JP2021173023A JP2020076373A JP2020076373A JP2021173023A JP 2021173023 A JP2021173023 A JP 2021173023A JP 2020076373 A JP2020076373 A JP 2020076373A JP 2020076373 A JP2020076373 A JP 2020076373A JP 2021173023 A JP2021173023 A JP 2021173023A
Authority
JP
Japan
Prior art keywords
concrete
box
formwork
extracting
anchor bolts
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2020076373A
Other languages
Japanese (ja)
Other versions
JP7474393B2 (en
Inventor
倫夫 伊藤
Michio Ito
秀治 大庭
Hideji Oba
拓哉 青木
Takuya Aoki
大致 岩澤
Daichi Iwasawa
賢一郎 村上
Kenichiro Murakami
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Senqcia Corp
Original Assignee
Senqcia Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Senqcia Corp filed Critical Senqcia Corp
Priority to JP2020076373A priority Critical patent/JP7474393B2/en
Publication of JP2021173023A publication Critical patent/JP2021173023A/en
Application granted granted Critical
Publication of JP7474393B2 publication Critical patent/JP7474393B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Joining Of Building Structures In Genera (AREA)

Abstract

To provide a construction method of an anchor bolt for reducing the amount of mortar used for forming a mortar layer, reducing material cost, and improving workability, and a box-removing form used for the method.SOLUTION: A plurality of anchor bolts 8 are arranged on a leveling concrete 1 so that each length part extends in the vertical direction, and a placing form 26 is arranged on the leveling concrete 1 so as to surround the periphery separated in the horizontal direction from a shape plate 42 and the plurality of anchor bolts 8 in the horizontal direction; by placing the upper surface of placed ready-mixed concrete 33b so as to be located above the lower end of a box-removing form 44 and below the upper end of the box-removing form 44, the plurality of anchor bolts 8 are arranged such that the respective length portions are embedded in concrete 33 and the respective upper ends protrude from the upper surface of the concrete 33, and the box-removing form 44 forms a recessed part 33a opening on the upper surface of the concrete 33.SELECTED DRAWING: Figure 5

Description

本発明は、建築構造物の一部を構成する柱部材やブレースの端部を、コンクリートにより形成された基礎や梁のような構造物に固定するための接合構造を構築する際に用いられるアンカーボルトの施工方法、及びそのアンカーボルトの施工方法に使用する箱抜き用型枠に関するものである。 The present invention is an anchor used for constructing a joint structure for fixing the ends of pillar members and braces that form a part of a building structure to a structure such as a foundation or a beam formed of concrete. It relates to a box-extracting mold used for a bolt construction method and an anchor bolt construction method.

S造やSRC造等の建築構造物においては、角型鋼管や円形鋼管等によって構成された柱部材を基礎コンクリートの上に立設するために、柱部材の下端部に溶接等により固定された接合金物に、基礎コンクリートの内部に埋設されたアンカーボルトの上端部が結合されるような接合構造が知られていた(例えば特許文献1の図4参照)。 In building structures such as S structure and SRC structure, pillar members composed of square steel pipes, circular steel pipes, etc. are fixed to the lower end of the pillar members by welding or the like in order to stand on the foundation concrete. A joining structure has been known in which the upper end portion of an anchor bolt embedded inside the foundation concrete is joined to the joining metal fitting (see, for example, FIG. 4 of Patent Document 1).

本願の図16の接合構造2は、そのような接合構造について説明するために参照する図である。 The joint structure 2 of FIG. 16 of the present application is a diagram referred to for explaining such a joint structure.

図16に示すように、接合構造2は、基礎コンクリート3の上に立設された柱部材5と、柱部材5の下端部に設けられた接合金物4と、基礎コンクリート3の内部に埋設され、上端部が接合金物4に結合された複数のアンカーボルト8を備えていた。 As shown in FIG. 16, the joint structure 2 is embedded inside the pillar member 5 erected on the foundation concrete 3, the joint metal fitting 4 provided at the lower end of the pillar member 5, and the foundation concrete 3. , A plurality of anchor bolts 8 having an upper end portion bonded to the joint metal fitting 4 were provided.

接合金物4は、図16中上下方向に所定の厚さ寸法を有し、平面形状が略正方形の板状に形成され、その板面の四隅部の近傍には、接合金物4を厚さ方向に貫通するボルト挿通孔4aが形成されていた。 The metal joint 4 has a predetermined thickness dimension in the vertical direction in FIG. 16, and is formed in a plate shape having a substantially square plane shape. In the vicinity of the four corners of the plate surface, the metal joint 4 is placed in the thickness direction. A bolt insertion hole 4a penetrating the space was formed.

そして、そのような接合金物4が、溶接等により柱部材5の下端部に固定されると共に、そのような接合金物4が固定された柱部材5が、接合金物4の下面と基礎コンクリート3の上面の間に形成されたモルタル層6を介して、基礎コンクリート3の上に立設されていた。 Then, such a metal joint 4 is fixed to the lower end of the pillar member 5 by welding or the like, and the pillar member 5 to which the metal joint 4 is fixed is formed on the lower surface of the metal joint 4 and the foundation concrete 3. It was erected on the foundation concrete 3 via the mortar layer 6 formed between the upper surfaces.

一方、基礎コンクリート3の内部には、図16に示すように、複数のアンカーボルト8が埋設されており、これらのアンカーボルト8の上端部は、モルタル層6を貫いて接合金物4に形成されたボルト挿通孔4aに挿通され、接合金物4の上面より上方に突出するアンカーボルト8の上端部のオネジ部には、ナット10がネジ締結されていた。 On the other hand, as shown in FIG. 16, a plurality of anchor bolts 8 are embedded inside the foundation concrete 3, and the upper ends of these anchor bolts 8 are formed in the metal joint 4 through the mortar layer 6. A nut 10 was screwed to the male screw portion at the upper end of the anchor bolt 8 which was inserted into the bolt insertion hole 4a and protruded upward from the upper surface of the metal joint 4.

このような接合構造2を用いることにより、建築構造物の柱部材の柱脚部に地震等による外力が作用した場合に、建築構造物の柱部材が傾いたり転倒したりすることを防止できるようになっていた。 By using such a joint structure 2, it is possible to prevent the column members of the building structure from tilting or tipping over when an external force such as an earthquake acts on the column bases of the column members of the building structure. It was.

すなわち、図16に示すように、地震等によって、柱部材5の柱脚部に曲げモーメントMが作用した場合、図中左側のアンカーボルト8に生じる引張力Tや、接合金物4の下面の図中右側にモルタル層6を介して生じる基礎コンクリート3からの圧縮力Cによって、柱部材5の柱脚部に、曲げモーメントMに抵抗するような曲げモーメントが作用するようになっていた。 That is, as shown in FIG. 16, when a bending moment M acts on the column base of the column member 5 due to an earthquake or the like, the tensile force T generated on the anchor bolt 8 on the left side of the figure and the lower surface of the metal joint 4 are shown. Due to the compressive force C generated from the foundation concrete 3 via the mortar layer 6 on the middle right side, a bending moment that resists the bending moment M acts on the column base portion of the column member 5.

しかしながら、このような接合構造2には、地震等によって、柱部材5の柱脚部にせん断方向(図16中左右方向、又は図の紙面に垂直方向)の力が作用した場合、柱脚部に作用するせん断力を基礎コンクリート3に伝達する際に、せん断力がアンカーボルト8に集中してしまうという問題があった。 However, when a force in the shearing direction (the left-right direction in FIG. 16 or the direction perpendicular to the paper surface in the figure) acts on the column base portion of the pillar member 5 due to an earthquake or the like, the column base portion is applied to such a joint structure 2. There is a problem that the shearing force is concentrated on the anchor bolt 8 when the shearing force acting on the foundation concrete 3 is transmitted to the foundation concrete 3.

そこで、柱脚部に作用するせん断力がアンカーボルトに集中することを防止して、せん断力を効率よく基礎コンクリートに伝達するために、接合金物の下面にシアコッターと呼ばれる突出部を設け、この突出部が基礎コンクリートの内部に埋設されるように柱部材が配置された接合構造が知られていた(例えば特許文献1の図5参照)。 Therefore, in order to prevent the shearing force acting on the column base from concentrating on the anchor bolts and efficiently transmit the shearing force to the foundation concrete, a protruding portion called a shear cotter is provided on the lower surface of the joint metal fitting, and this protruding portion is provided. A joint structure in which column members are arranged so that the portion is embedded inside the foundation concrete has been known (see, for example, FIG. 5 of Patent Document 1).

本願の図17の接合構造12は、そのようなシアコッターを備えた接合金物を用いた接合構造について説明するために参照する図である。なお、図16に示す接合構造2と同様の部分には原則として同じ符号を付し、重複する説明は原則として省略するものとする。 The joint structure 12 of FIG. 17 of the present application is a diagram referred to for explaining a joint structure using a joint metal fitting provided with such a shear cotter. In principle, the same parts as those of the joint structure 2 shown in FIG. 16 are designated by the same reference numerals, and duplicate explanations will be omitted in principle.

図17に示すように、接合構造12は、図16示す接合構造2と同様に、基礎コンクリート3の上に立設された柱部材5と、基礎コンクリート3の内部に埋設された複数のアンカーボルト8を備えていた。 As shown in FIG. 17, the joint structure 12 includes a pillar member 5 erected on the foundation concrete 3 and a plurality of anchor bolts embedded inside the foundation concrete 3, similarly to the joint structure 2 shown in FIG. It was equipped with 8.

そして、接合構造12は、図16示す接合構造2における接合金物4の代わりに、接合金物14(図3参照)が設けられている点において、接合構造2とはその構成が異なるものであり、また、アンカーボルト8の上端部が接合金物14に結合されている点においては、接合構造2とはその構成が共通するものであった。 The joint structure 12 is different from the joint structure 2 in that the joint metal 14 (see FIG. 3) is provided instead of the joint metal 4 in the joint structure 2 shown in FIG. Further, in that the upper end portion of the anchor bolt 8 is connected to the metal joint 14, the structure is common to that of the joint structure 2.

そして、接合金物14は、図3及び図17に示すように、所定の厚さ寸法を有し、平面形状が略正方形の板状に形成されたベースプレート16を備え、その板面の四隅部の近傍には、ベースプレート16を厚さ方向に貫通するボルト挿通孔16aが形成されると共に、ベースプレート16の下面には、水平断面形状が略十字型に形成された突出部18(シアコッター)が、ベースプレート16の下面から下方に突出するように、ベースプレート16に一体的に設けられている点において、図16に示す接合構造2における接合金物4とはその構成が異なるものであった。 Then, as shown in FIGS. 3 and 17, the joining metal fitting 14 includes a base plate 16 having a predetermined thickness dimension and having a substantially square flat plate shape, and the four corners of the plate surface thereof. A bolt insertion hole 16a that penetrates the base plate 16 in the thickness direction is formed in the vicinity, and a protrusion 18 (shear cotter) having a substantially cross-shaped horizontal cross section is formed on the lower surface of the base plate 16. The structure is different from that of the metal joint 4 in the joint structure 2 shown in FIG. 16 in that the base plate 16 is integrally provided so as to project downward from the lower surface of the metal 16.

そして、そのような接合金物14が、溶接等により柱部材5の下端部に固定されると共に、そのような接合金物14が固定された柱部材5が、接合金物14のベースプレート16の下面と基礎コンクリート3の上面の間に設けられたモルタル層6を介して、基礎コンクリート3の上に立設されていた。 Then, such a metal joint 14 is fixed to the lower end of the pillar member 5 by welding or the like, and the pillar member 5 to which the metal joint 14 is fixed is the lower surface and the foundation of the base plate 16 of the metal joint 14. It was erected on the foundation concrete 3 via a mortar layer 6 provided between the upper surfaces of the concrete 3.

このとき、接合金物14の突出部18の上端部から下端部までの全ての部分が、モルタル層6の上面より下方に向かってモルタル層6内に配置されると共に、モルタル層6は接合金物14と基礎コンクリート3の間に隙間なく設けられていた。 At this time, all the portions from the upper end to the lower end of the protruding portion 18 of the metal joint 14 are arranged in the mortar layer 6 downward from the upper surface of the mortar layer 6, and the mortar layer 6 is the metal joint 14. It was provided without a gap between the foundation concrete 3 and the foundation concrete 3.

その他の構成は、図16に示す接合構造2と同様であるため、このような接合構造12であっても、建築構造物の柱部材の柱脚部に地震等による外力が作用した場合に、建築構造物の柱部材が傾いたり転倒したりすることを防止できるようになっていた。 Since the other configurations are the same as those of the joint structure 2 shown in FIG. 16, even with such a joint structure 12, when an external force due to an earthquake or the like acts on the column base of the column member of the building structure, It was possible to prevent the pillar members of the building structure from tilting or tipping over.

そして、このような接合構造12を用いることにより、図17に示すように、地震等によって、柱部材5の柱脚部に作用するせん断力Fを、モルタル層6の内部に埋設された接合金物14の突出部18の各側面に負担させることができるため、柱脚部に作用するせん断力Fがアンカーボルト8に集中することを防止して、せん断力Fを効率よく基礎コンクリート3に伝達することができるようになっていた。 Then, by using such a joint structure 12, as shown in FIG. 17, the shearing force F acting on the column base portion of the column member 5 due to an earthquake or the like is applied to the joint metal fitting embedded inside the mortar layer 6. Since it can be applied to each side surface of the projecting portion 18 of 14, it is possible to prevent the shearing force F acting on the column base portion from concentrating on the anchor bolt 8 and efficiently transmit the shearing force F to the foundation concrete 3. I was able to do it.

一方、S造やSRC造等の建築構造物においては、建築構造物の強度を向上させるために、柱部材と梁部材の間を斜めに連結するブレースと呼ばれる補強部材を設けることがあり(例えば特許文献2参照)、図16及び図17に示すような接合金物4,14と同様の構成を有する接合金物を、そのようなブレースの端部をコンクリートによって形成された梁の長さ途中部に固定するために用いることがあった。 On the other hand, in a building structure such as an S structure or an SRC structure, in order to improve the strength of the building structure, a reinforcing member called a brace that diagonally connects the column member and the beam member may be provided (for example). (See Patent Document 2), a metal joint having the same structure as the metal joints 4 and 14 as shown in FIGS. 16 and 17 is provided at the end of such a brace in the middle of the length of a beam formed of concrete. Sometimes used to fix.

すなわち、図18(a)及び(b)に示すように、図16及び図17に示す接合構造2,12と同様に、基礎梁7の長さ途中部に、接合金物4,14を、モルタル層6を介して配置してアンカーボルト8やナット10を用いて固定し、その接合金物4の上面や接合金物14のベースプレート16の上面に、図の紙面に垂直方向に所定の厚さを有する板状に形成されたガセットプレート17を溶接等により固定し、2つのブレース9のそれぞれの端部がガセットプレート17に連結されてボルト等により固定されるような、接合構造29,30が用いられていた。 That is, as shown in FIGS. 18 (a) and 18 (b), similar to the joint structures 2 and 12 shown in FIGS. 16 and 17, the joint metal fittings 4 and 14 are placed in the middle of the length of the foundation beam 7. It is arranged via the layer 6 and fixed by using anchor bolts 8 and nuts 10, and has a predetermined thickness on the upper surface of the metal joint 4 and the upper surface of the base plate 16 of the metal joint 14 in the direction perpendicular to the paper surface of the drawing. Joining structures 29 and 30 are used in which the plate-shaped gusset plate 17 is fixed by welding or the like, and the ends of the two braces 9 are connected to the gusset plate 17 and fixed by bolts or the like. Was there.

ところで、このような接合構造2,12は、基礎コンクリート3の上面に多少の凹凸があっても、その上に立設される柱部材5の水平や高さ位置を正確に合わせると共に、接合金物4,14と基礎コンクリート3を確実に密着させるために、接合金物4,14と基礎コンクリート3の間に隙間を設けた状態で柱部材5を設置し、後からその隙間にモルタルを注入してモルタル層6を形成するようにしていた。 By the way, in such joint structures 2 and 12, even if the upper surface of the foundation concrete 3 has some unevenness, the horizontal and height positions of the column members 5 erected on the joint structure 3 can be accurately adjusted, and the joint metal fittings can be used. In order to ensure that the 4, 14 and the foundation concrete 3 are in close contact with each other, the column member 5 is installed with a gap between the joining hardware 4, 14 and the foundation concrete 3, and mortar is injected into the gap later. The mortar layer 6 was formed.

