JP2018073192A - Amount calculation apparatus, amount calculation method and amount calculation program - Google Patents

Amount calculation apparatus, amount calculation method and amount calculation program Download PDF

Info

Publication number
JP2018073192A
JP2018073192A JP2016213490A JP2016213490A JP2018073192A JP 2018073192 A JP2018073192 A JP 2018073192A JP 2016213490 A JP2016213490 A JP 2016213490A JP 2016213490 A JP2016213490 A JP 2016213490A JP 2018073192 A JP2018073192 A JP 2018073192A
Authority
JP
Japan
Prior art keywords
employee
unit price
identification information
sales
cost
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2016213490A
Other languages
Japanese (ja)
Other versions
JP6798856B2 (en
Inventor
健一 下瀬
Kenichi Shimose
健一 下瀬
邦明 芹澤
Kuniaki Serizawa
邦明 芹澤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Obic Co Ltd
Original Assignee
Obic Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Obic Co Ltd filed Critical Obic Co Ltd
Priority to JP2016213490A priority Critical patent/JP6798856B2/en
Publication of JP2018073192A publication Critical patent/JP2018073192A/en
Application granted granted Critical
Publication of JP6798856B2 publication Critical patent/JP6798856B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

PROBLEM TO BE SOLVED: To provide an amount calculation apparatus, amount calculation method and amount calculation program that can collectively manage contract information and estimated sales amount for each employee, budget required for a project, and arrangement of outsourced employees to a subcontractor company.SOLUTION: In the present embodiment, a sales amount calculation unit 102b calculates a sales amount of an employee based on a sales unit price corresponding to employee identification information included in a second unit price master, and work hours corresponding to a combination of employee identification information included in input employee management data and a work period. A purchase price calculation unit 102c calculates a purchase price based on a purchase unit price corresponding to the employee identification information of an outsource employment included in the second unit price master, and work hours corresponding to a combination of the employee identification information included in the employee management data and a work period. Each cost calculation unit 102d calculates each cost, for each type of costs, based on a cost unit price included in a first unit price master, and work hours or overtime hours included in the employee management data.SELECTED DRAWING: Figure 1

Description

本発明は、金額算出装置、金額算出方法および金額算出プログラムに関する。   The present invention relates to an amount calculation apparatus, an amount calculation method, and an amount calculation program.

特許文献1には、事業上の財産的価値を担う要員に係るデータを一元的に管理し、管理用データ請求時に最新の要員に係るデータを基に都度、集計演算して提供できる構成のプログラムが開示されている(例えば、段落0008等を参照)。   Patent Document 1 includes a program that is configured to centrally manage data related to personnel responsible for business property value, and to provide aggregated calculations based on the data related to the latest personnel when requesting management data. Is disclosed (see, for example, paragraph 0008).

特開2007−004386号公報JP 2007-004386 A

このように、要員(社員)の情報を効率よく管理する方法は存在するが、近年においては、プロジェクトを円滑に進める上で必要な複数の情報を一元的に管理できる方法が求められている。例えば、社員ごとの契約情報および売上予定金額、プロジェクトに要する労務費や外注費等を含めた予算、ならびに、外注先会社への外注社員の手配を一元的に管理できる方法が求められている。   As described above, there is a method for efficiently managing information on personnel (employees). However, in recent years, there is a demand for a method capable of centrally managing a plurality of information necessary for smoothly proceeding with a project. For example, there is a need for a method that can centrally manage contract information and planned sales amount for each employee, budget including labor and subcontracting costs required for the project, and arrangement of subcontracted employees to the subcontractor company.

本発明は、上記に鑑みてなされたものであって、社員ごとの契約情報および売上予定金額、プロジェクトに要する予算、ならびに、外注先会社への外注社員の手配を一元的に管理できる金額算出装置、金額算出方法および金額算出プログラムを提供する。   The present invention has been made in view of the above, and is a monetary amount calculation device capable of centrally managing contract information and planned sales amount for each employee, budget required for a project, and arrangement of subcontracted employees to a subcontractor company Provide an amount calculation method and amount calculation program.

上述した課題を解決し、目的を達成するために、本発明に係る金額算出装置は、制御部および記憶部を備え、自社社員および外注社員がある業務を行う場合において、これら両社員における売上金額、仕入金額および前記ある業務の遂行に要する各費用を算出する金額算出装置であって、前記記憶部には、自社社員用識別情報、費用の種類ならびに前記自社社員用識別情報および前記費用の種類の組合せに基づき決定される費用単価を含む第一の単価マスタと、前記自社社員の社員識別情報およびこれに対応する売上単価と、前記外注社員の社員識別情報ならびにこれに対応する売上単価および仕入単価と、を含む第二の単価マスタと、が格納されており、前記制御部は、前記第二の単価マスタに含まれる社員識別情報に対応する売上単価と、入力された社員管理データに含まれる社員識別情報および作業期間の組合せに対応する作業時間と、に基づき、前記両社員における売上金額を算出する売上金額算出手段と、前記第二の単価マスタに含まれる外注社員の社員識別情報に対応する仕入単価と、前記社員管理データに含まれる社員識別情報および作業期間の組合せに対応する作業時間と、に基づき、前記仕入金額を算出する仕入金額算出手段と、前記第一の単価マスタに含まれる費用単価と、前記社員管理データに含まれる作業時間または残業時間と、に基づき、前記費用の種類ごとに、前記各費用を算出する各費用算出手段と、を備えること、を特徴とする。   In order to solve the above-mentioned problems and achieve the object, the amount calculation apparatus according to the present invention includes a control unit and a storage unit, and when the company employee and the outsourced employee perform business, the sales amount of both these employees An amount calculation device for calculating a purchase amount and each cost required for the execution of a certain business, wherein the storage unit stores identification information for the company employee, the type of expense, the identification information for the company employee, and the cost The first unit price master including the cost unit price determined based on the combination of types, the employee identification information of the company employee and the corresponding sales unit price, the employee identification information of the subcontracted employee and the corresponding sales unit price and A second unit price master including a purchase unit price, and the control unit includes a unit price of sales corresponding to the employee identification information included in the second unit price master. Included in the second unit price master and sales amount calculation means for calculating the sales amount for both employees based on the employee identification information included in the input employee management data and the work time corresponding to the combination of the work periods The purchase price for calculating the purchase price based on the purchase unit price corresponding to the employee identification information of the subcontracted employee and the work time corresponding to the combination of the employee identification information and the work period included in the employee management data Each cost calculation that calculates each cost for each type of cost based on the calculation means, the cost unit price included in the first unit price master, and the working time or overtime time included in the employee management data And means.

また、本発明に係る金額算出方法は、制御部および記憶部を備えた情報処理装置で実行される、自社社員および外注社員がある業務を行う場合において、これら両社員における売上金額、仕入金額および前記ある業務の遂行に要する各費用を算出する金額算出方法であって、前記記憶部には、自社社員用識別情報、費用の種類ならびに前記自社社員用識別情報および前記費用の種類の組合せに基づき決定される費用単価を含む第一の単価マスタと、前記自社社員の社員識別情報およびこれに対応する売上単価と、前記外注社員の社員識別情報ならびにこれに対応する売上単価および仕入単価と、を含む第二の単価マスタと、が格納されており、前記制御部で実行される、前記第二の単価マスタに含まれる社員識別情報に対応する売上単価と、入力された社員管理データに含まれる社員識別情報および作業期間の組合せに対応する作業時間と、に基づき、前記両社員における売上金額を算出する売上金額算出ステップと、前記第二の単価マスタに含まれる外注社員の社員識別情報に対応する仕入単価と、前記社員管理データに含まれる社員識別情報および作業期間の組合せに対応する作業時間と、に基づき、前記仕入金額を算出する仕入金額算出ステップと、前記第一の単価マスタに含まれる費用単価と、前記社員管理データに含まれる作業時間または残業時間と、に基づき、前記費用の種類ごとに、前記各費用を算出する各費用算出ステップと、を含むこと、を特徴とする。   In addition, the amount calculation method according to the present invention is executed by an information processing apparatus having a control unit and a storage unit. And an amount calculation method for calculating each expense required to perform the certain business, wherein the storage unit includes identification information for the company employee, a type of expense, and a combination of the identification information for company employee and the expense type. The first unit price master including the cost unit price determined based on the employee identification information of the company employee and the corresponding sales unit price, the employee identification information of the subcontracted employee and the corresponding sales unit price and purchase unit price, , And a second unit price master, and the unit price of sales corresponding to the employee identification information included in the second unit price master, executed by the control unit, The sales amount calculation step for calculating the sales amount for both employees based on the working time corresponding to the combination of the employee identification information and the work period included in the received employee management data, and included in the second unit price master The purchase price for calculating the purchase price based on the purchase unit price corresponding to the employee identification information of the subcontracted employee and the work time corresponding to the combination of the employee identification information and the work period included in the employee management data Each cost calculation that calculates each cost for each type of cost based on the calculation step, the cost unit price included in the first unit price master, and the working hours or overtime hours included in the employee management data And a step.

