JP3717458B2 - Embedding unit - Google Patents

Embedding unit Download PDF

Info

Publication number
JP3717458B2
JP3717458B2 JP2002136977A JP2002136977A JP3717458B2 JP 3717458 B2 JP3717458 B2 JP 3717458B2 JP 2002136977 A JP2002136977 A JP 2002136977A JP 2002136977 A JP2002136977 A JP 2002136977A JP 3717458 B2 JP3717458 B2 JP 3717458B2
Authority
JP
Japan
Prior art keywords
embedding material
embedding
hemisphere
unit
material unit
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP2002136977A
Other languages
Japanese (ja)
Other versions
JP2003227200A (en
Inventor
康弘 小田
雅己 瀧口
泰行 細井
義行 村田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Penta Ocean Construction Co Ltd
Original Assignee
Penta Ocean Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Penta Ocean Construction Co Ltd filed Critical Penta Ocean Construction Co Ltd
Priority to JP2002136977A priority Critical patent/JP3717458B2/en
Publication of JP2003227200A publication Critical patent/JP2003227200A/en
Application granted granted Critical
Publication of JP3717458B2 publication Critical patent/JP3717458B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B5/00Floors; Floor construction with regard to insulation; Connections specially adapted therefor
    • E04B5/16Load-carrying floor structures wholly or partly cast or similarly formed in situ
    • E04B5/32Floor structures wholly cast in situ with or without form units or reinforcements
    • E04B5/326Floor structures wholly cast in situ with or without form units or reinforcements with hollow filling elements
    • E04B5/328Floor structures wholly cast in situ with or without form units or reinforcements with hollow filling elements the filling elements being spherical

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Manufacturing Of Tubular Articles Or Embedded Moulded Articles (AREA)