図19及び図20は、図17に示す接合構造12を構築する際に用いられる、従来のアンカーボルトの施工方法について説明するために参照する図である。 19 and 20 are views to be referred to for explaining a method of constructing a conventional anchor bolt used when constructing the joint structure 12 shown in FIG.

接合構造12を構築するには、まず、図19(a)に示すように、捨てコンクリート1の上に架台20を設置し、複数のアンカーボルト8を、それぞれの下端部が架台20に固定され、それぞれの長さ部分が図中上下方向に伸びるように配置し、これらのアンカーボルト8のそれぞれの上端部同士を連結するように形板22を取り付ける。 In order to construct the joint structure 12, first, as shown in FIG. 19A, a gantry 20 is installed on the waste concrete 1, and a plurality of anchor bolts 8 are fixed to the gantry 20 at their lower ends. , Each length portion is arranged so as to extend in the vertical direction in the drawing, and the shape plate 22 is attached so as to connect the upper end portions of each of these anchor bolts 8.

形板22は、図19(b)に示すように、平面形状が略正方形の枠板状に形成され、その外形が図3に示す接合金物14のベースプレート16と略同一か、ベースプレート16より大きくなるように形成され、その四隅部にはベースプレート16に形成されたボルト挿通孔16aと同じ位置に貫通孔22aが形成されると共に、形板22の枠部の内側には略正方形の中央孔22bが形成されていた。 As shown in FIG. 19B, the shape plate 22 is formed in a substantially square frame plate shape, and its outer shape is substantially the same as or larger than the base plate 16 of the metal joint 14 shown in FIG. A through hole 22a is formed at the same position as the bolt insertion hole 16a formed in the base plate 16 at the four corners thereof, and a substantially square central hole 22b is formed inside the frame portion of the shape plate 22. Was formed.

このような形板22が、図19(a)及び(b)に示すように、形板22の貫通孔22aにアンカーボルト8の上端部が挿通され、アンカーボルト8の上端部のオネジ部には、2つのナット24が形板22を表裏両側から挟むようにネジ締結されていた。 As shown in FIGS. 19A and 19B, the upper end portion of the anchor bolt 8 is inserted into the through hole 22a of the shape plate 22 and the male threaded portion of the upper end portion of the anchor bolt 8 is inserted into the shape plate 22. The two nuts 24 were screwed together so as to sandwich the profile plate 22 from both the front and back sides.

これにより、複数のアンカーボルト8の上端部の水平方向の位置や互いの間隔が、接合金物14のベースプレート16に形成されたボルト挿通孔16aの水平方向の位置と一致した状態から動かないように固定されていた。 As a result, the horizontal positions of the upper ends of the plurality of anchor bolts 8 and the distance between them do not move from the state where they match the horizontal positions of the bolt insertion holes 16a formed in the base plate 16 of the metal joint 14. It was fixed.

次に、図20(a)に示すように、これらの形板22、複数のアンカーボルト8、及び架台20から水平方向(図中左右方向、又は図の紙面に垂直方向)に離れた位置に、形板22、複数のアンカーボルト8、及び架台20の周囲を囲むように、捨てコンクリート1の上に打設用型枠26を設け、この打設用型枠26の内側の、形板22、複数のアンカーボルト8、及び架台20の周囲に、同図(b)に示すように、アンカーボルト8の上端部がコンクリート上面より上方に突出するように、生コンクリート3aを打設する。 Next, as shown in FIG. 20A, at positions separated from these formwork 22, the plurality of anchor bolts 8, and the gantry 20 in the horizontal direction (horizontal direction in the figure or direction perpendicular to the paper surface in the figure). , A casting formwork 26 is provided on the waste concrete 1 so as to surround the shape plate 22, the plurality of anchor bolts 8, and the gantry 20, and the formwork 22 inside the casting formwork 26. As shown in FIG. 3B, ready-mixed concrete 3a is placed around the plurality of anchor bolts 8 and the formwork 20 so that the upper end of the anchor bolts 8 protrudes above the upper surface of the concrete.

そして、打設した生コンクリート3aを一定期間養生させて十分に硬化させた後、アンカーボルト8の上端部からナット24を外して、形板22を取り除くことにより、図20(b)に示すように、複数のアンカーボルト8が、その長さ部分が基礎コンクリート3のコンクリートの内部に埋設されて、その上端部が基礎コンクリート3の上面より上方に突出するように配置されるようになっていた。 Then, after the cast ready-mixed concrete 3a is cured for a certain period of time and sufficiently hardened, the nut 24 is removed from the upper end of the anchor bolt 8 and the shape plate 22 is removed, as shown in FIG. 20 (b). In addition, a plurality of anchor bolts 8 are arranged so that their length portions are embedded inside the concrete of the foundation concrete 3 and the upper end portions thereof project upward from the upper surface of the foundation concrete 3. ..

そして、予め工場等で製造されて、下端部に接合金物14が一体的に固定された柱部材5を、図21(a)に示すように、柱部材5の下端部に固定された接合金物14のベースプレート16に形成されたボルト挿通孔16aにアンカーボルト8の上端部が挿通されるようにして、基礎コンクリート3の上に立設する。 Then, as shown in FIG. 21A, the column member 5 manufactured in advance at a factory or the like and having the joint metal fitting 14 integrally fixed to the lower end portion is fixed to the lower end portion of the pillar member 5. The anchor bolt 8 is erected on the foundation concrete 3 so that the upper end portion of the anchor bolt 8 is inserted into the bolt insertion hole 16a formed in the base plate 16 of 14.

このとき、基礎コンクリート3の上面に多少の凹凸があっても、その上に立設される柱部材5の水平や高さ位置を正確に合わせることができるようにするために、基礎コンクリート3の上面に部分モルタル28を形成し、その上に柱部材5の下端部に固定された接合金物14のベースプレート16の下面に設けられた突出部18が載置されるようにする。 At this time, even if the upper surface of the foundation concrete 3 has some irregularities, the foundation concrete 3 is provided so that the horizontal and height positions of the pillar members 5 erected on the pillar member 5 can be accurately aligned. A partial mortar 28 is formed on the upper surface, and a protruding portion 18 provided on the lower surface of the base plate 16 of the joining metal fitting 14 fixed to the lower end portion of the pillar member 5 is placed on the partial mortar 28.

そして、接合金物14のベースプレート16の上面より上方に突出するアンカーボルト8の上端部のオネジ部にナット10をネジ締結する。 Then, the nut 10 is screwed to the male threaded portion at the upper end of the anchor bolt 8 projecting upward from the upper surface of the base plate 16 of the metal joint 14.

そして、図21(b)に示すように、打設用型枠26の内側の、接合金物14と基礎コンクリート3の間の隙間に、接合金物14の突出部18の上端部から下端部までの全ての部分が、モルタル上面より下方に向かってモルタル6a内に配置されるように、モルタル6aを注入する。 Then, as shown in FIG. 21B, in the gap between the joint metal fitting 14 and the foundation concrete 3 inside the casting form 26, from the upper end portion to the lower end portion of the protruding portion 18 of the joint metal fitting 14. The mortar 6a is injected so that all the portions are arranged in the mortar 6a downward from the upper surface of the mortar.

そして、注入したモルタル6aを一定期間養生させて十分に硬化させたモルタル層6を形成した後、打設用型枠26を取り除くことにより、図17に示す接合構造12が構築されるようになっていた。 Then, the injected mortar 6a is cured for a certain period of time to form a sufficiently hardened mortar layer 6, and then the casting formwork 26 is removed to construct the joint structure 12 shown in FIG. Was there.

特開2000−319990号公報Japanese Unexamined Patent Publication No. 2000-319990

しかしながら、上述したような従来のアンカーボルトの施工方法では、接合構造を構築する際に、モルタル層を形成するために使用するモルタルの量が多くなることにより、材料費の増加や施工性の低下を招くおそれがあった。 However, in the conventional anchor bolt construction method as described above, when constructing the joint structure, the amount of mortar used to form the mortar layer increases, resulting in an increase in material cost and a decrease in workability. There was a risk of inviting.

すなわち、図17及び図18(b)に示す接合構造12,30においては、接合金物14の突出部18の上端部から下端部までの全ての部分が、モルタル層6の内部に配置される必要があるため、図16及び図18(a)に示す接合構造2,29に比べて、モルタル層6の厚さ寸法は大きくなり、その分、使用するモルタルの量が多くなっていた。 That is, in the joining structures 12 and 30 shown in FIGS. 17 and 18B, all the portions from the upper end to the lower end of the protruding portion 18 of the joining metal fitting 14 need to be arranged inside the mortar layer 6. Therefore, the thickness dimension of the mortar layer 6 is larger than that of the joint structures 2 and 29 shown in FIGS. 16 and 18 (a), and the amount of mortar used is increased accordingly.

そして、そのようなモルタル層6を形成するためには、基礎コンクリート3を形成するための一般的な生コンクリートより高価な無収縮性のモルタルを使用するため、接合構造の施工工事の材料費が増加するおそれがあった。 Then, in order to form such a mortar layer 6, a non-shrinkable mortar, which is more expensive than general ready-mixed concrete for forming the foundation concrete 3, is used, so that the material cost for the construction work of the joint structure is high. There was a risk of an increase.

また、柱脚部に作用する外力を基礎コンクリート3に確実に伝達するためには、十分な量のモルタル3aを接合金物14と基礎コンクリート3の間に隙間なく注入する必要があるため、注入するモルタル3aの量が増えると、注入に要する時間が長くなり、接合構造の施工工事の効率が低下するおそれがあった。 Further, in order to reliably transmit the external force acting on the column base to the foundation concrete 3, it is necessary to inject a sufficient amount of mortar 3a between the joint metal fitting 14 and the foundation concrete 3 without a gap. When the amount of the mortar 3a is increased, the time required for injection becomes long, and there is a risk that the efficiency of the construction work of the joint structure may be lowered.

そして、そのような、接合構造の施工工事における材料費の増加や施工性の低下を招くことにより、接合構造の施工工事全体のコストの増加を招くおそれがあった。 Further, such an increase in material cost and a decrease in workability in the construction work of the joint structure may lead to an increase in the cost of the entire construction work of the joint structure.

そこで本発明は、上記問題点に鑑みて、接合構造の施工工事において、モルタル層を形成するために使用するモルタルの量を減らすことができ、そのことにより、材料費の低減、及び施工性の向上を図り、そのことにより施工コストを低減することができるアンカーボルトの施工方法、及びその方法に使用する箱抜き用型枠を提供することを課題とするものである。 Therefore, in view of the above problems, the present invention can reduce the amount of mortar used for forming the mortar layer in the construction work of the joint structure, thereby reducing the material cost and the workability. An object of the present invention is to provide an anchor bolt construction method capable of improving the construction cost and thereby reducing the construction cost, and a box-extracting formwork used for the method.

本発明によるアンカーボルトの施工方法は、上記課題を解決するために、
捨てコンクリートの上に、複数のアンカーボルトを、それぞれの長さ部分が上下方向に伸びるように配置し、
前記アンカーボルトに箱抜き用型枠を備えた形板を取り付け、
前記形板及び前記複数のアンカーボルトから水平方向に離れた周囲を囲うように、捨てコンクリートの上に打設用型枠を配置し、
生コンクリートを、前記打設用型枠の内側の前記形板と前記複数のアンカーボルトの周囲に、前記アンカーボルトの上端部が打設した前記生コンクリートの上面より上方に突出すると共に、打設した前記生コンクリートの上面が前記箱抜き用型枠の下端部より上方、かつ前記箱抜き用型枠の上端部より下方に位置するように打設することにより、
前記複数のアンカーボルトが、それぞれの長さ部分がコンクリートの内部に埋設され、それぞれの上端部が前記コンクリートの上面から突出するように配置されると共に、
前記箱抜き用型枠によって、前記コンクリートの上面に開口する凹部が形成される
ことを特徴とするものである。
In order to solve the above problems, the method of constructing anchor bolts according to the present invention
Multiple anchor bolts are placed on the waste concrete so that their respective lengths extend in the vertical direction.
Attach a profile plate with a box-extracting formwork to the anchor bolts,
A casting formwork is placed on the waste concrete so as to surround the shape plate and the plurality of anchor bolts horizontally separated from each other.
The ready-mixed concrete is placed around the shape plate and the plurality of anchor bolts inside the casting form, with the upper end of the anchor bolts projecting upward from the upper surface of the ready-mixed concrete placed. By placing the ready-mixed concrete so that the upper surface of the ready-mixed concrete is located above the lower end of the box-extracting formwork and below the upper end of the box-extracting formwork.
The plurality of anchor bolts are arranged so that their respective length portions are embedded in the concrete and the upper end portions thereof protrude from the upper surface of the concrete.
The box-extracting formwork is characterized in that a recess that opens on the upper surface of the concrete is formed.

また、本発明によるアンカーボルトの施工方法は、
前記生コンクリートが硬化した後、前記箱抜き用型枠は前記形板と共に前記アンカーボルトから取り除かれる
ことを特徴とするものである。
Further, the method of constructing an anchor bolt according to the present invention is as follows.
After the ready-mixed concrete is hardened, the box-extracting formwork is removed from the anchor bolt together with the shape plate.

また、本発明によるアンカーボルトの施工方法は、
前記生コンクリートが硬化した後、前記形板は前記コンクリートの内部に埋設され、前記箱抜き用型枠は前記コンクリートの前記凹部に残置される
ことを特徴とするものである。
Further, the method of constructing an anchor bolt according to the present invention is as follows.
After the ready-mixed concrete is hardened, the shape plate is embedded inside the concrete, and the box-extracting formwork is left in the recess of the concrete.

また、本発明によるアンカーボルトの施工方法は、
前記箱抜き用型枠は、前記形板に対して着脱可能に設けられ、
前記生コンクリートが硬化した後、前記形板と前記箱抜き用型枠は分離され、前記形板は前記アンカーボルトから取り除かれ、前記箱抜き用型枠は前記コンクリートの前記凹部に残置される
ことを特徴とするものである。
Further, the method of constructing an anchor bolt according to the present invention is as follows.
The box removal form is provided so as to be removable from the shape plate.
After the ready-mixed concrete has hardened, the formwork and the box-extracting formwork are separated, the formwork is removed from the anchor bolts, and the box-extracting formwork is left in the recesses of the concrete. It is characterized by.

また、本発明によるアンカーボルトの施工方法は、
前記コンクリートによって形成された基礎に柱部材の下端部を固定するための接合構造であって、
前記基礎の上に、板状のベースプレートと前記ベースプレートの下面から突出するように設けられた突出部を備えた接合金物が設けられ、
前記ベースプレートの上面に前記柱部材の下端部が接合され、
前記突出部が前記凹部の内側に配置されて、その上端部から下端部までの全ての部分が、前記基礎と前記接合金物の間に設けられたモルタル層の内部に埋設され、
前記アンカーボルトの上端部が前記ベースプレートに結合されたような接合構造を構築するために用いられる
ことを特徴とするものである。
Further, the method of constructing an anchor bolt according to the present invention is as follows.
It is a joint structure for fixing the lower end of the column member to the foundation formed by the concrete.
On the foundation, a plate-shaped base plate and a metal joint having a protrusion provided so as to project from the lower surface of the base plate are provided.
The lower end of the pillar member is joined to the upper surface of the base plate.
The protrusion is arranged inside the recess, and the entire portion from the upper end to the lower end is embedded inside the mortar layer provided between the foundation and the metal joint.
It is characterized in that it is used to construct a joint structure in which the upper end portion of the anchor bolt is bonded to the base plate.

また、本発明によるアンカーボルトの施工方法は、
前記コンクリートによって形成された梁にブレースの端部を固定するための接合構造であって、
前記梁の長さ途中部に、板状のベースプレートと前記ベースプレートの下面から突出するように設けられた突出部を備えた接合金物が設けられ、
前記ベースプレートの上面に設けられたガセットプレートに前記ブレースの端部が固定され、
前記突出部が前記凹部の内側に配置されて、その上端部から下端部までの全ての部分が、前記梁と前記接合金物の間に設けられたモルタル層の内部に埋設され、
前記アンカーボルトの上端部が前記ベースプレートに結合されたような接合構造を構築するために用いられる
ことを特徴とするものである。
Further, the method of constructing an anchor bolt according to the present invention is as follows.
It is a joint structure for fixing the end of the brace to the beam formed of the concrete.
A metal joint having a plate-shaped base plate and a protruding portion provided so as to project from the lower surface of the base plate is provided in the middle of the length of the beam.
The end of the brace is fixed to a gusset plate provided on the upper surface of the base plate.
The protrusion is arranged inside the recess, and the entire portion from the upper end to the lower end is embedded inside the mortar layer provided between the beam and the metal joint.
It is characterized in that it is used to construct a joint structure in which the upper end portion of the anchor bolt is bonded to the base plate.