また、本発明に係る金額算出プログラムは、制御部および記憶部を備えた情報処理装置に実行させるための、自社社員および外注社員がある業務を行う場合において、これら両社員における売上金額、仕入金額および前記ある業務の遂行に要する各費用を算出する金額算出プログラムであって、前記記憶部には、自社社員用識別情報、費用の種類ならびに前記自社社員用識別情報および前記費用の種類の組合せに基づき決定される費用単価を含む第一の単価マスタと、前記自社社員の社員識別情報およびこれに対応する売上単価と、前記外注社員の社員識別情報ならびにこれに対応する売上単価および仕入単価と、を含む第二の単価マスタと、が格納されており、前記制御部に実行させるための、前記第二の単価マスタに含まれる社員識別情報に対応する売上単価と、入力された社員管理データに含まれる社員識別情報および作業期間の組合せに対応する作業時間と、に基づき、前記両社員における売上金額を算出する売上金額算出ステップと、前記第二の単価マスタに含まれる外注社員の社員識別情報に対応する仕入単価と、前記社員管理データに含まれる社員識別情報および作業期間の組合せに対応する作業時間と、に基づき、前記仕入金額を算出する仕入金額算出ステップと、前記第一の単価マスタに含まれる費用単価と、前記社員管理データに含まれる作業時間または残業時間と、に基づき、前記費用の種類ごとに、前記各費用を算出する各費用算出ステップと、を含むこと、を特徴とする。   In addition, the amount calculation program according to the present invention allows the information processing apparatus including the control unit and the storage unit to be executed when the company employee and the subcontractor perform business, and the sales amount and purchase amount of both of these employees. An amount calculation program for calculating an amount of money and each cost required to perform a certain business, wherein the storage unit includes identification information for own employees, types of expenses, and combinations of identification information for own employees and types of expenses The first unit price master including the cost unit price determined based on the above, the employee identification information of the company employee and the corresponding sales unit price, the employee identification information of the subcontracted employee and the corresponding sales unit price and purchase unit price And a second unit price master including the employee identification information included in the second unit price master to be executed by the control unit. A sales amount calculation step of calculating a sales amount for both employees based on a unit sales price corresponding to the above and a work time corresponding to a combination of employee identification information and work period included in the input employee management data; Based on the purchase unit price corresponding to the employee identification information of the subcontracted employee included in the second unit price master and the work time corresponding to the combination of the employee identification information and the work period included in the employee management data, the purchase Based on the purchase price calculation step for calculating the amount of money, the cost unit price included in the first unit price master, and the working hours or overtime hours included in the employee management data, Each cost calculating step for calculating the cost.

本発明によれば、社員ごとの契約情報および売上予定金額、プロジェクトに要する予算、ならびに、外注先会社への外注社員の手配を一元的に管理できるという効果を奏する。   According to the present invention, it is possible to centrally manage contract information and planned sales amount for each employee, a budget required for a project, and arrangement of subcontracted employees to a subcontractor company.

図1は、販売管理装置の構成の一例を示すブロック図である。FIG. 1 is a block diagram showing an example of the configuration of the sales management apparatus. 図2は、記憶部に格納されている情報およびそれに基づき作成されるデータの関連を示すテーブル図である。FIG. 2 is a table showing the relationship between information stored in the storage unit and data created based on the information. 図3は、記憶部に格納されている情報の一例を示す図である。FIG. 3 is a diagram illustrating an example of information stored in the storage unit. 図4は、作成されるデータの一例を示す図である。FIG. 4 is a diagram illustrating an example of data to be created. 図5は、要員管理データの入力画面の一例を示す図である。FIG. 5 is a diagram illustrating an example of an input screen for personnel management data. 図6は、作成されるPJ予算データの出力画面の一例を示す図である。FIG. 6 is a diagram illustrating an example of an output screen for PJ budget data to be created. 図7は、社員原価単価マスタの表示画面の一例を示す図である。FIG. 7 is a diagram showing an example of a display screen of the employee cost unit price master. 図8は、作成されるSES契約データおよびPJ予算データの出力画面の一例を示す図である。FIG. 8 is a diagram showing an example of an output screen for the created SES contract data and PJ budget data.

以下に、本発明に係る金額算出装置、金額算出方法および金額算出プログラムの実施形態を、図面に基づいて詳細に説明する。なお、本実施形態によりこの発明が限定されるものではない。   Hereinafter, embodiments of an amount calculation apparatus, an amount calculation method, and an amount calculation program according to the present invention will be described in detail with reference to the drawings. In addition, this invention is not limited by this embodiment.

[1.概要]
IT(Information Technology)業界、コンサルタント業界、サービス業界等の分野においては、得意先会社から依頼されたプロジェクトに取り組む際に、プロジェクト単位で、SES契約(システムエンジニアリングサービス契約)により外注社員に業務を委託することがよくある。
[1. Overview]
In the IT (Information Technology) industry, consulting industry, service industry, etc., when working on projects requested by customer companies, outsourced work to subcontracted employees by SES contract (system engineering service contract) on a project basis. Often to do.

このように、業務を外注する場合、社員ごとの契約情報および売上予定金額、前記依頼されたプロジェクトに要する予算、ならびに、外注先会社への外注社員の手配を管理する必要があるが、これらの情報の管理は、これまでは、異なるシステムを用いて別々に行っており、各情報の連携が出来ず、非常に効率が悪かった。   In this way, when subcontracting work, it is necessary to manage contract information and planned sales amount for each employee, the budget required for the requested project, and arrangement of subcontracted employees to the subcontractor company. Up to now, information management has been performed separately using different systems, and it has been extremely inefficient because the information cannot be linked.

そこで、本実施形態においては、プロジェクト単位で、社員ごと、月ごとの工数(作業時間)および残業時間を要員管理データとして登録することにより、社員ごとの契約情報および売上予定金額、プロジェクトに要する予算、ならびに、外注先会社への外注社員の手配を一元的に管理できる販売管理装置、販売管理方法および販売管理プログラムを提供している。以下、具体的な構成および動作について説明する。   Therefore, in this embodiment, by registering the man-hours (working hours) and overtime hours for each employee for each project as personnel management data, contract information for each employee, estimated sales amount, and budget required for the project In addition, a sales management device, a sales management method, and a sales management program that can centrally manage the arrangement of subcontracting employees to a subcontractor company are provided. Hereinafter, a specific configuration and operation will be described.

[2.構成]
本発明を包含する本実施形態に係る販売管理装置100の構成について、図1を用いて説明する。図1は、販売管理装置100の構成の一例を示すブロック図である。
[2. Constitution]
The configuration of the sales management apparatus 100 according to this embodiment including the present invention will be described with reference to FIG. FIG. 1 is a block diagram illustrating an example of the configuration of the sales management apparatus 100.

販売管理装置100は、市販のデスクトップ型パーソナルコンピュータである。なお、販売管理装置100は、デスクトップ型パーソナルコンピュータのような据置型情報処理装置に限らず、市販されているノート型パーソナルコンピュータ、PDA(Personal Digital Assistants)、スマートフォン、タブレット型パーソナルコンピュータなどの携帯型情報処理装置であってもよい。   The sales management apparatus 100 is a commercially available desktop personal computer. The sales management apparatus 100 is not limited to a stationary information processing apparatus such as a desktop personal computer, but is a portable type such as a commercially available notebook personal computer, PDA (Personal Digital Assistant), smartphone, or tablet personal computer. An information processing apparatus may be used.

販売管理装置100は、図1に示すように、制御部102と通信インターフェース部104と記憶部106と入出力インターフェース部108と、を備えている。販売管理装置100が備えている各部は、任意の通信路を介して通信可能に接続されている。   As shown in FIG. 1, the sales management apparatus 100 includes a control unit 102, a communication interface unit 104, a storage unit 106, and an input / output interface unit 108. Each unit included in the sales management device 100 is connected to be communicable via an arbitrary communication path.

通信インターフェース部104は、ルータ等の通信装置および専用線等の有線または無線の通信回線を介して、販売管理装置100をネットワーク300に通信可能に接続する。通信インターフェース部104は、他の装置と通信回線を介してデータを通信する機能を有する。ここで、ネットワーク300は、販売管理装置100とサーバ200とを相互に通信可能に接続する機能を有し、例えばインターネットやLAN(Local Area Network)等である。なお、後述する記憶部106に格納されるデータは、サーバ200に格納されてもよい。   The communication interface unit 104 connects the sales management device 100 to the network 300 via a communication device such as a router and a wired or wireless communication line such as a dedicated line. The communication interface unit 104 has a function of communicating data with other devices via a communication line. Here, the network 300 has a function of connecting the sales management apparatus 100 and the server 200 so that they can communicate with each other, and is, for example, the Internet or a LAN (Local Area Network). Note that data stored in the storage unit 106 to be described later may be stored in the server 200.

入出力インターフェース部108には、入力装置112および出力装置114が接続されている。出力装置114には、モニタ(家庭用テレビを含む)の他、スピーカやプリンタを用いることができる。入力装置112には、キーボード、マウス、およびマイクの他、マウスと協働してポインティングデバイス機能を実現するモニタを用いることができる。なお、以下では、出力装置114をモニタ114とし、入力装置112をキーボード112またはマウス112として記載する場合がある。   An input device 112 and an output device 114 are connected to the input / output interface unit 108. As the output device 114, a speaker (including a home television), a speaker, and a printer can be used. As the input device 112, in addition to a keyboard, a mouse, and a microphone, a monitor that realizes a pointing device function in cooperation with the mouse can be used. In the following description, the output device 114 may be described as the monitor 114, and the input device 112 may be described as the keyboard 112 or the mouse 112.

