JP2013083047A - Pipe roof and construction method of pipe roof - Google Patents

Pipe roof and construction method of pipe roof Download PDF

Info

Publication number
JP2013083047A
JP2013083047A JP2011222006A JP2011222006A JP2013083047A JP 2013083047 A JP2013083047 A JP 2013083047A JP 2011222006 A JP2011222006 A JP 2011222006A JP 2011222006 A JP2011222006 A JP 2011222006A JP 2013083047 A JP2013083047 A JP 2013083047A
Authority
JP
Japan
Prior art keywords
pipe
pipes
roof
shape
natural ground
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2011222006A
Other languages
Japanese (ja)
Other versions
JP5806576B2 (en
Inventor
Yutaka Sasaki
豊 佐々木
Seijiro Matsumoto
清治郎 松本
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kajima Corp
Original Assignee
Kajima Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kajima Corp filed Critical Kajima Corp
Priority to JP2011222006A priority Critical patent/JP5806576B2/en
Publication of JP2013083047A publication Critical patent/JP2013083047A/en
Application granted granted Critical
Publication of JP5806576B2 publication Critical patent/JP5806576B2/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

PROBLEM TO BE SOLVED: To improve workability when inserting pipes to natural ground.SOLUTION: When constructing a pipe roof, at positions where a plurality of first pipes 11 are scheduled to be inserted, a plurality of third pipes are separated from each other and inserted to natural ground 20 first. Then, in a space inside the third pipe, the first pipe 11 having a hand-drum-shaped cross section is inserted. Then, a filler 14 is filled in a space between an inner peripheral surface of the third pipe and an outer peripheral surface of the first pipe 11. Then, the third pipe is pulled out from the natural ground 20, and a second pipe 12 having a circular cross section is inserted between the first pipes 11. Thus, the first pipes 11 are interpolated by the second pipe 12. Thereafter, the first pipes 11 and the second pipes 12 are integrated through infilling concrete 17 and bolts 16 or the like.

Description

本発明は、地山に挿入される複数のパイプにより構成されるパイプルーフ、及び、このパイプルーフを構築する方法に関する。   The present invention relates to a pipe roof constituted by a plurality of pipes inserted into a natural ground, and a method for constructing the pipe roof.

都市部等の地盤内(地山内)にトンネル等の地下構造物を構築するにあたり、地盤における地下構造物の構築予定箇所の周囲に複数のパイプを予め並設してパイプルーフ(防護屋根)を構築する、いわゆるパイプルーフ工法が知られている。   When constructing underground structures such as tunnels in the ground of urban areas (inside mountains), pipes (protective roofs) are installed in parallel around the planned construction site of underground structures on the ground. A so-called pipe roof construction method is known.

このパイプルーフ工法に関する技術としては、例えば、特許文献1に記載の技術がある。
特許文献1には、パイプルーフ工法において、隣接するパイプ同士を各々の継手部で係合連結させてパイプルーフを構築することにより、隣接するパイプ間の間隙からの土砂流出を抑制することが記載されている。
As a technique related to this pipe roof construction method, for example, there is a technique described in Patent Document 1.
Patent Document 1 describes that, in the pipe roof construction method, the pipe roof is constructed by engaging and connecting adjacent pipes with each joint portion, thereby suppressing sediment discharge from the gap between adjacent pipes. Has been.

特開平10−37656号公報Japanese Patent Laid-Open No. 10-37656

しかしながら、特許文献1に記載のようなパイプルーフ工法では、既設のパイプに隣接するように継手部同士を係合させつつ新たなパイプを地山に挿入すると、既設のパイプの継手部と新たなパイプの継手部とが接触して互いに干渉しあうことで、パイプの挿入が難しくなり、それゆえ、パイプ挿入時の作業性が低下するという問題があった。   However, in the pipe roof construction method as described in Patent Document 1, when a new pipe is inserted into a natural ground while engaging the joint portions so as to be adjacent to the existing pipe, the joint portion of the existing pipe and the new pipe When the joint portion of the pipe comes into contact with each other and interferes with each other, it becomes difficult to insert the pipe, and therefore, there is a problem that workability at the time of inserting the pipe is lowered.

本発明は、このような実状に鑑み、地山へのパイプ挿入時の作業性を向上させることを課題とする。   This invention makes it a subject to improve workability | operativity at the time of the pipe insertion to a natural ground in view of such a real situation.

そのため本発明では、複数のパイプを互いに並列に地山に挿入してパイプルーフを構築する方法として、複数の第1のパイプを互いに離間させて並列に地山に挿入する工程と、隣り合う第1のパイプ同士の間を補間する形状を有する第2のパイプを第1のパイプ間に挿入する工程と、を含む。   Therefore, in the present invention, as a method of constructing a pipe roof by inserting a plurality of pipes in parallel to each other in the ground, a step of separating the plurality of first pipes from each other and inserting them into the ground in parallel, Inserting a second pipe having a shape for interpolating between the first pipes between the first pipes.

また、本発明に係るパイプルーフは、互いに離間して並列に地山に挿入される複数の第1のパイプと、隣り合う第1のパイプ同士の間を補間する形状を有して第1のパイプ間に挿入される第2のパイプと、を含んで構成される。   In addition, the pipe roof according to the present invention has a shape that interpolates between a plurality of first pipes that are spaced apart from each other and are inserted in parallel into the ground, and between adjacent first pipes. And a second pipe inserted between the pipes.

尚、ここでいう「パイプ同士の間を補間する形状」とは、パイプ同士の間を塞ぐ形状を意味する。   Here, the “shape for interpolating between pipes” means a shape for closing between the pipes.

本発明によれば、第2のパイプが、隣り合う第1のパイプ同士の間を補間する形状を有して、第1のパイプ間に挿入される。これにより、第1のパイプ間を、上記継手部に代えて、第2のパイプによって補間することができるので(換言すれば、第2のパイプ間を、上記継手部に代えて、第1のパイプによって補間することができるので)、パイプ外周部の構成が簡素化されても、パイプ間の土砂流出を抑制することができる。また、パイプ外周部の構成が簡素化されることにより、地山へのパイプ挿入時にパイプが受ける抗力を比較的低く抑えることができるので、パイプ挿入時の作業性を向上させることができる。   According to the present invention, the second pipe is inserted between the first pipes having a shape for interpolating between the adjacent first pipes. Thus, the first pipe can be interpolated by the second pipe instead of the joint portion (in other words, the second pipe is replaced by the first joint Even if the configuration of the outer periphery of the pipe is simplified, it is possible to suppress sediment discharge between the pipes. Moreover, since the structure of the pipe outer peripheral portion is simplified, the drag received by the pipe when the pipe is inserted into the natural ground can be kept relatively low, so that the workability during the pipe insertion can be improved.

本発明の第1実施形態におけるパイプルーフ工法を用いて構築されるトンネル合流部を示す図The figure which shows the tunnel junction part constructed | assembled using the pipe roof construction method in 1st Embodiment of this invention. 上記第1実施形態におけるパイプの構成を示す図The figure which shows the structure of the pipe in the said 1st Embodiment. 上記第1実施形態におけるパイプルーフの構築方法を示す図The figure which shows the construction method of the pipe roof in the said 1st Embodiment. 上記第1実施形態におけるパイプルーフの構築方法を示す図The figure which shows the construction method of the pipe roof in the said 1st Embodiment. 上記第1実施形態におけるパイプルーフの構築方法を示す図The figure which shows the construction method of the pipe roof in the said 1st Embodiment. 本発明の第2実施形態におけるパイプルーフの構築方法を示す図The figure which shows the construction method of the pipe roof in 2nd Embodiment of this invention. 本発明の第2実施形態の変形例におけるパイプルーフの構築方法を示す図The figure which shows the construction method of the pipe roof in the modification of 2nd Embodiment of this invention. 本発明の第3実施形態におけるパイプルーフの構築方法を示す図The figure which shows the construction method of the pipe roof in 3rd Embodiment of this invention. 本発明の第4実施形態におけるパイプルーフの構築方法を示す図The figure which shows the construction method of the pipe roof in 4th Embodiment of this invention. 本発明の第4実施形態におけるパイプルーフの構築方法を示す図The figure which shows the construction method of the pipe roof in 4th Embodiment of this invention. 楕円形断面を有する鋼殻構造体を示す図Diagram showing a steel shell structure with an elliptical cross section

以下に本発明の実施の形態を図面に基づいて説明する。尚、ここでは、2つのトンネルが互いに合流するトンネル合流部の構築を例にとってパイプルーフの構築について説明するが、これに限るものではない。   Embodiments of the present invention will be described below with reference to the drawings. Here, the construction of the pipe roof will be described by taking the construction of a tunnel junction where two tunnels join each other as an example, but the present invention is not limited to this.

図1は、本発明の第1実施形態におけるパイプルーフ工法を用いて構築されるトンネル合流部を示す。
地下構造物であるトンネル合流部1は、地面2の下方(地山20)に予め掘削形成された2つのトンネル(本線トンネル3及びランプトンネル4)が互いに合流する合流部である。
FIG. 1 shows a tunnel junction part constructed by using the pipe roof construction method in the first embodiment of the present invention.
The tunnel junction 1 which is an underground structure is a junction where two tunnels (main tunnel 3 and ramp tunnel 4) excavated and formed in advance under the ground 2 (natural mountain 20) merge with each other.

