Concrete placement method using formwork fitted with boxless foam

Info

Publication number
JP3527106B2
JP3527106B2 JP28213698A JP28213698A JP3527106B2 JP 3527106 B2 JP3527106 B2 JP 3527106B2 JP 28213698 A JP28213698 A JP 28213698A JP 28213698 A JP28213698 A JP 28213698A JP 3527106 B2 JP3527106 B2 JP 3527106B2
Authority
JP
Japan
Prior art keywords
box
concrete
foam
mold
curing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP28213698A
Other languages
Japanese (ja)
Other versions
JP2000110347A (en
Inventor
英二 野口
勉 北川
毅 相崎
常秀 大久保
真治 金子
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kajima Corp
Original Assignee
Kajima Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kajima Corp filed Critical Kajima Corp
Priority to JP28213698A priority Critical patent/JP3527106B2/en
Publication of JP2000110347A publication Critical patent/JP2000110347A/en
Application granted granted Critical
Publication of JP3527106B2 publication Critical patent/JP3527106B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
  • Lining And Supports For Tunnels (AREA)

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【発明の属する技術分野】本発明は、型枠に着脱自在の
箱抜フォームを使用して、コンクリート構築物である橋
脚、ビルの支柱、またはトンネルへのコンクリートの打
設時に、(装飾用、部材装着用、設備設置用)箱抜のス
ペースを同時成形することができる箱抜フォームを装着
した型枠によるコンクリート打設方法に関するものであ
る。なお、本明細書中、「打設」とは、養生硬化してな
い流動性コンクリートを各型枠間、または型枠とトンネ
ル内壁面(掘削面)または一次覆工用コンクリートとの
間、に充填させることをいう。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention uses a detachable box-out foam in a formwork, and when concrete is poured into a bridge pier, a pillar of a building, or a tunnel, which is a concrete structure (for decoration, members). for wearing, it relates to concrete設方method using a mold equipped with a box disconnect form that can be co-molding the space of equipment for installation) box disconnect. In the present specification, "casting" means that fluid concrete that has not been cured by curing is used between molds, or between a mold and a tunnel inner wall surface (excavation surface) or primary lining concrete. It means filling.

【0002】[0002]

【従来の技術】元来、コンクリート構築物、例えばトン
ネル内壁には、所定距離毎に、非常電話、消火器具、照
明器具等の各種設備が常設されている(図6参照)。
2. Description of the Related Art Originally, various structures such as an emergency telephone, a fire extinguishing device, and a lighting device are permanently installed in a concrete structure such as an inner wall of a tunnel at a predetermined distance (see FIG. 6).

【0003】この設備を設置するためのスペースは、ト
ンネル内への二次覆工用のコンクリート打設時に同時成
形される。
The space for installing this equipment is formed at the same time when concrete is poured into the tunnel for secondary lining.

【0004】この設備のスペースの成形方法は、図13
に示すように、二次覆工用のコンクリートを打設するた
めの型枠に先行し、予めトンネル内に設備用のスペース
に対応した箱抜フォームを設置した後、型枠を順次移動
させ、箱抜フォームと型枠とを固定した後、二次覆工用
のコンクリートを打設することにより、成形していた。
The molding method of the space of this equipment is shown in FIG.
As shown in, prior to the formwork for placing the concrete for the secondary lining, after installing the box-out foam corresponding to the space for the equipment in the tunnel beforehand, move the formwork sequentially, After fixing the box-extracting foam and the formwork, the concrete for secondary lining was poured and molded.

【0005】この箱抜フォームの構造は、図10〜図1
2に示すように、多数個のフォーム部材を連結させて形
成されている。
The structure of this box-out form is shown in FIGS.
As shown in FIG. 2, it is formed by connecting a number of foam members.

【0006】この箱抜フォームのトンネル内への設置作
業は、トンネルの底面にボルトにより固定していた。
The installation work of this box-out foam in the tunnel has been fixed to the bottom surface of the tunnel with bolts.

【0007】また、箱抜フォームと型枠との固定作業
は、型枠の検査窓等を介して箱抜フォームの設置位置を
確認しながら、型枠の内側からボルトを介して両者を固
定した後、二次覆工用のコンクリートの打設時に加わる
外力により箱抜フォームと型枠との固着位置ズレを防止
するため、ジャッキ等の器具を介して箱抜フォームを型
枠側へ引付けると共に、箱抜フォームとトンネル内壁面
との間にスペーサー等を介在させていた。
Further, in the fixing work between the box-out form and the form, the installation position of the box-out form is confirmed through an inspection window or the like of the form, and both are fixed through bolts from the inside of the form. Later, in order to prevent displacement of the fixed position between the box-out foam and the formwork due to the external force applied when pouring the concrete for the secondary lining, the box-out form is pulled toward the formwork via a device such as a jack. A spacer or the like was interposed between the box-out foam and the inner wall surface of the tunnel.