Description

【0001】
【発明の属する技術分野】
本発明は埋込材ユニットに関するものである。
【0002】
【従来の技術】
近年、軽量化を図るために軽量埋込材を埋設した中空スラブが多く構築されている。このような軽量埋込材を埋設した中空スラブ35の一例が、図19に示すものであり、軽量埋込材36を上部補強筋37と下部補強筋38とで挟み込んで、コンクリート39の打設時における浮き上がりを防いでいる。
【0003】
【発明が解決しようとする課題】
しかし、上記の中空スラブには以下のような問題がある。
(1)軽量埋込材を1個ずつ設置しなければならないため手間がかかる
(2)軽量埋込材の間に最低2本の鉄筋を配筋する必要があるため、スラブのスパンによっては過剰な配筋となっていた
(3)軽量埋込材を押さえ付ける上筋ユニットを繋ぐためのジョイント鉄筋が必要となり、スラブにしめる鉄筋量が増大していた
【0004】
本発明は上記のような問題に鑑みてなされたものであり、その目的は、効率的、経済的、かつ精度良く配置できる軽量埋込材ユニットを提供することである。
【0005】
【課題を解決するための手段】
以上の課題を解決するための埋込材ユニットは、適宜間隔ごとに配置された球形またはカプセル形の軽量埋込材が上半球と下半球とに分割可能であり、上半球の上部にわたって設けた溶接金網で上半球同士が連結されるとともに、隣接した下半球同士が、下半球の側面に一体形成した連結部で連結されたことを特徴とする。また溶接金網は上半球の上部に形成された十字状の切欠溝に設置されたこと含むものである。
また埋込材ユニットは、適宜間隔ごとに配置された球形またはカプセル形の軽量埋込材が上半球と下半球とに分割可能であり、上半球の上部にわたって設けた上半球同士が溶接金網で連結されるとともに、軽量埋込材の横方向への動きを規制するための突出部が、隣接した下半球の側面から対向状に突出して当接されたことを特徴とする。また溶接金網は上半球の上部に形成された十字状の切欠溝に設置されたこと含むものである。
【0013】
効率的、経済的、かつ精度良く設置できる埋込材ユニットを製作することができる。軽量埋込材を上下で分割可能としたことにより、埋込材ユニットを容易に製作することができる。隣接した軽量埋込材間に突出部が形成されたことにより、埋込材ユニットを設置した型枠内に打設されたコンクリートによって、軽量埋込材の動きを規制することができる。軽量埋込材の上部における切欠溝に格子状の掛止材をはめ込むことができる。型枠内にコンクリートを打設するときの軽量埋込材の浮き上がりが、上面にスラブ上筋を配筋した溶接金網で抑えられるので、中空スラブの施工手間やコストの削減を図ることができる。切欠溝にコンクリートが食い込むことにより、コンクリート板から埋込材ユニットが引き抜けないプレキャストコンクリート板を製作することができる。軽量埋込材がコンクリート板に設置しやすく、このコンクリート板から軽量埋込材が引き抜きにくくなる。
【0014】
【発明の実施の形態】
以下、本発明の埋込材ユニットおよびこれを使用した中空スラブ、およびその構築方法ならびにプレキャストコンクリート板(以下、PC板という)の実施の形態を図面に基づいて詳細に説明する。はじめに、埋込材ユニットの実施の形態について説明し、その後に中空スラブの構築方法およびPC板の実施の形態について説明する。また各実施の形態において同じ構成は同じ符号を付して説明し、異なった構成にのみ異なった符号を付して説明する。
【0015】
図1は第1の実施の形態の埋込材ユニット1を示したものである。この埋込材ユニット1は、上下で分割可能な軽量埋込材(例えばポリスチレンフォーム)2同士が溶接金網3で一体的に連結されて構成されている。この軽量埋込材2は、図2(1)および(2)に示すように、中央部で上半球4と下半球5とに分割され、上半球4の凹溝6に下半球5の嵌合突起7が嵌入して一体となり、上半球4同士が溶接金網3で一体的に連結されている。
【0016】
このように軽量埋込材2が上半球4と下半球5とに分割できるので、埋込材ユニット1の製作が容易になる。また下半球5を取り替えて軽量埋込材2の長さを変えることにより(図3参照)、厚さの異なるスラブにも容易に対応することができるようになる。また、図2の(3)に示すように、下半球5を取り外した上半球(溶接金網3で連結されている)4のみの埋込材ユニット1として使用することもできるので、厚さの薄いスラブにも使用することができる。さらに、同図の(4)に示すように、一つの埋込材ユニット1において長さの異なる下半球5を設置する例えば、一方のエリヤの下半球5と、他方のエリアの下半球5との長さを変えると、段差部のある中空スラブの構築に使用することもできる。また、前記の下半球5の長さを変えることにより、段差部の高さも自由に変えることができる。このように埋込材ユニット1は、厚さの異なるスラブや段差部のあるスラブにも容易に対応することができる。
【0017】
また溶接金網3が軽量埋込材2と一体的になっているため、埋込材ユニット1としての製作が簡単にでき、スラブ型枠へも簡単に設置することができる。また図3の(3)に示すように、下半球5と溶接金網3とを一体形成すると、上半球4と下半球5との接合や、下半球5の取り替え(長さの異なる下半球への)も簡単にできる。
【0018】
図3は軽量埋込材8をカプセル形にした第2の実施の形態の埋込材ユニット8であり、下半球5を長くしたこと以外は第1の実施の形態の埋込材ユニット1と同じ構成である。この埋込材ユニット8を前記の埋込材ユニット1と組み合わせて使用すると、段差部のある中空スラブやPC板を形成することができる。また軽量埋込材2の下半球5を取り替えるだけで、スラブ厚の変更に対応することができる。また同図の(3)は下半球5をさらに分割し、この分割した半球5aを溶接金網3で連結した3分割の埋込材ユニット8である。すなわち、この埋込材ユニット8は全体として3分割されたものであり、中央部の円柱5bの長さを変えることにより、軽量埋込材2の高さを自由に変えることができる。したがって、段差部のある中空スラブを形成する場合、その段差部の高さを自由に変えることができるようになる。
【0019】
図4は第3の実施の形態の埋込材ユニット9を示したものである。この埋込材ユニット9は、上半球4同士が連結部3aで連結された上部埋込材2aと、下半球5同士が連結部3aで連結された下部埋込材2bとが嵌め合わされたものであり、図5に示すように、上半球4の凹溝6に下半球5の嵌合突起7が嵌入して接合されている。また上部埋込材2aの上半球4には、溶接金網3をはめ込む十字状の切欠溝11が設けられている。
【0020】
図6は十字状の切欠溝11に溶接金網3をはめ込んだ第4の実施の形態の埋込材ユニット12を示したものであり、この溶接金網3をはめ込んだ以外は第3の実施の形態の埋込材ユニット9と同じ構成である。このような溶接金網3によってコンクリートの打設時における浮き上がりを抑えることができる。
【0021】
図7は第5の実施の形態の埋込材ユニット13を示したものである。この埋込材ユニット13は、下部埋込材2bの下半球5の側面に対向状に設けた突出部14同士が当接されて、軽量埋込材2の横方向への動きを規制したものであり、これ以外は第1の実施の形態の埋込材ユニット1と同じ構成である。この突出部14は、軽量埋込材2の上部が溶接金網3で連結されても、コンクリートの打設力による軽量埋込材2の変形を防いで、所定の形状を保持する役割がある。さらに、このような突出部14は、スラブ構造上もコンクリート部分の断面欠損を少なくするため、せん断耐力が犠牲にならない。また図8は、下半球5の側面に一体形成された連結部3aで隣接した下半球5同士が連結された埋込材ユニット13を示したものである。
【0022】
図9は第6の実施の形態の埋込材ユニット15を示したものである。この埋込材ユニット15は、溶接金網3と連結部3aとで上半球4同士が連結されて上部埋込材2aを形成したものであり、前記連結部3aで軽量埋込材2の横方向への動きを規制する。また図10は、溶接金網3と連結部3aとで上半球4同士が連結され、かつ下半球5同士が連結部3aで連結された埋込材ユニット15を示したものである。
【0023】
図11は第7の実施の形態の埋込材ユニット16を示したものである。この埋込材ユニット16は、図7の埋込材ユニット13の軽量埋込材2をカプセル形にしたものであり、下半球5を長くした以外は同じ構成である。また、この埋込材ユニット16も、図3の(3)と同じように、下半球5をさらに分割して3分割にすることもできる。
【0024】
図12は第8の実施の形態の埋込材ユニット17を示したものである。この埋込材ユニット17は、図8の埋込材ユニット13の軽量埋込材2をカプセル形にしたものであり、下半球5を長くした以外は同じ構成である。また、この埋込材ユニット17も、図3の(3)と同じように、下半球5をさらに分割して3分割にすることもできる。
【0025】
図13は第9の実施の形態の埋込材ユニット18を示したものである。この埋込材ユニット18は、図9の埋込材ユニット15の軽量埋込材2をカプセル形にしたものであり、下半球5を長くした以外は同じ構成である。また、この埋込材ユニット18も、図3の(3)と同じように、下半球5をさらに分割して3分割にすることもできる。
【0026】
図14は第10の実施の形態の埋込材ユニット19を示したものである。この埋込材ユニット19は、図10の埋込材ユニット15の軽量埋込材2をカプセル形にしたものであり、下半球5を長くした以外は同じ構成である。また、この埋込材ユニット19も、図3の(3)と同じように、下半球5をさらに分割して3分割にすることもできる。
【0027】
図15は第11の実施の形態の埋込材ユニット20を示したものである。この埋込材ユニット20は上下に分割しない軽量埋込材2を連結部3aで接続したものであり、これ以外は図4の埋込材ユニット9と同じ構成である。このように上下に分割しない軽量埋込材2を、図1、3、6〜14の埋込材ユニット1、8、12、13、15、16、17、18、19にも使用することができる。
【0028】
図16は図1の埋込材ユニット1を使用した中空スラブを示したものであり、空隙率が高くなっている。この埋込材ユニット1を使用した中空スラブの構築方法について説明する。この構築方法は、まずスラブ型枠21の底板22に固定具23を固定する。次に、埋込材ユニット1をスラブ型枠21に設置して、固定具23の固定ピン24を軽量埋込材2に差し通す。
【0029】
次に、この埋込材ユニット1の上に上部補強筋25を配筋するとともに、固定ピン24の先端に留め具26をねじ込んで埋込材ユニット1をスラブ型枠21に固定する。そして、この埋込材ユニット1が固定されたスラブ型枠21にコンクリート27を打設すると、軽量埋込材2の浮き上がりが固定具23で抑えられて中空スラブ28が構築される。また埋込材ユニット1が固定された後に、溶接金網3を上部補強筋26に結束することもできる。
【0030】
なお、この埋込材ユニット1の他に、図3、4、6〜14の埋込材ユニット8、9、12、13、15、16、17、18、19を使用した中空スラブ(図示せず)も同じ方法で構築する。この場合も、埋込材ユニット1が固定された後に、溶接金網3を上部補強筋(または下部補強筋25a)25に結束することもできる。
【0031】
図17は第1の実施の形態のPC板29、すなわち図4の埋込材ユニット9を使用したPC板29である。このPC板29は、切欠溝11が下側になるように軽量埋込材2の下部をコンクリート板30に埋め込んだものであり、切欠溝11内にコンクリートが食い込んで、埋込材ユニット9がコンクリート板30から引き抜けないようになっている。この埋込材ユニット9は、上記のようなPC板29に限らず、いわゆるフルPC板にも使用することができる。なお、この埋込材ユニット9の他にも、図1、3、6〜14の埋込材ユニット1、8、12、13、15、16、17、18、19を使用したPC板(図示せず)を形成することもできる。
【0032】
図18は第2の実施の形態のPC板31を示したものである。このPC板31は、凹部32が設けられた切欠部33が埋設されて球形の軽量埋込材2がコンクリート板30に適宜間隔ごとに設置され、これらの軽量埋込材2が連結部3aで連結されて構成されている。この切欠部33は軽量埋込材2を設置しやすく、凹部32がコンクリート板30に食い込むため引き抜けにくくなっている。なお、前記切欠部33には凹部32にかわって突部を設けることもでき、軽量埋込材2をカプセル形にすることもできる。