本線トンネル3は、ランプトンネル4に比べて大径の断面を有しており、図示しないシールド機によって掘削形成される。このシールド機は、地山20の掘削を行いつつその後方でセグメント30の組立を行って、円筒状の覆工体30Sを構築する。   The main tunnel 3 has a larger diameter cross section than the ramp tunnel 4 and is excavated by a shield machine (not shown). This shield machine assembles the segment 30 behind the excavation of the natural ground 20 to construct a cylindrical lining body 30S.

本線トンネル3に並設されるランプトンネル4においても、本線トンネル3と同様にセグメント40が組立てられて円筒状の覆工体40Sが構築される。
これらトンネルが互いに合流するトンネル合流部1は、主に、以下6つの工程を経て構築される。
(1)本線トンネル3とランプトンネル4との間のトンネル合流部施工箇所の端部近傍に、図示しない立坑を構築する。
(2)本線トンネル3の上端部3aとランプトンネル4の上端部4aとの間を塞ぐように上記立坑から複数のパイプ(後述する第1のパイプ11及び第2のパイプ12)を地山20に挿入して、なだらかなアーチ状のパイプルーフ21を構築する。
(3)本線トンネル3の下端部3bとランプトンネル4の下端部4bとの間を塞ぐように上記立坑から複数のパイプ(後述する第1のパイプ11及び第2のパイプ12)を地山20に挿入して、なだらかなアーチ状のパイプルーフ22を構築する。
(4)本線トンネル3とランプトンネル4との間でパイプルーフ21,22によって閉じられる領域5内を掘削する。
(5)パイプルーフ21,22間に位置するセグメント30a,40aを撤去する。これにより、トンネル合流部1では、パイプルーフ21,22と、上記(4)にて撤去されなかった残りのセグメント30b,40bとによって、卵形断面の大断面地下スペース6が形成される。
(6)地下スペース6内に道路7を構築する。
Also in the ramp tunnel 4 arranged in parallel with the main tunnel 3, the segments 40 are assembled in the same manner as the main tunnel 3 to construct a cylindrical covering body 40S.
The tunnel junction 1 where these tunnels merge with each other is mainly constructed through the following six steps.
(1) A vertical shaft (not shown) is constructed in the vicinity of the end of the tunnel junction portion construction site between the main tunnel 3 and the ramp tunnel 4.
(2) A plurality of pipes (a first pipe 11 and a second pipe 12 to be described later) are connected to the ground 20 so as to block between the upper end 3a of the main tunnel 3 and the upper end 4a of the ramp tunnel 4. A gentle arch-shaped pipe roof 21 is constructed.
(3) A plurality of pipes (a first pipe 11 and a second pipe 12 to be described later) are grounded 20 from the shaft so as to block between the lower end 3b of the main tunnel 3 and the lower end 4b of the ramp tunnel 4. A gentle arched pipe roof 22 is constructed.
(4) Excavate in the area 5 closed by the pipe roofs 21 and 22 between the main tunnel 3 and the ramp tunnel 4.
(5) The segments 30a and 40a located between the pipe roofs 21 and 22 are removed. Thereby, in the tunnel junction part 1, the large-section underground space 6 of an egg-shaped cross section is formed by the pipe roofs 21 and 22 and the remaining segments 30b and 40b not removed in the above (4).
(6) Build a road 7 in the underground space 6.

次に、パイプルーフ21の構築方法について、図1に加えて、図2〜図5を用いて説明する。
図2は、パイプルーフ21を構築する際に用いられる3種類のパイプの概略構成を示す図である。図3〜図5は、図1の部分Pに対応する部位の拡大図である。
Next, the construction method of the pipe roof 21 will be described with reference to FIGS. 2 to 5 in addition to FIG.
FIG. 2 is a diagram showing a schematic configuration of three types of pipes used when the pipe roof 21 is constructed. 3 to 5 are enlarged views of a portion corresponding to the portion P in FIG.

パイプルーフ21は、図2(A)〜(C)に示す3種類のパイプを用いて構築される。
図2(A)に示す第1のパイプ11はつづみ形の断面を有する鋼管であり、その両側面が凹面部11aをなす。すなわち、第1のパイプ11の凹形状の両側面が凹面部11aである。この凹面部11aは、後述する第2のパイプ12の外周面(凸面部12c)に対応するように、弓形に湾曲している。また、第1のパイプ11は、トンネル軸方向に略まっすぐに延びて、その長手方向の長さは、トンネル合流部1のトンネル軸方向の長さに一致する。
The pipe roof 21 is constructed using three types of pipes shown in FIGS.
The first pipe 11 shown in FIG. 2 (A) is a steel pipe having a zigzag cross section, and both side surfaces thereof form a concave portion 11a. That is, the concave side surfaces of the first pipe 11 are concave surface portions 11a. The concave surface portion 11a is curved in an arc shape so as to correspond to an outer peripheral surface (convex surface portion 12c) of the second pipe 12 described later. The first pipe 11 extends substantially straight in the tunnel axis direction, and the length in the longitudinal direction thereof matches the length of the tunnel junction 1 in the tunnel axis direction.

図2(B)に示す第2のパイプ12は円形断面を有する鋼管である。第2のパイプ12は、トンネル軸方向に略まっすぐに延びて、その長手方向の長さは、トンネル合流部1のトンネル軸方向の長さに一致する。   The second pipe 12 shown in FIG. 2 (B) is a steel pipe having a circular cross section. The second pipe 12 extends substantially straight in the tunnel axis direction, and the length in the longitudinal direction matches the length of the tunnel junction 1 in the tunnel axis direction.

第2のパイプ12の両側面には、それぞれ、一対の板状部材(例えば鋼板)12a,12bが設けられている。板状部材12a,12bは、互いに上下に離間して第2のパイプ12の側面(外周面)から横方向に外方に張り出し、かつ、第2のパイプ12の長手方向に沿って延びて第2のパイプ12に溶接されている。尚、板状部材12a,12b間の間隔は、第1のパイプ11の上下寸法により若干大きくなっている。   A pair of plate-like members (for example, steel plates) 12a and 12b are provided on both side surfaces of the second pipe 12, respectively. The plate-like members 12a and 12b are spaced apart from each other and project outward in the lateral direction from the side surface (outer peripheral surface) of the second pipe 12, and extend along the longitudinal direction of the second pipe 12. It is welded to two pipes 12. Note that the distance between the plate-like members 12 a and 12 b is slightly larger depending on the vertical dimension of the first pipe 11.

また、第2のパイプ12は、その円形の外周面の一部(両側面)が、第1のパイプ11の凹面部11aに対応する凸面部12cをなす。すなわち、第2のパイプ12の凸形状の両側面が凸面部12cである。   Further, a part (both side surfaces) of the circular outer peripheral surface of the second pipe 12 forms a convex surface portion 12 c corresponding to the concave surface portion 11 a of the first pipe 11. That is, both convex side surfaces of the second pipe 12 are convex surface portions 12c.

図2(C)に示す第3のパイプ13は、その内部に第1のパイプ11を挿入可能な円形断面を有する鋼管である。第3のパイプ13は、トンネル軸方向に略まっすぐに延びて、その長手方向の長さは、トンネル合流部1のトンネル軸方向の長さに一致する。   A third pipe 13 shown in FIG. 2C is a steel pipe having a circular cross section into which the first pipe 11 can be inserted. The third pipe 13 extends substantially straight in the tunnel axis direction, and the length of the third pipe 13 matches the length of the tunnel junction 1 in the tunnel axis direction.

第3のパイプ13は、第1のパイプ11を地山20に挿入する際に用いられる補助パイプであり、それゆえ、第1のパイプ11が地山20に挿入された後に撤去される。
本実施形態では、第1のパイプ11、第2のパイプ12、及び第3のパイプ13を用いて、パイプルーフ21を構築する。
The third pipe 13 is an auxiliary pipe used when the first pipe 11 is inserted into the natural ground 20, and is therefore removed after the first pipe 11 is inserted into the natural ground 20.
In the present embodiment, the pipe roof 21 is constructed using the first pipe 11, the second pipe 12, and the third pipe 13.

このパイプルーフ21の構築では、図3(A)〜図5(H)に示す工程を、図1の部分Pにて実施するのみならず、部分P以外の部分においても部分Pと同様に実施する。
パイプルーフ21の構築時には、まず、図1及び図3(A)に示すように、複数の第1のパイプ11が挿入される予定の位置に、複数の第3のパイプ13が、互いに所定間隔を空けて、上記立坑より地山20に順次挿入される。ここで、所定間隔とは、後述する図4(E)にて、第1のパイプ11間に第2のパイプ12が挿入可能なように予め設定された間隔である。
In the construction of the pipe roof 21, the steps shown in FIGS. 3A to 5H are performed not only at the portion P in FIG. 1 but also at portions other than the portion P in the same manner as the portion P. To do.
When constructing the pipe roof 21, first, as shown in FIGS. 1 and 3A, the plurality of third pipes 13 are arranged at predetermined intervals from each other at positions where the plurality of first pipes 11 are to be inserted. And is inserted into the natural ground 20 sequentially from the vertical shaft. Here, the predetermined interval is an interval set in advance so that the second pipe 12 can be inserted between the first pipes 11 in FIG.