記憶部106には、各種のデータベース、テーブル、およびファイルなどが格納される。記憶部106には、OS(Operating System)と協働してCPU(Central Processing Unit)に命令を与えて各種処理を行うためのコンピュータプログラムが記録される。記憶部106として、例えば、RAM(Random Access Memory)・ROM(Read Only Memory)等のメモリ装置、ハードディスクのような固定ディスク装置、フレキシブルディスク、および光ディスク等を用いることができる。   The storage unit 106 stores various databases, tables, files, and the like. The storage unit 106 stores a computer program for giving various instructions to a CPU (Central Processing Unit) in cooperation with an OS (Operating System). As the storage unit 106, for example, a memory device such as a RAM (Random Access Memory) and a ROM (Read Only Memory), a fixed disk device such as a hard disk, a flexible disk, and an optical disk can be used.

記憶部106は、社員マスタ106aと、第一の単価マスタとしての社員原価単価マスタ106bと、第二の単価マスタとしての社員契約単価マスタ106cと、PJデータ106dと、社員管理データとしての要員管理データ106eと、を備えている。これらのうち、社員マスタ106aは、任意の構成要素であり、販売管理装置100に含まれていても含まれていなくてもよい。また、PJデータ106dおよび要員管理データ106eは、図1に示すように、記憶部106に格納されていてもよいが、販売管理装置100の使用時にオペレータにより入力されることが好ましい。   The storage unit 106 includes an employee master 106a, an employee cost unit price master 106b as a first unit price master, an employee contract unit price master 106c as a second unit price master, PJ data 106d, and personnel management as employee management data. Data 106e. Among these, the employee master 106a is an arbitrary component, and may or may not be included in the sales management apparatus 100. Further, as shown in FIG. 1, the PJ data 106 d and the personnel management data 106 e may be stored in the storage unit 106, but are preferably input by an operator when using the sales management device 100.

記憶部106に格納されている前述の3つのマスタおよび前述の2つのデータが含む各項目を、主に図2および図3を用いて詳細に説明する。図2は、記憶部に格納されている情報およびそれに基づき作成されるデータの関連を示すテーブル図である。図3は、記憶部に格納されている情報の一例を示す図である。   Each item included in the three masters and the two data stored in the storage unit 106 will be described in detail mainly with reference to FIGS. FIG. 2 is a table showing the relationship between information stored in the storage unit and data created based on the information. FIG. 3 is a diagram illustrating an example of information stored in the storage unit.

なお、以下の説明において、各項目の後ろに示すかっこ内の表記は、各項目の具体例のことであり、図面においては、前記各項目の具体例を示している。例えば、社員識別情報(社員CD)と記載した場合には、社員識別情報の具体例として、社員CDがあげられることを意味する。また、以下の説明においては、得意先会社(○×株式会社)より依頼されたプロジェクトに、自社社員である山田太郎と外注社員である鈴木一郎が取り組む場面を想定している。   In the following description, the notation in parentheses after each item is a specific example of each item, and in the drawings, a specific example of each item is shown. For example, when the employee identification information (employee CD) is described, it means that the employee CD is given as a specific example of the employee identification information. In the following explanation, it is assumed that Taro Yamada, who is an employee, and Ichiro Suzuki, who is a subcontractor, work on a project requested by a customer company (XX Corporation).

社員マスタ106aは、自社社員および外注社員の各個人を識別するための情報を格納するマスタである。社員マスタ106aは、図2および図3に示すように、社員識別情報(社員CD)、社員名、外注先識別情報(外注先CD)、自社社員用識別情報(原価単価CD)、所属部署識別情報(所属部署CD)等の項目を含む。識別情報の表記としては、文字や数字やアルファベットの羅列のような識別CD(識別コード)であってもよいし、具体的な名称(例えば、具体的な社員名、外注先会社名、部署名等)であってもよく、これは以下においても同様である。   The employee master 106a is a master that stores information for identifying the individual of the company employee and the outsourced employee. As shown in FIG. 2 and FIG. 3, the employee master 106a includes employee identification information (employee CD), employee name, subcontractor identification information (subcontractor CD), company employee identification information (cost unit price CD), department identification. Includes items such as information (department CD). The notation of the identification information may be an identification CD (identification code) such as a list of letters, numbers and alphabets, or a specific name (for example, a specific employee name, subcontractor company name, department name). Etc.), and this also applies to the following.

社員マスタ106aが含む各項目のうち、社員識別情報は、自社社員と外注社員の両方に対して振られる識別情報であるが、自社社員と外注社員を区別しやすいように、例えば、識別コードの頭文字のアルファベットを異なるものにすることが好ましい。例えば、図3に示すように、自社社員である山田太郎には、社員CDとして、Sの頭文字で始まるS001が振られ、外注社員である鈴木一郎には、社員CDとして、Pの頭文字で始まるP001が振られている。また、自社社員用識別情報は、自社社員に対してのみ振られる識別情報であり、図3に示すように、自社社員である山田太郎には、自社社員用識別情報(原価単価CD)として、T10が振られている。   Of the items included in the employee master 106a, the employee identification information is identification information assigned to both the company employee and the subcontracted employee. It is preferable that the initial alphabet is different. For example, as shown in FIG. 3, Taro Yamada, who is a company employee, is given S001, which begins with the initials of S, as an employee CD, and Ichiro Suzuki, who is an outsourced employee, has an initial of P as an employee CD. P001 that starts with. In addition, identification information for in-house employees is identification information distributed only to the in-house employees. As shown in FIG. 3, the in-house employee Taro Yamada has identification information for in-house employees (cost unit price CD) T10 is swung.

社員原価単価マスタ106bは、自社社員の費用単価情報を格納するマスタである。社員原価単価マスタ106bは、図2および図3に示すように、自社社員用識別情報(原価単価CD)、適用日、単価名、費用の種類(原価要素)、費用単価(単価)等の項目を含む。図3の社員原価単価マスタは、自社社員用識別情報=T10である山田太郎の費用単価情報を格納している。   The employee cost unit price master 106b is a master that stores the cost unit price information of the company employees. As shown in FIGS. 2 and 3, the employee cost unit price master 106b includes items such as identification information for own employees (cost unit price CD), application date, unit price name, cost type (cost element), cost unit price (unit price), and the like. including. The employee cost unit price master of FIG. 3 stores the cost unit price information of Taro Yamada, whose identification information for company employees = T10.

社員原価単価マスタ106bが含む各項目のうち、費用の種類は、自社社員に対してかかる費用であり、例えば、図3の社員原価単価マスタに示すように、労務費、残業代、間接費、販管費等である。また、費用単価は、前記費用の種類ごとの、1時間あたりの金額である。費用単価は、前記自社社員用識別情報および前記費用の種類の組合せに基づき、1つの数値が決定される。これにより、自社社員一人一人に対して、異なる費用単価を設定することができる。例えば、図3に示すように、自社社員用識別情報=T10である山田太郎の場合、残業代は2,500円/時であるが、自社社員用識別情報=T20である別の自社社員には、図示していないが、例えば、残業代3,000円/時を設定することが可能となる。適用日とは、前記費用単価が前記自社社員に対して適用される日付である。単価名は、各自社社員の役職名、ランク等の情報である。社員原価単価マスタの表示画面の一例を、図7に示す。   Among the items included in the employee cost unit price master 106b, the type of expense is a cost for the company employee. For example, as shown in the employee cost unit price master in FIG. 3, labor costs, overtime charges, overhead costs, SG & A expenses, etc. The cost unit price is an amount per hour for each type of the cost. The unit price of the cost is determined as one numerical value based on the combination of the identification information for company employees and the type of cost. Thereby, different cost unit prices can be set for each employee. For example, as shown in FIG. 3, in the case of Taro Yamada whose identification information for company employees is T10, the overtime fee is 2,500 yen / hour, but another company employee whose identification information for company employees is T20. Although not shown, for example, it is possible to set an overtime fee of 3,000 yen / hour. The application date is a date on which the cost unit price is applied to the company employee. The unit price name is information such as the title and rank of each company employee. An example of the display screen of the employee cost unit price master is shown in FIG.

社員契約単価マスタ106cは、自社社員および外注社員の契約単価情報を格納するマスタである。社員契約単価マスタ106cは、図2および図3に示すように、自社社員に関して、社員識別情報(社員CD)、適用日、売上単価、得意先超過単価、得意先減額単価等の項目を含み、外注社員に関して、社員識別情報(社員CD)、適用日、売上単価、得意先超過単価、得意先減額単価、仕入単価、仕入先超過単価、仕入先減額単価等の項目を含む。図3の社員契約単価マスタは、社員識別情報=S001である自社社員の山田太郎および社員識別情報=P001である外注社員の鈴木一郎の契約単価情報を格納している。   The employee contract unit price master 106c is a master that stores contract unit price information of company employees and outsourced employees. As shown in FIGS. 2 and 3, the employee contract unit price master 106c includes items such as employee identification information (employee CD), application date, sales unit price, customer excess unit price, customer reduction unit price, etc. For subcontracted employees, items such as employee identification information (employee CD), application date, sales unit price, customer excess unit price, customer reduction unit price, purchase unit price, supplier excess unit price, supplier reduction unit price, etc. are included. The employee contract unit price master in FIG. 3 stores contract unit price information of the company employee Taro Yamada with employee identification information = S001 and the outsourced employee Ichiro Suzuki with employee identification information = P001.

