JP3109619B2 - Combining device in hydraulic circuit - Google Patents

Combining device in hydraulic circuit

Info

Publication number
JP3109619B2
JP3109619B2 JP04092502A JP9250292A JP3109619B2 JP 3109619 B2 JP3109619 B2 JP 3109619B2 JP 04092502 A JP04092502 A JP 04092502A JP 9250292 A JP9250292 A JP 9250292A JP 3109619 B2 JP3109619 B2 JP 3109619B2
Authority
JP
Japan
Prior art keywords
valve
pump
pressure
spool
load pressure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP04092502A
Other languages
Japanese (ja)
Other versions
JPH05296207A (en
Inventor
晋一 篠崎
光治 山下
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Komatsu Ltd
Original Assignee
Komatsu Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Komatsu Ltd filed Critical Komatsu Ltd
Priority to JP04092502A priority Critical patent/JP3109619B2/en
Publication of JPH05296207A publication Critical patent/JPH05296207A/en
Application granted granted Critical
Publication of JP3109619B2 publication Critical patent/JP3109619B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Operation Control Of Excavators (AREA)
  • Fluid-Pressure Circuits (AREA)

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【産業上の利用分野】本発明は、複数のポンプの吐出圧
油を複数の操作弁によって複数のアクチュエータに供給
する油圧回路における合分流装置に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a merging / branching device in a hydraulic circuit for supplying pressure oil discharged from a plurality of pumps to a plurality of actuators by a plurality of operation valves.

【0002】[0002]

【従来の技術】図1に示すように、第1ポンプ1と第2
ポンプ2の吐出路1a,2aを接続し、その吐出路1
a,1bに複数のクローズドセンタ型式の操作弁3を配
設し、その操作弁3とアクチュエータの接続回路4に圧
力補償弁5を設け、各アクチュエータの負荷圧における
最高圧をシャトル弁6で検出し、その負荷圧を各圧力補
償弁5のバネ室5aに供給して、その負荷圧に対応する
セット圧とする油圧回路が知られている。
2. Description of the Related Art As shown in FIG.
The discharge paths 1a and 2a of the pump 2 are connected, and the discharge path 1
A plurality of closed center type operation valves 3 are provided in a and 1b, and a pressure compensating valve 5 is provided in a connection circuit 4 between the operation valve 3 and the actuator, and the maximum pressure in the load pressure of each actuator is detected by a shuttle valve 6. A hydraulic circuit is known in which the load pressure is supplied to a spring chamber 5a of each pressure compensating valve 5 to set a set pressure corresponding to the load pressure.

【0003】かかる油圧回路であれば、複数の操作弁3
を同時操作した時に複数のアクチュエータの負荷圧にお
ける最高圧によって圧力補償弁5がセットされ、複数の
アクチェータの負荷圧が異なっても操作弁3の開口面積
比によって複数のアクチュエータに流量分配できる。
In such a hydraulic circuit, a plurality of operating valves 3
Are simultaneously operated, the pressure compensating valve 5 is set by the maximum pressure among the load pressures of the plurality of actuators. Even if the load pressures of the plurality of actuators are different, the flow rate can be distributed to the plurality of actuators by the opening area ratio of the operation valve 3.

【0004】かかる油圧回路であると、複数のアクチュ
エータを同時作動する場合に圧力補償弁は高い方の負荷
圧でセットされポンプ吐出圧力はそのセット圧より若干
高い高圧となるので、アクチュエータの負荷圧の差が大
きい場合には負荷圧の小さいアクチュエータ側の圧力補
償弁における圧力損失が大となり、第1・第2ポンプ
1,2を駆動する原動機の損失馬力が大となると共に、
作動油の温度が高くなって作動油の劣化を早めることに
なる。例えば、パワーショベルのブームシリンダと旋回
モータに圧油を供給してブーム下降、上部車体旋回する
場合に、ブームは自重降下するから負荷圧は低圧である
が、旋回モータは上部車体を起動・加速するため負荷圧
が高圧となり、その時のポンプ吐出圧はセット圧より若
干高い高圧となるので、ブームシリンダ側の圧力補償弁
では高圧−低圧の分が圧力損失となり、前述のように負
荷圧の差が大であるから圧力損失が大となってしまう。
このことは、アームシリンダでアームを上昇させバケッ
トシリンダでバケットをダンプして土砂を排出する場合
に、アームシリンダの負荷圧が高く、バケットシリンダ
の負荷圧が低くなるから同様である。
In such a hydraulic circuit, when a plurality of actuators are simultaneously operated, the pressure compensating valve is set at a higher load pressure and the pump discharge pressure is slightly higher than the set pressure. Is large, the pressure loss in the pressure compensating valve on the actuator side with a small load pressure becomes large, and the loss horsepower of the prime mover that drives the first and second pumps 1 and 2 becomes large,
The temperature of the hydraulic oil is increased, and the deterioration of the hydraulic oil is accelerated. For example, when pressure oil is supplied to the boom cylinder and the swing motor of a power shovel to lower the boom and turn the upper body, the load pressure is low because the boom falls by its own weight, but the swing motor starts and accelerates the upper body. As a result, the load pressure becomes high, and the pump discharge pressure at that time becomes slightly higher than the set pressure.Therefore, in the pressure compensating valve on the boom cylinder side, the high pressure minus the low pressure results in a pressure loss, and as described above, the difference between the load pressures Is large, the pressure loss becomes large.
This is the same because the load pressure of the arm cylinder is high and the load pressure of the bucket cylinder is low when the arm is lifted by the arm cylinder and the bucket is dumped by the bucket cylinder to discharge earth and sand.

【0005】このことを解消する油圧回路として図2に
示すものが知られている。すなわち、図2に示すように
第1ポンプ1の吐出路1aと第2ポンプ2の吐出路2a
を合分流弁16で接続し、第1ポンプ1の吐出路1aに
接続した操作弁3の圧力補償弁5の負荷圧導入路17と
第2ポンプ2の吐出路2aに接続した操作弁3の圧力補
償弁5の負荷圧導入路18を合分流弁19で接続した油
圧回路であり、これによって、合分流弁16,19によ
って各吐出路1a,1b及び各負荷圧導入路17,18
をそれぞれ独立させ、一方の吐出路1aに接続したアク
チュエータ10,11,12と他方の吐出路2aに接続
したアクチュエータ13,14,15を同時操作した時
に、それぞれのアクチュエータの負荷圧で圧力補償弁を
セットして、圧力損失を低減できるようにできる。
FIG. 2 shows a known hydraulic circuit for solving this problem. That is, as shown in FIG. 2, the discharge path 1a of the first pump 1 and the discharge path 2a of the second pump 2
Are connected by a merging / shunting valve 16, and the load pressure introduction path 17 of the pressure compensating valve 5 of the operation valve 3 connected to the discharge path 1 a of the first pump 1 and the operation valve 3 connected to the discharge path 2 a of the second pump 2. This is a hydraulic circuit in which the load pressure introduction path 18 of the pressure compensating valve 5 is connected by a junction valve 19, whereby the discharge paths 1 a and 1 b and the load pressure introduction paths 17 and 18 are connected by the junction valves 16 and 19.
When the actuators 10, 11, 12 connected to one discharge path 1a and the actuators 13, 14, 15 connected to the other discharge path 2a are operated simultaneously, the pressure compensating valve is operated by the load pressure of each actuator. Can be set to reduce the pressure loss.