【0033】
【発明の効果】
効率的、経済的、かつ精度良く設置できる埋込材ユニットを製作することができる。
【0034】
軽量埋込材を上下に分割可能としたことにより、埋込材ユニットを種々のサイズに対応して容易に製作することができる。
【0035】
軽量埋込材の上部における切欠溝に溶接金網をはめ込むことができる。
【0036】
軽量埋込材の上部また全体を連結材で一体形成したことにより、頑強な埋込材ユニットを形成することができる。
【0037】
型枠内にコンクリートを打設するときの軽量埋込材の浮き上がりが溶接金網で抑えられるので、中空スラブの施工手間やコストの削減を図ることができる。
【0038】
隣接した軽量埋込材間に突出部が形成されたことにより、埋込材ユニットを設置した型枠内に打設されたコンクリートによる軽量埋込材の動きを規制することができる。
【0039】
切欠溝にコンクリートが食い込むことにより、埋込材ユニットがコンクリート板から引き抜けないプレキャストコンクリート板を製作することができる。
【0040】
軽量埋込材がコンクリート板に設置しやすく、このコンクリート板から軽量埋込材が引き抜けないプレキャストコンクリート板を製作することができる。
【図面の簡単な説明】
【図1】(1)は第1の実施の形態の埋込材ユニットの平面図、(2)は同側面図である。
【図2】(1)は下半球を分割した軽量埋込材の断面図、(2)は分割した下半球の平面図、(3)は上半球のみの埋込材ユニットの側面図、(4)は下半球の長さを変えた埋込材ユニットの側面図である。
【図3】(1)は第2の実施の形態の埋込材ユニットの平面図、(2)は同側面図、(3)は3分割の埋込材ユニットの側面図である。
【図4】(1)は第3の実施の形態の埋込材ユニットの平面図、(2)は(1)のA−A線断面図、(3)は上下に分割した埋込材ユニットの断面図である。
【図5】 (1)は軽量埋込材の断面図、(2)は下半球を分割した軽量埋込材の断面図、(3)は分割した下半球の平面図である。
【図6】(1)は第4の実施の形態の埋込材ユニットの平面図、(2)は同側面図である。
【図7】 (1)は第5の実施の形態の埋込材ユニットの平面図、(2)は同側面図である。
【図8】 下半球を分割した埋込材ユニットの側面図である。
【図9】(1)は第6の実施の形態の埋込材ユニットの平面図、(2)は同側面図である。
【図10】下半球を分割した埋込材ユニットの側面図である。
【図11】第7の実施の形態の埋込材ユニットの側面図である。
【図12】第8の実施の形態の埋込材ユニットの側面図である。
【図13】第9の実施の形態の埋込材ユニットの側面図である。
【図14】第10の実施の形態の埋込材ユニットの側面図である。
【図15】(1)は第11の実施の形態の埋込材ユニットの平面図、(2)は同側面図である。
【図16】中空スラブおよびその構築方法を示す断面図である。
【図17】第1の実施の形態のPC板の断面図である。
【図18】第2の実施の形態のPC板の断面図である。
【図19】従来の中空スラブの断面図である。
【符号の説明】
1、8、9、12、13、15、16、17、18、19、20 埋込材ユニット
2、36 軽量埋込材
溶接金網
3a 連結部
4 上半球
5 下半球
5a 半球
6 凹溝
7 嵌合突起
11 切欠溝
14 突出部
21 スラブ型枠
22 底板
23 固定具
24 固定ピン
25、37 上部補強筋
26 留め具
27、39 コンクリート
28、35 中空スラブ
29、31 PC板
30 コンクリート板
32 凹部
33 切欠部
25a、38 下部補強筋
[0001]
BACKGROUND OF THE INVENTION
The present invention relates to the implant member unit.
[0002]
[Prior art]
In recent years, many hollow slabs in which a lightweight embedding material is embedded have been constructed in order to reduce the weight. An example of a hollow slab 35 in which such a lightweight embedding material is embedded is shown in FIG. 19, and the concrete 39 is placed by sandwiching the light embedding material 36 between the upper reinforcing bar 37 and the lower reinforcing bar 38. Prevents lifting in time.
[0003]
[Problems to be solved by the invention]
However, the above hollow slab has the following problems.
(1) It takes time because it is necessary to install lightweight embedding materials one by one. (2) Since it is necessary to arrange at least two reinforcing bars between lightweight embedding materials, it may be excessive depending on the span of the slab. (3) A joint rebar is required to connect the upper reinforcement unit that holds down the lightweight embedding material, and the amount of rebar that is attached to the slab has increased.
The present invention has been made in view of the above problems, and its object is efficient, economical, and is to provide Hisage lightweight filler material unit can be accurately positioned.
[0005]
[Means for Solving the Problems]
The embedding unit for solving the above-mentioned problems is provided with a spherical or capsule-shaped light-weight embedding material arranged at appropriate intervals, which can be divided into an upper hemisphere and a lower hemisphere, and is provided over the upper hemisphere. The upper hemispheres are connected to each other by a welded wire mesh, and the adjacent lower hemispheres are connected to each other by a connecting portion integrally formed on a side surface of the lower hemisphere. In addition, the welded wire mesh is installed in a cross-shaped notch groove formed in the upper part of the upper hemisphere.
The embedding unit can be divided into a spherical or capsule-shaped lightweight embedding material arranged at appropriate intervals into an upper hemisphere and a lower hemisphere, and the upper hemisphere provided over the upper hemisphere is a welded wire mesh. In addition to being connected, the protruding portion for restricting the lateral movement of the light-weight embedding material protrudes from the side surface of the adjacent lower hemisphere so as to be in contact with the protruding portion. In addition, the welded wire mesh is installed in a cross-shaped notch groove formed in the upper part of the upper hemisphere.
[0013]
An embedding unit that can be installed efficiently, economically and accurately can be manufactured. Since the lightweight embedding material can be divided vertically, the embedding material unit can be easily manufactured. Since the protruding portion is formed between the adjacent light-weight embedding materials, the movement of the light-weight embedding material can be restricted by the concrete placed in the mold in which the embedding material unit is installed. A grid-like latching material can be fitted into the notch groove in the upper part of the lightweight embedding material. Lifting of the lightweight embedding material when placing concrete in the mold can be suppressed by a welded wire mesh having a slab upper bar arranged on the upper surface, so that it is possible to reduce the labor and cost of constructing the hollow slab. When the concrete bites into the notch groove, a precast concrete board in which the embedding unit cannot be pulled out from the concrete board can be manufactured. The lightweight embedding material is easy to install on the concrete board, and the light embedding material is difficult to pull out from the concrete board.