【0008】また、トンネル内壁に打設したコンクリー
トの養生硬化後、型枠の脱型した後、箱抜フォームを養
生硬化したコンクリート内から脱型していた。
[0008] Further, after the curing and hardening of the concrete cast on the inner wall of the tunnel, the mold is removed from the mold, and then the box-out foam is removed from the cured and hardened concrete.

【0009】この箱抜フォームのトンネル内への設置作
業には約1日程度かかるのが現状である。
At present, it takes about one day to install the box-out form in the tunnel.

【0010】また、コンクリート構築物である橋脚表面
に装飾用凹部を成形する際、またはビルの支柱表面に壁
面パネル装着用凹部を成形する際、にも前記同様箱抜フ
ォームを型枠に多数の器具を介して個別に固定した後、
コンクリート打設し、型枠および箱抜フォームを脱型さ
せていた。
Also, when molding a recess for decoration on the surface of a pier, which is a concrete structure, or when molding a recess for mounting a wall panel on the surface of a pillar of a building, the box-out foam is used as a mold and a large number of tools are used. After fixing individually via
The concrete was placed, and the formwork and the box-out foam were removed from the mold.

【0011】なお、図6、図10〜図13中、12は型
枠、14はトンネル、16は二次覆工用のコンクリー
ト、24はトンネル内壁面、34は各種設備、36は設
備用スペース、44は箱抜フォーム、46はフォーム部
材、48はボルト、50はジャッキ、52はスペーサー
を示す。
In FIGS. 6 and 10 to 13, 12 is a formwork, 14 is a tunnel, 16 is concrete for secondary lining, 24 is an inner wall surface of the tunnel, 34 is various equipment, and 36 is equipment space. 44 is a foam member, 46 is a foam member, 48 is a bolt, 50 is a jack, and 52 is a spacer.

【0012】[0012]

【発明が解決しようとする課題】従来、コンクリート構
築物であるトンネル内壁への二次覆工用のコンクリート
打設時、設置用スペースの成形、橋脚表面への装飾用凹
部の成形、またはビルの支柱表面への壁面パネル装着用
凹部の成形において、型枠と箱抜フォームとの固定は、
ボルト、ジャッキ、スペーサー等の多数の器具を介して
行う必要があるため、固定作業が面倒であるばかりか、
細心の注意が必要であり、しかも作業時間も長くかかる
ことが問題となっていた。
Conventionally, when placing concrete for secondary lining on a tunnel inner wall, which is a concrete structure, forming an installation space, forming a decorative recess on the surface of a pier, or a pillar of a building. When molding the recess for mounting the wall panel on the surface, fixing the form and the box-out form is
Fixing work is not only troublesome because it needs to be carried out through a large number of devices such as bolts, jacks and spacers.
It has been a problem that it requires careful attention and that it requires a long working time.

【0013】本発明は、このような欠点に鑑み、(装飾
用、部材装着用、設備設置用)箱抜のスペースを形成す
るための箱抜フォームと型枠との固定作業を極めて容易
に、能率良く行うことができる箱抜フォームを装着した
型枠によるコンクリート打設方法を提供することを目的
とするものである。
In view of such drawbacks, the present invention makes it extremely easy to fix the box-extracting foam and the formwork for forming the box-extracting space (for decoration, member mounting, equipment installation), It is an object of the present invention to provide a concrete placing method using a form fitted with a box-out foam that can be efficiently performed.

【0014】[0014]