また、本発明による箱抜き用型枠は、
捨てコンクリートの上に、それぞれの長さ部分が上下方向に伸びるように配置された複数のアンカーボルトに取り付けられる形板に設けられた箱抜き用型枠であって、
前記形板及び前記複数のアンカーボルトから水平方向に離れた周囲を囲うように、捨てコンクリートの上に打設用型枠を配置し、
生コンクリートを、前記打設用型枠の内側の前記形板と前記複数のアンカーボルトの周囲に、前記アンカーボルトの上端部が打設した前記生コンクリートの上面より上方に突出すると共に、打設した前記生コンクリートの上面が前記箱抜き用型枠の下端部より上方、かつ前記箱抜き用型枠の上端部より下方に位置するように打設することにより、
前記複数のアンカーボルトが、それぞれの長さ部分がコンクリートの内部に埋設され、それぞれの上端部が前記コンクリートの上面から突出するように配置されると共に、
前記箱抜き用型枠によって、前記コンクリートの上面に開口する凹部が形成されるようにしたアンカーボルトの施工方法に使用するものである
ことを特徴とするものである。
Further, the box-extracting form according to the present invention is
It is a formwork for boxing provided on a shape plate attached to a plurality of anchor bolts arranged so that each length portion extends in the vertical direction on the waste concrete.
A casting formwork is placed on the waste concrete so as to surround the shape plate and the plurality of anchor bolts horizontally separated from each other.
The ready-mixed concrete is placed around the shape plate and the plurality of anchor bolts inside the casting form, with the upper end of the anchor bolts projecting upward from the upper surface of the ready-mixed concrete placed. By placing the ready-mixed concrete so that the upper surface of the ready-mixed concrete is located above the lower end of the box-extracting formwork and below the upper end of the box-extracting formwork.
The plurality of anchor bolts are arranged so that their respective length portions are embedded in the concrete and the upper end portions thereof protrude from the upper surface of the concrete.
It is characterized in that it is used in a method of constructing anchor bolts in which a recess that opens on the upper surface of the concrete is formed by the box-extracting formwork.

また、本発明による箱抜き用型枠は、
前記箱抜き用型枠は、上端部が開放され、下端部が閉塞された筒状に形成された
ことを特徴とするものである。
Further, the box-extracting form according to the present invention is
The box-extracting form is characterized in that the upper end is open and the lower end is closed to form a cylindrical shape.

また、本発明による箱抜き用型枠は、
前記箱抜き用型枠は、上下両端部が開放された筒状に形成された
ことを特徴とするものである。
Further, the box-extracting form according to the present invention is
The box-extracting form is characterized in that it is formed in a cylindrical shape with both upper and lower ends open.

このような本発明のアンカーボルトの施工方法によれば、
捨てコンクリートの上に、複数のアンカーボルトを、それぞれの長さ部分が上下方向に伸びるように配置し、
前記アンカーボルトに箱抜き用型枠を備えた形板を取り付け、
前記形板及び前記複数のアンカーボルトから水平方向に離れた周囲を囲うように、捨てコンクリートの上に打設用型枠を配置し、
生コンクリートを、前記打設用型枠の内側の前記形板と前記複数のアンカーボルトの周囲に、前記アンカーボルトの上端部が打設した前記生コンクリートの上面より上方に突出すると共に、打設した前記生コンクリートの上面が前記箱抜き用型枠の下端部より上方、かつ前記箱抜き用型枠の上端部より下方に位置するように打設することにより、
前記複数のアンカーボルトが、それぞれの長さ部分がコンクリートの内部に埋設され、それぞれの上端部が前記コンクリートの上面から突出するように配置されると共に、
前記箱抜き用型枠によって、前記コンクリートの上面に開口する凹部が形成されることにより、
接合構造の施工工事において、モルタル層を形成するために使用するモルタルの量を減らすことができ、そのことにより、材料費の低減、及び施工性の向上を図り、そのことにより施工コストを低減することができる。
According to such an anchor bolt construction method of the present invention,
Multiple anchor bolts are placed on the waste concrete so that their respective lengths extend in the vertical direction.
Attach a profile plate with a box-extracting formwork to the anchor bolts,
A casting formwork is placed on the waste concrete so as to surround the shape plate and the plurality of anchor bolts horizontally separated from each other.
The ready-mixed concrete is placed around the shape plate and the plurality of anchor bolts inside the casting form, with the upper end of the anchor bolts projecting upward from the upper surface of the ready-mixed concrete placed. By placing the ready-mixed concrete so that the upper surface of the ready-mixed concrete is located above the lower end of the box-extracting formwork and below the upper end of the box-extracting formwork.
The plurality of anchor bolts are arranged so that their respective length portions are embedded in the concrete and the upper end portions thereof protrude from the upper surface of the concrete.
By forming a recess that opens on the upper surface of the concrete by the box-extracting formwork,
In the construction work of the joint structure, the amount of mortar used to form the mortar layer can be reduced, thereby reducing the material cost and improving the workability, thereby reducing the construction cost. be able to.

このような本発明の箱抜き用型枠によれば、
捨てコンクリートの上に、それぞれの長さ部分が上下方向に伸びるように配置された複数のアンカーボルトに取り付けられる形板に設けられた箱抜き用型枠であって、
前記形板及び前記複数のアンカーボルトから水平方向に離れた周囲を囲うように、捨てコンクリートの上に打設用型枠を配置し、
生コンクリートを、前記打設用型枠の内側の前記形板と前記複数のアンカーボルトの周囲に、前記アンカーボルトの上端部が打設した前記生コンクリートの上面より上方に突出すると共に、打設した前記生コンクリートの上面が前記箱抜き用型枠の下端部より上方、かつ前記箱抜き用型枠の上端部より下方に位置するように打設することにより、
前記複数のアンカーボルトが、それぞれの長さ部分がコンクリートの内部に埋設され、それぞれの上端部が前記コンクリートの上面から突出するように配置されると共に、
前記箱抜き用型枠によって、前記コンクリートの上面に開口する凹部が形成されるようにしたアンカーボルトの施工方法に使用するものであるあることにより、
接合構造の施工工事において、モルタル層を形成するために使用するモルタルの量を減らすことができ、そのことにより、材料費の低減、及び施工性の向上を図り、そのことにより施工コストを低減することができる。
According to such a box-extracting form of the present invention,
It is a formwork for boxing provided on a shape plate attached to a plurality of anchor bolts arranged so that each length portion extends in the vertical direction on the waste concrete.
A casting formwork is placed on the waste concrete so as to surround the shape plate and the plurality of anchor bolts horizontally separated from each other.
The ready-mixed concrete is placed around the shape plate and the plurality of anchor bolts inside the casting form, with the upper end of the anchor bolts projecting upward from the upper surface of the ready-mixed concrete placed. By placing the ready-mixed concrete so that the upper surface of the ready-mixed concrete is located above the lower end of the box-extracting formwork and below the upper end of the box-extracting formwork.
The plurality of anchor bolts are arranged so that their respective length portions are embedded in the concrete and the upper end portions thereof protrude from the upper surface of the concrete.
By using the box-extracting formwork for an anchor bolt construction method in which a recess opening is formed on the upper surface of the concrete.
In the construction work of the joint structure, the amount of mortar used to form the mortar layer can be reduced, thereby reducing the material cost and improving the workability, thereby reducing the construction cost. be able to.

本発明の第1の実施の形態に係るアンカーボルトの施工方法を用いて構築される柱脚部の接合構造32を示す概略側面図である。It is a schematic side view which shows the joint structure 32 of the column base part constructed by using the construction method of the anchor bolt which concerns on 1st Embodiment of this invention. 図1に示す接合構造32を示す概略平面図である。It is a schematic plan view which shows the joint structure 32 shown in FIG. 図1に示す接合構造32に使用する接合金物14を示す図であって、図3(a)はその平面図であり、図3(b)はその側面図である。It is a figure which shows the joining metal fitting 14 used for the joining structure 32 shown in FIG. 1, FIG. 3A is a plan view thereof, and FIG. 3B is a side view thereof. 本発明の第1の実施の形態に係るアンカーボルトの施工方法を説明するための概略図であって、図4(a)はその側面図であり、図4(b)はその平面図である。It is a schematic diagram for demonstrating the construction method of the anchor bolt which concerns on 1st Embodiment of this invention, FIG. 4A is a side view, and FIG. 4B is a plan view thereof. .. 本発明の第1の実施の形態に係るアンカーボルトの施工方法を説明するための概略側面図である。It is a schematic side view for demonstrating the construction method of the anchor bolt which concerns on 1st Embodiment of this invention. 本発明の第1の実施の形態に係るアンカーボルトの施工方法を用いて、図1に示す接合構造32を構築する手順を説明するための概略側面図である。It is a schematic side view for demonstrating the procedure for constructing the joint structure 32 shown in FIG. 1 by using the anchor bolt construction method which concerns on 1st Embodiment of this invention. 本発明の第1の実施の形態に係るアンカーボルトの施工方法に使用する形板42と箱抜き用型枠44を示す図であって、図7(a)はその斜視図であり、図7(b)は図7(a)におけるA−A線矢視断面図である。FIG. 7A is a view showing a shape plate 42 and a box-extracting formwork 44 used in the method of constructing anchor bolts according to the first embodiment of the present invention, and FIG. 7A is a perspective view thereof. FIG. (B) is a cross-sectional view taken along the line AA in FIG. 7 (a). 本発明の第2の実施の形態に係るアンカーボルトの施工方法に使用する形板52と箱抜き用型枠54を示す図であって、図8(a)はその斜視図であり、図8(b)は図8(a)におけるB−B線矢視断面図である。It is a figure which shows the shape plate 52 and the formwork 54 for boxing used in the construction method of the anchor bolt which concerns on 2nd Embodiment of this invention, FIG. 8A is the perspective view, and FIG. (B) is a cross-sectional view taken along the line BB in FIG. 8 (a). 本発明の第2の実施の形態に係るアンカーボルトの施工方法を説明するための概略側面図である。It is a schematic side view for demonstrating the construction method of the anchor bolt which concerns on 2nd Embodiment of this invention. 本発明の第3の実施の形態に係るアンカーボルトの施工方法に使用する形板62と箱抜き用型枠64を示す図であって、図10(a)はその斜視図であり、図10(b)は図10(a)におけるC−C線矢視断面図である。It is a figure which shows the shape plate 62 and the formwork 64 for boxing used in the construction method of the anchor bolt which concerns on 3rd Embodiment of this invention, FIG. 10A is the perspective view, and FIG. (B) is a cross-sectional view taken along the line CC in FIG. 10 (a). 本発明の第3の実施の形態に係るアンカーボルトの施工方法を説明するための概略側面図である。It is a schematic side view for demonstrating the construction method of the anchor bolt which concerns on 3rd Embodiment of this invention. 本発明の第3の実施の形態に係るアンカーボルトの施工方法を用いて、図1に示す接合構造32を構築する手順を説明するための概略側面図である。It is a schematic side view for demonstrating the procedure of constructing the joint structure 32 shown in FIG. 1 by using the anchor bolt construction method which concerns on 3rd Embodiment of this invention. 本発明の第4の実施の形態に係るアンカーボルトの施工方法に使用する形板72と箱抜き用型枠74を示す図であって、図13(a)はその斜視図であり、図13(b)は図13(a)におけるD−D線矢視断面図である。It is a figure which shows the shape plate 72 and the formwork 74 for boxing used in the construction method of the anchor bolt which concerns on 4th Embodiment of this invention, FIG. 13A is the perspective view, FIG. (B) is a cross-sectional view taken along the line DD in FIG. 13 (a). 本発明の第4の実施の形態に係るアンカーボルトの施工方法を説明するための概略側面図である。It is a schematic side view for demonstrating the construction method of the anchor bolt which concerns on 4th Embodiment of this invention. 本発明の実施の形態に係るアンカーボルトの施工方法を用いて構築されるブレース9と基礎梁7の接合構造82を示す概略側面図である。It is a schematic side view which shows the joint structure 82 of the brace 9 and the foundation beam 7 constructed by using the construction method of the anchor bolt which concerns on embodiment of this invention. 接合金物4を用いた柱脚部の接合構造2を示す概略側面図である。It is a schematic side view which shows the joint structure 2 of the column base part using the joint metal fitting 4. 接合金物14を用いた柱脚部の接合構造12を示す概略側面図である。It is a schematic side view which shows the joint structure 12 of the column base part using the joint metal fitting 14. 図18(a)は接合金物4を用いたブレース9と基礎梁7の接合構造29を示す概略側面図であり、図18(b)は接合金物14を用いたブレース9と基礎梁7の接合構造30を示す概略側面図である。FIG. 18 (a) is a schematic side view showing a joint structure 29 of the brace 9 and the foundation beam 7 using the metal joint 4, and FIG. 18 (b) is a joint of the brace 9 and the foundation beam 7 using the metal joint 14. It is a schematic side view which shows the structure 30. 従来のアンカーボルトの施工方法を説明するための概略図であって、図19(a)はその側面図であり、図19(b)はその平面図である。It is a schematic diagram for demonstrating the construction method of the conventional anchor bolt, FIG. 19A is a side view thereof, and FIG. 19B is a plan view thereof. 従来のアンカーボルトの施工方法を説明するための概略側面図である。It is a schematic side view for demonstrating the construction method of the conventional anchor bolt. 従来のアンカーボルトの施工方法を用いて、図17に示す接合構造12を構築する手順を説明するための概略側面図である。It is a schematic side view for demonstrating the procedure of constructing the joint structure 12 shown in FIG. 17 by using the conventional anchor bolt construction method.

以下、本発明に係るアンカーボルトの施工方法、及びその方法に使用する箱抜き用型枠を実施するための形態について、図面に基づいて具体的に説明する。なお、図16ないし図21に示す従来の構成と同様の部分には、一部を除き同じ符号を付して説明するものとする。 Hereinafter, the method of constructing the anchor bolt according to the present invention and the mode for carrying out the box-extracting formwork used in the method will be specifically described with reference to the drawings. It should be noted that the same parts as those in the conventional configuration shown in FIGS. 16 to 21 will be described with the same reference numerals except for a part.

図1ないし図7は、本発明の第1の実施の形態に係るアンカーボルトの施工方法、及びその方法に使用する箱抜き用型枠について説明するために参照する図である。 1 to 7 are views for explaining the method of constructing anchor bolts according to the first embodiment of the present invention, and the box-extracting form used for the method.

図1及び図2に示すように、本実施の形態に係るアンカーボルトの施工方法を用いて構築される接合構造32は、基礎コンクリート33の上に立設された柱部材5と、柱部材5の下端部に設けられた接合金物14と、基礎コンクリート33の内部に埋設され、上端部が接合金物14に結合された複数のアンカーボルト8を備えている。 As shown in FIGS. 1 and 2, the joint structure 32 constructed by using the anchor bolt construction method according to the present embodiment includes a column member 5 erected on the foundation concrete 33 and a column member 5. It is provided with a metal joint 14 provided at the lower end portion of the above, and a plurality of anchor bolts 8 embedded inside the foundation concrete 33 and having an upper end portion bonded to the metal joint 14.

柱部材5は、水平断面形状が略正方形の角筒状に形成された角型鋼管であって、基礎コンクリート33の上に鉛直方向(図1中上下方向)に伸びるように立設され、その下端部には接合金物14が固定されている。 The column member 5 is a square steel pipe formed in a square cylindrical shape having a substantially square horizontal cross-sectional shape, and is erected on the foundation concrete 33 so as to extend in the vertical direction (vertical direction in FIG. 1). A metal joint 14 is fixed to the lower end.

接合金物14は、図3に示すように、ベースプレート16と、ベースプレート16の下面に設けられた突出部18を備えている。 As shown in FIG. 3, the metal joint 14 includes a base plate 16 and a protrusion 18 provided on the lower surface of the base plate 16.

