JP3213875U - Rope processing equipment - Google Patents

Rope processing equipment Download PDF

Info

Publication number
JP3213875U
JP3213875U JP2017004377U JP2017004377U JP3213875U JP 3213875 U JP3213875 U JP 3213875U JP 2017004377 U JP2017004377 U JP 2017004377U JP 2017004377 U JP2017004377 U JP 2017004377U JP 3213875 U JP3213875 U JP 3213875U
Authority
JP
Japan
Prior art keywords
pulley group
rope
movable pulley
fixed pulley
climbing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2017004377U
Other languages
Japanese (ja)
Inventor
康夫 中森
康夫 中森
Original Assignee
株式会社クライス工業
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 株式会社クライス工業 filed Critical 株式会社クライス工業
Priority to JP2017004377U priority Critical patent/JP3213875U/en
Application granted granted Critical
Publication of JP3213875U publication Critical patent/JP3213875U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Lift-Guide Devices, And Elevator Ropes And Cables (AREA)

Abstract

【課題】コンパクトな装置で昇降装置の長尺ロープを処理できるロープ処理装置を提供する。【解決手段】固定滑車群2と移動滑車群3と、固定滑車群2と移動滑車群3に交互に巻回されたロープ4と、固定滑車群2と移動滑車群3の間隔を調整するシリンダ5からなり、好ましくは、固定滑車群2が三基であり、移動滑車群が二基であり、該移動滑車群3の一基から延長されたロープが固定滑車群2の一基に懸架された後、移動滑車群3の他の一基に戻して、つぎに固定滑車群2の残る二基に懸架して先端を昇降体に連絡する。【選択図】図1A rope processing device capable of processing a long rope of a lifting device with a compact device. SOLUTION: A fixed pulley group 2, a movable pulley group 3, a rope 4 wound around the fixed pulley group 2 and the movable pulley group 3, and a cylinder for adjusting a distance between the fixed pulley group 2 and the movable pulley group 3. 5, and preferably three fixed pulley groups 2 and two movable pulley groups, and a rope extended from one movable pulley group 3 is suspended on one fixed pulley group 2. After that, it is returned to the other group of the movable pulley group 3 and then suspended on the remaining two groups of the fixed pulley group 2 to connect the tip to the lifting body. [Selection] Figure 1

Description

本考案は、各種の昇降装置に有効なロープ処理装置に関する。   The present invention relates to a rope processing apparatus effective for various lifting devices.

レジャーランド等に、高所への登攀、昇降等を楽しむクライミング装置が提案されている。該クライミング装置はクライマの登攀、昇降時の安全を確保するために安全ロープが必要とされる。   Climbing devices that can enjoy climbing and climbing to high places have been proposed in leisure lands. The climbing device requires a safety rope in order to ensure safety when climbing and climbing the climber.

従来、クライミング装置として、電動式巻き取りリールと、一端が前記巻き取りリールに取り付けられ、使用時、クライミングロープに沿った末端部分がクライマに取り付けられるクライミングロープと、荷重検知手段および電子制御診断システムを有する制御機構とを備えるビレイ装置(クライミング装置)が提案されている(特許文献1)。   Conventionally, as a climbing device, an electric take-up reel, a climbing rope in which one end is attached to the take-up reel, and a terminal portion along the climbing rope is attached to the climber when in use, a load detection means, and an electronic control diagnosis system A belay device (climbing device) that includes a control mechanism having a mechanism has been proposed (Patent Document 1).

前記のクライミング装置は、電力、電動機、荷重検知手段、電子制御診断システム等の多くの機器が用いられている。なお、クライミングロープは電動式の巻き取りリールによって処理されている。   The climbing apparatus uses many devices such as electric power, an electric motor, load detection means, and an electronic control diagnosis system. The climbing rope is processed by an electric take-up reel.

特開2008−538313号公報JP 2008-538313 A

クライミング装置等の昇降装置が極めて高所まで形成されている場合には長尺ロープが必要となり、その巻き取り、巻き戻しなどの処理に困難を生じる場合がある。このような場合にはロープの処理装置を大型化すれば問題を解決できる。   When a lifting device such as a climbing device is formed up to a very high place, a long rope is required, which may cause difficulty in processing such as winding and rewinding. In such a case, the problem can be solved by increasing the size of the rope processing apparatus.