【課題を解決するための手段】本発明は、型枠を介し
て、コンクリート構築物の表面に箱抜のスペースを形成
させるコンクリート打設方法において、箱抜のスペース
に対応した箱抜フォームの設置された位置へ型枠を移動
させた後に、箱抜フォームに配設さた電磁石に同時通
電することにより、箱抜フォームを型枠のコンクリート
構築物側に磁着させ、コンクリートを打設して養生硬化
させた後に、この養生硬化されたコンクリート内から箱
抜フォームを脱型させることを特徴とするもの、特に、
上記箱抜フォームの脱型に際して、電磁石への通電を停
止して箱抜フォームと型枠との磁着を解除した後に型枠
を脱型させて、養生硬化したコンクリート内から箱抜フ
ォームを脱型させるもの、あるいは、同脱型に際して、
電磁石の磁着力が養生硬化後のコンクリートと箱抜フォ
ームとの固着力よりも大きく設定されるように通電した
後に、養生硬化したコンクリート内から箱抜フォームを
型枠と共に脱型させるものである。また、本発明は、型
枠を介して、コンクリート構築物の表面に箱抜のスペー
スを形成させるコンクリート打設方法において、箱抜の
スペースに対応した箱抜フォームの設置された位置へ型
枠を移動させた後に、箱抜フォームに配設された電磁石
を介してコンクリート構築物側に向けて箱抜フォームを
型枠の少なくとも一部に磁着させ、コンクリートを打設
して養生硬化させた後に、電磁石への通電を停止して箱
抜フォームと型枠との磁着を解除し、その後、型枠を脱
型させて、養生硬化したコンクリート内から箱抜フォー
ムを脱型させることを特徴とするものである。また本発
明は、型枠を介して、コンクリート構築物の表面に箱抜
のスペースを形成させるコンクリート打設方法におい
て、箱抜のスペースに対応した箱抜フォームの設置され
た位置へ型枠を移動させた後に、箱抜フォームに配設さ
れた電磁石を介してコンクリート構築物側に向けて箱抜
フォームを型枠の少なくとも一部に磁着させ、コンクリ
ートを打設して養生硬化させた後に、電磁石の磁着力が
養生硬化後のコンクリートと箱抜フォームとの固着力よ
りも大きく設定されるように通電し、その後、養生硬化
したコンクリート内から箱抜フォームを型枠と共に脱型
させることを特徴とするものである。
SUMMARY OF THE INVENTION The present invention, through the mold, Oite the concrete設方method of forming a space Hako抜the surface of the concrete construction, boxes disconnect space
Move the formwork to the position where the box-out form corresponding to
After allowed to, simultaneous with the electromagnet which is arranged in a box disconnect form
By collecting, by magnetic dressed boxes disconnect form the concrete construction side of the mold, curing cured Da設the concrete
After this, let the box from within this cured concrete.
What is characterized by demolding the punching foam , especially,
When removing the above-mentioned box-out form, stop energizing the electromagnet.
After stopping and removing the magnetic attachment between the box-out form and the formwork, the formwork
Remove the mold and remove the box from the cured concrete.
To remove the mold, or when removing the mold,
The magnetizing force of the electromagnet causes the concrete and the box-out
Energized so that it is set to be larger than the fixing force with the arm
Later, the box-out foam was removed from within the cured and hardened concrete.
It is to be demolded together with the formwork. In addition, the present invention is a mold
Through the frame, the space without the box on the surface of the concrete structure.
In the concrete pouring method that forms the
Die to the position where the box-out form corresponding to the space is installed
Electromagnet placed on the box-out form after moving the frame
Through the box to the concrete structure side through
Placing concrete on at least part of the formwork and placing concrete
Then, after curing and curing, stop energizing the electromagnet and
Remove the magnetic attachment between the foam and the formwork, and then remove the formwork.
After molding, the box-extracting foam is removed from the cured and hardened concrete.
It is characterized by removing the mold. Again
Ming is boxed on the surface of the concrete structure through the formwork.
Of concrete pouring method to form the space of
In addition, a box-extracting form that corresponds to the box-extracting space is installed.
After moving the formwork to the
The box toward the concrete structure side via the electromagnet
Magnetically attach the foam to at least part of the formwork and
After placing the sheet and curing and curing, the magnetic force of the electromagnet
The adhesive strength between the concrete after curing and hardening and the box-out foam
Energize so that it is set to a larger value, then cure and cure
Demolding the box-out form with the formwork from inside the concrete
It is characterized by that.

【0015】[0015]

【発明の実施の形態】本発明に係る箱抜フォームを装着
した型枠によるコンクリート打設装置は、図1〜図6に
示すように、以下の構成からなるものである。
BEST MODE FOR CARRYING OUT THE INVENTION As shown in FIGS. 1 to 6, a concrete placing device using a form fitted with a box-out foam according to the present invention has the following structure.

【0016】本発明で使用する型枠12は、コンクリー
ト構築物であるトンネル内壁に二次覆工用のコンクリー
ト16を打設するためのものであり、トンネル14内に
移動自在に配設されたガントリー18上に、天端フォー
ム20および両側フォーム22,22が、ガントリー1
8の長さ方向に移動自在に配設され、各フォーム20,
22,22が伸縮自在であると共に、両側フォーム2
2,22が折畳み可能なものである。
The formwork 12 used in the present invention is for placing concrete 16 for secondary lining on a tunnel inner wall which is a concrete structure, and is a gantry movably arranged in the tunnel 14. The top end foam 20 and the double-sided foams 22, 22 are mounted on the gantry 1 on
8 are arranged movably in the longitudinal direction of each of the foams 20,
22 and 22 are expandable and contractible, and form 2 on both sides
Numerals 2 and 22 are foldable.

【0017】型枠12の少なくとも一方(図1において
左側)の側フォーム22に、トンネル内壁面24側に向
けて箱抜フォーム26が、固着されている。
A box-out foam 26 is fixed to at least one side foam 22 of the mold 12 (on the left side in FIG. 1) toward the tunnel inner wall surface 24 side.

【0018】本例において、箱抜フォーム26は、従来
例同様断面箱型のものであり、側フォーム22固定側
(図4において上側)に電磁石28が配設されている。
In this example, the box-out form 26 has a box-shaped cross section as in the conventional example, and an electromagnet 28 is arranged on the side of the side form 22 fixed (upper side in FIG. 4).

【0019】また、箱抜フォーム26の全体形状は、図
3に示すように、長方形30の上部長辺上に細長長方形
32を接合させ、下部長辺上に小型長方形33を接合さ
せた形状である。
As shown in FIG. 3, the overall shape of the box-out form 26 is such that an elongated rectangle 32 is joined on the upper long side of a rectangle 30 and a small rectangle 33 is joined on the lower long side. is there.

