JP3389943B2 - Reclaimer turning control method - Google Patents

Reclaimer turning control method

Info

Publication number
JP3389943B2
JP3389943B2 JP28707697A JP28707697A JP3389943B2 JP 3389943 B2 JP3389943 B2 JP 3389943B2 JP 28707697 A JP28707697 A JP 28707697A JP 28707697 A JP28707697 A JP 28707697A JP 3389943 B2 JP3389943 B2 JP 3389943B2
Authority
JP
Japan
Prior art keywords
payout
turning
amount
reclaimer
distance
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP28707697A
Other languages
Japanese (ja)
Other versions
JPH11116058A (en
Inventor
浩一 尾上
義男 松山
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yaskawa Electric Corp
Original Assignee
Yaskawa Electric Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yaskawa Electric Corp filed Critical Yaskawa Electric Corp
Priority to JP28707697A priority Critical patent/JP3389943B2/en
Publication of JPH11116058A publication Critical patent/JPH11116058A/en
Application granted granted Critical
Publication of JP3389943B2 publication Critical patent/JP3389943B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Control Of Conveyors (AREA)
  • Specific Conveyance Elements (AREA)

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【発明の属する技術分野】本発明は、原料ヤードに積付
けた石炭や鉄鉱石などの原料を払出すリクレーマの旋回
制御方法に関するものである。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a swirl control method for a reclaimer for discharging raw materials such as coal and iron ore loaded in a raw material yard.

【0002】[0002]

【従来の技術】製鉄所などの原料ヤードには、輸送され
てきた石炭や鉄鉱石などの原料を積付けて貯留してあ
る。一般的に、これらの原料を使用する際には、リクレ
ーマと称する原料払出し装置を用いる。このリクレーマ
は、走行レール上を走行する車両と、この車両に俯仰及
び旋回自在に搭載したブームと、このブームの先端に取
り付けられ積山から原料を払出すバケットホイルと、払
出した原料をブームに沿って車両まで搬送するブームコ
ンベアとを備えている。原料の払出しに際しては、バケ
ットホイルを回転させながらブームを水平方向に旋回さ
せ、積山の同一高さの原料を払出し、次にブーム先端の
高さを下げて、段替えを行って次の高さの原料を払出
し、最下段まで払出し終えると、積山へのバケットホイ
ルの突っ込み量が一定となるように車両を前進(寸動)
させて同様の作業を繰り返す。そして、払出し量が目標
量になると、その場で旋回動作を停止して、払出しを終
了していた。
2. Description of the Related Art Raw materials such as coal and iron ore that have been transported are loaded and stored in a raw material yard such as an iron mill. Generally, when using these raw materials, a raw material dispensing device called a reclaimer is used. This reclaimer is a vehicle that travels on a traveling rail, a boom that is mounted on this vehicle so that it can be lifted and turned freely, a bucket wheel that is attached to the tip of this boom and that discharges raw materials from piles, and the discharged raw materials along the boom. And a boom conveyor for transporting the vehicle to the vehicle. When discharging the raw materials, rotate the boom wheel horizontally while rotating the bucket wheel, discharge the raw material at the same height of the pile, and then lower the height of the boom tip to change the stage to the next height. When the raw materials of the above are discharged and the discharge to the bottom is completed, the vehicle is moved forward (inching) so that the amount of bucket wheel thrust into the pile is constant.
And repeat the same operation. When the payout amount reaches the target amount, the turning operation is stopped on the spot and the payout is completed.

【0003】[0003]