しかしながら、コンパクトな装置で昇降装置の長尺ロープを処理できれば経済的にも機械装置としても好都合である。   However, if the long rope of the lifting device can be processed with a compact device, it is advantageous both economically and mechanically.

本考案は、前記従来の電動式と異なる方式であり、コンパクトな装置で長尺ロープの巻き取り、巻き戻しなどの処理が可能なロープ処理装置を提供することを目的とする。   An object of the present invention is to provide a rope processing apparatus that is different from the above-described conventional electric type and that can perform processing such as winding and unwinding of a long rope with a compact apparatus.

本考案は、固定滑車群と移動滑車群と、前記固定滑車群と移動滑車群に交互に巻回されたロープと、前記固定滑車群と移動滑車群との間隔を調整するシリンダと、からなることを特徴とする(請求項1)。   The present invention comprises a fixed pulley group and a movable pulley group, ropes wound alternately around the fixed pulley group and the movable pulley group, and a cylinder for adjusting a distance between the fixed pulley group and the movable pulley group. (Claim 1).

前記構成によれば、固定滑車群と移動滑車群との間隔をシリンダにより調整することによりロープの巻き取り、巻き戻し量の調整が可能であり、コンパクトな装置で長尺ロープを処理することができる。   According to the above configuration, it is possible to adjust the amount of winding and unwinding of the rope by adjusting the distance between the fixed pulley group and the movable pulley group with the cylinder, and it is possible to process the long rope with a compact device. it can.

本考案の一実施の形態は、固定滑車群が三基であり、移動滑車群が二基であり、該移動滑車群の一基から延長されたロープが前記固定滑車群の一基に懸架された後、移動滑車群の他の一基に懸架され、さらに固定滑車群の残る二基に懸架されて先端が昇降体に連絡されることを特徴とする(請求項2)。   In one embodiment of the present invention, there are three fixed pulley groups, two movable pulley groups, and a rope extended from one of the movable pulley groups is suspended on one of the fixed pulley groups. After that, it is suspended by the other one of the movable pulley group, and further suspended by the remaining two of the stationary pulley group, and the tip is communicated with the lifting body (Claim 2).

前記構成よれば、移動滑車群の一基から延長されたロープを固定滑車群の一基に懸架した後、移動滑車群の他の一基に戻して、つぎに固定滑車群の残る二基に懸架したこと及び前記シリンダによる固定滑車群と移動滑車群との間隔調整により、コンパクトな装置で長尺ロープを処理することができる。   According to the above configuration, after the rope extended from one moving pulley group is suspended on one fixed pulley group, it is returned to the other moving pulley group, and then the remaining two fixed pulley groups. By suspending and adjusting the distance between the fixed pulley group and the movable pulley group by the cylinder, the long rope can be processed with a compact device.

本考案によれば、固定滑車群と移動滑車群の間隔を調整するシリンダを設けたこと、さらには固定滑車群と移動滑車群の間のロープの交互懸架により、コンパクトな装置で長尺ロープを処理することができる。   According to the present invention, a cylinder for adjusting the distance between the fixed pulley group and the movable pulley group is provided, and further, the rope is alternately suspended between the fixed pulley group and the movable pulley group. Can be processed.

固定滑車群、移動滑車群及びシリンダ部分を示す側面図である。It is a side view which shows a fixed pulley group, a movable pulley group, and a cylinder part. クライミング装置に適用した場合であってクライマが地上にある時のロープの状態を示す説明図である。It is explanatory drawing which shows the state of a rope when it is a case where it applies to a climbing apparatus and a climber exists on the ground. 図2のシリンダの状態を示す説明図である。It is explanatory drawing which shows the state of the cylinder of FIG. クライミング装置に適用した場合であってクライマが頂上部に達した時のロープの状態を示す説明図である。It is explanatory drawing which shows the state of a rope when it is a case where it applies to a climbing apparatus and the climber reaches the top. 図4のシリンダの状態を示す説明図である。It is explanatory drawing which shows the state of the cylinder of FIG. レジャーランドの一例を示す説明図である。It is explanatory drawing which shows an example of a leisure land.