社員契約単価マスタ106cが含む各項目のうち、売上単価は、前記自社社員および前記外注社員の1か月あたりの売上予定金額であり、社員により異なる金額が設定される。例えば、社員CD=S001の社員については、図3の社員契約単価マスタに示すように、売上単価を1,000,000円/月と設定する一方で、社員CD=S002の別の社員については、図示していないが、例えば、売上単価を2,000,000円/月と設定することができる。仕入単価は、前記外注社員の1か月あたりの外注金額であり、前記売上単価と同様に、外注社員により異なる金額が設定される。得意先超過単価は、社員が基準時間を上回って労働した場合に、得意先に対して請求する時間あたりの金額である。例えば、基準時間が150〜180時間の契約であるS001の社員が、190時間労働した場合、基準時間より10時間分多く働いているため、得意先に対しては、1,000,000円(売上単価)+3,000円(得意先超過単価)×10時間=1,030,000円請求することとなる。得意先減額単価は、基準時間を下回って労働した場合に、得意先に対する請求から控除される時間あたりの金額である。例えば、前記S001の社員が140時間しか労働しなかった場合、基準時間より労働時間が10時間少ないため、得意先に対しては、1,000,000円(売上単価)−5,000円(得意先減額単価)×10時間=950,000請求することとなる。仕入先超過単価および仕入先減額単価は、請求先が仕入先となる以外は、得意先超過単価および得意先減額単価と同義である。   Of the items included in the employee contract unit price master 106c, the unit sales price is the scheduled sales amount per month for the company employee and the outsourced employee, and different amounts are set for each employee. For example, for an employee with employee CD = S001, as shown in the employee contract unit price master of FIG. 3, the unit sales price is set to 1,000,000 yen / month, while another employee with employee CD = S002 is set. Although not shown, for example, the unit sales price can be set to 2,000,000 yen / month. The purchase unit price is a subcontracted amount per month for the subcontracted employee, and a different amount is set depending on the subcontracted employee in the same manner as the unit sales price. The customer excess unit price is an amount per hour charged to the customer when the employee works beyond the standard time. For example, if an employee of S001 who has a contract with a standard time of 150 to 180 hours works 190 hours, he works 10 hours more than the standard time. (Sales unit price) +3,000 yen (customer excess unit price) × 10 hours = 1,030,000 yen. Customer decrement unit price is the amount of money per hour that is deducted from the charge to the customer when working below the base time. For example, if the employee of S001 worked only 140 hours, the working time is 10 hours less than the standard time, and therefore, for the customer, 1,000,000 yen (unit sales price)-5,000 yen ( Customer reduced unit price) × 10 hours = 950,000. The supplier excess unit price and the vendor reduction unit price are synonymous with the customer excess unit price and the customer reduction unit price except that the billing party is the supplier.

PJデータ106dは、得意先会社から依頼されるプロジェクトに関するデータである。PJデータ106dは、図2および図3に示すように、案件識別情報(PJNO)、受注日、得意先識別情報(得意先)、作業期間(期間)、受注金額(金額)等の項目を含む。   The PJ data 106d is data related to a project requested from a customer company. As shown in FIGS. 2 and 3, the PJ data 106d includes items such as item identification information (PJNO), order date, customer identification information (customer), work period (period), order amount (amount), and the like. .

PJデータ106dが含む各項目のうち、PJNOは、プロジェクトナンバーであり、受注日は、プロジェクトを受注した日付であり、得意先は、前記プロジェクトを依頼した得意先の会社名であり、期間は、前記プロジェクトに対する作業期間であり、受注金額は、前記プロジェクトの受注金額である。   Among the items included in the PJ data 106d, PJNO is the project number, the order date is the date when the project is ordered, the customer is the name of the company that requested the project, and the period is This is a work period for the project, and the order amount is the order amount of the project.

要員管理データ106eは、プロジェクトに携わる要員(社員)の情報を管理するためのデータである。オペレータは、前記プロジェクトに関する売上予定金額、外注社員の仕入金額、前記プロジェクトに要する費用等を予め見積もるために、プロジェクト開始前に、要員管理データ106eの各項目を入力することが好ましい。要員管理データ106eは、図2および図3に示すように、案件識別情報(PJNO)、社員識別情報(社員CD)、年月情報(年月)、作業期間(期間)、作業時間(作業工数)、残業時間等の項目を含む。   The personnel management data 106e is data for managing information on personnel (employees) involved in the project. It is preferable that the operator inputs each item of the personnel management data 106e before starting the project in order to estimate in advance the planned sales amount related to the project, the purchase amount of the subcontracted employee, the cost required for the project, and the like. As shown in FIGS. 2 and 3, the personnel management data 106e includes project identification information (PJNO), employee identification information (employee CD), year / month information (year / month), work period (period), work time (work man-hours). ), Including items such as overtime hours.

要員管理データ106eが含む各項目のうち、年月情報および作業期間は、それぞれ、社員が前記プロジェクトに取り組む年月および期間である。また、作業時間は、1月あたりの、残業代を含めない作業時間、いわゆる、標準作業時間であり、本例では、標準作業時間=150時間としている。作業工数とは、前記標準作業時間を作業工数=1と定義したものであり、本例では、150時間を作業工数=1と定義している。このため、例えば、ある社員が1か月あたりに170時間作業を行った場合は、作業工数=1、残業時間=20時間となる。要員管理データ106eの入力画面の一例を、図5に示す。なお、以下において、単に「工数」と言う場合、作業工数のことを指す。   Of the items included in the personnel management data 106e, the year / month information and the work period are respectively the year / month and period in which the employee works on the project. Further, the work time is a work time not including overtime work per month, so-called standard work time, and in this example, standard work time = 150 hours. The work man-hour is defined as the standard work time as work man-hour = 1, and in this example, 150 hours is defined as work man-hour = 1. For this reason, for example, when a certain employee performs 170 hours of work per month, the work man-hour = 1 and the overtime hours = 20 hours. An example of the input screen for the personnel management data 106e is shown in FIG. In the following, the term “man-hour” simply refers to the work man-hour.

制御部102は、販売管理装置100を統括的に制御するCPU等である。制御部102は、OS等の制御プログラム・各種の処理手順等を規定したプログラム・所要データなどを格納するための内部メモリを有し、格納されているこれらのプログラムに基づいて種々の情報処理を実行する。制御部102は、機能概念的に、(1)外部からの入力に応じて、前記要員管理データを編集する編集手段としての編集部102aと、(2)前記第二の単価マスタに含まれる社員識別情報に対応する売上単価と、入力された社員管理データに含まれる社員識別情報および作業期間の組合せに対応する作業時間と、に基づき、自社社員と外注社員における売上金額を算出する売上金額算出手段としての売上金額算出部102bと、(3)前記第二の単価マスタに含まれる外注社員の社員識別情報に対応する仕入単価と、前記社員管理データに含まれる社員識別情報および作業期間の組合せに対応する作業時間と、に基づき、仕入金額を算出する仕入金額算出手段としての仕入金額算出部102cと、(4)前記第一の単価マスタに含まれる費用単価と、前記社員管理データに含まれる作業時間または残業時間と、に基づき、費用の種類ごとに、各費用を算出する各費用算出手段としての各費用算出部102dと、(5)当該編集された要員管理データを表示する表示手段としての表示部102eと、を備えている。これらのうち、売上金額算出部102b、仕入金額算出部102cおよび各費用算出部102dが実行する処理の詳細については、以下の[3.処理の具体例]にて詳細に説明する。   The control unit 102 is a CPU or the like that controls the sales management apparatus 100 in an integrated manner. The control unit 102 has an internal memory for storing a control program such as an OS, a program that defines various processing procedures, and necessary data, and performs various information processing based on these stored programs. Run. The control unit 102 is functionally conceptually (1) an editing unit 102a as an editing unit that edits the personnel management data in response to an input from the outside, and (2) an employee included in the second unit price master. Sales amount calculation that calculates the sales amount for in-house employees and subcontracted employees based on the unit sales price corresponding to the identification information and the working time corresponding to the combination of the employee identification information and work period included in the entered employee management data Sales amount calculation unit 102b as means, (3) purchase unit price corresponding to employee identification information of the subcontracted employee included in the second unit price master, employee identification information and work period included in the employee management data A purchase price calculation unit 102c as a purchase price calculation means for calculating a purchase price based on the work time corresponding to the combination; and (4) a cost included in the first unit price master. Each cost calculation unit 102d as each cost calculation means for calculating each cost for each type of cost based on the unit price and the working time or overtime included in the employee management data, and (5) the edited And a display unit 102e as display means for displaying the personnel management data. Among these, the details of the processing executed by the sales amount calculation unit 102b, the purchase amount calculation unit 102c, and each expense calculation unit 102d are described in [3. Specific Example of Processing] will be described in detail.

編集部102aは、前述のとおり、外部からの入力に応じて、前記要員管理データを編集する。ここでいう編集とは、前記要員管理データが含む各項目の追加・削除・変更・修正等を含む広い概念を意味する。   As described above, the editing unit 102a edits the personnel management data in accordance with an external input. Editing here means a broad concept including addition / deletion / change / modification of each item included in the personnel management data.

表示部102eは、前述のとおり、編集された要員管理データを表示する。なお、表示部102eは、少なくとも、編集された要員管理データを表示すればよいが、これに加えて、売上金額算出部102bが算出した売上算金額出結果、仕入金額算出部102cが算出した仕入金額算出結果および各費用算出部102dが算出した各費用算出結果を表示してもよい。   As described above, the display unit 102e displays the edited personnel management data. The display unit 102e only needs to display at least the edited personnel management data. In addition, the display unit 102e calculates the sales calculation amount calculation result calculated by the sales amount calculation unit 102b and the purchase amount calculation unit 102c. The purchase price calculation result and each cost calculation result calculated by each cost calculation unit 102d may be displayed.