[0014]
DETAILED DESCRIPTION OF THE INVENTION
DESCRIPTION OF THE PREFERRED EMBODIMENTS Embodiments of an embedding unit of the present invention, a hollow slab using the same, a construction method thereof, and a precast concrete board (hereinafter referred to as a PC board) will be described in detail with reference to the drawings. First, an embodiment of an embedding material unit will be described, and then a method for constructing a hollow slab and an embodiment of a PC board will be described. In the embodiments, the same components are described with the same reference numerals, and only different components are described with different reference numerals.
[0015]
FIG. 1 shows an embedding unit 1 according to the first embodiment. The filler material unit 1 is vertically divisible lightweight filler material (e.g., polystyrene foam) 2 each other is configured by integrally connected by welded wire network 3. As shown in FIGS. 2 (1) and 2 (2), this lightweight embedding material 2 is divided into an upper hemisphere 4 and a lower hemisphere 5 at the center, and the lower hemisphere 5 is fitted into the concave groove 6 of the upper hemisphere 4. The mating protrusions 7 are fitted and integrated, and the upper hemispheres 4 are integrally connected by the welded wire mesh 3.
[0016]
Thus, since the lightweight embedding material 2 can be divided | segmented into the upper hemisphere 4 and the lower hemisphere 5, manufacture of the embedding material unit 1 becomes easy. Further, by replacing the lower hemisphere 5 and changing the length of the lightweight embedding material 2 (see FIG. 3), it becomes possible to easily cope with slabs having different thicknesses. Further, as shown in FIG. 2 (3), so it can be used as a filler material unit 1 of the lower hemisphere 5 of the old upper half sphere (are connected by welded wire mesh 3) 4 only, the thickness Can also be used for thin slabs. Further, as shown in (4) of the figure, the lower hemisphere 5 having a different length is installed in one embedding unit 1 . For example, by changing the length of the lower hemisphere 5 of one area and the lower hemisphere 5 of the other area, it can be used to construct a hollow slab having a stepped portion. Further, the height of the step portion can be freely changed by changing the length of the lower hemisphere 5. As described above, the embedding material unit 1 can easily cope with slabs having different thicknesses or slabs having stepped portions.
[0017]
Further, since the welded wire mesh 3 is integrated with the lightweight embedding material 2, it can be easily manufactured as the embedding material unit 1 and can be easily installed in the slab formwork. 3 (3), when the lower hemisphere 5 and the welded wire mesh 3 are integrally formed, the upper hemisphere 4 and the lower hemisphere 5 are joined, and the lower hemisphere 5 is replaced (to the lower hemisphere having a different length). It's also easy.
[0018]
FIG. 3 shows an embedding unit 8 according to the second embodiment in which the light-weight embedding material 8 is formed into a capsule shape, and the embedding unit 1 according to the first embodiment except that the lower hemisphere 5 is lengthened. It is the same configuration. When this embedding material unit 8 is used in combination with the embedding material unit 1, a hollow slab or a PC plate having a stepped portion can be formed. Further, the slab thickness can be changed simply by replacing the lower hemisphere 5 of the lightweight embedding material 2. Further, (3) in the figure is a three-part embedded material unit 8 in which the lower hemisphere 5 is further divided and the divided hemisphere 5a is connected by the welded wire mesh 3 . That is, the embedding material unit 8 is divided into three as a whole, and the height of the lightweight embedding material 2 can be freely changed by changing the length of the central column 5b. Therefore, when forming a hollow slab having a stepped portion, the height of the stepped portion can be freely changed.
[0019]
FIG. 4 shows an embedding material unit 9 according to the third embodiment. The embedding material unit 9 includes an upper embedding material 2a in which upper hemispheres 4 are connected to each other by a connecting portion 3a and a lower embedding material 2b in which lower hemispheres 5 are connected to each other by a connecting portion 3a. As shown in FIG. 5, the fitting protrusion 7 of the lower hemisphere 5 is fitted and joined to the concave groove 6 of the upper hemisphere 4. Further, the upper hemisphere 4 of the upper embedding material 2a is provided with a cross-shaped cutout groove 11 into which the welding wire mesh 3 is fitted.
[0020]
FIG. 6 shows an embedding unit 12 according to a fourth embodiment in which a welded wire mesh 3 is fitted in a cross-shaped cutout groove 11. The third embodiment is the same except that this welded wire mesh 3 is fitted. The same structure as that of the embedding material unit 9 of FIG. With such a welded wire mesh 3 , it is possible to suppress lifting when concrete is placed.
[0021]