【0006】[0006]

【発明が解決しようとする課題】かかる合分流機能を有
する油圧回路であると、2つの合分流弁16,19が必
要となるので、油圧回路を構成する機器が多くなって全
体が大型となるばかりか、2つの合分流弁16,19へ
の配管が増えて配管が複雑となる。
In the case of a hydraulic circuit having such a merging / shunting function, two shunting valves 16 and 19 are required, so that the number of devices constituting the hydraulic circuit increases and the whole becomes large. Not only that, the number of pipes to the two branching valves 16 and 19 increases, and the pipes become complicated.

【0007】そこで、本発明は前述の課題を解決できる
ようにした油圧回路における合分流装置を提供すること
を目的とする。
Accordingly, an object of the present invention is to provide a merging / splitting device in a hydraulic circuit capable of solving the above-mentioned problems.

【0008】[0008]

【課題を解決するための手段】第1の発明は、複数の油
圧ポンプ30と、各油圧ポンプ30の吐出路30aにそ
れぞれ設けた複数のクローズドセンタ型式の操作弁3
1、複数の圧力補償弁34と、前記各油圧ポンプ30の
吐出路30aに設けた各操作弁31の負荷圧をそれぞれ
検出し、各圧力補償弁34にそれぞれ作用する複数の負
荷圧導入路35と、前記複数の油圧ポンプ30の吐出路
30aを合流、分離する第1合分流弁55と、前記複数
の負荷圧導入路35を合流、分離する第2合分流弁56
を有する油圧回路において、前記複数の操作弁31は、
操作弁本体70に複数のスプール71を摺動自在に設
け、その操作弁本体70に前記複数の負荷圧導入路35
を有し、前記操作弁本体70に弁ブロック73が取付け
られ、この弁ブロック73は、前記複数の油圧ポンプ3
0の吐出路30aがそれぞれ接続すると共に、前記操作
弁本体70の複数のポンプポートにそれぞれ連通した複
数のポンプポートを有する第1スプール孔75と、前記
複数の負荷圧導入路35にそれぞれ連通した複数のポー
トを有する第2スプール76を備え、前記第1スプール
孔75に、複数のポンプポートを連通・遮断する第1ス
プール87を嵌挿して前記第1合分流弁55を構成し、
前記第2スプール孔76に、前記複数のポートを連通・
遮断する第2スプール89を嵌挿して前記第2合分流弁
56を構成したことを特徴とする油圧回路における合分
流装置である。第2の発明は、第1の発明において前記
第1スプール87、第2スプール89を第1バネ88、
第2バネ93で連通位置に保持した油圧回路における合
分流装置である。
According to a first aspect of the present invention, there are provided a plurality of hydraulic pumps 30, and a plurality of closed center type operation valves 3 provided in a discharge passage 30a of each hydraulic pump 30 respectively.
1. A plurality of pressure compensating valves 34 and a plurality of load pressure introducing passages 35 which respectively detect the load pressures of the respective operating valves 31 provided in the discharge passages 30 a of the hydraulic pumps 30 and act on the respective pressure compensating valves 34. A first diverging valve 55 that merges and separates the discharge paths 30a of the plurality of hydraulic pumps 30, and a second diverging valve 56 that merges and separates the plurality of load pressure introduction paths 35
In the hydraulic circuit having:
A plurality of spools 71 are slidably provided on the operation valve body 70, and the plurality of load pressure introduction paths 35 are provided on the operation valve body 70.
A valve block 73 is attached to the operation valve body 70, and the valve block 73
The discharge passages 30a are connected to the first spool hole 75 having a plurality of pump ports respectively connected to the plurality of pump ports of the operation valve body 70, and the plurality of load pressure introduction paths 35 are connected to the first spool hole 75. A second spool 76 having a plurality of ports, and a first spool 87 that connects and disconnects a plurality of pump ports is inserted into the first spool hole 75 to constitute the first junction valve 55;
The plurality of ports communicate with the second spool hole 76.
A second branching device in a hydraulic circuit, wherein a second spool 89 to be shut off is inserted to constitute the second branching valve 56. According to a second aspect, in the first aspect, the first spool 87 and the second spool 89 are connected to a first spring 88,
This is a merging / shunting device in the hydraulic circuit held at the communication position by the second spring 93.

【0009】[0009]