以下、添付図面を参照して、本考案クライミング装置に適用した実施の一形態について説明する。   Hereinafter, an embodiment applied to a climbing apparatus of the present invention will be described with reference to the accompanying drawings.

図6は、クライミング部Cを有するレジャーランドの一例である。同図において、略中央部のクライミング部Cはネットで形成され、その左側のクライミング部Cは立木形状である。その他、いわゆる岩壁を形成してロッククライミングを楽しむことができる。本考案のロープ処理装置は、例えば、前記のクライミング部Cに適用される。   FIG. 6 is an example of a leisure land having a climbing part C. In the figure, the climbing portion C at the substantially central portion is formed of a net, and the climbing portion C on the left side thereof is a standing tree shape. In addition, you can enjoy rock climbing by forming a so-called rock wall. The rope processing apparatus of the present invention is applied to the climbing part C, for example.

図1は、本考案の固定滑車群、移動滑車群部及びシリンダ部分を示す側面図である。図中、1はガイド支柱、2は固定滑車群、3は前記ガイド支柱1に沿って昇降する移動滑車群、4は固定滑車群2と移動滑車群3に交互に巻回されたロープ、5は前記ガイド支柱1に沿って前記移動滑車群3を昇降させて前記固定滑車群2との間隔を調整するシリンダである。   FIG. 1 is a side view showing a fixed pulley group, a movable pulley group portion and a cylinder portion of the present invention. In the figure, 1 is a guide column, 2 is a fixed pulley group, 3 is a movable pulley group that moves up and down along the guide column 1, 4 is a rope wound around the fixed pulley group 2 and the movable pulley group 3, 5 Is a cylinder for adjusting the distance from the fixed pulley group 2 by moving the movable pulley group 3 up and down along the guide column 1.

なお、以下は、前記シリンダ5の制御装置の一例であり、図中、6はオイルタンク、7はクライマの下降速度を調整するオイル量調整弁、8はオイルホースである。   The following is an example of the control device for the cylinder 5. In the figure, 6 is an oil tank, 7 is an oil amount adjusting valve for adjusting the descending speed of the climber, and 8 is an oil hose.

前記固定滑車群2は、三基の滑車2a、2bおよび2cからなり、それぞれ同軸上に適数枚(例えば5枚)重ね合わせて構成され、前記移動滑車群3は、二基の滑車3aおよび3bからなり、それぞれ同軸上に敵数枚(例えば5枚)重ね合わせて構成されている。   The fixed pulley group 2 includes three pulleys 2a, 2b, and 2c, each of which is configured by overlapping an appropriate number of coaxials (for example, five), and the movable pulley group 3 includes two pulleys 3a and 3b. 3b, each of which is formed by overlapping several enemies (for example, 5) on the same axis.

そして、前記ロープ4は、前記移動滑車群3の滑車3aから前記固定滑車群2の滑車2c、前記移動滑車群3の滑車3b、前記固定滑車群2の滑車2bおよび滑車2aに掛け合わされたのちクライミング部Cの頂上に導かれる。   Then, after the rope 4 is hung from the pulley 3a of the movable pulley group 3 to the pulley 2c of the fixed pulley group 2, the pulley 3b of the movable pulley group 3, the pulley 2b of the fixed pulley group 2 and the pulley 2a. Guided to the top of the climbing part C.

前記シリンダ5は、図3および図5に示すように、内部のピストン10によって一方隔室11と他方隔室12が形成され、前記一方隔室11にはエアフィルタ9が連結され内部にピストンロッド13が設けられる。また、前記他方隔室12に前記オイルホース8およびオイル調整弁7を介してオイルタンク6が設けられる。   As shown in FIG. 3 and FIG. 5, the cylinder 5 is formed with a one compartment 11 and the other compartment 12 by an internal piston 10, and an air filter 9 is connected to the one compartment 11 and a piston rod inside. 13 is provided. An oil tank 6 is provided in the other compartment 12 via the oil hose 8 and the oil regulating valve 7.