FIG. 7 shows the embedding material unit 13 of the fifth embodiment. In this embedment unit 13, the protruding portions 14 provided in an opposing manner are brought into contact with the side surfaces of the respective lower hemispheres 5 of the lower embedment material 2b, thereby restricting the lateral movement of the light-weight embedment material 2. The rest of the configuration is the same as that of the embedding material unit 1 of the first embodiment. Even if the upper part of the lightweight embedding material 2 is connected by the welded wire mesh 3, the protruding portion 14 has a role of preventing the deformation of the light embedding material 2 due to the concrete placing force and maintaining a predetermined shape. Furthermore, since such a protrusion part 14 reduces the cross-sectional defect | deletion of a concrete part also on a slab structure, a shear strength is not sacrificed. FIG. 8 shows the embedding material unit 13 in which the adjacent lower hemispheres 5 are connected to each other by a connecting portion 3 a integrally formed on the side surface of the lower hemisphere 5.
[0022]
FIG. 9 shows an embedding material unit 15 according to the sixth embodiment. The filler material unit 15 is the upper hemisphere 4 to each other are connected by the connecting portion 3a and the welded wire mesh 3 is obtained by forming the upper filler material 2a, lateral light filler material 2 by the connecting portion 3a Regulate movement to FIG. 10 shows an embedding unit 15 in which the upper hemispheres 4 are connected to each other by the welding wire mesh 3 and the connecting portion 3a, and the lower hemispheres 5 are connected to each other by the connecting portion 3a .
[0023]
FIG. 11 shows the embedding material unit 16 according to the seventh embodiment. This embedding material unit 16 is a capsule-shaped light-weight embedding material 2 of the embedding material unit 13 of FIG. 7, and has the same configuration except that the lower hemisphere 5 is lengthened. Further, the embedding material unit 16 can also be divided into three parts by further dividing the lower hemisphere 5 as in (3) of FIG.
[0024]
FIG. 12 shows an embedding material unit 17 according to the eighth embodiment. The embedding material unit 17 is a capsule-shaped light-weight embedding material 2 of the embedding material unit 13 of FIG. 8 and has the same configuration except that the lower hemisphere 5 is elongated. Also, the embedding material unit 17 can also be divided into three parts by further dividing the lower hemisphere 5 as in (3) of FIG.
[0025]
FIG. 13 shows an embedding material unit 18 according to the ninth embodiment. This embedding material unit 18 is a capsule-shaped light-weight embedding material 2 of the embedding material unit 15 of FIG. 9 and has the same configuration except that the lower hemisphere 5 is lengthened. Further, the embedding material unit 18 can also be divided into three parts by further dividing the lower hemisphere 5 as in (3) of FIG.
[0026]
FIG. 14 shows an embedding material unit 19 according to the tenth embodiment. This embedding material unit 19 is a capsule-shaped light-weight embedding material 2 of the embedding material unit 15 of FIG. 10, and has the same configuration except that the lower hemisphere 5 is elongated. Further, this embedding material unit 19 can also be divided into three parts by further dividing the lower hemisphere 5 as in (3) of FIG.
[0027]
FIG. 15 shows the embedding material unit 20 according to the eleventh embodiment. This embedding material unit 20 is a structure in which a light-weight embedding material 2 that is not divided into upper and lower parts is connected by a connecting portion 3a , and the other configuration is the same as that of the embedding material unit 9 of FIG. Thus, the lightweight embedding material 2 which is not divided | segmented up and down can be used also for the embedding material unit 1, 8, 12, 13, 15, 16, 17, 18, 19 of FIG. it can.
[0028]
FIG. 16 shows a hollow slab using the embedding material unit 1 of FIG. 1, and the porosity is high. A method for constructing a hollow slab using the embedding material unit 1 will be described. In this construction method, first, a fixture 23 is fixed to the bottom plate 22 of the slab formwork 21. Next, the embedding material unit 1 is installed in the slab mold 21, and the fixing pin 24 of the fixing tool 23 is inserted into the lightweight embedding material 2.
[0029]
Next, the upper reinforcing bars 25 are arranged on the embedment material unit 1 and the fasteners 26 are screwed into the tips of the fixing pins 24 to fix the embedment material unit 1 to the slab mold 21 . Then, when concrete 27 is placed on the slab form 21 to which the embedding material unit 1 is fixed, the lifting of the light weight embedding material 2 is suppressed by the fixture 23, and the hollow slab 28 is constructed. Further, after the embedding material unit 1 is fixed, the welded wire mesh 3 can be bound to the upper reinforcing bar 26.
[0030]
In addition to this embedment material unit 1, a hollow slab (not shown) using the embedment material units 8, 9, 12, 13, 15, 16, 17, 18, and 19 shown in FIGS. Z) is constructed in the same way. Also in this case, the welded wire mesh 3 can be bound to the upper reinforcing bar (or the lower reinforcing bar 25a ) 25 after the embedding material unit 1 is fixed.
[0031]