【作 用】第1の発明によれば、操作弁本体70に取付
けた弁ブロック73における第1スプール孔75の複数
のポンプポートは操作弁本体70の複数のポンプポート
にそれぞれ連通すると共に、複数の油圧ポンプ30の吐
出路30aにそれぞれ接続し、第2スプール孔76の複
数のポートは操作弁本体70の複数の負荷圧導入路35
にそれぞれ連通している。第1スプール87を摺動して
複数のポンプポートを連通することで複数の油圧ポンプ
30の吐出路30aが合流して操作弁本体70の複数の
ポンプポートに連通するので、複数の油圧ポンプ30の
吐出圧油を合流して各操作弁31に供給できる。第1ス
プール87を摺動して複数のポンプポートを遮断するこ
とで複数の油圧ポンプ30の吐出路30aが操作弁本体
70の各ポンプポートにそれぞれ連通するので、1つの
油圧ポンプ30の吐出圧油は1つの操作弁31にそれぞ
れ供給される。第2スプール93を摺動して複数のポー
トを連通・遮断することで操作弁本体70の複数の負荷
圧導入路35は連通・遮断する。前述のように、1つの
弁ブロック73に第1・第2スプール87,93を設け
て第1・第2合分流弁55,56を構成しているので、
第1・第2合分流弁を構成するための機器が少なくコン
パクトである。また、弁ブロック73の複数のポンプポ
ートに複数の油圧ポンプ30の吐出路30aを接続する
だけで、弁ブロック73と操作弁本体70は配管で接続
されていないので、配管が簡単となる。第2の発明によ
れば、弁ブロック73の複数のポンプポートと操作弁本
体70の複数のポンプポートが常時それぞれ連通し、弁
ブロック73の複数のポートと操作弁本体70の複数の
負荷圧導入路35が常時それぞれ連通しているので、弁
ブロック73の複数のポンプポートのいずれか1つに油
圧ポンプ30の吐出路30aを接続することで、1つの
油圧ポンプ30の吐出圧油を複数の操作弁31に供給す
る1ポンプ多アクチュエータの油圧回路に容易に変更で
きる。
According to the first aspect, the plurality of pump ports of the first spool hole 75 in the valve block 73 attached to the operation valve body 70 communicate with the plurality of pump ports of the operation valve body 70, respectively. And the plurality of ports of the second spool hole 76 are connected to the plurality of load pressure introduction paths 35 of the operation valve body 70.
Are in communication with each other. By sliding the first spool 87 to communicate with the plurality of pump ports, the discharge passages 30a of the plurality of hydraulic pumps 30 join and communicate with the plurality of pump ports of the operation valve body 70. Can be combined and supplied to each of the operation valves 31. By sliding the first spool 87 to shut off the plurality of pump ports, the discharge paths 30a of the plurality of hydraulic pumps 30 communicate with the respective pump ports of the operation valve body 70, respectively. The oil is supplied to each of the operation valves 31. By sliding the second spool 93 to connect and disconnect the plurality of ports, the plurality of load pressure introduction paths 35 of the operation valve body 70 are connected and disconnected. As described above, since the first and second spools 87 and 93 are provided in one valve block 73 to form the first and second combined branching valves 55 and 56,
The number of devices for configuring the first and second branching valves is small and compact. Further, since the discharge passages 30a of the plurality of hydraulic pumps 30 are simply connected to the plurality of pump ports of the valve block 73, and the valve block 73 and the operation valve main body 70 are not connected by piping, piping is simplified. According to the second aspect, the plurality of pump ports of the valve block 73 and the plurality of pump ports of the operation valve body 70 always communicate with each other, and the plurality of ports of the valve block 73 and the plurality of load pressures of the operation valve body 70 are introduced. Since the passages 35 are always in communication with each other, by connecting the discharge passage 30a of the hydraulic pump 30 to any one of the plurality of pump ports of the valve block 73, the discharge pressure oil of one hydraulic pump 30 is supplied to the plurality of pump ports. It can be easily changed to the hydraulic circuit of one pump and multiple actuators supplied to the operation valve 31.

【0010】[0010]

【実 施 例】図3に基づいて合分流機能を有する油圧
回路を説明する。図3に示すように、油圧ポンプ30の
吐出路30aには操作弁31が設けられ、この操作弁3
1とアクチュエータ32を接続する回路33に圧力補償
弁34が設けてあり、そのアクチュエータ32の負荷圧
は操作弁30内の絞りを通して負荷圧導入路35に導入
される。前記油圧ポンプ30の斜板36は小径ピストン
37で容量大方向に傾転され、大径ピストン38で容量
小方向に傾転されると共に、その小径ピストン37の小
径受圧室37aは前記吐出路30aに接続してポンプ吐
出圧が供給され、前記大径ピストン38の大径受圧室3
8aはLS弁39で吐出路30aとタンク40に連通制
御される。前記LS弁39は負荷圧とばね41でドレー
ン位置Aに押され、ポンプ吐出圧で供給位置Bに押され
るようになって、ポンプ吐出圧を負荷圧よりも若干高い
圧力、例えば20kg/cm2 となるように斜板36を
傾転動作する。前記油圧ポンプ30の吐出路30aには
アンロード弁42が設けられ、このアンロード弁42は
ばねと第1受圧部43に供給される負荷圧でオンロード
位置42aに押され、第2受圧部44に供給されるポン
プ吐出圧でアンロード位置42bに押され、ポンプ吐出
圧と負荷圧の差圧が設定圧力、例えば30kg/cm2
以上となるとアンロード位置42bとなるもので、複数
の油圧ポンプの個別のポンプ吐出圧と負荷圧のみによっ
て作動する。パイロット油圧弁45はレバー46を操作
することで補助ポンプ47の吐出圧油を第1・第2パイ
ロット管路48,49で操作弁31の第1・第2受圧部
50,51に供給して操作弁31を中立位置31aから
第1位置31b、第2位置31cに切換えるものであ
り、この第1・第2パイロット管路48,49には第1
・第2圧力スイッチ52,53が設けられて圧力が発生
すると電気信号をコントローラ54に出力する。以上の
説明は図3において左側の油圧ポンプ30のみを示し、
右側の油圧ポンプ30も同様であるから符号を同一とし
て説明を省略する。
[Embodiment] A hydraulic circuit having a merging / branching function will be described with reference to FIG. As shown in FIG. 3, an operation valve 31 is provided in a discharge path 30 a of the hydraulic pump 30.
A pressure compensating valve 34 is provided in a circuit 33 connecting the actuator 1 and the actuator 32, and a load pressure of the actuator 32 is introduced into a load pressure introducing passage 35 through a throttle in the operation valve 30. The swash plate 36 of the hydraulic pump 30 is tilted in the large-capacity direction by the small-diameter piston 37, and tilted in the small-capacity direction by the large-diameter piston 38, and the small-diameter pressure receiving chamber 37a of the small-diameter piston 37 is connected to the discharge passage 30a. The large-diameter pressure receiving chamber 3 of the large-diameter piston 38 is supplied with a pump discharge pressure.
Reference numeral 8a denotes an LS valve 39 which controls the communication between the discharge path 30a and the tank 40. The LS valve 39 is pushed to the drain position A by the load pressure and the spring 41, and is pushed to the supply position B by the pump discharge pressure, so that the pump discharge pressure is slightly higher than the load pressure, for example, 20 kg / cm 2. The swash plate 36 is tilted. An unload valve 42 is provided in the discharge path 30 a of the hydraulic pump 30. The unload valve 42 is pressed to the on-load position 42 a by a spring and a load pressure supplied to the first pressure receiving portion 43, When the pump discharge pressure supplied to the pump 44 is pressed to the unload position 42b, the differential pressure between the pump discharge pressure and the load pressure is set to a set pressure, for example, 30 kg / cm 2.
As described above, the unload position 42b is reached, and the hydraulic pump is operated only by the individual pump discharge pressures and load pressures of the plurality of hydraulic pumps. The pilot hydraulic valve 45 supplies the discharge pressure oil of the auxiliary pump 47 to the first and second pressure receiving portions 50 and 51 of the operation valve 31 through the first and second pilot lines 48 and 49 by operating the lever 46. The operation valve 31 is switched from a neutral position 31a to a first position 31b and a second position 31c, and the first and second pilot lines 48 and 49 are connected to the first position.
When the second pressure switches 52 and 53 are provided and pressure is generated, an electric signal is output to the controller 54. The above description shows only the left hydraulic pump 30 in FIG.
Since the same applies to the right hydraulic pump 30, the same reference numerals are used and the description is omitted.