【0020】また、電磁石28は円形のものであり、支
持ブラケット38を介して箱抜フォーム26に位置調整
自在に配設されている。
The electromagnet 28 has a circular shape and is disposed on the box-out form 26 via a support bracket 38 so that its position can be adjusted.

【0021】本装置を使用してトンネル内壁に、災害器
具、照明器具等の各種設備34の(設置用)箱抜のスペ
ース36を形成させると共に、二次覆工用のコンクリー
ト16を打設する方法を以下に詳述する。
This device is used to form a space 36 for boxing (for installation) of various equipment 34 such as disaster equipment and lighting equipment on the inner wall of the tunnel, and concrete 16 for secondary lining is placed. The method is detailed below.

【0022】まず、形成すべき各種設備34の(設置
用)箱抜のスペース36に対応させた箱抜フォーム26
が予め設置されたトンネル14の所定位置へ型枠12を
移動させる。
First, the box-extracting form 26 corresponding to the box-extracting space 36 (for installation) of various equipments 34 to be formed.
Moves the formwork 12 to a predetermined position of the tunnel 14 which is installed in advance.

【0023】この際、型枠12のトンネル掘削側と反対
側は、既二次覆工コンクリート打設部(図示略)と重合
させておく必要がある。
At this time, the side of the formwork 12 opposite to the side where the tunnel is excavated needs to be overlapped with the already-exposed secondary lining concrete placing portion (not shown).

【0024】次に、箱抜フォーム26に配設された多数
の電磁石28を同時通電させることにより、箱抜フォー
ム26を型枠12の側フォーム22に磁着させる。
Next, by energizing a large number of electromagnets 28 arranged on the box-out form 26 at the same time, the box-out form 26 is magnetically attached to the side form 22 of the mold 12.

【0025】この際、箱抜フォーム26の側フォーム2
2への磁着(固着)は、多数の電磁石28の電線を予め
全て連結し、同時通電させることにより、箱抜フォーム
26全体を瞬時に側フォーム22に磁着させることがで
きる。
At this time, the side foam 2 of the box-out foam 26
For magnetic attachment (fixing) to 2, the whole of the box-out form 26 can be instantly attached to the side form 22 by connecting all the electric wires of a large number of electromagnets 28 in advance and simultaneously energizing them.

【0026】次に、型枠12のトンネル掘削側周縁を確
実に被覆(妻止め)する。
Next, the peripheral edge of the formwork 12 on the tunnel excavation side is surely covered (stopped).

【0027】その後、二次覆工用のコンクリート16を
打設し、養生硬化させる。
Then, the concrete 16 for the secondary lining is cast and cured by curing.

【0028】次に、型枠12を脱型させた後、養生硬化
したコンクリート16内から箱抜フォーム26を脱型さ
せる。
Next, after the mold 12 is demolded, the box-out foam 26 is demolded from the inside of the concrete 16 that has been cured by curing.

【0029】この際、箱抜フォーム26に配設された電
磁石28への通電を停止し、箱抜フォーム26と型枠1
2との固着を解除しておくことが必要である。
At this time, the energization of the electromagnet 28 arranged in the box-out form 26 is stopped, and the box-out form 26 and the mold 1
It is necessary to release the sticking with 2.

【0030】また、箱抜フォーム26の脱型作業を容易
に行うため、箱抜フォーム26を型枠12と共に脱型す
る場合もあり、その際には電磁石28を通電状態とした
ままとし、箱抜フォーム26に配設された電磁石28の
磁着力を、養生硬化後のコンクリート16と箱抜フォー
ム26との固着力より大きく設定することにより、養生
硬化したコンクリート16内から箱抜フォーム26をス
ムーズに脱型することが可能となる。
In addition, in order to facilitate the demolding work of the box-out form 26, the box-out form 26 may be demolded together with the mold 12. In that case, the electromagnet 28 is left in the energized state, and the box is removed. By setting the magnetic adhesion force of the electromagnet 28 disposed on the punch-out foam 26 to be larger than the fixing force between the concrete 16 and the box-out foam 26 after curing and curing, the box-out foam 26 can be smoothly removed from the inside of the cure-hardening concrete 16. It becomes possible to demold.

【0031】次に、箱抜フォーム26および型枠12を
洗浄し、次回使用に備える。
Next, the box-out foam 26 and the form 12 are washed and prepared for the next use.

【0032】前記工程により、型枠12が設置された個
所の二次覆工用コンクリートの打設と共に、各種設備3
4の(設置用)箱抜のスペース36の形成が完了する。
By the above-mentioned process, the concrete for the secondary lining at the place where the formwork 12 is installed is placed, and various equipment 3 is also installed.
The formation of the space 36 for removing the box (for installation) 4 is completed.

【0033】このコンクリートの打設を、トンネル掘削
側へ向けて順次型枠12を移動させて行い、トンネル1
4の全長にわたり行う。
This concrete is placed by sequentially moving the formwork 12 toward the tunnel excavation side, and the tunnel 1
4 over the entire length.

