JP2023101082A - Pre-receiver steel pipe driving position guidance system - Google Patents

Pre-receiver steel pipe driving position guidance system Download PDF

Info

Publication number
JP2023101082A
JP2023101082A JP2022001444A JP2022001444A JP2023101082A JP 2023101082 A JP2023101082 A JP 2023101082A JP 2022001444 A JP2022001444 A JP 2022001444A JP 2022001444 A JP2022001444 A JP 2022001444A JP 2023101082 A JP2023101082 A JP 2023101082A
Authority
JP
Japan
Prior art keywords
self
luminous
excavation
receiving member
cutting blade
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2022001444A
Other languages
Japanese (ja)
Other versions
JP7291995B1 (en
Inventor
敏実 永井
Toshizane Nagai
貴久 阪本
Takahisa Sakamoto
達朗 長野
Tatsuro Nagano
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
DRILL MACHINE KK
Prior Co Ltd
Original Assignee
DRILL MACHINE KK
Prior Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by DRILL MACHINE KK, Prior Co Ltd filed Critical DRILL MACHINE KK
Priority to JP2022001444A priority Critical patent/JP7291995B1/en
Application granted granted Critical
Publication of JP7291995B1 publication Critical patent/JP7291995B1/en
Publication of JP2023101082A publication Critical patent/JP2023101082A/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

To provide a steel pipe driving position guidance system for the AGF construction method, capable of setting a pre-receiver driving position and driving angle extremely efficiently, reliably and with high accuracy because of not spending more time than necessary on surveying and marking work.SOLUTION: The present invention comprises: a rock drill 6 projecting swingably from a vehicle body 2 and swinging a pre-receiver 27 with a cylindrical cutting edge 5 in the axial direction; a guide cell 4 for guiding the swinging movement of the rock drill 6; at least two self-luminous markers 9 attached at intervals near the installation position of the cutting edge 5 in the longitudinal direction of the guide cell 4; a plurality of near-infrared cameras 10 that acquire light from the self-luminous marker 9; means for measuring the coordinate positions of the two self-luminous markers 9 from the light acquired by the plurality of near-infrared cameras 10; and correction means for correcting the measured coordinate positions of the two self-luminous markers 9 to a shaft center position of the rock drill 6 and the center position of the cutting edge 5.SELECTED DRAWING: Figure 1

Description

本発明は、山岳トンネル工事などで採用される例えば長尺鋼管先受け工法における先受け鋼管打設位置誘導システムに関するものである。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a pre-receiving steel pipe placing position guidance system in, for example, a long steel pipe pre-receiving construction method employed in mountain tunnel construction or the like.

山岳トンネル工事などでは、切羽(掘削面)の岩盤が脆弱で不安定な場合に、補助工法の一部として、AGF工法(長尺鋼管先受け工法)が多く用いられている。
AGF工法(長尺鋼管先受け工法)とは、トンネル掘削に先立ち、トンネル外周において、略アーチ状に地山改良部材、すなわち先受けを形成する工法を指標し、該先受けの形成に伴う先受け鋼管打設と地山改良材の注入により切羽前方の地山を補強するものである。すなわち、前記先受けの形成により、トンネル掘削時の地山の先行変位や地山の緩みを抑制し、トンネル前方および上部からの崩落を防止するなどトンネル掘削施工時の安全性の確保を企図した工法である。
In mountain tunnel construction, etc., the AGF construction method (long steel pipe advance construction method) is often used as part of the auxiliary construction method when the bedrock of the face (excavation surface) is fragile and unstable.
The AGF method (long steel pipe pre-receiving method) refers to a construction method in which, prior to tunnel excavation, a ground improvement member, that is, pre-receiving, is formed on the outer periphery of the tunnel in a roughly arch shape. The ground in front of the face is reinforced by placing steel pipes and injecting ground improvement materials. In other words, the formation of the above-mentioned pre-supports is intended to ensure safety during tunnel excavation, such as by suppressing the preceding displacement and loosening of the ground during tunnel excavation and preventing collapse from the front and top of the tunnel. Construction method.

ここで、標準的なAGF工法としては、例えば1本あたり約3mの鋼管を、ドリルマシンの削岩機を用いて打ち込み、前記鋼管を継ぎ足しながら地山に約12mの長さで打設する先受け工法が知られている。
すなわち、前記先受け鋼管を切羽前方の天端アーチ部、例えば120°の範囲に亘り略半円形状に間隔をあけて複数本打設し補強域を構築するのである。
尚、略120°の範囲で間隔をあけて複数本の先受け鋼管の打設を行うため、トンネルの大きさによっては前記打設本数が変化するものとなる。
Here, as a standard AGF construction method, for example, a steel pipe of about 3m per pipe is driven using a rock drill of a drill machine, and the steel pipe is added to the ground to drive a length of about 12m into the ground. Receiving method is known.
That is, a plurality of the pre-receiving steel pipes are placed in a substantially semicircular shape over a range of, for example, 120° at the crest arch portion in front of the face to form a reinforcing region.
Since a plurality of pre-receiving steel pipes are placed at intervals of approximately 120°, the number of pre-received steel pipes placed varies depending on the size of the tunnel.

しかしながら、アーチ状に等間隔で打設し、トンネル掘削部前方に均整の取れたアーチ形状を構成させるには非常に高い打設精度が求められる。その為、正確な打設位置及び正確な打設角度の設定が本工法の採用に当たって極めて重要な設定事項となる。 However, in order to construct a well-proportioned arch in front of the excavated tunnel, a very high precision is required. Therefore, it is extremely important to set an accurate casting position and an accurate casting angle when adopting this construction method.

しかして、従来では下記の様な方法で前記打設精度の管理が行われていた。例えば、ガイドセルにターゲットを設置し、該ターゲットをトータルステーションにて測量を行い、正しい位置や角度に誘導する方法である。また、簡易的な方法としては、事前に測量を行い打設位置にマーキングを行う。そして、マーキングされた場所を打設開始位置の目印とし、角度は勾配計などの計測機器を使用して位置や角度を管理していた。
しかしながら、前記従来の方法では、測量やマーキングの作業に多大な労力と多大な時間が費やされる。そのため作業効率が良好ではないとの課題があった。
Conventionally, the placement accuracy has been managed by the following method. For example, there is a method of setting a target in a guide cell, measuring the target with a total station, and guiding it to a correct position and angle. In addition, as a simple method, surveying is done in advance and marking is done at the placement position. Then, the marked place is used as a mark of the placement start position, and the position and angle are managed using a measuring device such as a gradiometer.
However, the conventional method requires a great deal of labor and a great deal of time for surveying and marking work. Therefore, there was a problem that work efficiency was not good.

特開2008-248528号公報JP 2008-248528 A

本発明は前記従来の課題を解決するために創案されたものであり、測量やマーキングの作業に多大な労力や時間を必要以上に費やすことがないため、極めて効率良く、かつ確実で高精度に先受けの打設位置や打設角度が設定できるAGF工法での鋼管打設位置誘導システムを提供することを目的とするものである。 The present invention was invented to solve the above-mentioned conventional problems, and since it does not require a lot of labor and time for surveying and marking work, it is extremely efficient, reliable and highly accurate. It is an object of the present invention to provide a steel pipe driving position guidance system in the AGF construction method that can set the driving position and driving angle of the pre-receiver.

すなわち、モーションキャプチャー技術を活用した掘削ナビゲーションシステムを使用し、極めて効率良く確実で高精度なAGF工法での長尺鋼管を打設する技術を発明したものである。
In other words, we have invented a technology for driving long steel pipes by the AGF method, which is extremely efficient, reliable, and highly accurate, using an excavation navigation system that utilizes motion capture technology.

本発明は、
車両本体から揺動可能に突設され、円筒状をなす切削刃つき先受け部材を軸方向に揺動させる削岩機と、該削岩機の前記揺動をガイドするガイドセルと、
該ガイドセルの長手方向で、前記切削刃の設置位置の近傍位置に間隔をあけて少なくとも2個取り付けられた自発光マーカと、
前記自発光マーカからの光を取得する複数の近赤外線カメラと、
前記複数の近赤外線カメラが取得した光から前記2つの自発光マーカの座標位置を計測する手段と、
前記2つの自発光マーカの取付位置と前記先受け部材の軸芯位置間の距離及び前記2つの自発光マーカの取付位置と切削刃の中心位置間の距離を計測し、該距離を補正係数にして、計測した2つの自発光マーカの座標位置を削岩機の軸芯位置及び切削刃の中心位置に補正する補正手段と、を有し、
あらかじめ掘削データが表示された掘削計画図と前記座標認識された切削刃とをディスプレイ上に表示させ、切削刃による掘削作業が前記掘削計画図に沿って行える、
ことを特徴とし、
または、
車両本体から揺動可能に突設され、円筒状をなす切削刃つき先受け部材を軸方向に揺動させる削岩機と、該削岩機の前記揺動をガイドするガイドセルと、
該ガイドセルの長手方向で、前記切削刃の設置位置の近傍位置に間隔をあけて少なくとも3個取り付けられた自発光マーカと、
前記3個以上取り付けられた自発光マーカからの光を取得する複数の近赤外線カメラと、
前記複数の近赤外線カメラが取得した光から前記3個以上取り付けられた自発光マーカの座標位置を計測する手段と、
前記3個以上取り付けられた自発光マーカの取付位置と前記先受け部材の軸芯位置間の距離及び前記3個以上取り付けられた自発光マーカの取付位置と切削刃の中心位置間の距離を計測し、該距離を補正係数にして、計測した2つの自発光マーカの座標位置を削岩機の軸芯位置及び切削刃の中心位置に補正する補正手段と、を有し、
あらかじめ掘削データが表示された掘削計画図と前記座標認識された切削刃とをディスプレイ上に表示させ、切削刃による掘削作業が前記掘削計画図に沿って行える、
ことを特徴とし、
または、
車両本体から揺動可能に突設され、円筒状をなす切削刃つき先受け部材を軸方向に揺動させる削岩機と、該削岩機の前記揺動をガイドするガイドセルと、
該ガイドセルの長手方向で、前記切削刃の設置位置の近傍位置に間隔をあけて複数個取り付けられた点滅型の自発光マーカと、
前記点滅型の自発光マーカからの点滅する光を取得する複数の近赤外線カメラと、
前記複数の近赤外線カメラが取得した点滅する光から前記複数個取り付けられた点滅型の自発光マーカの座標位置を計測する手段と、を有し、
複数の点滅型の自発光マーカからの点滅する光は、異なる信号周期による点滅周期が与えられ、該信号周期の違いによりいずれのブームのガイドセルに取りつけられた点滅型の自発光マーカかが各々認識でき、
あらかじめ掘削データが表示された掘削計画図と前記座標認識された切削刃とをディスプレイ上に表示させ、切削刃による掘削作業が前記掘削計画図に沿って行える、
ことを特徴とし、
または、
前記点滅型の自発光マーカからの点滅する光は、増幅回路により光の輝度を増幅出来る、
ことを特徴とし、
または、
前記ガイドセルは、車両本体から複数本揺動可能に突設され、前記自発光マーカはそれぞれのガイドセルに取り付けられた、
ことを特徴とするものである。
The present invention
A rock drilling machine that is rockably protruding from a vehicle body and rocks a cylindrical tip receiving member with a cutting edge in the axial direction; a guide cell that guides the rocking movement of the rock drilling machine;
at least two self-luminous markers attached at intervals in the vicinity of the installation position of the cutting blade in the longitudinal direction of the guide cell;
a plurality of near-infrared cameras that acquire light from the self-luminous markers;
means for measuring coordinate positions of the two self-luminous markers from the light acquired by the plurality of near-infrared cameras;
The distance between the mounting position of the two self-luminous markers and the axial center position of the pre-receiving member and the distance between the mounting position of the two self-luminous markers and the center position of the cutting blade are measured, and the distance is used as a correction coefficient. and correction means for correcting the measured coordinate positions of the two self-luminous markers to the axial center position of the rock drill and the center position of the cutting blade,
An excavation plan on which excavation data is displayed in advance and the cutting blade whose coordinates are recognized are displayed on the display, and excavation work using the cutting blade can be performed along the excavation plan.
characterized by
or,
A rock drilling machine that is rockably protruding from a vehicle body and rocks a cylindrical tip receiving member with a cutting edge in the axial direction; a guide cell that guides the rocking movement of the rock drilling machine;
at least three self-luminous markers attached at intervals in the vicinity of the installation position of the cutting blade in the longitudinal direction of the guide cell;
a plurality of near-infrared cameras that acquire light from the three or more attached self-luminous markers;
means for measuring coordinate positions of the three or more attached self-luminous markers from light acquired by the plurality of near-infrared cameras;
Measure the distance between the mounting position of the three or more self-luminous markers and the axial center position of the pre-receiving member, and the distance between the mounting position of the three or more self-luminous markers and the center position of the cutting blade. and correction means for correcting the measured coordinate positions of the two self-luminous markers to the axial center position of the rock drilling machine and the center position of the cutting blade, using the distance as a correction coefficient;
An excavation plan on which excavation data is displayed in advance and the cutting blade whose coordinates are recognized are displayed on the display, and excavation work using the cutting blade can be performed along the excavation plan.
characterized by
or,
A rock drilling machine that is rockably protruding from a vehicle body and rocks a cylindrical tip receiving member with a cutting edge in the axial direction; a guide cell that guides the rocking movement of the rock drilling machine;
a plurality of blinking self-luminous markers attached at intervals near the installation position of the cutting blade in the longitudinal direction of the guide cell;
a plurality of near-infrared cameras that acquire blinking light from the blinking self-luminous marker;
means for measuring coordinate positions of the plurality of attached flashing type self-luminous markers from the flashing lights acquired by the plurality of near-infrared cameras;
The blinking light from the plurality of blinking self-luminous markers is given a blinking cycle according to a different signal cycle, and the difference in the signal cycle determines which boom's self-luminous marker is attached to the guide cell. recognizable,
An excavation plan on which excavation data is displayed in advance and the cutting blade whose coordinates are recognized are displayed on the display, and excavation work using the cutting blade can be performed along the excavation plan.
characterized by
or,
The brightness of the blinking light from the blinking self-luminous marker can be amplified by an amplifier circuit.
characterized by
or,
A plurality of the guide cells protrude from the vehicle body so as to be swingable, and the self-luminous markers are attached to the respective guide cells,
It is characterized by

本発明によれば、測量やマーキングの作業に必要以上に労力や時間を費やすことないため、極めて効率良く、かつ確実で高精度にAGF工法での長尺鋼管が打設できるとの効果を奏する。
すなわち、モーションキャプチャー技術を活用した掘削ナビゲーションシステムを使用し、極めて効率良く、かつ確実で高精度にてAGF工法での長尺鋼管を打設する技術を発明したのである。
According to the present invention, since it is not necessary to spend labor and time for surveying and marking work, it is possible to drive long steel pipes by the AGF construction method very efficiently, reliably and with high accuracy. .
In other words, using a drilling navigation system that utilizes motion capture technology, we have invented a technology for placing long steel pipes using the AGF method with extremely high efficiency, certainty, and high precision.

本発明によるドリルマシンの構成を説明する説明図である。It is an explanatory view explaining composition of a drill machine by the present invention. トンネル内に掘削する先受け部材の掘削位置、掘削の傾き、掘削の距離を正面図、側面図として表し説明する先受け部材打設計画図の説明図である。FIG. 4 is an explanatory drawing of a pre-receiving member hammering plan showing an excavation position of a pre-receiving member to be excavated in a tunnel, an excavation inclination, and an excavation distance in a front view and a side view. 図2の先受け部材打設計画図から先受け部材の打設位置の座標を算出する説明図である。FIG. 3 is an explanatory diagram for calculating the coordinates of the placement position of the pre-receiving member from the pre-receiving member striking design diagram of FIG. 2 ; ディスプレイ上に描画された先受け部材の打設位置を説明する説明図である。It is an explanatory view explaining the setting position of the pre-receiving member drawn on the display. ディスプレイ上に描画された先受け部材の打設位置を確認して先受け部材を掘削誘導する状態を説明する説明図(1)である。It is explanatory drawing (1) explaining the state which confirms the setting position of the pre-receiving member drawn on the display, and excavates and guides the pre-receiving member. ディスプレイ上に描画された先受け部材の打設位置を確認して先受け部材を掘削誘導する状態を説明する説明図(2)である。It is explanatory drawing (2) explaining the state which confirms the setting position of the pre-receiving member drawn on the display, and excavates and guides the pre-receiving member. ディスプレイ上に描画された先受け部材の打設位置を確認して先受け部材を掘削誘導する状態を説明する説明図(3)である。It is explanatory drawing (3) explaining the state which confirms the setting position of the pre-receiving member drawn on the display, and excavates and guides the pre-receiving member. ディスプレイ上に描画された先受け部材の打設位置を確認して先受け部材を掘削誘導する状態を説明する説明図(4)である。It is explanatory drawing (4) explaining the state which confirms the setting position of the pre-receiving member drawn on the display, and excavates and guides the pre-receiving member. ディスプレイ上に描画された先受け部材の打設位置を確認して先受け部材を掘削誘導する状態を説明する説明図(5)である。It is explanatory drawing (5) explaining the state which confirms the setting position of the pre-receiving member drawn on the display, and excavates and guides the pre-receiving member. ディスプレイ上に描画された先受け部材の打設位置を確認して先受け部材を掘削誘導する状態を説明する説明図(6)である。It is explanatory drawing (6) explaining the state which confirms the setting position of the pre-receiving member drawn on the display, and excavates and guides the pre-receiving member. PCの構成と通信状態を説明する説明図である。FIG. 3 is an explanatory diagram for explaining the configuration and communication state of a PC; 演算制御部の構成を説明する説明図である。FIG. 4 is an explanatory diagram for explaining the configuration of an arithmetic control unit; 自発光マーカ中心部と切削刃中心部までの距離をオフ設置距離として説明する説明図(1)である。FIG. 11 is an explanatory diagram (1) for explaining the distance between the center of the self-luminous marker and the center of the cutting blade as the off installation distance. 自発光マーカ中心部と切削刃中心部までの距離をオフ設置距離として説明する説明図(2)である。FIG. 11 is an explanatory diagram (2) for explaining the distance between the center of the self-luminous marker and the center of the cutting blade as the off installation distance. 自発光マーカ中心部と切削刃中心部までの距離をオフ設置距離として説明する説明図(3)である。Fig. 11 is an explanatory diagram (3) for explaining the distance between the center of the self-luminous marker and the center of the cutting blade as the off installation distance; 自発光マーカ中心部と切削刃中心部までの距離をオフ設置距離として説明する説明図(4)である。It is explanatory drawing (4) explaining the distance to a self-luminous marker center and a cutting blade center as an off installation distance. 自発光マーカ中心部と切削刃中心部までの距離をオフ設置距離として説明する説明図(5)である。It is explanatory drawing (5) explaining the distance to a self-luminous marker center part and a cutting blade center part as off installation distance. 自発光マーカ中心部と切削刃中心部までの距離をオフ設置距離として説明する説明図(6)である。It is explanatory drawing (6) explaining the distance to a self-luminous marker center and a cutting blade center as off installation distance. PCとサーバコンピュータとの通信状態を説明する説明図である。FIG. 4 is an explanatory diagram for explaining a communication state between a PC and a server computer;

山岳トンネル工事などで使用されるAGF工法(長尺鋼管先受け工法)は、長尺の先受けを、先受け鋼管打設と注入材の注入により構築するもので、現場で通常使用されているドリルマシン1を利用して施工を行っている。
AGF工法(長尺鋼管先受け工法)は、地質に応じた掘削システムが選定できるため適用地質の範囲が広く、効率の比較的良いとされる施工が可能となっている。また、地質や注入目的に応じた注入材・注入方式が選定できるとのメリットもある。
The AGF method (long steel pipe pre-receiving method), which is used in mountain tunnel construction, etc., constructs a long pre-receiving by placing steel pipes in advance and injecting injection materials, and is usually used at the site. A drill machine 1 is used for construction.
The AGF construction method (long steel pipe pre-receiving method) can be applied to a wide range of geological features because the excavation system can be selected according to the geological feature, and it is possible to perform construction that is considered to be relatively efficient. Another advantage is that the injection material and injection method can be selected according to the geology and purpose of injection.

本工法では、通常山岳トンネルで用いるドリルマシン1を用いて、比較的小口径の先受け鋼管につき先端に専用の切削ビットをつけて用い、二重管方式で掘削とパイプ挿入を同時に行うものである。
その後、先受け鋼管の外周面にあけた複数の孔より、地山側に所定の圧力で注入材を注入し、掘削線の外周部に鋼管が入った限定地山改良ゾーンを形成する。
In this construction method, a drill machine 1, which is normally used in mountain tunnels, is used to attach a special cutting bit to the tip of a comparatively small-diameter pre-receiving steel pipe. be.
After that, grouting material is injected at a predetermined pressure to the ground side through a plurality of holes drilled in the outer peripheral surface of the pre-received steel pipe to form a limited ground improvement zone in which the steel pipe enters the outer peripheral portion of the excavation line.

この切羽前方に構築された地山改良ゾーンにより、地山の先行変位を抑制し、さらに地山の緩み防止と施工の安全が図られるのである。
すなわち、山岳トンネル工事では、切羽(掘削面)天井部の岩盤が不安定な場合に、AGF工法を実施することでトンネルの前方および上部からの崩落を防止できる。
The ground improvement zone constructed in front of the face suppresses the preceding displacement of the ground, further prevents the loosening of the ground, and ensures the safety of construction work.
That is, in mountain tunnel construction, when the bedrock on the ceiling of the face (excavation surface) is unstable, the AGF construction method can prevent collapse from the front and top of the tunnel.

ここで、標準的なAGF工法では、前述の如く、例えば切羽頂部120°の範囲に、先受け鋼管をトンネルの掘削作業に先行して打ち込み、岩盤を補強する。そして、1ヵ所につき、長さ約3mの先受け鋼管を例えば4本つないで約12mの長さにして先受けを構成し、これを打ち込む。 Here, in the standard AGF construction method, as described above, a pre-receiving steel pipe is driven into the range of, for example, 120° of the face top prior to excavation of the tunnel to reinforce the bedrock. Then, for example, four pre-receiving steel pipes having a length of about 3 m are connected to form a pre-receiving steel pipe having a length of about 12 m, and this is driven in.

しかるに先受け鋼管と注入材によって地山を先行補強するのであり、トンネル断面を拡幅しないで施工できる。また、先受け鋼管打設はトンネル施工で使用するドリルマシン1を使用することが出来、鋼管打設後には、打設した円筒状をなす鋼管の開口からウレタン系やセメント系の注入材を注入し、該注入材は前記鋼管外周面に設けられた複数の穴から地山側に流れ、もってトンネル前方地山が補強されるのである。 However, since the ground is reinforced in advance by pre-loaded steel pipes and injection materials, construction can be performed without widening the tunnel cross section. In addition, it is possible to use the drill machine 1 used in tunnel construction to place the pre-received steel pipe. Then, the injection material flows from the plurality of holes provided on the outer peripheral surface of the steel pipe to the natural ground side, thereby reinforcing the natural ground ahead of the tunnel.

図1に本発明の長尺鋼管先受け工法における先受け鋼管打設位置誘導システムに使用されるドリルマシン1の構成を示す。
該ドリルマシン1は、車両本体2と、この車両本体2の前方から突設されたブーム3と該ブーム3に接続されたガイドセル4とその先端から突出揺動するロッド26と、該ロッド26を突出揺動させる削岩機6を有して構成されている。
FIG. 1 shows the configuration of a drill machine 1 used in a pre-receiving steel pipe placing position guiding system in the long steel pipe pre-receiving method of the present invention.
The drill machine 1 includes a vehicle body 2, a boom 3 projecting from the front of the vehicle body 2, a guide cell 4 connected to the boom 3, a rod 26 protruding and swinging from the tip of the guide cell 4, and the rod 26. It is configured to have a rock drill 6 that protrudes and swings.

そして、ロッド26の先端には切削刃5が取り付けられた円筒状の鋼管で構成された先受け部材27が接続されることとなる。前記先受け部材27の1本の長さは約3m程度であり、この先受け部材27を4本繋げて12mの長さの先受け部材27が敷設されるものとなる。図1では先受け部材27を4本繋げて12mの長さにした先受け部材27が描画されている。 A tip receiving member 27 made of a cylindrical steel pipe to which the cutting blade 5 is attached is connected to the tip of the rod 26 . The length of one of the pre-receiving members 27 is approximately 3 m, and four pre-receiving members 27 are connected to form a pre-receiving member 27 having a length of 12 m. In FIG. 1, the front receiving member 27 having a length of 12 m by connecting four of the front receiving members 27 is drawn.

ここで、ブーム3は、車両本体2の前方から揺動可能にして動作できるよう取り付けられている。すなわち、ブーム3は、上下、左右など広角度に自在に揺動できる様油圧シリンダなどの揺動部材が用いられて構成されている。そして、ブーム3の先端側に接続された直線状のガイドセル4についても前記ブーム3の揺動に伴って、またガイドセル4自体も広角に揺動するよう油圧シリンダなどの揺動部材が用いられて構成されている。 Here, the boom 3 is attached so as to be swingable and operable from the front of the vehicle body 2 . That is, the boom 3 is configured using a swinging member such as a hydraulic cylinder so that it can swing freely over a wide angle such as up and down, left and right. A swinging member such as a hydraulic cylinder is used to swing the linear guide cell 4 connected to the tip of the boom 3 with the swing of the boom 3 and to swing the guide cell 4 itself over a wide angle. configured.

該ガイドセル4は、先端に切削刃5を備えた直線円筒管状の先受け部材27を取り付けたロッド26の前後方向の突出揺動をガイドするための部材であり、該ガイドセル4の先端側で先受け部材27の先端に取り付けられた例えばビット状をなす切削刃5が突出揺動してトンネル内周面を掘削し前記先受け部材27を打設するものとなる。 The guide cell 4 is a member for guiding the protruding swing in the front-rear direction of a rod 26 to which a rectilinear cylindrical tube-like receiving member 27 having a cutting edge 5 at the tip is attached. 3, the bit-shaped cutting edge 5 attached to the tip of the tip receiving member 27 protrudes and swings to excavate the inner peripheral surface of the tunnel and drive the tip receiving member 27 therein.

すなわち、稼働制御された切削刃5、先受け部材27、ロッド26などによりトンネル地山の内周面に対し、所定の位置、所定の角度、かつ所定の深さで確実、正確に先受け部材27の打設が行えるよう構成されているのである。 That is, the cutting edge 5, the pre-receiving member 27, the rod 26, etc., whose operation is controlled, reliably and accurately cut the pre-receiving member 27 at a predetermined position, at a predetermined angle, and at a predetermined depth with respect to the inner peripheral surface of the tunnel ground. It is configured so that it can be placed.

ところで、ブーム3については、車両本体2に複数本取り付けられている場合もあり、その場合、各ブーム3の各先端側において各々ガイドセル4が取り付けられ、該各々のガイドセル4についても、それらガイドセル4の先端側にビット状をなす切削刃5が取り付けられた先受け部材27及びロッド26が突出揺動して掘削し、トンネル地山の内周内に打設出来るよう取り付けられている。 By the way, there are cases where a plurality of booms 3 are attached to the vehicle body 2. In that case, each guide cell 4 is attached to each tip side of each boom 3. A tip receiving member 27 having a bit-shaped cutting edge 5 attached to the tip side of the guide cell 4 and a rod 26 are attached so as to protrude, swing, excavate, and drive into the inner circumference of the tunnel ground.

なお、図14、図15、図17、図18から理解されるように、ガイドセル4の例えば先端側側面からは自発光マーカ9が複数個突設され、該複数個の自発光マーカ9とこの自発光マーカ9から発光された光を認識する複数個の近赤外線カメラ10により後述するモーションキャプチャ技術を応用したソフトウェアの測定データ、すなわち前記複数個の自発光マーカ9の座標位置が計測されるものとなっている。 14, 15, 17, and 18, a plurality of self-luminous markers 9 are projected from, for example, the distal end side surface of the guide cell 4, and the plurality of self-luminous markers 9 and A plurality of near-infrared cameras 10 that recognize the light emitted from the self-luminous markers 9 measure the measurement data of the software applying the motion capture technology described later, that is, the coordinate positions of the plurality of self-luminous markers 9. It is a thing.

そしてこの測定データを用いてガイドセル4を通過する先受け部材27、ロッド26や切削刃5の軸方向中心部につき、ガイドセル4の長手方向に間隔をおいて突設された自発光マーカ9について、その位置(座標)を認識すべくPC11の演算制御部12で演算することで、ガイドセル4のリアルタイムでの可動範囲、すなわち先受け部材27先端に有する切削刃5が掘削する位置や掘削する深さ及び掘削の向きなどの情報が取得出来るように構成されるものとなっている(図11、図12参照)。 Then, using this measurement data, self-luminous markers 9 projecting at intervals in the longitudinal direction of the guide cell 4 from the axial center of the pre-receiving member 27, rod 26 and cutting blade 5 passing through the guide cell 4 are detected. , the real-time movable range of the guide cell 4, that is, the position where the cutting blade 5 provided at the tip of the pre-receiving member 27 excavates and the excavation It is constructed so that information such as the depth of the excavation and the direction of excavation can be obtained (see FIGS. 11 and 12).

モーションキャプチャ用の近赤外線カメラ10は、ドリルマシン1の例えば、操縦席上部に間隔をあけて複数個設置されており、ガイドセル4先端の稼働範囲を撮影範囲として撮影できるものとなっている。 A plurality of near-infrared cameras 10 for motion capture are installed at intervals, for example, above the operator's seat of the drill machine 1, and are capable of photographing the operating range of the tip of the guide cell 4 as a photographing range.

ここで、前記近赤外線カメラ10の設置位置及び設置画角の設定は、なるべく最小限のカメラ台数でガイドセル4の稼働を捉えるべく、例えば偶数台あるいは奇数台を組み合わせてそれを交差させる向きであるいは交差させない向きで設置することなどが考えられる。
そして、近赤外線カメラ10は、自発光マーカ9が発光する近赤外線光を捉えるものとなる。
Here, the installation position and installation angle of view of the near-infrared camera 10 are set in such a manner that the operation of the guide cell 4 can be captured with a minimum number of cameras, for example, an even number or an odd number of cameras are combined and intersected. Alternatively, it is conceivable to install them in a direction in which they do not cross each other.
The near-infrared camera 10 captures the near-infrared light emitted by the self-luminous marker 9 .

すなわち、近赤外線カメラ10は、前記自発光マーカ9が発光する近赤外線光を捉え、これにより、例えば、ガイドセル4から突設された複数の自発光マーカ9の座標を認識することが出来、該座標認識のデータをPC11に送出し、PC11では、前記演算制御部12において、前記モーションキャプチャ技術を応用したソフトウェアを用いて認識した自発光マーカ9の位置から相対的にガイドセル4先端にある先受け部材27に取り付けられた切削刃5の座標位置などを計算していくのである。 That is, the near-infrared camera 10 captures the near-infrared light emitted by the self-luminous marker 9, thereby, for example, the coordinates of a plurality of self-luminous markers 9 projecting from the guide cell 4 can be recognized. The coordinate recognition data is sent to the PC 11, and in the PC 11, the position of the self-luminous marker 9 recognized by the software applying the motion capture technology in the arithmetic control unit 12 is relatively at the tip of the guide cell 4. The coordinate position of the cutting blade 5 attached to the pre-receiving member 27 is calculated.