接合金物14のベースプレート16は、図3(a)に示すように、図の紙面に垂直方向に所定の厚さ寸法を有し、平面形状が略正方形の板状に形成され、その板面の四隅部の近傍には、ベースプレート16を厚さ方向に貫通するボルト挿通孔16aが、それぞれの四隅部に1つずつ形成されている。 As shown in FIG. 3A, the base plate 16 of the metal joint 14 has a predetermined thickness dimension in the direction perpendicular to the paper surface of the drawing, and is formed in a substantially square plate shape in a planar shape. In the vicinity of the four corners, one bolt insertion hole 16a that penetrates the base plate 16 in the thickness direction is formed at each of the four corners.

接合金物14の突出部18は、図3(b)に示すように、図中上下方向に所定の高さ寸法を有し、図3(a)に示すように、水平断面形状が略十字型に形成されている。 As shown in FIG. 3B, the protruding portion 18 of the metal joint 14 has a predetermined height dimension in the vertical direction in the drawing, and as shown in FIG. 3A, the horizontal cross-sectional shape is substantially cross-shaped. Is formed in.

すなわち、突出部18は、図3(a)に示すように、図中上下方向に所定の長さ寸法を有し、図中左右方向に所定の厚さ寸法を有する第1垂直板部18aと、図中左右方向に所定の長さ寸法を有し、図中上下方向に所定の厚さ寸法を有する第2垂直板部18bが、それぞれの長さ方向の中央部で略直角に交差して一体的に結合されるように形成されている。 That is, as shown in FIG. 3A, the projecting portion 18 has a predetermined length dimension in the vertical direction in the drawing and a predetermined thickness dimension in the left-right direction in the drawing with the first vertical plate portion 18a. , The second vertical plate portion 18b having a predetermined length dimension in the left-right direction in the drawing and a predetermined thickness dimension in the vertical direction in the drawing intersects substantially at right angles in the central portion in each length direction. It is formed so as to be integrally connected.

そして、このような突出部18が、図3(a)及び(b)に示すように、その上端部がベースプレート16の下面の略中央に一体的に結合され、そこから下方に伸びる突出部18の高さ部分がベースプレート16の下面より下方に突出するように形成されている。 Then, as shown in FIGS. 3A and 3B, the upper end portion of such a protruding portion 18 is integrally connected to substantially the center of the lower surface of the base plate 16, and the protruding portion 18 extends downward from the upper end portion. The height portion of the base plate 16 is formed so as to project downward from the lower surface of the base plate 16.

このような接合部材14は、十分な強度を有する鋼材により形成することができ、例えば、鋼材により形成されたベースプレート16の下面に、複数の鋼板材(第1垂直板部18a及び第2垂直板部18b)を略十字型に組み合わせて形成した突出部18を溶接することにより形成したり、鋳造によりベースプレート16と突出部18を一体的に成型したりすることができる。 Such a joining member 14 can be formed of a steel material having sufficient strength. For example, a plurality of steel plate materials (first vertical plate portion 18a and second vertical plate) are formed on the lower surface of the base plate 16 formed of the steel material. The protruding portion 18 formed by combining the portions 18b) in a substantially cross shape can be formed by welding, or the base plate 16 and the protruding portion 18 can be integrally molded by casting.

そして、接合金物14は、図1に示すように、柱部材5の下端面が接合金物14のベースプレート16の上面に当接するように、柱部材5の下端部に配置され、柱部材5の側面とベースプレート16の上面を、柱部材5の下端部の周部に沿って溶接することにより、柱部材5の下端部に固定されている。 Then, as shown in FIG. 1, the metal joint 14 is arranged at the lower end of the pillar member 5 so that the lower end surface of the pillar member 5 abuts on the upper surface of the base plate 16 of the metal joint 14, and the side surface of the pillar member 5 is arranged. And the upper surface of the base plate 16 are fixed to the lower end portion of the pillar member 5 by welding along the peripheral portion of the lower end portion of the pillar member 5.

このとき、接合金物14のベースプレート16は、図1及び図2に示すように、その外形が柱部材5の下端部の外側面の水平断面形状より大きくなるように形成され、ベースプレート16のボルト挿通孔16aは、柱部材5の下端部の外側面より外側に位置するように形成されている。 At this time, as shown in FIGS. 1 and 2, the base plate 16 of the metal joint 14 is formed so that its outer shape is larger than the horizontal cross-sectional shape of the outer surface of the lower end portion of the column member 5, and the bolt insertion of the base plate 16 is performed. The hole 16a is formed so as to be located outside the outer surface of the lower end portion of the pillar member 5.

そして、そのようにして接合金物14が下端部に固定された柱部材5が、接合金物14と基礎コンクリート33の間に設けられたモルタル層36を介して、基礎コンクリート33の上に立設されている。 Then, the pillar member 5 in which the metal joint 14 is fixed to the lower end portion is erected on the foundation concrete 33 via the mortar layer 36 provided between the metal joint 14 and the foundation concrete 33. ing.

このとき、基礎コンクリート33の上面の略中央には、図2に示すように、水平断面形状が略円形に形成された円柱状の凹部33aが形成され、この凹部33aは、図1に示すように、図中上下方向に所定の深さ寸法を有し、基礎コンクリート33の上面から下方に向けて凹むように形成されている。 At this time, as shown in FIG. 2, a columnar recess 33a having a substantially circular horizontal cross-sectional shape is formed at substantially the center of the upper surface of the foundation concrete 33, and the recess 33a is as shown in FIG. In addition, it has a predetermined depth dimension in the vertical direction in the drawing, and is formed so as to be recessed downward from the upper surface of the foundation concrete 33.

そして、凹部33aは、図2に示すように、その内側面の水平断面形状が接合金物14の突出部18の水平断面形状の外形部より大きく、図1に示すように、その深さ寸法が突出部18の高さ寸法より大きくなるように形成されている。 As shown in FIG. 2, the concave portion 33a has a horizontal cross-sectional shape of its inner surface larger than the outer shape of the horizontal cross-sectional shape of the protruding portion 18 of the metal joint 14, and its depth dimension is large as shown in FIG. It is formed so as to be larger than the height dimension of the protruding portion 18.

そして、接合金物14の突出部18が、図1及び図2に示すように、その下端部が基礎コンクリート33の上面より下方に位置するように、凹部33aの内側に配置されている。 Then, as shown in FIGS. 1 and 2, the protruding portion 18 of the metal joint 14 is arranged inside the recess 33a so that the lower end portion thereof is located below the upper surface of the foundation concrete 33.

そして、モルタル層36が、接合金物14と基礎コンクリート33の間に隙間なく設けられ、接合金物14の突出部18の上端部から下端部までの全ての部分が、モルタル層36の上面より下方に向かってモルタル層36の内部に配置されている。 Then, the mortar layer 36 is provided between the metal joint 14 and the foundation concrete 33 without a gap, and all the portions from the upper end to the lower end of the protruding portion 18 of the metal joint 14 are below the upper surface of the mortar layer 36. It is arranged inside the mortar layer 36 toward the outside.

一方、基礎コンクリート33の内部には、図1に示すように、複数のアンカーボルト8が、その長さ部分が基礎コンクリート33の内部に図中上下方向に伸び、その上端部が基礎コンクリート33の上面より上方に突出するように埋設されている。 On the other hand, as shown in FIG. 1, a plurality of anchor bolts 8 extend inside the foundation concrete 33 in the vertical direction in the drawing, and the upper end thereof is the foundation concrete 33. It is buried so as to protrude upward from the upper surface.

そして、これらのアンカーボルト8の上端部は、モルタル層36を図1中上下方向に貫いて、接合金物14のベースプレート16に形成されたボルト挿通孔16aに下方から緩く挿通され、ベースプレート16の上面より上方に突出するアンカーボルト8の上端部のオネジ部には、ナット10がネジ締結されている。 Then, the upper end portions of these anchor bolts 8 penetrate the mortar layer 36 in the vertical direction in FIG. 1 and are loosely inserted from below into the bolt insertion holes 16a formed in the base plate 16 of the metal joint 14, and the upper surface of the base plate 16 is formed. A nut 10 is screwed to the male threaded portion at the upper end of the anchor bolt 8 protruding upward.

このような接合金物32を用いることによっても、図17に示す接合構造12と同様に、接合金物14の突出部18が柱脚部に作用するせん断力を基礎コンクリートへ効率よく伝達するためのシアコッターとして作用するため、建築構造物の柱脚部に作用するせん断力を効率よく基礎コンクリートへと伝達することができるようになっている。 By using such a metal joint 32, as in the joint structure 12 shown in FIG. 17, a shear cotter for efficiently transmitting the shearing force acting on the column base by the protruding portion 18 of the metal joint 14 to the foundation concrete. Therefore, the shearing force acting on the column base of the building structure can be efficiently transmitted to the foundation concrete.

次に、このような接合構造32を構築するために用いられる、アンカーボルトの施工方法について説明する。 Next, an anchor bolt construction method used for constructing such a joint structure 32 will be described.

接合構造32を構築するには、まず、図4(a)に示すように、捨てコンクリート1の上に架台20を設置し、その架台20に複数のアンカーボルト8を固定する。 To construct the joint structure 32, first, as shown in FIG. 4A, a gantry 20 is installed on the waste concrete 1, and a plurality of anchor bolts 8 are fixed to the gantry 20.

このとき、それぞれのアンカーボルト8は、その下端部が架台20に固定され、その長さ部分が図4(a)中上下方向に伸びるように配置されている。 At this time, the lower end of each anchor bolt 8 is fixed to the gantry 20, and the length portion thereof is arranged so as to extend in the vertical direction in FIG. 4A.

そして、これらのアンカーボルト8の水平方向の位置は、図3に示す接合金物14のベースプレート16に形成されたボルト挿通孔16aの水平方向の位置と一致するように配置されている。 The horizontal positions of these anchor bolts 8 are arranged so as to coincide with the horizontal positions of the bolt insertion holes 16a formed in the base plate 16 of the metal joint 14 shown in FIG.

そして、図4(a)及び(b)に示すように、これらのアンカーボルト8の上端部に、それぞれのアンカーボルト8を連結するように、形板42を取り付ける。 Then, as shown in FIGS. 4A and 4B, the shape plate 42 is attached to the upper end of these anchor bolts 8 so as to connect the respective anchor bolts 8.

形板42は、図4(b)に示すように、平面形状が略正方形の枠板状に形成され、その外形は、図3に示す接合金物14のベースプレート16と略同一か、ベースプレート16より大きくなるように形成されている。 As shown in FIG. 4B, the shape plate 42 is formed in a frame plate shape having a substantially square planar shape, and its outer shape is substantially the same as the base plate 16 of the metal joint 14 shown in FIG. 3, or is from the base plate 16. It is formed to be large.

そして、図7(a)に示すように、形板42の四隅部には、図3に示す接合金物14のベースプレート16に形成されたボルト挿通孔16aと同じ位置に、貫通孔42aが形成されると共に、形板42の枠部の内側には、略正方形の中央孔42bが形成されている。 Then, as shown in FIG. 7A, through holes 42a are formed at the four corners of the profile plate 42 at the same positions as the bolt insertion holes 16a formed in the base plate 16 of the metal joint 14 shown in FIG. At the same time, a substantially square central hole 42b is formed inside the frame portion of the shape plate 42.

そして、形板42の下面には、上端部が開放され、下端部が閉塞された円筒状に形成された箱抜き用型枠44が、形板42と一体的に設けられている。 Then, on the lower surface of the shape plate 42, a box-extracting form 44 formed in a cylindrical shape with the upper end portion open and the lower end portion closed is provided integrally with the shape plate 42.

箱抜き用型枠44は、図7(b)に示すように、中心軸線が図中上下方向に伸び、図4(b)に示すように、水平断面形状が略円形に形成された円筒状の側壁部44aと、この側壁部44aの下端部の開口部を閉塞するように設けられた平板状の底板部44bを備え、側壁部44aの上端部が形板42の下面に当接するように配置され、形板42の下面に固定されている。 As shown in FIG. 7 (b), the box-extracting form 44 has a cylindrical shape in which the central axis extends in the vertical direction in the drawing and the horizontal cross-sectional shape is formed in a substantially circular shape as shown in FIG. 4 (b). The side wall portion 44a and the flat plate-shaped bottom plate portion 44b provided so as to close the opening at the lower end portion of the side wall portion 44a are provided so that the upper end portion of the side wall portion 44a abuts on the lower surface of the shape plate 42. It is arranged and fixed to the lower surface of the shape plate 42.

そして、箱抜き用型枠44の内周面の水平断面形状は、接合金物14の突出部18の水平断面形状より大きくなるように形成され、箱抜き用型枠44の中心軸方向の高さ寸法は、突出部18の高さ寸法より大きくなるように形成されている。 The horizontal cross-sectional shape of the inner peripheral surface of the box-extracting formwork 44 is formed to be larger than the horizontal cross-sectional shape of the protruding portion 18 of the metal joint 14, and the height of the box-extracting formwork 44 in the central axis direction. The dimensions are formed so as to be larger than the height dimension of the protruding portion 18.

このような箱抜き用型枠44を備えた形板42が、図4(a)及び(b)に示すように、形板42の貫通孔42aにアンカーボルト8の上端部が挿通され、アンカーボルト8の上端部のオネジ部には、2つのナット24が形板42を表裏両側から挟むようにネジ締結されている。 As shown in FIGS. 4A and 4B, the shape plate 42 provided with such a box-extracting formwork 44 is anchored by inserting the upper end portion of the anchor bolt 8 into the through hole 42a of the shape plate 42. Two nuts 24 are screwed to the male screw portion at the upper end of the bolt 8 so as to sandwich the shape plate 42 from both the front and back sides.

これにより、複数のアンカーボルト8の上端部の水平方向の位置や互いの間隔が、接合金物14のベースプレート16に形成されたボルト挿通孔16aの水平方向の位置と一致した状態から動かないように固定されている。 As a result, the horizontal positions of the upper ends of the plurality of anchor bolts 8 and the distance between them do not move from the state where they match the horizontal positions of the bolt insertion holes 16a formed in the base plate 16 of the metal joint 14. It is fixed.

次に、図5(a)に示すように、これらの形板42、複数のアンカーボルト8、及び架台20から水平方向(図中左右方向、又は図の紙面に垂直方向)に離れた位置に、形板42、複数のアンカーボルト8、及び架台20の周囲を囲むように、捨てコンクリート1の上に打設用型枠26を設ける。 Next, as shown in FIG. 5A, the positions are separated from the formwork 42, the plurality of anchor bolts 8, and the gantry 20 in the horizontal direction (horizontal direction in the figure or perpendicular to the paper surface in the figure). A casting formwork 26 is provided on the waste concrete 1 so as to surround the shape plate 42, the plurality of anchor bolts 8, and the gantry 20.

そして、この打設用型枠26の内側の、形板42、複数のアンカーボルト8、及び架台20の周囲に、生コンクリート33bを打設する。 Then, ready-mixed concrete 33b is placed around the shape plate 42, the plurality of anchor bolts 8, and the gantry 20 inside the casting formwork 26.

このとき、生コンクリート33bは、アンカーボルト8の上端部が打設した生コンクリート33bの上面より上方に突出すると共に、打設した生コンクリート33bの上面が、形板42の下面に固定された箱抜き用型枠44の下端部より上方、かつ箱抜き用型枠44の上端部より下方に位置するように打設される。 At this time, in the ready-mixed concrete 33b, the upper end of the anchor bolt 8 projects upward from the upper surface of the cast ready-mixed concrete 33b, and the upper surface of the cast ready-mixed concrete 33b is fixed to the lower surface of the formwork 42. It is placed so as to be located above the lower end of the punching form 44 and below the upper end of the box punching form 44.

そして、打設した生コンクリート33bを一定期間養生させて十分に硬化させた後、アンカーボルト8の上端部のオネジ部からナット24を取り外して、形板42と箱抜き用型枠44を取り除く。 Then, after the cast ready-mixed concrete 33b is cured for a certain period of time and sufficiently hardened, the nut 24 is removed from the male screw portion at the upper end of the anchor bolt 8 to remove the shape plate 42 and the box-extracting form 44.

それにより、図5(b)に示すように、箱抜き用型枠44を取り除いた跡に、箱抜き用型枠44の側壁部44aの外形に対応した円筒状の内側面と、箱抜き用型枠44の底板部44bの下面の形状に対応した平坦な底面を有する円柱状の凹部33aが、コンクリートの上面の略中央に開口するように形成された基礎コンクリート33が形成され、複数のアンカーボルト8が、その長さ部分が基礎コンクリート33の内部に埋設され、その上端部が基礎コンクリート33の上面より上方に突出するように配置される。 As a result, as shown in FIG. 5B, the traces of removing the box-extracting formwork 44 are the cylindrical inner surface corresponding to the outer shape of the side wall portion 44a of the box-extracting formwork 44, and the box-extracting formwork 44. A foundation concrete 33 is formed in which a columnar recess 33a having a flat bottom surface corresponding to the shape of the lower surface of the bottom plate portion 44b of the formwork 44 is opened substantially in the center of the upper surface of the concrete, and a plurality of anchors are formed. The length portion of the bolt 8 is embedded inside the foundation concrete 33, and the upper end portion thereof is arranged so as to project upward from the upper surface of the foundation concrete 33.