【0011】前記左側の油圧ポンプ30の吐出路30a
と右側の油圧ポンプ30の吐出路30aは第1合分流弁
55で合流・分流可能となり、前記左側の負荷圧導入路
35と右側の負荷圧導入路35は第2合分流弁56で合
流・分流可能となり、その第1・第2合分流弁55,5
6はばね力で合流位置55a,56aに押され、受圧部
57,58に供給されるパイロット圧油で分流位置55
b,56bに切換える。前記補助ポンプ47の吐出圧油
は電磁弁59で受圧部57,58に供給制御され、その
電磁弁59はばね力でドレーン位置59aに保持され、
ソレノイド60に通電されると供給位置59bに切換わ
り、そのソレノイド60には前記コントローラ54によ
り通電制御される。
The discharge passage 30a of the left hydraulic pump 30
And the discharge path 30a of the right hydraulic pump 30 can be joined and divided by a first junction valve 55, and the left load pressure introduction path 35 and the right load pressure introduction path 35 are joined by a second junction valve 56. Dividing is possible, and the first and second merging valves 55, 5
6 is pushed by the spring force to the merging positions 55a and 56a, and is divided by the pilot pressure oil supplied to the pressure receiving portions 57 and 58 to the branching position 55a.
b, 56b. The discharge pressure oil of the auxiliary pump 47 is controlled to be supplied to pressure receiving portions 57 and 58 by an electromagnetic valve 59, and the electromagnetic valve 59 is held at a drain position 59a by a spring force.
When the solenoid 60 is energized, the position is switched to the supply position 59b, and the energization of the solenoid 60 is controlled by the controller 54.

【0012】前記左側の負荷圧導入路35と右側の負荷
圧導入路35は一対のチェック弁61,61を有する短
絡路62で連通し、この短絡路62にリリーフ弁63が
設けてあり、前記左側の油圧ポンプ30の吐出路30a
と右側の油圧ポンプ30の吐出路30aは一対のチェッ
ク弁64,64を有する短絡路65で連通し、この短絡
路65にアンロード弁66が接続してある。このアンロ
ード弁66はばね力と前記短絡路62の負荷圧によって
オンロード位置66aに保持され、前記短絡路65のポ
ンプ吐出圧でアンロード位置66bとなるもので、この
アンロード弁66のセット圧は前記個別のアンロード弁
42のセット圧よりも低くしてある。つまり、アンロー
ドする時のポンプ吐出圧と負荷圧の差圧が低くしてもあ
る。
The left load pressure introducing path 35 and the right load pressure introducing path 35 communicate with each other via a short circuit 62 having a pair of check valves 61, 61. A relief valve 63 is provided in the short circuit 62. Discharge path 30a of left hydraulic pump 30
The discharge path 30a of the right hydraulic pump 30 communicates with a short-circuit path 65 having a pair of check valves 64, 64, and an unload valve 66 is connected to the short-circuit path 65. The unload valve 66 is held at the on-load position 66a by the spring force and the load pressure of the short-circuit path 62, and becomes the unload position 66b by the pump discharge pressure of the short-circuit path 65. The pressure is lower than the set pressure of the individual unload valve 42. That is, the differential pressure between the pump discharge pressure and the load pressure at the time of unloading may be low.

【0013】次に作動を説明する。左側の操作レバー4
6でパイロット油圧弁45を操作して第1パイロット管
路48にパイロット圧油を供給すると操作弁31の第1
受圧部50にパイロット圧油が供給されて操作弁31は
第1位置31bとなり、左側の油圧ポンプ30の吐出圧
油が左側のアクチュエータ32に供給される。このアク
チュエータ32の負荷圧は操作弁31の第1位置31b
に設けた絞りを経て負荷圧導入路35に導入される。こ
れにより、第1圧力スイッチ52が電気信号をコントロ
ーラ54に入力してコントローラ54は左側の操作弁3
1が第1位置31bとなったと判断し、それによって合
流するかしないかを予め設定したパターンに基づいて演
算し、合流する場合には電磁弁59のソレノイド60に
通電せずにドレーン位置59aとし、第1・第2合分流
弁55,56を合流位置55a,56aとして左側と右
側の油圧ポンプ30の吐出圧を合流して左側のアクチュ
エータ32に供給する。分流する場合には電磁弁59の
ソレノイド60に通電して供給位置59bとし、補助油
圧ポンプ47の吐出圧油を第1・第2合分流弁55,5
6の受圧部57,58に供給して分流位置55b,56
bとし、左側の油圧ポンプ30の吐出圧油のみを左側の
アクチュエータ32に供給する。他方、負荷圧導入路3
5の負荷圧はLS弁39に作用して油圧ポンプ30の斜
板36を傾転しポンプ吐出圧と負荷圧の差圧を設定圧力
とすると共に、その負荷圧は圧力補償弁34に作用して
圧力補償する。左側の操作レバー46を前述と反対に操
作して第2パイロット管路49にパイロット圧油を供給
した場合及び、右側の操作レバー46を操作した場合も
前述と同様になる。
Next, the operation will be described. Left operating lever 4
When the pilot hydraulic oil is supplied to the first pilot line 48 by operating the pilot hydraulic valve 45 at 6, the first
The pilot pressure oil is supplied to the pressure receiving section 50, so that the operation valve 31 becomes the first position 31b, and the discharge pressure oil of the left hydraulic pump 30 is supplied to the left actuator 32. The load pressure of the actuator 32 is the first position 31b of the operation valve 31.
Is introduced into the load pressure introducing passage 35 through the restrictor provided in the above. As a result, the first pressure switch 52 inputs an electric signal to the controller 54, and the controller 54 operates the left operating valve 3
1 is determined to be the first position 31b, and whether or not to merge is calculated based on a preset pattern.
The power is not supplied to the drain position 59a, and the discharge pressures of the left and right hydraulic pumps 30 are combined and supplied to the left actuator 32 by setting the first and second combining valves 55 and 56 to the combining positions 55a and 56a. When the flow is divided, the solenoid 60 of the solenoid valve 59 is energized to the supply position 59b, and the discharge pressure oil of the auxiliary hydraulic pump 47 is supplied to the first and second branching valves 55,5.
And supplied to the pressure receiving portions 57, 58 at the branch positions 55b, 56
b, and only the pressure oil discharged from the left hydraulic pump 30 is supplied to the left actuator 32. On the other hand, the load pressure introduction path 3
The load pressure of 5 acts on the LS valve 39 to tilt the swash plate 36 of the hydraulic pump 30 to make the pressure difference between the pump discharge pressure and the load pressure the set pressure, and the load pressure acts on the pressure compensating valve 34. To compensate the pressure. The same applies to the case where the left operating lever 46 is operated in the opposite direction to supply pilot pressure oil to the second pilot pipe 49 and the case where the right operating lever 46 is operated.