【0034】また、コンクリート打設時に、各種設備3
4の(設置用)箱抜のスペース36を形成しない場合に
は、箱抜フォーム26をトンネル14内の作業に支障と
ならない個所に移動させ、通常通り型枠12のみにより
コンクリート打設を行う。
In addition, various kinds of equipment 3 at the time of pouring concrete
When the space 36 for boxing (for installation) 4 is not formed, the boxing foam 26 is moved to a place in the tunnel 14 where it does not interfere with the work, and concrete is poured by the mold 12 only as usual.

【0035】また、本発明に係る箱抜フォームを装着し
た型枠によるコンクリート打設装置の別の使用例が図7
および図8に示してある。
FIG. 7 shows another example of using the concrete pouring device with a form fitted with the box-out foam according to the present invention.
And shown in FIG.

【0036】本例は、コンクリート構築物が橋脚38で
ある場合、この橋脚38の表面に(装飾用)箱抜のスペ
ース(凹部)36を形成するものであり、橋脚38の四
方に型枠12を囲設させ、相対する2個の型枠12に箱
抜フォーム26を装着させてある。
In this example, when the concrete structure is a pier 38, spaces (recesses) for removing the box (for decoration) 36 are formed on the surface of the pier 38, and the formwork 12 is provided on four sides of the pier 38. The box-out foam 26 is attached to the two molds 12 that are surrounded and face each other.

【0037】これら型枠12内にコンクリート16を打
設し、養生硬化後、各型枠12および箱型フォーム26
を脱型させることにより、橋脚38の表面に(装飾用)
箱抜のスペース36が形成される。
Concrete 16 is placed in these molds 12, and after curing and hardening, each mold 12 and box form 26
On the surface of the pier 38 by removing the mold (for decoration)
A space 36 without a box is formed.

【0038】また、本発明に係る箱抜フォームを装着し
た型枠によるコンクリート打設装置のさらに別の使用例
が図9に示してある。
FIG. 9 shows still another example of use of the concrete placing device using the form fitted with the box-out foam according to the present invention.

【0039】本例は、コンクリート構築物がビルの支柱
40である場合、この支柱40の表面に壁面パネル42
の(装着用)箱抜のスペース(凹溝)36を形成するも
のであり、支柱40の四方に型枠12を囲設させ、1個
の型枠12に箱抜フォーム26を装着させてある。
In this example, when the concrete structure is a pillar 40 of a building, a wall panel 42 is provided on the surface of the pillar 40.
(For mounting) a box-extracting space (concave groove) 36 is formed, and the formwork 12 is surrounded on four sides of the support column 40, and the box-out form 26 is attached to one formwork 12. .

【0040】これら型枠12内にコンクリート16を打
設し、養生硬化後、各型枠12および箱型フォーム26
を脱型させることにより、支柱40の表面に(装着用)
箱抜のスペース36が形成される。
Concrete 16 is placed in these molds 12, and after curing and hardening, each mold 12 and box form 26
On the surface of the column 40 by removing the mold (for mounting)
A space 36 without a box is formed.

【0041】[0041]

【0042】また、電磁石28の形状および使用個数
は、必要に応じて変更可能である。
The shape and number of the electromagnets 28 used can be changed as required.

【0043】また、各種設備34の(設置用)箱抜のス
ペース36をトンネル14の両側に配備させる際には、
箱抜フォーム26を型枠12の両側フォーム22,22
にそれぞれ磁着させて使用する。
When the spaces 36 for installation (for installation) of various equipments 34 are placed on both sides of the tunnel 14,
Form the box-out form 26 on both sides of the formwork 22, 22.
Used by magnetically attaching to each.

【0044】また、二次覆工用コンクリート打設に使用
する型枠12は伸縮、折畳み自在のものであるが、必ず
しも伸縮折畳み自在のものに限定されることはない。
Further, the form 12 used for pouring the concrete for the secondary lining is expandable and foldable, but it is not necessarily limited to expandable and foldable.

【0045】また、二次覆工用コンクリート打設する例
は略半円形のトンネルにおけるものであるが、円形のト
ンネル、例えば海中トンネル、下水道等にも利用でき
る。
The example of placing concrete for the secondary lining is in a substantially semicircular tunnel, but it can also be used in circular tunnels, such as undersea tunnels and sewers.