【発明が解決しようとする課題】しかしながら、上述し
た従来のリクレーマの旋回制御では、払出し量が目標量
になると、旋回の途中で旋回動作を停止して払出しを終
了するため、次回の払出し時には、前回に停止した旋回
途中から新たな払出し作業を開始しなければならない。
また、仮に前回の作業が旋回の途中で終了していること
を無視して、旋回動作を最初(例えば、レール側の旋回
開始端)から行った場合には、積山の払出し面に段差が
生じているため、旋回途中で払出し量が激減したり、又
は払出し量が激増したりして一定量の原料が払出しでき
なくなり、操業効率を低下させる問題が生じた。本発明
は上記状況に鑑みてなされたもので、目標量の払出しを
終了する際に、常にリクレーマの旋回動作が旋回開始端
で停止するリクレーマの旋回制御方法を提供し、操業効
率の向上を図ることを目的とする。
However, in the swing control of the conventional reclaimer described above, when the payout amount reaches the target amount, the swing operation is stopped in the middle of the swing and the payout is ended. A new payout work must be started from the middle of the turning that was stopped last time.
In addition, if the previous operation is discontinued during the turn and the turning operation is performed from the beginning (for example, the turning start end on the rail side), a step is generated on the delivery surface of the pile. Therefore, the amount of dispensed material drastically decreases or the amount of dispensed material increases drastically during turning, and a certain amount of raw material cannot be dispensed, which causes a problem of lowering operating efficiency. The present invention has been made in view of the above circumstances, and provides a swivel control method for a reclaimer in which the swirling operation of the reclaimer always stops at the swirl start end when the target amount payout is completed, and the operation efficiency is improved. The purpose is to

【0004】[0004]

【課題を解決するための手段】本発明に係るリクレーマ
の旋回制御方法は、バケットホイルを回転させながらブ
ームを水平方向に旋回させて積山の原料を払出した後、
前記ブームを前方へ寸動走行させて前記バケットホイル
を積山へ突っ込み再び同様の払出し作業を繰り返すリク
レーマの旋回制御方法であって、払出し量が払出し目標
量の一定量前となったことを判断し、その回の旋回を旋
回開始端まで続行し、該旋回数を記憶し、該旋回数から
直前数回の1旋回当たりの平均払出し量を算出し、払出
し残量の1旋回当たりの予定払出し量を算出し、前記平
均払出し量と該予定払出し量との比を求め、該比の値を
1旋回当たりの平均寸動実績距離に乗じて次回の寸動距
離を算出するものである。また、リクレーマの旋回制御
方法は、前記次回の寸動距離を算出した以降、前記払出
し目標量の払出しが終了するまで、1旋回動作毎に前記
次回の寸動距離を繰り返して算出するものであってもよ
い。このリクレーマの旋回制御方法では、払出し開始か
らの累積の払出し量が、払出し目標量の一定量前に達し
た時、直前数回の1旋回当たりの平均払出し量を算出す
るとともに、払出し残量の1旋回当たりの予定払出し量
を算出し、この平均払出し量と、予定払出し量との比を
求め、この比の値を1旋回当たりの平均寸動実績距離に
乗じることで、払出し残量を整数回で終えるための寸動
距離が得られる。この結果、この寸動距離に基づき寸動
走行しながら旋回を行うことで、ブームが旋回開始位置
となる時と、払出し残量の払出しが終了する時とを一致
させることができる。また、次回の寸動距離を算出した
以降、1旋回動作毎に次回の寸動距離を繰り返して算出
する旋回制御方法では、次回の寸動距離が常に最新の諸
条件(平均払出し量、平均寸動実績距離など)に基づき
算出され、寸動距離の算出精度が高められることにな
る。
According to the swivel control method of a reclaimer according to the present invention, after rotating a bucket wheel, a boom is swung horizontally to discharge a pile of raw materials,
A swing control method for a reclaimer, in which the boom is jogged forward, the bucket wheel is thrust into a pile, and the same payout work is repeated again, and it is determined that the payout amount is a certain amount before the payout target amount. , The turn is continued to the turn start end, the number of turns is stored, the average payout amount per turn for the last several turns is calculated from the turn number, and the planned payout amount per turn of the remaining payout amount is calculated. Is calculated, the ratio between the average payout amount and the planned payout amount is obtained, and the value of the ratio is multiplied by the average actual inching distance per turn to calculate the next inching distance. In addition, the swing control method of the reclaimer is to calculate the next inching distance after calculating the next inching distance and then repeating the next inching distance for each turning operation until the payout of the payout target amount is completed. May be. In this reclaimer turning control method, when the cumulative payout amount from the start of payout reaches a certain amount before the payout target amount, the average payout amount per turn for the last several times is calculated, and the payout remaining amount is calculated. The planned payout amount per turn is calculated, the ratio of this average payout amount to the planned payout amount is calculated, and the value of this ratio is multiplied by the average inching actual distance per turn, so that the remaining payout amount is an integer. You can get the inching distance to finish in one turn. As a result, by performing turning while inching based on this inching distance, it is possible to match the time when the boom is at the turning start position and the time when the payout of the remaining payout amount is completed. Further, in the swing control method in which the next inching distance is repeatedly calculated for each one-turning operation after the next inching distance is calculated, the next inching distance is always the latest conditions (average payout amount, average size). It is calculated based on the actual movement distance, etc., and the accuracy of the inching distance calculation can be improved.