FIG. 17 shows the PC board 29 of the first embodiment, that is, the PC board 29 using the embedding unit 9 of FIG. The PC plate 29 is obtained by embedding the lower part of the lightweight embedding material 2 in the concrete plate 30 so that the notch groove 11 is on the lower side, and the concrete bites into the notch groove 11 so that the embedding unit 9 is It cannot be pulled out from the concrete plate 30. The embedding material unit 9 can be used not only for the PC board 29 as described above but also for a so-called full PC board. In addition to this embedding material unit 9, a PC board using the embedding material units 1, 8, 12, 13, 15, 16, 17, 18, 19 of FIGS. (Not shown) can also be formed.
[0032]
FIG. 18 shows the PC board 31 of the second embodiment. In this PC board 31, a notch 33 provided with a recess 32 is embedded, and the spherical lightweight embedding material 2 is installed on the concrete board 30 at appropriate intervals, and these light embedding materials 2 are connected to the connecting portion 3a . Concatenated. This notch 33 is easy to install the lightweight embedding material 2, and the recess 32 bites into the concrete plate 30, so that it is difficult to pull out. The notch 33 can be provided with a protrusion instead of the recess 32, and the lightweight implant 2 can be formed into a capsule shape.
[0033]
【The invention's effect】
An embedding unit that can be installed efficiently, economically and accurately can be manufactured.
[0034]
Since the lightweight embedding material can be divided into upper and lower parts, the embedding material unit can be easily manufactured corresponding to various sizes.
[0035]
A welded wire mesh can be fitted into the notch groove in the upper part of the lightweight embedding material.
[0036]
Since the upper part or the whole of the light-weight embedding material is integrally formed with the connecting material, a robust embedding material unit can be formed.
[0037]
Since the lifting of the lightweight embedding material when the concrete is placed in the formwork is suppressed by the welded wire mesh , it is possible to reduce the labor and cost for constructing the hollow slab.
[0038]
By forming the protruding portion between the adjacent lightweight embedding materials, it is possible to restrict the movement of the light embedding material due to the concrete placed in the mold in which the embedding material unit is installed.
[0039]
A concrete cast into the cutout groove can produce a precast concrete board in which the embedding unit cannot be pulled out of the concrete board.
[0040]
It is easy to install the lightweight embedding material on the concrete plate, and it is possible to manufacture a precast concrete plate from which the light embedding material cannot be pulled out.
[Brief description of the drawings]
FIG. 1 is a plan view of an embedding unit according to a first embodiment, and FIG.
2A is a cross-sectional view of a lightweight embedding material obtained by dividing the lower hemisphere, FIG. 2B is a plan view of the lower hemisphere divided, and FIG. 2B is a side view of the embedding unit having only the upper hemisphere. 4) is a side view of the embedding unit in which the length of the lower hemisphere is changed.
3A is a plan view of an embedding material unit according to a second embodiment, FIG. 3B is a side view of the embedding material unit according to the second embodiment, and FIG.
4A is a plan view of an embedding material unit according to a third embodiment, FIG. 4B is a cross-sectional view taken along line AA of FIG. 1A, and FIG. FIG.
5A is a cross-sectional view of a light-weight embedding material, FIG. 5B is a cross-sectional view of a light-weight embedding material obtained by dividing the lower hemisphere, and FIG.
6A is a plan view of an embedding material unit according to a fourth embodiment, and FIG. 6B is a side view of the same.
7A is a plan view of an embedding unit according to a fifth embodiment, and FIG. 7B is a side view thereof.
[8] Ru side view der buried material units obtained by dividing the lower hemisphere.
9A is a plan view of an embedding unit according to a sixth embodiment, and FIG. 9B is a side view thereof.
FIG. 10 is a side view of an embedding material unit obtained by dividing a lower hemisphere.
FIG. 11 is a side view of an embedding material unit according to a seventh embodiment.
FIG. 12 is a side view of an embedding unit according to an eighth embodiment.
FIG. 13 is a side view of an embedding material unit according to a ninth embodiment.
FIG. 14 is a side view of an embedding material unit according to a tenth embodiment.
15A is a plan view of an embedding material unit according to an eleventh embodiment, and FIG. 15B is a side view thereof.
FIG. 16 is a cross-sectional view showing a hollow slab and a construction method thereof.
FIG. 17 is a cross-sectional view of the PC board according to the first embodiment.
FIG. 18 is a cross-sectional view of a PC board according to the second embodiment.
FIG. 19 is a cross-sectional view of a conventional hollow slab.
[Explanation of symbols]
1, 8, 9, 12, 13, 15, 16, 17, 18, 19, 20 Embedding unit 2, 36 Lightweight embedding material 3 Welded wire mesh
3a connecting part 4 upper hemisphere 5 lower hemisphere 5a hemisphere 6 concave groove 7 fitting protrusion 11 notch groove 14 projecting part 21 slab form 22 bottom plate 23 fixing tool 24 fixing pin 25, 37 upper reinforcing bar 26 fixing tool 27, 39 concrete 28 , 35 Hollow slabs 29, 31 PC board 30 Concrete board 32 Recessed part 33 Notch part
25a, 38 Lower reinforcement