また、複数の第3のパイプ13は、その長手方向に対して略垂直な方向になだらかなアーチ状に並列配置される。
第3のパイプ13の地山20への挿入に際しては、例えば、図示しない回転掘削機を用いて第3のパイプ13挿入用の掘削孔を形成しつつ、この回転掘削機に追従するように第3のパイプ13を圧入する。このようにして回転掘削と第3のパイプ13の圧入(挿入)とが同時に行われ、この結果、第3のパイプ13の内部には空間13aが形成される。
The plurality of third pipes 13 are arranged in parallel in a gentle arch shape in a direction substantially perpendicular to the longitudinal direction.
When the third pipe 13 is inserted into the natural ground 20, for example, a third excavation hole for inserting the third pipe 13 is formed using a rotary excavator (not shown), and the third pipe 13 is followed to follow the rotary excavator. 3 pipe 13 is press-fitted. In this way, the rotary excavation and the press-fitting (insertion) of the third pipe 13 are performed at the same time. As a result, a space 13 a is formed inside the third pipe 13.

次に、図3(B)に示すように、上記立坑より、第3のパイプ13の内部の空間13aに第1のパイプ11を挿入する。
次に、図3(C)に示すように、第3のパイプ13の内周面と第1のパイプ11の外周面との間の空間13bに充填材14を充填する。充填材14の一例としては、モルタルに掘削残土を混ぜたソイルモルタルを挙げることができる。
Next, as shown in FIG. 3B, the first pipe 11 is inserted into the space 13 a inside the third pipe 13 from the shaft.
Next, as shown in FIG. 3C, a filler 14 is filled into a space 13 b between the inner peripheral surface of the third pipe 13 and the outer peripheral surface of the first pipe 11. As an example of the filler 14, a soil mortar in which excavation residue is mixed with a mortar can be cited.

次に、図3(D)に示すように、第3のパイプ13を地山20より引抜く。ここで、図3(A)に示した工程の前に、第3のパイプ13の表面に土砂付着防止用の剥離剤等を予め塗布しておくことにより、第3のパイプ13を地山20よりスムーズに引抜くことができる。   Next, as shown in FIG. 3D, the third pipe 13 is pulled out from the natural ground 20. Here, before the process shown in FIG. 3A, a release agent or the like for preventing sediment adhesion is applied to the surface of the third pipe 13 in advance, thereby connecting the third pipe 13 to the ground 20. It can be pulled out more smoothly.

また、第3のパイプ13の引抜き時には、空間13bに充填された充填材14により、地中の地盤の沈下が抑制される。
ここにおいて、図3(A)〜(D)に示した各工程が、本発明における「第1のパイプを地山に挿入する工程」に含まれる。
Further, when the third pipe 13 is pulled out, the subsidence of the ground in the ground is suppressed by the filler 14 filled in the space 13b.
Here, each process shown to FIG. 3 (A)-(D) is contained in the "process which inserts a 1st pipe in a natural ground" in this invention.

次に、図4(E)に示すように、上記立坑より、隣り合う第1のパイプ11間に第2のパイプ12を挿入する。これにより、パイプルーフ21を構成する複数のパイプ(第1のパイプ11及び第2のパイプルーフ12)が、その長手方向に対して略垂直な方向になだらかなアーチ状に並列配置される。   Next, as shown in FIG. 4E, the second pipe 12 is inserted between the adjacent first pipes 11 from the shaft. Thereby, the several pipe (1st pipe 11 and 2nd pipe roof 12) which comprises the pipe roof 21 is parallelly arranged in gentle arch shape in the direction substantially perpendicular | vertical with respect to the longitudinal direction.

第2のパイプ12の挿入に際しては、上述の第3のパイプ13の挿入時と同様に、図示しない回転掘削機を用いて第2のパイプ12挿入用の掘削孔を形成しつつ、この回転掘削機に追従するように第2のパイプ12を圧入する。このようにして回転掘削と第2のパイプ12の圧入(挿入)とが同時に行われ、この結果、第2のパイプ12の内部には空間12dが形成される。   When inserting the second pipe 12, as in the case of inserting the third pipe 13, this rotary excavation is performed while forming an excavation hole for inserting the second pipe 12 using a rotary excavator (not shown). The second pipe 12 is press-fitted so as to follow the machine. In this way, the rotary excavation and the press-fitting (insertion) of the second pipe 12 are performed at the same time. As a result, a space 12d is formed inside the second pipe 12.

また、第2のパイプ12の挿入時には、第2のパイプ12に設けられた板状部材12a,12b間に第1のパイプ11が位置した状態で、第2のパイプ12が挿入される。これにより、板状部材12a,12bが第2のパイプ12の挿入をガイドすることができるので、パイプ挿入時の作業性を向上させることができる。   In addition, when the second pipe 12 is inserted, the second pipe 12 is inserted in a state where the first pipe 11 is positioned between the plate-like members 12 a and 12 b provided on the second pipe 12. Thereby, since plate-shaped member 12a, 12b can guide insertion of the 2nd pipe 12, workability | operativity at the time of pipe insertion can be improved.

ここで、第2のパイプ12は、つづみ形断面を有する第1のパイプ11同士の間を補間する形状として、円形の断面形状を有している。これにより、第1のパイプ11間を、第2のパイプ12によって補間することができるので(換言すれば、第2のパイプ12間を、第1のパイプ11によって補間することができるので)、パイプ間の土砂流出を抑制することができる。   Here, the 2nd pipe 12 has circular cross-sectional shape as a shape which interpolates between the 1st pipes 11 which have a zigzag-shaped cross section. Thus, the first pipe 11 can be interpolated by the second pipe 12 (in other words, the second pipe 12 can be interpolated by the first pipe 11). Sediment runoff between pipes can be suppressed.

次に、パイプルーフ21の一体性を向上させて防護屋根としての機能を十分に発揮させるために、図5(F)〜(H)に示す一体化施工を行う。
一体化施工では、まず図5(F)に示すように、第1のパイプ11の凹面部11aと第2のパイプ12の凸面部12cとが対向するジャンクション部15の隙間を高圧水等により洗浄する。具体的には、例えば、第2のパイプ12の凸面部12cに適切なピッチで作業窓(図示せず)を予め設けて、この作業窓から人力で洗浄する。ここで、第2のパイプ12の板状部材12a,12bが当該隙間のカバーとして機能することで、洗浄時に当該隙間内に土砂等が入り込むことを抑制している。そして、洗浄後のジャンクション部15の隙間に高強度セメントミルクを注入する。
Next, in order to improve the integrity of the pipe roof 21 and to fully exhibit the function as a protective roof, the integrated construction shown in FIGS. 5 (F) to (H) is performed.
In the integrated construction, first, as shown in FIG. 5 (F), the gap between the junction portion 15 where the concave surface portion 11a of the first pipe 11 and the convex surface portion 12c of the second pipe 12 face each other is washed with high-pressure water or the like. To do. Specifically, for example, a work window (not shown) is provided in advance on the convex surface portion 12c of the second pipe 12 at an appropriate pitch, and the work window is cleaned manually. Here, the plate-like members 12a and 12b of the second pipe 12 function as a cover for the gap, thereby preventing dirt and the like from entering the gap during cleaning. And high intensity | strength cement milk is inject | poured into the clearance gap between the junction parts 15 after washing | cleaning.

次に、図5(G)に示すように、ジャンクション部15(第1のパイプ11の凹面部11aと第2のパイプ12の凸面部12cと)にボルト孔(図示せず)を複数削孔し、これらボルト孔にボルト16を挿通させて、第1のパイプ11と第2のパイプ12とをボルト締結する。ここで、ボルト16が、本発明における固定手段として機能している。   Next, as shown in FIG. 5G, a plurality of bolt holes (not shown) are drilled in the junction portion 15 (the concave surface portion 11a of the first pipe 11 and the convex surface portion 12c of the second pipe 12). Then, the bolts 16 are inserted into these bolt holes, and the first pipe 11 and the second pipe 12 are bolted together. Here, the bolt 16 functions as a fixing means in the present invention.

尚、第2のパイプ12の内径が800mm〜2000mm程度で比較的大きい場合には、作業員が第2のパイプ12内に入って、電動ドリル等の機器を用いて、第2のパイプ12の凸面部12cから第1のパイプ11の凹面部11aに向けて、上記ボルト孔を削孔することができる。また、第1のパイプ11と第2のパイプ12とが地山20に挿入される前に上記ボルト孔を予め削孔しておいてもよい。   When the inner diameter of the second pipe 12 is about 800 mm to 2000 mm and is relatively large, an operator enters the second pipe 12 and uses a device such as an electric drill to The bolt hole can be drilled from the convex surface portion 12 c toward the concave surface portion 11 a of the first pipe 11. In addition, the bolt holes may be drilled in advance before the first pipe 11 and the second pipe 12 are inserted into the natural ground 20.

次に、図5(H)に示すように、第1のパイプ11の内部の空間11bと第2のパイプ12の内部の空間12dとに中詰めコンクリート17を打設する。
中詰めコンクリート17が固結すると、第1のパイプ11と第2のパイプ12とが、中詰めコンクリート17及びボルト16を介して一体化される。また、ジャンクション部15の隙間が高圧水等により洗浄されたことにより、当該隙間に注入される高強度セメントミルクが良好に第1のパイプ11の凹面部11aの表面及び第2のパイプ12の凸面部12cの表面に接触するので、高強度セメントミルクの接着性を良好に発現させることができる。
Next, as shown in FIG. 5 (H), filling concrete 17 is placed in the space 11 b inside the first pipe 11 and the space 12 d inside the second pipe 12.
When the filling concrete 17 is solidified, the first pipe 11 and the second pipe 12 are integrated through the filling concrete 17 and the bolts 16. In addition, since the gap of the junction portion 15 is washed with high-pressure water or the like, the high-strength cement milk injected into the gap is favorably surfaced of the concave surface portion 11a of the first pipe 11 and the convex surface of the second pipe 12. Since it contacts the surface of the part 12c, the adhesiveness of high-strength cement milk can be expressed well.