そして、前記ピストンロッド13の先端に前記移動滑車群3が連結されて、該移動滑車群3がピストン10およびピストンロッド13により前記ガイド支柱1に沿って昇降自在に構成される。図中、14は前記クライミング部Cの頂上に延長されたロープ4のガイドローラ、15は昇降体のクライマである。   The movable pulley group 3 is connected to the tip of the piston rod 13, and the movable pulley group 3 is configured to be movable up and down along the guide column 1 by the piston 10 and the piston rod 13. In the figure, 14 is a guide roller of the rope 4 extended to the top of the climbing part C, and 15 is a climber climber.

つぎに、前記構成のクライミング装置の作用について説明する。本発明のシリンダによる移動滑車群の動きは、空気圧とロープの引っ張る力のバランスで上下する。   Next, the operation of the climbing apparatus having the above configuration will be described. The movement of the movable pulley group by the cylinder of the present invention goes up and down by the balance between the air pressure and the pulling force of the rope.

図3はクライミング開始時のシリダ5の状態であり、図2はクライミング開始時の固定滑車群2と移動滑車群3(いずれも省略)に巻回されたロープ4の状態を示す。   FIG. 3 shows the state of the cylinder 5 at the start of climbing, and FIG. 2 shows the state of the rope 4 wound around the fixed pulley group 2 and the movable pulley group 3 (both omitted) at the start of climbing.

また、図5はクライミング終了時のシリンダ5の状態であり、図4はクライミング終了時の固定滑車群2と移動滑車群3(いずれも省略)に巻回されたロープ4の状態を示す。   FIG. 5 shows a state of the cylinder 5 at the end of climbing, and FIG. 4 shows a state of the rope 4 wound around the fixed pulley group 2 and the movable pulley group 3 (both omitted) at the end of climbing.

図2に示すように、クライマ15がクライミング部Cの頂上部から垂下させられたロープ4の先端部を身体に固定してクライミング部Cを登り始める。クライマ15が登り始めてロープ4にクライマ15の身体荷重が加わっていない時には、ロープ4が軽くなり、前記シリンダ5の他方隔室12にオイルが流入し、前記一方隔室11の空気がエアフィルタ9から外気に放出される。その結果、図5に示すように、前記ピストンロッド13が進出(上昇)させられる。そして、図4に示すように前記移動滑車群3が前記固定滑車群2から離されて、ロープ4が弛むことなく、クライマ15が登った距離のロープ4が前記固定滑車群2と移動滑車群3によって吸収される。そして、クライマはクライミング部Cの頂上に達することができる。   As shown in FIG. 2, the climber 15 starts climbing the climbing portion C while fixing the tip of the rope 4 suspended from the top of the climbing portion C to the body. When the climber 15 starts climbing and the body load of the climber 15 is not applied to the rope 4, the rope 4 becomes lighter, oil flows into the other compartment 12 of the cylinder 5, and the air in the one compartment 11 flows into the air filter 9. To the outside air. As a result, as shown in FIG. 5, the piston rod 13 is advanced (raised). Then, as shown in FIG. 4, the movable pulley group 3 is separated from the fixed pulley group 2, and the rope 4 having a distance climbed by the climber 15 is not loosened, but the rope 4 is moved to the fixed pulley group 2 and the movable pulley group. 3 is absorbed. The climber can reach the top of the climbing portion C.

つぎに、クライマ15がクライミングに失敗し、クライミング部Cから外れて落下の危険がある場合には、クライマ15の身体荷重がロープ4に加わり、該ロープ4の力が移動滑車群3にかかり、該移動滑車群3が下方向に押し下げられる。   Next, when the climber 15 fails to climb and there is a risk of falling off the climbing portion C, the body load of the climber 15 is applied to the rope 4, and the force of the rope 4 is applied to the movable pulley group 3, The movable pulley group 3 is pushed downward.