【0005】[0005]

【発明の実施の形態】以下、本発明に係るリクレーマの
旋回制御方法の実施の形態を図面を参照して説明する。
図1は原料ヤードとリクレーマとの関係を示す平面図、
図2は図1の側面図、図3は本発明に係る旋回制御方法
を実施するリクレーマの制御系統の概略構成を示したブ
ロック図である。原料の積山1を積付けた原料ヤード3
には走行レール5を敷設してあり、走行レール5にはリ
クレーマ7を走行可能に設置してある。リクレーマ7に
は俯仰及び旋回可能なブーム9を搭載してあり、ブーム
9の先端にはバケットホイル11を取り付けてある。ま
た、ブーム9には、長手方向に沿ってブームコンベア1
3を付設してある。図3に示すように、リクレーマ7に
は、ブーム9の俯仰角度、旋回角度をそれぞれ検出する
俯仰角度検出器15、旋回角度検出器17と、リクレー
マ7の走行位置を検出する走行位置検出器19とを設け
てある。バケットホイル11の旋回方向両側には積山1
の旋回方向両端、即ち、積荷切れを超音波で検出する積
荷切れ検出器21a、21bを設けてある。ブーム9の
途中の両側には、払出し段の高さを超音波で検出するこ
とにより払出し段の端を検出する段替検出器23a、2
3bを設けてある。また、ブーム9の先端側には、積山
1までの距離を超音波で検出し、この距離が一定以下に
なると警報信号を出力する衝突防止検出器25を設けて
ある。リクレーマ7には、ブーム9を俯仰させる俯仰駆
動装置27と、ブーム9を旋回させる旋回駆動装置29
と、リクレーマ7を走行させる走行駆動装置31とを設
けてある。また、リクレーマ7には、これらを駆動制御
する俯仰制御装置33と、旋回制御装置35と、走行制
御装置37とを設けてある。俯仰制御装置33は、俯仰
角度検出器15からの検出信号を受け、俯仰制御信号
を、俯仰指令器39を介して俯仰駆動装置27へ送出す
る。旋回制御装置35は、旋回角度検出器17からの検
出信号を受け、旋回制御信号を、旋回指令器41を介し
て旋回駆動装置29へ送出する。走行制御装置37は、
走行位置検出器19からの検出信号を受け、走行制御信
号を、走行指令器43を介して走行駆動装置31へ送出
する。旋回制御装置35には安息角設定器45を接続し
てあり、安息角設定器45には積山1の安息角が設定さ
れる。旋回制御装置35は、通常の制御動作に加え、段
替えを行う際に、安息角設定器45に設定してある安息
角に従って、下段の払出し段で旋回動作を行う。走行制
御装置37には寸動走行距離設定器47を接続してあ
り、寸動走行距離設定器47には払出し段の寸動走行距
離が設定される。また、走行制御装置37には寸動走行
可能距離記憶器49を接続してあり、寸動走行可能距離
記憶器49には各払出し段毎の寸動走行可能距離が記憶
される。更に、走行制御装置37には走行距離演算処理
部51を接続してある。走行制御装置37は、通常の制
御動作に加え、走行距離演算処理部51で検出したリク
レーマ7の寸動走行距離を、寸動走行距離設定器47に
設定してある寸動走行距離設定値と、寸動走行可能距離
記憶器49に記憶してある今回の払出し段の寸動走行可
能距離と比較し、寸動走行距離が下記の条件、 寸動走行距離≧寸動走行距離設定値 寸動走行距離≧寸動走行可能距離 のいずれかを満足すれば自動段替えを行い、上述の条件
を満足する前に衝突防止検出器25が警報信号を出力し
た場合も同様に自動段替えする制御を行う。走行距離演
算処理部51には、払出し量検出器53、払出し量記憶
器55、旋回数記憶器57、寸動実績距離記憶器59を
接続してある。払出し量記憶器55は、払出し量検出器
53によって検出した払出し量値を積算することによ
り、払出し開始時からの合計払出し量、及び1旋回当た
りの各払出し量をデータとして記憶する。旋回数記憶器
57は、払出し開始からの旋回数を記憶する。寸動実績
距離記憶器59は、各旋回毎の寸動実績距離を記憶す
る。次に、以上のように構成したリクレーマ7の旋回制
御方法を図4に基づき説明する。図4は本発明に係るリ
クレーマの旋回制御方法の手順を説明するフローチャー
トである。リクレーマ7は、通常、不図示のCRT又は
操作台から設定した寸動走行距離で寸動走行を行い、バ
ケットホイル11を回転させながらブーム9を水平方向
に旋回させ、積山1の同一高さの原料を払出し、次にブ
ーム9の先端の高さを下げて(段替えを行って)、次の
高さの原料を払出す。最下段まで払出し終えると、積山
1へのバケットホイルの突っ込み量が一定となるように
車両を前方へ寸動走行させて同様の作業を繰り返す。こ
の時、リクレーマ7は、旋回数記憶器57によって払出
し開始からの旋回数を記憶するとともに、払出し量記憶
器55によって1旋回当たりの払出し量、払出し開始時
からの合計払出し量、寸動実績距離記憶器59によって
各旋回毎の寸動実績距離を記憶する(S101、S10
2、S103)。なお、リクレーマ7は、後述する動作
により、払出し終了時には、レール側の払出し開始端に
配置されるため、払出し開始は、常にレール側の払出し
開始端から旋回を始めるものとする。払出し開始からの
合計払出し量が、払出し目標量Qより一定量Aだけ少な
い量(Q−A)に達すると(S104)、リクレーマ7
は、寸動走行距離の制御を開始する。先ず、合計払出し
量が上述の(Q−A)に達した時に、ブーム9が旋回途
中である場合には、ブーム9がレール側の旋回開始端と
なるまで旋回を続行し、払出しを行う(S105)。ブ
ーム9がレール側の旋回開始端に戻った時の旋回数を、
N回目の旋回として旋回数記憶器57に記憶する(S1
06)。また、合計払出し量が(Q−A)に達した時点
から、N回目の旋回を終了した時点までの払出し量をα
として、合計払出し量(Q−A)に加え、払出し開始か
らの合計払出し量を(Q−A+α)として払出し量記憶
器55に記憶する。従って、リクレーマ7が払出し目標
量Qを払出し完了するには、残り(A−α)だけ払出し
を行わなければならないことになる。次に、走行距離演
算処理部51は、払出し量記憶器55に記憶したN回か
ら直前の数回の1旋回当たりの平均の払出し量Bを算出
する(S107)。次に、払出し残量(A−α)の1旋
回当たりの予定払出し量Vを算出する(S108)。な
お、払出し残量(A−α)を払いだすのに必要な旋回数
nは、例えば、既に算出している上述の平均の払出し量
Bで払出し残量(A−α)を除して、その値を切り捨
て、又は切上げした整数値nを用いればよい。これによ
り、(A−α)/n=Vが成立する。旋回数nは、ブー
ム9が往復方向で払出しを行い、且つ払出し目標量Qの
払出し終了時に、ブーム9をレール側の旋回開始端に戻
す場合(本実施形態の場合)のみ偶数となるように設定
するが、ブーム9が一方向のみで払出しを行う場合、又
はブーム9が旋回開始端のいずれに配置されてもよい場
合には、偶数、奇数のいずれであってもよい。次に、走
行距離演算処理部51は、VとBとの比(V/B)を求
め(S109)、この値を寸動実績距離記憶器59に記
憶してある直前数回の1旋回当たりの平均寸動実績距離
Lに乗じて、次回の寸動距離Mを算出する(S11
0)。即ち、L×V/B=Mとなる。リクレーマ7は、
このようにして得た寸動距離Mで、上述の旋回開始位置
から旋回をn回行うことにより、払出し残量(A−α)
の払出しを終了させた時、ブーム9をレール側の旋回開
始位置に停止させて、払出し目標量Qの払出しを終了す
る(S111)。このように、本実施形態による旋回制
御方法では、走行寸動距離と払出し量とが比例すること
を利用し、払出し目標量Qの一定量前から寸動走行距離
を制御することで、払出し目標量Qに達する時に、ブー
ム9の旋回動作をレール側の旋回開始端で停止させるこ
とができる。また、リクレーマ7は、N回目以降の旋回