パイプルーフ22の構築方法については、上述のパイプルーフ21の構築方法と同様であるので、その説明は省略する。
ところで、地下構造物として矩形断面形状の本設躯体を構築する場合には、一般に、門型にパイプが並列配置されたパイプルーフが仮設構造で本設躯体の外縁に平行に構築される。このような門型のパイプルーフでは、支保工の架設が必須となる。
Since the construction method of the pipe roof 22 is the same as the construction method of the above-described pipe roof 21, the description thereof is omitted.
By the way, when constructing a main housing having a rectangular cross section as an underground structure, generally, a pipe roof in which pipes are arranged in parallel in a gate shape is constructed in parallel with the outer edge of the main housing. In such a portal pipe roof, it is essential to construct a support work.

この点、本実施形態によれば、パイプルーフ21,22と本線トンネル3とランプトンネル4とによって、実質的に閉鎖したパイプのアーチが形成される。これにより、パイプルーフ21,22が自立して均衡を保持するので、支保工を削減することができる。また、パイプルーフ21,22は仮設構造としてのみならず本設構造としても用いることができる。   In this regard, according to the present embodiment, the pipe roofs 21 and 22, the main tunnel 3, and the ramp tunnel 4 form a substantially closed pipe arch. Thereby, since the pipe roofs 21 and 22 stand independently and hold | maintain balance, a support work can be reduced. The pipe roofs 21 and 22 can be used not only as a temporary structure but also as a permanent structure.

本実施形態によれば、パイプルーフ21,22の構築方法として、複数の第1のパイプ11を互いに離間させて並列に地山20に挿入する工程(図3)と、隣り合う第1のパイプ11同士の間を補間する形状を有する第2のパイプ12を第1のパイプ11間に挿入する工程(図4)と、を含む。これにより、第1のパイプ11間を、第2のパイプ12によって補間することができるので(換言すれば、第2のパイプ12間を、第1のパイプ11によって補間することができるので)、特許文献1に記載のような継手部を設けることなく、パイプ外周部の構成を簡素化して、パイプ間の土砂流出を抑制することができる。また、パイプ外周部の構成の簡素化により、地山20へのパイプ挿入時にパイプが受ける抗力を比較的低く抑えることができるので、パイプ挿入時の作業性を向上させることができる。   According to the present embodiment, as a method of constructing the pipe roofs 21 and 22, a step (FIG. 3) of inserting a plurality of first pipes 11 apart from each other and inserting them into the ground 20 in parallel, and the adjacent first pipes Inserting a second pipe 12 having a shape for interpolating between the first pipe 11 between the first pipes 11 (FIG. 4). Thus, the first pipe 11 can be interpolated by the second pipe 12 (in other words, the second pipe 12 can be interpolated by the first pipe 11). Without providing a joint part as described in Patent Document 1, the configuration of the pipe outer peripheral part can be simplified, and sediment outflow between pipes can be suppressed. In addition, the simplification of the configuration of the outer periphery of the pipe can suppress the drag received by the pipe when the pipe is inserted into the natural ground 20, so that the workability when inserting the pipe can be improved.

また本実施形態によれば、第1のパイプ11を地山20に挿入する工程(図3)は、複数の第3のパイプ13を互いに離間させて並列に地山20に挿入して各第3のパイプ13内に空間13aを形成する工程と(図3(A))、各第3のパイプ13内に、それぞれ、第1のパイプ11を挿入する工程と(図3(B))、第3のパイプ13と第1のパイプ11との間の空間13bに充填材14を充填する工程と(図3(C))、第3のパイプ13を地山20より引抜く工程と(図3(D))、を含む。これにより、つづみ形断面等の特殊な断面形状を有する第1のパイプ11を精度よく効率的に地山20に挿入することができる。   Further, according to the present embodiment, the step of inserting the first pipe 11 into the natural ground 20 (FIG. 3) is performed by inserting a plurality of third pipes 13 into the natural ground 20 in parallel with each other. A step of forming a space 13a in the three pipes 13 (FIG. 3A), a step of inserting the first pipe 11 into each of the third pipes 13, respectively (FIG. 3B), A step of filling the space 13b between the third pipe 13 and the first pipe 11 with the filler 14 (FIG. 3C), a step of drawing the third pipe 13 from the natural ground 20 (FIG. 3 (D)). Thereby, the 1st pipe 11 which has special cross-sectional shapes, such as a zigzag-shaped cross section, can be efficiently and efficiently inserted in the natural ground 20.

また本実施形態によれば、第1のパイプ11は、その両側面(凹面部11a)が凹形状をなす一方、第2のパイプ12は、その両側面(凸面部12c)が、凹面部11aに対応する凸形状をなす。これにより、第1のパイプ11の凹面部11aに第2のパイプ12の凸面部12cが嵌るので、パイプルーフ21,22におけるパイプ同士の一体性を向上させることができる。   According to the present embodiment, the first pipe 11 has a concave shape on both side surfaces (concave surface portion 11a), while the second pipe 12 has a concave surface portion 11a on both side surfaces (convex surface portion 12c). Convex shape corresponding to. Thereby, since the convex surface part 12c of the 2nd pipe 12 fits into the concave surface part 11a of the 1st pipe 11, the integrity of the pipes in the pipe roofs 21 and 22 can be improved.

また本実施形態によれば、第2のパイプ12は円形断面を有し、この円形の外周面の一部(凸面部12c)が凸形状をなすので、比較的簡易な構成で、第1のパイプ11の凹面部11aと第2のパイプ12の凸面部12cとの嵌め合いを実現することができる。   Further, according to the present embodiment, the second pipe 12 has a circular cross section, and a part of the circular outer peripheral surface (convex surface portion 12c) has a convex shape. The fitting between the concave surface portion 11a of the pipe 11 and the convex surface portion 12c of the second pipe 12 can be realized.

また本実施形態によれば、第3のパイプ13は円形断面を有するので、第1のパイプ11を地山20に挿入するための補助パイプとして比較的簡易に設置・撤去を行うことができる。   Further, according to the present embodiment, since the third pipe 13 has a circular cross section, it can be installed and removed relatively easily as an auxiliary pipe for inserting the first pipe 11 into the natural ground 20.

また本実施形態によれば、パイプルーフ21,22の構築方法として、第1のパイプ11と第2のパイプ12とを一体化する工程(図5)を更に含む。これにより、パイプルール21,22の一体性を十分に確保することができるので、防護屋根としての機能を十分に発揮することができる。   Moreover, according to this embodiment, the construction method of the pipe roofs 21 and 22 further includes a step of integrating the first pipe 11 and the second pipe 12 (FIG. 5). Thereby, since the integrity of the pipe rules 21 and 22 can be sufficiently ensured, the function as a protective roof can be sufficiently exhibited.

尚、本実施形態では、第1のパイプ11と第2のパイプ12とを、中詰めコンクリート17及びボルト16を介して一体化しているが、一体化の手法はこれに限らず、例えば、上記ボルト孔の代わりとして、上記ボルト孔より大きめの貫通孔を複数削孔し、これら貫通孔に鋼棒を差し込んで、第1のパイプ11の内部の空間11bと第2のパイプ12の内部の空間12dとに中詰めコンクリート17を打設することで、第1のパイプ11と第2のパイプ12とを、中詰めコンクリート17及び鋼棒を介して一体化してもよい。また、鋼棒の代わりとして、本線トンネル3の上端部3aから貫通孔を通過してランプトンネル4の上端部4aに延びるPC鋼線(固定手段)を用いて、このPC鋼線を緊張定着させることによって、パイプルーフ21における第1のパイプ11と第2のパイプ12との一体性を高めるようにしてもよい。尚、このPC鋼線を用いる一体化手法は、パイプルーフ22にも適用可能である。   In the present embodiment, the first pipe 11 and the second pipe 12 are integrated via the filling concrete 17 and the bolts 16, but the integration method is not limited to this. Instead of the bolt holes, a plurality of through holes larger than the bolt holes are drilled, and steel rods are inserted into these through holes, so that the space 11b inside the first pipe 11 and the space inside the second pipe 12 are inserted. The first pipe 11 and the second pipe 12 may be integrated through the intermediate concrete 17 and the steel rod by placing the intermediate concrete 17 on 12d. Further, instead of the steel rod, a PC steel wire (fixing means) extending from the upper end 3a of the main tunnel 3 to the upper end 4a of the ramp tunnel 4 through the through hole is used to fix the PC steel wire in tension. Thus, the integrity of the first pipe 11 and the second pipe 12 in the pipe roof 21 may be enhanced. The integration method using the PC steel wire can also be applied to the pipe roof 22.

また本実施形態では、複数のパイプ(第1のパイプ11及び第2のパイプ12)は、その長手方向に対して略垂直な方向にアーチ状に配置されているが、これらパイプの配置形状はアーチ状に限らず、例えば、パイプの配置形状として、門型状を採用することも可能である。   In the present embodiment, the plurality of pipes (first pipe 11 and second pipe 12) are arranged in an arch shape in a direction substantially perpendicular to the longitudinal direction. For example, it is possible to adopt a gate shape as an arrangement shape of the pipes in addition to the arch shape.