ここで、切削刃5自体に自発光マーカ9を取り付けることが出来れば、確実に切削刃5の先端位置などの座標認識が出来る。しかし切削刃5自体に自発光マーカ9を取り付けることは出来ない。掘削作業や先受け部材27の打設作業の邪魔になってしまい、また掘削作業や先受け部材27の打設作業により破損するからである。 Here, if the self-luminous marker 9 can be attached to the cutting blade 5 itself, the coordinates such as the tip position of the cutting blade 5 can be reliably recognized. However, the self-luminous marker 9 cannot be attached to the cutting blade 5 itself. This is because it interferes with the excavation work and the work of placing the pre-receiving member 27 and is damaged during the excavation work and the work of placing the pre-receiving member 27 .

そこで、本発明では、前述したように、切削刃5の近傍位置、すなわちガイドセル4の側面などに複数個の自発光マーカ9を設置し、切削刃5との距離をいわゆるオフセット補正できるようにして、切削刃5の座標位置を認識するものとしている。詳細は後述する。 Therefore, in the present invention, as described above, a plurality of self-luminous markers 9 are installed near the cutting edge 5, that is, on the side surface of the guide cell 4, so that the distance from the cutting edge 5 can be offset. , the coordinate position of the cutting blade 5 is recognized. Details will be described later.

本発明によるトンネル内周面への先受け部材27の打設作業につき説明する。
図2に示す様なトンネル内周面における先受け部材27の打設位置を示した先受け部材打設計画図などの打設計画図データを予め設定して用意しておく。図2は先受け部材27の打設計画位置をトンネルの正面から見た正面図と側面図であり、例えばCADなどで描画形成した先受け部材打設計画図である。そして、前記図2の先受け部材打設計画図からロックボルト座標位置を算出していく。すなわち、先受け部材打設計画図(例えばCAD図)からY座標、Z座標、のみ先離れ、表示角度を算出していく。
The operation of placing the pre-receiving member 27 on the inner peripheral surface of the tunnel according to the present invention will be described.
Striking plan data such as a pre-receiving member striking plan showing the placement position of the pre-receiving member 27 on the inner peripheral surface of the tunnel as shown in FIG. 2 is preset and prepared. 2A and 2B are a front view and a side view of the design position of the pre-receiving member 27 viewed from the front of the tunnel, which is a design drawing of the pre-receiving member 27 drawn and formed, for example, by CAD. Then, the coordinate positions of the lock bolts are calculated from the plan for hammering the pre-receiving member shown in FIG. That is, only the Y coordinate and the Z coordinate are separated from the design drawing (for example, CAD drawing) of the previous receiving member, and the display angle is calculated.

すると、図3に示す様に(1)で示された先受け部材27の座標位置は、原点14の位置からY座標は-5205mm、Z座標は3450mmと算出され、のみ先離れは、2113mm、表示角度は-132°と算出される。また、(2)で示された先受け部材27の座標位置は、原点14の位置からY座標は3446mm、Z座標は4841mm、のみ先離れは、2113mm、表示角度は151°と算出される。 Then, as shown in FIG. 3, the coordinate position of the front receiving member 27 indicated by (1) is calculated from the position of the origin 14 as -5205 mm for the Y coordinate and 3450 mm for the Z coordinate, and the tip separation is 2113 mm. The display angle is calculated as -132°. Further, the coordinate position of the receiving member 27 indicated by (2) is calculated from the position of the origin 14 with a Y coordinate of 3446 mm, a Z coordinate of 4841 mm, a tip separation of 2113 mm, and a display angle of 151°.

なお、のみ先とは、トンネル地山の先端部にあたる掘削刃5の部分をいい、のみ先離れとは、掘削開始位置から掘削目標位置までの掘削刃5の離れ位置を、正面からみて2次元平面上で表した数値をいう。すなわち、図3において、(1)の先受け部材27につき、2113mmと記載されている数値がのみ先離れの数値となる。換言すれば掘削する先受け部材27の掘削深さを示しているといえる。 The tip refers to the portion of the excavation blade 5 corresponding to the tip of the tunnel ground, and the tip separation refers to the separation position of the excavation blade 5 from the excavation start position to the excavation target position in two dimensions when viewed from the front. A numerical value expressed on a plane. That is, in FIG. 3, only the numerical value described as 2113 mm for the receiving member 27 of (1) is the numerical value of the tip separation. In other words, it can be said that it indicates the excavation depth of the pre-receiving member 27 to be excavated.

そして、上記算出された数値を基に例えば、CSVファイルを作成し、このCSVファイルのデータを描画アプリを用いてディスプレイ15上に描画された図に上書きする操作を行う。これにより前記作業用のディスプレイ15上に先受け部材27の打設位置が反映されるものとなる。 Then, for example, a CSV file is created based on the calculated numerical values, and the drawing application is used to overwrite the drawing drawn on the display 15 with the data of this CSV file. As a result, the placement position of the pre-receiving member 27 is reflected on the display 15 for work.

図4は、ディスプレイ15上に描画された先受け部材27の打設位置を示したものであり、画面は例えば4分割されて表示されている。すなわち、左下の画面にはトンネルの正面図が描画されており、右下にはトンエルの正面図の拡大図、そして、左上の画面にはトンネルを上から見た平面図の拡大図、右上の画面はその側面図が示されて構成されている。 FIG. 4 shows the placing position of the pre-receiving member 27 drawn on the display 15, and the screen is divided into four for example. In other words, the bottom left screen shows the front view of the tunnel, the bottom right is an enlarged view of the front view of the tunnel, and the top left screen is an enlarged plan view of the tunnel seen from above. The screen is configured with its side view shown.

図4において丸部分16は掘削を開始する位置を示している。そして、そこから延びる直線部分は先受け部材27の掘削方向の傾きと掘削深さを示したものである。 In FIG. 4, circled portion 16 indicates the position from which excavation is started. A linear portion extending therefrom indicates the inclination of the pre-receiving member 27 in the excavation direction and the excavation depth.

そして、作業用のディスプレイ15上に表示された先受け部材27の打設計画図上においては、リアルタイムに稼働するガイドセル4先端に有する先受け部材27の切削刃5の実際の稼働位置をあわせて表示できる様構成されている。 On the cutting plan for the pre-receiving member 27 displayed on the work display 15, the actual operating position of the cutting edge 5 of the pre-receiving member 27 at the tip of the guide cell 4 operating in real time is also displayed. configured to be displayed.

よって、この表示をディスプレイ15上で確認し、操作者は、ガイドセル4を稼働させ、切削刃5を有する先受け部材27を操作して先受け部材27の打設作業を行っていくのである。 Therefore, after confirming this display on the display 15, the operator activates the guide cell 4 and operates the pre-receiving member 27 having the cutting edge 5 to perform the work of placing the pre-receiving member 27. .

なお、先受け部材27の打設掘削位置誘導についてであるが、例えば山岳トンネルで用いられている先受け部材27は略円筒状をなす略3mの長さからなる鋼管を繋ぎ合わせられるよう形成されており、トンネルの形状や地山の強度によって前記繋ぎ合わせる長さが使い分けられている。通常は前記鋼管を繋ぎ合わせて例えば12mの長さの先受け部材27が打設される。
ここで、先受け部材27での掘削をドリルマシン1で行い、掘削すると同時に先受け部材27を挿入打設していく。
As for the position guidance for placing and excavating the pre-receiving member 27, the pre-receiving member 27 used in, for example, a mountain tunnel is formed so as to be able to join steel pipes of approximately 3 m in length forming a substantially cylindrical shape. The length to be joined is selected depending on the shape of the tunnel and the strength of the ground. Usually, the steel pipes are joined together to form a pre-receiving member 27 having a length of, for example, 12 m.
Here, the drilling with the pre-receiving member 27 is performed by the drill machine 1, and the pre-receiving member 27 is inserted and driven simultaneously with the excavation.

本発明では、前述のごとく先受け部材27の打設位置は予め計画されて先受け部材打設計画図が作成されており、この先受け部材打設計画図を使用して正しい位置や向き(角度)に打設することによって、より先受け部材27の効果が発揮されることとなる。
したがって、ドリルマシン1で行う先受け部材27の打設位置と掘削方向及び掘削深さは正確確実なのである。
In the present invention, as described above, the placement position of the pre-receiving member 27 is planned in advance and the pre-receiving member striking plan is created. By driving, the effect of the pre-receiving member 27 is exhibited more.
Therefore, the placement position, excavation direction and excavation depth of the pre-receiving member 27 performed by the drill machine 1 are accurate and reliable.

本発明による先受け部材27の打設作業の手順は図5乃至図10に示すとおりである。
目標とする打設位置にガイドセル4を合わせる作業を行う。図5、図6のように正面図で打設開始位置と角度を合わせる。
5 to 10 show the procedure for placing the pre-receiving member 27 according to the present invention.
Work is performed to align the guide cell 4 with the target placement position. As shown in FIGS. 5 and 6, match the placement start position and angle in the front view.

図5乃至図10は白黒の図で示されているが、実際はカラーで表示されており、例えばディスプレイ15上では、先受け部材27の掘削計画位置(図6において矢印の先にある直線)は青色で示され、ガイドセル4の実際の方向(矢印の基端側にある直線)は緑色で示される如きである。すなわち、色分け表示することでディスプレイ15上で容易に認識でき、掘削作業がしやすいように構成されている。 5 to 10 are shown in black and white, but they are actually displayed in color. Shown in blue, the actual direction of the guide cell 4 (the straight line proximal to the arrow) is as shown in green. That is, the color-coded display makes it easy to recognize on the display 15 and facilitates the excavation work.

そして、図6、図8、図9、図10に示すように、ディスプレイ15上の図を確認し、その後、所定の深さまでガイドセル4を押し込んで掘削、挿入打設作業を行うのである。 Then, as shown in FIGS. 6, 8, 9, and 10, after confirming the diagrams on the display 15, the guide cell 4 is pushed in to a predetermined depth for excavation and insertion and driving.

しかるに、ガイドセル4の位置と姿勢を掘削計画図における位置と姿勢に合わせて打設作業を行うのであるが、本発明では、図5乃至図10に示すように、この打設位置(掘削すべき位置と傾きと掘削深さ)を打設計画図上に重ねて描画出来ると共に、前記打設位置(掘削すべき位置と掘削深さ)を平面的に描画して表せることができるのである。
すなわち、先受け部材27の掘削深さの描画方法は、直線の長さによって表すこととし、この直線の長さが掘削深さの長さとなっているのである。
However, the placement work is carried out by adjusting the position and posture of the guide cell 4 to the position and posture in the excavation plan drawing. Position, inclination, and excavation depth) can be superimposed and drawn on the driving plan drawing, and the driving position (position to be excavated and excavation depth) can be represented by drawing two-dimensionally.
That is, the drawing method of the excavation depth of the pre-receiving member 27 is represented by the length of a straight line, and the length of this straight line is the length of the excavation depth.

次に、自発光マーカ9の構成につき説明する。
本発明では自ら光る自発光マーカ9を用い、ガイドセル4先端側にある先受け部材27先端の切削刃5の位置の常時検出ができる構成としたものである。
Next, the configuration of the self-luminous marker 9 will be described.
In the present invention, a self-luminous marker 9 that emits light by itself is used so that the position of the cutting edge 5 at the tip of the tip receiving member 27 on the tip side of the guide cell 4 can always be detected.

トンネル掘削時のトンネル内環境につき、現場によってはトンネル内部空間内に水滴や土埃などが多く浮遊していることがある。その場合、反射型のマーカを用いると、発光体より照射された光が反射型マーカに到達するまでに乱反射が起こる。すると、前記乱反射光により近赤外線カメラ10はマーカ位置を正確に捉えることが出来なくなる場合がある。
また反射型マーカの反射光は、近赤外線カメラ10で捉える時点で、輝度が低下して充分な精度が得られない。
そこで、本件発明者らはマーカ自体が近赤外光を発する自発光マーカ9を発明したものである。
Regarding the tunnel environment during tunnel excavation, depending on the site, many water droplets and dirt may be floating in the tunnel interior space. In that case, if a reflective marker is used, irregular reflection occurs before the light emitted from the light emitter reaches the reflective marker. Then, the near-infrared camera 10 may not be able to accurately capture the marker position due to the irregularly reflected light.
In addition, when the near-infrared camera 10 captures the reflected light from the reflective marker, the luminance is lowered and sufficient accuracy cannot be obtained.
Therefore, the inventors have invented a self-luminous marker 9 in which the marker itself emits near-infrared light.

本発明での自発光マーカ9は、反射型と比べ光の経路が半分で済むため、輝度の低下を抑えられる。特に、空間内に水滴などが存在して乱反射が起こる場合、近赤外線カメラ10にはマーカが中心にぼやけて見えるため、半径が少し大きく検出されるが、依然マーカ中心位置を正確に検出することが可能なのである。なお、自発光マーカ9は取付位置付近に電源(例えば、充電式モバイルバッテリを使用する)があることが必要とされる。 The self-luminous marker 9 according to the present invention requires only half the path of light compared to a reflective marker, so that the decrease in brightness can be suppressed. In particular, when irregular reflection occurs due to the presence of water droplets in the space, the near-infrared camera 10 sees the marker as blurred in the center, so the detected radius is slightly larger, but the center position of the marker can still be detected accurately. is possible. It should be noted that the self-luminous marker 9 is required to have a power supply (for example, using a rechargeable mobile battery) near the mounting position.

従って、自発光マーカ9の近傍位置には、バッテリー17などが納められたベースステーション18が設けられる。そして、自発光マーカ9とバッテリー17とは例えば有線で接続される(図19参照)。 Accordingly, a base station 18 containing a battery 17 and the like is provided near the self-luminous marker 9 . The self-luminous marker 9 and the battery 17 are connected by wire, for example (see FIG. 19).

トンネル内周面への先受け部材27の掘削作業に際しては、前述した様にこの自発光マーカ9を切削刃5近傍位置のガイドセル4の2カ所に間隔をあけて取り付ける(図14、図15など参照)。これにより確実な掘削作業が行えることとなる。 When excavating the pre-receiving member 27 on the inner peripheral surface of the tunnel, as described above, the self-luminous markers 9 are attached to the guide cell 4 near the cutting edge 5 with a space therebetween (FIGS. 14 and 15). etc.). As a result, reliable excavation work can be performed.

すなわち、掘削作業時において、複数の近赤外線カメラ10によって少なくとも2カ所に取り付けられた自発光マーカ9の光を受光し、この受光した自発光マーカ9の相対位置からPC11にて前記自発光マーカ9の座標位置2点を計算する。
モーションキャプチャ技術には複数の手法が存在するが、本発明のモーションキャプチャ技術は光学式モーションキャプチャ技術である。
That is, during excavation work, light from the self-luminous markers 9 attached at least two locations is received by the plurality of near-infrared cameras 10, and the self-luminous markers 9 are detected by the PC 11 from the relative positions of the self-luminous markers 9 that have received the light. Calculate the two coordinate positions of .
Although there are multiple methods of motion capture technology, the motion capture technology of the present invention is an optical motion capture technology.

この光学式キャプチャ技術の基本的な仕組みとしては、対象物(ここでは切削刃5近傍位置のガイドセル4上)に自発光マーカ9につき間隔をあけて2カ所に設置し、前記自発光マーカ9により、例えば目に見えない近赤外線光(波長850nm程度)を発光させ、該光を複数の近赤外線カメラ10により撮影するものである。 As a basic mechanism of this optical capture technology, a self-luminous marker 9 is placed on the target (here, on the guide cell 4 near the cutting blade 5) at two locations with an interval therebetween, and the self-luminous marker 9 , for example, invisible near-infrared light (wavelength of about 850 nm) is emitted, and the light is photographed by a plurality of near-infrared cameras 10 .

なお、前記2カ所に設置する自発光マーカ9は、削岩機6に取り付けられたロッド26及び先受け部材27先端の切削刃5の軸方向中心軸線と、なるべく近接する位置するよう設置するものとする。後述する回転誤差があっても、その影響を少なくすることが求められるからである。 The self-luminous markers 9 installed at the two locations are installed so as to be as close as possible to the axial center axis of the cutting blade 5 at the tip of the rod 26 and the tip of the tip receiving member 27 attached to the rock drill 6. and This is because even if there is a rotation error, which will be described later, it is required to reduce its influence.

上記のように2つの自発光マーカ9を設置すれば、削岩機6及び切削刃5、特に切削刃5の先端の座標位置を計測することが出来る。なお、前記したように自発光マーカ9の取付位置と切削刃5の軸方向中心線との距離が離れているが、該距離の長さをあらかじめ認識していわゆるオフセット補正するものとしてある。 By installing two self-luminous markers 9 as described above, it is possible to measure the coordinate positions of the rock drilling machine 6 and the cutting blade 5 , especially the tip of the cutting blade 5 . As described above, the distance between the attachment position of the self-luminous marker 9 and the axial center line of the cutting blade 5 is long, but the length of the distance is recognized in advance and the so-called offset correction is performed.

前記近赤外線カメラ10にて取得した画像はデータとしてPC11に転送され、該画像データはソフトウェア処理により、背景とマーカ光の輝度差を利用してマーカ部分の画像のみが抽出される。
そして、PC11に取り込まれた画像において、例えば、画面上の左上隅を原点として、各自発光マーカ9の重心座標をピクセル単位で各々測定する。これにより各々の自発光マーカ9の座標位置がほぼ認識できる。
The image acquired by the near-infrared camera 10 is transferred as data to the PC 11, and only the image of the marker portion is extracted by software processing using the luminance difference between the background and the marker light.
Then, in the image captured by the PC 11, for example, with the upper left corner of the screen as the origin, the coordinates of the center of gravity of each light-emitting marker 9 are measured in units of pixels. As a result, the coordinate position of each self-luminous marker 9 can be almost recognized.

すなわち、複数台の近赤外線カメラ10にて自発光マーカ9からの光を同時撮影することで、ステレオビジョンの要領で視差を基に深さ方向の距離が認識され、深さ方向の位置も計算することができる。
各々の自発光マーカ9の座標位置に前述のオフセット補正をすることにより、切削刃5の先端位置の座標位置が認識できるものとなる。
That is, by simultaneously photographing the light from the self-luminous marker 9 with a plurality of near-infrared cameras 10, the distance in the depth direction is recognized based on the parallax in the manner of stereo vision, and the position in the depth direction is also calculated. can do.
By performing the aforementioned offset correction on the coordinate position of each self-luminous marker 9, the coordinate position of the tip position of the cutting blade 5 can be recognized.

ここで、PC11は、送信部20、受信部21、演算制御部12、記憶部22、入力部23を有して構成されている。さらに、ディスプレイ15と接続されており、PC11の情報がディスプレイ15上に表示できるものとなっている(図11参照)。
さらに、PC11はインターネット回線などの通信回線網23を介して外部のサーバコンピュータ24などと接続されており、該サーバコンピュータ24は、PC11の情報を受信し、該情報を記憶、保存できるものとなっている。
尚、演算制御部12は、掘削計画図読み込み部31、掘削計画図形成部32、掘削位置等読み込み部33、掘削位置等描画部34を有している(図12参照)。
Here, the PC 11 includes a transmission section 20 , a reception section 21 , an arithmetic control section 12 , a storage section 22 and an input section 23 . Furthermore, it is connected to a display 15 so that information of the PC 11 can be displayed on the display 15 (see FIG. 11).
Furthermore, the PC 11 is connected to an external server computer 24 or the like via a communication network 23 such as the Internet line, and the server computer 24 receives information from the PC 11 and can store and save the information. ing.
The arithmetic control unit 12 has an excavation plan drawing reading unit 31, an excavation plan drawing forming unit 32, an excavation position reading unit 33, and an excavation position drawing unit 34 (see FIG. 12).

よって、例えば、前記サーバコンピュータ24から掘削計画図のデータをPC11が受信すると、演算制御部12の掘削計画図読み込み部31で読み込み、掘削計画図形成部32で平面図が形成されて、ディスプレイ15に表示される。 Therefore, for example, when the PC 11 receives the excavation plan drawing data from the server computer 24, the excavation plan drawing reading unit 31 of the arithmetic control unit 12 reads the excavation plan drawing data, and the excavation plan drawing forming unit 32 forms a plan view, which is displayed on the display 15. to be displayed.

そして、操作者は、ガイドセル4を稼働操作し、ディスプレイ15に表示された掘削位置等に基づいて掘削していく。すると、その掘削作業を掘削位置等読み込み部33がリアルタイムに読み取って、掘削位置等描画部34によって前記掘削計画図上に異なる色で描画し表示していくのである(図5乃至図10参照)。 Then, the operator operates the guide cell 4 to excavate based on the excavation position and the like displayed on the display 15 . Then, the excavation work is read by the excavation position reading unit 33 in real time, and the excavation position drawing unit 34 draws and displays it in different colors on the excavation plan drawing (see FIGS. 5 to 10). .

そして、これらのデータはリアルタイムに記憶部22に送出され、記憶部22に保存される。また、保存されたデータは通信回線網25を介してサーバコンピュータ24へ送信され、そこで保存されると共に、記録として残すことが出来る。 These data are sent to the storage unit 22 in real time and stored in the storage unit 22 . In addition, the saved data is transmitted to the server computer 24 via the communication network 25, where it is saved and can be left as a record.

ここで、本発明において自発光マーカ9を用いる手法は、ガイドセル4の長手方向に間隔をあけて2カ所に設置する場合につき説明した。
しかしながら、2カ所の設置であると、切削刃5が2つの自発光マーカ9の中心を結ぶ延長線を回転軸として回転したときの切削刃5の座標位置認識のずれを解決できない。
Here, the method of using the self-luminous markers 9 in the present invention has been described for the case where the self-luminous markers 9 are installed at two locations with an interval in the longitudinal direction of the guide cell 4 .
However, if they are installed at two locations, it is not possible to solve the problem of misrecognition of the coordinate position of the cutting blade 5 when the cutting blade 5 rotates about the extension line connecting the centers of the two self-luminous markers 9 as the rotation axis.

自発光マーカ9は切削刃5の軸方向中心線上に設置されたものではない。逆に、既に述べたように自発光マーカ9は切削刃5の軸方向中心線上に決して設置出来ない。切削刃5の稼働の邪魔になるからであり、仮に設置したとしても稼働作業により破壊されてしまうからである。 The self-luminous marker 9 is not placed on the axial centerline of the cutting blade 5 . Conversely, the self-luminous marker 9 can never be placed on the axial centerline of the cutting blade 5 as already described. This is because it interferes with the operation of the cutting blade 5, and even if it were installed, it would be destroyed during the operation.

よって、自発光マーカ9の実際の設置位置から切削刃5の軸方向中心線までの距離を補正係数としてあらかじめオフセット認識して計測するのである。この自発光マーカ9の実際の設置位置から切削刃5の軸方向中心線までの距離を補正係数としての計測は、前記オフセット補正係数、すなわち自発光マーカ9の実際の設置位置から切削刃5の軸方向中心線までの距離データが演算制御部12に入力されて行われる(図13乃至図18の「オフセット距離」を参照)。 Therefore, the distance from the actual installation position of the self-luminous marker 9 to the center line of the cutting blade 5 in the axial direction is used as a correction coefficient, and the offset is previously recognized and measured. Measurement using the distance from the actual installation position of the self-luminous marker 9 to the axial centerline of the cutting blade 5 as a correction factor is the offset correction coefficient, that is, the distance from the actual installation position of the self-luminous marker 9 to the cutting blade 5 Distance data to the center line in the axial direction is input to the arithmetic control unit 12 (see "offset distance" in FIGS. 13 to 18).

ところが、自発光マーカ9の2カ所の設置であると、前記自発光マーカ9の延長線上を回転軸として前記オフセット補正の距離を半径にした円周上のいずれの位置に切削刃5が位置するか認識できずに切削刃5の位置認識にずれが生じてしまうのである。 However, if the self-luminous markers 9 are installed at two locations, the cutting edge 5 can be located at any position on the circumference of the circle whose radius is the distance for the offset correction with the extension of the self-luminous markers 9 as the axis of rotation. Therefore, the positional recognition of the cutting blade 5 is deviated.

すなわち、2つの自発光マーカ9のみを使用した場合、ガイドセル4の位置、切削刃5の位置は一意に決まらないことになる。なぜなら2つの自発光マーカ9の中心を通る直線を回転軸にして、切削刃5の中心と自発光マーカ9の設置位置との距離を半径とする円周上のどこかに目標座標があることになるからである(回転誤差)。 That is, when only two self-luminous markers 9 are used, the position of the guide cell 4 and the position of the cutting edge 5 cannot be uniquely determined. This is because the target coordinates are located somewhere on a circle whose radius is the distance between the center of the cutting blade 5 and the installation position of the self-luminous marker 9, with the straight line passing through the centers of the two self-luminous markers 9 as the axis of rotation. (rotational error).

しかしながら、実際の掘削作業においては、ガイドセル4の姿勢はおおよそ一定の範囲でのみ動作するため前述の回転誤差は掘削作業において許容範囲内と考えることができ、前記2点の自発光マーカ9の設置での運用が可能になっている。従って、2つの自発光マーカ9は、なるべく切削刃5の軸方向中心に近い箇所に取り付けることが好ましいのである。 However, in an actual excavation work, the posture of the guide cell 4 operates only within a roughly constant range, so the aforementioned rotational error can be considered to be within an allowable range for the excavation work. Installation is possible. Therefore, it is preferable to attach the two self-luminous markers 9 at locations as close to the axial center of the cutting blade 5 as possible.

そこで、本件発明者らは、さらに掘削作業の正確性を期すべく、上記事態を解消すべく、自発光マーカ9を3カ所、あるいはそれ以上の箇所に設置する発明を創案した(図17乃至図19参照)。 Therefore, the inventors of the present invention have created an invention in which the self-luminous markers 9 are installed at three or more locations in order to further improve the accuracy of the excavation work and to solve the above-described situation (Fig. 17 to Fig. 17). 19).

まず、自発光マーカ9を取り付ける取付杆19の各々の長さが異なるようにした3つの自発光マーカ9を使用し、これら3つの自発光マーカ9について間隔をあけてガイドセル4に取り付ける。
そして、前記した複数の近赤外線カメラ7で前記3つの自発光マーカ9を撮影し、モーションキャプチャによりこれら3つの自発光マーカ9の座標位置を測定する。
First, three self-luminous markers 9 having different lengths of mounting rods 19 for attaching the self-luminous markers 9 are used, and these three self-luminous markers 9 are attached to the guide cell 4 with a space therebetween.
Then, the three self-luminous markers 9 are photographed by the plurality of near-infrared cameras 7, and the coordinate positions of the three self-luminous markers 9 are measured by motion capture.

なお、前記測定に際しては自発光マーカ9の実際の設置位置から切削刃5の軸方向中心線までの距離をオフセット補正係数としてあらかじめ設定しておき、その上で演算制御部12で計測することは、前述した2つ自発光マーカの場合と同様である。 In the above measurement, the distance from the actual installation position of the self-luminous marker 9 to the center line of the cutting blade 5 in the axial direction may be set in advance as an offset correction coefficient, and then the calculation control unit 12 may perform the measurement. , is the same as the case of the two self-luminous markers described above.

すると、測定したそれぞれ3つの自発光マーカ9の座標位置からオフセット(補正係数)を考慮した目標座標が一意に計測することが出来るものとなる。
この場合であれば、自発光マーカ9の座標認識による目標座標が確実に認識でき、そのため前記した自発光マーカ9の2カ所設置による切削刃5の回転による位置認識のずれをも解消できる。従って、確実に掘削箇所に合致させられ、もって正確な掘削が出来る。なお、3つ以上自発光マーカ9を設置した場合でも同様の結果が得られる。
Then, the target coordinates can be uniquely measured with the offset (correction coefficient) taken into account from the coordinate positions of the three self-luminous markers 9 that have been measured.
In this case, the target coordinates can be reliably recognized by recognizing the coordinates of the self-luminous markers 9, so that the displacement of the position recognition caused by the rotation of the cutting blade 5 due to the installation of the self-luminous markers 9 at two locations can be eliminated. Therefore, it is possible to reliably match the excavation point, thereby enabling accurate excavation. Similar results can be obtained even when three or more self-luminous markers 9 are installed.

ここで、前記複数の近赤外線カメラ10の設置位置及び設置画角の設定は、なるべく最小限のカメラ台数でブーム3及びガイドセル4の稼働を捉えるべく、例えば偶数台を各々交差させる向きであるいは交差させない向きで設置することなどが考えられる。
そして、複数の近赤外線カメラ10は、自発光マーカ9から発光された近赤外線光を捉えるものとなる。
Here, the installation positions and installation angles of view of the plurality of near-infrared cameras 10 are set so that the operation of the boom 3 and the guide cell 4 can be captured with the minimum number of cameras as possible, for example, an even number of cameras are intersected, or It is conceivable to install them so that they do not cross each other.
A plurality of near-infrared cameras 10 capture the near-infrared light emitted from the self-luminous marker 9 .

すなわち、近赤外線カメラ10が前記近赤外線光を捉え、これにより、例えば、切削刃5近傍位置に取り付けられた自発光マーカ9の座標を認識することが出来、該座標認識のデータをPC11に送出し、PC11では、前記演算制御部12において、モーションキャプチャ技術を応用したソフトウェアを用いて自発光マーカ9の座標を認識する。そして、認識した座標から相対的に切削刃5の位置を計算し、順次計算される座標位置を認識しながら、切削刃5を稼働操作し、切削していくものとなる。 That is, the near-infrared camera 10 captures the near-infrared light, thereby, for example, the coordinates of the self-luminous marker 9 attached near the cutting blade 5 can be recognized, and the coordinate recognition data is sent to the PC 11. In the PC 11, the arithmetic control unit 12 recognizes the coordinates of the self-luminous marker 9 using software to which motion capture technology is applied. Then, the position of the cutting blade 5 is calculated relative to the recognized coordinates, and the cutting blade 5 is operated while recognizing the sequentially calculated coordinate positions to perform cutting.

次に、所定間隔で点滅を繰り返す点滅型の自発光マーカ9を用いた構成について本件発明者らはさらに発明したので該新規発明の構成についても説明する。
なお、点滅型の自発光マーカ9をガイドセル4に取りつける個数については、2個でも構わないし、2個以上でも構わない。前述した自発光マーカ9の場合と同様である。
Next, the inventors of the present invention have further invented a configuration using a flashing self-luminous marker 9 that repeats flashing at predetermined intervals, so the configuration of the new invention will also be described.
The number of flashing self-luminous markers 9 attached to the guide cell 4 may be two, or two or more. This is the same as the self-luminous marker 9 described above.

トンネル空間内に複数のマーカが取り付けられた対象物、すなわちブーム3及びガイドセル4が複数存在する場合でこれら複数のブーム3及びガイドセル4が交差したり回転等の動きがある場合、前記ブーム3及びガイドセル4のどの位置にどのマーカが取り付けられているか判別できなくなることがある(これはマーカ入替り現象と称されている)。 In the case where there are a plurality of objects to which a plurality of markers are attached, that is, a plurality of booms 3 and guide cells 4, in the tunnel space, if these plurality of booms 3 and guide cells 4 intersect or move such as rotation, the boom 3 and guide cell 4, it may not be possible to determine which marker is attached to which position (this is called a marker replacement phenomenon).

その場合、例えば、近赤外線カメラ10のフレームレートを考慮した同期機能を持つ所定間隔で点滅を繰り返す点滅型の自発光マーカ9が効果を発揮するものとなる。本件発明者らは独自に本件発明に関するガイドセル4用に前記所定間隔で点滅を繰り返す点滅型の自発光マーカ9及び点滅型の自発光マーカ9の輝度などの増幅回路を含むハードウェアを発明した(図19参照)。 In that case, for example, a blinking self-luminous marker 9 that repeats blinking at predetermined intervals and has a synchronization function considering the frame rate of the near-infrared camera 10 is effective. The inventors independently invented hardware for the guide cell 4 related to the present invention, including a flashing self-luminous marker 9 that repeats flashing at predetermined intervals and an amplifier circuit for the brightness of the flashing self-luminous marker 9. (See FIG. 19).