についても、1旋回毎に上述と同様の寸動走行距離の制
御を繰り返すことにより、払出し目標量Qと、ブーム9
の旋回開始端での停止をより高精度に一致させることが
できる。
BEST MODE FOR CARRYING OUT THE INVENTION An embodiment of a turning control method for a reclaimer according to the present invention will be described below with reference to the drawings.
1 is a plan view showing the relationship between the raw material yard and the reclaimer,
FIG. 2 is a side view of FIG. 1, and FIG. 3 is a block diagram showing a schematic configuration of a control system of a reclaimer for carrying out the turning control method according to the present invention. Raw material yard 3 loaded with raw material piles 1
A traveling rail 5 is laid on the traveling rail 5, and a reclaimer 7 is installed on the traveling rail 5 so as to be capable of traveling. The reclaimer 7 is equipped with a boom 9 which can be raised and lowered and a bucket wheel 11 is attached to the tip of the boom 9. Further, the boom 9 has a boom conveyor 1 along the longitudinal direction.
3 is attached. As shown in FIG. 3, the reclaimer 7 includes a depression / elevation angle detector 15, a turning angle detector 17, which detects a depression / elevation angle and a turning angle of the boom 9, and a traveling position detector 19 which detects a traveling position of the reclaimer 7. And are provided. A pile of mountains 1 on both sides of the bucket wheel 11 in the turning direction.
In the turning direction at both ends, that is, dead load detectors 21a and 21b for detecting dead load with ultrasonic waves are provided. On both sides in the middle of the boom 9, stage change detectors 23a, 2a for detecting the end of the payout stage by ultrasonically detecting the height of the payout stage.
3b is provided. Further, on the tip side of the boom 9, there is provided a collision prevention detector 25 which detects the distance to the pile 1 by ultrasonic waves and outputs an alarm signal when this distance becomes less than a certain value. The reclaimer 7 includes a raising / lowering drive device 27 for raising the boom 9 and a turning drive device 29 for turning the boom 9.
And a traveling drive device 31 for traveling the reclaimer 7. Further, the reclaimer 7 is provided with an elevation control device 33 for driving and controlling these, a turning control device 35, and a travel control device 37. The elevation control device 33 receives the detection signal from the elevation angle detector 15, and sends the elevation control signal to the elevation drive device 27 via the elevation command device 39. The turning control device 35 receives the detection signal from the turning angle detector 17, and sends the turning control signal to the turning drive device 29 via the turning command device 41. The traveling control device 37 is
Upon receiving a detection signal from the traveling position detector 19, the traveling control signal is sent to the traveling drive device 31 via the traveling command device 43. A repose angle setting device 45 is connected to the turning control device 35, and the repose angle setting device 45 sets the repose angle of the mountain 1. In addition to the normal control operation, the turning control device 35 performs the turning operation in the lower payout stage according to the angle of repose set in the angle of repose setting device 45 when performing the stage change. A jogging distance setting device 47 is