このように、本実施形態に係る販売管理装置100によれば、例えば、前記要員管理データを外注先の会社のシステムと紐付けておくことにより、外注先会社への外注社員の手配を効率よく管理できる。また、本実施形態に係る販売管理装置100によれば、現場担当者等が、前記要員管理データにおける各社員の作業工数や残業時間の項目を参照することにより、各社員の忙しさを把握し、その結果、例えば、残業が多い社員の作業量を減らす等の調整を行うことにより、社員の負荷の調整を容易に行うことができる。さらに、本実施形態に係る販売管理装置100は、社員により日報等に入力される売上実績を含めば、社員の予定と、日報等に入力される売上実績等と、を同時に管理(いわゆる予実管理)できる。   As described above, according to the sales management apparatus 100 according to the present embodiment, for example, by arranging the personnel management data with the system of the subcontractor company, it is possible to efficiently arrange the subcontracting employee to the subcontractor company. Can manage. In addition, according to the sales management apparatus 100 according to the present embodiment, the person in charge of the site grasps the busyness of each employee by referring to the items of the man-hours and overtime hours of each employee in the personnel management data. As a result, for example, by making adjustments such as reducing the amount of work for employees who have a lot of overtime, it is possible to easily adjust the load on the employees. Furthermore, the sales management device 100 according to the present embodiment simultaneously manages the employee's schedule and the sales results inputted in the daily report, etc., including the sales results inputted in the daily report by the employees (so-called prognostic management). )it can.

[3.処理の具体例]
本実施形態に係る処理の具体例について、図4、図6および図8を参照して詳細に説明する。図4は、作成されるデータの一例を示す図である。図6は、作成されるPJ予算データの出力画面の一例を示す図である。図8は、作成されるSES契約データおよびPJ予算データの出力画面の一例を示す図である。
[3. Specific example of processing]
Specific examples of processing according to the present embodiment will be described in detail with reference to FIGS. 4, 6, and 8. FIG. 4 is a diagram illustrating an example of data to be created. FIG. 6 is a diagram illustrating an example of an output screen for PJ budget data to be created. FIG. 8 is a diagram showing an example of an output screen for the created SES contract data and PJ budget data.

ここで、本実施形態における処理の概略を説明する。本実施形態に係る販売管理装置100は、以下のようにして、自社社員および外注社員における売上金額、外注社員に関する仕入金額およびプロジェクトの遂行に要する各費用を、同時に算出する。具体的には、売上金額算出部102bが、社員契約単価マスタ106cと、要員管理データ106eと、に基づき、売上金額算出処理を行い、自社社員および外注社員における売上金額を算出する。仕入金額算出部102cが、社員契約単価マスタ106cと、要員管理データ106eと、に基づき、仕入金額算出処理を行い、前記外注社員に関する仕入金額を算出する。各費用算出部102dが、社員原価単価マスタ106bと、要員管理データ106eと、に基づき、各費用算出処理を行い、プロジェクトの遂行に要する各費用を算出する。以下、この処理の順序で、詳細に説明をする。   Here, an outline of processing in the present embodiment will be described. The sales management apparatus 100 according to the present embodiment simultaneously calculates the sales amount of the company employee and the subcontracted employee, the purchase amount related to the subcontracted employee, and the expenses required for executing the project as follows. Specifically, the sales amount calculation unit 102b performs a sales amount calculation process based on the employee contract unit price master 106c and the personnel management data 106e, and calculates the sales amount of the company employee and the outsourced employee. The purchase amount calculation unit 102c performs purchase amount calculation processing based on the employee contract unit price master 106c and the personnel management data 106e, and calculates the purchase amount related to the subcontracted employee. Each expense calculation unit 102d performs each expense calculation process based on the employee cost unit price master 106b and the personnel management data 106e, and calculates each expense required for the execution of the project. Hereinafter, this process will be described in detail in the order.

[売上金額算出処理]
売上金額算出部102bは、社員契約単価マスタに含まれる社員CDに対応する売上単価と、入力された要員管理データに含まれる社員CDおよび期間の組合せに対応する工数と、に基づき、自社社員および外注社員における売上金額を算出する。
[Sales amount calculation processing]
Based on the sales unit price corresponding to the employee CD included in the employee contract unit price master and the man-hour corresponding to the combination of the employee CD and the period included in the input personnel management data, the sales amount calculation unit 102b Calculate the sales amount of outsourced employees.

具体例として、図4に示すSES契約データにおける、上から1つ目(社員CD=S001、期間=4/16〜4/30)の売上金額(売上単価)=500,000円を算出する場合について説明する。まず、社員契約単価マスタに含まれる社員CD(S001)に対応する売上単価は、1,000,000円/月である。一方で、入力された要員管理データに含まれる社員CD(S001)および期間(4/16〜4/30)の組合せに対応する工数は、0.5である。   As a specific example, when calculating the first sales amount (employee CD = S001, period = 4/16 to 4/30) in the SES contract data shown in FIG. 4 (sales unit price) = 500,000 yen Will be described. First, the sales unit price corresponding to the employee CD (S001) included in the employee contract unit price master is 1,000,000 yen / month. On the other hand, the man-hour corresponding to the combination of the employee CD (S001) and the period (4/16 to 4/30) included in the input personnel management data is 0.5.

これらより、売上金額算出部102bは、前記対応する売上単価(1,000,000円/月)と、前記対応する工数(0.5)と、に基づき、社員CDがS001である自社社員の、4/16〜4/30の期間における売上金額を、1,000,000円/月×0.5=500,000円と算出する。なお、本例では、社員CDがS001である自社社員の売上金額の算出について説明したが、社員CDがP001である外注社員の売上金額も、同様の方法で算出できる。   Based on these, the sales amount calculation unit 102b is based on the corresponding sales unit price (1,000,000 yen / month) and the corresponding man-hour (0.5), and the employee CD is S001 of the employee The sales amount in the period from 4/16 to 4/30 is calculated as 1,000,000 yen / month × 0.5 = 500,000 yen. In this example, the calculation of the sales amount of the company employee whose employee CD is S001 has been described. However, the sales amount of an outsourced employee whose employee CD is P001 can also be calculated by the same method.

このように算出された売上金額は、図4に示すように、SES契約データの表として示してもよい。前記SES契約データの表は、図4に示すように、PJNO、社員CD、期間、算出した売上金額(売上単価)の項目を含むほか、社員契約単価マスタにおける得意先超過単価および得意先減額単価の数値をそのまま右2列に示してもよい。なお、図8に、作成されるSES契約データの出力画面の一例を示す。   The sales amount calculated in this way may be shown as a table of SES contract data as shown in FIG. As shown in FIG. 4, the SES contract data table includes items of PJNO, employee CD, period, and calculated sales amount (sales unit price), as well as customer excess unit price and customer decrement unit price in the employee contract unit price master. May be shown in the right two columns as they are. FIG. 8 shows an example of the output screen of the created SES contract data.

このように、本実施形態に係る販売管理装置100によれば、作成された前記SES契約データの表を参照することにより、社員ごとの契約情報(社員CD、期間等)および売上予定金額を、効率よく管理することができる。   As described above, according to the sales management apparatus 100 according to the present embodiment, by referring to the created SES contract data table, the contract information (employee CD, period, etc.) for each employee and the planned sales amount are obtained. It can be managed efficiently.

[仕入金額算出処理]
仕入金額算出部102cは、社員契約単価マスタに含まれる外注社員の社員CDに対応する仕入単価と、入力された要員管理データに含まれる社員CDおよび期間の組合せに対応する工数と、に基づき、前記外注社員に関する仕入金額を算出する。
[Purchase amount calculation processing]
The purchase price calculation unit 102c includes a purchase unit price corresponding to the employee CD of the subcontracted employee included in the employee contract unit price master, and a man-hour corresponding to the combination of the employee CD and the period included in the input personnel management data. Based on this, the purchase amount for the outsourced employee is calculated.

具体例として、図4に示すSES発注予定データにおける、上から1つ目(社員CD=P001、期間=4/16〜4/30)の仕入金額(仕入単価)=200,000円を算出する場合について説明する。まず、社員契約単価マスタに含まれる外注社員の社員CD(P001)に対応する仕入単価は、400,000円/月である。一方で、入力された要員管理データに含まれる社員CD(P001)および期間(4/16〜4/30)の組合せに対応する工数は、0.5である。   As a specific example, the first purchase amount (employee CD = P001, period = 4/16 to 4/30) in the SES order schedule data shown in FIG. The case of calculating will be described. First, the purchase unit price corresponding to the employee CD (P001) of the subcontracted employee included in the employee contract unit price master is 400,000 yen / month. On the other hand, the man-hour corresponding to the combination of the employee CD (P001) and the period (4/16 to 4/30) included in the input personnel management data is 0.5.

これらより、仕入金額算出部102cは、前記対応する仕入単価(400,000円/月)と、前記対応する工数(0.5)と、に基づき、社員CDがP001である外注社員の、4/16〜4/30の期間における仕入金額を、400,000円/月×0.5=200,000円と算出する。   From these, the purchase price calculation unit 102c, based on the corresponding purchase unit price (400,000 yen / month) and the corresponding man-hour (0.5), the subcontracted employee whose employee CD is P001. The purchase amount in the period from 4/16 to 4/30 is calculated as 400,000 yen / month × 0.5 = 200,000 yen.