各々の点滅型の自発光マーカ9の近傍位置にベースステーション18が設けられており、該ベースステーション18内には、例えばバッテリー17、同期信号受信器42、増幅回路40などが収納されている。 A base station 18 is provided in the vicinity of each flashing self-luminous marker 9, and the base station 18 accommodates, for example, a battery 17, a synchronizing signal receiver 42, an amplifier circuit 40, and the like.

また、ドリルマシン1側には同期信号送信器41が設けられ、該同期信号送信器41から各々の点滅型の自発光マーカ9側に同期信号が送信される。
そして、各々の点滅型の自発光マーカ9は、自己の同期信号を受信し、これにより独自の信号周期(点滅周期)による点滅が行えるのである。
A synchronizing signal transmitter 41 is provided on the drill machine 1 side, and a synchronizing signal is transmitted from the synchronizing signal transmitter 41 to each blinking self-luminous marker 9 side.
Each flashing type self-luminous marker 9 receives its own synchronizing signal, thereby enabling flashing according to its own signal cycle (blinking cycle).

そして、PC11側では、各々の点滅型の自発光マーカ9についてそれぞれの信号周期で点滅することが認識できるものとなっており、それぞれの信号周期での点滅が、いわば各々の点滅型の自発光マーカ9のIDとなっているのである。よって、たとえ近赤外線カメラ10によって捉えられた自発光マーカ9がいずれの位置に取り付けられた点滅型の自発光マーカ9から照射された光か目視などで判断ができない場合であっても、前記IDを検索することでいずれのガイドセル4に取り付けられた点滅型の自発光マーカ9であるかが判断できるものとなる。 On the PC 11 side, it is possible to recognize that each blinking type self-luminous marker 9 blinks in each signal period, and the blinking in each signal period corresponds to each blinking type self-luminous marker. This is the ID of the marker 9. Therefore, even if it is not possible to visually determine whether the self-luminous marker 9 captured by the near-infrared camera 10 is the light emitted from the flashing self-luminous marker 9 attached at any position, the ID , it is possible to determine to which guide cell 4 the blinking self-luminous marker 9 is attached.

すなわち、本件発明者らが発明した点滅型の自発光マーカ9を用いることで、全ての点滅型の自発光マーカ9は異なる信号周期で点滅を繰り返す。従って、異なる信号周期で点滅を繰り返す点滅型の自発光マーカ9は、その異なる信号周期での点滅の違いがそれぞれのID となり、このIDを認識することによりいずれのガイドセル4のいずれの位置に取り付けられた点滅型の自発光マーカ9であるかが判別できるものとなる。 That is, by using the blinking self-luminous markers 9 invented by the inventors, all the blinking self-luminous markers 9 repeat blinking at different signal cycles. Therefore, the flashing type self-luminous marker 9 that repeats flashing at different signal cycles has an ID corresponding to the difference in flashing at different signal cycles. It can be determined whether it is the attached flashing type self-luminous marker 9 or not.

このように、検出された点滅型の自発光マーカ9がいずれの座標位置にある点滅型の自発光マーカ9であるかが一意に決まるため、マーカの入れ替わりを防ぐことが出来る。 In this manner, it is uniquely determined at which coordinate position the detected blinking self-luminous marker 9 is located, so that the replacement of markers can be prevented.

さらに詳細に説明すると、まず、本件発明の点滅型の自発光マーカ9に、例えば異なったパルス波形のパルス信号、すなわち、異なる信号周期で点滅を繰り返すパルス信号を振り分ける。 More specifically, first, pulse signals having different pulse waveforms, that is, pulse signals that repeatedly blink at different signal periods, are distributed to the flashing self-luminous marker 9 of the present invention.

これにより、それぞれの点滅型の自発光マーカ9は異なる信号周期で点滅を繰り返すことができる。しかも、前記異なった信号周期の点滅が点滅型の自発光マーカ9のそれぞれのIDになるのである。そのIDを有する点滅型の自発光マーカ9の取り付け位置をあらかじめ認識しておけば、たとえ、近赤外線カメラ10でいずれかの点滅型の自発光マーカ9の取り付け位置が目視などで判断できなくなっても、前記IDの違いにより点滅型の自発光マーカ9の取り付け位置が判断できることになるのである。 As a result, the blinking self-luminous markers 9 can repeat blinking at different signal cycles. Moreover, the blinking of the different signal periods becomes the ID of each of the blinking self-luminous markers 9 . If the mounting position of the flashing self-luminous marker 9 having the ID is recognized in advance, even if the near-infrared camera 10 cannot visually determine the mounting position of any of the flashing self-luminous markers 9. Also, the attachment position of the blinking self-luminous marker 9 can be determined from the difference in the ID.

このように、点滅型の自発光マーカ9の全てに、例えば異なった信号周期の点滅をIDにして振り分け、次いでそのラベリングを行う。これによりすべての点滅型の自発光マーカ9の取り付け位置が認識できる。 In this way, all the blinking type self-luminous markers 9 are assigned, for example, blinking with different signal periods as IDs, and then labeled. This makes it possible to recognize the attachment positions of all the blinking self-luminous markers 9 .

ところで、点滅型の自発光マーカ9は、例えば取り付け位置近傍に設置されたバッテリーから電源供給を受け、それぞれの点滅型の自発光マーカ9を点滅させる。
この点滅に際しては、増幅回路40によって点滅型の自発光マーカ9の光源であるLEDの輝度を増幅させることもできる。この輝度向上により、さらに近赤外線カメラ10からの認識度を向上させることができる。
By the way, the flashing type self-luminous markers 9 receive power supply from, for example, a battery installed near the mounting position, and blink the respective flashing type self-luminous markers 9 .
At the time of blinking, the amplifier circuit 40 can also amplify the brightness of the LED, which is the light source of the blinking self-luminous marker 9 . With this improvement in luminance, the degree of recognition from the near-infrared camera 10 can be further improved.

図19は本発明の本発明の構成を含んだシステム概要図であり、図から理解されるように、それぞれの点滅型の自発光マーカ9の近傍位置には電源としてのバッテリー17、LEDの輝度を増幅させる増幅回路40及び同期信号送信器41からの同期信号を受信する同期信号受信器42が収納されたベースステーション18が設置されている。 FIG. 19 is a schematic diagram of the system including the configuration of the present invention. As can be seen from the figure, a battery 17 as a power source and an LED brightness A base station 18 containing an amplifier circuit 40 for amplifying a synchronous signal and a synchronous signal receiver 42 for receiving a synchronous signal from a synchronous signal transmitter 41 is installed.

そして、前記同期信号送信器41と同期信号受信器42との信号の送受信によっていずれの取り付け位置にある点滅型の自発光マーカ9かが認識できるものとなっている。 By transmitting and receiving signals between the synchronous signal transmitter 41 and the synchronous signal receiver 42, it is possible to recognize which mounting position the flashing type self-luminous marker 9 is located.

本発明の掘削システムは、前記したように、ドリルマシン1におけるガイドセル4先端側に取り付けられた切削刃5の稼働動作を、いわゆるモーションキャプチャ技術を用いて、まず第一に、リアルタイムに前記ガイドセル4先端側に取り付けられた切削刃5の稼働動作をドリルマシン1に搭載されたディスプレイ15に表示出来、該ディスプレイ15上の画像を確認しながら操作者がトンネル内周面に対する掘削作業が行える。さらに、第二に掘削作業を行っているトンネル内周面に対する大量の先受け部材277の掘削位置データについてリアルタイムにPC11等に記録、保存できるものとしている。 As described above, the drilling system of the present invention uses so-called motion capture technology to detect the operating motion of the cutting blade 5 attached to the tip side of the guide cell 4 in the drill machine 1, first of all, in real time. The operation of the cutting blade 5 attached to the tip of the cell 4 can be displayed on the display 15 mounted on the drill machine 1, and the operator can perform the excavation work on the inner peripheral surface of the tunnel while checking the image on the display 15. . Furthermore, secondly, a large amount of excavation position data of the pre-receiving member 277 on the inner peripheral surface of the tunnel being excavated can be recorded and saved in the PC 11 or the like in real time.

よって、ドリルマシン1の操作者は、前記リアルタイムで取得されたガイドセル4先端側に取り付けられた切削刃5の稼働動作をディスプレイ15上に描画された映像で確認しながら掘削作業を行えるものとなる。よって、従来、目視で確認した掘削作業においては、死角が存在することがあったが、ディスプレイ15上の確認作業に死角がほぼ存在することはないものとなった。 Therefore, the operator of the drill machine 1 can perform the drilling operation while confirming the operation of the cutting blade 5 attached to the tip of the guide cell 4 acquired in real time on the image drawn on the display 15. Become. Therefore, in the past, there was a blind spot in the excavation work visually confirmed, but there is almost no blind spot in the confirmation work on the display 15 .

ここで、図3に内周面についての掘削計画図である正面図を示す。該正面図においては、ガイドセル4の代表2点から取得した座標をどのように描画するかも重要となる。 Here, FIG. 3 shows a front view which is an excavation plan drawing for the inner peripheral surface. In the front view, how the coordinates acquired from the two representative points of the guide cell 4 are drawn is also important.

本発明では前述のごとく、前記図2の先受け部材27の掘削打設計画図(例えばCAD図)から先受け部材27の掘削打設座標位置を算出していくのである。すなわち、先受け部材27の掘削打設計画図からY座標、Z座標、のみ先離れ、表示角度を算出していくのである(図3参照)。 In the present invention, as described above, the drilling and driving coordinate position of the pre-receiving member 27 is calculated from the drilling and punching design drawing (for example, CAD drawing) of the pre-receiving member 27 shown in FIG. That is, only the Y coordinate and Z coordinate are separated from the plan drawing of the drilling strike of the pre-receiving member 27, and the display angle is calculated (see FIG. 3).

一方、記録、保存に関しては、自発光マーカ9の2点の座標の変化を例えば、1秒単位で記録することもできる。例えば、PC11のハードドライブなど記憶部21に例えばCSV形式にて保存できるのである。 On the other hand, regarding recording and storage, changes in the coordinates of two points of the self-luminous marker 9 can be recorded, for example, in units of one second. For example, it can be saved in the storage unit 21 such as the hard drive of the PC 11 in, for example, CSV format.

なお、掘削時において、例えばガイドセル4に設けられた掘削距離測定部を構成する油圧シリンダの油圧データ(例えばガイドセル4や削岩機の揺動部材4として使用される油圧シリンダの油圧流量変化量)などをドリルマシン1(建機)から取得してPC11に転送することで、各先受け部材27の掘削距離を前記記憶部21に追加して保存することも出来る。この様に、掘削長さを表すのみ先離れの距離などについて別途前記の様に油圧データなどを介して計測することも出来る。 During excavation, for example, the hydraulic pressure data of the hydraulic cylinders constituting the excavation distance measuring unit provided in the guide cell 4 (for example, the hydraulic pressure data of the hydraulic cylinders used as the rocking member 4 of the guide cell 4 and the rock drilling machine) , etc., from the drill machine 1 (construction machine) and transferred to the PC 11, the excavation distance of each pre-receiving member 27 can be added to the storage unit 21 and stored. In this way, it is also possible to separately measure the distance between the tip and the like, which represents the excavation length, through the oil pressure data and the like as described above.

以上において、本発明による使用状態の概略を説明する。
トンネルの内周面に対し、ドリルマシン1のガイドセル4を対向させて設置させる。所定の内周面に対し、掘削計画図が用意されている場合、該掘削計画図をディスプレイ15に写し出す。
In the above, the outline of the use state by this invention is demonstrated.
The guide cell 4 of the drill machine 1 is installed facing the inner peripheral surface of the tunnel. When an excavation plan is prepared for a predetermined inner circumferential surface, the excavation plan is displayed on the display 15 .

そして、該掘削計画図に描画された掘削位置、掘削の傾き、掘削長(のみ先離れの距離)に従ってガイドセル4を稼働させる。すなわち、ガイドセル4の操作者はディスプレイ15上でリアルタイムにガイドセル4先端側に取り付けられた切削刃5の稼働動作を確認出来、その稼働動作を確認しながら先受け部材27の掘削が行える。 Then, the guide cell 4 is operated in accordance with the excavation position, the excavation inclination, and the excavation length (distance away from the tip) drawn on the excavation plan drawing. That is, the operator of the guide cell 4 can confirm the operation of the cutting blade 5 attached to the tip side of the guide cell 4 in real time on the display 15, and can excavate the tip receiving member 27 while confirming the operation.

ここで、PC11には、図11に示す様に、送信部20、受信部21、演算制御部12、記憶部22、入力部23を有して構成されている。さらに、ディスプレイ15と接続されており、PC11の情報がディスプレイ15上に表示できるものとなっている。 Here, as shown in FIG. 11, the PC 11 includes a transmission section 20, a reception section 21, an arithmetic control section 12, a storage section 22, and an input section . Furthermore, it is connected to a display 15 so that information of the PC 11 can be displayed on the display 15 .

さらに、PC11はインターネット回線などの通信回線網23を介して外部のサーバコンピュータ24などと接続されており、該サーバコンピュータ24は、PC11の情報を受信し、該情報を記憶、保存できるものとなっている。
尚、演算制御部12は、図12に示すように、掘削計画図読み込み部31、掘削計画図形成部32、掘削位置等読み込み部33、掘削位置等描画部34を有して構成されている。
Furthermore, the PC 11 is connected to an external server computer 24 or the like via a communication network 23 such as the Internet line, and the server computer 24 receives information from the PC 11 and can store and save the information. ing.
As shown in FIG. 12, the arithmetic control section 12 includes an excavation plan drawing reading section 31, an excavation plan drawing forming section 32, an excavation position reading section 33, and an excavation position drawing section 34. .

よって、例えば、前記サーバコンピュータ24から掘削計画図のデータをPC11が受信すると、演算制御部12の掘削計画図読み込み部31で読み込み、掘削計画図形成部32でトンネルの正面図が形成されて、ディスプレイ15に表示される。 Therefore, for example, when the PC 11 receives the excavation plan drawing data from the server computer 24, the excavation plan drawing reading unit 31 of the arithmetic control unit 12 reads the data, and the excavation plan drawing forming unit 32 forms a front view of the tunnel. It is displayed on the display 15 .

操作者は、ガイドセル4を稼働操作し、ディスプレイ15に表示された掘削位置等に基づいて掘削していく。すると、その掘削作業を掘削位置等読み込み部33がリアルタイムに読み取って、掘削位置等描画部34によって前記掘削計画図上に異なる色で描画し表示していくのである。 The operator operates the guide cell 4 to excavate based on the excavation position and the like displayed on the display 15 . Then, the excavation position reading section 33 reads the excavation work in real time, and the excavation position drawing section 34 draws and displays it in different colors on the excavation plan drawing.

そして、これらのデータはリアルタイムに記憶部21に送出され、記憶部21に保存される。また、保存されたデータは通信回線網23を介してサーバコンピュータ24へ送信され、そこで保存されると共に、記録として残すことが出来る。
These data are sent to the storage unit 21 in real time and stored in the storage unit 21 . Also, the saved data is transmitted to the server computer 24 via the communication line network 23, where it is saved and can be left as a record.

1 ドリルマシン
2 車両本体
3 ブーム
4 ガイドセル
5 切削刃
6 削岩機
8 ガイド部材
9 自発光マーカ
10 近赤外線カメラ
11 PC
12 演算制御部
14 原点
15 ディスプレイ
16 丸部分
17 バッテリー
18 ベースステーション
19 取付杆
20 送信部
21 受信部
22 記憶部
23 入力部
24 サーバコンピュータ
25 通信回線網
26 ロッド
27 先受け部材
31 掘削計画図読み込み部
32 掘削計画図形成部
33 掘削位置等読み込み部
34 掘削位置等描画部
40 増幅回路
41 同期信号送信器
42 同期信号受信器
1 drill machine 2 vehicle body 3 boom 4 guide cell 5 cutting blade 6 rock drill 8 guide member 9 self-luminous marker 10 near-infrared camera 11 PC
12 Arithmetic control unit 14 Origin 15 Display 16 Circle part 17 Battery 18 Base station 19 Mounting rod 20 Transmitting unit 21 Receiving unit 22 Storage unit 23 Input unit 24 Server computer 25 Communication network 26 Rod 27 Pre-receiving member 31 Excavation plan drawing reading unit 32 Excavation plan drawing forming unit 33 Excavation position reading unit 34 Excavation position drawing unit 40 Amplifier circuit 41 Synchronization signal transmitter 42 Synchronization signal receiver

本発明は、山岳トンネル工事などで採用される例えば長尺鋼管先受け工法における先受け鋼管打設位置誘導システムに関するものである。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a pre-receiving steel pipe placing position guidance system in, for example, a long steel pipe pre-receiving construction method employed in mountain tunnel construction or the like.

山岳トンネル工事などでは、切羽(掘削面)の岩盤が脆弱で不安定な場合に、補助工法の一部として、AGF工法(長尺鋼管先受け工法)が多く用いられている。
AGF工法(長尺鋼管先受け工法)とは、トンネル掘削に先立ち、トンネル外周において、略アーチ状に地山改良部材、すなわち先受けを形成する工法を指標し、該先受けの形成に伴う先受け鋼管打設と地山改良材の注入により切羽前方の地山を補強するものである。すなわち、前記先受けの形成により、トンネル掘削時の地山の先行変位や地山の緩みを抑制し、トンネル前方および上部からの崩落を防止するなどトンネル掘削施工時の安全性の確保を企図した工法である。
In mountain tunnel construction, etc., the AGF construction method (long steel pipe advance construction method) is often used as part of the auxiliary construction method when the bedrock of the face (excavation surface) is fragile and unstable.
The AGF method (long steel pipe pre-receiving method) refers to a construction method in which, prior to tunnel excavation, a ground improvement member, that is, pre-receiving, is formed on the outer periphery of the tunnel in a roughly arch shape. The ground in front of the face is reinforced by placing steel pipes and injecting ground improvement material. In other words, the formation of the above-mentioned pre-supports is intended to ensure safety during tunnel excavation, such as by suppressing the preceding displacement and loosening of the ground during tunnel excavation and preventing collapse from the front and top of the tunnel. Construction method.

ここで、標準的なAGF工法としては、例えば1本あたり約3mの鋼管を、ドリルマシンの削岩機を用いて打ち込み、前記鋼管を継ぎ足しながら地山に約12mの長さで打設する先受け工法が知られている。
すなわち、前記先受け鋼管を切羽前方の天端アーチ部、例えば120°の範囲に亘り略半円形状に間隔をあけて複数本打設し補強域を構築するのである。
尚、略120°の範囲で間隔をあけて複数本の先受け鋼管の打設を行うため、トンネルの大きさによっては前記打設本数が変化するものとなる。
Here, as a standard AGF construction method, for example, a steel pipe of about 3m per pipe is driven using a rock drill of a drill machine, and the steel pipe is added to the ground to drive a length of about 12m into the ground. Receiving method is known.
That is, a plurality of the pre-receiving steel pipes are placed in a substantially semicircular shape over a range of, for example, 120° at the crest arch portion in front of the face to form a reinforcing region.
Since a plurality of pre-receiving steel pipes are placed at intervals of approximately 120°, the number of pre-received steel pipes placed varies depending on the size of the tunnel.

しかしながら、アーチ状に等間隔で打設し、トンネル掘削部前方に均整の取れたアーチ形状を構成させるには非常に高い打設精度が求められる。その為、正確な打設位置及び正確な打設角度の設定が本工法の採用に当たって極めて重要な設定事項となる。 However, in order to construct a well-proportioned arch in front of the excavated tunnel, a very high precision is required. Therefore, it is extremely important to set an accurate casting position and an accurate casting angle when adopting this construction method.

しかして、従来では下記の様な方法で前記打設精度の管理が行われていた。例えば、ガイドセルにターゲットを設置し、該ターゲットをトータルステーションにて測量を行い、正しい位置や角度に誘導する方法である。また、簡易的な方法としては、事前に測量を行い打設位置にマーキングを行う。そして、マーキングされた場所を打設開始位置の目印とし、角度は勾配計などの計測機器を使用して位置や角度を管理していた。
しかしながら、前記従来の方法では、測量やマーキングの作業に多大な労力と多大な時間が費やされる。そのため作業効率が良好ではないとの課題があった。
Conventionally, the placement accuracy has been managed by the following method. For example, there is a method of setting a target in a guide cell, measuring the target with a total station, and guiding it to a correct position and angle. In addition, as a simple method, surveying is done in advance and marking is done at the placement position. Then, the marked place is used as a mark of the placement start position, and the position and angle are managed using a measuring device such as a gradiometer.
However, the conventional method requires a great deal of labor and a great deal of time for surveying and marking work. Therefore, there was a problem that work efficiency was not good.

特開2008-248528号公報JP 2008-248528 A

本発明は前記従来の課題を解決するために創案されたものであり、測量やマーキングの作業に多大な労力や時間を必要以上に費やすことがないため、極めて効率良く、かつ確実で高精度に先受けの打設位置や打設角度が設定できるAGF工法での鋼管打設位置誘導システムを提供することを目的とするものである。 The present invention was invented to solve the above-mentioned conventional problems, and since it does not require a lot of labor and time for surveying and marking work, it is extremely efficient, reliable and highly accurate. It is an object of the present invention to provide a steel pipe driving position guidance system in the AGF construction method that can set the driving position and driving angle of the pre-receiver.

すなわち、モーションキャプチャー技術を活用した掘削ナビゲーションシステムを使用し、極めて効率良く確実で高精度なAGF工法での長尺鋼管を打設する技術を発明したものである。
In other words, we have invented a technology for driving long steel pipes by the AGF method, which is extremely efficient, reliable, and highly accurate, using an excavation navigation system that utilizes motion capture technology.

本発明は、
トンネル外周面に、略アーチ状に先受けを形成すべく先受け部材での掘削と挿入を同時に行うと共に、挿入された先受け部材内に地山改良材の注入を行う掘削システムであって、
車両本体から揺動可能に突設され、円筒状をなし、外周面に複数の穴が設けられた切削刃つき先受け部材を軸方向に揺動させる削岩機と、該削岩機の前記揺動をガイドするガイドセルと、
該ガイドセルの長手方向で、前記切削刃の設置位置の近傍位置に間隔をあけて少なくとも2個取り付けられた自発光マーカと、
前記自発光マーカからの光を取得する複数の近赤外線カメラと、
前記複数の近赤外線カメラが取得した光から前記2つの自発光マーカの座標位置を計測する手段と、
前記2つの自発光マーカの取付位置と前記先受け部材の軸芯位置間の距離及び前記2つの自発光マーカの取付位置と切削刃の中心位置間の距離が補正係数として入力され、該入力された補正係数の値と前記計測する手段で求められた前記2つの自発光マーカの座標位置の値が用いられて演算され、前記自発光マーカの座標位置を削岩機の軸芯位置及び切削刃の中心位置に補正する補正手段とを有し、
あらかじめ掘削データが表示された掘削計画図と前記座標認識された切削刃とをディスプレイ上に表示させ、切削刃による掘削作業が前記掘削計画図に沿って行える、
ことを特徴とし、
または、
トンネル外周面に、略アーチ状に先受けを形成すべく先受け部材での掘削と挿入を同時に行うと共に、挿入された先受け部材内に地山改良材の注入を行う掘削システムであって、
車両本体から揺動可能に突設され、円筒状をなし、外周面に複数の穴が設けられた切削刃つき先受け部材を軸方向に揺動させる削岩機と、該削岩機の前記揺動をガイドするガイドセルと、
該ガイドセルの長手方向で、前記切削刃の設置位置の近傍位置に間隔をあけて少なくとも3個取り付けられた自発光マーカと、
前記3個以上取り付けられた自発光マーカからの光を取得する複数の近赤外線カメラと、
前記複数の近赤外線カメラが取得した光から前記3個以上取り付けられた自発光マーカの座標位置を計測する手段と、
前記3個以上取り付けられた自発光マーカの取付位置と前記先受け部材の軸芯位置間の距離及び前記3個以上取り付けられた自発光マーカの取付位置と切削刃の中心位置間の距離が補正係数として入力され、該入力された補正係数の値と前記計測する手段で求められた前記3つ以上取り付けられた自発光マーカの座標位置の値が用いられて演算され、前記自発光マーカの座標位置を削岩機の軸芯位置及び切削刃の中心位置に補正する補正手段とを有し、
あらかじめ掘削データが表示された掘削計画図と前記座標認識された切削刃とをディスプレイ上に表示させ、切削刃による掘削作業が前記掘削計画図に沿って行える、
ことを特徴とし、
または、
トンネル外周面に、略アーチ状に先受けを形成すべく先受け部材での掘削と挿入を同時に行うと共に、挿入された先受け部材内に地山改良材の注入を行う掘削システムであって、
車両本体から揺動可能に突設され、円筒状をなし、外周面に複数の穴が設けられた切削刃つき先受け部材を軸方向に揺動させる削岩機と、該削岩機の前記揺動をガイドするガイドセルと、
該ガイドセルの長手方向で、前記切削刃の設置位置の近傍位置に間隔をあけて
複数個取り付けられた点滅型の自発光マーカと、
前記複数の近赤外線カメラが取得した点滅する光から前記複数個取り付けられた点滅型の自発光マーカの座標位置を計測する手段と、
前記複数取り付けられた点滅型の自発光マーカの取付位置と前記先受け部材の軸芯位置間の距離及び前記複数取り付けられた点滅型の自発光マーカの取付位置と切削刃の中心位置間の距離が補正係数として入力され、該入力された補正係数の値と前記計測する手段で求められた前記複数取り付けられた点滅型の自発光マーカの座標位置の値が用いられて演算され、前記点滅型の自発光マーカの座標位置を削岩機の軸芯位置及び切削刃の中心位置に補正する補正手段とを有し、
複数の点滅型の自発光マーカからの点滅する光は、異なる信号周期による点滅周期が与えられ、該信号周期の違いによりいずれのブームのガイドセルに取りつけられた点滅型の自発光マーカかが各々認識でき、
あらかじめ掘削データが表示された掘削計画図と前記座標認識された切削刃とをディスプレイ上に表示させ、切削刃による掘削作業が前記掘削計画図に沿って行える、
ことを特徴とし、
または、
前記点滅型の自発光マーカからの点滅する光は、増幅回路により光の輝度を増幅出来る、
ことを特徴とし、
または、
前記ガイドセルは、車両本体から複数本揺動可能に突設され、前記自発光マーカはそれぞれのガイドセルに取り付けられた、
ことを特徴とするものである。
The present invention
An excavation system for simultaneously excavating and inserting a pre-receiving member to form a substantially arch-shaped pre-receiving member on the outer peripheral surface of a tunnel, and for injecting a ground improvement material into the inserted pre-receiving member,
A rock drill that rocks in the axial direction a tip receiving member with a cutting edge that protrudes rockably from a vehicle body, has a cylindrical shape, and has a plurality of holes on its outer peripheral surface; a guide cell that guides the oscillation;
at least two self-luminous markers attached at intervals in the vicinity of the installation position of the cutting blade in the longitudinal direction of the guide cell;
a plurality of near-infrared cameras that acquire light from the self-luminous markers;
means for measuring coordinate positions of the two self-luminous markers from the light acquired by the plurality of near-infrared cameras;
The distance between the attachment positions of the two self-luminous markers and the axial center position of the pre-receiving member and the distance between the attachment positions of the two self-luminous markers and the center position of the cutting blade are input as correction coefficients. The values of the correction coefficient obtained and the values of the coordinate positions of the two self-luminous markers obtained by the measuring means are used for calculation, and the coordinate positions of the self-luminous markers are calculated based on the axial center position of the rock drill and the cutting blade. and a correction means for correcting to the center position of
An excavation plan on which excavation data is displayed in advance and the cutting blade whose coordinates are recognized are displayed on the display, and excavation work using the cutting blade can be performed along the excavation plan.
characterized by
or,
An excavation system for simultaneously excavating and inserting a pre-receiving member to form a substantially arch-shaped pre-receiving member on the outer peripheral surface of a tunnel, and for injecting a ground improvement material into the inserted pre-receiving member,
A rock drill that rocks in the axial direction a tip receiving member with a cutting edge that protrudes rockably from a vehicle body, has a cylindrical shape, and has a plurality of holes on its outer peripheral surface; a guide cell that guides the oscillation;
at least three self-luminous markers attached at intervals in the vicinity of the installation position of the cutting blade in the longitudinal direction of the guide cell;
a plurality of near-infrared cameras that acquire light from the three or more attached self-luminous markers;
means for measuring coordinate positions of the three or more attached self-luminous markers from light acquired by the plurality of near-infrared cameras;
The distance between the mounting positions of the three or more self-luminous markers and the axial center position of the pre-receiving member and the distance between the mounting positions of the three or more self-luminous markers and the center position of the cutting blade are corrected. is input as a coefficient, and is calculated using the input correction coefficient value and the coordinate position values of the three or more self-luminous markers attached by the measuring means, and the coordinates of the self-luminous marker are calculated. a correction means for correcting the position to the axial center position of the rock drill and the center position of the cutting blade,
An excavation plan on which excavation data is displayed in advance and the cutting blade whose coordinates are recognized are displayed on the display, and excavation work using the cutting blade can be performed along the excavation plan.
characterized by
or,
An excavation system for simultaneously excavating and inserting a pre-receiving member to form a substantially arch-shaped pre-receiving member on the outer peripheral surface of a tunnel, and for injecting a ground improvement material into the inserted pre-receiving member,
A rock drill that rocks in the axial direction a tip receiving member with a cutting edge that protrudes rockably from a vehicle body, has a cylindrical shape, and has a plurality of holes on its outer peripheral surface; a guide cell that guides the oscillation;
a plurality of blinking self-luminous markers attached at intervals in the longitudinal direction of the guide cell near the installation position of the cutting blade;
means for measuring coordinate positions of the plurality of attached flashing type self-luminous markers from the flashing lights acquired by the plurality of near-infrared cameras;
The distance between the mounting positions of the plurality of flashing type self-luminous markers and the axial center position of the pre-receiving member, and the distance between the mounting positions of the plurality of flashing type self-luminous markers and the center position of the cutting blade. is input as a correction coefficient, and the value of the input correction coefficient and the values of the coordinate positions of the self-luminous self-luminous markers attached to the plurality of flashing markers obtained by the measuring means are used to perform calculations. correction means for correcting the coordinate position of the self-luminous marker to the axial center position of the rock drill and the center position of the cutting blade ,
The blinking light from the plurality of blinking self-luminous markers is given a blinking cycle according to a different signal cycle, and the difference in the signal cycle determines which boom's self-luminous marker is attached to the guide cell. recognizable,
An excavation plan on which excavation data is displayed in advance and the cutting blade whose coordinates are recognized are displayed on the display, and excavation work using the cutting blade can be performed along the excavation plan.
characterized by
or,
The brightness of the blinking light from the blinking self-luminous marker can be amplified by an amplifier circuit.
characterized by
or,
A plurality of the guide cells protrude from the vehicle body so as to be swingable, and the self-luminous markers are attached to the respective guide cells,
It is characterized by

本発明によれば、測量やマーキングの作業に必要以上に労力や時間を費やすことないため、極めて効率良く、かつ確実で高精度にAGF工法での長尺鋼管が打設できるとの効果を奏する。
すなわち、モーションキャプチャー技術を活用した掘削ナビゲーションシステムを使用し、極めて効率良く、かつ確実で高精度にてAGF工法での長尺鋼管を打設する技術を発明したのである。
According to the present invention, since it is not necessary to spend labor and time for surveying and marking work, it is possible to drive long steel pipes by the AGF construction method very efficiently, reliably and with high accuracy. .
In other words, using a drilling navigation system that utilizes motion capture technology, we have invented a technology for placing long steel pipes using the AGF method with extremely high efficiency, certainty, and high precision.