そして、予め工場等で製造されて、下端部に接合金物14が一体的に固定された柱部材5を、図6(a)に示すように、柱部材5の下端部に固定された接合金物14の突出部18の下端部が基礎コンクリート33の凹部33aの内側に配置され、接合金物14のベースプレート16に形成されたボルト挿通孔16aにアンカーボルト8の上端部が挿通されるようにして、基礎コンクリート33の上に立設する。 Then, as shown in FIG. 6A, the pillar member 5 manufactured in advance at a factory or the like and having the joint metal fitting 14 integrally fixed to the lower end portion is fixed to the lower end portion of the pillar member 5. The lower end of the protrusion 18 of the 14 is arranged inside the recess 33a of the foundation concrete 33, and the upper end of the anchor bolt 8 is inserted into the bolt insertion hole 16a formed in the base plate 16 of the metal joint 14. It is erected on the foundation concrete 33.

このとき、基礎コンクリート33の凹部33aの底面に多少の凹凸があっても、その上に立設される柱部材5の水平や高さ位置を正確に合わせることができるようにするために、凹部33aの底面に部分モルタル38を形成し、その上に柱部材5の下端部に固定された接合金物14の下面に設けられた突出部18が載置されるようにする。 At this time, even if the bottom surface of the recess 33a of the foundation concrete 33 has some irregularities, the recesses are provided so that the horizontal and height positions of the pillar members 5 erected on the bottom surface can be accurately aligned. A partial mortar 38 is formed on the bottom surface of the 33a, and a protruding portion 18 provided on the lower surface of the joining metal fitting 14 fixed to the lower end portion of the pillar member 5 is placed on the partial mortar 38.

そして、接合金物14のベースプレート16の上面より上方に突出するアンカーボルト8の上端部のオネジ部にナット10をネジ締結する。 Then, the nut 10 is screwed to the male threaded portion at the upper end of the anchor bolt 8 projecting upward from the upper surface of the base plate 16 of the metal joint 14.

そして、図6(b)に示すように、打設用型枠26の内側の、接合金物14と基礎コンクリート33の間の隙間に、モルタル36aを注入する。 Then, as shown in FIG. 6B, the mortar 36a is injected into the gap between the metal joint 14 and the foundation concrete 33 inside the casting formwork 26.

このとき、接合金物14の突出部18の上端部から下端部までの全ての部分が、モルタル層36の上面より下方に向かってモルタル層36の内部に配置されるように、モルタル36aは、ベースプレート16の下面と基礎コンクリート33の上面との間や、突出部18と基礎コンクリート33の凹部33aとの間の隙間の隅々まで注入される。 At this time, the mortar 36a is a base plate so that all the portions from the upper end to the lower end of the protruding portion 18 of the metal joint 14 are arranged inside the mortar layer 36 downward from the upper surface of the mortar layer 36. It is injected to every corner of the gap between the lower surface of 16 and the upper surface of the foundation concrete 33 and between the protrusion 18 and the recess 33a of the foundation concrete 33.

そして、注入したモルタル36aを一定期間養生させて十分に硬化させたモルタル層36を形成した後、打設用型枠26を取り除くことにより、図1に示す接合構造32が構築されるようになっている。 Then, the injected mortar 36a is cured for a certain period of time to form a sufficiently hardened mortar layer 36, and then the casting formwork 26 is removed to construct the joint structure 32 shown in FIG. ing.

このような本実施の形態に係るアンカーボルトの施工方法を用いることにより、接合構造を構築する際に、接合金物と基礎コンクリートの間に設けられるモルタル層を形成するために使用するモルタルの量の少なくすることができる。 By using the anchor bolt construction method according to the present embodiment, the amount of mortar used to form the mortar layer provided between the metal joint and the foundation concrete when constructing the joint structure. Can be reduced.

すなわち、基礎コンクリート33の上面に開口する凹部33aを形成し、その内側に接合金物14の突出部18が配置されるように柱部材5が立設されるため、図14に示す接合構造12と比べて、接合金物14のベースプレート16の下面と基礎コンクリート33の上面の間のモルタル層36の厚さ寸法が小さくなり、その分、モルタル層36を形成するために使用するモルタルの量を減らすことができる。 That is, since the pillar member 5 is erected so that the recess 33a that opens on the upper surface of the foundation concrete 33 is formed and the protruding portion 18 of the metal joint 14 is arranged inside the recess 33a, the joint structure 12 shown in FIG. In comparison, the thickness dimension of the mortar layer 36 between the lower surface of the base plate 16 of the metal joint 14 and the upper surface of the foundation concrete 33 becomes smaller, and the amount of mortar used to form the mortar layer 36 is reduced accordingly. Can be done.

そのことにより、モルタルの材料費の低減を図ることができると共に、モルタルの注入に要する時間も短縮されるため、施工工事の効率の向上を図ることができる。 As a result, the material cost of the mortar can be reduced, and the time required for injecting the mortar is also shortened, so that the efficiency of the construction work can be improved.

このように、本実施の形態に係るアンカーボルトの施工方法、及びその方法に使用する箱抜き用型枠によれば、接合構造の施工工事において、モルタル層を形成するために使用するモルタルの量を減らすことができ、そのことにより、材料費の低減、及び施工性の向上を図り、そのことにより施工コストを低減することができる。 As described above, according to the anchor bolt construction method according to the present embodiment and the box-extracting formwork used in the method, the amount of mortar used to form the mortar layer in the construction work of the joint structure. By doing so, it is possible to reduce the material cost and improve the workability, thereby reducing the construction cost.

また、本実施の形態に係るアンカーボルトの施工方法によれば、基礎コンクリート33の凹部33aの底面が、箱抜き用型枠44の底板部44bの下面によって平坦に形成されるため、基礎コンクリート33の凹部33aの底面が凹凸状になることを防ぐことができる。 Further, according to the method of constructing the anchor bolts according to the present embodiment, the bottom surface of the recess 33a of the foundation concrete 33 is formed flat by the bottom surface of the bottom plate portion 44b of the box punching form 44, so that the foundation concrete 33 It is possible to prevent the bottom surface of the concave portion 33a of the above from becoming uneven.

そして、そのことにより、柱部材5を立設する際に(図6(a)参照)、基礎コンクリート33の凹部33aの底面に形成する部分モルタル38の厚さ寸法や大きさを小さくしたり、部分モルタル38を形成する工程そのものを省略したりすることができるため、一層、施工工事の効率の向上を図ることができる。 As a result, when the column member 5 is erected (see FIG. 6A), the thickness dimension and size of the partial mortar 38 formed on the bottom surface of the recess 33a of the foundation concrete 33 can be reduced. Since the step itself of forming the partial mortar 38 can be omitted, the efficiency of the construction work can be further improved.

図8及び図9は、本発明の第2の実施の形態に係るアンカーボルトの施工方法、及びその方法に使用する箱抜き用型枠について説明するために参照する図である。 8 and 9 are views for explaining the method of constructing anchor bolts according to the second embodiment of the present invention, and the box-extracting form used for the method.

本実施の形態に係るアンカーボルトの施工方法は、前記第1の実施の形態に係るアンカーボルトの施工方法(図4及び図5参照)における形板42と箱抜き用型枠44(図7参照)の代わりに、図8に示すような形板52と箱抜き用型枠54が用いられている点で、前記第1の実施の形態に係るアンカーボルトの施工方法とはその構成が異なるものである。 The method of constructing the anchor bolts according to the present embodiment is the shape plate 42 and the formwork for boxing 44 (see FIG. 7) in the method of constructing the anchor bolts according to the first embodiment (see FIGS. 4 and 5). ) Is used instead of the shape plate 52 and the box-extracting formwork 54 as shown in FIG. 8, which is different from the anchor bolt construction method according to the first embodiment. Is.

形板52は、図8(a)に示すように、平面形状が略正方形の枠板状に形成され、その外形が、図3に示す接合金物14のベースプレート16と略同一か、ベースプレート16より大きくなるように形成され、その四隅部にはベースプレート16に形成されたボルト挿通孔16aと同じ位置に貫通孔52aが形成されると共に、形板52の枠部の内側には略正方形の中央孔52bが形成されている。 As shown in FIG. 8A, the shape plate 52 is formed in the shape of a frame plate having a substantially square planar shape, and its outer shape is substantially the same as the base plate 16 of the metal joint 14 shown in FIG. 3, or from the base plate 16. It is formed so as to be large, and through holes 52a are formed at the same positions as the bolt insertion holes 16a formed in the base plate 16 at its four corners, and a substantially square central hole is formed inside the frame portion of the shape plate 52. 52b is formed.

そして、形板52の下面には、上下両端部が開放された円筒状に形成された箱抜き用型枠54が、形板52と一体的に設けられている。 Then, on the lower surface of the shape plate 52, a box-extracting form 54 formed in a cylindrical shape with both upper and lower ends open is provided integrally with the shape plate 52.

箱抜き用型枠54は、図8(b)に示すように、中心軸線が図中上下方向に伸び、図8(a)に示すように、水平断面形状が略円形に形成された円筒状の側壁部54aを備え、側壁部54aの上端部が形板52の下面に当接するように配置され、形板52の下面に固定されている。 As shown in FIG. 8B, the box-extracting form 54 has a cylindrical shape in which the central axis extends in the vertical direction in the drawing and the horizontal cross-sectional shape is formed in a substantially circular shape as shown in FIG. 8A. The side wall portion 54a is provided, and the upper end portion of the side wall portion 54a is arranged so as to abut on the lower surface of the shape plate 52 and is fixed to the lower surface of the shape plate 52.

そして、箱抜き用型枠54の内周面の水平断面形状は、接合金物14の突出部18の水平断面形状より大きくなるように形成され、箱抜き用型枠54の中心軸方向の高さ寸法は、突出部18の高さ寸法より大きくなるように形成されている。 The horizontal cross-sectional shape of the inner peripheral surface of the box-extracting form 54 is formed to be larger than the horizontal cross-sectional shape of the protruding portion 18 of the metal joint 14, and the height of the box-extracting form 54 in the central axis direction. The dimensions are formed so as to be larger than the height dimension of the protruding portion 18.

このような箱抜き用型枠54を備えた形板52を用いて、前記第1の実施の形態に係るアンカーボルトの施工方法(図4及び図5参照)と同様の手順を実施することにより、図1に示す接合構造32と同様の接合構造を構築することができる。 By using the shape plate 52 provided with the box-extracting formwork 54, the same procedure as the anchor bolt construction method (see FIGS. 4 and 5) according to the first embodiment is performed. , A joint structure similar to the joint structure 32 shown in FIG. 1 can be constructed.

すなわち、図4(a)及び(b)に示す前記第1の実施の形態に係るアンカーボルトの施工方法の手順と同様に、捨てコンクリート1の上に架台20を設置し、その架台20に複数のアンカーボルト8を固定し、これらのアンカーボルト8の上端部にそれぞれのアンカーボルト8を連結するように形板52を取り付ける。 That is, similarly to the procedure of the method of constructing the anchor bolts according to the first embodiment shown in FIGS. Anchor bolts 8 are fixed, and a shape plate 52 is attached to the upper ends of these anchor bolts 8 so as to connect the respective anchor bolts 8.

そして、図9(a)に示すように、これらの形板52、複数のアンカーボルト8、及び架台20の周囲を囲むように打設用型枠26を設け、この打設用型枠26の内側に生コンクリート33bを打設する。 Then, as shown in FIG. 9A, a casting formwork 26 is provided so as to surround the periphery of these shape plates 52, the plurality of anchor bolts 8, and the gantry 20, and the casting formwork 26 is provided. Ready-mixed concrete 33b is placed inside.

ところで、基礎コンクリートを形成するために使用される一般的な生コンクリートは非常に粘性が高く、通常は、振動機(バイブレータ)を用いてコンクリートの内部や表面に振動を加えながら、型枠の隅々まで生コンクリートを打設するようにしている。 By the way, general ready-mixed concrete used to form foundation concrete is very viscous, and usually, the corners of the formwork are vibrated while applying vibration to the inside and surface of the concrete using a vibrator. I try to cast ready-mixed concrete.

そこで、生コンクリート33bを打設する際に、箱抜き用型枠54の周辺に加える振動を適宜調節することにより、図9(a)に示すように、生コンクリート33bが箱抜き用型枠54の下端部の開口からその内側に流れ込まないように打設することができる。 Therefore, as shown in FIG. 9A, the ready-mixed concrete 33b is formed by the box-extracting formwork 54 by appropriately adjusting the vibration applied to the periphery of the box-extracting formwork 54 when the ready-mixed concrete 33b is placed. It can be placed so that it does not flow inward from the opening at the lower end of the concrete.

そして、打設した生コンクリート33bが十分に硬化した後、形板52と箱抜き用型枠54を取り除くことにより、図9(b)に示すように、箱抜き用型枠54を取り除いた跡に、箱抜き用型枠54の側壁部54aの外形に対応した円筒状の内側面を有する円柱状の凹部33aが、コンクリートの上面の略中央に開口するように形成された基礎コンクリート33が形成され、複数のアンカーボルト8が、その長さ部分が基礎コンクリート33の内部に埋設され、その上端部が基礎コンクリート33の上面より上方に突出するように配置される。 Then, after the cast ready-mixed concrete 33b is sufficiently hardened, the shape plate 52 and the box-extracting formwork 54 are removed to remove the box-extracting formwork 54 as shown in FIG. 9B. In addition, a foundation concrete 33 is formed in which a columnar recess 33a having a cylindrical inner surface corresponding to the outer shape of the side wall portion 54a of the box-extracting formwork 54 is formed so as to open substantially in the center of the upper surface of the concrete. A plurality of anchor bolts 8 are arranged so that their length portions are embedded inside the foundation concrete 33 and the upper end portions thereof project upward from the upper surface of the foundation concrete 33.

そして、図6(a)及び(b)に示す手順と同様に、基礎コンクリート33の凹部33aの底面に部分モルタル38を形成してその上に柱部材5を立設し、打設用型枠26の内側の、接合金物14と基礎コンクリート33の間の隙間にモルタル36aを注入する。 Then, in the same manner as in the procedure shown in FIGS. 6A and 6B, a partial mortar 38 is formed on the bottom surface of the recess 33a of the foundation concrete 33, and the pillar member 5 is erected on the partial mortar, and the casting formwork is erected. The mortar 36a is injected into the gap between the joint metal fitting 14 and the foundation concrete 33 inside the 26.

そして、注入したモルタル36aが十分に硬化したモルタル層36が形成された後、打設用型枠26を取り除くことにより、図1に示す接合構造32と同様の接合構造が構築されるようになっている。 Then, after the injected mortar 36a is sufficiently cured to form the mortar layer 36, the casting formwork 26 is removed to construct a bonding structure similar to the bonding structure 32 shown in FIG. ing.

その他の構成や手順は、前記第1の実施の形態に係る構成や手順と同様であり、このようなアンカーボルトの施工方法、及びその方法に使用する箱抜き用型枠によっても、接合構造の施工工事において、モルタル層を形成するために使用するモルタルの量を減らすことができ、そのことにより、材料費の低減、及び施工性の向上を図り、そのことにより施工コストを低減することができる。 Other configurations and procedures are the same as the configurations and procedures according to the first embodiment, and the joint structure can be formed by the method of constructing such anchor bolts and the box-extracting form used for the method. In the construction work, the amount of mortar used to form the mortar layer can be reduced, thereby reducing the material cost and improving the workability, thereby reducing the construction cost. ..

また、本実施の形態に係るアンカーボルトの施工方法、及びその方法に使用する箱抜き用型枠によれば、箱抜き用型枠の下端部を閉塞する底板部を形成する必要がないため、その分、箱抜き用型枠をより軽量化することができ、箱抜き用型枠の製造コストを低減することができる。 Further, according to the method of constructing the anchor bolts according to the present embodiment and the box-extracting formwork used in the method, it is not necessary to form a bottom plate portion for closing the lower end portion of the box-extracting formwork. Therefore, the weight of the box-extracting form can be reduced, and the manufacturing cost of the box-extracting form can be reduced.