【0014】次に合流時のアンロード弁42のアンロー
ド動作(油圧ホンプの最高ポンプ吐出圧の制限動作)を
説明する。前述の状態で左側のアクチュエータ32がス
トロークエンドとなった時、又はアクチュエータ32の
負荷が非常に大きく、負荷圧が非常に高い時には、その
負荷圧はチェック弁61より短絡路62に流入してリリ
ーフ弁63よりリリーフする。左右側の油圧ポンプ3
0,30のポンプ吐出圧油はチェック弁64より短絡路
65に流入してアンロード弁66の入口側に流入すると
同時にアンロード弁66に作用する。これにより、アン
ロード弁66に作用する負荷圧がポンプ吐出圧よりも低
下してアンロード弁66がアンロード位置66bとなっ
て左右側の油圧ポンプ30の吐出圧の一部がアンロード
する。
Next, the unloading operation of the unloading valve 42 at the time of merging (operation of limiting the maximum pump discharge pressure of the hydraulic pump) will be described. When the left actuator 32 reaches the stroke end in the above-described state, or when the load of the actuator 32 is very large and the load pressure is very high, the load pressure flows from the check valve 61 into the short-circuit path 62 and is relieved. Relief from valve 63. Left and right hydraulic pump 3
The pump discharge pressure oils 0 and 30 flow into the short circuit path 65 from the check valve 64 and flow into the inlet side of the unload valve 66 and act on the unload valve 66 at the same time. As a result, the load pressure acting on the unload valve 66 becomes lower than the pump discharge pressure, and the unload valve 66 becomes the unload position 66b, so that a part of the discharge pressure of the left and right hydraulic pumps 30 is unloaded.

【0015】次に分流時のアンロード弁42のアンロー
ド動作(油圧ポンプの最高ポンプ吐出圧の制限動作)を
説明する。左側の油圧ポンプ30の吐出路30aと右側
の油圧ポンプ30の吐出路30aとが分離すると同時に
左側の負荷圧導入路35と右側の負荷圧導入路35が分
離するので、前述の左側のアクチュエータ32の負荷圧
が非常に高くなると、その負荷圧は左側のチェック弁6
1より短絡路62に流入し右側のチェック弁61で右側
の負荷圧導入路35に流れることを阻止され、その負荷
圧は前述と同様にリリーフ弁63よりリリーフする。左
側の油圧ポンプ30の吐出圧は左側のチェック弁64よ
り短絡路65に流入して右側のチェック弁64で右側の
油圧ポンプ30の吐出路30aに流れることを阻止さ
れ、そのポンプ吐出圧はアンロード66の入口側に作用
する。これにより合流時と同様にしてアンロード弁66
がアンロード位置66bとなってポンプ吐出圧の一部を
アンロードする。以上の動作において、右側の操作弁3
1が中立位置31aであると右側の負荷圧導入路35は
操作弁31の中立位置31aを経てタンクに接続される
から、その負荷圧はほぼ0kg/cm2 であり、右側の
アンロード弁42の第1受圧部43に作用する負荷圧が
ほぼ0kg/cm2 となってそのアンロード弁42は第
2受圧部44に作用する低圧のポンプ吐出圧でアンロー
ド位置42bとなり、右側の油圧ポンプ30のポンプ吐
出圧はごく低圧となる。
Next, the unloading operation of the unloading valve 42 at the time of branching (the operation of limiting the maximum pump discharge pressure of the hydraulic pump) will be described. Since the discharge path 30a of the left hydraulic pump 30 and the discharge path 30a of the right hydraulic pump 30 are separated from each other, the left load pressure introduction path 35 and the right load pressure introduction path 35 are separated from each other. When the load pressure of the check valve 6 becomes very high, the load pressure
1 and is prevented from flowing into the short-circuit path 62 and flowing into the right load pressure introducing path 35 by the right check valve 61, and the load pressure is relieved by the relief valve 63 in the same manner as described above. The discharge pressure of the left hydraulic pump 30 flows into the short-circuit path 65 from the left check valve 64 and is prevented from flowing to the discharge path 30a of the right hydraulic pump 30 by the right check valve 64. Acts on the inlet side of the load 66. As a result, the unload valve 66 is operated in the same manner as at the time of merging.
Becomes the unload position 66b and unloads a part of the pump discharge pressure. In the above operation, the right operating valve 3
When 1 is at the neutral position 31a, the right load pressure introducing passage 35 is connected to the tank through the neutral position 31a of the operation valve 31, so that the load pressure is almost 0 kg / cm 2 , and the right unload valve 42 The load pressure acting on the first pressure receiving portion 43 becomes approximately 0 kg / cm 2, and the unload valve 42 becomes the unload position 42b by the low pressure pump discharge pressure acting on the second pressure receiving portion 44, and the right hydraulic pump The pump discharge pressure at 30 is very low.

【0016】以上のように合流時でも分流時でも負荷圧
は1つのリリーフ弁63よりリリーフするから、アンロ
ード弁66がアンロードする差圧となるリリーフ流量が
リリーフ弁63のオーバライド特性により決定され、そ
の際の負荷圧が図4に示すように同一となり、最高ポン
プ吐出圧を合流時と分流時で同一にできる。また、図3
においてリリーフ弁63の流入側とタンクを小径のオリ
フィス67で連通してあるが、これは操作弁31を中立
位置31aとした時に一対のチェック弁61,61で遮
断されている短絡路62の負荷圧をすみやかにタンクに
流出するためである。
As described above, since the load pressure is relieved by one relief valve 63 at the time of merging or splitting, the relief flow rate at which the unload valve 66 unloads is determined by the override characteristic of the relief valve 63. The load pressure at that time becomes the same as shown in FIG. 4 , and the maximum pump discharge pressure can be made the same at the time of merging and the time of branching. FIG.
In the above, the inflow side of the relief valve 63 and the tank are communicated with each other through the small-diameter orifice 67. This is because the load on the short-circuit path 62 interrupted by the pair of check valves 61 when the operation valve 31 is in the neutral position 31a. This is because the pressure quickly flows into the tank.