図6は、本発明の第2実施形態におけるパイプルーフの構築方法を示す図である。
図3〜図5に示す第1の実施形態と異なる点について説明する。
第1実施形態では、第1のパイプ11がつづみ形の断面形状を有し、第2のパイプ12が円形断面を有しているが、第2実施形態では、第1のパイプ31及び第2のパイプ32が双方共に矩形断面を有している。
FIG. 6 is a diagram showing a method for constructing a pipe roof in the second embodiment of the present invention.
Differences from the first embodiment shown in FIGS. 3 to 5 will be described.
In the first embodiment, the first pipe 11 has a continuous cross-sectional shape, and the second pipe 12 has a circular cross-section. In the second embodiment, the first pipe 31 and the first pipe Both pipes 32 have a rectangular cross section.

また、第2のパイプ32の両側面には、それぞれ、パイプ挿入ガイド用の一対の板状部材(図示せず)が設けられている。これら板状部材は、互いに上下に離間して第2のパイプ32の側面(外周面)から横方向に外方に張り出し、かつ、第2のパイプ32の長手方向に沿って延びて第2のパイプ32に溶接されている。また、これら板状部材間の間隔は、第1のパイプ31の上下寸法により若干大きくなっている。尚、第2のパイプ32の地山への挿入時の安定性が十分に確保される場合には、パイプ挿入ガイド用の板状部材を設けなくてもよい。   A pair of plate-like members (not shown) for pipe insertion guides are provided on both side surfaces of the second pipe 32, respectively. These plate-like members are spaced apart from each other and project outward in the lateral direction from the side surface (outer peripheral surface) of the second pipe 32, and extend along the longitudinal direction of the second pipe 32. It is welded to the pipe 32. Further, the interval between these plate-like members is slightly larger due to the vertical dimension of the first pipe 31. In addition, when the stability at the time of the insertion of the 2nd pipe 32 to the natural ground is fully ensured, it is not necessary to provide the plate-shaped member for pipe insertion guide.

パイプルーフ21の構築時には、まず、図6(A)に示すように、複数の第1のパイプ31が、互いに所定間隔を空けて、上記立坑より地山20に順次挿入される。ここで、所定間隔とは、後述する図6(B)にて、第1のパイプ31間に第2のパイプ32が挿入可能なように予め設定された間隔である。   When the pipe roof 21 is constructed, first, as shown in FIG. 6A, a plurality of first pipes 31 are sequentially inserted into the natural ground 20 from the vertical shaft with a predetermined interval therebetween. Here, the predetermined interval is an interval set in advance so that the second pipe 32 can be inserted between the first pipes 31 in FIG.

第1のパイプ31の地山20への挿入に際しては、例えば、図示しない回転掘削機を用いて第1のパイプ31挿入用の掘削孔を形成しつつ、この回転掘削機に追従するように第1のパイプ31を圧入する。このようにして回転掘削と第1のパイプ31の圧入(挿入)とが同時に行われ、この結果、第1のパイプ31の内部には空間31aが形成される。   When inserting the first pipe 31 into the natural ground 20, for example, a first excavation hole for inserting the first pipe 31 is formed using a rotary excavator (not shown), and the first excavator is configured to follow the rotary excavator. 1 pipe 31 is press-fitted. Thus, the rotary excavation and the press-fitting (insertion) of the first pipe 31 are performed at the same time. As a result, a space 31 a is formed inside the first pipe 31.

次に、図6(B)に示すように、上記立坑より、隣り合う第1のパイプ31間に第2のパイプ32を挿入する。
第2のパイプ32の挿入に際しては、上述の第1のパイプ31の挿入時と同様に、図示しない回転掘削機を用いて第2のパイプ32挿入用の掘削孔を形成しつつ、この回転掘削機に追従するように第2のパイプ32を圧入する。このようにして回転掘削と第2のパイプ32の圧入(挿入)とが同時に行われ、この結果、第2のパイプ32の内部には空間32aが形成される。
Next, as shown to FIG. 6 (B), the 2nd pipe 32 is inserted between the adjacent 1st pipes 31 from the said shaft.
When inserting the second pipe 32, as in the case of the insertion of the first pipe 31 described above, the rotary excavator for inserting the second pipe 32 is formed using a rotary excavator (not shown), and this rotary excavation is performed. The second pipe 32 is press-fitted so as to follow the machine. In this way, the rotary excavation and the press-fitting (insertion) of the second pipe 32 are performed at the same time. As a result, a space 32 a is formed inside the second pipe 32.

ここで、第2のパイプ32は、矩形断面を有する第1のパイプ31同士の間を補間する形状として、矩形断面を有している。これにより、第1のパイプ31間を、第2のパイプ32によって補間することができるので(換言すれば、第2のパイプ32間を、第1のパイプ31によって補間することができるので)、パイプ間の土砂流出を抑制することができる。   Here, the 2nd pipe 32 has a rectangular cross section as a shape which interpolates between the 1st pipes 31 which have a rectangular cross section. Thus, the first pipe 31 can be interpolated by the second pipe 32 (in other words, the second pipe 32 can be interpolated by the first pipe 31). Sediment runoff between pipes can be suppressed.

この後に、図6(C)に示すように、第1実施形態と同様の一体化工程を経て、ボルト16によるボルト締結と、パイプの内部の空間31a,32aへの中詰めコンクリート17の打設とにより、第1のパイプ31と第2のパイプ32とを一体化する。   Thereafter, as shown in FIG. 6 (C), through the same integration process as in the first embodiment, bolt fastening with the bolt 16 and placement of the filled concrete 17 into the spaces 31a and 32a inside the pipe. Thus, the first pipe 31 and the second pipe 32 are integrated.

図7は、図6に示した第2実施形態の変形例である。
この変形例では、第1のパイプ41及び第2のパイプ42が双方共に台形断面を有している。ここで、第1のパイプ41は、上底に比べて下底が長い等脚台形状の断面を有する。また、第2のパイプ42は、上底に比べて下底が短い等脚台形状の断面を有する。
FIG. 7 is a modification of the second embodiment shown in FIG.
In this modification, both the first pipe 41 and the second pipe 42 have a trapezoidal cross section. Here, the first pipe 41 has an isosceles trapezoidal cross section with a lower bottom that is longer than the upper bottom. Further, the second pipe 42 has an isosceles trapezoidal cross section in which the lower bottom is shorter than the upper bottom.

第2のパイプ42の両側面には、それぞれ、パイプ挿入ガイド用の一対の板状部材(図示せず)が設けられている。これら板状部材は、互いに上下に離間して第2のパイプ42の側面(外周面)から横方向に外方に張り出し、かつ、第2のパイプ42の長手方向に沿って延びて第2のパイプ42に溶接されている。また、これら板状部材間の間隔は、第1のパイプ41の上下寸法により若干大きくなっている。尚、第2のパイプ42の地山への挿入時の安定性が十分に確保される場合には、パイプ挿入ガイド用の板状部材を設けなくてもよい。   A pair of plate-like members (not shown) for pipe insertion guides are provided on both side surfaces of the second pipe 42, respectively. These plate-like members are spaced apart from each other in the vertical direction and project outward in the lateral direction from the side surface (outer peripheral surface) of the second pipe 42, and extend along the longitudinal direction of the second pipe 42. It is welded to the pipe 42. Further, the interval between these plate-like members is slightly larger due to the vertical dimension of the first pipe 41. In addition, when the stability at the time of the insertion of the 2nd pipe 42 in the natural ground is fully ensured, it is not necessary to provide the plate-shaped member for a pipe insertion guide.

図7に示す変形例では、パイプルーフ21の構築時には、まず、図7(A)に示すように、複数の第1のパイプ41が、互いに所定間隔を空けて、上記立坑より地山20に順次挿入される。ここで、所定間隔とは、後述する図7(B)にて、第1のパイプ41間に第2のパイプ42が挿入可能なように予め設定された間隔である。   In the modification shown in FIG. 7, when the pipe roof 21 is constructed, first, as shown in FIG. 7A, a plurality of first pipes 41 are spaced from each other by a predetermined distance from the vertical shaft to the ground 20. Inserted sequentially. Here, the predetermined interval is an interval set in advance so that the second pipe 42 can be inserted between the first pipes 41 in FIG.

第1のパイプ41の地山20への挿入に際しては、例えば、図示しない回転掘削機を用いて第1のパイプ41挿入用の掘削孔を形成しつつ、この回転掘削機に追従するように第1のパイプ41を圧入する。このようにして回転掘削と第1のパイプ41の圧入(挿入)とが同時に行われ、この結果、第1のパイプ41の内部には空間41aが形成される。   When inserting the first pipe 41 into the natural ground 20, for example, a first excavation hole for inserting the first pipe 41 is formed using a rotary excavator (not shown), and the first excavator is followed to follow the rotary excavator. 1 pipe 41 is press-fitted. Thus, the rotary excavation and the press-fitting (insertion) of the first pipe 41 are performed at the same time. As a result, a space 41 a is formed inside the first pipe 41.