図10ないし図12は、本発明の第3の実施の形態に係るアンカーボルトの施工方法、及びその方法に使用する箱抜き用型枠について説明するために参照する図である。 10 to 12 are views for explaining the method of constructing anchor bolts according to the third embodiment of the present invention, and the box-extracting form used for the method.

本実施の形態に係るアンカーボルトの施工方法は、前記第1の実施の形態に係るアンカーボルトの施工方法(図4及び図5参照)における形板42と箱抜き用型枠44(図7参照)の代わりに、図10に示すような形板62と箱抜き用型枠64が用いられている点で、前記第1の実施の形態に係るアンカーボルトの施工方法とはその構成が異なるものである。 The method of constructing the anchor bolts according to the present embodiment is the shape plate 42 and the formwork for boxing 44 (see FIG. 7) in the method of constructing the anchor bolts according to the first embodiment (see FIGS. 4 and 5). ) Is used instead of the shape plate 62 and the box-extracting formwork 64 as shown in FIG. 10, which is different from the anchor bolt construction method according to the first embodiment. Is.

形板62は、図10(a)に示すように、平面形状が略正方形の枠板状に形成され、その外形が、図3に示す接合金物14のベースプレート16と略同一か、ベースプレート16より大きくなるように形成され、その四隅部にはベースプレート16に形成されたボルト挿通孔16aと同じ位置に貫通孔62aが形成されると共に、形板62の枠部の内側には、略正方形の中央孔62bが形成されている。 As shown in FIG. 10A, the shape plate 62 is formed in a substantially square frame plate shape, and its outer shape is substantially the same as the base plate 16 of the metal joint 14 shown in FIG. 3, or from the base plate 16. It is formed so as to be large, and through holes 62a are formed at the same positions as the bolt insertion holes 16a formed in the base plate 16 at its four corners, and the center of a substantially square is formed inside the frame portion of the shape plate 62. The hole 62b is formed.

そして、形板62の下面には、中心軸線が図10(b)中上下方向に伸びると共に、図10(a)に示すように、平面形状が環状に形成された係合部62cが、形板62と一体的に設けられている。 Then, on the lower surface of the shape plate 62, an engaging portion 62c having a central axis extending in the vertical direction in FIG. 10B and having a planar shape in an annular shape is formed as shown in FIG. 10A. It is provided integrally with the plate 62.

そして、形板62の下面には、係合部62cの他に、上端部が開放され、下端部が閉塞された円筒状に形成された箱抜き用型枠64が設けられている。 Then, on the lower surface of the shape plate 62, in addition to the engaging portion 62c, a box-extracting form 64 formed in a cylindrical shape with the upper end portion open and the lower end portion closed is provided.

箱抜き用型枠64は、図10(b)に示すように、中心軸線が図中上下方向に伸び、図10(a)に示すように、水平断面形状が略円形に形成された円筒状の側壁部64aと、この側壁部64aの下端部の開口部を閉塞するように設けられた平板状の底板部64bを備えている。 As shown in FIG. 10 (b), the box-extracting form 64 has a cylindrical shape in which the central axis extends in the vertical direction in the drawing and the horizontal cross-sectional shape is formed in a substantially circular shape as shown in FIG. 10 (a). The side wall portion 64a and the flat plate-shaped bottom plate portion 64b provided so as to close the opening at the lower end portion of the side wall portion 64a are provided.

そして、箱抜き用型枠64の側壁部64aの外周面の水平断面形状は、係合部62cの内周面の水平断面形状と略同一に形成されている。 The horizontal cross-sectional shape of the outer peripheral surface of the side wall portion 64a of the box-extracting form 64 is formed to be substantially the same as the horizontal cross-sectional shape of the inner peripheral surface of the engaging portion 62c.

そして、箱抜き用型枠64は、その側壁部64aの上端部の外周面が、形板62の下面に固定された係合部62cの内周面に嵌合するように配置されることにより、形板62の下面に対して着脱可能に設けられている。 The box removal formwork 64 is arranged so that the outer peripheral surface of the upper end portion of the side wall portion 64a fits into the inner peripheral surface of the engaging portion 62c fixed to the lower surface of the profile plate 62. , Is detachably provided on the lower surface of the shape plate 62.

そして、箱抜き用型枠64の内周面の水平断面形状は、接合金物14の突出部18の水平断面形状より大きくなるように形成され、箱抜き用型枠64の中心軸方向の高さ寸法は、突出部18の高さ寸法よりわずかに小さくなるように形成されている。 The horizontal cross-sectional shape of the inner peripheral surface of the box-extracting form 64 is formed so as to be larger than the horizontal cross-sectional shape of the protruding portion 18 of the metal joint 14, and the height of the box-extracting form 64 in the central axis direction. The dimension is formed so as to be slightly smaller than the height dimension of the protrusion 18.

このような箱抜き用型枠64を備えた形板62を用いて、前記第1の実施の形態に係るアンカーボルトの施工方法(図4及び図5参照)と同様の手順を実施することにより、図1に示す接合構造32と同様の接合構造を構築することができる。 By carrying out the same procedure as the anchor bolt construction method (see FIGS. 4 and 5) according to the first embodiment using the shape plate 62 provided with such a box-extracting form 64. , A joint structure similar to the joint structure 32 shown in FIG. 1 can be constructed.

すなわち、図4(a)及び(b)に示す前記第1の実施の形態に係るアンカーボルトの施工方法の手順と同様に、捨てコンクリート1の上に架台20を設置し、その架台20に複数のアンカーボルト8を固定し、これらのアンカーボルト8の上端部にそれぞれのアンカーボルト8を連結するように形板62を取り付ける。 That is, similarly to the procedure of the method of constructing the anchor bolts according to the first embodiment shown in FIGS. Anchor bolts 8 are fixed, and a profile plate 62 is attached to the upper ends of these anchor bolts 8 so as to connect the respective anchor bolts 8.

そして、図11(a)に示すように、これらの形板62、複数のアンカーボルト8、及び架台20の周囲を囲むように打設用型枠26を設け、この打設用型枠26の内側に生コンクリート33bを打設する。 Then, as shown in FIG. 11A, a casting formwork 26 is provided so as to surround the periphery of these shape plates 62, the plurality of anchor bolts 8, and the gantry 20, and the casting formwork 26 is provided. Ready-mixed concrete 33b is placed inside.

そして、打設した生コンクリート33bが十分に硬化した後、形板62と箱抜き用型枠64を分離して、形板62だけを取り除く。 Then, after the cast ready-mixed concrete 33b is sufficiently hardened, the shape plate 62 and the box-extracting formwork 64 are separated, and only the shape plate 62 is removed.

それにより、図11(b)に示すように、箱抜き用型枠64の側壁部64aの外形に対応した円筒状の内側面と、箱抜き用型枠64の底板部64bの下面の形状に対応した平坦な底面を有し、コンクリートの上面の略中央に開口するように形成された円柱状の凹部33aに、箱抜き用型枠64が残置された基礎コンクリート33が形成され、複数のアンカーボルト8が、その長さ部分が基礎コンクリート33の内部に埋設され、その上端部が基礎コンクリート33の上面より上方に突出するように配置される。 As a result, as shown in FIG. 11B, the shape of the cylindrical inner surface corresponding to the outer shape of the side wall portion 64a of the box-extracting formwork 64 and the shape of the lower surface of the bottom plate portion 64b of the box-extracting formwork 64 are formed. A foundation concrete 33 in which a box-extracting formwork 64 is left is formed in a columnar recess 33a having a corresponding flat bottom surface and formed so as to open substantially in the center of the upper surface of the concrete, and a plurality of anchors. The length portion of the bolt 8 is embedded inside the foundation concrete 33, and the upper end portion thereof is arranged so as to project upward from the upper surface of the foundation concrete 33.

そして、図12(a)に示すように、柱部材5の下端部に固定された接合金物14の突出部18の下端部が基礎コンクリート33の凹部33aに残置された箱抜き用型枠64の内側に配置され、接合金物14のベースプレート16に形成されたボルト挿通孔16aにアンカーボルト8の上端部が挿通されるようにして、柱部材5を基礎コンクリート33の上に立設する。 Then, as shown in FIG. 12 (a), the lower end of the protruding portion 18 of the joint metal fitting 14 fixed to the lower end of the pillar member 5 is left in the recess 33a of the foundation concrete 33. The column member 5 is erected on the foundation concrete 33 so that the upper end portion of the anchor bolt 8 is inserted into the bolt insertion hole 16a arranged inside and formed in the base plate 16 of the metal joint 14.

このとき、基礎コンクリート33の凹部33aの底面は、箱抜き用型枠64の底板部64bによって平坦に形成されているため、接合金物14の突出部18が箱抜き用型枠64の底板部64bの上面に直接載置されるようにする。 At this time, since the bottom surface of the recess 33a of the foundation concrete 33 is formed flat by the bottom plate portion 64b of the box punching form 64, the protruding portion 18 of the metal joint 14 is formed by the bottom plate portion 64b of the box punching form 64. It should be placed directly on the top surface of the.

また、箱抜き用型枠64の高さ寸法は、突出部18の高さ寸法よりわずかに(例えば5mm程度)小さくなるように形成されているため、箱抜き用型枠64の側壁部64aの上端部と接合金物14のベースプレート16の下面の間には隙間が形成されるようになっている。 Further, since the height dimension of the box-extracting form 64 is formed so as to be slightly smaller (for example, about 5 mm) than the height dimension of the projecting portion 18, the side wall portion 64a of the box-extracting form 64 A gap is formed between the upper end portion and the lower surface of the base plate 16 of the metal joint 14.

そして、接合金物14のベースプレート16の上面より上方に突出するアンカーボルト8の上端部のオネジ部にナット10をネジ締結する。 Then, the nut 10 is screwed to the male threaded portion at the upper end of the anchor bolt 8 projecting upward from the upper surface of the base plate 16 of the metal joint 14.

そして、図12(b)に示すように、打設用型枠26の内側の、接合金物14と基礎コンクリート33の間の隙間、及び、接合金物14のベースプレート16の下面と箱抜き用型枠64の側壁部64aの上端部との間の隙間を通って、箱抜き用型枠64の内側にモルタル36aを注入する。 Then, as shown in FIG. 12B, the gap between the joining metal fitting 14 and the foundation concrete 33 inside the casting formwork 26, and the lower surface of the base plate 16 of the joining metal fitting 14 and the box-extracting formwork. The mortar 36a is injected into the inside of the box-extracting form 64 through the gap between the side wall portion 64a of 64 and the upper end portion.

そして、注入したモルタル36aが十分に硬化したモルタル層36が形成された後、打設用型枠26を取り除くことにより、図1に示す接合構造32と同様の接合構造が構築されるようになっている。 Then, after the injected mortar 36a is sufficiently cured to form the mortar layer 36, the casting formwork 26 is removed to construct a bonding structure similar to the bonding structure 32 shown in FIG. ing.

その他の構成や手順は、前記第1の実施の形態に係る構成や手順と同様であり、このようなアンカーボルトの施工方法、及びその方法に使用する箱抜き用型枠によっても、接合構造の施工工事において、モルタル層を形成するために使用するモルタルの量を減らすことができ、そのことにより、材料費の低減、及び施工性の向上を図り、そのことにより施工コストを低減することができる。 Other configurations and procedures are the same as the configurations and procedures according to the first embodiment, and the joint structure can be formed by the method of constructing such anchor bolts and the box-extracting form used for the method. In the construction work, the amount of mortar used to form the mortar layer can be reduced, thereby reducing the material cost and improving the workability, thereby reducing the construction cost. ..

また、本実施の形態に係るアンカーボルトの施工方法によれば、基礎コンクリート33の凹部33aの底面が、箱抜き用型枠64の底板部64bによって平坦に形成されるため、柱部材5を立設する面が凹凸状になることを防ぐことができる。 Further, according to the method of constructing the anchor bolts according to the present embodiment, the bottom surface of the recess 33a of the foundation concrete 33 is formed flat by the bottom plate portion 64b of the box-extracting formwork 64, so that the pillar member 5 stands up. It is possible to prevent the surface to be installed from becoming uneven.

そして、予め、箱抜き用型枠64の水平や高さ位置を正確に合わせて配置することにより、前記第1の実施の形態に係るアンカーボルトの施工方法を用いて接合構造を構築する際に、柱部材5を立設する際に部分モルタル38を形成する工程(図6(a)参照)を省略することができるため、一層、施工工事の効率の向上を図ることができる。 Then, when the joint structure is constructed by using the anchor bolt construction method according to the first embodiment by arranging the box-extracting formwork 64 in advance by accurately aligning the horizontal and height positions. Since the step of forming the partial mortar 38 (see FIG. 6A) when the pillar member 5 is erected can be omitted, the efficiency of the construction work can be further improved.

図13及び図14は、本発明の第4の実施の形態に係るアンカーボルトの施工方法、及びその方法に使用する箱抜き用型枠について説明するために参照する図である。 13 and 14 are views to be referred to for explaining the method of constructing anchor bolts according to the fourth embodiment of the present invention and the box-extracting formwork used in the method.

本実施の形態に係るアンカーボルトの施工方法は、前記第1の実施の形態に係るアンカーボルトの施工方法(図4及び図5参照)における形板42と箱抜き用型枠44(図7参照)の代わりに、図13に示すような形板72、箱抜き用型枠74が用いられ、更に、図14(a)に示すような追加形板76が用いられている点で、前記第1の実施の形態に係るアンカーボルトの施工方法とはその構成が異なるものである。 The method of constructing the anchor bolts according to the present embodiment is the shape plate 42 and the formwork for boxing 44 (see FIG. 7) in the method of constructing the anchor bolts according to the first embodiment (see FIGS. 4 and 5). ), The shape plate 72 as shown in FIG. 13 and the box-extracting mold 74 are used, and further, the additional shape plate 76 as shown in FIG. 14 (a) is used. The configuration is different from the anchor bolt construction method according to the first embodiment.

形板72は、図13(a)に示すように、平面形状が略正方形の枠板状に形成され、その外形が、図3に示す接合金物14のベースプレート16と略同一か、ベースプレート16より大きくなるように形成され、その四隅部にはベースプレート16に形成されたボルト挿通孔16aと同じ位置に貫通孔72aが形成されている。 As shown in FIG. 13A, the profile plate 72 is formed in a substantially square frame plate shape, and its outer shape is substantially the same as the base plate 16 of the metal joint 14 shown in FIG. 3, or from the base plate 16. It is formed so as to be large, and through holes 72a are formed at the same positions as the bolt insertion holes 16a formed in the base plate 16 at the four corners thereof.

そして、形板72の上面には、上端部が開放され、下端部が閉塞された円筒状に形成された箱抜き用型枠74が設けられている。 Then, on the upper surface of the shape plate 72, a box-extracting form 74 formed in a cylindrical shape with an upper end portion open and a lower end portion closed is provided.

箱抜き用型枠74は、図13(b)に示すように、中心軸線が図中上下方向に伸び、図13(a)に示すように、水平断面形状が略円形に形成された円筒状の側壁部74aと、この側壁部74aの下端部の開口部を閉塞するように設けられた平板状の底板部74bを備え、底板部74bの下面が形板72の上面に当接するように配置され、形板72の上面に固定されている。 As shown in FIG. 13 (b), the box-extracting form 74 has a cylindrical shape in which the central axis extends in the vertical direction in the drawing and the horizontal cross-sectional shape is formed in a substantially circular shape as shown in FIG. 13 (a). 72 And fixed to the upper surface of the shape plate 72.

そして、箱抜き用型枠74の内周面の水平断面形状は、接合金物14の突出部18の水平断面形状より大きくなるように形成され、箱抜き用型枠74の中心軸方向の高さ寸法は、突出部18の高さ寸法よりわずかに小さくなるように形成されている。 The horizontal cross-sectional shape of the inner peripheral surface of the box-extracting form 74 is formed to be larger than the horizontal cross-sectional shape of the protruding portion 18 of the metal joint 14, and the height of the box-extracting form 74 in the central axis direction. The dimension is formed so as to be slightly smaller than the height dimension of the protrusion 18.

このような箱抜き用型枠74を備えた形板72を用いて、前記第1の実施の形態に係るアンカーボルトの施工方法(図4及び図5参照)と同様の手順を実施することにより、図1に示す接合構造32と同様の接合構造を構築することができる。 By carrying out the same procedure as the anchor bolt construction method (see FIGS. 4 and 5) according to the first embodiment using the shape plate 72 provided with such a box-extracting form 74. , A joint structure similar to the joint structure 32 shown in FIG. 1 can be constructed.