【0017】次に第1・第2合分流弁55,56の取付
構造について説明する。図5に示すように、操作弁本体
70は直方体形状となり、その相対向する両側面70a
間に複数のスプール71が摺動自在に嵌挿されて複数の
操作弁31を有する操作弁装置72を構成し、その操作
弁本体70の両側面70aと隣接する一側面70bに弁
ブロック73の一側面73aがボルト74で取付けてあ
る。前記弁ブロック73には図6に示すように第1スプ
ール孔75と第2スプール孔76が上下に間隔を置いて
形成され、弁ブロック73には、その第1スプール孔7
5に開口する第1・第2ポンプポート77,78及び第
1スプール孔75と第2スプール孔76を連通するパイ
ロット用ポート79、空洞部80並びに第2スプール孔
76と一側面73aに開口した第1・第2・第3ポート
81,82,83がそれぞれ形成してあり、前記第1・
第2ポンプポート77,78に図3の左側の油圧ポンプ
30と右側の油圧ポンプ30の吐出路30aがそれぞれ
接続し、その第1・第2ポンプポート77,78は操作
弁本体70の各スプール71により切換えられる各ポン
プポートに連通し、第1・第2・第3ポート81,8
2,83は操作弁本体70の第1・第2・第3油孔8
4,85,86に連通し、その第1油孔84が図3にお
ける左側の負荷圧導入路35となり、第3油孔86が右
側の負荷圧導入路35となっている。前記パイロット用
ポート79は電磁弁59で補助ポンプ47の吐出側に接
続している。前記第1スプール孔75には第1スプール
87が嵌挿され、この第1スプール87は第1バネ88
で第1・第2ポンプポート77,78を連通する合流位
置に保持され、パイロット用ポート79にパイロット圧
油が供給されると第1・第2ポンプポート77,78を
遮断する分流位置となり、これにより第1合分流弁55
を構成している。前記第2スプール孔76には第2スプ
ール89が嵌挿され、この第2スプール89には軸孔9
0と第1・第2径方向孔91,92が形成してあり、そ
の第2スプール89は第2バネ93で前記第1・第3ポ
ート81,83を軸孔90と第1・第2径方向孔91,
92で連通する合分流位置に保持され、前記パイロット
用ポート79の圧油で遮断する分流位置に押されるよう
になって第2合分流弁56を構成している。
Next, the mounting structure of the first and second junction valves 55 and 56 will be described. As shown in FIG. 5, the operation valve main body 70 has a rectangular parallelepiped shape, and opposing two side surfaces 70a thereof.
A plurality of spools 71 are slidably fitted therebetween to form an operation valve device 72 having a plurality of operation valves 31, and a valve block 73 is provided on one side surface 70 b adjacent to both side surfaces 70 a of the operation valve body 70. One side 73a is attached with a bolt 74. As shown in FIG. 6, a first spool hole 75 and a second spool hole 76 are formed in the valve block 73 at an interval vertically, and the first spool hole 75 and the second spool hole 7 are formed in the valve block 73.
5, the first and second pump ports 77 and 78, the pilot port 79 communicating the first spool hole 75 and the second spool hole 76, the cavity 80, and the second spool hole 76 and one side surface 73a. First, second, and third ports 81, 82, and 83 are formed respectively, and the first and second ports are formed.
The discharge paths 30a of the left hydraulic pump 30 and the right hydraulic pump 30 in FIG. 3 are connected to the second pump ports 77 and 78, respectively, and the first and second pump ports 77 and 78 are connected to the respective spools of the operation valve body 70. The first, second, and third ports 81, 8 communicate with the respective pump ports switched by the switch 71.
Reference numerals 2 and 83 denote first, second, and third oil holes 8 of the operation valve body 70.
4, 85, 86, the first oil hole 84 is the load pressure introduction passage 35 on the left side in FIG. 3 , and the third oil hole 86 is the load pressure introduction passage 35 on the right side. The pilot port 79 is connected to the discharge side of the auxiliary pump 47 by an electromagnetic valve 59. A first spool 87 is fitted into the first spool hole 75, and the first spool 87 is
At the merging position where the first and second pump ports 77 and 78 are communicated with each other, and when the pilot pressure oil is supplied to the pilot port 79, the first and second pump ports 77 and 78 are separated and the flow is divided. Thereby, the first junction valve 55
Is composed. A second spool 89 is inserted into the second spool hole 76, and a shaft hole 9 is inserted into the second spool 89.
0, and first and second radial holes 91 and 92 are formed. The second spool 89 is formed by a second spring 93 to connect the first and third ports 81 and 83 to the shaft hole 90 and the first and second holes. Radial holes 91,
The second merging valve 56 is configured to be held at the merging / branching position communicating at 92 and to be pushed to the diverting position interrupted by the pressure oil of the pilot port 79.

【0018】次に作動を説明する。電磁弁59によって
パイロット用ポート79に圧油を供給しない時には図6
に示すように第1・第2スプール87,89が第1・第
2スプリング88,89で合流位置となる。これによ
り、第1・第2ポンプポート77,78が連通して左側
の油圧ポンプ30の吐出油と右側の油圧ポンプ30の吐
出圧油が合流し、第1ポート81と第2ポート83が連
通し、左側の負荷圧導入路35と右側の負荷圧導入路3
5が連通して合流モードとなる。電磁弁59を切換えて
パイロット用ポート79に圧油を供給すると図7に示す
ように第1・第2ポンプポート77,78が遮断して左
側の油圧ポンプ30と右側の油圧ポンプ30が分離し、
第1・第3ポート81,83が遮断して左側の負荷圧導
入路35と右側の負荷圧導入路35が分離して分流モー
ドとなる。
Next, the operation will be described. When pressure oil is not supplied to the pilot port 79 by the solenoid valve 59, FIG.
As shown in (1), the first and second spools 87 and 89 are brought to the merging position by the first and second springs 88 and 89. As a result, the first and second pump ports 77 and 78 communicate with each other, so that the discharge oil of the left hydraulic pump 30 and the discharge pressure oil of the right hydraulic pump 30 merge, and the first port 81 and the second port 83 communicate. And the load pressure introduction path 35 on the left and the load pressure introduction path 3 on the right
5 communicate with each other to enter the merge mode. When pressure oil is supplied to the pilot port 79 by switching the solenoid valve 59, the first and second pump ports 77 and 78 are shut off, and the left hydraulic pump 30 and the right hydraulic pump 30 are separated as shown in FIG. ,
The first and third ports 81 and 83 are shut off, and the load pressure introduction path 35 on the left side and the load pressure introduction path 35 on the right side are separated from each other, so that a split mode is set.