connected to the travel control device 37, and the jogging distance setting device 47 sets the jogging distance of the payout stage. Further, the travel control device 37 is connected to a jogging travelable distance storage device 49, and the jogging travelable distance storage device 49 stores therein the jogging travelable distance for each payout stage. Further, a travel distance calculation processing unit 51 is connected to the travel control device 37. In addition to the normal control operation, the traveling control device 37 sets the inching travel distance of the reclaimer 7 detected by the traveling distance calculation processing unit 51 to the inching travel distance set value set in the inching travel distance setter 47. In comparison with the inching travelable distance of the present payout stage stored in the inching travelling distance storage device 49, the inching travelling distance satisfies the following conditions: If any one of the travel distance ≧ distance travelable distance is satisfied, automatic changeover is performed, and if the collision prevention detector 25 outputs an alarm signal before the above condition is satisfied, the automatic changeover control is similarly performed. To do. A payout amount detector 53, a payout amount storage device 55, a turn count storage device 57, and an inching actual distance storage device 59 are connected to the traveling distance calculation processing unit 51. The payout amount storage device 55 integrates the payout amount values detected by the payout amount detector 53 to store the total payout amount from the start of the payout and each payout amount per turn as data. The number of turns memory 57 stores the number of turns from the start of dispensing. The inching actual distance memory 59 stores the inching actual distance for each turning. Next, a turning control method of the reclaimer 7 configured as above will be described with reference to FIG. FIG. 4 is a flowchart explaining the procedure of the reclaimer turning control method according to the present invention. The reclaimer 7 normally makes an inching travel at an inching travel distance set from a CRT or an operation console (not shown), and while rotating the bucket wheel 11, the boom 9 is horizontally swiveled, and the pile mountain 1 at the same height is rotated. The raw material is dispensed, then the height of the tip of the boom 9 is lowered (stage change is performed), and the raw material of the next height is dispensed. When the payout is completed up to the bottom, the vehicle is moved forward so that the amount of bucket wheel thrust into the pile 1 is constant, and the same work is repeated. At this time, the reclaimer 7 stores the number of turns from the start of the payout by the turn number storage device 57, and the payout amount per turn, the total payout amount from the start of the payout, and the inching actual distance by the payout amount storage device 55. The memory 59 stores the actual inching distance for each turn (S101, S10).
2, S103). It should be noted that the reclaimer 7 is arranged at the payout start end on the rail side at the end of payout by an operation to be described later, and therefore the payout start always starts turning from the payout start end on the rail side. When the total payout amount from the start of payout reaches the amount (Q-A) smaller than the target payout amount Q by the fixed amount A (S104), the reclaimer 7