本発明によるドリルマシンの構成を説明する説明図である。It is an explanatory view explaining composition of a drill machine by the present invention. トンネル内に掘削する先受け部材の掘削位置、掘削の傾き、掘削の距離を正面図、側面図として表し説明する先受け部材打設計画図の説明図である。FIG. 4 is an explanatory drawing of a pre-receiving member hammering plan showing an excavation position of a pre-receiving member to be excavated in a tunnel, an excavation inclination, and an excavation distance in a front view and a side view. 図2の先受け部材打設計画図から先受け部材の打設位置の座標を算出する説明図である。FIG. 3 is an explanatory diagram for calculating the coordinates of the placement position of the pre-receiving member from the pre-receiving member striking design diagram of FIG. 2 ; ディスプレイ上に描画された先受け部材の打設位置を説明する説明図である。It is an explanatory view explaining the setting position of the pre-receiving member drawn on the display. ディスプレイ上に描画された先受け部材の打設位置を確認して先受け部材を掘削誘導する状態を説明する説明図(1)である。It is explanatory drawing (1) explaining the state which confirms the setting position of the pre-receiving member drawn on the display, and excavates and guides the pre-receiving member. ディスプレイ上に描画された先受け部材の打設位置を確認して先受け部材を掘削誘導する状態を説明する説明図(2)である。It is explanatory drawing (2) explaining the state which confirms the setting position of the pre-receiving member drawn on the display, and excavates and guides the pre-receiving member. ディスプレイ上に描画された先受け部材の打設位置を確認して先受け部材を掘削誘導する状態を説明する説明図(3)である。It is explanatory drawing (3) explaining the state which confirms the setting position of the pre-receiving member drawn on the display, and excavates and guides the pre-receiving member. ディスプレイ上に描画された先受け部材の打設位置を確認して先受け部材を掘削誘導する状態を説明する説明図(4)である。It is explanatory drawing (4) explaining the state which confirms the setting position of the pre-receiving member drawn on the display, and excavates and guides the pre-receiving member. ディスプレイ上に描画された先受け部材の打設位置を確認して先受け部材を掘削誘導する状態を説明する説明図(5)である。It is explanatory drawing (5) explaining the state which confirms the setting position of the pre-receiving member drawn on the display, and excavates and guides the pre-receiving member. ディスプレイ上に描画された先受け部材の打設位置を確認して先受け部材を掘削誘導する状態を説明する説明図(6)である。It is explanatory drawing (6) explaining the state which confirms the setting position of the pre-receiving member drawn on the display, and excavates and guides the pre-receiving member. PCの構成と通信状態を説明する説明図である。FIG. 3 is an explanatory diagram for explaining the configuration and communication state of a PC; 演算制御部の構成を説明する説明図である。FIG. 4 is an explanatory diagram for explaining the configuration of an arithmetic control unit; 自発光マーカ中心部と切削刃中心部までの距離をオフ設置距離として説明する説明図(1)である。FIG. 11 is an explanatory diagram (1) for explaining the distance between the center of the self-luminous marker and the center of the cutting blade as the off installation distance. 自発光マーカ中心部と切削刃中心部までの距離をオフ設置距離として説明する説明図(2)である。FIG. 11 is an explanatory diagram (2) for explaining the distance between the center of the self-luminous marker and the center of the cutting blade as the off installation distance. 自発光マーカ中心部と切削刃中心部までの距離をオフ設置距離として説明する説明図(3)である。Fig. 11 is an explanatory diagram (3) for explaining the distance between the center of the self-luminous marker and the center of the cutting blade as the off installation distance; 自発光マーカ中心部と切削刃中心部までの距離をオフ設置距離として説明する説明図(4)である。It is explanatory drawing (4) explaining the distance to a self-luminous marker center and a cutting blade center as an off installation distance. 自発光マーカ中心部と切削刃中心部までの距離をオフ設置距離として説明する説明図(5)である。It is explanatory drawing (5) explaining the distance to a self-luminous marker center part and a cutting blade center part as off installation distance. 自発光マーカ中心部と切削刃中心部までの距離をオフ設置距離として説明する説明図(6)である。It is explanatory drawing (6) explaining the distance to a self-luminous marker center and a cutting blade center as off installation distance. PCとサーバコンピュータとの通信状態を説明する説明図である。FIG. 4 is an explanatory diagram for explaining a communication state between a PC and a server computer;

山岳トンネル工事などで使用されるAGF工法(長尺鋼管先受け工法)は、長尺の先受けを、先受け鋼管打設と注入材の注入により構築するもので、現場で通常使用されているドリルマシン1を利用して施工を行っている。
AGF工法(長尺鋼管先受け工法)は、地質に応じた掘削システムが選定できるため適用地質の範囲が広く、効率の比較的良いとされる施工が可能となっている。また、地質や注入目的に応じた注入材・注入方式が選定できるとのメリットもある。
The AGF method (long steel pipe pre-receiving method), which is used in mountain tunnel construction, etc., constructs a long pre-receiving by placing steel pipes in advance and injecting injection materials, and is usually used at the site. A drill machine 1 is used for construction.
The AGF construction method (long steel pipe pre-receiving method) can be applied to a wide range of geological features because the excavation system can be selected according to the geological feature, and it is possible to perform construction that is considered to be relatively efficient. Another advantage is that the injection material and injection method can be selected according to the geology and purpose of injection.

本工法では、通常山岳トンネルで用いるドリルマシン1を用いて、比較的小口径の先受け鋼管につき先端に専用の切削ビットをつけて用い、二重管方式で掘削とパイプ挿入を同時に行うものである。
その後、先受け鋼管の外周面にあけた複数の孔より、地山側に所定の圧力で注入材を注入し、掘削線の外周部に鋼管が入った限定地山改良ゾーンを形成する。
In this construction method, a drill machine 1, which is normally used in mountain tunnels, is used to attach a special cutting bit to the tip of a comparatively small-diameter pre-receiving steel pipe. be.
After that, grouting material is injected at a predetermined pressure to the ground side through a plurality of holes drilled in the outer peripheral surface of the pre-received steel pipe to form a limited ground improvement zone in which the steel pipe enters the outer peripheral portion of the excavation line.

この切羽前方に構築された地山改良ゾーンにより、地山の先行変位を抑制し、さらに地山の緩み防止と施工の安全が図られるのである。
すなわち、山岳トンネル工事では、切羽(掘削面)天井部の岩盤が不安定な場合に、AGF工法を実施することでトンネルの前方および上部からの崩落を防止できる。
The ground improvement zone constructed in front of the face suppresses the preceding displacement of the ground, further prevents the loosening of the ground, and ensures the safety of construction work.
That is, in mountain tunnel construction, when the bedrock on the ceiling of the face (excavation surface) is unstable, the AGF construction method can prevent collapse from the front and top of the tunnel.

ここで、標準的なAGF工法では、前述の如く、例えば切羽頂部120°の範囲に、先受け鋼管をトンネルの掘削作業に先行して打ち込み、岩盤を補強する。そして、1ヵ所につき、長さ約3mの先受け鋼管を例えば4本つないで約12mの長さにして先受けを構成し、これを打ち込む。 Here, in the standard AGF construction method, as described above, a pre-receiving steel pipe is driven into the range of, for example, 120° of the face top prior to excavation of the tunnel to reinforce the bedrock. Then, for example, four pre-receiving steel pipes having a length of about 3 m are connected to form a pre-receiving steel pipe having a length of about 12 m, and this is driven in.

しかるに先受け鋼管と注入材によって地山を先行補強するのであり、トンネル断面を拡幅しないで施工できる。また、先受け鋼管打設はトンネル施工で使用するドリルマシン1を使用することが出来、鋼管打設後には、打設した円筒状をなす鋼管の開口からウレタン系やセメント系の注入材を注入し、該注入材は前記鋼管外周面に設けられた複数の穴から地山側に流れ、もってトンネル前方地山が補強されるのである。 However, since the ground is reinforced in advance by pre-loaded steel pipes and injection materials, construction can be performed without widening the tunnel cross section. In addition, it is possible to use the drill machine 1 used in tunnel construction to place the pre-received steel pipe. Then, the injection material flows from the plurality of holes provided on the outer peripheral surface of the steel pipe to the natural ground side, thereby reinforcing the natural ground ahead of the tunnel.

図1に本発明の長尺鋼管先受け工法における先受け鋼管打設位置誘導システムに使用されるドリルマシン1の構成を示す。
該ドリルマシン1は、車両本体2と、この車両本体2の前方から突設されたブーム3と該ブーム3に接続されたガイドセル4とその先端から突出揺動するロッド26と、該ロッド26を突出揺動させる削岩機6を有して構成されている。
FIG. 1 shows the configuration of a drill machine 1 used in a pre-receiving steel pipe placing position guiding system in the long steel pipe pre-receiving method of the present invention.
The drill machine 1 includes a vehicle body 2, a boom 3 projecting from the front of the vehicle body 2, a guide cell 4 connected to the boom 3, a rod 26 protruding and swinging from the tip of the guide cell 4, and the rod 26. It is configured to have a rock drill 6 that protrudes and swings.

そして、ロッド26の先端には切削刃5が取り付けられた円筒状の鋼管で構成された先受け部材27が接続されることとなる。前記先受け部材27の1本の長さは約3m程度であり、この先受け部材27を4本繋げて12mの長さの先受け部材27が敷設されるものとなる。図1では先受け部材27を4本繋げて12mの長さにした先受け部材27が描画されている。 A tip receiving member 27 made of a cylindrical steel pipe to which the cutting blade 5 is attached is connected to the tip of the rod 26 . The length of one of the pre-receiving members 27 is approximately 3 m, and four pre-receiving members 27 are connected to form a pre-receiving member 27 having a length of 12 m. In FIG. 1, the front receiving member 27 having a length of 12 m by connecting four of the front receiving members 27 is drawn.

ここで、ブーム3は、車両本体2の前方から揺動可能にして動作できるよう取り付けられている。すなわち、ブーム3は、上下、左右など広角度に自在に揺動できる様油圧シリンダなどの揺動部材が用いられて構成されている。そして、ブーム3の先端側に接続された直線状のガイドセル4についても前記ブーム3の揺動に伴って、またガイドセル4自体も広角に揺動するよう油圧シリンダなどの揺動部材が用いられて構成されている。 Here, the boom 3 is attached so as to be swingable and operable from the front of the vehicle body 2 . That is, the boom 3 is configured using a swinging member such as a hydraulic cylinder so that it can swing freely over a wide angle such as up and down, left and right. A swinging member such as a hydraulic cylinder is used to swing the linear guide cell 4 connected to the tip of the boom 3 with the swing of the boom 3 and to swing the guide cell 4 itself over a wide angle. configured.

該ガイドセル4は、先端に切削刃5を備えた直線円筒管状の先受け部材27を取り付けたロッド26の前後方向の突出揺動をガイドするための部材であり、該ガイドセル4の先端側で先受け部材27の先端に取り付けられた例えばビット状をなす切削刃5が突出揺動してトンネル内周面を掘削し前記先受け部材27を打設するものとなる。 The guide cell 4 is a member for guiding the protruding swing in the front-rear direction of a rod 26 to which a rectilinear cylindrical tube-like receiving member 27 having a cutting edge 5 at the tip is attached. 3, the bit-shaped cutting edge 5 attached to the tip of the tip receiving member 27 protrudes and swings to excavate the inner peripheral surface of the tunnel and drive the tip receiving member 27 therein.

すなわち、稼働制御された切削刃5、先受け部材27、ロッド26などによりトンネル地山の内周面に対し、所定の位置、所定の角度、かつ所定の深さで確実、正確に先受け部材27の打設が行えるよう構成されているのである。 That is, the cutting edge 5, the pre-receiving member 27, the rod 26, etc., whose operation is controlled, reliably and accurately cut the pre-receiving member 27 at a predetermined position, at a predetermined angle, and at a predetermined depth with respect to the inner peripheral surface of the tunnel ground. It is configured so that it can be placed.

ところで、ブーム3については、車両本体2に複数本取り付けられている場合もあり、その場合、各ブーム3の各先端側において各々ガイドセル4が取り付けられ、該各々のガイドセル4についても、それらガイドセル4の先端側にビット状をなす切削刃5が取り付けられた先受け部材27及びロッド26が突出揺動して掘削し、トンネル地山の内周内に打設出来るよう取り付けられている。 By the way, there are cases where a plurality of booms 3 are attached to the vehicle body 2. In that case, each guide cell 4 is attached to each tip side of each boom 3. A tip receiving member 27 having a bit-shaped cutting edge 5 attached to the tip side of the guide cell 4 and a rod 26 are attached so as to protrude, swing, excavate, and drive into the inner circumference of the tunnel ground.

なお、図14、図15、図17、図18から理解されるように、ガイドセル4の例えば先端側側面からは自発光マーカ9が複数個突設され、該複数個の自発光マーカ9とこの自発光マーカ9から発光された光を認識する複数個の近赤外線カメラ10により後述するモーションキャプチャ技術を応用したソフトウェアの測定データ、すなわち前記複数個の自発光マーカ9の座標位置が計測されるものとなっている。 14, 15, 17, and 18, a plurality of self-luminous markers 9 are projected from, for example, the distal end side surface of the guide cell 4, and the plurality of self-luminous markers 9 and A plurality of near-infrared cameras 10 that recognize the light emitted from the self-luminous markers 9 measure the measurement data of the software applying the motion capture technology described later, that is, the coordinate positions of the plurality of self-luminous markers 9. It is a thing.

そしてこの測定データを用いてガイドセル4を通過する先受け部材27、ロッド26や切削刃5の軸方向中心部につき、ガイドセル4の長手方向に間隔をおいて突設された自発光マーカ9について、その位置(座標)を認識すべくPC11の演算制御部12で演算することで、ガイドセル4のリアルタイムでの可動範囲、すなわち先受け部材27先端に有する切削刃5が掘削する位置や掘削する深さ及び掘削の向きなどの情報が取得出来るように構成されるものとなっている(図11、図12参照)。 Then, using this measurement data, self-luminous markers 9 projecting at intervals in the longitudinal direction of the guide cell 4 from the axial center of the pre-receiving member 27, rod 26 and cutting blade 5 passing through the guide cell 4 are detected. , the real-time movable range of the guide cell 4, that is, the position where the cutting blade 5 provided at the tip of the pre-receiving member 27 excavates and the excavation It is constructed so that information such as the depth of the excavation and the direction of excavation can be obtained (see FIGS. 11 and 12).

モーションキャプチャ用の近赤外線カメラ10は、ドリルマシン1の例えば、操縦席上部に間隔をあけて複数個設置されており、ガイドセル4先端の稼働範囲を撮影範囲として撮影できるものとなっている。 A plurality of near-infrared cameras 10 for motion capture are installed at intervals, for example, above the operator's seat of the drill machine 1, and are capable of photographing the operating range of the tip of the guide cell 4 as a photographing range.

ここで、前記近赤外線カメラ10の設置位置及び設置画角の設定は、なるべく最小限のカメラ台数でガイドセル4の稼働を捉えるべく、例えば偶数台あるいは奇数台を組み合わせてそれを交差させる向きであるいは交差させない向きで設置することなどが考えられる。
そして、近赤外線カメラ10は、自発光マーカ9が発光する近赤外線光を捉えるものとなる。
Here, the installation position and installation angle of view of the near-infrared camera 10 are set in such a manner that the operation of the guide cell 4 can be captured with a minimum number of cameras, for example, an even number or an odd number of cameras are combined and intersected. Alternatively, it is conceivable to install them in a direction in which they do not cross each other.
The near-infrared camera 10 captures the near-infrared light emitted by the self-luminous marker 9 .

すなわち、近赤外線カメラ10は、前記自発光マーカ9が発光する近赤外線光を捉え、これにより、例えば、ガイドセル4から突設された複数の自発光マーカ9の座標を認識することが出来、該座標認識のデータをPC11に送出し、PC11では、前記演算制御部12において、前記モーションキャプチャ技術を応用したソフトウェアを用いて認識した自発光マーカ9の位置から相対的にガイドセル4先端にある先受け部材27に取り付けられた切削刃5の座標位置などを計算していくのである。 That is, the near-infrared camera 10 captures the near-infrared light emitted by the self-luminous marker 9, thereby, for example, the coordinates of a plurality of self-luminous markers 9 projecting from the guide cell 4 can be recognized. The coordinate recognition data is sent to the PC 11, and in the PC 11, the position of the self-luminous marker 9 recognized by the software applying the motion capture technology in the arithmetic control unit 12 is relatively at the tip of the guide cell 4. The coordinate position of the cutting blade 5 attached to the pre-receiving member 27 is calculated.

ここで、切削刃5自体に自発光マーカ9を取り付けることが出来れば、確実に切削刃5の先端位置などの座標認識が出来る。しかし切削刃5自体に自発光マーカ9を取り付けることは出来ない。掘削作業や先受け部材27の打設作業の邪魔になってしまい、また掘削作業や先受け部材27の打設作業により破損するからである。 Here, if the self-luminous marker 9 can be attached to the cutting blade 5 itself, the coordinates such as the tip position of the cutting blade 5 can be reliably recognized. However, the self-luminous marker 9 cannot be attached to the cutting blade 5 itself. This is because it interferes with the excavation work and the work of placing the pre-receiving member 27 and is damaged during the excavation work and the work of placing the pre-receiving member 27 .

そこで、本発明では、前述したように、切削刃5の近傍位置、すなわちガイドセル4の側面などに複数個の自発光マーカ9を設置し、切削刃5との距離をいわゆるオフセット補正できるようにして、切削刃5の座標位置を認識するものとしている。詳細は後述する。 Therefore, in the present invention, as described above, a plurality of self-luminous markers 9 are installed near the cutting edge 5, that is, on the side surface of the guide cell 4, so that the distance from the cutting edge 5 can be offset. , the coordinate position of the cutting blade 5 is recognized. Details will be described later.

本発明によるトンネル内周面への先受け部材27の打設作業につき説明する。
図2に示す様なトンネル内周面における先受け部材27の打設位置を示した先受け部材打設計画図などの打設計画図データを予め設定して用意しておく。図2は先受け部材27の打設計画位置をトンネルの正面から見た正面図と側面図であり、例えばCADなどで描画形成した先受け部材打設計画図である。そして、前記図2の先受け部材打設計画図からロックボルト座標位置を算出していく。すなわち、先受け部材打設計画図(例えばCAD図)からY座標、Z座標、のみ先離れ、表示角度を算出していく。
The operation of placing the pre-receiving member 27 on the inner peripheral surface of the tunnel according to the present invention will be described.
Striking plan data such as a pre-receiving member striking plan showing the placement position of the pre-receiving member 27 on the inner peripheral surface of the tunnel as shown in FIG. 2 is preset and prepared. 2A and 2B are a front view and a side view of the design position of the pre-receiving member 27 viewed from the front of the tunnel, which is a design drawing of the pre-receiving member 27 drawn and formed, for example, by CAD. Then, the coordinate positions of the lock bolts are calculated from the plan for hammering the pre-receiving member shown in FIG. That is, only the Y coordinate and the Z coordinate are separated from the design drawing (for example, CAD drawing) of the previous receiving member, and the display angle is calculated.

すると、図3に示す様に(1)で示された先受け部材27の座標位置は、原点14の位置からY座標は-5205mm、Z座標は3450mmと算出され、のみ先離れは、2113mm、表示角度は-132°と算出される。また、(2)で示された先受け部材27の座標位置は、原点14の位置からY座標は3446mm、Z座標は4841mm、のみ先離れは、2113mm、表示角度は151°と算出される。 Then, as shown in FIG. 3, the coordinate position of the front receiving member 27 indicated by (1) is calculated from the position of the origin 14 as -5205 mm for the Y coordinate and 3450 mm for the Z coordinate, and the tip separation is 2113 mm. The display angle is calculated as -132°. Further, the coordinate position of the receiving member 27 indicated by (2) is calculated from the position of the origin 14 with a Y coordinate of 3446 mm, a Z coordinate of 4841 mm, a tip separation of 2113 mm, and a display angle of 151°.

なお、のみ先とは、トンネル地山の先端部にあたる掘削刃5の部分をいい、のみ先離れとは、掘削開始位置から掘削目標位置までの掘削刃5の離れ位置を、正面からみて2次元平面上で表した数値をいう。すなわち、図3において、(1)の先受け部材27につき、2113mmと記載されている数値がのみ先離れの数値となる。換言すれば掘削する先受け部材27の掘削深さを示しているといえる。 The tip refers to the portion of the excavation blade 5 corresponding to the tip of the tunnel ground, and the tip separation refers to the separation position of the excavation blade 5 from the excavation start position to the excavation target position in two dimensions when viewed from the front. A numerical value expressed on a plane. That is, in FIG. 3, only the numerical value described as 2113 mm for the receiving member 27 of (1) is the numerical value of the tip separation. In other words, it can be said that it indicates the excavation depth of the pre-receiving member 27 to be excavated.

そして、上記算出された数値を基に例えば、CSVファイルを作成し、このCSVファイルのデータを描画アプリを用いてディスプレイ15上に描画された図に上書きする操作を行う。これにより前記作業用のディスプレイ15上に先受け部材27の打設位置が反映されるものとなる。 Then, for example, a CSV file is created based on the calculated numerical values, and the drawing application is used to overwrite the drawing drawn on the display 15 with the data of this CSV file. As a result, the placement position of the pre-receiving member 27 is reflected on the display 15 for work.

図4は、ディスプレイ15上に描画された先受け部材27の打設位置を示したものであり、画面は例えば4分割されて表示されている。すなわち、左下の画面にはトンネルの正面図が描画されており、右下にはトンエルの正面図の拡大図、そして、左上の画面にはトンネルを上から見た平面図の拡大図、右上の画面はその側面図が示されて構成されている。 FIG. 4 shows the placing position of the pre-receiving member 27 drawn on the display 15, and the screen is divided into four for example. In other words, the bottom left screen shows the front view of the tunnel, the bottom right is an enlarged view of the front view of the tunnel, and the top left screen is an enlarged plan view of the tunnel seen from above. The screen is configured with its side view shown.

図4において丸部分16は掘削を開始する位置を示している。そして、そこから延びる直線部分は先受け部材27の掘削方向の傾きと掘削深さを示したものである。 In FIG. 4, circled portion 16 indicates the position from which excavation is started. A linear portion extending therefrom indicates the inclination of the pre-receiving member 27 in the excavation direction and the excavation depth.

そして、作業用のディスプレイ15上に表示された先受け部材27の打設計画図上においては、リアルタイムに稼働するガイドセル4先端に有する先受け部材27の切削刃5の実際の稼働位置をあわせて表示できる様構成されている。 On the cutting plan for the pre-receiving member 27 displayed on the work display 15, the actual operating position of the cutting edge 5 of the pre-receiving member 27 at the tip of the guide cell 4 operating in real time is also displayed. configured to be displayed.

よって、この表示をディスプレイ15上で確認し、操作者は、ガイドセル4を稼働させ、切削刃5を有する先受け部材27を操作して先受け部材27の打設作業を行っていくのである。 Therefore, after confirming this display on the display 15, the operator activates the guide cell 4 and operates the pre-receiving member 27 having the cutting edge 5 to perform the work of placing the pre-receiving member 27. .

なお、先受け部材27の打設掘削位置誘導についてであるが、例えば山岳トンネルで用いられている先受け部材27は略円筒状をなす略3mの長さからなる鋼管を繋ぎ合わせられるよう形成されており、トンネルの形状や地山の強度によって前記繋ぎ合わせる長さが使い分けられている。通常は前記鋼管を繋ぎ合わせて例えば12mの長さの先受け部材27が打設される。
ここで、先受け部材27での掘削をドリルマシン1で行い、掘削すると同時に先受け部材27を挿入打設していく。
As for the position guidance for placing and excavating the pre-receiving member 27, the pre-receiving member 27 used in, for example, a mountain tunnel is formed so as to be able to join steel pipes of approximately 3 m in length forming a substantially cylindrical shape. The length to be joined is selected depending on the shape of the tunnel and the strength of the ground. Usually, the steel pipes are joined together to form a pre-receiving member 27 having a length of, for example, 12 m.
Here, the drilling with the pre-receiving member 27 is performed by the drill machine 1, and the pre-receiving member 27 is inserted and driven simultaneously with the excavation.

本発明では、前述のごとく先受け部材27の打設位置は予め計画されて先受け部材打設計画図が作成されており、この先受け部材打設計画図を使用して正しい位置や向き(角度)に打設することによって、より先受け部材27の効果が発揮されることとなる。
したがって、ドリルマシン1で行う先受け部材27の打設位置と掘削方向及び掘削深さは正確確実なのである。
In the present invention, as described above, the placement position of the pre-receiving member 27 is planned in advance and the pre-receiving member striking plan is created. By driving, the effect of the pre-receiving member 27 is exhibited more.
Therefore, the placement position, excavation direction and excavation depth of the pre-receiving member 27 performed by the drill machine 1 are accurate and reliable.

本発明による先受け部材27の打設作業の手順は図5乃至図10に示すとおりである。
目標とする打設位置にガイドセル4を合わせる作業を行う。図5、図6のように正面図で打設開始位置と角度を合わせる。
5 to 10 show the procedure for placing the pre-receiving member 27 according to the present invention.
Work is performed to align the guide cell 4 with the target placement position. As shown in FIGS. 5 and 6, match the placement start position and angle in the front view.

図5乃至図10は白黒の図で示されているが、実際はカラーで表示されており、例えばディスプレイ15上では、先受け部材27の掘削計画位置(図6において矢印の先にある直線)は青色で示され、ガイドセル4の実際の方向(矢印の基端側にある直線)は緑色で示される如きである。すなわち、色分け表示することでディスプレイ15上で容易に認識でき、掘削作業がしやすいように構成されている。 5 to 10 are shown in black and white, but they are actually displayed in color. Shown in blue, the actual direction of the guide cell 4 (the straight line proximal to the arrow) is as shown in green. That is, the color-coded display makes it easy to recognize on the display 15 and facilitates the excavation work.

そして、図6、図8、図9、図10に示すように、ディスプレイ15上の図を確認し、その後、所定の深さまでガイドセル4を押し込んで掘削、挿入打設作業を行うのである。 Then, as shown in FIGS. 6, 8, 9, and 10, after confirming the diagrams on the display 15, the guide cell 4 is pushed in to a predetermined depth for excavation and insertion and driving.

しかるに、ガイドセル4の位置と姿勢を掘削計画図における位置と姿勢に合わせて打設作業を行うのであるが、本発明では、図5乃至図10に示すように、この打設位置(掘削すべき位置と傾きと掘削深さ)を打設計画図上に重ねて描画出来ると共に、前記打設位置(掘削すべき位置と掘削深さ)を平面的に描画して表せることができるのである。
すなわち、先受け部材27の掘削深さの描画方法は、直線の長さによって表すこととし、この直線の長さが掘削深さの長さとなっているのである。
However, the placement work is carried out by adjusting the position and posture of the guide cell 4 to the position and posture in the excavation plan drawing. Position, inclination, and excavation depth) can be superimposed and drawn on the driving plan drawing, and the driving position (position to be excavated and excavation depth) can be represented by drawing two-dimensionally.
That is, the drawing method of the excavation depth of the pre-receiving member 27 is represented by the length of a straight line, and the length of this straight line is the length of the excavation depth.

次に、自発光マーカ9の構成につき説明する。
本発明では自ら光る自発光マーカ9を用い、ガイドセル4先端側にある先受け部材27先端の切削刃5の位置の常時検出ができる構成としたものである。
Next, the configuration of the self-luminous marker 9 will be described.
In the present invention, a self-luminous marker 9 that emits light by itself is used so that the position of the cutting edge 5 at the tip of the tip receiving member 27 on the tip side of the guide cell 4 can always be detected.

トンネル掘削時のトンネル内環境につき、現場によってはトンネル内部空間内に水滴や土埃などが多く浮遊していることがある。その場合、反射型のマーカを用いると、発光体より照射された光が反射型マーカに到達するまでに乱反射が起こる。すると、前記乱反射光により近赤外線カメラ10はマーカ位置を正確に捉えることが出来なくなる場合がある。
また反射型マーカの反射光は、近赤外線カメラ10で捉える時点で、輝度が低下して充分な精度が得られない。
そこで、本件発明者らはマーカ自体が近赤外光を発する自発光マーカ9を発明したものである。
Regarding the tunnel environment during tunnel excavation, depending on the site, many water droplets and dirt may be floating in the tunnel interior space. In that case, if a reflective marker is used, irregular reflection occurs before the light emitted from the light emitter reaches the reflective marker. Then, the near-infrared camera 10 may not be able to accurately capture the marker position due to the irregularly reflected light.
In addition, when the near-infrared camera 10 captures the reflected light from the reflective marker, the luminance is lowered and sufficient accuracy cannot be obtained.
Therefore, the inventors have invented a self-luminous marker 9 in which the marker itself emits near-infrared light.

本発明での自発光マーカ9は、反射型と比べ光の経路が半分で済むため、輝度の低下を抑えられる。特に、空間内に水滴などが存在して乱反射が起こる場合、近赤外線カメラ10にはマーカが中心にぼやけて見えるため、半径が少し大きく検出されるが、依然マーカ中心位置を正確に検出することが可能なのである。なお、自発光マーカ9は取付位置付近に電源(例えば、充電式モバイルバッテリを使用する)があることが必要とされる。 The self-luminous marker 9 according to the present invention requires only half the path of light compared to a reflective marker, so that the decrease in brightness can be suppressed. In particular, when irregular reflection occurs due to the presence of water droplets in the space, the near-infrared camera 10 sees the marker as blurred in the center, so the detected radius is slightly larger, but the center position of the marker can still be detected accurately. is possible. It should be noted that the self-luminous marker 9 is required to have a power supply (for example, using a rechargeable mobile battery) near the mounting position.

従って、自発光マーカ9の近傍位置には、バッテリー17などが納められたベースステーション18が設けられる。そして、自発光マーカ9とバッテリー17とは例えば有線で接続される(図19参照)。 Accordingly, a base station 18 containing a battery 17 and the like is provided near the self-luminous marker 9 . The self-luminous marker 9 and the battery 17 are connected by wire, for example (see FIG. 19).

トンネル内周面への先受け部材27の掘削作業に際しては、前述した様にこの自発光マーカ9を切削刃5近傍位置のガイドセル4の2カ所に間隔をあけて取り付ける(図14、図15など参照)。これにより確実な掘削作業が行えることとなる。 When excavating the pre-receiving member 27 on the inner peripheral surface of the tunnel, as described above, the self-luminous markers 9 are attached to the guide cell 4 near the cutting edge 5 with a space therebetween (FIGS. 14 and 15). etc.). As a result, reliable excavation work can be performed.

すなわち、掘削作業時において、複数の近赤外線カメラ10によって少なくとも2カ所に取り付けられた自発光マーカ9の光を受光し、この受光した自発光マーカ9の相対位置からPC11にて前記自発光マーカ9の座標位置2点を計算する。
モーションキャプチャ技術には複数の手法が存在するが、本発明のモーションキャプチャ技術は光学式モーションキャプチャ技術である。
That is, during excavation work, light from the self-luminous markers 9 attached at least two locations is received by the plurality of near-infrared cameras 10, and the self-luminous markers 9 are detected by the PC 11 from the relative positions of the self-luminous markers 9 that have received the light. Calculate the two coordinate positions of .
Although there are multiple methods of motion capture technology, the motion capture technology of the present invention is an optical motion capture technology.