【0019】また、第1・第2スプール87,89を第
1・第2バネ88,93で図6に示す合流位置に保持し
たので、第1又は第2ポンプポートの77,78に1つ
の油圧ポンプの吐出圧油を供給することで1ポンプ多ア
クチュエータの油圧回路に容易に変更できる。
Further, since the first and second spools 87 and 89 are held at the merging position shown in FIG. 6 by the first and second springs 88 and 93, one of the first and second pump ports 77 and 78 is provided. By supplying the discharge pressure oil of the hydraulic pump, it is possible to easily change to a hydraulic circuit of one pump multi-actuator.

【0020】[0020]

【発明の効果】請求項1に係る発明によれば、操作弁本
体70に取付けた弁ブロック73における第1スプール
孔75の複数のポンプポートは操作弁本体70の複数の
ポンプポートにそれぞれ連通すると共に、複数の油圧ポ
ンプ30の吐出路30aにそれぞれ接続し、第2スプー
ル孔76の複数のポートは操作弁本体70の複数の負荷
圧導入路35にそれぞれ連通している。第1スプール8
7を摺動して複数のポンプポートを連通することで複数
の油圧ポンプ30の吐出路30aが合流して操作弁本体
70の複数のポンプポートに連通するので、複数の油圧
ポンプ30の吐出圧油を合流して各操作弁31に供給で
きる。第1スプール87を摺動して複数のポンプポート
を遮断することで複数の油圧ポンプ30の吐出路30a
が操作弁本体70の各ポンプポートにそれぞれ連通する
ので、1つの油圧ポンプ30の吐出圧油は1つの操作弁
31にそれぞれ供給される。第2スプール93を摺動し
て複数のポートを連通・遮断することで操作弁本体70
の複数の負荷圧導入路35は連通・遮断する。前述のよ
うに、1つの弁ブロック73に第1・第2スプール8
7,93を設けて第1・第2合分流弁55,56を構成
しているので、第1・第2合分流弁を構成するための機
器が少なくコンパクトである。また、弁ブロック73の
複数のポンプポートに複数の油圧ポンプ30の吐出路3
0aを接続するだけで、弁ブロック73と操作弁本体7
0は配管で接続されていないので、配管が簡単となる。
請求項2に係る発明によれば、弁ブロック73の複数の
ポンプポートと操作弁本体70の複数のポンプポートが
常時それぞれ連通し、弁ブロック73の複数のポートと
操作弁本体70の複数の負荷圧導入路35が常時それぞ
れ連通しているので、弁ブロック73の複数のポンプポ
ートのいずれか1つに油圧ポンプ30の吐出路30aを
接続することで、1つの油圧ポンプ30の吐出圧油を複
数の操作弁31に供給する1ポンプ多アクチュエータの
油圧回路に容易に変更できる。
According to the first aspect of the present invention, the plurality of pump ports of the first spool hole 75 in the valve block 73 attached to the operation valve body 70 communicate with the plurality of pump ports of the operation valve body 70, respectively. At the same time, they are connected to the discharge passages 30a of the plurality of hydraulic pumps 30, respectively, and the plurality of ports of the second spool holes 76 communicate with the plurality of load pressure introduction passages 35 of the operation valve body 70, respectively. First spool 8
7, the discharge passages 30a of the hydraulic pumps 30 are joined to communicate with the pump ports of the operation valve body 70 by connecting the pump ports to each other. Oil can be combined and supplied to each operation valve 31. By sliding the first spool 87 to cut off the plurality of pump ports, the discharge paths 30a of the plurality of hydraulic pumps 30 are formed.
Communicates with the respective pump ports of the operation valve body 70, so that the discharge pressure oil of one hydraulic pump 30 is supplied to one operation valve 31. By sliding and blocking the plurality of ports by sliding the second spool 93, the operation valve body 70
The plurality of load pressure introduction paths 35 communicate and shut off. As described above, one valve block 73 includes the first and second spools 8.
Since the first and second diverging valves 55 and 56 are provided by providing the first and second diverting valves 7, 93, the equipment for configuring the first and second diverging valves is small and compact. Further, the discharge paths 3 of the plurality of hydraulic pumps 30 are connected to the plurality of pump ports of the valve block 73.
0a, the valve block 73 and the operating valve body 7
Since 0 is not connected by piping, piping is simplified.
According to the invention of claim 2, the plurality of pump ports of the valve block 73 and the plurality of pump ports of the operation valve body 70 are always in communication with each other, and the plurality of ports of the valve block 73 and the plurality of loads of the operation valve body 70 are provided. Since the pressure introduction paths 35 are always in communication with each other, the discharge pressure oil of one hydraulic pump 30 is connected by connecting the discharge path 30a of the hydraulic pump 30 to any one of the plurality of pump ports of the valve block 73. It can be easily changed to a hydraulic circuit of one pump multi-actuator to supply to a plurality of operation valves 31.

【図面の簡単な説明】[Brief description of the drawings]

【図1】従来の油圧回路図である。FIG. 1 is a conventional hydraulic circuit diagram.

【図2】改良した従来の油圧回路図である。FIG. 2 is an improved conventional hydraulic circuit diagram.

【図3】本発明の実施例を示す油圧回路図である。FIG. 3 is a hydraulic circuit diagram showing an embodiment of the present invention.

【図4】リリーフ流量と負荷圧の関係を示す図表であ
る。
FIG. 4 is a table showing a relationship between a relief flow rate and a load pressure.

【図5】合分流弁を取付けた操作弁の正面図である。FIG. 5 is a front view of the operation valve to which the junction valve is attached.

【図6】図5の−断面図である。FIG. 6 is a sectional view of FIG. 5;

【図7】動作説明図である。FIG. 7 is an operation explanatory diagram.

【符号の説明】[Explanation of symbols]

30…油圧ポンプ、30a…吐出路、31…操作弁、3
2…アクチュエータ、34…圧力補償弁、35…負荷圧
導入路、55…第1合分流弁、56…第2合分流弁、7
0…操作弁本体、73…弁ブロック、77…第1ポンプ
ポート、78…第2ポンプポート、79…パイロット用
ポート、81…第1ポート、83…第3ポート、87…
第1スプール、88…第1バネ、89…第2スプール、
93…第2バネ。
Reference numeral 30: hydraulic pump, 30a: discharge path, 31: operating valve, 3
2. Actuator, 34: Pressure compensating valve, 35: Load pressure introduction path, 55: First diverging valve, 56: Second diverting valve, 7
0 ... operating valve main body, 73 ... valve block, 77 ... first pump port, 78 ... second pump port, 79 ... pilot port, 81 ... first port, 83 ... third port, 87 ...
1st spool, 88 ... 1st spring, 89 ... 2nd spool,
93 ... second spring.