Starts the control of the jogging distance. First, when the boom 9 is in the middle of turning when the total payout amount reaches the above (Q-A), the turning is continued until the boom 9 reaches the turning start end on the rail side, and the payout is performed ( S105). The number of turns when the boom 9 returns to the turning start end on the rail side,
It is stored in the number-of-turns storage 57 as the Nth turn (S1).
06). In addition, the payout amount from the time when the total payout amount reaches (Q-A) to the time when the Nth turn is completed is α
In addition to the total payout amount (Q−A), the total payout amount from the start of payout is stored in the payout amount storage 55 as (Q−A + α). Therefore, in order for the reclaimer 7 to complete the payout target amount Q, the remaining amount (A−α) must be paid out. Next, the traveling distance calculation processing unit 51 calculates the average payout amount B per one turn from the N times stored in the payout amount storage unit 55 to the last several times (S107). Next, the planned payout amount V per turn of the payout remaining amount (A-α) is calculated (S108). The number of turns n required to pay out the payout remaining amount (A-α) is obtained by dividing the payout remaining amount (A-α) by the above-described average payout amount B that has already been calculated, for example. The integer value n rounded down or rounded up may be used. As a result, (A−α) / n = V holds. The number of turns n should be an even number only when the boom 9 pays out in the reciprocating direction and when the payout of the payout target amount Q is completed, the boom 9 is returned to the turning start end on the rail side (in this embodiment). Although set, if the boom 9 pays out in only one direction, or if the boom 9 may be arranged at any of the turning start ends, it may be an even number or an odd number. Next, the traveling distance calculation processing unit 51 obtains a ratio (V / B) of V and B (S109), and this value is stored in the inching actual distance storage 59 for each of the last few turns. The next inching distance M is calculated by multiplying the average inching actual distance L of (S11).
0). That is, L × V / B = M. Reclaimer 7
With the inching distance M thus obtained, by performing n times of turning from the above turning start position, the payout remaining amount (A-α)
When the payout is finished, the boom 9 is stopped at the turning start position on the rail side, and the payout of the payout target amount Q is finished (S111). As described above, in the turning control method according to the present embodiment, by utilizing the fact that the traveling inching distance and the payout amount are proportional to each other, by controlling the inching traveling distance from before a predetermined amount of the payout target amount Q, the payout target is obtained. When the quantity Q is reached, the turning operation of the boom 9 can be stopped at the turning start end on the rail side. Further, the reclaimer 7 repeats the same inching travel distance control as described above for each turn for the Nth turn and thereafter, so that the payout target amount Q and the boom 9 are increased.
The stop at the turning start end can be more accurately matched.