【0046】[0046]

【発明の効果】本発明に係る箱抜フォームを装着した型
枠によるコンクリート打設方法によれば、コンクリート
構築物に箱抜のスペースを形成するための箱抜フォーム
を、型枠の少なくとも一部に、箱抜フォームに配設され
た電磁石を介して磁着するため、従来必要であったボル
ト、ジャッキ、スペーサー等の器具による箱抜フォーム
と型枠との固定作業および箱抜フォームと型枠との固着
位置ズレ防止作業が皆無となり、瞬時に箱抜フォームを
型枠に固着(固定)することができ、作業が極めて容易
となり、作業能率の向上に役立つ。
EFFECTS OF THE INVENTION According to the method for placing concrete by using the form fitted with the box removing foam according to the present invention, the box removing form for forming the box removing space in the concrete structure is provided with at least a part of the form. In addition, since it is magnetically attached through an electromagnet arranged in the box-out form, it is necessary to fix the box-out form and the frame with tools such as bolts, jacks and spacers, which are conventionally required, and the box-out form and the frame. There is no work to prevent the fixed position from sticking to each other, and the box-out form can be fixed (fixed) to the form frame instantly, which makes the work extremely easy and helps improve work efficiency.

【図面の簡単な説明】[Brief description of drawings]

【図1】本発明に係るコンクリート打設装置の正面図。FIG. 1 is a front view of a concrete pouring device according to the present invention.

【図2】同、要部拡大正面図。FIG. 2 is an enlarged front view of the same part.

【図3】箱抜フォームを示す平面図。FIG. 3 is a plan view showing a box-out form.

【図4】同、要部拡大縦断面図。FIG. 4 is an enlarged vertical sectional view of the same.

【図5】電磁石の装着状態を示す拡大正面図。FIG. 5 is an enlarged front view showing a mounted state of the electromagnet.

【図6】災害設備の収納スペースを備えたトンネルの略
線断面図。
FIG. 6 is a schematic cross-sectional view of a tunnel having a storage space for disaster equipment.

【図7】本装置の別の使用例を示す平面図。FIG. 7 is a plan view showing another usage example of the present apparatus.

【図8】同、成形された橋脚を示す正面図。FIG. 8 is a front view showing the molded pier.

【図9】本装置のさらに別の使用例を示す平面図。FIG. 9 is a plan view showing still another usage example of the present apparatus.

【図10】箱抜フォームの従来例を示す正面図。FIG. 10 is a front view showing a conventional example of a box-out form.

【図11】同、平面図。FIG. 11 is a plan view of the same.

【図12】同、取付状態を示す正面図。FIG. 12 is a front view showing a mounting state of the same.

【図13】従来例のトンネル内壁に各種設備を設置する
スペースの形成作業を示す略線平面図。
FIG. 13 is a schematic line plan view showing the work of forming a space for installing various types of equipment on the tunnel inner wall of the conventional example.

【符号の説明】[Explanation of symbols]

12 型枠 14 トンネル 16 コンクリート 18 ガントリー 20 天端フォーム 22 側フォーム 24 トンネル内壁面 26 箱抜フォーム 28 電磁石 34 各種設備 36 スペース 12 formwork 14 tunnels 16 concrete 18 gantry 20 Top Form 22 side form 24 Tunnel inner wall 26 Form without a box 28 Electromagnet 34 Various equipment 36 spaces

───────────────────────────────────────────────────── フロントページの続き (72)発明者 相崎 毅 岐阜県本巣郡真正町十四条144番地 岐 阜工業株式会社内 (72)発明者 大久保 常秀 岐阜県本巣郡真正町十四条144番地 岐 阜工業株式会社内 (72)発明者 金子 真治 岐阜県本巣郡真正町十四条144番地 岐 阜工業株式会社内 (56)参考文献 特開 昭62−121297(JP,A) 実開 平1−70945(JP,U) (58)調査した分野(Int.Cl.7,DB名) E04G 9/10 102 E04G 11/34 E21D 11/10 ─────────────────────────────────────────────────── ─── Continuation of the front page (72) Inventor Takeshi Aizaki 144 No. 14 Shijo, Masashi-cho, Motosu-gun, Gifu Gifu Industrial Co., Ltd. (72) Tsunehide Okubo 144 No. 14 Shijo-cho, Motosu-gun, Gifu Gifu Kogyo Co., Ltd. (72) Inventor Shinji Kaneko, No. 144, 14 Shijo, Shinma-cho, Motosu-gun, Gifu Gifu Kogyo Co., Ltd. (56) Reference JP 62-121297 (JP, A) −70945 (JP, U) (58) Fields surveyed (Int.Cl. 7 , DB name) E04G 9/10 102 E04G 11/34 E21D 11/10