この光学式キャプチャ技術の基本的な仕組みとしては、対象物(ここでは切削刃5近傍位置のガイドセル4上)に自発光マーカ9につき間隔をあけて2カ所に設置し、前記自発光マーカ9により、例えば目に見えない近赤外線光(波長850nm程度)を発光させ、該光を複数の近赤外線カメラ10により撮影するものである。 As a basic mechanism of this optical capture technology, a self-luminous marker 9 is placed on the target (here, on the guide cell 4 near the cutting blade 5) at two locations with an interval therebetween, and the self-luminous marker 9 , for example, invisible near-infrared light (wavelength of about 850 nm) is emitted, and the light is photographed by a plurality of near-infrared cameras 10 .

なお、前記2カ所に設置する自発光マーカ9は、削岩機6に取り付けられたロッド26及び先受け部材27先端の切削刃5の軸方向中心軸線と、なるべく近接する位置するよう設置するものとする。後述する回転誤差があっても、その影響を少なくすることが求められるからである。 The self-luminous markers 9 installed at the two locations are installed so as to be as close as possible to the axial center axis of the cutting blade 5 at the tip of the rod 26 and the tip of the tip receiving member 27 attached to the rock drill 6. and This is because even if there is a rotation error, which will be described later, it is required to reduce its influence.

上記のように2つの自発光マーカ9を設置すれば、削岩機6及び切削刃5、特に切削刃5の先端の座標位置を計測することが出来る。なお、前記したように自発光マーカ9の取付位置と切削刃5の軸方向中心線との距離が離れているが、該距離の長さをあらかじめ認識していわゆるオフセット補正するものとしてある。 By installing two self-luminous markers 9 as described above, it is possible to measure the coordinate positions of the rock drilling machine 6 and the cutting blade 5 , especially the tip of the cutting blade 5 . As described above, the distance between the attachment position of the self-luminous marker 9 and the axial center line of the cutting blade 5 is long, but the length of the distance is recognized in advance and the so-called offset correction is performed.

前記近赤外線カメラ10にて取得した画像はデータとしてPC11に転送され、該画像データはソフトウェア処理により、背景とマーカ光の輝度差を利用してマーカ部分の画像のみが抽出される。
そして、PC11に取り込まれた画像において、例えば、画面上の左上隅を原点として、各自発光マーカ9の重心座標をピクセル単位で各々測定する。これにより各々の自発光マーカ9の座標位置がほぼ認識できる。
The image acquired by the near-infrared camera 10 is transferred as data to the PC 11, and only the image of the marker portion is extracted by software processing using the luminance difference between the background and the marker light.
Then, in the image captured by the PC 11, for example, with the upper left corner of the screen as the origin, the coordinates of the center of gravity of each light-emitting marker 9 are measured in units of pixels. As a result, the coordinate position of each self-luminous marker 9 can be almost recognized.

すなわち、複数台の近赤外線カメラ10にて自発光マーカ9からの光を同時撮影することで、ステレオビジョンの要領で視差を基に深さ方向の距離が認識され、深さ方向の位置も計算することができる。
各々の自発光マーカ9の座標位置に前述のオフセット補正をすることにより、切削刃5の先端位置の座標位置が認識できるものとなる。
That is, by simultaneously photographing the light from the self-luminous marker 9 with a plurality of near-infrared cameras 10, the distance in the depth direction is recognized based on the parallax in the manner of stereo vision, and the position in the depth direction is also calculated. can do.
By performing the aforementioned offset correction on the coordinate position of each self-luminous marker 9, the coordinate position of the tip position of the cutting blade 5 can be recognized.

ここで、PC11は、送信部20、受信部21、演算制御部12、記憶部22、入力部23を有して構成されている。さらに、ディスプレイ15と接続されており、PC11の情報がディスプレイ15上に表示できるものとなっている(図11参照)。
さらに、PC11はインターネット回線などの通信回線網23を介して外部のサーバコンピュータ24などと接続されており、該サーバコンピュータ24は、PC11の情報を受信し、該情報を記憶、保存できるものとなっている。
尚、演算制御部12は、掘削計画図読み込み部31、掘削計画図形成部32、掘削位置等読み込み部33、掘削位置等描画部34を有している(図12参照)。
Here, the PC 11 includes a transmission section 20 , a reception section 21 , an arithmetic control section 12 , a storage section 22 and an input section 23 . Furthermore, it is connected to a display 15 so that information of the PC 11 can be displayed on the display 15 (see FIG. 11).
Furthermore, the PC 11 is connected to an external server computer 24 or the like via a communication network 23 such as the Internet line, and the server computer 24 receives information from the PC 11 and can store and save the information. ing.
The arithmetic control unit 12 has an excavation plan drawing reading unit 31, an excavation plan drawing forming unit 32, an excavation position reading unit 33, and an excavation position drawing unit 34 (see FIG. 12).

よって、例えば、前記サーバコンピュータ24から掘削計画図のデータをPC11が受信すると、演算制御部12の掘削計画図読み込み部31で読み込み、掘削計画図形成部32で平面図が形成されて、ディスプレイ15に表示される。 Therefore, for example, when the PC 11 receives the excavation plan drawing data from the server computer 24, the excavation plan drawing reading unit 31 of the arithmetic control unit 12 reads the excavation plan drawing data, and the excavation plan drawing forming unit 32 forms a plan view, which is displayed on the display 15. to be displayed.

そして、操作者は、ガイドセル4を稼働操作し、ディスプレイ15に表示された掘削位置等に基づいて掘削していく。すると、その掘削作業を掘削位置等読み込み部33がリアルタイムに読み取って、掘削位置等描画部34によって前記掘削計画図上に異なる色で描画し表示していくのである(図5乃至図10参照)。 Then, the operator operates the guide cell 4 to excavate based on the excavation position and the like displayed on the display 15 . Then, the excavation work is read by the excavation position reading unit 33 in real time, and the excavation position drawing unit 34 draws and displays it in different colors on the excavation plan drawing (see FIGS. 5 to 10). .

そして、これらのデータはリアルタイムに記憶部22に送出され、記憶部22に保存される。また、保存されたデータは通信回線網25を介してサーバコンピュータ24へ送信され、そこで保存されると共に、記録として残すことが出来る。 These data are sent to the storage unit 22 in real time and stored in the storage unit 22 . In addition, the saved data is transmitted to the server computer 24 via the communication network 25, where it is saved and can be left as a record.

ここで、本発明において自発光マーカ9を用いる手法は、ガイドセル4の長手方向に間隔をあけて2カ所に設置する場合につき説明した。
しかしながら、2カ所の設置であると、切削刃5が2つの自発光マーカ9の中心を結ぶ延長線を回転軸として回転したときの切削刃5の座標位置認識のずれを解決できない。
Here, the method of using the self-luminous markers 9 in the present invention has been described for the case where the self-luminous markers 9 are installed at two locations with an interval in the longitudinal direction of the guide cell 4 .
However, if they are installed at two locations, it is not possible to solve the problem of misrecognition of the coordinate position of the cutting blade 5 when the cutting blade 5 rotates about the extension line connecting the centers of the two self-luminous markers 9 as the rotation axis.

自発光マーカ9は切削刃5の軸方向中心線上に設置されたものではない。逆に、既に述べたように自発光マーカ9は切削刃5の軸方向中心線上に決して設置出来ない。切削刃5の稼働の邪魔になるからであり、仮に設置したとしても稼働作業により破壊されてしまうからである。 The self-luminous marker 9 is not placed on the axial centerline of the cutting blade 5 . Conversely, the self-luminous marker 9 can never be placed on the axial centerline of the cutting blade 5 as already described. This is because it interferes with the operation of the cutting blade 5, and even if it were installed, it would be destroyed during the operation.

よって、自発光マーカ9の実際の設置位置から切削刃5の軸方向中心線までの距離を補正係数としてあらかじめオフセット認識して計測するのである。この自発光マーカ9の実際の設置位置から切削刃5の軸方向中心線までの距離を補正係数としての計測は、前記オフセット補正係数、すなわち自発光マーカ9の実際の設置位置から切削刃5の軸方向中心線までの距離データが演算制御部12に入力されて行われる(図13乃至図18の「オフセット距離」を参照)。 Therefore, the distance from the actual installation position of the self-luminous marker 9 to the center line of the cutting blade 5 in the axial direction is used as a correction coefficient, and the offset is previously recognized and measured. Measurement using the distance from the actual installation position of the self-luminous marker 9 to the axial centerline of the cutting blade 5 as a correction factor is the offset correction coefficient, that is, the distance from the actual installation position of the self-luminous marker 9 to the cutting blade 5 Distance data to the center line in the axial direction is input to the arithmetic control unit 12 (see "offset distance" in FIGS. 13 to 18).

ところが、自発光マーカ9の2カ所の設置であると、前記自発光マーカ9の延長線上を回転軸として前記オフセット補正の距離を半径にした円周上のいずれの位置に切削刃5が位置するか認識できずに切削刃5の位置認識にずれが生じてしまうのである。 However, if the self-luminous markers 9 are installed at two locations, the cutting edge 5 can be located at any position on the circumference of the circle whose radius is the distance for the offset correction with the extension of the self-luminous markers 9 as the axis of rotation. Therefore, the positional recognition of the cutting blade 5 is deviated.

すなわち、2つの自発光マーカ9のみを使用した場合、ガイドセル4の位置、切削刃5の位置は一意に決まらないことになる。なぜなら2つの自発光マーカ9の中心を通る直線を回転軸にして、切削刃5の中心と自発光マーカ9の設置位置との距離を半径とする円周上のどこかに目標座標があることになるからである(回転誤差)。 That is, when only two self-luminous markers 9 are used, the position of the guide cell 4 and the position of the cutting edge 5 cannot be uniquely determined. This is because the target coordinates are located somewhere on a circle whose radius is the distance between the center of the cutting blade 5 and the installation position of the self-luminous marker 9, with the straight line passing through the centers of the two self-luminous markers 9 as the axis of rotation. (rotational error).

しかしながら、実際の掘削作業においては、ガイドセル4の姿勢はおおよそ一定の範囲でのみ動作するため前述の回転誤差は掘削作業において許容範囲内と考えることができ、前記2点の自発光マーカ9の設置での運用が可能になっている。従って、2つの自発光マーカ9は、なるべく切削刃5の軸方向中心に近い箇所に取り付けることが好ましいのである。 However, in an actual excavation work, the posture of the guide cell 4 operates only within a roughly constant range, so the aforementioned rotational error can be considered to be within an allowable range for the excavation work. Installation is possible. Therefore, it is preferable to attach the two self-luminous markers 9 at locations as close to the axial center of the cutting blade 5 as possible.

そこで、本件発明者らは、さらに掘削作業の正確性を期すべく、上記事態を解消すべく、自発光マーカ9を3カ所、あるいはそれ以上の箇所に設置する発明を創案した(図17乃至図19参照)。 Therefore, the inventors of the present invention have created an invention in which the self-luminous markers 9 are installed at three or more locations in order to further improve the accuracy of the excavation work and to solve the above-described situation (Fig. 17 to Fig. 17). 19).

まず、自発光マーカ9を取り付ける取付杆19の各々の長さが異なるようにした3つの自発光マーカ9を使用し、これら3つの自発光マーカ9について間隔をあけてガイドセル4に取り付ける。
そして、前記した複数の近赤外線カメラ7で前記3つの自発光マーカ9を撮影し、モーションキャプチャによりこれら3つの自発光マーカ9の座標位置を測定する。
First, three self-luminous markers 9 having different lengths of mounting rods 19 for attaching the self-luminous markers 9 are used, and these three self-luminous markers 9 are attached to the guide cell 4 with a space therebetween.
Then, the three self-luminous markers 9 are photographed by the plurality of near-infrared cameras 7, and the coordinate positions of the three self-luminous markers 9 are measured by motion capture.

なお、前記測定に際しては自発光マーカ9の実際の設置位置から切削刃5の軸方向中心線までの距離をオフセット補正係数としてあらかじめ設定しておき、その上で演算制御部12で計測することは、前述した2つ自発光マーカの場合と同様である。 In the above measurement, the distance from the actual installation position of the self-luminous marker 9 to the center line of the cutting blade 5 in the axial direction may be set in advance as an offset correction coefficient, and then the calculation control unit 12 may perform the measurement. , is the same as the case of the two self-luminous markers described above.

すると、測定したそれぞれ3つの自発光マーカ9の座標位置からオフセット(補正係数)を考慮した目標座標が一意に計測することが出来るものとなる。
この場合であれば、自発光マーカ9の座標認識による目標座標が確実に認識でき、そのため前記した自発光マーカ9の2カ所設置による切削刃5の回転による位置認識のずれをも解消できる。従って、確実に掘削箇所に合致させられ、もって正確な掘削が出来る。なお、3つ以上自発光マーカ9を設置した場合でも同様の結果が得られる。
Then, the target coordinates can be uniquely measured with the offset (correction coefficient) taken into account from the coordinate positions of the three self-luminous markers 9 that have been measured.
In this case, the target coordinates can be reliably recognized by recognizing the coordinates of the self-luminous markers 9, so that the displacement of the position recognition caused by the rotation of the cutting blade 5 due to the installation of the self-luminous markers 9 at two locations can be eliminated. Therefore, it is possible to reliably match the excavation point, thereby enabling accurate excavation. Similar results can be obtained even when three or more self-luminous markers 9 are installed.

ここで、前記複数の近赤外線カメラ10の設置位置及び設置画角の設定は、なるべく最小限のカメラ台数でブーム3及びガイドセル4の稼働を捉えるべく、例えば偶数台を各々交差させる向きであるいは交差させない向きで設置することなどが考えられる。
そして、複数の近赤外線カメラ10は、自発光マーカ9から発光された近赤外線光を捉えるものとなる。
Here, the installation positions and installation angles of view of the plurality of near-infrared cameras 10 are set so that the operation of the boom 3 and the guide cell 4 can be captured with the minimum number of cameras as possible, for example, an even number of cameras are intersected, or It is conceivable to install them so that they do not cross each other.
A plurality of near-infrared cameras 10 capture the near-infrared light emitted from the self-luminous marker 9 .

すなわち、近赤外線カメラ10が前記近赤外線光を捉え、これにより、例えば、切削刃5近傍位置に取り付けられた自発光マーカ9の座標を認識することが出来、該座標認識のデータをPC11に送出し、PC11では、前記演算制御部12において、モーションキャプチャ技術を応用したソフトウェアを用いて自発光マーカ9の座標を認識する。そして、認識した座標から相対的に切削刃5の位置を計算し、順次計算される座標位置を認識しながら、切削刃5を稼働操作し、切削していくものとなる。 That is, the near-infrared camera 10 captures the near-infrared light, thereby, for example, the coordinates of the self-luminous marker 9 attached near the cutting blade 5 can be recognized, and the coordinate recognition data is sent to the PC 11. In the PC 11, the arithmetic control unit 12 recognizes the coordinates of the self-luminous marker 9 using software to which motion capture technology is applied. Then, the position of the cutting blade 5 is calculated relative to the recognized coordinates, and the cutting blade 5 is operated while recognizing the sequentially calculated coordinate positions to perform cutting.

次に、所定間隔で点滅を繰り返す点滅型の自発光マーカ9を用いた構成について本件発明者らはさらに発明したので該新規発明の構成についても説明する。
なお、点滅型の自発光マーカ9をガイドセル4に取りつける個数については、2個でも構わないし、2個以上でも構わない。前述した自発光マーカ9の場合と同様である。
Next, the inventors of the present invention have further invented a configuration using a flashing self-luminous marker 9 that repeats flashing at predetermined intervals, so the configuration of the new invention will also be described.
The number of flashing self-luminous markers 9 attached to the guide cell 4 may be two, or two or more. This is the same as the self-luminous marker 9 described above.

トンネル空間内に複数のマーカが取り付けられた対象物、すなわちブーム3及びガイドセル4が複数存在する場合でこれら複数のブーム3及びガイドセル4が交差したり回転等の動きがある場合、前記ブーム3及びガイドセル4のどの位置にどのマーカが取り付けられているか判別できなくなることがある(これはマーカ入替り現象と称されている)。 In the case where there are a plurality of objects to which a plurality of markers are attached, that is, a plurality of booms 3 and guide cells 4, in the tunnel space, if these plurality of booms 3 and guide cells 4 intersect or move such as rotation, the boom 3 and guide cell 4, it may not be possible to determine which marker is attached to which position (this is called a marker replacement phenomenon).

その場合、例えば、近赤外線カメラ10のフレームレートを考慮した同期機能を持つ所定間隔で点滅を繰り返す点滅型の自発光マーカ9が効果を発揮するものとなる。本件発明者らは独自に本件発明に関するガイドセル4用に前記所定間隔で点滅を繰り返す点滅型の自発光マーカ9及び点滅型の自発光マーカ9の輝度などの増幅回路を含むハードウェアを発明した(図19参照)。 In that case, for example, a blinking self-luminous marker 9 that repeats blinking at predetermined intervals and has a synchronization function considering the frame rate of the near-infrared camera 10 is effective. The inventors independently invented hardware for the guide cell 4 related to the present invention, including a flashing self-luminous marker 9 that repeats flashing at predetermined intervals and an amplifier circuit for the brightness of the flashing self-luminous marker 9. (See FIG. 19).

各々の点滅型の自発光マーカ9の近傍位置にベースステーション18が設けられており、該ベースステーション18内には、例えばバッテリー17、同期信号受信器42、増幅回路40などが収納されている。 A base station 18 is provided in the vicinity of each flashing self-luminous marker 9, and the base station 18 accommodates, for example, a battery 17, a synchronizing signal receiver 42, an amplifier circuit 40, and the like.

また、ドリルマシン1側には同期信号送信器41が設けられ、該同期信号送信器41から各々の点滅型の自発光マーカ9側に同期信号が送信される。
そして、各々の点滅型の自発光マーカ9は、自己の同期信号を受信し、これにより独自の信号周期(点滅周期)による点滅が行えるのである。
A synchronizing signal transmitter 41 is provided on the drill machine 1 side, and a synchronizing signal is transmitted from the synchronizing signal transmitter 41 to each blinking self-luminous marker 9 side.
Each flashing type self-luminous marker 9 receives its own synchronizing signal, thereby enabling flashing according to its own signal cycle (blinking cycle).

そして、PC11側では、各々の点滅型の自発光マーカ9についてそれぞれの信号周期で点滅することが認識できるものとなっており、それぞれの信号周期での点滅が、いわば各々の点滅型の自発光マーカ9のIDとなっているのである。よって、たとえ近赤外線カメラ10によって捉えられた自発光マーカ9がいずれの位置に取り付けられた点滅型の自発光マーカ9から照射された光か目視などで判断ができない場合であっても、前記IDを検索することでいずれのガイドセル4に取り付けられた点滅型の自発光マーカ9であるかが判断できるものとなる。 On the PC 11 side, it is possible to recognize that each blinking type self-luminous marker 9 blinks in each signal period, and the blinking in each signal period corresponds to each blinking type self-luminous marker. This is the ID of the marker 9. Therefore, even if it is not possible to visually determine whether the self-luminous marker 9 captured by the near-infrared camera 10 is the light emitted from the flashing self-luminous marker 9 attached at any position, the ID , it is possible to determine to which guide cell 4 the blinking self-luminous marker 9 is attached.

すなわち、本件発明者らが発明した点滅型の自発光マーカ9を用いることで、全ての点滅型の自発光マーカ9は異なる信号周期で点滅を繰り返す。従って、異なる信号周期で点滅を繰り返す点滅型の自発光マーカ9は、その異なる信号周期での点滅の違いがそれぞれのID となり、このIDを認識することによりいずれのガイドセル4のいずれの位置に取り付けられた点滅型の自発光マーカ9であるかが判別できるものとなる。 That is, by using the blinking self-luminous markers 9 invented by the inventors, all the blinking self-luminous markers 9 repeat blinking at different signal cycles. Therefore, the flashing type self-luminous marker 9 that repeats flashing at different signal cycles has an ID corresponding to the difference in flashing at different signal cycles. It can be determined whether it is the attached flashing type self-luminous marker 9 or not.

このように、検出された点滅型の自発光マーカ9がいずれの座標位置にある点滅型の自発光マーカ9であるかが一意に決まるため、マーカの入れ替わりを防ぐことが出来る。 In this manner, it is uniquely determined at which coordinate position the detected blinking self-luminous marker 9 is located, so that the replacement of markers can be prevented.

さらに詳細に説明すると、まず、本件発明の点滅型の自発光マーカ9に、例えば異なったパルス波形のパルス信号、すなわち、異なる信号周期で点滅を繰り返すパルス信号を振り分ける。 More specifically, first, pulse signals having different pulse waveforms, that is, pulse signals that repeatedly blink at different signal periods, are distributed to the flashing self-luminous marker 9 of the present invention.

これにより、それぞれの点滅型の自発光マーカ9は異なる信号周期で点滅を繰り返すことができる。しかも、前記異なった信号周期の点滅が点滅型の自発光マーカ9のそれぞれのIDになるのである。そのIDを有する点滅型の自発光マーカ9の取り付け位置をあらかじめ認識しておけば、たとえ、近赤外線カメラ10でいずれかの点滅型の自発光マーカ9の取り付け位置が目視などで判断できなくなっても、前記IDの違いにより点滅型の自発光マーカ9の取り付け位置が判断できることになるのである。 As a result, the blinking self-luminous markers 9 can repeat blinking at different signal cycles. Moreover, the blinking of the different signal periods becomes the ID of each of the blinking self-luminous markers 9 . If the mounting position of the flashing self-luminous marker 9 having the ID is recognized in advance, even if the near-infrared camera 10 cannot visually determine the mounting position of any of the flashing self-luminous markers 9. Also, the attachment position of the blinking self-luminous marker 9 can be determined from the difference in the ID.

このように、点滅型の自発光マーカ9の全てに、例えば異なった信号周期の点滅をIDにして振り分け、次いでそのラベリングを行う。これによりすべての点滅型の自発光マーカ9の取り付け位置が認識できる。 In this way, all the blinking type self-luminous markers 9 are assigned, for example, blinking with different signal periods as IDs, and then labeled. This makes it possible to recognize the attachment positions of all the blinking self-luminous markers 9 .

ところで、点滅型の自発光マーカ9は、例えば取り付け位置近傍に設置されたバッテリーから電源供給を受け、それぞれの点滅型の自発光マーカ9を点滅させる。
この点滅に際しては、増幅回路40によって点滅型の自発光マーカ9の光源であるLEDの輝度を増幅させることもできる。この輝度向上により、さらに近赤外線カメラ10からの認識度を向上させることができる。
By the way, the flashing type self-luminous markers 9 receive power supply from, for example, a battery installed near the mounting position, and blink the respective flashing type self-luminous markers 9 .
At the time of blinking, the amplifier circuit 40 can also amplify the brightness of the LED, which is the light source of the blinking self-luminous marker 9 . With this improvement in luminance, the degree of recognition from the near-infrared camera 10 can be further improved.

図19は本発明の本発明の構成を含んだシステム概要図であり、図から理解されるように、それぞれの点滅型の自発光マーカ9の近傍位置には電源としてのバッテリー17、LEDの輝度を増幅させる増幅回路40及び同期信号送信器41からの同期信号を受信する同期信号受信器42が収納されたベースステーション18が設置されている。 FIG. 19 is a schematic diagram of the system including the configuration of the present invention. As can be seen from the figure, a battery 17 as a power source and an LED brightness A base station 18 containing an amplifier circuit 40 for amplifying a synchronous signal and a synchronous signal receiver 42 for receiving a synchronous signal from a synchronous signal transmitter 41 is installed.

そして、前記同期信号送信器41と同期信号受信器42との信号の送受信によっていずれの取り付け位置にある点滅型の自発光マーカ9かが認識できるものとなっている。 By transmitting and receiving signals between the synchronous signal transmitter 41 and the synchronous signal receiver 42, it is possible to recognize which mounting position the flashing type self-luminous marker 9 is located.

本発明の掘削システムは、前記したように、ドリルマシン1におけるガイドセル4先端側に取り付けられた切削刃5の稼働動作を、いわゆるモーションキャプチャ技術を用いて、まず第一に、リアルタイムに前記ガイドセル4先端側に取り付けられた切削刃5の稼働動作をドリルマシン1に搭載されたディスプレイ15に表示出来、該ディスプレイ15上の画像を確認しながら操作者がトンネル内周面に対する掘削作業が行える。さらに、第二に掘削作業を行っているトンネル内周面に対する大量の先受け部材277の掘削位置データについてリアルタイムにPC11等に記録、保存できるものとしている。 As described above, the drilling system of the present invention uses so-called motion capture technology to detect the operating motion of the cutting blade 5 attached to the tip side of the guide cell 4 in the drill machine 1, first of all, in real time. The operation of the cutting blade 5 attached to the tip of the cell 4 can be displayed on the display 15 mounted on the drill machine 1, and the operator can perform the excavation work on the inner peripheral surface of the tunnel while checking the image on the display 15. . Furthermore, secondly, a large amount of excavation position data of the pre-receiving member 277 on the inner peripheral surface of the tunnel being excavated can be recorded and saved in the PC 11 or the like in real time.

よって、ドリルマシン1の操作者は、前記リアルタイムで取得されたガイドセル4先端側に取り付けられた切削刃5の稼働動作をディスプレイ15上に描画された映像で確認しながら掘削作業を行えるものとなる。よって、従来、目視で確認した掘削作業においては、死角が存在することがあったが、ディスプレイ15上の確認作業に死角がほぼ存在することはないものとなった。 Therefore, the operator of the drill machine 1 can perform the drilling operation while confirming the operation of the cutting blade 5 attached to the tip of the guide cell 4 acquired in real time on the image drawn on the display 15. Become. Therefore, in the past, there was a blind spot in the excavation work visually confirmed, but there is almost no blind spot in the confirmation work on the display 15 .

ここで、図3に内周面についての掘削計画図である正面図を示す。該正面図においては、ガイドセル4の代表2点から取得した座標をどのように描画するかも重要となる。 Here, FIG. 3 shows a front view which is an excavation plan drawing for the inner peripheral surface. In the front view, how the coordinates acquired from the two representative points of the guide cell 4 are drawn is also important.

本発明では前述のごとく、前記図2の先受け部材27の掘削打設計画図(例えばCAD図)から先受け部材27の掘削打設座標位置を算出していくのである。すなわち、先受け部材27の掘削打設計画図からY座標、Z座標、のみ先離れ、表示角度を算出していくのである(図3参照)。 In the present invention, as described above, the drilling and driving coordinate position of the pre-receiving member 27 is calculated from the drilling and punching design drawing (for example, CAD drawing) of the pre-receiving member 27 shown in FIG. That is, only the Y coordinate and Z coordinate are separated from the plan drawing of the drilling strike of the pre-receiving member 27, and the display angle is calculated (see FIG. 3).

一方、記録、保存に関しては、自発光マーカ9の2点の座標の変化を例えば、1秒単位で記録することもできる。例えば、PC11のハードドライブなど記憶部21に例えばCSV形式にて保存できるのである。 On the other hand, regarding recording and storage, changes in the coordinates of two points of the self-luminous marker 9 can be recorded, for example, in units of one second. For example, it can be saved in the storage unit 21 such as the hard drive of the PC 11 in, for example, CSV format.

なお、掘削時において、例えばガイドセル4に設けられた掘削距離測定部を構成する油圧シリンダの油圧データ(例えばガイドセル4や削岩機の揺動部材4として使用される油圧シリンダの油圧流量変化量)などをドリルマシン1(建機)から取得してPC11に転送することで、各先受け部材27の掘削距離を前記記憶部21に追加して保存することも出来る。この様に、掘削長さを表すのみ先離れの距離などについて別途前記の様に油圧データなどを介して計測することも出来る。 During excavation, for example, the hydraulic pressure data of the hydraulic cylinders constituting the excavation distance measuring unit provided in the guide cell 4 (for example, the hydraulic pressure data of the hydraulic cylinders used as the rocking member 4 of the guide cell 4 and the rock drilling machine) , etc., from the drill machine 1 (construction machine) and transferred to the PC 11, the excavation distance of each pre-receiving member 27 can be added to the storage unit 21 and stored. In this way, it is also possible to separately measure the distance between the tip and the like, which represents the excavation length, through the oil pressure data and the like as described above.

以上において、本発明による使用状態の概略を説明する。
トンネルの内周面に対し、ドリルマシン1のガイドセル4を対向させて設置させる。所定の内周面に対し、掘削計画図が用意されている場合、該掘削計画図をディスプレイ15に写し出す。
In the above, the outline of the use state by this invention is demonstrated.
The guide cell 4 of the drill machine 1 is installed facing the inner peripheral surface of the tunnel. When an excavation plan is prepared for a predetermined inner circumferential surface, the excavation plan is displayed on the display 15 .

そして、該掘削計画図に描画された掘削位置、掘削の傾き、掘削長(のみ先離れの距離)に従ってガイドセル4を稼働させる。すなわち、ガイドセル4の操作者はディスプレイ15上でリアルタイムにガイドセル4先端側に取り付けられた切削刃5の稼働動作を確認出来、その稼働動作を確認しながら先受け部材27の掘削が行える。 Then, the guide cell 4 is operated in accordance with the excavation position, the excavation inclination, and the excavation length (distance away from the tip) drawn on the excavation plan drawing. That is, the operator of the guide cell 4 can confirm the operation of the cutting blade 5 attached to the tip side of the guide cell 4 in real time on the display 15, and can excavate the tip receiving member 27 while confirming the operation.

ここで、PC11には、図11に示す様に、送信部20、受信部21、演算制御部12、記憶部22、入力部23を有して構成されている。さらに、ディスプレイ15と接続されており、PC11の情報がディスプレイ15上に表示できるものとなっている。 Here, as shown in FIG. 11, the PC 11 includes a transmission section 20, a reception section 21, an arithmetic control section 12, a storage section 22, and an input section . Furthermore, it is connected to a display 15 so that information of the PC 11 can be displayed on the display 15 .

さらに、PC11はインターネット回線などの通信回線網23を介して外部のサーバコンピュータ24などと接続されており、該サーバコンピュータ24は、PC11の情報を受信し、該情報を記憶、保存できるものとなっている。
尚、演算制御部12は、図12に示すように、掘削計画図読み込み部31、掘削計画図形成部32、掘削位置等読み込み部33、掘削位置等描画部34を有して構成されている。
Furthermore, the PC 11 is connected to an external server computer 24 or the like via a communication network 23 such as the Internet line, and the server computer 24 receives information from the PC 11 and can store and save the information. ing.
As shown in FIG. 12, the arithmetic control section 12 includes an excavation plan drawing reading section 31, an excavation plan drawing forming section 32, an excavation position reading section 33, and an excavation position drawing section 34. .

よって、例えば、前記サーバコンピュータ24から掘削計画図のデータをPC11が受信すると、演算制御部12の掘削計画図読み込み部31で読み込み、掘削計画図形成部32でトンネルの正面図が形成されて、ディスプレイ15に表示される。 Therefore, for example, when the PC 11 receives the excavation plan drawing data from the server computer 24, the excavation plan drawing reading unit 31 of the arithmetic control unit 12 reads the data, and the excavation plan drawing forming unit 32 forms a front view of the tunnel. It is displayed on the display 15 .

操作者は、ガイドセル4を稼働操作し、ディスプレイ15に表示された掘削位置等に基づいて掘削していく。すると、その掘削作業を掘削位置等読み込み部33がリアルタイムに読み取って、掘削位置等描画部34によって前記掘削計画図上に異なる色で描画し表示していくのである。 The operator operates the guide cell 4 to excavate based on the excavation position and the like displayed on the display 15 . Then, the excavation position reading section 33 reads the excavation work in real time, and the excavation position drawing section 34 draws and displays it in different colors on the excavation plan drawing.