Claims (3)

適宜間隔ごとに配置された球形またはカプセル形の軽量埋込材が上半球と下半球とに分割可能であり、上半球の上部にわたって設けた溶接金網で上半球同士が連結されるとともに、隣接した下半球同士が、下半球の側面に一体形成した連結部で連結されたことを特徴とする埋込材ユニット。 Spherical or capsule-shaped lightweight implants arranged at appropriate intervals can be divided into an upper hemisphere and a lower hemisphere, and the upper hemispheres are connected to each other with a welded wire mesh provided over the upper hemisphere and adjacent An embedding unit characterized in that lower hemispheres are connected to each other by a connecting portion integrally formed on a side surface of the lower hemisphere . 適宜間隔ごとに配置された球形またはカプセル形の軽量埋込材が上半球と下半球とに分割可能であり、上半球の上部にわたって設けた溶接金網で上半球同士が連結されるとともに、軽量埋込材の横方向への動きを規制するための突出部が、隣接した下半球の側面から対向状に突出して当接されたことを特徴とする埋込材ユニット。 Spherical or capsule-shaped lightweight implants arranged at appropriate intervals can be divided into an upper hemisphere and a lower hemisphere, and the upper hemispheres are connected to each other by a welded wire mesh provided over the upper hemisphere. An embedding unit characterized in that a projecting portion for restricting the lateral movement of the insert material protrudes and comes into contact with the side surface of the adjacent lower hemisphere . 溶接金網は上半球の上部に形成された十字状の切欠溝に設置されたことを特徴とする請求項1または2に記載の埋込材ユニット。The embedding unit according to claim 1 or 2 , wherein the welded wire mesh is installed in a cross-shaped cutout groove formed in an upper part of the upper hemisphere .
JP2002136977A 2001-11-29 2002-05-13 Embedding unit Expired - Lifetime JP3717458B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2002136977A JP3717458B2 (en) 2001-11-29 2002-05-13 Embedding unit