次に、図7(B)に示すように、上記立坑より、隣り合う第1のパイプ41間に第2のパイプ42を挿入する。
第2のパイプ42の挿入に際しては、上述の第1のパイプ41の挿入時と同様に、図示しない回転掘削機を用いて第2のパイプ42挿入用の掘削孔を形成しつつ、この回転掘削機に追従するように第2のパイプ42を圧入する。このようにして回転掘削と第2のパイプ42の圧入(挿入)とが同時に行われ、この結果、第2のパイプ42の内部には空間42aが形成される。
Next, as shown to FIG. 7 (B), the 2nd pipe 42 is inserted between the adjacent 1st pipes 41 from the said shaft.
When inserting the second pipe 42, as in the case of inserting the first pipe 41 described above, a rotary excavator for inserting the second pipe 42 is formed using a rotary excavator (not shown), and this rotary excavation is performed. The second pipe 42 is press-fitted so as to follow the machine. In this way, the rotary excavation and the press-fitting (insertion) of the second pipe 42 are performed at the same time. As a result, a space 42 a is formed inside the second pipe 42.

ここで、第2のパイプ42は、台形状の断面を有する第1のパイプ41同士の間を補間する形状として、台形状の断面を有している。これにより、第1のパイプ41間を、第2のパイプ42によって補間することができるので(換言すれば、第2のパイプ42間を、第1のパイプ41によって補間することができるので)、パイプ間の土砂流出を抑制することができる。   Here, the second pipe 42 has a trapezoidal cross section as a shape for interpolating between the first pipes 41 having a trapezoidal cross section. Thus, the first pipe 41 can be interpolated by the second pipe 42 (in other words, the second pipe 42 can be interpolated by the first pipe 41). Sediment runoff between pipes can be suppressed.

この後に、図7(C)に示すように、第1実施形態と同様の一体化工程を経て、ボルト16によるボルト締結と、パイプの内部の空間41a,42aへの中詰めコンクリート17の打設とにより、第1のパイプ41と第2のパイプ42とを一体化する。   Thereafter, as shown in FIG. 7 (C), through the same integration process as in the first embodiment, bolt fastening with the bolt 16 and placement of the filled concrete 17 into the spaces 41a and 42a inside the pipe. Thus, the first pipe 41 and the second pipe 42 are integrated.

特に本実施形態によれば、第1のパイプ31及び第2のパイプ32は双方共に矩形断面を有する。また、第1のパイプ41及び第2のパイプ42は双方共に台形断面を有する。すなわち、第1のパイプ31,41及び第2のパイプ32,42を比較的単純な断面形状とすることにより、第3のパイプ13を用いることなくパイプルーフ21,22を構築することができるので、施工工程を低減することができ、ひいては、工期を短縮することができる。   In particular, according to this embodiment, both the first pipe 31 and the second pipe 32 have a rectangular cross section. Both the first pipe 41 and the second pipe 42 have a trapezoidal cross section. That is, since the first pipes 31 and 41 and the second pipes 32 and 42 have a relatively simple cross-sectional shape, the pipe roofs 21 and 22 can be constructed without using the third pipe 13. Therefore, the construction process can be reduced, and the construction period can be shortened.

図8は、本発明の第3の実施形態におけるパイプルーフの構築方法を示す。
図3〜図5に示す第1実施形態と異なる点について説明する。
第3実施形態では、第1のパイプ51が円形断面を有し、第2のパイプ12の代わりとして、第2のH形鋼材(第2の形鋼材)52を用いている。
FIG. 8 shows a method for constructing a pipe roof in the third embodiment of the present invention.
A different point from 1st Embodiment shown in FIGS. 3-5 is demonstrated.
In the third embodiment, the first pipe 51 has a circular cross section, and a second H-section steel material (second shape steel material) 52 is used instead of the second pipe 12.

第1のパイプ51は、第1実施形態における第2のパイプ12と同様の構成を有しており、それゆえ、第1のパイプ51の両側面には、それぞれ、一対の板状部材51a,51bが設けられている。尚、板状部材51a,51b間の間隔は、第2のH形鋼材52の上下寸法により若干大きくなっている。   The first pipe 51 has the same configuration as that of the second pipe 12 in the first embodiment. Therefore, on both side surfaces of the first pipe 51, a pair of plate-shaped members 51a, 51b is provided. The interval between the plate-like members 51 a and 51 b is slightly larger due to the vertical dimension of the second H-shaped steel material 52.

第2のH形鋼材52は上フランジ及び下フランジとこれらフランジ間に位置するウェブとからなり、隣り合う第1のパイプ51同士の間を補間するように、その大きさ及び形状が予め定められている。   The second H-shaped steel material 52 includes an upper flange, a lower flange, and a web positioned between the flanges. The size and shape of the second H-shaped steel material 52 are determined in advance so as to interpolate between the adjacent first pipes 51. ing.

パイプルーフ21の構築時には、まず、図8(A)に示すように、複数の第1のパイプ51が、互いに所定間隔を空けて、上記立坑より地山20に順次挿入される。ここで、所定間隔とは、後述する図8(B)にて、第1のパイプ51間に第2のH形鋼材52が挿入可能なように予め設定された間隔である。   When constructing the pipe roof 21, first, as shown in FIG. 8A, a plurality of first pipes 51 are sequentially inserted into the natural ground 20 from the vertical shaft with a predetermined interval therebetween. Here, the predetermined interval is an interval set in advance so that the second H-shaped steel material 52 can be inserted between the first pipes 51 in FIG.

第1のパイプ51の地山20への挿入に際しては、例えば、図示しない回転掘削機を用いて第1のパイプ51挿入用の掘削孔を形成しつつ、この回転掘削機に追従するように第1のパイプ51を圧入する。このようにして回転掘削と第1のパイプ51の圧入(挿入)とが同時に行われ、この結果、第1のパイプ51の内部には空間51cが形成される。   When inserting the first pipe 51 into the ground 20, for example, a first excavator for inserting the first pipe 51 is formed using a rotary excavator (not shown), and the first excavator 51 is followed to follow the rotary excavator. 1 pipe 51 is press-fitted. Thus, the rotary excavation and the press-fitting (insertion) of the first pipe 51 are performed at the same time. As a result, a space 51 c is formed inside the first pipe 51.

次に、図8(B)に示すように、上記立坑より、隣り合う第1のパイプ51間に第2のH形鋼材52を挿入(圧入)する。この圧入時には板状部材51a,51bが第2のH形鋼材52の挿入をガイドすることができるので、H形鋼材挿入時の作業性を向上させることができる。   Next, as shown in FIG. 8B, a second H-shaped steel material 52 is inserted (press-fitted) between the adjacent first pipes 51 from the shaft. Since the plate-like members 51a and 51b can guide the insertion of the second H-shaped steel material 52 during the press-fitting, workability at the time of inserting the H-shaped steel material can be improved.

ここで、第2のH形鋼材52は、隣接する第1のパイプ51同士の間を補間する形状として、H形の断面形状を有している。これにより、第1のパイプ51間を、第2のH形鋼材52によって補間することができるので(換言すれば、第2のH形鋼材52間を、第1のパイプ51によって補間することができるので)、パイプ間及びH形鋼材間の土砂流出を抑制することができる。   Here, the second H-shaped steel material 52 has an H-shaped cross-sectional shape as a shape for interpolating between the adjacent first pipes 51. Thereby, since the space between the first pipes 51 can be interpolated by the second H-shaped steel material 52 (in other words, the space between the second H-shaped steel materials 52 can be interpolated by the first pipe 51. Therefore, it is possible to suppress sediment discharge between pipes and between H-shaped steel materials.

この後に、図8(C)に示すように、第1のパイプ51と第2のH形鋼材52との接触箇所を溶接することにより、第1のパイプ51と第2のH形鋼材52とを一体化する。また、第1のパイプ51の内部の空間51cに中詰めコンクリート17を打設する。   Thereafter, as shown in FIG. 8C, the first pipe 51 and the second H-shaped steel material 52 are welded by welding the contact portion between the first pipe 51 and the second H-shaped steel material 52. Is integrated. Further, the filling concrete 17 is placed in the space 51 c inside the first pipe 51.

特に本実施形態によれば、パイプルーフ21が、円形断面を有する第1のパイプ51と第2のH形鋼材52とにより構成される。これにより、隣接する第1のパイプ51同士の間を、第2のH形鋼材52によって比較的容易に補間することができる。   In particular, according to the present embodiment, the pipe roof 21 is configured by the first pipe 51 and the second H-shaped steel material 52 having a circular cross section. Thereby, between the adjacent first pipes 51 can be relatively easily interpolated by the second H-shaped steel material 52.

図9及び図10は、本発明の第4の実施形態におけるパイプルーフの構築方法を示す。
図3〜図5に示す第1実施形態と異なる点について説明する。
第4実施形態では、第1のパイプ11の代わりとして、第1のH形鋼材(第1の形鋼材)61を用いる。
9 and 10 show a pipe roof construction method according to the fourth embodiment of the present invention.
A different point from 1st Embodiment shown in FIGS. 3-5 is demonstrated.
In the fourth embodiment, instead of the first pipe 11, a first H-section steel material (first shape steel material) 61 is used.

第1のH形鋼材61は上フランジ及び下フランジとこれらフランジ間に位置するウェブとからなり、隣り合う第2のパイプ12同士の間を補間するように、その大きさ及び形状が予め定められている。   The first H-shaped steel member 61 is composed of an upper flange, a lower flange, and a web positioned between the flanges. The size and shape of the first H-shaped steel material 61 are determined in advance so as to interpolate between the adjacent second pipes 12. ing.