そして、これらのデータはリアルタイムに記憶部21に送出され、記憶部21に保存される。また、保存されたデータは通信回線網23を介してサーバコンピュータ24へ送信され、そこで保存されると共に、記録として残すことが出来る。
These data are sent to the storage unit 21 in real time and stored in the storage unit 21 . Also, the saved data is transmitted to the server computer 24 via the communication line network 23, where it is saved and can be left as a record.

1 ドリルマシン
2 車両本体
3 ブーム
4 ガイドセル
5 切削刃
6 削岩機
8 ガイド部材
9 自発光マーカ
10 近赤外線カメラ
11 PC
12 演算制御部
14 原点
15 ディスプレイ
16 丸部分
17 バッテリー
18 ベースステーション
19 取付杆
20 送信部
21 受信部
22 記憶部
23 入力部
24 サーバコンピュータ
25 通信回線網
26 ロッド
27 先受け部材
31 掘削計画図読み込み部
32 掘削計画図形成部
33 掘削位置等読み込み部
34 掘削位置等描画部
40 増幅回路
41 同期信号送信器
42 同期信号受信器
1 drill machine 2 vehicle body 3 boom 4 guide cell 5 cutting blade 6 rock drill 8 guide member 9 self-luminous marker 10 near-infrared camera 11 PC
12 Arithmetic control unit 14 Origin 15 Display 16 Circle part 17 Battery 18 Base station 19 Mounting rod 20 Transmitting unit 21 Receiving unit 22 Storage unit 23 Input unit 24 Server computer 25 Communication network 26 Rod 27 Pre-receiving member 31 Excavation plan drawing reading unit 32 Excavation plan drawing forming unit 33 Excavation position reading unit 34 Excavation position drawing unit 40 Amplifier circuit 41 Synchronization signal transmitter 42 Synchronization signal receiver

本発明は、山岳トンネル工事などで採用される例えば長尺鋼管先受け工法における先受け鋼管打設位置誘導システムに関するものである。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a pre-receiving steel pipe placing position guidance system in, for example, a long steel pipe pre-receiving construction method employed in mountain tunnel construction or the like.

山岳トンネル工事などでは、切羽(掘削面)の岩盤が脆弱で不安定な場合に、補助工法の一部として、AGF工法(長尺鋼管先受け工法)が多く用いられている。
AGF工法(長尺鋼管先受け工法)とは、トンネル掘削に先立ち、トンネル外周において、略アーチ状に地山改良部材、すなわち先受けを形成する工法を指標し、該先受けの形成に伴う先受け鋼管打設と地山改良材の注入により切羽前方の地山を補強するものである。すなわち、前記先受けの形成により、トンネル掘削時の地山の先行変位や地山の緩みを抑制し、トンネル前方および上部からの崩落を防止するなどトンネル掘削施工時の安全性の確保を企図した工法である。
In mountain tunnel construction, etc., the AGF construction method (long steel pipe advance construction method) is often used as part of the auxiliary construction method when the bedrock of the face (excavation surface) is fragile and unstable.
The AGF method (long steel pipe pre-receiving method) refers to a construction method in which, prior to tunnel excavation, a ground improvement member, that is, pre-receiving, is formed on the outer periphery of the tunnel in a roughly arch shape. The ground in front of the face is reinforced by placing steel pipes and injecting ground improvement material. In other words, the formation of the above-mentioned pre-supports is intended to ensure safety during tunnel excavation, such as by suppressing the preceding displacement and loosening of the ground during tunnel excavation and preventing collapse from the front and top of the tunnel. Construction method.

ここで、標準的なAGF工法としては、例えば1本あたり約3mの鋼管を、ドリルマシンの削岩機を用いて打ち込み、前記鋼管を継ぎ足しながら地山に約12mの長さで打設する先受け工法が知られている。
すなわち、前記先受け鋼管を切羽前方の天端アーチ部、例えば120°の範囲に亘り略半円形状に間隔をあけて複数本打設し補強域を構築するのである。
尚、略120°の範囲で間隔をあけて複数本の先受け鋼管の打設を行うため、トンネルの大きさによっては前記打設本数が変化するものとなる。
Here, as a standard AGF construction method, for example, a steel pipe of about 3m per pipe is driven using a rock drill of a drill machine, and the steel pipe is added to the ground to drive a length of about 12m into the ground. Receiving method is known.
That is, a plurality of the pre-receiving steel pipes are placed in a substantially semicircular shape over a range of, for example, 120° at the crest arch portion in front of the face to form a reinforcing region.
Since a plurality of pre-receiving steel pipes are placed at intervals of approximately 120°, the number of pre-received steel pipes placed varies depending on the size of the tunnel.

しかしながら、アーチ状に等間隔で打設し、トンネル掘削部前方に均整の取れたアーチ形状を構成させるには非常に高い打設精度が求められる。その為、正確な打設位置及び正確な打設角度の設定が本工法の採用に当たって極めて重要な設定事項となる。 However, in order to construct a well-proportioned arch in front of the excavated tunnel, a very high precision is required. Therefore, it is extremely important to set an accurate casting position and an accurate casting angle when adopting this construction method.

しかして、従来では下記の様な方法で前記打設精度の管理が行われていた。例えば、ガイドセルにターゲットを設置し、該ターゲットをトータルステーションにて測量を行い、正しい位置や角度に誘導する方法である。また、簡易的な方法としては、事前に測量を行い打設位置にマーキングを行う。そして、マーキングされた場所を打設開始位置の目印とし、角度は勾配計などの計測機器を使用して位置や角度を管理していた。
しかしながら、前記従来の方法では、測量やマーキングの作業に多大な労力と多大な時間が費やされる。そのため作業効率が良好ではないとの課題があった。
Conventionally, the placement accuracy has been managed by the following method. For example, there is a method of setting a target in a guide cell, measuring the target with a total station, and guiding it to a correct position and angle. In addition, as a simple method, surveying is done in advance and marking is done at the placement position. Then, the marked place is used as a mark of the placement start position, and the position and angle are managed using a measuring device such as a gradiometer.
However, the conventional method requires a great deal of labor and a great deal of time for surveying and marking work. Therefore, there was a problem that work efficiency was not good.

特開2008-248528号公報JP 2008-248528 A

本発明は前記従来の課題を解決するために創案されたものであり、測量やマーキングの作業に多大な労力や時間を必要以上に費やすことがないため、極めて効率良く、かつ確実で高精度に先受けの打設位置や打設角度が設定できるAGF工法での鋼管打設位置誘導システムを提供することを目的とするものである。 The present invention was invented to solve the above-mentioned conventional problems, and since it does not require a lot of labor and time for surveying and marking work, it is extremely efficient, reliable and highly accurate. It is an object of the present invention to provide a steel pipe driving position guidance system in the AGF construction method that can set the driving position and driving angle of the pre-receiver.

すなわち、モーションキャプチャー技術を活用した掘削ナビゲーションシステムを使用し、極めて効率良く確実で高精度なAGF工法での長尺鋼管を打設する技術を発明したものである。
In other words, we have invented a technology for driving long steel pipes by the AGF method, which is extremely efficient, reliable, and highly accurate, using an excavation navigation system that utilizes motion capture technology.

本発明は、
トンネル外周面に、略アーチ状に先受けを形成すべく先受け部材での掘削と挿入を同時に行うと共に、挿入された先受け部材内に地山改良材の注入を行う掘削システムであって、
車両本体から揺動可能に突設され、円筒状をなし、外周面に複数の穴が設けられた切削刃つき先受け部材を軸方向に揺動させる削岩機と、該削岩機の前記揺動をガイドするガイドセルと、
該ガイドセルの長手方向で、前記切削刃の設置位置の近傍位置に間隔をあけて少なくとも2個取り付けられた自発光マーカと、
前記自発光マーカからの光を取得する複数の近赤外線カメラと、
前記複数の近赤外線カメラが取得した光から前記2つの自発光マーカの座標位置を計測する手段と、
前記2つの自発光マーカの取付位置と前記先受け部材の軸芯位置間の距離及び前記2つの自発光マーカの取付位置と切削刃の中心位置間の距離が補正係数として入力され、該入力された補正係数の値と前記計測する手段で求められた前記2つの自発光マーカの座標位置の値が用いられて演算され、前記自発光マーカの座標位置を削岩機の軸芯位置及び切削刃の中心位置に補正する補正手段とを有し、
あらかじめ掘削データが表示された掘削計画図と前記座標認識された切削刃とをディスプレイ上に表示させ、切削刃による掘削作業が前記掘削計画図に沿って行える、
ことを特徴とし、
または、
トンネル外周面に、略アーチ状に先受けを形成すべく先受け部材での掘削と挿入を同時に行うと共に、挿入された先受け部材内に地山改良材の注入を行う掘削システムであって、
車両本体から揺動可能に突設され、円筒状をなし、外周面に複数の穴が設けられた切削刃つき先受け部材を軸方向に揺動させる削岩機と、該削岩機の前記揺動をガイドするガイドセルと、
該ガイドセルの長手方向で、前記切削刃の設置位置の近傍位置に間隔をあけて少なくとも3個取り付けられた自発光マーカと、
前記3個以上取り付けられた自発光マーカからの光を取得する複数の近赤外線カメラと、
前記複数の近赤外線カメラが取得した光から前記3個以上取り付けられた自発光マーカの座標位置を計測する手段と、
前記3個以上取り付けられた自発光マーカの取付位置と前記先受け部材の軸芯位置間の距離及び前記3個以上取り付けられた自発光マーカの取付位置と切削刃の中心位置間の距離が補正係数として入力され、該入力された補正係数の値と前記計測する手段で求められた前記3つ以上取り付けられた自発光マーカの座標位置の値が用いられて演算され、前記自発光マーカの座標位置を削岩機の軸芯位置及び切削刃の中心位置に補正する補正手段とを有し、
あらかじめ掘削データが表示された掘削計画図と前記座標認識された切削刃とをディスプレイ上に表示させ、切削刃による掘削作業が前記掘削計画図に沿って行える、
ことを特徴とし、
または、
トンネル外周面に、略アーチ状に先受けを形成すべく先受け部材での掘削と挿入を同時に行うと共に、挿入された先受け部材内に地山改良材の注入を行う掘削システムであって、
車両本体から揺動可能に突設され、円筒状をなし、外周面に複数の穴が設けられた切削刃つき先受け部材を軸方向に揺動させる削岩機と、該削岩機の前記揺動をガイドするガイドセルと、
該ガイドセルの長手方向で、前記切削刃の設置位置の近傍位置に間隔をあけて複数個取り付けられた点滅型の自発光マーカと、
前記点滅型の自発光からの点滅する光を取得する複数の近赤外線カメラと、
前記複数の近赤外線カメラが取得した点滅する光から前記複数個取り付けられた点滅型の自発光マーカの座標位置を計測する手段と、
前記複数取り付けられた点滅型の自発光マーカの取付位置と前記先受け部材の軸芯位置間の距離及び前記複数取り付けられた点滅型の自発光マーカの取付位置と切削刃の中心位置間の距離が補正係数として入力され、該入力された補正係数の値と前記計測する手段で求められた前記複数取り付けられた点滅型の自発光マーカの座標位置の値が用いられて演算され、前記点滅型の自発光マーカの座標位置を削岩機の軸芯位置及び切削刃の中心位置に補正する補正手段とを有し、
複数の点滅型の自発光マーカからの点滅する光は、異なる信号周期による点滅周期が与えられ、該信号周期の違いによりいずれのブームのガイドセルに取りつけられた点滅型の自発光マーカかが各々認識でき、
あらかじめ掘削データが表示された掘削計画図と前記座標認識された切削刃とをディスプレイ上に表示させ、切削刃による掘削作業が前記掘削計画図に沿って行える、
ことを特徴とし、
または、
前記点滅型の自発光マーカからの点滅する光は、増幅回路により光の輝度を増幅出来る、
ことを特徴とし、
または、
前記ガイドセルは、車両本体から複数本揺動可能に突設され、前記自発光マーカはそれぞれのガイドセルに取り付けられた、
ことを特徴とするものである。
The present invention
An excavation system for simultaneously excavating and inserting a pre-receiving member to form a substantially arch-shaped pre-receiving member on the outer peripheral surface of a tunnel, and for injecting a ground improvement material into the inserted pre-receiving member,
A rock drill that rocks in the axial direction a tip receiving member with a cutting edge that protrudes rockably from a vehicle body, has a cylindrical shape, and has a plurality of holes on its outer peripheral surface; a guide cell that guides the oscillation;
at least two self-luminous markers attached at intervals in the vicinity of the installation position of the cutting blade in the longitudinal direction of the guide cell;
a plurality of near-infrared cameras that acquire light from the self-luminous markers;
means for measuring coordinate positions of the two self-luminous markers from the light acquired by the plurality of near-infrared cameras;
The distance between the attachment positions of the two self-luminous markers and the axial center position of the pre-receiving member and the distance between the attachment positions of the two self-luminous markers and the center position of the cutting blade are input as correction coefficients. The values of the correction coefficient obtained and the values of the coordinate positions of the two self-luminous markers obtained by the measuring means are used for calculation, and the coordinate positions of the self-luminous markers are calculated based on the axial center position of the rock drill and the cutting blade. and a correction means for correcting to the center position of
An excavation plan on which excavation data is displayed in advance and the cutting blade whose coordinates are recognized are displayed on the display, and excavation work using the cutting blade can be performed along the excavation plan.
characterized by
or,
An excavation system for simultaneously excavating and inserting a pre-receiving member to form a substantially arch-shaped pre-receiving member on the outer peripheral surface of a tunnel, and for injecting a ground improvement material into the inserted pre-receiving member,
A rock drill that rocks in the axial direction a tip receiving member with a cutting edge that protrudes rockably from a vehicle body, has a cylindrical shape, and has a plurality of holes on its outer peripheral surface; a guide cell that guides the oscillation;
at least three self-luminous markers attached at intervals in the vicinity of the installation position of the cutting blade in the longitudinal direction of the guide cell;
a plurality of near-infrared cameras that acquire light from the three or more attached self-luminous markers;
means for measuring coordinate positions of the three or more attached self-luminous markers from light acquired by the plurality of near-infrared cameras;
The distance between the mounting positions of the three or more self-luminous markers and the axial center position of the pre-receiving member and the distance between the mounting positions of the three or more self-luminous markers and the center position of the cutting blade are corrected. is input as a coefficient, and is calculated using the input correction coefficient value and the coordinate position values of the three or more self-luminous markers attached by the measuring means, and the coordinates of the self-luminous marker are calculated. a correction means for correcting the position to the axial center position of the rock drill and the center position of the cutting blade,
An excavation plan on which excavation data is displayed in advance and the cutting blade whose coordinates are recognized are displayed on the display, and excavation work using the cutting blade can be performed along the excavation plan.
characterized by
or,
An excavation system for simultaneously excavating and inserting a pre-receiving member to form a substantially arch-shaped pre-receiving member on the outer peripheral surface of a tunnel, and for injecting a ground improvement material into the inserted pre-receiving member,
A rock drill that rocks in the axial direction a tip receiving member with a cutting edge that protrudes rockably from a vehicle body, has a cylindrical shape, and has a plurality of holes on its outer peripheral surface; a guide cell that guides the oscillation;
a plurality of blinking self-luminous markers attached at intervals near the installation position of the cutting blade in the longitudinal direction of the guide cell;
a plurality of near-infrared cameras that acquire blinking light from the blinking self-luminescence;
means for measuring coordinate positions of the plurality of attached flashing type self-luminous markers from the flashing lights acquired by the plurality of near-infrared cameras;
The distance between the mounting positions of the plurality of flashing type self-luminous markers and the axial center position of the pre-receiving member, and the distance between the mounting positions of the plurality of flashing type self-luminous markers and the center position of the cutting blade. is input as a correction coefficient, and the value of the input correction coefficient and the values of the coordinate positions of the self-luminous self-luminous markers attached to the plurality of flashing markers obtained by the measuring means are used to perform calculations. correction means for correcting the coordinate position of the self-luminous marker to the axial center position of the rock drill and the center position of the cutting blade,
The blinking light from the plurality of blinking self-luminous markers is given a blinking cycle according to a different signal cycle, and the difference in the signal cycle determines which boom's self-luminous marker is attached to the guide cell. recognizable,
An excavation plan on which excavation data is displayed in advance and the cutting blade whose coordinates are recognized are displayed on the display, and excavation work using the cutting blade can be performed along the excavation plan.
characterized by
or,
The brightness of the blinking light from the blinking self-luminous marker can be amplified by an amplifier circuit.
characterized by
or,
A plurality of the guide cells protrude from the vehicle body so as to be swingable, and the self-luminous markers are attached to the respective guide cells,
It is characterized by

本発明によれば、測量やマーキングの作業に必要以上に労力や時間を費やすことないため、極めて効率良く、かつ確実で高精度にAGF工法での長尺鋼管が打設できるとの効果を奏する。
すなわち、モーションキャプチャー技術を活用した掘削ナビゲーションシステムを使用し、極めて効率良く、かつ確実で高精度にてAGF工法での長尺鋼管を打設する技術を発明したのである。
According to the present invention, since it is not necessary to spend labor and time for surveying and marking work, it is possible to drive long steel pipes by the AGF construction method very efficiently, reliably and with high accuracy. .
In other words, using a drilling navigation system that utilizes motion capture technology, we have invented a technology for placing long steel pipes using the AGF method with extremely high efficiency, certainty, and high precision.

本発明によるドリルマシンの構成を説明する説明図である。It is an explanatory view explaining composition of a drill machine by the present invention. トンネル内に掘削する先受け部材の掘削位置、掘削の傾き、掘削の距離を正面図、側面図として表し説明する先受け部材打設計画図の説明図である。FIG. 4 is an explanatory drawing of a pre-receiving member hammering plan showing an excavation position of a pre-receiving member to be excavated in a tunnel, an excavation inclination, and an excavation distance in a front view and a side view. 図2の先受け部材打設計画図から先受け部材の打設位置の座標を算出する説明図である。FIG. 3 is an explanatory diagram for calculating the coordinates of the placement position of the pre-receiving member from the pre-receiving member striking design diagram of FIG. 2 ; ディスプレイ上に描画された先受け部材の打設位置を説明する説明図である。It is an explanatory view explaining the setting position of the pre-receiving member drawn on the display. ディスプレイ上に描画された先受け部材の打設位置を確認して先受け部材を掘削誘導する状態を説明する説明図(1)である。It is explanatory drawing (1) explaining the state which confirms the setting position of the pre-receiving member drawn on the display, and excavates and guides the pre-receiving member. ディスプレイ上に描画された先受け部材の打設位置を確認して先受け部材を掘削誘導する状態を説明する説明図(2)である。It is explanatory drawing (2) explaining the state which confirms the setting position of the pre-receiving member drawn on the display, and excavates and guides the pre-receiving member. ディスプレイ上に描画された先受け部材の打設位置を確認して先受け部材を掘削誘導する状態を説明する説明図(3)である。It is explanatory drawing (3) explaining the state which confirms the setting position of the pre-receiving member drawn on the display, and excavates and guides the pre-receiving member. ディスプレイ上に描画された先受け部材の打設位置を確認して先受け部材を掘削誘導する状態を説明する説明図(4)である。It is explanatory drawing (4) explaining the state which confirms the setting position of the pre-receiving member drawn on the display, and excavates and guides the pre-receiving member. ディスプレイ上に描画された先受け部材の打設位置を確認して先受け部材を掘削誘導する状態を説明する説明図(5)である。It is explanatory drawing (5) explaining the state which confirms the setting position of the pre-receiving member drawn on the display, and excavates and guides the pre-receiving member. ディスプレイ上に描画された先受け部材の打設位置を確認して先受け部材を掘削誘導する状態を説明する説明図(6)である。It is explanatory drawing (6) explaining the state which confirms the setting position of the pre-receiving member drawn on the display, and excavates and guides the pre-receiving member. PCの構成と通信状態を説明する説明図である。FIG. 3 is an explanatory diagram for explaining the configuration and communication state of a PC; 演算制御部の構成を説明する説明図である。FIG. 4 is an explanatory diagram for explaining the configuration of an arithmetic control unit; 自発光マーカ中心部と切削刃中心部までの距離をオフ設置距離として説明する説明図(1)である。FIG. 11 is an explanatory diagram (1) for explaining the distance between the center of the self-luminous marker and the center of the cutting blade as the off installation distance. 自発光マーカ中心部と切削刃中心部までの距離をオフ設置距離として説明する説明図(2)である。FIG. 11 is an explanatory diagram (2) for explaining the distance between the center of the self-luminous marker and the center of the cutting blade as the off installation distance. 自発光マーカ中心部と切削刃中心部までの距離をオフ設置距離として説明する説明図(3)である。Fig. 11 is an explanatory diagram (3) for explaining the distance between the center of the self-luminous marker and the center of the cutting blade as the off installation distance; 自発光マーカ中心部と切削刃中心部までの距離をオフ設置距離として説明する説明図(4)である。It is explanatory drawing (4) explaining the distance to a self-luminous marker center and a cutting blade center as an off installation distance. 自発光マーカ中心部と切削刃中心部までの距離をオフ設置距離として説明する説明図(5)である。It is explanatory drawing (5) explaining the distance to a self-luminous marker center part and a cutting blade center part as off installation distance. 自発光マーカ中心部と切削刃中心部までの距離をオフ設置距離として説明する説明図(6)である。It is explanatory drawing (6) explaining the distance to a self-luminous marker center and a cutting blade center as off installation distance. PCとサーバコンピュータとの通信状態を説明する説明図である。FIG. 4 is an explanatory diagram for explaining a communication state between a PC and a server computer;

山岳トンネル工事などで使用されるAGF工法(長尺鋼管先受け工法)は、長尺の先受けを、先受け鋼管打設と注入材の注入により構築するもので、現場で通常使用されているドリルマシン1を利用して施工を行っている。
AGF工法(長尺鋼管先受け工法)は、地質に応じた掘削システムが選定できるため適用地質の範囲が広く、効率の比較的良いとされる施工が可能となっている。また、地質や注入目的に応じた注入材・注入方式が選定できるとのメリットもある。
The AGF method (long steel pipe pre-receiving method), which is used in mountain tunnel construction, etc., constructs a long pre-receiving by placing steel pipes in advance and injecting injection materials, and is usually used at the site. A drill machine 1 is used for construction.
The AGF construction method (long steel pipe pre-receiving method) can be applied to a wide range of geological features because the excavation system can be selected according to the geological feature, and it is possible to perform construction that is considered to be relatively efficient. Another advantage is that the injection material and injection method can be selected according to the geology and purpose of injection.

本工法では、通常山岳トンネルで用いるドリルマシン1を用いて、比較的小口径の先受け鋼管につき先端に専用の切削ビットをつけて用い、二重管方式で掘削とパイプ挿入を同時に行うものである。
その後、先受け鋼管の外周面にあけた複数の孔より、地山側に所定の圧力で注入材を注入し、掘削線の外周部に鋼管が入った限定地山改良ゾーンを形成する。
In this construction method, a drill machine 1, which is normally used in mountain tunnels, is used to attach a special cutting bit to the tip of a comparatively small-diameter pre-receiving steel pipe. be.
After that, grouting material is injected at a predetermined pressure to the ground side through a plurality of holes drilled in the outer peripheral surface of the pre-received steel pipe to form a limited ground improvement zone in which the steel pipe enters the outer peripheral portion of the excavation line.

この切羽前方に構築された地山改良ゾーンにより、地山の先行変位を抑制し、さらに地山の緩み防止と施工の安全が図られるのである。
すなわち、山岳トンネル工事では、切羽(掘削面)天井部の岩盤が不安定な場合に、AGF工法を実施することでトンネルの前方および上部からの崩落を防止できる。
The ground improvement zone constructed in front of the face suppresses the preceding displacement of the ground, further prevents the loosening of the ground, and ensures the safety of construction work.
That is, in mountain tunnel construction, when the bedrock on the ceiling of the face (excavation surface) is unstable, the AGF construction method can prevent collapse from the front and top of the tunnel.

ここで、標準的なAGF工法では、前述の如く、例えば切羽頂部120°の範囲に、先受け鋼管をトンネルの掘削作業に先行して打ち込み、岩盤を補強する。そして、1ヵ所につき、長さ約3mの先受け鋼管を例えば4本つないで約12mの長さにして先受けを構成し、これを打ち込む。 Here, in the standard AGF construction method, as described above, a pre-receiving steel pipe is driven into the range of, for example, 120° of the face top prior to excavation of the tunnel to reinforce the bedrock. Then, for example, four pre-receiving steel pipes having a length of about 3 m are connected to form a pre-receiving steel pipe having a length of about 12 m, and this is driven in.

しかるに先受け鋼管と注入材によって地山を先行補強するのであり、トンネル断面を拡幅しないで施工できる。また、先受け鋼管打設はトンネル施工で使用するドリルマシン1を使用することが出来、鋼管打設後には、打設した円筒状をなす鋼管の開口からウレタン系やセメント系の注入材を注入し、該注入材は前記鋼管外周面に設けられた複数の穴から地山側に流れ、もってトンネル前方地山が補強されるのである。 However, since the ground is reinforced in advance by pre-loaded steel pipes and injection materials, construction can be performed without widening the tunnel cross section. In addition, it is possible to use the drill machine 1 used in tunnel construction to place the pre-received steel pipe. Then, the injection material flows from the plurality of holes provided on the outer peripheral surface of the steel pipe to the natural ground side, thereby reinforcing the natural ground ahead of the tunnel.

図1に本発明の長尺鋼管先受け工法における先受け鋼管打設位置誘導システムに使用されるドリルマシン1の構成を示す。
該ドリルマシン1は、車両本体2と、この車両本体2の前方から突設されたブーム3と該ブーム3に接続されたガイドセル4とその先端から突出揺動するロッド26と、該ロッド26を突出揺動させる削岩機6を有して構成されている。
FIG. 1 shows the configuration of a drill machine 1 used in a pre-receiving steel pipe placing position guiding system in the long steel pipe pre-receiving method of the present invention.
The drill machine 1 includes a vehicle body 2, a boom 3 projecting from the front of the vehicle body 2, a guide cell 4 connected to the boom 3, a rod 26 protruding and swinging from the tip of the guide cell 4, and the rod 26. It is configured to have a rock drill 6 that protrudes and swings.

そして、ロッド26の先端には切削刃5が取り付けられた円筒状の鋼管で構成された先受け部材27が接続されることとなる。前記先受け部材27の1本の長さは約3m程度であり、この先受け部材27を4本繋げて12mの長さの先受け部材27が敷設されるものとなる。図1では先受け部材27を4本繋げて12mの長さにした先受け部材27が描画されている。 A tip receiving member 27 made of a cylindrical steel pipe to which the cutting blade 5 is attached is connected to the tip of the rod 26 . The length of one of the pre-receiving members 27 is approximately 3 m, and four pre-receiving members 27 are connected to form a pre-receiving member 27 having a length of 12 m. In FIG. 1, the front receiving member 27 having a length of 12 m by connecting four of the front receiving members 27 is drawn.

ここで、ブーム3は、車両本体2の前方から揺動可能にして動作できるよう取り付けられている。すなわち、ブーム3は、上下、左右など広角度に自在に揺動できる様油圧シリンダなどの揺動部材が用いられて構成されている。そして、ブーム3の先端側に接続された直線状のガイドセル4についても前記ブーム3の揺動に伴って、またガイドセル4自体も広角に揺動するよう油圧シリンダなどの揺動部材が用いられて構成されている。 Here, the boom 3 is attached so as to be swingable and operable from the front of the vehicle body 2 . That is, the boom 3 is configured using a swinging member such as a hydraulic cylinder so that it can swing freely over a wide angle such as up and down, left and right. A swinging member such as a hydraulic cylinder is used to swing the linear guide cell 4 connected to the tip of the boom 3 with the swing of the boom 3 and to swing the guide cell 4 itself over a wide angle. configured.

該ガイドセル4は、先端に切削刃5を備えた直線円筒管状の先受け部材27を取り付けたロッド26の前後方向の突出揺動をガイドするための部材であり、該ガイドセル4の先端側で先受け部材27の先端に取り付けられた例えばビット状をなす切削刃5が突出揺動してトンネル内周面を掘削し前記先受け部材27を打設するものとなる。 The guide cell 4 is a member for guiding the protruding swing in the front-rear direction of a rod 26 to which a rectilinear cylindrical tube-like receiving member 27 having a cutting edge 5 at the tip is attached. 3, the bit-shaped cutting edge 5 attached to the tip of the tip receiving member 27 protrudes and swings to excavate the inner peripheral surface of the tunnel and drive the tip receiving member 27 therein.

すなわち、稼働制御された切削刃5、先受け部材27、ロッド26などによりトンネル地山の内周面に対し、所定の位置、所定の角度、かつ所定の深さで確実、正確に先受け部材27の打設が行えるよう構成されているのである。 That is, the cutting edge 5, the pre-receiving member 27, the rod 26, etc., whose operation is controlled, reliably and accurately cut the pre-receiving member 27 at a predetermined position, at a predetermined angle, and at a predetermined depth with respect to the inner peripheral surface of the tunnel ground. It is configured so that it can be placed.

ところで、ブーム3については、車両本体2に複数本取り付けられている場合もあり、その場合、各ブーム3の各先端側において各々ガイドセル4が取り付けられ、該各々のガイドセル4についても、それらガイドセル4の先端側にビット状をなす切削刃5が取り付けられた先受け部材27及びロッド26が突出揺動して掘削し、トンネル地山の内周内に打設出来るよう取り付けられている。 By the way, there are cases where a plurality of booms 3 are attached to the vehicle body 2. In that case, each guide cell 4 is attached to each tip side of each boom 3. A tip receiving member 27 having a bit-shaped cutting edge 5 attached to the tip side of the guide cell 4 and a rod 26 are attached so as to protrude, swing, excavate, and drive into the inner circumference of the tunnel ground.

なお、図14、図15、図17、図18から理解されるように、ガイドセル4の例えば先端側側面からは自発光マーカ9が複数個突設され、該複数個の自発光マーカ9とこの自発光マーカ9から発光された光を認識する複数個の近赤外線カメラ10により後述するモーションキャプチャ技術を応用したソフトウェアの測定データ、すなわち前記複数個の自発光マーカ9の座標位置が計測されるものとなっている。 14, 15, 17, and 18, a plurality of self-luminous markers 9 are projected from, for example, the distal end side surface of the guide cell 4, and the plurality of self-luminous markers 9 and A plurality of near-infrared cameras 10 that recognize the light emitted from the self-luminous markers 9 measure the measurement data of the software applying the motion capture technology described later, that is, the coordinate positions of the plurality of self-luminous markers 9. It is a thing.

そしてこの測定データを用いてガイドセル4を通過する先受け部材27、ロッド26や切削刃5の軸方向中心部につき、ガイドセル4の長手方向に間隔をおいて突設された自発光マーカ9について、その位置(座標)を認識すべくPC11の演算制御部12で演算することで、ガイドセル4のリアルタイムでの可動範囲、すなわち先受け部材27先端に有する切削刃5が掘削する位置や掘削する深さ及び掘削の向きなどの情報が取得出来るように構成されるものとなっている(図11、図12参照)。 Then, using this measurement data, self-luminous markers 9 projecting at intervals in the longitudinal direction of the guide cell 4 from the axial center of the pre-receiving member 27, rod 26 and cutting blade 5 passing through the guide cell 4 are detected. , the real-time movable range of the guide cell 4, that is, the position where the cutting blade 5 provided at the tip of the pre-receiving member 27 excavates and the excavation It is constructed so that information such as the depth of the excavation and the direction of excavation can be obtained (see FIGS. 11 and 12).