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
JP2001364795 2001-11-29
JP2001-364795 2001-11-29
JP2002136977A JP3717458B2 (en) 2001-11-29 2002-05-13 Embedding unit

Publications (2)

Publication Number Publication Date
JP2003227200A JP2003227200A (en) 2003-08-15
JP3717458B2 true JP3717458B2 (en) 2005-11-16

Family

ID=27759481

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2002136977A Expired - Lifetime JP3717458B2 (en) 2001-11-29 2002-05-13 Embedding unit

Country Status (1)

Country Link
JP (1) JP3717458B2 (en)

Families Citing this family (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4530350B2 (en) * 2004-10-14 2010-08-25 五洋建設株式会社 Concrete slab
JP2006138166A (en) * 2004-11-15 2006-06-01 Penta Ocean Constr Co Ltd Pre-cast concrete slab and hollow slab
JP2006138165A (en) * 2004-11-15 2006-06-01 Penta Ocean Constr Co Ltd Light embedded material, light embedded material unit and its locking method
KR100899339B1 (en) * 2008-06-05 2009-05-26 주식회사 신화엔지니어링 Open type spacer inserted in slab
DK200801853A (en) * 2008-12-31 2010-07-01 Bubbledeck Internat A S System and Method of displacement volumes in composite members
DK177889B1 (en) 2012-11-23 2014-11-17 Kim Illner Breuning System and Method for biaxial semi-prefabricated lightweight concrete slab
KR101601628B1 (en) * 2015-08-04 2016-03-09 (주)덕신하우징 Light Weight Body for Hollow Core Slab
KR101601629B1 (en) * 2015-08-04 2016-03-09 (주)덕신하우징 Hollow Core Deck Plate with Light Weight Body
KR101601630B1 (en) * 2015-08-04 2016-03-09 (주)덕신하우징 Hollow Core Insulation Deck Plate with Light Weight Body
KR101909351B1 (en) * 2016-12-30 2018-10-17 박규남 Fabricated type hollow body for hollow core slab

Also Published As

Publication number Publication date
JP2003227200A (en) 2003-08-15

Similar Documents

Publication Publication Date Title
JP3717458B2 (en) Embedding unit
JP4697834B2 (en) Precast concrete board, method for producing the same, and method for constructing slab
JP2020125605A (en) Precast floor slab connection structure and connection method
JP4541592B2 (en) Step slab forming concrete plate and step slab structure using the same
JP3654879B2 (en) Hollow material unit, precast concrete board and concrete slab
KR20050063089A (en) Precast concrete deck being connected by roof steel and constructing method of such precast concrete deck
JP2006322137A (en) Hollow concrete slab and its forming method
JP6625146B2 (en) Concrete member connection method
JP4037894B2 (en) Hook anchor for concrete slab and concrete slab construction method using the same
KR100615042B1 (en) Method for producing reinforced concrete structures including spacers
WO2002092935A1 (en) Buried material unit, precast concrete panel and method of manufacturing the concrete panel, and slab and method of constructing the slab
KR101708274B1 (en) Integrated hollow bodies for void slab, void slim-floor and flat slab structure using the same
JP2005105534A (en) Structure of exterior wall and its construction method
JP4264900B2 (en) Beam-floor joint structure
KR20200114453A (en) Twin-leaf precast arch structure with lower projecting lib of arch crown and construction method of the same
JP2003003608A (en) Spacer for reinforcement
CN217079362U (en) Prefabricated shear wall component and building structure
KR101047426B1 (en) Steel composite bridge construction method by mortar bonding and steel composite bridge obtained by using
KR101120245B1 (en) reverse triangle shaped prestressed concrete girder
JP4530350B2 (en) Concrete slab
JPH0444550A (en) Semi-precast rc building
JP4490297B2 (en) Method for producing plate for forming floor slab
JP2005220571A (en) Two-way concrete void slab
JPH0725363Y2 (en) Concrete beam
KR200414182Y1 (en) Spacer for reinforced concrete structures

Legal Events

Date Code Title Description
A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20040901

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20050216

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20050413

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20050518

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20050713

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20050815

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20050830

R150 Certificate of patent or registration of utility model

Ref document number: 3717458

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20080909

Year of fee payment: 3

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110909

Year of fee payment: 6

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110909

Year of fee payment: 6

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120909

Year of fee payment: 7

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130909

Year of fee payment: 8

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

EXPY Cancellation because of completion of term