Claims (5)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】 型枠(12)を介して、コンクリート構築物
の表面に箱抜のスペース(36)を形成るコンクリート打
設方法において、箱抜のスペース (36) に対応した箱抜フォーム (26) の設置
された位置へ型枠 (12) を移動させる工程と、 箱抜フォーム(26)に配設さた電磁石(28)に同時通電す
ることにより、箱抜フォーム (26) を型枠 (12) コンクリ
ート構築物側に磁着させる工程と、 コンクリート(16)を打設し、養生硬化させる工程と、 養生硬化したコンクリート (16) 内から箱抜フォーム (26)
を脱型させる工程とを備える ことを特徴とする箱抜フォ
ームを装着した型枠によるコンクリート打設方法。
Through 1. A mold (12), in concrete設方method that form a space (36) of Hako抜the surface of the concrete construction, boxes disconnect form corresponding to the box disconnect the space (36) ( 26) Installation
Simultaneously energize the step of moving the mold (12) to the specified position and the electromagnet (28) arranged in the box-out form (26) .
The Rukoto, a step of magnetic wear boxes disconnect foam (26) to the concrete <br/> over preparative construct side mold (12), a step of concrete (16) and Da設, thereby curing curing, curing curing Foam-out foam (26) from inside concrete (16 )
And a step of demolding the concrete.
【請求項2】 請求項1に記載の箱抜フォームを装着し
た型枠によるコンクリート打設方法において、 養生硬化したコンクリート (16) 内から箱抜フォーム (26)
を脱型させる工程は、電磁石 (28) への通電を停止して箱
抜フォーム (26) と型枠 (12) との磁着を解除した後に、型
(12) を脱型させて、養生硬化したコンクリート (16)
から箱抜フォーム (26) を脱型させる ことを特徴とする箱
抜フォームを装着した型枠によるコンクリート打設方
法。
2. The box removing foam according to claim 1 is attached.
In the concrete pouring method using the closed form, the box-out foam (26) is set from the curing-hardened concrete (16) .
The step of removing the mold is to stop the energization of the electromagnet (28) and
After releasing the magnetic attachment between the punching foam (26) and the formwork (12) ,
Inside the concrete (16) that has been cured by curing by removing the frame (12)
A method for placing concrete using a form fitted with a box- extracting foam , characterized by removing the box- extracting foam (26) from the mold.
【請求項3】 請求項1に記載の箱抜フォームを装着し
た型枠によるコンクリート打設方法において、 養生硬化したコンクリート (16) 内から箱抜フォーム (26)
を脱型させる工程は、電磁石 (28) の磁着力が養生硬化後
のコンクリート (16) と箱抜フォーム (26) との固着力より
も大きく設定されるように通電した後に、養生硬化した
コンクリート (16) 内から箱抜フォーム (26) を型枠 (12)
共に脱型させる ことを特徴とする箱抜フォームを装着し
た型枠によるコンクリート打設方法
3. The box removing foam according to claim 1 is attached.
In the concrete pouring method using the closed form, the box-out foam (26) is set from the curing-hardened concrete (16) .
The step of demolding is that the magnetizing force of the electromagnet (28) is
From the adhesion strength of concrete (16) and foam without box (26)
Also cured so that it is set to a large value after being energized and cured
Form the box-out foam (26) from the concrete (16) to the formwork (12) .
Concreting process according mold was fitted with a box-disconnect form <br/> for causing demolded together.
【請求項4】 型枠 (12) を介して、コンクリート構築物
の表面に箱抜のスペース(36)を形成させるコンクリート
打設方法において、箱抜のスペース (36) に対応した箱抜フォーム (26) が設置
された位置へ型枠 (12) を移動させる工程と、 箱抜フォーム(26)に配設さた電磁石(28)を介してコン
クリート構築物側に向けて箱抜フォーム(26)を型枠(12)
の少なくとも一部に磁着させる工程と、 コンクリート(16)を打設し、養生硬化させる工程と、 電磁石 (28) への通電を停止して箱抜フォーム (26) と型枠
(12) との磁着を解除した後に、型枠 (12) を脱型させて、
養生硬化したコンクリート (16) 内から箱抜フォーム (26)
を脱型させる工程とを備える ことを特徴とする箱抜フォ
ームを装着した型枠によるコンクリート打設方法
4. A concrete structure through a formwork (12) .
Installation in concreting method of forming a box disconnect space (36) on the surface of the box disconnect form corresponding to the box disconnect the space (36) (26)
A step of moving to the mold to a position (12), con via an electromagnet (28) arranged in a box disconnect form (26)
Form the box-out foam (26) toward the cleat construction side (12)
A step of Ru is magnetically attached to at least a portion of, and Da設concrete (16), a step of curing the curing, the mold electromagnet boxes disconnect form stops energization of the (28) (26)
After releasing the magnetically attached to the (12), the mold (12) by demolding
Box-out foam (26) from inside the hardened concrete (16 )
Concreting process according mold equipped with a box-disconnect form, characterized in that it comprises a step for demolding.
【請求項5】 型枠 (12) を介して、コンクリート構築物
の表面に箱抜のスペース (36) を形成させるコンクリート
打設方法において、 箱抜のスペース (36) に対応した箱抜フォーム (26) が設置
された位置へ型枠 (12) を移動させる工程と、 箱抜フォーム (26) に配設された電磁石 (28) を介してコン
クリート構築物側に向けて箱抜フォーム (26) を型枠 (12)
の少なくとも一部に磁着させる工程と、 コンクリート (16) を打設し、養生硬化させる工程と、 電磁石 (28) の磁着力が養生硬化後のコンクリート (16)
箱抜フォーム (26) との固着力よりも大きく設定されるよ
うに通電した後に、養生硬化したコンクリート (16) 内か
ら箱抜フォーム (26) を型枠 (12) と共に脱型させる工程と
を備えることを特徴とする箱抜フォームを装着した型枠
によるコンクリート打設方法。
5. A concrete structure through a formwork (12) .
Concrete that forms an open space (36) on the surface of
In the placing method, the box- extracting form (26) corresponding to the box- extracting space (36 ) is installed.
To move the mold (12) to the specified position and the magnet via the electromagnet (28) arranged on the box-out form (26).
Toward cleat construct side boxes disconnect form (26) a mold (12)
A step of magnetically attached to at least a portion of the concrete (16) and Da設, a step of curing the curing, the electromagnet concrete magnetic attraction force after curing curing (28) (16)
It is set to be larger than the adhesion strength with the box-out foam (26) .
After urchin energized, or cured hardened in concrete (16)
Et boxes disconnect form (26) a mold with (12) a step of demolding
Formwork equipped with a box-out form characterized in that
Concrete placing method.
JP28213698A 1998-10-05 1998-10-05 Concrete placement method using formwork fitted with boxless foam Expired - Fee Related JP3527106B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP28213698A JP3527106B2 (en) 1998-10-05 1998-10-05 Concrete placement method using formwork fitted with boxless foam