モーションキャプチャ用の近赤外線カメラ10は、ドリルマシン1の例えば、操縦席上部に間隔をあけて複数個設置されており、ガイドセル4先端の稼働範囲を撮影範囲として撮影できるものとなっている。 A plurality of near-infrared cameras 10 for motion capture are installed at intervals, for example, above the operator's seat of the drill machine 1, and are capable of photographing the operating range of the tip of the guide cell 4 as a photographing range.

ここで、前記近赤外線カメラ10の設置位置及び設置画角の設定は、なるべく最小限のカメラ台数でガイドセル4の稼働を捉えるべく、例えば偶数台あるいは奇数台を組み合わせてそれを交差させる向きであるいは交差させない向きで設置することなどが考えられる。
そして、近赤外線カメラ10は、自発光マーカ9が発光する近赤外線光を捉えるものとなる。
Here, the installation position and installation angle of view of the near-infrared camera 10 are set in such a manner that the operation of the guide cell 4 can be captured with a minimum number of cameras, for example, an even number or an odd number of cameras are combined and intersected. Alternatively, it is conceivable to install them in a direction in which they do not cross each other.
The near-infrared camera 10 captures the near-infrared light emitted by the self-luminous marker 9 .

すなわち、近赤外線カメラ10は、前記自発光マーカ9が発光する近赤外線光を捉え、これにより、例えば、ガイドセル4から突設された複数の自発光マーカ9の座標を認識することが出来、該座標認識のデータをPC11に送出し、PC11では、前記演算制御部12において、前記モーションキャプチャ技術を応用したソフトウェアを用いて認識した自発光マーカ9の位置から相対的にガイドセル4先端にある先受け部材27に取り付けられた切削刃5の座標位置などを計算していくのである。 That is, the near-infrared camera 10 captures the near-infrared light emitted by the self-luminous marker 9, thereby, for example, the coordinates of a plurality of self-luminous markers 9 projecting from the guide cell 4 can be recognized. The coordinate recognition data is sent to the PC 11, and in the PC 11, the position of the self-luminous marker 9 recognized by the software applying the motion capture technology in the arithmetic control unit 12 is relatively at the tip of the guide cell 4. The coordinate position of the cutting blade 5 attached to the pre-receiving member 27 is calculated.

ここで、切削刃5自体に自発光マーカ9を取り付けることが出来れば、確実に切削刃5の先端位置などの座標認識が出来る。しかし切削刃5自体に自発光マーカ9を取り付けることは出来ない。掘削作業や先受け部材27の打設作業の邪魔になってしまい、また掘削作業や先受け部材27の打設作業により破損するからである。 Here, if the self-luminous marker 9 can be attached to the cutting blade 5 itself, the coordinates such as the tip position of the cutting blade 5 can be reliably recognized. However, the self-luminous marker 9 cannot be attached to the cutting blade 5 itself. This is because it interferes with the excavation work and the work of placing the pre-receiving member 27 and is damaged during the excavation work and the work of placing the pre-receiving member 27 .

そこで、本発明では、前述したように、切削刃5の近傍位置、すなわちガイドセル4の側面などに複数個の自発光マーカ9を設置し、切削刃5との距離をいわゆるオフセット補正できるようにして、切削刃5の座標位置を認識するものとしている。詳細は後述する。 Therefore, in the present invention, as described above, a plurality of self-luminous markers 9 are installed near the cutting edge 5, that is, on the side surface of the guide cell 4, so that the distance from the cutting edge 5 can be offset. , the coordinate position of the cutting blade 5 is recognized. Details will be described later.

本発明によるトンネル内周面への先受け部材27の打設作業につき説明する。
図2に示す様なトンネル内周面における先受け部材27の打設位置を示した先受け部材打設計画図などの打設計画図データを予め設定して用意しておく。図2は先受け部材27の打設計画位置をトンネルの正面から見た正面図と側面図であり、例えばCADなどで描画形成した先受け部材打設計画図である。そして、前記図2の先受け部材打設計画図からロックボルト座標位置を算出していく。すなわち、先受け部材打設計画図(例えばCAD図)からY座標、Z座標、のみ先離れ、表示角度を算出していく。
The operation of placing the pre-receiving member 27 on the inner peripheral surface of the tunnel according to the present invention will be described.
Striking plan data such as a pre-receiving member striking plan showing the placement position of the pre-receiving member 27 on the inner peripheral surface of the tunnel as shown in FIG. 2 is preset and prepared. 2A and 2B are a front view and a side view of the design position of the pre-receiving member 27 viewed from the front of the tunnel, which is a design drawing of the pre-receiving member 27 drawn and formed, for example, by CAD. Then, the coordinate positions of the lock bolts are calculated from the plan for hammering the pre-receiving member shown in FIG. That is, only the Y coordinate and the Z coordinate are separated from the design drawing (for example, CAD drawing) of the previous receiving member, and the display angle is calculated.

すると、図3に示す様に(1)で示された先受け部材27の座標位置は、原点14の位置からY座標は-5205mm、Z座標は3450mmと算出され、のみ先離れは、2113mm、表示角度は-132°と算出される。また、(2)で示された先受け部材27の座標位置は、原点14の位置からY座標は3446mm、Z座標は4841mm、のみ先離れは、2113mm、表示角度は151°と算出される。 Then, as shown in FIG. 3, the coordinate position of the front receiving member 27 indicated by (1) is calculated from the position of the origin 14 as -5205 mm for the Y coordinate and 3450 mm for the Z coordinate, and the tip separation is 2113 mm. The display angle is calculated as -132°. Further, the coordinate position of the receiving member 27 indicated by (2) is calculated from the position of the origin 14 with a Y coordinate of 3446 mm, a Z coordinate of 4841 mm, a tip separation of 2113 mm, and a display angle of 151°.

なお、のみ先とは、トンネル地山の先端部にあたる掘削刃5の部分をいい、のみ先離れとは、掘削開始位置から掘削目標位置までの掘削刃5の離れ位置を、正面からみて2次元平面上で表した数値をいう。すなわち、図3において、(1)の先受け部材27につき、2113mmと記載されている数値がのみ先離れの数値となる。換言すれば掘削する先受け部材27の掘削深さを示しているといえる。 The tip refers to the portion of the excavation blade 5 corresponding to the tip of the tunnel ground, and the tip separation refers to the separation position of the excavation blade 5 from the excavation start position to the excavation target position in two dimensions when viewed from the front. A numerical value expressed on a plane. That is, in FIG. 3, only the numerical value described as 2113 mm for the receiving member 27 of (1) is the numerical value of the tip separation. In other words, it can be said that it indicates the excavation depth of the pre-receiving member 27 to be excavated.

そして、上記算出された数値を基に例えば、CSVファイルを作成し、このCSVファイルのデータを描画アプリを用いてディスプレイ15上に描画された図に上書きする操作を行う。これにより前記作業用のディスプレイ15上に先受け部材27の打設位置が反映されるものとなる。 Then, for example, a CSV file is created based on the calculated numerical values, and the drawing application is used to overwrite the drawing drawn on the display 15 with the data of this CSV file. As a result, the placement position of the pre-receiving member 27 is reflected on the display 15 for work.

図4は、ディスプレイ15上に描画された先受け部材27の打設位置を示したものであり、画面は例えば4分割されて表示されている。すなわち、左下の画面にはトンネルの正面図が描画されており、右下にはトンエルの正面図の拡大図、そして、左上の画面にはトンネルを上から見た平面図の拡大図、右上の画面はその側面図が示されて構成されている。 FIG. 4 shows the placing position of the pre-receiving member 27 drawn on the display 15, and the screen is divided into four for example. In other words, the bottom left screen shows the front view of the tunnel, the bottom right is an enlarged view of the front view of the tunnel, and the top left screen is an enlarged plan view of the tunnel seen from above. The screen is configured with its side view shown.

図4において丸部分16は掘削を開始する位置を示している。そして、そこから延びる直線部分は先受け部材27の掘削方向の傾きと掘削深さを示したものである。 In FIG. 4, circled portion 16 indicates the position from which excavation is started. A linear portion extending therefrom indicates the inclination of the pre-receiving member 27 in the excavation direction and the excavation depth.

そして、作業用のディスプレイ15上に表示された先受け部材27の打設計画図上においては、リアルタイムに稼働するガイドセル4先端に有する先受け部材27の切削刃5の実際の稼働位置をあわせて表示できる様構成されている。 On the cutting plan for the pre-receiving member 27 displayed on the work display 15, the actual operating position of the cutting edge 5 of the pre-receiving member 27 at the tip of the guide cell 4 operating in real time is also displayed. configured to be displayed.

よって、この表示をディスプレイ15上で確認し、操作者は、ガイドセル4を稼働させ、切削刃5を有する先受け部材27を操作して先受け部材27の打設作業を行っていくのである。 Therefore, after confirming this display on the display 15, the operator activates the guide cell 4 and operates the pre-receiving member 27 having the cutting edge 5 to perform the work of placing the pre-receiving member 27. .

なお、先受け部材27の打設掘削位置誘導についてであるが、例えば山岳トンネルで用いられている先受け部材27は略円筒状をなす略3mの長さからなる鋼管を繋ぎ合わせられるよう形成されており、トンネルの形状や地山の強度によって前記繋ぎ合わせる長さが使い分けられている。通常は前記鋼管を繋ぎ合わせて例えば12mの長さの先受け部材27が打設される。
ここで、先受け部材27での掘削をドリルマシン1で行い、掘削すると同時に先受け部材27を挿入打設していく。
As for the position guidance for placing and excavating the pre-receiving member 27, the pre-receiving member 27 used in, for example, a mountain tunnel is formed so as to be able to join steel pipes of approximately 3 m in length forming a substantially cylindrical shape. The length to be joined is selected depending on the shape of the tunnel and the strength of the ground. Usually, the steel pipes are joined together to form a pre-receiving member 27 having a length of, for example, 12 m.
Here, the drilling with the pre-receiving member 27 is performed by the drill machine 1, and the pre-receiving member 27 is inserted and driven simultaneously with the excavation.

本発明では、前述のごとく先受け部材27の打設位置は予め計画されて先受け部材打設計画図が作成されており、この先受け部材打設計画図を使用して正しい位置や向き(角度)に打設することによって、より先受け部材27の効果が発揮されることとなる。
したがって、ドリルマシン1で行う先受け部材27の打設位置と掘削方向及び掘削深さは正確確実なのである。
In the present invention, as described above, the placement position of the pre-receiving member 27 is planned in advance and the pre-receiving member striking plan is created. By driving, the effect of the pre-receiving member 27 is exhibited more.
Therefore, the placement position, excavation direction and excavation depth of the pre-receiving member 27 performed by the drill machine 1 are accurate and reliable.

本発明による先受け部材27の打設作業の手順は図5乃至図10に示すとおりである。
目標とする打設位置にガイドセル4を合わせる作業を行う。図5、図6のように正面図で打設開始位置と角度を合わせる。
5 to 10 show the procedure for placing the pre-receiving member 27 according to the present invention.
Work is performed to align the guide cell 4 with the target placement position. As shown in FIGS. 5 and 6, match the placement start position and angle in the front view.

図5乃至図10は白黒の図で示されているが、実際はカラーで表示されており、例えばディスプレイ15上では、先受け部材27の掘削計画位置(図6において矢印の先にある直線)は青色で示され、ガイドセル4の実際の方向(矢印の基端側にある直線)は緑色で示される如きである。すなわち、色分け表示することでディスプレイ15上で容易に認識でき、掘削作業がしやすいように構成されている。 5 to 10 are shown in black and white, but they are actually displayed in color. Shown in blue, the actual direction of the guide cell 4 (the straight line proximal to the arrow) is as shown in green. That is, the color-coded display makes it easy to recognize on the display 15 and facilitates the excavation work.

そして、図6、図8、図9、図10に示すように、ディスプレイ15上の図を確認し、その後、所定の深さまでガイドセル4を押し込んで掘削、挿入打設作業を行うのである。 Then, as shown in FIGS. 6, 8, 9, and 10, after confirming the diagrams on the display 15, the guide cell 4 is pushed in to a predetermined depth for excavation and insertion and driving.

しかるに、ガイドセル4の位置と姿勢を掘削計画図における位置と姿勢に合わせて打設作業を行うのであるが、本発明では、図5乃至図10に示すように、この打設位置(掘削すべき位置と傾きと掘削深さ)を打設計画図上に重ねて描画出来ると共に、前記打設位置(掘削すべき位置と掘削深さ)を平面的に描画して表せることができるのである。
すなわち、先受け部材27の掘削深さの描画方法は、直線の長さによって表すこととし、この直線の長さが掘削深さの長さとなっているのである。
However, the placement work is carried out by adjusting the position and posture of the guide cell 4 to the position and posture in the excavation plan drawing. Position, inclination, and excavation depth) can be superimposed and drawn on the driving plan drawing, and the driving position (position to be excavated and excavation depth) can be represented by drawing two-dimensionally.
That is, the drawing method of the excavation depth of the pre-receiving member 27 is represented by the length of a straight line, and the length of this straight line is the length of the excavation depth.

次に、自発光マーカ9の構成につき説明する。
本発明では自ら光る自発光マーカ9を用い、ガイドセル4先端側にある先受け部材27先端の切削刃5の位置の常時検出ができる構成としたものである。
Next, the configuration of the self-luminous marker 9 will be described.
In the present invention, a self-luminous marker 9 that emits light by itself is used so that the position of the cutting edge 5 at the tip of the tip receiving member 27 on the tip side of the guide cell 4 can always be detected.

トンネル掘削時のトンネル内環境につき、現場によってはトンネル内部空間内に水滴や土埃などが多く浮遊していることがある。その場合、反射型のマーカを用いると、発光体より照射された光が反射型マーカに到達するまでに乱反射が起こる。すると、前記乱反射光により近赤外線カメラ10はマーカ位置を正確に捉えることが出来なくなる場合がある。
また反射型マーカの反射光は、近赤外線カメラ10で捉える時点で、輝度が低下して充分な精度が得られない。
そこで、本件発明者らはマーカ自体が近赤外光を発する自発光マーカ9を発明したものである。
Regarding the tunnel environment during tunnel excavation, depending on the site, many water droplets and dirt may be floating in the tunnel interior space. In that case, if a reflective marker is used, irregular reflection occurs before the light emitted from the light emitter reaches the reflective marker. Then, the near-infrared camera 10 may not be able to accurately capture the marker position due to the irregularly reflected light.
In addition, when the near-infrared camera 10 captures the reflected light from the reflective marker, the luminance is lowered and sufficient accuracy cannot be obtained.
Therefore, the inventors have invented a self-luminous marker 9 in which the marker itself emits near-infrared light.

本発明での自発光マーカ9は、反射型と比べ光の経路が半分で済むため、輝度の低下を抑えられる。特に、空間内に水滴などが存在して乱反射が起こる場合、近赤外線カメラ10にはマーカが中心にぼやけて見えるため、半径が少し大きく検出されるが、依然マーカ中心位置を正確に検出することが可能なのである。なお、自発光マーカ9は取付位置付近に電源(例えば、充電式モバイルバッテリを使用する)があることが必要とされる。 The self-luminous marker 9 according to the present invention requires only half the path of light compared to a reflective marker, so that the decrease in brightness can be suppressed. In particular, when irregular reflection occurs due to the presence of water droplets in the space, the near-infrared camera 10 sees the marker as blurred in the center, so the detected radius is slightly larger, but the center position of the marker can still be detected accurately. is possible. It should be noted that the self-luminous marker 9 is required to have a power supply (for example, using a rechargeable mobile battery) near the mounting position.

従って、自発光マーカ9の近傍位置には、バッテリー17などが納められたベースステーション18が設けられる。そして、自発光マーカ9とバッテリー17とは例えば有線で接続される(図19参照)。 Accordingly, a base station 18 containing a battery 17 and the like is provided near the self-luminous marker 9 . The self-luminous marker 9 and the battery 17 are connected by wire, for example (see FIG. 19).

トンネル内周面への先受け部材27の掘削作業に際しては、前述した様にこの自発光マーカ9を切削刃5近傍位置のガイドセル4の2カ所に間隔をあけて取り付ける(図14、図15など参照)。これにより確実な掘削作業が行えることとなる。 When excavating the pre-receiving member 27 on the inner peripheral surface of the tunnel, as described above, the self-luminous markers 9 are attached to the guide cell 4 near the cutting edge 5 with a space therebetween (FIGS. 14 and 15). etc.). As a result, reliable excavation work can be performed.

すなわち、掘削作業時において、複数の近赤外線カメラ10によって少なくとも2カ所に取り付けられた自発光マーカ9の光を受光し、この受光した自発光マーカ9の相対位置からPC11にて前記自発光マーカ9の座標位置2点を計算する。
モーションキャプチャ技術には複数の手法が存在するが、本発明のモーションキャプチャ技術は光学式モーションキャプチャ技術である。
That is, during excavation work, light from the self-luminous markers 9 attached at least two locations is received by the plurality of near-infrared cameras 10, and the self-luminous markers 9 are detected by the PC 11 from the relative positions of the self-luminous markers 9 that have received the light. Calculate the two coordinate positions of .
Although there are multiple methods of motion capture technology, the motion capture technology of the present invention is an optical motion capture technology.

この光学式キャプチャ技術の基本的な仕組みとしては、対象物(ここでは切削刃5近傍位置のガイドセル4上)に自発光マーカ9につき間隔をあけて2カ所に設置し、前記自発光マーカ9により、例えば目に見えない近赤外線光(波長850nm程度)を発光させ、該光を複数の近赤外線カメラ10により撮影するものである。 As a basic mechanism of this optical capture technology, a self-luminous marker 9 is placed on the target (here, on the guide cell 4 near the cutting blade 5) at two locations with an interval therebetween, and the self-luminous marker 9 , for example, invisible near-infrared light (wavelength of about 850 nm) is emitted, and the light is photographed by a plurality of near-infrared cameras 10 .

なお、前記2カ所に設置する自発光マーカ9は、削岩機6に取り付けられたロッド26及び先受け部材27先端の切削刃5の軸方向中心軸線と、なるべく近接する位置するよう設置するものとする。後述する回転誤差があっても、その影響を少なくすることが求められるからである。 The self-luminous markers 9 installed at the two locations are installed so as to be as close as possible to the axial center axis of the cutting blade 5 at the tip of the rod 26 and the tip of the tip receiving member 27 attached to the rock drill 6. and This is because even if there is a rotation error, which will be described later, it is required to reduce its influence.

上記のように2つの自発光マーカ9を設置すれば、削岩機6及び切削刃5、特に切削刃5の先端の座標位置を計測することが出来る。なお、前記したように自発光マーカ9の取付位置と切削刃5の軸方向中心線との距離が離れているが、該距離の長さをあらかじめ認識していわゆるオフセット補正するものとしてある。 By installing two self-luminous markers 9 as described above, it is possible to measure the coordinate positions of the rock drilling machine 6 and the cutting blade 5 , especially the tip of the cutting blade 5 . As described above, the distance between the attachment position of the self-luminous marker 9 and the axial center line of the cutting blade 5 is long, but the length of the distance is recognized in advance and the so-called offset correction is performed.

前記近赤外線カメラ10にて取得した画像はデータとしてPC11に転送され、該画像データはソフトウェア処理により、背景とマーカ光の輝度差を利用してマーカ部分の画像のみが抽出される。
そして、PC11に取り込まれた画像において、例えば、画面上の左上隅を原点として、各自発光マーカ9の重心座標をピクセル単位で各々測定する。これにより各々の自発光マーカ9の座標位置がほぼ認識できる。
The image acquired by the near-infrared camera 10 is transferred as data to the PC 11, and only the image of the marker portion is extracted by software processing using the luminance difference between the background and the marker light.
Then, in the image captured by the PC 11, for example, with the upper left corner of the screen as the origin, the coordinates of the center of gravity of each light-emitting marker 9 are measured in units of pixels. As a result, the coordinate position of each self-luminous marker 9 can be almost recognized.

すなわち、複数台の近赤外線カメラ10にて自発光マーカ9からの光を同時撮影することで、ステレオビジョンの要領で視差を基に深さ方向の距離が認識され、深さ方向の位置も計算することができる。
各々の自発光マーカ9の座標位置に前述のオフセット補正をすることにより、切削刃5の先端位置の座標位置が認識できるものとなる。
That is, by simultaneously photographing the light from the self-luminous marker 9 with a plurality of near-infrared cameras 10, the distance in the depth direction is recognized based on the parallax in the manner of stereo vision, and the position in the depth direction is also calculated. can do.
By performing the aforementioned offset correction on the coordinate position of each self-luminous marker 9, the coordinate position of the tip position of the cutting blade 5 can be recognized.

ここで、PC11は、送信部20、受信部21、演算制御部12、記憶部22、入力部23を有して構成されている。さらに、ディスプレイ15と接続されており、PC11の情報がディスプレイ15上に表示できるものとなっている(図11参照)。
さらに、PC11はインターネット回線などの通信回線網23を介して外部のサーバコンピュータ24などと接続されており、該サーバコンピュータ24は、PC11の情報を受信し、該情報を記憶、保存できるものとなっている。
尚、演算制御部12は、掘削計画図読み込み部31、掘削計画図形成部32、掘削位置等読み込み部33、掘削位置等描画部34を有している(図12参照)。
Here, the PC 11 includes a transmission section 20 , a reception section 21 , an arithmetic control section 12 , a storage section 22 and an input section 23 . Furthermore, it is connected to a display 15 so that information of the PC 11 can be displayed on the display 15 (see FIG. 11).
Furthermore, the PC 11 is connected to an external server computer 24 or the like via a communication network 23 such as the Internet line, and the server computer 24 receives information from the PC 11 and can store and save the information. ing.
The arithmetic control unit 12 has an excavation plan drawing reading unit 31, an excavation plan drawing forming unit 32, an excavation position reading unit 33, and an excavation position drawing unit 34 (see FIG. 12).

よって、例えば、前記サーバコンピュータ24から掘削計画図のデータをPC11が受信すると、演算制御部12の掘削計画図読み込み部31で読み込み、掘削計画図形成部32で平面図が形成されて、ディスプレイ15に表示される。 Therefore, for example, when the PC 11 receives the excavation plan drawing data from the server computer 24, the excavation plan drawing reading unit 31 of the arithmetic control unit 12 reads the excavation plan drawing data, and the excavation plan drawing forming unit 32 forms a plan view, which is displayed on the display 15. to be displayed.

そして、操作者は、ガイドセル4を稼働操作し、ディスプレイ15に表示された掘削位置等に基づいて掘削していく。すると、その掘削作業を掘削位置等読み込み部33がリアルタイムに読み取って、掘削位置等描画部34によって前記掘削計画図上に異なる色で描画し表示していくのである(図5乃至図10参照)。 Then, the operator operates the guide cell 4 to excavate based on the excavation position and the like displayed on the display 15 . Then, the excavation work is read by the excavation position reading unit 33 in real time, and the excavation position drawing unit 34 draws and displays it in different colors on the excavation plan drawing (see FIGS. 5 to 10). .

そして、これらのデータはリアルタイムに記憶部22に送出され、記憶部22に保存される。また、保存されたデータは通信回線網25を介してサーバコンピュータ24へ送信され、そこで保存されると共に、記録として残すことが出来る。 These data are sent to the storage unit 22 in real time and stored in the storage unit 22 . In addition, the saved data is transmitted to the server computer 24 via the communication network 25, where it is saved and can be left as a record.

ここで、本発明において自発光マーカ9を用いる手法は、ガイドセル4の長手方向に間隔をあけて2カ所に設置する場合につき説明した。
しかしながら、2カ所の設置であると、切削刃5が2つの自発光マーカ9の中心を結ぶ延長線を回転軸として回転したときの切削刃5の座標位置認識のずれを解決できない。
Here, the method of using the self-luminous markers 9 in the present invention has been described for the case where the self-luminous markers 9 are installed at two locations with an interval in the longitudinal direction of the guide cell 4 .
However, if they are installed at two locations, it is not possible to solve the problem of misrecognition of the coordinate position of the cutting blade 5 when the cutting blade 5 rotates about the extension line connecting the centers of the two self-luminous markers 9 as the rotation axis.

自発光マーカ9は切削刃5の軸方向中心線上に設置されたものではない。逆に、既に述べたように自発光マーカ9は切削刃5の軸方向中心線上に決して設置出来ない。切削刃5の稼働の邪魔になるからであり、仮に設置したとしても稼働作業により破壊されてしまうからである。 The self-luminous marker 9 is not placed on the axial centerline of the cutting blade 5 . Conversely, the self-luminous marker 9 can never be placed on the axial centerline of the cutting blade 5 as already described. This is because it interferes with the operation of the cutting blade 5, and even if it were installed, it would be destroyed during the operation.

よって、自発光マーカ9の実際の設置位置から切削刃5の軸方向中心線までの距離を補正係数としてあらかじめオフセット認識して計測するのである。この自発光マーカ9の実際の設置位置から切削刃5の軸方向中心線までの距離を補正係数としての計測は、前記オフセット補正係数、すなわち自発光マーカ9の実際の設置位置から切削刃5の軸方向中心線までの距離データが演算制御部12に入力されて行われる(図13乃至図18の「オフセット距離」を参照)。 Therefore, the distance from the actual installation position of the self-luminous marker 9 to the center line of the cutting blade 5 in the axial direction is used as a correction coefficient, and the offset is previously recognized and measured. Measurement using the distance from the actual installation position of the self-luminous marker 9 to the axial centerline of the cutting blade 5 as a correction factor is the offset correction coefficient, that is, the distance from the actual installation position of the self-luminous marker 9 to the cutting blade 5 Distance data to the center line in the axial direction is input to the arithmetic control unit 12 (see "offset distance" in FIGS. 13 to 18).

ところが、自発光マーカ9の2カ所の設置であると、前記自発光マーカ9の延長線上を回転軸として前記オフセット補正の距離を半径にした円周上のいずれの位置に切削刃5が位置するか認識できずに切削刃5の位置認識にずれが生じてしまうのである。 However, if the self-luminous markers 9 are installed at two locations, the cutting edge 5 can be located at any position on the circumference of the circle whose radius is the distance for the offset correction with the extension of the self-luminous markers 9 as the axis of rotation. Therefore, the positional recognition of the cutting blade 5 is deviated.

すなわち、2つの自発光マーカ9のみを使用した場合、ガイドセル4の位置、切削刃5の位置は一意に決まらないことになる。なぜなら2つの自発光マーカ9の中心を通る直線を回転軸にして、切削刃5の中心と自発光マーカ9の設置位置との距離を半径とする円周上のどこかに目標座標があることになるからである(回転誤差)。 That is, when only two self-luminous markers 9 are used, the position of the guide cell 4 and the position of the cutting edge 5 cannot be uniquely determined. This is because the target coordinates are located somewhere on a circle whose radius is the distance between the center of the cutting blade 5 and the installation position of the self-luminous marker 9, with the straight line passing through the centers of the two self-luminous markers 9 as the axis of rotation. (rotational error).

しかしながら、実際の掘削作業においては、ガイドセル4の姿勢はおおよそ一定の範囲でのみ動作するため前述の回転誤差は掘削作業において許容範囲内と考えることができ、前記2点の自発光マーカ9の設置での運用が可能になっている。従って、2つの自発光マーカ9は、なるべく切削刃5の軸方向中心に近い箇所に取り付けることが好ましいのである。 However, in an actual excavation work, the posture of the guide cell 4 operates only within a roughly constant range, so the aforementioned rotational error can be considered to be within an allowable range for the excavation work. Installation is possible. Therefore, it is preferable to attach the two self-luminous markers 9 at locations as close to the axial center of the cutting blade 5 as possible.

そこで、本件発明者らは、さらに掘削作業の正確性を期すべく、上記事態を解消すべく、自発光マーカ9を3カ所、あるいはそれ以上の箇所に設置する発明を創案した(図17乃至図19参照)。 Therefore, the inventors of the present invention have created an invention in which the self-luminous markers 9 are installed at three or more locations in order to further improve the accuracy of the excavation work and to solve the above-described situation (Fig. 17 to Fig. 17). 19).

まず、自発光マーカ9を取り付ける取付杆19の各々の長さが異なるようにした3つの自発光マーカ9を使用し、これら3つの自発光マーカ9について間隔をあけてガイドセル4に取り付ける。
そして、前記した複数の近赤外線カメラ7で前記3つの自発光マーカ9を撮影し、モーションキャプチャによりこれら3つの自発光マーカ9の座標位置を測定する。
First, three self-luminous markers 9 having different lengths of mounting rods 19 for attaching the self-luminous markers 9 are used, and these three self-luminous markers 9 are attached to the guide cell 4 with a space therebetween.
Then, the three self-luminous markers 9 are photographed by the plurality of near-infrared cameras 7, and the coordinate positions of the three self-luminous markers 9 are measured by motion capture.

なお、前記測定に際しては自発光マーカ9の実際の設置位置から切削刃5の軸方向中心線までの距離をオフセット補正係数としてあらかじめ設定しておき、その上で演算制御部12で計測することは、前述した2つ自発光マーカの場合と同様である。 In the above measurement, the distance from the actual installation position of the self-luminous marker 9 to the center line of the cutting blade 5 in the axial direction may be set in advance as an offset correction coefficient, and then the calculation control unit 12 may perform the measurement. , is the same as the case of the two self-luminous markers described above.

すると、測定したそれぞれ3つの自発光マーカ9の座標位置からオフセット(補正係数)を考慮した目標座標が一意に計測することが出来るものとなる。
この場合であれば、自発光マーカ9の座標認識による目標座標が確実に認識でき、そのため前記した自発光マーカ9の2カ所設置による切削刃5の回転による位置認識のずれをも解消できる。従って、確実に掘削箇所に合致させられ、もって正確な掘削が出来る。なお、3つ以上自発光マーカ9を設置した場合でも同様の結果が得られる。
Then, the target coordinates can be uniquely measured with the offset (correction coefficient) taken into account from the coordinate positions of the three self-luminous markers 9 that have been measured.
In this case, the target coordinates can be reliably recognized by recognizing the coordinates of the self-luminous markers 9, so that the displacement of the position recognition caused by the rotation of the cutting blade 5 due to the installation of the self-luminous markers 9 at two locations can be eliminated. Therefore, it is possible to reliably match the excavation point, thereby enabling accurate excavation. Similar results can be obtained even when three or more self-luminous markers 9 are installed.

ここで、前記複数の近赤外線カメラ10の設置位置及び設置画角の設定は、なるべく最小限のカメラ台数でブーム3及びガイドセル4の稼働を捉えるべく、例えば偶数台を各々交差させる向きであるいは交差させない向きで設置することなどが考えられる。
そして、複数の近赤外線カメラ10は、自発光マーカ9から発光された近赤外線光を捉えるものとなる。
Here, the installation positions and installation angles of view of the plurality of near-infrared cameras 10 are set so that the operation of the boom 3 and the guide cell 4 can be captured with the minimum number of cameras as possible, for example, an even number of cameras are intersected, or It is conceivable to install them so that they do not cross each other.
A plurality of near-infrared cameras 10 capture the near-infrared light emitted from the self-luminous marker 9 .