このように算出された売上金額は、図4に示すように、SES発注予定データの表として示してもよい。前記SES発注予定データの表は、図4に示すように、PJNO、社員CD、外注先CD、期間、算出した仕入金額(仕入単価)の項目を含むほか、社員契約単価マスタにおける仕入先超過単価および仕入先減額単価の数値をそのまま右2列に示してもよい。   The sales amount calculated in this way may be shown as a table of SES order schedule data as shown in FIG. As shown in FIG. 4, the SES order schedule data table includes items of PJNO, employee CD, subcontractor CD, period, calculated purchase amount (purchase unit price), and purchase in the employee contract unit price master. The numerical values of the excess excess unit price and the supplier reduced unit price may be shown in the right two columns as they are.

このように、本実施形態に係る販売管理装置100によれば、作成された前記SES発注予定データの表を参照することにより、プロジェクトに要する予算の一種である仕入金額、すなわち、外注費を、効率よく管理することができる。   As described above, according to the sales management apparatus 100 according to the present embodiment, by referring to the table of the created SES order schedule data, the purchase amount, which is a kind of budget required for the project, that is, the subcontracting cost is reduced. Can be managed efficiently.

[各費用算出処理]
各費用算出部102dは、社員原価単価マスタに含まれる単価と、入力された要員管理データに含まれる工数または残業時間と、に基づき、費用の種類ごとに、各費用を算出する。
[Each expense calculation process]
Each expense calculation part 102d calculates each expense for every kind of expense based on the unit price contained in the employee cost unit price master, and the man-hour or overtime contained in the input personnel management data.

なお、ここでいう各費用とは、図4に示すPJ予算データの各費用のうち、労務費、残業代、間接費および販管費のことを指す。これらの費用はすべて、自社社員に対してかかる費用である。一方、外注社員に対してかかる費用である外注費は、これらの費用の中には入っておらず、前述の仕入金額の算出方法により算出することができる。   Each expense here refers to labor costs, overtime charges, indirect costs, and SG & A expenses among the costs of the PJ budget data shown in FIG. All of these costs are costs for our employees. On the other hand, subcontracting costs, which are costs for subcontracting employees, are not included in these costs, and can be calculated by the above-described method for calculating the purchase price.

各費用の算出の具体例として、図4に示すPJ予算データにおける、4月分における自社社員の労務費および残業代を算出する場合について説明する。   As a specific example of calculation of each expense, a case will be described in which the labor costs and overtime charges of the company employees for April are calculated in the PJ budget data shown in FIG.

最初に、労務費の算出について説明する。社員原価単価マスタに含まれる、労務費の単価は、2,000円/時である。一方、入力された要員管理データに含まれる、自社社員(S001)の4月分の工数は、工数=0.5である。   First, calculation of labor costs will be described. The unit cost of labor costs included in the employee cost unit price master is 2,000 yen / hour. On the other hand, the man-hour for April of the company employee (S001) included in the input personnel management data is man-hour = 0.5.

これらより、各費用算出部102dは、前記労務費の単価(2,000円/時)と、前記自社社員の4月分の工数(0.5)と、に基づき、自社社員の4月分の労務費を算出する。ここで、前述の[2.構成]の要員管理データ106eの説明箇所で述べたとおり、本例においては、1月あたりの標準作業時間である150時間を、作業工数=1としている。このため、各費用算出部102dは、自社社員の4月分の労務費を、労務費の単価/時×1月あたりの標準作業時間数×4月分の工数=2000円/時×150時間×0.5=150,000円と算出する。間接費および販管費も、同様の方法で算出できる。   From these, each expense calculation part 102d is based on the unit price (2,000 yen / hour) of the labor cost and the April man-hour of the company employee (0.5). Calculate labor costs. Here, [2. As described in the explanation of the personnel management data 106e in [Configuration], in this example, 150 hours, which is the standard work time per month, is set to 1 as the number of work steps. For this reason, each cost calculation unit 102d calculates the labor costs for April of its employees as the unit cost of labor costs / hour × standard number of hours per month × time for April = 2000 yen / hour × 150 hours. * Calculated as 0.5 = 150,000 yen. Indirect costs and SG & A expenses can be calculated in the same way.

つぎに、残業代の算出について説明する。社員原価単価マスタに含まれる、残業代の単価は、2,500円/時である。一方、入力された要員管理データに含まれる、自社社員(S001)の4月分の残業時間は、10時間である。   Next, calculation of overtime charges will be described. The unit price for overtime included in the employee cost unit price master is 2,500 yen / hour. On the other hand, the overtime for April of the company employee (S001) included in the input personnel management data is 10 hours.

これらより、各費用算出部102dは、前記残業代の単価(2,500円/時)と、前記自社社員の4月分の残業時間(10時間)と、に基づき、自社社員の4月分の残業代を、2,500円/時×10時間=25,000円と算出する。   From these, each expense calculation part 102d is based on the unit price (2,500 yen / hour) of the overtime fee and the overtime hours (10 hours) for April of the company employee. Is calculated as 2,500 yen / hour × 10 hours = 25,000 yen.

このように算出された各費用は、図4に示すように、PJ予算データの表として示してもよい。前記PJ予算データの表には、図4に示すように、月ごとに、労務費、残業代、間接費および販管費が記されている。また、前記PJ予算データの表において、外注社員に対してかかる費用である外注費の項目も、図4に示すように追加してもよいが、外注費の値は、本項目の[各費用算出処理]の算出方法ではなく、[仕入金額算出処理]の算出方法により算出されるものである。なお、図6に、間接費および販管費が記載されたPJ予算データの出力画面の一例を示し、図8に、外注費、労務費(通常)および労務費(残業)が記載されたPJ予算データの出力画面の一例を示す。   Each expense calculated in this way may be shown as a table of PJ budget data as shown in FIG. In the PJ budget data table, as shown in FIG. 4, labor costs, overtime charges, indirect costs, and SG & A expenses are recorded for each month. Also, in the PJ budget data table, an item of subcontracting cost, which is a cost for subcontracting employees, may be added as shown in FIG. It is calculated by the calculation method of [purchase amount calculation process], not the calculation method of [calculation process]. FIG. 6 shows an example of an output screen of PJ budget data in which indirect costs and SG & A expenses are described, and FIG. 8 shows a PJ budget in which outsourcing costs, labor costs (normal), and labor costs (overtime) are described. An example of the data output screen is shown.

このように、本実施形態に係る販売管理装置100によれば、作成されたPJ予算データの表を参照することにより、プロジェクトに要する予算(労務費、残業代、外注費、間接費、販管費等)を、効率よく管理することができる。   As described above, according to the sales management apparatus 100 according to the present embodiment, by referring to the created PJ budget data table, the budget required for the project (labor cost, overtime fee, subcontracting cost, indirect cost, SG & A cost) Etc.) can be managed efficiently.

以上まとめると、本実施形態に係る販売管理装置100によれば、前記SES契約データを参照して、社員ごとの契約情報および売上予定金額を管理でき、前記SES発注予定データおよび前記PJ予算データを参照して、プロジェクトに要する予算を管理でき、前記要員管理データを参照して、外注先会社への外注社員の手配を管理できる。すなわち、本実施形態に係る販売管理装置100によれば、前記社員ごとの契約情報および売上予定金額、プロジェクトに要する予算、ならびに、外注先会社への外注社員の手配を一元的に管理できるため、非常に管理効率がよく、見易さの観点においても優れている。   In summary, according to the sales management apparatus 100 according to the present embodiment, referring to the SES contract data, contract information and planned sales amount for each employee can be managed, and the SES order planned data and the PJ budget data are stored. The budget required for the project can be managed by referring to the staff management data, and the arrangement of subcontracting employees to the subcontractor company can be managed. That is, according to the sales management apparatus 100 according to the present embodiment, the contract information for each employee and the planned sales amount, the budget required for the project, and the arrangement of the subcontracted employee to the subcontractor company can be centrally managed. It is very efficient and easy to see.

[4.他の実施形態]
本発明は、上述した実施形態以外にも、特許請求の範囲に記載した技術的思想の範囲内において種々の異なる実施形態にて実施されてよいものである。
[4. Other Embodiments]
In addition to the above-described embodiments, the present invention may be implemented in various different embodiments within the scope of the technical idea described in the claims.

例えば、実施形態において説明した各処理のうち、自動的に行われるものとして説明した処理の全部または一部を手動的に行うこともでき、あるいは、手動的に行われるものとして説明した処理の全部または一部を公知の方法で自動的に行うこともできる。   For example, among the processes described in the embodiments, all or part of the processes described as being automatically performed can be performed manually, or all of the processes described as being performed manually are all performed. Alternatively, a part can be automatically performed by a known method.

また、本明細書中や図面中で示した処理手順、制御手順、具体的名称、各処理の登録データや検索条件等のパラメータを含む情報、画面例、データベース構成については、特記する場合を除いて任意に変更することができる。   In addition, the processing procedures, control procedures, specific names, information including parameters such as registration data and search conditions for each processing, screen examples, and database configurations shown in the present specification and drawings, unless otherwise specified. Can be changed arbitrarily.

また、販売管理装置100に関して、図示の各構成要素は機能概念的なものであり、必ずしも物理的に図示の如く構成されていることを要しない。   Moreover, regarding the sales management apparatus 100, each illustrated component is functionally conceptual and does not necessarily need to be physically configured as illustrated.