一方隔室11にエアフィルタ9から空気が自然に供給され、シリンダ5の他方隔隔室12のオイルがオイルホース8およびオイル調整弁7を介してオイルタンク6に戻されてゆっくり下降が行われて、クライマ15の安全が確保されるものである。この下降工程は、クライマが登頂に成功して下降する場合も同様である。   Air is naturally supplied to the one compartment 11 from the air filter 9, and the oil in the other compartment 12 of the cylinder 5 is returned to the oil tank 6 through the oil hose 8 and the oil regulating valve 7 and slowly descends. Thus, the safety of the climber 15 is ensured. This descending process is the same when the climber descends successfully after climbing.

2 固定滑車群
3 移動滑車群
4 ロープ
5 シリンダ
6 オイルタンク
9 エアフィルタ
11 一方隔室
12 他方隔室
14 ガイドローラ
C クライミング部
2 Fixed pulley group 3 Moving pulley group 4 Rope 5 Cylinder 6 Oil tank 9 Air filter 11 One compartment 12 Other compartment 14 Guide roller C Climbing section

Claims (2)

固定滑車群と移動滑車群と、前記固定滑車群と移動滑車群に交互に巻回されたロープと、前記固定滑車群と移動滑車群との間隔を調整するシリンダとからなることを特徴とするロープ処理装置。   A fixed pulley group, a movable pulley group, a rope wound alternately around the fixed pulley group and the movable pulley group, and a cylinder that adjusts an interval between the fixed pulley group and the movable pulley group. Rope processing equipment. 前記固定滑車が三基であり、前記移動滑車群が二基であり、該移動滑車群の一基から延長されたロープが前記固定滑車群の一基に懸架された後、移動滑車群の他の一基に懸架され、さらに固定滑車群の残る二基に懸架されて先端が昇降体に連絡されてなることを特徴とする請求項1に記載のロープ処理装置。   There are three fixed pulleys, two mobile pulley groups, and a rope extended from one of the movable pulley groups is suspended on one of the fixed pulley groups. The rope processing apparatus according to claim 1, wherein the rope processing apparatus is suspended by one of the two, further suspended by the remaining two of the fixed pulley group, and the tip of which is connected to the lifting body.
JP2017004377U 2017-09-25 2017-09-25 Rope processing equipment Active JP3213875U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2017004377U JP3213875U (en) 2017-09-25 2017-09-25 Rope processing equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2017004377U JP3213875U (en) 2017-09-25 2017-09-25 Rope processing equipment

Publications (1)

Publication Number Publication Date
JP3213875U true JP3213875U (en) 2017-12-07

Family

ID=60580462

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2017004377U Active JP3213875U (en) 2017-09-25 2017-09-25 Rope processing equipment

Country Status (1)

Country Link
JP (1) JP3213875U (en)

Similar Documents

Publication Publication Date Title
JPH0137155B2 (en)
US6497623B2 (en) Amusement device
JP6442806B1 (en) Climbing equipment
JP3213875U (en) Rope processing equipment
EP1277495B1 (en) Climbing aid
JP2008110128A (en) Maintenance support device and maintenance method of construction using the same
JP6883844B2 (en) Wire drawing device
CN208071214U (en) A kind of material lifting device of automatic discharging
US6342017B1 (en) Amusement ride with enhanced ride control
CN202078661U (en) High-altitude slow descent device
CN205442449U (en) Portable tower crane device
KR101898998B1 (en) Up and down lift operation and self-moving cable car
CN204737558U (en) Integral type elevating gear
JP3181831U (en) Fall prevention device
KR20050002153A (en) For both descent and bungee jumping apparatus
CN205442450U (en) Long -range controlled tower crane device
JP2002070017A (en) Slope face working method and slope face-work safety belt used for it
KR20140002823U (en) Moving sheave of crane
CN107313275A (en) A kind of efficient life line manufacturing machine
JP7100304B1 (en) Governor and elevator
CN215110311U (en) Intelligent rope lock for rock climbing
CN108969918B (en) Escape equipment for wind generating set and wind generating set
CN104784836A (en) Multifunctional reel-off equipment
CN104800981A (en) Multifunctional rope-releasing equipment
CN112587828A (en) Deep hole rescue equipment for collapse danger

Legal Events

Date Code Title Description
R150 Certificate of patent or registration of utility model

Ref document number: 3213875

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250