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP28213698A JP3527106B2 (en) 1998-10-05 1998-10-05 Concrete placement method using formwork fitted with boxless foam

Publications (2)

Publication Number Publication Date
JP2000110347A JP2000110347A (en) 2000-04-18
JP3527106B2 true JP3527106B2 (en) 2004-05-17

Family

ID=17648588

Family Applications (1)

Application Number Title Priority Date Filing Date
JP28213698A Expired - Fee Related JP3527106B2 (en) 1998-10-05 1998-10-05 Concrete placement method using formwork fitted with boxless foam

Country Status (1)

Country Link
JP (1) JP3527106B2 (en)

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4519190B1 (en) * 2009-02-11 2010-08-04 永井木工株式会社 Forming box for use in placing concrete and boxing space forming method using the same
CN107905845B (en) * 2017-10-19 2019-05-31 秦士杰 Support of tunnel structure with locating alarming function
CN108824480A (en) * 2018-05-09 2018-11-16 上海市政工程设计研究总院(集团)有限公司 The gang form and its construction method poured for pipe gallery concrete roof
CN109372552B (en) * 2018-11-26 2023-10-31 四川蓝海智能装备制造有限公司 Die spraying device with electromagnetic template
CN109736848A (en) * 2019-02-26 2019-05-10 重庆交通建设(集团)有限责任公司 Prevent two lining trolleys that vault comes to nothing and prevention vault comes to nothing construction method
CN112523780B (en) * 2020-12-01 2022-11-29 中铁十二局集团有限公司 Soft rock tunnel lining vault anti-hollowing active monitoring construction method

Also Published As

Publication number Publication date
JP2000110347A (en) 2000-04-18

Similar Documents

Publication Publication Date Title
CN107700533A (en) A kind of box quick assembly and disassembly mould piping lane construction technology
JP3527106B2 (en) Concrete placement method using formwork fitted with boxless foam
KR102107939B1 (en) Magnetic type embeded anchor
KR20160099410A (en) Pretension precast partition wall and construction method of the same
CN207177286U (en) Add region mould after fabricated shear wall is reserved
JP6616629B2 (en) Grating mounting structure and method
JP4066060B2 (en) Construction method of partition in shield tunnel
KR20190111476A (en) Apparatus for hydraulically separating core steel from
KR101528732B1 (en) Bracket-Forklift Set for Handling a Mold and Method for Handling a Mold Using the Same
KR101781067B1 (en) Casing Apparatus and Method for Constructing In-situ Concrete Pile
US5028364A (en) Process for forming concrete structures and stripping concrete forms
JPS6218694B2 (en)
JP2012057331A (en) Road side structure inside tunnel and construction method therefor
JP3157488B2 (en) Method and apparatus for placing concrete for tunnel using formwork with boxless foam
CN111424828A (en) Prefabricated panel, connecting device, structure and manufacturing method thereof and building manufacturing method
CN210589821U (en) Wall mould in middle of pit toilet
JP3773734B2 (en) Staircase construction method and apparatus
JP3546115B2 (en) Waterproof panel mounting device for the final joint of a buried box
KR970002839Y1 (en) Movable steel form for outside walls
JPS63194070A (en) Execution of culvert by moving type mold frame
JPH0825338A (en) Manufacture of hollow pc beam
CN210132617U (en) Dry toilet cover plate mold
JP4261283B2 (en) Mounting method for base-isolated buildings
JP2008137212A (en) Method for simultaneously molding plurality of concrete blocks and rubber core mold used in the method
KR200379649Y1 (en) Link fixed on the wall for Rope

Legal Events

Date Code Title Description
A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20031212

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20040120

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20040218

R150 Certificate of patent or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090227

Year of fee payment: 5

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090227

Year of fee payment: 5

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100227

Year of fee payment: 6

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130227

Year of fee payment: 9

LAPS Cancellation because of no payment of annual fees