例えば、販売管理装置100が備える処理機能、特に制御部102にて行われる各処理機能については、その全部または任意の一部を、CPUおよび当該CPUにて解釈実行されるプログラムにて実現してもよく、また、ワイヤードロジックによるハードウェアとして実現してもよい。尚、プログラムは、本実施形態で説明した処理を情報処理装置に実行させるためのプログラム化された命令を含む一時的でないコンピュータ読み取り可能な記録媒体に記録されており、必要に応じて販売管理装置100に機械的に読み取られる。すなわち、ROMまたはHDD(Hard Disk Drive)などの記憶部などには、OSと協働してCPUに命令を与え、各種処理を行うためのコンピュータプログラムが記録されている。このコンピュータプログラムは、RAMにロードされることによって実行され、CPUと協働して制御部を構成する。   For example, the processing functions provided in the sales management device 100, in particular, the processing functions performed by the control unit 102, are realized entirely or arbitrarily by a CPU and a program interpreted and executed by the CPU. It may also be realized as hardware by wired logic. The program is recorded on a non-transitory computer-readable recording medium including a programmed instruction for causing the information processing apparatus to execute the processing described in the present embodiment. 100 mechanically read. In other words, in a storage unit such as a ROM or a HDD (Hard Disk Drive), a computer program for giving instructions to the CPU in cooperation with the OS and performing various processes is recorded. This computer program is executed by being loaded into the RAM, and constitutes a control unit in cooperation with the CPU.

また、このコンピュータプログラムは、販売管理装置100に対して任意のネットワークを介して接続されたアプリケーションプログラムサーバに記憶されていてもよく、必要に応じてその全部または一部をダウンロードすることも可能である。   The computer program may be stored in an application program server connected to the sales management apparatus 100 via an arbitrary network, and may be downloaded in whole or in part as necessary. is there.

また、本実施形態で説明した処理を実行するためのプログラムを、一時的でないコンピュータ読み取り可能な記録媒体に格納してもよく、また、プログラム商品として構成することもできる。ここで、この「記録媒体」とは、メモリーカード、USB(Universal Serial Bus)メモリ、SD(Secure Digital)カード、フレキシブルディスク、光磁気ディスク、ROM、EPROM(Erasable Programmable Read Only Memory)、EEPROM(登録商標)(Electrically Erasable and Programmable Read Only Memory)、CD−ROM(Compact Disk Read Only Memory)、MO(Magneto−Optical disk)、DVD(Digital Versatile Disk)、および、Blu−ray(登録商標) Disc等の任意の「可搬用の物理媒体」を含むものとする。 したがって、本明細書で説明したような処理又は処理方法を実行するためのプログラムを格納した記録媒体もまた本発明を構成することとなる。   In addition, a program for executing the processing described in this embodiment may be stored in a non-temporary computer-readable recording medium, or may be configured as a program product. Here, the “recording medium” refers to a memory card, USB (Universal Serial Bus) memory, SD (Secure Digital) card, flexible disk, magneto-optical disk, ROM, EPROM (Erasable Programmable Read Only Memory), EEPROM (registration). Trademark) (Electrically Erasable and Programmable Read Only Memory), CD-ROM (Compact Disk Read Only Memory), MO (Magneto-Optical disk), DVD (Digital Digital, Trademark) Any “portable physical media It is intended to include. Therefore, a recording medium storing a program for executing the processing or processing method described in this specification also constitutes the present invention.

また、「プログラム」とは、任意の言語または記述方法にて記述されたデータ処理方法であり、ソースコードまたはバイナリコード等の形式を問わない。なお、「プログラム」は必ずしも単一的に構成されるものに限られず、複数のモジュールやライブラリとして分散構成されるものや、OSに代表される別個のプログラムと協働してその機能を達成するものをも含む。なお、実施形態に示した各装置において記録媒体を読み取るための具体的な構成および読み取り手順ならびに読み取り後のインストール手順等については、周知の構成や手順を用いることができる。   The “program” is a data processing method described in an arbitrary language or description method, and may be in any form such as source code or binary code. Note that the “program” is not necessarily limited to a single configuration, and functions are achieved in cooperation with a separate configuration such as a plurality of modules and libraries or a separate program represented by the OS. Including things. In addition, a well-known structure and procedure can be used about the specific structure and reading procedure for reading a recording medium in each apparatus shown to embodiment, the installation procedure after reading, etc.

記憶部106に格納される各種のデータベース等は、RAM、ROM等のメモリ装置、ハードディスク等の固定ディスク装置、フレキシブルディスク、および、光ディスク等のストレージ手段であり、各種処理やウェブサイト提供に用いる各種のプログラム、テーブル、データベース、および、ウェブページ用ファイル等を格納する。   Various databases and the like stored in the storage unit 106 are storage devices such as a memory device such as a RAM and a ROM, a fixed disk device such as a hard disk, a flexible disk, and an optical disk. Programs, tables, databases, web page files, and the like.

また、販売管理装置100は、既知のパーソナルコンピュータまたはワークステーション等の情報処理装置として構成してもよく、また、任意の周辺装置が接続された当該情報処理装置として構成してもよい。また、販売管理装置100は、当該装置に本実施形態で説明した処理を実現させるソフトウェア(プログラムまたはデータ等を含む)を実装することにより実現してもよい。   Further, the sales management apparatus 100 may be configured as an information processing apparatus such as a known personal computer or workstation, or may be configured as the information processing apparatus to which an arbitrary peripheral device is connected. Further, the sales management apparatus 100 may be realized by installing software (including a program or data) that realizes the processing described in the present embodiment in the apparatus.

更に、装置の分散・統合の具体的形態は図示するものに限られず、その全部または一部を、各種の付加等に応じてまたは機能負荷に応じて、任意の単位で機能的または物理的に分散・統合して構成することができる。すなわち、上述した実施形態を任意に組み合わせて実施してもよく、実施形態を選択的に実施してもよい。   Furthermore, the specific form of distribution / integration of the devices is not limited to that shown in the figure, and all or a part of them may be functionally or physically in arbitrary units according to various additions or according to functional loads. It can be configured to be distributed and integrated. That is, the above-described embodiments may be arbitrarily combined and may be selectively implemented.

本発明は、特に、IT業界、コンサルタント業界、サービス業界等の分野において有用である。   The present invention is particularly useful in fields such as the IT industry, consulting industry, and service industry.

100 販売管理装置
102 制御部
102a 編集部
102b 売上金額算出部
102c 仕入金額算出部
102d 各費用算出部
102e 表示部
104 通信インターフェース部
106 記憶部
106a 社員マスタ
106b 社員原価単価マスタ
106c 社員契約単価マスタ
106d PJデータ
106e 要員管理データ
108 入出力インターフェース部
112 入力装置
114 出力装置
200 サーバ
300 ネットワーク
100 Sales management device
102 Control unit
102a editorial department
102b Sales amount calculation part
102c Purchase amount calculation part
102d Cost calculation unit
102e Display unit
104 Communication interface
106 Storage unit
106a Employee Master
106b Employee cost unit price master
106c Employee contract unit price master
106d PJ data
106e Personnel management data
108 Input / output interface
112 Input device
114 Output device 200 Server 300 Network

Claims (3)