すなわち、近赤外線カメラ10が前記近赤外線光を捉え、これにより、例えば、切削刃5近傍位置に取り付けられた自発光マーカ9の座標を認識することが出来、該座標認識のデータをPC11に送出し、PC11では、前記演算制御部12において、モーションキャプチャ技術を応用したソフトウェアを用いて自発光マーカ9の座標を認識する。そして、認識した座標から相対的に切削刃5の位置を計算し、順次計算される座標位置を認識しながら、切削刃5を稼働操作し、切削していくものとなる。 That is, the near-infrared camera 10 captures the near-infrared light, thereby, for example, the coordinates of the self-luminous marker 9 attached near the cutting blade 5 can be recognized, and the coordinate recognition data is sent to the PC 11. In the PC 11, the arithmetic control unit 12 recognizes the coordinates of the self-luminous marker 9 using software to which motion capture technology is applied. Then, the position of the cutting blade 5 is calculated relative to the recognized coordinates, and the cutting blade 5 is operated while recognizing the sequentially calculated coordinate positions to perform cutting.

次に、所定間隔で点滅を繰り返す点滅型の自発光マーカ9を用いた構成について本件発明者らはさらに発明したので該新規発明の構成についても説明する。
なお、点滅型の自発光マーカ9をガイドセル4に取りつける個数については、2個でも構わないし、2個以上でも構わない。前述した自発光マーカ9の場合と同様である。
Next, the inventors of the present invention have further invented a configuration using a flashing self-luminous marker 9 that repeats flashing at predetermined intervals, so the configuration of the new invention will also be described.
The number of flashing self-luminous markers 9 attached to the guide cell 4 may be two, or two or more. This is the same as the self-luminous marker 9 described above.

トンネル空間内に複数のマーカが取り付けられた対象物、すなわちブーム3及びガイドセル4が複数存在する場合でこれら複数のブーム3及びガイドセル4が交差したり回転等の動きがある場合、前記ブーム3及びガイドセル4のどの位置にどのマーカが取り付けられているか判別できなくなることがある(これはマーカ入替り現象と称されている)。 In the case where there are a plurality of objects to which a plurality of markers are attached, that is, a plurality of booms 3 and guide cells 4, in the tunnel space, if these plurality of booms 3 and guide cells 4 intersect or move such as rotation, the boom 3 and guide cell 4, it may not be possible to determine which marker is attached to which position (this is called a marker replacement phenomenon).

その場合、例えば、近赤外線カメラ10のフレームレートを考慮した同期機能を持つ所定間隔で点滅を繰り返す点滅型の自発光マーカ9が効果を発揮するものとなる。本件発明者らは独自に本件発明に関するガイドセル4用に前記所定間隔で点滅を繰り返す点滅型の自発光マーカ9及び点滅型の自発光マーカ9の輝度などの増幅回路を含むハードウェアを発明した(図19参照)。 In that case, for example, a blinking self-luminous marker 9 that repeats blinking at predetermined intervals and has a synchronization function considering the frame rate of the near-infrared camera 10 is effective. The inventors independently invented hardware for the guide cell 4 related to the present invention, including a flashing self-luminous marker 9 that repeats flashing at predetermined intervals and an amplifier circuit for the brightness of the flashing self-luminous marker 9. (See FIG. 19).

各々の点滅型の自発光マーカ9の近傍位置にベースステーション18が設けられており、該ベースステーション18内には、例えばバッテリー17、同期信号受信器42、増幅回路40などが収納されている。 A base station 18 is provided in the vicinity of each flashing self-luminous marker 9, and the base station 18 accommodates, for example, a battery 17, a synchronizing signal receiver 42, an amplifier circuit 40, and the like.

また、ドリルマシン1側には同期信号送信器41が設けられ、該同期信号送信器41から各々の点滅型の自発光マーカ9側に同期信号が送信される。
そして、各々の点滅型の自発光マーカ9は、自己の同期信号を受信し、これにより独自の信号周期(点滅周期)による点滅が行えるのである。
A synchronizing signal transmitter 41 is provided on the drill machine 1 side, and a synchronizing signal is transmitted from the synchronizing signal transmitter 41 to each blinking self-luminous marker 9 side.
Each flashing type self-luminous marker 9 receives its own synchronizing signal, thereby enabling flashing according to its own signal cycle (blinking cycle).

そして、PC11側では、各々の点滅型の自発光マーカ9についてそれぞれの信号周期で点滅することが認識できるものとなっており、それぞれの信号周期での点滅が、いわば各々の点滅型の自発光マーカ9のIDとなっているのである。よって、たとえ近赤外線カメラ10によって捉えられた自発光マーカ9がいずれの位置に取り付けられた点滅型の自発光マーカ9から照射された光か目視などで判断ができない場合であっても、前記IDを検索することでいずれのガイドセル4に取り付けられた点滅型の自発光マーカ9であるかが判断できるものとなる。 On the PC 11 side, it is possible to recognize that each blinking type self-luminous marker 9 blinks in each signal period, and the blinking in each signal period corresponds to each blinking type self-luminous marker. This is the ID of the marker 9. Therefore, even if it is not possible to visually determine whether the self-luminous marker 9 captured by the near-infrared camera 10 is the light emitted from the flashing self-luminous marker 9 attached at any position, the ID , it is possible to determine to which guide cell 4 the blinking self-luminous marker 9 is attached.

すなわち、本件発明者らが発明した点滅型の自発光マーカ9を用いることで、全ての点滅型の自発光マーカ9は異なる信号周期で点滅を繰り返す。従って、異なる信号周期で点滅を繰り返す点滅型の自発光マーカ9は、その異なる信号周期での点滅の違いがそれぞれのID となり、このIDを認識することによりいずれのガイドセル4のいずれの位置に取り付けられた点滅型の自発光マーカ9であるかが判別できるものとなる。 That is, by using the blinking self-luminous markers 9 invented by the inventors, all the blinking self-luminous markers 9 repeat blinking at different signal cycles. Therefore, the flashing type self-luminous marker 9 that repeats flashing at different signal cycles has an ID corresponding to the difference in flashing at different signal cycles. It can be determined whether it is the attached flashing type self-luminous marker 9 or not.

このように、検出された点滅型の自発光マーカ9がいずれの座標位置にある点滅型の自発光マーカ9であるかが一意に決まるため、マーカの入れ替わりを防ぐことが出来る。 In this manner, it is uniquely determined at which coordinate position the detected blinking self-luminous marker 9 is located, so that the replacement of markers can be prevented.

さらに詳細に説明すると、まず、本件発明の点滅型の自発光マーカ9に、例えば異なったパルス波形のパルス信号、すなわち、異なる信号周期で点滅を繰り返すパルス信号を振り分ける。 More specifically, first, pulse signals having different pulse waveforms, that is, pulse signals that repeatedly blink at different signal periods, are distributed to the flashing self-luminous marker 9 of the present invention.

これにより、それぞれの点滅型の自発光マーカ9は異なる信号周期で点滅を繰り返すことができる。しかも、前記異なった信号周期の点滅が点滅型の自発光マーカ9のそれぞれのIDになるのである。そのIDを有する点滅型の自発光マーカ9の取り付け位置をあらかじめ認識しておけば、たとえ、近赤外線カメラ10でいずれかの点滅型の自発光マーカ9の取り付け位置が目視などで判断できなくなっても、前記IDの違いにより点滅型の自発光マーカ9の取り付け位置が判断できることになるのである。 As a result, the blinking self-luminous markers 9 can repeat blinking at different signal cycles. Moreover, the blinking of the different signal periods becomes the ID of each of the blinking self-luminous markers 9 . If the mounting position of the flashing self-luminous marker 9 having the ID is recognized in advance, even if the near-infrared camera 10 cannot visually determine the mounting position of any of the flashing self-luminous markers 9. Also, the attachment position of the blinking self-luminous marker 9 can be determined from the difference in the ID.

このように、点滅型の自発光マーカ9の全てに、例えば異なった信号周期の点滅をIDにして振り分け、次いでそのラベリングを行う。これによりすべての点滅型の自発光マーカ9の取り付け位置が認識できる。 In this way, all the blinking type self-luminous markers 9 are assigned, for example, blinking with different signal periods as IDs, and then labeled. This makes it possible to recognize the attachment positions of all the blinking self-luminous markers 9 .

ところで、点滅型の自発光マーカ9は、例えば取り付け位置近傍に設置されたバッテリーから電源供給を受け、それぞれの点滅型の自発光マーカ9を点滅させる。
この点滅に際しては、増幅回路40によって点滅型の自発光マーカ9の光源であるLEDの輝度を増幅させることもできる。この輝度向上により、さらに近赤外線カメラ10からの認識度を向上させることができる。
By the way, the flashing type self-luminous markers 9 receive power supply from, for example, a battery installed near the mounting position, and blink the respective flashing type self-luminous markers 9 .
At the time of blinking, the amplifier circuit 40 can also amplify the brightness of the LED, which is the light source of the blinking self-luminous marker 9 . With this improvement in luminance, the degree of recognition from the near-infrared camera 10 can be further improved.

図19は本発明の本発明の構成を含んだシステム概要図であり、図から理解されるように、それぞれの点滅型の自発光マーカ9の近傍位置には電源としてのバッテリー17、LEDの輝度を増幅させる増幅回路40及び同期信号送信器41からの同期信号を受信する同期信号受信器42が収納されたベースステーション18が設置されている。 FIG. 19 is a schematic diagram of the system including the configuration of the present invention. As can be seen from the figure, a battery 17 as a power source and an LED brightness A base station 18 containing an amplifier circuit 40 for amplifying a synchronous signal and a synchronous signal receiver 42 for receiving a synchronous signal from a synchronous signal transmitter 41 is installed.

そして、前記同期信号送信器41と同期信号受信器42との信号の送受信によっていずれの取り付け位置にある点滅型の自発光マーカ9かが認識できるものとなっている。 By transmitting and receiving signals between the synchronous signal transmitter 41 and the synchronous signal receiver 42, it is possible to recognize which mounting position the flashing type self-luminous marker 9 is located.

本発明の掘削システムは、前記したように、ドリルマシン1におけるガイドセル4先端側に取り付けられた切削刃5の稼働動作を、いわゆるモーションキャプチャ技術を用いて、まず第一に、リアルタイムに前記ガイドセル4先端側に取り付けられた切削刃5の稼働動作をドリルマシン1に搭載されたディスプレイ15に表示出来、該ディスプレイ15上の画像を確認しながら操作者がトンネル内周面に対する掘削作業が行える。さらに、第二に掘削作業を行っているトンネル内周面に対する大量の先受け部材277の掘削位置データについてリアルタイムにPC11等に記録、保存できるものとしている。 As described above, the drilling system of the present invention uses so-called motion capture technology to detect the operating motion of the cutting blade 5 attached to the tip side of the guide cell 4 in the drill machine 1, first of all, in real time. The operation of the cutting blade 5 attached to the tip of the cell 4 can be displayed on the display 15 mounted on the drill machine 1, and the operator can perform the excavation work on the inner peripheral surface of the tunnel while checking the image on the display 15. . Furthermore, secondly, a large amount of excavation position data of the pre-receiving member 277 on the inner peripheral surface of the tunnel being excavated can be recorded and saved in the PC 11 or the like in real time.

よって、ドリルマシン1の操作者は、前記リアルタイムで取得されたガイドセル4先端側に取り付けられた切削刃5の稼働動作をディスプレイ15上に描画された映像で確認しながら掘削作業を行えるものとなる。よって、従来、目視で確認した掘削作業においては、死角が存在することがあったが、ディスプレイ15上の確認作業に死角がほぼ存在することはないものとなった。 Therefore, the operator of the drill machine 1 can perform the drilling operation while confirming the operation of the cutting blade 5 attached to the tip of the guide cell 4 acquired in real time on the image drawn on the display 15. Become. Therefore, in the past, there was a blind spot in the excavation work visually confirmed, but there is almost no blind spot in the confirmation work on the display 15 .

ここで、図3に内周面についての掘削計画図である正面図を示す。該正面図においては、ガイドセル4の代表2点から取得した座標をどのように描画するかも重要となる。 Here, FIG. 3 shows a front view which is an excavation plan drawing for the inner peripheral surface. In the front view, how the coordinates acquired from the two representative points of the guide cell 4 are drawn is also important.

本発明では前述のごとく、前記図2の先受け部材27の掘削打設計画図(例えばCAD図)から先受け部材27の掘削打設座標位置を算出していくのである。すなわち、先受け部材27の掘削打設計画図からY座標、Z座標、のみ先離れ、表示角度を算出していくのである(図3参照)。 In the present invention, as described above, the drilling and driving coordinate position of the pre-receiving member 27 is calculated from the drilling and punching design drawing (for example, CAD drawing) of the pre-receiving member 27 shown in FIG. That is, only the Y coordinate and Z coordinate are separated from the plan drawing of the drilling strike of the pre-receiving member 27, and the display angle is calculated (see FIG. 3).

一方、記録、保存に関しては、自発光マーカ9の2点の座標の変化を例えば、1秒単位で記録することもできる。例えば、PC11のハードドライブなど記憶部21に例えばCSV形式にて保存できるのである。 On the other hand, regarding recording and storage, changes in the coordinates of two points of the self-luminous marker 9 can be recorded, for example, in units of one second. For example, it can be saved in the storage unit 21 such as the hard drive of the PC 11 in, for example, CSV format.

なお、掘削時において、例えばガイドセル4に設けられた掘削距離測定部を構成する油圧シリンダの油圧データ(例えばガイドセル4や削岩機の揺動部材4として使用される油圧シリンダの油圧流量変化量)などをドリルマシン1(建機)から取得してPC11に転送することで、各先受け部材27の掘削距離を前記記憶部21に追加して保存することも出来る。この様に、掘削長さを表すのみ先離れの距離などについて別途前記の様に油圧データなどを介して計測することも出来る。 During excavation, for example, the hydraulic pressure data of the hydraulic cylinders constituting the excavation distance measuring unit provided in the guide cell 4 (for example, the hydraulic pressure data of the hydraulic cylinders used as the rocking member 4 of the guide cell 4 and the rock drilling machine) , etc., from the drill machine 1 (construction machine) and transferred to the PC 11, the excavation distance of each pre-receiving member 27 can be added to the storage unit 21 and stored. In this way, it is also possible to separately measure the distance between the tip and the like, which represents the excavation length, through the oil pressure data and the like as described above.

以上において、本発明による使用状態の概略を説明する。
トンネルの内周面に対し、ドリルマシン1のガイドセル4を対向させて設置させる。所定の内周面に対し、掘削計画図が用意されている場合、該掘削計画図をディスプレイ15に写し出す。
In the above, the outline of the use state by this invention is demonstrated.
The guide cell 4 of the drill machine 1 is installed facing the inner peripheral surface of the tunnel. When an excavation plan is prepared for a predetermined inner circumferential surface, the excavation plan is displayed on the display 15 .

そして、該掘削計画図に描画された掘削位置、掘削の傾き、掘削長(のみ先離れの距離)に従ってガイドセル4を稼働させる。すなわち、ガイドセル4の操作者はディスプレイ15上でリアルタイムにガイドセル4先端側に取り付けられた切削刃5の稼働動作を確認出来、その稼働動作を確認しながら先受け部材27の掘削が行える。 Then, the guide cell 4 is operated in accordance with the excavation position, the excavation inclination, and the excavation length (distance away from the tip) drawn on the excavation plan drawing. That is, the operator of the guide cell 4 can confirm the operation of the cutting blade 5 attached to the tip side of the guide cell 4 in real time on the display 15, and can excavate the tip receiving member 27 while confirming the operation.

ここで、PC11には、図11に示す様に、送信部20、受信部21、演算制御部12、記憶部22、入力部23を有して構成されている。さらに、ディスプレイ15と接続されており、PC11の情報がディスプレイ15上に表示できるものとなっている。 Here, as shown in FIG. 11, the PC 11 includes a transmission section 20, a reception section 21, an arithmetic control section 12, a storage section 22, and an input section . Furthermore, it is connected to a display 15 so that information of the PC 11 can be displayed on the display 15 .

さらに、PC11はインターネット回線などの通信回線網23を介して外部のサーバコンピュータ24などと接続されており、該サーバコンピュータ24は、PC11の情報を受信し、該情報を記憶、保存できるものとなっている。
尚、演算制御部12は、図12に示すように、掘削計画図読み込み部31、掘削計画図形成部32、掘削位置等読み込み部33、掘削位置等描画部34を有して構成されている。
Furthermore, the PC 11 is connected to an external server computer 24 or the like via a communication network 23 such as the Internet line, and the server computer 24 receives information from the PC 11 and can store and save the information. ing.
As shown in FIG. 12, the arithmetic control section 12 includes an excavation plan drawing reading section 31, an excavation plan drawing forming section 32, an excavation position reading section 33, and an excavation position drawing section 34. .

よって、例えば、前記サーバコンピュータ24から掘削計画図のデータをPC11が受信すると、演算制御部12の掘削計画図読み込み部31で読み込み、掘削計画図形成部32でトンネルの正面図が形成されて、ディスプレイ15に表示される。 Therefore, for example, when the PC 11 receives the excavation plan drawing data from the server computer 24, the excavation plan drawing reading unit 31 of the arithmetic control unit 12 reads the data, and the excavation plan drawing forming unit 32 forms a front view of the tunnel. It is displayed on the display 15 .

操作者は、ガイドセル4を稼働操作し、ディスプレイ15に表示された掘削位置等に基づいて掘削していく。すると、その掘削作業を掘削位置等読み込み部33がリアルタイムに読み取って、掘削位置等描画部34によって前記掘削計画図上に異なる色で描画し表示していくのである。 The operator operates the guide cell 4 to excavate based on the excavation position and the like displayed on the display 15 . Then, the excavation position reading section 33 reads the excavation work in real time, and the excavation position drawing section 34 draws and displays it in different colors on the excavation plan drawing.

そして、これらのデータはリアルタイムに記憶部21に送出され、記憶部21に保存される。また、保存されたデータは通信回線網23を介してサーバコンピュータ24へ送信され、そこで保存されると共に、記録として残すことが出来る。
These data are sent to the storage unit 21 in real time and stored in the storage unit 21 . Also, the saved data is transmitted to the server computer 24 via the communication line network 23, where it is saved and can be left as a record.

1 ドリルマシン
2 車両本体
3 ブーム
4 ガイドセル
5 切削刃
6 削岩機
8 ガイド部材
9 自発光マーカ
10 近赤外線カメラ
11 PC
12 演算制御部
14 原点
15 ディスプレイ
16 丸部分
17 バッテリー
18 ベースステーション
19 取付杆
20 送信部
21 受信部
22 記憶部
23 入力部
24 サーバコンピュータ
25 通信回線網
26 ロッド
27 先受け部材
31 掘削計画図読み込み部
32 掘削計画図形成部
33 掘削位置等読み込み部
34 掘削位置等描画部
40 増幅回路
41 同期信号送信器
42 同期信号受信器
1 drill machine 2 vehicle body 3 boom 4 guide cell 5 cutting blade 6 rock drill 8 guide member 9 self-luminous marker 10 near-infrared camera 11 PC
12 Arithmetic control unit 14 Origin 15 Display 16 Circle part 17 Battery 18 Base station 19 Mounting rod 20 Transmitting unit 21 Receiving unit 22 Storage unit 23 Input unit 24 Server computer 25 Communication network 26 Rod 27 Pre-receiving member 31 Excavation plan drawing reading unit 32 Excavation plan drawing forming unit 33 Excavation position reading unit 34 Excavation position drawing unit 40 Amplifier circuit 41 Synchronization signal transmitter 42 Synchronization signal receiver

Claims (5)

車両本体から揺動可能に突設され、円筒状をなす切削刃つき先受け部材を軸方向に揺動させる削岩機と、該削岩機の前記揺動をガイドするガイドセルと、
該ガイドセルの長手方向で、前記切削刃の設置位置の近傍位置に間隔をあけて少なくとも2個取り付けられた自発光マーカと、
前記自発光マーカからの光を取得する複数の近赤外線カメラと、
前記複数の近赤外線カメラが取得した光から前記2つの自発光マーカの座標位置を計測する手段と、
前記2つの自発光マーカの取付位置と前記先受け部材の軸芯位置間の距離及び前記2つの自発光マーカの取付位置と切削刃の中心位置間の距離を計測し、該距離を補正係数にして、計測した2つの自発光マーカの座標位置を削岩機の軸芯位置及び切削刃の中心位置に補正する補正手段と、を有し、
あらかじめ掘削データが表示された掘削計画図と前記座標認識された切削刃とをディスプレイ上に表示させ、切削刃による掘削作業が前記掘削計画図に沿って行える、
ことを特徴とする自発光マーカを使用した掘削システム
A rock drilling machine that is rockably protruding from a vehicle body and rocks a cylindrical tip receiving member with a cutting edge in the axial direction; a guide cell that guides the rocking movement of the rock drilling machine;
at least two self-luminous markers attached at intervals in the vicinity of the installation position of the cutting blade in the longitudinal direction of the guide cell;
a plurality of near-infrared cameras that acquire light from the self-luminous markers;
means for measuring coordinate positions of the two self-luminous markers from the light acquired by the plurality of near-infrared cameras;
The distance between the mounting position of the two self-luminous markers and the axial center position of the pre-receiving member and the distance between the mounting position of the two self-luminous markers and the center position of the cutting blade are measured, and the distance is used as a correction coefficient. and correction means for correcting the measured coordinate positions of the two self-luminous markers to the axial center position of the rock drill and the center position of the cutting blade,
An excavation plan on which excavation data is displayed in advance and the cutting blade whose coordinates are recognized are displayed on the display, and excavation work using the cutting blade can be performed along the excavation plan.
An excavation system using a self-luminous marker characterized by
車両本体から揺動可能に突設され、円筒状をなす切削刃つき先受け部材を軸方向に揺動させる削岩機と、該削岩機の前記揺動をガイドするガイドセルと、
該ガイドセルの長手方向で、前記切削刃の設置位置の近傍位置に間隔をあけて少なくとも3個取り付けられた自発光マーカと、
前記3個以上取り付けられた自発光マーカからの光を取得する複数の近赤外線カメラと、
前記複数の近赤外線カメラが取得した光から前記3個以上取り付けられた自発光マーカの座標位置を計測する手段と、
前記3個以上取り付けられた自発光マーカの取付位置と前記先受け部材の軸芯位置間の距離及び前記3個以上取り付けられた自発光マーカの取付位置と切削刃の中心位置間の距離を計測し、該距離を補正係数にして、計測した2つの自発光マーカの座標位置を削岩機の軸芯位置及び切削刃の中心位置に補正する補正手段と、を有し、
あらかじめ掘削データが表示された掘削計画図と前記座標認識された切削刃とをディスプレイ上に表示させ、切削刃による掘削作業が前記掘削計画図に沿って行える、
ことを特徴とする自発光マーカを使用した掘削システム
A rock drilling machine that is rockably protruding from a vehicle body and rocks a cylindrical tip receiving member with a cutting edge in the axial direction; a guide cell that guides the rocking movement of the rock drilling machine;
at least three self-luminous markers attached at intervals in the vicinity of the installation position of the cutting blade in the longitudinal direction of the guide cell;
a plurality of near-infrared cameras that acquire light from the three or more attached self-luminous markers;
means for measuring coordinate positions of the three or more attached self-luminous markers from light acquired by the plurality of near-infrared cameras;
Measure the distance between the mounting position of the three or more self-luminous markers and the axial center position of the pre-receiving member, and the distance between the mounting position of the three or more self-luminous markers and the center position of the cutting blade. and correction means for correcting the measured coordinate positions of the two self-luminous markers to the axial center position of the rock drilling machine and the center position of the cutting blade, using the distance as a correction coefficient;
An excavation plan on which excavation data is displayed in advance and the cutting blade whose coordinates are recognized are displayed on the display, and excavation work using the cutting blade can be performed along the excavation plan.
An excavation system using a self-luminous marker characterized by
車両本体から揺動可能に突設され、円筒状をなす切削刃つき先受け部材を軸方向に揺動させる削岩機と、該削岩機の前記揺動をガイドするガイドセルと、
該ガイドセルの長手方向で、前記切削刃の設置位置の近傍位置に間隔をあけて複数個取り付けられた点滅型の自発光マーカと、
前記点滅型の自発光マーカからの点滅する光を取得する複数の近赤外線カメラと、
前記複数の近赤外線カメラが取得した点滅する光から前記複数個取り付けられた点滅型の自発光マーカの座標位置を計測する手段と、を有し、
複数の点滅型の自発光マーカからの点滅する光は、異なる信号周期による点滅周期が与えられ、該信号周期の違いによりいずれのブームのガイドセルに取りつけられた点滅型の自発光マーカかが各々認識でき、
あらかじめ掘削データが表示された掘削計画図と前記座標認識された切削刃とをディスプレイ上に表示させ、切削刃による掘削作業が前記掘削計画図に沿って行える、
ことを特徴とする自発光マーカを使用した掘削システム。
A rock drilling machine that is rockably protruding from a vehicle body and rocks a cylindrical tip receiving member with a cutting edge in the axial direction; a guide cell that guides the rocking movement of the rock drilling machine;
a plurality of blinking self-luminous markers attached at intervals near the installation position of the cutting blade in the longitudinal direction of the guide cell;
a plurality of near-infrared cameras that acquire blinking light from the blinking self-luminous marker;
means for measuring coordinate positions of the plurality of attached flashing type self-luminous markers from the flashing lights acquired by the plurality of near-infrared cameras;
The blinking light from the plurality of blinking self-luminous markers is given a blinking cycle according to a different signal cycle, and the difference in the signal cycle determines which boom's self-luminous marker is attached to the guide cell. recognizable,
An excavation plan on which excavation data is displayed in advance and the cutting blade whose coordinates are recognized are displayed on the display, and excavation work using the cutting blade can be performed along the excavation plan.
An excavation system using a self-luminous marker, characterized by:
前記点滅型の自発光マーカからの点滅する光は、増幅回路により光の輝度を増幅出来る、
ことを特徴とする請求項3記載の自発光マーカを使用した掘削システム。
The brightness of the blinking light from the blinking self-luminous marker can be amplified by an amplifier circuit.
An excavation system using the self-luminous marker according to claim 3, characterized in that:
前記ガイドセルは、車両本体から複数本揺動可能に突設され、前記自発光マーカはそれぞれのガイドセルに取り付けられた、
ことを特徴とする請求項1乃至請求項4記載の自発光マーカを使用した掘削システム。
A plurality of the guide cells protrude from the vehicle body so as to be swingable, and the self-luminous markers are attached to the respective guide cells,
An excavation system using the self-luminous marker according to any one of claims 1 to 4, characterized in that:
JP2022001444A 2022-01-07 2022-01-07 Pre-receiving steel pipe placing position guidance system Active JP7291995B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2022001444A JP7291995B1 (en) 2022-01-07 2022-01-07 Pre-receiving steel pipe placing position guidance system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2022001444A JP7291995B1 (en) 2022-01-07 2022-01-07 Pre-receiving steel pipe placing position guidance system

Publications (2)

Publication Number Publication Date
JP7291995B1 JP7291995B1 (en) 2023-06-16
JP2023101082A true JP2023101082A (en) 2023-07-20

Family

ID=86729172

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2022001444A Active JP7291995B1 (en) 2022-01-07 2022-01-07 Pre-receiving steel pipe placing position guidance system

Country Status (1)

Country Link
JP (1) JP7291995B1 (en)

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH05156886A (en) * 1991-12-05 1993-06-22 Konoike Constr Ltd Method and apparatus for controlling location of boring by rock drill
JPH05156885A (en) * 1991-12-03 1993-06-22 Konoike Constr Ltd Method and apparatus for controlling location of boring by rock drill
JPH1096627A (en) * 1996-09-25 1998-04-14 Furukawa Co Ltd Display for drilling machine
JP2000292167A (en) * 1999-04-06 2000-10-20 Sentan Kensetsu Gijutsu Center Method for detecting elevation angle and swivel angle of excavating boom of free section excavator
JP2002188389A (en) * 2000-12-20 2002-07-05 Toda Constr Co Ltd Blasting excavation and drilling method for tunnel, and drilling system
JP2006057238A (en) * 2004-08-17 2006-03-02 Enzan Kobo:Kk Drilling positioning control method for rock drill-equipped truck
JP2007303987A (en) * 2006-05-12 2007-11-22 Hitachi High-Tech Science Systems Corp Chromatographic device
JP2013106238A (en) * 2011-11-15 2013-05-30 Meidensha Corp Marker detection and tracking device
JP2020097821A (en) * 2018-12-17 2020-06-25 ドリルマシン株式会社 Drilling system
JP2021156117A (en) * 2020-03-30 2021-10-07 フジモリ産業株式会社 Extension method of forepiling steel pipe

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH05156885A (en) * 1991-12-03 1993-06-22 Konoike Constr Ltd Method and apparatus for controlling location of boring by rock drill
JPH05156886A (en) * 1991-12-05 1993-06-22 Konoike Constr Ltd Method and apparatus for controlling location of boring by rock drill
JPH1096627A (en) * 1996-09-25 1998-04-14 Furukawa Co Ltd Display for drilling machine
JP2000292167A (en) * 1999-04-06 2000-10-20 Sentan Kensetsu Gijutsu Center Method for detecting elevation angle and swivel angle of excavating boom of free section excavator
JP2002188389A (en) * 2000-12-20 2002-07-05 Toda Constr Co Ltd Blasting excavation and drilling method for tunnel, and drilling system
JP2006057238A (en) * 2004-08-17 2006-03-02 Enzan Kobo:Kk Drilling positioning control method for rock drill-equipped truck
JP2007303987A (en) * 2006-05-12 2007-11-22 Hitachi High-Tech Science Systems Corp Chromatographic device
JP2013106238A (en) * 2011-11-15 2013-05-30 Meidensha Corp Marker detection and tracking device
JP2020097821A (en) * 2018-12-17 2020-06-25 ドリルマシン株式会社 Drilling system
JP2021156117A (en) * 2020-03-30 2021-10-07 フジモリ産業株式会社 Extension method of forepiling steel pipe

Also Published As

Publication number Publication date
JP7291995B1 (en) 2023-06-16

Similar Documents

Publication Publication Date Title
JP7278022B2 (en) Rock bolt drilling system using self-luminous markers
US10012068B2 (en) Alignment system for alignment of a drill rod during drilling
US20170292248A1 (en) Excavation measurement
JP6677567B2 (en) Tunnel excavation method and blast hole setting system
JP6746250B2 (en) Drilling system
JP2020509272A (en) Augmented reality display for material transfer machines
US5361854A (en) Laser positioning system for earth boring apparatus
SE1450818A1 (en) Method and mining vehicle for post-drilling insertion
JP2003527514A (en) Positioning method for unmanned mining vehicles
JP5492880B2 (en) Drilling display method and apparatus and drill rod guide method for drilling rock mass
WO2013098459A1 (en) Method and arrangement for post-drilling insertion
JP6918716B2 (en) Construction machinery
FI90373B (en) Device for positioning a drill bit
AU2016308671A1 (en) A drill rig positioning and drill rod alignment system
JP7291995B1 (en) Pre-receiving steel pipe placing position guidance system
JP7278021B2 (en) Drilling system using self-luminous markers
CA3118408A1 (en) Method and device for determining the position of a mining and/or construction machine
JP2004138422A (en) Method of surveying in tunnel hole and system of surveying in tunnel hole
US11002075B1 (en) Mine drilling system and related method
KR100463260B1 (en) Methods to measure drilling path and drilling angle of tunnel
JP2020045682A (en) Excavator position measurement system and operation analysis system
US20230314577A1 (en) Measuring system for a construction and work machine
JPH0686798B2 (en) Instruction method of tunnel excavation position
JP2010270518A (en) Drilling positioning control method for rock-drill loaded truck, and boom movement control method for tunnel construction machine
FI121243B (en) loading Machine

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20220218

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20230111

A601 Written request for extension of time

Free format text: JAPANESE INTERMEDIATE CODE: A601

Effective date: 20230228

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20230501

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20230526

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20230530

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20230605

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20230605

R150 Certificate of patent or registration of utility model

Ref document number: 7291995

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150