パイプルーフ21の構築時には、上述の図3(A)に示した第3のパイプ13の地山20への挿入後に、図9(A)に示すように、上記立坑より、第3のパイプ13の内部の空間13aに第1のH形鋼材61を挿入する。   When the pipe roof 21 is constructed, after the third pipe 13 shown in FIG. 3 (A) is inserted into the natural ground 20, the third pipe 13 is inserted from the shaft as shown in FIG. 9 (A). The first H-shaped steel material 61 is inserted into the space 13a.

次に、図9(B)に示すように、第3のパイプ13の内周面と第1のH形鋼材61との間の空間13bに充填材14を充填する。
次に、図9(C)に示すように、第3のパイプ13を地山20より引抜く。
Next, as illustrated in FIG. 9B, the filler 14 is filled into a space 13 b between the inner peripheral surface of the third pipe 13 and the first H-shaped steel material 61.
Next, as shown in FIG. 9C, the third pipe 13 is pulled out from the natural ground 20.

次に、図10(D)に示すように、上記立坑より、隣り合う第1のH形鋼材61間に第2のパイプ12を挿入すると共に、第2のパイプ12の内部に空間12dを形成する。
第2のパイプ12の挿入時には、板状部材12a,12b間に第1のH形鋼材61が位置した状態で、第2のパイプ12が挿入される。これにより、板状部材12a,12bが第2のパイプ12の挿入をガイドすることができるので、パイプ挿入時の作業性を向上させることができる。
Next, as shown in FIG. 10 (D), the second pipe 12 is inserted between the adjacent first H-shaped steel members 61 from the vertical shaft, and a space 12d is formed inside the second pipe 12. To do.
When the second pipe 12 is inserted, the second pipe 12 is inserted with the first H-shaped steel member 61 positioned between the plate-like members 12a and 12b. Thereby, since plate-shaped member 12a, 12b can guide insertion of the 2nd pipe 12, workability | operativity at the time of pipe insertion can be improved.

ここで、第1のH形鋼材61は、隣接する第2のパイプ12同士の間を補間する形状として、H形の断面形状を有している。これにより、第2のパイプ12間を、第1のH形鋼材61によって補間することができるので(換言すれば、第1のH形鋼材61間を、第2のパイプ12によって補間することができるので)、パイプ間及びH形鋼材間の土砂流出を抑制することができる。   Here, the first H-shaped steel member 61 has an H-shaped cross-sectional shape as a shape for interpolating between the adjacent second pipes 12. Thereby, since the space between the second pipes 12 can be interpolated by the first H-shaped steel material 61 (in other words, the space between the first H-shaped steel materials 61 can be interpolated by the second pipe 12. Therefore, it is possible to suppress sediment discharge between pipes and between H-shaped steel materials.

この後に、図10(E)に示すように、第1のH形鋼材61と第2のパイプ12との接触箇所を溶接することにより、第1のH形鋼材61と第2のパイプ12とを一体化する。また、第2のパイプ12の内部の空間12dに中詰めコンクリート17を打設する。   Thereafter, as shown in FIG. 10 (E), the first H-section steel 61 and the second pipe 12 are welded by welding the contact portion between the first H-section steel 61 and the second pipe 12. Is integrated. Further, the filling concrete 17 is placed in the space 12 d inside the second pipe 12.

特に本実施形態によれば、地山20に挿入された各第3のパイプ13内に、それぞれ、第1のH形鋼材(第1の形鋼材)61を挿入し、この後に、第3のパイプ13と第1のH形鋼材61との間の空間13bに充填材14を充填する。これにより、複雑な断面形状を有する形鋼材であっても、上述の第1のパイプ11の代わりとして、パイプルーフ21の構成部材として、比較的簡易に精度よく地山20に挿入することができる。   In particular, according to the present embodiment, the first H-section steel material (first shape steel material) 61 is inserted into each of the third pipes 13 inserted into the natural ground 20, and thereafter, The space 14 b between the pipe 13 and the first H-shaped steel material 61 is filled with the filler 14. Thereby, even if it is a shape steel material which has a complicated cross-sectional shape, it can insert into the natural ground 20 comparatively easily and accurately as a structural member of the pipe roof 21 instead of the above-mentioned 1st pipe 11. .

尚、上記第3及び第4実施形態では、隣接するパイプ同士の間に配置される形鋼材としてH形鋼材を例にとってパイプルーフの構築を説明したが、形鋼材は、隣接するパイプ同士の間を補間する断面形状を有するものであればこれに限らず、例えば、形鋼材として、I形鋼材や溝形鋼材を用いてもよい。   In the third and fourth embodiments, the construction of the pipe roof has been described by taking an H-shaped steel material as an example of the shape steel material arranged between adjacent pipes. However, the shape steel material is between adjacent pipes. For example, an I-shaped steel material or a grooved steel material may be used as the shape steel material.

また、上記第1〜第4実施形態では、2つのトンネルが互いに合流するトンネル合流部の構築を例にとってパイプルーフの構築について説明したが、本発明に係るパイプルーフ及びその構築方法は、自由断面鋼殻構造体(例えば、図11に示すような楕円形断面を有する鋼殻構造体71)の構築に適用可能である。   In the first to fourth embodiments, the construction of the pipe roof has been described by taking the construction of a tunnel junction where two tunnels join each other as an example. However, the pipe roof and the construction method according to the present invention are free cross sections. The present invention is applicable to the construction of a steel shell structure (for example, a steel shell structure 71 having an elliptical cross section as shown in FIG. 11).

鋼殻構造体(パイプルーフ)71の構築に際して、上述の第1実施形態におけるパイプルーフ及びその構築方法を適用する場合には、第1のパイプ11及び第2のパイプ12からなる鋼殻構造体71を閉ループ構造として、その内部を掘削することにより、大断面地下スペース72を確保することができる。また、第1のパイプ11及び第2のパイプ12からなる閉ループ構造を任意形状とすることにより、合理的な鋼殻構造体(パイプルーフ)を提供することができる。更に、小径の鋼殻構造体(パイプルーフ)を連続配置し連結することにより、大断面の地下構造物を提供することが可能となる。この地下構造物については、既存の近接構造物との離隔も小さく配置することが可能である。   When constructing the steel shell structure (pipe roof) 71, when the pipe roof and the construction method thereof in the first embodiment are applied, the steel shell structure composed of the first pipe 11 and the second pipe 12 is used. A large-section underground space 72 can be secured by excavating the interior of 71 with a closed loop structure. Moreover, the rational steel shell structure (pipe roof) can be provided by making the closed loop structure which consists of the 1st pipe 11 and the 2nd pipe 12 into arbitrary shapes. Furthermore, it is possible to provide an underground structure having a large cross section by continuously arranging and connecting small-diameter steel shell structures (pipe roofs). About this underground structure, it is possible to arrange | position small with the separation from the existing adjacent structure.

1 トンネル合流部
2 地面
3 本線トンネル
3a 上端部
3b 下端部
4 ランプトンネル
4a 上端部
4b 下端部
5 領域
6 大断面地下スペース
7 道路
11 第1のパイプ
11a 凹面部
11b 空間
12 第2のパイプ
12a,12b 板状部材
12c 凸面部
12d 空間
13 第3のパイプ
13a,13b 空間
14 充填材
15 ジャンクション部
16 ボルト
17 中詰めコンクリート
20 地山
21,22 パイプルーフ
30,30a,30b セグメント
30S 覆工体
31 第1のパイプ
31a 空間
32 第2のパイプ
32a 空間
40,40a,40b セグメント
40S 覆工体
41 第1のパイプ
41a 空間
42 第2のパイプ
42a 空間
51 第1のパイプ
51a,51b 板状部材
51c 空間
52 第2のH形鋼材
61 第1のH形鋼材
71 鋼殻構造体(パイプルーフ)
72 大断面地下スペース
DESCRIPTION OF SYMBOLS 1 Tunnel junction part 2 Ground 3 Main line tunnel 3a Upper end part 3b Lower end part 4 Lamp tunnel 4a Upper end part 4b Lower end part 5 Area | region 6 Large section underground space 7 Road 11 1st pipe 11a Concave surface part 11b Space 12 2nd pipe 12a, 12b Plate-like member 12c Convex surface part 12d Space 13 Third pipe 13a, 13b Space 14 Filler 15 Junction part 16 Bolt 17 Filled concrete 20 Ground mountain 21, 22 Pipe roof 30, 30a, 30b Segment 30S Overlay body 31 First 1 pipe 31a space 32 second pipe 32a space 40, 40a, 40b segment 40S lining body 41 first pipe 41a space 42 second pipe 42a space 51 first pipe 51a, 51b plate member 51c space 52 Second H-shaped steel 61 First H-shaped steel 71 Steel shell structure Body (pipe roof)
72 Large section underground space

Claims (14)