すなわち、図4(a)及び(b)に示す前記第1の実施の形態に係るアンカーボルトの施工方法の手順と同様に、捨てコンクリート1の上に架台20を設置し、その架台20に複数のアンカーボルト8を固定する。 That is, similarly to the procedure of the anchor bolt construction method according to the first embodiment shown in FIGS. 4A and 4B, a gantry 20 is installed on the waste concrete 1, and a plurality of gantry 20s are installed on the gantry 20. Anchor bolt 8 is fixed.

そして、図14(a)に示すように、形板72を、これらのアンカーボルト8の長さ途中部に、それぞれのアンカーボルト8を連結するように取り付けると共に、図19に示す従来のアンカーボルトの施工方法に用いられる形板22と同様の構成の追加形板76を、これらのアンカーボルト8の上端部に、それぞれのアンカーボルト8を連結するように取り付ける。 Then, as shown in FIG. 14A, the profile plate 72 is attached so as to connect the respective anchor bolts 8 to the intermediate portion of the lengths of these anchor bolts 8, and the conventional anchor bolts shown in FIG. 19 are attached. An additional shape plate 76 having the same configuration as the shape plate 22 used in the above construction method is attached to the upper ends of these anchor bolts 8 so as to connect the respective anchor bolts 8.

そして、図14(a)に示すように、これらの形板72、追加形板76を、複数のアンカーボルト8、及び架台20の周囲を囲むように打設用型枠26を設け、この打設用型枠26の内側に生コンクリート33bを打設する。 Then, as shown in FIG. 14A, these shape plates 72 and additional shape plates 76 are provided with a casting formwork 26 so as to surround the periphery of the plurality of anchor bolts 8 and the gantry 20, and the casting formwork 26 is provided. Ready-mixed concrete 33b is placed inside the installation formwork 26.

そして、打設した生コンクリート33bが十分に硬化した後、追加形板76を取り除く。 Then, after the cast ready-mixed concrete 33b is sufficiently hardened, the additional shape plate 76 is removed.

それにより、図14(b)に示すように、打設した生コンクリート33bの内部に形板72が残置されると共に、箱抜き用型枠74の側壁部74aの外形に対応した円筒状の内側面と、形板72の上面の形状に対応した平坦な底面を有し、コンクリートの上面の略中央に開口するように形成された円柱状の凹部33aに、箱抜き用型枠74が残置された基礎コンクリート33が形成され、複数のアンカーボルト8が、その長さ部分が基礎コンクリート33の内部に埋設され、その上端部が基礎コンクリート33の上面より上方に突出するように配置される。 As a result, as shown in FIG. 14B, the shape plate 72 is left inside the cast ready-mixed concrete 33b, and the inside of the cylindrical shape corresponding to the outer shape of the side wall portion 74a of the box-extracting form 74. The box-extracting formwork 74 is left in the columnar recess 33a, which has a side surface and a flat bottom surface corresponding to the shape of the upper surface of the profile plate 72 and is formed so as to open substantially in the center of the upper surface of the concrete. The foundation concrete 33 is formed, and a plurality of anchor bolts 8 are arranged so that their length portions are embedded inside the foundation concrete 33 and the upper end thereof projects upward from the upper surface of the foundation concrete 33.

そして、図12(a)及び(b)に示す手順と同様に、基礎コンクリート33の凹部33aに残置された箱抜き用型枠74の底板部74bの上面に柱部材5を立設し、打設用型枠26の内側の、接合金物14と基礎コンクリート33の間の隙間、及び、箱抜き用型枠74の内側にモルタル36aを注入する。 Then, in the same manner as in the procedure shown in FIGS. 12A and 12B, the pillar member 5 is erected on the upper surface of the bottom plate portion 74b of the box-extracting formwork 74 left in the recess 33a of the foundation concrete 33 and hit. The mortar 36a is injected into the gap between the joint metal fitting 14 and the foundation concrete 33 inside the installation formwork 26 and the inside of the box removal formwork 74.

そして、注入したモルタル36aが十分に硬化したモルタル層36が形成された後、打設用型枠26を取り除くことにより、図1に示す接合構造32と同様の接合構造が構築されるようになっている。 Then, after the injected mortar 36a is sufficiently cured to form the mortar layer 36, the casting formwork 26 is removed to construct a bonding structure similar to the bonding structure 32 shown in FIG. ing.

その他の構成や手順は、前記第1の実施の形態に係る構成や手順と同様であり、このようなアンカーボルトの施工方法、及びその方法に使用する箱抜き用型枠によっても、接合構造の施工工事において、モルタル層を形成するために使用するモルタルの量を減らすことができ、そのことにより、材料費の低減、及び施工性の向上を図り、そのことにより施工コストを低減することができる。 Other configurations and procedures are the same as the configurations and procedures according to the first embodiment, and the joint structure can be formed by the method of constructing such anchor bolts and the box-extracting form used for the method. In the construction work, the amount of mortar used to form the mortar layer can be reduced, thereby reducing the material cost and improving the workability, thereby reducing the construction cost. ..

また、本実施の形態に係るアンカーボルトの施工方法によれば、前記第3の実施の形態に係るアンカーボルトの施工方法と同様に、柱部材5が立設される面(箱抜き用型枠74の底板部74bの上面)が平坦に形成されるため、柱部材5を立設する際に部分モルタル38を形成する工程(図6(a)参照)を省略することができ、施工工事の効率の向上を図ることができる。 Further, according to the anchor bolt construction method according to the present embodiment, the surface on which the pillar member 5 is erected (box-extracting formwork) is the same as the anchor bolt construction method according to the third embodiment. Since the upper surface of the bottom plate portion 74b of the 74 is formed flat, the step of forming the partial mortar 38 when the column member 5 is erected (see FIG. 6A) can be omitted, and the construction work can be carried out. Efficiency can be improved.

また、本実施の形態に係るアンカーボルトの施工方法によれば、形板72や箱抜き用型枠74をアンカーボルト8から取り除く必要がないため、その分、施工工事の効率の向上を図ることができる。 Further, according to the anchor bolt construction method according to the present embodiment, it is not necessary to remove the shape plate 72 and the box-extracting formwork 74 from the anchor bolts 8, so that the efficiency of the construction work can be improved accordingly. Can be done.

なお、本発明は、前記実施の形態のみに限定されるものではなく、本発明の目的を達成することができる範囲内であれば、種々の変更が可能である。 The present invention is not limited to the above-described embodiment, and various modifications can be made as long as the object of the present invention can be achieved.

例えば、前記第1から第4の実施の形態に係るアンカーボルトの施工方法においては、図7、図8、図10、及び図13に示すように、箱抜き用型枠44,54,64,74の側壁部44a,54a,64a,74aは、水平断面形状が略円形の円筒状に形成されているが、箱抜き用型枠44,54,64,74の形状は、それにより形成される基礎コンクリート33の凹部33aの内側に接合金物14の突出部18が配置できる形状であればどのような形状であってもよい。 For example, in the method of constructing the anchor bolts according to the first to fourth embodiments, as shown in FIGS. 7, 8, 10, and 13, the box-extracting formwork 44, 54, 64, The side wall portions 44a, 54a, 64a, 74a of 74 are formed in a cylindrical shape having a substantially circular horizontal cross-sectional shape, whereas the shapes of the box-extracting molds 44, 54, 64, 74 are formed thereby. Any shape may be used as long as the protruding portion 18 of the metal joint 14 can be arranged inside the recess 33a of the foundation concrete 33.

例えば、箱抜き用型枠の側壁部の水平断面形状が、正方形や菱形等、円形以外の形状に形成されていてもよく、突出部18の水平断面形状を一回り大きくしたような略十字型に形成されていてもよい。 For example, the horizontal cross-sectional shape of the side wall portion of the box-extracting form may be formed in a shape other than a circular shape such as a square or a rhombus, and a substantially cross shape such that the horizontal cross-sectional shape of the protruding portion 18 is slightly enlarged. It may be formed in.

また、前記第3及び第4の実施の形態に係るアンカーボルトの施工方法においては、図10及び図13に示すように、上端部が開放され、下端部が閉塞された円筒状に形成された箱抜き用型枠64,74が使用されているが、前記第2の実施の形態に係るアンカーボルトの施工方法に使用する箱抜き用型枠54(図8参照)のような、上下両端部が開放された円筒状に形成された箱抜き用型枠が使用されていてもよい。 Further, in the method of constructing the anchor bolts according to the third and fourth embodiments, as shown in FIGS. 10 and 13, the upper end portion is opened and the lower end portion is closed to form a cylindrical shape. Although the box-extracting formwork 64 and 74 are used, both upper and lower ends such as the box-extracting formwork 54 (see FIG. 8) used in the method of constructing the anchor bolts according to the second embodiment. A box-extracting form may be used, which is formed in an open cylindrical shape.

また、前記第3の実施の形態に係るアンカーボルトの施工方法においては、図10に示すように、箱抜き用型枠64の側壁部64aの外周面が形板62の下面に設けられた環状の係合部62cの内周面に嵌合することにより、箱抜き用型枠64が形板62に対して着脱可能になっているが、箱抜き用型枠64が形板62に対して着脱可能であればどのような態様であってもよい。 Further, in the method of constructing the anchor bolts according to the third embodiment, as shown in FIG. 10, the outer peripheral surface of the side wall portion 64a of the box punching form 64 is provided on the lower surface of the shape plate 62. By fitting to the inner peripheral surface of the engaging portion 62c, the box-extracting formwork 64 can be attached to and detached from the shape plate 62, but the box-extracting formwork 64 is attached to the shape plate 62. Any mode may be used as long as it is removable.

例えば、側壁部64aの内周面が環状の係合部62cの外周面に嵌合するようにしたり、爪状の係合部62cを円周上の複数の位置に設け、それらによって側壁部64aの上端部を挟み込むように保持するようにしてもよく、また、ボルトやナットを用いて箱抜き用型枠64が形板62に一時的に固定されるようにしてもよい。 For example, the inner peripheral surface of the side wall portion 64a may be fitted to the outer peripheral surface of the annular engaging portion 62c, or the claw-shaped engaging portion 62c may be provided at a plurality of positions on the circumference, thereby providing the side wall portion 64a. The upper end portion of the box may be held so as to sandwich it, or the box-extracting formwork 64 may be temporarily fixed to the shape plate 62 by using bolts or nuts.

また、前記第4の実施の形態に係るアンカーボルトの施工方法においては、図13に示すように、形板72は箱抜き用型枠74の下端部に設けられていたが、打設したコンクリートの内部に形板72が残置されるのであれば、形板72は箱抜き用型枠74のどの位置に設けられていてもよく、例えば、形板72が箱抜き用型枠74の高さ方向の中程の位置に設けられていてもよい。 Further, in the method of constructing the anchor bolts according to the fourth embodiment, as shown in FIG. 13, the shape plate 72 was provided at the lower end of the box-extracting form 74, but the cast concrete. As long as the shape plate 72 is left inside the box, the shape plate 72 may be provided at any position of the box punching form 74, for example, the shape plate 72 is the height of the box punching form 74. It may be provided at a position in the middle of the direction.

また、前記第4の実施の形態に係るアンカーボルトの施工方法においては、図14(a)に示すように、追加形板76は、形板72や箱抜き用型枠74とは独立した別部材として設けられていたが、追加形板76に、前記第3の実施の形態に係るアンカーボルトの施工方法に使用する箱抜き用型枠64(図10参照)のような、係合部を設けることにより、追加形板76と箱抜き用型枠74が着脱可能に設けられるようにしてもよい。 Further, in the method of constructing the anchor bolts according to the fourth embodiment, as shown in FIG. 14A, the additional formwork 76 is separate from the formwork 72 and the box-extracting formwork 74. Although it was provided as a member, the additional formwork 76 is provided with an engaging portion such as the box-extracting formwork 64 (see FIG. 10) used in the method of constructing the anchor bolts according to the third embodiment. By providing the additional shape plate 76 and the box-extracting form 74, the additional formwork 76 may be detachably provided.

また、前記第1から第4の実施の形態に係るアンカーボルトの施工方法においては、接合構造32を構築するために用いられる接合金物14は、ベースプレート16は、その平面形状が略正方形に形成されているが、ベースプレート16の平面形状は、正八角形や円形等、正方形以外の形状に形成されていてもよい。 Further, in the method of constructing anchor bolts according to the first to fourth embodiments, the base plate 16 of the joint metal fitting 14 used for constructing the joint structure 32 has a substantially square planar shape. However, the planar shape of the base plate 16 may be formed in a shape other than a square, such as a regular octagon or a circle.

また、前記第1から第4の実施の形態に係るアンカーボルトの施工方法においては、接合構造32を構築するために用いられる接合金物14は、ベースプレート16の上面や下面はいずれも平坦に形成されているが、それらの部分は平坦でなくともよく、例えば、ベースプレート16の上面に、ベースプレート16の強度を向上させるためのリブを形成したり、ベースプレート16の下面に、モルタル層36との付着力を向上させるための凹凸形状を形成してもよい。 Further, in the method of constructing anchor bolts according to the first to fourth embodiments, the upper surface and the lower surface of the base plate 16 of the joint metal fitting 14 used for constructing the joint structure 32 are formed flat. However, these portions do not have to be flat. For example, ribs for improving the strength of the base plate 16 are formed on the upper surface of the base plate 16, and the adhesive force with the mortar layer 36 is formed on the lower surface of the base plate 16. The uneven shape may be formed to improve the above.

また、前記第1から第4の実施の形態に係るアンカーボルトの施工方法においては、接合構造32を構築するために用いられる接合金物14は、ベースプレート16には、それぞれの四隅部に1つずつ、合計4つのボルト挿通孔16aが形成されているが、ベースプレート16に形成されるボルト挿通孔16aの数は、4つより多くてもよく、また、ボルト挿通孔16aがベースプレート16の四隅部以外の位置に形成されていてもよい。 Further, in the method of constructing the anchor bolts according to the first to fourth embodiments, the joining metal fitting 14 used for constructing the joining structure 32 is provided on the base plate 16 one by one at each of the four corners. Although a total of four bolt insertion holes 16a are formed, the number of bolt insertion holes 16a formed in the base plate 16 may be more than four, and the bolt insertion holes 16a are other than the four corners of the base plate 16. It may be formed at the position of.

また、前記第1から第4の実施の形態に係るアンカーボルトの施工方法においては、接合構造32を構築するために用いられる接合金物14は、突出部18は、その水平断面形状が略十字型に形成されているが、突出部18は、例えば、平面形状が中心から八方に放射状に広がるような形状等、十字型以外の形状に形成されていてもよい。 Further, in the method of constructing anchor bolts according to the first to fourth embodiments, the joint metal fitting 14 used for constructing the joint structure 32 has a protruding portion 18 having a substantially cross-shaped horizontal cross section. However, the protruding portion 18 may be formed in a shape other than a cross shape, for example, a shape in which the planar shape extends radially from the center in all directions.

また、前記第1から第4の実施の形態に係るアンカーボルトの施工方法においては、接合構造32を構築するために用いられる接合金物14は、突出部18は、ベースプレート16の下面に1つ設けられているが、ベースプレート16の下面に2つ以上の突出部18が設けられていてもよい。 Further, in the method of constructing anchor bolts according to the first to fourth embodiments, the joining metal fitting 14 used for constructing the joining structure 32 is provided with one protruding portion 18 on the lower surface of the base plate 16. However, two or more protrusions 18 may be provided on the lower surface of the base plate 16.

また、前記第1から第4の実施の形態に係るアンカーボルトの施工方法においては、接合構造32を構築するために用いられる接合金物14は、図1に示すように、基礎コンクリート33の上に立設される柱部材5の下端部に設けられていたが、図18に示す接合構造29,30と同様に、接合金物14を、コンクリートによって形成された梁の長さ途中部にブレースの端部を固定するために用いてもよい。 Further, in the method of constructing anchor bolts according to the first to fourth embodiments, the metal joint 14 used for constructing the joint structure 32 is placed on the foundation concrete 33 as shown in FIG. Although it was provided at the lower end of the column member 5 to be erected, the joint metal fitting 14 was placed at the end of the brace in the middle of the length of the beam formed of concrete, as in the joint structures 29 and 30 shown in FIG. It may be used to fix the part.