制御部および記憶部を備え、
自社社員および外注社員がある業務を行う場合において、これら両社員における売上金額、仕入金額および前記ある業務の遂行に要する各費用を算出する金額算出装置であって、
前記記憶部には、
自社社員用識別情報、費用の種類ならびに前記自社社員用識別情報および前記費用の種類の組合せに基づき決定される費用単価を含む第一の単価マスタと、
前記自社社員の社員識別情報およびこれに対応する売上単価と、前記外注社員の社員識別情報ならびにこれに対応する売上単価および仕入単価と、を含む第二の単価マスタと、
が格納されており、
前記制御部は、
前記第二の単価マスタに含まれる社員識別情報に対応する売上単価と、入力された社員管理データに含まれる社員識別情報および作業期間の組合せに対応する作業時間と、に基づき、前記両社員における売上金額を算出する売上金額算出手段と、
前記第二の単価マスタに含まれる外注社員の社員識別情報に対応する仕入単価と、前記社員管理データに含まれる社員識別情報および作業期間の組合せに対応する作業時間と、に基づき、前記仕入金額を算出する仕入金額算出手段と、
前記第一の単価マスタに含まれる費用単価と、前記社員管理データに含まれる作業時間または残業時間と、に基づき、前記費用の種類ごとに、前記各費用を算出する各費用算出手段と、
を備えること、
を特徴とする金額算出装置。
A control unit and a storage unit;
An amount calculation device that calculates the sales amount, purchase amount, and each expense required for the execution of a certain business when both of its employees and outsourced employees conduct business,
In the storage unit,
A first unit price master including a cost unit price determined based on a combination of the identification information for company employees, the type of expense and the identification information for company employees and the type of expense,
A second unit price master including employee identification information of the company employee and sales unit price corresponding thereto, employee identification information of the subcontracted employee and sales unit price and purchase unit price corresponding thereto,
Is stored,
The controller is
Based on the unit sales price corresponding to the employee identification information included in the second unit price master and the work time corresponding to the combination of the employee identification information and the work period included in the input employee management data, Sales amount calculation means for calculating sales amount;
Based on the purchase unit price corresponding to the employee identification information of the subcontracted employee included in the second unit price master and the work time corresponding to the combination of the employee identification information and the work period included in the employee management data, Purchase amount calculation means for calculating the deposit amount;
Based on the cost unit price included in the first unit price master and work hours or overtime hours included in the employee management data, each cost calculation means for calculating each cost for each type of cost,
Providing
A monetary amount calculation device characterized by
制御部および記憶部を備えた情報処理装置で実行される、
自社社員および外注社員がある業務を行う場合において、これら両社員における売上金額、仕入金額および前記ある業務の遂行に要する各費用を算出する金額算出方法であって、
前記記憶部には、
自社社員用識別情報、費用の種類ならびに前記自社社員用識別情報および前記費用の種類の組合せに基づき決定される費用単価を含む第一の単価マスタと、
前記自社社員の社員識別情報およびこれに対応する売上単価と、前記外注社員の社員識別情報ならびにこれに対応する売上単価および仕入単価と、を含む第二の単価マスタと、
が格納されており、
前記制御部で実行される、
前記第二の単価マスタに含まれる社員識別情報に対応する売上単価と、入力された社員管理データに含まれる社員識別情報および作業期間の組合せに対応する作業時間と、に基づき、前記両社員における売上金額を算出する売上金額算出ステップと、
前記第二の単価マスタに含まれる外注社員の社員識別情報に対応する仕入単価と、前記社員管理データに含まれる社員識別情報および作業期間の組合せに対応する作業時間と、に基づき、前記仕入金額を算出する仕入金額算出ステップと、
前記第一の単価マスタに含まれる費用単価と、前記社員管理データに含まれる作業時間または残業時間と、に基づき、前記費用の種類ごとに、前記各費用を算出する各費用算出ステップと、
を含むこと、
を特徴とする金額算出方法。
Executed by an information processing device including a control unit and a storage unit;
An amount calculation method for calculating the sales amount, purchase amount, and each expense required for the execution of a certain business when both the company employee and the outsourced employee perform business,
In the storage unit,
A first unit price master including a cost unit price determined based on a combination of the identification information for company employees, the type of expense and the identification information for company employees and the type of expense,
A second unit price master including employee identification information of the company employee and sales unit price corresponding thereto, employee identification information of the subcontracted employee and sales unit price and purchase unit price corresponding thereto,
Is stored,
Executed by the control unit,
Based on the unit sales price corresponding to the employee identification information included in the second unit price master and the work time corresponding to the combination of the employee identification information and the work period included in the input employee management data, A sales amount calculation step for calculating a sales amount;
Based on the purchase unit price corresponding to the employee identification information of the subcontracted employee included in the second unit price master and the work time corresponding to the combination of the employee identification information and the work period included in the employee management data, A purchase amount calculation step for calculating a deposit amount;
Each cost calculating step for calculating each cost for each type of the cost based on the cost unit price included in the first unit price master and the working time or overtime included in the employee management data;
Including,
An amount calculation method characterized by
制御部および記憶部を備えた情報処理装置に実行させるための、
自社社員および外注社員がある業務を行う場合において、これら両社員における売上金額、仕入金額および前記ある業務の遂行に要する各費用を算出する金額算出プログラムであって、
前記記憶部には、
自社社員用識別情報、費用の種類ならびに前記自社社員用識別情報および前記費用の種類の組合せに基づき決定される費用単価を含む第一の単価マスタと、
前記自社社員の社員識別情報およびこれに対応する売上単価と、前記外注社員の社員識別情報ならびにこれに対応する売上単価および仕入単価と、を含む第二の単価マスタと、
が格納されており、
前記制御部に実行させるための、
前記第二の単価マスタに含まれる社員識別情報に対応する売上単価と、入力された社員管理データに含まれる社員識別情報および作業期間の組合せに対応する作業時間と、に基づき、前記両社員における売上金額を算出する売上金額算出ステップと、
前記第二の単価マスタに含まれる外注社員の社員識別情報に対応する仕入単価と、前記社員管理データに含まれる社員識別情報および作業期間の組合せに対応する作業時間と、に基づき、前記仕入金額を算出する仕入金額算出ステップと、
前記第一の単価マスタに含まれる費用単価と、前記社員管理データに含まれる作業時間または残業時間と、に基づき、前記費用の種類ごとに、前記各費用を算出する各費用算出ステップと、
を含むこと、
を特徴とする金額算出プログラム。
In order to make an information processing device including a control unit and a storage unit execute,
An amount calculation program for calculating the sales amount, purchase amount, and expenses required for the execution of a certain business when both employees and outsourced employees conduct business,
In the storage unit,
A first unit price master including a cost unit price determined based on a combination of the identification information for company employees, the type of expense and the identification information for company employees and the type of expense,
A second unit price master including employee identification information of the company employee and sales unit price corresponding thereto, employee identification information of the subcontracted employee and sales unit price and purchase unit price corresponding thereto,
Is stored,
For causing the control unit to execute,
Based on the unit sales price corresponding to the employee identification information included in the second unit price master and the work time corresponding to the combination of the employee identification information and the work period included in the input employee management data, A sales amount calculation step for calculating a sales amount;
Based on the purchase unit price corresponding to the employee identification information of the subcontracted employee included in the second unit price master and the work time corresponding to the combination of the employee identification information and the work period included in the employee management data, A purchase amount calculation step for calculating a deposit amount;
Each cost calculating step for calculating each cost for each type of the cost based on the cost unit price included in the first unit price master and the working time or overtime included in the employee management data;
Including,
An amount calculation program characterized by
JP2016213490A 2016-10-31 2016-10-31 Amount calculation device, amount calculation method and amount calculation program Active JP6798856B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2016213490A JP6798856B2 (en) 2016-10-31 2016-10-31 Amount calculation device, amount calculation method and amount calculation program

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2016213490A JP6798856B2 (en) 2016-10-31 2016-10-31 Amount calculation device, amount calculation method and amount calculation program

Publications (2)

Publication Number Publication Date
JP2018073192A true JP2018073192A (en) 2018-05-10
JP6798856B2 JP6798856B2 (en) 2020-12-09

Family

ID=62114386

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2016213490A Active JP6798856B2 (en) 2016-10-31 2016-10-31 Amount calculation device, amount calculation method and amount calculation program

Country Status (1)

Country Link
JP (1) JP6798856B2 (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2020004196A (en) * 2018-06-29 2020-01-09 株式会社オービック Business related information management support device, business related information management support method and business related information management support program
KR102155748B1 (en) * 2020-01-03 2020-09-17 주식회사 크라우드웍스 Method for automatic apdating inspection unit price using work time versus inspection time of crowdsourcing based project for artificial intelligence training data generation
JP2020194397A (en) * 2019-05-29 2020-12-03 株式会社オービック Journal approval work support device, journal approval work support method and journal approval work support program

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2007041799A (en) * 2005-08-02 2007-02-15 Hitachi Software Eng Co Ltd Project management support system

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2007041799A (en) * 2005-08-02 2007-02-15 Hitachi Software Eng Co Ltd Project management support system

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2020004196A (en) * 2018-06-29 2020-01-09 株式会社オービック Business related information management support device, business related information management support method and business related information management support program
JP2020194397A (en) * 2019-05-29 2020-12-03 株式会社オービック Journal approval work support device, journal approval work support method and journal approval work support program
KR102155748B1 (en) * 2020-01-03 2020-09-17 주식회사 크라우드웍스 Method for automatic apdating inspection unit price using work time versus inspection time of crowdsourcing based project for artificial intelligence training data generation
WO2021137523A1 (en) * 2020-01-03 2021-07-08 주식회사 크라우드웍스 Method for automatically updating unit cost of inspection by using comparison between inspection time and work time of crowdsourcing-based project for generating artificial intelligence training data

Also Published As

Publication number Publication date
JP6798856B2 (en) 2020-12-09

Similar Documents

Publication Publication Date Title
JP6798856B2 (en) Amount calculation device, amount calculation method and amount calculation program
JP2019139388A (en) Work in process automatic transfer device and work in process automatic transfer method and work in process automatic transfer program
JP7085304B2 (en) Cost calculator, cost calculation method and cost calculation program
JP7485751B2 (en) Work-related information management support device, work-related information management support method, and work-related information management support program
JP7197989B2 (en) Progress rate calculation device, progress rate calculation method, and progress rate calculation program
JP2020194397A (en) Journal approval work support device, journal approval work support method and journal approval work support program
JP2018109869A (en) Amount calculation apparatus, amount calculation method and amount calculation program
JP2017174401A (en) Work completion control device, work completion control method, and work completion control program
JP6830792B2 (en) Sales management equipment, sales management methods and sales management programs
JP7011470B2 (en) Work-in-process automatic transfer device, work-in-process automatic transfer method, and work-in-process automatic transfer program
JP7470000B2 (en) Profit and Loss Management Simulation Device, Profit and Loss Management Simulation Method, and Profit and Loss Management Simulation Program
JP7233177B2 (en) Budget control device, budget control method and budget control program
JP7324162B2 (en) Cost output device, cost output method, and cost output program
JP2019168979A (en) Journalizing data creation device, journalizing data creation method and journalizing data creation program
JP7461853B2 (en) Information processing device, information processing method, and information processing program
JP7492450B2 (en) Sales planning support device, sales planning support method, and sales planning support program
JP2019113965A (en) Financing management device, financing management method, and financing management program
JP7104817B2 (en) Voucher registration control device, voucher registration control method, and voucher registration control program
JP3296318B2 (en) Demand forecasting method, demand forecasting device, and storage medium storing demand forecasting program
JP7280931B2 (en) Information processing device, information processing method, and information processing program
JP7261332B2 (en) Automatic work-in-process transfer device, automatic work-in-process transfer method, and automatic work-in-process transfer program
JP2018112988A (en) Journaling preparation device, journaling preparation method, and journaling preparation program
JP7065704B2 (en) Calculation device, calculation method and calculation program
JP7394716B2 (en) Inspection schedule data generation device, inspection schedule data generation method, and inspection schedule data generation program
JP2024044063A (en) Income and expenditure management device, income and expenditure management method, and income and expenditure management program

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20191007

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20201027

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20201119

R150 Certificate of patent or registration of utility model

Ref document number: 6798856

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250