
CN111691303A (en) * | 2020-06-03 | 2020-09-22 | 胡增永 | Modular pier base pouring tower for building construction |
CN111851300A (en) * | 2020-07-09 | 2020-10-30 | 中铁六局集团天津铁路建设有限公司 | Rectangular frame column construction method adopting template chamfering |
CN113699877B (en) * | 2021-10-09 | 2023-03-31 | 四川省交通勘察设计研究院有限公司 | Steel-concrete composite structure pier suitable for high-intensity area and construction method thereof |
-
1998
- 1998-02-23 JP JP04041498A patent/JP4136049B2/en not_active Expired - Fee Related
Also Published As
Publication number | Publication date |
---|---|
JPH11241311A (en) | 1999-09-07 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JP4136049B2 (en) | Concrete pier construction method | |
JPH1030212A (en) | Reinforced concrete structure and its construction method | |
KR101117497B1 (en) | Bridge having continuous arch hybrid girders and the bridge construction method using the same | |
JPH09310405A (en) | Reinforced concrete column and precast form | |
KR100377868B1 (en) | pier construction method using Pier scaffolding | |
JP3841498B2 (en) | PCa formwork and pier construction method using this PCa formwork | |
JPH0978532A (en) | Work execution method for concrete bridge pier | |
KR100456192B1 (en) | Composition of precast concrete wall and precast concrete column for outdoor to sustain external force | |
JP3031530B2 (en) | How to build a concrete pier | |
KR100235117B1 (en) | Ready-made steel net for r.c column and the executing method with it | |
JPH1136229A (en) | Construction method for reinforced concrete bridge pier | |
JP2000129633A (en) | Erection method for bridge floor slab | |
JPH1113017A (en) | Construction method of hollow cylindrical skeleton | |
JP3824242B2 (en) | Viaduct-free support construction method | |
JP2002364072A (en) | Beam for hybrid-structure frame | |
JPH0835210A (en) | Tower-like structure and construction method thereof | |
JPH03279533A (en) | Constructing method for rigid-frame type rc super-high building | |
WO2001020089A1 (en) | Concrete structure and method of constructing the same | |
JP3319709B2 (en) | Construction method of prestressed concrete steel beam | |
JP3388454B2 (en) | Bridge pier construction method | |
JPH05239810A (en) | Constructing method for reinforced concrete arch bridge | |
JP2001207409A (en) | Pier structure and its constructing method | |
JPS61169559A (en) | Semi-existing concrete panel using assembled reinforcement | |
JPS62121251A (en) | Building ramen | |
JP2023175116A (en) | Installation method of metal lath |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20041115 |
|
A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20061031 |
|
A521 | Written amendment |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20061225 |
|
A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20070417 |
|
A521 | Written amendment |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20070614 |
|
A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20071023 |
|
A521 | Written amendment |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20071221 |
|
TRDD | Decision of grant or rejection written | ||
A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20080513 |
|
A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 |
|
A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20080603 |
|
R150 | Certificate of patent or registration of utility model |
Free format text: JAPANESE INTERMEDIATE CODE: R150 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20110613 Year of fee payment: 3 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20120613 Year of fee payment: 4 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20130613 Year of fee payment: 5 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
LAPS | Cancellation because of no payment of annual fees |