すなわち、図15に示すように、接合金物14を、基礎梁7の長さ途中部に、モルタル層36を介して、突出部18が基礎梁7に形成された凹部7aの内側に配置されてモルタル層36の内部に埋設するように配置し、アンカーボルト8とナット10を用いて固定し、そのベースプレート16の上面にガセットプレート17を溶接等により固定し、2つのブレース9のそれぞれの端部がガセットプレート17に連結されてボルト等により固定されるような、接合構造82を用いてもよい。 That is, as shown in FIG. 15, the metal joint 14 is arranged in the middle of the length of the foundation beam 7 and the protruding portion 18 is arranged inside the recess 7a formed in the foundation beam 7 via the mortar layer 36. It is arranged so as to be embedded inside the mortar layer 36, fixed using anchor bolts 8 and nuts 10, and the gusset plate 17 is fixed to the upper surface of the base plate 16 by welding or the like, and the respective ends of the two braces 9 are fixed. You may use the joint structure 82 such that is connected to the gusset plate 17 and fixed by bolts or the like.

また、前記第1から第4の実施の形態に係るアンカーボルトの施工方法においては、接合構造32を構築するために用いられる接合金物14は、コンクリートにより形成されていれば、基礎や梁以外の構造物に設けることができるため、接合金物14を、そのようなコンクリートにより形成された基礎や梁以外の構造物に柱部材やブレースの端部を固定するために用いてもよい。 Further, in the method of constructing anchor bolts according to the first to fourth embodiments, if the joint metal fitting 14 used for constructing the joint structure 32 is made of concrete, it is not a foundation or a beam. Since it can be provided on a structure, the joint metal fitting 14 may be used to fix the end portion of a column member or a brace to a structure other than a foundation or a beam formed of such concrete.

1 捨てコンクリート
2 接合構造
3 基礎コンクリート
3a 生コンクリート
4 接合金物
4a ボルト挿通孔
5 柱部材
6 モルタル層
6a モルタル
7 基礎梁
7a 凹部
8 アンカーボルト
9 ブレース
10 ナット
12 接合構造
14 接合金物
16 ベースプレート
16a ボルト挿通孔
17 ガセットプレート
18 突出部
18a 第1垂直板部
18b 第2垂直板部
20 架台
22 形板
22a 貫通孔
22b 中央孔
24 ナット
26 打設用型枠
28 部分モルタル
29 接合構造
30 接合構造
32 接合構造
33 基礎コンクリート
33a 凹部
33b 生コンクリート
36 モルタル層
36a モルタル
38 部分モルタル
42 形板
42a 貫通孔
42b 中央孔
44 箱抜き用型枠
44a 側壁部
44b 底板部
52 形板
52a 貫通孔
52b 中央孔
54 箱抜き用型枠
54a 側壁部
62 形板
62a 貫通孔
62b 中央孔
62c 係合部
64 箱抜き用型枠
64a 側壁部
64b 底板部
72 形板
72a 貫通孔
74 箱抜き用型枠
74a 側壁部
74b 底板部
76 追加形板
82 接合構造
M 曲げモーメント
T 引張力
C 圧縮力
F せん断力
1 Waste concrete 2 Joint structure 3 Foundation concrete 3a Ready-mixed concrete 4 Join metal 4a Bolt insertion hole 5 Pillar member 6 Mortal layer 6a Mortal 7 Foundation beam 7a Recess 8 Anchor bolt 9 Brace 10 Nut 12 Join structure 14 Join metal 16 Base plate 16a Hole 17 Gusset plate 18 Protruding part 18a First vertical plate part 18b Second vertical plate part 20 Stand 22 Shaped plate 22a Through hole 22b Central hole 24 Nut 26 Casting formwork 28 Partial mortar 29 Joint structure 30 Joint structure 32 Joint structure 33 Foundation concrete 33a Recessed 33b Ready-mixed concrete 36 Mortal layer 36a Mortal 38 Partial mortar 42 Shaped plate 42a Through hole 42b Central hole 44 Box punching formwork 44a Side wall 44b Bottom plate 52 Shaped board 52a Through hole 52b Central hole 54 Formwork 54a Side wall 62 Shape plate 62a Through hole 62b Central hole 62c Engagement part 64 Box punching formwork 64a Side wall part 64b Bottom plate part 72 Formwork 72a Through hole 74 Box punching formwork 74a Side wall part 74b Bottom plate part 76 Addition Formwork 82 Joint structure M Bending moment T Tensile force C Compressive force F Shear force

Claims (9)

捨てコンクリートの上に、複数のアンカーボルトを、それぞれの長さ部分が上下方向に伸びるように配置し、
前記アンカーボルトに箱抜き用型枠を備えた形板を取り付け、
前記形板及び前記複数のアンカーボルトから水平方向に離れた周囲を囲うように、捨てコンクリートの上に打設用型枠を配置し、
生コンクリートを、前記打設用型枠の内側の前記形板と前記複数のアンカーボルトの周囲に、前記アンカーボルトの上端部が打設した前記生コンクリートの上面より上方に突出すると共に、打設した前記生コンクリートの上面が前記箱抜き用型枠の下端部より上方、かつ前記箱抜き用型枠の上端部より下方に位置するように打設することにより、
前記複数のアンカーボルトが、それぞれの長さ部分がコンクリートの内部に埋設され、それぞれの上端部が前記コンクリートの上面から突出するように配置されると共に、
前記箱抜き用型枠によって、前記コンクリートの上面に開口する凹部が形成される
ことを特徴とするアンカーボルトの施工方法。
Multiple anchor bolts are placed on the waste concrete so that their respective lengths extend in the vertical direction.
Attach a profile plate with a box-extracting formwork to the anchor bolts,
A casting formwork is placed on the waste concrete so as to surround the shape plate and the plurality of anchor bolts horizontally separated from each other.
The ready-mixed concrete is placed around the shape plate and the plurality of anchor bolts inside the casting form, with the upper end of the anchor bolts projecting upward from the upper surface of the ready-mixed concrete placed. By placing the ready-mixed concrete so that the upper surface of the ready-mixed concrete is located above the lower end of the box-extracting formwork and below the upper end of the box-extracting formwork.
The plurality of anchor bolts are arranged so that their respective length portions are embedded in the concrete and the upper end portions thereof protrude from the upper surface of the concrete.
A method of constructing an anchor bolt, characterized in that a recess that opens on the upper surface of the concrete is formed by the box-extracting formwork.
前記生コンクリートが硬化した後、前記箱抜き用型枠は前記形板と共に前記アンカーボルトから取り除かれる
ことを特徴とする請求項1に記載のアンカーボルトの施工方法。
The method for constructing anchor bolts according to claim 1, wherein after the ready-mixed concrete has hardened, the box-extracting formwork is removed from the anchor bolts together with the shape plate.
前記生コンクリートが硬化した後、前記形板は前記コンクリートの内部に埋設され、前記箱抜き用型枠は前記コンクリートの前記凹部に残置される
ことを特徴とする請求項1に記載のアンカーボルトの施工方法。
The anchor bolt according to claim 1, wherein after the ready-mixed concrete has hardened, the profile plate is embedded in the concrete, and the box-extracting formwork is left in the recess of the concrete. Construction method.
前記箱抜き用型枠は、前記形板に対して着脱可能に設けられ、
前記生コンクリートが硬化した後、前記形板と前記箱抜き用型枠は分離され、前記形板は前記アンカーボルトから取り除かれ、前記箱抜き用型枠は前記コンクリートの前記凹部に残置される
ことを特徴とする請求項1に記載のアンカーボルトの施工方法。
The box removal form is provided so as to be removable from the shape plate.
After the ready-mixed concrete has hardened, the shape plate and the box-extracting form are separated, the shape plate is removed from the anchor bolts, and the box-extracting form is left in the recess of the concrete. The method for constructing an anchor bolt according to claim 1, wherein the anchor bolt is constructed.
前記コンクリートによって形成された基礎に柱部材の下端部を固定するための接合構造であって、
前記基礎の上に、板状のベースプレートと前記ベースプレートの下面から突出するように設けられた突出部を備えた接合金物が設けられ、
前記ベースプレートの上面に前記柱部材の下端部が接合され、
前記突出部が前記凹部の内側に配置されて、その上端部から下端部までの全ての部分が、前記基礎と前記接合金物の間に設けられたモルタル層の内部に埋設され、
前記アンカーボルトの上端部が前記ベースプレートに結合されたような接合構造を構築するために用いられる
ことを特徴とする請求項1から4のいずれかに記載のアンカーボルトの施工方法。
It is a joint structure for fixing the lower end of the column member to the foundation formed by the concrete.
On the foundation, a plate-shaped base plate and a metal joint having a protrusion provided so as to project from the lower surface of the base plate are provided.
The lower end of the pillar member is joined to the upper surface of the base plate.
The protrusion is arranged inside the recess, and the entire portion from the upper end to the lower end is embedded inside the mortar layer provided between the foundation and the metal joint.
The method for constructing an anchor bolt according to any one of claims 1 to 4, wherein the upper end portion of the anchor bolt is used for constructing a joint structure such that the upper end is bonded to the base plate.
前記コンクリートによって形成された梁にブレースの端部を固定するための接合構造であって、
前記梁の長さ途中部に、板状のベースプレートと前記ベースプレートの下面から突出するように設けられた突出部を備えた接合金物が設けられ、
前記ベースプレートの上面に設けられたガセットプレートに前記ブレースの端部が固定され、
前記突出部が前記凹部の内側に配置されて、その上端部から下端部までの全ての部分が、前記梁と前記接合金物の間に設けられたモルタル層の内部に埋設され、
前記アンカーボルトの上端部が前記ベースプレートに結合されたような接合構造を構築するために用いられる
ことを特徴とする請求項1から4のいずれかに記載のアンカーボルトの施工方法。
It is a joint structure for fixing the end of the brace to the beam formed of the concrete.
A metal joint having a plate-shaped base plate and a protruding portion provided so as to project from the lower surface of the base plate is provided in the middle of the length of the beam.
The end of the brace is fixed to a gusset plate provided on the upper surface of the base plate.
The protrusion is arranged inside the recess, and the entire portion from the upper end to the lower end is embedded inside the mortar layer provided between the beam and the metal joint.
The method for constructing an anchor bolt according to any one of claims 1 to 4, wherein the upper end portion of the anchor bolt is used for constructing a joint structure such that the upper end is bonded to the base plate.
捨てコンクリートの上に、それぞれの長さ部分が上下方向に伸びるように配置された複数のアンカーボルトに取り付けられる形板に設けられた箱抜き用型枠であって、
前記形板及び前記複数のアンカーボルトから水平方向に離れた周囲を囲うように、捨てコンクリートの上に打設用型枠を配置し、
生コンクリートを、前記打設用型枠の内側の前記形板と前記複数のアンカーボルトの周囲に、前記アンカーボルトの上端部が打設した前記生コンクリートの上面より上方に突出すると共に、打設した前記生コンクリートの上面が前記箱抜き用型枠の下端部より上方、かつ前記箱抜き用型枠の上端部より下方に位置するように打設することにより、
前記複数のアンカーボルトが、それぞれの長さ部分がコンクリートの内部に埋設され、それぞれの上端部が前記コンクリートの上面から突出するように配置されると共に、
前記箱抜き用型枠によって、前記コンクリートの上面に開口する凹部が形成されるようにしたアンカーボルトの施工方法に使用するものである
ことを特徴とする箱抜き用型枠。
It is a formwork for boxing provided on a shape plate attached to a plurality of anchor bolts arranged so that each length portion extends in the vertical direction on the waste concrete.
A casting formwork is placed on the waste concrete so as to surround the shape plate and the plurality of anchor bolts horizontally separated from each other.
The ready-mixed concrete is placed around the shape plate and the plurality of anchor bolts inside the casting form, with the upper end of the anchor bolts projecting upward from the upper surface of the ready-mixed concrete placed. By placing the ready-mixed concrete so that the upper surface of the ready-mixed concrete is located above the lower end of the box-extracting formwork and below the upper end of the box-extracting formwork.
The plurality of anchor bolts are arranged so that their respective length portions are embedded in the concrete and the upper end portions thereof protrude from the upper surface of the concrete.
A formwork for boxing, which is used in a method of constructing an anchor bolt in which a recess opening to be formed on the upper surface of the concrete is formed by the formwork for boxing.
前記箱抜き用型枠は、上端部が開放され、下端部が閉塞された筒状に形成された
ことを特徴とする請求項7に記載の箱抜き用型枠。
The box-extracting form according to claim 7, wherein the box-extracting form is formed in a cylindrical shape in which the upper end is open and the lower end is closed.
前記箱抜き用型枠は、上下両端部が開放された筒状に形成された
ことを特徴とする請求項7に記載の箱抜き用型枠。
The box-extracting form according to claim 7, wherein the box-extracting form is formed in a cylindrical shape with both upper and lower ends open.
JP2020076373A 2020-04-22 2020-04-22 Method of installing anchor bolts and formwork for box removal used in said method Active JP7474393B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2020076373A JP7474393B2 (en) 2020-04-22 2020-04-22 Method of installing anchor bolts and formwork for box removal used in said method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2020076373A JP7474393B2 (en) 2020-04-22 2020-04-22 Method of installing anchor bolts and formwork for box removal used in said method

Publications (2)

Publication Number Publication Date
JP2021173023A true JP2021173023A (en) 2021-11-01
JP7474393B2 JP7474393B2 (en) 2024-04-25

Family

ID=78279301

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2020076373A Active JP7474393B2 (en) 2020-04-22 2020-04-22 Method of installing anchor bolts and formwork for box removal used in said method

Country Status (1)

Country Link
JP (1) JP7474393B2 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116240915A (en) * 2023-02-27 2023-06-09 中国五冶集团有限公司 Cup-type foundation internal mold construction structure and construction method

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SI2718320T1 (en) 2011-06-10 2018-06-29 Medimmune Limited Anti-pseudomonas psl binding molecules and uses thereof
JP5306524B1 (en) 2011-11-21 2013-10-02 吉澤石灰工業株式会社 Hazardous material insolubilizing material and treatment method using the same

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116240915A (en) * 2023-02-27 2023-06-09 中国五冶集团有限公司 Cup-type foundation internal mold construction structure and construction method

Also Published As

Publication number Publication date
JP7474393B2 (en) 2024-04-25

Similar Documents

Publication Publication Date Title
KR101030419B1 (en) Joint structure of vertical member and horizontal member
KR101523532B1 (en) Closed steel assembly for column
JP2016098586A (en) Reinforced concrete column-steel beam joint member and manufacturing method thereof and building construction method
JP6815183B2 (en) Complex building
JP2017106236A (en) Structure construction method and structure
JP2008075425A (en) Joining structure of pile and column
KR101561212B1 (en) Concrete precast wall and the construction method using the same
JP2021173023A (en) Construction method of anchor bolt and box-removing form used in the method
JP4949116B2 (en) Wall unit and shear wall
KR101908356B1 (en) Aseismatic Reinforcement Double Steel Frame and Aseismatic Reinforcement Method using thereof
JP6849491B2 (en) Exposed column base structure of steel columns and its construction method
KR20190046336A (en) Sandwich precast concrete wall and manufacturing method thereof
KR20160073202A (en) Joint part forming apparatus of reinforced concrete and method of placing joint using the same
JP3851563B2 (en) Frame reinforcement structure and its construction method
JP2003253788A (en) Structure of earthquake resistant reinforced opening part having door opening part
KR101685632B1 (en) Shear connector to increase strength and ductility
KR101577704B1 (en) Reformed concrete filled tube column structure
JP7315151B2 (en) About the connection structure of wooden members
JP7137978B2 (en) Plate-shaped member for pillar
KR102554408B1 (en) Connection Structure Between Steel-Concrete Hybrid Columns Using Vetical Member
JP2021173021A (en) Joint metal fitting
JP7165548B2 (en) Seismic isolation foundation structure and its construction method
JPH04143338A (en) Building method of damping construction pillar with placing formwork
JP6842296B2 (en) Foundation structure
JP6807157B2 (en) Joint member and joint structure

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20230331

RD02 Notification of acceptance of power of attorney

Free format text: JAPANESE INTERMEDIATE CODE: A7422

Effective date: 20230331

TRDD Decision of grant or rejection written
A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20240119

A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20240130

A711 Notification of change in applicant

Free format text: JAPANESE INTERMEDIATE CODE: A712

Effective date: 20240208

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20240208

R150 Certificate of patent or registration of utility model

Ref document number: 7474393

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150