複数のパイプを互いに並列に地山に挿入してパイプルーフを構築する方法であって、
複数の第1のパイプを互いに離間させて並列に地山に挿入する工程と、
隣り合う第1のパイプ同士の間を補間する形状を有する第2のパイプを前記第1のパイプ間に挿入する工程と、
を含むことを特徴とするパイプルーフの構築方法。
A method of constructing a pipe roof by inserting a plurality of pipes into a natural ground in parallel with each other,
Inserting a plurality of first pipes into a natural ground in parallel and spaced apart from each other;
Inserting a second pipe having a shape for interpolating between adjacent first pipes between the first pipes;
A method for constructing a pipe roof, comprising:
前記第1のパイプを地山に挿入する工程は、
複数の第3のパイプを互いに離間させて並列に地山に挿入して各第3のパイプ内に空間を形成する工程と、
各第3のパイプ内に、それぞれ、前記第1のパイプを挿入する工程と、
前記第3のパイプと前記第1のパイプとの間の空間に充填材を充填する工程と、
前記第3のパイプを地山より引抜く工程と、
を含むことを特徴とする請求項1記載のパイプルーフの構築方法。
The step of inserting the first pipe into the natural ground includes:
A plurality of third pipes spaced apart from each other and inserted into the ground in parallel to form a space in each third pipe;
Inserting each of the first pipes into each third pipe;
Filling a space between the third pipe and the first pipe with a filler;
Extracting the third pipe from a natural ground;
The method for constructing a pipe roof according to claim 1, comprising:
前記第1のパイプは、その両側面が凹形状をなす一方、前記第2のパイプは、その両側面が、前記凹形状に対応する凸形状をなすことを特徴とする請求項2記載のパイプルーフの構築方法。   3. The pipe according to claim 2, wherein both sides of the first pipe have a concave shape, and both sides of the second pipe have a convex shape corresponding to the concave shape. How to build a roof. 前記第2のパイプは円形断面を有し、この円形の外周面の一部が前記凸形状をなすことを特徴とする請求項3記載のパイプルーフの構築方法。   The method for constructing a pipe roof according to claim 3, wherein the second pipe has a circular cross section, and a part of the outer peripheral surface of the circular shape has the convex shape. 前記第3のパイプは円形断面を有することを特徴とする請求項2〜請求項4のいずれか1つに記載のパイプルーフの構築方法。   The pipe roof construction method according to any one of claims 2 to 4, wherein the third pipe has a circular cross section. 地山に挿入された前記第1のパイプと前記第2のパイプとを一体化する工程を更に含むことを特徴とする請求項1〜請求項5のいずれか1つに記載のパイプルーフの構築方法。   The construction of a pipe roof according to any one of claims 1 to 5, further comprising a step of integrating the first pipe and the second pipe inserted into a natural ground. Method. 前記第1のパイプを地山に挿入する代わりに、隣り合う前記第2のパイプ同士の間を補間する形状を有する第1の形鋼材を地山に挿入することを特徴とする請求項1又は請求項2記載のパイプルーフの構築方法。   The first structural steel material having a shape for interpolating between the adjacent second pipes is inserted into the ground instead of inserting the first pipe into the ground. The construction method of the pipe roof of Claim 2. 前記第2のパイプを地山に挿入する代わりに、隣り合う前記第1のパイプ同士の間を補間する形状を有する第2の形鋼材を地山に挿入することを特徴とする請求項1記載のパイプルーフの構築方法。   The second structural steel material having a shape for interpolating between the adjacent first pipes is inserted into the natural ground instead of inserting the second pipe into the natural ground. How to build a pipe roof. 互いに離間して並列に地山に挿入される複数の第1のパイプと、
隣り合う第1のパイプ同士の間を補間する形状を有して前記第1のパイプ間に挿入される第2のパイプと、
を含んで構成されることを特徴とするパイプルーフ。
A plurality of first pipes inserted into the ground in parallel and spaced apart from each other;
A second pipe inserted between the first pipes having a shape for interpolating between adjacent first pipes;
A pipe roof characterized by comprising.
前記第1のパイプは、その両側面が凹形状をなす一方、前記第2のパイプは、その両側面が前記凹形状に対応する凸形状をなすことを特徴とする請求項9記載のパイプルーフ。   10. The pipe roof according to claim 9, wherein both sides of the first pipe have a concave shape, and both sides of the second pipe have a convex shape corresponding to the concave shape. 11. . 前記第2のパイプは円形断面を有し、この円形の外周面の一部が前記凸形状をなすことを特徴とする請求項10記載のパイプルーフ。   The pipe roof according to claim 10, wherein the second pipe has a circular cross section, and a part of the circular outer peripheral surface forms the convex shape. 前記第1のパイプと前記第2のパイプとを固定する固定手段を備えることを特徴とする請求項9〜請求項11のいずれか1つに記載のパイプルーフ。   The pipe roof according to any one of claims 9 to 11, further comprising fixing means for fixing the first pipe and the second pipe. 前記第1のパイプの代わりとして、隣り合う前記第2のパイプ同士の間を補間する形状を有する第1の形鋼材を含んで構成されることを特徴とする請求項9記載のパイプルーフ。   10. The pipe roof according to claim 9, wherein the pipe roof is configured to include a first shape steel material having a shape for interpolating between the adjacent second pipes, instead of the first pipe. 前記第2のパイプの代わりとして、隣り合う前記第1のパイプ同士の間を補間する形状を有する第2の形鋼材を含んで構成されることを特徴とする請求項9記載のパイプルーフ。   10. The pipe roof according to claim 9, comprising a second structural member having a shape for interpolating between the adjacent first pipes as a substitute for the second pipe. 11.
JP2011222006A 2011-10-06 2011-10-06 Pipe roof and pipe roof construction method Expired - Fee Related JP5806576B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2011222006A JP5806576B2 (en) 2011-10-06 2011-10-06 Pipe roof and pipe roof construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2011222006A JP5806576B2 (en) 2011-10-06 2011-10-06 Pipe roof and pipe roof construction method

Publications (2)

Publication Number Publication Date
JP2013083047A true JP2013083047A (en) 2013-05-09
JP5806576B2 JP5806576B2 (en) 2015-11-10

Family

ID=48528489

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2011222006A Expired - Fee Related JP5806576B2 (en) 2011-10-06 2011-10-06 Pipe roof and pipe roof construction method

Country Status (1)

Country Link
JP (1) JP5806576B2 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2015098685A (en) * 2013-11-18 2015-05-28 株式会社大林組 Natural ground reinforcement material and natural ground reinforcement structure
JP2020143564A (en) * 2019-03-08 2020-09-10 フジモリ産業株式会社 Tunnel support structure

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108590668B (en) * 2018-04-27 2020-02-14 中国电建市政建设集团有限公司 Method for drawing pipes of overlength pipe shed of underground excavation station

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4365913A (en) * 1978-02-21 1982-12-28 Compagnie International des Pieux Armes Frankignoul Method and device for building in the ground vertical walled structures starting from a subterranean conduit
JPH02296914A (en) * 1989-05-09 1990-12-07 Fujiigumi:Kk Construction method for row of steel pipe pile
JPH10196271A (en) * 1997-01-10 1998-07-28 Komatsu Ltd Composite material pipe and pipe roof construction method
JP2007162323A (en) * 2005-12-13 2007-06-28 Fukuda Corp Wall body forming method and wall body

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4365913A (en) * 1978-02-21 1982-12-28 Compagnie International des Pieux Armes Frankignoul Method and device for building in the ground vertical walled structures starting from a subterranean conduit
JPH02296914A (en) * 1989-05-09 1990-12-07 Fujiigumi:Kk Construction method for row of steel pipe pile
JPH10196271A (en) * 1997-01-10 1998-07-28 Komatsu Ltd Composite material pipe and pipe roof construction method
JP2007162323A (en) * 2005-12-13 2007-06-28 Fukuda Corp Wall body forming method and wall body

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2015098685A (en) * 2013-11-18 2015-05-28 株式会社大林組 Natural ground reinforcement material and natural ground reinforcement structure
JP2020143564A (en) * 2019-03-08 2020-09-10 フジモリ産業株式会社 Tunnel support structure

Also Published As

Publication number Publication date
JP5806576B2 (en) 2015-11-10

Similar Documents

Publication Publication Date Title
JP6636773B2 (en) Construction structure and construction method of tunnel lining body
JP5024228B2 (en) Widening method of shield tunnel
JP2006348718A (en) Construction method of underground structure and underground structure
JP6480815B2 (en) Tunnel junction structure and tunnel construction method
JP5806576B2 (en) Pipe roof and pipe roof construction method
JP3966334B2 (en) Method for forming communication part of parallel shield tunnel and its communication part structure
JP4205615B2 (en) How to construct a confluence of shield tunnels
JP4104781B2 (en) Construction method of underground joint structure
JP5246426B2 (en) Construction method of underground structure
JP2004353264A (en) Construction method of tunnel confluence section and tunnel confluence section
JP2002220991A (en) Partition wall installed in main-tunnel shield tunnel and construction method therefor
JP5012149B2 (en) Ground support structure and ground support method
JP6019690B2 (en) Tunnel widening method
JP2009091742A (en) Tunnel construction method
JP4668829B2 (en) Tunnel excavation method, tunnel branching / merging widening part using the same, and tunnel branching / merging widening part constructed thereby
JP6019689B2 (en) Tunnel widening method
JP2017089105A (en) Integrated structure of pipe roof material
JP6092359B1 (en) Large section lining body and large section tunnel construction method
JP2006112137A (en) Structure of diverging/merging section of branch tunnel, and its construction method
JP3900683B2 (en) Construction method of branch / merge part of main line tunnel and rampway
JP4500221B2 (en) Construction method of underground structure
JP5167578B2 (en) Construction method for underground structures
JP2011080310A (en) Construction method of tunnel
JP4397797B2 (en) Construction method of underground structure
JP4319122B2 (en) Branch and junction structure of branching tunnel and its construction method

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20140609

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20150220

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20150303

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20150427

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20150825

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20150904

R150 Certificate of patent or registration of utility model

Ref document number: 5806576

Country of ref document: JP