───────────────────────────────────────────────────── フロントページの続き (58)調査した分野(Int.Cl.7,DB名) F15B 11/00 - 11/22 ──────────────────────────────────────────────────続 き Continued on the front page (58) Field surveyed (Int.Cl. 7 , DB name) F15B 11/00-11/22

Claims (2)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】 複数の油圧ポンプ30と、 各油圧ポンプ30の吐出路30aにそれぞれ設けた複数
のクローズドセンタ型式の操作弁31、複数の圧力補償
弁34と、 前記各油圧ポンプ30の吐出路30aに設けた各操作弁
31の負荷圧をそれぞれ検出し、各圧力補償弁34にそ
れぞれ作用する複数の負荷圧導入路35と、 前記複数の油圧ポンプ30の吐出路30aを合流、分離
する第1合分流弁55と、 前記複数の負荷圧導入路35を合流、分離する第2合分
流弁56を有する油圧回路において、 前記複数の操作弁31は、操作弁本体70に複数のスプ
ール71を摺動自在に設け、その操作弁本体70に前記
複数の負荷圧導入路35を有し、 前記操作弁本体70に弁ブロック73が取付けられ、 この弁ブロック73は、前記複数の油圧ポンプ30の吐
出路30aがそれぞれ接続すると共に、前記操作弁本体
70の複数のポンプポートにそれぞれ連通した複数のポ
ンプポートを有する第1スプール孔75と、 前記複数の負荷圧導入路35にそれぞれ連通した複数の
ポートを有する第2スプール76を備え、 前記第1スプール孔75に、複数のポンプポートを連通
・遮断する第1スプール87を嵌挿して前記第1合分流
弁55を構成し、 前記第2スプール孔76に、前記複数のポートを連通・
遮断する第2スプール89を嵌挿して前記第2合分流弁
56を構成したことを特徴とする油圧回路における合分
流装置。
A plurality of hydraulic pumps and a plurality of hydraulic pumps provided in a discharge path of each hydraulic pump.
Closed center type operating valve 31, multiple pressure compensation
A valve 34 and each operating valve provided in the discharge path 30a of each of the hydraulic pumps 30
31 is detected and applied to each pressure compensating valve 34.
A plurality of load pressure introducing passages 35 acting respectively and a discharge passage 30a of the plurality of hydraulic pumps 30 are joined and separated.
A first branching valve 55 that merges and a second branching that merges and separates the plurality of load pressure introduction paths 35
In the hydraulic circuit having the flow valve 56, the plurality of operation valves 31 are connected to the operation valve body 70 by a plurality of spurs.
The valve 71 is slidably provided, and the
A plurality of load pressure introduction passage 35, the valve block 73 to the operation valve body 70 is attached, the valve block 73, ejection of the plurality of hydraulic pumps 30
The outlets 30a are respectively connected, and the operation valve body
70 are connected to a plurality of pump ports, respectively.
A first spool hole 75 having a pump port and a plurality of load pressure introduction passages 35 respectively communicating with the plurality of load pressure introduction paths 35.
A second spool having a port, and a plurality of pump ports communicating with the first spool hole;
· Inserting the first spool 87 to be cut off and joining the first junction
A plurality of ports communicating with the second spool hole 76;
Inserting the second spool 89 to be shut off and inserting the second
56 in which the hydraulic circuit is combined.
Flow device.
【請求項2】 前記第1スプール87、第2スプール8
9を第1バネ88、第2バネ93で連通位置に保持した
請求項1記載の油圧回路における合分流装置。
2. The first spool 87 and the second spool 8.
9 was held at the communicating position by the first spring 88 and the second spring 93
3. The merging / joining device in the hydraulic circuit according to claim 1.
JP04092502A 1992-04-13 1992-04-13 Combining device in hydraulic circuit Expired - Fee Related JP3109619B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP04092502A JP3109619B2 (en) 1992-04-13 1992-04-13 Combining device in hydraulic circuit

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP04092502A JP3109619B2 (en) 1992-04-13 1992-04-13 Combining device in hydraulic circuit

Publications (2)

Publication Number Publication Date
JPH05296207A JPH05296207A (en) 1993-11-09
JP3109619B2 true JP3109619B2 (en) 2000-11-20

Family

ID=14056090

Family Applications (1)

Application Number Title Priority Date Filing Date
JP04092502A Expired - Fee Related JP3109619B2 (en) 1992-04-13 1992-04-13 Combining device in hydraulic circuit

Country Status (1)

Country Link
JP (1) JP3109619B2 (en)

Also Published As

Publication number Publication date
JPH05296207A (en) 1993-11-09

Similar Documents

Publication Publication Date Title
US6170261B1 (en) Hydraulic fluid supply system
JP3491771B2 (en) Pressure compensation valve and pressure oil supply device
US5259192A (en) Hydraulic circuit system
WO2009154140A1 (en) Multi-directional control valve having bucket parallel movement function
US7305821B2 (en) Hydraulic control apparatus
US5845678A (en) Pressurized fluid supply system
KR101432564B1 (en) Hydraulic two-circuit system and interconnecting valve arrangement
US4986072A (en) Hydraulic actuator circuit with flow-joining control
US6161467A (en) Fluid control system with regeneration
US5673557A (en) Displacement control system for variable displacement type hydraulic pump
JP3625149B2 (en) Hydraulic control circuit for construction machinery
JP3142170B2 (en) Pressure relief device in hydraulic circuit
JP3109619B2 (en) Combining device in hydraulic circuit
JP3289852B2 (en) Direction control valve for flow rate support
EP0913586A1 (en) Hydraulic oil supply apparatus
JPH07103882B2 (en) Hydraulic valve with pressure compensation
JPH05272504A (en) Hydraulic circuit
JP3097041B2 (en) Return flow sharing circuit for pressure oil supply device
KR100490110B1 (en) Main Control Valve for Heavy Equipment
JPH0663521B2 (en) Control valve device
JPH0324302A (en) Hydraulic circuit
JPH02248706A (en) Hydraulic circuit
JP2900839B2 (en) Hydraulic circuits for injection molding machines, etc.
JPH05172115A (en) Hydraulic circuit
KR100221597B1 (en) Isolation apparatus for flow conflux

Legal Events

Date Code Title Description
LAPS Cancellation because of no payment of annual fees