【0006】[0006]

【発明の効果】以上詳細に説明したように、本発明に係
るリクレーマの旋回制御方法によれば、払出し量が目標
量に達した時、ブームの旋回動作が常にレール側の旋回
開始端で終了するので、次回の払出し作業をレール側の
旋回開始端より開始することができ、操業効率を向上さ
せることができる。また、次回の寸動距離を算出した以
降、払出し目標量の払出しが終了するまで、1旋回動作
毎に次回の寸動距離を繰り返して算出すれば、払出し目
標量と、ブームの旋回開始端での停止をより高精度に一
致させることができる。
As described in detail above, according to the swing control method for a reclaimer according to the present invention, when the payout amount reaches the target amount, the swing motion of the boom is always ended at the swing start end on the rail side. Therefore, the next payout work can be started from the turning start end on the rail side, and the operation efficiency can be improved. Also, after the next inching distance is calculated, if the next inching distance is repeatedly calculated for each turning operation until the payout target amount is completely paid out, the payout target amount and the turning start end of the boom can be calculated. The stop can be matched with higher accuracy.

【図面の簡単な説明】[Brief description of drawings]

【図1】原料ヤードとリクレーマとの関係を示す平面図
である。
FIG. 1 is a plan view showing a relationship between a raw material yard and a reclaimer.

【図2】図1の側面図である。FIG. 2 is a side view of FIG.

【図3】本発明に係る旋回制御方法を実施するリクレー
マの制御系統の概略構成を示したブロック図である。
FIG. 3 is a block diagram showing a schematic configuration of a control system of a reclaimer that implements a turning control method according to the present invention.

【図4】本発明に係るリクレーマの旋回制御方法の手順
を説明するフローチャートである。
FIG. 4 is a flowchart illustrating a procedure of a reclaimer turning control method according to the present invention.

【符号の説明】[Explanation of symbols]

1 積山 3 原料ヤード 5 走行レール 7 リクレーマ 9 ブーム 11 バケットホイル 13 ブームコンベア A 一定量 B 平均払出し量 L 平均寸動実績距離 N 旋回数 M 次回の寸動距離 Q 払出し目標量 V 予定払出し量 1 Sekiyama 3 raw material yard 5 running rails 7 reclaimer 9 boom 11 bucket wheels 13 boom conveyor A fixed amount B average payout amount L average inching actual distance N number of turns M Next inching distance Q target amount to be paid out V planned payout amount

───────────────────────────────────────────────────── フロントページの続き (58)調査した分野(Int.Cl.7,DB名) B65G 65/00 - 65/22 B65G 63/00 ─────────────────────────────────────────────────── ─── Continuation of the front page (58) Fields surveyed (Int.Cl. 7 , DB name) B65G 65/00-65/22 B65G 63/00

Claims (2)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】 バケットホイルを回転させながらブーム
を水平方向に旋回させて積山の原料を払出した後、前記
ブームを前方へ寸動走行させて前記バケットホイルを積
山へ突っ込み再び同様の払出し作業を繰り返すリクレー
マの旋回制御方法において、 払出し量が払出し目標量の一定量前となったことを判断
し、 その回の旋回を旋回開始端まで続行し、 該旋回数を記憶し、 該旋回数から直前数回の1旋回当たりの平均払出し量を
算出し、 払出し残量の1旋回当たりの予定払出し量を算出し、 前記平均払出し量と該予定払出し量との比を求め、 該比の値を1旋回当たりの平均寸動実績距離に乗じて次
回の寸動距離を算出することを特徴とするリクレーマの
旋回制御方法。
1. After rotating a bucket wheel and horizontally rotating a boom to discharge a pile of raw material, the boom is moved forward and inward so that the bucket wheel is thrust into the pile and the same discharging operation is performed again. In the repetitive turning control method of the reclaimer, it is judged that the payout amount is a certain amount before the payout target amount, the turning of that time is continued until the turning start end, the turning number is stored, and the turning number is immediately before the turning number. The average payout amount per one turn is calculated several times, the planned payout amount per turn of the payout remaining amount is calculated, the ratio between the average payout amount and the planned payout amount is calculated, and the value of the ratio is set to 1 A swing control method for a reclaimer, wherein the next swing distance is calculated by multiplying the actual average swing distance per swing.
【請求項2】 前記次回の寸動距離を算出した以降、前
記払出し目標量の払出しが終了するまで、1旋回動作毎
に前記次回の寸動距離を繰り返して算出することを特徴
とする請求項1記載のリクレーマの旋回制御方法。
2. After the calculation of the next inching distance, the next inching distance is repeatedly calculated for each turning motion until the payout of the payout target amount is completed. The method for controlling the turning of the reclaimer according to 1.
JP28707697A 1997-10-20 1997-10-20 Reclaimer turning control method Expired - Fee Related JP3389943B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP28707697A JP3389943B2 (en) 1997-10-20 1997-10-20 Reclaimer turning control method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP28707697A JP3389943B2 (en) 1997-10-20 1997-10-20 Reclaimer turning control method

Publications (2)

Publication Number Publication Date
JPH11116058A JPH11116058A (en) 1999-04-27
JP3389943B2 true JP3389943B2 (en) 2003-03-24

Family

ID=17712754

Family Applications (1)

Application Number Title Priority Date Filing Date
JP28707697A Expired - Fee Related JP3389943B2 (en) 1997-10-20 1997-10-20 Reclaimer turning control method

Country Status (1)

Country Link
JP (1) JP3389943B2 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2013181727A1 (en) * 2012-06-04 2013-12-12 Vale S.A. Bulk material reclaimer control system

Also Published As

Publication number Publication date
JPH11116058A (en) 1999-04-27

Similar Documents

Publication Publication Date Title
US5697753A (en) Semiautomatic stacker for stackable articles
CA2210420A1 (en) Method of operating a bucket wheel excavator
JP3389943B2 (en) Reclaimer turning control method
JP3225969B2 (en) Reclaimer control device
JPS6223683B2 (en)
JPS5889525A (en) Operation method of reclaimer of dismantled matters storage yard
JPS6150851B2 (en)
JP3289255B2 (en) Material discharge control method for automatic work vehicles
JP2555686B2 (en) Reclaimer automatic payout control system
JP2785523B2 (en) Load transfer equipment
JP2007008617A (en) Automatic delivering method of raw material yard moving machine
JPH10338356A (en) Bulk material stack shape measuring method and bulk material stack storage quantity computing method
JP3458524B2 (en) Quantitative excavation control method for continuous unloader
JPH04223933A (en) Control of rotation reversal in automatic operation of reclaimer
JPH05139542A (en) Indoor bulk stuff discharging device
JPH05301638A (en) Time reduction control method for reclaimer at automatic body movement
CN116968743B (en) Dump truck and reversing auxiliary device
JP2971668B2 (en) Stacker reclaimer for bulk storage
JPS6139255B2 (en)
JPH059904A (en) Mixture delivering method for asphalt mixture silo
JPH062980Y2 (en) Reclaimer's load detection device
JPH04235829A (en) Automatic operating method of stacker or reclaimer
JPS6111144Y2 (en)
JPH0912149A (en) Discharge method of loose article piled hill
JPH05124733A (en) Automatic control method for loader

Legal Events

Date Code Title Description
FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090117

Year of fee payment: 6

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100117

Year of fee payment: 7

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110117

Year of fee payment: 8

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110117

Year of fee payment: 8

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120117

Year of fee payment: 9

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120117

Year of fee payment: 9

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130117

Year of fee payment: 10

LAPS Cancellation because of no payment of annual fees